PROPOSED EXTENSION OF HOUSE FOR

Mr. CAP FAIZAN

ARCHITECTURE DRAWINGS
JULY 2021

PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN
DESIGN BY:

INSHAULLAH MARWAT
DATE: DWG TITLE:
JULY, 2021 ARCHITECTURE
SCALE: DWG NO:
NTS A-01
3D VIEW

PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN
DESIGN BY:

INSHAULLAH MARWAT
DATE: DWG TITLE:
JULY, 2021 ARCHITECTURE
SCALE: DWG NO:
NTS A-02
3D VIEW

PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN
DESIGN BY:

INSHAULLAH MARWAT
DATE: DWG TITLE:
JULY, 2021 ARCHITECTURE
SCALE: DWG NO:
NTS A-03
3D VIEW

PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN
DESIGN BY:

INSHAULLAH MARWAT
DATE: DWG TITLE:
JULY, 2021 ARCHITECTURE
SCALE: DWG NO:
NTS A-04
17' OPEN
D4

STORE

9'-6"
3' 6' 13'-712"
17'-0''x 9'-6''
D2

412" 3'-6"
12'
412"
KITCHEN BED ROOM

12'

12'
6'
9"
12'-0''x 12'-0'' D2
13'-8''x 12'-0''

412"
2'-6"
D3
412" 3'-6" 41 2" 3'-6"
BATH

3'
4'-x 7' 12'-3"
OPEN
6" 6"
2' BED ROOM D2 D1

14'
13'-3''x 14'-0''

3'-6"
712"
V2

22'-6"
5'

D3 D2

3'-6"
D1 TV LOUNGE

13'

6'
26'-0''x 13'-0'' 3'-6"
712"

412"
9"

3'-6" 4 2"
1

D1
3'
D1
UP
D3 D1
13'-3" 412"
1 1 MAIN ENT
4 2" 3'-6" 7'-1 2" 2'-712" 3' 412"

11'-9"
GUEST BED BATH
13'
DRAWING 11'-0''x 12'-0'' 6'-0''x 12'-0''
24'

13'-3''x 24'-0''
412" 3'-6" 1'-1" 5' 1'-012"
1'-6" 3' 1'-6"
D3 V1
D1
712"
3'-6"

PASSAGE 4'
4'
D1 712"
CAR PORCH
412"

12'-8''x 28'-6''
3'-412"
3'

17'-9"
STAIR CS 13'
CAR PORCH
7'-9"

17'-9''x 11'-4 1 2"'


8'

712"
3' 9' 1'
4'-0"

UP 14' 712" PROJECT:


PROPOSED EXTENSION OF HOUSE FOR
V.GATE Mr. CAP FAIZAN
GATE
DESIGN BY:

1'
INSHAULLAH MARWAT
GROUND FLOOR PLAN RAMP DATE: DWG TITLE:

EXTENSION WORK DEMARCATION JULY, 2021 ARCHITECTURE


SCALE: DWG NO:
NTS A-05
412"
OPEN 1'-1012"
V2

412"
2'

1'-6"
D4
STORE
17'-0''x 9'-6'' 3' 6' 13'-712"

D2

412" 3'-6"
12'
412"
KITCHEN BED ROOM

12'

12'
6'
9"
12'-0''x 12'-0'' D2

412"
13'-8''x 12'-0''

2'-6"
D3
412" 3'-6" 412" 3'-6"
BATH

3'
4'-x 7' 12'-3" O
6" 6" P
2' BED ROOM D2 D1
E

14'
13'-3''x 14'-0'' N
V2 712"
17'-11"
5'

D3 D2

3'-6"
TV LOUNGE WR

13'

6'
26'-0''x 13'-0'' 412" 412"
712"

412"
3'-4"

4'-512" 412"
9"

3'-6" 412"
4'-412"

WR D1 WR
1'-1012"
9"

D3
412"

2'-6"
13'-3" 11' 12'-712"
6'
BED ROOM 32'-6"
6'

16'-3"

BATH

7'-812"
D2
13'-3''x 16'-3'' 6'-0''x 8'-1'' BED ROOM
12'-7 1 2"x 11'-0''

11'
D2

6'
3"Ø
9"

3'-5" 412" VENT PIPE


4'-412"

19'-6"
WR

2'-6"
SITTING D3

D1
11'-0''x 19'-6'' 6'

10'-312"

3'-9"
BATH
6'-10'-3 1 2"
D1
11'-9"

6" 6" 6" 6" 6" 6" 6"


4'-0" D3

6" 6" 6" 6" 6" 6"


6' 2'-6"
12'-712"
13' D2 V1

15'-9"
D1

8'
6'-8"

MUMTY 3' 1'-3"


TERRACE
12'-8''x 15'-9''
7'-9"

8'-1012"

VERANDAH
8' WIDE
4'-0"

4'-0" UP 3'-212" 6' 3'-212"


1'
PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
2'-112" 10' 5'-712" Mr. CAP FAIZAN
412" 412" DESIGN BY:

INSHAULLAH MARWAT
FIRST FLOOR PLAN DATE: DWG TITLE:
EXTENSION WORK DEMARCATION JULY, 2021 ARCHITECTURE
SCALE: DWG NO:
NTS A-06
50'

OPEN

O
P
E
N

TERRACE

O.H.W.T
1'

9"
3'

D2
17'

6" 6" 6" 6" 6" 6" 6"


6" 6" 6" 6" 6" 6"
DN
MUMTY
15'-9"

PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
FIX GLASS Mr. CAP FAIZAN
DESIGN BY:
TOP ROOF PLAN
INSHAULLAH MARWAT
EXTENSION WORK DEMARCATION DATE: DWG TITLE:
JULY, 2021 ARCHITECTURE
SCALE: DWG NO:
NTS A-07
6"
OPEN

2'-6"
17'
W4

STORE

9'-6"
3' 6' 13'-712"
17'-0''x 9'-6''
D2

412" 3'-6"
12'
412"
KITCHEN BED ROOM

12'

12'
6'
9"
12'-0''x 12'-0'' W2
13'-8''x 12'-0''

412"
2'-6"
D3
412" 3'-6" 412" 3'-6"
BATH

3'
4'-x 7' 12'-3"
OPEN
6" 6"
2' BED ROOM D2 D1

14'
13'-3''x 14'-0''

3'-6"

3'-6"
V2 712"

22'-6"
5'

W3 W2

3'-6"
D1 TV LOUNGE

13'

6'
26'-0''x 13'-0'' 3'-6"
712"

412"
9"

3'-6" 412" D1
3' 4'
D1
UP
D3 D1
13'-3" 412"
MAIN ENT
412" 3'-6" 7'-112" 2'-712" 3' 412"

