1. Introduction .................................................................................................................................... 1
1. Take off quantities of the below work items of proposed Workers’ Rest Room block in
accordance with NRM2 as per attached drawings................................................................................ 3
2. Part A: Describe 3 main pre-design studies you recommend to carry out for the site. ............ 10
3. Conclusion .................................................................................................................................... 11
4. References .................................................................................................................................... 12
iii
Table of Figures
List of Tables
iv
1. Introduction
1
PART A
Take-off Quantities for Worker’s Rest
Room
2
1. Take off quantities of the work items for proposed Workers’ Rest Room block in
accordance with SMM7 as per attached drawings
2. T D S Description T D S Description
Project: Proposed Worker’s
Room for AQUA
Consultants Ltd
DWG No: WR/01
Date: 18/02/2022
3
1. T D S Description T D S Description
Removing Trees (D20.1.1.2) Excavation (D20.2.2.3)
Removing 3 nos of Jack trees, Excavation commencing from
3 girth 1.50m to 3.00m underside of the top soil, bulk
inclusive of grubbing up roots excavation not exceeding 2m
and filling voids with deep in reduce level
imported red earth. 14.40
6.78
Site Clearance (D20.1.3.4) 0.30
Clear site of all vegetation 29.30
including other growth and Total wall length = 14400mm
25.5 dispose off-site, extending Total wall width = 6782mm
12.0 the land 20m x 10m for site
306 clearance Surplus excavated materials
Length = 13.5+12 = 25.5m to be removed 5km away
Width = 7 + 5 = 12m from the site.
4
1. T D S Description T D S Description
Support to faces (D20.7.2.3) 39.66 Rubble Masonry Wall in
External earthwork support 0.45 Foundation
42.40 for 225mm thick brick wall, 1.15 20.52 1.5ct sand mixed rubble
1.15 48.76 depth not exceeding 2.0m masonry walls in foundation
External perimeter girth 450mm thick built against
=(2x14400) + (2x6782) other work
=42364mm
5
1. T D S Description T D S Description
Damp Proof Course (DPC) Imported Filling
39.66 Damp proof course >300mm Imported filling to makeup
0.45 17.85 wide 20mm thick - horizontal 13.05 levels, beds over 50mm thick
6.33 82.61 but not exceeding 500mm
7.42 thick deep finished thickness
0.30 2.23 Damp proof course ≤300mm
20.08 wide 20mm thick - horizontal
= 36164 – (4x2x1/2x75)
= 35864mm
6
1. T D S Description T D S Description
T.O list: Superstructure
7
1. T D S Description T D S Description
8
9
PART B
Bills of Quantities (BOQ)
2. Part B
10
3. Conclusion
11
4. References
12