Builder’s Reply
For
Exxon Mobile Low Temperature Operations requirements

<Denote>
- A HYUNDAI
: Agreed or Noted to Owner’s Comments

DYNAGAS
- SCA : Subject to Cost and DWT Adjustment
- TBD : To Be Discussed
- NA : Not Applicable

CAUTION

THIS DOCUMENT CONTAINS CONFIDENTIAL PROPRIETARY INFORMATION. HENCE,


THE REPRODUCTION, TRANSFER AND/OR UTILIZATION IN WHOLE OR PART FOR
ANY PURPOSE ARE PROHIBITED WITHOUT THE WRITTEN PERMISSION OF HYUNDAI

HYUNDAI
Total 2 pages incl. cover sheet
1

Cost adjust. DWT


No. Buyer’s Requirement Builder’s Reply/Proposal Remark
(USD/ship) (M.T)

Vessels operating in severe sub-zero


1 The notation of the Ice Class 1A FS by LR for Hull
conditions MUST have a valid Ice Class
nos.2556/2558/2580 and ICE CLASS 1A by BV for Hull
notation.
nos. 2557/2565 will be assigned.
The vessel’s safety management system
2 To be prepared by the Buyer.
MUST identify risks associated with
operations in sub-zero and/or ice
conditions, and provide appropriate
safeguards against those identified risks,
including but not limited to, procedures for
personnel training, navigation, operations
and preparation of equipment for use in
such conditions.
3
The vessel MUST have means to prevent
the icing up of air pipes to settling and
service tanks required for the operation of
the main propulsion plant and essential
HYUNDAI
Air vent head with electric heat tracing is provided.

4
auxiliaries.
The vessel MUST have means to keep at
least one machinery space sea water inlet
ice-free.
DYNAGAS
One(1) ice sea chest with warm water re-circulating and steam
blowing connection to be arranged.

The vessel MUST have means provided for


5 One(1) X-band radar scanner to be installed on foremast
ice observation and detection.
and the ice navigation system (RUTTER) to be interfaced.
One of the radars fitted MUST be of a type
6 The radars to be fitted with heating device in the scanners.
classed as being suitable for sub zero
temperatures.
Systems MUST be in place for the routine
7 To be prepared by the Buyer.
receipt of navigational, meteorological and
environmental data, including ice data and
ice charts.
Personal Protective Equipment provided
8 Personal Protective Equipment to be prepared by the
MUST be suitable for sub-zero conditions.
Buyer.