RFA & RFI For 400KV Gantry Verticality Checking
RFA & RFI For 400KV Gantry Verticality Checking
CIVIL
400kV Single & Double Gantries for circuit 1&2 and 3&4 Easting:
STEEL
Checking of Verticality for Structures in Column CKT 1&2 and 3&4 Northing:
SUBCONTRACT STRUCTURES
OR
INSPECTORS
UTILITIES 400kV Gantry Verticality Checking
SITE INSPECTR
IBERINCO
MATERIALS
ENGINEER
OWNERS MPCL/PB
IBO SUPERVISOR
Approved Drawing # and WITNESS POINT ( * )
Description of Actvity to Signature
Item RFA # REVISION # and approved Date Time
be Inspected (ready for client IBO CLIENT
Design Changes
Inspection) (I) (I)
On Going Activities:
1 Gantry # 1 22 25 55
2 Gantry # 2 22 25 55
3 Gantry # 3 22 25 55
4 Gantry # 4 22 25 55
5 Gantry # 5 22 25 55
6 Gantry # 6 22 25 55
7 Gantry # 7 22 25 55
* Gantry 1, 2, 3, 4, 5, 6, 7 are loaded by insulator strings, Counter weight and Conductors, etc.
* The above mentioned verticality tolerance are as per KAHRAMAA - Qatar Technical Specifications for
Overhead line systems. (See attached KAHRAMAA specifications)