Professional Documents
Culture Documents
Enp GW57-363-550
Enp GW57-363-550
Product manual
GW57 363-550
Horizontal knee disconnectors
—
Contents
06 - 24 Installation
25 - 26 Maintenance
GW57 363-550 Horizontal knee disconnectors 3
—
Packing, transport and storage
—
Packing, transport and storage
—
Product and application
—
Application
Operation conditions
ABB Horizontal knee disconnectors GW57 series
applies highest voltage of equipment 420,550KV Application Outdoor or indoor
ensure isolation and connection directly across the Altitude Less than 1000 m*
horizontal gap. Atmosphere conditions There shall be no dust, corrosive
or explosive mediums in the
ambient air that may significantly
Type designation influence disconnectors
GW57-XXX(D) Maximum daily average relative humidity 95%℃
GW57: Horizontal knee disconnectors. Maximum wind velocity 35 m/s*
XXX: maximum equipment voltage,
Note: * or upon request.
ie D: one earthing switch applied.
DII: two earthing switch applied. General
Without D: earthing switch not applied. The disconnector is a two-column and single-arm
horizontal knee outdoor AC disconnector. After
Main technical parameters opening, it has an isolated fracture in the
Technical parameters comply with latest IEC horizontal direction that is clear and convenient to
standard or upon request. Please refer to technical check. The operating insulator drives the drive
datasheet approved by contract and nameplate. crank arm that drives the drive gear and rack
driving transmission mechanism to make the main
Electrical schematic diagram blade for opening and closing operations.
Electrical schematic diagram will be delivered
along with drive. Earthing switches can be fitted at both sides of
the disconnector and swing in a plane, which is
parallel to the close direction of disconnector.
Disconnector and earthing switch have separate
operating mechanisms. The main units are:
—
Installation
Delivery
Components designation
Item Description Qty/Unit Components photo 363-550 kV
2 ES 1 ES 0 ES
Foundation bolts
1 (Option upon scope) 24 X1D X1D X1D
X2E
Steel frame-Phase B
2 3
(Option upon scope)
X2F
X2G
8 GW57 363-550 Horizontal knee disconnectors
—
Installation
Components designation
Item Description Qty/Unit Components photo 363-550 kV
2 ES 1 ES 0 ES
3 X3D
2 ES
Right ES
3
3 X3F
0 ES
X3H X3H
Right ES/0 ES
GW57 363-550 Horizontal knee disconnectors 9
Components designation
Item Description Qty/Unit Components photo 363/420 kV 550 kV
2 ES 1 ES 0 ES 2 ES 1 ES 0 ES
Upper rotatory
3 X4D X4D X4D
insulator
Lower rotatory
3 X4E X4E X4E
insulator
Upper of support
6 X4F X4F X4F
insulator
Lower of support
6 X4G X4G X4G
insulator
Upper rotatory
3 X4H X4H X4H
insulator
Middle rotatory
3 X4I X4I X4I
insulator
Lower rotatory
3 X4J X4J X4J
insulator
Upper of support
6 X4K X4K X4K
insulator
Middle rotatory
6 X4L X4L X4L
insulator
Lower of support
6 X4M X4M X4M
insulator
Note: Dimension for insulator can be found from product drawing bound to the orders.
10 GW57 363-550 Horizontal knee disconnectors
—
Installation
Components designation
Item Description Qty/Unit Components photo 363-550 kV
2 ES 1 ES 0 ES
5 Coupling rod-DIS 3
X5E X5E
Earthing switch
moving contact side
6 (Option upon requirement, 3 X6D X6D
different length with
different voltage)
Earthing switch
fixed contact side
7 (Option upon requirement, 3 X7D X7D
different length with
different voltage)
ES fixed contact
8 moving contact side 3 X8D X8D
(Option upon requirement)
ES fixed contact
9 fixed contact side 3 X9D X9D
(Option upon requirement)
Corona ring on
10 6 X10D X10D X10D
moving contact base
Corona ring on
11 moving contact upper 6 X11D X11D X11D
and lower arm
Corona ring on
12 6 X12D X12D X12D
fixed contact
Components designation
Item Description Qty/Unit Components photo 363-550 kV
2 ES 1 ES 0 ES
—
Installation
1.1 Check foundation dimension (if steel frame is in ABB scope). (Figure 2)
363-550 kV
Description Qty/Unit
2 ES 1 ES 0 ES
Foundation bolts 24 X1D X1D X1D
GW57 363-550 Horizontal knee disconnectors 13
1.2 Check dimension of steel frame (if steel frame is not in ABB scope).
1.2.1 363-550kV
Note: D1, D2, H1, H2 can be found from product drawing bound to the orders.
—
Installation
2 Base installation
363-550 kV
Description Qty/Unit
2 ES 1 ES 0 ES
Base - Phase 3 X3D & X3G X3D & X3H; X3F & X3G X3F & X3H
M20*150/195 N.m 24 STD-1 STD-1 STD-1
Notes: adjust the distance between base bottom and top support structure plate is about 50 mm,
and the interphase distance meets the engineering drawing requirements.
