Commissioning Service Department

Commissioning Standard Test Formats


Description: FUNCTIONAL TEST – BBP & CBF Record No.:
Bay no.: Drawing ref.: Sheet: 1 of 21
Contractor: Contract no.: Substation No :

As Per the Schematic Drawings the Contents in This Test Format Can Be Modified

1.GENERAL DATA AND INFORMATION

Panel Designation
Serial No
Manufacture
Dwg & Sch No
Panel No

2.MECHANICAL CHECK AND VISUAL INSPECTION As per TCS–P-105 Rev -01,


Item no 4.1

Item Description Checked


1 Check tightness of all connections Yes N/A
2 Inspect for physical damage / defects Yes N/A
3 Panel condition, cleanliness, organization, labeling, readiness for Yes N/A
service, panel doors, handles...etc
4 CT shorting checked Yes N/A
5 Indications checked Yes N/A
6 Contact resistance of tripping and alarm checked Yes N/A
7 Check the ferrules as per specification Yes N/A
8 Confirm that each panel has been properly secured to the floor in its Yes N/A
final service location.
9 Panel Earthing checked Yes N/A
10 Confirm that panels are constructed and wired as per SEC relevant Yes N/A
specification.
11 Check case cover and gasket for proper seal against dust. Yes N/A
12 Check all installed equipment nameplate information for compliance to Yes N/A
approved drawings and equipment /material lists.
13 For all internal and external panel wiring, confirm that all screw Yes N/A
terminations are tight and that crimp connectors are firmly secured to
the wire and to the termination point. Ensure that no part of the wire is
bent at the termination point. Check Ferrules.
14 Check that panel equipment is mounted securely and protected against Yes N/A
mal operation due to vibration, shock, etc
15 Use of ring type terminals for wire termination for current circuit Yes N/A
wires.

3. GENERAL PANEL FUNCTIONAL CHECKS: As per TCS–P-105 Rev -01, Item no


5.1 & 5.7

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: FUNCTIONAL TEST – BBP & CBF Record No.:
Bay no.: Drawing ref.: Sheet: 2 of 21
Contractor: Contract no.: Substation No :

Item Description Remarks


1 Check Output Of Ac Outlet Yes N/A
2 Check Illumination Lamp Yes N/A
3 Check Door Switch Yes N/A
4 Check Heater / Thermostat Yes N/A

4. DC LOOP TEST

Loop Open Due to Supervision Relay


Loop
MCB Protection
Function TB FMK ( ) ( ) Expected Actual
off Relay

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: FUNCTIONAL TEST – BBP & CBF Record No.:
Bay no.: Drawing ref.: Sheet: 3 of 21
Contractor: Contract no.: Substation No :

5. SINGLE LINE DIAGRAM

23
0
23 236
130
4

134 13
6
BB SEC BB SEC 2B UPPER BUS
2A
226A 226B
BB SEC
BB SEC LOWER
1B
1A BUS
406
306 124A
206 404
304 124B
106 104 204

120

205 405
305 105

UGF GRID T1 UGF GRID T2

6. FUNCTIONAL CHECKS OF DISCRIMINATION ZONE 1A

Discrimination zone Check zone Trip initiate

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: FUNCTIONAL TEST – BBP & CBF Record No.:
Bay no.: Drawing ref.: Sheet: 4 of 21
Contractor: Contract no.: Substation No :

CT In/Out CT
In/Out 87B 87B-CH Expected Actual
supervision status supervision
In Healthy Operated In Healthy Operated Yes
In Healthy Operated Out Healthy ------ Yes
Not
In Healthy Operated In Un healthy Yes
operated
Out Healthy ------ In Healthy Operated Yes
Out Healthy ------ Out Healthy ------ NO
Not
Out Healthy ------ In Un healthy No
operated
Not
In Un healthy In Healthy Operated Yes
operated
Not
In Un healthy Out Healthy ------ NO
operated
Not Not
In Un healthy In Un healthy No
operated operated

Note:
1. Observe R130 86B-1A / 86B-2A. For zone 1A / 2A trip indication.
2. Observe R130 86B-1B / 86B-2B. For zone 1B / 2B trip indication.

