DUHAYLUNGSOD
RECEIVING
MAINTENANCE
OUTLINE
RECEIVING OF 1 TON CONTAINERS
RECEIVING OF 68KG CYLINDERS
TOPICS TO BE COVERED
RECEIVING OF 1 TON
CONTAINERS
WRITE THE LIST OF CONTAINERS
IN THE CHLORINE
CONTAINER/CYLINDER RECEIVING
REPORT
Write the:
1. CODE NUMBER
2. SERIAL NUMBER
3. LATEST HYDROTEST
LHU | 2021
THE LIST OF CONTAINERS WILL BE
EVALUATED FIRST BY THE
SUPERVISOR
LHU | 2021
THINGS TO CONSIDER
IS THE VALVE CYCLE ON BOTH
VALVES THE SAME?
1. If not, assume 3C
2. If no markings, look at the QC sticker, the date
must be AFTER March 2021, ask the supervisor
on what to do with the container
3. If the valve looks damage, assume DV
(Defective Valve)
PRESSURE TEST
Use only gas ammonia to detect the presence of GAS
CHLORINE
ALLOCATION OF
RESOURCES
100
50
0
Item 1 Item 2 Item 3 Item 4 Item 5
63%
AVERAGE ACCURACY OF
INVENTORY REPORTS
PLANNING
Presentations are communication tools that can be
used as demonstrations, reports, and more.
IMPLEMENTATION
Presentations are communication tools that can be
used as demonstrations, reports, and more.
MONITORING
Presentations are communication tools that can be
used as demonstrations, reports, and more.
ADVICE FROM FOUNDERS
DRIVE DISCPLINE
ADAPTABILITY AUTHENTICITY
PHONE NUMBER
123 456 7890
EMAIL ADDRESS
hello@reallygreatsite.com