Sieve Weights
Sieve Analysis of Soil (IS:2720 (Part 4) - 1985)
Atterberg Limits
Data sheet for compaction Test of soil (IS:2720 (Part 7) - 1983)
Field density of soil
Tests for Drainage Layer
Tests for Granular sub base
Tests for Wet Mix Macadam Base
Test for Bitumen(binder) content
Mass of Various sized Materials to be taken up for Sieve Analysis (Table 301.1.1)
Sample number:
40 mm
25 mm
20 mm
10 mm
4.75 mm
2.36 mm
1.18 mm
600 μ
425 μ
75 μ
Summary of results
If results don't confirm to the prescribed limits, non conformance report will be issued by the PIU. The
reference of the page No. of this register on which Non conformance Reports copy preserved
Page No:……………………….Date of issue:…………………………..
S.No
3
2
1
6
5
4
3
2
1
Container Number
Weight of Container +
Wet sample
Weight of Container +
Dry sample
Loss of Moisture
Weight of Container
Atterberg limits
Number of Blows
%
%
%
mc3 Remarks
mc2
mc1
Data sheet for compaction Test of soil (IS:2720 (Part 7) - 1983)
Test No:
Road/Section Details: Date of testing:
Weight of container +
Weight of container +
Weight of container
(Ww) (gm)
(Ws) (gm)
W2 - W1
S.No.
(gm)
(W)
1
2
3
4
5
6
If results don't confirm to the prescribed limits, non conformance report will be issued by the PIU. The
reference of the page No. of this register on which Non conformance Reports copy preserved
Page No:……………………….Date of issue:…………………………..
Observation Tables
(a) Calibration
(i) Mean weight of sand in cone (of pouring cylinder) (W2) in gms
(ii) Volume of calibrating cylinder (V) in cc
(iii) Weight of sand (+ cylinder) before pouring (W1) in gms
(iv) Mean weight of sand (+ cylinder) after pouring (W3) in gms
(v) Weight of sand to fill calibrating cylinser (Ws = W1-W2-W3) in gms
(vi) Bulk density of sand Ys = (W2/V) gm/cc
(b) Determination of soil density
(i) Determination number
(ii) Weight of wet soil from hole (Ww) in gm
(iii) Weight of sand (+ cylinder) before pouring (W1) in gms
(iv) Weight of sand (+ cylinder) after pouring (W4) in gms
(v) Weight of sand in hole, in gm Wb = (W1-W4-W2)
(vi) Bulk density Yb = (Ww/Wb)xYs gm/cc
(vii) Moisture content container number
(viii) Moisture content (W) percent
(ix) Weight of dry sample from hole in gm (Wd)
(x) Dry density Yd = ((Wd/Wb) x Ys gm/cc
If results don't confirm to the prescribed limits, non conformance report will be issued by the PIU. The
reference of the page No. of this register on which Non conformance Reports copy preserved
Page No:……………………….Date of issue:…………………………..
Sample number:
53
26.5
9.5
4.75
2.36
0.425
0.075
Tray
If results don't confirm to the prescribed limits, non conformance report will be issued by the PIU.
The reference of the page No. of this register on which Non conformance Reports copy preserved
Page No:……………………….Date of issue:…………………………..
Sample number:
If results don't confirm to the prescribed limits, non conformance report will be issued by the PIU.
The reference of the page No. of this register on which Non conformance Reports copy preserved
Page No:……………………….Date of issue:…………………………..
If results don't conform to the prescribed limits, non conformance report will be issued by the PIU. The
reference of the page No. of this register on which Non conformance Reports copy preserved
Page No:……………………….Date of issue:…………………………..
Date
Wt. of mix taken before
extraction in gms (A)
1003.32
1079.72
1149.49
1129.52
1101.5
1107.3
2.18
2.35
2.2
2.37
2.33
2.03
944.9
2.9
Percentage of bitumen in
the mix (A-G)x100/A
5.51
5.57
5.58
5.57
5.55
5.6