IBERDROLA

MESAIEED POWER PLANT PROJECT


National Contracting Co. LTD CONTRACTOR :

REQUEST FOR APPROVAL


RFA NO. : NCC-IBO-ECTN-005 ITEM:

DATE OF INSPECTION: 16.12.2009 ON: Wednesday TIME: 2.00 P.M

REQUESTED BY: N.C.C Ltd DESIGNATION: QA/QC SIGNATURE:


(Contractor)
RECEIVED BY: ON: TIME:
(Consultant)
TEAM: (Please select and √ box)

SURVEY √ INSPECTION MATERIALS TESTING OTHERS

WORK DESCRIPTION: (Please select and √ box)

EXCAVATION GSB ASPHALT PAVING BORE HOLE PILING WORKS

ROCK FILL PRIME COAT MATERIAL SAMPLING CONCRETE WORKS

EMBANKMENT FILL TACK COAT REBAR WORKS √ STEEL STRUCTURES

LOCATION: 400kV Gantry Circuit 1&2 and Circuit 3&4

WORK DETAILS: 400kV Gantry Verticality Checking

POSITION COMMENTS SIGNATURE

NCC QA/QC ENGINEER

CIVIL

400kV Single & Double Gantries for circuit 1&2 and 3&4 Easting:
STEEL
Checking of Verticality for Structures in Column CKT 1&2 and 3&4 Northing:
SUBCONTRACT STRUCTURES
OR
INSPECTORS
UTILITIES 400kV Gantry Verticality Checking

MATERIALS As per Method statement & As per Drawings

SITE INSPECTR

IBERINCO

MATERIALS
ENGINEER

OWNERS MPCL/PB

STATUS OF RFA: APPROVED APPROVED AS NOTED DISAPPROVED

DATE : IBO SIGNATURE OWNERS SIGNATURE


MESAIEED A IPP PROJECT
INSPECTION PROGRAMME

REQ.# NCC-IBO-48 REQ.Date:15.12.2009

IBO SUPERVISOR
Approved Drawing # and WITNESS POINT ( * )
Description of Actvity to Signature
Item RFA # REVISION # and approved Date Time
be Inspected (ready for client IBO CLIENT
Design Changes
Inspection) (I) (I)

NCC-IBO- 400KV Gantry Erection


1
ECTN-005 Checking
Checking of Verticality for
Structures in Column &
14T2-00-AA-EDP-NCC-003 16.12.09 2.00PM W W
Beam in Circuit 1&2 and
3&4

On Going Activities:

Company Contractor - NCC LTD IBERDROLA CLIENT


Name
Signature
Date

(*) W WITNESS POINT


NA NOT APPLICABLE

IBO QA FORM 1, Rev 0


VERTICALITY FOR 400kV GANTRIES
National Cotracting Co.Ltd
Record: 14T2-AA-EDP-NCC-010 Page 1 of 1
PROJECT : MESAIEED A IPP
KKS No:14T2--AA-EDP-NCC-IPP-01

400kV Gantry Steel Structures - CKT # 1&2 and 3&4

Actual Deviation After


Permissible Permissible
Height in Loading in (mm)
S.No Gantry No Deviation upto Deviation upto
(M)
10M Height (MM) Peak (MM)
E/W N/S

1 Gantry # 1 22 25 55
2 Gantry # 2 22 25 55
3 Gantry # 3 22 25 55

4 Gantry # 4 22 25 55
5 Gantry # 5 22 25 55
6 Gantry # 6 22 25 55

7 Gantry # 7 22 25 55

* Gantry 1, 2, 3, 4, 5, 6, 7 are loaded by insulator strings, Counter weight and Conductors, etc.

* The above mentioned verticality tolerance are as per KAHRAMAA - Qatar Technical Specifications for
Overhead line systems. (See attached KAHRAMAA specifications)

QC: NCC LTD QC: IBERDROLA

Date: 16.12.2009 DATE: 16.12.2009

Signature: Signature: