Project: Taloja CETP upgradation

Team Handling: Nitin, Nilesh.

Working part : RCC drawings and Plant Area Lighting

Sr. Document status Status at Responsibility


No.

1 RCC Drawings : A Code : 24 nos Out of 8 drawings in B code, 6 Pravin


38 drawings drawings is at Ch2M side and
submitted to B Code : 8 nos 2 drawings are with structural
consultant for consultant side
approval C Code: 6 nos

2 Out of 6 drawings in C code, 3 Pravin


drawings is at CH2m side and
3 drawings is with the
structural consultant.

3 Plant Area Drawing is again sent to vendor as Bajaj Pravin


Lighting per final discussion
4 Operation and Nilesh is preparing the same. Aquachem Nilesh
Maintenance
Manual
5 Training to It is pending. We have to prepare Pravin
MIDC officers presentation for the same.