ESTIMASI VOLUME

POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

Pekerjaan : Perencanaan Peningkatan Jalan Poli polia - Batas Kolaka/Koltim


Lokasi : Kota Kendari
Tahun Anggaran : 2020
Volume : 9725 meter
Kontraktor :
Konsultan : CV. Multi Pratama

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer
M (2020)

Kolaka/Koltim

Kontraktor
0

……………………..., ST
Quantity Engineer
ESTUMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
PEKERJAAN : Perencanaan Peningkatan Jalan Poli polia - Batas Kolaka/Koltim
SUMBER DANA : APBN MURNI
TAHUN ANGGARAN : 2020
KONSULTAN : CV. Multi Pratama

NO. MATA VOLUME


URAIAN PEKERJAAN SAT
PEMBAYARAN RENCANA HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6(4X5)
DIVISI I. MOBILISASI
1.2 Mobilisasi Ls 1.00 76,525,000.00 76,525,000.00
1.8 (1) Manajemen dan Keselamatan Lalu lintas Ls 1.00 32,600,000.00 32,600,000.00
1.17 Pengamanan Lingkungan Hidup Ls 1.00 19,500,000.00 19,500,000.00
1.19 Keselamatan dan Kesehatan Kerja Ls 1.00 30,274,800.00 30,274,800.00
1.21 Manajemen Mutu Ls 1.00 45,000,000.00 45,000,000.00
203,899,800.00
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 2,565.00 30,420.58 78,028,786.37
2.2(1) Pasangan Batu dengan Mortar M3 3,359.20 917,079.46 3,080,653,325.79
3,158,682,112.15
DIVISI 3. PEKERJAAN TANAH
3.1 (1) Galian Biasa M3 331,617.98 14,585.12 4,836,689,280.41
3.2 (1) Timbunan Biasa M3 175,801.83 12,891.69 2,266,382,629.33
3.2 (2) Timbunan Pilihan M3 14,004.00 143,922.17 2,015,486,024.55
3.3 (1) Penyiapan Badan Jalan M2 - 2,156.24 -
9,118,557,934.29
DIVISI 4. PERBAIKAN TEPI PERKERASAN DAN BAHU JALAN
4.2. 2b Lapis Pondasi Agregat Kelas S M3 2,917.50 343,580.58 1,002,396,342.15
1,002,396,342.15
DIVISI 5. PEKERJAAN BERBUTIR
5.1 (1) Lapis Pondasi Agregat Kelas A M3 13,906.75 553,802.34 7,701,590,691.80
5.1 (2) Lapis Pondasi Agregat Kelas B M3 - 420,070.93 -
7,701,590,691.80
DIVISI 6. PERKERASAN ASPAL
6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 54,460.00 11,879.34 646,948,856.40
6.1 (2)(a) Lapis Perekat - Aspal Cair Liter 17,018.75 6,027.65 102,583,068.44
SKh.5.6.3.1.(1a) CBA. AsbLawele Lapis Aus ( AC-WC AsbLawele) Ton 6,249.29 1,536,821.25 9,604,033,985.31
SKh.5.6.3.1.(2a) CBA AsbLawele Lapis Antara (AC-BC AsbLawele) Ton 9,373.93 1,519,750.46 14,246,030,630.13
24,599,596,540.28
DIVISI 7. STRUKTUR
7.15 Beton Mutu Sedang fc'=20 Mpa (K-250), Plat Deker M3 20.80 1,424,439.14 29,628,334.11
7.3.1 Baja Tulangan U-24 Polos Kg 1,865.87 19,991.25 37,300,985.68
7.3.3 Baja Tulangan U-32 Ulir Kg 2,121.22 20,213.44 42,877,205.03
7.9 (1) Pasangan Batu M3 104.80 898,597.91 94,173,060.82
203,979,585.64
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.4.1 Marka Jalan Termoplastik M2 3,157.88 288,282.3 910,359,468.11
8.4 3a Rambu Jalan Tunggal dengan permukaan Pemantul Enginer Grade BH 24.00 844,882.9 20,277,189.01
930,636,657.12

TOTAL 46,919,339,663.42
PPN 10 % 4,691,933,966.34

TOTAL + PPN 10 % 51,611,273,629.77


DI BULATKAN 51,611,273,000.00

PAGU

SELISIH (51,611,273,000.00)
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

Pekerjaan : Galian Untuk Selokan Drainase dan Saluran Air


Mata Pembayaran : 2.1
Satuan : M3
Kontraktor : 0
Konsultan : CV. Multi Pratama

REKAPITULASI
No STA - STA VOLUME M3 KETERANGAN

1 0+000 ~ 0+500 - M3 Kiri/Kanan


2 0+500 ~ 1+000 135.000 M3 Kiri/Kanan
3 1+000 ~ 1+500 67.500 M3 Kiri/Kanan
4 1+500 ~ 2+000 135.000 M3 Kiri/Kanan
5 2+000 ~ 2+500 277.500 M3 Kiri/Kanan
6 2+500 ~ 3+000 - M3 Kiri/Kanan
7 3+000 ~ 3+500 240.000 M3 Kiri/Kanan
8 3+500 ~ 4+000 150.000 M3 Kiri/Kanan
9 4+000 ~ 4+500 142.500 M3 Kiri/Kanan
10 4+500 ~ 5+000 82.500 M3 Kiri/Kanan
11 5+000 ~ 5+500 - M3 Kiri/Kanan
12 5+500 ~ 6+000 67.500 M3 Kiri/Kanan
13 6+000 ~ 6+500 195.000 M3 Kiri/Kanan
14 6+500 ~ 7+000 210.000 M3 Kiri/Kanan
15 7+000 ~ 7+500 120.000 M3 Kiri/Kanan
16 7+500 ~ 8+000 120.000 M3 Kiri/Kanan
17 8+000 ~ 8+500 195.000 M3 Kiri/Kanan
18 8+500 ~ 9+000 112.500 M3 Kiri/Kanan
19 9+000 ~ 9+500 202.500 M3 Kiri/Kanan
20 9+500 ~ 9+725 112.500 M3 Kiri/Kanan
M3 Kiri/Kanan

JUMLAH 2,565.000 M3

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

Pekerjaan : Pasangan Batu Dengan Mortar


Mata Pembayaran : 2.2
Satuan : M3
Kontraktor : 0
Konsultan : CV. Multi Pratama

REKAPITULASI
No STA - STA VOLUME M3 KETERANGAN

1 0+000 ~ 0+500 - M3 Kiri/Kanan


2 0+500 ~ 1+000 177.840 M3 Kiri/Kanan
3 1+000 ~ 1+500 88.920 M3 Kiri/Kanan
4 1+500 ~ 2+000 197.600 M3 Kiri/Kanan
5 2+000 ~ 2+500 365.560 M3 Kiri/Kanan
6 2+500 ~ 3+000 - M3 Kiri/Kanan
7 3+000 ~ 3+500 296.400 M3 Kiri/Kanan
8 3+500 ~ 4+000 197.600 M3 Kiri/Kanan
9 4+000 ~ 4+500 197.600 M3 Kiri/Kanan
10 4+500 ~ 5+000 118.560 M3 Kiri/Kanan
11 5+000 ~ 5+500 - M3 Kiri/Kanan
12 5+500 ~ 6+000 88.920 M3 Kiri/Kanan
13 6+000 ~ 6+500 237.120 M3 Kiri/Kanan
14 6+500 ~ 7+000 276.640 M3 Kiri/Kanan
15 7+000 ~ 7+500 158.080 M3 Kiri/Kanan
16 7+500 ~ 8+000 158.080 M3 Kiri/Kanan
17 8+000 ~ 8+500 256.880 M3 Kiri/Kanan
18 8+500 ~ 9+000 148.200 M3 Kiri/Kanan
19 9+000 ~ 9+500 247.000 M3 Kiri/Kanan
20 9+500 ~ 9+725 148.200 M3 Kiri/Kanan
Kiri/Kanan

JUMLAH 3,359.200 M3

Direksi PU Direksi PU Kontraktor


Bina Marga Bina Marga 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

Pekerjaan : Galian Biasa


Mata Pembayaran : 3.1.1
Satuan : M3
Kontraktor : 0
Konsultan : CV. Multi Pratama

REKAPITULASI
No STA - STA VOLUME M3 KETERANGAN

1 0+000 ~ 0+500 1,733.300 M3


2 0+500 ~ 1+000 6,139.450 M3
3 1+000 ~ 1+500 3,246.075 M3
4 1+500 ~ 2+000 26,747.200 M3
5 2+000 ~ 2+500 49,148.388 M3
6 2+500 ~ 3+000 10,945.89 M3
7 3+000 ~ 3+500 23,619.56 M3
8 3+500 ~ 4+000 21,050.13 M3
9 4+000 ~ 4+500 20,899.44 M3
10 4+500 ~ 5+000 14,950.99 M3
11 5+000 ~ 5+500 4,361.54 M3
12 5+500 ~ 6+000 6,950.13 M3
13 6+000 ~ 6+500 37,956.14 M3
14 6+500 ~ 7+000 24,803.36 M3
15 7+000 ~ 7+500 11,682.48 M3
16 7+500 ~ 8+000 5,929.30 M3
17 8+000 ~ 8+500 31,244.83 M3
18 8+500 ~ 9+000 10,323.11 M3
19 9+000 ~ 9+500 13,323.44 M3
20 9+500 ~ 9+725 6,563.25 M3

JUMLAH 331,617.98 M3

Direksi PU Direksi PU Kontraktor


Bina Marga Bina Marga 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

Pekerjaan : Timbunan Biasa


Mata Pembayaran : 3.2.1
Satuan : M3
Kontraktor : 0
Konsultan : CV. Multi Pratama

REKAPITULASI
No STA - STA VOLUME M3 KETERANGAN

1 0+000 ~ 0+500 4,635.138 M3


2 0+500 ~ 1+000 8,225.913 M3
3 1+000 ~ 1+500 2,662.525 M3
4 1+500 ~ 2+000 9,175.150 M3
5 2+000 ~ 2+500 - M3
6 2+500 ~ 3+000 38,837.94 M3
7 3+000 ~ 3+500 7,685.86 M3
8 3+500 ~ 4+000 14,400.75 M3
9 4+000 ~ 4+500 11,425.93 M3
10 4+500 ~ 5+000 8,490.41 M3
11 5+000 ~ 5+500 15,527.71 M3
12 5+500 ~ 6+000 15,194.98 M3
13 6+000 ~ 6+500 484.20 M3
14 6+500 ~ 7+000 10,426.53 M3
15 7+000 ~ 7+500 2,724.49 M3
16 7+500 ~ 8+000 8,515.64 M3
17 8+000 ~ 8+500 3,270.08 M3
18 8+500 ~ 9+000 10,548.45 M3
19 9+000 ~ 9+500 3,570.15 M3
20 9+500 ~ 9+725 - M3
M3

JUMLAH 175,801.83 M3

Direksi PU Direksi PU Kontraktor


Bina Marga Bina Marga 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

Pekerjaan : Timbunan Pilihan


Mata Pembayaran : 3.2.2
Satuan : M3
Kontraktor : 0
Konsultan : CV. Multi Pratama

REKAPITULASI
No STA - STA VOLUME M3 KETERANGAN

1 0+000 ~ 0+500 720.000 M3


2 0+500 ~ 1+000 720.000 M3
3 1+000 ~ 1+500 720.000 M3
4 1+500 ~ 2+000 720.000 M3
5 2+000 ~ 2+500 720.000 M3
6 2+500 ~ 3+000 720.000 M3
7 3+000 ~ 3+500 720.000 M3
8 3+500 ~ 4+000 720.000 M3
9 4+000 ~ 4+500 720.000 M3
10 4+500 ~ 5+000 720.000 M3
11 5+000 ~ 5+500 720.000 M3
12 5+500 ~ 6+000 720.000 M3
13 6+000 ~ 6+500 720.000 M3
14 6+500 ~ 7+000 720.000 M3
15 7+000 ~ 7+500 720.000 M3
16 7+500 ~ 8+000 720.000 M3
17 8+000 ~ 8+500 720.000 M3
18 8+500 ~ 9+000 720.000 M3
19 9+000 ~ 9+500 720.000 M3
20 9+500 ~ 9+725 324.000 M3

JUMLAH 14,004.000 M3

Direksi PU Direksi PU Kontraktor


Bina Marga Bina Marga 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

Pekerjaan : Penyiapan Badan Jalan


Mata Pembayaran : 3.3
Satuan : M2
Kontraktor : 0
Konsultan : CV. Multi Pratama

REKAPITULASI
No STA - STA VOLUME M2 KETERANGAN

1 0+000 ~ 0+500 M2
2 0+500 ~ 1+000 M2
3 1+000 ~ 1+500 M2
4 1+500 ~ 2+000 M2
5 2+000 ~ 2+500 M2
6 2+500 ~ 3+000 M2
7 3+000 ~ 3+500 M2
8 3+500 ~ 4+000 M2
9 4+000 ~ 4+500 M2
10 4+500 ~ 5+000 M2
11 5+000 ~ 5+500 M2
12 5+500 ~ 6+000 M2
13 6+000 ~ 6+500 M2
14 6+500 ~ 7+000 M2
15 7+000 ~ 7+500 M2
16 7+500 ~ 8+000 M2
17 8+000 ~ 8+500 M2
18 8+500 ~ 9+000 M2
19 9+000 ~ 9+500 M2
20 9+500 ~ 9+725 M2

JUMLAH - M2

Direksi PU Direksi PU Kontraktor


Bina Marga Bina Marga 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

Pekerjaan : Lapis Pondasi Agregat Kelas S


Mata Pembayaran : 4.2.2b
Satuan : M3
Kontraktor : 0
Konsultan : CV. Multi Pratama

REKAPITULASI
No STA - STA VOLUME M3 KETERANGAN

1 0+000 ~ 0+500 150.000 M3


2 0+500 ~ 1+000 150.000 M3
3 1+000 ~ 1+500 150.000 M3
4 1+500 ~ 2+000 150.000 M3
5 2+000 ~ 2+500 150.000 M3
6 2+500 ~ 3+000 150.000 M3
7 3+000 ~ 3+500 150.000 M3
8 3+500 ~ 4+000 150.000 M3
9 4+000 ~ 4+500 150.000 M3
10 4+500 ~ 5+000 150.000 M3
11 5+000 ~ 5+500 150.000 M3
12 5+500 ~ 6+000 150.000 M3
13 6+000 ~ 6+500 150.000 M3
14 6+500 ~ 7+000 150.000 M3
15 7+000 ~ 7+500 150.000 M3
16 7+500 ~ 8+000 150.000 M3
17 8+000 ~ 8+500 150.000 M3
18 8+500 ~ 9+000 150.000 M3
19 9+000 ~ 9+500 150.000 M3
20 9+500 ~ 9+725 67.500 M3

JUMLAH 2,917.500 M3

Direksi PU Direksi PU Kontraktor


Bina Marga Bina Marga 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

Pekerjaan : Lapis Pondasi Agregat Kelas A


Mata Pembayaran : 5.1.1
Satuan : M3
Kontraktor : 0
Konsultan : CV. Multi Pratama

REKAPITULASI
No STA - STA VOLUME M3 KETERANGAN

1 0+000 ~ 0+500 715.000 M3


2 0+500 ~ 1+000 715.000 M3
3 1+000 ~ 1+500 715.000 M3
4 1+500 ~ 2+000 715.000 M3
5 2+000 ~ 2+500 715.000 M3
6 2+500 ~ 3+000 715.000 M3
7 3+000 ~ 3+500 715.000 M3
8 3+500 ~ 4+000 715.000 M3
9 4+000 ~ 4+500 715.000 M3
10 4+500 ~ 5+000 715.000 M3
11 5+000 ~ 5+500 715.000 M3
12 5+500 ~ 6+000 715.000 M3
13 6+000 ~ 6+500 715.000 M3
14 6+500 ~ 7+000 715.000 M3
15 7+000 ~ 7+500 715.000 M3
16 7+500 ~ 8+000 715.000 M3
17 8+000 ~ 8+500 715.000 M3
18 8+500 ~ 9+000 715.000 M3
19 9+000 ~ 9+500 715.000 M3
20 9+500 ~ 9+725 321.750 M3

JUMLAH 13,906.750 M3

Direksi PU Direksi PU Kontraktor


Bina Marga Bina Marga 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

Pekerjaan : Lapis Pondasi Agregat Kelas B


Mata Pembayaran : 5.1.2
Satuan : M3
Kontraktor : 0
Konsultan : CV. Multi Pratama

REKAPITULASI
No STA - STA VOLUME M3 KETERANGAN

1 0+000 ~ 0+500 750.000 M3


2 0+500 ~ 1+000 750.000 M3
3 1+000 ~ 1+500 750.000 M3
4 1+500 ~ 2+000 750.000 M3
5 2+000 ~ 2+500 750.000 M3
6 2+500 ~ 3+000 750.000 M3
7 3+000 ~ 3+500 750.000 M3
8 3+500 ~ 4+000 750.00 M3
9 4+000 ~ 4+500 750.00 M3
10 4+500 ~ 5+000 750.00 M3
11 5+000 ~ 5+500 750.00 M3
12 5+500 ~ 6+000 750.00 M3
13 6+000 ~ 6+500 750.00 M3
14 6+500 ~ 7+000 750.00 M3
15 7+000 ~ 7+500 750.00 M3
16 7+500 ~ 8+000 750.00 M3
17 8+000 ~ 8+500 750.00 M3
18 8+500 ~ 9+000 750.00 M3
19 9+000 ~ 9+500 750.00 M3
20 9+500 ~ 9+725 337.50 M3

JUMLAH 14,587.500 M3

Direksi PU Direksi PU Kontraktor


Bina Marga Bina Marga 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

Pekerjaan : Lapis Resap Pengikat -Aspal Cair


Mata Pembayaran : 6.1.1a
Satuan : Liter
Kontraktor : 0
Konsultan : CV. Multi Pratama

REKAPITULASI
No STA - STA VOLUME Liter KETERANGAN

1 0+000 ~ 0+500 2,800.000 Liter


2 0+500 ~ 1+000 2,800.000 Liter
3 1+000 ~ 1+500 2,800.000 Liter
4 1+500 ~ 2+000 2,800.000 Liter
5 2+000 ~ 2+500 2,800.000 Liter
6 2+500 ~ 3+000 2,800.000 Liter
7 3+000 ~ 3+500 2,800.000 Liter
8 3+500 ~ 4+000 2,800.00 Liter
9 4+000 ~ 4+500 2,800.00 Liter
10 4+500 ~ 5+000 2,800.00 Liter
11 5+000 ~ 5+500 2,800.00 Liter
12 5+500 ~ 6+000 2,800.00 Liter
13 6+000 ~ 6+500 2,800.00 Liter
14 6+500 ~ 7+000 2,800.00 Liter
15 7+000 ~ 7+500 2,800.00 Liter
16 7+500 ~ 8+000 2,800.00 Liter
17 8+000 ~ 8+500 2,800.00 Liter
18 8+500 ~ 9+000 2,800.00 Liter
19 9+000 ~ 9+500 2,800.00 Liter
20 9+500 ~ 9+725 1,260.00 Liter

JUMLAH 54,460.000 Liter

Direksi PU Direksi PU Kontraktor


Bina Marga Bina Marga 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

Pekerjaan : Lapis Perekat -Aspal Cair


Mata Pembayaran : 6.1.2a
Satuan : Liter
Kontraktor : 0
Konsultan : CV. Multi Pratama

REKAPITULASI
No STA - STA VOLUME Liter KETERANGAN

1 0+000 ~ 0+500 875.000 Liter


2 0+500 ~ 1+000 875.000 Liter
3 1+000 ~ 1+500 875.000 Liter
4 1+500 ~ 2+000 875.000 Liter
5 2+000 ~ 2+500 875.000 Liter
6 2+500 ~ 3+000 875.000 Liter
7 3+000 ~ 3+500 875.000 Liter
8 3+500 ~ 4+000 875.000 Liter
9 4+000 ~ 4+500 875.000 Liter
10 4+500 ~ 5+000 875.000 Liter
11 5+000 ~ 5+500 875.000 Liter
12 5+500 ~ 6+000 875.000 Liter
13 6+000 ~ 6+500 875.000 Liter
14 6+500 ~ 7+000 875.000 Liter
15 7+000 ~ 7+500 875.000 Liter
16 7+500 ~ 8+000 875.000 Liter
17 8+000 ~ 8+500 875.000 Liter
18 8+500 ~ 9+000 875.000 Liter
19 9+000 ~ 9+500 875.000 Liter
20 9+500 ~ 9+725 393.750 Liter

JUMLAH 17,018.750 Liter

Direksi PU Direksi PU Kontraktor


Bina Marga Bina Marga 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

Pekerjaan : AC-WC Asb.Lawele- Lapis Aus


Mata Pembayaran : SKh.5.6.3.1.(1a)
Satuan : Ton
Kontraktor : 0
Konsultan : CV. Multi Pratama

REKAPITULASI
No STA - STA VOLUME Ton KETERANGAN

1 0+000 ~ 0+700 449.820 Ton


2 0+700 1+400 449.820 Ton
3 1+400 2+100 449.820 Ton
4 2+100 2+800 449.820 Ton
5 2+800 3+500 449.820 Ton
6 3+500 4+200 449.820 Ton
7 4+200 4+900 449.820 Ton
8 4+900 5+600 449.820 Ton
9 5+600 6+300 449.820 Ton
10 6+300 7+000 449.820 Ton
11 7+000 7+700 449.820 Ton
12 7+700 8+400 449.820 Ton
13 8+400 9+100 449.820 Ton
14 9+100 9+725 401.625 Ton

JUMLAH 6,249.285 Ton

Direksi PU Direksi PU Kontraktor


Bina Marga Bina Marga 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

Pekerjaan : AC-BC AsbLawele - Lapis Antara


Mata Pembayaran : SKh.5.6.3.1.(2a)
Satuan : Ton
Kontraktor : 0
Konsultan : CV. Multi Pratama

REKAPITULASI
No STA - STA VOLUME Ton KETERANGAN

1 0+000 ~ 0+700 674.730 Ton


2 0+700 1+400 674.730 Ton
3 1+400 2+100 674.730 Ton
4 2+100 2+800 674.730 Ton
5 2+800 3+500 674.730 Ton
6 3+500 4+200 674.730 Ton
7 4+200 4+900 674.730 Ton
8 4+900 5+600 674.730 Ton
9 5+600 6+300 674.730 Ton
10 6+300 7+000 674.730 Ton
11 7+000 7+700 674.730 Ton
12 7+700 8+400 674.730 Ton
13 8+400 9+100 674.730 Ton
14 9+100 9+725 602.438 Ton

JUMLAH 9,373.928 Ton

Direksi PU Direksi PU Kontraktor


Bina Marga Bina Marga 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

Pekerjaan : Beton Mutu Sedang fc'=20 Mpa


Mata Pembayaran : 7.15
Satuan : M3
Kontraktor : 0
Konsultan : CV. Multi Pratama

REKAPITULASI
No STA - STA VOLUME M3 KETERANGAN

1 1+000 5.200 M3

2 2+000 5.200 M3

3 3+000 5.200 M3

4 4+000 5.200 M3

JUMLAH 20.800 M3

Direksi PU Direksi PU Kontraktor


Bina Marga Bina Marga 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

Pekerjaan : Baja Tulangan U-24


Mata Pembayaran : 7.3.1
Satuan : Kg
Kontraktor : 0
Konsultan : CV. Multi Pratama

REKAPITULASI
No STA - STA VOLUME Kg KETERANGAN

1 1+000 466.466 Kg

2 2+000 466.466 Kg

3 3+000 466.466 Kg

4 4+000 466.466 Kg

JUMLAH 1,865.866 Kg

Direksi PU Direksi PU Kontraktor


Bina Marga Bina Marga 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

Pekerjaan : Baja Tulangan D-32


Mata Pembayaran : 7.3.3
Satuan : Kg
Kontraktor : 0
Konsultan : CV. Multi Pratama

REKAPITULASI
No STA - STA VOLUME Kg KETERANGAN

1 1+000 530.306 Kg

2 2+000 530.306 Kg

3 3+000 530.306 Kg

4 4+000 530.306 Kg

JUMLAH 2,121.223 Kg

Direksi PU Direksi PU Kontraktor


Bina Marga Bina Marga 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

Pekerjaan : Pasangan Batu Talud


Mata Pembayaran : 7.9
Satuan : M3
Kontraktor : 0
Konsultan : CV. Multi Pratama

REKAPITULASI
No STA - STA VOLUME M3 KETERANGAN

1 1+000 26.200 M3

2 2+000 26.200 M3

3 3+000 26.200 M3

4 4+000 26.200 M3

JUMLAH 104.800 M3

Direksi PU Direksi PU Kontraktor


Bina Marga Bina Marga 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

Pekerjaan : Marka Jalan Termoplastik


Mata Pembayaran : 8.4,1
Satuan : M2
Kontraktor : 0
Konsultan : CV. Multi Pratama

REKAPITULASI
No STA - STA VOLUME M2 KETERANGAN

1 0+000 ~ 3+500 1,111.875 M2

2 3+500 ~ 6+375 956.250 M2

3 6+375 ~ 9+725 1,089.750 M2

JUMLAH 3,157.875 M2

Direksi PU Direksi PU Kontraktor


Bina Marga Bina Marga 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

Pekerjaan : Rambu Jalan Tunggal dengan permukaan Pemantul Enginer Grade


Mata Pembayaran : 8.4,3a
Satuan : BH
Kontraktor : 0
Konsultan : CV. Multi Pratama

REKAPITULASI
No STA - STA VOLUME BH KETERANGAN

1 0+000 ~ 9+725 24.000 BH

JUMLAH 24.000 BH

Direksi PU Direksi PU Kontraktor


Bina Marga Bina Marga 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
W
h ac
b
ESTIMASI VOLUME
2
4
1
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Galian untuk Selokan Drainase dan Saluran Air
Mata Pembayaran : 2.1
Satuan : m3
Konsultan CV. Multi Pratama
a
Sket

c
c1

b
PERHITUNGAN
DIMENSI LUAS LUAS PANJANG (M) VOLUME KETERANGAN
NO STA kr / kn
a b c c1 M2 RATA2 Kiri Kanan M3

1 0+000 kr/kn 0.800 0.400 0.500 0.500 0.300


0.300 0.000
2 0+025 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
3 0+050 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
4 0+075 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
5 0+100 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
6 0+125 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
7 0+150 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
8 0+175 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
9 0+200 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
10 0+225 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
11 0+250 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
12 0+275 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
13 0+300 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
14 0+325 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
15 0+350 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
16 0+375 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
17 0+400 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
18 0+425 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
19 0+450 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
20 0+475 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
21 0+500 kr/kn 0.800 0.400 0.500 0.500 0.300
Sub total -
Total -

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
W
h ac
b
ESTIMASI VOLUME
2
4
1
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Galian untuk Selokan Drainase dan Saluran Air
Mata Pembayaran : 2.1
Satuan : m3
Konsultan CV. Multi Pratama
a
Sket

c
c1

b
PERHITUNGAN
DIMENSI LUAS LUAS PANJANG (M) VOLUME KETERANGAN
NO STA kr / kn
a b c c1 M2 RATA2 Kiri Kanan M3

21 0+500 kr/kn 0.800 0.400 0.500 0.500 0.300


0.300 0.000
22 0+525 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
23 0+550 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
24 0+575 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
25 0+600 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
26 0+625 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
27 0+650 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
28 0+675 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
29 0+700 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
30 0+725 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
31 0+750 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
32 0+775 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
33 0+800 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
34 0+825 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
35 0+850 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
36 0+875 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
37 0+900 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
38 0+925 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
39 0+950 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
40 0+975 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
41 1+000 kr/kn 0.800 0.400 0.500 0.500 0.300
Sub total 135.000
Total 135.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
W
h ac
b
ESTIMASI VOLUME
2
4
1
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Galian untuk Selokan Drainase dan Saluran Air
Mata Pembayaran : 2.1
Satuan : m3
Konsultan CV. Multi Pratama
a
Sket

c
c1

b
PERHITUNGAN
DIMENSI LUAS LUAS PANJANG (M) VOLUME KETERANGAN
NO STA kr / kn
a b c c1 M2 RATA2 Kiri Kanan M3

41 1+000 kr/kn 0.800 0.400 0.500 0.500 0.300


0.300 0.000
42 1+025 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
43 1+050 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
44 1+075 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
45 1+100 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
46 1+125 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
47 1+150 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
48 1+175 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
49 1+200 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
50 1+225 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
51 1+250 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
52 1+275 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
53 1+300 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
54 1+325 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
55 1+350 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
56 1+375 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
57 1+400 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
58 1+425 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
59 1+450 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
60 1+475 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
61 1+500 kr/kn 0.800 0.400 0.500 0.500 0.300
Sub total 67.500
Total 202.500

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
W
h ac
b
ESTIMASI VOLUME
2
4
1
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Galian untuk Selokan Drainase dan Saluran Air
Mata Pembayaran : 2.1
Satuan : m3
Konsultan CV. Multi Pratama
a
Sket

c
c1

b
PERHITUNGAN
DIMENSI LUAS LUAS PANJANG (M) VOLUME KETERANGAN
NO STA kr / kn
a b c c1 M2 RATA2 Kiri Kanan M3

61 1+500 kr/kn 0.800 0.400 0.500 0.500 0.300


0.300 25.0 25.0 15.000
62 1+525 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
63 1+550 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
64 1+575 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
65 1+600 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
66 1+625 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
67 1+650 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
68 1+675 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
69 1+700 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
70 1+725 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
71 1+750 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
72 1+775 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
73 1+800 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
74 1+825 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
75 1+850 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
76 1+875 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
77 1+900 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
78 1+925 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
79 1+950 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
80 1+975 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
81 2+000 kr/kn 0.800 0.400 0.500 0.500 0.300
Sub total 135.000
Total 337.500

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
W
h ac
b
ESTIMASI VOLUME
2
4
1
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Galian untuk Selokan Drainase dan Saluran Air
Mata Pembayaran : 2.1
Satuan : m3
Konsultan CV. Multi Pratama
a
Sket

c
c1

b
PERHITUNGAN
DIMENSI LUAS LUAS PANJANG (M) VOLUME KETERANGAN
NO STA kr / kn
a b c c1 M2 RATA2 Kiri Kanan M3

81 2+000 kr/kn 0.800 0.400 0.500 0.500 0.300


0.300 25.0 25.0 15.000
82 2+025 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
83 2+050 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
84 2+075 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
85 2+100 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
86 2+125 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
87 2+150 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
88 2+175 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
89 2+200 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
90 2+225 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
91 2+250 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
92 2+275 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
93 2+300 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
94 2+325 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
95 2+350 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
96 2+375 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
97 2+400 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
98 2+425 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
99 2+450 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
100 2+475 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
101 2+500 kr/kn 0.800 0.400 0.500 0.500 0.300
Sub total 277.500
Total 615.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
W
h ac
b
ESTIMASI VOLUME
2
4
1
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Galian untuk Selokan Drainase dan Saluran Air
Mata Pembayaran : 2.1
Satuan : m3
Konsultan CV. Multi Pratama
a
Sket

c
c1

b
PERHITUNGAN
DIMENSI LUAS LUAS PANJANG (M) VOLUME KETERANGAN
NO STA kr / kn
a b c c1 M2 RATA2 Kiri Kanan M3

101 2+500 kr/kn 0.800 0.400 0.500 0.500 0.300


0.300 0.000
102 2+525 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
103 2+550 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
104 2+575 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
105 2+600 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
106 2+625 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
107 2+650 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
108 2+675 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
109 2+700 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
110 2+725 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
111 2+750 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
112 2+775 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
113 2+800 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
114 2+825 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
115 2+850 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
116 2+875 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
117 2+900 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
118 2+925 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
119 2+950 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
120 2+975 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
121 3+000 kr/kn 0.800 0.400 0.500 0.500 0.300
Sub total -
Total 615.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
W
h ac
b
ESTIMASI VOLUME
2
4
1
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Galian untuk Selokan Drainase dan Saluran Air
Mata Pembayaran : 2.1
Satuan : m3
Konsultan CV. Multi Pratama
a
Sket

c
c1

b
PERHITUNGAN
DIMENSI LUAS LUAS PANJANG (M) VOLUME KETERANGAN
NO STA kr / kn
a b c c1 M2 RATA2 Kiri Kanan M3

121 3+000 kr/kn 0.800 0.400 0.500 0.500 0.300


0.300 0.000
122 3+025 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
123 3+050 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
124 3+075 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
125 3+100 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
126 3+125 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
127 3+150 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
128 3+175 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
129 3+200 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
130 3+225 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
131 3+250 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
132 3+275 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
133 3+300 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
134 3+325 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
135 3+350 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
136 3+375 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
137 3+400 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
138 3+425 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
139 3+450 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
140 3+475 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
141 3+500 kr/kn 0.800 0.400 0.500 0.500 0.300
Sub total 240.000
Total 855.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
W
h ac
b
ESTIMASI VOLUME
2
4
1
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Galian untuk Selokan Drainase dan Saluran Air
Mata Pembayaran : 2.1
Satuan : m3
Konsultan CV. Multi Pratama
a
Sket

c
c1

b
PERHITUNGAN
DIMENSI LUAS LUAS PANJANG (M) VOLUME KETERANGAN
NO STA kr / kn
a b c c1 M2 RATA2 Kiri Kanan M3

141 3+500 kr/kn 0.800 0.400 0.500 0.500 0.300


0.300 25.0 7.500
142 3+525 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
143 3+550 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
144 3+575 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
145 3+600 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
146 3+625 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
147 3+650 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
148 3+675 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
149 3+700 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
150 3+725 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
151 3+750 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
152 3+775 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
153 3+800 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
154 3+825 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
155 3+850 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
156 3+875 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
157 3+900 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
158 3+925 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
159 3+950 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
160 3+975 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
161 4+000 kr/kn 0.800 0.400 0.500 0.500 0.300
Sub total 150.000
Total 1,005.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
W
h ac
b
ESTIMASI VOLUME
2
4
1
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Galian untuk Selokan Drainase dan Saluran Air
Mata Pembayaran : 2.1
Satuan : m3
Konsultan CV. Multi Pratama
a
Sket

c
c1

b
PERHITUNGAN
DIMENSI LUAS LUAS PANJANG (M) VOLUME KETERANGAN
NO STA kr / kn
a b c c1 M2 RATA2 Kiri Kanan M3

161 4+000 kr/kn 0.800 0.400 0.500 0.500 0.300


0.300 25.0 7.500
162 4+025 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
163 4+050 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
164 4+075 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
165 4+100 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
166 4+125 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
167 4+150 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
168 4+175 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
169 4+200 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
170 4+225 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
171 4+250 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
172 4+275 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
173 4+300 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
174 4+325 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
175 4+350 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
176 4+375 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
177 4+400 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
178 4+425 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
179 4+450 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
180 4+475 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
181 4+500 kr/kn 0.800 0.400 0.500 0.500 0.300
Sub total 142.500
Total 1,147.500

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
W
h ac
b
ESTIMASI VOLUME
2
4
1
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Galian untuk Selokan Drainase dan Saluran Air
Mata Pembayaran : 2.1
Satuan : m3
Konsultan CV. Multi Pratama
a
Sket

c
c1

b
PERHITUNGAN
DIMENSI LUAS LUAS PANJANG (M) VOLUME KETERANGAN
NO STA kr / kn
a b c c1 M2 RATA2 Kiri Kanan M3

181 4+500 kr/kn 0.800 0.400 0.500 0.500 0.300


0.300 0.000
182 4+525 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
183 4+550 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
184 4+575 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
185 4+600 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
186 4+625 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
187 4+650 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
188 4+675 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
189 4+700 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
190 4+725 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
191 4+750 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
192 4+775 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
193 4+800 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
194 4+825 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
195 4+850 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
196 4+875 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
197 4+900 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
198 4+925 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
199 4+950 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
200 4+975 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
201 5+000 kr/kn 0.800 0.400 0.500 0.500 0.300
Sub total 82.500
Total 1,230.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
W
h ac
b
ESTIMASI VOLUME
2
4
1
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Galian untuk Selokan Drainase dan Saluran Air
Mata Pembayaran : 2.1
Satuan : m3
Konsultan CV. Multi Pratama
a
Sket

c
c1

b
PERHITUNGAN
DIMENSI LUAS LUAS PANJANG (M) VOLUME KETERANGAN
NO STA kr / kn
a b c c1 M2 RATA2 Kiri Kanan M3

201 5+000 kr/kn 0.800 0.400 0.500 0.500 0.300


0.300 0.000
202 5+025 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
203 5+050 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
204 5+075 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
205 5+100 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
206 5+125 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
207 5+150 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
208 5+175 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
209 5+200 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
210 5+225 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
211 5+250 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
212 5+275 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
213 5+300 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
214 5+325 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
215 5+350 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
216 5+375 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
217 5+400 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
218 5+425 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
219 5+450 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
220 5+475 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
221 5+500 kr/kn 0.800 0.400 0.500 0.500 0.300
Sub total -
Total 1,230.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
W
h ac
b
ESTIMASI VOLUME
2
4
1
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Galian untuk Selokan Drainase dan Saluran Air
Mata Pembayaran : 2.1
Satuan : m3
Konsultan CV. Multi Pratama
a
Sket

c
c1

b
PERHITUNGAN
DIMENSI LUAS LUAS PANJANG (M) VOLUME KETERANGAN
NO STA kr / kn
a b c c1 M2 RATA2 Kiri Kanan M3

221 5+500 kr/kn 0.800 0.400 0.500 0.500 0.300


0.300 0.000
222 5+525 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
223 5+550 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
224 5+575 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
225 5+600 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
226 5+625 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
227 5+650 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
228 5+675 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
229 5+700 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
230 5+725 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
231 5+750 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
232 5+775 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
233 5+800 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
234 5+825 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
235 5+850 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
236 5+875 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
237 5+900 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
238 5+925 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
239 5+950 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
240 5+975 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
241 6+000 kr/kn 0.800 0.400 0.500 0.500 0.300
Sub total 67.500
Total 1,297.500

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
W
h ac
b
ESTIMASI VOLUME
2
4
1
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Galian untuk Selokan Drainase dan Saluran Air
Mata Pembayaran : 2.1
Satuan : m3
Konsultan CV. Multi Pratama
a
Sket

c
c1

b
PERHITUNGAN
DIMENSI LUAS LUAS PANJANG (M) VOLUME KETERANGAN
NO STA kr / kn
a b c c1 M2 RATA2 Kiri Kanan M3

241 6+000 kr/kn 0.800 0.400 0.500 0.500 0.300


0.300 0.000
242 6+025 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
243 6+050 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
244 6+075 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
245 6+100 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
246 6+125 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
247 6+150 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
248 6+175 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
249 6+200 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
250 6+225 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
251 6+250 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
252 6+275 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
253 6+300 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
254 6+325 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
255 6+350 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
256 6+375 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
257 6+400 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
258 6+425 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
259 6+450 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
260 6+475 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
261 6+500 kr/kn 0.800 0.400 0.500 0.500 0.300
Sub total 195.000
Total 1,492.500

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
W
h ac
b
ESTIMASI VOLUME
2
4
1
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Galian untuk Selokan Drainase dan Saluran Air
Mata Pembayaran : 2.1
Satuan : m3
Konsultan CV. Multi Pratama
a
Sket

c
c1

b
PERHITUNGAN
DIMENSI LUAS LUAS PANJANG (M) VOLUME KETERANGAN
NO STA kr / kn
a b c c1 M2 RATA2 Kiri Kanan M3

261 6+500 kr/kn 0.800 0.400 0.500 0.500 0.300


0.300 25.0 25.0 15.000
262 6+525 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
263 6+550 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
264 6+575 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
265 6+600 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
266 6+625 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
267 6+650 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
268 6+675 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
269 6+700 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
270 6+725 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
271 6+750 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
272 6+775 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
273 6+800 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
274 6+825 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
275 6+850 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
276 6+875 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
277 6+900 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
278 6+925 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
279 6+950 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
280 6+975 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
281 7+000 kr/kn 0.800 0.400 0.500 0.500 0.300
Sub total 210.000
Total 1,702.500

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
W
h ac
b
ESTIMASI VOLUME
2
4
1
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Galian untuk Selokan Drainase dan Saluran Air
Mata Pembayaran : 2.1
Satuan : m3
Konsultan CV. Multi Pratama
a
Sket

c
c1

b
PERHITUNGAN
DIMENSI LUAS LUAS PANJANG (M) VOLUME KETERANGAN
NO STA kr / kn
a b c c1 M2 RATA2 Kiri Kanan M3

281 7+000 kr/kn 0.800 0.400 0.500 0.500 0.300


0.300 25.0 25.0 15.000
282 7+025 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
283 7+050 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
284 7+075 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
285 7+100 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
286 7+125 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
287 7+150 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
288 7+175 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
289 7+200 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
290 7+225 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
291 7+250 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
292 7+275 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
293 7+300 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
294 7+325 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
295 7+350 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
296 7+375 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
297 7+400 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
298 7+425 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
299 7+450 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
300 7+475 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
301 7+500 kr/kn 0.800 0.400 0.500 0.500 0.300
Sub total 120.000
Total 1,822.500

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
W
h ac
b
ESTIMASI VOLUME
2
4
1
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Galian untuk Selokan Drainase dan Saluran Air
Mata Pembayaran : 2.1
Satuan : m3
Konsultan CV. Multi Pratama
a
Sket

c
c1

b
PERHITUNGAN
DIMENSI LUAS LUAS PANJANG (M) VOLUME KETERANGAN
NO STA kr / kn
a b c c1 M2 RATA2 Kiri Kanan M3

301 7+500 kr/kn 0.800 0.400 0.500 0.500 0.300


0.300 0.000
302 7+525 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
303 7+550 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
304 7+575 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
305 7+600 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
306 7+625 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
307 7+650 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
308 7+675 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
309 7+700 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
310 7+725 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
311 7+750 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
312 7+775 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
313 7+800 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
314 7+825 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
315 7+850 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
316 7+875 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
317 7+900 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
318 7+925 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
319 7+950 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
320 7+975 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
321 8+000 kr/kn 0.800 0.400 0.500 0.500 0.300
Sub total 120.000
Total 1,942.500

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
W
h ac
b
ESTIMASI VOLUME
2
4
1
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Galian untuk Selokan Drainase dan Saluran Air
Mata Pembayaran : 2.1
Satuan : m3
Konsultan CV. Multi Pratama
a
Sket

c
c1

b
PERHITUNGAN
DIMENSI LUAS LUAS PANJANG (M) VOLUME KETERANGAN
NO STA kr / kn
a b c c1 M2 RATA2 Kiri Kanan M3

