Organization Plant / Unit Output

Date
1/5/2022 MPC PAP PHOS ACID
2/5/2022 MPC PAP PHOS ACID
3/5/2022 MPC PAP PHOS ACID
4/5/2022 MPC PAP PHOS ACID
5/5/2022 MPC PAP PHOS ACID
6/5/2022 MPC PAP PHOS ACID
7/5/2022 MPC PAP PHOS ACID
8/5/2022 MPC PAP PHOS ACID
9/5/2022 MPC PAP PHOS ACID
10/5/2022 MPC PAP PHOS ACID
11/5/2022 MPC PAP PHOS ACID
12/5/2022 MPC PAP PHOS ACID
Unit of
Actual Production Quantity
Line / Train Measure Design Capacity
Planned Production Quantity
(Good Quality)
ment

TRAIN A MT 1460 1400 1275


TRAIN A MT 1460 980 980
TRAIN A MT 1460 1460 1240
TRAIN A MT 1460 1460 1210
TRAIN A MT 1460 1460 1150
TRAIN A MT 1460 1460 1275
TRAIN A MT 1460 1460 1480
TRAIN A MT 1460 1220 980
TRAIN A MT 1460 1460 1376
TRAIN A MT 1460 1460 1285
TRAIN A MT 1460 1460 1489
TRAIN A MT 1460 1460 1423
Unplanne
d Down
Unplanned Down Time Time due
Actual Rejection Quantity (Poor
Planned Down Time (Hours) due to Equipment Issues to
Quality)
(Hours) Operation
al Issues
(Hours)

0 1 2 0
0 8 0 0
100 0 2 0
0 0 0
0 0 0 0
0 0 0 2
0 0 0 0
0 4 0 0
0 0 0 1
0 0 0
0 0 0 0
0 0 1 0
Unplanne Unplanne
d Down d Down
Time due Time due
to to
External Business
Issues Issues
(Hours) (Hours)

0 0
0 0
0 0
2
2 0
0 0
0 0
4 0

2
0 0
0 0
Organization Plant / Unit Output

Date
1/5/2022 MPC PAP PHOS ACID
2/5/2022 MPC PAP PHOS ACID
3/5/2022 MPC PAP PHOS ACID
4/5/2022 MPC PAP PHOS ACID
5/5/2022 MPC PAP PHOS ACID
6/5/2022 MPC PAP PHOS ACID
7/5/2022 MPC PAP PHOS ACID
8/5/2022 MPC PAP PHOS ACID
9/5/2022 MPC PAP PHOS ACID
10/5/2022 MPC PAP PHOS ACID
11/5/2022 MPC PAP PHOS ACID
12/5/2022 MPC PAP PHOS ACID
Unit of
Actual Production Quantity
Line / Train Measure Design Capacity
Planned Production Quantity
(Good Quality)
ment

TRAIN B MT 1460 1400 1275


TRAIN B MT 1460 980 980
TRAIN B MT 1460 1460 1240
TRAIN B MT 1460 1460 1210
TRAIN B MT 1460 1460 1150
TRAIN B MT 1460 1460 1275
TRAIN B MT 1460 1460 1480
TRAIN B MT 1460 1220 980
TRAIN B MT 1460 1460 1276
TRAIN B MT 1460 1460 1285
TRAIN B MT 1460 1460 1429
TRAIN B MT 1460 1460 1423
Unplanne
d Down
Unplanned Down Time Time due
Actual Rejection Quantity (Poor
Planned Down Time (Hours) due to Equipment Issues to
Quality)
(Hours) Operation
al Issues
(Hours)

0 1 2 0
0 8 0 0
100 0 2 0
0 0 0
0 0 0 0
0 0 0 2
0 0 0 0
0 4 0 0
100 0 0 1
0 0 0
0 0 0 0
0 0 1 0
Unplanne Unplanne
d Down d Down
Time due Time due
to to
External Business
Issues Issues
(Hours) (Hours)

