The Client The Contractor

E0001 – PACKAGE 2S
Railway Integration and System

Inspection and Testing Request


ITR Revision
Inspection Request No.: E0001-S02-GQC-IR-22907 00
Number:
Inspection Date: 29 September 2022 Inspection Time: 10.30 a.m
Reference no. Rev Status
Inspection Request Information and Receipt by the Engineer

Method Statement E0001-S02-GCX-PM-00020 00 Code 1


ITP E0001-S02-GQA-PN-00019 01 Code 1
Documents
References

E0001-FJP-GCX-DS-90038 AA Under Review


Drawing

Material Approval N/A Choose Status


Others N/A
Contact Person: Engg.Ganesh Mobile No: 0566882991
Details of Inspection
Test/Inspection Stage Installation Testing and Commissioning (T&C)
Power Supply and
Civil Earthing and Bonding
Distribution System
Discipline/ Subsystem: MEP Signalling ICSS
APS Telecommunication Other (Specify)
2B ICD - Industrial City Abu Dhabi Spur
Package 2B Line Section
Site Name Shelter - ICD01 Chainage ICAD(Ch.S3+400 to Ch.S3+800)
Inspection Point Hold Point Witness Point ITP Item Number 2.2
Item to be inspected:
Detailed description as per ITP
Survey setting out-Marking of locations for package 2B MV Cable Internal ring,Quantiy=400m
Inspection Requested By
Name Date / Time Designation Signature
Project (IR Raised By STS/
Engg. Ganesh 28-09-2022 Subcontractor)
Engineer
Inspection Requested Approved By (STS)
Section Name Date / Time Designation Signature
QC Department Arnold 28-09-2022 QA/QC Engineer
ITR Approval by STS

Survey Department
(If Applicable)
Rail Systems Interface
(if required)
STS Comments:
Comment reviewed & closed
(signature and date)

The Work Activity described here has been checked by the Contractor in accordance with Exhibit D, Part 1, Appendix 13.0, Section 6.0, where the contractor shall
plan, perform and record all QUALITY CONTROL activities to ensure that all work is performed in accordance with the QMS documentation reviewed by the
Engineer and in compliance with the requirements of the Contract.
This is to certify that the above referenced work/activity has been inspected and/or witnessed by the Engineer .
Inspection Conducted By (The Engineer’s Representative)
Name:
Approved
Designation:
Approved With Comments
ITR Approval by The Engineer

Date / Time:
Rejected
Signature:

Comments:
Declined
Reason to Decline:
The minimum quota of inspection/witness points required to be
attend by the Engineer has been exceeded, the ITR will be declined by
the Engineer

Others (specify): Comment reviewed & closed


(signature and date)

Template No: E0001-S02-GQC-WX-00002 Rev. 01 Date Issued: 02Jun-21


GENERAL SURVEY CHECKLIST
Location : ICAD(Ch.S3+400 to Ch.S3+800) ITR NO. E0001-S02-GQC-IR-22907

Element: MV Cable Internal ring Date of Inspection : 29-09-2022

Inspection result
SN. Inspection phase description Remarks
Yes No N/A
ACTIVITIES

1 Surveyor's qualification had been provided.

Survey Equipment is in good working condition & has valid ✓


2
calibration Certificates

3 General Survey Work carried out as per Method Statement


4 Permanent / Government Bench marks protected.

Approved Temporary Bench mark / Control Points are ✓


5
secured, maintained & protected.

6 Survey Report verified.

Remarks:

Subcontractor STS Construction STS QC The Engineer (optional)


Name Eng.Ganesh

Signature

Date 29-09-2022

UNLESS SPECIFIED OTHERWISE, THIS PRINTED COPY OF THIS DOCUMENT IS UNCONTROLLED AND FOR REFERENCE PURPOSE ONLY
E0001-S02-GQC-WX-00013-00 Page 1 of 1
SURVEY & SETTING OUT CHECK REPORT
ITR No. E0001-S02-GQC-IR-22907 Date & Time 29-09-2022 & 10.30A.M

Ref. Drawings E0001-FJP-GCX-DS-90038-AA Station Identification Co-ordinates Levels

