Professional Documents
Culture Documents
Proposed 3 Storey Campus
Proposed 3 Storey Campus
STEEL BRIDGE
EXISTING
BUILDING CIRCULAR POST
2 ROOF PLAN
A-2
COMPANY
BUILDING
TOP OF THE BEAM LINE TOP OF THE BEAM LINE
NGL NGL
ADDITIONAL
REMOVE LEDGE DOOR PANEL
1 FRONT ELEVATION 3 RIGHT-SIDE ELEVATION
A-3 A-3
REMOVE LEDGE
APEX LINE APEX LINE
NGL NGL
2 PANEL FOR
ALL WINDOW AT
2 REAR ELEVATION 4 LEFTT-SIDE ELEVATION
REAR A-3 A-3
COMPANY