—
Installation
Figure 10 Corona ring install position for main blade base and fixed contact 420-550 kV
363/420 kV 550 kV
Description Qty/Unit
2 ES 1 ES 0 ES 2 ES 1 ES 0 ES
Main blade 3 X16D X16D X16D X16D X16D X16D
Fixed contact 3 X17D X17D X17D X17D X17D X17D
Corona ring 6 X10D X10D X10D X10D X10D X10D
Corona ring 6 X11D X11D X11D X11D X11D X11D
Corona ring 6 X12D X12D X12D X12D X12D X12D
Corona ring 3 X15D X15D X15D X15D X15D X15D
Support 6 X13D X13D X13D X13D X13D X13D
Support 3 X14D X14D X14D X14D X14D X14D
Support Insulator 6
Upper Insulator 6 X4F X4F X4F X4K X4K X4K
Middle Insulator 6 X4L X4L X4L
Lower Insulator 6 X4G X4G X4G X4M X4M X4M
Rotatory Insulator 3
Upper Insulator 3 X4D X4D X4D X4H X4H X4H
Middle Insulator 3 X4I X4I X4I
Lower Insulator 3 X4E X4E X4E X4J X4J X4J
M12*35 12 STD-2 STD-2 STD-2 STD-2 STD-2 STD-2
M12*30 12 STD-3 STD-3 STD-3 STD-3 STD-3 STD-3
M16*70 52/100 STD-4 STD-4 STD-4 STD-4 STD-4 STD-4
M16*75 48 STD-5 STD-5 STD-5 STD-5 STD-5 STD-5
M16*60 24/48 STD-6 STD-6 STD-6 STD-6 STD-6 STD-6
M16*30 12 STD-7 STD-7 STD-7 STD-7 STD-7 STD-7
M16*55 12 STD-8 STD-8 STD-8 STD-8 STD-8 STD-8
M12*30 12 STD-9 STD-9 STD-9 STD-9 STD-9 STD-9
M12*35 6 STD-10 STD-10 STD-10 STD-10 STD-10 STD-10
M12*45 12 STD-11 STD-11 STD-11 STD-11 STD-11 STD-11
Note: Dimension for insulator can be found from product drawing bound to the orders.
GW57 363-550 Horizontal knee disconnectors 17
Notes: When the both side interlock rod can move from left to right into the interlock disk, the base is in the open position.
4.2 Install the main blade(with insulator) and fixed contact(with insulator) to the base
Figure 11 Install the main blade(with insulator) and fixed contact(with insulator) on main base
18 GW57 363-550 Horizontal knee disconnectors
—
Installation
Figure 12 Install the operation mechanism and vertical rod for main base
Keep the dimension meets the engineering drawing requirements. Install the operation mechanism at
open position with M16*120 bolt.
GW57 363-550 Horizontal knee disconnectors 19
1. Operate the mechanism box manually in the 3. The contact insertion depth meets the
opening position (Confirm the main blade just in requirements that there is a distance 50±5mm
the opening position. Otherwise, it is necessary to between the rear of upper arm plate and the outer
loosen M16 U bolts on the vertical rod to be supporting plate of fixed contact. The driving
adjusted). crank arm passes through the dead point). If the
insertion depth of the main blade does not meet
2. Operate the operating mechanism manually to the requirements, M20 bolts fastening in the base
close the main blade. When the mechanism is in on the fixed contact side or the main blade side
closing place, the main blade is in closing place too can be adjusted to make the insertion depth meet
(Judging criteria: The upper arm of main blade is the requirements.
horizontal, and the lower arm angle is between 0°
and 2°, as shown in the following figures.
—
Installation
363-550 kV
Description Qty/Unit
2 ES 1 ES 0 ES
Earthing switch moving contact side
3 X6D X6D
(Option upon requirement)
Note: Dimension for earthing switch can be found from product drawing bound to the orders.
1. Check marks on the box or pallet according to a. Correctly install the earthing switch in the
engineering configurations and project drawings. installing position on the base, and connect the
corresponding connecting rod or crank arm.
2. Lift the earthing switch out of the box or pallet.
b. Connect all the flexible connections of earthing
3. Pay attention to distinguishing the difference switch correctly to the installation holes on the
between earthing switches on the moving contact base.
side and the fixed contact side
c. Check the installation position of earthing
4. Install the earthing switch follow a,b,c steps on switch support plate and base supporting plate to
the base. ensure the earthing switch plate is parallel to the
base installation plate.
5. Keep the dimension meets the engineering
drawing requirements. Install the operation
mechanism at open position with M16*120 bolt.
GW57 363-550 Horizontal knee disconnectors 21
1. Operate the operating mechanism box manually If the position of earthing switch relating to the
to the opening position (Confirm the earthing fixed contact of earthing switch does not meet the
switch be just in the opening position. Otherwise, requirements, adjust the relative position of
it is necessary to loosen M16 U-shaped bolts on earthing switch installation plate and base
vertical connecting rod to carry out adjusting). installation plate. The method is to increase
Then, manually operate the operating mechanism adjustment gaskets on the diagonal line of 4
to close the earthing switch, and stop it when fastening bolts between earthing switch
approaching to the guide block of fixed contact installation plate and base installation plate to
for earthing switch. Check the relative position of adjust the relative position of earthing switch and
earthing switch arm relating to the fixed contact fixed contact for earthing switch.
of earthing switch, and ensure the center of
earthing switch arm is aligned with that of fixed
contact for earthing switch, as shown in the
following figure.
