Scan 404

You might also like

Download as pdf
Download as pdf
You are on page 1of 1
| j DAKSHIN HARYANA BIJLI VITRAN NIGAM 5 (A Power Distribution & Retail Supply Utility, Govt. of Haryana) ‘An ISO 9001:2008 Compliant Utility, CIN:- HBV U99999HR1999SGC034165 Pp N offs one Chel Enger aoe \Vidyut Sadan, Vidyut Nagar, Hisar ~ 125005-06 (Haryana) Tel: 01662-22306", (SE:01662-223332) Website: ynww.dhbvn.ora.in, mail ID: cemm@ahbvn.ora.in h-20/DH- _____semmé@dhbynorgin ——J '7IRC-401/QH-12557/XEN/MMILoose File Dated: »91/9/22 Mis Nucon Power Controls Pvt. Ltd. D-46, Phase- V, Focal Point, Ludhiana _ E-mail sushil@nucon.co.in GSTIN- 03AABCN1128N1ZO davqup@amail.com & . davaup@nucon.co.in Stbject:- Supply of 100 KVA, Eneray ncy Level-2, Aluminium Wound out door type distribution transformers against Purchase Order no. DH- 2387/RC-401/QH-I/2557/KEN/MM dated 15.03.2022 placed _upon M/s Nucon Power Controls Pvt. Ltd., D-46, Phase- V, Focal Point, Ludhiana == Offer for Final Inspection thereof, Please refer to the joint inspection report of 240 no. 100 KVA, Energy Efficiency Level-2, Aluminium Wound out door type distribution transformers carried out by Er. Gaurav Dahiya, SDO/Op, S/Divn., DHBVN, Manesar along with Sh, Manoj Kumar, LM Ofo SDO/Op., S/Divn., DHBVN, Dabwali & Sh. Sanjay, LM O/o SDO/Op., S/Division DHBVN, Ding on 13.09.2022 to 14.09.22. The results of the stage inspection have been checked and found generally technically in order. Accordingly, you are requested to offer the T/Fs for final inspection as per terms and conditions of the P.O. Superintey ngineer/MM For CE/MIM, DHBVN, Hisar cc: - 4. The Chief Engineer/MM, DHBVN Hisar for kind information, please. 6 DAD Drive newit00 KVA DTSNIT FY 2021-22 (QH.2557 doled 05 08 2021)DH 287 (16.02.2022) -Nucon Power Cottle Pit LISI Be ee ene banacae Later - Uea28T dock,

You might also like