DESIGN TENT
ASSESSMENT DESIGN & CONSTRUCTION TURN KEY PROJECT
MANAGEMENT
Level 2 House 192/B Road 01 New DOHS Mohakhali Dhaka 1206 01737688211 tentmail02@gmail.com tentpage.com
ENGINEERING PLANNING ARCHITECTURE INTERIOR
DESIGN TENT
ASSESSMENT DESIGN & CONSTRUCTION TURN KEY PROJECT
MANAGEMENT
Level 2 House 192/B Road 01 New DOHS Mohakhali Dhaka 1206 01737688211 tentmail02@gmail.com tentpage.com
ENGINEERING PLANNING ARCHITECTURE INTERIOR
DESIGN TENT
ASSESSMENT DESIGN & CONSTRUCTION TURN KEY PROJECT
MANAGEMENT
Level 2 House 192/B Road 01 New DOHS Mohakhali Dhaka 1206 01737688211 tentmail02@gmail.com tentpage.com
ENGINEERING PLANNING ARCHITECTURE INTERIOR
DESIGN TENT
ASSESSMENT DESIGN & CONSTRUCTION TURN KEY PROJECT
MANAGEMENT
Level 2 House 192/B Road 01 New DOHS Mohakhali Dhaka 1206 01737688211 tentmail02@gmail.com tentpage.com
ENGINEERING PLANNING ARCHITECTURE INTERIOR
DESIGN TENT
ASSESSMENT DESIGN & CONSTRUCTION TURN KEY PROJECT
MANAGEMENT
Level 2 House 192/B Road 01 New DOHS Mohakhali Dhaka 1206 01737688211 tentmail02@gmail.com tentpage.com
ENGINEERING PLANNING ARCHITECTURE INTERIOR
DESIGN TENT
ASSESSMENT DESIGN & CONSTRUCTION TURN KEY PROJECT
MANAGEMENT
Station
o Preparation of Data Sheet for Distribution Line
Electrical Plans (Power, Lighting, Fixture Schedules, and Details)
o
Electrical Design for Building Structure (Utility)
o Preparation of Layout plan and design specification of Sub-
Station
o Design & Detailing of all distribution boards, LT, PFI plan &
necessary Electrical Control Panels
o Preparation of Data Sheet for Distribution Line
o Planning and Designing of Lighting layout including Solar
System
o Stand-by Generator System Design
o Preparation of Electrical Conduit Layout Plan
16. Preparation of fire detection & protection Plan
o Preparation of fire detection & protection Plan
o Planning fire design parameters for structure i.e. stair,
Occupancy Isolation
o Fire detection system design
o Design efficient alarm System
o Fire protection plan i.e Fire hydrant, Extinguisher etc.
o
o Mechanical Plan (HVAC with Equipment Schedules and
Details)
Level 2 House 192/B Road 01 New DOHS Mohakhali Dhaka 1206 01737688211 tentmail02@gmail.com tentpage.com
ENGINEERING PLANNING ARCHITECTURE INTERIOR
DESIGN TENT
ASSESSMENT DESIGN & CONSTRUCTION TURN KEY PROJECT
MANAGEMENT
Ensure that the model aligns with the standards and goals set in
BIM Execution Plan and BIM project workflow criteria.
22. Prepare BIM execution plans and project specific training docu-
mentation.
24. Manage and maintain project content and source any additional
content as required.
26. Coordinate and manage BIM project data sets/workflow and project
set up.
Level 2 House 192/B Road 01 New DOHS Mohakhali Dhaka 1206 01737688211 tentmail02@gmail.com tentpage.com
ENGINEERING PLANNING ARCHITECTURE INTERIOR
DESIGN TENT
ASSESSMENT DESIGN & CONSTRUCTION TURN KEY PROJECT
MANAGEMENT
Supervision phase
o Consultant management.
32. Contract Administration.
Coordinate meetings with Utility companies as necessary
Level 2 House 192/B Road 01 New DOHS Mohakhali Dhaka 1206 01737688211 tentmail02@gmail.com tentpage.com
ENGINEERING PLANNING ARCHITECTURE INTERIOR
DESIGN TENT
ASSESSMENT DESIGN & CONSTRUCTION TURN KEY PROJECT
MANAGEMENT
Level 2 House 192/B Road 01 New DOHS Mohakhali Dhaka 1206 01737688211 tentmail02@gmail.com tentpage.com
ENGINEERING PLANNING ARCHITECTURE INTERIOR
DESIGN TENT
ASSESSMENT DESIGN & CONSTRUCTION TURN KEY PROJECT
MANAGEMENT
o
smart building
services
Floor plans indicating the distribution of the systems.