11'-9"
GUEST BED BATH
13'
DRAWING 11'-0''x 12'-0'' 6'-0''x 12'-0''
24'

13'-3''x 24'-0''
412" 3'-6" 1'-1" 5' 1'-012"
1'-6" 3' 1'-6"
W3 V1
D1
712"
3'-6"

PASSAGE 4'
4'
D1 712"
CAR PORCH
412"

12'-8''x 28'-6''
3'-412"
3'

17'-9"
STAIR CS 13'
CAR PORCH
7'-9"

17'-9''x 11'-4 1 2"'


8'

712"
1
3' 7 2"
4'-0"

UP 14' 712"
V.GATE
GATE PROJECT:
PROPOSED EXTENSION OF HOUSE FOR

1'
Mr. CAP FAIZAN
GROUND FLOOR PLAN RAMP DESIGN BY:
PHASE WISE DISTRIBUTION PHASE-1 = 418 SFT INSHAULLAH MARWAT
DATE: DWG TITLE:
PHASE-2 = 971 SFT
JULY, 2021 ARCHITECTURE
PHASE-3 = 1243 SFT SCALE: DWG NO:
NTS A-08
6"
OPEN 1'-1012"

2'-6"

412"
V2

1'-6"
W4
STORE
17'-0''x 9'-6'' 3' 6' 13'-712"

D2

412" 3'-6"
12'
412"
KITCHEN BED ROOM

12'

12'
6'
9"
12'-0''x 12'-0'' W2

412"
13'-8''x 12'-0''

2'-6"
D3
412" 3'-6" 412" 3'-6"
BATH

3'
4'-x 7' 12'-3" O
6" 6" P
2' BED ROOM D2 D1
E

14'
13'-3''x 14'-0'' N

3'-6"
V2 712"
17'-11"
5'

W3 W2

3'-6"
TV LOUNGE WR

13'

6'
26'-0''x 13'-0'' 412" 412"
712"

3'-4"

412"

4'-512" 412"
9"

3'-6" 4 2"
1
4'-412"

WR D1 WR
1'-1012" 4'
9"

D3
412"

2'-6"
MAIN ENT 12'-712"
13'-3" 11'
6'
BED ROOM 32'-6"
6'

16'-3"

BATH

7'-812"
W2
13'-3''x 16'-3'' 6'-0''x 8'-1'' BED ROOM
12'-7 1 2"x 11'-0''

11'
W2

6'
3"Ø
9"

3'-5" 412" VENT PIPE


4'-412"

19'-6"
WR

2'-6"
SITTING D3

D1 11'-0''x 19'-6'' 6' D1

10'-312"

3'-9"
BATH
6'-10'-3 1 2"
D1
11'-9"

6" 6" 6" 6" 6" 6" 6"


4'-0" D3

6" 6" 6" 6" 6" 6"


6' 2'-6"
12'-712"
13' W2 V1

15'-9"
W1

8'
6'-8"

MUMTY 3' 1'-3"


TERRACE
12'-8''x 15'-9''
7'-9"

8'-1012"

VERANDAH
8' WIDE
4'-0"

4'-0" UP 3'-212" 6' 3'-212"


1'
PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
4'-3" 10'
FIX GLASS
3'-6" Mr. CAP FAIZAN
412" 412" DESIGN BY:
PHASE-1 = 418 SFT
INSHAULLAH MARWAT
FIRST FLOOR PLAN PHASE-2 = 971 SFT DATE: DWG TITLE:
PHASE WISE DISTRIBUTION PHASE-3 = 1243 SFT JULY, 2021 ARCHITECTURE
SCALE: DWG NO:
NTS A-09
50'

OPEN

O
P
E
N

TERRACE

O.H.W.T
1'

9"
3'

D2
17'

6" 6" 6" 6" 6" 6" 6"


6" 6" 6" 6" 6" 6"
DN
MUMTY
15'-9"

PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
FIX GLASS Mr. CAP FAIZAN
DESIGN BY:
TOP ROOF PLAN PHASE-1 = 418 SFT
INSHAULLAH MARWAT
PHASE WISE DISTRIBUTION PHASE-2 = 971 SFT DATE: DWG TITLE:
PHASE-3 = 1243 SFT + 375 SFT JULY, 2021 ARCHITECTURE
SCALE: DWG NO:
NTS A-10
6"
OPEN

2'-6"
17'
W4

STORE

9'-6"
3' 6' 13'-712"
17'-0''x 9'-6''
D2

412" 3'-6"
12'
412"
KITCHEN BED ROOM

12'

12'
6'
9"
12'-0''x 12'-0'' W2
13'-8''x 12'-0''

412"
2'-6"
D3
412" 3'-6" 412" 3'-6"
BATH

3'
4'-x 7' 12'-3"
OPEN
6" 6"
2' BED ROOM D2 D1

14'
13'-3''x 14'-0''

3'-6"

3'-6"
712"
V2

22'-6"
5'

W3 W2

3'-6"
D1 TV LOUNGE

13'

6'
26'-0''x 13'-0'' 3'-6"
712"

412"
9"

3'-6" 4 2"
1

D1
3' 4'
D1
UP
D3 D1
13'-3" 412"
MAIN ENT
412" 3'-6" 7'-112" 2'-712" 3' 412"

11'-9"
GUEST BED BATH
13'
DRAWING 11'-0''x 12'-0'' 6'-0''x 12'-0''
24'

13'-3''x 24'-0''
412" 3'-6" 1'-1" 5' 1'-012"
1'-6" 3' 1'-6"
W3 V1
D1
712"
3'-6"

PASSAGE 4'
4'

D1 712"
CAR PORCH
412"

12'-8''x 28'-6''
3'-412"
3'

17'-9"
STAIR CS 13'
CAR PORCH
7'-9"

17'-9''x 11'-4 1 2"'


8'

712"
1
3' 7 2"
4'-0"

UP 14' 712"
V.GATE
GATE PROJECT:
PROPOSED EXTENSION OF HOUSE FOR

1'
Mr. CAP FAIZAN
GROUND FLOOR PLAN RAMP DESIGN BY:
DETAILED DIMENSION PLAN INSHAULLAH MARWAT
DATE: DWG TITLE:
JULY, 2021 ARCHITECTURE
SCALE: DWG NO:
NTS A-11
6"
OPEN 1'-1012"

2'-6"

412"
V2

1'-6"
W4
STORE
17'-0''x 9'-6'' 3' 6' 13'-712"

D2

412" 3'-6"
12'
412"
KITCHEN BED ROOM

12'

12'
6'
9"
12'-0''x 12'-0'' W2

412"
13'-8''x 12'-0''

