| j DAKSHIN HARYANA BIJLI VITRAN NIGAM
5 (A Power Distribution & Retail Supply Utility, Govt. of Haryana)
‘An ISO 9001:2008 Compliant Utility, CIN:-
HBV U99999HR1999SGC034165
Pp N offs one Chel Enger aoe
\Vidyut Sadan, Vidyut Nagar, Hisar ~ 125005-06 (Haryana)
Tel: 01662-22306", (SE:01662-223332)
Website: ynww.dhbvn.ora.in,
mail ID: cemm@ahbvn.ora.in
h-20/DH-
_____semmé@dhbynorgin ——J
'7IRC-401/QH-12557/XEN/MMILoose File Dated: »91/9/22
Mis Nucon Power Controls Pvt. Ltd.
D-46, Phase- V, Focal Point, Ludhiana _ E-mail sushil@nucon.co.in
GSTIN- 03AABCN1128N1ZO davqup@amail.com &
. davaup@nucon.co.in
Stbject:- Supply of 100 KVA, Eneray ncy Level-2, Aluminium Wound out
door type distribution transformers against Purchase Order no. DH-
2387/RC-401/QH-I/2557/KEN/MM dated 15.03.2022 placed _upon M/s
Nucon Power Controls Pvt. Ltd., D-46, Phase- V, Focal Point, Ludhiana
== Offer for Final Inspection thereof,
Please refer to the joint inspection report of 240 no. 100 KVA, Energy
Efficiency Level-2, Aluminium Wound out door type distribution transformers carried out by
Er. Gaurav Dahiya, SDO/Op, S/Divn., DHBVN, Manesar along with Sh, Manoj Kumar, LM
Ofo SDO/Op., S/Divn., DHBVN, Dabwali & Sh. Sanjay, LM O/o SDO/Op., S/Division
DHBVN, Ding on 13.09.2022 to 14.09.22. The results of the stage inspection have been
checked and found generally technically in order.
Accordingly, you are requested to offer the T/Fs for final inspection as per
terms and conditions of the P.O.
Superintey ngineer/MM
For CE/MIM, DHBVN, Hisar
cc: -
4. The Chief Engineer/MM, DHBVN Hisar for kind information, please.
6
DAD Drive newit00 KVA DTSNIT FY 2021-22 (QH.2557 doled 05 08 2021)DH 287 (16.02.2022) -Nucon Power Cottle Pit LISI
Be ee ene banacae Later - Uea28T dock,