8/20/2021 RUSH.Net© R2 - Request Using Service Helpdesk Release 2.

0
 Request Header
      2 1 2 2 2 7 1 2 1 7 1 - CONSTRUCTION REQUEST - SITE INSTRUCTION (SI)

Requestor DE VERA, JOSE TEODOLITO V. Contact #


Date Requested Jun 22, 2021 09:48 AM Department EXTERNAL CONSTRUCTION MANAGEMENT
Current Status IN-PROCESS Division PNM DIVISION
Age (in Days) 59 Group TFM GROUP

 Request Details

# Particular Required Date Notes View Attachments


1 SITE INSTRUCTION (SI) Jun 22, 2021  

Field Value
If with Construction Bulletin, indicate Rush.Net Reference number, if none
n/a
indicate N/A
Project Name MPR 4
Site Instruction No. 5
Name of Contractor - please indicate complete company name Cypress Bomanite Inc.
Contract Package No./Name General Construction
Scope of Work External Landscaping Works
Description of Site Instruction Additional Landscaping Works at Lower Ground Floor
Classification Developer Initiated
Specify classification if others  
Attachment Others (pls. specify)
Specify attachment if others Landscaping Plan for Lower Ground
Reason for Site Instruction Issuance of Additional Landscaping Plan for Lower Ground
You are hereby notify that there will be a possible revision of Work which may incur a change in the contract sum or
contract time. If you consider that a change in Contract Sum and/or Contract time is necessary, notify the CM within
Message three (3) days from your receipt of Site Instruction, submit a Cost Estimate and/or proposed Time Extension within seven
(7) days from your notification. Proceeding with the implementation of this SI indicates acceptance with no change in the
contract sum or time.
Reminder File attachment limit is up to 20MB. Please make sure to attach signed CB (if applicable)

 Work Flow

Description Assign To Assigned Fullfilled Expected TAT Actual TAT Status Remarks        
Days: 0
Jun 22, 2021 Jun 22, 2021
APPLICATION OWNER APPROVAL NAVAL, RICHARD Hours: 1 APPROVED  
09:48 AM 11:16 AM
Minutes: 28
Days: 43
Jun 22, 2021
APPLICATION OWNER APPROVAL PELEGRINO, ROSELLER   Hours: 6 IN-PROCESS  
09:48 AM
Minutes: 41
Days: 1
Jun 22, 2021 Jun 23, 2021
APPLICATION OWNER APPROVAL LACHICA, ROY BAYANI Hours: 0 APPROVED  
09:48 AM 09:58 AM
Minutes: 10

  Cancel Request Print Close


 

https://rush.federalland.ph/RUSH/ReqstQueue/RequestDetailsViewVert.aspx?popup=1&REQST_NUM=21222712171 1/1
NOTE:

-ALL DIMENSIONS SHALL BE VERIFIED


ON ACTUAL LOCATION. E.A.AURELIO
LANDSCAPE ARCHITECTS
B -ANY EQUIVALENT MATERIAL SHALL BE EAALA UNIT 1610 FUTURE POINT PLAZA 1, CONDOMINIUM
112 PANAY AVE., BRGY. SOUTH TRIANGLE, QUEZON CITY.
TEL. Nos. (632) 410-5401/376-6755 CEL. No. 0920-9024419
APPROVED BY LANDSCAPE ARCHITECT.

N
AREA DRAIN
A -ALL STRUCTURES VERIFY TO STRUCTURAL
B +150mm ENGINEER.

00
ELEVATED SLAB

42
17
25 A
-50mm
TRENCH
C-9264968

+150mm
B

900
AREA DRAIN -50mm ZOCALO 08 JANUARY 2020
TRENCH
A 400

A AREA DRAIN

B +150mm
ZOCALO
CEBU
AREA DRAIN
-50mm
TRENCH
-50mm
TRENCH
A A 4L
GF
-50mm
TRENCH
+150mm -13
ZOCALO

AREA DRAIN

4L
GF A CONCRETE TROWEL FINISH
-12

-14 REINFORCED CONCRETE STRUCTURE


GF

BY: STRUCTURAL ENGINEERS DETAIL


4L

B #3 PEBBLE WASH-OUT WATER PROOFING MEMBRANE


FINISH

1 MATERIAL PLAN COLOR: BEIGE C/S MORTAR SCREEDING LAYER

T3-MP-01 SCALE 1 : 50MTS. FLOOR DRAIN PIPE


TO SPECIALIST'S DET.

PAVING AREA WALKWAY


5220 750

DRIVEWAY
VERIFY

PLANTING PLAN
KEY PLAN

N
B A +150MM ZOCALO
PEBBLE DRAIN
150

FROM B-2

RAMP DN
RAMP UP

TO B-2

SL BY
S
OB
OT

S
RK FF L

IN OT
RK SL

S
G
-O

OT
IN
40 TS PA G
OP

L
SL
: SLO+2T KIN

VE
DR
PA

G
R
:

LE
ND

IN
: 3 4 PA
37

RK
GE

D
5

PA
2

N
:
T2
LE

OU
:
T3
T4

GR
T5

ER
AREA DRAIN -50MM DRAIN

W
LO
2 3 3 1 1 2

2 SECTION DETAIL 4
SCALE 1 : 15MTS.
T3-MP-01
T3-MP-01
TECHNICAL SUBMITTAL ROUTING FORM (TSRF)

PROJECT : MARCO POLO OCEANVIEW TOWER4 PROJECT


LOCATION : Marco Pdrive Nivel Hills, Apas, Cebu City

SUBMITTAL NO. : RFA-PL-83


DISCIPLINE : PLUMBING & SANITARY

FLOW ENTITY INITIAL ITEM DESCRIPTION NO. OF TECHNICAL SPECIFI- MANUFACTURER / ACTION PRIORITY
NO. COPIES A B C D E F CATION REFERENCE SUPPLIER CODE LEVEL

ATMCI PROPOSED DRAINS & PIPING LAYOUT


1 1 X CCC
DATE SENT : 07-Jul-21 FOR LANDSCAPE AREA LGF

FLI-TPD
2 DATE RECEIVED :
FLI-TPD: APPROVED AS COMMENTED.
DATE SENT : 07142021
MARGUAD TRADING
3 SERVICES
DATE RECEIVED :

DATE SENT :
ACTION CODE : LEGEND : PM's REMARKS : NOTES / REMARKS :

1 - APPROVED, WORK MAY PROCEED A - SHOPDRAWING 1. Contractor is required to


B - SAMPLE prepare five (5) copies of this
2 - REVISE & RESUBMIT, WORK MAY PROCEED C - CATALOGUE CUTS / BROCHURE form for distribution as follows :
SUBJECT TO INCORPORATION OF CORRECTION/ D - CERTIFICATE
CHANGES INDICATED. E - TEST DATA 1 - Project Manager/RCM
F - 1 - Architect
3 - REVISE & RESUBMIT. DO NOT PROCEED WITH 1 - Engineering Consultant
THE WORK. PRIORITY LEVEL : 1 - Contractor
CCC - HIGHEST PRIORITY 1 - File
4 - DISAPPROVED CC - SECOND PRIORITY
C - THIRD PRIORITY
5 - REVIEW NOT REQUIRED, WORK MAY PROCEED

ATMCI-F-OPN-42/82 Revision 00 Page 1 of 1


NOTE:

-ALL DIMENSIONS SHALL BE VERIFIED


ON ACTUAL LOCATION. E.A.AURELIO
LANDSCAPE ARCHITECTS
-ANY EQUIVALENT MATERIAL SHALL BE EAALA UNIT 1610 FUTURE POINT PLAZA 1, CONDOMINIUM
112 PANAY AVE., BRGY. SOUTH TRIANGLE, QUEZON CITY.
TEL. Nos. (632) 410-5401/376-6755 CEL. No. 0920-9024419
APPROVED BY LANDSCAPE ARCHITECT.

N
AREA DRAIN
A -ALL STRUCTURES VERIFY TO STRUCTURAL
B +150mm
ENGINEER.

00
ELEVATED SLAB

42

M
0M
A

10
17
25 -50mm
TRENCH
C-9264968

AREA DRAIN
B +150mm
FLOOR DRAIN USED AT LANDSCAPE AREA UPPER GROUND FLOOR

900
-50mm ZOCALO
TRENCH 08 JANUARY 2020

A 400

Existing A AREA DRAIN


B
Existing
.
DIA +150mm
M
ZOCALO
CEBU
0M
0
60

10

AREA DRAIN
-50mm
+150mm
TRENCH
ZOCALO
-50mm
TRENCH
A A 4L
A GF
+150mm
ZOCALO
-50mm
TRENCH +150mm
100mm Dia. -13
A ZOCALO PVC Pipes
Existing
AREA DRAIN

4L
GF A CONCRETE TROWEL FINISH
-12

-14 REINFORCED CONCRETE STRUCTURE


GF

BY: STRUCTURAL ENGINEERS DETAIL


4L

B #3 PEBBLE WASH-OUT WATER PROOFING MEMBRANE


FINISH

PIPING
1 LAYOUT
MATERIAL PLAN COLOR: BEIGE C/S MORTAR SCREEDING LAYER

T3-MP-01 SCALE 1 : 50MTS. FLOOR DRAIN PIPE


TPDE COMMENT: TO SPECIALIST'S DET.
VERIFY DIRECTION OF FLOW FOR DRAINAGE. COLLECTOR PIPE
WITH 2 DIFFERENT DIRECTION IS NOT ALLOWED.

OK WITH FD PROPOSAL.

PAVING AREA WALKWAY


5220 750

DRIVEWAY
VERIFY

PLANTING PLAN
KEY PLAN

N
B A +150MM ZOCALO
PEBBLE DRAIN

FROM B-2

RAMP DN
RAMP UP

TO B-2

SL BY
S
OB
OT

S
RK FF L

IN OT
RK SL

S
G
-O

OT
IN
40 TS PA G
OP

L
SL
: SLO+2T KIN

VE
-50MM DRAIN

DR
PA

G
R
:

LE
ND

IN
: 3 4 PA
37

RK
GE

D
5

PA
2

N
:
T2
LE

OU
:
T3
T4

GR
T5

ER
AREA DRAIN

W
LO
250

2 3 3 1 1 2

2 SECTION DETAIL 4
SCALE 1 : 15MTS.
T3-MP-01
T3-MP-01