Working part : RCC drawings and Plant Area Lighting
Sr. Document status Status at Responsibility
No.
1 RCC Drawings : A Code : 24 nos Out of 8 drawings in B code, 6 Pravin
38 drawings drawings is at Ch2M side and submitted to B Code : 8 nos 2 drawings are with structural consultant for consultant side approval C Code: 6 nos
2 Out of 6 drawings in C code, 3 Pravin
drawings is at CH2m side and 3 drawings is with the structural consultant.
3 Plant Area Drawing is again sent to vendor as Bajaj Pravin
Lighting per final discussion 4 Operation and Nilesh is preparing the same. Aquachem Nilesh Maintenance Manual 5 Training to It is pending. We have to prepare Pravin MIDC officers presentation for the same.