Chemical Handling - Hira

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 6

FORMAT

Date: 30-11-2021

Activity: Instal

Sl. No Activity Hazard Risk Involved People at risk

Slip and trip fall on


1.Fall of Material same level

2.Combustible material
stacked near Chemical Fire Risk
storage

3.Inhalation of toxic Health


fumes / Eye problems/headache,
irritation/Skin nausea,throt
irritation/Swallowing irritation

Store
Chemical Keeper/Store
1 handling and
Storage assistant/Engineer
s/ Worker's
Store
Chemical Keeper/Store
1 handling and assistant/Engineer
Storage
s/ Worker's

4.Hot work
near/stacking Fire Risk
chemicals under high
temperature

5.Spillage of Chemicals Environment affect

6.Improper Accsess Slip and trip fall on


same level

7.Poor Housekeeping Slip and trip fall on


and Illimination same level

_________________________
Prepared By : HIRA Team- ____ (Contractor Electrical Manager);
_________________________
Reviewed By :
Contractor Project Manager :
______________________________
Regional Safety Manager
________________________________________________
Approved By:
Client Project Manager
HAZARD IDENTIFICATION & RISK ASSESSMENT

Ref No. : SPTL/CHEMICAL/01

Activity: Installation of Cable Trays

Assessment

Control Measures
P S Risk
Level

1a.Material should be stacked properly 1b.Do


not stack material too high above 1.8 mtr
1c.All material should be placed at designated positions 1d.Do
not stack the Chemicals near by the edges 1 1 1
1e.Identification to be done for each Chemical Section
1f.MSDS should be displayed and communicated to all chemical
handlers

2a.To be provide seperate storage area for Flammable materials


2b.Do not stack any Combustible
materials along with Flammable material inside the chemical storage
2c.Conduct Tool box talk all are workers about 2 1 2
Chemical handling and storage
2d.Adequte Fire
extinguishers to be provideAdequte 2e.cautionary sign boards should
be displayed in storage area

3a. For inhalation Provide and use suitable respirators/if inhaled


remove to fresh air/if not breathing give artificial respiration/if
breathing is difficult give oxygen,get medical attension immediately.
3b.For Eye irritation Flush immediately with plenty of water atleast
5minutes and to get medical treatment.
3c.For skin irritation remove all contaminated
clothing/wash affected skin with soap and water/wash clothing before
reuse and destroy condaminated shoes. 2 1 2
3d.If swallowed do not induce vomiting,give large quantities of water
or several glasses of milk/never give anything by mouth to an
unconsious person,Get medical attention immediately.
3e.Cap containers when chemicals are not
in use 3f.Follow the instruction from MSDS during the
activity.
4a.Do not allow any type of Hot works near by the chemical storage
4b.Remove all
ignition sources 4c.Keep suitable fire
extinguisher in working area. Halogen lights and match
boxes or any other spark materials shall not be allow in working area. 1 2 2
4d.Keep in cool and well vendilated area.
4e.store away from direct sulight and sources of heat.
4f.Tool box talk to be done before start the work
4g.Job specific training should be done

5a.Chemical spillages to be remove immediately with spill kit.


5b.to be done chemical spillage
trainning to all worker's and staff
5c.Follow the instruction from MSDS during the activity.
1 2 2
5d.Tool box talk to be done before start the work
5e.Job specific training should be done
5f.Adequte PPE'S to be use (Safety helmet,Safety shoe,Safety
goggles and Rubber hand glove)

6a.Easy access should be maintained


6b.Clean and clear access should be maintained 6c.Emergency 1 1 1
exit should be clean and free from obstruction

7a.Proper housekeeping to be provide 1 1 1


7b.Proper Illumination will be maintained (100 LUX)

____________________________
(Contractor OHSE Head):_____________________________
_________________________
PMC Safety Head :
_______________________________________________
TL/CHEMICAL/01 Revision No. : R - 01

Re-assessment
Additional
Control
Measures P S Residual
Risk
_________________
__________________________________________________________
_____________________________
PMC Project Manager: