Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 11

COMPANY NAME:

ADDRESS:
CONTACT INFO:
PROJECT NAME: O!SAVE BULAON SAN FERNANDO CITY PAMPANGA
LOCATION: BRGY. BULAON SAN FERNANDO CITY PAMPANGA
DROPPED PIN: https://goo.gl/maps/fi5KmV2BrVZ9wZmG9
DATE: APRIL 25, 2022
GROUND ZERO CONSTRUCTION
MATERIALS LABOR
ITEM NO. SCOPE OF WORKS UNIT QTY AMOUNT
UNIT PRICE TOTAL UNIT PRICE TOTAL
A. GENERAL REQUIREMENTS / PRELIMINARIES
1 Mobilization and Demobilization LOT 1.00 -
2 Permit and Clearances - Design including Sign and Seal
Barangay Clearance - Barangay and/or Village Homeowners Association (HOA) for Business Permit
2.1 LOT 1.00 -
for OSAVE (whichever are warranted)
2.2 Building Permit LOT 1.00 -
2.3 Land Use and Zoning Clearance LOT 1.00 -
2.4 Demolition Permit (if needed) LOT 1.00 -
2.5 Plumbing / Sanitary Permit LOT 1.00 -
2.6 Electrical Permit LOT 1.00 -
2.7 Signage Permit LOT 1.00 -
2.8 Fires Safety Inspection Certificate (FSIC) including necessary requirements LOT 1.00 -
2.9 Fire Extinguisher purchase & installation (Min of 5 pcs) (follow BFP requirements) LOT 1.00 -
Fire Alarm System (Min. of 5pcs - Smoke Detector (Battery Operated), Alarm Bell and Manual Pull)
2.10 LOT 1.00 -
(follow BFP requirements)
2.11 Certificate of Final Electrical Inspection LOT 1.00 -
2.12 Certificate of Completion LOT 1.00 -
2.13 Occupancy Permit LOT 1.00 -
Relocation Survey (signed by Geodetic Engr.) including topographic plan and section with monument
3 LOT 1.00 -
(muhon) on site
4 Temporary board up / enclosure LOT 1.00 -
All temporary utilities (power and water) during construction provided with corresponding sub-meters until
5 LOT 1.00 -
permanent connection
6 Permanent waterline application for Osave (Legwork up to connection) LOT 1.00 -
7 Permanent Electric power Application for Osave (Legwork up to connection) -
8 Working Drawings & As-Built Plan LOT 1.00 -
Eight (8) sets of As Built Plan working CAD File (USB) and signed and sealed (per perspective
8.1
trades) blue print copies delivered to Osave main office
Whole set of working Drawings (Arch'l, Electrical, Mechanical, Plumbing & Structural) - signed and
8.2
Sealed for permits processing

SUB TOTAL-A (PRELIMINARIES) -


B. SUB-STRUCTURE & SUPER STRUCTURE

1 EARTHWORKS
1.1 Excavation works / Soil triming including hauling (if needed) Lot -
1.2 Backfiling works including hauling & compaction (if needed) Lot -
1.3 Demolition works including hauling (if needed) Lot -

2 REBAR WORKS (BUILDING AREA, PORCH AND PARKING)


2.1 All Structural Foundation, Columns and Beams Kgs -
2.2 All Concrete Slab/Flooring Kgs -
2.3 Pylon signage pedestal and footing ; inclusive of 25 mm dia. anchor bolt setting (4 pcs) Kgs -
2.4 Concrete cage for Safe Box Deposit Vault Kgs -
2.5 Concrete Zocalo Kgs -
2.6 Service Entrance Kgs -

3 CONCRETE WORKS (BUILDING AREA, PORCH AND PARKING)


3.1 All Structural Foundation, Columns and Beams Cu. M -
3.2 All Concrete Slab/Flooring (Ready Mix 3000psi) Cu. M -
3.3 Pylon signage pedestal and footing Cu. M -
3.4 Concrete cage for Safe Box Deposit Vault Cu. M -
3.5 Concrete Zocalo Cu. M -
3.6 Service Entrance Cu. M -

4 MASONRY WORKS (PERIMETER WALLS, TOILET AND MOP SINK)


4.1 Supply and installation of CHB wall -
5" thick non-load bearing CHB walls for exterior wall (Perimeter walls) Sq. M -
4" thick non-load bearing CHB walls for interior wall (Toilet & Mop sink) Sq. M -
- with 10mm diameter vertical rebar spaced at 0.60m -
- with 10mm diameter horizontal rebar at every 3 layers CHB -
- lintel beam at every 2.40m ht -
4.2 Plastering works (Interior & Exterior walls) Sq. M -
4.3 Plain cement finish for Storage (with floor sealant), Porch, PWD ramp & Parking Sq. M -
4.4 Car Wheel Stopper for Parking 600mm(L) x 150mm(W) x 120mm(H) Pcs -
4.5 3- Chamber Septic Tank Lot -
4.6 Catch Basin for Storm Drainage line Lot -

5 STEEL WORKS (BUILDING AREA, ACCU AREA AND PARKING)


5.1 Steel Roof Trusses Lot -
5.2 ACCU Cage - angle bar framing with 2" steel matting (with redoxide primer; final painted - white) Lot -

40mm dia. Stainless steel mirror finished for pushcart barrier, chest freezer area, counter area, and
5.3 Lot -
beside the entrance
5.4 40 mm dia. Stainless steel mirror finished for handrail for PWD ramp (use standard design) Pc -
2"x2" stainless steel 1m(H) as corner guards at All Exposed Columns, SMO, Storage and Pantry
5.5 Pcs -
(316L Stainless Steel Sheet #4 Finish)
5.6 2"x4" tubular for pallet guards (with redoxide primer; final painted - Boysen Gray B-2930) Lm -
5.7 Stainless Steel mirror finished Retractable Entrance (One way swing) Pc -
Sliding Mesh Gate (with redoxide primer; final painted - Boysen Gray B-2930) (applicable only to
5.8 Lot -
the store with night delivery)
5.9 Wall mounted Canopy (if applicable) Lot -
5.10 Barb wire fence (if required) Sq. M -
5.11 Catch Basin Grate Pc -

6 ROOFING SHEET, BENDED ACCESSORIESS & TINSMITRY

Main roof - Twin RIB type, pre-painted red, 0.5mm THK (including stainless steel gutter with screen
6.1 cover and basket strainer, flashing, fascia, hardware & accessories) complete with sealant and other Sq. M -
materials to complete the said work
ADDRESS:
CONTACT INFO:
PROJECT NAME: O!SAVE BULAON SAN FERNANDO CITY PAMPANGA
LOCATION: BRGY. BULAON SAN FERNANDO CITY PAMPANGA
DROPPED PIN: https://goo.gl/maps/fi5KmV2BrVZ9wZmG9
DATE: APRIL 25, 2022
GROUND ZERO CONSTRUCTION
MATERIALS LABOR
ITEM NO. SCOPE OF WORKS UNIT QTY AMOUNT
UNIT PRICE TOTAL UNIT PRICE TOTAL
6.2 Double foil bubble roof insulation, 10 mm thk Sq. M -

SUB TOTAL-B (SUB-STRUCTURE & SUPER STRUCTURE) -


C. PLUMBING WORKS

1 SANITARY / SEWER LINE


1.1 3- Chamber Septic Tank Chamber Assembly (including pipes and fittings) tapped to existing outlet Lot -
1.2 4" dia. Main soil pipe (Atlanta Brand) Lm -
1.3 3" dia. Floor drain pipe (Atlanta Brand) Lm -

2 STORM DRAINAGE LINE


2.1 6" dia. Gutter downspout (Atlanta Brand) Lm -
2.2 12" dia. Concrete pipes Lm -
FCU drain pipes and fittings (1-1/2" dia.); Embedded on walls, Tapped to drainage line / catch basin
2.3 Lm -
(Atlanta Brand)

3 COLD WATER LINE


3.1 1/2" dia. PPR Pipes and Fittings (Belden Brand) Lm -
3.2 1/2" Gate Valve and Check valves (Belden Brand) Pcs -

4 PLUMBING FIXTURES & CABINETRY


4.1 Water Closet Assembly - Push button type (Pozzi Brand Model: Ptt-14529) Set -
4.2 Lavatory Assemby (Pozzi Brand Model: Pwk-2023); Lavatory Faucet (Pozzi Brand Model: 8348-2) Set -
4.3 Stainless Steel Bidet (Pozzi Brand) Set -
4.4 Stainless Steel Grab Bar (40mm dia., 1m length) for water closet - PWD REQUIREMENT Pc -
4.5 6mm thk. Facial Mirror (40cm x 50cm) frameless Pc 1 -
4.6 Stainless Steel Faucet for Mop Sink Lot -
4.7 4''x4'' Stainless floor drain cover with trap for Toilet & Mop sink Set -

SUB TOTAL-C (PLUMBING WORKS) -


D. ELECTRICAL WORKS

2 SERVICE ENTRANCE & GROUNDING (Check Meralco Standards)


2.1 IMC Rough ins, use 40mmØ (with coupling, elbows & service head) Set -
2.2 Grounding rod 16mmØ x 2400mm and ground wire (white) Set -

3 ELECTRICAL PANEL BOARD & CIRCUIT BREAKERS


Panelboard 1-Main CB (80A), 6-Branches (30A) in Nema-1 enclosure with label/tagging - (Himel
3.1 Set -
Brand)
Panelboard with built-in manual transfer switch 2-Main CB (60A), 12-Branches (20A) in Nema-1
3.2 Set -
enclosure with label/tagging (Himel Brand)
3.3 NEMA 3R for Genset Tapping Point(60A) (Himel Brand) Pc -
3.4 NEMA-3R KWHR Meter Disconnecting Mean(120A) (Himel Brand) Pc -

4 CONDUITS & FITTINGS


4.1 Roughing-ins for Main power line use 40mmØ PVC conduit (Atlanta Brand) Lm -
Roughing-in for lightings, C.O., ACU and Auxillary (Data, CCTV, LAN Cable) use 20mmØ PVC
4.2 Lm -
conduit and PVC junction/utility/square box (Atlanta Brand)
4.3 12"x12" Pull Box on each Panelboards Pcs -

5 WIRES
5.1 Wires for Service Entrance 1set (2-30mm² THHN + 1-14mm² THHN) (Philflex Brand) Lm -
Wires from panelboard to disconnecting mean 1set (2-30mm² THHN + 1-14mm² THHN) (Philflex
5.2 Lm -
Brand)
Wires for Emergency Power 1set (2-14mm² THHN + 1-5.5mm² THHN) for Generator set (Philflex
5.3 Lm -
Brand)
5.4 Wires for lighting & power (2-3.5mm² THHN + 3.5mm² THHN) (Philflex Brand) Lm -
5.5 Wires from ACCU breaker to panelboard (2-5.5mm² THHN + 3.5mm² THHN) (Philflex Brand) Lm -

6 SWITCHES & OUTLETS (ROYU BRAND)


6.1 Switches (Wide series white) Pcs -
6.2 Convenience Outlet - Duplex with ground (SMO, Selling, Storage & Pantry) Pcs -
6.3 Convenience Outlet - Duplex with ground in amco box with flexible conduit (for Cashier table) Pcs -
Convenience Outlet - Duplex with ground in amco box (mounted in stainless steel pipe) (for Chest
6.4 Pcs -
freezers)
6.5 Convenience Outlet - Duplex (ceiling mounted for emergency lights) Pcs -
6.6 Convenience Outlet - Duplex with weatherproof cover (porch beside genset box provision) Pcs

7 LIGHTING FIXTURES
7.1 18w T8 4ft. LED - Day Light (Ecolum box type set) Pcs -
7.2 Automatic Emergency Lights LED (Omni Model: AEL-3038) Pcs -
7.3 9w LED Bulb type Daylight (Omni brand) for toilet & canopy Pcs -
7.4 Fire Exit Sign (Backlighted) Pcs -
7.5 100w LED Floodlight Pcs 2 -

8 FANS
12" Ceiling Exhaust Fan (Toilet & Mop Sink) on aluminum flexible duct for branch & PVC pipe for
8.1 Pc -
Main exhaust duct running up to exterior wall with vent grille end cover (Omni Model: XFC-300)
8.2 16" Orbit Fan Banana Type (Storage) (Standard Model: SOF-16B) Pc 1 -

SUB TOTAL-D (ELECTRICAL WORKS) -


E. FINISHES
1 CEILING, CARPENTRY & CLADDING WORKS
600mm x 600mm x 1/2" thk acoustic ceiling boards (Fine Fissured) on powder coated T-runner snap
1.1 Sq. M -
on type with 25mm x 25mm wall angle and hanger rods assembly for selling area
1.2 6mm thick fiber cement board for ceiling of storage area & toilet Sq. M -
1.3 6mm thick fiber cement board for wall of SMO & Storage Area Sq. M -
ADDRESS:
CONTACT INFO:
PROJECT NAME: O!SAVE BULAON SAN FERNANDO CITY PAMPANGA
LOCATION: BRGY. BULAON SAN FERNANDO CITY PAMPANGA
DROPPED PIN: https://goo.gl/maps/fi5KmV2BrVZ9wZmG9
DATE: APRIL 25, 2022
GROUND ZERO CONSTRUCTION
MATERIALS LABOR
ITEM NO. SCOPE OF WORKS UNIT QTY AMOUNT
UNIT PRICE TOTAL UNIT PRICE TOTAL
1.4 PVC Spandrel (white) for porch ceiling Sq. M -
1.5 Aluminum Composite Panel for cladding on façade (Color: Pantone 185 C; Height: 1.2m) Sq. M -

2 DOORS AND WINDOWS


Gauge 20 Galvalume Manual Operated Roll Up Door with Hasp Lock Assembly (provide heavy duty
2.1 Set -
padlock upon turn over)
Automatic sliding door including accessories and mechanism (2 Panel of 12mm tempered clear glass
2.2 Set -
1.80m total width, 2.1m height)
12mm thick, 1.90m height façade clear tempered glass FD100 with powder-coated finish white frame
2.3 Lot -
seated on 0.2m(H) concrete zocalo
6mm thick glass (0.80 x 1.50)m size - One Way Mirror FD100 with powder-coated finish white
2.4 Lot 1 -
frame for Store Manager's Office
2.5 700mm x 2100mm x 50mm thick PVC Door with louver - White (Toilet) Set -
2.5.1 Lockset for toilet - Stainless (Stanley Brand) -
2.6 Sliding Wooden Door (1500mm x 2100mm x 50mm thick Panel Door) - Storage Area Set -
2.6.1 350 x 100 mm Push & Pull handle Stainless -
2.6.2 Heavy Duty Head bolt Chrome Finish -
2.6.3 3mm Stainless kick plate, 0.8m height (Back to Back) -
2.6.4 Single Cylinder Deadbolt (Silver) (Stanley Brand) -
Store Manager's Office Wooden Door - 900mm x 2100mm with Single Cylinder Deadbolt and Door
2.7 Set -
knob (Silver) (Stanley Brand)
2.8 Fire Exit Steel Door - 900mm x 2100mm with panic device & lock Set -

3 FINISHES
3.1 Painting Works
3.1.1 Elastomeric Paint White (Exterior Walls & Toilet Wall) Sq. M -
3.1.2 Elastomeric Paint Gray (Exterior side of zocalo & porch step) Sq. M -
3.1.3 Elastomeric Paint Red & White stripes (Pylon pedestal) Sq. M -
3.1.4 Semi Gloss White Latex Paint Finish (Interior Walls) on white skimcoated wall Sq. M -
3.1.5 Flat White Latex Paint Finish (Toilet & Storage Ceiling) Sq. M -
Painting Works for Parking lines (Yellow), PWD Sign (Handicapped Blue), and Wheelstopper
3.1.6 Sq. M -
(Traffic Paint - Yellow and Black); Aqua epoxy
3.1.7 Nippon Paint Slate Finish Clear - Gloss (3 coats) for Storage and Porch Area Sq. M -
3.1.8 Waterproofing of walls for Toilet and Mop Sink Sq. M -

3.2 Tiling Works


3.2.1 400x400mm Granite tiles - Selling Area Sq. M -
Toilet Wall Tiles: Mariwasa, 30cm x 30cm Madison White VFT (L2, 041421) 1.5m height from
3.2.2 Toilet FFL and Toilet Floor Tiles: Mariwasa, 30cm x 30cm Chandon Porfido Matte (M3, 03214) - Sq. M -
Same Wall & Floor Tiles for Mop Sink
3.2.3 PVC Tile Corner Trim-White for Toilet & Mop Sink Lm -

SUB TOTAL-E (FINISHES) -


F. OTHER ITEMS
1 Mop Hooks Set 1 -
2 Tarpulin Hooks Pcs 4 -
3 Archive Folder Shelve Pc 1
4 Permits, Plans, Supplier Quotes in Hard bound Pc 1

SUB TOTAL-F (OTHER ITEMS) -


TOTAL -
VAT
GRAND TOTAL
OWNER SUPPLY MATERIALS

1 AIRCONDITIONING WORKS
1.1
1.2
1.3
1.4
2 CCTV WORKS
2.1
3 SIGNAGES
3.1
3.2
4 AHT Chest Freezers
5 Cashier Tables
6 Packing Tables
7 Carton Cage
8 Tables and Chairs at SMO and Pantry
9 Generator Set
10 Gondolas
11 Trash Bins
12 Grocery Baskets and Pushcarts
13 Safety Vault
14 Pallets

SUPPLIERS
Automatic Sliding Door

Stainless Steel Pushcart Barrier, Chest Freezer Guard & Retractable Entrance
WNER SUPPLY MATERIALS

AIRCONDITIONING WORKS
3.0HP Wall mounted Inverter – DAIKIN DSMART QUEEN SERIES; Model:
FTKC71TVM/RKC71TVM
Fabrication and installation of brackets and supports
Installation of ACCU breaker
Wires from FCU to ACCU
CCTV WORKS
CCTV cameras, wires, DVR, monitor and CCTV Cabinet
SIGNAGES
Pylon Signage (1.5 x 1.5)m and Pylon post (8m)
Front Signage of Osave (3.5 x 1.0)m
AHT Chest Freezers
Cashier Tables
Packing Tables
Carton Cage
Tables and Chairs at SMO and Pantry
Generator Set
Gondolas
Trash Bins
Grocery Baskets and Pushcarts
Safety Vault
Pallets

UPPLIERS
Automatic Sliding Door
GOLDEN AMBERSKY GLASS AND ALUMINUM
Contact Person: Mary Joy Sunga
Contact Number: 0926 5067252
Stainless Steel Pushcart Barrier, Chest Freezer Guard & Retractable Entrance
SHINRAI METAL INCORPORATION
Contact Person: Ryan Carriaga
Contact Number: 09778420577
QTY UNIT
5 Sets
1 Lot
5 Pcs
1 Lot

1 Lot

1 Lot
1 Lot
3 Pcs
2 Pcs
1 Lot
1 Pc
1 Lot
1 Pc
1 Lot
1 Lot
1 Lot
1 Pc
1 Lot
ALPHALAND MAKATI TOWER, INC.
17th Floor, Tower 6789, Ayala Ave., Makati City

BILL OF QUANTITIES- Ground Zero


ITEM NO. SCOPE OF WORKS MATERIALS LABOR OTHERS AMOUNT

UNIT QTY UNIT PRICE TOTAL UNIT PRICE TOTAL


A. GENERAL REQUIREMENTS / PRELIMINARIES
1 Mobilization and Demobilization LOT - - -
2 Permit and Clearances - Design including Sign and Seal LOT - - -
a. Barangay Clearance - Barangay and/or Village Homeowners Association (HOA) for Business
Permit for PUREMART (whichever are warranted)
b. Building Permit
c. Land Use and Zoning Clearance
d. Demolition Permit
e. Plumbing / Sanitary Permit
f. Electrical Permit
g. Signage Permit
h. Fires Safety Inspection Certificate (FSIC) including necessary requirements
h.1. Fire Extinguisher
h.2. Fire Alarm
h.3. Smoke Detector (minimum of 2 sets)
h.4. Fire Exit Sign
i. Certificate of Final Electrical Inspection
j. Certificate of Completion
k. Occupancy Permit
Relocation ot Plan (signed by Geodetic Engr.) including topographic plan and section with monument
3 LOT - - -
(muhon) on site
4 Temporary board up / enclosure LOT - - -
5 All necessary utilities, power and water supply during construction LOT - - -
Meralco Temporary Power - single phase, 230V - 150 Amperes Deposit and Processing with all
6 LOT - - -
necessary requirements
Eight (8) sets of As Built Plan working CAD File (CD) and signed and sealed (per perspective trades)
7 LOT - - -
blue print copies delivered to Puremart main office
8 Gantt Chart Tarpaulin (1.00mHT x 2.00mW) LOT - - -
Whole set of working Drawings (Arch'l, Electrical, Mechanical, Plumbing & Structural) - signed and
9 LOT - - -
Sealed
SUB TOTAL 1 (GENERAL REQUIREMENTS) 0.00

