To: Resident Engineer
ne orRene 1970922
ojED BASED A Mako.
Prec Name MOUAIMEDENTASHD ALMAROWM yaar yay beans Cena Le
contac: 263 onetan: 97Cosstant
Teaco \ccion/frs | ReareoPoion | _oneofo7 | Hawsaor
one.ruuie
orton Ten fornsateacrerousasen | Raa | Meanca! | soya | 4
‘eta
‘overtime s requested
"we cannot make Leak Test [ight Tes for G1 & FR Ducting in the day ight so we are requesting evening time.
ame Ze
=
pom shall be deducted from the contractor.
RegularTiming 8:00AM to 5:00PM
‘ontiactor's Signature / Stamp Overtime FromyTo 5:00 PM to 9:00 PM
consultant Ste Supervision
|AE7 Sta Assigned Supervision Consuitant
Date: Date:
(Gverie shout be submited 24 hours advance: ®
Q27 ¢: PIC re ieee Sa
Request to work Non-Normal Hours (Overtime)
To: Reet engine Date ofreques: 19709722
MonAnen ervnasio AL MAKTOUM .
Projet Name MOANIED BRASH ALMATOM gr: away rtrtoal Conatng LC
onze 826 3 Consuan:AE7 Const
Jo Bescon locaton Area | Requred Poston | _DawefoT | HeusoroT
Gre pestis
eaten Uae TesiforimateacierRoucsatsnan, | 19702"18.38 | Mecranear | so yogon9 ‘
Sane recor
feason overtime requested
[Pom nst TTSTETEDETT SenreTS
4A
Presenter Ze A
1 extra supervision costs incurred shall be deducted from the contractor.
z
Regular Timing 8 00AM to 5:00PM
[Contractor's Signature / Stamp Overtime FromyTo 5:00 FM to 9:00 PM
Site Supervision
|AEz staf Assigned ‘Supervision Consultant
Date: Date:
(Gvertme shoud be submitted 24 hous Th advanceQ27 PIC,
Request to work Non-Normal Hours (Overtime)
To: Resident Engincer Date of Request 17/09/22 |
MOHAMMED BA RASHID AL MAKTOUM sertional Cac
Project NAME Crry DISTRICT ONE PHASE 3A. (BP263} ae oe aenae
convoct 6°26 Comstan: AE? Corsutant
To Deipon Toxaton/Aea | Reged Poston | oaearor | omsaor
Gu16-r4416
tek 1.104,
Lest Tet ine Ten forintoledGeeRDucsatsman. |Thieaseaa| MEM | sy99032 ‘
VIA37A rene
Shots
fioson oon weaned
‘we Cannot make Leak Test (Light Test for GI & FR Ducting in the day light sa we are requesting evening tmme
Regular Timing _&:00AM 10 5:00PM
Overtime FromyTo 5:00 PM to 9:00 PM
ontractor’ Signature / Stamp
|Consuttant ste Supervision
7 Staff Assigned Supervision Consultant
Joate: Date:
(Gverime shoul be submitted 4 hours advance