0 0
0 0
0 0
2
2 0
0 0
0 0
4 0

2
1 0
0 0
Organization Plant / Unit Output Line / Train

Date
1/5/2022 MPC PAP PHOS ACID TRAIN C
2/5/2022 MPC PAP PHOS ACID TRAIN C
3/5/2022 MPC PAP PHOS ACID TRAIN C
4/5/2022 MPC PAP PHOS ACID TRAIN C
5/5/2022 MPC PAP PHOS ACID TRAIN C
6/5/2022 MPC PAP PHOS ACID TRAIN C
7/5/2022 MPC PAP PHOS ACID TRAIN C
8/5/2022 MPC PAP PHOS ACID TRAIN C
9/5/2022 MPC PAP PHOS ACID TRAIN C
10/5/2022 MPC PAP PHOS ACID TRAIN C
11/5/2022 MPC PAP PHOS ACID TRAIN C
12/5/2022 MPC PAP PHOS ACID TRAIN C
Unit of
Actual Production Quantity
Measure Design Capacity
Planned Production Quantity
(Good Quality)
ment

MT 1460 1400 1275


MT 1460 980 980
MT 1460 1460 1240
MT 1460 1360 1210
MT 1460 1460 1150
MT 1460 1460 1275
MT 1460 1460 1480
MT 1460 1220 980
MT 1460 1460 1276
MT 1460 1460 1285
MT 1460 1460 1429
MT 1460 1360 1303
Unplanne
d Down
Unplanned Down Time Time due
Actual Rejection Quantity (Poor
Planned Down Time (Hours) due to Equipment Issues to
Quality)
(Hours) Operation
al Issues
(Hours)

0 1 2 0
0 8 0 0
0 0 2 0
0 2 2
0 0 0 0
0 0 0 2
0 0 0 0
0 4 0 0
0 0 0 1
0 0 0
0 0 0 0
0 2 2 2
Unplanne Unplanne
d Down d Down
Time due Time due
to to
External Business
Issues Issues
(Hours) (Hours)

0 0
0 0
0 0
2 0
2 0
0 0
0 0
4 0

2
1 0
0 0
Organization Plant / Unit Output Line / Train

Date
1/5/2022 MPC AMN1 AMMONIA AMMONIA 1
2/5/2022 MPC AMN1 AMMONIA AMMONIA 1
3/5/2022 MPC AMN1 AMMONIA AMMONIA 1
4/5/2022 MPC AMN1 AMMONIA AMMONIA 1
5/5/2022 MPC AMN1 AMMONIA AMMONIA 1
6/5/2022 MPC AMN1 AMMONIA AMMONIA 1
7/5/2022 MPC AMN1 AMMONIA AMMONIA 1
8/5/2022 MPC AMN1 AMMONIA AMMONIA 1
9/5/2022 MPC AMN1 AMMONIA AMMONIA 1
10/5/2022 MPC AMN1 AMMONIA AMMONIA 1
11/5/2022 MPC AMN1 AMMONIA AMMONIA 1
12/5/2022 MPC AMN1 AMMONIA AMMONIA 1
Unit of
Actual Production Quantity
Measure Design Capacity
Planned Production Quantity
(Good Quality)
ment

MT 3300 3300 3300


MT 3300 3300 3300
MT 3300 3300 3300
MT 3300 3300 3300
MT 3300 3300 3300
MT 3300 3300 2300
MT 3300 3300 0
MT 3300 3300 0
MT 3300 3300 1500
MT 3300 3300 3300
MT 3300 3300 3300
MT 3300 3300 3300
Unplanne
d Down
Unplanned Down Time Time due
Actual Rejection Quantity (Poor
Planned Down Time (Hours) due to Equipment Issues to
Quality)
(Hours) Operation
al Issues
(Hours)

