1. Background
Sahmiye Ground water Survey and Drilling Consultation were requested by Mr.
Cilmi ibrahim a detailed information on prospects of drilling production borehole,
And the objective of the present study was to assess the availability of groundwater,
recommend a drilling site and comment on aspects of depth of potential aquifers,
aquifer availability and type, possible yield and water quality in ceel la helay area
of Inshaca region in Ethiopia.
This report summarizes the result of the profile survey of which is both
geophysical and hydro geological survey that had been carried out to find out the
ground water potential area.
This survey was made to identify the best suitable site to be drilled in order to
provide fresh water for drinking and irrigation purposes.
The surveyed area lies approximately 20Km from Xariirad.
Two Electrical Resistivity Profiles trending E-W direction and south to
South of Ceel la helay was conducted in the Eastern part, while the other
profile line is conducted in a site situated at about 2km from the center
and1km of the residential area.
2
SAHAMIYE
UNDERGROUNDWATERSURVEYANDDRILLINGCONSULTATION
ADDRESS: JIGJIGAYAR, HARGEISASOMALILAND
TEL: 0634428946Email:alfaaiz046@gmail.com
drilling method.
Point out the geological formation likely to been counter enduring drilling
and implications with regard to water type (fresh, Mineral, salty)
methodology, borehole yields and ground water quality.
Preparation of hydro geological and geophysical survey reports, including
the following:
• Site Name ,Location and GPS readings
• Methodology ,Geophysical data and analysis
• General and Local Geology and hydrogeology of the area
• Conclusion and Recommendations
spacing is10m with horizontal profiling the curve analyses using both
during the field and the software will carry out the subsurface layering
interpretation.
4. Geophysical Investigation
In conjunction with hydrological and geological investigations, geophysical
survey is the basic input for assessment of groundwater potential of the
area. The activities in this survey are critical and, hence, require good
interpretation of the subsurface geologic and structural features to
understand the depth, thickness and lateral extent of water-bearing
formations or structures and the possible factors that controls its flow
Geophysical exploration is detecting graphic rocks, geological structure
and other geological conditions through the study and observation of
changes in a variety of geophysical fields. Commonly used geophysical
exploration methods include gravity exploration, DC exploration, and
alternating current survey exploration, magnetic exploration, sonic
exploration, seismic exploration, radioactive exploration. At present, the
main geological exploration instrument is electricity exploration in the
market and most of these instruments are too complex post-data
processing.PQWT-TC series of natural Electric field geophysical
4
SAHAMIYE
UNDERGROUNDWATERSURVEYANDDRILLINGCONSULTATION
exploration underground water detector
ADDRESS: JIGJIGAYAR, is the latest product in research
HARGEISASOMALILAND
TEL: 0634428946Email:alfaaiz046@gmail.com
and development. Using a number of Frequency domain
electromagnetic
The new test methods of power supply, voltage and current, improved
the electrode cable test, programming using the latest digital filtering
technology, including FFT digital filtering, FIR, IIR and other filtering
technology. Digital filtering combined with conventional filtering,
frequency resolution up to 0.1Hz. Software upgrade online, new UI,
optimize operation interface, which make the instrument easier to use.
Geophysical survey namely, Frequency Electromagnetic Survey was
carried out in conjunction with Geological and Hydro geological studies
at the main site.
The main objectives of geophysical (FEM) investigations are:
The collected data each time is the data of mid-point between two
electrodes data, the point O is the first set of data as shown below in this
7
SAHAMIYE
UNDERGROUNDWATERSURVEYANDDRILLINGCONSULTATION
Figure1:JIGJIGAYAR,
ADDRESS: Three electrode connecting diagram
HARGEISASOMALILAND
TEL: 0634428946Email:alfaaiz046@gmail.com
Figure2: Measuring electrode with spacing parameter
and soil in a barrel, and then put the mud on the hard point so that we can
insert the electrode. Meanwhile, you need cover the line that you will
measure with salt water to improve the electrical conductivity.
8
SAHAMIYE
UNDERGROUNDWATERSURVEYANDDRILLINGCONSULTATION
insert a large-capacity storage, the
ADDRESS: JIGJIGAYAR, instrument with Real-time mapping
HARGEISASOMALILAND
TEL: 0634428946Email:alfaaiz046@gmail.com
function, to find high resistance (fracture Band), low resistance (such as
detection of water and karst cave) through real-time mapping, it can be
directly displayed the geological structure abnormal on-sites.
By the M, N electrode probe (transducer) via a cable earth's magnetic
field to electrical signal input to high impedance input stage, after the
anti-jamming exchange amplification, frequency selection, select the
desired operating frequency, and then by the A / D sampling, central
processor (CPU) for data processing. Where in the entire measurement
process, high-speed Central processing unit (CPU) of the control,
instrumentation automatic range conversion and automatic frequency
selection.
Finally display the measured data and curves graph, and then click
9
SAHAMIYE
UNDERGROUNDWATERSURVEYANDDRILLINGCONSULTATION
suppression, theADDRESS:
best model fit may
JIGJIGAYAR, not necessarily agree with the litho
HARGEISASOMALILAND
TEL: 0634428946Email:alfaaiz046@gmail.com
logy of the project area. In order to describe the subsurface Geological
succession of investigated area, the Profile Maps were calibrated using
the observed Litho logical borehole logs in the proximity of the surveyed
traverses and reviewed geological formation from the previous studies.
Profile map will be observed (The horizontal line of profile map is
measurement point, and the vertical line of profile map is measurement
depth)
So note a color could stand for anything, the map just could help us to
analysis the geological structure, need to combine the local geological,
that’s the reason.
As we all know, if it is a whole rock, the water will not gather into the
underground. So when we find the crack/fracture between the two
rocks.
Rocks capable of high porosity and permeability, there is high
probability to find the water deep underground. You also can find the
rock perched is broken there, and there is the blue between them (the
10
SAHAMIYE
UNDERGROUNDWATERSURVEYANDDRILLINGCONSULTATION
ADDRESS: JIGJIGAYAR, HARGEISASOMALILAND
TEL: 0634428946Email:alfaaiz046@gmail.com
11
SAHAMIYE
UNDERGROUNDWATERSURVEYANDDRILLINGCONSULTATION
ADDRESS: JIGJIGAYAR, HARGEISASOMALILAND
TEL: 0634428946Email:alfaaiz046@gmail.com
6. Conclusions
Ground water potential in the investigated areas is fair to moderate
Generally deep boreholes of more than 180m have to be drilled in order to
have meaningful yields
There is a wide variation in the subsurface conditions and
drilling has to be carried out at the recommended site.
The water quality is expected to be good and fresh
Large storage tanks are necessary once the boreholes are
successfully drilled in order to cope with the high demand during
the peak of dry season.
Due to the presence of unstable formations at depth as well as hard
formation, mud drilling may be the most appropriate method to
employ when drilling.
The Overall result of Geological, geophysical and hydro geological
data the study site is recommending to drill a production well ,and
can be with medium yield and can pump more than 14m3/hour
7.Recommendations
SAHAMIYE
UNDERGROUNDWATERSURVEYANDDRILLINGCONSULTATION
ADDRESS: JIGJIGAYAR, HARGEISASOMALILAND
TEL: 0634428946Email:alfaaiz046@gmail.com
It is recommended to drill the borehole at the first location to a
maximumof120m below ground level.
It’s highly recommended that monitoring of the struck aquifers should
be done by measuring the electrical conductivity of the drilling water
and the drilling mud at the same intervals as the geological sample
(ideally every 2m).In this respect, it’s recommended that the
implementing agency acquiring electrical/TDS meter capable of
measuringupto20, 000us/cm of conductivity for the current future use.
SAHAMIYE
UNDERGROUNDWATERSURVEYANDDRILLINGCONSULTATION
ADDRESS: JIGJIGAYAR, HARGEISASOMALILAND
TEL: 0634428946Email:alfaaiz046@gmail.com
Drilling, Construction and Pumping Tests Technical
Specification
1. General
.
The responsibility of the owner is to earn site access permission from local
administration and provide supervision.
Surface of any private roads, fences or gates by the contractor's plant and
equipment, Drilling mud pits, abandoned drywells & others must be
properly back filled and leveled after completion of drilling works. After
completion of drilling and construction work, the environment shall be
thoroughly cleaned from foreign substances brought to the site during the
construction activity. Any other damage to private property will be
handled strictly according to the general condition of contract.
The drilling unit shall consist but not limited to the following items:
1. The drilling rig must be equipped with hoist block for pulling
drilling tools stacked wells.
2. A services truck to transport well casing, fuel, water and
SAHAMIYE
UNDERGROUNDWATERSURVEYANDDRILLINGCONSULTATION
3. other supplies and
ADDRESS: equipment
JIGJIGAYAR, HARGEISASOMALILAND
TEL: 0634428946Email:alfaaiz046@gmail.com
4. A vehicle to transport the crew from site to living quarters.
5. A welding plant.
6. A water tank suitable for hauling water to the site for use in drilling.
7. A list of all equipment’s ,vehicles ,drilling tools ,hand
tools ,welding equipment ,pumping sets ,deep meter etc to be
assigned for the project shall be included in the contractor
3. Materials
The materials to be used for the construction of this well shall meet the following
requirements:
b. Inner casing
The working (production) casing to be installed shall be manufactured of
steel for deep wells. These casings shall have a diameter specified in the
BOQ. The casing can be threaded or blank of the aforementioned
standards.
c. Well Screen
The Well screen shall be manufactured of steel based for deep wells, and
shall have a minimum of 10%open area. The slots shall be widening
inward to minimize clogging. Johnson Division or an equal if approved
by the engineer shall manufacture the well screen.
4. Wells Depths
The target wells depths are different and the drilling might be ordered to
SAHAMIYE
UNDERGROUNDWATERSURVEYANDDRILLINGCONSULTATION
be stopped at shallower
ADDRESS:depths, or toHARGEISASOMALILAND
JIGJIGAYAR, be continued based on the actual field
TEL: 0634428946Email:alfaaiz046@gmail.com
hydro geological and geological findings. The drilling Contractor is
there for required to be equipped, accordingly.
5. Drilling Diameters
Drilling shall be started with diameter specified in the BOQ for the well in
the unconsolidated upper section for the installation of surface casing
sand continued to the final depth with the diameter specified in the BOQ.
The drilling diameter however may change according to the geological
situation during actual drilling. Changes shall not be made unless
otherwise the engineer feels changes are necessary and gives written
approval
6.Geological Logging
Litho-logic log of formation penetrated should be done at 2m intervals.
Drilling cuttings shall be collected during the drilling operation and
handled in a manner that they can easily be identified. Samples shall be
taken at predetermined intervals of 2m and whenever there is change
information type inform the owner with recommendations
7. Electrical Logging
Electrical (resistivity) logging of drilled wells shall be carried out to
determine the aquifer position in the well as deemed necessary by the
engineer. Casing arrangement shall be based on the litho logical and
electrical log result.
8. Well Development
The term well development means the work carried out after completion of
the construction of a well and prior to test pumping. The objective of
development is to improve well performance, to increase well capacity
and to reduce an unacceptable level of the amount of sediment contained in
SAHAMIYE
UNDERGROUNDWATERSURVEYANDDRILLINGCONSULTATION
the Water yielded by the
ADDRESS: well. InHARGEISASOMALILAND
JIGJIGAYAR, a few cases further development maybe
TEL: 0634428946Email:alfaaiz046@gmail.com
required after testing.
specified in the BOQ and with capacity to be specified at the end of drilling
should be available onsite, to carry out pumping test. All equipment
shall be reliable for periods of 36 hours of continuous operation at the
designed rate.
b. Generators
The contractor must be equipped with generator sets with a capacity to
drive the submersible pumps, welding machine sand all power
requirements. The generator set should be capable to operate for a
minimum of 4hrs.
a) Drilling
1. The location of the drilling site, name of well,
SAHAMIYE
UNDERGROUNDWATERSURVEYANDDRILLINGCONSULTATION
2. Make, model ,type
ADDRESS: and sizeHARGEISASOMALILAND
JIGJIGAYAR, of drilling rig,
TEL: 0634428946Email:alfaaiz046@gmail.com
3. Date of cement and completion of drilling,
4. Type of work performed including mobilization, demobilization
and on site relocation and number of hours on each type of
work,
5. Name of all crew members,
6. Size of hole and depth penetrated,
7. Logo formation penetrated,
8. Length and size of casing installed,
9. Length and size of screen installed,
10. Length and size of observation pipe installed,
11. Any problems encountered,
b) Test pumping
1. The location and name of the well being tested. Physical
characteristic of the well including depth, diameter, size of casing
screen setting and length of screen,
2. Date of cement and completion of pumping test,
3. Type and capacity of pumps used,
4. Type of work performed and number of hours on each type of
work including mobilization, demobilization or onsite relocation
position of the pump.
16. Final Reports
After completion of the well (drilling, development, re-development, and
pumping tests) the contractor has to submit a final report incorporating
all-important result of specific activities.
The well report has to contain remarks on all special observations,
difficulties, etc. The complete well report must be such that the activities
and findings can be reproduced step by step.
For the well the final report has to consider the specific well reports and
SAHAMIYE
UNDERGROUNDWATERSURVEYANDDRILLINGCONSULTATION
must be submitted afterJIGJIGAYAR,
ADDRESS: completion of all activities in the relevant well.
HARGEISASOMALILAND
TEL: 0634428946Email:alfaaiz046@gmail.com
17. Drilling
Payment for drilling will be made at the unit price per meter by the drilling
company for the various diameters of the borehole.
Measurement will be made vertically to the nearest 0.1m from the original
ground level to the bottom of the completed hole.
This price should include all materials, equipment, and lab our and all
work
Incidentals there to except for those items for which payment is specified
additionally to that of drilling .No payment will be made for boreholes
abandoned or incomplete as a result of lost or stuck tools, stuck casing,
failure to meet plump necessary alignment tests, or any other reasons
that
PREAMBLE
1. The Bill of Quantities forms parts of the contract document and
shall be read in conjunction with all other documents comprising
the contract documents.
4. All rates and sum of money quoted in the Bill of Quantities shall
be in the currency of USD.
5. The units of measurement described in the Bill of Quantities
are metric units
SAHAMIYE
UNDERGROUNDWATERSURVEYANDDRILLINGCONSULTATION
ADDRESS: JIGJIGAYAR, HARGEISASOMALILAND
TEL: 0634428946Email:alfaaiz046@gmail.com