Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 11

NBC FORM NO.

B - 09
Republic of the Philippines City/Municipality of                                     
Province of                                                         
OFFICE OF THE BUILDING OFFICIAL
NOTICE OF VIOLATION
DATE
Sir/Madam:
Please be informed that an inspection conducted by this Office on                                                                                    of your
building/structure/construction and premises located at                                                                                                        
                                                                                                    reveals the following violation/s of the National Building Code (PD 1096) an
Implementing Rules and Regulations:
SECTION 301 – BUILDING PERMIT
 No person, firm or corporation, including any agency or instrumentality of the government shall erect, construct, alter, r
move, convert or demolish any building/structure or cause the same to be done without first obtaining a building permit the
from the Office of the Building Official assigned in the place where the subject building/structure is located or the bu
work is to be done.
SECTION 309 – CERTIFICATE OF OCCUPANCY
 Failure to post or display the Certificate of Occupancy at a conspicuous place on the premises of the building.
RULE II – ADMINISTRATIVE SANCTIONS
 Non-compliance with work stoppage order for alteration/addition/conversion/repair without permit.
 Use or occupancy without Certificate of Occupancy.
 Change in existing use or occupancy without Certificate of Change of Occupancy.
 Unauthorized changes during construction.
 Unauthorized change in type of construction from more fire-resistive to less fire-resistive.
 Non-compliance with order to abate or demolish.
 Non-compliance with work stoppage order for construction without permit.
                                                                                                                                                                             
                                                                                                                                                                             
                                                                                                                                                                             
You or your representative shall contact this Office within three (3) days from receipt hereof. Failure to do so shall cause this Office to institute
appropriate action against you.
Your cooperation on this matter is highly appreciated.
BUILDING OFFICIAL
(Signature Over Printed Name) Date                                     
Served by :_                                                         Date :                                                            Received :                                                      
Date: :                                                           

You might also like