B. SUB-STRUCTURE & SUPER STRUCTURE

1 DEMOLITION & SITE CLEARING WORKS LOT - - -


a. Demolition of existing fence wall
b. Site clearing and hauling of excess debris

2 EARTHWORKS
a. Excavation / backfill and compaction Cu. M - - -
b. Site fill and compaction (aditional backfilling) Cu. M - - -

3 FORMWORKS & SCAFFOLDING Sq. M - - -


a. Formworks and scaffolding

4 GRAVEL BEDDING
a. to column footing; 50mm thk Cu. M - - -
b. to wall footing; 50mm thk Cu. M - - -
c. to slab on-fill; 100mm thk Cu. M - - -
d. to footing tie beam; 50mm thk Cu. M - - -

5 REBAR WORKS
a. to Column Footings Kgs - - -
b. to Columns Kgs - - -
c. to footing tie beam & wall footing Kgs - - -
d. to beams & girders Kgs - - -
e. Slab on Grade 10mmØ at 300mmO.C.B.W. (Building Area) Kgs - - -
f. Concrete pad for Safe Box Deposit Vault Kgs - - -

6 CONCRETE WORKS
a. to Column footings Cu. M - - -
b. to Columns Cu. M - - -
c. to Wall footings Cu. M - - -
d. to Footing Tie Beam Cu. M - - -
e. to Beams & Girders Cu. M - - -
e. Slab on Grade Building Area (100mm thk, 3000psi) Cu. M - - -
f. Concrete pad for Safe Box Deposit Vault; including steel door, 3-16mm dia. Barrel bolt and
Cu. M - - -
padlock
g. Mop Sink including tiles with 0.60m high tile above mop sink Cu. M - - -

7 MASONRY WORKS
ALPHALAND MAKATI TOWER, INC.
17th Floor, Tower 6789, Ayala Ave., Makati City

BILL OF QUANTITIES- Ground Zero


ITEM NO. SCOPE OF WORKS MATERIALS LABOR OTHERS AMOUNT

UNIT QTY UNIT PRICE TOTAL UNIT PRICE TOTAL


a. 5" thick non-load bearing CHB walls including rebars for exterior wall Sq. M - - -
b. 4" thick non-load bearing CHB walls including rebars for interior walls Sq. M - - -

c. 4" thick non-load bearing CHB walls including rebars for fixed glass panel zocalo (front façade) Sq. M - - -

d. Plastering works ( interior & exterior walls) Sq. M - - -

8 STEEL WORKS
a. Main Roof - Steel Truss / Rafter type assembly (including purlins, sagrods and cross brace) with
Kgs - - -
primer
b. ACCU Cage (angle bar framing with round bar support) with redoxide primer; final painted white Kgs - - -
c. Perimeter Firewall Kgs - - -
d. Monkey ladder at wing wall for aircon
9 ROOFING SHEET & BENDED ACCESSORIESS & TINSMITRY
a. Main roof - RIB type, pre-painted, 0.5mm THK ( including gutter, flashing, fascia, hardware &
Sq. M - - -
accssories, delivery fee)
b. Double Foil, single bubble roof insulation, 10 mm thk Sq. M - - -

SUB TOTAL 2 (SUB-STRUCTURE & SUPERSTRUCTURE) 0.00

C. PLUMBING WORKS

1 SANITARY / SEWER LINE


a.1. 3- Chamber Septic Tank Chamber Assembly (including pipes and fittings) tapped to existing
LOT - - -
outlet
a.2. PVC Pipes and Fittings (6"Ø main) LOT - - -
a.3. Floor Drains (3"Ø pipe) LOT - - -
a.4. Floor Drain Cover PCS - - -

2 STORM DRAINAGE LINE LOT - - -


b.1. Catch basin tapped to existing outlet (400mmL x 400mmW x 400mmH)
b.2. PVC Downspout and fittings including hangers (3"Ø downspout)
b.3. Aircon, PVC Pipes and fitting drain for ACU (1 1/2"Ø); Tapped to Drainage Line / with catch
basin (if applicable)

3 COLD WATER LINE LOT - - -


c.1. PPR Pipes and Fittings (ATLANTA/EMERALD BRAND) including hangers - 1 1/2"Ø

c.2. Gate Valve and Check valves


c.3. Calibrated Water Meter 50mm diameter with certificate from NWRB

4 PLUMBING FIXTURES
d.1. Water Closet Assembly - Push button type (Hcg brand) UNIT - - -
d.2. Lavatory Assemby including faucet Counter Type (Hcg Brand) UNIT - - -
> Soap Holder UNIT - - -
> Tissue Holder UNIT - - -
d.3. Stainless Steel Bidet Shower Faucet UNIT - - -
d.4. Stainless Steel Grab Bar (40mm dia., ss 304, 1m length) for water closet and urinal - PWD
UNIT - - -
REQUIREMENT
d.5. 6mm thk. Facial Mirror (60cm x 90cm) on 6mm thk plywood backing UNIT - - -

d.6. "FOOD SERVICE" 400x500mm Stainless Sink Assembly including ss gooseneck faucet UNIT - - -

