ADAMSON UNIVERSITY

Civil Engineering Department


PRACTICUM – 50001/50002
Midyear Term SY 2022-2023

ACCOMPLISHMENT REPORT NO.2


JUNE 27- JULY 02,2022

Name of Practicumer: ASUNCION, ALYSSA MARIE R. Program: BS Civil Engineering Student No: 201912244
Company Name: Ybalai Builders Name of Project: Proposed 2-Storey Residential Renovation
Company Address: 1254 Don Pedro St., Brgy. 759, Santa Ana Manila, 1004 Project Address: 102 Apitong, Ayala Alabang

DESCRIPTION OF SUPERVISOR’S
INCLUSIVE DATES DETAILS OF THE ACTIVITY PERSONAL REMARKS
ACTIVITY ASSIGNED REMARKS
Informing the interns about
Intern was able to know an
Orientation of Ybalai their respective sites. Tips
easy way to go to the site and
with Project and Field for commute like an easy
June 27,2022 have an idea what to say to N/A
Engineers via zoom way to go to the sites.
the people in the inspection
meeting Meeting the supervisors in
area for an easy access.
each site.
Intern was adjusting with the
Familiarizing the routine of everyday routine of a Field
Site Inspection and a Field Engineer and also Engineer. Learned how to
June 28,2022 Meeting the the site. Reading the plan read architectural plans. N/A
supervisor review. Learning how to do Intern is not used to the
the breakdown of workers. breakdown of workers, so
still learning.
Started to do the
breakdown of workers in
Intern was able to learn the
each room. Supervisor
right format to make an easy
assigned interns to do a
and fast way to do
material monitoring
Materials Monitoring breakdown reports. Was able
wherein we will double
and Area Estimation of to learn how to estimate
check the materials that are
Architectural ceiling ceiling and tiling with the
June 29,2022 On-site, to be follow-up, N/A
and tiling. And guide of the architectural
and ordered by looking at
Breakdown of plan in a spreadsheet. In
the receipt with the
workers. materials monitoring, Intern
quantity of each material.
utilize a spreadsheet for an
In the Estimation, we get
easy tracking of quantity of
the area of each room
materials that are on-site.
where they will install a
ceiling and tiling.
Prepared by: Checked by:

ALYSSA MARIE R. ASUNCION ENGR. JOYCE C. VILLAMAR


Electronic Signature Date: 27-Jun-2022 Electronic Signature Date: 1-Jul-2022
Intern made an organized
breakdown report of workers
and progress report of the
Always starting our day site. Intern learned how to do
with the breakdown of estimating by getting the
Estimating Rebars, workers. Supervisor number of rebars and
Stirrups, Concrete, assigned interns to do an stirrups, total volume of
June 30,2022 and Formworks. And estimating in rebars, concrete, number of phenolic N/A
Breakdown of stirrups, concrete, and boards to be used. Learned
workers. formworks. Supervisor the word ‘toolbox meeting’,
entertain our questions for learned the different sizes
the site. and lengths of rebars.
Learned the concrete cover
sizes for ground, beams and
columns, and slabs.
Supervisor made us do the
breakdown of reports but
Intern was able to
that time we should identify
communicate not only to the
which workers are skilled or
supervisor but also with the
Inspection of labor. Supplier visits the site
Foreman and other Head of
openings, listing the for an inspection of
the workers in the site. Intern
issues and concerns in openings. It is more on
was getting used to doing a
site, and searching for measurements of window
breakdown report. Intern
a concrete cylinder openings and wardrobes.
was able to find the wrong
July 01,2022 mold supplier. Supervisor assigned interns N/A
measurement of opening in
Breakdown of workers to do a list of issues and
the site and was able to find a
and Meeting the Head concerns in the site starting
possible supplier for concrete
of electrical, from June 27- July 1.
cylinder mold. As for the
plumbing, mechanical, Supervisor assigned us to
issues and concerns, intern
pool. look for the wrong
learned the different
measurement of opening in
solutions in each issue in the
the site and to look for a
site.
supplier of concrete
cylinder mold.
July 02,2022 N/A
Prepared by: Checked by:

ALYSSA MARIE R. ASUNCION ENGR. JOYCE C. VILLAMAR


Electronic Signature Date: 27-Jun-2022 Electronic Signature Date: 1-Jul-2022