7. FUNCTIONAL CHECKS OF DISCRIMINATION ZONE 2A:

Discrimination zone Check zone Trip initiate


In/Out CT 87B In/Out CT 87B-CH Expected Actual

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: FUNCTIONAL TEST – BBP & CBF Record No.:
Bay no.: Drawing ref.: Sheet: 5 of 21
Contractor: Contract no.: Substation No :

supervision status supervision


In Healthy Operated In Healthy Operated Yes
In Healthy Operated Out Healthy ------ Yes
Not
In Healthy Operated In Un healthy Yes
operated
Out Healthy ------ In Healthy Operated Yes
Out Healthy ------ Out Healthy ------ No
Not
Out Healthy ------ In Un healthy No
operated
Not
In Un healthy In Healthy Operated Yes
operated
Not
In Un healthy Out Healthy ------ No
operated
Not Not
In Un healthy In Un healthy No
operated operated

Note:
1. Observe R130 86B-1A / 86B-2A. For zone 1A / 2A trip indication.
2. Observe R130 86B-1B / 86B-2B. For zone 1B / 2B trip indication.

8.FUNCTIONAL CHECKS OF DISCRIMINATION ZONE 1B:

Discrimination zone Check zone Trip initiate


CT In/Out CT
In/Out 87B 87B-CH Expected Actual
supervision status supervision
In Healthy Operated In Healthy Operated Yes
Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: FUNCTIONAL TEST – BBP & CBF Record No.:
Bay no.: Drawing ref.: Sheet: 6 of 21
Contractor: Contract no.: Substation No :

In Healthy Operated Out Healthy ------ Yes


Not
In Healthy Operated In Un healthy Yes
operated
Out Healthy ------ In Healthy Operated Yes
Out Healthy ------ Out Healthy ------ No
Not
Out Healthy ------ In Un healthy No
operated
Not
In Un healthy In Healthy Operated Yes
operated
Not
In Un healthy Out Healthy ------ No
operated
Not Not
In Un healthy In Un healthy No
operated operated

Note:
1. Observe R130 86B-1A / 86B-2A. For zone 1A / 2A trip indication.
2. Observe R130 86B-1B / 86B-2B. For zone 1B / 2B trip indication.

9.FUNCTIONAL CHECKS OF DISCRIMINATION ZONE 2B:

Discrimination zone Check zone Trip initiate


CT In/Out CT
In/Out 87B 87B-CH Expected Actual
supervision status supervision

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: FUNCTIONAL TEST – BBP & CBF Record No.:
Bay no.: Drawing ref.: Sheet: 7 of 21
Contractor: Contract no.: Substation No :

In Healthy Operated In Healthy Operated Yes


In Healthy Operated Out Healthy ------ Yes
Not
In Healthy Operated In Un healthy Yes
operated
Out Healthy ------ In Healthy Operated Yes
Out Healthy ------ Out Healthy ------ No
Not
Out Healthy ------ In Un healthy No
operated
Not
In Un healthy In Healthy Operated Yes
operated
Not
In Un healthy Out Healthy ------ No
operated
Not Not
In Un healthy In Un healthy No
operated operated

Note:
1. Observe R130 86B-1A / 86B-2A. For zone 1A / 2A trip indication.
2. Observe R130 86B-1B / 86B-2B. For zone 1B / 2B trip indication.

10.Functional Checks of Discrimination Zone 1A & 2A (130, 120, &230) are Open

Check Zone operation Condition is simulated:

Bus bar protection Bay bus Disconnector 86B (1A) 86B(2A)


zone operation position Expected Actual Expected Actual
104 Open N.OP N.OP

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: FUNCTIONAL TEST – BBP & CBF Record No.:
Bay no.: Drawing ref.: Sheet: 8 of 21
Contractor: Contract no.: Substation No :

Close OP N.OP
106 Open N.OP N.OP
1A Close N.OP N.OP
(87B 1A) 304 Open N.OP N.OP
Close OP N.OP
306 Open N.OP N.OP
Close N.OP N.OP
104 Open N.OP N.OP
Close N.OP N.OP
106 Open N.OP N.OP
2A Close N.OP OP
(87B 2A) 304 Open N.OP N.OP
Close N.OP N.OP
306 Open N.OP N.OP
Close N.OP OP

Note: N.OP = Not Operated, OP = Operated.

