Six‐Laning

of Barwa‐Adda‐Panagarh Section of NH‐2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP
Phase V on Toll on DBFOT Pattern.
Name of Client: National Highway Authority of India
Authority's Engineer: S.A. Infrastructure Consultants Pvt. Ltd.
Name of Concessionaire: Barwa ‐ Adda Expressway Limited.
EPC Contractor ITNL
Contractor S&P ‐ SIEPL (JV)
Str Drain Ref - Reinforcement Drawing No:- SKY / STR / RW / 002 REV R1
Type 3 Ref - Working Drawing No:- SKY / STR / RW / 001 REV R1
Length 1000
Raft Width 6350
Wall height 8000
Cover 50
BAR BENDING SCHEDULE of Retaining Wall of 1 m Length
Unit
Bar Mark Description Shape of bar Dia(mm) Spacing Cutting Length No.of Bar Total Length [Meter] Weight/Meter Total weight in MT
[Kg]

5320
1 Vertical Bar Earthside 20 180 7550 6 45300 2.469 111.852
2270

7900
2 Vertical Bar Earthside Alter 16 180 10138 6 60828 1.580 96.123
2270
150

7900
8 Vertical Bar Outerside 12 150 8302 7 58114 0.889 51.657
300
4656
3245
3 Raft Top Main Bar Alter 12 180 7991 6 47946 0.889 42.619
150

1320
3190
3 Raft Top Main Bar Alter 12 180 4600 6 27600 0.889 24.533
150

3245 3190

4 Raft Top Main Bar 150 150


16 180.00 6591 6 39546 1.580 62.492

2550

5 Raft Top Main Bar 150 150


12 150.00 2802 14 39228 0.889 34.869
Six‐Laning of Barwa‐Adda‐Panagarh Section of NH‐2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP
Phase V on Toll on DBFOT Pattern.
Name of Client: National Highway Authority of India
Authority's Engineer: S.A. Infrastructure Consultants Pvt. Ltd.
Name of Concessionaire: Barwa ‐ Adda Expressway Limited.
EPC Contractor ITNL
Contractor S&P ‐ SIEPL (JV)
Str Drain Ref - Reinforcement Drawing No:- SKY / STR / RW / 002 REV R1
Type 3 Ref - Working Drawing No:- SKY / STR / RW / 001 REV R1
Length 1000
Raft Width 6350
Wall height 8000
Cover 50
BAR BENDING SCHEDULE of Retaining Wall of 1 m Length
Unit
Bar Mark Description Shape of bar Dia(mm) Spacing Cutting Length No.of Bar Total Length [Meter] Weight/Meter Total weight in MT
[Kg]

6 Raft Bottom Bar 150 6200 150


16 180.00 6436 6 38616 1.580 61.023

6a Raft Bottom Bar Alter 150 2270 150


16 180.00 2506 6 15036 1.580 23.761

7 Raft Distributor Bar 150 6200 150


16 180.00 6436 6 38616 1.580 61.023

9 & 10 Distributor Wall 150 900 150


10 150.00 1160 216 250560 0.617 154.667

Quantity Required in Quantity Required in MT(For 18


Dia
MT(For 1m) m) Reinforcement Required for 1 M Length (in Mt) 724.619
10 154.667 2784.000 Steel Wastage 4.0% in MT:‐ 28.985
12 103.602 1864.828 Total Reinforcement  Required in MT:‐ 753.603
16 304.422 5479.595
20 111.852 2013.333
0.675 12.142

EPC Representative Concessioner Representative I.E. Representative


Name Name Name

Sign Sign Sign

Date Date Date