Rehabilation and Upgradation to 2L+PS Cofiguration of Jalkot-Togari section of NH-50 from km 65.952to km 111.409 (Design chainage) (excluding km 96.

240
to 96.820 and km 97.190 to km 97.895) in the State of Maharashtra through an Engineering ,Procurement and Constrution(EPC)mode

Chainage differences (Sructures)

Existing Structure to be Sech-A (Existing Sech-B (Design. Proposed Span AS On site


Sr. no EX Span Remarks
Structure built Ch.) Ch) Per SCHEDULE B Chainages

1 HPC 1*1.2 HPC 67+910 66+660 1*1.200 66+668


2 HPC 1*1.2 HPC 68+385 67+135 1*1.200 67+139
3 NEW CUP 67+375 1*7
4 MNB 1*86 MNB 68+760 67+490 2*10 67+494
5 NEW BC 68+285 1*2.0*2.0 68+285
6 HPC 3*0.900 BC 70+645 69+360 1*3.0*2.5 69+370
7 HPC 1*1.2 HPC 71+150 69+865 1*1.200 69+875
8 HPC 3*0750 BC 71+910 70+625 1*3.0*2.5 70+635
9 HPC 1*1.2 HPC 72+390 71+110 1*1.200 71+120
10 HPC 3*900 BC 73+280 71+990 1*3.0*2.5 72+004
11 NEW BC 72+515 1*2.0*2.0 72+510
12 HPC 1*1.2 HPC 74+140 72+845 1*1.200 72+858
13 MJB MJB 74+875 74+575 4*25 74+601
14 HPC 1*1.2 HPC 77+590 76+285 1*1.200 76+296
15 NEW BC 77+400 1*2.0*2.0 77+442
16 NEW BC 77+740 1*2.0*2.0 77+765
17 MNB 4*5.3 MNB 79+615 78+280 4*10 78+306
18 HPC buried BC 79+975 78+645 1*2.0*2.0 78+666
19 HPC 3*900 BC 80+545 79+210 1*3.0*2.5 79+235
20 HPC 4*900 BC 81+850 80+520 1*4.0*2.5 80+543
21 HPC 1*1.2 HPC 83+260 81+930 1*1.200 81+958
22 MNB 2*6.5 MNB 83+540 82+210 5*10 82+235
23 NEW CUP 82+350 1*7
24 HPC 1*1.2 HPC 83+850 82+520 1*1.200 82+540
25 HPC buried BC 83+920 82+590 1*2.0*2.0 82+608
26 HPC 1*1.2 HPC 84+045 82+715 1*1.200 82+748
27 HPC 1*1.2 HPC 84+630 83+300 1*1.200 83+338
28 HPC 1*1.2 HPC 85+000 83+660 1*1.200 83+692
29 MNB 2*4.2 MNB 85+040 83+710 2*10 83+745
30 MNB 5*6.0 MNB 85+360 84+030 4*10 84+070
31 HPC 1*1.2 HPC 86+460 85+125 1*1.200 85+172
32 HPC 1*1.2 HPC 86+860 85+525 1*1.200 85+575
33 HPC 3*0750 BC 87+160 85+830 1*3.0*2.5 85+878
34 HPC 1*1.2 HPC 87+665 86+330 1*1.200 86+383
35 HPC 2*0.750 HPC 88+565 87+230 2*1.200 87+292
36 HPC 1*1.2 HPC 88+960 87+610 1*1.200 87+671
37 MNB 2*4.0 MNB 89+445 88+100 2*10 88+136
38 MNB 2*5.6 MNB 90+220 88+880 3*10 88+937
39 HPC 1*1.2 HPC 90+480 89+125 1*1.200 89+068
40 NEW - BC - - 1*2.0*2.0 89+400
41 MNB 2*5.6 MNB 90+730 89+370 2*10 89+661
42 HPC buried BC 90+955 89+595 1*2.0*2.0 89+451
43 HPC 1*1.2 HPC 91+610 90+250 1*1.200 90+316
44 MNB 2*6.5 MNB 91+905 90+545 3*10 90+609
45 MNB 3*6.9 MNB 92+680 91+315 16 91+379
46 HPC 1*1.2 HPC 93+360 91+985 1*1.200 91+925
47 HPC 6*1.2 MNB 95+580 92+200 1*10 92+269
48 HPC 1*1.2 HPC 93+880 92+500 1*1.200 92+552
49 NEW HPC 2*1.200 92+824
50 NEW HPC 2*1.200 93+757
51 MNB 2*4.0 MNB 95+210 93+820 1*10 93+895
52 HPC 1*1.2 HPC 99+560 98+170 1*1.200 98+170
53 HPC 1*1.2 HPC 100+560 99+170 1*1.200 99+265
54 HPC 1*1.2 HPC 101+060 99+670 1*1.200 99+799
55 HPC 1*1.2 HPC 102+210 100+820 1*1.200 100+800
56 HPC 2*1.2 HPC 102+795 101+400 2*1.200 101+383
57 HPC 1*1.2 HPC 102+960 101+570 1*1.200 101+700
58 NEW CUP 102+800 1*7 102+584
59 HPC 4*1.2 BC 104+260 102+870 1*6.0*3.0 102+783
60 HPC 2*1.2 HPC 104+570 103+180 2*1.200 103+156
61 MNB 2*5.7 MNB 106+460 105+065 2*10 105+046
62 MNB 2*6 MNB 106+890 105+500 16 105+478
63 SC SC 107+440 106+050 1*3.6*2.5 106+028
64 SC SC 107+875 106+480 1*4.0*2.5 106+443
65 NEW CUP 107+950 1*7 107+910
66 HPC 1*1.2 HPC 109+445 108+055 1*1.200 108+035
67 SC 2*1.8 BC 110+125 108+735 1*4.0*2.5 108+714
68 MNB 3*5.7 MNB 110+520 109+140 3*6.5 109+136
69 HPC 4*1.2 HPC 111+105 109+700 1*1.200 109+677
70 HPC 4*1.2 BC 112+200 110+800 1*6.0*3.0 110+769
71 SC 1*3.6 BC 112+430 111+025 1*4.0*2.5 111+002
72 HPC 1*1.2 HPC 112+780 111+375 1*1.200 111+351