0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 24 0
0 0 24 0
0 0 0 12
0 0 0 0
0 0 0 0
0 0 0 0
Unplanne Unplanne
d Down d Down
Time due Time due
to to
External Business
Issues Issues
(Hours) (Hours)

0 0
0 0
0 0
0 0
0 0
12 0
0 0
0 0

0 0
0 0
0 0
Organization Plant / Unit Output Line / Train

Date
1/5/2022 MPC SAP Sulphuric acid SAPA
2/5/2022 MPC SAP Sulphuric acid SAPA
3/5/2022 MPC SAP Sulphuric acid SAPA
4/5/2022 MPC SAP Sulphuric acid SAPA
5/5/2022 MPC SAP Sulphuric acid SAPA
6/5/2022 MPC SAP Sulphuric acid SAPA
7/5/2022 MPC SAP Sulphuric acid SAPA
8/5/2022 MPC SAP Sulphuric acid SAPA
9/5/2022 MPC SAP Sulphuric acid SAPA
10/5/2022 MPC SAP Sulphuric acid SAPA
11/5/2022 MPC SAP Sulphuric acid SAPA
12/5/2022 MPC SAP Sulphuric acid SAPA
Unit of
Actual Production Quantity
Measure Design Capacity Planned Production Quantity
(Good Quality)
ment

MT 4500 4500 4500


MT 4500 4500 4500
MT 4500 2250 2000
MT 4500 4500 4500
MT 4500 4500 4500
MT 4500 4500 4500
MT 4500 4500 4500
MT 4500 4500 4500
MT 4500 4500 0
MT 4500 4500 0
MT 4500 4500 4500
MT 4500 4500 4500
Unplanne
d Down
Unplanned Down Time Time due
Actual Rejection Quantity (Poor
Planned Down Time (Hours) due to Equipment Issues to
Quality)
(Hours) Operation
al Issues
(Hours)

0 0 0 0
0 0 0 0
0 12 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 24 0
0 0 24 0
0 0 0 0
0 0 0 0
Unplanne Unplanne
d Down d Down
Time due Time due
to to
External Business
Issues Issues
(Hours) (Hours)

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Organization Plant / Unit Output

Date
1/5/2022 MPC SAP Sulphuric acid
2/5/2022 MPC SAP Sulphuric acid
3/5/2022 MPC SAP Sulphuric acid
4/5/2022 MPC SAP Sulphuric acid
5/5/2022 MPC SAP Sulphuric acid
6/5/2022 MPC SAP Sulphuric acid
7/5/2022 MPC SAP Sulphuric acid
8/5/2022 MPC SAP Sulphuric acid
9/5/2022 MPC SAP Sulphuric acid
10/5/2022 MPC SAP Sulphuric acid
11/5/2022 MPC SAP Sulphuric acid
12/5/2022 MPC SAP Sulphuric acid
Unit of
Actual Production Quantity
Line / Train Measure Design Capacity
Planned Production Quantity
(Good Quality)
ment

SAPB MT 4500 4500 4500


SAPB MT 4500 4500 4500
SAPB MT 4500 2250 2000
SAPB MT 4500 4500 4500
SAPB MT 4500 4500 4500
SAPB MT 4500 4500 4500
SAPB MT 4500 4500 4500
SAPB MT 4500 4500 4500
SAPB MT 4500 4500 0
SAPB MT 4500 4500 0
SAPB MT 4500 4500 4500
SAPB MT 4500 4500 4500
Unplanne
d Down
Unplanned Down Time Time due
Actual Rejection Quantity (Poor
Planned Down Time (Hours) due to Equipment Issues to
Quality)
(Hours) Operation
al Issues
(Hours)

0 0 0 0
0 0 0 0
0 12 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 24 0
0 0 24 0
0 0 0 0
0 0 0 0
Unplanne Unplanne
d Down d Down
Time due Time due
to to
External Business
Issues Issues
(Hours) (Hours)