2'-6"
D3
412" 3'-6" 412" 3'-6"
BATH

3'
4'-x 7' 12'-3" O
6" 6" P
2' BED ROOM D2 D1
E

14'
13'-3''x 14'-0'' N

3'-6"
712"
V2
17'-11"
5'

W3 W2

3'-6"
TV LOUNGE WR

13'

6'
26'-0''x 13'-0'' 412" 412"
712"

3'-4"

412"

4'-512" 412"
9"

3'-6" 412"
4'-412"

WR D1 WR
1'-1012" 4'
9"

D3
412"

2'-6"
MAIN ENT 12'-712"
13'-3" 11'
6'
BED ROOM 32'-6"
6'

16'-3"

BATH

7'-812"
W2
13'-3''x 16'-3'' 6'-0''x 8'-1'' BED ROOM
12'-7 1 2"x 11'-0''

11'
W2

6'
3"Ø
9"

3'-5" 412" VENT PIPE


4'-412"

19'-6"
WR

2'-6"
SITTING D3

D1 11'-0''x 19'-6'' 6' D1


10'-312"

3'-9"
BATH
6'-10'-3 1 2"
D1
11'-9"

6" 6" 6" 6" 6" 6" 6"


4'-0" D3

6" 6" 6" 6" 6" 6"


6' 2'-6"
12'-712"
13' W2 V1

15'-9"
W1

8'
6'-8"

MUMTY 3' 1'-3"


TERRACE
12'-8''x 15'-9''
7'-9"

8'-1012"

VERANDAH
8' WIDE
4'-0"

4'-0" UP 3'-212" 6' 3'-212"


1'
PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
4'-3" 10'
FIX GLASS
3'-6" Mr. CAP FAIZAN
412" 412" DESIGN BY:

INSHAULLAH MARWAT
FIRST FLOOR PLAN DATE: DWG TITLE:
DETAILED DIMENSION PLAN JULY, 2021 ARCHITECTURE
SCALE: DWG NO:
NTS A-12
50'

OPEN

O
P
E
N

TERRACE

O.H.W.T
1'

9"
3'

D2
17'

6" 6" 6" 6" 6" 6" 6"


6" 6" 6" 6" 6" 6"
DN
MUMTY
15'-9"

PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
FIX GLASS Mr. CAP FAIZAN
DESIGN BY:
TOP ROOF PLAN
INSHAULLAH MARWAT
DETAILED DIMENSION PLAN DATE: DWG TITLE:
JULY, 2021 ARCHITECTURE
SCALE: DWG NO:
NTS A-13
OPEN

SLOPE

PE
SLO
PE 2'x2' KURRAH
SLO

PE
SLO
O
P
TERRACE E
N
PE
1" STEEL BEND PATI
SLO

E
OP
SL
PE
SLO

PE
SLO
KHURRA 2'x2'

4"Ø PIPE
RIDGE LINE

PE
SLO 4"Ø L-BEND

E
OP
PE
SLO

SL
KHURRA 2'x2'
SUMP PIPE DETAIL

E
OP

SLOPE
SL
TERRACE

E
E OP
OP SL
SL

E
OP
SL E
OP
SL
PE
O
SL

E
OP
SL

PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN
TOP ROOF PLAN DESIGN BY:

SLOPE PLAN INSHAULLAH MARWAT


DATE: DWG TITLE:
JULY, 2021 ARCHITECTURE
SCALE: DWG NO:
NTS A-14
1'
6"

6"
5'
10'
412" 10'-0" 412"

2"

6"
4'-6"
5'
3'
16'-3"

6"
412"
2"

10'-6"

34'
41 2"

6" 2'-51 2"


1'-0"

6"
1'-6"

10'-6"
1'-6"
FRONT ELEVATION

PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN
DESIGN BY:

INSHAULLAH MARWAT
DATE: DWG TITLE:
JULY, 2021 ARCHITECTURE
SCALE: DWG NO:
NTS A-15
6"
10'
5'
1'-6"

1'

6"
6'

10'-6"
412"

6'

34'
1'-6"

1'

6"
10'-6"
1'-6"
SIDE ELEVATION

PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN
DESIGN BY:

INSHAULLAH MARWAT
DATE: DWG TITLE:
JULY, 2021 ARCHITECTURE
SCALE: DWG NO:
NTS A-16
4' 3'-6" 3'

1'-6"
2'-6" 3'-6"

8'-6"
7'

7'

7'
F.F.LEVEL
MAIN ENT D-1 D-2 D-3 D-4
4'-0" X 8'-6" 3'-6" x 8'-6" 3'-0" x 8'-6" 2'-6" x 7'-0" 3'-6" x 7'-0"
4 1 2" 10'-0" 4 1 2"

4 1 2"
8' 6' 5' 6'
EQ EQ EQ EQ EQ EQ EQ EQ

16'-3"
4'-6"
SLIDE FIXED
SLIDE FIXED SLIDE FIXED
6'

6'

6'
SLIDE FIXED

8'-6"
8'-6"

8'-6"

8'-6"

4 1 2"
4'
2'-6"

2'-6"

2'-6"
F.F.LEVEL
W-2 W-3 W-4 FIX GLASS
W-1 6'-0" x 6'-0" 5'-0" x 6'-0" 5'-0" x 5'-0"
8'-0" x 6'-0"

3' 2'-6"
EQ EQ EQ EQ
2'-6"

2'-6"
6'

6'

PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN
F.F.LEVEL
V1 DESIGN BY:
V2
3'-0" x 2'-0" 2'-0" x 2'-0" INSHAULLAH MARWAT
DATE: DWG TITLE:
JULY, 2021 ARCHITECTURE
SCALE: DWG NO:
NTS A-16
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN

STRUCTURE DRAWING
JULY 2021

PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN
DATE: DWG TITLE:
JULY, 2021 STRUCTURE
SCALE: DWG NO:
NTS S-01
GENERAL NOTES
1. BUILDING DESCRIPTION & DESIGN 9. FORMWORK & REMOVEL
a. FORMWORK TO CONCRETE SHALL BE OF METAL SHEETS
a. BUILDING IS 2 STOREY. OR PLY WOOD.
b. THE FORMWORK BE DONE AS PER STRUCTURAL FORMS
b- DESIGN OF STRUCTURE IS BASED ON PAKISTAN BUILDING CODE c. FORMWORK BE WATER TIGHT.
(S.P- 2007) , ACI 318-2005 AND UBC 97.
d. FORMWORK BE REMOVED AS PER FOLLOWING SCHEDULE
C- BEARING CAPACITY OF SOIL IS TAKEN AS 1.0 T/SFT. COLUMNS & SIDE OF BEAMS & WALLS 24 HOURS
SLAB, BOTTOM OF BEAMS 14 DAYS.

