Standard Specification For Waste Water Table of Contents
Standard Specification For Waste Water Table of Contents
“WASTE WATER”
GENERAL CONTENTS
1 GENERAL REQUIREMENTS
2 MATERIALS
EXCAVATION, BACKFILLING AND
3
RESTORATION
4 CONCRETE AND FORMWORK
CONSTRUCTION OF PIPELINES, TUNNELS
5
AND ANCILLARY WORKS
6 BUILDING WORKS Unused
7 TESTING AND DISINFECTION
8 ROADWORKS Unused
9 SEWER AND WATER MAIN RENOVATION
PROTECTIVE COATINGS TO METAL
10 Unused
WORK
11 DESIGN
12 MECHANICAL WORKS Unused
13 ELECTRICAL SPECIFICATIONS Unused
General Notes
3 EXCAVATION,
BACKFILLING AND
RESTORATION 3.1 Excavation 1-14
3.2 Clearing and Grubbing
3.3 Test Pits
3.4 Trench Excavation
3.5 Headings, Tunnels and Shafts
3.6 Excavation in Carriageway/Roadways
4 CONCRETE AND
FORMWORK 4.1 Concrete Quality 1-15
4.2 Small Construction Concrete
4.3 Ready Mixed Concrete
4.4 Concrete Mixes
4.5 Mortar Mixes
4.6 Cement Grout
4.7 Testing
4.8 Porous No-Fines Concrete
4.9 Air-Entrained Concrete
4.10 Chloride Content
4.11 Workability
4.12 Transporting, Placing and Compacting
4.13 Concrete Temperature
4.14 Protection and Curing
4.15 Records of Concreting
4.16 Construction of Formwork
4.17 Cleaning and Treatment of Forms
4.18 Stripping of Formwork
4.19 Sloping of Formwork
4.20 Cutting and Bending of Reinforcement
4.21 Fixing of Reinforcement
4.22 Surface Condition of Reinforcement
4.23 Laps and Joints
4.24 Welding of Reinforcement
4.25 Built-In Items
5 CONSTRUCTION OF
PIPELINES, TUNNELS AND
ANCILLARY WORK 5.1 General 1-26
5.2 Pipe Bedding
5.3 Concrete Protection to Pipes
5.4 Completion of Pipe Surround
5.5 Pipelaying in Headings
5.6 Thrust Blocks
5.7 Pipe Jointing Generally
5.8 Welded Joints in Plastic Pipes
5.9 Butt Fusion Jointing in Polyethylene
Pipelines
5.10 Flanged Joints
5.11 Ogee Joints
5.12 Welded Joints in Steel Pipes
5.13 Cement Mortar Joints
5.14 Run Lead Joints
5.15 Protection of Ferrous Pipes, Joints and
Fittings
5.16 Cutting Pipes
5.17 Precast Concrete Manholes
5.18 Precast Concrete Segmental Manholes
5.19 Brick and In-Situ Concrete Manholes and
Chambers
5.20 Inverts and Benching
5.21 Pipes and Joints Adjacent to Structures
5.22 Watertightness of Manholes and Chambers
5.23 Setting Manhole Covers and Frames
5.24 Connections to Existing Sewers
5.25 Sewers and Manholes to be Abandoned
5.26 Pipe Jacking
5.27 Shafts
5.28 Openings in Shafts and Tunnels
5.29 Segmental Shaft and Tunnel Linings
5.30 Unbolted Concrete Tunnel Segments
5.31 Bolted Concrete Segmental Linings
5.32 Grouting of Segments
5.33 Caulking
5.34 Pointing of Joints
5.35 Shafts and Tunnel to be Watertight
5.36 Recording Information
5.37 Junctions and Laterals on Sewers
5.38 Marker and Indicator Posts
5.39 Tolerances for Pipelines, Shafts and Tunnels
7 TESTING AND
DISINFECTION 7.1 Cleansing of Pipelines 1-5
7.2 Precautions Prior to Testing Pipelines
7.3 Notification of Test
7.4 Testing of Non-Pressure Pipelines
7.5 Water Test for Non-Pressure Pipelines
(Exfiltration)
7.6 Air Test for Non-Pressure Pipelines
7.7 CCTV Inspection for Non-Pressure Pipelines
7.8 Infiltration
7.9 Testing of Pressure Pipelines
7.10 Swabbing of Watermains
7.11 Disinfection of Watermains
7.12 Cleansing of Structures
7.13 Testing of Concrete Structures Designed to
Retain an Aqueous Liquid
7.14 Testing of Roofs
7.15 Disinfection of Structures for Potable Water
7.16 Pressure Testing Polyethylene Pipelines