Chemical Handling - Hira
Chemical Handling - Hira
Date: 30-11-2021
Activity: Instal
2.Combustible material
stacked near Chemical Fire Risk
storage
Store
Chemical Keeper/Store
1 handling and
Storage assistant/Engineer
s/ Worker's
Store
Chemical Keeper/Store
1 handling and assistant/Engineer
Storage
s/ Worker's
4.Hot work
near/stacking Fire Risk
chemicals under high
temperature
_________________________
Prepared By : HIRA Team- ____ (Contractor Electrical Manager);
_________________________
Reviewed By :
Contractor Project Manager :
______________________________
Regional Safety Manager
________________________________________________
Approved By:
Client Project Manager
HAZARD IDENTIFICATION & RISK ASSESSMENT
Assessment
Control Measures
P S Risk
Level
____________________________
(Contractor OHSE Head):_____________________________
_________________________
PMC Safety Head :
_______________________________________________
TL/CHEMICAL/01 Revision No. : R - 01
Re-assessment
Additional
Control
Measures P S Residual
Risk
_________________
__________________________________________________________
_____________________________
PMC Project Manager: