Sr. No. Items Location Reference Phase Unit No.s Length (m) Total Remarks
(m) thk. (m)
1.5.2 Embankments - 2 Road Ramp for Dyke Cu.M 1 13 10 2 260 Flat portion at the Dyke top
1.5.2 Embankments - 2 Road Ramp for Dyke Cu.M 1 29 8 2 232 Sloping Portion only
1.5.2 Embankments - 2 Road Ramp for Culvert-1 Cu.M 1 29 20 3 1740 Flat portion at the Dyke top
1.5.2 Embankments - 2 Road Ramp for Culvert-1 Cu.M 1.5 31.5 14.5 3 1027.7 Sloping Portion only
1.5.2 Embankments - 2 Road Ramp for Culvert-2 Cu.M 1.5 12 14 3 378.0 Sloping Portion only
3637.7
2.1 Site Preparation Plot Boundary J55 Sq.M. 1 303 432 130896
2.1 Site Preparation Dedn for Road type-1 J55 Sq.M. -1 489 12 -5868
2.1 Site Preparation Dedn for Road type-2 J55 Sq.M. -1 1612 6 -9672
2.1 Site Preparation Dedn for SWD J55 Sq.M. -1 3295 1.5 -4942.5
2.1 Site Preparation Dedn for U-304 J55 Sq.M. -1 97.3 97.5 -9486.75
2.1 Site Preparation Dedn for U-302 J55 Sq.M. -1 14 11 -154
2.1 Site Preparation Dedn for U-204 J55 Sq.M. -1 30.2 30.2 -912.04
2.1 Site Preparation Dedn for D-501A/B J55 Sq.M. -1 22.3 13.3 -296.59
2.1 Site Preparation Dedn for G-504A/B J55 Sq.M. -1 11 10 -110
2.1 Site Preparation Dedn for D-502A/B J55 Sq.M. -1 19.5 10 -195
2.1 Site Preparation Dedn for G-503A/B J55 Sq.M. -1 11.3 10.3 -116.39
2.1 Site Preparation Dedn for U-501 J55 Sq.M. -1 40 20 -800
2.1 Site Preparation Dedn for U-502 J55 Sq.M. -1 11 11 -121
2.1 Site Preparation Dedn for U-205 J55 Sq.M. -1 10.3 20.3 -209.09
2.1 Site Preparation Dedn for U-205/206 J55 Sq.M. -1 10.3 28.3 -291.49
2.1 Site Preparation Dedn for U-101 J55 Sq.M. -1 20.3 20.3 -412.09
2.1 Site Preparation Dedn for D-101 J55 Sq.M. -1 24.3 24.3 -590.49
2.1 Site Preparation Dedn for G-206A/B J55 Sq.M. -1 13.3 10.3 -136.99
2.1 Site Preparation Dedn for U-203 J55 Sq.M. -1 19.5 10.3 -200.85
2.1 Site Preparation Dedn for G-204A/B J55 Sq.M. -1 16.1 10.3 -165.83
2.1 Site Preparation Dedn for U-202 J55 Sq.M. -1 20.3 15.3 -310.59
2.1 Site Preparation Dedn for G-203A/B J55 Sq.M. -1 15.9 10 -159
2.1 Site Preparation Dedn for D-503 J55 Sq.M. -1 10 10 -100
Dedn for
2.1 Site Preparation G-205A/B,207A/B,E- J55 Sq.M. -1 40.7 10.3 -419.21
201,D-203
Dedn for
2.1 Site Preparation G-205A/B,207A/B,E- J55 Sq.M. -1 9.3 6.15 -57.195
201,D-203
2.1 Site Preparation Dedn for U-301 J55 Sq.M. -1 49.7 106 -5268.2
2.1 Site Preparation Dedn for U-201 J55 Sq.M. -1 44.7 24 -1072.8
2.1 Site Preparation Dedn for D-201,202,204 J55 Sq.M. -1 161.1 65.6 -10568.16
6.1.1.1 Heavy Duty Paving - 200 Thk For G-504A/B J55 Sq.M. 1 11 10 110
6.1.1.1 Heavy Duty Paving - 200 Thk For G-503A/B J55 Sq.M. 1 11.3 10.3 116.39
6.1.1.1 Heavy Duty Paving - 200 Thk For G-206A/B J55 Sq.M. 1 13.3 10.3 136.99
6.1.1.1 Heavy Duty Paving - 200 Thk Ffor G-204A/B J55 Sq.M. 1 16.1 10.3 165.83
6.1.1.1 Heavy Duty Paving - 200 Thk For G-203A/B J55 Sq.M. 1 15.9 10 159
6.1.1.1 Heavy Duty Paving - 200 Thk For G-205A/B,207A/B,E- J55 1 40.7 10.3 419.21
201,D-203 Sq.M.
For G-205A/B,207A/B,E-
6.1.1.1 Heavy Duty Paving - 200 Thk 201,D-203 J55 Sq.M. 1 9.3 6.15 57.195
6.1.1.2 Heavy Duty Paving - 150 Thk For U-204 J55 Sq.M. 1 30.2 30.2 912.04
6.1.1.2 Heavy Duty Paving - 150 Thk Dedn for D-501A/B J55 Sq.M. 1 22.3 13.3 296.59
Heavy Duty Paving - 150 Thk Dedn for tank J55 3.14 -2 5.6 -49.2
6.1.1.2 Heavy Duty Paving - 150 Thk Dedn for D-502A/B J55 Sq.M. 1 19.5 10 195
Heavy Duty Paving - 150 Thk Dedn for tanks J55 3.14 -2 6.6 -68.4
6.1.1.2 Heavy Duty Paving - 150 Thk Dedn for U-501 J55 Sq.M. 1 40 20 800
6.1.1.2 Heavy Duty Paving - 150 Thk Dedn for U-502 J55 Sq.M. 1 11 11 121
6.1.1.2 Heavy Duty Paving - 150 Thk Dedn for U-205 J55 Sq.M. 1 10.3 20.3 209.09
6.1.1.2 Heavy Duty Paving - 150 Thk Dedn for U-205/206 J55 Sq.M. 1 10.3 28.3 291.49
6.1.1.2 Heavy Duty Paving - 150 Thk Dedn for U-101 J55 Sq.M. 1 20.3 20.3 412.09
6.1.1.2 Heavy Duty Paving - 150 Thk Dedn for D-101 J55 Sq.M. 1 24.3 24.3 590.49
Heavy Duty Paving - 150 Thk Dedn for tank J55 3.14 -1 9.6 -72.3
6.1.1.2 Heavy Duty Paving - 150 Thk Dedn for U-203 J55 Sq.M. 1 19.5 10.3 200.85
6.1.1.2 Heavy Duty Paving - 150 Thk Dedn for U-202 J55 Sq.M. 1 20.3 15.3 310.59
6.1.1.2 Heavy Duty Paving - 150 Thk Dedn for D-201,202,204 J55 Sq.M. 1 161.1 65.6 10568.16
Heavy Duty Paving - 150 Thk Dedn for tanks J55 3.14 -3 37 -3224
7.3.1 Plant Road Type 1- 8m Road pipe track/ service J55 489 489
corridor M
13.2.1 Storm Water Drain-1 pipe track/ service J55 824 824
corridor M
13.2.1 Storm Water Drain-1 Off-spec storage pond J55 M 390 390
13.2.1 Storm Water Drain-1 U-204 J55 M 1033 1033
13.2.1 Storm Water Drain-1 U-501 J55 M 118 118
13.2.1 Storm Water Drain-1 U-205,206,101 J55 M 499 499
13.2.1 Storm Water Drain-1 U-205,202,203 J55 M 87 87
13.2.1 Storm Water Drain-1 SUB, PIB, Parking J55 M 344 344
3295
15.1.1.1 Valve pit of size 1.5m W X 1.5m L X 1.2m D For Fire Water Nos 1
15.1.4 Valve pit of size 1.5m W X 2m L X 1.2m D for OWS For OWS Nos 4
16.2.1.1 Gates - Emergency Gates- 6.3m 2 posts for each gate Nos
16.2.1.2 Gates - Emergency Gates- 8.3m 2 posts for each gate Nos
16.1.2 Gates - Boom Gates 2 posts for each gate Nos
20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-002 J60-3 M 3 55 8 2 165
20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-002 J60-3 M 2 93 8 2 186
20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-003 J60-3 M 2 60 8 2 120
20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-003 J60-3 M 2 55 8 2 110
20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-003 J60-3 M 1 72 8 2 72
20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-005 J60-3 M 4 40 8 2 160
20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-005 J60-3 M 1 65 8 2 65
20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-006 J60-3 M 4 70 8 2 280
20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-006 J60-3 M 1 60 8 2 60
20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-006 J60-2 M 6 35 8 2 210
20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-007 J60-3 M 3 60 8 2 180
20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-007 J60-3 M 2 55 8 2 110
20.4.1 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-008 J60-5 M 4 96 6 2 384
20.4.1 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-008 J60-5 M 2 95 6 2 190
20.4.1 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-009 J60-5 M 3 95 6 2 285
20.4.1 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-009 J60-5 M 1 55 6 2 55
20.4.1 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-010 J60-5 M 2 90 6 2 180
20.4.1 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-010 J60-5 M 1 55 6 2 55
20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-011 J60-2 M 1 60 8 2 60
20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-011 J60-2 M 2 55 8 2 110
20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-012 J60-2 M 1 60 8 2 60
20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-013 J60-2 M 1 95 8 2 95
20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-013 J60-2 M 1 55 8 2 55
20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-013 J60-2 M 1 52 8 2 52
20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-014 J60-2 M 1 55 8 2 55
20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-014 J60-2 M 1 100 8 2 100
20.4.1 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-016 J60-5 M 4 33 6 2 132
20.4.1 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-016 J60-5 M 2 45 6 2 90
20.4.1 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-016 J60-5 M 2 90 6 2 180
20.4.1 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-016 J60-5 M 2 65 6 2 130
10 Inch Pipe FW M