284166.776
Structure Identification 2B INTERNAL MV CABLE Set Station B62 42.959
2724271.193
CHANAGE Ch.S3+400 to Ch.S3+800 282621.811
Reference Station B66 45.980
SHEET NO 1 OF1 2723095.512
Instrument TRIMBLE R8s
COORDINATES
EGL REMARKS
Pt. No. CHAINAGE TITLE East North
1 S 2-650 TRENCH 240265.145 2680868.925 13.292
2 S 2-450 TRENCH 240220.515 2680891.462 11.423
3 S 3-500 TRENCH 240188.069 2680907.543 9.962
4 S 3-600 TRENCH 240099.077 2680953.775 6.898
5 S 3-700 TRENCH 240011.988 2681003.154 5.295
6 S 3-750 PD TRENCH 239970.286 2681023.338 3.423
7 S 3-810 PD TRENCH 239917.312 2681056.882 3.332

APPROVAL JUPITER EMC SQS CONSTRUCTION STS QC JACOBS


NAME.: TAYYAB RAZI
SIGNATURE.:
DATE.: 26/09/2022
INSPECTION AND TEST PLAN
FOR BURIED MV CABLES

Reference Documents Intervention Points


Test / Inspection Requirements
No Activity Description (Drawing / Spec / MS / Frequency Verification Document No.
and Criteria
Standard / Code) SC STS Engineer
The exact line of cable route as per
approved drawing
Survey Report E0001-S02-GQC-
The demarked area for excavation shall be Prior to start of WX-00012-00 + Survey
2.2 Survey Setting Out – Marking of locations As per approved drawing H H W
cleared from any form of surface work Checklist E0001-S02-GQC-WX-
obstructions for excavation such as 00013 + ADDC Approval
buildings, trees, bushes and any other
form of vegetation manually.
Earthworks Checklist E0001-
CAT Scan for existing utilities Method Statement for
Each location S02-GQC-WX-00003 + Buried
2.3 Trial Pit Excavation to check existing utilities Trenching by manual, using spade / hand Earthworks H S S
Prior to excavation MV Cable Checklist E0001-S02-
shovels E0001-S02-GCX-PM-30051
GQC-WX-00023
MIR X0231-S23-GQA-WX-
00013-01 + Material Inspection
Incoming Materials Inspection Exhibit D, Part 1, Appendix 1
Approved or approved with comments Checklist E0001-S02-GQC-WX-
2.4 (Cables, accessories, warning tapes, cable §16 & Relevant approved Each delivery at site H H W
Material Approval Request 00011-00 + Delivery Note +
tiles, route markers, cable tags, etc) Material submittal
Country of Origin + Cable Test
certificate + Approved FAT
 Insulation Resistance & Continuity
Test after Installation & Termination
of Cables
*(Use 1000Vdc IR Voltage and
acceptable value is 1MΩ-1Km or a
min of 1000MΩ for 1 minute)
Cable Testing Checklist E0001-
 VLF test set : Range of frequency 0.01
Method Statement Prior to delivery to S02-GQC-WX-00024 +
Cable continuity and Insulation Resistance to 0.1
2.5 E0001-S02-GCX-PM-00020 site prior to cable H H W Insulation Resistance and
Test on cable drum  VRMS = 3Uo = 3*11 KV / √3 = VRMS =
As per ADDC Specification laying/pulling Continuity E0001-S02-GQC-
13.5 KV
WX-00025
 VPEAK = √2 * VRMS = √2 * 13.5 = 19KV
 Test duration = 15mins

Test passed if no breakdown occurs within


the testing time frame

As per method statement


Selection and Sampling of Filling Materials
2.6 Refer to Method Statement for Earthworks E0001-S02-GCX-PM-30051-00 and ITP for Earthworks E0001-S02-GQA-PN-30051-00
including sand bedding

3 Execution of the Works

UNLESS SPECIFIED OTHERWISE, THIS PRINTED COPY OF THIS DOCUMENT IS UNCONTROLLED AND FOR REFERENCE PURPOSE ONLY
E0001-S02-GQA-PN-00019-01 PAGE 7 OF 15
1 2 3
SHEET - 02
4 5 6 7 8

FOR CONTINUATION REFER SHEET: 02 OF 05


E=239777.067
N=2681188.748
A A
E=239761.064
- The copying, reproduction and use of this work in any form whatsoever
is forbidden without the written authorization of Hitachi Rail STS S.p.A.

