Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

KSP EQUIPMENTS

Gali no 4 A, Mujeri Industrial Area, sector 70, Faridabad-121 004 (India)


GSTIN: 06AFQPV1993L1ZH
Mobile: 9911685501
E-Mail:kspequipment@yahoo.com Web: www.kspplant.com
DEDICATED TO COST EFFECTIVE MECHANIZATION OF MACHINERY
Kindly take the reference of your communication regarding Fly ash Bricks machine. We
are pleased to submit the details as under –

Budgetary Offer-
S.No. Item Details Qty. Rate Amount
(Rs.) (Rs.)
1. Auto Unloading conveyer (375mmX3 1 No 90,000.00 90,000.00
meter)1 H.P.3 phase 440 volts

2. Machine hydraulic Power pack 7.5 HP 1 No. 4,00,000.00 4,00,000.00


motor 440 volts
3. Moulds 9X4X3 inches 10 bricks 1 Set 1,00,000.00 1,00,000.00

4. Conveyor Shifting Mixed material 34 feet 1 Set 1,00,000.00 1,00,000.00


heavy duty steel structure. Length 600
mm width rubber. Elect power 2 H.P.3
Ph 440 volts
5. Penal Auto PLC 1 No. 50,000.00 50,000.00

6. Mixer Pan star with heavy duty 02 M.S. 1 No. 2,00,000.00 2,00,000.00
Rollers, Hydraulic discharge (volume
400 kg). Reduction Gear Box, Electric
Power 15+2 H.P. 3Ph. 440 volts without
star delta starter

Total 9,40,000.00 9,40,000.00

Trolleys as per Requirements:

1
BUSINESS TERMS:-
Prices: The above prices are Ex-works, Faridabad.

GST: GST 18% Will be charged

Transportation & Octroi: Extra at your end.

Payment: 50% of the total order value as advance (Non Returnable)by


Demand Draft/RTGS along with your order. Balance 50% along with all
Govt. Taxes against our Performa

Inspection: Inspection of the machine can be done before delivery in working


Condition At Faridabad (HR) only.

Delivery: Within 8/9 weeks (or as agreed) from the date of receipt of your confirmed
order along with the advance payment by Demand Draft. This is subject to
Force Majeure.

Production: Production capacity will depends on skills and efficiency of users.


Capacity

Installation Technical person(s) to and fro travel by AC two tier or By air above 800
Km+ lodging and boarding + Rs.2000/- per day daily allowance will have to
be born by the buyer. Extra stay beyond 3 days will be Rs.3000/- day per
person. All payments to be remitted in advance. Ask for material, manpower
check list before arrival of Technical persons.

Validity: This offer is valid for a period of six weeks from the date of issue of this
letter.

Warranty: One year warranty against any manufacturing defects.


Rubber and Electrical Parts are not covered under warranty.
If visit of technical person is required the traveling expenses will
have to be paid by customer in advance. Please refer to “Installation” head
for the expenses. Warranty applicable only if operating instructions are
followed.

CHANGE IN MODEL - SYSTEM WITHOUT ANY PRIOR APPROVAL AT OUR WILL.


THE AFTER SALES SERVICE IN WHICH, VISIT OF TECHNICAL STAFF IS
REQUIRED WILL BE PAID BY THE BUYERS. DAILY PREVENTIVE MAINTENANCE
IS MANDATORY TO ENSURE PROPER PERFORMANCE.
The following are not included in our delivery:-
• Erection of cable and electrical starters.
• Foundation Bolts and Material or any type of civil work

Thanking you and assuring you of our best services always.


Yours faithfully,

for KSP Equipments

You might also like