2. BUILDING LAYOUT
a. BUILDING LAYOUT BE DONE WRT TO STRUCTURAL DRAWINGS 10. JOINTS
AND ARCH DRAWINGS
b. ANY DIFFERENCE BE DISCUSSED WITH STR. DESIGNER. a. EXPANSION JOINTS BE FINALIZED AND GOT APPROVED
BY THE RESIDENT ENGINEER.
b. EXPANSION JOINT IN THE BUILDING BE PROVIDED AS SHOWN
ON THE DRAWIGS.
3. EXCAVATION AND TERMITE TREATMENT
a. FOUNDATIONS TO BE PLACED ON COMPACTED SOIL 11. STEEL BINDING
b. IN CASE OF FILL / OVERBURDEN REMOVE IT. a. STEEL BARS BE PLACED IN THE FORM AS PER DRAWINGS.
c. IN CASE OF RAISED PLINTH, FILL WITH SAND / GRAVEL & b. ALL JUNCTION OF THE BARS / CROSS BE TIED WITH BINDING
COMPCAT BEFORE FLOORING. WIRE.
d. PROVIDE TERMITE TREATMENT IN FOUNDATIONS AND IN FLOOR
BEFORE LAYING PCC. 12. DRAIN PIPES & SLEEVES
a. TOILET WASHING & DRAIN PIPES BE PLACED IN SLAB AT PROPER
4. W:C:S: AGGREGATES AND SIZES DESIGNED POSITION BEFORE CONCRETE.
FRESH WATER: IN ACCORDANCE OF UBC 97 SECTION 1903.4 b. WHERE PLUMBING AND OTHER PIPES ARE PLACES IN SLAB
CEMENT: FRESH PORTLAND CEMENT TO BE USED FOR ALL WORKS. ADDITIONAL STEEL BARS BE PROVIDED ABOVE AND BELOW
SAND : LAWRANCEPUR / GHAZI. TO COVER THE REDUCED STRENGTH.
AGGREGATES:IN ACCORDANCE OF UBC 97 SECTION 1903.3

MARGALLA STONE CRUSHED AGGREGATES SHALL BE AS: 13. WALL TIES


STRUCTURAL ELEMENTS MAXIMUM AGGREGATE SIZE a. WALL TIES OF #3 (10MM) BARS BE PLACED IN COLUMNS AS
WALL TIES AT 2' CC TO ANCHOR THE WALLS
FOUNDATIONS 1.25 " DOWN GRADED
COLUMNS & BEAMS 3/4 DOWN GRADED 14. BRICK , CONC BLOCK MASONRY
SLABS 3/4" DOWN GRADED
a. FIRST CLASS BRICKS BE USED FOR MASONRY WORK.
3/4" DOWN GRADED MEANS 1/2" AND 3/8" MIX b. BRICKS BE SOACKED IN WATER A DAY BEFORE USE.
c. CONCRETE BLOCKS BE MOISED JUST BEFORE USE.
5 REINFORCING STEEL d. JOINTS BE 3/8" FILLED WITH CEMENT SAND MORTAR.
a. DESIGN OF STRUCTURE IS BASED ON STEEL DEFORMED e. ALL MORTAR BE MACHINE MIXED.
MAIN STEEL FOR ASTM A 706 f. MORTAR FOR WALLS 8" , 9" SHALL BE 1:5
FOR 4" & 4.5" SHALL BE 1:4
FOUNDATION, COLUMNS, BEAMS, SLABS GRADE - 40 g. ALL INTERNAL PARTITIONS 4.5" BRICKS / 6" HOLLOW BLOCKS /
WOODEN PARTITION OUTER 8" HOLLOW / 9" BRICKS OR 12" CAVITY WALLS.
b. SAMPLES OF STEEL BE GOT TESTED BEFORE USE.
h. ALL ABOVE ITEM TO BE EXECUTED ,TESTED AND MAITAINED IN ACCORDANCE
OF UBC 1997 CODE STANDARD CHAPTER 21.
6 CONC. MIXING & PLACING 15. STEEL BAR SPACING
a. CONCRETE BE WELL MIXED, VIBRATED, COMPACTED , CURED,
TESTED AND RECORD TO BE MAINTAINED AS PER a. FIRST & LAST BAR IN WALLS & SLAB BE PLACED AT 1/2 OF
ACI 318 AND UBC 1997 CHAPTER 19 THE SPACING OF BARS.OR JUST GIVE COVER AND PLACE THE BAR
b. MIXED CONCRETE BE PLACED IN POSITION WITHIN 15 MINUTES b. FIRST AND THE LAST HOOP/TIE IN BEAMS & COLUMNS BE
c. MIN WATER IN CONC. GIVES MORE STRENGHT. BE PLACED AT 2" FROM THE SUPPORT.
d. TRY 5 TO 6 GALLONS OF WATER / BAG OF CEMENT c. COLUMN TIES TO BE PROVIDED THROUNGHOUT FROM
e. MIXING TIME OF CONCRETE PER BATCH 1.5 MINUTES AFTER FOUNDATION TO TOP.
ADDING WATER.

7 CONC. STRENGTHS 16. HOOKED BAR EMBEDMENT


a. CONCRETE BE TESTED AT IMPORTANT PLACES & STRENGTH BE AS THE FOLLOWING EMBEDMENT LENGTHS SHALL BE
CONSIDERED FOR ALL HOOKED BARS WITH STANDARD
FOUND. WALLS, BEAMS, SLAB 3000 PSI 28 DAYS CYLINDER STRENGTH
HOOKS, UNLESS OTHERWISE SPECIFIED.
COLUMNS 3000 PSI 28 DAYS CYLINDER STRENGTH
Bar No. #3 #4 #5 #6 #7 #8
Bar Dia (inches) 3/8 1/2 5/8 3/4 7/8 1
8 CONC. PROTECTION & LAPS TO STEEL Lap Length (inch) 9 9 10 12 13 15
a. MIN. COVER TO BARS SHALL BE AS UNLESS GIVEN ON DRAWINGS
b. LAPS IN COLUMNS BE PREFFERED AT MID ( COMP. ZONE). LAP BE 17. ACCESSORIES
AS TENSION SPLICE UBC 1997, ACI 2005 & B. CODE OF PAK.
SP 2007. = fy' / 65 fc' a. BAR SUPPORTS , SPACERS & AND OTHER ACCESSORIES ARE
fy' = YIELD STRENGHT OF STEEL , fc' = CONC STRENGTH NOT SHOWN IN DRAWINGS.
b. THE BAR SUPPORTS BE PROVIDES AS APPROVED
STRUCTURAL MEMBER COVER LAP TO BARS BY ENGINEER
c. SUPPORTS TO BARS BE SUFFICIENT & STRONG
FOUNDATIONS 3" TO PCC GRADE -60 STEEL SUCH THAT THE STEEL REMAIN IN POSITION
SLABS , RCC WALLS 3/4" 55 DIA DURING CONCRETING.
COLUMNS & BEAMS 1.5" 18. BAR BENDING & HOOKS
6" THICK
RCC SLAB

2'
db

2-#6
10
db

db
4db

8db 1D=4db
12db

2-#6 2-#6
db
4db 4db
2.5 in (mm) 9" THICK RCC
4db
RETAINING WALL
PROJECT:
90° HOOK
(PRIMARY REINF.)
180° HOOK 135° HOOK
TYP. DETAIL OF RCC PROPOSED EXTENSION OF HOUSE FOR
(PRIMARY REINF.) (STIRRUPS & TIE REINF.) 2-#6 RETAINING WALL Mr. CAP FAIZAN
DUCT OPEN
TYP DUCT OPENING DETAIL
DATE: DWG TITLE:
JULY, 2021 STRUCTURE
SCALE: DWG NO:
NTS S-02
GENERAL DETAILS
R.C.C. COLUMN 2'-6" 9"
#3@6"c/c
12" 12"

3"
9"
#3@12"c/c

9"
LB
#4 dowel bars @ 18"c/c
BRICK/BLOCK MASONRY

DETAIL OF COLUMN WALL TIE DETAIL OF WINDOW


PROJECTION
9"

BEAM TOP BARS


PRIMARY BEAM
BEAM HOOPS

1 1/2" CL.
TO END OF HOOKS BEAM BARS
ON BEAM BARS

M M

3'-"0 3'-"0
INTERIOR BEAM HOOPS SECONDARY BEAM INTERIOR BEAM HOOPS
BEAM BOTTOM BARS
(SMALLER SECTION BEAM)
SECTION AT M-M

PLAN OF BEAM TO BEAM DETAIL


WATER
STOPPER

NOTE:-

3T/8
1. SHRINKAGE STRIPS MUST BE PROVIDED AT A SPACING OF
NOT MORE THAN 100ft.

T/5

T/4

T
2. PREFERABLY SHRINKAGE STRIP BE PROVIDED AT
CONSTRUCTION JOINT. 1
3
3. LOCATION OF SHRINKAGE STRIP BE KEPT AT A DISTANCE
OF SPAN/3 FROM THE COLUMN SUPPORT.
4. 3ft WIDE PORTION OF SHRINKAGE STRIP BE KEPT OPEN FOR
AT LEAST 3 WEEKS.THE OPENED PORTION SHOULD BE TYP. DETAIL OF CONSTRUCTION
JOINT IN RAFT & SLABS
POURED AFTERWARDS.
5. REINFORCEMENT BE LAPPED IN SHRINKAGE STRIPS.
ALTERNATIVELY BARS MAY BE SLIGHTLY BENT IN PLAN
PARALLEL TO FACE OF SLAB.

BEAM HOOPS
COLUMN HOOPS
1 1/2" CL.COVER
TO END OF HOOKS
ON BEAM BARS BEAM BARS
1 1/2" CL.
TO END OF HOOKS
ON BEAM BARS
COL. HOOPS
Y Y
X X
Column ties are Column ties are
necessary in necessary in
this region this region
INTERIOR BEAM HOOPS
2#4
BEAM HOOPS
2#4

PLAN SECTION
TYPICAL SEISMIC-RESISTANT JOINT DETAILS COLUMN AND BEAM JOINT FOR SEISMIC FORCE CONTROL
SECTION AT X-X SECTION AT Y-Y

BEAM
6" THICH
FLOOR SLAB 2#3@AFTER EIGHT COURSE

#3@36"C/C
(ANCHOR BAR)

PARTITION WALL OPEN OPEN

#3@36"C/C
(ANCHOR BAR) COLUMN PROJECT:
12"X18" 1#4 (VERTICAL BARS) PROPOSED EXTENSION OF HOUSE FOR
PLINTH BEAM BOTH SIDE OF OPENING
Mr. CAP FAIZAN
TYP. DETAIL OF CONNECTION OF
PARTITION WALL WITH BEAM SECTIONAL ELEVATION OF WALL DATE:
& COLUMN FOR SEISMIC LOADING DWG TITLE:
JULY, 2021 STRUCTURE
SCALE: DWG NO:
NTS S-03
GROUND FLOOR PLAN
SUPPORT/DEMOLISH AREA DETAILDETAIL PLAN

9'-41 2"
3'-0"

8'-9"

3'-0"
3'-0"
3'-0"

TO BE DEMLOISH NOTE :
1. PROVIDE PROPER SUPPORT BEFORE DEMOLISHING AT MENTIONED AREA
SUPPORTIVE AREA 2. DEMOLISHING MUST BE DONE PROPOER WITH DRILL MASHIN PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
INSTED OF HAMMER STROKING. Mr. CAP FAIZAN
3. PROVIDE MINIMUM 3' OVERLAP BETWEEN THE OLD SLAB BARS AND NEW
DATE: DWG TITLE:
SLAB BARS
JULY, 2021 STRUCTURE
4. AFTER PROVIDING OVER LAP MUST BE WELD THE OVERLAP PORTION OF STEEL
SCALE: DWG NO:
NTS S-04
4'-3" 6"

4'-0"

C-1

4'-0"
A

6"
C1-F1

11'-6"
4'-0"

C1-F1
A

4'-0"
C-1

6" 12'-41 2" 6"

16'-6"
4'-0" 4'-0" 4'-0"

C1-F1 C1-F1 C1-F1


A A A
4'-0"

4'-0"

4'-0"
6"

C-1 C-1 C-1

GROUND FLOOR PLAN


FOUNDATION EXCAVATION PLAN 6" 17'-11 2" 13'-41 2" 6"
PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN
DATE: DWG TITLE:
JULY, 2021 STRUCTURE
SCALE: DWG NO:
NTS S-05
412"
CONCRETE (3000 PSI) RCC COLUMNS
C2

4½" TH.
BRICK WALL
RCC COLUMN RCC COLUMN
12"X12" 12"X12"
2" TH D.P.C
1:2:4
F.F.L F.F.L

PB-2
As Per

As Per
Site

Site
9"X9"
PB-1
6"X9" (Approx. 24") #3 BARS
N.S.L N.S.L N.S.L AFTER EVERY 2'
9" TH.

3" 6" 1'-3"


BRICK WALL

2'
2'-9"

2'-9"
P.C.C (1:2:4)
4'

4'
P.C.C (1:4:8)

2'-0"
SECTION AT B-B
BRICK MASONRY
3" 1'

3" 3" 1' 3"


P.C.C (1:4:8) P.C.C (1:4:8)

#4@6"c/c #4@6"c/c
#4@6"c/c #4@6"c/c
4' 4'
SECTION AT A-A SECTION AT A-A
C1-F1 4'-0"X4'-0" FOOTING DETAIL C1-F1 4'-0"X4'-0" FOOTING DETAIL

CONFINEMENT ELEMENT DETAIL

12''
9" 6"
8-#4
#3@ 6" C/C #3@6"cc #3@6"cc
12''

9"

9"
4-#5 4-#4
1.5" COVER 1.5" COVER
Rcc (1:2:4)

PB-1 DETAIL PB-2 DETAIL


C-1 DETAIL
PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN
DATE: DWG TITLE:
JULY, 2021 STRUCTURE
SCALE: DWG NO:
NTS S-06
PB-1

PB-2

PB-2

PB-1

PB-1 PB-1

GROUND FLOOR PLAN PROJECT:


PROPOSED EXTENSION OF HOUSE FOR
PLITH BEAM PLAN Mr. CAP FAIZAN
DATE: DWG TITLE:
JULY, 2021 STRUCTURE
SCALE: DWG NO:
NTS S-07
6"
412"

9"
9"

GB-1

GB-1

9"
S-1
9"
GB-1

GB-1

GB-1
S-1

9"
S-1 S-1 GB-1
GB-1
CB-1
9"
GB-1 GB-1

GROUND FLOOR PLAN PROJECT:


PROPOSED EXTENSION OF HOUSE FOR
ROOF BEAM PLAN Mr. CAP FAIZAN
DATE: DWG TITLE:
JULY, 2021 STRUCTURE
SCALE: DWG NO:
NTS S-08
L 9" 5-#4
9" 5-#4
L/4 L/3
5-#4 5-#4 5-#4
6"

6"

6"
1'-6"

1'-6"
#3@6"c/c #3@6"c/c

1'

1'
#3@4"CC #3@6"CC #3@4"CC
12"

5-#4 5-#4
EDGE SECTION MID SECTION
5-#4 E M 5-#4 5-#4
3*L/4 DETAIL OF GB-1
ELEVATION OF GB-1

9" 5-#4
9" 5-#4
L

L/4 L/3

6"

6"
5-#4 5-#4 5-#4
6"

1'-6"

1'-6"
#3@6"c/c #3@6"c/c

1'

1'
#3@4"CC #3@6"CC #3@4"CC
12"

5-#4 5-#4
EDGE SECTION MID SECTION
5-#4 E M 5-#4 5-#4
DETAIL OF RB-1
3*L/4
ELEVATION OF RB-1

9" 9"
3"

3"
3-#6 3-#6

#3@6"c/c
6"

6"
#3@6"c/c

3-#6 3-#6

EDGE SECTION MID SECTION


DETAIL OF CB-1

PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN
DATE: DWG TITLE:
JULY, 2021 STRUCTURE
SCALE: DWG NO:
NTS S-09
BOTTOM BARS
TOP BARS

SLAB REINF. DETAIL


1:- SLAB BOTTOM BARS #4@6"C/C B/W
2:-SLAB TOP EXTRA BARS #4@4"C/C B/W
3:-ALL TOP EXTRA DISTRIBUTION BARS ARE #3@12" C/C
4:-SLAB THICK. IS 6" (S-1)EXCEPT MENTIONED
5:-PROVIDE "L" AT THE END OF EXTRA TOP BARS

SPLICE LENGHT DETAIL


1:- OVERLAP OF THE TOP BAR SHOULD BE GIVEN
TWICE OF THE SPAN OF THE CANTILEVER
2:- SPLICE LENGHT OF BARS IN COLUMNS / BEAMS / SLAB
ALREADY SHOULD BE GIVEN 48 TIMES OF DIA BAR
CONSTRUCTED SLAB

1'-0"

PORTION
1
4'-10 "
2
TO BE WELD

BOTTOM MESS
3'
#4@6"C/C

4'-1021"
TOP BARS
3'
TOP BARS S-1 #4@6"C/C
3'

3'
#4@6"C/C

3'
5'-3"
TOP BARS
7'-121"
#4@6"C/C
3'

S-1 S-1
BOTTOM MESS
6'-7"

#4@6"C/C
8' 8'
TOP BARS
5'-6" 4'-3" #4@6"C/C
TOP BARS S-1
#4@6"C/C
6'-1021"

S-1 TOP BARS


3'-1121"

#4@6"C/C

GROUND FLOOR PLAN PROJECT:


SLAB REINFORCEMENT PLAN PROPOSED EXTENSION OF HOUSE FOR
BOTTOM MESS TOP BARS Mr. CAP FAIZAN
#4@6"C/C #4@6"C/C DATE: DWG TITLE:
JULY, 2021 STRUCTURE
SCALE: DWG NO:
NTS S-10
OPEN

ALREADY
CONSTRUCTED SLAB

O
P
E
N
TO BE
DEMOLISHED

CB-1

RB-2 RB-1

RB-1 RB-1
O.H.W.T

RB-1

CB-1

RB-2

CB-1 RB-2 RB-2

RB-2 RB-2

FIX GLASS
PROJECT:
FIRST FLOOR PLAN SLAB REINF. DETAIL
1:- SLAB BOTTOM BARS #4@6"C/C B/W
SPLICE LENGHT DETAIL PROPOSED EXTENSION OF HOUSE FOR
ROOF BEAM PLAN 2:-SLAB TOP EXTRA BARS #4@4"C/C B/W
1:- OVERLAP OF THE TOP BAR SHOULD BE GIVEN
TWICE OF THE SPAN OF THE CANTILEVER Mr. CAP FAIZAN
3:-ALL TOP EXTRA DISTRIBUTION BARS ARE #3@12" C/C
2:- SPLICE LENGHT OF BARS IN COLUMNS / BEAMS / SLAB
4:-SLAB THICK. IS 6" (S-1)EXCEPT MENTIONED
5:-PROVIDE "L" AT THE END OF EXTRA TOP BARS
SHOULD BE GIVEN 48 TIMES OF DIA BAR
DATE: DWG TITLE:
STRUCTURE
BOTTOM BARS
TOP BARS JULY, 2021
SCALE: DWG NO:
NTS S-11
L 9" 5-#4
9" 5-#4
L/4 L/3
5-#4 5-#4 5-#4
6"

6"

6"
1'-6"

1'-6"
#3@6"c/c #3@6"c/c

1'

1'
#3@4"CC #3@6"CC #3@4"CC
12"

5-#4 5-#4
EDGE SECTION MID SECTION
5-#4 E M 5-#4 5-#4
3*L/4 DETAIL OF GB-1
ELEVATION OF GB-1

9" 5-#4
9" 5-#4
L

L/4 L/3

6"

6"
5-#4 5-#4 5-#4
6"

1'-6"

1'-6"
#3@6"c/c #3@6"c/c

1'

1'
#3@4"CC #3@6"CC #3@4"CC
12"

5-#4 5-#4
EDGE SECTION MID SECTION
5-#4 E M 5-#4 5-#4
DETAIL OF RB-1
3*L/4
ELEVATION OF RB-1

9" 9"
3"

3"
3-#6 3-#6

#3@6"c/c
6"

6"
#3@6"c/c

3-#6 3-#6

EDGE SECTION MID SECTION


DETAIL OF CB-1

PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN
DATE: DWG TITLE:
JULY, 2021 STRUCTURE
SCALE: DWG NO:
NTS S-12
OPEN

ALREADY
CONSTRUCTED SLAB

#4@6"C/C

4'-8"
O
P
#4@6"C/C
E
#4@6"C/C N

4'-4"
4'-5" 4'-5" 4'-8" 4'-8" 3'-9" 3'-9"

4'-8"
#4@6"C/C #4@6"C/C #4@6"C/C #4@6"C/C

#4@6"C/C
#4@6"C/C
#4@6"C/C

4'-4"
5'-5"

#4@6"C/C

6'-3"
#4@6"C/C

#4@6"C/C
6'
10'-6"

#4@6"C/C

4'-5" 6'
DOUBLE
#4@6"C/C
#4@6"C/C MESH
#4@6"C/C
5'-3"

5'-3"
#4@6"C/C #4@6"C/C
6'-3"

#4@6"C/C

#4@6"C/C #4@6"C/C 5'

#4@6"C/C 5'-6" 4'-3"

#4@6"C/C

5'-3"
8' 10'

FIX GLASS
PROJECT:
FIRST FLOOR PLAN PROPOSED EXTENSION OF HOUSE FOR
SLAB REINFORCEMENT PLAN Mr. CAP FAIZAN
DATE: DWG TITLE:
JULY, 2021 STRUCTURE
SCALE: DWG NO:
NTS S-13
# 3 @ 9"

5"
4 # 6" # 3 @ 9"

1 21" Cavity for 1 21" Cavity for

12"
Thermapour sheet
6" WATER LEVEL 6" Thermapour sheet

# 3 @ 5"
# 3 @ 9"

4'-0"
6"
# 3 DIAGONAL BAR 12"

5"
# 3 @ 12" C/C
6"

# 4 @ 6"

2'-0"
18"
# 3 @ 6" C/C
4#6

RCC SLAB
DETAIL OF OVER HEAD WATER TANK

PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN
DATE: DWG TITLE:
JULY, 2021 STRUCTURE
SCALE: DWG NO:
NTS S-14
SLAB

6" WAIST

#4@6"CC
#4@6"CC
#4@8"CC
#4@6"CC

#4@6"CC
#4@6"CC

#4@6"CC
#4@6"CC
#4@6"CC
#4@6"CC

#4@8"CC
6" WAIST

#4@6"CC BFF LEVEL


REINFORCEMENT DETAIL OF STAIR CASE

PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN
DATE: DWG TITLE:
JULY, 2021 STRUCTURE
SCALE: DWG NO:
NTS S-15
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN

ELECTRICAL DRAWINGS

PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN
DESIGN BY:

INSHAULLAH MARWAT
DATE: DWG TITLE:
JULY, 2021 ELECTRICAL
SCALE: DWG NO:
NTS E-01
L E G E N D
S.N0 DESCRIPTIONS SYMBOLS

1
CEILING FAN 56" SWEEP

2
EXHAUST FAN (MILLAT)
3 WALL LIGHT Wast WaterPROOF
4 CEILING LIGHT 1 x 12 W DONE LITE L.E.D

5 (40
(40W)
W)T.M.S
T.M.S140
140

6 CELING LIGHT 1X 18 W

7 5A, 3-PIN SOCKET OUTET

8 20A, 3-PIN SWITCH SOCKET OUTET

9 SWITCH BOARD

10 NETWORKING

11 T.PHONE .J.BOX

12 T.V.J.BOX

T.PHONE POINT T.P


13
DISTRIBUTION BOARD P.D.B - L.D.B
14

15 T.V. POINT.

16 OUT DOOR LIGHT

17 TWO WAY SWITCH BOARD

18 EARTH POINT

19 SHENDLILEARY

20 BRICK FAN PROJECT:


PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN
DESIGN BY:

INSHAULLAH MARWAT
DATE: DWG TITLE:
JULY, 2021 ELECTRICAL
SCALE: DWG NO:
NTS E-02
STORE OPEN
17'-0''x 9'-6''

BED ROOM
13'-8''x 12'-0''

KITCHEN
12'-0''x 12'-0''

BED ROOM
13'-3''x 14'-0''

OPEN
BATH
4'-x 7'

TV LOUNGE
26'-0''x 13'-0''

UP

GUEST BED BATH MAIN ENT


11'-0''x12'-0'' 6'-0''x 12'-0''
DRAWING
13'-3''x 24'-0''

DB

CAR PORCH
PASSAGE 4'
12'-8''x 28'-6''

CAR PORCH 17'-9''x


11'-4 1 2"'

STAIR CS

UP
V.GATE PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
GATE
Mr. CAP FAIZAN
DESIGN BY:
GROUND FLOOR PLAN RAMP INSHAULLAH MARWAT
ELECTRICAL PLAN DATE: DWG TITLE:
JULY, 2021 ELECTRICAL
SCALE: DWG NO:
NTS E-03
OPEN
STORE
17'-0''x 9'-6''

BED ROOM
13'-8''x 12'-0''

KITCHEN
12'-0''x 12'-0''

BATH BED ROOM


4'-x 7' 13'-3''x 14'-0''

O
P
E
N

TV LOUNGE
26'-0''x 13'-0''

WR

WR WR

BED ROOM
13'-3''X 16'-3'' BED ROOM
BATH 12'-7 1 2"x 11'-0''
6'-0''x 8'-1''

WR
BATH
6'-10'-3 1 2"

VERANDAH
/TERRACE
DB

VERANDAH TERRACE
8' WIDE 12'-8''x 15'-9''

UP
PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN
FIX GLASS
DESIGN BY:

FIRST FLOOR PLAN INSHAULLAH MARWAT


DATE: DWG TITLE:
ELECTRICAL PLAN JULY, 2021 ELECTRICAL
SCALE: DWG NO:
NTS E-04
OPEN

O
P
E
N

TERRACE

DN MUMTY

PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN
FIX GLASS
DESIGN BY:

TOP ROOF PLAN INSHAULLAH MARWAT


DATE: DWG TITLE:
ELECTRICAL PLAN JULY, 2021 ELECTRICAL
SCALE: DWG NO:
NTS E-05
STORE OPEN
17'-0''x 9'-6''

BED ROOM
13'-8''x 12'-0''

KITCHEN
12'-0''x 12'-0''

BED ROOM
13'-3''x 14'-0''

BATH OPEN
4'-x 7'

TV LOUNGE
26'-0''x 13'-0''

UP

GUEST BED BATH MAIN ENT


DRAWING 11'-0''x12'-0'' 6'-0''x 12'-0''
13'-3''x 24'-0''

DB

CAR PORCH
PASSAGE 4'
12'-8''x 28'-6''

CAR PORCH 17'-9''x


11'-4 1 2"'

STAIR CS

UP
PROJECT:
V.GATE PROPOSED EXTENSION OF HOUSE FOR
GATE Mr. CAP FAIZAN
DESIGN BY:
GROUND FLOOR PLAN RAMP INSHAULLAH MARWAT
UPS PLAN DATE: DWG TITLE:
JULY, 2021 ELECTRICAL
SCALE: DWG NO:
NTS E-06
OPEN
STORE
17'-0''x 9'-6''

BED ROOM
13'-8''x 12'-0''

KITCHEN
12'-0''x 12'-0''

BATH BED ROOM


4'-x 7' 13'-3''x 14'-0''

O
P
E
N

TV LOUNGE
26'-0''x 13'-0''

WR

WR WR

BED ROOM
13'-3''X 16'-3'' BED ROOM
BATH 12'-7 1 2"x 11'-0''
6'-0''x 8'-1''

WR
BATH
6'-10'-3 1 2"

VERANDAH
/TERRACE
DB

VERANDAH TERRACE
8' WIDE 12'-8''x 15'-9''

UP
PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN
FIX GLASS DESIGN BY:

INSHAULLAH MARWAT
FIRST FLOOR PLAN DATE: DWG TITLE:
UPS PLAN JULY, 2021 ELECTRICAL
SCALE: DWG NO:
NTS E-07
OPEN

O
P
E
N

TERRACE

DN MUMTY

PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN
FIX GLASS DESIGN BY:

INSHAULLAH MARWAT
TOP ROOF PLAN DATE: DWG TITLE:
UPS PLAN JULY, 2021 ELECTRICAL
SCALE: DWG NO:
NTS E-08
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN

PUBLIC HELATH DRAWINGS

PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN
DESIGN BY:

INSHAULLAH MARWAT
DATE: DWG TITLE:
JULY, 2021 PH DRAWINGS
SCALE: DWG NO:
NTS PH-01
6" Ø
3" Ø Sewer
Sewer PVC Pipe
PVC Pipe

OPEN
MH MH
6" Ø
Sewer
STORE PVC Pipe
17'-0''x 9'-6''

KITCHEN BED ROOM


12'-0''x 12'-0'' 13'-8''x 12'-0''

BATH
4'-x 7'
OPEN

4" Ø BED ROOM


SEWERAGE 13'-3''x 14'-0''
PVC PIPE
3" Ø
MH
Waste Water
PVC Pipe
TV LOUNGE
26'-0''x 13'-0''

6" Ø
PVC PIPE MH

UP
6" Ø
Sewer
BATH MAIN ENT PVC Pipe
6'-0''x 12'-0''
DRAWING
MH 13'-3''x 24'-0'' 3" Ø
GUEST BED Waste Water
11'-0''x12'-0'' PVC Pipe

4" Ø
6" Ø SEWERAGER
PVC PIPE PVC PIPE

MH
PASSAGE 4'

CAR PORCH 17'-9''x


11'-4 1 2"'
SEPTIC TANK
5'x7'
MH MH MH
STAIR CS

CAR PORCH
UP 12'-8''x 28'-6''
V.GATE
GATE PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN
GROUND FLOOR PLAN RAMP DESIGN BY:
6" Ø
PUBLIC HEALTH PLAN PVC PIPE INSHAULLAH MARWAT
TO MAIN SEWER LINE DATE: DWG TITLE:
JULY, 2021 PH DRAWINGS
SCALE: DWG NO:
NTS PH-02
3" Ø
Waste Water
PVC Pipe

OPEN

STORE
17'-0''x 9'-6''

KITCHEN BED ROOM


12'-0''x 12'-0'' 13'-8''x 12'-0''
BATH
4'-x 7'

O
P
E
BED ROOM N
4" Ø
SEWERAGE 13'-3''x 14'-0''
PVC PIPE
3" Ø
Waste Water
PVC Pipe WR
TV LOUNGE
26'-0''x 13'-0''

WR WR

BED ROOM BATH BED ROOM


13'-3''X 16'-3'' 6'-0''x 8'-1'' 12'-7 1 2"x 11'-0''
3" Ø
Waste Water
PVC Pipe

4" Ø
SEWERAGE
WR PVC PIPE

VERANDAH
BATH
/TERRACE
6'-10'-3 1 2"

TERRACE
12'-8''x 15'-9''

VERANDAH
8' WIDE

UP

PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
FIX GLASS Mr. CAP FAIZAN

FIRST FLOOR PLAN DESIGN BY:

INSHAULLAH MARWAT
PUBLIC HEALTH PLAN DATE: DWG TITLE:
JULY, 2021 PH DRAWINGS
SCALE: DWG NO:
NTS PH-03
OPEN KHURRA 2'x2'

SLOPE

PE
SLO
PE 2'x2' KURRAH
SLO

PE
SLO
O
P
TERRACE E
N
PE 1" STEEL BEND PATI
SLO

E
OP
SL
PE
SLO

PE
SLO
KHURRA 2'x2'

RIDGE LINE
4"Ø PIPE

PE
SLO

E
OP
PE
SLO 4"Ø L-BEND

SL
KHURRA 2'x2'

E
OP

SLOPE
SL SUMP PIPE DETAIL
TERRACE

E
PE OP
LO SL
S

E
OP
SL E
OP
SL
E
OP
SL

E
OP
SL

PROJECT:
PROPOSED EXTENSION OF HOUSE FOR
Mr. CAP FAIZAN

TOP ROOF PLAN DESIGN BY:

INSHAULLAH MARWAT
SLOPE PLAN DATE: DWG TITLE:
JULY, 2021 PH DRAWINGS
SCALE: DWG NO:
NTS PH-04