N=2681198.891
© Property of Hitachi Rail STS S.p.A, 2020, all rights reserved.

E=239760.083
N=2681199.511

E=239757.907
N=2681200.874

E=239755.184
N=2681202.689
E=239750.416
N=2681205.689
E=239743.345

AF
E=239696.062

GH
Q
N=2681210.198 N=2681240.16
E=239733.529
B B

AF
N=2681216.368

GH
Q
E=239731.018
N=2681217.991

AF
GH
Q
E=239722.828
N=2681223.21

AF
AF

GH

DU
ADMC FUTURE DUCT

GH

D
Q

TU
EL
EC
E=239698.667

OM
AF
GH
N=2681238.63

AD
QAFG

D
AF

C
DDU
H

W
GH

AT
Q

TE

ER
E=239719.527

LE
CO
M
N=2681225.345

AF
GH

AD
DU

AF
QAFG

DC
ETISALAT FUTURE DUCT

GH
AF

W
DU
H

Q
GH
E=239713.227

AT
Q

TE
S 3-600 EGL

ER
LE
S 3-500 EGL N=2681229.249

CO
S 3-700 EGL

M
EGL:6.898

AF

DU
EGL:9.962

HQAF G

AD

AF
E:240099.077 EGL:5.295

DC
S 3-810 EGL

GH
E=239705.875

AF
E:240188.069

GH

W
DU
S 3-750 PD EGL

Q
GH
E=239872.319

AT
N:2680953.775 E:240011.988
C C

TE
Q
EGL:3.332

ER
N:2680907.543 N=2681233.973

LE

ET
EGL:3.423

COD
N=2681084.067

AF FGH A
N:2681003.154

IS
AL
E:239917.312

GH Q FG

MU
A

AT
Q
E:239970.286

AD
S 2-450 EGL E=239896.676

AF
N:2681056.882 E=239703.339

DC

GH
S 2-650 EGL

AF
N:2681023.338 E=239772.564 E=239771.091

W
DU
HQ

Q
GH
EGL:11.423 N=2681067.986

AT
N=2681235.558

TE
Q

E
EGL:13.292

R
LD

ET
N=2681152.365 N=2681150.042

ECU
AF FGH A
E:240220.515

IS
OM

AL
GH Q FG
E:240265.145

AT
Q
N:2680891.462

AD

AF
E=240305.322 N:2680868.925

D
E=239834.529

GH
C
AF

SE
62.63m

W
DU
HQ

Q
GH

AT

W
N=2680845.56

DTEU
Q
N=2681109.941

ER
LE

ET
CO
AF FG A

IS
AL
GH HQ FG

M
A

A
Q
o o o o o o o o o o o o o o o o o o o

T
AD

AF
D

SE
GH
C
AF
C1

DDUU

W
Q
HQ
G

AT

ET
HQ

TE

ER

IS
E=240305.307

LE
o

AL
ET
GH
CO
AF FG A

AT
IS
o

A
GH HQ FG

Q
A

LA
N=2680846.008 o o

Q
o

T
o

6m
o

AD
C1

SE
o

AF
o

DU

ET

ET
GH

W
o

C
E=239775.777

IS

IS
FG

DU

Q
HQ
o

AL

A
E=239873.96

AT

E
H

LA
TE

TIS

AT
Q
o

ER

T
N=2681157.432

LE

AL
ET

T
o

EL
CO
5.98m

AF FG A
N=2681086.451

A
IS
GH

T
o

AL
M
GH HQ FG
A

AT
o

IRR
Q

T
Q

SE

EL
E=239790.312

DU

AD
o

AF

W
DC

ET
GH
o
E=239877.35

TE
A

IS
N=2681180.356

L
FG

DU

IRR
o
E=239878.28

Q
HQ

AL
AT

ET
HQ

TE

ETEL
AT
E

IS
N=2681091.378

T
R
LE

IS
AL
ET
N=2681124.578

AL TE
CO
E=239841.224

AF AFG A