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Organization Plant / Unit Output Line / Train

Date
1/5/2022 MPC SAP Sulphuric acid SAPC
2/5/2022 MPC SAP Sulphuric acid SAPC
3/5/2022 MPC SAP Sulphuric acid SAPC
4/5/2022 MPC SAP Sulphuric acid SAPC
5/5/2022 MPC SAP Sulphuric acid SAPC
6/5/2022 MPC SAP Sulphuric acid SAPC
7/5/2022 MPC SAP Sulphuric acid SAPC
8/5/2022 MPC SAP Sulphuric acid SAPC
9/5/2022 MPC SAP Sulphuric acid SAPC
10/5/2022 MPC SAP Sulphuric acid SAPC
11/5/2022 MPC SAP Sulphuric acid SAPC
12/5/2022 MPC SAP Sulphuric acid SAPC
Unit of Actual Production Quantity
Design CapacityPlanned Production Quantity
Measurement (Good Quality)

MT 4500 4500 4500


MT 4500 4500 4500
MT 4500 2250 2000
MT 4500 4500 4500
MT 4500 4500 4500
MT 4500 4500 4500
MT 4500 4500 4500
MT 4500 4500 4500
MT 4500 4500 0
MT 4500 4500 0
MT 4500 4500 4500
MT 4500 4500 4500
Unplanne Unplanne Unplanne
d Down d Down d Down
Unplanned Down Time Time due Time due Time due
Actual Rejection Planned Down
due to Equipment Issues to to to
Quantity (Poor Quality) Time (Hours)
(Hours) Operation External Business
al Issues Issues Issues
(Hours) (Hours) (Hours)

0 0 0 0 0 0
0 0 0 0 0 0
0 12 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 24 0 0 0
0 0 24 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
Organization Plant / Unit Output

Date
1/5/2022 MPC PAU POWER
2/5/2022 MPC PAU POWER
3/5/2022 MPC PAU POWER
4/5/2022 MPC PAU POWER
5/5/2022 MPC PAU POWER
6/5/2022 MPC PAU POWER
7/5/2022 MPC PAU POWER
8/5/2022 MPC PAU POWER
9/5/2022 MPC PAU POWER
10/5/2022 MPC PAU POWER
11/5/2022 MPC PAU POWER
12/5/2022 MPC PAU POWER
1/5/2022 MPC PAU POWER
2/5/2022 MPC PAU POWER
3/5/2022 MPC PAU POWER
4/5/2022 MPC PAU POWER
5/5/2022 MPC PAU POWER
6/5/2022 MPC PAU POWER
7/5/2022 MPC PAU POWER
8/5/2022 MPC PAU POWER
9/5/2022 MPC PAU POWER
10/5/2022 MPC PAU POWER
11/5/2022 MPC PAU POWER
12/5/2022 MPC PAU POWER
Unit of
Actual Production Quantity
Line / Train Measure Design Capacity
Planned Production Quantity
(Good Quality)
ment

STG1 MwH 1812 1812 1812


STG1 MwH 1812 1812 1812
STG1 MwH 1812 1812 1812
STG1 MwH 1812 1812 1812
STG1 MwH 1812 1812 1812
STG1 MwH 1812 1812 1812
STG1 MwH 1812 1812 1812
STG1 MwH 1812 1812 1812
STG1 MwH 1812 1812 1812
STG1 MwH 1812 1812 1812
STG1 MwH 1812 1812 1812
STG1 MwH 1812 1812 1812
STG2 MwH 1812 1812 1812
STG2 MwH 1812 1812 1812
STG2 MwH 1812 1812 1812
STG2 MwH 1812 1812 1812
STG2 MwH 1812 1812 1812
STG2 MwH 1812 1812 1812
STG2 MwH 1812 1812 1812
STG2 MwH 1812 1812 1812
STG2 MwH 1812 1812 1812
STG2 MwH 1812 1812 1812
STG2 MwH 1812 1812 1812
STG2 MwH 1812 1812 1812
Unplanne
d Down
Unplanned Down Time Time due
Actual Rejection Quantity (Poor
Planned Down Time (Hours) due to Equipment Issues to
Quality)
(Hours) Operation
al Issues
(Hours)

0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
Unplanne Unplanne
d Down d Down
Time due Time due
to to
External Business
Issues Issues
(Hours) (Hours)

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Organization Plant / Unit Output Line / Train

Date
1/5/2022 MPC DAP_1 DAP/MAP DAPA
2/5/2022 MPC DAP_1 DAP/MAP DAPA
3/5/2022 MPC DAP_1 DAP/MAP DAPA
4/5/2022 MPC DAP_1 DAP/MAP DAPA
5/5/2022 MPC DAP_1 DAP/MAP DAPA
6/5/2022 MPC DAP_1 DAP/MAP DAPA
7/5/2022 MPC DAP_1 DAP/MAP DAPA
8/5/2022 MPC DAP_1 DAP/MAP DAPA
9/5/2022 MPC DAP_1 DAP/MAP DAPA
10/5/2022 MPC DAP_1 DAP/MAP DAPA
11/5/2022 MPC DAP_1 DAP/MAP DAPA
12/5/2022 MPC DAP_1 DAP/MAP DAPA
Unit of
Actual Production Quantity
Measure Design Capacity
Planned Production Quantity
(Good Quality)
ment

MT 2250 2250 2100


MT 2250 2250 2100
MT 2250 2250 2100
MT 2250 2250 2100
MT 2250 2250 2100
MT 2250 2250 2250
MT 2250 2250 0
MT 2250 2250 0
MT 2250 2250 2250
MT 2250 2250 2250
MT 2250 2250 2100
MT 2250 2250 1100
Unplanne
d Down
Unplanned Down Time Time due
Actual Rejection Quantity (Poor
Planned Down Time (Hours) due to Equipment Issues to
Quality)
(Hours) Operation
al Issues
(Hours)

100 1 0 0
100 1 0 0
1 0 0
1 0 0
100 0 0
100 0 0
24 0 0
0 24 0
100 0 0
1 0 0
1 0 0
1 0 0
Unplanne Unplanne
d Down d Down
Time due Time due
to to
External Business
Issues Issues
(Hours) (Hours)

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Organization Plant / Unit Output Line / Train

Date
1/5/2022 MPC DAP_1 DAP/MAP DAPB
2/5/2022 MPC DAP_1 DAP/MAP DAPB
3/5/2022 MPC DAP_1 DAP/MAP DAPB
4/5/2022 MPC DAP_1 DAP/MAP DAPB
5/5/2022 MPC DAP_1 DAP/MAP DAPB
6/5/2022 MPC DAP_1 DAP/MAP DAPB
7/5/2022 MPC DAP_1 DAP/MAP DAPB
8/5/2022 MPC DAP_1 DAP/MAP DAPB
9/5/2022 MPC DAP_1 DAP/MAP DAPB
10/5/2022 MPC DAP_1 DAP/MAP DAPB
11/5/2022 MPC DAP_1 DAP/MAP DAPB
12/5/2022 MPC DAP_1 DAP/MAP DAPB
Unit of
Actual Production Quantity
Measure Design Capacity
Planned Production Quantity
(Good Quality)
ment

MT 2250 2250 2100


MT 2250 2250 2100
MT 2250 2250 2100
MT 2250 2250 2100
MT 2250 2250 2100
MT 2250 2250 2250
MT 2250 2250 0
MT 2250 2250 0
MT 2250 2250 2250
MT 2250 2250 2250
MT 2250 2250 2100
MT 2250 2250 1100
Unplanne
d Down
Unplanned Down Time Time due
Actual Rejection Quantity (Poor
Planned Down Time (Hours) due to Equipment Issues to
Quality)
(Hours) Operation
al Issues
(Hours)

100 1 0 0
100 1 0 0
1 0 0
1 0 0
100 0 0
100 0 0
24 0 0
0 24 0
100 0 0
1 0 0
1 0 0
1 0 0
Unplanne Unplanne
d Down d Down
Time due Time due
to to
External Business
Issues Issues
(Hours) (Hours)

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Actual
Actual
Productio
Unit of Rejection
n
Organization
Plant / Unit Output Line / Train Measure
Design
Planned
Capacity
Production Quantity Quantity
Quantity
ment (Poor
(Good
Quality)
Quality)

Date
1/5/2022 MPC DAP_1 DAP/MAP DAPC MT 2250 2250 2100 100
2/5/2022 MPC DAP_1 DAP/MAP DAPC MT 2250 2250 2100 100
3/5/2022 MPC DAP_1 DAP/MAP DAPC MT 2250 2250 2100
4/5/2022 MPC DAP_1 DAP/MAP DAPC MT 2250 2250 2100
5/5/2022 MPC DAP_1 DAP/MAP DAPC MT 2250 2250 2100 100
6/5/2022 MPC DAP_1 DAP/MAP DAPC MT 2250 2250 2250 100
7/5/2022 MPC DAP_1 DAP/MAP DAPC MT 2250 2250 2250
8/5/2022 MPC DAP_1 DAP/MAP DAPC MT 2250 2250 2250
9/5/2022 MPC DAP_1 DAP/MAP DAPC MT 2250 2250 2250 100
10/5/2022 MPC DAP_1 DAP/MAP DAPC MT 2250 2250 2250
11/5/2022 MPC DAP_1 DAP/MAP DAPC MT 2250 2250 2100
12/5/2022 MPC DAP_1 DAP/MAP DAPC MT 2250 1250 1100
Unplanne Unplanne Unplanne Unplanne
d Down d Down d Down d Down
Time due Time due Time due Time due
Planned Down Time (Hours)
to to to to
Equipmen Operation External Business
t Issues al Issues Issues Issues
(Hours) (Hours) (Hours) (Hours)

1 0 0 0 0
1 0 0 0 0
1 0 0 0 0
1 0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0 0
0 24 0 0 0
0 0 0 0
1 0 0 0 0
1 0 0 0 0
8 0 0 0 0
Unit of
Organization
Plant / Unit Output Line / Train Measure
Design Capacity
ment

Date
1/5/2022 MPC DAP_1 DAP/MAP DAPD MT 2250
2/5/2022 MPC DAP_1 DAP/MAP DAPD MT 2250
3/5/2022 MPC DAP_1 DAP/MAP DAPD MT 2250
4/5/2022 MPC DAP_1 DAP/MAP DAPD MT 2250
5/5/2022 MPC DAP_1 DAP/MAP DAPD MT 2250
6/5/2022 MPC DAP_1 DAP/MAP DAPD MT 2250
7/5/2022 MPC DAP_1 DAP/MAP DAPD MT 2250
8/5/2022 MPC DAP_1 DAP/MAP DAPD MT 2250
9/5/2022 MPC DAP_1 DAP/MAP DAPD MT 2250
10/5/2022 MPC DAP_1 DAP/MAP DAPD MT 2250
11/5/2022 MPC DAP_1 DAP/MAP DAPD MT 2250
12/5/2022 MPC DAP_1 DAP/MAP DAPD MT 1500
Unplanne Unplanne Unplanne Unplanne
Actual
Actual d Down d Down d Down d Down
Productio
Rejection Time due Time due Time due Time due
n
Planned Production Quantity Quantity
Planned Down Time (Hours)
to to to to
Quantity
(Poor Equipmen Operation External Business
(Good
Quality) t Issues al Issues Issues Issues
Quality)
(Hours) (Hours) (Hours) (Hours)