> Grease Trap Stainless Steel 5 GPM UNIT - - -


d.7. Mop Sink including tiles with 0.60m high tile above mop sink UNIT - - -
d.8. SS Hose bibb - (0.70m high) - for toilet UNIT - - -
d.9. SS Faucet - (0.70m High) - for mop sink UNIT - - -
d.10. Urinal (Hcg Brand or Pozzi Brand) UNIT - - -

SUB TOTAL 3 (PLUMBING WORKS) 0.00

D. ELECTRICAL & AUXILIARY WORKS

1 METER CENTER LOT - - -

2 SERVICE ENTRANCE & GROUNDING LOT - - -


2.1. RSC Conduits Rough ins, use 50mmØ (with coupling & elbows)

2.2. Copperweld (Grounding) 16mmØ x 2400mm - wire grounding on terminal log

3 ELECTRICAL PANEL BOARD & CIRCUIT BREAKERS LOT - - -


3.1 Panel Board 12 branches, Ga. 18, (w/o MTS)
3.2 Panel Board 12 branches, Ga. 18, (with MTS)-Emergency Panel
3.3 NEMA 3R ( 30Amps, 40Amps ) - For Aircon Power Supply Porvision on Fire Wall

4 CONDUITS & FITTINGS LOT - - -


4.1. Roughing-in (EXPOSED with clamp for PVC pipes and fittings) lightings, c.o., ACU and
Auxillary (tel data, CCTV and Speaker System), use 20mmØ PVC conduit / boxes - use 16mm PVC
Junction Box
4.2 Wire Runners on 200 mm wide x 5mm thick C-Purlins as/ Cable Tray
4.3. 2 -12" x 12" Pull Box on Each Panel Boards
5 WIRES
ALPHALAND MAKATI TOWER, INC.
17th Floor, Tower 6789, Ayala Ave., Makati City

BILL OF QUANTITIES- Ground Zero


ITEM NO. SCOPE OF WORKS MATERIALS LABOR OTHERS AMOUNT

UNIT QTY UNIT PRICE TOTAL UNIT PRICE TOTAL


5.1. Wire (Phelp Dodge) for Service Entrance (2-80mm² THWN; 1-14mm² THHN) LM - - -
5.2. Wire (Phelp Dodge) for Emergency Power - GENSET (OSM) (2-30mm² THWN; 1-14mm²
LM - - -
THHN)
5.3. Wire (Phelp Dodge) for lighting (2-3.5mm² THHN + 2.0mm² THHN) LM - - -
5.4. Wire (Phelp Dodge) for ACU; 2-5.5mm² THHN + 3.5mm² THHN LM - - -

6 SWITCHES & OUTLETS (PANASONIC BRAND)-As Per Electrical Plan


6.1 One-gang Switch (Panasonic Brand) PCS 2 - - -
6.2 Two-gang Switch (Panasonic Brand) PCS 2 - - -
6.3 Three-gang Switch (Panasonic Brand) PCS 7 - - -
6.4 Convinience Outlet Wall - Duplex with Ground ( For All Outlets ) PCS 20 - - -
6.5 Floor Pop Up (Panasonic Brand) (Duplex with ground) PCS 10 - - -
6.6 Twistlock Outlet( For ATM and Genset Tapping Point ) PCS 3 - - -

7 LIGHTING FIXTURES (OSM) - Installation Only


7.1. T8 LED Lights Warm White ( Selling Area ) PCS - - -
7.2. 36w Omni Light ( Porch Area ) PCS
7.3. Emergency Lights ( Selling Area & Storage Area ) PCS 6 - - -
7.4. 6" Pinlight ( Front Drop Ceiling & Chiller Area ) PCS 4 - - -
7.5. Adjustable Pinlight ( Cashier Area ) PCS 8 - - -
7.6. Pendant Lamp( Table Area & Vegetable Area ) PCS 6
7.7. Wall Light ( Exterior Column Porch Area ) PCS 4
7.8. LED Flood Light- Bolted on Wingwall ( Parking Area ) PCS 4

8 OTHER ITEMS (OSM) - Installation Only


8.1. Air Curtains ( Entrance ) PCS 2
8.2. Exhaust Fans ( Chiller Area, Storage & Comfort Room ) PCS 7

SUB TOTAL 4 (ELECTRICAL WORKS) 0.00

E. FINISHES

1 PARTITION, CEILING WORKS AND CARPENTRY WORKS


a. 6mm thick fiber cement board "DOUBLE" wall partition (HARDIFLEX) on 64mm vertical and
Sq. M - - -
horizontal metal studs for storage room partition wall
b. 1/2" thk acoustic ceiling boards on T-runners with hanger rods assembly for selling area Sq. M - - -
c. 10 mm THK moisture resistant gypsum board on light metal framing at seling areas for drop
Sq. M - - -
ceiling @ selling and storage area

e. 6mm thick fiber cement board ceiling on 64mm metal furring for vanity area and toilet area Sq. M - - -

e. 250 mm width PVC Ceiling panels on J-channel CYPRESS finish for porch ceiling Sq. M - - -

2 DOORS AND WINDOWS

a. Gauge 24 Galvalume Manual Operated Roll Up Door with Hasp Lock Assembly

a.1. Gauge 24 Galvalume Manual Operated Roll Up Door with Hasp Lock Assembly (4500mmx275 SET - - -
a.2. Gauge 24 Galvalume Manual Operated Roll Up Door with Hasp Lock Assembly (4600mmx275 SET - - -
a.3. Gauge 24 Galvalume Manual Operated Roll Up Door with Hasp Lock Assembly (4500mmx275 SET - - -
b. Entrance Door - double leaf 1800mm x 2100mm x 10mm thick clear safety / tempered glass
SET/S - - -
(framed - white), including 1m chain and padlock
c. 10mm thick clear ordinary fixed glass on 50x100mm Aluminum Frame (powder coated finish
LOT - - -
white) seated on concrete zocalo
d. 800mm x 2100mm x 50mm thick Panel Door (Toilet), Lever type door knob/Handle and Barrel
Bolt with Hydrolic Hinges with 3mm thk kick plate and push plate w/ overhead door closer (Hafele SET/S - - -
Brand)
e. 800mm x 2100mm x 50mm thick Semi-Panel Door (Storage) with dead bolt complete accessories
with Hydrolic Hinges with 3mm thk kick plate and push plate w/ overhead door closer (Hafele SET/S - - -
Brand)
e.2. SS Door Handle SET/S - - -

3 FINISHES
a. Painting Works
a.1. Elastomeric Paint (Firewall, Toilet Lower Wall and Mop Sink) -DAVIES SR-0103
Sq. M - - -
WHITEWASH
a.2 Semi Gloss Latex Paint Finish (concrete and drywalls) - Primer, putty with 2 coats - DAVIES
Sq. M - - -
MCS - 0103 BRIDAL WHITE
a.3 Flat Latex Paint Finish (Ceiling) - Primer, putty with 2 coats - Boysen White Sq. M - - -
a.5. Interior Painting (depends on approved color) - primer, putty with 2 coats - Boysen Sq. M - - -
a.6. Façade Zocalo Painting - primer, putty with 2 coats - Boysen Sq. M - - -
b. Tiling Works

b.1. 600x600mm Macciso Perla granite floor tiles - for Selling Area & Storage Room Sq. M - - -

b.2. 600x600mm VEGAS BEIGE granite floor tiles - for Selling Area Accent flooring

b.2. Toilet Area Wall (300mmx600mm PARIS WHITE & AUTUMN MAFLE) and Floor Tiles -
(300x300mm MATT SWISS RISER) - Note: wall tiles - 2400mm high from FFL and rest shall be Sq. M - - -
plaster painted finish
ALPHALAND MAKATI TOWER, INC.
17th Floor, Tower 6789, Ayala Ave., Makati City

BILL OF QUANTITIES- Ground Zero


ITEM NO. SCOPE OF WORKS MATERIALS LABOR OTHERS AMOUNT

UNIT QTY UNIT PRICE TOTAL UNIT PRICE TOTAL


c. Waterproofing Works (for concrete gutter / Toilet / Storage Mop Sink / Firewall); if applicable LOT - - -

SUB TOTAL 5 (FINISHES) 0.00

F. OTHER ITEMS
a. H2O pressure leak test at 60 PSI LOT - - -
b. Electrical Megger Test LOT - - -
c. 48 Hours waterproofing leak test (at least 300mm high from wall) for toilet and mop sink LOT - - -
d. Hanger Rod for Banners (using emt pipe, angle bar or flat bar, bolted on parapet wall) LOT - - -
e. Ceiling Exhaust Fan including electrical works (for storage room, chiller, freezer and Toilet) Omni LOT - - -
f. Portable Water Testing LOT - - -

SUB TOTAL 6 (OTHER ITEMS) 0.00

G. PORCH AREA

1 EARTHWORKS
a. Excavation / backfill and compaction Cu. M - - -

2 FORMWORKS & SCAFFOLDING Sq. M - - -


a. Formworks and scaffolding

3 GRAVEL BEDDING
a. to column footing; 50mm thk Cu. M - - -
b. to wall footing; 50mm thk Cu. M - - -
c. to slab on-fill; 100mm thk Cu. M - - -

4 REBAR WORKS
a. to Column Footings Kgs - - -
b. to Columns Kgs - - -
c. to footing tie beam, beam & wall footing Kgs - - -
d. Slab on Grade 10mmØ at 300mmO.C.B.W. (Porch Area) Kgs - - -

5 CONCRETE WORKS
a. to Column footings Cu. M - - -
b. to Columns Cu. M - - -
c. to Wall footings Cu. M - - -
d. to Footing Tie Beam Cu. M - - -
e. to Beams & Girders Cu. M - - -
e. Slab on Grade Porch Area (100mm thk, 3000psi) Cu. M - - -
f. Concrete Pad for Genset Pad Cu. M - - -

6 MASONRY WORKS
a. 5" thick non-load bearing CHB walls including rebars for exterior wall Sq. M - - -
b. Plastering works ( interior & exterior walls) Sq. M - - -
c. Pebble washout finish for ramp (top and side) and Porch stairs (Step Nosing) LM - - -

7 STEEL WORKS
a. Main Roof - Steel Truss / Rafter type assembly (including purlins, sagrods and cross brace) with
Kgs - - -
primer
b. ACCU Cage (angle bar framing with round bar support) with redoxide primer; final painted white Kgs - - -

c. Wire Mesh (3mmx50mmx50mm) with angle bar (3mmx50mmx50mm) for inside ceiling area Kgs - - -
d. Steel Frame for exterior signage (signage - OSM) Kgs - - -
e. 40mm dia. Stainless Steel - (SS 304) Handrail for Porch and Steps LOT - - -
f. Genset Cage (see details), if necessary LOT - - -
g. LED Arm (see detail) LOT - - -

8 ROOFING SHEET & BENDED ACCESSORIESS & TINSMITRY


a. Main roof - RIB type, pre-painted, 0.5mm THK ( including gutter, flashing, fascia, hardware &
Sq. M - - -
accssories, delivery fee)
e. Double Foil, single bubble roof insulation, 10 mm thk Sq. M - - -

9 WIRES
a. Wire (Philflex) for lighting (2-3.5mm² THHN + 2.0mm² TW - PHELPS DODGE LM - - -

10 LIGHTING FIXTURES
7.1 Troffer lights, recessed type (OSM) and Labor for installation and wiring by contractor PCS - - -
7.2 50 Watts LED Flood Light (Outdoor) - (OSM) and Labor for installation, bracket and
PCS - - -
wiring by contractor (see details)

11 PARTITION, CEILING WORKS AND CARPENTRY WORKS


a. Pvc Panel with metal furring for Porch Area (8'x9.5') Sq. M - - -
b. Aluminum composite cladding on façade Sq. M - - -

12 FINISHES
a. Painting Works
a.1. Elastomeric Paint Firewall Sq. M - - -
b. Tiling Works
b.1. 45 x 45 rustic floor tiles for porch area Sq. M - - -
ALPHALAND MAKATI TOWER, INC.
17th Floor, Tower 6789, Ayala Ave., Makati City

BILL OF QUANTITIES- Ground Zero


ITEM NO. SCOPE OF WORKS MATERIALS LABOR OTHERS AMOUNT

UNIT QTY UNIT PRICE TOTAL UNIT PRICE TOTAL


b.2 25 x 40 Narbonne Blanco (Porch Column)
SUB TOTAL 7 (SITE DEVELOPMENT/ PARKING AREA) -

H. SITE DEVELOPMENT / PARKING AREA

1 EARTHWORKS Cu. M - - -
a. Excavation / backfill and compaction

2 FORMWORKS & SCAFFOLDING Sq. M - - -


a. Formworks and scaffolding

3 GRAVEL BEDDING
a. footing; 50mm thk Cu. M - - -
b. wall footing; 50mm thk Cu. M - - -
c. slab on-fill; 100mm thk (Parking Area) Cu. M - - -

4 REBAR WORKS
a. Meralco Service Entrance Pole & Footing Kgs - - -
b. Sinage Pole Pedestal & Footing Kgs - - -
c. Parking Area Sog 10mmØ at 400mmO.C.B.W. Kgs - - -
e. Column & Footings Kgs - - -
f. Wall footings Kgs - - -

5 CONCRETE WORKS
a. Parking (150mm thk, 3000 PSI) Cu. M - - -
b. Meralco Service Entrance Pylon Cu. M - - -

c. Signage Pole Pedestal & Footing including 4-16mm anchor bolt (0.60m length) and base plate Cu. M - - -

6 MASONRY WORKS

a. 5" thick non-load bearing CHB walls including rebars for exterior wall (Perimeter Fence) Sq. M - - -
b. Plastering works (Exterior Walls) Sq. M - - -
c. Plain cement finish for parking, PWD ramp and sidewalk Sq. M - - -
d. Car Wheel Stopper for Parking PCS - - -

7 FINISHES
a. Painting Works
a.1. Elastomeric Paint (Porch Area and Perimeter Fence) Sq. M - - -
b. Painting Works for Parking Slots, PWD Sign and Wheelstopper (Boysen Traffic Paint - Yellow /
Sq. M - - -
Black / Blue)

8 OTHERS
a. Genset Tap - including NEMA 3R) LOT - - -
b. Alarm LOT - - -
c. Razor wire above perimeter fence (2.50 M high) at right and left side ROLLS - - -

SUB TOTAL (SITE DEVELOPMENT/ PARKING AREA) -

TOTAL CONSTRUCTION COST -


NOTE: ALL BIDDERS ARE ADVISED TO STRICTLY FOLLOW BOQ FORMAT BY THE COMPANY, ANY ALTERATION THAT SEEMS RELEVANT SHALL BE IN BLUE ITALIC FONT. GANTT CHART SHALL BE SUBMITTED TOGETHER
WITH THE BOQ.

OSM ITEMS: CCTV


AIRCONDITIONING UNIT (ACU)
SPEAKERS
LIGHTING FIXTURES
STORE SIGNAGES
GENSET UNIT

DURATION 60 CALENDAR DAYS