Professional Documents
Culture Documents
WW-16-CON-01 - PART 1 - ETP For A&I
WW-16-CON-01 - PART 1 - ETP For A&I
PMD I ENGINEERING
Improtant Notes:
• Only one (1)alternate proposal is allowed. Thus, brand of each equipment shall only be limited in to two (2).
• Submit all required documents
• Usetabs for easy validation. Labelof the tabs shall be written in the "Reference"column.
• Highlight the the Exact Model and Requirements of Maynilad in the Brochures.
• Mayniladrepresentatives' expenses for all localand overseas in plant testing shall be considered in the contractor's proposal
• The certificate of completion shall be issued after the run-in period/endurance testing of thirty (30) calendar days with no failures and when
assured that all completely assembled units installed performs in a normal manner.
• Final Acceptance shall be issued after the defects and liability period of one (1) year.
• Contractor/Supplier shall provide a minimum of one (1)year warranty / aftersales on supplie equipment and shall commence the day following
the final acceptance has been issued.
• For PLC, PLC Power Supply, Modules and HMI - 3 years Comprehensive after-sales / Support Service / Warranty.This includes spare
replacement in case of faults.
• Ifthe Manufacturer's authorization and warranty documents are not delivered upon submission of bid, commitment from the Bidder is acceptable.
ITEM. NO. MAYNILAD PARAMETERS and SPECIFICATION PROPOSAL of the BIDDER REFERENCE REQUIRED DOCUMENT
1.3 Other
1.3.1 UPS
Accompished Data Sheet/Technical
I.3.2 UPS Battery Brochures
I.3.3 24VDC Power Supply
ication from an Authorized System
I.3.4 A&l Vendor
Integrator of Maynilad
Note: Please submit these A&l checklist (submittals) per site/location. One technical submittals for all location will be evaluated as non-complying.
PMD-OP-ENG-08F2
Revision date: August 2016 MAYNILAD WATER SERVICES, inc. katipunan ave., balara, Quezon city, Philippines
Page 1 of 3 TEL. NO. +632 981 3440; TELEFAX +632 981 3431