2250 2100 0 1 0 0 0 0
2250 2100 0 1 0 0 0 0
2250 2100 0 0 0 0
2250 2100 100 0 0 0 0
2250 2100 0 0 0 0
2250 2250 100 0 0 0 0
2250 0 0 24 0 0
2250 0 0 24 0 0 0
2250 2250 100 0 0 0 0
2250 0 24 0 0 0 0
2250 2100 1 0 0 0 0
2250 1100 100 8 0 0 0 0
1/5/2022 MPC MH ROCK-IMP MH MT 2000 2000 1850
2/5/2022 MPC MH ROCK-IMP MH MT 2000 2000 1600
3/5/2022 MPC MH ROCK-IMP MH MT 2000 2000 1400
4/5/2022 MPC MH ROCK-IMP MH MT 2000 2000 1550
5/5/2022 MPC MH ROCK-IMP MH MT 2000 2000 2000
6/5/2022 MPC MH ROCK-IMP MH MT 2000 2000 2000
7/5/2022 MPC MH ROCK-IMP MH MT 2000 2000 2000
8/5/2022 MPC MH ROCK-IMP MH MT 2000 2000 2000
9/5/2022 MPC MH ROCK-IMP MH MT 2000 2000 1600
10/5/2022 MPC MH ROCK-IMP MH MT 2000 2000 1700
11/5/2022 MPC MH ROCK-IMP MH MT 2000 2000 1750
12/5/2022 MPC MH ROCK-IMP MH MT 2000 2000 1450
0 2 0 0 0
0 2 2 0 0 0
0 2 2 0 0 0
0 2 2 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 2 2 0 2 0
0 2 2 0 0 0
0 2 2 0 0 2
0 2 2 2 0 0
Unit of
Organization
Plant / Unit Output Line / Train Measure
Design
Planned
Capacity
Production Quantity
ment

Date
1/5/2022 MPC MH2 DAP/MAP-EXPORT MH2 MT 2000 2000
2/5/2022 MPC MH2 DAP/MAP-EXPORT MH2 MT 2000 2000
3/5/2022 MPC MH2 DAP/MAP-EXPORT MH2 MT 2000 2000
4/5/2022 MPC MH2 DAP/MAP-EXPORT MH2 MT 2000 2000
5/5/2022 MPC MH2 DAP/MAP-EXPORT MH2 MT 2000 2000
6/5/2022 MPC MH2 DAP/MAP-EXPORT MH2 MT 2000 2000
7/5/2022 MPC MH2 DAP/MAP-EXPORT MH2 MT 2000 2000
8/5/2022 MPC MH2 DAP/MAP-EXPORT MH2 MT 2000 2000
9/5/2022 MPC MH2 DAP/MAP-EXPORT MH2 MT 2000 2000
### MPC MH2 DAP/MAP-EXPORT MH2 MT 2000 2000
### MPC MH2 DAP/MAP-EXPORT MH2 MT 2000 2000
### MPC MH2 DAP/MAP-EXPORT MH2 MT 2000 2000
Unplanne Unplanne Unplanne Unplanne
Actual
Actual d Down d Down d Down d Down
Productio
Rejection Time due Time due Time due Time due
n
Quantity
Planned Down Time (Hours)
to to to to
Quantity
(Poor Equipmen Operation External Business
(Good
Quality) t Issues al Issues Issues Issues
Quality)
(Hours) (Hours) (Hours) (Hours)

1850 0 2 0 0 0
1600 0 2 2 0 0 0
1400 0 2 2 0 0 0
1550 0 2 2 0 0 0
2000 0 0 0 0 0 0
2000 0 0 0 0 0 0
2000 0 0 0 0 0 0
2000 0 0 0 0 0 0
1600 0 2 2 0 2 0
1700 0 2 2 0 0 0
1750 0 2 2 0 0 2
1450 0 2 2 2 0 0