Professional Documents
Culture Documents
Triangular Plots
Triangular Plots
Triangular Plots
Segments 5
Points 15
Table 02
Point X Y
Line 01 1 0.0 0.0 Triangular Plot using Excel
2 5.0 0.0 5.0
4.5
4.0
3.5
3.0
2.5
2.0
1.5
1.0
0.5
0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
4.0
3.5
3.0
2.5
2.0
1.5
1.0
0.5
0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
4.5
4.0
3.5
3.0
2.5
2.0
1.5
1.0
0.5
0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
Table 01
Segment Type Pts Angle X Y
0 H 1 0 0 0
g Excel 1 H 12 0 1 0
2 H 13 0 2 0
3 H 14 0 3 0
4 H 15 0 4 0
5 H 2 0 5 0
0 L 1 60 0 0
1 L 4 60 0.5 0.87
2 L 5 60 1 1.73
3 L 8 60 1.5 2.60
4 L 9 60 2 3.46
5 L 11 60 2.5 4.33
0 R 2 120 5 0.00
1 R 3 120 4.5 0.87
2 R 6 120 4 1.73
3 R 7 120 3.5 2.60
3.0 3.5 4.0 4.5 5.0
4 R 10 120 3 3.46
5 R 11 120 2.5 4.33
s toward Right
oward Left