CMR 2020

You might also like

Download as pdf
Download as pdf
You are on page 1of 5
PPRO-FORMA PROPONENT COMPLIANCE MONITORING REPORT (CMR): Semi-annual Module Sot sur “NNEXS-1 Venice Corporate Center Building PROPONENT'S NAME MONITORING PERIOD COVERED: January 2020 to June 2020 |. BASIC PROJECT INFORMATION AND UPDATES ECC Control No/REFERENCE Code No: ECC-NCR0809-0047 Project Tile: _ SCIENCE At OGY PLAZA PROJECT (VEN! RATE CENTER) Project Type:__ OFFICE BUILDING Location: _~8 Turin St. Mckinley Town Center, Pinagsama, Taguig City Project Coordinates: — 145329", 12.0521 & Project Stage/Phase:(e constuction conmesionng et) Contact Person: Marion D. Padullo/ Managing Head EMP Approval: il During ECC Applicaton Stage Updated after ECC Issuance; approved on ‘Changes in Project Design (if any): __N/A Operational EXECUTIVE SUMMARY ‘This section should include a summary ofthe major fndings forthe monitoring period. Fo ‘no major activites that influenced the monitoring parameters during the monitoring period can be made if there wer ‘activites by the proponent that affected the monitored parameters. Table il-1. Summary of Major Findings for the Monitoring Period omplanes Sus & | RecommendatoniConmiine Condom Comminant | suerte tn _| “arn conpincs wth Eco Sem ana stomssons of | Proper nanong of ECC I ‘apat conten [=eeowner Upsle of EMP wears Proper nena oT ENE apple te poet | ieionarinin af aprepias Ease an/alinpaa’ | Appronrate and efecwe | Papa nanibng eae ‘aed atosin aa erngoncrs enveonmena mee conden fonodal eden wee inglonarsd Campi Vaagera Tisconpans Racaved | Taman cin | Raion cot ule corr to inane ovr indidetin be vr mers moniorng and au acne severe oc ensoonant on ‘curb - anid peonnl re cargodwih be | APCO ie appanad ioe | Indued sch mosis iho tounenortengtteposcaciviesntemect "| moving te proce!” | TOR orsope ote coectr votes - La Il, RESULTS AND DISCUSSIONS ‘A. Compliance Monitoring Testa ofcompanc tothe ECC condones ante tira =f EMP commitments shouldbe dabrtein he etn 's for noncompliance or unmet commitment should be explained and solutions and measures fo attain full compliance of EGC tems and conto as wel 2s satacior atnment of EMP commitments shoud be iscussed as renewed eft fr the next monitoring period, Table 1 may be used to summarize the status of compliance, ble 1. Summary Status of ECC & EMP Complian: Relevant ECC Condon fay) Sitio compianes | —geyanxs a Lesson oe {vi complying) | ~ The EOC covers the Science and Technology | on Pura Proetwineto rd wea 9024442 — jek eit are mrad ate Fo | ea) «| Bbc Tega - t Ho obr Atrios seb wan oe | Senate cpa nt EW PO Rpt a | oe | Should hers any permed expansion ofthe | eee a project beyend the projet dasrpton inthe E | Site Gooner ey pone angen Propet con ema cceaustire Coomera | | ANNEX 34 ist ba ade pir impli any project expansion msifaton ‘The projects a4 ower oc baling peee wth ‘262perkng sot and 224 bide ses at rund er, caren ofr tower to hae 8 oes ‘oor ara of 3, 781. 7sqm, An wil Rave 2 ~ 10 storey ofc space for 5 itl faze 170 pking sts and sits at basement with (05s or area 5809s: noice etal at — oil || orenrnaeecnacens coms Sahn |emeRiimnreaeeaetere ns, [x | Gruen with a gross floor area of 6,062.43 sqm; at 5* floor Project coverage, renieeanere cane Dereta | 4,161.22 sqm and a 64 parking slots wih an area | Se eee rea ae Hanwmcgenteemcnneriee fete caepae Sinsen eee om rosin css Sucre fomeeen eer Reeuece wate vane os et me Tmt obeogeste | 183 TEOO\RABT(PhippneCeanaraacs | eon Somes ham ene cone some, oomneracatog wasnt, maa cena oie ae aspen eel gg a— a 5 Conk ie ore gg ee ataante Fe La Te es {7)_ Regular reporting T aaa 1Bat | pesosingos anérerogener nesesin ” ieee ae Cena ECan Ty Sanne ‘An Enurcmental Unt EU) Paliton Cobol fcr (PCO) must be exabished epported to hand he enronmont rested espe of he 8) Inttutonalarangomenss | necessary fr irlementaton of 14 || pepctnatiionote noungrgnens | snscrnnt meager Ss paced ne Emer tengenet Pie Eneomeral vont Banfene) ease ort onan | tesceansendine oreo oe eo [> sani OR oamenton | 27 indbetandioveselbereqaeé oath be" | ¥ foment _EMB-NCR within fifteen (15) days as regards to borane ewes Suita eorcomor Pans Be EVE NCR 1 ‘st ye rrp anne 10) Sanda OENRwaiemorion | ,qp | Tan sel ele reebttaon menses) | Deore Tap rmadain cores locos be sro! end peed sharp iy en Pan eeetuar/ cosets | NA NA wa | WA Enoonera ragan ‘SDs Pan] WR rm i eran Wk wa [Wak 1a) Conger wa PWR Pansrequaae | WA NA | Aetna a—tm 5 Reet Pn ie = WA [WA Tepe dala tala Sane Tpomac nguyen renee Rinanmergequenere epely foe cramneosine tenia 6) norman Neng Pan Erma np Sy Exomert , (EMeP) nas) Performance Report{ EPRMP), its modification % slodasnd norma ar predby be EME.NCR daring he EIA Report evi shal be ‘nated and cy plemented reughat he { projet iploneration| | 47) (Others) 1BS5S ‘That the project proponent shall allow = | ANNEX 3-1 Identification card and mission’ tavel ‘order to conduct inspection! monitoring in the entire premises without prior note to _ averse compliance to ECC candtions B. Impact Monitoring ‘This section shall contain relevant graphical presentation of quanttative and semi-quanttative impact monitoring results showing trends, comparing past monitoring results wth the current Relevant monitoring resus inthe other SMR modules shal be refered to. The latest monitoring findings and conclusion shouldbe discussed intext form, Qualitative impact monitoring results may be presented intext frm or interme of pictorial coverage, if applicable. Examples of ‘ualtatve impacts are those relating to quality of ie, degree of happiness, and sense of environmental cleanness, i, Summary of Previous Monitoring The key findings, recommendations, and action plan from the previous monitoring and outstanding ies from earlier monitoring periods (f applicable) shouldbe highlighted in tis section, i. Current Monitoring Resuits and Findings “The data collected and related expenses from the various sampling and measurement events done under the Environmental Monitoring Pian (EMoP) or a Sampling and Measurement Plan (SAMP) for the current monitoring period shall be summarized in a tabular form, preferably using te prescribed formatin Tables 2 and 3 below, and discussed under this section. Only processed ‘and summarized data must be presented here, ‘The current monitoring results must be related tothe historical trend for each parameter. Any deviation from this trend must be explained. More, important, the discussion must focus on point-by-point comparison ofthe gathered values with Environmental ‘Quality Performance Levels (EPL), if EGPLs have been committed by the Proponent or established withthe Mull-parile Monitoring Team. The monitoring results could also be used to determine the action and limit levels Tor the specific project. ‘These should all be presented herein detall and summarized in the conclusions and recommendations section, ‘Compliances, non-compliances and exceedances must all be thoroughly explained. In cases of compliances, success factors must be cited. For non-compliances and exceedances, the proponent’ response should be explained. Moreover, causative factors must be identified and addtional solutions and mitigation measures proposed, Ineeded, It should also cite the weather condiions and other factors which may affect the results of the sampling actives. ‘The status of compliance to recommendations rom previous monitoring and measures included in the action plan should be described and any unmet commitment mist be raonalized and aternatve, if needed, presented ‘Table 2. Summary Status of Environmental impact Management and Monitoring Pan Implementation 1 ‘Set Teme | Fer Moning | Ent | Ent oy | Me | Sn ee ee eee eer | Previous | curent | Pret | ME | “enti sas ion om) *EQPL Environmental Quality Performance Level (2 Nettr Red Fag early waring ‘© Aaton Levepint where management measures must be empoyeé 0 85 rte each he regula treshatd rit vel, oo educe

You might also like