Progress Report & Plan - SNT3 - Project
Progress Report & Plan - SNT3 - Project
Progress Report & Plan - SNT3 - Project
REPORT
SATRIA-1 GATEWAY INFRASTRUCTURE FACILITIES MULTIFUNCTION SATELLITE
PUBLIC-PRIVATE PROJECT
PROGRESS
REPORT ACTIVITY
24/08/2022 17.06, WIB 24/08/2022 17.52, WIB 24/08/2022 20.58, WIB 24/08/2022 10.29, WIB
EQUIPMENT ARRIVED ON LOCATION RACK SERVER ASSEMBLY PROCESS RACK SERVER ALREADY ASSEMBLED PDU UNIT CHECK
PROJECT
RACK INSTALATION &
PENARIKAN KABEL FO (BANJARMASIN). *
* Intalasi tergantung jadwal kedatangan
rack server di lokasi.
SCHEDULE SEPT. 7
EST. EQUIPMENT ARRIVE ON
LOCATION
SEPT. 12
SITE VISIT “ BANJARMASIN”
AUG. 29
SHIPPING TO BANJARMASIN
( RACK SERVER, PDU, ROUTER, ACCESS POINT )
AUG. 24&25
RACK SERVERS
INSTALATIONS CIKARANG
TBC TBC
PONTIANAK GATEWAYS
MANOKWARI GATEWAYS
TBC
READY
TBC JAYAPURA GATEWAYS
BANJARMASIN GATEWAYS
AMBON GATEWAYS
TBC
TIMIKA GATEWAYS
READY
CIKARANG GATEWAYS
TBC
KUPANG GATEWAYS
SITE VISIT EQUIPMENT SHIPPING EQUIPMENT ARRIVED ON LOCATION EQUIPMENT INSTALLATIONS ASSESMENT