EDI 040 - BQ Jasa Balancing IDF Boiler

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

PT.

TUNGGAL PERKASA PLANTATIONS 4


ENGINEERING & MANUFACTURING
Site : PO BOX 01 Air Molek – Inhu - Riau 29353
HO : Jl Puloayang Raya Blok OR-I Kawasan Industri Pulogadung Jak-Tim
Telp. 021-4616555 Fax.021-4616553

040/INT/PWRN/WS/TPP4/III/2021

CUSTOMER : PT. Ekadura Indonesia DATE :

MACHINE NAME : Jasa Balancing IDF Boiler PREPARED : Sufi Sihotang

DELIVERY : REVISION NO. :

DRAWING NO. : QUANTITY/UNITS : 1 Lot

NO DESCRIPSI RINCIAN HARGA KETERANGAN


1 Manufacturing (material) Rp -
manufacturing (Indirect Material) Rp -
Manufacturing (Jasa Balancing) Rp 2.730.000
laba fabrikasi Rp 27.300
Manufacturing total Rp 2.757.300
2 Jasa Install Rp -
laba install Rp -
3 Overhead Rp 390.000
4 Transport Rp -
Rp 3.147.300
Grand Total (Manufacturing+install+overhead+Transport)
Rp 3.100.000

Scope : Jasa Balancing IDF Boiler


:

Function : Pengisap Udara Buang Boiler

SPECIFICATIONS :
Quantity : 1 (satu) Lot Jasa Balancing IDF Boiler
Capacity :
Construction Details :

Construction Material :

Testing :
:
Calibration

Demikian rincian Penawaran harga ini kami buat sebagai landasan untuk dimulainya proses pabrikasi, agar diteruskan proses pembuatan PR/PO nya
Atas perhatiannya kami ucapkan terima kasih.

Sungai Sagu, 24 Maret 2021


Hormat kami,
Dibuat : Diperiksa :

Ali Akbar Ari Iswahyudi


Manager Workshop Central Ka. Pabrik PT.EDI

Disetujui : Mengetahui :

Rien Risma Grandika Arisman Siregar


KTU PT.EDI ADM PT.EDI
PT. TUNGGAL PERKASA PLANTATIONS 4
Harga Jasa Balancing IDF Boiler
Project : Jasa Balancing IDF Boiler
Customer : PT. Ekadura Indonesia
Location : Rokan Hulu - Riau

Kategori 1 Kategori 2 Kategori 3 Kategori 4 PART NUMBER DESCRIPTION TYPE DESIGNATION Weight (Kg) Total Kg Qty U/M Price Total Price
1.. Manufacturing 1. COGS Direct material

Direct material total - 0,0 0,0 Rp -


Indirect material

Indirect Material Total 0,0 0 Rp -


1. COGS Jasa Jasa Fabrikasi mh 42 Rp 65.000 Rp 2.730.000
2. Laba Manufacturing Laba fabrikasi Laba fabrikasi lot 0,01 Rp 27.300
Jasa Total Rp 2.757.300
Manufacturing total Rp 2.757.300
2. Install 1. COGS Jasa Jasa Install mh - Rp -
2. Laba Install Laba Install Laba Install lot Rp -
Install total Rp -
3. Overhead Overhead Rp 390.000
4. Transport 1. COGS Transport 1 Rp -
Transport total
- 0,0 Rp 3.147.300
Grand Total (Manufacturing + Install +Overhead + Transport)
Round (pembulatan) Rp 3.100.000
Rp/kg Total #DIV/0!
Rp/kg manufacturing total #DIV/0!
Rp/kg Install #DIV/0!
Rp/kg transport #DIV/0!
Kg/mh fabrikasi -
Kg/mh install
Kg/mh Total #DIV/0!

Dibuat : Diketahui :

Sufi M Sihotang Budi Prawoto


BQ PT. TPP4 Ka. Eng. PT. TPP4