Detailed Design
on
Mombasa Special Economic Zone Development Project
Inception Report
Table of Contents
Abbreviations
Project Location Map
第 1 章 F/S レビューの実施...........................................................................................................................................1-1
1.3 港湾建築施設......................................................................................................................................................1-1
1.3.1 港湾建築施設の詳細設計(DD)における基本方針............................................................................1-1
1.3.2 本事業で採用する規格・基準 (建築).....................................................................................................1-1
1.3.3 F/S からの変更又は追加事項.......................................................................................................................1-1
(1) F/S に記載された建築施設と KPA より提示された施設コンポーネント...........................................1-1
(2) 本事業での建設の可否・必要性ついての見解......................................................................................1-2
1.3.4 本事業の対象となる港湾建築施設の概要.............................................................................................1-3
1.3.5 敷地利用計画............................................................................................................................................1-4
(1) 施設配置計画の検討.................................................................................................................................1-4
1.3.6 各施設の概要............................................................................................................................................1-5
(1) ポートゲート及びオフィス.....................................................................................................................1-5
(2) 管理棟........................................................................................................................................................ 1-6
(3) 休憩・福利施設........................................................................................................................................1-7
(4) コンテナゲート及びオフィス.................................................................................................................1-8
(5) サブステーション.....................................................................................................................................1-9
(6) 発電機室(管理棟).................................................................................................................................1-9
(7) 給油施設.................................................................................................................................................... 1-9
(8) 電気・機械ワークショップ.....................................................................................................................1-9
(9) 荷役機械用ワークショップ...................................................................................................................1-10
(10) 消防署...................................................................................................................................................... 1-11
(11) カスタム倉庫...........................................................................................................................................1-11
(12) 公衆トイレ..............................................................................................................................................1-12
(13) 受水槽及び高架水槽...............................................................................................................................1-12
(14) 待機所...................................................................................................................................................... 1-12
1.3.7 港湾建築施設概略設計図.......................................................................................................................1-13
1) F/S レビューの実施
1.1 Port facilities
1.1.1 Design objectives in detailed design development
Planning and design development are based on the contents of the F/S report and function of
the existing facilities of Mombasa Port (especially Container Terminal-2 (CT2)).
The design objectives are shown below.
All facilities to promote a barrier-free concept to enable easy access for the peopl
accordance with Kenya and the International Standard.
To ensure safe and efficient port functions and facilitie s. They should not be excessive or
insufficient.
The plan will ensure cost efficiency and ease in maintenance while c
function as a social infrastructure.
To make efficient and effective use of the natural energy such as daylighting and natural
ventilation.
1
・ Administration Building ・Administration block
・ Substation ・Operation block
・ Water tower and water tank ・Public toilet (ablution)
・ Port labor rest facility ・Customs Warehouse
・ Gas station ・Fire engine station
・ Vehicle waiting area ・Mobile equipment workshop
・ Maintenance workshop ・Clinic
・ Generator room ・Port gate and office
・Container gate and office
・Substation
・Generator room
・Fuel station
・Police station
・Welfare building
・Water reservoir and elevated water tank
・Scanners/Radiations
・Bio-digester
Source:JCT
The necessity of the facility indicated by KPA was confirmed through a survey. There is a need
therefore to sort out the conditions for the facilities marked as △ or × in the above ta
shown below.
3
1.1.4 Outline of port facilities covered by this project
The table below is outline of the port facilities subject to this project.
The port gate and office, custom warehouse (including large X-ray equipment) will be installed
outside of the DK1 terminal, and other facilities will be planned in the DK1 terminal.
Total 9,363.5
ECC: Emergency Care Centre, RC: Reinforced Concrete Structure, S: Steel Structure
Source:JCT
5
2) 所要室の構成 List of the Required Rooms
The rooms required for Port Gate and Gate Office are shown in the table below.
Staff
室名 面積(m2) 備考
no.
Number
Floor
Room/Function of Notes
Area (m2) Workers
GL Port Gate (Canopy Area) 1,403.0 Traffic Lanes:4 In/4 out
GL Gate Office
-KRA office 36.0 8
-KPA office (Security) 36.0 7
-Kitchen 5.5
-Washrooms(M&W) 19.5
-Locker 7.5
-Storage 4.5
-Common Area 35
Administration Block
Electrical Seal Maintenance 48.5 5
Lobby 42.0
Common Area 115.5 Toilet (M,F,D), Storage, Kitchen
1F Operation Block
Accounts Office 105.0 12
Billing Stevedoring Office 42.0 4
Common Area 213.0 Toilet (M,F,D), Storage, Kitchen
Administration Block
CFS & Containerised Operations 69.5 8
(KRA)
Common Area 136.5 Toilet (M,F,D), Storage, Kitchen
2F Operation Block
Principal Operations Officer 36.8 2
Room (Ship & Resource)
Principal Operations Officer 36.8 2
Room (Planning & MIS)
Principal Operations Officer 36.8 2
Room (CFS)
Principal Operations Officer 36.8 2
Room (Shore)
Common Area 213.0 Toilet (M,F,D), Storage, Kitchen
Administration Block
KRA Office 69.5 6
Common Area 136.5 Toilet (M,F,D), Storage, Kitchen
3F Operation Block
Head of Operations 63.0 2
Conference Room 63.0
Janitor Room 15.0 2
Common Area 219.0 Toilet (M,F,D), Storage, Kitchen
4F Operation Block
Snr. Operations Officer Room 105.0
-Ship/Berth 1
-Yard Planning 1
7
-EDI Manifest 1
-Equipment 1
-Car Operation 1
Meeting Room 30.0
Common Area 225.0 Toilet (M,F,D), Storage, Kitchen
PH Operation Block
Signal Station 42.0 3
Common Area 48.0 Toilet (M,F,D), Storage, Kitchen
Total 2508.0 60
出 典: JCT
1F Dining 108.0
Kitchen 36 6
Chef's Office 15.0
Prayer Room(M,F) 12.6
Toilet (M,F,D) 37.8
ATM 18.0
Storage 13.5
Common Area 83.1
Total 720.0 8
出 典: 調査 団
8
(4) コンテナゲート及びオフィス Container Gate and Gate Office
1) 計画に当たっての留意事項
A Container Gate will be required in the future when the operation is transferred from KPA to
a private company etc. As with the Port Gate, it will be planned to follow the existing Gate 24.
2) 所要室の構成
The rooms required for Container Gate and Gate Office are shown in the table below.
Staff
室名 面積(m2) 備考
no.
GL Container Gate (Canopy Area) 770.5 Traffic Lanes:2 In/2 out
GL Gate Office
-KRA office 36.0 6
-KPA office (Security) 36.0 4
-Kitchen 5.0
-Washrooms(M&W) 20.0
-Common Area 11
Total 878.5 10
出 典: 調査 団
Total 380.0
出 典: 調査 団
9
2) 所要室の構成
The rooms required for Generator Room are shown in the table below.
Staff
室名 面積(m2) 備考
no.
GL Generator Room 70.0
Electrical Room 36.6
Common Area 23.4
Total 130.0
出 典: 調査 団
WC 5.9
Kitchen 3.2
Common Area 2.9
Total 504.0 8
出 典: 調査 団
10
tractor etc.). It will also include disassembling, cleaning, and reassembling the engine and other
m a c h i n e r y t o r e s t o r e t h e m t o t h e i r o r i g i n a l c o n d i t i o n . M o b i l e E q u i p m e n t Wo
planned to be able to operate this series of work.
2) 所要室の構成
荷 役機 械用 ワー クシ ョッ プの 要求 室は 以下 の表 の通 りで ある 。
The rooms required for Mobile Equipment Workshop are shown in the table below.
Staff
室名 面積(m2) 備考
no.
Including Tool store, Compressor
GL Workshop area 816.0 Room, laundry
Toilet (M, F) 12.0
Office 72.0
Electrical Room 18.0
Laundry 12.0
Common Area 30.0
Total 1152.0 6
出 典: 調査 団
11
Dormitory 81.0
WC, Shower 32.8
Common areas 14.4
Rest Room 40.5
Kitchen 24.3
Store 9.5
Total 540.0 6
出 典: 調査 団
Total 28.0
出 典: 調査 団
12
(13) 受水槽及び高架水槽 Water Reservoir and Elevated Water Tank
1) 計画に当たっての留意事項
The water supply system for this project will be an elevated water tank system. In the elevated
water tank system, water stored in a storage tank is pressurized by a pump and
elevated water tank, where it falls naturally and is sent to each facility. This system can supply a
certain amount of water even during water outages or power outages. At the same time, a water
storage tank for firefighting will be installed, and it is planned that the water for firefight
will be kept pressurized at all times by a pressurizing pump. The required capacity of the water
storage tank will be calculated based on the type of building, expected water usage, and number
of users.
Total 108.0
出 典: 調査 団
13
出 典: 調査 団
14