321 8+000 kr/kn 0.800 0.400 0.500 0.500 0.300


0.300 0.000
322 8+025 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
323 8+050 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
324 8+075 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
325 8+100 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
326 8+125 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
327 8+150 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
328 8+175 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
329 8+200 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
330 8+225 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
331 8+250 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
332 8+275 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
333 8+300 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
334 8+325 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
335 8+350 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
336 8+375 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
337 8+400 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
338 8+425 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
339 8+450 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
340 8+475 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
341 8+500 kr/kn 0.800 0.400 0.500 0.500 0.300
Sub total 195.000
Total 2,137.500

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
W
h ac
b
ESTIMASI VOLUME
2
4
1
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Galian untuk Selokan Drainase dan Saluran Air
Mata Pembayaran : 2.1
Satuan : m3
Konsultan CV. Multi Pratama
a
Sket

c
c1

b
PERHITUNGAN
DIMENSI LUAS LUAS PANJANG (M) VOLUME KETERANGAN
NO STA kr / kn
a b c c1 M2 RATA2 Kiri Kanan M3

341 8+500 kr/kn 0.800 0.400 0.500 0.500 0.300


0.300 0.000
342 8+525 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
343 8+550 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
344 8+575 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
345 8+600 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
346 8+625 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
347 8+650 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
348 8+675 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
349 8+700 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
350 8+725 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
351 8+750 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
352 8+775 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
353 8+800 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
354 8+825 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
355 8+850 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
356 8+875 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
357 8+900 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
358 8+925 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
359 8+950 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
360 8+975 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
361 9+000 kr/kn 0.800 0.400 0.500 0.500 0.300
Sub total 112.500
Total 2,250.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
W
h ac
b
ESTIMASI VOLUME
2
4
1
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Galian untuk Selokan Drainase dan Saluran Air
Mata Pembayaran : 2.1
Satuan : m3
Konsultan CV. Multi Pratama
a
Sket

c
c1

b
PERHITUNGAN
DIMENSI LUAS LUAS PANJANG (M) VOLUME KETERANGAN
NO STA kr / kn
a b c c1 M2 RATA2 Kiri Kanan M3

361 9+000 kr/kn 0.800 0.400 0.500 0.500 0.300


0.300 0.000
362 9+025 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
363 9+050 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
364 9+075 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
365 9+100 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 0.000
366 9+125 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
367 9+150 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
368 9+175 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
369 9+200 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
370 9+225 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
371 9+250 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
372 9+275 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
373 9+300 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
374 9+325 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
375 9+350 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
376 9+375 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
377 9+400 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
378 9+425 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
379 9+450 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
380 9+475 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
381 9+500 kr/kn 0.800 0.400 0.500 0.500 0.300
Sub total 202.500
Total 2,452.500

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
W
h ac
b
ESTIMASI VOLUME
2
4
1
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Galian untuk Selokan Drainase dan Saluran Air
Mata Pembayaran : 2.1
Satuan : m3
Konsultan CV. Multi Pratama
a
Sket

c
c1

b
PERHITUNGAN
DIMENSI LUAS LUAS PANJANG (M) VOLUME KETERANGAN
NO STA kr / kn
a b c c1 M2 RATA2 Kiri Kanan M3

381 9+500 kr/kn 0.800 0.400 0.500 0.500 0.300


0.300 25.0 25.0 15.000
382 9+525 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
383 9+550 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
384 9+575 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
385 9+600 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
386 9+625 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 25.0 15.000
387 9+650 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
388 9+675 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
389 9+700 kr/kn 0.800 0.400 0.500 0.500 0.300
0.300 25.0 7.500
390 9+725 kr/kn 0.800 0.400 0.500 0.500 0.300

Sub total 112.500


Total 2,565.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Pasangan Batu Mortar
Mata Pembayaran : 2.1
Satuan : M3
Konsultan CV. Multi Pratama

W3

H1
Dilicin
W4

H2 Pas. Batu Mortar


W2

DEMENSI ( m ) Luas Panjang


NO STA Posisi Luas Volume Keterangan
Rata-rata
W1 W2 W3 W4 H1 H2 Kiri Kanan

1 0+000 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395


0.395 0.000
2 0+025 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
3 0+050 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
4 0+075 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
5 0+100 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
6 0+125 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
7 0+150 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
8 0+175 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
9 0+200 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
10 0+225 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
11 0+250 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
12 0+275 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
13 0+300 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
14 0+325 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
15 0+350 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
16 0+375 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
17 0+400 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
18 0+425 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
19 0+450 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
20 0+475 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
21 0+500 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395

Sub total 0.000


Total -

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Pasangan Batu Mortar
Mata Pembayaran : 2.1
Satuan : M3
Konsultan CV. Multi Pratama

W3

H1
Dilicin
W4

H2 Pas. Batu Mortar


W2

DEMENSI ( m ) Luas Panjang


NO STA Posisi Luas Volume Keterangan
Rata-rata
W1 W2 W3 W4 H1 H2 Kiri Kanan

21 0+500 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395


0.395 0.000
22 0+525 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
23 0+550 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
24 0+575 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
25 0+600 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
26 0+625 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
27 0+650 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
28 0+675 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
29 0+700 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
30 0+725 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
31 0+750 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
32 0+775 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
33 0+800 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
34 0+825 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
35 0+850 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
36 0+875 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
37 0+900 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
38 0+925 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
39 0+950 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
40 0+975 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
41 1+000 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395

Sub total 177.840


Total 177.840

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Pasangan Batu Mortar
Mata Pembayaran : 2.1
Satuan : M3
Konsultan CV. Multi Pratama

W3

H1
Dilicin
W4

H2 Pas. Batu Mortar


W2

DEMENSI ( m ) Luas Panjang


NO STA Posisi Luas Volume Keterangan
Rata-rata
W1 W2 W3 W4 H1 H2 Kiri Kanan

41 1+000 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395


0.395 0.000
42 1+025 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
43 1+050 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
44 1+075 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
45 1+100 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
46 1+125 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
47 1+150 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
48 1+175 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
49 1+200 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
50 1+225 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
51 1+250 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
52 1+275 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
53 1+300 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
54 1+325 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
55 1+350 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
56 1+375 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
57 1+400 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
58 1+425 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
59 1+450 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
60 1+475 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
61 1+500 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395

Sub total 88.920


Total 266.760

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Pasangan Batu Mortar
Mata Pembayaran : 2.1
Satuan : M3
Konsultan CV. Multi Pratama

W3

H1
Dilicin
W4

H2 Pas. Batu Mortar


W2

DEMENSI ( m ) Luas Panjang


NO STA Posisi Luas Volume Keterangan
Rata-rata
W1 W2 W3 W4 H1 H2 Kiri Kanan

61 1+500 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395


0.395 25.0 25.0 19.760
62 1+525 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
63 1+550 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
64 1+575 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
65 1+600 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
66 1+625 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
67 1+650 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
68 1+675 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
69 1+700 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
70 1+725 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
71 1+750 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
72 1+775 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
73 1+800 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
74 1+825 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
75 1+850 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
76 1+875 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
77 1+900 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
78 1+925 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
79 1+950 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
80 1+975 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
81 2+000 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395

Sub total 197.600


Total 464.360

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Pasangan Batu Mortar
Mata Pembayaran : 2.1
Satuan : M3
Konsultan CV. Multi Pratama

W3

H1
Dilicin
W4

H2 Pas. Batu Mortar


W2

DEMENSI ( m ) Luas Panjang


NO STA Posisi Luas Volume Keterangan
Rata-rata
W1 W2 W3 W4 H1 H2 Kiri Kanan

81 2+000 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395


0.395 25.0 25.0 19.760
82 2+025 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
83 2+050 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
84 2+075 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
85 2+100 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
86 2+125 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
87 2+150 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
88 2+175 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
89 2+200 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
90 2+225 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
91 2+250 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
92 2+275 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
93 2+300 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
94 2+325 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
95 2+350 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
96 2+375 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
97 2+400 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
98 2+425 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
99 2+450 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
100 2+475 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
101 2+500 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395

Sub total 365.560


Total 829.920

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Pasangan Batu Mortar
Mata Pembayaran : 2.1
Satuan : M3
Konsultan CV. Multi Pratama

W3

H1
Dilicin
W4

H2 Pas. Batu Mortar


W2

DEMENSI ( m ) Luas Panjang


NO STA Posisi Luas Volume Keterangan
Rata-rata
W1 W2 W3 W4 H1 H2 Kiri Kanan

101 2+500 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
102 2+525 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
103 2+550 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
104 2+575 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
105 2+600 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
106 2+625 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
107 2+650 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
108 2+675 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
109 2+700 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
110 2+725 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
111 2+750 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
112 2+775 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
113 2+800 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
114 2+825 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
115 2+850 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
116 2+875 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
117 2+900 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
118 2+925 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
119 2+950 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
120 2+975 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
121 3+000 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395

Sub total 0.000


Total 829.920

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Pasangan Batu Mortar
Mata Pembayaran : 2.1
Satuan : M3
Konsultan CV. Multi Pratama

W3

H1
Dilicin
W4

H2 Pas. Batu Mortar


W2

DEMENSI ( m ) Luas Panjang


NO STA Posisi Luas Volume Keterangan
Rata-rata
W1 W2 W3 W4 H1 H2 Kiri Kanan

121 3+000 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
122 3+025 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
123 3+050 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
124 3+075 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
125 3+100 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
126 3+125 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
127 3+150 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
128 3+175 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
129 3+200 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
130 3+225 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
131 3+250 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
132 3+275 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
133 3+300 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
134 3+325 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
135 3+350 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
136 3+375 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
137 3+400 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
138 3+425 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
139 3+450 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
140 3+475 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
141 3+500 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395

Sub total 296.400


Total 1,126.320

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Pasangan Batu Mortar
Mata Pembayaran : 2.1
Satuan : M3
Konsultan CV. Multi Pratama

W3

H1
Dilicin
W4

H2 Pas. Batu Mortar


W2

DEMENSI ( m ) Luas Panjang


NO STA Posisi Luas Volume Keterangan
Rata-rata
W1 W2 W3 W4 H1 H2 Kiri Kanan

141 3+500 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
142 3+525 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
143 3+550 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
144 3+575 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
145 3+600 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
146 3+625 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
147 3+650 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
148 3+675 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
149 3+700 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
150 3+725 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
151 3+750 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
152 3+775 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
153 3+800 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
154 3+825 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
155 3+850 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
156 3+875 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
157 3+900 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
158 3+925 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
159 3+950 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
160 3+975 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
161 4+000 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395

Sub total 197.600


Total 1,323.920

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Pasangan Batu Mortar
Mata Pembayaran : 2.1
Satuan : M3
Konsultan CV. Multi Pratama

W3

H1
Dilicin
W4

H2 Pas. Batu Mortar


W2

DEMENSI ( m ) Luas Panjang


NO STA Posisi Luas Volume Keterangan
Rata-rata
W1 W2 W3 W4 H1 H2 Kiri Kanan

161 4+000 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
162 4+025 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
163 4+050 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
164 4+075 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
165 4+100 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
166 4+125 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
167 4+150 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
168 4+175 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
169 4+200 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
170 4+225 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
171 4+250 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
172 4+275 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
173 4+300 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
174 4+325 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
175 4+350 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
176 4+375 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
177 4+400 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
178 4+425 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
179 4+450 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
180 4+475 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
181 4+500 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395

Sub total 197.600


Total 1,521.520

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Pasangan Batu Mortar
Mata Pembayaran : 2.1
Satuan : M3
Konsultan CV. Multi Pratama

W3

H1
Dilicin
W4

H2 Pas. Batu Mortar


W2

DEMENSI ( m ) Luas Panjang


NO STA Posisi Luas Volume Keterangan
Rata-rata
W1 W2 W3 W4 H1 H2 Kiri Kanan

181 4+500 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
182 4+525 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
183 4+550 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
184 4+575 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
185 4+600 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
186 4+625 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
187 4+650 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
188 4+675 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
189 4+700 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
190 4+725 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
191 4+750 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
192 4+775 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
193 4+800 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
194 4+825 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
195 4+850 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
196 4+875 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
197 4+900 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
198 4+925 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
199 4+950 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
200 4+975 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
201 5+000 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395

Sub total 118.560


Total 1,640.080

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Pasangan Batu Mortar
Mata Pembayaran : 2.1
Satuan : M3
Konsultan CV. Multi Pratama

W3

H1
Dilicin
W4

H2 Pas. Batu Mortar


W2

DEMENSI ( m ) Luas Panjang


NO STA Posisi Luas Volume Keterangan
Rata-rata
W1 W2 W3 W4 H1 H2 Kiri Kanan
201 5+000 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
202 5+025 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
203 5+050 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
204 5+075 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
205 5+100 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
206 5+125 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
207 5+150 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
208 5+175 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
209 5+200 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
210 5+225 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
211 5+250 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
212 5+275 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
213 5+300 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
214 5+325 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
215 5+350 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
216 5+375 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
217 5+400 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
218 5+425 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
219 5+450 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
220 5+475 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
221 5+500 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395

Sub total 0.000


Total 1,640.080

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

221 5+500 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Pasangan Batu Mortar
Mata Pembayaran : 2.1
Satuan : M3
Konsultan CV. Multi Pratama

W3

H1
Dilicin
W4

H2 Pas. Batu Mortar


W2

DEMENSI ( m ) Luas Panjang


NO STA Posisi Luas Volume Keterangan
Rata-rata
W1 W2 W3 W4 H1 H2 Kiri Kanan
0.395 0.000
222 5+525 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
223 5+550 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
224 5+575 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
225 5+600 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
226 5+625 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
227 5+650 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
228 5+675 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
229 5+700 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
230 5+725 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
231 5+750 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
232 5+775 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
233 5+800 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
234 5+825 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
235 5+850 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
236 5+875 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
237 5+900 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
238 5+925 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
239 5+950 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
240 5+975 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
241 6+000 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395

Sub total 88.920


Total 1,729.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

241 6+000 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Pasangan Batu Mortar
Mata Pembayaran : 2.1
Satuan : M3
Konsultan CV. Multi Pratama

W3

H1
Dilicin
W4

H2 Pas. Batu Mortar


W2

DEMENSI ( m ) Luas Panjang


NO STA Posisi Luas Volume Keterangan
Rata-rata
W1 W2 W3 W4 H1 H2 Kiri Kanan
242 6+025 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
243 6+050 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
244 6+075 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
245 6+100 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
246 6+125 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
247 6+150 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
248 6+175 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
249 6+200 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
250 6+225 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
251 6+250 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
252 6+275 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
253 6+300 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
254 6+325 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
255 6+350 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
256 6+375 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
257 6+400 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
258 6+425 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
259 6+450 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
260 6+475 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
261 6+500 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395

Sub total 237.120


Total 1,966.120

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

261 6+500 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
262 6+525 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Pasangan Batu Mortar
Mata Pembayaran : 2.1
Satuan : M3
Konsultan CV. Multi Pratama

W3

H1
Dilicin
W4

H2 Pas. Batu Mortar


W2

DEMENSI ( m ) Luas Panjang


NO STA Posisi Luas Volume Keterangan
Rata-rata
W1 W2 W3 W4 H1 H2 Kiri Kanan
0.395 25.0 25.0 19.760
263 6+550 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
264 6+575 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
265 6+600 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
266 6+625 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
267 6+650 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
268 6+675 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
269 6+700 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
270 6+725 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
271 6+750 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
272 6+775 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
273 6+800 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
274 6+825 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
275 6+850 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
276 6+875 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
277 6+900 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
278 6+925 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
279 6+950 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
280 6+975 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
281 7+000 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395

Sub total 276.640


Total 2,242.760

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

281 7+000 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
282 7+025 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Pasangan Batu Mortar
Mata Pembayaran : 2.1
Satuan : M3
Konsultan CV. Multi Pratama

W3

H1
Dilicin
W4

H2 Pas. Batu Mortar


W2

DEMENSI ( m ) Luas Panjang


NO STA Posisi Luas Volume Keterangan
Rata-rata
W1 W2 W3 W4 H1 H2 Kiri Kanan
283 7+050 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
284 7+075 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
285 7+100 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
286 7+125 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
287 7+150 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
288 7+175 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
289 7+200 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
290 7+225 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
291 7+250 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
292 7+275 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
293 7+300 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
294 7+325 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
295 7+350 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
296 7+375 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
297 7+400 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
298 7+425 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
299 7+450 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
300 7+475 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
301 7+500 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395

Sub total 158.080


Total 2,400.840

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

301 7+500 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
302 7+525 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
303 7+550 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Pasangan Batu Mortar
Mata Pembayaran : 2.1
Satuan : M3
Konsultan CV. Multi Pratama

W3

H1
Dilicin
W4

H2 Pas. Batu Mortar


W2

DEMENSI ( m ) Luas Panjang


NO STA Posisi Luas Volume Keterangan
Rata-rata
W1 W2 W3 W4 H1 H2 Kiri Kanan
0.395 0.000
304 7+575 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
305 7+600 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
306 7+625 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
307 7+650 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
308 7+675 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
309 7+700 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
310 7+725 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
311 7+750 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
312 7+775 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
313 7+800 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
314 7+825 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
315 7+850 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
316 7+875 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
317 7+900 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
318 7+925 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
319 7+950 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
320 7+975 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
321 8+000 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395

Sub total 158.080


Total 2,558.920

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

321 8+000 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
322 8+025 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
323 8+050 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Pasangan Batu Mortar
Mata Pembayaran : 2.1
Satuan : M3
Konsultan CV. Multi Pratama

W3

H1
Dilicin
W4

H2 Pas. Batu Mortar


W2

DEMENSI ( m ) Luas Panjang


NO STA Posisi Luas Volume Keterangan
Rata-rata
W1 W2 W3 W4 H1 H2 Kiri Kanan
324 8+075 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
325 8+100 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
326 8+125 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
327 8+150 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
328 8+175 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
329 8+200 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
330 8+225 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
331 8+250 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
332 8+275 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
333 8+300 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
334 8+325 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
335 8+350 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
336 8+375 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
337 8+400 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
338 8+425 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
339 8+450 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
340 8+475 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
341 8+500 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395

Sub total 256.880


Total 2,815.800

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

341 8+500 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
342 8+525 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
343 8+550 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
344 8+575 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Pasangan Batu Mortar
Mata Pembayaran : 2.1
Satuan : M3
Konsultan CV. Multi Pratama

W3

H1
Dilicin
W4

H2 Pas. Batu Mortar


W2

DEMENSI ( m ) Luas Panjang


NO STA Posisi Luas Volume Keterangan
Rata-rata
W1 W2 W3 W4 H1 H2 Kiri Kanan
0.395 0.000
345 8+600 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
346 8+625 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
347 8+650 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
348 8+675 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
349 8+700 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
350 8+725 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
351 8+750 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
352 8+775 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
353 8+800 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
354 8+825 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
355 8+850 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
356 8+875 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
357 8+900 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
358 8+925 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
359 8+950 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
360 8+975 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
361 9+000 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395

Sub total 148.200


Total 2,964.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

361 9+000 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
362 9+025 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
363 9+050 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
364 9+075 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Pasangan Batu Mortar
Mata Pembayaran : 2.1
Satuan : M3
Konsultan CV. Multi Pratama

W3

H1
Dilicin
W4

H2 Pas. Batu Mortar


W2

DEMENSI ( m ) Luas Panjang


NO STA Posisi Luas Volume Keterangan
Rata-rata
W1 W2 W3 W4 H1 H2 Kiri Kanan
365 9+100 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
366 9+125 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 0.000
367 9+150 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
368 9+175 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
369 9+200 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
370 9+225 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
371 9+250 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
372 9+275 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
373 9+300 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
374 9+325 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
375 9+350 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
376 9+375 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
377 9+400 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
378 9+425 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
379 9+450 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
380 9+475 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
381 9+500 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395

Sub total 247.000


Total 3,211.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

381 9+500 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
382 9+525 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
383 9+550 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
384 9+575 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
385 9+600 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Pasangan Batu Mortar
Mata Pembayaran : 2.1
Satuan : M3
Konsultan CV. Multi Pratama

W3

H1
Dilicin
W4

H2 Pas. Batu Mortar


W2

DEMENSI ( m ) Luas Panjang


NO STA Posisi Luas Volume Keterangan
Rata-rata
W1 W2 W3 W4 H1 H2 Kiri Kanan
0.395 25.0 25.0 19.760
386 9+625 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 25.0 19.760
387 9+650 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
388 9+675 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
389 9+700 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395
0.395 25.0 9.880
390 9+725 kr/kn 0.200 0.688 0.800 0.400 0.600 0.200 0.395

Sub total 148.200


Total 3,359.200

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan
Mata Pembayara
Satuan
Kontraktor
Konsultan

Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
m2 m2 m2 m2 m m3

1 0+000 0.000 0.000


0.000 25.00 -
2 0+025 0.000
0.000 25.00 -
3 0+050 0.000
0.000 25.00 -
4 0+075 0.000
0.000 25.00 -
5 0+100 0.000
0.000 25.00 -
6 0+125 0.000
0.000 25.00 -
7 0+150 0.000
0.000 25.00 -
8 0+175 0.000
3.172 25.00 79.288
9 0+200 7.394 1.051 6.343
3.172 25.00 79.288
10 0+225 0.000
0.000 25.00 -
11 0+250 0.000
6.360 25.00 159.000
12 0+275 13.771 1.051 12.720
13.825 25.00 345.613
13 0+300 15.980 1.051 14.929
13.731 25.00 343.275
14 0+325 13.584 1.051 12.533
6.267 25.00 156.663
15 0+350 0.000
0.000 25.00 -
16 0+375 0.000
3.692 25.00 92.288
17 0+400 8.434 1.051 7.383
11.404 25.00 285.088
18 0+425 16.475 1.051 15.424
7.712 25.00 192.800
19 0+450 0.000
0.000 25.00 -
20 0+475 0.000
0.000 25.00 -
21 0+500 0.000

Sub total 1,733.300


Total 1,733.300

Direksi PU Konsultan Kontraktor


Bina Marga
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan
Mata Pembayara
Satuan
Kontraktor
Konsultan

Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
m2 m2 m2 m2 m m3

Koordinator Lapangan Chief Inspector / QE Quantity Engineer

21 0+500 0.000 0.000 0.000


0.000 25.00 -
22 0+525 0.000
0.000 25.00 -
23 0+550 0.000
0.000 25.00 -
24 0+575 0.000
2.433 25.00 60.813
25 0+600 5.916 1.051 4.865
18.027 25.00 450.675
26 0+625 32.240 1.051 31.189
30.541 25.00 763.513
27 0+650 30.943 1.051 29.892
33.703 25.00 842.575
28 0+675 38.565 1.051 37.514
37.865 25.00 946.625
29 0+700 39.267 1.051 38.216
33.958 25.00 848.950
30 0+725 30.751 1.051 29.700
25.076 25.00 626.888
31 0+750 21.502 1.051 20.451
16.096 25.00 402.388
32 0+775 12.791 1.051 11.740
11.615 25.00 290.375
33 0+800 12.541 1.051 11.490
14.497 25.00 362.413
34 0+825 18.554 1.051 17.503
15.261 25.00 381.513
35 0+850 14.069 1.051 13.018
6.509 25.00 162.725
36 0+875 0.000
0.000 25.00 -
37 0+900 0.000
0.000 25.00 -
38 0+925 0.000
0.000 25.00 -
39 0+950 0.000
0.000 25.00 -
40 0+975 0.000
0.000 25.00 -
41 1+000 0.000

Sub total 6,139.450


Total 7,872.750

Direksi PU Konsultan Kontraktor


ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan
Mata Pembayara
Satuan
Kontraktor
Konsultan

Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
m2 m2 m2 m2 m m3
Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

41 1+000 0.000 0.000 0.000


0.000 25.00 -
42 1+025 0.000
0.000 25.00 -
43 1+050 0.000
0.000 25.00 -
44 1+075 0.000
0.000 25.00 -
45 1+100 0.000
1.871 25.00 46.763
46 1+125 3.741 3.741
12.317 25.00 307.913
47 1+150 21.943 1.051 20.892
21.723 25.00 543.075
48 1+175 23.605 1.051 22.554
15.643 25.00 391.075
49 1+200 9.783 1.051 8.732
9.366 25.00 234.150
50 1+225 11.051 1.051 10.000
7.903 25.00 197.563
51 1+250 6.856 1.051 5.805
2.903 25.00 72.563
52 1+275 0.000
0.000 25.00 -
53 1+300 0.000
0.000 25.00 -
54 1+325 0.000
0.000 25.00 -
55 1+350 0.000
0.000 25.00 -
56 1+375 0.000
0.000 25.00 -
57 1+400 0.000
0.000 25.00 -
58 1+425 0.000
8.813 25.00 220.325
59 1+450 18.677 1.051 17.626
19.509 25.00 487.713
60 1+475 22.442 1.051 21.391
29.798 25.00 744.938
61 1+500 39.255 1.051 38.204

Sub total 3,246.075


ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan
Mata Pembayara
Satuan
Kontraktor
Konsultan

Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
m2 m2 m2 m2 m m3
Total 11,118.825

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

61 1+500 39.255 1.051 38.204


29.530 25.00 738.250
62 1+525 21.907 1.051 20.856
10.428 25.00 260.700
63 1+550 0.000
0.000 25.00 -
64 1+575 0.000
0.000 25.00 -
65 1+600 0.000
0.000 25.00 -
66 1+625 0.000
0.000 25.00 -
67 1+650 0.000
0.000 25.00 -
68 1+675 0.000
0.000 25.00 -
69 1+700 0.000
0.000 25.00 -
70 1+725 0.000
0.000 25.00 -
71 1+750 0.000
0.000 25.00 -
72 1+775 0.000
4.202 25.00 105.038
73 1+800 9.454 1.051 8.403
41.208 25.00 1,030.188
74 1+825 75.063 1.051 74.012
104.635 25.00 2,615.863
75 1+850 136.308 1.051 135.257
139.205 25.00 3,480.113
76 1+875 144.203 1.051 143.152
148.642 25.00 3,716.050
77 1+900 155.183 1.051 154.132
151.135 25.00 3,778.363
78 1+925 149.188 1.051 148.137
151.393 25.00 3,784.825
79 1+950 155.700 1.051 154.649
149.992 25.00 3,749.800
80 1+975 146.386 1.051 145.335
139.521 25.00 3,488.013
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan
Mata Pembayara
Satuan
Kontraktor
Konsultan

Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
m2 m2 m2 m2 m m3
81 2+000 134.757 1.051 133.706

Sub total 26,747.200


Total 37,866.025

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

81 2+000 134.757 1.051 133.706


145.034 25.00 3,625.838
82 2+025 157.412 1.051 156.361
142.756 25.00 3,568.888
83 2+050 130.201 1.051 129.150
125.835 25.00 3,145.875
84 2+075 123.571 1.051 122.520
119.542 25.00 2,988.538
85 2+100 117.614 1.051 116.563
128.825 25.00 3,220.625
86 2+125 142.138 1.051 141.087
148.365 25.00 3,709.113
87 2+150 156.693 1.051 155.642
151.047 25.00 3,776.163
88 2+175 147.502 1.051 146.451
130.715 25.00 3,267.875
89 2+200 116.030 1.051 114.979
117.949 25.00 2,948.713
90 2+225 121.969 1.051 120.918
126.563 25.00 3,164.075
91 2+250 133.259 1.051 132.208
116.326 25.00 2,908.138
92 2+275 101.494 1.051 100.443
82.384 25.00 2,059.588
93 2+300 65.375 1.051 64.324
53.941 25.00 1,348.525
94 2+325 44.609 1.051 43.558
40.930 25.00 1,023.250
95 2+350 39.353 1.051 38.302
35.818 25.00 895.450
96 2+375 34.385 1.051 33.334
36.244 25.00 906.088
97 2+400 40.204 1.051 39.153
46.044 25.00 1,151.088
98 2+425 53.985 1.051 52.934
66.755 25.00 1,668.863
99 2+450 80.575 80.575
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan
Mata Pembayara
Satuan
Kontraktor
Konsultan

Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
m2 m2 m2 m2 m m3
82.155 25.00 2,053.863
100 2+475 83.734 83.734
68.714 25.00 1,717.838
101 2+500 53.693 53.693

Sub total 49,148.388


Total 87,014.413

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

101 2+500 53.693 0.000 53.693


53.193 25.00 1,329.813
102 2+525 52.692 52.692
49.715 25.00 1,242.863
103 2+550 46.737 46.737
39.778 25.00 994.450
104 2+575 33.870 1.051 32.819
25.241 25.00 631.025
105 2+600 18.714 1.051 17.663
16.525 25.00 413.113
106 2+625 16.437 1.051 15.386
20.647 25.00 516.175
107 2+650 25.908 25.908
40.320 25.00 1,008.000
108 2+675 54.732 54.732
69.119 25.00 1,727.963
109 2+700 83.505 83.505
69.271 25.00 1,731.763
110 2+725 56.087 1.051 55.036
40.774 25.00 1,019.338
111 2+750 26.511 26.511
13.256 25.00 331.388
112 2+775 0.000
0.000 25.00 -
113 2+800 0.000
0.000 25.00 -
114 2+825 0.000
0.000 25.00 -
115 2+850 0.000
0.000 25.00 -
116 2+875 0.000
0.000 25.00 -
117 2+900 0.000
0.000 25.00 -
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan
Mata Pembayara
Satuan
Kontraktor
Konsultan

Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
m2 m2 m2 m2 m m3
118 2+925 0.000
0.000 25.00 -
119 2+950 0.000
0.000 25.00 -
120 2+975 0.000
0.000 25.00 -
121 3+000 0.000

Sub total 10,945.888


Total 97,960.300

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

121 3+000 0.000 0.000 0.000


0.000 25.00 -
122 3+025 0.000
0.000 25.00 -
123 3+050 0.000
0.000 25.00 -
124 3+075 0.000
17.570 25.00 439.238
125 3+100 36.190 1.051 35.139
45.602 25.00 1,140.038
126 3+125 57.115 1.051 56.064
59.703 25.00 1,492.563
127 3+150 64.392 1.051 63.341
51.819 25.00 1,295.475
128 3+175 41.348 1.051 40.297
32.670 25.00 816.750
129 3+200 26.094 1.051 25.043
25.235 25.00 630.863
130 3+225 26.477 1.051 25.426
35.482 25.00 887.038
131 3+250 46.588 1.051 45.537
39.253 25.00 981.325
132 3+275 34.020 1.051 32.969
48.983 25.00 1,224.575
133 3+300 66.048 1.051 64.997
61.969 25.00 1,549.225
134 3+325 59.992 1.051 58.941
78.421 25.00 1,960.513
135 3+350 98.951 1.051 97.900
85.127 25.00 2,128.163
136 3+375 73.404 1.051 72.353
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan
Mata Pembayara
Satuan
Kontraktor
Konsultan

Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
m2 m2 m2 m2 m m3
75.646 25.00 1,891.138
137 3+400 79.989 1.051 78.938
68.708 25.00 1,717.700
138 3+425 59.529 1.051 58.478
61.377 25.00 1,534.413
139 3+450 65.326 1.051 64.275
75.356 25.00 1,883.888
140 3+475 87.487 1.051 86.436
81.867 25.00 2,046.663
141 3+500 78.348 1.051 77.297

Sub total 23,619.563


Total 121,579.863

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

141 3+500 78.348 1.051 77.297


71.314 25.00 1,782.850
142 3+525 66.382 1.051 65.331
71.041 25.00 1,776.013
143 3+550 77.801 1.051 76.750
107.679 25.00 2,691.975
144 3+575 139.659 1.051 138.608
117.557 25.00 2,938.913
145 3+600 97.556 1.051 96.505
69.781 25.00 1,744.525
146 3+625 44.108 1.051 43.057
35.053 25.00 876.325
147 3+650 28.100 1.051 27.049
35.205 25.00 880.125
148 3+675 44.412 1.051 43.361
44.388 25.00 1,109.688
149 3+700 46.465 1.051 45.414
58.824 25.00 1,470.600
150 3+725 73.285 1.051 72.234
59.302 25.00 1,482.550
151 3+750 47.421 1.051 46.370
38.804 25.00 970.088
152 3+775 32.288 1.051 31.237
22.296 25.00 557.400
153 3+800 14.406 1.051 13.355
11.504 25.00 287.588
154 3+825 10.703 1.051 9.652
14.101 25.00 352.525
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan
Mata Pembayara
Satuan
Kontraktor
Konsultan

Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
m2 m2 m2 m2 m m3
155 3+850 19.601 1.051 18.550
25.703 25.00 642.575
156 3+875 33.907 1.051 32.856
32.677 25.00 816.913
157 3+900 33.548 1.051 32.497
16.249 25.00 406.213
158 3+925 0.000
2.585 25.00 64.625
159 3+950 5.170 5.170
4.572 25.00 114.300
160 3+975 3.974 3.974
3.374 25.00 84.338
161 4+000 2.773 2.773

Sub total 21,050.125


Total 142,629.988

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

161 4+000 2.773 0.000 2.773


8.382 25.00 209.538
162 4+025 15.041 1.051 13.990
13.573 25.00 339.325
163 4+050 14.207 1.051 13.156
9.287 25.00 232.163
164 4+075 5.417 5.417
21.437 25.00 535.913
165 4+100 38.507 1.051 37.456
56.091 25.00 1,402.263
166 4+125 74.725 74.725
67.116 25.00 1,677.900
167 4+150 59.507 59.507
59.828 25.00 1,495.688
168 4+175 60.148 60.148
36.992 25.00 924.800
169 4+200 14.887 1.051 13.836
9.095 25.00 227.375
170 4+225 4.354 4.354
7.043 25.00 176.063
171 4+250 9.731 9.731
6.753 25.00 168.813
172 4+275 3.774 3.774
3.460 25.00 86.488
173 4+300 3.145 3.145
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan
Mata Pembayara
Satuan
Kontraktor
Konsultan

Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
m2 m2 m2 m2 m m3
3.613 25.00 90.325
174 4+325 4.081 4.081
22.367 25.00 559.163
175 4+350 41.703 1.051 40.652
39.818 25.00 995.438
176 4+375 40.034 1.051 38.983
50.288 25.00 1,257.200
177 4+400 61.593 61.593
80.256 25.00 2,006.388
178 4+425 98.918 98.918
114.716 25.00 2,867.900
179 4+450 130.514 130.514
126.496 25.00 3,162.400
180 4+475 122.478 122.478
99.372 25.00 2,484.300
181 4+500 77.317 1.051 76.266

Sub total 20,899.438


Total 163,529.425

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

181 4+500 77.317 1.051 76.266


67.767 25.00 1,694.163
182 4+525 59.267 59.267
57.786 25.00 1,444.650
183 4+550 56.305 56.305
63.031 25.00 1,575.775
184 4+575 69.757 69.757
70.022 25.00 1,750.538
185 4+600 70.286 70.286
58.728 25.00 1,468.188
186 4+625 47.169 47.169
40.986 25.00 1,024.638
187 4+650 34.802 34.802
22.138 25.00 553.438
188 4+675 10.524 1.051 9.473
19.510 25.00 487.738
189 4+700 30.597 1.051 29.546
24.933 25.00 623.325
190 4+725 21.371 1.051 20.320
20.780 25.00 519.488
191 4+750 22.290 1.051 21.239
20.647 25.00 516.175
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan
Mata Pembayara
Satuan
Kontraktor
Konsultan

Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
m2 m2 m2 m2 m m3
192 4+775 21.106 1.051 20.055
14.773 25.00 369.325
193 4+800 10.542 1.051 9.491
4.746 25.00 118.638
194 4+825 0.000
1.238 25.00 30.938
195 4+850 3.526 1.051 2.475
16.205 25.00 405.125
196 4+875 30.986 1.051 29.935
39.579 25.00 989.475
197 4+900 50.274 1.051 49.223
34.094 25.00 852.350
198 4+925 20.016 1.051 18.965
9.483 25.00 237.063
199 4+950 0.000
2.125 25.00 53.125
200 4+975 5.301 1.051 4.250
9.474 25.00 236.838
201 5+000 15.748 1.051 14.697

Sub total 14,950.988


Total 178,480.413

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

201 5+000 15.748 1.051 14.697


14.130 25.00 353.238
202 5+025 14.613 1.051 13.562
10.287 25.00 257.163
203 5+050 8.062 1.051 7.011
3.506 25.00 87.638
204 5+075 0.000
0.000 25.00 -
205 5+100 0.000
0.000 25.00 -
206 5+125 0.000
0.000 25.00 -
207 5+150 0.000
0.000 25.00 -
208 5+175 0.000
11.086 25.00 277.150
209 5+200 23.223 1.051 22.172
18.200 25.00 455.000
210 5+225 15.279 1.051 14.228
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan
Mata Pembayara
Satuan
Kontraktor
Konsultan

Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
m2 m2 m2 m2 m m3
8.597 25.00 214.925
211 5+250 4.017 1.051 2.966
1.483 25.00 37.075
212 5+275 0.000
0.000 25.00 -
213 5+300 0.000
2.470 25.00 61.750
214 5+325 4.940 4.940
9.837 25.00 245.913
215 5+350 15.784 1.051 14.733
20.612 25.00 515.288
216 5+375 27.541 1.051 26.490
24.225 25.00 605.625
217 5+400 23.011 1.051 21.960
18.842 25.00 471.038
218 5+425 16.774 1.051 15.723
13.383 25.00 334.563
219 5+450 12.093 1.051 11.042
8.288 25.00 207.200
220 5+475 6.585 1.051 5.534
9.519 25.00 237.975
221 5+500 14.555 1.051 13.504

Sub total 4,361.538


Total 182,841.950

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

221 5+500 14.555 1.051 13.504


6.752 25.00 168.800
222 5+525 0.000
0.000 25.00 -
223 5+550 0.000
0.000 25.00 -
224 5+575 0.000
0.000 25.00 -
225 5+600 0.000
0.000 25.00 -
226 5+625 0.000
4.045 25.00 101.113
227 5+650 9.140 1.051 8.089
19.748 25.00 493.700
228 5+675 32.458 1.051 31.407
27.749 25.00 693.713
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan
Mata Pembayara
Satuan
Kontraktor
Konsultan

Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
m2 m2 m2 m2 m m3
229 5+700 25.141 1.051 24.090
20.370 25.00 509.238
230 5+725 17.700 1.051 16.649
16.056 25.00 401.400
231 5+750 16.514 1.051 15.463
20.737 25.00 518.425
232 5+775 27.062 1.051 26.011
38.699 25.00 967.463
233 5+800 52.437 1.051 51.386
50.034 25.00 1,250.838
234 5+825 49.732 1.051 48.681
35.831 25.00 895.763
235 5+850 24.031 1.051 22.980
14.579 25.00 364.475
236 5+875 6.178 6.178
3.089 25.00 77.225
237 5+900 0.000
0.000 25.00 -
238 5+925 0.000
2.838 25.00 70.938
239 5+950 5.675 5.675
5.669 25.00 141.725
240 5+975 5.663 5.663
11.813 25.00 295.313
241 6+000 19.013 1.051 17.962

Sub total 6,950.125


Total 189,792.075

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

241 6+000 19.013 1.051 17.962


21.310 25.00 532.750
242 6+025 25.709 1.051 24.658
47.283 25.00 1,182.075
243 6+050 70.959 1.051 69.908
72.860 25.00 1,821.500
244 6+075 76.863 1.051 75.812
73.329 25.00 1,833.213
245 6+100 71.896 1.051 70.845
78.066 25.00 1,951.638
246 6+125 86.337 1.051 85.286
82.028 25.00 2,050.700
247 6+150 79.821 1.051 78.770
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan
Mata Pembayara
Satuan
Kontraktor
Konsultan

Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
m2 m2 m2 m2 m m3
92.136 25.00 2,303.400
248 6+175 106.553 1.051 105.502
102.714 25.00 2,567.850
249 6+200 100.977 1.051 99.926
94.613 25.00 2,365.325
250 6+225 90.351 1.051 89.300
114.926 25.00 2,873.150
251 6+250 141.603 1.051 140.552
163.651 25.00 4,091.275
252 6+275 187.801 1.051 186.750
138.528 25.00 3,463.200
253 6+300 91.357 1.051 90.306
60.365 25.00 1,509.125
254 6+325 31.475 1.051 30.424
28.859 25.00 721.463
255 6+350 28.344 1.051 27.293
28.133 25.00 703.325
256 6+375 30.024 1.051 28.973
28.895 25.00 722.363
257 6+400 29.867 1.051 28.816
30.791 25.00 769.775
258 6+425 33.817 1.051 32.766
73.076 25.00 1,826.900
259 6+450 114.437 1.051 113.386
101.153 25.00 2,528.813
260 6+475 89.970 1.051 88.919
85.532 25.00 2,138.300
261 6+500 83.196 1.051 82.145

Sub total 37,956.138


Total 227,748.213

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

261 6+500 83.196 1.051 82.145


85.971 25.00 2,149.263
262 6+525 90.847 1.051 89.796
83.891 25.00 2,097.263
263 6+550 79.036 1.051 77.985
80.919 25.00 2,022.975
264 6+575 84.904 1.051 83.853
88.075 25.00 2,201.863
265 6+600 93.347 1.051 92.296
107.192 25.00 2,679.788
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan
Mata Pembayara
Satuan
Kontraktor
Konsultan

Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
m2 m2 m2 m2 m m3
266 6+625 123.138 1.051 122.087
119.343 25.00 2,983.575
267 6+650 117.650 1.051 116.599
109.104 25.00 2,727.600
268 6+675 102.660 1.051 101.609
73.316 25.00 1,832.888
269 6+700 46.073 1.051 45.022
45.246 25.00 1,131.150
270 6+725 46.521 1.051 45.470
44.365 25.00 1,109.113
271 6+750 44.310 1.051 43.259
41.911 25.00 1,047.775
272 6+775 41.614 1.051 40.563
35.876 25.00 896.900
273 6+800 32.240 1.051 31.189
25.291 25.00 632.275
274 6+825 20.444 1.051 19.393
9.697 25.00 242.413
275 6+850 0.000
0.000 25.00 -
276 6+875 0.000
0.000 25.00 -
277 6+900 0.000
0.000 25.00 -
278 6+925 0.000
0.000 25.00 -
279 6+950 0.000
10.597 25.00 264.913
280 6+975 22.244 1.051 21.193
31.345 25.00 783.613
281 7+000 42.547 1.051 41.496

Sub total 24,803.363


Total 252,551.575

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

281 7+000 42.547 1.051 41.496


49.548 25.00 1,238.700
282 7+025 58.651 1.051 57.600
54.566 25.00 1,364.150
283 7+050 52.583 1.051 51.532
46.909 25.00 1,172.713
284 7+075 43.336 1.051 42.285
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan
Mata Pembayara
Satuan
Kontraktor
Konsultan

Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
m2 m2 m2 m2 m m3
57.877 25.00 1,446.925
285 7+100 74.520 1.051 73.469
64.096 25.00 1,602.400
286 7+125 55.774 1.051 54.723
62.145 25.00 1,553.613
287 7+150 70.617 1.051 69.566
64.750 25.00 1,618.750
288 7+175 60.985 1.051 59.934
40.082 25.00 1,002.038
289 7+200 21.280 1.051 20.229
10.891 25.00 272.275
290 7+225 1.553 1.553
0.777 25.00 19.413
291 7+250 0.000
0.000 25.00 -
292 7+275 0.000
0.000 25.00 -
293 7+300 0.000
0.000 25.00 -
294 7+325 0.000
0.000 25.00 -
295 7+350 0.000
0.000 25.00 -
296 7+375 0.000
0.000 25.00 -
297 7+400 0.000
4.758 25.00 118.938
298 7+425 10.566 1.051 9.515
4.758 25.00 118.938
299 7+450 0.000
0.000 25.00 -
300 7+475 0.000
6.145 25.00 153.625
301 7+500 12.290 12.290

Sub total 11,682.475


Total 264,234.050

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

301 7+500 12.290 0.000 12.290


6.145 25.00 153.625
302 7+525 0.000
0.000 25.00 -
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan
Mata Pembayara
Satuan
Kontraktor
Konsultan

Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
m2 m2 m2 m2 m m3
303 7+550 0.000
0.000 25.00 -
304 7+575 0.000
2.569 25.00 64.213
305 7+600 5.137 5.137
2.569 25.00 64.213
306 7+625 0.000
6.345 25.00 158.613
307 7+650 12.689 12.689
13.587 25.00 339.675
308 7+675 14.485 14.485
7.752 25.00 193.800
309 7+700 1.019 1.019
9.019 25.00 225.463
310 7+725 18.069 1.051 17.018
24.841 25.00 621.025
311 7+750 33.715 1.051 32.664
35.383 25.00 884.575
312 7+775 39.153 1.051 38.102
33.037 25.00 825.913
313 7+800 29.022 1.051 27.971
28.580 25.00 714.488
314 7+825 30.239 1.051 29.188
32.924 25.00 823.100
315 7+850 37.711 1.051 36.660
23.900 25.00 597.488
316 7+875 12.190 1.051 11.139
7.191 25.00 179.775
317 7+900 3.243 3.243
1.622 25.00 40.538
318 7+925 0.000
0.856 25.00 21.400
319 7+950 1.712 1.712
0.856 25.00 21.400
320 7+975 0.000
0.000 25.00 -
321 8+000 0.000

Sub total 5,929.300


Total 270,163.350

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

321 8+000 0.000 0.000 0.000


ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan
Mata Pembayara
Satuan
Kontraktor
Konsultan

Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
m2 m2 m2 m2 m m3
0.000 25.00 -
322 8+025 0.000
0.000 25.00 -
323 8+050 0.000
1.677 25.00 41.925
324 8+075 3.354 3.354
15.420 25.00 385.500
325 8+100 28.537 1.051 27.486
41.939 25.00 1,048.475
326 8+125 57.443 1.051 56.392
98.633 25.00 2,465.825
327 8+150 141.925 1.051 140.874
158.910 25.00 3,972.738
328 8+175 177.996 1.051 176.945
155.530 25.00 3,888.250
329 8+200 135.166 1.051 134.115
130.229 25.00 3,255.713
330 8+225 127.393 1.051 126.342
151.351 25.00 3,783.775
331 8+250 177.411 1.051 176.360
139.826 25.00 3,495.650
332 8+275 104.343 1.051 103.292
77.907 25.00 1,947.663
333 8+300 53.572 1.051 52.521
45.015 25.00 1,125.375
334 8+325 38.560 1.051 37.509
19.968 25.00 499.188
335 8+350 3.477 1.051 2.426
7.086 25.00 177.138
336 8+375 12.796 1.051 11.745
37.359 25.00 933.963
337 8+400 64.023 1.051 62.972
62.062 25.00 1,551.538
338 8+425 62.202 1.051 61.151
45.043 25.00 1,126.063
339 8+450 29.985 1.051 28.934
34.182 25.00 854.538
340 8+475 40.480 1.051 39.429
27.661 25.00 691.513
341 8+500 16.943 1.051 15.892

Sub total 31,244.825


Total 301,408.175

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan
Mata Pembayara
Satuan
Kontraktor
Konsultan

Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
m2 m2 m2 m2 m m3
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

341 8+500 16.943 1.051 15.892


7.946 25.00 198.650
342 8+525 0.000
0.000 25.00 -
343 8+550 0.000
0.000 25.00 -
344 8+575 0.000
0.000 25.00 -
345 8+600 0.000
0.000 25.00 -
346 8+625 0.000
0.000 25.00 -
347 8+650 0.000
0.000 25.00 -
348 8+675 0.000
0.000 25.00 -
349 8+700 0.000
2.682 25.00 67.050
350 8+725 5.364 5.364
2.682 25.00 67.050
351 8+750 0.000
3.843 25.00 96.075
352 8+775 8.737 1.051 7.686
10.904 25.00 272.588
353 8+800 15.172 1.051 14.121
31.706 25.00 792.638
354 8+825 50.341 1.051 49.290
51.157 25.00 1,278.925
355 8+850 54.075 1.051 53.024
48.147 25.00 1,203.675
356 8+875 44.321 1.051 43.270
41.025 25.00 1,025.613
357 8+900 39.830 1.051 38.779
37.541 25.00 938.513
358 8+925 37.353 1.051 36.302
53.025 25.00 1,325.613
359 8+950 70.798 1.051 69.747
68.631 25.00 1,715.775
360 8+975 68.566 1.051 67.515
53.638 25.00 1,340.950
361 9+000 40.812 1.051 39.761

Sub total 10,323.113


Total 311,731.288

Direksi PU Konsultan Kontraktor


Bina Marga 0 0
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan
Mata Pembayara
Satuan
Kontraktor
Konsultan

Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
m2 m2 m2 m2 m m3

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

361 9+000 40.812 1.051 39.761


19.881 25.00 497.013
362 9+025 0.000
0.000 25.00 -
363 9+050 0.000
0.000 25.00 -
364 9+075 0.000
0.000 25.00 -
365 9+100 0.000
2.827 25.00 70.663
366 9+125 5.653 5.653
18.957 25.00 473.925
367 9+150 33.312 1.051 32.261
34.395 25.00 859.875
368 9+175 37.580 1.051 36.529
27.494 25.00 687.350
369 9+200 19.510 1.051 18.459
17.037 25.00 425.913
370 9+225 16.665 1.051 15.614
17.236 25.00 430.900
371 9+250 19.909 1.051 18.858
14.170 25.00 354.238
372 9+275 10.532 1.051 9.481
23.066 25.00 576.638
373 9+300 37.701 1.051 36.650
55.282 25.00 1,382.050
374 9+325 74.965 1.051 73.914
67.806 25.00 1,695.150
375 9+350 62.749 1.051 61.698
56.613 25.00 1,415.313
376 9+375 52.578 1.051 51.527
47.319 25.00 1,182.963
377 9+400 44.161 1.051 43.110
41.117 25.00 1,027.913
378 9+425 40.174 1.051 39.123
34.367 25.00 859.175
379 9+450 30.662 1.051 29.611
30.060 25.00 751.488
380 9+475 31.559 1.051 30.508
25.315 25.00 632.875
381 9+500 21.173 1.051 20.122

Sub total 13,323.438


Total 325,054.725
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan
Mata Pembayara
Satuan
Kontraktor
Konsultan

Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
m2 m2 m2 m2 m m3
Direksi PU Konsultan Kontraktor
Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

381 9+500 21.173 1.051 20.122


25.126 25.00 628.150
382 9+525 31.181 1.051 30.130
45.256 25.00 1,131.400
383 9+550 61.433 1.051 60.382
56.299 25.00 1,407.475
384 9+575 53.267 1.051 52.216
34.994 25.00 874.838
385 9+600 18.822 1.051 17.771
12.724 25.00 318.088
386 9+625 8.727 1.051 7.676
11.384 25.00 284.588
387 9+650 16.142 1.051 15.091
20.853 25.00 521.325
388 9+675 27.666 1.051 26.615
31.556 25.00 788.900
389 9+700 37.548 1.051 36.497
24.340 25.00 608.488
390 9+725 13.233 1.051 12.182
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan
Mata Pembayara
Satuan
Kontraktor
Konsultan

Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
m2 m2 m2 m2 m m3
Sub total 6,563.250
Total 331,617.975

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Biasa
Mata Pembayar : 3.2.1
Satuan : m3
Kontraktor
Konsultan CV. Multi Pratama

Posisi Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
L/CL/R m2 m2 m2 m2 m m3

1 0+000 cl 0.000 0.000 0.000


8.259 25.00 206.463
2 0+025 cl 15.319 1.198 16.517
30.757 25.00 768.925
3 0+050 cl 43.799 1.198 44.997
42.797 25.00 1,069.925
4 0+075 cl 39.399 1.198 40.597
35.327 25.00 883.175
5 0+100 cl 28.859 1.198 30.057
20.070 25.00 501.750
6 0+125 cl 8.885 1.198 10.083
8.865 25.00 221.613
7 0+150 cl 6.448 1.198 7.646
5.474 25.00 136.838
8 0+175 cl 3.301 3.301
1.651 25.00 41.263
9 0+200 cl 0.000
0.780 25.00 19.488
10 0+225 cl 1.559 1.559
0.780 25.00 19.488
11 0+250 cl 0.000
0.000 25.00 -
12 0+275 cl 0.000
0.000 25.00 -
13 0+300 cl 0.000
0.000 25.00 -
14 0+325 cl 0.000
1.090 25.00 27.250
15 0+350 cl 2.180 2.180
3.007 25.00 75.163
16 0+375 cl 2.635 1.198 3.833
1.917 25.00 47.913
17 0+400 cl 0.000
0.000 25.00 -
18 0+425 cl 0.000
0.849 25.00 21.213
19 0+450 cl 1.697 1.697
11.978 25.00 299.450
20 0+475 cl 21.061 1.198 22.259
11.809 25.00 295.225
21 0+500 cl 1.359 1.359

Sub total 4,635.138


Total 4,635.138

Direksi PU Konsultan Kontraktor


Bina Marga
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Biasa
Mata Pembayar : 3.2.1
Satuan : m3
Kontraktor
Konsultan CV. Multi Pratama

Posisi Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
L/CL/R m2 m2 m2 m2 m m3

Koordinator Lapangan Chief Inspector / QE Quantity Engineer

21 0+500 cl 1.359 0.000 1.359


5.118 25.00 127.938
22 0+525 cl 7.678 1.198 8.876
14.204 25.00 355.100
23 0+550 cl 18.334 1.198 19.532
15.969 25.00 399.225
24 0+575 cl 11.208 1.198 12.406
6.203 25.00 155.075
25 0+600 cl 0.000
0.000 25.00 -
26 0+625 cl 0.000
0.000 25.00 -
27 0+650 cl 0.000
0.000 25.00 -
28 0+675 cl 0.000
0.000 25.00 -
29 0+700 cl 0.000
0.000 25.00 -
30 0+725 cl 0.000
0.000 25.00 -
31 0+750 cl 0.000
0.000 25.00 -
32 0+775 cl 0.000
0.000 25.00 -
33 0+800 cl 0.000
0.000 25.00 -
34 0+825 cl 0.000
0.000 25.00 -
35 0+850 cl 0.000
7.332 25.00 183.300
36 0+875 cl 13.466 1.198 14.664
33.302 25.00 832.550
37 0+900 cl 50.742 1.198 51.940
62.056 25.00 1,551.388
38 0+925 cl 70.973 1.198 72.171
76.257 25.00 1,906.425
39 0+950 cl 79.145 1.198 80.343
69.961 25.00 1,749.013
40 0+975 cl 58.380 1.198 59.578
38.636 25.00 965.900
41 1+000 cl 16.496 1.198 17.694

Sub total 8,225.913


Total 12,861.050

Direksi PU Konsultan Kontraktor


ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Biasa
Mata Pembayar : 3.2.1
Satuan : m3
Kontraktor
Konsultan CV. Multi Pratama

Posisi Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
L/CL/R m2 m2 m2 m2 m m3
Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

41 1+000 cl 16.496 1.198 17.694


11.720 25.00 293.000
42 1+025 cl 4.548 1.198 5.746
2.873 25.00 71.825
43 1+050 cl 0.000
5.188 25.00 129.700
44 1+075 cl 9.178 1.198 10.376
15.396 25.00 384.888
45 1+100 cl 19.217 1.198 20.415
17.337 25.00 433.413
46 1+125 cl 13.060 1.198 14.258
7.129 25.00 178.225
47 1+150 cl 0.000
0.000 25.00 -
48 1+175 cl 0.000
0.000 25.00 -
49 1+200 cl 0.000
3.627 25.00 90.675
50 1+225 cl 7.254 7.254
3.627 25.00 90.675
51 1+250 cl 0.000
0.522 25.00 13.050
52 1+275 cl 1.044 1.044
2.035 25.00 50.863
53 1+300 cl 1.827 1.198 3.025
5.759 25.00 143.963
54 1+325 cl 7.294 1.198 8.492
12.878 25.00 321.950
55 1+350 cl 16.066 1.198 17.264
11.782 25.00 294.550
56 1+375 cl 5.102 1.198 6.300
3.709 25.00 92.713
57 1+400 cl 1.117 1.117
1.740 25.00 43.500
58 1+425 cl 2.363 2.363
1.182 25.00 29.538
59 1+450 cl 0.000
0.000 25.00 -
60 1+475 cl 0.000
0.000 25.00 -
61 1+500 cl 0.000

Sub total 2,662.525


ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Biasa
Mata Pembayar : 3.2.1
Satuan : m3
Kontraktor
Konsultan CV. Multi Pratama

Posisi Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
L/CL/R m2 m2 m2 m2 m m3
Total 15,523.575

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

61 1+500 cl 0.000 0.000 0.000


0.000 25.00 -
62 1+525 cl 0.000
0.426 25.00 10.650
63 1+550 cl 0.852 0.852
3.299 25.00 82.463
64 1+575 cl 4.547 1.198 5.745
8.196 25.00 204.900
65 1+600 cl 9.449 1.198 10.647
17.862 25.00 446.550
66 1+625 cl 23.879 1.198 25.077
30.999 25.00 774.975
67 1+650 cl 35.723 1.198 36.921
49.406 25.00 1,235.150
68 1+675 cl 60.693 1.198 61.891
66.762 25.00 1,669.050
69 1+700 cl 70.435 1.198 71.633
73.047 25.00 1,826.163
70 1+725 cl 73.262 1.198 74.460
60.300 25.00 1,507.488
71 1+750 cl 44.941 1.198 46.139
39.890 25.00 997.250
72 1+775 cl 32.443 1.198 33.641
16.821 25.00 420.513
73 1+800 cl 0.000
0.000 25.00 -
74 1+825 cl 0.000
0.000 25.00 -
75 1+850 cl 0.000
0.000 25.00 -
76 1+875 cl 0.000
0.000 25.00 -
77 1+900 cl 0.000
0.000 25.00 -
78 1+925 cl 0.000
0.000 25.00 -
79 1+950 cl 0.000
0.000 25.00 -
80 1+975 cl 0.000
0.000 25.00 -
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Biasa
Mata Pembayar : 3.2.1
Satuan : m3
Kontraktor
Konsultan CV. Multi Pratama

Posisi Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
L/CL/R m2 m2 m2 m2 m m3
81 2+000 cl 0.000

Sub total 9,175.150


Total 24,698.725

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

81 2+000 cl 0.000 0.000 0.000


0.000 25.00 -
82 2+025 cl 0.000
0.000 25.00 -
83 2+050 cl 0.000
0.000 25.00 -
84 2+075 cl 0.000
0.000 25.00 -
85 2+100 cl 0.000
0.000 25.00 -
86 2+125 cl 0.000
0.000 25.00 -
87 2+150 cl 0.000
0.000 25.00 -
88 2+175 cl 0.000
0.000 25.00 -
89 2+200 cl 0.000
0.000 25.00 -
90 2+225 cl 0.000
0.000 25.00 -
91 2+250 cl 0.000
0.000 25.00 -
92 2+275 cl 0.000
0.000 25.00 -
93 2+300 cl 0.000
0.000 25.00 -
94 2+325 cl 0.000
0.000 25.00 -
95 2+350 cl 0.000
0.000 25.00 -
96 2+375 cl 0.000
0.000 25.00 -
97 2+400 cl 0.000
0.000 25.00 -
98 2+425 cl 0.000
0.000 25.00 -
99 2+450 cl 0.000
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Biasa
Mata Pembayar : 3.2.1
Satuan : m3
Kontraktor
Konsultan CV. Multi Pratama

Posisi Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
L/CL/R m2 m2 m2 m2 m m3
0.000 25.00 -
100 2+475 cl 0.000
0.000 25.00 -
101 2+500 cl 0.000

Sub total -
Total 24,698.725

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

101 2+500 cl 0.000 0.000 0.000


0.000 25.00 -
102 2+525 cl 0.000
0.000 25.00 -
103 2+550 cl 0.000
0.000 25.00 -
104 2+575 cl 0.000
0.000 25.00 -
105 2+600 cl 0.000
0.000 25.00 -
106 2+625 cl 0.000
0.000 25.00 -
107 2+650 cl 0.000
0.000 25.00 -
108 2+675 cl 0.000
0.000 25.00 -
109 2+700 cl 0.000
0.000 25.00 -
110 2+725 cl 0.000
0.000 25.00 -
111 2+750 cl 0.000
0.605 25.00 15.113
112 2+775 cl 1.209 1.209
91.467 25.00 2,286.663
113 2+800 cl 180.526 1.198 181.724
190.769 25.00 4,769.213
114 2+825 cl 198.615 1.198 199.813
152.177 25.00 3,804.413
115 2+850 cl 103.342 1.198 104.540
128.764 25.00 3,219.088
116 2+875 cl 151.789 1.198 152.987
180.823 25.00 4,520.575
117 2+900 cl 207.461 1.198 208.659
201.198 25.00 5,029.938
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Biasa
Mata Pembayar : 3.2.1
Satuan : m3
Kontraktor
Konsultan CV. Multi Pratama

Posisi Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
L/CL/R m2 m2 m2 m2 m m3
118 2+925 cl 192.538 1.198 193.736
161.559 25.00 4,038.975
119 2+950 cl 128.184 1.198 129.382
191.601 25.00 4,790.013
120 2+975 cl 252.621 1.198 253.819
254.558 25.00 6,363.950
121 3+000 cl 254.099 1.198 255.297

Sub total 38,837.938


Total 63,536.663

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

121 3+000 cl 254.099 1.198 255.297


195.237 25.00 4,880.925
122 3+025 cl 133.979 1.198 135.177
89.582 25.00 2,239.550
123 3+050 cl 42.789 1.198 43.987
22.305 25.00 557.613
124 3+075 cl 0.622 0.622
0.311 25.00 7.775
125 3+100 cl 0.000
0.000 25.00 -
126 3+125 cl 0.000
0.000 25.00 -
127 3+150 cl 0.000
0.000 25.00 -
128 3+175 cl 0.000
0.000 25.00 -
129 3+200 cl 0.000
0.000 25.00 -
130 3+225 cl 0.000
0.000 25.00 -
131 3+250 cl 0.000
0.000 25.00 -
132 3+275 cl 0.000
0.000 25.00 -
133 3+300 cl 0.000
0.000 25.00 -
134 3+325 cl 0.000
0.000 25.00 -
135 3+350 cl 0.000
0.000 25.00 -
136 3+375 cl 0.000
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Biasa
Mata Pembayar : 3.2.1
Satuan : m3
Kontraktor
Konsultan CV. Multi Pratama

Posisi Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
L/CL/R m2 m2 m2 m2 m m3
0.000 25.00 -
137 3+400 cl 0.000
0.000 25.00 -
138 3+425 cl 0.000
0.000 25.00 -
139 3+450 cl 0.000
0.000 25.00 -
140 3+475 cl 0.000
0.000 25.00 -
141 3+500 cl 0.000

Sub total 7,685.863


Total 71,222.525

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

141 3+500 cl 0.000 0.000 0.000


0.000 25.00 -
142 3+525 cl 0.000
0.000 25.00 -
143 3+550 cl 0.000
0.000 25.00 -
144 3+575 cl 0.000
0.000 25.00 -
145 3+600 cl 0.000
0.000 25.00 -
146 3+625 cl 0.000
38.002 25.00 950.038
147 3+650 cl 76.003 76.003
76.882 25.00 1,922.038
148 3+675 cl 77.760 77.760
60.962 25.00 1,524.038
149 3+700 cl 44.163 44.163
22.082 25.00 552.038
150 3+725 cl 0.000
23.200 25.00 580.000
151 3+750 cl 46.400 46.400
62.333 25.00 1,558.325
152 3+775 cl 78.266 78.266
56.572 25.00 1,414.288
153 3+800 cl 34.877 34.877
32.224 25.00 805.600
154 3+825 cl 29.571 29.571
53.448 25.00 1,336.200
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Biasa
Mata Pembayar : 3.2.1
Satuan : m3
Kontraktor
Konsultan CV. Multi Pratama

Posisi Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
L/CL/R m2 m2 m2 m2 m m3
155 3+850 cl 77.325 77.325
38.663 25.00 966.563
156 3+875 cl 0.000
0.000 25.00 -
157 3+900 cl 0.000
4.123 25.00 103.063
158 3+925 cl 8.245 8.245
28.533 25.00 713.313
159 3+950 cl 47.622 1.198 48.820
43.737 25.00 1,093.413
160 3+975 cl 37.455 1.198 38.653
35.274 25.00 881.838
161 4+000 cl 30.696 1.198 31.894

Sub total 14,400.750


Total 85,623.275

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

161 4+000 cl 30.696 1.198 31.894


31.295 25.00 782.375
162 4+025 cl 30.696 30.696
31.195 25.00 779.863
163 4+050 cl 31.693 31.693
36.179 25.00 904.463
164 4+075 cl 39.466 1.198 40.664
20.332 25.00 508.300
165 4+100 cl 0.000
0.000 25.00 -
166 4+125 cl 0.000
0.000 25.00 -
167 4+150 cl 0.000
0.000 25.00 -
168 4+175 cl 0.000
12.390 25.00 309.738
169 4+200 cl 24.779 24.779
41.959 25.00 1,048.975
170 4+225 cl 57.941 1.198 59.139
65.677 25.00 1,641.925
171 4+250 cl 71.017 1.198 72.215
72.616 25.00 1,815.400
172 4+275 cl 71.819 1.198 73.017
39.798 25.00 994.950
173 4+300 cl 5.381 1.198 6.579
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Biasa
Mata Pembayar : 3.2.1
Satuan : m3
Kontraktor
Konsultan CV. Multi Pratama

Posisi Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
L/CL/R m2 m2 m2 m2 m m3
28.173 25.00 704.313
174 4+325 cl 48.568 1.198 49.766
35.514 25.00 887.838
175 4+350 cl 21.261 21.261
26.271 25.00 656.775
176 4+375 cl 31.281 31.281
15.641 25.00 391.013
177 4+400 cl 0.000
0.000 25.00 -
178 4+425 cl 0.000
0.000 25.00 -
179 4+450 cl 0.000
0.000 25.00 -
180 4+475 cl 0.000
0.000 25.00 -
181 4+500 cl 0.000

Sub total 11,425.925


Total 97,049.200

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

181 4+500 cl 0.000 0.000 0.000


0.000 25.00 -
182 4+525 cl 0.000
0.000 25.00 -
183 4+550 cl 0.000
0.000 25.00 -
184 4+575 cl 0.000
0.000 25.00 -
185 4+600 cl 0.000
0.000 25.00 -
186 4+625 cl 0.000
0.000 25.00 -
187 4+650 cl 0.000
19.434 25.00 485.850
188 4+675 cl 38.868 38.868
35.449 25.00 886.225
189 4+700 cl 32.030 32.030
29.523 25.00 738.075
190 4+725 cl 27.016 27.016
26.786 25.00 669.650
191 4+750 cl 26.556 26.556
30.625 25.00 765.625
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Biasa
Mata Pembayar : 3.2.1
Satuan : m3
Kontraktor
Konsultan CV. Multi Pratama

Posisi Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
L/CL/R m2 m2 m2 m2 m m3
192 4+775 cl 34.694 34.694
17.347 25.00 433.675
193 4+800 cl 0.000
0.000 25.00 -
194 4+825 cl 0.000
0.000 25.00 -
195 4+850 cl 0.000
0.000 25.00 -
196 4+875 cl 0.000
0.000 25.00 -
197 4+900 cl 0.000
14.999 25.00 374.975
198 4+925 cl 29.998 29.998
58.793 25.00 1,469.825
199 4+950 cl 86.390 1.198 87.588
66.764 25.00 1,669.088
200 4+975 cl 45.939 45.939
39.897 25.00 997.425
201 5+000 cl 33.855 33.855

Sub total 8,490.413


Total 105,539.613

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

201 5+000 cl 33.855 0.000 33.855


31.358 25.00 783.938
202 5+025 cl 28.860 28.860
14.430 25.00 360.750
203 5+050 cl 0.000
0.895 25.00 22.375
204 5+075 cl 1.790 1.790
5.849 25.00 146.213
205 5+100 cl 8.709 1.198 9.907
16.901 25.00 422.525
206 5+125 cl 22.697 1.198 23.895
29.014 25.00 725.350
207 5+150 cl 32.935 1.198 34.133
35.565 25.00 889.125
208 5+175 cl 35.799 1.198 36.997
27.944 25.00 698.600
209 5+200 cl 18.891 18.891
30.869 25.00 771.713
210 5+225 cl 42.846 42.846
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Biasa
Mata Pembayar : 3.2.1
Satuan : m3
Kontraktor
Konsultan CV. Multi Pratama

Posisi Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
L/CL/R m2 m2 m2 m2 m m3
41.002 25.00 1,025.038
211 5+250 cl 39.157 39.157
68.691 25.00 1,717.263
212 5+275 cl 97.026 1.198 98.224
100.443 25.00 2,511.075
213 5+300 cl 101.464 1.198 102.662
78.366 25.00 1,959.138
214 5+325 cl 52.871 1.198 54.069
36.354 25.00 908.850
215 5+350 cl 18.639 18.639
22.487 25.00 562.175
216 5+375 cl 26.335 26.335
13.168 25.00 329.188
217 5+400 cl 0.000
0.000 25.00 -
218 5+425 cl 0.000
19.313 25.00 482.813
219 5+450 cl 38.625 38.625
28.658 25.00 716.438
220 5+475 cl 18.690 18.690
19.806 25.00 495.150
221 5+500 cl 20.922 20.922

Sub total 15,527.713


Total 121,067.325

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

221 5+500 cl 20.922 0.000 20.922


36.561 25.00 914.013
222 5+525 cl 51.001 1.198 52.199
97.725 25.00 2,443.113
223 5+550 cl 142.052 1.198 143.250
105.116 25.00 2,627.900
224 5+575 cl 65.784 1.198 66.982
116.363 25.00 2,909.075
225 5+600 cl 164.546 1.198 165.744
95.531 25.00 2,388.275
226 5+625 cl 24.120 1.198 25.318
18.730 25.00 468.238
227 5+650 cl 12.141 12.141
10.658 25.00 266.438
228 5+675 cl 9.174 9.174
13.505 25.00 337.625
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Biasa
Mata Pembayar : 3.2.1
Satuan : m3
Kontraktor
Konsultan CV. Multi Pratama

Posisi Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
L/CL/R m2 m2 m2 m2 m m3
229 5+700 cl 17.836 17.836
11.922 25.00 298.050
230 5+725 cl 6.008 6.008
4.405 25.00 110.125
231 5+750 cl 2.802 2.802
1.401 25.00 35.025
232 5+775 cl 0.000
0.000 25.00 -
233 5+800 cl 0.000
0.000 25.00 -
234 5+825 cl 0.000
0.000 25.00 -
235 5+850 cl 0.000
5.774 25.00 144.350
236 5+875 cl 10.350 1.198 11.548
25.013 25.00 625.325
237 5+900 cl 37.280 1.198 38.478
21.853 25.00 546.313
238 5+925 cl 4.029 1.198 5.227
14.516 25.00 362.900
239 5+950 cl 23.805 23.805
20.316 25.00 507.888
240 5+975 cl 16.826 16.826
8.413 25.00 210.325
241 6+000 cl 0.000

Sub total 15,194.975


Total 136,262.300

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

241 6+000 cl 0.000 0.000 0.000


0.000 25.00 -
242 6+025 cl 0.000
0.000 25.00 -
243 6+050 cl 0.000
0.000 25.00 -
244 6+075 cl 0.000
0.000 25.00 -
245 6+100 cl 0.000
0.000 25.00 -
246 6+125 cl 0.000
0.000 25.00 -
247 6+150 cl 0.000
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Biasa
Mata Pembayar : 3.2.1
Satuan : m3
Kontraktor
Konsultan CV. Multi Pratama

Posisi Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
L/CL/R m2 m2 m2 m2 m m3
0.000 25.00 -
248 6+175 cl 0.000
0.000 25.00 -
249 6+200 cl 0.000
0.000 25.00 -
250 6+225 cl 0.000
0.000 25.00 -
251 6+250 cl 0.000
0.000 25.00 -
252 6+275 cl 0.000
0.000 25.00 -
253 6+300 cl 0.000
0.000 25.00 -
254 6+325 cl 0.000
1.073 25.00 26.813
255 6+350 cl 2.145 2.145
9.684 25.00 242.100
256 6+375 cl 17.223 17.223
8.612 25.00 215.288
257 6+400 cl 0.000
0.000 25.00 -
258 6+425 cl 0.000
0.000 25.00 -
259 6+450 cl 0.000
0.000 25.00 -
260 6+475 cl 0.000
0.000 25.00 -
261 6+500 cl 0.000

Sub total 484.200


Total 136,746.500

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

261 6+500 cl 0.000 0.000 0.000


0.000 25.00 -
262 6+525 cl 0.000
0.000 25.00 -
263 6+550 cl 0.000
0.000 25.00 -
264 6+575 cl 0.000
0.000 25.00 -
265 6+600 cl 0.000
0.000 25.00 -
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Biasa
Mata Pembayar : 3.2.1
Satuan : m3
Kontraktor
Konsultan CV. Multi Pratama

Posisi Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
L/CL/R m2 m2 m2 m2 m m3
266 6+625 cl 0.000
0.000 25.00 -
267 6+650 cl 0.000
0.000 25.00 -
268 6+675 cl 0.000
0.000 25.00 -
269 6+700 cl 0.000
0.000 25.00 -
270 6+725 cl 0.000
0.000 25.00 -
271 6+750 cl 0.000
0.000 25.00 -
272 6+775 cl 0.000
0.000 25.00 -
273 6+800 cl 0.000
0.000 25.00 -
274 6+825 cl 0.000
10.026 25.00 250.650
275 6+850 cl 18.854 1.198 20.052
58.743 25.00 1,468.575
276 6+875 cl 96.236 1.198 97.434
130.271 25.00 3,256.763
277 6+900 cl 161.909 1.198 163.107
140.035 25.00 3,500.875
278 6+925 cl 115.765 1.198 116.963
68.234 25.00 1,705.850
279 6+950 cl 18.307 1.198 19.505
9.753 25.00 243.813
280 6+975 cl 0.000
0.000 25.00 -
281 7+000 cl 0.000

Sub total 10,426.525


Total 147,173.025

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

281 7+000 cl 0.000 0.000 0.000


0.000 25.00 -
282 7+025 cl 0.000
0.000 25.00 -
283 7+050 cl 0.000
0.000 25.00 -
284 7+075 cl 0.000
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Biasa
Mata Pembayar : 3.2.1
Satuan : m3
Kontraktor
Konsultan CV. Multi Pratama

Posisi Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
L/CL/R m2 m2 m2 m2 m m3
0.000 25.00 -
285 7+100 cl 0.000
0.000 25.00 -
286 7+125 cl 0.000
0.000 25.00 -
287 7+150 cl 0.000
0.000 25.00 -
288 7+175 cl 0.000
0.000 25.00 -
289 7+200 cl 0.000
1.624 25.00 40.588
290 7+225 cl 2.049 1.198 3.247
9.383 25.00 234.575
291 7+250 cl 14.321 1.198 15.519
10.728 25.00 268.188
292 7+275 cl 4.738 1.198 5.936
3.320 25.00 83.000
293 7+300 cl 0.704 0.704
11.821 25.00 295.525
294 7+325 cl 21.740 1.198 22.938
15.030 25.00 375.738
295 7+350 cl 5.923 1.198 7.121
7.038 25.00 175.938
296 7+375 cl 5.756 1.198 6.954
3.477 25.00 86.925
297 7+400 cl 0.000
0.000 25.00 -
298 7+425 cl 0.000
5.858 25.00 146.450
299 7+450 cl 10.518 1.198 11.716
17.439 25.00 435.963
300 7+475 cl 21.963 1.198 23.161
23.264 25.00 581.600
301 7+500 cl 23.367 23.367

Sub total 2,724.488


Total 149,897.513

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

301 7+500 cl 23.367 0.000 23.367


34.997 25.00 874.925
302 7+525 cl 45.429 1.198 46.627
44.823 25.00 1,120.563
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Biasa
Mata Pembayar : 3.2.1
Satuan : m3
Kontraktor
Konsultan CV. Multi Pratama

Posisi Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
L/CL/R m2 m2 m2 m2 m m3
303 7+550 cl 41.820 1.198 43.018
26.709 25.00 667.713
304 7+575 cl 9.201 1.198 10.399
12.756 25.00 318.900
305 7+600 cl 13.915 1.198 15.113
34.017 25.00 850.413
306 7+625 cl 51.722 1.198 52.920
28.504 25.00 712.588
307 7+650 cl 2.889 1.198 4.087
12.478 25.00 311.938
308 7+675 cl 19.670 1.198 20.868
17.905 25.00 447.613
309 7+700 cl 13.743 1.198 14.941
7.471 25.00 186.763
310 7+725 cl 0.000
0.000 25.00 -
311 7+750 cl 0.000
0.000 25.00 -
312 7+775 cl 0.000
0.000 25.00 -
313 7+800 cl 0.000
0.000 25.00 -
314 7+825 cl 0.000
0.000 25.00 -
315 7+850 cl 0.000
1.327 25.00 33.175
316 7+875 cl 2.654 2.654
7.274 25.00 181.850
317 7+900 cl 10.696 1.198 11.894
17.338 25.00 433.450
318 7+925 cl 21.584 1.198 22.782
20.482 25.00 512.050
319 7+950 cl 16.984 1.198 18.182
30.612 25.00 765.300
320 7+975 cl 41.844 1.198 43.042
43.936 25.00 1,098.400
321 8+000 cl 43.632 1.198 44.830

Sub total 8,515.638


Total 158,413.150

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

321 8+000 cl 43.632 1.198 44.830


ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Biasa
Mata Pembayar : 3.2.1
Satuan : m3
Kontraktor
Konsultan CV. Multi Pratama

Posisi Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
L/CL/R m2 m2 m2 m2 m m3
52.557 25.00 1,313.913
322 8+025 cl 59.085 1.198 60.283
42.239 25.00 1,055.963
323 8+050 cl 22.996 1.198 24.194
13.885 25.00 347.113
324 8+075 cl 3.575 3.575
1.788 25.00 44.688
325 8+100 cl 0.000
0.000 25.00 -
326 8+125 cl 0.000
0.000 25.00 -
327 8+150 cl 0.000
0.000 25.00 -
328 8+175 cl 0.000
0.000 25.00 -
329 8+200 cl 0.000
0.000 25.00 -
330 8+225 cl 0.000
0.000 25.00 -
331 8+250 cl 0.000
0.000 25.00 -
332 8+275 cl 0.000
0.000 25.00 -
333 8+300 cl 0.000
0.000 25.00 -
334 8+325 cl 0.000
0.793 25.00 19.825
335 8+350 cl 1.586 1.586
10.168 25.00 254.200
336 8+375 cl 18.750 18.750
9.375 25.00 234.375
337 8+400 cl 0.000
0.000 25.00 -
338 8+425 cl 0.000
0.000 25.00 -
339 8+450 cl 0.000
0.000 25.00 -
340 8+475 cl 0.000
0.000 25.00 -
341 8+500 cl 0.000

Sub total 3,270.075


Total 161,683.225

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Biasa
Mata Pembayar : 3.2.1
Satuan : m3
Kontraktor
Konsultan CV. Multi Pratama

Posisi Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
L/CL/R m2 m2 m2 m2 m m3
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

341 8+500 cl 0.000 0.000 0.000


0.348 25.00 8.700
342 8+525 cl 0.696 0.696
29.642 25.00 741.038
343 8+550 cl 57.389 1.198 58.587
73.018 25.00 1,825.450
344 8+575 cl 86.251 1.198 87.449
68.110 25.00 1,702.750
345 8+600 cl 47.573 1.198 48.771
54.310 25.00 1,357.738
346 8+625 cl 58.650 1.198 59.848
63.499 25.00 1,587.463
347 8+650 cl 65.951 1.198 67.149
67.599 25.00 1,689.963
348 8+675 cl 66.850 1.198 68.048
42.660 25.00 1,066.500
349 8+700 cl 16.074 1.198 17.272
9.442 25.00 236.038
350 8+725 cl 1.611 1.611
7.059 25.00 176.475
351 8+750 cl 11.309 1.198 12.507
6.254 25.00 156.338
352 8+775 cl 0.000
0.000 25.00 -
353 8+800 cl 0.000
0.000 25.00 -
354 8+825 cl 0.000
0.000 25.00 -
355 8+850 cl 0.000
0.000 25.00 -
356 8+875 cl 0.000
0.000 25.00 -
357 8+900 cl 0.000
0.000 25.00 -
358 8+925 cl 0.000
0.000 25.00 -
359 8+950 cl 0.000
0.000 25.00 -
360 8+975 cl 0.000
0.000 25.00 -
361 9+000 cl 0.000

Sub total 10,548.450


Total 172,231.675

Direksi PU Konsultan Kontraktor


Bina Marga 0 0
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Biasa
Mata Pembayar : 3.2.1
Satuan : m3
Kontraktor
Konsultan CV. Multi Pratama

Posisi Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
L/CL/R m2 m2 m2 m2 m m3

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

361 9+000 cl 0.000 0.000 0.000


4.481 25.00 112.013
362 9+025 cl 7.763 1.198 8.961
22.302 25.00 557.538
363 9+050 cl 34.444 1.198 35.642
44.356 25.00 1,108.888
364 9+075 cl 51.871 1.198 53.069
42.600 25.00 1,064.988
365 9+100 cl 30.932 1.198 32.130
21.363 25.00 534.075
366 9+125 cl 9.398 1.198 10.596
5.298 25.00 132.450
367 9+150 cl 0.000
0.000 25.00 -
368 9+175 cl 0.000
0.000 25.00 -
369 9+200 cl 0.000
0.000 25.00 -
370 9+225 cl 0.000
1.204 25.00 30.100
371 9+250 cl 2.408 2.408
1.204 25.00 30.100
372 9+275 cl 0.000
0.000 25.00 -
373 9+300 cl 0.000
0.000 25.00 -
374 9+325 cl 0.000
0.000 25.00 -
375 9+350 cl 0.000
0.000 25.00 -
376 9+375 cl 0.000
0.000 25.00 -
377 9+400 cl 0.000
0.000 25.00 -
378 9+425 cl 0.000
0.000 25.00 -
379 9+450 cl 0.000
0.000 25.00 -
380 9+475 cl 0.000
0.000 25.00 -
381 9+500 cl 0.000

Sub total 3,570.150


Total 175,801.825
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Biasa
Mata Pembayar : 3.2.1
Satuan : m3
Kontraktor
Konsultan CV. Multi Pratama

Posisi Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
L/CL/R m2 m2 m2 m2 m m3
Direksi PU Konsultan Kontraktor
Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer

381 9+500 cl 0.000 0.000 0.000


0.000 25.00 -
382 9+525 cl 0.000
0.000 25.00 -
383 9+550 cl 0.000
0.000 25.00 -
384 9+575 cl 0.000
0.000 25.00 -
385 9+600 cl 0.000
0.000 25.00 -
386 9+625 cl 0.000
0.000 25.00 -
387 9+650 cl 0.000
0.000 25.00 -
388 9+675 cl 0.000
0.000 25.00 -
389 9+700 cl 0.000
0.000 25.00 -
390 9+725 cl 0.000
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Biasa
Mata Pembayar : 3.2.1
Satuan : m3
Kontraktor
Konsultan CV. Multi Pratama

Posisi Luas MDP17 Luas Luas Rata2 Jarak Volume


No STA Keterangan
L/CL/R m2 m2 m2 m2 m m3
Sub total -
Total 175,801.825

Direksi PU Konsultan Kontraktor


Bina Marga 0 0

0 0 0
Koordinator Lapangan Chief Inspector / QE Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

1 0+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
2 0+025 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
3 0+050 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
4 0+075 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
5 0+100 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
6 0+125 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
7 0+150 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
8 0+175 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
9 0+200 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
10 0+225 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
11 0+250 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
12 0+275 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
13 0+300 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
14 0+325 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
15 0+350 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
16 0+375 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
17 0+400 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
18 0+425 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
19 0+450 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
20 0+475 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
21 0+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 720.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

21 0+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
22 0+525 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
23 0+550 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
24 0+575 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
25 0+600 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
26 0+625 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
27 0+650 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
28 0+675 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
29 0+700 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
30 0+725 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
31 0+750 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
32 0+775 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
33 0+800 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
34 0+825 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
35 0+850 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
36 0+875 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
37 0+900 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
38 0+925 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
39 0+950 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
40 0+975 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
41 1+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 1,440.00

Direksi PU Konsultan Kontraktor


ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

41 1+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
42 1+025 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
43 1+050 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
44 1+075 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
45 1+100 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
46 1+125 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
47 1+150 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
48 1+175 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
49 1+200 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
50 1+225 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
51 1+250 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
52 1+275 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
53 1+300 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
54 1+325 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
55 1+350 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
56 1+375 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
57 1+400 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
58 1+425 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
59 1+450 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
60 1+475 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
61 1+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
Total 2,160.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

61 1+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
62 1+525 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
63 1+550 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
64 1+575 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
65 1+600 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
66 1+625 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
67 1+650 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
68 1+675 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
69 1+700 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
70 1+725 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
71 1+750 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
72 1+775 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
73 1+800 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
74 1+825 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
75 1+850 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
76 1+875 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
77 1+900 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
78 1+925 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
79 1+950 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
80 1+975 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
81 2+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 2,880.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

81 2+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
82 2+025 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
83 2+050 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
84 2+075 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
85 2+100 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
86 2+125 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
87 2+150 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
88 2+175 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
89 2+200 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
90 2+225 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
91 2+250 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
92 2+275 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
93 2+300 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
94 2+325 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
95 2+350 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
96 2+375 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
97 2+400 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
98 2+425 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
99 2+450 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.440 25.00 36.000
100 2+475 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
101 2+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 3,600.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

101 2+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
102 2+525 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
103 2+550 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
104 2+575 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
105 2+600 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
106 2+625 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
107 2+650 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
108 2+675 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
109 2+700 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
110 2+725 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
111 2+750 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
112 2+775 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
113 2+800 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
114 2+825 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
115 2+850 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
116 2+875 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
117 2+900 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
118 2+925 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
119 2+950 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
120 2+975 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
121 3+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 4,320.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

121 3+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
122 3+025 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
123 3+050 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
124 3+075 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
125 3+100 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
126 3+125 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
127 3+150 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
128 3+175 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
129 3+200 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
130 3+225 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
131 3+250 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
132 3+275 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
133 3+300 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
134 3+325 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
135 3+350 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
136 3+375 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.440 25.00 36.000
137 3+400 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
138 3+425 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
139 3+450 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
140 3+475 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
141 3+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 5,040.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

141 3+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
142 3+525 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
143 3+550 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
144 3+575 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
145 3+600 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
146 3+625 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
147 3+650 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
148 3+675 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
149 3+700 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
150 3+725 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
151 3+750 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
152 3+775 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
153 3+800 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
154 3+825 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
155 3+850 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
156 3+875 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
157 3+900 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
158 3+925 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
159 3+950 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
160 3+975 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
161 4+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 5,760.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

161 4+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
162 4+025 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
163 4+050 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
164 4+075 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
165 4+100 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
166 4+125 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
167 4+150 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
168 4+175 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
169 4+200 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
170 4+225 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
171 4+250 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
172 4+275 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
173 4+300 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.440 25.00 36.000
174 4+325 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
175 4+350 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
176 4+375 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
177 4+400 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
178 4+425 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
179 4+450 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
180 4+475 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
181 4+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 6,480.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

181 4+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
182 4+525 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
183 4+550 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
184 4+575 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
185 4+600 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
186 4+625 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
187 4+650 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
188 4+675 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
189 4+700 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
190 4+725 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
191 4+750 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
192 4+775 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
193 4+800 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
194 4+825 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
195 4+850 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
196 4+875 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
197 4+900 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
198 4+925 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
199 4+950 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
200 4+975 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
201 5+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 7,200.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

201 5+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
202 5+025 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
203 5+050 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
204 5+075 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
205 5+100 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
206 5+125 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
207 5+150 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
208 5+175 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
209 5+200 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
210 5+225 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.440 25.00 36.000
211 5+250 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
212 5+275 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
213 5+300 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
214 5+325 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
215 5+350 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
216 5+375 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
217 5+400 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
218 5+425 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
219 5+450 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
220 5+475 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
221 5+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 7,920.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

221 5+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
222 5+525 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
223 5+550 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
224 5+575 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
225 5+600 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
226 5+625 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
227 5+650 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
228 5+675 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
229 5+700 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
230 5+725 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
231 5+750 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
232 5+775 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
233 5+800 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
234 5+825 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
235 5+850 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
236 5+875 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
237 5+900 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
238 5+925 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
239 5+950 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
240 5+975 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
241 6+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 8,640.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

241 6+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
242 6+025 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
243 6+050 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
244 6+075 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
245 6+100 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
246 6+125 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
247 6+150 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.440 25.00 36.000
248 6+175 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
249 6+200 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
250 6+225 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
251 6+250 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
252 6+275 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
253 6+300 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
254 6+325 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
255 6+350 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
256 6+375 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
257 6+400 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
258 6+425 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
259 6+450 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
260 6+475 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
261 6+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 9,360.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

261 6+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
262 6+525 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
263 6+550 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
264 6+575 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
265 6+600 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
266 6+625 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
267 6+650 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
268 6+675 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
269 6+700 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
270 6+725 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
271 6+750 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
272 6+775 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
273 6+800 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
274 6+825 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
275 6+850 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
276 6+875 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
277 6+900 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
278 6+925 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
279 6+950 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
280 6+975 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
281 7+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 10,080.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

281 7+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
282 7+025 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
283 7+050 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
284 7+075 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.440 25.00 36.000
285 7+100 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
286 7+125 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
287 7+150 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
288 7+175 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
289 7+200 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
290 7+225 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
291 7+250 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
292 7+275 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
293 7+300 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
294 7+325 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
295 7+350 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
296 7+375 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
297 7+400 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
298 7+425 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
299 7+450 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
300 7+475 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
301 7+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 10,800.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

301 7+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
302 7+525 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
303 7+550 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
304 7+575 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
305 7+600 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
306 7+625 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
307 7+650 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
308 7+675 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
309 7+700 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
310 7+725 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
311 7+750 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
312 7+775 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
313 7+800 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
314 7+825 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
315 7+850 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
316 7+875 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
317 7+900 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
318 7+925 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
319 7+950 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
320 7+975 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
321 8+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 11,520.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

321 8+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.440 25.00 36.000
322 8+025 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
323 8+050 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
324 8+075 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
325 8+100 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
326 8+125 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
327 8+150 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
328 8+175 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
329 8+200 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
330 8+225 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
331 8+250 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
332 8+275 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
333 8+300 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
334 8+325 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
335 8+350 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
336 8+375 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
337 8+400 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
338 8+425 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
339 8+450 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
340 8+475 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
341 8+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 12,240.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
Nip…………………………… Highway Engineer Quantity Engineer

341 8+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
342 8+525 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
343 8+550 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
344 8+575 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
345 8+600 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
346 8+625 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
347 8+650 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
348 8+675 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
349 8+700 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
350 8+725 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
351 8+750 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
352 8+775 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
353 8+800 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
354 8+825 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
355 8+850 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
356 8+875 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
357 8+900 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
358 8+925 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
359 8+950 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
360 8+975 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
361 9+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 12,960.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

361 9+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
362 9+025 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
363 9+050 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
364 9+075 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
365 9+100 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
366 9+125 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
367 9+150 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
368 9+175 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
369 9+200 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
370 9+225 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
371 9+250 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
372 9+275 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
373 9+300 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
374 9+325 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
375 9+350 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
376 9+375 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
377 9+400 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
378 9+425 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
379 9+450 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
380 9+475 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
381 9+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 13,680.00
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
Direksi PU Konsultan Kontraktor
Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

381 9+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
382 9+525 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
383 9+550 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
384 9+575 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
385 9+600 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
386 9+625 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
387 9+650 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
388 9+675 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
389 9+700 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
390 9+725 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
Sub total 324.00
Total 14,004.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

1 0+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
2 0+025 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
3 0+050 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
4 0+075 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
5 0+100 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
6 0+125 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
7 0+150 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
8 0+175 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
9 0+200 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
10 0+225 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
11 0+250 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
12 0+275 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
13 0+300 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
14 0+325 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
15 0+350 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
16 0+375 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
17 0+400 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
18 0+425 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
19 0+450 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
20 0+475 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
21 0+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 720.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

1 0+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
2 0+025 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
3 0+050 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
4 0+075 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
5 0+100 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
6 0+125 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
7 0+150 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
8 0+175 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
9 0+200 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
10 0+225 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
11 0+250 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
12 0+275 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
13 0+300 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
14 0+325 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
15 0+350 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
16 0+375 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
17 0+400 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
18 0+425 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
19 0+450 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
20 0+475 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
21 0+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 720.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Existing

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

1 0+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
2 0+025 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
3 0+050 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
4 0+075 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
5 0+100 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
6 0+125 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
7 0+150 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
8 0+175 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
9 0+200 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
10 0+225 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
11 0+250 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
12 0+275 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
13 0+300 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
14 0+325 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
15 0+350 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
16 0+375 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
17 0+400 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
18 0+425 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
19 0+450 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
20 0+475 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
21 0+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 720.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Existing

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

1 0+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
2 0+025 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
3 0+050 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
4 0+075 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
5 0+100 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
6 0+125 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
7 0+150 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
8 0+175 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
9 0+200 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
10 0+225 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
11 0+250 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
12 0+275 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
13 0+300 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
14 0+325 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
15 0+350 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
16 0+375 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
17 0+400 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
18 0+425 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
19 0+450 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
20 0+475 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
21 0+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 720.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

1.50
-5 %

Existing

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

1 0+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
2 0+025 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
3 0+050 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
4 0+075 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
5 0+100 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
6 0+125 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
7 0+150 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
8 0+175 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
9 0+200 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
10 0+225 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
11 0+250 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
12 0+275 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
13 0+300 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
14 0+325 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
15 0+350 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
16 0+375 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
17 0+400 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
18 0+425 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
19 0+450 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
20 0+475 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
21 0+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 720.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Timbun

6
1.50 4
-5 % -3 %

Existing

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

1 0+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
2 0+025 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
3 0+050 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
4 0+075 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
5 0+100 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
6 0+125 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
7 0+150 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
8 0+175 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
9 0+200 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
10 0+225 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
11 0+250 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
12 0+275 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
13 0+300 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
14 0+325 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
15 0+350 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
16 0+375 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
17 0+400 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
18 0+425 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
19 0+450 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
20 0+475 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
21 0+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 720.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Timbunan Pilihan

6.00
1.50 4.50
-5 % -3 % -3 %

Existing
Timbu
Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume
No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

1 0+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
2 0+025 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
3 0+050 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
4 0+075 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
5 0+100 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
6 0+125 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
7 0+150 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
8 0+175 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
9 0+200 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
10 0+225 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
11 0+250 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
12 0+275 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
13 0+300 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
14 0+325 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
15 0+350 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
16 0+375 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
17 0+400 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
18 0+425 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
19 0+450 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
20 0+475 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
21 0+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 720.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Timbunan Pilihan

6.00
1.50 4.50 1.
-5 % -3 % -3 %
-5

Existing
Timbunan Pilihan
Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume
No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

1 0+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
2 0+025 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
3 0+050 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
4 0+075 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
5 0+100 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
6 0+125 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
7 0+150 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
8 0+175 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
9 0+200 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
10 0+225 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
11 0+250 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
12 0+275 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
13 0+300 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
14 0+325 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
15 0+350 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
16 0+375 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
17 0+400 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
18 0+425 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
19 0+450 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
20 0+475 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
21 0+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 720.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Timbunan Pilihan

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Timbunan Pilihan
Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume
No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

1 0+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
2 0+025 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
3 0+050 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
4 0+075 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
5 0+100 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
6 0+125 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
7 0+150 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
8 0+175 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
9 0+200 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
10 0+225 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
11 0+250 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
12 0+275 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
13 0+300 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
14 0+325 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
15 0+350 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
16 0+375 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
17 0+400 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
18 0+425 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
19 0+450 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
20 0+475 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
21 0+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 720.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Timbunan Pilihan
Mata Pembayaran : 3.2.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Timbunan Pilihan

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existi
Existing
Timbunan Pilihan
Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume
No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

1 0+000 kr/cl/kn 7.00 7.40 7.20 0.20 1.440


1.440 25.00 36.000
2 0+025 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
3 0+050 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
4 0+075 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
5 0+100 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
6 0+125 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
7 0+150 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
8 0+175 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
9 0+200 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
10 0+225 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
11 0+250 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
12 0+275 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
13 0+300 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
14 0+325 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
15 0+350 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
16 0+375 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
17 0+400 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
18 0+425 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
19 0+450 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
20 0+475 kr/cl/kn 7.00 7.40 7.20 0.20 1.440
1.440 25.00 36.000
21 0+500 kr/cl/kn 7.00 7.40 7.20 0.20 1.440

Sub total 720.00


Total 720.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Penyiapan Badan Jalan
Mata Pembayaran : 3.3
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Penyiapan Badan Jalan

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing

Penyiapan Badan Jalan

Lebar Lebar Rata2 Panjang Volume


No STA Posisi Keterangan
m m (m) ( m2 )

1 0+000 kr/cl/kn 7.00


7.00 25.00
2 0+025 kr/cl/kn 7.00
7.00 25.00
3 0+050 kr/cl/kn 7.00
7.00 25.00
4 0+075 kr/cl/kn 7.00
7.00 25.00
5 0+100 kr/cl/kn 7.00
7.00 25.00
6 0+125 kr/cl/kn 7.00
7.00 25.00
7 0+150 kr/cl/kn 7.00
7.00 25.00
8 0+175 kr/cl/kn 7.00
7.00 25.00
9 0+200 kr/cl/kn 7.00
7.00 25.00
10 0+225 kr/cl/kn 7.00
7.00 25.00
11 0+250 kr/cl/kn 7.00
7.00 25.00
12 0+275 kr/cl/kn 7.00
7.00 25.00
13 0+300 kr/cl/kn 7.00
7.00 25.00
14 0+325 kr/cl/kn 7.00
7.00 25.00
15 0+350 kr/cl/kn 7.00
7.00 25.00
16 0+375 kr/cl/kn 7.00
7.00 25.00
17 0+400 kr/cl/kn 7.00
7.00 25.00
18 0+425 kr/cl/kn 7.00
7.00 25.00
19 0+450 kr/cl/kn 7.00
7.00 25.00
20 0+475 kr/cl/kn 7.00
7.00 25.00
21 0+500 kr/cl/kn 7.00

Sub total -
Total -

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Penyiapan Badan Jalan
Mata Pembayaran : 3.3
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Penyiapan Badan Jalan

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing

Penyiapan Badan Jalan

Lebar Lebar Rata2 Panjang Volume


No STA Posisi Keterangan
m m (m) ( m2 )

21 0+500 kr/cl/kn 7.00


7.00 25.00
22 0+525 kr/cl/kn 7.00
7.00 25.00
23 0+550 kr/cl/kn 7.00
7.00 25.00
24 0+575 kr/cl/kn 7.00
7.00 25.00
25 0+600 kr/cl/kn 7.00
7.00 25.00
26 0+625 kr/cl/kn 7.00
7.00 25.00
27 0+650 kr/cl/kn 7.00
7.00 25.00
28 0+675 kr/cl/kn 7.00
7.00 25.00
29 0+700 kr/cl/kn 7.00
7.00 25.00
30 0+725 kr/cl/kn 7.00
7.00 25.00
31 0+750 kr/cl/kn 7.00
7.00 25.00
32 0+775 kr/cl/kn 7.00
7.00 25.00
33 0+800 kr/cl/kn 7.00
7.00 25.00
34 0+825 kr/cl/kn 7.00
7.00 25.00
35 0+850 kr/cl/kn 7.00
7.00 25.00
36 0+875 kr/cl/kn 7.00
7.00 25.00
37 0+900 kr/cl/kn 7.00
7.00 25.00
38 0+925 kr/cl/kn 7.00
7.00 25.00
39 0+950 kr/cl/kn 7.00
7.00 25.00
40 0+975 kr/cl/kn 7.00
7.00 25.00
41 1+000 kr/cl/kn 7.00

Sub total -
Total -

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Penyiapan Badan Jalan
Mata Pembayaran : 3.3
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Penyiapan Badan Jalan

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing

Penyiapan Badan Jalan

Lebar Lebar Rata2 Panjang Volume


No STA Posisi Keterangan
m m (m) ( m2 )

41 1+000 kr/cl/kn 7.00


7.00 25.00
42 1+025 kr/cl/kn 7.00
7.00 25.00
43 1+050 kr/cl/kn 7.00
7.00 25.00
44 1+075 kr/cl/kn 7.00
7.00 25.00
45 1+100 kr/cl/kn 7.00
7.00 25.00
46 1+125 kr/cl/kn 7.00
7.00 25.00
47 1+150 kr/cl/kn 7.00
7.00 25.00
48 1+175 kr/cl/kn 7.00
7.00 25.00
49 1+200 kr/cl/kn 7.00
7.00 25.00
50 1+225 kr/cl/kn 7.00
7.00 25.00
51 1+250 kr/cl/kn 7.00
7.00 25.00
52 1+275 kr/cl/kn 7.00
7.00 25.00
53 1+300 kr/cl/kn 7.00
7.00 25.00
54 1+325 kr/cl/kn 7.00
7.00 25.00
55 1+350 kr/cl/kn 7.00
7.00 25.00
56 1+375 kr/cl/kn 7.00
7.00 25.00
57 1+400 kr/cl/kn 7.00
7.00 25.00
58 1+425 kr/cl/kn 7.00
7.00 25.00
59 1+450 kr/cl/kn 7.00
7.00 25.00
60 1+475 kr/cl/kn 7.00
7.00 25.00
61 1+500 kr/cl/kn 7.00

Sub total -
Total -

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Penyiapan Badan Jalan
Mata Pembayaran : 3.3
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Penyiapan Badan Jalan

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing

Penyiapan Badan Jalan

Lebar Lebar Rata2 Panjang Volume


No STA Posisi Keterangan
m m (m) ( m2 )

61 1+500 kr/cl/kn 7.00


7.00 25.00
62 1+525 kr/cl/kn 7.00
7.00 25.00
63 1+550 kr/cl/kn 7.00
7.00 25.00
64 1+575 kr/cl/kn 7.00
7.00 25.00
65 1+600 kr/cl/kn 7.00
7.00 25.00
66 1+625 kr/cl/kn 7.00
7.00 25.00
67 1+650 kr/cl/kn 7.00
7.00 25.00
68 1+675 kr/cl/kn 7.00
7.00 25.00
69 1+700 kr/cl/kn 7.00
7.00 25.00
70 1+725 kr/cl/kn 7.00
7.00 25.00
71 1+750 kr/cl/kn 7.00
7.00 25.00
72 1+775 kr/cl/kn 7.00
7.00 25.00
73 1+800 kr/cl/kn 7.00
7.00 25.00
74 1+825 kr/cl/kn 7.00
7.00 25.00
75 1+850 kr/cl/kn 7.00
7.00 25.00
76 1+875 kr/cl/kn 7.00
7.00 25.00
77 1+900 kr/cl/kn 7.00
7.00 25.00
78 1+925 kr/cl/kn 7.00
7.00 25.00
79 1+950 kr/cl/kn 7.00
7.00 25.00
80 1+975 kr/cl/kn 7.00
7.00 25.00
81 2+000 kr/cl/kn 7.00

Sub total -
Total -

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Penyiapan Badan Jalan
Mata Pembayaran : 3.3
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Penyiapan Badan Jalan

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing

Penyiapan Badan Jalan

Lebar Lebar Rata2 Panjang Volume


No STA Posisi Keterangan
m m (m) ( m2 )

81 2+000 kr/cl/kn 7.00


7.00 25.00
82 2+025 kr/cl/kn 7.00
7.00 25.00
83 2+050 kr/cl/kn 7.00
7.00 25.00
84 2+075 kr/cl/kn 7.00
7.00 25.00
85 2+100 kr/cl/kn 7.00
7.00 25.00
86 2+125 kr/cl/kn 7.00
7.00 25.00
87 2+150 kr/cl/kn 7.00
7.00 25.00
88 2+175 kr/cl/kn 7.00
7.00 25.00
89 2+200 kr/cl/kn 7.00
7.00 25.00
90 2+225 kr/cl/kn 7.00
7.00 25.00
91 2+250 kr/cl/kn 7.00
7.00 25.00
92 2+275 kr/cl/kn 7.00
7.00 25.00
93 2+300 kr/cl/kn 7.00
7.00 15.00
94 2+315 kr/cl/kn 7.00

Sub total -
Total -

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas S (Bahu)
Mata Pembayaran : 4.2.2b
Satuan : M3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas S (bahu)

1.50 4.50 1.50


Agg. Kelas S = 10 cm -5 % -3 % -3 % Agg. Kelas S = 10 cm
-5 %

Existing
Existing

POSISI LEBAR LEBAR TEBAL TEBAL Luas Luas PANJANG VOLUME


NO STA KETERANGAN
kr/kn kiri kanan kiri kanan kiri kanan M M3

1 0+000 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150


25.00 7.500
2 0+025 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
3 0+050 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
4 0+075 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
5 0+100 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
6 0+125 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
7 0+150 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
8 0+175 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
9 0+200 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
10 0+225 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
11 0+250 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
12 0+275 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
13 0+300 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
14 0+325 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
15 0+350 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
16 0+375 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
17 0+400 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
18 0+425 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
19 0+450 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
20 0+475 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
21 0+500 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150

Sub Total 150.00


Total 150.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas S (Bahu)
Mata Pembayaran : 4.2.2b
Satuan : M3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas S (bahu)

1.50 4.50 1.50


Agg. Kelas S = 10 cm -5 % -3 % -3 % Agg. Kelas S = 10 cm
-5 %

Existing
Existing

POSISI LEBAR LEBAR TEBAL TEBAL Luas Luas PANJANG VOLUME


NO STA KETERANGAN
kr/kn kiri kanan kiri kanan kiri kanan M M3

21 0+500 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150


25.00 7.500
22 0+525 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
23 0+550 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
24 0+575 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
25 0+600 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
26 0+625 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
27 0+650 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
28 0+675 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
29 0+700 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
30 0+725 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
31 0+750 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
32 0+775 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
33 0+800 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
34 0+825 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
35 0+850 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
36 0+875 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
37 0+900 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
38 0+925 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
39 0+950 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
40 0+975 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
41 1+000 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150

Sub Total 150.000


Total 300.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas S (Bahu)
Mata Pembayaran : 4.2.2b
Satuan : M3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas S (bahu)

1.50 4.50 1.50


Agg. Kelas S = 10 cm -5 % -3 % -3 % Agg. Kelas S = 10 cm
-5 %

Existing
Existing

POSISI LEBAR LEBAR TEBAL TEBAL Luas Luas PANJANG VOLUME


NO STA KETERANGAN
kr/kn kiri kanan kiri kanan kiri kanan M M3

41 1+000 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150


25.00 7.500
42 1+025 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
43 1+050 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
44 1+075 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
45 1+100 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
46 1+125 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
47 1+150 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
48 1+175 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
49 1+200 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
50 1+225 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
51 1+250 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
52 1+275 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
53 1+300 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
54 1+325 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
55 1+350 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
56 1+375 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
57 1+400 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
58 1+425 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
59 1+450 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
60 1+475 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
61 1+500 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150

Sub Total 150.000


Total 450.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas S (Bahu)
Mata Pembayaran : 4.2.2b
Satuan : M3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas S (bahu)

1.50 4.50 1.50


Agg. Kelas S = 10 cm -5 % -3 % -3 % Agg. Kelas S = 10 cm
-5 %

Existing
Existing

POSISI LEBAR LEBAR TEBAL TEBAL Luas Luas PANJANG VOLUME


NO STA KETERANGAN
kr/kn kiri kanan kiri kanan kiri kanan M M3

61 1+500 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150


25.00 7.500
62 1+525 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
63 1+550 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
64 1+575 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
65 1+600 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
66 1+625 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
67 1+650 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
68 1+675 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
69 1+700 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
70 1+725 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
71 1+750 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
72 1+775 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
73 1+800 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
74 1+825 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
75 1+850 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
76 1+875 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
77 1+900 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
78 1+925 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
79 1+950 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
80 1+975 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
81 2+000 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150

Sub Total 150.000


Total 600.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas S (Bahu)
Mata Pembayaran : 4.2.2b
Satuan : M3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas S (bahu)

1.50 4.50 1.50


Agg. Kelas S = 10 cm -5 % -3 % -3 % Agg. Kelas S = 10 cm
-5 %

Existing
Existing

POSISI LEBAR LEBAR TEBAL TEBAL Luas Luas PANJANG VOLUME


NO STA KETERANGAN
kr/kn kiri kanan kiri kanan kiri kanan M M3

81 2+000 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150


25.00 7.500
82 2+025 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
83 2+050 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
84 2+075 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
85 2+100 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
86 2+125 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
87 2+150 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
88 2+175 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
89 2+200 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
90 2+225 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
91 2+250 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
92 2+275 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
93 2+300 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
94 2+325 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
95 2+350 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
96 2+375 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
97 2+400 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
98 2+425 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
99 2+450 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
100 2+475 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
101 2+500 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150

Sub Total 150.000


Total 750.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

101 2+500 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150


25.00 7.500
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas S (Bahu)
Mata Pembayaran : 4.2.2b
Satuan : M3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas S (bahu)

1.50 4.50 1.50


Agg. Kelas S = 10 cm -5 % -3 % -3 % Agg. Kelas S = 10 cm
-5 %

Existing
Existing

POSISI LEBAR LEBAR TEBAL TEBAL Luas Luas PANJANG VOLUME


NO STA KETERANGAN
kr/kn kiri kanan kiri kanan kiri kanan M M3
102 2+525 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
103 2+550 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
104 2+575 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
105 2+600 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
106 2+625 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
107 2+650 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
108 2+675 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
109 2+700 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
110 2+725 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
111 2+750 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
112 2+775 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
113 2+800 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
114 2+825 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
115 2+850 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
116 2+875 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
117 2+900 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
118 2+925 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
119 2+950 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
120 2+975 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
121 3+000 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150

Sub Total 150.000


Total 900.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

121 3+000 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150


25.00 7.500
122 3+025 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
123 3+050 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas S (Bahu)
Mata Pembayaran : 4.2.2b
Satuan : M3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas S (bahu)

1.50 4.50 1.50


Agg. Kelas S = 10 cm -5 % -3 % -3 % Agg. Kelas S = 10 cm
-5 %

Existing
Existing

POSISI LEBAR LEBAR TEBAL TEBAL Luas Luas PANJANG VOLUME


NO STA KETERANGAN
kr/kn kiri kanan kiri kanan kiri kanan M M3
25.00 7.500
124 3+075 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
125 3+100 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
126 3+125 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
127 3+150 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
128 3+175 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
129 3+200 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
130 3+225 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
131 3+250 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
132 3+275 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
133 3+300 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
134 3+325 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
135 3+350 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
136 3+375 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
137 3+400 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
138 3+425 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
139 3+450 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
140 3+475 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
141 3+500 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150

Sub Total 150.000


Total 1,050.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

141 3+500 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150


25.00 7.500
142 3+525 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
143 3+550 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
144 3+575 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas S (Bahu)
Mata Pembayaran : 4.2.2b
Satuan : M3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas S (bahu)

1.50 4.50 1.50


Agg. Kelas S = 10 cm -5 % -3 % -3 % Agg. Kelas S = 10 cm
-5 %

Existing
Existing

POSISI LEBAR LEBAR TEBAL TEBAL Luas Luas PANJANG VOLUME


NO STA KETERANGAN
kr/kn kiri kanan kiri kanan kiri kanan M M3
145 3+600 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
146 3+625 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
147 3+650 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
148 3+675 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
149 3+700 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
150 3+725 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
151 3+750 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
152 3+775 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
153 3+800 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
154 3+825 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
155 3+850 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
156 3+875 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
157 3+900 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
158 3+925 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
159 3+950 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
160 3+975 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
161 4+000 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150

Sub Total 150.000


Total 1,200.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

161 4+000 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150


25.00 7.500
162 4+025 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
163 4+050 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
164 4+075 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
165 4+100 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
166 4+125 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas S (Bahu)
Mata Pembayaran : 4.2.2b
Satuan : M3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas S (bahu)

1.50 4.50 1.50


Agg. Kelas S = 10 cm -5 % -3 % -3 % Agg. Kelas S = 10 cm
-5 %

Existing
Existing

POSISI LEBAR LEBAR TEBAL TEBAL Luas Luas PANJANG VOLUME


NO STA KETERANGAN
kr/kn kiri kanan kiri kanan kiri kanan M M3
25.00 7.500
167 4+150 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
168 4+175 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
169 4+200 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
170 4+225 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
171 4+250 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
172 4+275 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
173 4+300 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
174 4+325 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
175 4+350 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
176 4+375 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
177 4+400 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
178 4+425 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
179 4+450 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
180 4+475 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
181 4+500 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150

Sub Total 150.000


Total 1,350.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

181 4+500 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150


25.00 7.500
182 4+525 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
183 4+550 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
184 4+575 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
185 4+600 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
186 4+625 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
187 4+650 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas S (Bahu)
Mata Pembayaran : 4.2.2b
Satuan : M3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas S (bahu)

1.50 4.50 1.50


Agg. Kelas S = 10 cm -5 % -3 % -3 % Agg. Kelas S = 10 cm
-5 %

Existing
Existing

POSISI LEBAR LEBAR TEBAL TEBAL Luas Luas PANJANG VOLUME


NO STA KETERANGAN
kr/kn kiri kanan kiri kanan kiri kanan M M3
188 4+675 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
189 4+700 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
190 4+725 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
191 4+750 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
192 4+775 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
193 4+800 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
194 4+825 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
195 4+850 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
196 4+875 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
197 4+900 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
198 4+925 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
199 4+950 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
200 4+975 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
201 5+000 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150

Sub Total 150.000


Total 1,500.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

201 5+000 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150


25.00 7.500
202 5+025 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
203 5+050 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
204 5+075 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
205 5+100 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
206 5+125 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
207 5+150 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
208 5+175 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
209 5+200 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas S (Bahu)
Mata Pembayaran : 4.2.2b
Satuan : M3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas S (bahu)

1.50 4.50 1.50


Agg. Kelas S = 10 cm -5 % -3 % -3 % Agg. Kelas S = 10 cm
-5 %

Existing
Existing

POSISI LEBAR LEBAR TEBAL TEBAL Luas Luas PANJANG VOLUME


NO STA KETERANGAN
kr/kn kiri kanan kiri kanan kiri kanan M M3
25.00 7.500
210 5+225 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
211 5+250 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
212 5+275 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
213 5+300 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
214 5+325 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
215 5+350 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
216 5+375 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
217 5+400 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
218 5+425 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
219 5+450 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
220 5+475 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
221 5+500 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150

Sub Total 150.000


Total 1,650.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

221 5+500 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150


25.00 7.500
222 5+525 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
223 5+550 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
224 5+575 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
225 5+600 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
226 5+625 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
227 5+650 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
228 5+675 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
229 5+700 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
230 5+725 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas S (Bahu)
Mata Pembayaran : 4.2.2b
Satuan : M3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas S (bahu)

1.50 4.50 1.50


Agg. Kelas S = 10 cm -5 % -3 % -3 % Agg. Kelas S = 10 cm
-5 %

Existing
Existing

POSISI LEBAR LEBAR TEBAL TEBAL Luas Luas PANJANG VOLUME


NO STA KETERANGAN
kr/kn kiri kanan kiri kanan kiri kanan M M3
231 5+750 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
232 5+775 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
233 5+800 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
234 5+825 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
235 5+850 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
236 5+875 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
237 5+900 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
238 5+925 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
239 5+950 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
240 5+975 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
241 6+000 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150

Sub Total 150.000


Total 1,800.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

241 6+000 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150


25.00 7.500
242 6+025 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
243 6+050 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
244 6+075 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
245 6+100 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
246 6+125 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
247 6+150 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
248 6+175 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
249 6+200 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
250 6+225 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
251 6+250 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
252 6+275 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas S (Bahu)
Mata Pembayaran : 4.2.2b
Satuan : M3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas S (bahu)

1.50 4.50 1.50


Agg. Kelas S = 10 cm -5 % -3 % -3 % Agg. Kelas S = 10 cm
-5 %

Existing
Existing

POSISI LEBAR LEBAR TEBAL TEBAL Luas Luas PANJANG VOLUME


NO STA KETERANGAN
kr/kn kiri kanan kiri kanan kiri kanan M M3
25.00 7.500
253 6+300 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
254 6+325 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
255 6+350 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
256 6+375 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
257 6+400 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
258 6+425 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
259 6+450 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
260 6+475 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
261 6+500 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150

Sub Total 150.000


Total 1,950.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

261 6+500 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150


25.00 7.500
262 6+525 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
263 6+550 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
264 6+575 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
265 6+600 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
266 6+625 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
267 6+650 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
268 6+675 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
269 6+700 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
270 6+725 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
271 6+750 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
272 6+775 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
273 6+800 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas S (Bahu)
Mata Pembayaran : 4.2.2b
Satuan : M3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas S (bahu)

1.50 4.50 1.50


Agg. Kelas S = 10 cm -5 % -3 % -3 % Agg. Kelas S = 10 cm
-5 %

Existing
Existing

POSISI LEBAR LEBAR TEBAL TEBAL Luas Luas PANJANG VOLUME


NO STA KETERANGAN
kr/kn kiri kanan kiri kanan kiri kanan M M3
274 6+825 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
275 6+850 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
276 6+875 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
277 6+900 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
278 6+925 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
279 6+950 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
280 6+975 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
281 7+000 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150

Sub Total 150.000


Total 2,100.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

281 7+000 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150


25.00 7.500
282 7+025 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
283 7+050 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
284 7+075 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
285 7+100 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
286 7+125 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
287 7+150 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
288 7+175 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
289 7+200 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
290 7+225 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
291 7+250 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
292 7+275 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
293 7+300 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
294 7+325 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
295 7+350 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas S (Bahu)
Mata Pembayaran : 4.2.2b
Satuan : M3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas S (bahu)

1.50 4.50 1.50


Agg. Kelas S = 10 cm -5 % -3 % -3 % Agg. Kelas S = 10 cm
-5 %

Existing
Existing

POSISI LEBAR LEBAR TEBAL TEBAL Luas Luas PANJANG VOLUME


NO STA KETERANGAN
kr/kn kiri kanan kiri kanan kiri kanan M M3
25.00 7.500
296 7+375 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
297 7+400 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
298 7+425 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
299 7+450 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
300 7+475 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
301 7+500 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150

Sub Total 150.000


Total 2,250.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

301 7+500 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150


25.00 7.500
302 7+525 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
303 7+550 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
304 7+575 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
305 7+600 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
306 7+625 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
307 7+650 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
308 7+675 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
309 7+700 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
310 7+725 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
311 7+750 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
312 7+775 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
313 7+800 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
314 7+825 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
315 7+850 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
316 7+875 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas S (Bahu)
Mata Pembayaran : 4.2.2b
Satuan : M3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas S (bahu)

1.50 4.50 1.50


Agg. Kelas S = 10 cm -5 % -3 % -3 % Agg. Kelas S = 10 cm
-5 %

Existing
Existing

POSISI LEBAR LEBAR TEBAL TEBAL Luas Luas PANJANG VOLUME


NO STA KETERANGAN
kr/kn kiri kanan kiri kanan kiri kanan M M3
317 7+900 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
318 7+925 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
319 7+950 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
320 7+975 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
321 8+000 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150

Sub Total 150.000


Total 2,400.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

321 8+000 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150


25.00 7.500
322 8+025 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
323 8+050 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
324 8+075 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
325 8+100 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
326 8+125 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
327 8+150 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
328 8+175 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
329 8+200 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
330 8+225 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
331 8+250 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
332 8+275 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
333 8+300 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
334 8+325 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
335 8+350 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
336 8+375 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
337 8+400 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
338 8+425 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas S (Bahu)
Mata Pembayaran : 4.2.2b
Satuan : M3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas S (bahu)

1.50 4.50 1.50


Agg. Kelas S = 10 cm -5 % -3 % -3 % Agg. Kelas S = 10 cm
-5 %

Existing
Existing

POSISI LEBAR LEBAR TEBAL TEBAL Luas Luas PANJANG VOLUME


NO STA KETERANGAN
kr/kn kiri kanan kiri kanan kiri kanan M M3
25.00 7.500
339 8+450 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
340 8+475 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
341 8+500 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150

Sub Total 150.000


Total 2,550.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

341 8+500 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150


25.00 7.500
342 8+525 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
343 8+550 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
344 8+575 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
345 8+600 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
346 8+625 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
347 8+650 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
348 8+675 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
349 8+700 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
350 8+725 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
351 8+750 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
352 8+775 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
353 8+800 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
354 8+825 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
355 8+850 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
356 8+875 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
357 8+900 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
358 8+925 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
359 8+950 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas S (Bahu)
Mata Pembayaran : 4.2.2b
Satuan : M3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas S (bahu)

1.50 4.50 1.50


Agg. Kelas S = 10 cm -5 % -3 % -3 % Agg. Kelas S = 10 cm
-5 %

Existing
Existing

POSISI LEBAR LEBAR TEBAL TEBAL Luas Luas PANJANG VOLUME


NO STA KETERANGAN
kr/kn kiri kanan kiri kanan kiri kanan M M3
360 8+975 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
361 9+000 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150

Sub Total 150.000


Total 2,700.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

361 9+000 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150


25.00 7.500
362 9+025 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
363 9+050 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
364 9+075 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
365 9+100 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
366 9+125 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
367 9+150 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
368 9+175 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
369 9+200 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
370 9+225 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
371 9+250 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
372 9+275 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
373 9+300 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
374 9+325 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
375 9+350 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
376 9+375 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
377 9+400 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
378 9+425 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
379 9+450 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
380 9+475 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
381 9+500 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas S (Bahu)
Mata Pembayaran : 4.2.2b
Satuan : M3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas S (bahu)

1.50 4.50 1.50


Agg. Kelas S = 10 cm -5 % -3 % -3 % Agg. Kelas S = 10 cm
-5 %

Existing
Existing

POSISI LEBAR LEBAR TEBAL TEBAL Luas Luas PANJANG VOLUME


NO STA KETERANGAN
kr/kn kiri kanan kiri kanan kiri kanan M M3

Sub Total 150.000


Total 2,850.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

381 9+500 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150


25.00 7.500
382 9+525 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
383 9+550 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
384 9+575 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
385 9+600 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
386 9+625 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
387 9+650 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
388 9+675 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
389 9+700 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150
25.00 7.500
390 9+725 kr/kn 1.50 1.50 0.10 0.10 0.150 0.150

Sub Total 67.500


Total 2,917.500
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas S (Bahu)
Mata Pembayaran : 4.2.2b
Satuan : M3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas S (bahu)

1.50 4.50 1.50


Agg. Kelas S = 10 cm -5 % -3 % -3 % Agg. Kelas S = 10 cm
-5 %

Existing
Existing

POSISI LEBAR LEBAR TEBAL TEBAL Luas Luas PANJANG VOLUME


NO STA KETERANGAN
kr/kn kiri kanan kiri kanan kiri kanan M M3

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas A
Mata Pembayaran : 5.1.1
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas A

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas A = 15 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

1 0+000 kr/cl/kn 7.00 7.30 7.15 0.20 1.430


1.430 25.00 35.750
2 0+025 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
3 0+050 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
4 0+075 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
5 0+100 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
6 0+125 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
7 0+150 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
8 0+175 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
9 0+200 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
10 0+225 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
11 0+250 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
12 0+275 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
13 0+300 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
14 0+325 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
15 0+350 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
16 0+375 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
17 0+400 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
18 0+425 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
19 0+450 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
20 0+475 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
21 0+500 kr/cl/kn 7.00 7.30 7.15 0.20 1.430

Sub total 715.00


Total 715.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas A
Mata Pembayaran : 5.1.1
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas A

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas A = 15 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

21 0+500 kr/cl/kn 7.00 7.30 7.15 0.20 1.430


1.430 25.00 35.750
22 0+525 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
23 0+550 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
24 0+575 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
25 0+600 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
26 0+625 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
27 0+650 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
28 0+675 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
29 0+700 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
30 0+725 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
31 0+750 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
32 0+775 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
33 0+800 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
34 0+825 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
35 0+850 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
36 0+875 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
37 0+900 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
38 0+925 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
39 0+950 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
40 0+975 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
41 1+000 kr/cl/kn 7.00 7.30 7.15 0.20 1.430

Sub total 715.00


Total 1,430.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas A
Mata Pembayaran : 5.1.1
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas A

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas A = 15 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

41 1+000 kr/cl/kn 7.00 7.30 7.15 0.20 1.430


1.430 25.00 35.750
42 1+025 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
43 1+050 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
44 1+075 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
45 1+100 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
46 1+125 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
47 1+150 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
48 1+175 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
49 1+200 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
50 1+225 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
51 1+250 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
52 1+275 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
53 1+300 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
54 1+325 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
55 1+350 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
56 1+375 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
57 1+400 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
58 1+425 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
59 1+450 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
60 1+475 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
61 1+500 kr/cl/kn 7.00 7.30 7.15 0.20 1.430

Sub total 715.00


Total 2,145.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas A
Mata Pembayaran : 5.1.1
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas A

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas A = 15 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

61 1+500 kr/cl/kn 7.00 7.30 7.15 0.20 1.430


1.430 25.00 35.750
62 1+525 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
63 1+550 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
64 1+575 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
65 1+600 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
66 1+625 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
67 1+650 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
68 1+675 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
69 1+700 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
70 1+725 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
71 1+750 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
72 1+775 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
73 1+800 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
74 1+825 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
75 1+850 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
76 1+875 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
77 1+900 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
78 1+925 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
79 1+950 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
80 1+975 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
81 2+000 kr/cl/kn 7.00 7.30 7.15 0.20 1.430

Sub total 715.00


Total 2,860.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas A
Mata Pembayaran : 5.1.1
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas A

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas A = 15 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

81 2+000 kr/cl/kn 7.00 7.30 7.15 0.20 1.430


1.430 25.00 35.750
82 2+025 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
83 2+050 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
84 2+075 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
85 2+100 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
86 2+125 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
87 2+150 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
88 2+175 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
89 2+200 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
90 2+225 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
91 2+250 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
92 2+275 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
93 2+300 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
94 2+325 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
95 2+350 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
96 2+375 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
97 2+400 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
98 2+425 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
99 2+450 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
100 2+475 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
101 2+500 kr/cl/kn 7.00 7.30 7.15 0.20 1.430

Sub total 715.00


Total 3,575.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

101 2+500 kr/cl/kn 7.00 7.30 7.15 0.20 1.430


ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas A
Mata Pembayaran : 5.1.1
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas A

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas A = 15 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.430 25.00 35.750
102 2+525 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
103 2+550 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
104 2+575 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
105 2+600 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
106 2+625 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
107 2+650 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
108 2+675 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
109 2+700 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
110 2+725 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
111 2+750 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
112 2+775 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
113 2+800 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
114 2+825 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
115 2+850 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
116 2+875 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
117 2+900 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
118 2+925 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
119 2+950 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
120 2+975 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
121 3+000 kr/cl/kn 7.00 7.30 7.15 0.20 1.430

Sub total 715.00


Total 4,290.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

121 3+000 kr/cl/kn 7.00 7.30 7.15 0.20 1.430


1.430 25.00 35.750
122 3+025 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas A
Mata Pembayaran : 5.1.1
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas A

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas A = 15 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.430 25.00 35.750
123 3+050 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
124 3+075 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
125 3+100 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
126 3+125 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
127 3+150 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
128 3+175 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
129 3+200 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
130 3+225 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
131 3+250 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
132 3+275 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
133 3+300 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
134 3+325 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
135 3+350 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
136 3+375 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
137 3+400 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
138 3+425 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
139 3+450 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
140 3+475 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
141 3+500 kr/cl/kn 7.00 7.30 7.15 0.20 1.430

Sub total 715.00


Total 5,005.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

141 3+500 kr/cl/kn 7.00 7.30 7.15 0.20 1.430


1.430 25.00 35.750
142 3+525 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
143 3+550 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas A
Mata Pembayaran : 5.1.1
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas A

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas A = 15 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.430 25.00 35.750
144 3+575 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
145 3+600 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
146 3+625 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
147 3+650 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
148 3+675 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
149 3+700 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
150 3+725 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
151 3+750 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
152 3+775 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
153 3+800 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
154 3+825 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
155 3+850 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
156 3+875 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
157 3+900 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
158 3+925 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
159 3+950 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
160 3+975 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
161 4+000 kr/cl/kn 7.00 7.30 7.15 0.20 1.430

Sub total 715.00


Total 5,720.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

161 4+000 kr/cl/kn 7.00 7.30 7.15 0.20 1.430


1.430 25.00 35.750
162 4+025 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
163 4+050 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
164 4+075 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas A
Mata Pembayaran : 5.1.1
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas A

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas A = 15 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.430 25.00 35.750
165 4+100 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
166 4+125 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
167 4+150 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
168 4+175 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
169 4+200 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
170 4+225 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
171 4+250 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
172 4+275 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
173 4+300 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
174 4+325 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
175 4+350 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
176 4+375 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
177 4+400 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
178 4+425 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
179 4+450 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
180 4+475 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
181 4+500 kr/cl/kn 7.00 7.30 7.15 0.20 1.430

Sub total 715.00


Total 6,435.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

181 4+500 kr/cl/kn 7.00 7.30 7.15 0.20 1.430


1.430 25.00 35.750
182 4+525 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
183 4+550 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
184 4+575 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
185 4+600 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas A
Mata Pembayaran : 5.1.1
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas A

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas A = 15 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.430 25.00 35.750
186 4+625 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
187 4+650 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
188 4+675 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
189 4+700 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
190 4+725 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
191 4+750 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
192 4+775 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
193 4+800 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
194 4+825 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
195 4+850 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
196 4+875 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
197 4+900 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
198 4+925 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
199 4+950 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
200 4+975 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
201 5+000 kr/cl/kn 7.00 7.30 7.15 0.20 1.430

Sub total 715.00


Total 7,150.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

201 5+000 kr/cl/kn 7.00 7.30 7.15 0.20 1.430


1.430 25.00 35.750
202 5+025 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
203 5+050 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
204 5+075 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
205 5+100 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
206 5+125 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas A
Mata Pembayaran : 5.1.1
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas A

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas A = 15 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.430 25.00 35.750
207 5+150 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
208 5+175 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
209 5+200 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
210 5+225 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
211 5+250 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
212 5+275 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
213 5+300 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
214 5+325 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
215 5+350 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
216 5+375 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
217 5+400 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
218 5+425 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
219 5+450 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
220 5+475 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
221 5+500 kr/cl/kn 7.00 7.30 7.15 0.20 1.430

Sub total 715.00


Total 7,865.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

221 5+500 kr/cl/kn 7.00 7.30 7.15 0.20 1.430


1.430 25.00 35.750
222 5+525 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
223 5+550 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
224 5+575 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
225 5+600 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
226 5+625 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
227 5+650 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas A
Mata Pembayaran : 5.1.1
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas A

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas A = 15 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.430 25.00 35.750
228 5+675 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
229 5+700 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
230 5+725 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
231 5+750 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
232 5+775 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
233 5+800 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
234 5+825 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
235 5+850 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
236 5+875 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
237 5+900 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
238 5+925 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
239 5+950 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
240 5+975 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
241 6+000 kr/cl/kn 7.00 7.30 7.15 0.20 1.430

Sub total 715.00


Total 8,580.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

241 6+000 kr/cl/kn 7.00 7.30 7.15 0.20 1.430


1.430 25.00 35.750
242 6+025 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
243 6+050 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
244 6+075 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
245 6+100 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
246 6+125 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
247 6+150 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
248 6+175 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas A
Mata Pembayaran : 5.1.1
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas A

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas A = 15 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.430 25.00 35.750
249 6+200 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
250 6+225 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
251 6+250 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
252 6+275 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
253 6+300 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
254 6+325 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
255 6+350 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
256 6+375 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
257 6+400 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
258 6+425 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
259 6+450 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
260 6+475 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
261 6+500 kr/cl/kn 7.00 7.30 7.15 0.20 1.430

Sub total 715.00


Total 9,295.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

261 6+500 kr/cl/kn 7.00 7.30 7.15 0.20 1.430


1.430 25.00 35.750
262 6+525 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
263 6+550 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
264 6+575 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
265 6+600 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
266 6+625 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
267 6+650 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
268 6+675 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
269 6+700 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas A
Mata Pembayaran : 5.1.1
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas A

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas A = 15 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.430 25.00 35.750
270 6+725 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
271 6+750 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
272 6+775 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
273 6+800 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
274 6+825 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
275 6+850 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
276 6+875 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
277 6+900 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
278 6+925 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
279 6+950 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
280 6+975 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
281 7+000 kr/cl/kn 7.00 7.30 7.15 0.20 1.430

Sub total 715.00


Total 10,010.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

281 7+000 kr/cl/kn 7.00 7.30 7.15 0.20 1.430


1.430 25.00 35.750
282 7+025 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
283 7+050 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
284 7+075 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
285 7+100 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
286 7+125 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
287 7+150 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
288 7+175 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
289 7+200 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
290 7+225 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas A
Mata Pembayaran : 5.1.1
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas A

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas A = 15 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.430 25.00 35.750
291 7+250 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
292 7+275 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
293 7+300 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
294 7+325 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
295 7+350 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
296 7+375 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
297 7+400 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
298 7+425 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
299 7+450 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
300 7+475 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
301 7+500 kr/cl/kn 7.00 7.30 7.15 0.20 1.430

Sub total 715.00


Total 10,725.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

301 7+500 kr/cl/kn 7.00 7.30 7.15 0.20 1.430


1.430 25.00 35.750
302 7+525 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
303 7+550 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
304 7+575 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
305 7+600 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
306 7+625 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
307 7+650 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
308 7+675 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
309 7+700 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
310 7+725 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
311 7+750 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas A
Mata Pembayaran : 5.1.1
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas A

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas A = 15 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.430 25.00 35.750
312 7+775 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
313 7+800 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
314 7+825 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
315 7+850 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
316 7+875 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
317 7+900 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
318 7+925 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
319 7+950 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
320 7+975 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
321 8+000 kr/cl/kn 7.00 7.30 7.15 0.20 1.430

Sub total 715.00


Total 11,440.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

321 8+000 kr/cl/kn 7.00 7.30 7.15 0.20 1.430


1.430 25.00 35.750
322 8+025 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
323 8+050 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
324 8+075 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
325 8+100 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
326 8+125 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
327 8+150 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
328 8+175 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
329 8+200 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
330 8+225 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
331 8+250 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
332 8+275 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas A
Mata Pembayaran : 5.1.1
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas A

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas A = 15 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.430 25.00 35.750
333 8+300 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
334 8+325 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
335 8+350 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
336 8+375 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
337 8+400 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
338 8+425 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
339 8+450 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
340 8+475 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
341 8+500 kr/cl/kn 7.00 7.30 7.15 0.20 1.430

Sub total 715.00


Total 12,155.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

341 8+500 kr/cl/kn 7.00 7.30 7.15 0.20 1.430


1.430 25.00 35.750
342 8+525 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
343 8+550 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
344 8+575 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
345 8+600 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
346 8+625 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
347 8+650 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
348 8+675 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
349 8+700 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
350 8+725 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
351 8+750 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
352 8+775 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
353 8+800 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas A
Mata Pembayaran : 5.1.1
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas A

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas A = 15 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.430 25.00 35.750
354 8+825 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
355 8+850 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
356 8+875 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
357 8+900 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
358 8+925 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
359 8+950 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
360 8+975 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
361 9+000 kr/cl/kn 7.00 7.30 7.15 0.20 1.430

Sub total 715.00


Total 12,870.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

361 9+000 kr/cl/kn 7.00 7.30 7.15 0.20 1.430


1.430 25.00 35.750
362 9+025 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
363 9+050 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
364 9+075 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
365 9+100 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
366 9+125 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
367 9+150 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
368 9+175 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
369 9+200 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
370 9+225 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
371 9+250 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
372 9+275 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
373 9+300 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
374 9+325 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas A
Mata Pembayaran : 5.1.1
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas A

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas A = 15 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.430 25.00 35.750
375 9+350 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
376 9+375 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
377 9+400 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
378 9+425 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
379 9+450 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
380 9+475 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
381 9+500 kr/cl/kn 7.00 7.30 7.15 0.20 1.430

Sub total 715.00


Total 13,585.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

381 9+500 kr/cl/kn 7.00 7.30 7.15 0.20 1.430


1.430 25.00 35.750
382 9+525 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
383 9+550 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
384 9+575 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
385 9+600 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
386 9+625 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
387 9+650 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
388 9+675 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
389 9+700 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
1.430 25.00 35.750
390 9+725 kr/cl/kn 7.00 7.30 7.15 0.20 1.430
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas A
Mata Pembayaran : 5.1.1
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas A

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas A = 15 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

Sub total 321.75


Total 13,906.75

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas B
Mata Pembayaran : 5.1.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas B

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas B = 20 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

1 0+000 kr/cl/kn 7.30 7.70 7.50 0.20 1.500


1.500 25.00 37.500
2 0+025 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
3 0+050 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
4 0+075 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
5 0+100 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
6 0+125 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
7 0+150 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
8 0+175 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
9 0+200 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
10 0+225 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
11 0+250 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
12 0+275 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
13 0+300 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
14 0+325 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
15 0+350 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
16 0+375 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
17 0+400 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
18 0+425 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
19 0+450 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
20 0+475 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
21 0+500 kr/cl/kn 7.30 7.70 7.50 0.20 1.500

Sub total 750.00


Total 750.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas B
Mata Pembayaran : 5.1.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas B

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas B = 20 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

21 0+500 kr/cl/kn 7.30 7.70 7.50 0.20 1.500


1.500 25.00 37.500
22 0+525 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
23 0+550 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
24 0+575 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
25 0+600 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
26 0+625 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
27 0+650 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
28 0+675 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
29 0+700 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
30 0+725 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
31 0+750 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
32 0+775 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
33 0+800 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
34 0+825 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
35 0+850 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
36 0+875 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
37 0+900 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
38 0+925 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
39 0+950 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
40 0+975 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
41 1+000 kr/cl/kn 7.30 7.70 7.50 0.20 1.500

Sub total 750.00


Total 1,500.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas B
Mata Pembayaran : 5.1.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas B

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas B = 20 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

41 1+000 kr/cl/kn 7.30 7.70 7.50 0.20 1.500


1.500 25.00 37.500
42 1+025 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
43 1+050 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
44 1+075 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
45 1+100 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
46 1+125 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
47 1+150 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
48 1+175 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
49 1+200 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
50 1+225 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
51 1+250 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
52 1+275 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
53 1+300 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
54 1+325 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
55 1+350 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
56 1+375 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
57 1+400 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
58 1+425 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
59 1+450 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
60 1+475 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
61 1+500 kr/cl/kn 7.30 7.70 7.50 0.20 1.500

Sub total 750.00


Total 2,250.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas B
Mata Pembayaran : 5.1.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas B

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas B = 20 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

61 1+500 kr/cl/kn 7.30 7.70 7.50 0.20 1.500


1.500 25.00 37.500
62 1+525 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
63 1+550 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
64 1+575 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
65 1+600 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
66 1+625 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
67 1+650 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
68 1+675 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
69 1+700 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
70 1+725 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
71 1+750 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
72 1+775 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
73 1+800 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
74 1+825 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
75 1+850 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
76 1+875 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
77 1+900 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
78 1+925 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
79 1+950 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
80 1+975 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
81 2+000 kr/cl/kn 7.30 7.70 7.50 0.20 1.500

Sub total 750.00


Total 3,000.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas B
Mata Pembayaran : 5.1.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas B

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas B = 20 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

81 2+000 kr/cl/kn 7.30 7.70 7.50 0.20 1.500


1.500 25.00 37.500
82 2+025 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
83 2+050 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
84 2+075 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
85 2+100 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
86 2+125 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
87 2+150 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
88 2+175 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
89 2+200 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
90 2+225 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
91 2+250 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
92 2+275 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
93 2+300 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
94 2+325 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
95 2+350 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
96 2+375 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
97 2+400 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
98 2+425 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
99 2+450 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
100 2+475 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
101 2+500 kr/cl/kn 7.30 7.70 7.50 0.20 1.500

Sub total 750.00


Total 3,750.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

101 2+500 kr/cl/kn 7.30 7.70 7.50 0.20 1.500


ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas B
Mata Pembayaran : 5.1.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas B

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas B = 20 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.500 25.00 37.500
102 2+525 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
103 2+550 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
104 2+575 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
105 2+600 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
106 2+625 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
107 2+650 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
108 2+675 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
109 2+700 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
110 2+725 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
111 2+750 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
112 2+775 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
113 2+800 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
114 2+825 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
115 2+850 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
116 2+875 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
117 2+900 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
118 2+925 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
119 2+950 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
120 2+975 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
121 3+000 kr/cl/kn 7.30 7.70 7.50 0.20 1.500

Sub total 750.00


Total 4,500.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

121 3+000 kr/cl/kn 7.30 7.70 7.50 0.20 1.500


1.500 25.00 37.500
122 3+025 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas B
Mata Pembayaran : 5.1.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas B

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas B = 20 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.500 25.00 37.500
123 3+050 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
124 3+075 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
125 3+100 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
126 3+125 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
127 3+150 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
128 3+175 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
129 3+200 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
130 3+225 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
131 3+250 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
132 3+275 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
133 3+300 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
134 3+325 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
135 3+350 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
136 3+375 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
137 3+400 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
138 3+425 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
139 3+450 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
140 3+475 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
141 3+500 kr/cl/kn 7.30 7.70 7.50 0.20 1.500

Sub total 750.00


Total 5,250.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

141 3+500 kr/cl/kn 7.30 7.70 7.50 0.20 1.500


1.500 25.00 37.500
142 3+525 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
143 3+550 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas B
Mata Pembayaran : 5.1.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas B

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas B = 20 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.500 25.00 37.500
144 3+575 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
145 3+600 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
146 3+625 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
147 3+650 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
148 3+675 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
149 3+700 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
150 3+725 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
151 3+750 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
152 3+775 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
153 3+800 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
154 3+825 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
155 3+850 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
156 3+875 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
157 3+900 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
158 3+925 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
159 3+950 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
160 3+975 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
161 4+000 kr/cl/kn 7.30 7.70 7.50 0.20 1.500

Sub total 750.00


Total 6,000.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

161 4+000 kr/cl/kn 7.30 7.70 7.50 0.20 1.500


1.500 25.00 37.500
162 4+025 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
163 4+050 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
164 4+075 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas B
Mata Pembayaran : 5.1.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas B

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas B = 20 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.500 25.00 37.500
165 4+100 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
166 4+125 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
167 4+150 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
168 4+175 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
169 4+200 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
170 4+225 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
171 4+250 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
172 4+275 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
173 4+300 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
174 4+325 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
175 4+350 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
176 4+375 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
177 4+400 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
178 4+425 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
179 4+450 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
180 4+475 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
181 4+500 kr/cl/kn 7.30 7.70 7.50 0.20 1.500

Sub total 750.00


Total 6,750.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

181 4+500 kr/cl/kn 7.30 7.70 7.50 0.20 1.500


1.500 25.00 37.500
182 4+525 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
183 4+550 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
184 4+575 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
185 4+600 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas B
Mata Pembayaran : 5.1.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas B

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas B = 20 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.500 25.00 37.500
186 4+625 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
187 4+650 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
188 4+675 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
189 4+700 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
190 4+725 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
191 4+750 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
192 4+775 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
193 4+800 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
194 4+825 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
195 4+850 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
196 4+875 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
197 4+900 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
198 4+925 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
199 4+950 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
200 4+975 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
201 5+000 kr/cl/kn 7.30 7.70 7.50 0.20 1.500

Sub total 750.00


Total 7,500.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

201 5+000 kr/cl/kn 7.30 7.70 7.50 0.20 1.500


1.500 25.00 37.500
202 5+025 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
203 5+050 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
204 5+075 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
205 5+100 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
206 5+125 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas B
Mata Pembayaran : 5.1.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas B

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas B = 20 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.500 25.00 37.500
207 5+150 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
208 5+175 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
209 5+200 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
210 5+225 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
211 5+250 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
212 5+275 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
213 5+300 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
214 5+325 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
215 5+350 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
216 5+375 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
217 5+400 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
218 5+425 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
219 5+450 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
220 5+475 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
221 5+500 kr/cl/kn 7.30 7.70 7.50 0.20 1.500

Sub total 750.00


Total 8,250.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

221 5+500 kr/cl/kn 7.30 7.70 7.50 0.20 1.500


1.500 25.00 37.500
222 5+525 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
223 5+550 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
224 5+575 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
225 5+600 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
226 5+625 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
227 5+650 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas B
Mata Pembayaran : 5.1.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas B

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas B = 20 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.500 25.00 37.500
228 5+675 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
229 5+700 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
230 5+725 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
231 5+750 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
232 5+775 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
233 5+800 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
234 5+825 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
235 5+850 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
236 5+875 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
237 5+900 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
238 5+925 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
239 5+950 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
240 5+975 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
241 6+000 kr/cl/kn 7.30 7.70 7.50 0.20 1.500

Sub total 750.00


Total 9,000.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

241 6+000 kr/cl/kn 7.30 7.70 7.50 0.20 1.500


1.500 25.00 37.500
242 6+025 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
243 6+050 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
244 6+075 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
245 6+100 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
246 6+125 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
247 6+150 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
248 6+175 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas B
Mata Pembayaran : 5.1.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas B

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas B = 20 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.500 25.00 37.500
249 6+200 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
250 6+225 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
251 6+250 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
252 6+275 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
253 6+300 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
254 6+325 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
255 6+350 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
256 6+375 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
257 6+400 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
258 6+425 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
259 6+450 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
260 6+475 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
261 6+500 kr/cl/kn 7.30 7.70 7.50 0.20 1.500

Sub total 750.00


Total 9,750.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

261 6+500 kr/cl/kn 7.30 7.70 7.50 0.20 1.500


1.500 25.00 37.500
262 6+525 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
263 6+550 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
264 6+575 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
265 6+600 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
266 6+625 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
267 6+650 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
268 6+675 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
269 6+700 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas B
Mata Pembayaran : 5.1.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas B

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas B = 20 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.500 25.00 37.500
270 6+725 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
271 6+750 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
272 6+775 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
273 6+800 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
274 6+825 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
275 6+850 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
276 6+875 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
277 6+900 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
278 6+925 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
279 6+950 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
280 6+975 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
281 7+000 kr/cl/kn 7.30 7.70 7.50 0.20 1.500

Sub total 750.00


Total 10,500.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

281 7+000 kr/cl/kn 7.30 7.70 7.50 0.20 1.500


1.500 25.00 37.500
282 7+025 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
283 7+050 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
284 7+075 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
285 7+100 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
286 7+125 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
287 7+150 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
288 7+175 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
289 7+200 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
290 7+225 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas B
Mata Pembayaran : 5.1.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas B

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas B = 20 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.500 25.00 37.500
291 7+250 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
292 7+275 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
293 7+300 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
294 7+325 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
295 7+350 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
296 7+375 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
297 7+400 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
298 7+425 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
299 7+450 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
300 7+475 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
301 7+500 kr/cl/kn 7.30 7.70 7.50 0.20 1.500

Sub total 750.00


Total 11,250.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

301 7+500 kr/cl/kn 7.30 7.70 7.50 0.20 1.500


1.500 25.00 37.500
302 7+525 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
303 7+550 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
304 7+575 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
305 7+600 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
306 7+625 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
307 7+650 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
308 7+675 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
309 7+700 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
310 7+725 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
311 7+750 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas B
Mata Pembayaran : 5.1.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas B

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas B = 20 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.500 25.00 37.500
312 7+775 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
313 7+800 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
314 7+825 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
315 7+850 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
316 7+875 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
317 7+900 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
318 7+925 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
319 7+950 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
320 7+975 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
321 8+000 kr/cl/kn 7.30 7.70 7.50 0.20 1.500

Sub total 750.00


Total 12,000.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

321 8+000 kr/cl/kn 7.30 7.70 7.50 0.20 1.500


1.500 25.00 37.500
322 8+025 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
323 8+050 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
324 8+075 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
325 8+100 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
326 8+125 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
327 8+150 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
328 8+175 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
329 8+200 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
330 8+225 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
331 8+250 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
332 8+275 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas B
Mata Pembayaran : 5.1.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas B

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas B = 20 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.500 25.00 37.500
333 8+300 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
334 8+325 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
335 8+350 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
336 8+375 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
337 8+400 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
338 8+425 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
339 8+450 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
340 8+475 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
341 8+500 kr/cl/kn 7.30 7.70 7.50 0.20 1.500

Sub total 750.00


Total 12,750.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

341 8+500 kr/cl/kn 7.30 7.70 7.50 0.20 1.500


1.500 25.00 37.500
342 8+525 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
343 8+550 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
344 8+575 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
345 8+600 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
346 8+625 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
347 8+650 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
348 8+675 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
349 8+700 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
350 8+725 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
351 8+750 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
352 8+775 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
353 8+800 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas B
Mata Pembayaran : 5.1.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas B

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas B = 20 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.500 25.00 37.500
354 8+825 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
355 8+850 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
356 8+875 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
357 8+900 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
358 8+925 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
359 8+950 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
360 8+975 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
361 9+000 kr/cl/kn 7.30 7.70 7.50 0.20 1.500

Sub total 750.00


Total 13,500.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

361 9+000 kr/cl/kn 7.30 7.70 7.50 0.20 1.500


1.500 25.00 37.500
362 9+025 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
363 9+050 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
364 9+075 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
365 9+100 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
366 9+125 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
367 9+150 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
368 9+175 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
369 9+200 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
370 9+225 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
371 9+250 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
372 9+275 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
373 9+300 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
374 9+325 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas B
Mata Pembayaran : 5.1.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas B

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas B = 20 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )
1.500 25.00 37.500
375 9+350 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
376 9+375 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
377 9+400 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
378 9+425 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
379 9+450 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
380 9+475 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
381 9+500 kr/cl/kn 7.30 7.70 7.50 0.20 1.500

Sub total 750.00


Total 14,250.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer

381 9+500 kr/cl/kn 7.30 7.70 7.50 0.20 1.500


1.500 25.00 37.500
382 9+525 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
383 9+550 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
384 9+575 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
385 9+600 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
386 9+625 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
387 9+650 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
388 9+675 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
389 9+700 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
1.500 25.00 37.500
390 9+725 kr/cl/kn 7.30 7.70 7.50 0.20 1.500
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Lapis Pondasi Agregate Kelas B
Mata Pembayaran : 5.1.2
Satuan : m3
Kontraktor 0
Konsultan CV. Multi Pratama

Agg.Kelas B

6.00
1.50 4.50 1.50
-5 % -3 % -3 %
-5 %

Existing
Existing
Agg. Kelas B = 20 cm

Lbr.atas Lbr.bawah Lbr.rata2 Tebal Luas Luas Panjang Volume


No STA Posisi Keterangan
(m ) (m ) (m ) (m ) (m 2) (m2) (m) ( m3 )

Sub total 337.50


Total 14,587.50

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Prime Coat
Mata Pembayaran : 6.1.1a
Satuan : Liter
Kontraktor 0
Konsultan CV. Multi Pratama

Prime Coat

1.50 4.50 1.50


-5 % -3 % -3 %
-5 %
Existing
Existing
Prime Coat

Lebar Lebar Rata2 Koef. Liter / m2 Panjang Volume


No STA Posisi Keterangan
(m) (m) (Liter) (m) ( Liter )

1 0+000 kr/cl/kn 7.00


7.00 0.80 25.00 140.000
2 0+025 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
3 0+050 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
4 0+075 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
5 0+100 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
6 0+125 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
7 0+150 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
8 0+175 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
9 0+200 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
10 0+225 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
11 0+250 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
12 0+275 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
13 0+300 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
14 0+325 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
15 0+350 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
16 0+375 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
17 0+400 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
18 0+425 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
19 0+450 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
20 0+475 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
21 0+500 kr/cl/kn 7.00

Sub total 2,800.00


Total 2,800.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Prime Coat
Mata Pembayaran : 6.1.1a
Satuan : Liter
Kontraktor 0
Konsultan CV. Multi Pratama

Prime Coat

1.50 4.50 1.50


-5 % -3 % -3 %
-5 %
Existing
Existing
Prime Coat

Lebar Lebar Rata2 Koef. Liter / m2 Panjang Volume


No STA Posisi Keterangan
(m) (m) (Liter) (m) ( Liter )

21 0+500 kr/cl/kn 7.00


7.00 0.80 25.00 140.000
22 0+525 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
23 0+550 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
24 0+575 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
25 0+600 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
26 0+625 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
27 0+650 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
28 0+675 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
29 0+700 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
30 0+725 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
31 0+750 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
32 0+775 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
33 0+800 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
34 0+825 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
35 0+850 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
36 0+875 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
37 0+900 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
38 0+925 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
39 0+950 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
40 0+975 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
41 1+000 kr/cl/kn 7.00

Sub total 2,800.00


Total 5,600.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Prime Coat
Mata Pembayaran : 6.1.1a
Satuan : Liter
Kontraktor 0
Konsultan CV. Multi Pratama

Prime Coat

1.50 4.50 1.50


-5 % -3 % -3 %
-5 %
Existing
Existing
Prime Coat

Lebar Lebar Rata2 Koef. Liter / m2 Panjang Volume


No STA Posisi Keterangan
(m) (m) (Liter) (m) ( Liter )

41 1+000 kr/cl/kn 7.00


7.00 0.80 25.00 140.000
42 1+025 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
43 1+050 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
44 1+075 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
45 1+100 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
46 1+125 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
47 1+150 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
48 1+175 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
49 1+200 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
50 1+225 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
51 1+250 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
52 1+275 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
53 1+300 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
54 1+325 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
55 1+350 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
56 1+375 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
57 1+400 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
58 1+425 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
59 1+450 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
60 1+475 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
61 1+500 kr/cl/kn 7.00

Sub total 2,800.00


Total 8,400.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Prime Coat
Mata Pembayaran : 6.1.1a
Satuan : Liter
Kontraktor 0
Konsultan CV. Multi Pratama

Prime Coat

1.50 4.50 1.50


-5 % -3 % -3 %
-5 %
Existing
Existing
Prime Coat

Lebar Lebar Rata2 Koef. Liter / m2 Panjang Volume


No STA Posisi Keterangan
(m) (m) (Liter) (m) ( Liter )

61 1+500 kr/cl/kn 7.00


7.00 0.80 25.00 140.000
62 1+525 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
63 1+550 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
64 1+575 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
65 1+600 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
66 1+625 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
67 1+650 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
68 1+675 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
69 1+700 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
70 1+725 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
71 1+750 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
72 1+775 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
73 1+800 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
74 1+825 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
75 1+850 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
76 1+875 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
77 1+900 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
78 1+925 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
79 1+950 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
80 1+975 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
81 2+000 kr/cl/kn 7.00

Sub total 2,800.00


Total 11,200.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Prime Coat
Mata Pembayaran : 6.1.1a
Satuan : Liter
Kontraktor 0
Konsultan CV. Multi Pratama

Prime Coat

1.50 4.50 1.50


-5 % -3 % -3 %
-5 %
Existing
Existing
Prime Coat

Lebar Lebar Rata2 Koef. Liter / m2 Panjang Volume


No STA Posisi Keterangan
(m) (m) (Liter) (m) ( Liter )

81 2+000 kr/cl/kn 7.00


7.00 0.80 25.00 140.000
82 2+025 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
83 2+050 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
84 2+075 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
85 2+100 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
86 2+125 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
87 2+150 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
88 2+175 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
89 2+200 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
90 2+225 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
91 2+250 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
92 2+275 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
93 2+300 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
94 2+325 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
95 2+350 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
96 2+375 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
97 2+400 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
98 2+425 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
99 2+450 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
100 2+475 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
101 2+500 kr/cl/kn 7.00

Sub total 2,800.00


Total 14,000.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Prime Coat
Mata Pembayaran : 6.1.1a
Satuan : Liter
Kontraktor 0
Konsultan CV. Multi Pratama

Prime Coat

1.50 4.50 1.50


-5 % -3 % -3 %
-5 %
Existing
Existing
Prime Coat

Lebar Lebar Rata2 Koef. Liter / m2 Panjang Volume


No STA Posisi Keterangan
(m) (m) (Liter) (m) ( Liter )

101 2+500 kr/cl/kn 7.00


7.00 0.80 25.00 140.000
102 2+525 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
103 2+550 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
104 2+575 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
105 2+600 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
106 2+625 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
107 2+650 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
108 2+675 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
109 2+700 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
110 2+725 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
111 2+750 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
112 2+775 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
113 2+800 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
114 2+825 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
115 2+850 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
116 2+875 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
117 2+900 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
118 2+925 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
119 2+950 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
120 2+975 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
121 3+000 kr/cl/kn 7.00

Sub total 2,800.00


Total 16,800.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Prime Coat
Mata Pembayaran : 6.1.1a
Satuan : Liter
Kontraktor 0
Konsultan CV. Multi Pratama

Prime Coat

1.50 4.50 1.50


-5 % -3 % -3 %
-5 %
Existing
Existing
Prime Coat

Lebar Lebar Rata2 Koef. Liter / m2 Panjang Volume


No STA Posisi Keterangan
(m) (m) (Liter) (m) ( Liter )

121 3+000 kr/cl/kn 7.00


7.00 0.80 25.00 140.000
122 3+025 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
123 3+050 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
124 3+075 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
125 3+100 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
126 3+125 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
127 3+150 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
128 3+175 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
129 3+200 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
130 3+225 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
131 3+250 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
132 3+275 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
133 3+300 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
134 3+325 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
135 3+350 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
136 3+375 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
137 3+400 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
138 3+425 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
139 3+450 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
140 3+475 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
141 3+500 kr/cl/kn 7.00

Sub total 2,800.00


Total 19,600.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Prime Coat
Mata Pembayaran : 6.1.1a
Satuan : Liter
Kontraktor 0
Konsultan CV. Multi Pratama

Prime Coat

1.50 4.50 1.50


-5 % -3 % -3 %
-5 %
Existing
Existing
Prime Coat

Lebar Lebar Rata2 Koef. Liter / m2 Panjang Volume


No STA Posisi Keterangan
(m) (m) (Liter) (m) ( Liter )

141 3+500 kr/cl/kn 7.00


7.00 0.80 25.00 140.000
142 3+525 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
143 3+550 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
144 3+575 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
145 3+600 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
146 3+625 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
147 3+650 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
148 3+675 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
149 3+700 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
150 3+725 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
151 3+750 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
152 3+775 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
153 3+800 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
154 3+825 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
155 3+850 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
156 3+875 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
157 3+900 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
158 3+925 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
159 3+950 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
160 3+975 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
161 4+000 kr/cl/kn 7.00

Sub total 2,800.00


Total 22,400.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Prime Coat
Mata Pembayaran : 6.1.1a
Satuan : Liter
Kontraktor 0
Konsultan CV. Multi Pratama

Prime Coat

1.50 4.50 1.50


-5 % -3 % -3 %
-5 %
Existing
Existing
Prime Coat

Lebar Lebar Rata2 Koef. Liter / m2 Panjang Volume


No STA Posisi Keterangan
(m) (m) (Liter) (m) ( Liter )

161 4+000 kr/cl/kn 7.00


7.00 0.80 25.00 140.000
162 4+025 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
163 4+050 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
164 4+075 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
165 4+100 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
166 4+125 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
167 4+150 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
168 4+175 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
169 4+200 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
170 4+225 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
171 4+250 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
172 4+275 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
173 4+300 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
174 4+325 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
175 4+350 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
176 4+375 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
177 4+400 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
178 4+425 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
179 4+450 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
180 4+475 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
181 4+500 kr/cl/kn 7.00

Sub total 2,800.00


Total 25,200.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Prime Coat
Mata Pembayaran : 6.1.1a
Satuan : Liter
Kontraktor 0
Konsultan CV. Multi Pratama

Prime Coat

1.50 4.50 1.50


-5 % -3 % -3 %
-5 %
Existing
Existing
Prime Coat

Lebar Lebar Rata2 Koef. Liter / m2 Panjang Volume


No STA Posisi Keterangan
(m) (m) (Liter) (m) ( Liter )

181 4+500 kr/cl/kn 7.00


7.00 0.80 25.00 140.000
182 4+525 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
183 4+550 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
184 4+575 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
185 4+600 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
186 4+625 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
187 4+650 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
188 4+675 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
189 4+700 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
190 4+725 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
191 4+750 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
192 4+775 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
193 4+800 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
194 4+825 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
195 4+850 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
196 4+875 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
197 4+900 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
198 4+925 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
199 4+950 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
200 4+975 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
201 5+000 kr/cl/kn 7.00

Sub total 2,800.00


Total 28,000.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Prime Coat
Mata Pembayaran : 6.1.1a
Satuan : Liter
Kontraktor 0
Konsultan CV. Multi Pratama

Prime Coat

1.50 4.50 1.50


-5 % -3 % -3 %
-5 %
Existing
Existing
Prime Coat

Lebar Lebar Rata2 Koef. Liter / m2 Panjang Volume


No STA Posisi Keterangan
(m) (m) (Liter) (m) ( Liter )

201 5+000 kr/cl/kn 7.00


7.00 0.80 25.00 140.000
202 5+025 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
203 5+050 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
204 5+075 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
205 5+100 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
206 5+125 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
207 5+150 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
208 5+175 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
209 5+200 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
210 5+225 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
211 5+250 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
212 5+275 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
213 5+300 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
214 5+325 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
215 5+350 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
216 5+375 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
217 5+400 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
218 5+425 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
219 5+450 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
220 5+475 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
221 5+500 kr/cl/kn 7.00

Sub total 2,800.00


Total 30,800.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Prime Coat
Mata Pembayaran : 6.1.1a
Satuan : Liter
Kontraktor 0
Konsultan CV. Multi Pratama

Prime Coat

1.50 4.50 1.50


-5 % -3 % -3 %
-5 %
Existing
Existing
Prime Coat

Lebar Lebar Rata2 Koef. Liter / m2 Panjang Volume


No STA Posisi Keterangan
(m) (m) (Liter) (m) ( Liter )

221 5+500 kr/cl/kn 7.00


7.00 0.80 25.00 140.000
222 5+525 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
223 5+550 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
224 5+575 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
225 5+600 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
226 5+625 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
227 5+650 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
228 5+675 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
229 5+700 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
230 5+725 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
231 5+750 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
232 5+775 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
233 5+800 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
234 5+825 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
235 5+850 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
236 5+875 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
237 5+900 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
238 5+925 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
239 5+950 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
240 5+975 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
241 6+000 kr/cl/kn 7.00

Sub total 2,800.00


Total 33,600.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Prime Coat
Mata Pembayaran : 6.1.1a
Satuan : Liter
Kontraktor 0
Konsultan CV. Multi Pratama

Prime Coat

1.50 4.50 1.50


-5 % -3 % -3 %
-5 %
Existing
Existing
Prime Coat

Lebar Lebar Rata2 Koef. Liter / m2 Panjang Volume


No STA Posisi Keterangan
(m) (m) (Liter) (m) ( Liter )

241 6+000 kr/cl/kn 7.00


7.00 0.80 25.00 140.000
242 6+025 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
243 6+050 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
244 6+075 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
245 6+100 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
246 6+125 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
247 6+150 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
248 6+175 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
249 6+200 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
250 6+225 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
251 6+250 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
252 6+275 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
253 6+300 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
254 6+325 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
255 6+350 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
256 6+375 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
257 6+400 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
258 6+425 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
259 6+450 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
260 6+475 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
261 6+500 kr/cl/kn 7.00

Sub total 2,800.00


Total 36,400.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Prime Coat
Mata Pembayaran : 6.1.1a
Satuan : Liter
Kontraktor 0
Konsultan CV. Multi Pratama

Prime Coat

1.50 4.50 1.50


-5 % -3 % -3 %
-5 %
Existing
Existing
Prime Coat

Lebar Lebar Rata2 Koef. Liter / m2 Panjang Volume


No STA Posisi Keterangan
(m) (m) (Liter) (m) ( Liter )

261 6+500 kr/cl/kn 7.00


7.00 0.80 25.00 140.000
262 6+525 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
263 6+550 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
264 6+575 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
265 6+600 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
266 6+625 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
267 6+650 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
268 6+675 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
269 6+700 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
270 6+725 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
271 6+750 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
272 6+775 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
273 6+800 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
274 6+825 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
275 6+850 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
276 6+875 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
277 6+900 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
278 6+925 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
279 6+950 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
280 6+975 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
281 7+000 kr/cl/kn 7.00

Sub total 2,800.00


Total 39,200.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Prime Coat
Mata Pembayaran : 6.1.1a
Satuan : Liter
Kontraktor 0
Konsultan CV. Multi Pratama

Prime Coat

1.50 4.50 1.50


-5 % -3 % -3 %
-5 %
Existing
Existing
Prime Coat

Lebar Lebar Rata2 Koef. Liter / m2 Panjang Volume


No STA Posisi Keterangan
(m) (m) (Liter) (m) ( Liter )

281 7+000 kr/cl/kn 7.00


7.00 0.80 25.00 140.000
282 7+025 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
283 7+050 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
284 7+075 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
285 7+100 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
286 7+125 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
287 7+150 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
288 7+175 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
289 7+200 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
290 7+225 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
291 7+250 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
292 7+275 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
293 7+300 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
294 7+325 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
295 7+350 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
296 7+375 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
297 7+400 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
298 7+425 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
299 7+450 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
300 7+475 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
301 7+500 kr/cl/kn 7.00

Sub total 2,800.00


Total 42,000.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Prime Coat
Mata Pembayaran : 6.1.1a
Satuan : Liter
Kontraktor 0
Konsultan CV. Multi Pratama

Prime Coat

1.50 4.50 1.50


-5 % -3 % -3 %
-5 %
Existing
Existing
Prime Coat

Lebar Lebar Rata2 Koef. Liter / m2 Panjang Volume


No STA Posisi Keterangan
(m) (m) (Liter) (m) ( Liter )

301 7+500 kr/cl/kn 7.00


7.00 0.80 25.00 140.000
302 7+525 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
303 7+550 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
304 7+575 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
305 7+600 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
306 7+625 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
307 7+650 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
308 7+675 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
309 7+700 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
310 7+725 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
311 7+750 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
312 7+775 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
313 7+800 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
314 7+825 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
315 7+850 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
316 7+875 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
317 7+900 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
318 7+925 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
319 7+950 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
320 7+975 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
321 8+000 kr/cl/kn 7.00

Sub total 2,800.00


Total 44,800.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Prime Coat
Mata Pembayaran : 6.1.1a
Satuan : Liter
Kontraktor 0
Konsultan CV. Multi Pratama

Prime Coat

1.50 4.50 1.50


-5 % -3 % -3 %
-5 %
Existing
Existing
Prime Coat

Lebar Lebar Rata2 Koef. Liter / m2 Panjang Volume


No STA Posisi Keterangan
(m) (m) (Liter) (m) ( Liter )

321 8+000 kr/cl/kn 7.00


7.00 0.80 25.00 140.000
322 8+025 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
323 8+050 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
324 8+075 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
325 8+100 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
326 8+125 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
327 8+150 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
328 8+175 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
329 8+200 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
330 8+225 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
331 8+250 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
332 8+275 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
333 8+300 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
334 8+325 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
335 8+350 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
336 8+375 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
337 8+400 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
338 8+425 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
339 8+450 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
340 8+475 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
341 8+500 kr/cl/kn 7.00

Sub total 2,800.00


Total 47,600.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Prime Coat
Mata Pembayaran : 6.1.1a
Satuan : Liter
Kontraktor 0
Konsultan CV. Multi Pratama

Prime Coat

1.50 4.50 1.50


-5 % -3 % -3 %
-5 %
Existing
Existing
Prime Coat

Lebar Lebar Rata2 Koef. Liter / m2 Panjang Volume


No STA Posisi Keterangan
(m) (m) (Liter) (m) ( Liter )

341 8+500 kr/cl/kn 7.00


7.00 0.80 25.00 140.000
342 8+525 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
343 8+550 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
344 8+575 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
345 8+600 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
346 8+625 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
347 8+650 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
348 8+675 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
349 8+700 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
350 8+725 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
351 8+750 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
352 8+775 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
353 8+800 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
354 8+825 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
355 8+850 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
356 8+875 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
357 8+900 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
358 8+925 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
359 8+950 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
360 8+975 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
361 9+000 kr/cl/kn 7.00

Sub total 2,800.00


Total 50,400.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Prime Coat
Mata Pembayaran : 6.1.1a
Satuan : Liter
Kontraktor 0
Konsultan CV. Multi Pratama

Prime Coat

1.50 4.50 1.50


-5 % -3 % -3 %
-5 %
Existing
Existing
Prime Coat

Lebar Lebar Rata2 Koef. Liter / m2 Panjang Volume


No STA Posisi Keterangan
(m) (m) (Liter) (m) ( Liter )

361 9+000 kr/cl/kn 7.00


7.00 0.80 25.00 140.000
362 9+025 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
363 9+050 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
364 9+075 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
365 9+100 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
366 9+125 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
367 9+150 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
368 9+175 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
369 9+200 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
370 9+225 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
371 9+250 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
372 9+275 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
373 9+300 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
374 9+325 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
375 9+350 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
376 9+375 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
377 9+400 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
378 9+425 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
379 9+450 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
380 9+475 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
381 9+500 kr/cl/kn 7.00

Sub total 2,800.00


Total 53,200.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Prime Coat
Mata Pembayaran : 6.1.1a
Satuan : Liter
Kontraktor 0
Konsultan CV. Multi Pratama

Prime Coat

1.50 4.50 1.50


-5 % -3 % -3 %
-5 %
Existing
Existing
Prime Coat

Lebar Lebar Rata2 Koef. Liter / m2 Panjang Volume


No STA Posisi Keterangan
(m) (m) (Liter) (m) ( Liter )

381 9+500 kr/cl/kn 7.00


7.00 0.80 25.00 140.000
382 9+525 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
383 9+550 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
384 9+575 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
385 9+600 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
386 9+625 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
387 9+650 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
388 9+675 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
389 9+700 kr/cl/kn 7.00
7.00 0.80 25.00 140.000
390 9+725 kr/cl/kn 7.00

Sub total 1,260.00


Total 54,460.00

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Tack Coat
Mata Pembayaran : 6.1.2a
Satuan : Liter
Kontraktor 0
Konsultan CV. Multi Pratama

Lebar Lebar Rata2 Koef. Liter / m2 Panjang


No STA Posisi
(m) (m) (Liter) (m)

1 0+000 kr/cl/kn 7.00


7.00 0.25 25.00
2 0+025 kr/cl/kn 7.00
7.00 0.25 25.00
3 0+050 kr/cl/kn 7.00
7.00 0.25 25.00
4 0+075 kr/cl/kn 7.00
7.00 0.25 25.00
5 0+100 kr/cl/kn 7.00
7.00 0.25 25.00
6 0+125 kr/cl/kn 7.00
7.00 0.25 25.00
7 0+150 kr/cl/kn 7.00
7.00 0.25 25.00
8 0+175 kr/cl/kn 7.00
7.00 0.25 25.00
9 0+200 kr/cl/kn 7.00
7.00 0.25 25.00
10 0+225 kr/cl/kn 7.00
7.00 0.25 25.00
11 0+250 kr/cl/kn 7.00
7.00 0.25 25.00
12 0+275 kr/cl/kn 7.00
7.00 0.25 25.00
13 0+300 kr/cl/kn 7.00
7.00 0.25 25.00
14 0+325 kr/cl/kn 7.00
7.00 0.25 25.00
15 0+350 kr/cl/kn 7.00
7.00 0.25 25.00
16 0+375 kr/cl/kn 7.00
7.00 0.25 25.00
17 0+400 kr/cl/kn 7.00
7.00 0.25 25.00
18 0+425 kr/cl/kn 7.00
7.00 0.25 25.00
19 0+450 kr/cl/kn 7.00
7.00 0.25 25.00
20 0+475 kr/cl/kn 7.00
7.00 0.25 25.00
21 0+500 kr/cl/kn 7.00

Sub total
Total

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

21 0+500 kr/cl/kn 7.00


7.00 0.25 25.00
22 0+525 kr/cl/kn 7.00
7.00 0.25 25.00
23 0+550 kr/cl/kn 7.00
7.00 0.25 25.00
24 0+575 kr/cl/kn 7.00
7.00 0.25 25.00
25 0+600 kr/cl/kn 7.00
7.00 0.25 25.00
26 0+625 kr/cl/kn 7.00
7.00 0.25 25.00
27 0+650 kr/cl/kn 7.00
7.00 0.25 25.00
28 0+675 kr/cl/kn 7.00
7.00 0.25 25.00
29 0+700 kr/cl/kn 7.00
7.00 0.25 25.00
30 0+725 kr/cl/kn 7.00
7.00 0.25 25.00
31 0+750 kr/cl/kn 7.00
7.00 0.25 25.00
32 0+775 kr/cl/kn 7.00
7.00 0.25 25.00
33 0+800 kr/cl/kn 7.00
7.00 0.25 25.00
34 0+825 kr/cl/kn 7.00
7.00 0.25 25.00
35 0+850 kr/cl/kn 7.00
7.00 0.25 25.00
36 0+875 kr/cl/kn 7.00
7.00 0.25 25.00
37 0+900 kr/cl/kn 7.00
7.00 0.25 25.00
38 0+925 kr/cl/kn 7.00
7.00 0.25 25.00
39 0+950 kr/cl/kn 7.00
7.00 0.25 25.00
40 0+975 kr/cl/kn 7.00
7.00 0.25 25.00
41 1+000 kr/cl/kn 7.00

Sub total
Total

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

41 1+000 kr/cl/kn 7.00


7.00 0.25 25.00
42 1+025 kr/cl/kn 7.00
7.00 0.25 25.00
43 1+050 kr/cl/kn 7.00
7.00 0.25 25.00
44 1+075 kr/cl/kn 7.00
7.00 0.25 25.00
45 1+100 kr/cl/kn 7.00
7.00 0.25 25.00
46 1+125 kr/cl/kn 7.00
7.00 0.25 25.00
47 1+150 kr/cl/kn 7.00
7.00 0.25 25.00
48 1+175 kr/cl/kn 7.00
7.00 0.25 25.00
49 1+200 kr/cl/kn 7.00
7.00 0.25 25.00
50 1+225 kr/cl/kn 7.00
7.00 0.25 25.00
51 1+250 kr/cl/kn 7.00
7.00 0.25 25.00
52 1+275 kr/cl/kn 7.00
7.00 0.25 25.00
53 1+300 kr/cl/kn 7.00
7.00 0.25 25.00
54 1+325 kr/cl/kn 7.00
7.00 0.25 25.00
55 1+350 kr/cl/kn 7.00
7.00 0.25 25.00
56 1+375 kr/cl/kn 7.00
7.00 0.25 25.00
57 1+400 kr/cl/kn 7.00
7.00 0.25 25.00
58 1+425 kr/cl/kn 7.00
7.00 0.25 25.00
59 1+450 kr/cl/kn 7.00
7.00 0.25 25.00
60 1+475 kr/cl/kn 7.00
7.00 0.25 25.00
61 1+500 kr/cl/kn 7.00

Sub total
Total

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

61 1+500 kr/cl/kn 7.00


7.00 0.25 25.00
62 1+525 kr/cl/kn 7.00
7.00 0.25 25.00
63 1+550 kr/cl/kn 7.00
7.00 0.25 25.00
64 1+575 kr/cl/kn 7.00
7.00 0.25 25.00
65 1+600 kr/cl/kn 7.00
7.00 0.25 25.00
66 1+625 kr/cl/kn 7.00
7.00 0.25 25.00
67 1+650 kr/cl/kn 7.00
7.00 0.25 25.00
68 1+675 kr/cl/kn 7.00
7.00 0.25 25.00
69 1+700 kr/cl/kn 7.00
7.00 0.25 25.00
70 1+725 kr/cl/kn 7.00
7.00 0.25 25.00
71 1+750 kr/cl/kn 7.00
7.00 0.25 25.00
72 1+775 kr/cl/kn 7.00
7.00 0.25 25.00
73 1+800 kr/cl/kn 7.00
7.00 0.25 25.00
74 1+825 kr/cl/kn 7.00
7.00 0.25 25.00
75 1+850 kr/cl/kn 7.00
7.00 0.25 25.00
76 1+875 kr/cl/kn 7.00
7.00 0.25 25.00
77 1+900 kr/cl/kn 7.00
7.00 0.25 25.00
78 1+925 kr/cl/kn 7.00
7.00 0.25 25.00
79 1+950 kr/cl/kn 7.00
7.00 0.25 25.00
80 1+975 kr/cl/kn 7.00
7.00 0.25 25.00
81 2+000 kr/cl/kn 7.00

Sub total
Total

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

81 2+000 kr/cl/kn 7.00


7.00 0.25 25.00
82 2+025 kr/cl/kn 7.00
7.00 0.25 25.00
83 2+050 kr/cl/kn 7.00
7.00 0.25 25.00
84 2+075 kr/cl/kn 7.00
7.00 0.25 25.00
85 2+100 kr/cl/kn 7.00
7.00 0.25 25.00
86 2+125 kr/cl/kn 7.00
7.00 0.25 25.00
87 2+150 kr/cl/kn 7.00
7.00 0.25 25.00
88 2+175 kr/cl/kn 7.00
7.00 0.25 25.00
89 2+200 kr/cl/kn 7.00
7.00 0.25 25.00
90 2+225 kr/cl/kn 7.00
7.00 0.25 25.00
91 2+250 kr/cl/kn 7.00
7.00 0.25 25.00
92 2+275 kr/cl/kn 7.00
7.00 0.25 25.00
93 2+300 kr/cl/kn 7.00
7.00 0.25 25.00
94 2+325 kr/cl/kn 7.00
7.00 0.25 25.00
95 2+350 kr/cl/kn 7.00
7.00 0.25 25.00
96 2+375 kr/cl/kn 7.00
7.00 0.25 25.00
97 2+400 kr/cl/kn 7.00
7.00 0.25 25.00
98 2+425 kr/cl/kn 7.00
7.00 0.25 25.00
99 2+450 kr/cl/kn 7.00
7.00 0.25 25.00
100 2+475 kr/cl/kn 7.00
7.00 0.25 25.00
101 2+500 kr/cl/kn 7.00

Sub total
Total

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

101 2+500 kr/cl/kn 7.00


7.00 0.25 25.00
102 2+525 kr/cl/kn 7.00
7.00 0.25 25.00
103 2+550 kr/cl/kn 7.00
7.00 0.25 25.00
104 2+575 kr/cl/kn 7.00
7.00 0.25 25.00
105 2+600 kr/cl/kn 7.00
7.00 0.25 25.00
106 2+625 kr/cl/kn 7.00
7.00 0.25 25.00
107 2+650 kr/cl/kn 7.00
7.00 0.25 25.00
108 2+675 kr/cl/kn 7.00
7.00 0.25 25.00
109 2+700 kr/cl/kn 7.00
7.00 0.25 25.00
110 2+725 kr/cl/kn 7.00
7.00 0.25 25.00
111 2+750 kr/cl/kn 7.00
7.00 0.25 25.00
112 2+775 kr/cl/kn 7.00
7.00 0.25 25.00
113 2+800 kr/cl/kn 7.00
7.00 0.25 25.00
114 2+825 kr/cl/kn 7.00
7.00 0.25 25.00
115 2+850 kr/cl/kn 7.00
7.00 0.25 25.00
116 2+875 kr/cl/kn 7.00
7.00 0.25 25.00
117 2+900 kr/cl/kn 7.00
7.00 0.25 25.00
118 2+925 kr/cl/kn 7.00
7.00 0.25 25.00
119 2+950 kr/cl/kn 7.00
7.00 0.25 25.00
120 2+975 kr/cl/kn 7.00
7.00 0.25 25.00
121 3+000 kr/cl/kn 7.00

Sub total
Total

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

121 3+000 kr/cl/kn 7.00


7.00 0.25 25.00
122 3+025 kr/cl/kn 7.00
7.00 0.25 25.00
123 3+050 kr/cl/kn 7.00
7.00 0.25 25.00
124 3+075 kr/cl/kn 7.00
7.00 0.25 25.00
125 3+100 kr/cl/kn 7.00
7.00 0.25 25.00
126 3+125 kr/cl/kn 7.00
7.00 0.25 25.00
127 3+150 kr/cl/kn 7.00
7.00 0.25 25.00
128 3+175 kr/cl/kn 7.00
7.00 0.25 25.00
129 3+200 kr/cl/kn 7.00
7.00 0.25 25.00
130 3+225 kr/cl/kn 7.00
7.00 0.25 25.00
131 3+250 kr/cl/kn 7.00
7.00 0.25 25.00
132 3+275 kr/cl/kn 7.00
7.00 0.25 25.00
133 3+300 kr/cl/kn 7.00
7.00 0.25 25.00
134 3+325 kr/cl/kn 7.00
7.00 0.25 25.00
135 3+350 kr/cl/kn 7.00
7.00 0.25 25.00
136 3+375 kr/cl/kn 7.00
7.00 0.25 25.00
137 3+400 kr/cl/kn 7.00
7.00 0.25 25.00
138 3+425 kr/cl/kn 7.00
7.00 0.25 25.00
139 3+450 kr/cl/kn 7.00
7.00 0.25 25.00
140 3+475 kr/cl/kn 7.00
7.00 0.25 25.00
141 3+500 kr/cl/kn 7.00

Sub total
Total

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

141 3+500 kr/cl/kn 7.00


7.00 0.25 25.00
142 3+525 kr/cl/kn 7.00
7.00 0.25 25.00
143 3+550 kr/cl/kn 7.00
7.00 0.25 25.00
144 3+575 kr/cl/kn 7.00
7.00 0.25 25.00
145 3+600 kr/cl/kn 7.00
7.00 0.25 25.00
146 3+625 kr/cl/kn 7.00
7.00 0.25 25.00
147 3+650 kr/cl/kn 7.00
7.00 0.25 25.00
148 3+675 kr/cl/kn 7.00
7.00 0.25 25.00
149 3+700 kr/cl/kn 7.00
7.00 0.25 25.00
150 3+725 kr/cl/kn 7.00
7.00 0.25 25.00
151 3+750 kr/cl/kn 7.00
7.00 0.25 25.00
152 3+775 kr/cl/kn 7.00
7.00 0.25 25.00
153 3+800 kr/cl/kn 7.00
7.00 0.25 25.00
154 3+825 kr/cl/kn 7.00
7.00 0.25 25.00
155 3+850 kr/cl/kn 7.00
7.00 0.25 25.00
156 3+875 kr/cl/kn 7.00
7.00 0.25 25.00
157 3+900 kr/cl/kn 7.00
7.00 0.25 25.00
158 3+925 kr/cl/kn 7.00
7.00 0.25 25.00
159 3+950 kr/cl/kn 7.00
7.00 0.25 25.00
160 3+975 kr/cl/kn 7.00
7.00 0.25 25.00
161 4+000 kr/cl/kn 7.00

Sub total
Total

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

161 4+000 kr/cl/kn 7.00


7.00 0.25 25.00
162 4+025 kr/cl/kn 7.00
7.00 0.25 25.00
163 4+050 kr/cl/kn 7.00
7.00 0.25 25.00
164 4+075 kr/cl/kn 7.00
7.00 0.25 25.00
165 4+100 kr/cl/kn 7.00
7.00 0.25 25.00
166 4+125 kr/cl/kn 7.00
7.00 0.25 25.00
167 4+150 kr/cl/kn 7.00
7.00 0.25 25.00
168 4+175 kr/cl/kn 7.00
7.00 0.25 25.00
169 4+200 kr/cl/kn 7.00
7.00 0.25 25.00
170 4+225 kr/cl/kn 7.00
7.00 0.25 25.00
171 4+250 kr/cl/kn 7.00
7.00 0.25 25.00
172 4+275 kr/cl/kn 7.00
7.00 0.25 25.00
173 4+300 kr/cl/kn 7.00
7.00 0.25 25.00
174 4+325 kr/cl/kn 7.00
7.00 0.25 25.00
175 4+350 kr/cl/kn 7.00
7.00 0.25 25.00
176 4+375 kr/cl/kn 7.00
7.00 0.25 25.00
177 4+400 kr/cl/kn 7.00
7.00 0.25 25.00
178 4+425 kr/cl/kn 7.00
7.00 0.25 25.00
179 4+450 kr/cl/kn 7.00
7.00 0.25 25.00
180 4+475 kr/cl/kn 7.00
7.00 0.25 25.00
181 4+500 kr/cl/kn 7.00

Sub total
Total

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

181 4+500 kr/cl/kn 7.00


7.00 0.25 25.00
182 4+525 kr/cl/kn 7.00
7.00 0.25 25.00
183 4+550 kr/cl/kn 7.00
7.00 0.25 25.00
184 4+575 kr/cl/kn 7.00
7.00 0.25 25.00
185 4+600 kr/cl/kn 7.00
7.00 0.25 25.00
186 4+625 kr/cl/kn 7.00
7.00 0.25 25.00
187 4+650 kr/cl/kn 7.00
7.00 0.25 25.00
188 4+675 kr/cl/kn 7.00
7.00 0.25 25.00
189 4+700 kr/cl/kn 7.00
7.00 0.25 25.00
190 4+725 kr/cl/kn 7.00
7.00 0.25 25.00
191 4+750 kr/cl/kn 7.00
7.00 0.25 25.00
192 4+775 kr/cl/kn 7.00
7.00 0.25 25.00
193 4+800 kr/cl/kn 7.00
7.00 0.25 25.00
194 4+825 kr/cl/kn 7.00
7.00 0.25 25.00
195 4+850 kr/cl/kn 7.00
7.00 0.25 25.00
196 4+875 kr/cl/kn 7.00
7.00 0.25 25.00
197 4+900 kr/cl/kn 7.00
7.00 0.25 25.00
198 4+925 kr/cl/kn 7.00
7.00 0.25 25.00
199 4+950 kr/cl/kn 7.00
7.00 0.25 25.00
200 4+975 kr/cl/kn 7.00
7.00 0.25 25.00
201 5+000 kr/cl/kn 7.00

Sub total
Total

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

201 5+000 kr/cl/kn 7.00


7.00 0.25 25.00
202 5+025 kr/cl/kn 7.00
7.00 0.25 25.00
203 5+050 kr/cl/kn 7.00
7.00 0.25 25.00
204 5+075 kr/cl/kn 7.00
7.00 0.25 25.00
205 5+100 kr/cl/kn 7.00
7.00 0.25 25.00
206 5+125 kr/cl/kn 7.00
7.00 0.25 25.00
207 5+150 kr/cl/kn 7.00
7.00 0.25 25.00
208 5+175 kr/cl/kn 7.00
7.00 0.25 25.00
209 5+200 kr/cl/kn 7.00
7.00 0.25 25.00
210 5+225 kr/cl/kn 7.00
7.00 0.25 25.00
211 5+250 kr/cl/kn 7.00
7.00 0.25 25.00
212 5+275 kr/cl/kn 7.00
7.00 0.25 25.00
213 5+300 kr/cl/kn 7.00
7.00 0.25 25.00
214 5+325 kr/cl/kn 7.00
7.00 0.25 25.00
215 5+350 kr/cl/kn 7.00
7.00 0.25 25.00
216 5+375 kr/cl/kn 7.00
7.00 0.25 25.00
217 5+400 kr/cl/kn 7.00
7.00 0.25 25.00
218 5+425 kr/cl/kn 7.00
7.00 0.25 25.00
219 5+450 kr/cl/kn 7.00
7.00 0.25 25.00
220 5+475 kr/cl/kn 7.00
7.00 0.25 25.00
221 5+500 kr/cl/kn 7.00

Sub total
Total

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

221 5+500 kr/cl/kn 7.00


7.00 0.25 25.00
222 5+525 kr/cl/kn 7.00
7.00 0.25 25.00
223 5+550 kr/cl/kn 7.00
7.00 0.25 25.00
224 5+575 kr/cl/kn 7.00
7.00 0.25 25.00
225 5+600 kr/cl/kn 7.00
7.00 0.25 25.00
226 5+625 kr/cl/kn 7.00
7.00 0.25 25.00
227 5+650 kr/cl/kn 7.00
7.00 0.25 25.00
228 5+675 kr/cl/kn 7.00
7.00 0.25 25.00
229 5+700 kr/cl/kn 7.00
7.00 0.25 25.00
230 5+725 kr/cl/kn 7.00
7.00 0.25 25.00
231 5+750 kr/cl/kn 7.00
7.00 0.25 25.00
232 5+775 kr/cl/kn 7.00
7.00 0.25 25.00
233 5+800 kr/cl/kn 7.00
7.00 0.25 25.00
234 5+825 kr/cl/kn 7.00
7.00 0.25 25.00
235 5+850 kr/cl/kn 7.00
7.00 0.25 25.00
236 5+875 kr/cl/kn 7.00
7.00 0.25 25.00
237 5+900 kr/cl/kn 7.00
7.00 0.25 25.00
238 5+925 kr/cl/kn 7.00
7.00 0.25 25.00
239 5+950 kr/cl/kn 7.00
7.00 0.25 25.00
240 5+975 kr/cl/kn 7.00
7.00 0.25 25.00
241 6+000 kr/cl/kn 7.00

Sub total
Total

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

241 6+000 kr/cl/kn 7.00


7.00 0.25 25.00
242 6+025 kr/cl/kn 7.00
7.00 0.25 25.00
243 6+050 kr/cl/kn 7.00
7.00 0.25 25.00
244 6+075 kr/cl/kn 7.00
7.00 0.25 25.00
245 6+100 kr/cl/kn 7.00
7.00 0.25 25.00
246 6+125 kr/cl/kn 7.00
7.00 0.25 25.00
247 6+150 kr/cl/kn 7.00
7.00 0.25 25.00
248 6+175 kr/cl/kn 7.00
7.00 0.25 25.00
249 6+200 kr/cl/kn 7.00
7.00 0.25 25.00
250 6+225 kr/cl/kn 7.00
7.00 0.25 25.00
251 6+250 kr/cl/kn 7.00
7.00 0.25 25.00
252 6+275 kr/cl/kn 7.00
7.00 0.25 25.00
253 6+300 kr/cl/kn 7.00
7.00 0.25 25.00
254 6+325 kr/cl/kn 7.00
7.00 0.25 25.00
255 6+350 kr/cl/kn 7.00
7.00 0.25 25.00
256 6+375 kr/cl/kn 7.00
7.00 0.25 25.00
257 6+400 kr/cl/kn 7.00
7.00 0.25 25.00
258 6+425 kr/cl/kn 7.00
7.00 0.25 25.00
259 6+450 kr/cl/kn 7.00
7.00 0.25 25.00
260 6+475 kr/cl/kn 7.00
7.00 0.25 25.00
261 6+500 kr/cl/kn 7.00

Sub total
Total

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

261 6+500 kr/cl/kn 7.00


7.00 0.25 25.00
262 6+525 kr/cl/kn 7.00
7.00 0.25 25.00
263 6+550 kr/cl/kn 7.00
7.00 0.25 25.00
264 6+575 kr/cl/kn 7.00
7.00 0.25 25.00
265 6+600 kr/cl/kn 7.00
7.00 0.25 25.00
266 6+625 kr/cl/kn 7.00
7.00 0.25 25.00
267 6+650 kr/cl/kn 7.00
7.00 0.25 25.00
268 6+675 kr/cl/kn 7.00
7.00 0.25 25.00
269 6+700 kr/cl/kn 7.00
7.00 0.25 25.00
270 6+725 kr/cl/kn 7.00
7.00 0.25 25.00
271 6+750 kr/cl/kn 7.00
7.00 0.25 25.00
272 6+775 kr/cl/kn 7.00
7.00 0.25 25.00
273 6+800 kr/cl/kn 7.00
7.00 0.25 25.00
274 6+825 kr/cl/kn 7.00
7.00 0.25 25.00
275 6+850 kr/cl/kn 7.00
7.00 0.25 25.00
276 6+875 kr/cl/kn 7.00
7.00 0.25 25.00
277 6+900 kr/cl/kn 7.00
7.00 0.25 25.00
278 6+925 kr/cl/kn 7.00
7.00 0.25 25.00
279 6+950 kr/cl/kn 7.00
7.00 0.25 25.00
280 6+975 kr/cl/kn 7.00
7.00 0.25 25.00
281 7+000 kr/cl/kn 7.00

Sub total
Total

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

281 7+000 kr/cl/kn 7.00


7.00 0.25 25.00
282 7+025 kr/cl/kn 7.00
7.00 0.25 25.00
283 7+050 kr/cl/kn 7.00
7.00 0.25 25.00
284 7+075 kr/cl/kn 7.00
7.00 0.25 25.00
285 7+100 kr/cl/kn 7.00
7.00 0.25 25.00
286 7+125 kr/cl/kn 7.00
7.00 0.25 25.00
287 7+150 kr/cl/kn 7.00
7.00 0.25 25.00
288 7+175 kr/cl/kn 7.00
7.00 0.25 25.00
289 7+200 kr/cl/kn 7.00
7.00 0.25 25.00
290 7+225 kr/cl/kn 7.00
7.00 0.25 25.00
291 7+250 kr/cl/kn 7.00
7.00 0.25 25.00
292 7+275 kr/cl/kn 7.00
7.00 0.25 25.00
293 7+300 kr/cl/kn 7.00
7.00 0.25 25.00
294 7+325 kr/cl/kn 7.00
7.00 0.25 25.00
295 7+350 kr/cl/kn 7.00
7.00 0.25 25.00
296 7+375 kr/cl/kn 7.00
7.00 0.25 25.00
297 7+400 kr/cl/kn 7.00
7.00 0.25 25.00
298 7+425 kr/cl/kn 7.00
7.00 0.25 25.00
299 7+450 kr/cl/kn 7.00
7.00 0.25 25.00
300 7+475 kr/cl/kn 7.00
7.00 0.25 25.00
301 7+500 kr/cl/kn 7.00

Sub total
Total

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

301 7+500 kr/cl/kn 7.00


7.00 0.25 25.00
302 7+525 kr/cl/kn 7.00
7.00 0.25 25.00
303 7+550 kr/cl/kn 7.00
7.00 0.25 25.00
304 7+575 kr/cl/kn 7.00
7.00 0.25 25.00
305 7+600 kr/cl/kn 7.00
7.00 0.25 25.00
306 7+625 kr/cl/kn 7.00
7.00 0.25 25.00
307 7+650 kr/cl/kn 7.00
7.00 0.25 25.00
308 7+675 kr/cl/kn 7.00
7.00 0.25 25.00
309 7+700 kr/cl/kn 7.00
7.00 0.25 25.00
310 7+725 kr/cl/kn 7.00
7.00 0.25 25.00
311 7+750 kr/cl/kn 7.00
7.00 0.25 25.00
312 7+775 kr/cl/kn 7.00
7.00 0.25 25.00
313 7+800 kr/cl/kn 7.00
7.00 0.25 25.00
314 7+825 kr/cl/kn 7.00
7.00 0.25 25.00
315 7+850 kr/cl/kn 7.00
7.00 0.25 25.00
316 7+875 kr/cl/kn 7.00
7.00 0.25 25.00
317 7+900 kr/cl/kn 7.00
7.00 0.25 25.00
318 7+925 kr/cl/kn 7.00
7.00 0.25 25.00
319 7+950 kr/cl/kn 7.00
7.00 0.25 25.00
320 7+975 kr/cl/kn 7.00
7.00 0.25 25.00
321 8+000 kr/cl/kn 7.00

Sub total
Total

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

321 8+000 kr/cl/kn 7.00


7.00 0.25 25.00
322 8+025 kr/cl/kn 7.00
7.00 0.25 25.00
323 8+050 kr/cl/kn 7.00
7.00 0.25 25.00
324 8+075 kr/cl/kn 7.00
7.00 0.25 25.00
325 8+100 kr/cl/kn 7.00
7.00 0.25 25.00
326 8+125 kr/cl/kn 7.00
7.00 0.25 25.00
327 8+150 kr/cl/kn 7.00
7.00 0.25 25.00
328 8+175 kr/cl/kn 7.00
7.00 0.25 25.00
329 8+200 kr/cl/kn 7.00
7.00 0.25 25.00
330 8+225 kr/cl/kn 7.00
7.00 0.25 25.00
331 8+250 kr/cl/kn 7.00
7.00 0.25 25.00
332 8+275 kr/cl/kn 7.00
7.00 0.25 25.00
333 8+300 kr/cl/kn 7.00
7.00 0.25 25.00
334 8+325 kr/cl/kn 7.00
7.00 0.25 25.00
335 8+350 kr/cl/kn 7.00
7.00 0.25 25.00
336 8+375 kr/cl/kn 7.00
7.00 0.25 25.00
337 8+400 kr/cl/kn 7.00
7.00 0.25 25.00
338 8+425 kr/cl/kn 7.00
7.00 0.25 25.00
339 8+450 kr/cl/kn 7.00
7.00 0.25 25.00
340 8+475 kr/cl/kn 7.00
7.00 0.25 25.00
341 8+500 kr/cl/kn 7.00

Sub total
Total

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

341 8+500 kr/cl/kn 7.00


7.00 0.25 25.00
342 8+525 kr/cl/kn 7.00
7.00 0.25 25.00
343 8+550 kr/cl/kn 7.00
7.00 0.25 25.00
344 8+575 kr/cl/kn 7.00
7.00 0.25 25.00
345 8+600 kr/cl/kn 7.00
7.00 0.25 25.00
346 8+625 kr/cl/kn 7.00
7.00 0.25 25.00
347 8+650 kr/cl/kn 7.00
7.00 0.25 25.00
348 8+675 kr/cl/kn 7.00
7.00 0.25 25.00
349 8+700 kr/cl/kn 7.00
7.00 0.25 25.00
350 8+725 kr/cl/kn 7.00
7.00 0.25 25.00
351 8+750 kr/cl/kn 7.00
7.00 0.25 25.00
352 8+775 kr/cl/kn 7.00
7.00 0.25 25.00
353 8+800 kr/cl/kn 7.00
7.00 0.25 25.00
354 8+825 kr/cl/kn 7.00
7.00 0.25 25.00
355 8+850 kr/cl/kn 7.00
7.00 0.25 25.00
356 8+875 kr/cl/kn 7.00
7.00 0.25 25.00
357 8+900 kr/cl/kn 7.00
7.00 0.25 25.00
358 8+925 kr/cl/kn 7.00
7.00 0.25 25.00
359 8+950 kr/cl/kn 7.00
7.00 0.25 25.00
360 8+975 kr/cl/kn 7.00
7.00 0.25 25.00
361 9+000 kr/cl/kn 7.00

Sub total
Total

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

361 9+000 kr/cl/kn 7.00


7.00 0.25 25.00
362 9+025 kr/cl/kn 7.00
7.00 0.25 25.00
363 9+050 kr/cl/kn 7.00
7.00 0.25 25.00
364 9+075 kr/cl/kn 7.00
7.00 0.25 25.00
365 9+100 kr/cl/kn 7.00
7.00 0.25 25.00
366 9+125 kr/cl/kn 7.00
7.00 0.25 25.00
367 9+150 kr/cl/kn 7.00
7.00 0.25 25.00
368 9+175 kr/cl/kn 7.00
7.00 0.25 25.00
369 9+200 kr/cl/kn 7.00
7.00 0.25 25.00
370 9+225 kr/cl/kn 7.00
7.00 0.25 25.00
371 9+250 kr/cl/kn 7.00
7.00 0.25 25.00
372 9+275 kr/cl/kn 7.00
7.00 0.25 25.00
373 9+300 kr/cl/kn 7.00
7.00 0.25 25.00
374 9+325 kr/cl/kn 7.00
7.00 0.25 25.00
375 9+350 kr/cl/kn 7.00
7.00 0.25 25.00
376 9+375 kr/cl/kn 7.00
7.00 0.25 25.00
377 9+400 kr/cl/kn 7.00
7.00 0.25 25.00
378 9+425 kr/cl/kn 7.00
7.00 0.25 25.00
379 9+450 kr/cl/kn 7.00
7.00 0.25 25.00
380 9+475 kr/cl/kn 7.00
7.00 0.25 25.00
381 9+500 kr/cl/kn 7.00

Sub total
Total

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

381 9+500 kr/cl/kn 7.00


7.00 0.25 25.00
382 9+525 kr/cl/kn 7.00
7.00 0.25 25.00
383 9+550 kr/cl/kn 7.00
7.00 0.25 25.00
384 9+575 kr/cl/kn 7.00
7.00 0.25 25.00
385 9+600 kr/cl/kn 7.00
7.00 0.25 25.00
386 9+625 kr/cl/kn 7.00
7.00 0.25 25.00
387 9+650 kr/cl/kn 7.00
7.00 0.25 25.00
388 9+675 kr/cl/kn 7.00
7.00 0.25 25.00
389 9+700 kr/cl/kn 7.00
7.00 0.25 25.00
390 9+725 kr/cl/kn 7.00
Sub total
Total

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer
M (2020)

Prime Coat

1.50 4.50 1.5


-5 % -3 % -3 %
-5 %

Existing
Prime Coat

Volume
Keterangan
( Liter )

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750
43.750

43.750

43.750

43.750

43.750

875.00
875.00

Kontraktor
0

……………………..., ST
Quantity Engineer

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750
43.750

43.750

43.750

43.750

43.750

875.00
1,750.00

Kontraktor
0

……………………..., ST
Quantity Engineer

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750
43.750

43.750

43.750

43.750

43.750

875.00
2,625.00

Kontraktor
0

……………………..., ST
Quantity Engineer

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750
43.750

43.750

43.750

43.750

43.750

875.00
3,500.00

Kontraktor
0

……………………..., ST
Quantity Engineer

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750
43.750

43.750

43.750

43.750

43.750

875.00
4,375.00

Kontraktor
0

……………………..., ST
Quantity Engineer

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750
43.750

43.750

43.750

43.750

43.750

875.00
5,250.00

Kontraktor
0

……………………..., ST
Quantity Engineer

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750
43.750

43.750

43.750

43.750

43.750

875.00
6,125.00

Kontraktor
0

……………………..., ST
Quantity Engineer

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750
43.750

43.750

43.750

43.750

43.750

875.00
7,000.00

Kontraktor
0

……………………..., ST
Quantity Engineer

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750
43.750

43.750

43.750

43.750

43.750

875.00
7,875.00

Kontraktor
0

……………………..., ST
Quantity Engineer

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750
43.750

43.750

43.750

43.750

43.750

875.00
8,750.00

Kontraktor
0

……………………..., ST
Quantity Engineer

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750
43.750

43.750

43.750

43.750

43.750

875.00
9,625.00

Kontraktor
0

……………………..., ST
Quantity Engineer

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750
43.750

43.750

43.750

43.750

43.750

875.00
10,500.00

Kontraktor
0

……………………..., ST
Quantity Engineer

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750
43.750

43.750

43.750

43.750

43.750

875.00
11,375.00

Kontraktor
0

……………………..., ST
Quantity Engineer

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750
43.750

43.750

43.750

43.750

43.750

875.00
12,250.00

Kontraktor
0

……………………..., ST
Quantity Engineer

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750
43.750

43.750

43.750

43.750

43.750

875.00
13,125.00

Kontraktor
0

……………………..., ST
Quantity Engineer

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750
43.750

43.750

43.750

43.750

43.750

875.00
14,000.00

Kontraktor
0

……………………..., ST
Quantity Engineer

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750
43.750

43.750

43.750

43.750

43.750

875.00
14,875.00

Kontraktor
0

……………………..., ST
Quantity Engineer

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750
43.750

43.750

43.750

43.750

43.750

875.00
15,750.00

Kontraktor
0

……………………..., ST
Quantity Engineer

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750
43.750

43.750

43.750

43.750

43.750

875.00
16,625.00

Kontraktor
0

……………………..., ST
Quantity Engineer

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750

43.750
393.75
17,018.75

Kontraktor
0

……………………..., ST
Quantity Engineer
me Coat

4.50 1.50
-3 %
-5 %
Existing
Prime Coat
KONTRAKTOR 0
KONSULTAN CV. Multi Pratama
DIVISI PERKERASAN : 6. PERKERASAN ASPAL
DISKRIPSI PEKERJAAN : 1. CBA.AsbLawele Lapis Pondasi ( AC-WC AsbLawele )
2. Aspal Keras
3. Asbuton Lawele Butir
4. Bahan Anti Pengelupasan

Lebar Rata2
NO STA L/R Panjang (m') Lebar (m') Luas (m2)
(m')

1 0+000 Kr/Kn 7.000


25.000 7.000 175.000
2 0+025 Kr/Kn 7.000
25.000 7.000 175.000
3 0+050 Kr/Kn 7.000
25.000 7.000 175.000
4 0+075 Kr/Kn 7.000
25.000 7.000 175.000
5 0+100 Kr/Kn 7.000
25.000 7.000 175.000
6 0+125 Kr/Kn 7.000
25.000 7.000 175.000
7 0+150 Kr/Kn 7.000
25.000 7.000 175.000
8 0+175 Kr/Kn 7.000
25.000 7.000 175.000
9 0+200 Kr/Kn 7.000
25.000 7.000 175.000
10 0+225 Kr/Kn 7.000
25.000 7.000 175.000
11 0+250 Kr/Kn 7.000
25.000 7.000 175.000
12 0+275 Kr/Kn 7.000
25.000 7.000 175.000
13 0+300 Kr/Kn 7.000
25.000 7.000 175.000
25.000 7.000 175.000
14 0+325 Kr/Kn 7.000
25.000 7.000 175.000
15 0+350 Kr/Kn 7.000
25.000 7.000 175.000
16 0+375 Kr/Kn 7.000
25.000 7.000 175.000
17 0+400 Kr/Kn 7.000
25.000 7.000 175.000
18 0+425 Kr/Kn 7.000
25.000 7.000 175.000
19 0+450 Kr/Kn 7.000
25.000 7.000 175.000
20 0+475 Kr/Kn 7.000
25.000 7.000 175.000
21 0+500 Kr/Kn 7.000
25.000 7.000 175.000
22 0+525 Kr/Kn 7.000
25.000 7.000 175.000
23 0+550 Kr/Kn 7.000
25.000 7.000 175.000
24 0+575 Kr/Kn 7.000
25.000 7.000 175.000
25 0+600 Kr/Kn 7.000
25.000 7.000 175.000
26 0+625 Kr/Kn 7.000
25.000 7.000 175.000
27 0+650 Kr/Kn 7.000
25.000 7.000 175.000
28 0+675 Kr/Kn 7.000
25.000 7.000 175.000
29 0+700 Kr/Kn 7.000

TOTA

Direksi PU
Bina Marga

……………………, ST
Nip……………………………

29 0+700 Kr/Kn 7.000


25.000 7.000 175.000
30 0+725 Kr/Kn 7.000
25.000 7.000 175.000
31 0+750 Kr/Kn 7.000
25.000 7.000 175.000
32 0+775 Kr/Kn 7.000
25.000 7.000 175.000
33 0+800 Kr/Kn 7.000
25.000 7.000 175.000
34 0+825 Kr/Kn 7.000
25.000 7.000 175.000
35 0+850 Kr/Kn 7.000
35 0+850 Kr/Kn 7.000
25.000 7.000 175.000
36 0+875 Kr/Kn 7.000
25.000 7.000 175.000
37 0+900 Kr/Kn 7.000
25.000 7.000 175.000
38 0+925 Kr/Kn 7.000
25.000 7.000 175.000
39 0+950 Kr/Kn 7.000
25.000 7.000 175.000
40 0+975 Kr/Kn 7.000
25.000 7.000 175.000
41 1+000 Kr/Kn 7.000
25.000 7.000 175.000
42 1+025 Kr/Kn 7.000
25.000 7.000 175.000
43 1+050 Kr/Kn 7.000
25.000 7.000 175.000
44 1+075 Kr/Kn 7.000
25.000 7.000 175.000
45 1+100 Kr/Kn 7.000
25.000 7.000 175.000
46 1+125 Kr/Kn 7.000
25.000 7.000 175.000
47 1+150 Kr/Kn 7.000
25.000 7.000 175.000
48 1+175 Kr/Kn 7.000
25.000 7.000 175.000
49 1+200 Kr/Kn 7.000
25.000 7.000 175.000
50 1+225 Kr/Kn 7.000
25.000 7.000 175.000
51 1+250 Kr/Kn 7.000
25.000 7.000 175.000
52 1+275 Kr/Kn 7.000
25.000 7.000 175.000
53 1+300 Kr/Kn 7.000
25.000 7.000 175.000
54 1+325 Kr/Kn 7.000
25.000 7.000 175.000
55 1+350 Kr/Kn 7.000
25.000 7.000 175.000
56 1+375 Kr/Kn 7.000
25.000 7.000 175.000
57 1+400 Kr/Kn 7.000

TOTA

Direksi PU
Bina Marga

……………………, ST
Nip……………………………
57 1+400 Kr/Kn 7.000
25.000 7.000 175.000
58 1+425 Kr/Kn 7.000
25.000 7.000 175.000
59 1+450 Kr/Kn 7.000
25.000 7.000 175.000
60 1+475 Kr/Kn 7.000
25.000 7.000 175.000
61 1+500 Kr/Kn 7.000
25.000 7.000 175.000
62 1+525 Kr/Kn 7.000
25.000 7.000 175.000
63 1+550 Kr/Kn 7.000
25.000 7.000 175.000
64 1+575 Kr/Kn 7.000
25.000 7.000 175.000
65 1+600 Kr/Kn 7.000
25.000 7.000 175.000
66 1+625 Kr/Kn 7.000
25.000 7.000 175.000
67 1+650 Kr/Kn 7.000
25.000 7.000 175.000
68 1+675 Kr/Kn 7.000
25.000 7.000 175.000
69 1+700 Kr/Kn 7.000
25.000 7.000 175.000
70 1+725 Kr/Kn 7.000
25.000 7.000 175.000
71 1+750 Kr/Kn 7.000
25.000 7.000 175.000
72 1+775 Kr/Kn 7.000
25.000 7.000 175.000
73 1+800 Kr/Kn 7.000
25.000 7.000 175.000
74 1+825 Kr/Kn 7.000
25.000 7.000 175.000
75 1+850 Kr/Kn 7.000
25.000 7.000 175.000
76 1+875 Kr/Kn 7.000
25.000 7.000 175.000
77 1+900 Kr/Kn 7.000
25.000 7.000 175.000
78 1+925 Kr/Kn 7.000
25.000 7.000 175.000
79 1+950 Kr/Kn 7.000
25.000 7.000 175.000
80 1+975 Kr/Kn 7.000
25.000 7.000 175.000
81 2+000 Kr/Kn 7.000
25.000 7.000 175.000
82 2+025 Kr/Kn 7.000
25.000 7.000 175.000
83 2+050 Kr/Kn 7.000
25.000 7.000 175.000
84 2+075 Kr/Kn 7.000
25.000 7.000 175.000
85 2+100 Kr/Kn 7.000

TOTA
Direksi PU
Bina Marga

……………………, ST
Nip……………………………

85 2+100 Kr/Kn 7.000


25.000 7.000 175.000
86 2+125 Kr/Kn 7.000
25.000 7.000 175.000
87 2+150 Kr/Kn 7.000
25.000 7.000 175.000
88 2+175 Kr/Kn 7.000
25.000 7.000 175.000
89 2+200 Kr/Kn 7.000
25.000 7.000 175.000
90 2+225 Kr/Kn 7.000
25.000 7.000 175.000
91 2+250 Kr/Kn 7.000
25.000 7.000 175.000
92 2+275 Kr/Kn 7.000
25.000 7.000 175.000
93 2+300 Kr/Kn 7.000
25.000 7.000 175.000
94 2+325 Kr/Kn 7.000
25.000 7.000 175.000
95 2+350 Kr/Kn 7.000
25.000 7.000 175.000
96 2+375 Kr/Kn 7.000
25.000 7.000 175.000
97 2+400 Kr/Kn 7.000
25.000 7.000 175.000
98 2+425 Kr/Kn 7.000
25.000 7.000 175.000
99 2+450 Kr/Kn 7.000
25.000 7.000 175.000
100 2+475 Kr/Kn 7.000
25.000 7.000 175.000
101 2+500 Kr/Kn 7.000
25.000 7.000 175.000
102 2+525 Kr/Kn 7.000
25.000 7.000 175.000
103 2+550 Kr/Kn 7.000
25.000 7.000 175.000
104 2+575 Kr/Kn 7.000
25.000 7.000 175.000
105 2+600 Kr/Kn 7.000
25.000 7.000 175.000
106 2+625 Kr/Kn 7.000
25.000 7.000 175.000
107 2+650 Kr/Kn 7.000
25.000 7.000 175.000
108 2+675 Kr/Kn 7.000
25.000 7.000 175.000
109 2+700 Kr/Kn 7.000
25.000 7.000 175.000
110 2+725 Kr/Kn 7.000
110 2+725 Kr/Kn 7.000
25.000 7.000 175.000
111 2+750 Kr/Kn 7.000
25.000 7.000 175.000
112 2+775 Kr/Kn 7.000
25.000 7.000 175.000
113 2+800 Kr/Kn 7.000

TOTA

Direksi PU
Bina Marga

……………………, ST
Nip……………………………

113 2+800 Kr/Kn 7.000


25.000 7.000 175.000
114 2+825 Kr/Kn 7.000
25.000 7.000 175.000
115 2+850 Kr/Kn 7.000
25.000 7.000 175.000
116 2+875 Kr/Kn 7.000
25.000 7.000 175.000
117 2+900 Kr/Kn 7.000
25.000 7.000 175.000
118 2+925 Kr/Kn 7.000
25.000 7.000 175.000
119 2+950 Kr/Kn 7.000
25.000 7.000 175.000
120 2+975 Kr/Kn 7.000
25.000 7.000 175.000
121 3+000 Kr/Kn 7.000
25.000 7.000 175.000
122 3+025 Kr/Kn 7.000
25.000 7.000 175.000
123 3+050 Kr/Kn 7.000
25.000 7.000 175.000
124 3+075 Kr/Kn 7.000
25.000 7.000 175.000
125 3+100 Kr/Kn 7.000
25.000 7.000 175.000
126 3+125 Kr/Kn 7.000
25.000 7.000 175.000
127 3+150 Kr/Kn 7.000
25.000 7.000 175.000
128 3+175 Kr/Kn 7.000
25.000 7.000 175.000
129 3+200 Kr/Kn 7.000
25.000 7.000 175.000
130 3+225 Kr/Kn 7.000
25.000 7.000 175.000
131 3+250 Kr/Kn 7.000
25.000 7.000 175.000
25.000 7.000 175.000
132 3+275 Kr/Kn 7.000
25.000 7.000 175.000
133 3+300 Kr/Kn 7.000
25.000 7.000 175.000
134 3+325 Kr/Kn 7.000
25.000 7.000 175.000
135 3+350 Kr/Kn 7.000
25.000 7.000 175.000
136 3+375 Kr/Kn 7.000
25.000 7.000 175.000
137 3+400 Kr/Kn 7.000
25.000 7.000 175.000
138 3+425 Kr/Kn 7.000
25.000 7.000 175.000
139 3+450 Kr/Kn 7.000
25.000 7.000 175.000
140 3+475 Kr/Kn 7.000
25.000 7.000 175.000
141 3+500 Kr/Kn 7.000

TOTA

Direksi PU
Bina Marga

……………………, ST
Nip……………………………

141 3+500 Kr/Kn 7.000


25.000 7.000 175.000
142 3+525 Kr/Kn 7.000
25.000 7.000 175.000
143 3+550 Kr/Kn 7.000
25.000 7.000 175.000
144 3+575 Kr/Kn 7.000
25.000 7.000 175.000
145 3+600 Kr/Kn 7.000
25.000 7.000 175.000
146 3+625 Kr/Kn 7.000
25.000 7.000 175.000
147 3+650 Kr/Kn 7.000
25.000 7.000 175.000
148 3+675 Kr/Kn 7.000
25.000 7.000 175.000
149 3+700 Kr/Kn 7.000
25.000 7.000 175.000
150 3+725 Kr/Kn 7.000
25.000 7.000 175.000
151 3+750 Kr/Kn 7.000
25.000 7.000 175.000
152 3+775 Kr/Kn 7.000
25.000 7.000 175.000
153 3+800 Kr/Kn 7.000
153 3+800 Kr/Kn 7.000
25.000 7.000 175.000
154 3+825 Kr/Kn 7.000
25.000 7.000 175.000
155 3+850 Kr/Kn 7.000
25.000 7.000 175.000
156 3+875 Kr/Kn 7.000
25.000 7.000 175.000
157 3+900 Kr/Kn 7.000
25.000 7.000 175.000
158 3+925 Kr/Kn 7.000
25.000 7.000 175.000
159 3+950 Kr/Kn 7.000
25.000 7.000 175.000
160 3+975 Kr/Kn 7.000
25.000 7.000 175.000
161 4+000 Kr/Kn 7.000
25.000 7.000 175.000
162 4+025 Kr/Kn 7.000
25.000 7.000 175.000
163 4+050 Kr/Kn 7.000
25.000 7.000 175.000
164 4+075 Kr/Kn 7.000
25.000 7.000 175.000
165 4+100 Kr/Kn 7.000
25.000 7.000 175.000
166 4+125 Kr/Kn 7.000
25.000 7.000 175.000
167 4+150 Kr/Kn 7.000
25.000 7.000 175.000
168 4+175 Kr/Kn 7.000
25.000 7.000 175.000
169 4+200 Kr/Kn 7.000

TOTA

Direksi PU
Bina Marga

……………………, ST
Nip……………………………

169 4+200 Kr/Kn 7.000


25.000 7.000 175.000
170 4+225 Kr/Kn 7.000
25.000 7.000 175.000
171 4+250 Kr/Kn 7.000
25.000 7.000 175.000
172 4+275 Kr/Kn 7.000
25.000 7.000 175.000
173 4+300 Kr/Kn 7.000
25.000 7.000 175.000
174 4+325 Kr/Kn 7.000
25.000 7.000 175.000
25.000 7.000 175.000
175 4+350 Kr/Kn 7.000
25.000 7.000 175.000
176 4+375 Kr/Kn 7.000
25.000 7.000 175.000
177 4+400 Kr/Kn 7.000
25.000 7.000 175.000
178 4+425 Kr/Kn 7.000
25.000 7.000 175.000
179 4+450 Kr/Kn 7.000
25.000 7.000 175.000
180 4+475 Kr/Kn 7.000
25.000 7.000 175.000
181 4+500 Kr/Kn 7.000
25.000 7.000 175.000
182 4+525 Kr/Kn 7.000
25.000 7.000 175.000
183 4+550 Kr/Kn 7.000
25.000 7.000 175.000
184 4+575 Kr/Kn 7.000
25.000 7.000 175.000
185 4+600 Kr/Kn 7.000
25.000 7.000 175.000
186 4+625 Kr/Kn 7.000
25.000 7.000 175.000
187 4+650 Kr/Kn 7.000
25.000 7.000 175.000
188 4+675 Kr/Kn 7.000
25.000 7.000 175.000
189 4+700 Kr/Kn 7.000
25.000 7.000 175.000
190 4+725 Kr/Kn 7.000
25.000 7.000 175.000
191 4+750 Kr/Kn 7.000
25.000 7.000 175.000
192 4+775 Kr/Kn 7.000
25.000 7.000 175.000
193 4+800 Kr/Kn 7.000
25.000 7.000 175.000
194 4+825 Kr/Kn 7.000
25.000 7.000 175.000
195 4+850 Kr/Kn 7.000
25.000 7.000 175.000
196 4+875 Kr/Kn 7.000
25.000 7.000 175.000
197 4+900 Kr/Kn 7.000

TOTA

Direksi PU
Bina Marga

……………………, ST
Nip……………………………
197 4+900 Kr/Kn 7.000
25.000 7.000 175.000
198 4+925 Kr/Kn 7.000
25.000 7.000 175.000
199 4+950 Kr/Kn 7.000
25.000 7.000 175.000
200 4+975 Kr/Kn 7.000
25.000 7.000 175.000
201 5+000 Kr/Kn 7.000
25.000 7.000 175.000
202 5+025 Kr/Kn 7.000
25.000 7.000 175.000
203 5+050 Kr/Kn 7.000
25.000 7.000 175.000
204 5+075 Kr/Kn 7.000
25.000 7.000 175.000
205 5+100 Kr/Kn 7.000
25.000 7.000 175.000
206 5+125 Kr/Kn 7.000
25.000 7.000 175.000
207 5+150 Kr/Kn 7.000
25.000 7.000 175.000
208 5+175 Kr/Kn 7.000
25.000 7.000 175.000
209 5+200 Kr/Kn 7.000
25.000 7.000 175.000
210 5+225 Kr/Kn 7.000
25.000 7.000 175.000
211 5+250 Kr/Kn 7.000
25.000 7.000 175.000
212 5+275 Kr/Kn 7.000
25.000 7.000 175.000
213 5+300 Kr/Kn 7.000
25.000 7.000 175.000
214 5+325 Kr/Kn 7.000
25.000 7.000 175.000
215 5+350 Kr/Kn 7.000
25.000 7.000 175.000
216 5+375 Kr/Kn 7.000
25.000 7.000 175.000
217 5+400 Kr/Kn 7.000
25.000 7.000 175.000
218 5+425 Kr/Kn 7.000
25.000 7.000 175.000
219 5+450 Kr/Kn 7.000
25.000 7.000 175.000
220 5+475 Kr/Kn 7.000
25.000 7.000 175.000
221 5+500 Kr/Kn 7.000
25.000 7.000 175.000
222 5+525 Kr/Kn 7.000
25.000 7.000 175.000
223 5+550 Kr/Kn 7.000
25.000 7.000 175.000
224 5+575 Kr/Kn 7.000
25.000 7.000 175.000
225 5+600 Kr/Kn 7.000

TOTA
Direksi PU
Bina Marga

……………………, ST
Nip……………………………

225 5+600 Kr/Kn 7.000


25.000 7.000 175.000
226 5+625 Kr/Kn 7.000
25.000 7.000 175.000
227 5+650 Kr/Kn 7.000
25.000 7.000 175.000
228 5+675 Kr/Kn 7.000
25.000 7.000 175.000
229 5+700 Kr/Kn 7.000
25.000 7.000 175.000
230 5+725 Kr/Kn 7.000
25.000 7.000 175.000
231 5+750 Kr/Kn 7.000
25.000 7.000 175.000
232 5+775 Kr/Kn 7.000
25.000 7.000 175.000
233 5+800 Kr/Kn 7.000
25.000 7.000 175.000
234 5+825 Kr/Kn 7.000
25.000 7.000 175.000
235 5+850 Kr/Kn 7.000
25.000 7.000 175.000
236 5+875 Kr/Kn 7.000
25.000 7.000 175.000
237 5+900 Kr/Kn 7.000
25.000 7.000 175.000
238 5+925 Kr/Kn 7.000
25.000 7.000 175.000
239 5+950 Kr/Kn 7.000
25.000 7.000 175.000
240 5+975 Kr/Kn 7.000
25.000 7.000 175.000
241 6+000 Kr/Kn 7.000
25.000 7.000 175.000
242 6+025 Kr/Kn 7.000
25.000 7.000 175.000
243 6+050 Kr/Kn 7.000
25.000 7.000 175.000
244 6+075 Kr/Kn 7.000
25.000 7.000 175.000
245 6+100 Kr/Kn 7.000
25.000 7.000 175.000
246 6+125 Kr/Kn 7.000
25.000 7.000 175.000
247 6+150 Kr/Kn 7.000
25.000 7.000 175.000
248 6+175 Kr/Kn 7.000
25.000 7.000 175.000
249 6+200 Kr/Kn 7.000
25.000 7.000 175.000
25.000 7.000 175.000
250 6+225 Kr/Kn 7.000
25.000 7.000 175.000
251 6+250 Kr/Kn 7.000
25.000 7.000 175.000
252 6+275 Kr/Kn 7.000
25.000 7.000 175.000
253 6+300 Kr/Kn 7.000

TOTA

Direksi PU
Bina Marga

……………………, ST
Nip……………………………

253 6+300 Kr/Kn 7.000


25.000 7.000 175.000
254 6+325 Kr/Kn 7.000
25.000 7.000 175.000
255 6+350 Kr/Kn 7.000
25.000 7.000 175.000
256 6+375 Kr/Kn 7.000
25.000 7.000 175.000
257 6+400 Kr/Kn 7.000
25.000 7.000 175.000
258 6+425 Kr/Kn 7.000
25.000 7.000 175.000
259 6+450 Kr/Kn 7.000
25.000 7.000 175.000
260 6+475 Kr/Kn 7.000
25.000 7.000 175.000
261 6+500 Kr/Kn 7.000
25.000 7.000 175.000
262 6+525 Kr/Kn 7.000
25.000 7.000 175.000
263 6+550 Kr/Kn 7.000
25.000 7.000 175.000
264 6+575 Kr/Kn 7.000
25.000 7.000 175.000
265 6+600 Kr/Kn 7.000
25.000 7.000 175.000
266 6+625 Kr/Kn 7.000
25.000 7.000 175.000
267 6+650 Kr/Kn 7.000
25.000 7.000 175.000
268 6+675 Kr/Kn 7.000
25.000 7.000 175.000
269 6+700 Kr/Kn 7.000
25.000 7.000 175.000
270 6+725 Kr/Kn 7.000
25.000 7.000 175.000
271 6+750 Kr/Kn 7.000
271 6+750 Kr/Kn 7.000
25.000 7.000 175.000
272 6+775 Kr/Kn 7.000
25.000 7.000 175.000
273 6+800 Kr/Kn 7.000
25.000 7.000 175.000
274 6+825 Kr/Kn 7.000
25.000 7.000 175.000
275 6+850 Kr/Kn 7.000
25.000 7.000 175.000
276 6+875 Kr/Kn 7.000
25.000 7.000 175.000
277 6+900 Kr/Kn 7.000
25.000 7.000 175.000
278 6+925 Kr/Kn 7.000
25.000 7.000 175.000
279 6+950 Kr/Kn 7.000
25.000 7.000 175.000
280 6+975 Kr/Kn 7.000
25.000 7.000 175.000
281 7+000 Kr/Kn 7.000

TOTA

Direksi PU
Bina Marga

……………………, ST
Nip……………………………

281 7+000 Kr/Kn 7.000


25.000 7.000 175.000
282 7+025 Kr/Kn 7.000
25.000 7.000 175.000
283 7+050 Kr/Kn 7.000
25.000 7.000 175.000
284 7+075 Kr/Kn 7.000
25.000 7.000 175.000
285 7+100 Kr/Kn 7.000
25.000 7.000 175.000
286 7+125 Kr/Kn 7.000
25.000 7.000 175.000
287 7+150 Kr/Kn 7.000
25.000 7.000 175.000
288 7+175 Kr/Kn 7.000
25.000 7.000 175.000
289 7+200 Kr/Kn 7.000
25.000 7.000 175.000
290 7+225 Kr/Kn 7.000
25.000 7.000 175.000
291 7+250 Kr/Kn 7.000
25.000 7.000 175.000
292 7+275 Kr/Kn 7.000
25.000 7.000 175.000
25.000 7.000 175.000
293 7+300 Kr/Kn 7.000
25.000 7.000 175.000
294 7+325 Kr/Kn 7.000
25.000 7.000 175.000
295 7+350 Kr/Kn 7.000
25.000 7.000 175.000
296 7+375 Kr/Kn 7.000
25.000 7.000 175.000
297 7+400 Kr/Kn 7.000
25.000 7.000 175.000
298 7+425 Kr/Kn 7.000
25.000 7.000 175.000
299 7+450 Kr/Kn 7.000
25.000 7.000 175.000
300 7+475 Kr/Kn 7.000
25.000 7.000 175.000
301 7+500 Kr/Kn 7.000
25.000 7.000 175.000
302 7+525 Kr/Kn 7.000
25.000 7.000 175.000
303 7+550 Kr/Kn 7.000
25.000 7.000 175.000
304 7+575 Kr/Kn 7.000
25.000 7.000 175.000
305 7+600 Kr/Kn 7.000
25.000 7.000 175.000
306 7+625 Kr/Kn 7.000
25.000 7.000 175.000
307 7+650 Kr/Kn 7.000
25.000 7.000 175.000
308 7+675 Kr/Kn 7.000
25.000 7.000 175.000
309 7+700 Kr/Kn 7.000

TOTA

Direksi PU
Bina Marga

……………………, ST
Nip……………………………

309 7+700 Kr/Kn 7.000


25.000 7.000 175.000
310 7+725 Kr/Kn 7.000
25.000 7.000 175.000
311 7+750 Kr/Kn 7.000
25.000 7.000 175.000
312 7+775 Kr/Kn 7.000
25.000 7.000 175.000
313 7+800 Kr/Kn 7.000
25.000 7.000 175.000
314 7+825 Kr/Kn 7.000
314 7+825 Kr/Kn 7.000
25.000 7.000 175.000
315 7+850 Kr/Kn 7.000
25.000 7.000 175.000
316 7+875 Kr/Kn 7.000
25.000 7.000 175.000
317 7+900 Kr/Kn 7.000
25.000 7.000 175.000
318 7+925 Kr/Kn 7.000
25.000 7.000 175.000
319 7+950 Kr/Kn 7.000
25.000 7.000 175.000
320 7+975 Kr/Kn 7.000
25.000 7.000 175.000
321 8+000 Kr/Kn 7.000
25.000 7.000 175.000
322 8+025 Kr/Kn 7.000
25.000 7.000 175.000
323 8+050 Kr/Kn 7.000
25.000 7.000 175.000
324 8+075 Kr/Kn 7.000
25.000 7.000 175.000
325 8+100 Kr/Kn 7.000
25.000 7.000 175.000
326 8+125 Kr/Kn 7.000
25.000 7.000 175.000
327 8+150 Kr/Kn 7.000
25.000 7.000 175.000
328 8+175 Kr/Kn 7.000
25.000 7.000 175.000
329 8+200 Kr/Kn 7.000
25.000 7.000 175.000
330 8+225 Kr/Kn 7.000
25.000 7.000 175.000
331 8+250 Kr/Kn 7.000
25.000 7.000 175.000
332 8+275 Kr/Kn 7.000
25.000 7.000 175.000
333 8+300 Kr/Kn 7.000
25.000 7.000 175.000
334 8+325 Kr/Kn 7.000
25.000 7.000 175.000
335 8+350 Kr/Kn 7.000
25.000 7.000 175.000
336 8+375 Kr/Kn 7.000
25.000 7.000 175.000
337 8+400 Kr/Kn 7.000

TOTA

Direksi PU
Bina Marga

……………………, ST
Nip……………………………
337 8+400 Kr/Kn 7.000
25.000 7.000 175.000
338 8+425 Kr/Kn 7.000
25.000 7.000 175.000
339 8+450 Kr/Kn 7.000
25.000 7.000 175.000
340 8+475 Kr/Kn 7.000
25.000 7.000 175.000
341 8+500 Kr/Kn 7.000
25.000 7.000 175.000
342 8+525 Kr/Kn 7.000
25.000 7.000 175.000
343 8+550 Kr/Kn 7.000
25.000 7.000 175.000
344 8+575 Kr/Kn 7.000
25.000 7.000 175.000
345 8+600 Kr/Kn 7.000
25.000 7.000 175.000
346 8+625 Kr/Kn 7.000
25.000 7.000 175.000
347 8+650 Kr/Kn 7.000
25.000 7.000 175.000
348 8+675 Kr/Kn 7.000
25.000 7.000 175.000
349 8+700 Kr/Kn 7.000
25.000 7.000 175.000
350 8+725 Kr/Kn 7.000
25.000 7.000 175.000
351 8+750 Kr/Kn 7.000
25.000 7.000 175.000
352 8+775 Kr/Kn 7.000
25.000 7.000 175.000
353 8+800 Kr/Kn 7.000
25.000 7.000 175.000
354 8+825 Kr/Kn 7.000
25.000 7.000 175.000
355 8+850 Kr/Kn 7.000
25.000 7.000 175.000
356 8+875 Kr/Kn 7.000
25.000 7.000 175.000
357 8+900 Kr/Kn 7.000
25.000 7.000 175.000
358 8+925 Kr/Kn 7.000
25.000 7.000 175.000
359 8+950 Kr/Kn 7.000
25.000 7.000 175.000
360 8+975 Kr/Kn 7.000
25.000 7.000 175.000
361 9+000 Kr/Kn 7.000
25.000 7.000 175.000
362 9+025 Kr/Kn 7.000
25.000 7.000 175.000
363 9+050 Kr/Kn 7.000
25.000 7.000 175.000
364 9+075 Kr/Kn 7.000
25.000 7.000 175.000
365 9+100 Kr/Kn 7.000

TOTA
Direksi PU
Bina Marga

……………………, ST
Nip……………………………

365 9+100 Kr/Kn 7.000


25.000 7.000 175.000
366 9+125 Kr/Kn 7.000
25.000 7.000 175.000
367 9+150 Kr/Kn 7.000
25.000 7.000 175.000
368 9+175 Kr/Kn 7.000
25.000 7.000 175.000
369 9+200 Kr/Kn 7.000
25.000 7.000 175.000
370 9+225 Kr/Kn 7.000
25.000 7.000 175.000
371 9+250 Kr/Kn 7.000
25.000 7.000 175.000
372 9+275 Kr/Kn 7.000
25.000 7.000 175.000
373 9+300 Kr/Kn 7.000
25.000 7.000 175.000
374 9+325 Kr/Kn 7.000
25.000 7.000 175.000
375 9+350 Kr/Kn 7.000
25.000 7.000 175.000
376 9+375 Kr/Kn 7.000
25.000 7.000 175.000
377 9+400 Kr/Kn 7.000
25.000 7.000 175.000
378 9+425 Kr/Kn 7.000
25.000 7.000 175.000
379 9+450 Kr/Kn 7.000
25.000 7.000 175.000
380 9+475 Kr/Kn 7.000
25.000 7.000 175.000
381 9+500 Kr/Kn 7.000
25.000 7.000 175.000
382 9+525 Kr/Kn 7.000
25.000 7.000 175.000
383 9+550 Kr/Kn 7.000
25.000 7.000 175.000
384 9+575 Kr/Kn 7.000
25.000 7.000 175.000
385 9+600 Kr/Kn 7.000
25.000 7.000 175.000
386 9+625 Kr/Kn 7.000
25.000 7.000 175.000
387 9+650 Kr/Kn 7.000
25.000 7.000 175.000
388 9+675 Kr/Kn 7.000
25.000 7.000 175.000
25.000 7.000 175.000
389 9+700 Kr/Kn 7.000
25.000 7.000 175.000
390 9+725 Kr/Kn 7.000

TOTA

Direksi PU
Bina Marga

……………………, ST
Nip……………………………
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

NO. ITEM PEMBAYARAN : 1. SKh= 5 6.3.1 (2a)


2. SKh= 5 6.3.1 (4)
3. SKh= 5 6.3.1 (5)
4. SKh= 5 6.3.1 (6)

Rumus Pemba
Berat Jenis Aspal
Tebal Rata- Volume Volume
Tebal (m') Gabungan
rata (m') (m3) (Ton) CBA LAWELE
(Ton/M3)
(100-5.8)%

0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
JUMLAH 196.000 M3 449.820 Ton
TOTAL JUMLAH 196.000 M3 449.820 Ton

0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
JUMLAH 196.000 M3 449.820 Ton
TOTAL JUMLAH 392.000 M3 899.640 Ton
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
JUMLAH 196.000 M3 449.820 Ton
TOTAL JUMLAH 588.000 M3 1,349.460 Ton
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
JUMLAH 196.000 M3 449.820 Ton
TOTAL JUMLAH 784.000 M3 1,799.280 Ton

0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
JUMLAH 196.000 M3 449.820 Ton
TOTAL JUMLAH 980.000 M3 2,249.100 Ton

0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
JUMLAH 196.000 M3 449.820 Ton
TOTAL JUMLAH 1,176.000 M3 2,698.920 Ton

0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
JUMLAH 196.000 M3 449.820 Ton
TOTAL JUMLAH 1,372.000 M3 3,148.740 Ton
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
JUMLAH 196.000 M3 449.820 Ton
TOTAL JUMLAH 1,568.000 M3 3,598.560 Ton
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
JUMLAH 196.000 M3 449.820 Ton
TOTAL JUMLAH 1,764.000 M3 4,048.380 Ton

0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
JUMLAH 196.000 M3 449.820 Ton
TOTAL JUMLAH 1,960.000 M3 4,498.200 Ton

0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
JUMLAH 196.000 M3 449.820 Ton
TOTAL JUMLAH 2,156.000 M3 4,948.020 Ton

0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
JUMLAH 196.000 M3 449.820 Ton
TOTAL JUMLAH 2,352.000 M3 5,397.840 Ton
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
JUMLAH 196.000 M3 449.820 Ton
TOTAL JUMLAH 2,548.000 M3 5,847.660 Ton
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040 7.000 2.295 16.065 0.8670
0.040
0.040 7.000 2.295 16.065 0.8670
0.040

JUMLAH 175.000 M3 401.625 Ton


TOTAL JUMLAH 2,723.000 M3 6,249.285 Ton
IM (2020)

MC NO.
LEMBAR

Rumus Pembayaran Volume

Bahan Anti
ASPAL KERAS Asbuton Lawele AC-WC Asbuton Lawele Aspal Keras
Pengelupasan (fol.x
( 3.3 % ) Berbutir ((10%)x25) (Ton) Berbutir (Ton) (Ton)
pbx0.3/100)

0.0350 0.1000 0.1050 13.928 1.607 0.562


0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530

389.994 44.982 14.876


389.994 44.982 14.876

Konsultan
CV. Multi Pratama

Haerullah, ST
Highway Engineer

0.0330 0.1000 0.0990 13.928 1.607 0.530


0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530

389.994 44.982 14.844


779.988 89.964 29.720

Konsultan
CV. Multi Pratama

Haerullah, ST
Highway Engineer
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530

389.994 44.982 14.844


1,169.982 134.946 44.564
Konsultan
CV. Multi Pratama

Haerullah, ST
Highway Engineer

0.0330 0.1000 0.0990 13.928 1.607 0.530


0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530

389.994 44.982 14.844


1,559.976 179.928 59.408

Konsultan
CV. Multi Pratama

Haerullah, ST
Highway Engineer

0.0330 0.1000 0.0990 13.928 1.607 0.530


0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530

389.994 44.982 14.844


1,949.970 224.910 74.252

Konsultan
CV. Multi Pratama

Haerullah, ST
Highway Engineer

0.0330 0.1000 0.0990 13.928 1.607 0.530


0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530

389.994 44.982 14.844


2,339.964 269.892 89.096

Konsultan
CV. Multi Pratama

Haerullah, ST
Highway Engineer

0.0330 0.1000 0.0990 13.928 1.607 0.530


0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530

389.994 44.982 14.844


2,729.958 314.874 103.941

Konsultan
CV. Multi Pratama

Haerullah, ST
Highway Engineer
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530

389.994 44.982 14.844


3,119.952 359.856 118.785
Konsultan
CV. Multi Pratama

Haerullah, ST
Highway Engineer

0.0330 0.1000 0.0990 13.928 1.607 0.530


0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530

389.994 44.982 14.844


3,509.945 404.838 133.629

Konsultan
CV. Multi Pratama

Haerullah, ST
Highway Engineer

0.0330 0.1000 0.0990 13.928 1.607 0.530


0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530

389.994 44.982 14.844


3,899.939 449.820 148.473

Konsultan
CV. Multi Pratama

Haerullah, ST
Highway Engineer

0.0330 0.1000 0.0990 13.928 1.607 0.530


0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530

389.994 44.982 14.844


4,289.933 494.802 163.317

Konsultan
CV. Multi Pratama

Haerullah, ST
Highway Engineer

0.0330 0.1000 0.0990 13.928 1.607 0.530


0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530

389.994 44.982 14.844


4,679.927 539.784 178.161

Konsultan
CV. Multi Pratama

Haerullah, ST
Highway Engineer
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530

389.994 44.982 14.844


5,069.921 584.766 193.005
Konsultan
CV. Multi Pratama

Haerullah, ST
Highway Engineer

0.0330 0.1000 0.0990 13.928 1.607 0.530


0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530
0.0330 0.1000 0.0990 13.928 1.607 0.530

348.209 40.163 13.254


5,418.130 624.929 206.259

Konsultan
CV. Multi Pratama

Haerullah, ST
Highway Engineer
AC-BC Asb

1.50 4.50
-3 %
:0 -5 %

:1
Existing

KADAR BITUMEN 27.94


RUMUS =

Bahan Anti Keterangan 5.5 1000 55


Pengelupasan
(Kg) 2.794 1000 27.94
27.06
2.295
CBA 1000 - 27.06 - 100 872.94
1.687 6.000
ASMIN 27.06 0.08118
1.590 2.500
LAWELE 100
1.590 10.00%
1000
1.590 3.30%
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590

44.629
44.629

#REF!
CBA 1000 - 27.06 - 100 872.94
1.590
ASMIN 27.06 0.08118
1.590
LAWELE 100
1.590
1000
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590

44.532
89.161

n
tama

ST
ineer
#REF!
CBA 1000 - 27.06 - 100 872.94
1.590
ASMIN 27.06 0.08118
1.590
LAWELE 100
1.590
1000
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590

44.532
133.693
n
tama

ST
ineer
#REF!
CBA 1000 - 27.06 - 100 872.94
1.590
ASMIN 27.06 0.08118
1.590
LAWELE 100
1.590
1000
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590

44.532
178.225

n
tama

ST
ineer
#REF!
CBA 1000 - 27.06 - 100 872.94
1.590
ASMIN 27.06 0.08118
1.590
LAWELE 100
1.590
1000
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590

44.532
222.757

n
tama

ST
ineer
#REF!
CBA 1000 - 27.06 - 100 872.94
1.590
ASMIN 27.06 0.08118
1.590
LAWELE 100
1.590
1000
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590

44.532
267.289

n
tama

ST
ineer
#REF!
CBA 1000 - 27.06 - 100 872.94
1.590
ASMIN 27.06 0.08118
1.590
LAWELE 100
1.590
1000
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590

44.532
311.822

n
tama

ST
ineer
#REF!
#REF!
CBA 1000 - 27.06 - 100 872.94
1.590
ASMIN 27.06 0.08118
1.590
LAWELE 100
1.590
1000
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590

44.532
356.354
n
tama

ST
ineer
#REF!
CBA 1000 - 27.06 - 100 872.94
1.590
ASMIN 27.06 0.08118
1.590
LAWELE 100
1.590
1000
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590

44.532
400.886

n
tama

ST
ineer
#REF!
CBA 1000 - 27.06 - 100 872.94
1.590
ASMIN 27.06 0.08118
1.590
LAWELE 100
1.590
1000
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590

44.532
445.418

n
tama

ST
ineer
#REF!
CBA 1000 - 27.06 - 100 872.94
1.590
ASMIN 27.06 0.08118
1.590
LAWELE 100
1.590
1000
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590

44.532
489.950

n
tama

ST
ineer
#REF!
CBA 1000 - 27.06 - 100 872.94
1.590
ASMIN 27.06 0.08118
1.590
LAWELE 100
1.590
1000
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590

44.532
534.483

n
tama

ST
ineer
#REF!
CBA 1000 - 27.06 - 100 872.94
1.590
ASMIN 27.06 0.08118
1.590
LAWELE 100
1.590
1000
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590

44.532
579.015
n
tama

ST
ineer
#REF!
CBA 1000 - 27.06 - 100 872.94
1.590
ASMIN 27.06 0.08118
1.590
LAWELE 100
1.590
1000
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590
1.590

39.761
618.776

n
tama

ST
ineer
AC-BC AsbPLawele

0 4.50 1.50
% -3 % -3 %
-5 %
Existing
AC-BC AsbP.Lawele = 6 cm

2.00 7.00
3.50 3.50
1.25 1.25

AC-WC Asb.Lawele =
AC-BC Asb.Lawele = 6
2.00
3.50
1.25

AC-WC Asb.Lawele = 4 cm
AC-BC Asb.Lawele = 6 cm
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
KONTRAKTOR 0
KONSULTAN CV. Multi Pratama
DIVISI PERKERASAN : 6. PERKERASAN ASPAL
DISKRIPSI PEKERJAAN : 1. CBA.AsbLawele Lapis Pondasi ( AC-BC AsbLawele ) NO. ITEM PEMBAYARAN : 1. SKh= 5 6.3.1 (2a)
2. Aspal Keras 2. SKh= 5 6.3.1 (4)
3. Asbuton Lawele Butir 3. SKh= 5 6.3.1 (5) MC NO. :0
4. Bahan Anti Pengelupasan 4. SKh= 5 6.3.1 (6) LEMBAR :1

Rumus Pembayaran Volume


Berat Jenis Aspal
Lebar Rata2 Tebal Rata- Volume Volume
NO STA L/R Panjang (m') Lebar (m') Luas (m2) Tebal (m') Gabungan Bahan Anti Bahan Anti Keterangan
(m') rata (m') (m3) (Ton) CBA LAWELE ASPAL KERAS Asbuton Lawele AC-BC Asbuton Lawele Aspal Keras
(Ton/M3) Pengelupasan (fol.x Pengelupasan
(100-5.8)% ( 3.3 % ) Berbutir ((10%)x25) (Ton) Berbutir (Ton) (Ton)
pbx0.3/100) (Kg)

2.295
1 0+000 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386 5.800
2 0+025 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386 2.500
3 0+050 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386 10.00%
4 0+075 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386 3.30%
5 0+100 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
6 0+125 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
7 0+150 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
8 0+175 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
9 0+200 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
10 0+225 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
11 0+250 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
12 0+275 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
13 0+300 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
14 0+325 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
15 0+350 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
16 0+375 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
17 0+400 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
18 0+425 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
19 0+450 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
20 0+475 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
21 0+500 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
22 0+525 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
23 0+550 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
24 0+575 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
25 0+600 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
26 0+625 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
27 0+650 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
28 0+675 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
29 0+700 Kr/Kn 7.000 0.060
JUMLAH 294.000 M3 674.730 Ton 584.991 67.473 22.266 66.798
TOTAL JUMLAH 294.000 M3 674.730 Ton 584.991 67.473 22.266 66.798

Direksi PU Konsultan
Bina Marga CV. Multi Pratama
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
KONTRAKTOR 0
KONSULTAN CV. Multi Pratama
DIVISI PERKERASAN : 6. PERKERASAN ASPAL
DISKRIPSI PEKERJAAN : 1. CBA.AsbLawele Lapis Pondasi ( AC-BC AsbLawele ) NO. ITEM PEMBAYARAN : 1. SKh= 5 6.3.1 (2a)
2. Aspal Keras 2. SKh= 5 6.3.1 (4)
3. Asbuton Lawele Butir 3. SKh= 5 6.3.1 (5) MC NO. :0
4. Bahan Anti Pengelupasan 4. SKh= 5 6.3.1 (6) LEMBAR :1

Rumus Pembayaran Volume


Berat Jenis Aspal
Lebar Rata2 Tebal Rata- Volume Volume
NO STA L/R Panjang (m') Lebar (m') Luas (m2) Tebal (m') Gabungan Bahan Anti Bahan Anti Keterangan
(m') rata (m') (m3) (Ton) CBA LAWELE ASPAL KERAS Asbuton Lawele AC-BC Asbuton Lawele Aspal Keras
(Ton/M3) Pengelupasan (fol.x Pengelupasan
(100-5.8)% ( 3.3 % ) Berbutir ((10%)x25) (Ton) Berbutir (Ton) (Ton)
pbx0.3/100) (Kg)

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

29 0+700 Kr/Kn 7.000 0.060


25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
30 0+725 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
31 0+750 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
32 0+775 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
33 0+800 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
34 0+825 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
35 0+850 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
36 0+875 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
37 0+900 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
38 0+925 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
39 0+950 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
40 0+975 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
41 1+000 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
42 1+025 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
43 1+050 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
44 1+075 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
45 1+100 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
46 1+125 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
47 1+150 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
48 1+175 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
49 1+200 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
50 1+225 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
51 1+250 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
52 1+275 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
53 1+300 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
54 1+325 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
55 1+350 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
56 1+375 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
57 1+400 Kr/Kn 7.000 0.060
JUMLAH 294.000 M3 674.730 Ton 584.991 67.473 22.266 66.798
TOTAL JUMLAH 588.000 M3 1,349.460 Ton 1,169.982 134.946 44.532 133.597

Direksi PU Konsultan
Bina Marga CV. Multi Pratama
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
KONTRAKTOR 0
KONSULTAN CV. Multi Pratama
DIVISI PERKERASAN : 6. PERKERASAN ASPAL
DISKRIPSI PEKERJAAN : 1. CBA.AsbLawele Lapis Pondasi ( AC-BC AsbLawele ) NO. ITEM PEMBAYARAN : 1. SKh= 5 6.3.1 (2a)
2. Aspal Keras 2. SKh= 5 6.3.1 (4)
3. Asbuton Lawele Butir 3. SKh= 5 6.3.1 (5) MC NO. :0
4. Bahan Anti Pengelupasan 4. SKh= 5 6.3.1 (6) LEMBAR :1

Rumus Pembayaran Volume


Berat Jenis Aspal
Lebar Rata2 Tebal Rata- Volume Volume
NO STA L/R Panjang (m') Lebar (m') Luas (m2) Tebal (m') Gabungan Bahan Anti Bahan Anti Keterangan
(m') rata (m') (m3) (Ton) CBA LAWELE ASPAL KERAS Asbuton Lawele AC-BC Asbuton Lawele Aspal Keras
(Ton/M3) Pengelupasan (fol.x Pengelupasan
(100-5.8)% ( 3.3 % ) Berbutir ((10%)x25) (Ton) Berbutir (Ton) (Ton)
pbx0.3/100) (Kg)

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

57 1+400 Kr/Kn 7.000 0.060


25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
58 1+425 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
59 1+450 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
60 1+475 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
61 1+500 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
62 1+525 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
63 1+550 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
64 1+575 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
65 1+600 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
66 1+625 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
67 1+650 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
68 1+675 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
69 1+700 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
70 1+725 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
71 1+750 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
72 1+775 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
73 1+800 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
74 1+825 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
75 1+850 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
76 1+875 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
77 1+900 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
78 1+925 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
79 1+950 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
80 1+975 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
81 2+000 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
82 2+025 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
83 2+050 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
84 2+075 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
85 2+100 Kr/Kn 7.000 0.060
JUMLAH 294.000 M3 674.730 Ton 584.991 67.473 22.266 66.798
TOTAL JUMLAH 882.000 M3 2,024.190 Ton 1,754.973 202.419 66.798 200.395
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
KONTRAKTOR 0
KONSULTAN CV. Multi Pratama
DIVISI PERKERASAN : 6. PERKERASAN ASPAL
DISKRIPSI PEKERJAAN : 1. CBA.AsbLawele Lapis Pondasi ( AC-BC AsbLawele ) NO. ITEM PEMBAYARAN : 1. SKh= 5 6.3.1 (2a)
2. Aspal Keras 2. SKh= 5 6.3.1 (4)
3. Asbuton Lawele Butir 3. SKh= 5 6.3.1 (5) MC NO. :0
4. Bahan Anti Pengelupasan 4. SKh= 5 6.3.1 (6) LEMBAR :1

Rumus Pembayaran Volume


Berat Jenis Aspal
Lebar Rata2 Tebal Rata- Volume Volume
NO STA L/R Panjang (m') Lebar (m') Luas (m2) Tebal (m') Gabungan Bahan Anti Bahan Anti Keterangan
(m') rata (m') (m3) (Ton) CBA LAWELE ASPAL KERAS Asbuton Lawele AC-BC Asbuton Lawele Aspal Keras
(Ton/M3) Pengelupasan (fol.x Pengelupasan
(100-5.8)% ( 3.3 % ) Berbutir ((10%)x25) (Ton) Berbutir (Ton) (Ton)
pbx0.3/100) (Kg)

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

85 2+100 Kr/Kn 7.000 0.060


25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
86 2+125 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
87 2+150 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
88 2+175 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
89 2+200 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
90 2+225 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
91 2+250 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
92 2+275 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
93 2+300 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
94 2+325 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
95 2+350 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
96 2+375 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
97 2+400 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
98 2+425 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
99 2+450 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
100 2+475 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
101 2+500 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
102 2+525 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
103 2+550 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
104 2+575 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
105 2+600 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
106 2+625 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
107 2+650 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
108 2+675 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
109 2+700 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
110 2+725 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
111 2+750 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
112 2+775 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
113 2+800 Kr/Kn 7.000 0.060
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
KONTRAKTOR 0
KONSULTAN CV. Multi Pratama
DIVISI PERKERASAN : 6. PERKERASAN ASPAL
DISKRIPSI PEKERJAAN : 1. CBA.AsbLawele Lapis Pondasi ( AC-BC AsbLawele ) NO. ITEM PEMBAYARAN : 1. SKh= 5 6.3.1 (2a)
2. Aspal Keras 2. SKh= 5 6.3.1 (4)
3. Asbuton Lawele Butir 3. SKh= 5 6.3.1 (5) MC NO. :0
4. Bahan Anti Pengelupasan 4. SKh= 5 6.3.1 (6) LEMBAR :1

Rumus Pembayaran Volume


Berat Jenis Aspal
Lebar Rata2 Tebal Rata- Volume Volume
NO STA L/R Panjang (m') Lebar (m') Luas (m2) Tebal (m') Gabungan Bahan Anti Bahan Anti Keterangan
(m') rata (m') (m3) (Ton) CBA LAWELE ASPAL KERAS Asbuton Lawele AC-BC Asbuton Lawele Aspal Keras
(Ton/M3) Pengelupasan (fol.x Pengelupasan
(100-5.8)% ( 3.3 % ) Berbutir ((10%)x25) (Ton) Berbutir (Ton) (Ton)
pbx0.3/100) (Kg)

JUMLAH 294.000 M3 674.730 Ton 584.991 67.473 22.266 66.798


TOTAL JUMLAH 1,176.000 M3 2,698.920 Ton 2,339.964 269.892 89.064 267.193

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

113 2+800 Kr/Kn 7.000 0.060


25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
114 2+825 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
115 2+850 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
116 2+875 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
117 2+900 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
118 2+925 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
119 2+950 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
120 2+975 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
121 3+000 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
122 3+025 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
123 3+050 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
124 3+075 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
125 3+100 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
126 3+125 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
127 3+150 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
128 3+175 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
129 3+200 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
130 3+225 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
131 3+250 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
132 3+275 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
133 3+300 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
134 3+325 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
135 3+350 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
136 3+375 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
137 3+400 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
138 3+425 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
139 3+450 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
KONTRAKTOR 0
KONSULTAN CV. Multi Pratama
DIVISI PERKERASAN : 6. PERKERASAN ASPAL
DISKRIPSI PEKERJAAN : 1. CBA.AsbLawele Lapis Pondasi ( AC-BC AsbLawele ) NO. ITEM PEMBAYARAN : 1. SKh= 5 6.3.1 (2a)
2. Aspal Keras 2. SKh= 5 6.3.1 (4)
3. Asbuton Lawele Butir 3. SKh= 5 6.3.1 (5) MC NO. :0
4. Bahan Anti Pengelupasan 4. SKh= 5 6.3.1 (6) LEMBAR :1

Rumus Pembayaran Volume


Berat Jenis Aspal
Lebar Rata2 Tebal Rata- Volume Volume
NO STA L/R Panjang (m') Lebar (m') Luas (m2) Tebal (m') Gabungan Bahan Anti Bahan Anti Keterangan
(m') rata (m') (m3) (Ton) CBA LAWELE ASPAL KERAS Asbuton Lawele AC-BC Asbuton Lawele Aspal Keras
(Ton/M3) Pengelupasan (fol.x Pengelupasan
(100-5.8)% ( 3.3 % ) Berbutir ((10%)x25) (Ton) Berbutir (Ton) (Ton)
pbx0.3/100) (Kg)
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
140 3+475 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
141 3+500 Kr/Kn 7.000 0.060
JUMLAH 294.000 M3 674.730 Ton 584.991 67.473 22.266 66.798
TOTAL JUMLAH 1,470.000 M3 3,373.650 Ton 2,924.955 337.365 111.330 333.991

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

141 3+500 Kr/Kn 7.000 0.060


25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
142 3+525 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
143 3+550 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
144 3+575 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
145 3+600 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
146 3+625 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
147 3+650 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
148 3+675 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
149 3+700 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
150 3+725 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
151 3+750 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
152 3+775 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
153 3+800 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
154 3+825 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
155 3+850 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
156 3+875 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
157 3+900 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
158 3+925 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
159 3+950 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
160 3+975 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
161 4+000 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
162 4+025 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
163 4+050 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
164 4+075 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
165 4+100 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
KONTRAKTOR 0
KONSULTAN CV. Multi Pratama
DIVISI PERKERASAN : 6. PERKERASAN ASPAL
DISKRIPSI PEKERJAAN : 1. CBA.AsbLawele Lapis Pondasi ( AC-BC AsbLawele ) NO. ITEM PEMBAYARAN : 1. SKh= 5 6.3.1 (2a)
2. Aspal Keras 2. SKh= 5 6.3.1 (4)
3. Asbuton Lawele Butir 3. SKh= 5 6.3.1 (5) MC NO. :0
4. Bahan Anti Pengelupasan 4. SKh= 5 6.3.1 (6) LEMBAR :1

Rumus Pembayaran Volume


Berat Jenis Aspal
Lebar Rata2 Tebal Rata- Volume Volume
NO STA L/R Panjang (m') Lebar (m') Luas (m2) Tebal (m') Gabungan Bahan Anti Bahan Anti Keterangan
(m') rata (m') (m3) (Ton) CBA LAWELE ASPAL KERAS Asbuton Lawele AC-BC Asbuton Lawele Aspal Keras
(Ton/M3) Pengelupasan (fol.x Pengelupasan
(100-5.8)% ( 3.3 % ) Berbutir ((10%)x25) (Ton) Berbutir (Ton) (Ton)
pbx0.3/100) (Kg)
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
166 4+125 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
167 4+150 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
168 4+175 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
169 4+200 Kr/Kn 7.000 0.060
JUMLAH 294.000 M3 674.730 Ton 584.991 67.473 22.266 66.798
TOTAL JUMLAH 1,764.000 M3 4,048.380 Ton 3,509.945 404.838 133.597 400.790

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

169 4+200 Kr/Kn 7.000 0.060


25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
170 4+225 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
171 4+250 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
172 4+275 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
173 4+300 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
174 4+325 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
175 4+350 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
176 4+375 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
177 4+400 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
178 4+425 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
179 4+450 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
180 4+475 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
181 4+500 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
182 4+525 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
183 4+550 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
184 4+575 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
185 4+600 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
186 4+625 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
187 4+650 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
188 4+675 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
189 4+700 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
190 4+725 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
191 4+750 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
KONTRAKTOR 0
KONSULTAN CV. Multi Pratama
DIVISI PERKERASAN : 6. PERKERASAN ASPAL
DISKRIPSI PEKERJAAN : 1. CBA.AsbLawele Lapis Pondasi ( AC-BC AsbLawele ) NO. ITEM PEMBAYARAN : 1. SKh= 5 6.3.1 (2a)
2. Aspal Keras 2. SKh= 5 6.3.1 (4)
3. Asbuton Lawele Butir 3. SKh= 5 6.3.1 (5) MC NO. :0
4. Bahan Anti Pengelupasan 4. SKh= 5 6.3.1 (6) LEMBAR :1

Rumus Pembayaran Volume


Berat Jenis Aspal
Lebar Rata2 Tebal Rata- Volume Volume
NO STA L/R Panjang (m') Lebar (m') Luas (m2) Tebal (m') Gabungan Bahan Anti Bahan Anti Keterangan
(m') rata (m') (m3) (Ton) CBA LAWELE ASPAL KERAS Asbuton Lawele AC-BC Asbuton Lawele Aspal Keras
(Ton/M3) Pengelupasan (fol.x Pengelupasan
(100-5.8)% ( 3.3 % ) Berbutir ((10%)x25) (Ton) Berbutir (Ton) (Ton)
pbx0.3/100) (Kg)
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
192 4+775 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
193 4+800 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
194 4+825 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
195 4+850 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
196 4+875 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
197 4+900 Kr/Kn 7.000 0.060
JUMLAH 294.000 M3 674.730 Ton 584.991 67.473 22.266 66.798
TOTAL JUMLAH 2,058.000 M3 4,723.110 Ton 4,094.936 472.311 155.863 467.588

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

197 4+900 Kr/Kn 7.000 0.060


25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
198 4+925 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
199 4+950 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
200 4+975 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
201 5+000 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
202 5+025 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
203 5+050 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
204 5+075 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
205 5+100 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
206 5+125 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
207 5+150 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
208 5+175 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
209 5+200 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
210 5+225 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
211 5+250 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
212 5+275 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
213 5+300 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
214 5+325 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
215 5+350 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
216 5+375 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
217 5+400 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
KONTRAKTOR 0
KONSULTAN CV. Multi Pratama
DIVISI PERKERASAN : 6. PERKERASAN ASPAL
DISKRIPSI PEKERJAAN : 1. CBA.AsbLawele Lapis Pondasi ( AC-BC AsbLawele ) NO. ITEM PEMBAYARAN : 1. SKh= 5 6.3.1 (2a)
2. Aspal Keras 2. SKh= 5 6.3.1 (4)
3. Asbuton Lawele Butir 3. SKh= 5 6.3.1 (5) MC NO. :0
4. Bahan Anti Pengelupasan 4. SKh= 5 6.3.1 (6) LEMBAR :1

Rumus Pembayaran Volume


Berat Jenis Aspal
Lebar Rata2 Tebal Rata- Volume Volume
NO STA L/R Panjang (m') Lebar (m') Luas (m2) Tebal (m') Gabungan Bahan Anti Bahan Anti Keterangan
(m') rata (m') (m3) (Ton) CBA LAWELE ASPAL KERAS Asbuton Lawele AC-BC Asbuton Lawele Aspal Keras
(Ton/M3) Pengelupasan (fol.x Pengelupasan
(100-5.8)% ( 3.3 % ) Berbutir ((10%)x25) (Ton) Berbutir (Ton) (Ton)
pbx0.3/100) (Kg)
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
218 5+425 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
219 5+450 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
220 5+475 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
221 5+500 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
222 5+525 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
223 5+550 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
224 5+575 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
225 5+600 Kr/Kn 7.000 0.060
JUMLAH 294.000 M3 674.730 Ton 584.991 67.473 22.266 66.798
TOTAL JUMLAH 2,352.000 M3 5,397.840 Ton 4,679.927 539.784 178.129 534.386

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

225 5+600 Kr/Kn 7.000 0.060


25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
226 5+625 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
227 5+650 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
228 5+675 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
229 5+700 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
230 5+725 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
231 5+750 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
232 5+775 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
233 5+800 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
234 5+825 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
235 5+850 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
236 5+875 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
237 5+900 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
238 5+925 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
239 5+950 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
240 5+975 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
241 6+000 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
242 6+025 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
243 6+050 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
KONTRAKTOR 0
KONSULTAN CV. Multi Pratama
DIVISI PERKERASAN : 6. PERKERASAN ASPAL
DISKRIPSI PEKERJAAN : 1. CBA.AsbLawele Lapis Pondasi ( AC-BC AsbLawele ) NO. ITEM PEMBAYARAN : 1. SKh= 5 6.3.1 (2a)
2. Aspal Keras 2. SKh= 5 6.3.1 (4)
3. Asbuton Lawele Butir 3. SKh= 5 6.3.1 (5) MC NO. :0
4. Bahan Anti Pengelupasan 4. SKh= 5 6.3.1 (6) LEMBAR :1

Rumus Pembayaran Volume


Berat Jenis Aspal
Lebar Rata2 Tebal Rata- Volume Volume
NO STA L/R Panjang (m') Lebar (m') Luas (m2) Tebal (m') Gabungan Bahan Anti Bahan Anti Keterangan
(m') rata (m') (m3) (Ton) CBA LAWELE ASPAL KERAS Asbuton Lawele AC-BC Asbuton Lawele Aspal Keras
(Ton/M3) Pengelupasan (fol.x Pengelupasan
(100-5.8)% ( 3.3 % ) Berbutir ((10%)x25) (Ton) Berbutir (Ton) (Ton)
pbx0.3/100) (Kg)
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
244 6+075 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
245 6+100 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
246 6+125 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
247 6+150 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
248 6+175 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
249 6+200 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
250 6+225 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
251 6+250 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
252 6+275 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
253 6+300 Kr/Kn 7.000 0.060
JUMLAH 294.000 M3 674.730 Ton 584.991 67.473 22.266 66.798
TOTAL JUMLAH 2,646.000 M3 6,072.570 Ton 5,264.918 607.257 200.395 601.184

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

253 6+300 Kr/Kn 7.000 0.060


25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
254 6+325 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
255 6+350 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
256 6+375 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
257 6+400 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
258 6+425 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
259 6+450 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
260 6+475 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
261 6+500 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
262 6+525 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
263 6+550 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
264 6+575 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
265 6+600 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
266 6+625 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
267 6+650 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
268 6+675 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
269 6+700 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
KONTRAKTOR 0
KONSULTAN CV. Multi Pratama
DIVISI PERKERASAN : 6. PERKERASAN ASPAL
DISKRIPSI PEKERJAAN : 1. CBA.AsbLawele Lapis Pondasi ( AC-BC AsbLawele ) NO. ITEM PEMBAYARAN : 1. SKh= 5 6.3.1 (2a)
2. Aspal Keras 2. SKh= 5 6.3.1 (4)
3. Asbuton Lawele Butir 3. SKh= 5 6.3.1 (5) MC NO. :0
4. Bahan Anti Pengelupasan 4. SKh= 5 6.3.1 (6) LEMBAR :1

Rumus Pembayaran Volume


Berat Jenis Aspal
Lebar Rata2 Tebal Rata- Volume Volume
NO STA L/R Panjang (m') Lebar (m') Luas (m2) Tebal (m') Gabungan Bahan Anti Bahan Anti Keterangan
(m') rata (m') (m3) (Ton) CBA LAWELE ASPAL KERAS Asbuton Lawele AC-BC Asbuton Lawele Aspal Keras
(Ton/M3) Pengelupasan (fol.x Pengelupasan
(100-5.8)% ( 3.3 % ) Berbutir ((10%)x25) (Ton) Berbutir (Ton) (Ton)
pbx0.3/100) (Kg)
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
270 6+725 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
271 6+750 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
272 6+775 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
273 6+800 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
274 6+825 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
275 6+850 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
276 6+875 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
277 6+900 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
278 6+925 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
279 6+950 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
280 6+975 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
281 7+000 Kr/Kn 7.000 0.060
JUMLAH 294.000 M3 674.730 Ton 584.991 67.473 22.266 66.798
TOTAL JUMLAH 2,940.000 M3 6,747.300 Ton 5,849.909 674.730 222.661 667.983

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

281 7+000 Kr/Kn 7.000 0.060


25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
282 7+025 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
283 7+050 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
284 7+075 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
285 7+100 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
286 7+125 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
287 7+150 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
288 7+175 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
289 7+200 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
290 7+225 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
291 7+250 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
292 7+275 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
293 7+300 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
294 7+325 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
295 7+350 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
KONTRAKTOR 0
KONSULTAN CV. Multi Pratama
DIVISI PERKERASAN : 6. PERKERASAN ASPAL
DISKRIPSI PEKERJAAN : 1. CBA.AsbLawele Lapis Pondasi ( AC-BC AsbLawele ) NO. ITEM PEMBAYARAN : 1. SKh= 5 6.3.1 (2a)
2. Aspal Keras 2. SKh= 5 6.3.1 (4)
3. Asbuton Lawele Butir 3. SKh= 5 6.3.1 (5) MC NO. :0
4. Bahan Anti Pengelupasan 4. SKh= 5 6.3.1 (6) LEMBAR :1

Rumus Pembayaran Volume


Berat Jenis Aspal
Lebar Rata2 Tebal Rata- Volume Volume
NO STA L/R Panjang (m') Lebar (m') Luas (m2) Tebal (m') Gabungan Bahan Anti Bahan Anti Keterangan
(m') rata (m') (m3) (Ton) CBA LAWELE ASPAL KERAS Asbuton Lawele AC-BC Asbuton Lawele Aspal Keras
(Ton/M3) Pengelupasan (fol.x Pengelupasan
(100-5.8)% ( 3.3 % ) Berbutir ((10%)x25) (Ton) Berbutir (Ton) (Ton)
pbx0.3/100) (Kg)
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
296 7+375 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
297 7+400 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
298 7+425 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
299 7+450 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
300 7+475 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
301 7+500 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
302 7+525 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
303 7+550 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
304 7+575 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
305 7+600 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
306 7+625 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
307 7+650 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
308 7+675 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
309 7+700 Kr/Kn 7.000 0.060
JUMLAH 294.000 M3 674.730 Ton 584.991 67.473 22.266 66.798
TOTAL JUMLAH 3,234.000 M3 7,422.030 Ton 6,434.900 742.203 244.927 734.781

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

309 7+700 Kr/Kn 7.000 0.060


25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
310 7+725 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
311 7+750 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
312 7+775 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
313 7+800 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
314 7+825 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
315 7+850 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
316 7+875 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
317 7+900 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
318 7+925 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
319 7+950 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
320 7+975 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
321 8+000 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
KONTRAKTOR 0
KONSULTAN CV. Multi Pratama
DIVISI PERKERASAN : 6. PERKERASAN ASPAL
DISKRIPSI PEKERJAAN : 1. CBA.AsbLawele Lapis Pondasi ( AC-BC AsbLawele ) NO. ITEM PEMBAYARAN : 1. SKh= 5 6.3.1 (2a)
2. Aspal Keras 2. SKh= 5 6.3.1 (4)
3. Asbuton Lawele Butir 3. SKh= 5 6.3.1 (5) MC NO. :0
4. Bahan Anti Pengelupasan 4. SKh= 5 6.3.1 (6) LEMBAR :1

Rumus Pembayaran Volume


Berat Jenis Aspal
Lebar Rata2 Tebal Rata- Volume Volume
NO STA L/R Panjang (m') Lebar (m') Luas (m2) Tebal (m') Gabungan Bahan Anti Bahan Anti Keterangan
(m') rata (m') (m3) (Ton) CBA LAWELE ASPAL KERAS Asbuton Lawele AC-BC Asbuton Lawele Aspal Keras
(Ton/M3) Pengelupasan (fol.x Pengelupasan
(100-5.8)% ( 3.3 % ) Berbutir ((10%)x25) (Ton) Berbutir (Ton) (Ton)
pbx0.3/100) (Kg)
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
322 8+025 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
323 8+050 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
324 8+075 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
325 8+100 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
326 8+125 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
327 8+150 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
328 8+175 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
329 8+200 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
330 8+225 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
331 8+250 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
332 8+275 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
333 8+300 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
334 8+325 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
335 8+350 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
336 8+375 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
337 8+400 Kr/Kn 7.000 0.060
JUMLAH 294.000 M3 674.730 Ton 584.991 67.473 22.266 66.798
TOTAL JUMLAH 3,528.000 M3 8,096.760 Ton 7,019.891 809.676 267.193 801.579

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

337 8+400 Kr/Kn 7.000 0.060


25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
338 8+425 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
339 8+450 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
340 8+475 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
341 8+500 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
342 8+525 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
343 8+550 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
344 8+575 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
345 8+600 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
346 8+625 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
347 8+650 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
KONTRAKTOR 0
KONSULTAN CV. Multi Pratama
DIVISI PERKERASAN : 6. PERKERASAN ASPAL
DISKRIPSI PEKERJAAN : 1. CBA.AsbLawele Lapis Pondasi ( AC-BC AsbLawele ) NO. ITEM PEMBAYARAN : 1. SKh= 5 6.3.1 (2a)
2. Aspal Keras 2. SKh= 5 6.3.1 (4)
3. Asbuton Lawele Butir 3. SKh= 5 6.3.1 (5) MC NO. :0
4. Bahan Anti Pengelupasan 4. SKh= 5 6.3.1 (6) LEMBAR :1

Rumus Pembayaran Volume


Berat Jenis Aspal
Lebar Rata2 Tebal Rata- Volume Volume
NO STA L/R Panjang (m') Lebar (m') Luas (m2) Tebal (m') Gabungan Bahan Anti Bahan Anti Keterangan
(m') rata (m') (m3) (Ton) CBA LAWELE ASPAL KERAS Asbuton Lawele AC-BC Asbuton Lawele Aspal Keras
(Ton/M3) Pengelupasan (fol.x Pengelupasan
(100-5.8)% ( 3.3 % ) Berbutir ((10%)x25) (Ton) Berbutir (Ton) (Ton)
pbx0.3/100) (Kg)
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
348 8+675 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
349 8+700 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
350 8+725 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
351 8+750 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
352 8+775 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
353 8+800 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
354 8+825 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
355 8+850 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
356 8+875 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
357 8+900 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
358 8+925 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
359 8+950 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
360 8+975 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
361 9+000 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
362 9+025 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
363 9+050 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
364 9+075 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
365 9+100 Kr/Kn 7.000 0.060
JUMLAH 294.000 M3 674.730 Ton 584.991 67.473 22.266 66.798
TOTAL JUMLAH 3,822.000 M3 8,771.490 Ton 7,604.882 877.149 289.459 868.378

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer

365 9+100 Kr/Kn 7.000 0.060


25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
366 9+125 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
367 9+150 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
368 9+175 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
369 9+200 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
370 9+225 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
371 9+250 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
372 9+275 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
373 9+300 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
KONTRAKTOR 0
KONSULTAN CV. Multi Pratama
DIVISI PERKERASAN : 6. PERKERASAN ASPAL
DISKRIPSI PEKERJAAN : 1. CBA.AsbLawele Lapis Pondasi ( AC-BC AsbLawele ) NO. ITEM PEMBAYARAN : 1. SKh= 5 6.3.1 (2a)
2. Aspal Keras 2. SKh= 5 6.3.1 (4)
3. Asbuton Lawele Butir 3. SKh= 5 6.3.1 (5) MC NO. :0
4. Bahan Anti Pengelupasan 4. SKh= 5 6.3.1 (6) LEMBAR :1

Rumus Pembayaran Volume


Berat Jenis Aspal
Lebar Rata2 Tebal Rata- Volume Volume
NO STA L/R Panjang (m') Lebar (m') Luas (m2) Tebal (m') Gabungan Bahan Anti Bahan Anti Keterangan
(m') rata (m') (m3) (Ton) CBA LAWELE ASPAL KERAS Asbuton Lawele AC-BC Asbuton Lawele Aspal Keras
(Ton/M3) Pengelupasan (fol.x Pengelupasan
(100-5.8)% ( 3.3 % ) Berbutir ((10%)x25) (Ton) Berbutir (Ton) (Ton)
pbx0.3/100) (Kg)
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
374 9+325 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
375 9+350 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
376 9+375 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
377 9+400 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
378 9+425 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
379 9+450 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
380 9+475 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
381 9+500 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
382 9+525 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
383 9+550 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
384 9+575 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
385 9+600 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
386 9+625 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
387 9+650 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
388 9+675 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
389 9+700 Kr/Kn 7.000 0.060
25.000 7.000 175.000 0.060 10.500 2.295 24.098 0.8670 0.0330 0.1000 0.0990 20.893 2.410 0.795 2.386
390 9+725 Kr/Kn 7.000 0.060
0.0990 - - - -
0.0990 - - - -
0.0990 - - - -

JUMLAH 262.500 M3 602.438 Ton 522.313 60.244 19.880 59.641


TOTAL JUMLAH 4,084.500 M3 9,373.928 Ton 8,127.195 937.393 309.340 928.019

Direksi PU Konsultan
Bina Marga CV. Multi Pratama

……………………, ST Haerullah, ST
Nip…………………………… Highway Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

Pekerjaan : Beton Mutu Sedang, fc'20 Mpa atau K-250 (Plat Lantai)
Mata Pembayaran : 7.1.7
Satuan : M3
Kontraktor 0
Konsultan CV. Multi Pratama

SKET BETON K- 250

Bant alan Plat

DEMENSI Luas Panjang Volume


No STA Kr/Kn Ket
W1 H1 bh M2 M M3

1 1+000 kr/kn 1.400 0.200 1.00 0.280 10.00 2.800 Plat Lantai
kr/kn 0.200 0.400 2.00 0.080 10.00 1.600 Bantalan
kr/kn 0.200 0.200 2.00 0.040 10.00 0.800 Bantalan
5.200

2 2+000 kr/kn 1.400 0.200 1.00 0.280 10.00 2.800 Plat Lantai
kr/kn 0.200 0.400 2.00 0.080 10.00 1.600 Bantalan
kr/kn 0.200 0.200 2.00 0.040 10.00 0.800 Bantalan
5.200

3 3+000 kr/kn 1.400 0.200 1.00 0.280 10.00 2.800 Plat Lantai
kr/kn 0.200 0.400 2.00 0.080 10.00 1.600 Bantalan
kr/kn 0.200 0.200 2.00 0.040 10.00 0.800 Bantalan
5.200

4 4+000 kr/kn 1.400 0.200 1.00 0.280 10.00 2.800 Plat Lantai
kr/kn 0.200 0.400 2.00 0.080 10.00 1.600 Bantalan
kr/kn 0.200 0.200 2.00 0.040 10.00 0.800 Bantalan
5.200

Sub total 10.400


Total 10.400

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

Pekerjaan : Beton Mutu Sedang, fc'20 Mpa atau K-250 (Plat Lantai)
Mata Pembayaran : 7.1.7
Satuan : M3
Kontraktor 0
Konsultan CV. Multi Pratama

SKET BETON K- 250

Bant alan Plat

DEMENSI Luas Panjang Volume


No STA Kr/Kn Ket
W1 H1 bh M2 M M3

Sub total 0.000


Total 10.400

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME

POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

Pekerjaan : Baja tulangan U24 polos


Mata Pembayaran : 7.3.2
Satuan : Kg `
Kontraktor 0
Konsultan CV. Multi Pratama

A1 A2 B1
B2 A3

C1

jarak Culvert
Buildings Conc. Spaceier Conc. Spaceier Lebar Plat Panjang Plat H1 W1 tebal Wide Ø Dia Panjang (m) Roundup Total Panjang Unit
pembesian
Pcs Pcs Pcs Weight
No. Type (m) (m) Diagram
STA (m) (m) (m) (m) (m) (m) (m) (mm) Total (m) Pcs (m) kg/m kg
a b c d e
1+000 A1 (1 sisi) A2(2 Sisi)= A1 x 2 B C = B +(40*d/1000) D E F G H = F+(2*G) J K = sum(a:e) L1 = ((C-A1,A2)/D+1)*i L2 = ((H-A1,A2)/D+1)*I L3 = ((E)/D+1)*I M=Roundup(L3;0) N=KxM O = ((J) )/36*0,222
2
P=NxO

A. Duiker Plat
1 Plat Lantai A1 0.03 0.06 10.00 1.40 0.150 1.00 1.00 0.20 1.40 16 1.340 0.140 1.340 0.140 0.160 3.120 67.27 68 212.16 1.579
(tulangan pokok)

2 Plat Lantai A2 0.03 0.06 10.00 1.40 0.15 1.00 1.00 0.20 1.40 12 9.940 0.120 10.060 9.93 10 100.60 0.888 89.333
(tulangan BAGI)
A3 0.03 0.06 10.00 1.40 0.15 1.00 1.00 0.20 1.40 12 0.140 9.940 0.140 0.120 10.340 9.93 10 103.40 0.888 91.819

3 Bantalan B1 0.03 0.06 10.00 1.40 0.15 1.00 0.20 0.40 1.40 12 0.680 0.280 0.680 0.120 1.760 67.27 67.27 135 237.60 0.888 210.989
(behel)

4 Bantalan B2 0.03 0.06 10.00 1.40 0.15 1.00 1.00 0.20 1.40 16 9.940 0.160 10.100 8.00 8.00 16 161.60 1.579
(tulangan pokok)

4 Angker C1 0.03 0.06 10.00 1.40 0.15 1.00 1.00 0.20 1.40 12 0.500 0.120 0.620 67.27 67.27 135 83.70 0.888 74.326

Sub Total 466.466


Total 466.466

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME

POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)

Pekerjaan : Baja tulangan U24 polos


Mata Pembayaran : 7.3.2
Satuan : Kg `
Kontraktor 0
Konsultan CV. Multi Pratama

A1 A2 B1
B2 A3

C1

jarak Culvert
Buildings Conc. Spaceier Conc. Spaceier Lebar Plat Panjang Plat pembesian H1 W1 tebal Wide Ø Dia Panjang (m) Roundup Total Panjang Unit
Pcs Pcs Pcs Weight
No. Type (m) (m) Diagram
STA (m) (m) (m) (m) (m) (m) (m) (mm) Total (m) Pcs (m) kg/m kg
a b c d e
2+000 A1 (1 sisi) A2(2 Sisi)= A1 x 2 B C = B +(40*d/1000) D E F G H = F+(2*G) J K = sum(a:e) L1 = ((C-A1,A2)/D+1)*i L2 = ((H-A1,A2)/D+1)*I L3 = ((E)/D+1)*I M=Roundup(L3;0) N=KxM O = ((J) )/36*0,222
2
P=NxO

B. Duiker Plat
1 Plat Lantai A1 0.03 0.06 10.00 1.40 0.150 1.00 1.00 0.20 1.40 16 1.340 0.140 1.340 0.140 0.160 3.120 67.27 68 212.16 1.579
(tulangan pokok)

2 Plat Lantai A2 0.03 0.06 10.00 1.40 0.15 1.00 1.00 0.20 1.40 12 9.940 0.120 10.060 9.93 10 100.60 0.888 89.333
(tulangan BAGI)
A3 0.03 0.06 10.00 1.40 0.15 1.00 1.00 0.20 1.40 12 0.140 9.940 0.140 0.120 10.340 9.93 10 103.40 0.888 91.819

3 Bantalan B1 0.03 0.06 10.00 1.40 0.15 1.00 0.20 0.40 1.40 12 0.680 0.280 0.680 0.120 1.760 67.27 67.27 135 237.60 0.888 210.989
(behel)

4 Bantalan B2 0.03 0.06 10.00 1.40 0.15 1.00 1.00 0.20 1.40 16 9.940 0.160 10.100 8.00 8.00 16 161.60 1.579
(tulangan pokok)

4 Angker C1 0.03 0.06 10.00 1.40 0.15 1.00 1.00 0.20 1.40 12 0.500 0.120 0.620 67.27 67.27 135 83.70 0.888 74.326

Sub Total 466.466


Total 932.933

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI QUANTITY

PALANGGA-BAITO

Pekerjaan : Baja tulangan U24 polos


Mata Pembayaran : 7.3.2
Satuan : Kg `
Kontraktor : PT. Win Wahan Cipta Marga
Konsultan : CV. Multi Pratama

A1 A2 B1
B2 A3

C1

jarak Culvert
Buildings Conc. Spaceier Conc. Spaceier Lebar Plat Panjang Plat H1 W1 tebal Wide Ø Dia Panjang (m) Roundup Total Panjang Unit
pembesian
Pcs Pcs Pcs Weight
No. Type (m) (m) Diagram
STA (m) (m) (m) (m) (m) (m) (m) (mm) Total (m) Pcs (m) kg/m kg
a b c d e
1+000 A1 (1 sisi) A2(2 Sisi)= A1 x 2 B C = B +(40*d/1000) D E F G H = F+(2*G) J K = sum(a:e) L1 = ((C-A1,A2)/D+1)*i L2 = ((H-A1,A2)/D+1)*I L3 = ((E)/D+1)*I M=Roundup(L3;0) N=KxM O = ((J) )/36*0,222
2
P=NxO

A. Duiker Plat
1 Plat Lantai A1 0.03 0.06 9.00 1.40 0.150 1.00 1.00 0.20 1.40 16 1.340 0.140 1.340 0.140 0.160 3.120 60.60 61 190.32 1.579 300.452
(tulangan pokok)

2 Plat Lantai A2 0.03 0.06 9.00 1.40 0.15 1.00 1.00 0.20 1.40 12 8.940 0.120 9.060 9.93 10 90.60 0.888
(tulangan BAGI)
A3 0.03 0.06 9.00 1.40 0.15 1.00 1.00 0.20 1.40 12 0.140 8.940 0.140 0.120 9.340 9.93 10 93.40 0.888

3 Bantalan B1 0.03 0.06 9.00 1.40 0.15 1.00 0.20 0.40 1.40 12 0.680 0.280 0.680 0.120 1.760 60.60 60.60 122 214.72 0.888
(behel)

4 Bantalan B2 0.03 0.06 9.00 1.40 0.15 1.00 1.00 0.20 1.40 16 8.940 0.160 9.100 8.00 8.00 16 145.60 1.579 229.854
(tulangan pokok)

4 Angker C1 0.03 0.06 9.00 1.40 0.15 1.00 1.00 0.20 1.40 12 0.500 0.120 0.620 60.60 60.60 122 75.64 0.888

Sub Total 530.306


Total 530.306

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI QUANTITY

PALANGGA-BAITO

Pekerjaan : Baja tulangan U24 polos


Mata Pembayaran : 7.3.2
Satuan : Kg `
Kontraktor : PT. Win Wahan Cipta Marga
Konsultan : CV. Multi Pratama

A1 A2 B1
B2 A3

C1

Lebar Plat Panjang Plat jarak Culvert


No. Buildings Type Conc. Spaceier Conc. Spaceier
(m) (m) pembesian H1 W1 tebal Wide Ø Dia Diagram Panjang (m) Pcs Pcs Pcs Roundup Total Panjang Unit
Weight
STA (m) (m) (m) (m) (m) (m) (m) (mm) a b c d e Total (m) Pcs (m) kg/m kg
2+000 A1 (1 sisi) A2(2 Sisi)= A1 x 2 B C = B +(40*d/1000) D E F G H = F+(2*G) J K = sum(a:e) L1 = ((C-A1,A2)/D+1)*i L2 = ((H-A1,A2)/D+1)*I L3 = ((E)/D+1)*I M=Roundup(L3;0) N=KxM O = ((J) )/36*0,222
2
P=NxO

B. Duiker
Plat
1 Plat Lantai A1 0.03 0.06 9.00 1.40 0.150 1.00 1.00 0.20 1.40 16 1.340 0.140 1.340 0.140 0.160 3.120 60.60 61 190.32 1.579 300.452
(tulangan pokok)

2 Plat Lantai A2 0.03 0.06 9.00 1.40 0.15 1.00 1.00 0.20 1.40 12 8.940 0.120 9.060 9.93 10 90.60 0.888
(tulangan BAGI)
A3 0.03 0.06 9.00 1.40 0.15 1.00 1.00 0.20 1.40 12 0.140 8.940 0.140 0.120 9.340 9.93 10 93.40 0.888

3 Bantalan B1 0.03 0.06 9.00 1.40 0.15 1.00 0.20 0.40 1.40 12 0.680 0.280 0.680 0.120 1.760 60.60 60.60 122 214.72 0.888
(behel)

4 Bantalan B2 0.03 0.06 9.00 1.40 0.15 1.00 1.00 0.20 1.40 16 8.940 0.160 9.100 8.00 8.00 16 145.60 1.579 229.854
(tulangan pokok)

4 Angker C1 0.03 0.06 9.00 1.40 0.15 1.00 1.00 0.20 1.40 12 0.500 0.120 0.620 60.60 60.60 122 75.64 0.888

Sub Total 530.306


Total 1,060.611

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Pasangan Batu
Mata Pembayaran : 7:9
Satuan : M3
Kontraktor
Konsultan CV. Multi Pratama

Sket: Psg. Batu 0.5 Lening 0.5 0.3

0.4
0.6 Lening 1
0.80
0.2
0.3
0.6 0.6
0.1
0.2 Sayap Deker

0.1 1.0 1.0 1.0

DIMENSI ( m ) Luas L.Rata2 Panjang Volume


No STA kr/kn Keterangan
W1 W2 W3 H1 H2 M2 M2 M M3

1 1+000 kr/kn 0.500 0.800 1.000 0.800 0.600 1.120 1.120 10.00 11.200 dinding 1

0.500 0.800 1.000 0.800 0.600 1.120 1.120 10.00 11.200 dinding 2

kr/kn 1.000 0.300 0.300 0.300 10.00 3.000 lantai

kr/kn 0.500 0.400 0.200 0.200 2.00 0.400 lening kiri

kr/kn 0.500 0.400 0.200 0.200 2.00 0.400 lening kanan

26.200

2 2+000 kr/kn 0.500 0.800 1.000 0.800 0.600 1.120 1.120 10.00 11.200 dinding 1

0.500 0.800 1.000 0.800 0.600 1.120 1.120 10.00 11.200 dinding 2

kr/kn 1.000 0.300 0.300 0.300 10.00 3.000 lantai

kr/kn 0.500 0.400 0.200 0.200 2.00 0.400 lening kiri

kr/kn 0.500 0.400 0.200 0.200 2.00 0.400 lening kanan

26.200

3 3+000 kr/kn 0.500 0.800 1.000 0.800 0.600 1.120 1.120 10.00 11.200 dinding 1

0.500 0.800 1.000 0.800 0.600 1.120 1.120 10.00 11.200 dinding 2

kr/kn 1.000 0.300 0.300 0.300 10.00 3.000 lantai

kr/kn 0.500 0.400 0.200 0.200 2.00 0.400 lening kiri

kr/kn 0.500 0.400 0.200 0.200 2.00 0.400 lening kanan

26.200

Sub total 146.000


Total 146.000

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Pasangan Batu
Mata Pembayaran : 7:9
Satuan : M3
Kontraktor
Konsultan CV. Multi Pratama

Sket: Psg. Batu 0.5 Lening 0.5 0.3

0.4
0.6 Lening 1
0.80
0.2
0.3
0.6 0.6
0.1
0.2 Sayap Deker

0.1 1.0 1.0 1.0

DIMENSI ( m ) Luas L.Rata2 Panjang Volume


No STA kr/kn Keterangan
W1 W2 W3 H1 H2 M2 M2 M M3

4 4+000 kr/kn 0.500 0.800 1.000 0.800 0.600 1.120 1.120 10.00 11.200 dinding 1

0.500 0.800 1.000 0.800 0.600 1.120 1.120 10.00 11.200 dinding 2

kr/kn 1.000 0.300 0.300 0.300 10.00 3.000 lantai

kr/kn 0.500 0.400 0.200 0.200 2.00 0.400 lening kiri

kr/kn 0.500 0.400 0.200 0.200 2.00 0.400 lening kanan

26.200

Sub total 0.400


Total 146.400

Direksi PU Konsultan Kontraktor


Bina Marga CV. Multi Pratama 0

……………………, ST Haerullah, ST ……………………..., ST


Nip…………………………… Highway Engineer Quantity Engineer
ESTIMASI VOLUME
POLI POLIA - BTS.KOLAKA/BTS.KOLTIM (2020)
Pekerjaan : Marka Jalan Termoplastik
Mata Pembayaran : 8.4.1
Satuan : m2
Kontraktor 0
Konsultan CV. Multi Pratama

0.12
0.12
3.00 5.00 3.00 5.00 3.00 5.00 3.00 5.00 3.00

0.12
Panjang Marka Jalan Total Lebar
No Sta. To Sta. Jarak
solid CL. (Type-RM-A) Kn (Type-RM-C) (m) (m)

1 0+000 ~ 0+250 250 250 94 250 593.75 0.12

2 0+250 ~ 0+425 175 175 175 175 525.00 0.12

3 0+425 ~ 0+550 125 125 47 125 296.88 0.12

4 0+550 ~ 0+950 400 400 400 400 1200.00 0.12

5 0+950 ~ 1+400 450 450 169 450 1068.75 0.12

6 1+400 ~ 1+475 75 75 75 75 225.00 0.12

7 1+475 ~ 1+550 75 75 28 75 178.13 0.12

8 1+550 ~ 1+675 125 125 125 125 375.00 0.12

9 1+675 ~ 1+875 200 200 75 200 475.00 0.12

10 1+875 ~ 1+950 75 75 75 75 225.00 0.12

11 1+950 ~ 2+175 225 225 84 225 534.38 0.12

12 2+175 ~ 2+250 75 75 75 75 225.00 0.12

13 2+250 ~ 2+450 200 200 75 200 475.00 0.12

14 2+450 ~ 2+525 75 75 75 75 225.00 0.12

15 2+525 ~ 2+675 150 150 56 150 356.25 0.12

16 2+675 ~ 2+900 225 225 225 225 675.00 0.12


17 2+900 ~ 3+100 200 200 75 200 475.00 0.12

18 3+100 ~ 3+275 175 175 175 175 525.00 0.12

19 3+275 ~ 3+375 100 100 38 100 237.50 0.12

20 3+375 ~ 3+500 125 125 125 125 375.00 0.12

3500.00 2265.63 3500.00 Sub total


3500.00 3500.00 Total

Direksi PU Konsultan Supervisi Kontraktor P

Koordinator Lapangan Chief Inspector / QE

21 3+500 ~ 3+725 225 225 84 225 534.38 0.12

22 3+725 ~ 3+900 175 175 175 175 525.00 0.12

23 3+900 ~ 4+075 175 175 66 175 415.63 0.12

24 4+075 ~ 4+175 100 100 100 100 300.00 0.12

25 4+175 ~ 4+250 75 75 28 75 178.13 0.12

26 4+250 ~ 4+325 75 75 75 75 225.00 0.12

27 4+325 ~ 4+375 50 50 19 50 118.75 0.12

28 4+375 ~ 4+525 150 150 150 150 450.00 0.12

29 4+525 ~ 4+625 100 100 38 100 237.50 0.12

30 4+625 ~ 5+050 425 425 425 425 1275.00 0.12

31 5+050 ~ 5100 50 50 19 50 118.75 0.12

32 5+100 ~ 5+150 50 50 50 50 150.00 0.12

33 5+150 ~ 5+225 75 75 28 75 178.13 0.12

34 5+225 ~ 5+300 75 75 75 75 225.00 0.12

35 5+300 ~ 5+350 50 50 19 50 118.75 0.12

36 5+350 ~ 5+800 450 450 450 450 1350.00 0.12

37 5+800 ~ 5+850 50 50 19 50 118.75 0.12


38 5+850 ~ 6+075 225 225 225 225 675.00 0.12

39 6+075 ~ 6+275 200 200 75 200 475.00 0.12

40 6+275 ~ 6+375 100 100 100 100 300.00 0.12

2875.00 2875.00 Sub total


2875.00 2875.00 Total

Direksi PU Konsultan Supervisi Kontraktor P


0 0

0 0
Koordinator Lapangan Chief Inspector / QE

41 6+375 ~ 6+425 50 50 19 50 118.75 0.12

42 6+425 ~ 6+575 150 150 150 150 450.00 0.12

43 6+575 ~ 6+700 125 125 47 125 296.88 0.12

44 6+700 ~ 6+800 100 100 100 100 300.00 0.12

45 6+800 ~ 7+150 350 350 131 350 831.25 0.12

46 7+150 ~ 7+225 75 75 75 75 225.00 0.12

47 7+225 ~ 7+325 100 100 38 100 237.50 0.12

48 7+325 ~ 7+550 225 225 225 225 675.00 0.12

49 7+550 ~ 7+600 50 50 19 50 118.75 0.12

50 7+600 ~ 7+675 75 75 75 75 225.00 0.12

51 7+675 ~ 7+850 175 175 66 175 415.63 0.12

52 7+850 ~ 8+050 200 200 200 200 600.00 0.12

53 8+050 ~ 8+150 100 100 38 100 237.50 0.12

54 8+150 ~ 8+200 50 50 50 50 150.00 0.12

55 8+200 ~ 8+300 100 100 38 100 237.50 0.12

56 8+300 ~ 8+350 50 50 50 50 150.00 0.12

57 8+350 ~ 8+425 75 75 28 75 178.13 0.12

58 8+425 ~ 9+200 775 775 775 775 2325.00 0.12


59 9+200 ~ 9+625 425 425 159 425 1009.38 0.12

60 9+625 ~ 9+725 100 100 100 100 300.00 0.12

3350.00 3350.00 Sub total


3350.00 3350.00 Total

Direksi PU Konsultan Supervisi Kontraktor P


0 0

0 0
Koordinator Lapangan Chief Inspector / QE
0.12
0.12

3.00

0.3 0.3
0.12

1 2.5 1

0.3
Volume

STOP
Keterangan
( m2 ) 0.3

0.3

71.250 0.375
0.3

63.000 solid 1.000 0.3

0.3
35.625 0.375
0.3

144.000 solid 1.000

128.250 0.375

27.000 solid 1.000

21.375 0.375

45.000 solid 1.000

57.000 0.375

27.000 solid 1.000

64.125 0.375

27.000 solid 1.000

57.000 0.375

27.000 solid 1.000

42.750 0.375

81.000 solid 1.000


57.000 0.375

63.000 solid 1.000

28.500 0.375

45.000 solid 1.000

1,111.875
1,111.875

Kontraktor Pelaksana

4650
13950
1674
Site Manager

64.125 0.375

63.000 solid 1.000

49.875 0.375

36.000 solid 1.000

21.375 0.375

27.000 solid 1.000

14.250 0.375

54.000 solid 1.000

28.500 0.375

153.000 solid 1.000

14.250 0.375

18.000 solid 1.000

21.375 0.375

27.000 solid 1.000

14.250 0.375

162.000 solid 1.000

14.250 0.375
81.000 solid 1.000

57.000 0.375

36.000 solid 1.000

956.250
2,068.125

Kontraktor Pelaksana
0

0
Site Manager

14.250 0.375

54.000 solid 1.000

35.625 0.375

36.000 solid 1.000

99.750 0.375

27.000 solid 1.000

28.500 0.375

81.000 solid 1.000

14.250 0.375

27.000 solid 1.000

49.875 0.375

72.000 solid 1.000

28.500 0.375

18.000 solid 1.000

28.500 0.375

18.000 solid 1.000

21.375 0.375

279.000 solid 1.000


121.125 0.375

36.000 solid 1.000

1,089.750
3,157.875

Kontraktor Pelaksana
0

0
Site Manager
0.3 0.3
1 2.5 1

0.3

0.3

0.3

0.3
STOP

0.3

0.3

0.3

You might also like