Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

EVALUATION OF TECHNICAL PROPOSALS (Checklist for A&I and IT)

PMD I ENGINEERING

Contract No.: WW-16-CON-01


Maynilad
Project Title: Proposed Cavite City Sewerage Interceptor System
Bidder: <insert name of bidder hero
Date Accomplished: <insert date of accomplishement of the Checklist>
Date Checked: <insert date when checklist was validated>
as of March 2017

Improtant Notes:
• Only one (1)alternate proposal is allowed. Thus, brand of each equipment shall only be limited in to two (2).
• Submit all required documents
• Usetabs for easy validation. Labelof the tabs shall be written in the "Reference"column.
• Highlight the the Exact Model and Requirements of Maynilad in the Brochures.
• Mayniladrepresentatives' expenses for all localand overseas in plant testing shall be considered in the contractor's proposal
• The certificate of completion shall be issued after the run-in period/endurance testing of thirty (30) calendar days with no failures and when
assured that all completely assembled units installed performs in a normal manner.
• Final Acceptance shall be issued after the defects and liability period of one (1) year.
• Contractor/Supplier shall provide a minimum of one (1)year warranty / aftersales on supplie equipment and shall commence the day following
the final acceptance has been issued.
• For PLC, PLC Power Supply, Modules and HMI - 3 years Comprehensive after-sales / Support Service / Warranty.This includes spare
replacement in case of faults.
• Ifthe Manufacturer's authorization and warranty documents are not delivered upon submission of bid, commitment from the Bidder is acceptable.

ITEM. NO. MAYNILAD PARAMETERS and SPECIFICATION PROPOSAL of the BIDDER REFERENCE REQUIRED DOCUMENT

Automation and Instrumentation Equipment (PS-


1
Miranda)
1.1 Automation
Accomplished Key System
1.1.1 Programmable Logic Controller
Requirements/Technical Brochures
1.1.2 PLC I/O Module
1.1.3 Communication Module (Ethernet)
1.1.4 Communication Module (Profibus)
1.1.5 HMI Panel
Accompished Data Sheet/Technical
1.1.6 Layer 2 Managed Switch Brochures
1.1.7 Communication Protocol Profibus Cable
1.1.8 Communication Protocol Profibus Termination
1.1.9 Communication Protocol Ethernet Cable
1.1.10 Communication Protocol Ethernet Termination
1.2 Instrumentation
1.2.1 Level Float Switch
1.2.2 Level Indicating Transmitter
1.2.3 Pressure Indicating Transmitter
1.2.4 Pressure Indicator Accompished Data Sheet/Technical
1.2.5 Surge Protection Brochures

1.2.6 Flowmeter with Remote Transmitter


1.2.7 Instrument Cable
1.2.8 Powermeter

1.3 Other
1.3.1 UPS
Accompished Data Sheet/Technical
I.3.2 UPS Battery Brochures
I.3.3 24VDC Power Supply
ication from an Authorized System
I.3.4 A&l Vendor
Integrator of Maynilad

Note: Please submit these A&l checklist (submittals) per site/location. One technical submittals for all location will be evaluated as non-complying.

Evaluation Summary for Item 1- Automation and Instrumentation


Equipment (PS-Miranda)
Automation and Instrumentation Equipment (LS-
II
Bautista)
11.1 Automation

PMD-OP-ENG-08F2
Revision date: August 2016 MAYNILAD WATER SERVICES, inc. katipunan ave., balara, Quezon city, Philippines
Page 1 of 3 TEL. NO. +632 981 3440; TELEFAX +632 981 3431