TREE Olivo Colocation EN

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

TOWERCO SOLUTION

COLOCATION
The Colocation process is the core business process of an infrastructure manager. This
process is carried out by a default workflow that enables to handle customer requests and
occupy the requested space in the managed infrastructures.

SCOPE
IMPROVEMENTS
This module has three functionalities that are essential for automati-
cally manage customer requests. Validation of the space available The customer itself can make his
for the new request, electrical power available and that the struc- requests and controls the status of
ture can safely support the new load. his requests at all times.

During the processing of the


request, it is possible to access
KEY CAPABILITIES
the technical feasibility of the
The infrastructure operator can generate its catalogue of services so request, so that the approval and
that customers can make their requests. The service catalogue allows subsequent implementation can
the automatic generation of budgets and the configuration of each proceed.
service to assess the location of the different elements, either on the
tower or on the ground. TREE operational processes allow
knowing at all times the installed
Thanks to the catalogue of services, the client has an initial budget inventory of each site (as well as the
with the assessment of the services. This budget can be modified if planned one).
additional services are necessary to be able to attend to the request
(reinforcement of the structure for example), but in any case, the BENEFITS
client has such information accessible and has to approve the costs
of the request for it to run. The available space may be shared
by different tenants.
The intervention of customers and suppliers in the whole process of
co-localization is carried out on the tool itself. The automation of processes
avoids manual errors in order to
Furthermore, TREE has a functionality to display a 3D model of a
maximize the efficiency of the
tower to properly assess its location.
procedure.

Reduces processing times and


improve the efficiency of the
process in each step.

Maximize site occupancy and


revenues associated.

TREE OLIVO / COLOCATION atrebo.com

You might also like