—
Installation
2. Continue to switch on earthing switches a. The distance from the upper guide pipe at the
manually to make earthing switch rods contact top of earthing switch to the lower of fixed
with damping pads on fixed contacts of earthing contact for earthing switch is 10±3mm. If not
switch, and check the position relationship of each meeting the requirements, loosen fixed bolts of
part between earthing switch and fixed contact copper tube for fixed contact to adjust the upper
for earthing switch. and lower positions of copper tube for fixed
contact properly.
10±3
26±3
4. Then performs a complete opening operation to 7. Operate the electric closing operation of
check whether there is any abnormality during the earthing switch. Pay attention that there should
opening process. not be any interference or abnormal occurrence in
the process. If yes, stop the operation mechanism
5. Once again, a complete manual closing process immediately. Check the parts that have problems,
is carried out to keep the speed during the closing and carry out troubleshooting according to the
process as much as possible so that the speed is above steps.
the same basically as the time of electric closing.
The movement of earthing switch during the 8. Carry out electric opening and closing for many
closing process is checked, especially the relative times to check the movement of earthing switch,
position of earthing switch and fixed contact for and ensure that the earthing switch can be
earthing switch during the process of earthing opened/closed in place without any abnormality.
switch in the upward process.
6 Commissioning
—
Installation
7 Final inspection
It is necessary to inspect and verify the equipment f. Inspect whether or not the operations,
carefully after its installation and before its lubrication and strokes of all the drive
operation. mechanisms are correct. Check their idle strokes,
mechanical connection, and the excessive
a. Inspect all the insulators to see if any of them clearance during their control or installation.
are broken or defective.
g. Inspect the safety, proper functions and
b. Inspect the positioning conditions of all the operation convenience of all the switch locking
contacts. drive mechanisms (if any).
c. Inspect the tightness of all the bolts. h. Inspect whether or not the insulators and the
moving parts are clean.
d. Inspect the isolation distance, the net safety
distances of live parts of the equipment, and the
stroke of the equipment.
—
Maintenance
Lubrication
It is suggestive to use the lubricants of the
following types to lubricate the main bearings and
pivots of the connecting rods.
—
Maintenance
Maintenance plan
Minimal maintenance is required. However, routine Preventive maintenance schedule is made below.It
checks and necessary maintenance are is recommended to follow below procedures on
recommended to ensure good performance. schedule.
MINOR INSPECTION
A1) Verify the mechanical parts of the equipment and of the protection surfaces
are not damaged.
A2) Verify the shell of the low voltage cables and the earthing cables are not damaged.
A3) Verify the insulators are not damaged and there is no filth deposition
A on the surfaces. A4) Verify equipment and drive mechanisms in good status.
During site routine
Disconnector A5) Verify the bolts, nuts and gaskets in their original positions and good condition.
inspection or, in any
in service Replace the seriously worn or corrosion parts.
case, every 2 years
A6) Verify all interlock components and test to ensure them in good condition.
A7) Verify terminals connecting according to this manual.
A8) Verify the sealing of gear box if aging. Keep gear box clean.
A9) Verify the drive mechanism is not damaged.
OPTIONAL:
Check the heater with thermal detector.
INSPECTION ON DISCONNECTOR
B1) Carry out checks A1-A9 described in section A.
B2) Verify and clean all live parts.
B3) Measure resistance of live parts.
B4) Verify bolt tightening.
B5) Verify operation of local controls.
B6) Verify manual operation.
B B7) Verify correct coupling of main contact.
Every 5 years or every
Disconnector B8) Verify surface condition of contacts.
1500 operations
out of service
INSPECTION OF THE DRIVE MECHANISM
B9) Verify that all mechanical and electrical components, cables and earthing
connections are not damaged.
B10) Verify lubrication of gears.
B11) Verify the correct operation of the following electrical components:
Heating and anti-condensation resistance;
Motor protection automatic switch;
Electromechanical interlock.
MAJOR INSPECTION
C1) Full check of the disconnector as per section B;
C2) Check the condition and the wear of the main components, the conditions
C
of the insulators and the mechanical adjustments performed during installation
Disconnector Every 15 years or every
(see installation manual). If you find any deviation, restore the required conditions.
out of service 10.000 operations
In case replacement of units or components is required, comply with procedures
in the installation manual. In case of troubles or doubts on how to restore
correctly the required conditions, please contact ABB
—
ABB High Voltage Switchgear
Co., Ltd., Beijing
Add.: No.12 Jingyuan Street,
Beijing Economic-Technological
Development Area Beijing, 100176,
P.R.China
Tel: +86 10 6781 8000
Fax: +86 10 6781 8001
www.abb.com.cn