AT
IS

IRR
AT L
D D

LV
AL
M
GH HQ FG

DU

SE
GH
A
Q

W
N=2681160.507

Q
E=239891.418

AD

AF

IRR
DC

TE
E
S 2+656 S 3+500 S 3+600 S 3+800

GH

L
TIS
3+500 3+600 3+700

AF
S 3+700

DU

Q
N=2681111.768

HQ
GH

AL
S 3+400

AT
S 2+600

LV
TE

TIS

ET
AT

TE
Q
27.17m

IRR
L
R
LED

IS
AL
ET

AL TE
E=240320.996

COU
AF AFG A

AT
IS

SE
S 4+200

ATL
AL
M
GH HQ FG

W
AT

IRRLV
GH
Q
N=2680873.615

A
S 4+100

AF
DD

TE
Q
S 4+200 E=239893.539

L
ET
S 3+900 S 4+000

GH
S 3+800

C
E=239897.655

AF

IS
DU

IRR
HQ
GH

A
AT

TE
ET

LA
N=2681114.903

TE

L
ET
S 3+700

ER
DLU

IS
N=2681138.408

IS
AL
ET
EC

SE

ATLEL
AF AFG A

AT
I

LV
IRR
OM

SA

A
GH HQ FG

T
LA
Q

T
E=240042.61 E=239891.426

GH

T
AD
4.58m

4.65m

EL

IRR
o

E
Q
C

TIS
AF
o
N=2681128.703

DD

W
N=2681071.266

TE
HQ

AF
GH

UU

A
8W

AT

L
ET

LA
o

TE

E
GH
Q

ER

IS
SE

TIS

IRR
LE

AL
Q
o

ET

TE
W

AL L
CO
AF AFG

AT
I
E=239788.244

SA
o

SL
M
GH H AFG

T
AT L
o

IRR
Q Q

TE
L
01

AD
o N=2681193.991

GH
F 13
16 14 27

DC
16 F

ET
FROM ISS ICAD TO
19 GMC07

D
XLPE AL. 11kV U/G CABLE
20 PROPOSED 3CF x 150 sq.mm
F
FROM GMC-06 TO ISS
o

AF

TE
ICAD IV
XLPE AL. 11kV U/G
Outgoing Feeder

Incoming Feeder

Aux Trasformer

Q
Outgoing Feeder

CABLE
Incoming Feeder

PROPOSED 3C x 150
Outgoing Feeder

Outgoing Feeder
Capacitor Bank /

IS
Harmonic Filter

Bus Coupler

sq.mm
SPARE

U
Bus Riser

Feeder

W
DU

L
SPARE

1
1
2
2

F
3
4

FROM ISS ICADIV TO


ICAD 01

IRR
XLPE AL. 11kV U/G CABLE

HQ
o

AF
PROPOSED 3C x 150 sq.mm

G
16 16

AL
08 09

AT
F

ET
SE
HQ
28
23 INSIDE SUBSTATION

TE
F
TERMINATION -1NOS 10M CABLE LOOP AT

GH

AT

ET
11KV CABLE
26 25 24

ER
PROPOSED TERMINATION -1NOS
F F
11KV CABLE

IS
INSIDE SUBSTATION
PROPOSED
10M CABLE LOOP AT
07

W
E=240323.942

TE
LE
1470.0000

IS
17 06 05
o o

A
12

ET
oo
F

L
F F
MV F F
10
LV

SL
03

LA
E=239772.118
04

CO

AL
MV LV 11

AF AFG

IS

IRR
18

C1

T
F

AT
M

AL
GH H
o
N=2680878.814

TE
AT
o

L
o o o o o o o o

Q Q
o N=2681204.171

AD
o

DU

IRR
DC
AF

ET
o

TE
o o o

GH

L
E=239905.533

AF

GH

IS
W
DU

SE
Q
AF
G

AL
A

ET
Q
HQ

TE

W
TE

GH

A
TE

SL
I

T
C1

IRR
L
SA
R
N=2681150.884

LE
E=239855.386

ET

L
CO
AF AFG

AT
IS
E=240214.974

TE
M

AL
GH H

L
62.63m N=2681182.776

DU

AT
