This document provides a cost estimation for a major overhaul of transformer TK-2, including assessment tests such as insulation resistance, turn ratio, and oil analysis tests to check properties like color, water content, and flash point. It lists the test items and codes, unit prices, and calculates subtotals to estimate the total material and service costs of IDR for the job order.
This document provides a cost estimation for a major overhaul of transformer TK-2, including assessment tests such as insulation resistance, turn ratio, and oil analysis tests to check properties like color, water content, and flash point. It lists the test items and codes, unit prices, and calculates subtotals to estimate the total material and service costs of IDR for the job order.
This document provides a cost estimation for a major overhaul of transformer TK-2, including assessment tests such as insulation resistance, turn ratio, and oil analysis tests to check properties like color, water content, and flash point. It lists the test items and codes, unit prices, and calculates subtotals to estimate the total material and service costs of IDR for the job order.
RAW MATERIAL & SERVICE COST ESTIMATION FOR JOB ORDER
Job Order No. : Major overhaul TK-2
Job Description : TK-2 Major Overhaul Assessment Main & HV Aux Transformer PR Department : CoGen TK2
IC Code Unit Price ( USD ) Tot
No. Code Number Item Description Qty UoM M S MS Material Service Materia 1 ~ Assessment Transformer ( Main & Auxilliary ) X 2 ACT 1. Characteristic Test a. Insulation resistance b. Polarization index c. Turn ratio d. Excitation test current phase R-S-T e. Winding resistance test 2. Tan Delta a. High to low (H-HL) b. High to Ground (H) c. Low to Ground (L) 3. PDC ( Polarization Depolarization Current ) 4. FDC ( Frequency Domain Spectroscopy ) 5. SFRA (Sweep Frequency Response Analysis ) 6. Oil Analysis a. Colour, ASTM D 1500 b. Water Content, IEC 814 c. Neutralization value, IEC 296 d. Dissipation factor, IEC 247 e. Resistifity, IEC 247 f. Flash Point, ISO 2719 g. Sediment, IEC 422
Sub Total Cost Estimation ( IDR ) :
Reduce Material Cost ( IDR ) : Total Cost Estimation ( IDR ) : Grand Total Cost Estimation ( IDR ) : OB ORDER