11.Functional checks of Discrimination Zone 1B & 2B (130, 120, &230) are open

Check Zone operation Condition is simulated

Bus bar Bay bus 86B (1B) 86B(2B)


protection zone disconnector Expected Actual Expected Actual
operation position
204 Open N.OP N.OP

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: FUNCTIONAL TEST – BBP & CBF Record No.:
Bay no.: Drawing ref.: Sheet: 9 of 21
Contractor: Contract no.: Substation No :

Close OP N.OP
206 Open N.OP N.OP
1B Close N.OP N.OP
(87B 1B) 404 Open N.OP N.OP
Close OP N.OP
406 Open N.OP N.OP
Close N.OP N.OP
204 Open N.OP N.OP
Close N.OP N.OP
206 Open N.OP N.OP
2B Close N.OP OP
(87B 2B) 404 Open N.OP N.OP
Close N.OP N.OP
406 Open N.OP N.OP
Close N.OP OP

Note: N.OP = Not Operated, OP = Operated.

12. Functional checks of Discrimination Zone 1A & 2A with the following conditions,
Bus coupler (i.e., 134,136 &130) closed and (120 & 130) are open:
Check Zone operation Condition is simulated:

Bus bar Bay bus 86B (1A) 86B(2A) Bus Coupler 130
protection disconnector Expected Actua Expected Actual 86B(1A) 86B(2A)
zone operation position l
104 Open N.OP N.OP OP N.OP
Close OP N.OP OP N.OP

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: FUNCTIONAL TEST – BBP & CBF Record No.:
Bay no.: Drawing ref.: Sheet: 10 of 21
Contractor: Contract no.: Substation No :

106 Open N.OP N.OP OP N.OP


1A Close N.OP N.OP OP N.OP
(87B 1A) 104&106 OP OP OP OP
closed
304 Open N.OP N.OP OP N.OP
Close OP N.OP OP N.OP
306 Open N.OP N.OP OP N.OP
Close N.OP N.OP OP N.OP
304&306 OP OP OP OP
closed
104 Open N.OP N.OP N.OP OP
Close N.OP N.OP N.OP OP
106 Open N.OP N.OP N.OP OP
2A Close N.OP OP N.OP OP
(87B 2A) 104&106 OP OP OP OP
closed
304 Open N.OP N.OP N.OP OP
Close N.OP N.OP N.OP OP
306 Open N.OP N.OP N.OP OP
Close N.OP OP N.OP OP
304&306 OP OP OP OP
closed

Note: N.OP = Not Operated, OP = Operated.

13. Functional checks of Discrimination Zone 1B & 2B with the following conditions,
Bus coupler (i.e., 234,236 &230) closed and (120 &130) are open:
Check Zone operation Condition is simulated:

Bus bar Bay bus 86B (1B) 86B(2B) Bus Coupler 230
protection zone disconnector Expected Actual Expected Actual 86B(1B) 86B(2B)
operation
position
204 Open N.OP N.OP OP N.OP
Close OP N.OP OP N.OP
206 Open N.OP N.OP OP N.OP
1B Close N.OP N.OP OP N.OP

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: FUNCTIONAL TEST – BBP & CBF Record No.:
Bay no.: Drawing ref.: Sheet: 11 of 21
Contractor: Contract no.: Substation No :