Q Q

IRR
E=240133.793 E=240020.102 E=239770.967

AD
N=2680949.86 E=240046.057

T
E E=239717.669 E

EL
D
AF

ET
SE
C
AF

GH LECD

IS
N=2681091.204

W
DU
N=2681008.55 N=2681205.043

SL
IRR
AF
G

AL
E=239744.85

AT
N=2681077.18

E
Q

TE
E=239857.882

HQ
N=2681238.898

TE

TIS

L
GH

AT
E=239908.028

ER
E=239964.024

AL
ET
N=2681221.641

AF AF

AT
IS

TE
OMU
N=2681186.7

IRR
L
N=2681154.808

AL
GHGH
E=240017.288 N=2681130.526

AT
Q Q
ISS ICAD IV

AD

TE
SE

L
N=2681097.583 E=239742.228 E=239714.521

DC

IRR
E=239769.267

AF

ET EL
W
AF

GH LEU

IS
W
DU

T
AF

AL
GH

AT
N=2681240.895

Q
N=2681223.359

TE D
N=2681206.168

GH

AT
ER
Q

IRR
E=239953.066

ET

TE
CO
A

L
SA I
FG

M
AF
E=239708.82

LA
HQHQ
N=2681138.998

IRR
TE
T

SE

L
AD
E=239766.297 E=239733.962

W
DC
N=2681244.442

ET
ET
FG
AF

TE
I
IS
W
DUD

SA
L
N=2681228.501

IRR
AF

AL
GH

AT
N=2681208.051

LA
TE

GH

A
ER
U
Q

SL
T
T
LE

TE
Q
E=239707.662

L
C
AF AF

OM
E=239730.657

IRR
ET
GHGH

SE

TE
IS
E=239761.83 N=2681245.293

L
Q Q

W
A

LA
N=2681230.584

DD

IRR
T

ET
AF TEL

ET

T
C

EL
N=2681210.967

D
AF

IS
W
GH

IS
DU
U

AF

SL
AL TEL
AT

AL
GH

AT
AT
ER
Q
E=239724.595

HQ

IRR
EC
AFAF

S
M

ET

TE
GHGH
N=2681234.489

EW

L
IS
E=239754.714

Q Q

IRR
AL
AD
DU

AT

TE
D

L
ET

ET
AF TEL

SL
N=2681215.492

AF

IS
W

IS
DU
GH

AF

IRR
AL
AT

ATLEL
GH

GH

AT

AT
ER
Q

EC

SE
AFAF

TE

IRR
M

L
ET

W
GHGH

IS
DU
QQ

A
AD

TE

SL
LA

L
DC

IRR
ET

ET
AF TE
AF

W
DU

IS

ISTEL
GH LEC

AF
AT

AL

AL
GH

Q
F F

GH

AT

A
ER
Q

T
SE

IRR
Q

TE
W
AF

L
OD
MU

ET
GH

IS
Q

TE

IRR
AL
AD

L
AT
DC

ET

ET
AF TE
AF

W
DU

IS

IS
GH LED

AF
AT

IRR
AL

A
GH

LA
SE
GH
ER

AT
AF
Q

T
W
Q
GH

CU
AQ

OM
FG

IRR
ET
HQ

IS
A
AD

LA
D

IRR
ET
AF TD

C
AF

W
DU

IS
GH ELU

SE
AF
AT

A
GH

Q CO

LA
GH
ER

W
AF
Q

IRR
E

Q
HQ G
AF

ET
HQ G

IS
A
AD

ET
LA
DC

IS
T

ET
AF TE

AL
SE
AF

W
DUU

IS
GH LE
D

AT
AF
AT

AL
W
GH

Q CO

GH
ER

AT
AF
Q

Q
HQ G
AF

ET
HQ G

IS
AL
AD

ET
FOR CONTINUATION REFER SHEET: 78 OF 267

AT

SE
DC

IS
DU

ET
AF U TE

AL
W
AF

W
D

IS
GH LE

AT
AF
AT

AL
GH

Q CO

GH
E

AT
AF
Q

Q
HQ G
AF

ET
HQ G

IS
AL
DU

SE

ET
DD

AT

IS
W

ET
C
AF U TE

AL
W
AF

IS
GH LE

AT
AT

AF

AL
GH

Q CO

ER

GH

AT
AF
Q

Q
HQ G
AF
G

MD

ET
GH

SE
I
U

SA
Q

ET

ET
L

W
DD

AD
AT

IS

IS
ET

DC
C
AF U T

AL

A
D

W
AF

IS

L
GH ELE

AT

AT
A

AF

AL
GH

TE

A
Q CD

GH

TE
AT
AF
Q

R
Q
GH
AQ

OU
FG

ET

EW S
H

IS
Q

AL
A

ET

ET
DD

AD

DU
AT

IS

IS
ET

DC
C
AF U T

AL

TE
AL
D

W
AF

IS
GH EL

AT

A
AF
AT

LE
AL
GH

T
A
Q EC

GH
ER

TE
AT

CO
AF
Q

R
Q
G

M
HQ

SE
AF

OM

ET
GH

W
IS
Q

AL
AD

ET

E
AD

DU
AT

TIS
D

IS

ET

DC
C
AF U T

AL

TE
AL
D

W
AF

IS
GH EL

AT

AT

L
AT

AF

AL
GH

EC
AT
Q E

ER

GH

AT
A

ER
Q

OM
FG

Q
CO
HQ
AF

ET
HQ G

IS
AL
AD

ET

ET
AD

DU
AT
DC

IS

IS
DC
ET
AF U T

AL

TE
AL
D

W
AF

IS
GH EL

AT

AT

LE
AT

AF

AL
GH

AT
Q E

ER

GH

CO
AT
AF

ET
ER
Q

Q
GH

IS
M
CO

A
Q

LEAT
M

ET

TIS
IS
AL

AL
AT

AT
KEY PLAN DUBAI PREPARED PROJECT
ETIHAD RAIL STAGE 2 & 3 PROJECT DRAWING TITLE
LEGEND: LAYOUT REFERENCE DRAWING : E0001-S02-EGE-DG-30054-00 Rev. Date CO Revision Description Drwn Vrfr Appr Atzr
LINESIDE PROPOSED MV CABLE ROUTING LAYOUT
BTME
MV RING SLD REFERENCE DRAWING : E0001-S02-ERZ-DG-30036-00 B E0001 - PACKAGE 2S
KP

DM DATE 06-SEP-2022 ISS ICAD TO ICAD01 & ICAD01 TO ISS ICAD


Z

H PR. 3Cx150sq.mm XLPE AL. 11kV U.G CABLE LINESIDE ACCESS ROAD AA 08-SEP-2022 -- ISSUED FOR APPROVAL (VER 00.00) HE MI DT AA
VERIFIED
Design & Build Contract
PROPOSED UTILITY PROTECTION RIGHT OF WAY ABU DHABI
(Railway Integration and Systems) PACKAGE-2B
A. ELGOHARI
PIPE SLEEVE PROTECTION FENCE NOTE: DATE 06-SEP-2022
CLIENT PMC SHEET No SCALE ORIGINAL SIZE
02 of 05 1:1000 A1
DMA

PROPOSED DUCT (BY OTHERS) DITCH / DRAIN 1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE NOTED. ICA
QUALITY PROCESS APPROVAL
CONTRACTOR PROJECT STAGE DOCUMENT STATUS
PROPOSED MV CABLE JOINT SAND MITIGATION D S. SAHADEVAN
2. COORDINATE REFERENCE SYSTEM WG84 UTM39N. DCP3 Issued for Acceptance
DATE 06-SEP-2022
ROUTE MARKER 3. DETAILS OF EXISTING SERVICES HAVE BEEN TAKEN FROM GM
C
ELECTRICAL SUB CONTRACTOR DRAWING No REVISION
APPROVED DESIGN CONSULTANT
DRAWING:C0304-UAE-EUT-M2-39611 AL AIN JUPITER EMC LLC. ENGINEER
A. ALOI TEBODIN ELECTRO MECHANICAL CONTRACTING
E0001-FJP-GCX-DS-90038 AA
P.O.Box : 128150 Tel. : 02-6419541
DATE 06-SEP-2022 Abu Dhabi Fax. : 02-6419542
FILE NAME: E
0001F
-JPG
-CXD
-S9-0038A
-A
d.wg
1 2 3 4 5 6 7