20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-002 J60-3 Sq.M. 1 744 206 153264
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -4 65 -13267
20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-003 J60-3 Sq.M. 1 342 206 70452
20.3.1 200mm thick approved clean sand cushion Dyke area J60-3 Sq.M. 1 262 266 69692
20.3.1 200mm thick approved clean sand cushion Dyke area J60-3 Sq.M. 1 211 70 14770
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -4 62 -12070
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -3 35 -2885
20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-005 J60-3 Sq.M. 1 183 71 12993
20.3.1 200mm thick approved clean sand cushion Dyke area J60-3 Sq.M. 1 202 61 12322
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -3 9 -190.755
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -2 24 -904.32
20.3.1
20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-006 J60-3 Sq.M. 1 239 120 28680
20.3.1 200mm thick approved clean sand cushion Dyke area J60-3 Sq.M. 1 159 65 10335
20.3.1 200mm thick approved clean sand cushion Dyke area J60-3 Sq.M. 1 80 40 3200
20.3.1 200mm thick approved clean sand cushion Dyke area J60-2 Sq.M. 1 100 90 9000
20.3.1 200mm thick approved clean sand cushion Dyke area J60-2 Sq.M. 1 60 50 3000
20.3.1 200mm thick approved clean sand cushion Dyke area J60-2 Sq.M. 1 50 30 1500
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -3 37 -3223.995
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -1 27 -572.265
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -4 20 -1256
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -2 14 -307.72
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-2 Sq.M. -2 15 -353.25
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-2 Sq.M. -2 8 -100.48
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-2 Sq.M. -4 14 -615.44
20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-007 J60-3 Sq.M. 1 272 166 45152
20.3.1 200mm thick approved clean sand cushion Dyke area J60-3 Sq.M. 1 151 85 12835
20.3.1 200mm thick approved clean sand cushion Dyke area J60-3 Sq.M. 1 266 216 57456
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -3 42 -4154.22
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -2 30 -1413
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -1 35 -961.625
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -1 61 -2920.985
20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-008 J60-5 Sq.M. 2 475 207 196650
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-5 Sq.M. -4 73 -16733.06
20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-009 J60-5 Sq.M. 2 409 259 211862
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-5 Sq.M. -4 75 -17662.5
20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-010 J60-5 Sq.M. 1 407 258 105006
20.3.1 200mm thick approved clean sand cushion Dyke area J60-5 Sq.M. 1 202 258
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-5 Sq.M. -3 75 -13246.875
20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-011 J60-2 Sq.M. 1 545 144 78480
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-2 Sq.M. -2 64 -6430.72
20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-012 J60-2 Sq.M. 1 270 135 36450
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-2 Sq.M. -1 64 -3215.36
20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-013 J60-2 Sq.M. 1 411 328 134808
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-2 Sq.M. -2 84 -11077.92
20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-014 J60-2 Sq.M. 1 411 328 134808
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-2 Sq.M. -2 84 -11077.92
20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-015 J60-4 Sq.M. 4 52 52 10816
20.3.1 200mm thick approved clean sand cushion Dyke area J60-4 Sq.M. 4 56 50 11200
20.3.1 200mm thick approved clean sand cushion Dyke area J60-4 Sq.M. 4 56 56 12544
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-4 Sq.M. -4 23 -1661.06
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-4 Sq.M. -4 20 -1256
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-4 Sq.M. -4 27 -2289.06
20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-016 J60-5 Sq.M. 2 225 50 22500
20.3.1 200mm thick approved clean sand cushion Dyke area J60-5 Sq.M. 1 230 150 34500
20.3.1 200mm thick approved clean sand cushion Dyke area J60-5 Sq.M. 1 109 102 11118
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-5 Sq.M. -6 18 -1526.04
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-5 Sq.M. -3 41 -3958.755
20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-5 Sq.M. -3 29 -1980.555
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-002 J60-3 Sq.M. 1 78 19 1482
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-003 J60-3 Sq.M. 1 57 12 684
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-003 J60-3 Sq.M. 1 39 8 312
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-005 J60-3 Sq.M. 1 30 11 330
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-005 J60-3 Sq.M. 1 52 9 468
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-006 J60-3 Sq.M. 1 49 10 490
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-006 J60-3 Sq.M. 1 76 9 684
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-006 J60-2 Sq.M. 1 66 10 660
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-006 J60-2 Sq.M. 1 84 18 1512
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-007 J60-3 Sq.M. 1 65 10 650
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-007 J60-3 Sq.M. 1 72 11 792
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-008 J60-5 Sq.M. 1 90 13 1170
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-009 J60-5 Sq.M. 1 61 13 793
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-011 J60-2 Sq.M. 1 54 10 540
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-013 J60-2 Sq.M. 1 28 10 280
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-014 J60-2 Sq.M. 1 29 10 290
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-015 J60-4 Sq.M. 1 74 10 740
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-015 J60-4 Sq.M. 1 25 10 250
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-015 J60-4 Sq.M. 1 60 10 600
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-016 J60-5 Sq.M. 1 30 12 360
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-016 J60-5 Sq.M. 1 33 12 396
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-016 J60-5 Sq.M. 1 27 12 324
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-016 J60-5 Sq.M. 1 27 12 324
Primary Road: 8m wide + 2m wide shoulder J60-S-VA-541686-011 J60 J60-2 1411 1411
13.1.1 M
Primary Road: 8m wide + 2m wide shoulder
13.1.1 J60-S-VA-541686-012 J60 J60-2 M 588 588
Primary Road: 8m wide + 2m wide shoulder J60-S-VA-541686-015 J60 J60-4 1404 1404
13.1.1 M
Primary Road: 8m wide + 2m wide shoulder
13.1.1 J60-S-VA-541686-016 J60 J60-5 M 867 867
19467
0
13.2.2 Storm Water Drain - 2 M
13.2.3 Storm Water Drain - 3 M
13.2.4 Storm Water Drain - 4 M
16.2.1.1 Gates - Emergency Gates- 6.3m 2 posts for each gate Nos
16.2.1.2 Gates - Emergency Gates- 8.3m 2 posts for each gate Nos
16.1.2 Gates - Boom Gates 2 posts for each gate Nos
15879
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-002 J60 J60-3 m 1 578 578
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-002 J60 J60-3 m 1 578 578
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-002 J60 J60-3 m 1 578 578
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-002 J60 J60-3 m 1 578 578
15.3.1.4a Rect ditch with gratting -1 0
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-003 J60 J60-3 m 1 548 548
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-003 J60 J60-3 m 1 548 548
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-003 J60 J60-3 m 1 528 528
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-003 J60 J60-3 m 1 528 528
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-003 J60 J60-3 m 1 351 351
15.3.1.4a Rect ditch with gratting -1 0
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-005 J60 J60-3 m 1 193 193
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-005 J60 J60-3 m 1 193 193
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-005 J60 J60-3 m 1 193 193
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-005 J60 J60-3 m 1 223 223
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-011 J60 J60-2 m 1 560 560
26104
Important Note to Subcontractor : Subcontractor shall include associated preliminaries in direct rates only. No Separate
preliminaries are to be quoted.
A] PKG#5 - AREA-4 / UTILITY & OFFSITE MEI
S.No Bill Provisional Subcontract
Provisional Element Description Remarks
Price in USD
No.
1 Bill-3 Structural Erection 9,943,631
2 Bill-4A Field Piping 17,555,504
3 Bill-4.1 Primary Pipe Supports 364,780
4 Bill-4.2 Piping Offline Manual Valve Testing 138,000
5 Bill-5.1 Static Equipment Erection 4,612,170
6 Bill-5.2 Rotary Equipment Erection 7,422,728
7 Bill-8 Piping Insulation 17,386,382
8 Bill-8E Equipment Insulation 3,063,635
9 Bill-9 Field Piping Painting 1,305,421
10 Bill-10 HSE Not Included
11 Bill-6 Electrical 14,266,464
12 Bill-6.1 Telecom 1,531,163
13 Bill-6.2 Cathodic Protection Not Included
14 Bill-7 Instrumentation 6,060,684
15 N.A EXCLUSIONS / QUALIFICATIONS / DEVIATIONS
TOTAL PRICE FOR
PKG#5 - AREA-4 / UTILITY & OFFSITE MEI ==> 83,650,562