(87B 1B) 204&206 OP OP OP OP


closed
404 Open N.OP N.OP OP N.OP
Close OP N.OP OP N.OP
406 Open N.OP N.OP OP N.OP
Close N.OP N.OP OP N.OP
404&406 OP OP OP OP
closed
204 Open N.OP N.OP N.OP OP
Close N.OP N.OP N.OP OP
206 Open N.OP N.OP N.OP OP
2B Close N.OP OP N.OP OP
(87B 2B) 204&406 OP OP OP OP
closed
404 Open N.OP N.OP N.OP OP
Close N.OP N.OP N.OP OP
406 Open N.OP N.OP N.OP OP
Close N.OP OP N.OP OP
404&406 OP OP OP OP
closed

Note: N.OP = Not Operated, OP = Operated

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: FUNCTIONAL TEST – BBP & CBF Record No.:
Bay no.: Drawing ref.: Sheet: 12 of 21
Contractor: Contract no.: Substation No :

14.Functional checks of Discrimination Zone 1A & 2A with the following conditions,


130,120.226A, 226B closed and 230 is open
Check Zone operation Condition is simulated

Bus bar Bay bus 86B (1A) 86B(2A) Bus coupler Bus section Any feeder
protn disconnector 130 120 connected
zone position to 2B
operation E A E A 86B 86B 86B 86B 86 2B
(1A) (2A) (1A) (1B)
104 Open N.op N.op Op N.op Op N.op N.op
Close Op N.op Op N.op Op N.op N.op
106 Open N.op N.op Op N.op Op N.op N.op
1A Close N.op N.op Op N.op Op N.op N.op
(87B 1A) 104&106 closed Op Op Op Op Op N.op Op
304 Open N.op N.op Op N.op Op N.op N.op
Close Op N.op Op N.op Op N.op N.op
306 Open N.op N.op Op N.op Op N.op N.op
Close N.op Op Op N.op Op N.op N.op
304&306 closed Op Op Op Op Op N.op Op
104 Open N.op N.op N.op Op N.op N.op Op
Close N.op N.op N.op Op N.op N.op Op
106 Open N.op N.op N.op Op N.op N.op Op
Close N.op Op N.op Op N.op N.op Op
104&106 closed Op Op Op Op Op N.op Op
304 Open N.op N.op N.op Op N.op N.op Op
2A Close N.op N.op N.op Op N.op N.op Op
(87B 2A) 306 Open N.op N.op N.op Op N.op N.op Op
Close N.op Op N.op Op N.op N.op Op
304&306 closed Op Op Op Op Op N.op Op

Note: N.OP = Not Operated, OP = Operated

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: FUNCTIONAL TEST – BBP & CBF Record No.:
Bay no.: Drawing ref.: Sheet: 13 of 21
Contractor: Contract no.: Substation No :

15.Functional checks of Discrimination Zone 1B & 2B with the following conditions,


130,120.226A, 226B closed and 230 is open
Check Zone operation Condition is simulated

Bus bar Bay bus 86B (1B) 86B(2B) Bus coupler Bus section Any
protn disconnecto 130 120 feeder
zone r position connecte
operation d to 2A
E A E A 86B 86B 86B 86B 86 2A
(1A) (2A) (1A) (1B)
204 Open N.op N.op N.op N.op N.op Op N.op
Close Op N.op N.op N.op N.op Op N.op
206 Open N.op N.op N.op N.op N.op Op N.op
1B Close N.op N.op N.op N.op N.op Op N.op
(87B 1B) 204&206 Op Op N.op Op N.op Op Op
closed
404 Open N.op N.op N.op N.op N.op Op N.op
Close Op N.op N.op N.op N.op Op N.op
406 Open N.op N.op N.op N.op N.op Op N.op
Close N.op N.op N.op N.op N.op Op N.op
404&406 Op Op N.op Op N.op Op Op
closed
204 Open N.op N.op N.op Op N.op N.op Op
Close N.op N.op N.op Op N.op N.op Op
206 Open N.op N.op N.op Op N.op N.op Op
2B Close N.op Op N.op Op N.op N.op Op
(87B 2B) 204&206 Op Op N.op Op N.op Op Op
closed
404 Open N.op N.op N.op Op N.op N.op Op
Close N.op N.op N.op Op N.op N.op Op
406 Open N.op N.op N.op Op N.op N.op Op
Close N.op Op N.op Op N.op N.op Op
404&406 Op Op N.op Op N.op Op Op
closed

Note: N.OP = Not Operated, OP = Operated,

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: FUNCTIONAL TEST – BBP & CBF Record No.:
Bay no.: Drawing ref.: Sheet: 14 of 21
Contractor: Contract no.: Substation No :

16.Functional Checks of Discrimination Zone 1A & 2A With the Following Conditions,


230,120.226A, 226B closed and 130 is open
Check Zone operation Condition is simulated:

Bus bar Bay bus 86B (1A) 86B(2A) Bus coupler 230 Bus section Any
protn disconnecto 120 feeder
zone r position Connect
operation ed to 2B
E A E A 86B 86B 86B 86B 86 2B
(1B) (2B) (1A) (1B)
104 Open N.OP N.OP N.OP N.OP OP N.OP N.OP
Close OP N.OP N.OP N.OP OP N.OP N.OP
106 Open N.OP N.OP N.OP N.OP OP N.OP N.OP
1A Close N.OP N.OP N.OP N.OP OP N.OP N.OP
(87B 1A) 104&106 Op Op N.op Op Op N.op Op
closed
304 Open N.OP N.OP N.OP N.OP OP N.OP N.OP
Close OP N.OP N.OP N.OP OP N.OP N.OP
306 Open N.OP N.OP N.OP N.OP OP N.OP N.OP
Close N.OP N.OP N.OP N.OP OP N.OP N.OP
304&306 Op Op N.op Op Op N.op Op
closed
104 Open N.OP N.OP N.OP OP N.OP N.OP OP
Close N.OP N.OP N.OP OP N.OP N.OP OP
106 Open N.OP N.OP N.OP OP N.OP N.OP OP
2A Close N.OP OP N.OP OP N.OP N.OP OP
(87B 2A) 104&106 Op Op N.op Op Op N.op Op
closed
304 Open N.OP N.OP N.OP OP N.OP N.OP OP
Close N.OP N.OP N.OP OP N.OP N.OP OP
306 Open N.OP N.OP N.OP OP N.OP N.OP OP
Close N.OP OP N.OP OP N.OP N.OP OP
304&306 Op Op N.op Op Op N.op Op
closed

Note: N.OP = Not Operated, OP = Operated

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: FUNCTIONAL TEST – BBP & CBF Record No.:
Bay no.: Drawing ref.: Sheet: 15 of 21
Contractor: Contract no.: Substation No :

17.Functional checks of Discrimination Zone 1B & 2B with the following conditions,


230,120.226A, 226B closed and 130 is open
Check Zone operation Condition is simulated

Bus bar Bay bus 86B (1B) 86B(2B) Bus coupler 230 Bus section Any
protection disconn 120 feeder
zone Ector connecte
operation position d to 2A
E A E A 86B 86B 86B 86B 86 2A
(1B) (2B) (1A) (1B)
20 Open N.OP N.OP OP N.OP N.OP OP N.OP
4 Close OP N.OP OP N.OP N.OP OP N.OP
20 Open N.OP N.OP OP N.OP N.OP OP N.OP
1B 6 Close N.OP N.OP OP N.OP N.OP OP N.OP
(87B 1B) 204&206 Op Op Op Op N.op op Op
closed
40 Open N.OP N.OP OP N.OP N.OP OP N.OP
4 Close OP N.OP OP N.OP N.OP OP N.OP
40 Open N.OP N.OP OP N.OP N.OP OP N.OP
6 Close N.OP N.OP OP N.OP N.OP OP N.OP
404&406 Op Op Op Op N.op Op Op
closed
20 Open N.OP N.OP N.OP OP N.OP N.OP OP
4 Close N.OP N.OP N.OP OP N.OP N.OP OP
20 Open N.OP N.OP N.OP OP N.OP N.OP OP
2B 6 Close N.OP OP N.OP OP N.OP N.OP OP
(87B 2B) 204&206 Op Op Op Op N.op Op Op
closed
40 Open N.OP N.OP N.OP OP N.OP N.OP OP
4 Close N.OP N.OP N.OP OP N.OP N.OP OP
40 Open N.OP N.OP N.OP OP N.OP N.OP OP
6 Close N.OP OP N.OP OP N.OP N.OP OP
404&406 Op Op Op Op N.op Op Op
closed

N.OP = Not Operated, OP = Operated

18.Functional checks of Discrimination Zone 1A & 2A with the following conditions,


Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: FUNCTIONAL TEST – BBP & CBF Record No.:
Bay no.: Drawing ref.: Sheet: 16 of 21
Contractor: Contract no.: Substation No :

230,130.226A, 226B closed and 120 is open


Check Zone operation Condition is simulated

Any
feeder
Bus bar 86B Bus Coupler
Bay bus 86B (1A) Bus Coupler 230 connec
protection (2A) 130
disconnecto ted to
zone
r position 2B
operation
86B 86B 86B 86B
E A E A 86 2B
(1A) (2A) (1B) (2B)
10 Open N.OP N.OP OP N.OP N.OP N.OP N.OP
4 Close OP N.OP OP N.OP N.OP N.OP N.OP
10 Open N.OP N.OP OP N.OP N.OP N.OP N.OP
6 Close N.OP N.OP OP N.OP N.OP N.OP N.OP
104&106
Op Op Op Op N.op Op Op
closed
30 Open N.OP N.OP OP N.OP N.OP N.OP N.OP
1A
4 Close OP N.OP OP N.OP N.OP N.OP N.OP
(87B 1A)
30 Open N.OP N.OP OP N.OP N.OP N.OP N.OP
6 Close N.OP N.OP OP N.OP N.OP N.OP N.OP
304&306
Op Op Op Op N.op Op Op
closed
10 Open N.OP N.OP N.OP OP N.OP OP OP
4 Close N.OP N.OP N.OP OP N.OP OP OP
10 Open N.OP N.OP N.OP OP N.OP OP OP
6 Close N.OP OP N.OP OP N.OP OP OP
104&106
Op Op Op Op N.op Op Op
2A closed
(87B 2A) 30 Open N.OP N.OP N.OP OP N.OP OP OP
4 Close N.OP N.OP N.OP OP N.OP OP OP
30 Open N.OP N.OP N.OP OP N.OP OP OP
6 Close N.OP OP N.OP OP N.OP OP OP
304&306
Op Op Op Op N.op Op Op
closed

Note: N.OP = Not Operated, OP = Operated

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: FUNCTIONAL TEST – BBP & CBF Record No.:
Bay no.: Drawing ref.: Sheet: 17 of 21
Contractor: Contract no.: Substation No :

19. Functional checks of Discrimination Zone 1B & 2B with the following


conditions, 230,130.226A, 226B closed and 120 is open
Check Zone operation Condition is simulated

Any feeder
Bus bar 86B Bus coupler Bus coupler
Bay bus 86B (1B) connected
protection (2B) 130 230
disconnecto to 2A
zone
r position 86B 86B 86B 86B
operation E A E A 86 2A
(1A) (2A) (1B) (2B)
Open N.op N.OP N.OP N.OP OP N.OP N.OP
204
Close Op N.OP N.OP N.OP OP N.OP N.OP
Open N.op N.OP N.OP N.OP OP N.OP N.OP
206
Close N.op N.OP N.OP N.OP OP N.OP N.OP
204&206
Op Op N.op Op Op Op Op
closed
Open N.op N.OP N.OP N.OP OP N.OP N.OP
1B 404
Close Op N.OP N.OP N.OP OP N.OP N.OP
(87B 1B)
Open N.op N.OP N.OP N.OP OP N.OP N.OP
406
Close N.op N.OP N.OP N.OP OP N.OP N.OP
404&406
Op Op N.op Op Op Op Op
closed
Open N.op N.OP N.OP OP N.OP OP OP
204
Close N.op N.OP N.OP OP N.OP OP OP
Open N.op N.OP N.OP OP N.OP OP OP
206
Close N.op OP N.OP OP N.OP OP OP
204&206
Op Op N.op Op Op Op Op
closed
Open N.op N.OP N.OP OP N.OP OP OP
2B 404
Close N.op N.OP N.OP OP N.OP OP OP
(87B 2B)
Open N.op N.OP N.OP OP N.OP OP OP
406
Close N.op OP N.OP OP N.OP OP OP
404&406
Op Op N.op Op Op Op Op
closed

Note: N.OP = Not Operated, OP = Operated

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: FUNCTIONAL TEST – BBP & CBF Record No.:
Bay no.: Drawing ref.: Sheet: 18 of 21
Contractor: Contract no.: Substation No :

20. BB Protection/ CBF Scheme Check (1A&2A)

Bus bar
Bay bus Bus bar
Protection 50/62 86 CBF 86B zone 2A
disconnector zone 1A trip
zone BFOperate trip
position
E A E A E A E A
Open
104
Close
Open
106
Close
104&106
closed
Open
1A 304
Close
Open
306
Close
304&306
closed
Open
104
Close
Open
106
Close
104&106
closed
Open
2A 304
Close
Open
306
Close
304&306
closed

Note: E = Expected, A = Actual

21.BB Protection/ CBF Scheme Check (1B & 2B )

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: FUNCTIONAL TEST – BBP & CBF Record No.:
Bay no.: Drawing ref.: Sheet: 19 of 21
Contractor: Contract no.: Substation No :

Bus bar Bus bar


Bay bus
Protection 50/62 BF 86 CBF 86B zone 1B zone 2B
disconnector
zone Operate trip trip
position
E A E A E A E A
Open
204
Close
Open
206
Close
204&206 closed
Open
1B 404
Close
Open
406
Close
404&406 closed
Open
204
Close
Open
206
Close
204&206 closed
Open
2B 404
Close
Open
406
Close
404&406 closed

Note: E = Expected, A = Actual

22.CBF of 130 operation :

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: FUNCTIONAL TEST – BBP & CBF Record No.:
Bay no.: Drawing ref.: Sheet: 20 of 21
Contractor: Contract no.: Substation No :

BB prtn BB prtn BB prtn BB prtn


CB 120 CB 230
Operation status zone 1A zone 2A zone 1B zone 2B
Trip trip
Trip Trip trip Trip
230,120, E N.op N.op Op Op N.op N.op
226 A,226 B open A
120 closed, 226 E Op N.op Op Op N.op N.op
A,226 B & 230
open A
120 open, 226 E N.op Op Op Op N.op Op
A,226 B & 230
closed A

Note: N.OP = Not Operated, OP = Operated

23.CBF OF 230 Operation

BB prtn BB prtn BB prtn BB prtn


CB 120 CB 130
Operation status zone 1A zone 2A zone 1B zone 2B
Trip trip
trip Trip trip Trip
130,120, E N.OP N.OP OP OP N.OP N.OP
226 A,226 B open A
120 closed, 226 E OP N.OP OP OP N.OP N.OP
A,226 B & 130
open A
120 OPEN, 226 E N.OP OP OP OP N.OP OP
A,226 B & 130
closed A

Note: N.OP = Not Operated, OP = Operated

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: FUNCTIONAL TEST – BBP & CBF Record No.:
Bay no.: Drawing ref.: Sheet: 21 of 21
Contractor: Contract no.: Substation No :

24.CBF of 120 Operation

BB prtn BB prtn BB prtn BB prtn


Operation CB 120
CB 230 trip zone 1A zone 2A zone 1B zone 2B
status Trip
trip Trip trip Trip
230,130, E N.op N.op Op N.op Op N.op
226 A,226
B open A
130closed E Op N.op Op N.op Op N.op
226 A,226
B & 230 A
open
130 open, E N.op Op Op N.op Op N.op
226 A,226
B & 230 A
closed
130 & 230 E Op Op Op N.op Op N.op
closed A

Note: N.OP = Not Operated, OP = Operated

25.Auto Reset Scheme Checking:

Zone Trip relay operate Trip relay reset


Feeder
1A 2A 1B 2B E A E A

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date: