Book Summary
Book Summary
By:
JEMAL EBRAHIM
September 2014
Dessie/Ethiopia
Introduction
At the upper level of the project management process is project control. It can be part of the day‐
to‐day responsibilities of the project manager, or it can be under the jurisdiction of the more
specialized project analyst. Project control combines the management skills of the project
manager with the analytical focus of the professional accountant. The construction industry has
always been cost and schedule conscious; however, in lean economic times, that consciousness
maintaining a delivery date often define the difference between success and failure. Contracts
carry substantial penalties for performance failures in the form of liquidated damages as well as
the actual and consequential damages that may result from the delay.
Getting to the finish line on time is critical. No less critical for the contractor is controlling costs
in the process. The mainstream use of computers in the construction process has been a
tremendous boon to the industry; at the same time, it has added a layer of complexity to the
management process. The data is collected, collated, updated, filtered, and finally released for
the project manager to analyze and interpret. The resulting information, subjective as it may be,
is driving the decision process, leaving the manager with little doubt as to the appropriate real
With the correct and timely information, decisions can be made and actions implemented.
Productivity studies have proven that human performance and its corresponding labor costs have
always been the wild card in the construction process. In comparison, material costs are more
easily definable and to a large degree finite. Accurate estimating procedures and recognized
professional standards help to pinpoint material quantity and cost. This is not so with labor.
1
Despite standardized procedures for most tasks and a bounty of data on production rates, small
errors can force labor costs to run amok. Labor requires the lion’s share of management time to
estimate, schedule, monitor, and control. Productivity for even the simplest task can be affected
by a plethora of variables from crew size to weather. Productivity models, once created for an
individual project, must be monitored and controlled, and deviations from those models require
corrective actions. For projects that extend over multiple years, the concept of project control
becomes even more of a concern. Costly projects with labor‐intensive tasks such as process
piping or electrical distribution lines must be monitored to ensure adherence to the estimated
productivity rates. With these types of tasks, a small decrease in productivity can become chronic
The key to successful project control is the fusing of cost to schedule whereby the management
of one helps to manage the other. This requires that a task’s cost and its duration have a direct
relationship, and not be just the scheduler’s arbitrary assignment. Ensuring that relationship is
correct and setting the appropriate baseline for tracking is the domain of the project control
expert. Accurate project control also serves as the basis of historical cost data for fine-
This book will explore the reasons behind and the methodologies for proper planning,
monitoring, and controlling both project costs and schedule. It will take a fresh, simplified look
at the topic of project control as it applied in the construction industry today. To this end, in
chapters one, the book explains the basics project management theory and a brief history of the
science. This chapter emphasis on the benefits of proper planning are significant and provide an
in‐depth education on the project itself. As the lead on the project team, the project manager
2
plays a role in the project management process that cannot be overstated. It is the project
More importantly, in this chapter the author provides brief discussion of the concept of project
management and how it is applied in the construction industry. Focus on the process was limited
to what was needed for a frame of reference for later in this text. While project management is
the parent discipline, its offspring, project control, is the concentration of this text. Even a
technically flawless project is soured by cost and schedule overruns and can damage
relationships between parties. Therefore, project control is an essential aspect of the project
management process.
It also discusses the different approaches to project management and the five processes within
the Traditional Approach. It reviews the roles and goals of the project manager in the
construction industry today. It defines the role of the contract documents in the controls process.
Lastly, the book explored the relationship between the schedule and the budget.
Moreover, this chapter reviewed the basic concept of project management with special focus on
its application to the construction industry, also including a brief history of project management
and the contribution of two of its early practitioners, and introduced several approaches to
project management but highlighted the most common methodology and its five steps or
processes: initiating, planning, executing, monitoring and controlling, and closing. Besides, the
book in this chapter also explained the roles of the contract documents—plans, specifications,
and addenda—in the project management process. It is one of the most important tools the
project manager uses to manage. The schedule and the budget are two critical components that
3
Following this, in chapter two, the author outlined introduction to project Control for the reader
how the project control process works, where it fits in the project management process, and some
of the more common project control terms and formulae. To this end, the book presents an
overview of project control and the role of schedule and cost. It defines the terminology behind
the process with formulas common to the control process and the project control cycle. In the
overview section of this chapter, the reader was introduced to the project control process by
identifying where project control fits in the overall project management profession and who
The two main components for project control are time and cost, which are represented in real
project terms by the budget and the schedule. It is from the budget and schedule that the
performance measurement baseline is created and set in place as the guidance system during the
project life cycle. It is the integration of the budget with the progress of the schedule that allows
the project manager to know exactly where the progress of the project lies. The reader was
introduced to some of the more common terms used in project control and a systematic
elaboration of how the project control cycle works during an average construction project.
