Site Instruction No.05
Site Instruction No.05
0
Request Header
2 1 2 2 2 7 1 2 1 7 1 - CONSTRUCTION REQUEST - SITE INSTRUCTION (SI)
Request Details
Field Value
If with Construction Bulletin, indicate Rush.Net Reference number, if none
n/a
indicate N/A
Project Name MPR 4
Site Instruction No. 5
Name of Contractor - please indicate complete company name Cypress Bomanite Inc.
Contract Package No./Name General Construction
Scope of Work External Landscaping Works
Description of Site Instruction Additional Landscaping Works at Lower Ground Floor
Classification Developer Initiated
Specify classification if others
Attachment Others (pls. specify)
Specify attachment if others Landscaping Plan for Lower Ground
Reason for Site Instruction Issuance of Additional Landscaping Plan for Lower Ground
You are hereby notify that there will be a possible revision of Work which may incur a change in the contract sum or
contract time. If you consider that a change in Contract Sum and/or Contract time is necessary, notify the CM within
Message three (3) days from your receipt of Site Instruction, submit a Cost Estimate and/or proposed Time Extension within seven
(7) days from your notification. Proceeding with the implementation of this SI indicates acceptance with no change in the
contract sum or time.
Reminder File attachment limit is up to 20MB. Please make sure to attach signed CB (if applicable)
Work Flow
Description Assign To Assigned Fullfilled Expected TAT Actual TAT Status Remarks
Days: 0
Jun 22, 2021 Jun 22, 2021
APPLICATION OWNER APPROVAL NAVAL, RICHARD Hours: 1 APPROVED
09:48 AM 11:16 AM
Minutes: 28
Days: 43
Jun 22, 2021
APPLICATION OWNER APPROVAL PELEGRINO, ROSELLER Hours: 6 IN-PROCESS
09:48 AM
Minutes: 41
Days: 1
Jun 22, 2021 Jun 23, 2021
APPLICATION OWNER APPROVAL LACHICA, ROY BAYANI Hours: 0 APPROVED
09:48 AM 09:58 AM
Minutes: 10
https://rush.federalland.ph/RUSH/ReqstQueue/RequestDetailsViewVert.aspx?popup=1&REQST_NUM=21222712171 1/1
NOTE:
N
AREA DRAIN
A -ALL STRUCTURES VERIFY TO STRUCTURAL
B +150mm ENGINEER.
00
ELEVATED SLAB
42
17
25 A
-50mm
TRENCH
C-9264968
+150mm
B
900
AREA DRAIN -50mm ZOCALO 08 JANUARY 2020
TRENCH
A 400
A AREA DRAIN
B +150mm
ZOCALO
CEBU
AREA DRAIN
-50mm
TRENCH
-50mm
TRENCH
A A 4L
GF
-50mm
TRENCH
+150mm -13
ZOCALO
AREA DRAIN
4L
GF A CONCRETE TROWEL FINISH
-12
DRIVEWAY
VERIFY
PLANTING PLAN
KEY PLAN
N
B A +150MM ZOCALO
PEBBLE DRAIN
150
FROM B-2
RAMP DN
RAMP UP
TO B-2
SL BY
S
OB
OT
S
RK FF L
IN OT
RK SL
S
G
-O
OT
IN
40 TS PA G
OP
L
SL
: SLO+2T KIN
VE
DR
PA
G
R
:
LE
ND
IN
: 3 4 PA
37
RK
GE
D
5
PA
2
N
:
T2
LE
OU
:
T3
T4
GR
T5
ER
AREA DRAIN -50MM DRAIN
W
LO
2 3 3 1 1 2
2 SECTION DETAIL 4
SCALE 1 : 15MTS.
T3-MP-01
T3-MP-01
TECHNICAL SUBMITTAL ROUTING FORM (TSRF)
FLOW ENTITY INITIAL ITEM DESCRIPTION NO. OF TECHNICAL SPECIFI- MANUFACTURER / ACTION PRIORITY
NO. COPIES A B C D E F CATION REFERENCE SUPPLIER CODE LEVEL
FLI-TPD
2 DATE RECEIVED :
FLI-TPD: APPROVED AS COMMENTED.
DATE SENT : 07142021
MARGUAD TRADING
3 SERVICES
DATE RECEIVED :
DATE SENT :
ACTION CODE : LEGEND : PM's REMARKS : NOTES / REMARKS :
N
AREA DRAIN
A -ALL STRUCTURES VERIFY TO STRUCTURAL
B +150mm
ENGINEER.
00
ELEVATED SLAB
42
M
0M
A
10
17
25 -50mm
TRENCH
C-9264968
AREA DRAIN
B +150mm
FLOOR DRAIN USED AT LANDSCAPE AREA UPPER GROUND FLOOR
900
-50mm ZOCALO
TRENCH 08 JANUARY 2020
A 400
10
AREA DRAIN
-50mm
+150mm
TRENCH
ZOCALO
-50mm
TRENCH
A A 4L
A GF
+150mm
ZOCALO
-50mm
TRENCH +150mm
100mm Dia. -13
A ZOCALO PVC Pipes
Existing
AREA DRAIN
4L
GF A CONCRETE TROWEL FINISH
-12
PIPING
1 LAYOUT
MATERIAL PLAN COLOR: BEIGE C/S MORTAR SCREEDING LAYER
OK WITH FD PROPOSAL.
DRIVEWAY
VERIFY
PLANTING PLAN
KEY PLAN
N
B A +150MM ZOCALO
PEBBLE DRAIN
FROM B-2
RAMP DN
RAMP UP
TO B-2
SL BY
S
OB
OT
S
RK FF L
IN OT
RK SL
S
G
-O
OT
IN
40 TS PA G
OP
L
SL
: SLO+2T KIN
VE
-50MM DRAIN
DR
PA
G
R
:
LE
ND
IN
: 3 4 PA
37
RK
GE
D
5
PA
2
N
:
T2
LE
OU
:
T3
T4
GR
T5
ER
AREA DRAIN
W
LO
250
2 3 3 1 1 2
2 SECTION DETAIL 4
SCALE 1 : 15MTS.
T3-MP-01
T3-MP-01