Esci Div-21 2018-19 2038 R
h. Name(s) of Inspecting Officers : Sri. A. Muralidhar Rao (Sr. TPQC Consultant, ESCI)
Page 1 of 3
nominal size 20mm and fine aggregates of zone II.
75mm thick.
OBSERVATIONS:
The following items are verified at random and item wise remarks are tabulated
below.
WMM:
Observed Avg
Width Short fall
thickness (mm) thickness Specified
S. of thickness
Location of cross thickness
No road L C R observed
section (mm)
(mts) (mm)
(mm)
General observations:
1. It is observed that the average thickness of WMM is 103mm against 150mm thick
specified. Necessary recovery shall be effected.
RMC M10:
Observed Avg
Width Short fall
thickness (mm) thickness Specified
S. of thickness
Location of cross thickness
No road L C R observed
section (mm)
(mts) (mm)
(mm)
Page 2 of 3
Foundation
General observations:
1. It is observed that the average thickness of RMC M10 is 90.5mm against 75mm thick
specified.
2. The field have not informed the progress of M10 work during execution. Hence, the
ingredients of RMC M10 could not be verified by TPQC-ESCI. The field staff are
advised to certify the content of fine aggregate provided in RMC M10 before making
the payment.
Overall observations:
1. It is observed that the average thickness of WMM is 103mm against 150mm thick
specified. Necessary recovery shall be effected.
2. It is observed that the average thickness of RMC M10 is 90.5mm against 75mm thick
specified.
3. The field have not informed the progress of M10 work during execution. Hence, the
ingredients of RMC M10 could not be verified by TPQC-ESCI. The field staff are
advised to certify the content of fine aggregate provided in RMC M10 before making
the payment.
4. Ensure proper curing for RMC M10 and M30 as curing plays a vital role in attaining
Compressive strength.
5. The field staff are advised to obtain design mix for RMC M30 in advance and ensure
that same shall be achieved in batch mixing plant.
Page 3 of 3
A.MURALIDHAR RAO B. JAGADISHWER
(TPQC Consultant ESCI) (Chief Projects Co-ordinator, ESCI)