After providing a general understanding of the project control process and why it exists in
chapter one and two, in its chapter three, the book discuss how it begins with a special focus on
the planning stages and setup for project control including the importance of communication and
provides a window to the key personnel and their responsibilities in the cycle. The importance of
pre‐construction planning and setting both budget and schedule for baseline controls cannot be
4
over emphasized. Pre‐Construction Planning involves setting in place policies and procedures so
that each action is effective and efficient. This leaves more time for the problem solving that is
Means and methods for the plan are created and ratified by the project team and go on to become
the detailed CPM schedule or baseline for measuring performance from a time reference. Equally
important is the original budget, derived from the estimate that will be the baseline for cost
control. Some team members are direct employees of the contractor; others are bound to the
project through their contract with the owner. Still other team members are peripheral such as the
Identifying the team and their individual responsibilities is essential to setting up project control
and getting the project off to a good start. When all of the team members function effectively and
efficiently, and understand the communication plan, information flows freely and in a timely
manner among the group, and the project progresses. This synergy of individuals working
cooperatively to further the project goals becomes the project team. Each team member
contributes to the information stream for the project and allows others to make decisions based
on that information.
Under Chapter of the book, the author focus on the project schedule, and define it as a review of
basic scheduling types and methods, with a detailed review of the critical path method. It
A major part of the integrated control process is the schedule. The schedule is the plan set to
time. The project schedule, once complete and agreed upon, becomes the baseline for the
5
progress and performance measurement. Performance is based on the relationship or
interdependency between tasks on the schedule. Regular updates to the schedule allow the team
to analyze the status of the project and what, if any, decisions or corrective actions are required.
In addition, the book in this chapter explains schedule and the estimate are different but very
much interrelated in project control. It is the integration of both schedule and cost that allows the
project manager the accurate control needed to manage the work. Having reviewed the
scheduling process in the project control paradigm, it is now time to consider the budget and its
role in project control. Thus, in chapter five, as per its sequence, the book provides highlights on
the Budget, which is the cost side of the controls process and the fundamentals of going from
estimate to budget. In line with this, the book in this chapter discusses the specifications and the
organizational structure of the budget. It reviews the creation of the cost breakdown structure and
Of equal importance to the integrated control process is the project budget. Since few projects, if
any, have unlimited financial resources, tracking costs are an essential part of determining
project status. The estimate is deconstructed into a Cost Breakdown Structure to arrive at the as
planned budget for entire categories of work as well as detailed tasks. The level of detail in the
budget is directly related to the level of project control necessary to manage the project. CSI
Master Format, used for the WBS in the scheduling process, is often employed to arrive at the
CBS. This provides continuity across both cost and schedule that provides for more accurate and
In Chapter 6, in integrating the schedule and the budget, the book explores how the integration
provides the necessary tools to manage the project. Integrate the schedule and the budget for the
6
full impact of project control is all about the combination of both schedule and budget that
allows the project manager the range of control needed to manage the work. Besides, integrating
the Schedule and the Budget provides detail on how both of these come together to create the full
view of project control. It provides a brief introduction into developing the Schedule of Values.
Combining costs with schedule allows the project manager a new window into the status of the
project. The direct relationship between progress and the amount of money earned remains
constant. The project manager can use the integrated information to predict future performance
As the basis for payment, the project manager creates the Schedule of Values (SOV) that reflects
the full value of the work including overhead and profit. It is the SOV that will be used along
with the schedule to establish the value of the work the contractor will be paid. It is critical that
the individual items in the SOV represent real, not inflated values to obtain a genuine status of
Following this, the book deals with calculating and analyzing progress, to explore the
measurement process further and the last component to the Earned Value Management system. A
crucial part of the project control process is the accurate measurement of the progress of the
work, without which it would be impossible to calculate the status of the project accurately. It is
the measurement of progress for each individual item, however dissimilar from the next, which
summarizes the overall progress of the project. Moreover, calculating and analyzing progress
explores how performance is measured, and expands on the concept of Earned Value
Management for both fixed and variable budgets. It explains the schedule and cost performance
7
measurements and indicators so crucial to determining project status. Most analysis is performed
Computers allow the project manager to do analysis on hundreds or perhaps thousands of cost
accounts that provide the team with real time data for decision making. The first step in
analyzing progress is measuring the amount of work performed. There are six methods for
measuring the quantity of work performed. Once the quantity of work has been determined, it
must be compared with the amount of work that was planned to be accomplished. This process is
called Earned Value Analysis, and it is the basis for payment to the contractor. There are two
Approaches for performing Earned Value Analysis: the Fixed Budget and Variable Budget
approaches. Each has unique characteristics that make them appropriate applications.
A very important tool for the project manager is the measure of performance, both schedule and
cost. This is done by measuring the efficiency of both cost and schedule performance and is
expressed in ratios as CPI and SPI, respectively. It can also be reported as a difference in cost
represented by a dollar value. These are the CV and the SV, respectively. Analyzing progress
and its monetary value is part of the tracking process and occurs during the execution of the
work. However, it has little chance of success if the appropriate baseline controls for costs and
In Chapter 8— the book analyzing and reporting variances in schedule and cost will explore the
reasons behind variances and the information that can be derived from them. Having determined
that either the schedule or the cost of the plan is not proceeding as intended, the project manager
must review and analyze data. He or she must then decide if action needs to be taken or if the
variance is part of the normal course of events. Analyzing and Reporting Variances in Schedule
8
and Cost provides a look at how to interpret and display project data through common tools such
as the S‐curve and root cause analysis, and how the data can be reported for use. Sources of
information for project control are numerous and as such require careful analysis in order to be
of value. One tool for analyzing and comparing data is the Earned Value S‐curve (EVS). The
EVS allows the team to compare planned versus actual schedule and cost data and derive
Efficiency factors can signal a problem that may require further analysis to determine the cause.
While there are many causes of variances, there are some common threads to both cost and
schedule variance. Some can be identified and corrected easily when they exceed the threshold
set by the team. Others require a more in depth analysis through a process called a Root Cause
Analysis.
The Tracking Gantt chart can compare actual start/finish dates and durations of individual tasks
and their impact on the critical path. Other types of graphic depictions such as control, SPI, and
CPI charts indicate a bigger picture tracked over time. As with all project information, good or
bad, it must be shared so that stakeholders know the status and the project team can correct or
The discussion was expanded to include the efficiency ratios that are helpful in identifying any
variations. The next step is to consider the scale of the variances and efficiencies and what
impact they may have on the project, if any at all. For most variances there is a reason; some are
easily determined and others require a more in depth investigation. Moreover, the chapter
9
explore the presentation of the analyses, how they are interpreted, potential causes of the
Chapter 9 of the book discuss on recognizing trends and forecasting performance in elaborating
how the data can be used to spot trends and predict future performance. One of the biggest
advantages to project control is not only to look at past and current performance but to try to
predict what will happen at crucial points in the future of the project up to its completion.
Recognizing Trends and Forecasting Performance explains how the measurements and the
derived data can be used to recognize emerging trends and how the same data can be used to
forecast future performance. It also explains key indicator values for predicting final
performance.
One of the tangible benefits of the comprehensive collection and analysis of data is its use in
forecasting future performance. Several key values aid the project team in predicting future cost
and schedule performance. The main one is the EAC, which defines the anticipated cost based on
The ETC is the amount required to complete the task, measured in dollars or in labor‐hours. The
VAC is the variance at completion, and it is the difference in dollars or labor‐hours between the
baseline value and forecasted value. These values can be calculated not only at completion but
also as various percentages of completion of the project. The To‐Complete Performance Index
(TCPI) is a ratio of work remaining to remaining cost. Another overall status frame of reference
is project percentage analysis, which is the measure of planned earnings and costs.
In Chapter 10, the book deals with productivity, and explore performance and some of the
factors that affect it. For most construction projects, the biggest concern and focus of project
10
control analysts is labor. While the management of materials and equipment is crucial, labor has
been and will remain the deciding factor in most projects. When we discuss efficiency factors
like CPI and SPI, we are almost always looking to productivity as the influencing factor. This
chapter will discuss the concept of productivity and the factors that affect it.
Productivity is a measure of the efficiency of labor. The productivity index compares planned
production to actual production. There are numerous factors that affect productivity, many of
which are within the control of the project team and most of which center around management
Following this, in chapter 11—Acceleration and Schedule Compression, the book discuss on the
have delivery dates. The owner dictates some, and the contractor dictates some. Most delivery
dates are contractual. There is a multitude of reasons, but the most prominent one is that a project
needs a delivery date for control. Without a delivery date, there is no goal and human natures
In construction, the age-old adage of “time is money” becomes very apparent for all parties
when the work is delayed. Many contracts include the phrase “time is of the essence” to establish
the criticality of time management as it relates to economic significance. Lost revenue, extended
overhead, additional financing, and pending damages can all change the dynamics of the project
Beyond money, there are the logistical considerations that are part of a delay. What happens to a
restaurant grand opening that is rescheduled due to construction delay or the first day of school
11
that has to be postponed? Both have a far‐reaching impact. Schedule is important and, on
occasion, more important than cost. Every project manager will at one time or another face a
project that has fallen behind schedule. The project manager may have to consider acceleration
of the work to make up the time or may be requested to compress the schedule to deliver early.
Both are common and must be understood fully to manage and control.
why and how they are used. It also considers schedule compression and what can be expected.
Finally, it looks at time‐cost trade‐off analysis and what it means in terms of task performance.
The requirement for schedule compression can occur for many reasons. To reduce the duration
requires that the work be accelerated. There are three forms of acceleration: actual, constructive,
and forced. Each has unique conditions that are required for its use. Deciding on which activities
to crash is part of Time-Cost Trade-off Analysis in which the lowest cost per day task is crashed
first, then proceeding to tasks that are more expensive. The exception to this is when lower cost
tasks offer more risk for failure. In this circumstance, higher cost tasks are selected.
Making the case for acceleration requires careful and thorough calculations of savings and
increased costs as well as any potential areas of high risk. There must be a distinct reduction in
schedule for any funds expended. Early delivery of a project is usually desirable; however,
discussion and approval of other parties, especially the owner, is essential to avoid an unprepared
or unwilling owner. Recovery schedules are often contractually required when a project exceeds
Chapter 12 of a book deals with resource management and explore the timely and efficient use of
labor and equipment resources as a means to control costs and schedule. From the very
12
beginning, this text has stressed the value of planning. Planning is not limited to the earliest
phases of the project, but is the continual mantra throughout the entire process. Right up to the
very end, the project manager must plan for the project closeout. Initial planning for baseline
controls is considered the long-term planning aspect of the project. However, there is still a need
to plan for resources to execute the work in the short term. This part of project control is called
resource management. Resource management has two key goals: to insure that the correct
resource is available at the correct time and in sufficient quantity, and to insure that the resource
is used efficiently.
Shortages and mismanagement of resources are frequent causes of substantial delays. Most
project managers have watched tradesmen standing idly by due to lack of materials, or
experienced delays due to the wrong piece of equipment used in performing a task. Proper
types of inefficiencies.
Resource Management develops the concept of resources and how they can impact a project.
Resource and material management is introduced as a practical method for control. The
availability and efficient use of resources, especially labor, is always of paramount concern to
project managers when trying to control costs. Early attention to the limitations of the available
resources and periods of high demand can often be planned for in the scheduling of resources.
Even though appropriate durations have been scheduled in the CPM, problems can still arise
when demand for the same resource occurs at the same time.
constrained projects focus on the fixed delivery date while resource constrained projects work
13
around a fixed amount of resources with a more flexible delivery date. While resource
should not be discounted. Resource management is a valuable tool in project control even if the
precision is unattainable.
Resource leveling uses float available in noncritical tasks to absorb the labor available after
periods of high demand. While resource leveling is a desirable practice, excessive attention on
leveling can refocus the team away from the goal of the scheduled delivery. Resource
management also includes the appropriate and timely management of material and equipment.
This starts in the early phases of the construction process with timely and correct submittals.
Chapter 13 of a book discuss on risk management and consider the impact of risk on project
control and various ways to reduce or allocate risk with other parties. All projects contain some
amount of risk. Construction project risk is defined as the chance of an uncertain event or
condition occurring, one that can have a positive or negative effect on the goals of the project. A
risk has a cause, and if it occurs, a consequence. Experienced project managers realize it is
Although some risks can have a positive impact, the vast majority and the main concern of the
project manager are the risks with negative consequences. Some potential risks can be identified
in advance and a plan to deal with them can be developed and implemented if they occur. Others
The sources of risk in construction are numerous. Some are within the control of the project team
and others, such as extreme weather events, economic changes, and material shortages, are
clearly outside of the team’s best efforts to control. It is the goal of a proactive risk management
14
process to identify potential risks, reduce their chance of occurring, and minimize their impact if
they do occur. The successful management of project risk can provide better control for the life
of the project and can substantially improve the likelihood of achieving the project goals of time
and budget.
The primary responsibility of the project manager is to identify and manage risk. Each process or
discipline in the project control spectrum focuses on reducing the negative occurrences that can
sink a project. Despite the best efforts, risk can never fully be eliminated, so a plan to manage or
minimize its impact must be developed and implemented if the event occurs. The primary take‐
away is that risk management is limited by the assumptions on which the calculations are based.
As with all parts of the project control process, risk must be recognized in the early planning
stages so that a plan can be developed to address it in the most economical way possible. The
concept of planning for risk helps compensate for the inevitability of some risks occurring. The
risk identification process follows the Work Breakdown Structure as an outline to avoid
omission. It forces a detailed analysis of what can go wrong and what is its impact should it
occur.
Experience has shown that using a structured process for dealing with the known and unknowns
of the construction project minimizes delay, manages cost, and reduces personnel fatigue. In
general, risk management adds value to the control process. Risk management is predicated on
the project or company’s tolerance for risk. How much confidence is the project willing to pay
for?
Finally, in chapter 14 of a book, an author deals with project closeout which is the final stages of
project control that deal with the analysis of performance through the lessons learned process. In
15
addition, all of the data from the project must be saved, archived, and made available as a guide
to future performance so that mistakes are not repeated and achievements are. The final step in
the construction project life cycle is the project closeout. While project closeout occurs at the end
of the project, planning for closeout starts in the initial pre‐construction phase. The information
and documentation needed for closeout are collected from the very early stages, beginning even
before the execution of the work. The physical construction work is clearly the largest phase of
the construction process; however, it is not the only phase. There is administrative and
contractual paperwork that play a large part in the transferring of the project from the
construction team to the owner’s team. Project closeout is not a complicated process, but it can
be time-consuming.
Moreover, Project Closeout discusses how projects are wrapped up and the importance of
project management principles for the extra level of professional control so many projects are in
need of. Of equal importance to the planning phase of the project is the closeout of the project.
To prevent critical information learned during execution from being forgotten, the closeout
process begins almost immediately with the start of the work. Setting specific criteria for
monitoring and reporting closeout early on helps create value in the process and eliminates the
crisis management that occurs in the absence of a protocol. Establishing a plan early helps
prevent “holes” or the inevitable omissions that occur near the end of each project.
16
Project closeout can be classified into two categories, contract and administrative, each with its
own field of focus. Overlapping duties in each can often provide a check and balance to the
process, thereby ensuring a complete transition. The final documentation is archived for future
use. The closeout process is aimed at creating a smooth transition between the contractor and the
owner during the turnover. This turnover must be orderly and professional and must demonstrate
the contractor’s commitment right to the end. Ideally, each project imparts some practical
wisdom on the participants. It is the by-product of experiencing and solving real life problems or
creating opportunities that are part of every project. Documenting and sharing this wisdom to
help improve future projects is part of the lessons-learned process and crucial to the growth of
Conclusion
Successful projects do not happen by accident. Far too often, construction projects fail due to a
only to deliver an individual project, but also to stay in business. In this book, the author
analyzes the concept of project control and how it is critical to achieve project success.
Managing the schedule can help manage costs. Projects frequently fail because contractors focus
on cost or schedule, not both simultaneously. We all have heard the phrase “time is money.” This
truth cannot be overstated. Project Control explains how schedule and budget are integrated and
discusses how to anticipate, prepare for, and resolve the inevitable road bumps that commonly
occur on construction projects large and small. A key component that is stressed throughout the
text is planning. Sounds simple, right? It’s not. Planning requires due diligence not only at the
17
Developing and updating a CPM schedule, monitoring cash flow, allocating resources,
and anticipating risks are just some of the factors of planning that are discussed within this text.
Those of us in the industry that have witnessed projects that fall behind schedule or exceed
For a myriad of reasons, construction projects often do deviate from the initial schedule and/or
budget. Project Control examines the details behind how performance is measured and tracked
and provides the tools to analyze a project at any phase. By creating a detailed budget and CPM
schedule and regularly monitoring performance in relation to these items, a project manager can
identify and evaluate causes of significant deviation and take corrective action to keep the project
on time and on budget. Of equal importance, Project Control teaches the reader not only how to
nature of the project, the cause of the deviation, the budget, the schedule, and risk factors
associated with any potential solution. Project Control provides an in‐depth look at these items
and offers sound, practical advice for determining and evaluating potential solutions. Many
books have been written about project management, but none that I have read have been tailored
18