Schematic diagrams indicating the networks.
Level 2 House 192/B Road 01 New DOHS Mohakhali Dhaka 1206 01737688211 tentmail02@gmail.com tentpage.com
ENGINEERING PLANNING ARCHITECTURE INTERIOR
DESIGN TENT
ASSESSMENT DESIGN & CONSTRUCTION TURN KEY PROJECT
MANAGEMENT
BIM Coordinator is an integral part of the design team who leads and coordinates the process of generating
digital models and integrated data often referred as ‘Information’ about a project, from the design stage, to the
construction stage.
The BIM Coordinator is often regarded as a chief figure in a project team as they are responsible for the BIM
workflow and ensuring that any potential issues during modelling, clash detection and data conversion is dealt
with efficiently. In smaller organisations the lead modeller may occupy the role of BIM Coordinator. In general,
the BIM Coordinator is the go-to person for setting up project specific guidelines for Technicians and
Architects, and responsible for linking information across disciplines.
Level 2 House 192/B Road 01 New DOHS Mohakhali Dhaka 1206 01737688211 tentmail02@gmail.com tentpage.com
ENGINEERING PLANNING ARCHITECTURE INTERIOR
DESIGN TENT
ASSESSMENT DESIGN & CONSTRUCTION TURN KEY PROJECT
MANAGEMENT
Level 2 House 192/B Road 01 New DOHS Mohakhali Dhaka 1206 01737688211 tentmail02@gmail.com tentpage.com
ENGINEERING PLANNING ARCHITECTURE INTERIOR
DESIGN TENT
ASSESSMENT DESIGN & CONSTRUCTION TURN KEY PROJECT
MANAGEMENT
The following three methods are available for selection to certify a building for the structural capability
to receive an additional load from the solar panel or to adjust the loading pattern due to these
installations.
1. Based on the previous report: Most RMG factories have already completed their structural
compliance audits. So we can use these reports as a basis for ensuring the structural capacity of the
building. In this case, the demand-to-capacity ratio of structural elements from the Accord / Alliance
report, some manual calculations of the components most affected by these installations, some Excel
base preliminary analysis will suffice.
2. Simplified FEM Analysis: If no previous assessment report or design report is available, we need to
go through a simplified representative lump FEM model. All information regarding the structure and
drawing must be submitted by the client-side. Will be analyzed according to the information provided.
No site visit or test will be conducted. The feasibility of installing solar panels will be calculated from
the FEM model, the details of the structural drawing, and the localized stresses of the most affected
components of the building. The lower tier demand-capacity ratio of the structure will not be analyzed,
considering that the load will be distributed through the diaphragm so there will be very little impact on
the structural stability due to the load from the solar panel. As a minimum document requirement, as-
built drawings are mandatory. Deliverable is only a certification about safety and integrity. No
assessment report will be given.
3. Complete detailed engineering assessment can be conducted with the material test, complete FEM
model, as-built drawing preparation. After the identification of structural and non-structural elements,
which are significant in terms of stiffness and load, a complete FEM simulation model will be prepared.
Preparation of assessment report as per BNBC requirements in section 1.9.1.1. and other referenced
standards on the overall structure performance, as well as the demand-capacity ratio of the individual
components, a summary of computer outputs, including all input data, final results, Verification of the
input data and interpretation of results.
According to the phone discussion and available documents for the project in "Urmi Group", we are
proposing on the basis of the second option described above. Although there are some FEM models
in the files we have received, we cannot accept these models as basis of analysis without approval
Level 2 House 192/B Road 01 New DOHS Mohakhali Dhaka 1206 01737688211 tentmail02@gmail.com tentpage.com
ENGINEERING PLANNING ARCHITECTURE INTERIOR
DESIGN TENT
ASSESSMENT DESIGN & CONSTRUCTION TURN KEY PROJECT
MANAGEMENT
Accord/Alliance/RSC. Also there is no as-built drawing in the file set, which is mandatory for
assessment.
Level 2 House 192/B Road 01 New DOHS Mohakhali Dhaka 1206 01737688211 tentmail02@gmail.com tentpage.com