Overview

BHARAT HEAVY ELECTRICALS LIMITED, BHOPAL Organisational Profile: BHEL, Bhopal, heralded the beginning of heavy electrical industry in India. The Bhopal plant of BHEL started in collaboration with M/s AEI, U.K and was registered as Heavy Electricals (India) Limited, HE(I)L on 29th August 1956. Later it merged with Bharat Heavy Electricals Limited (BHEL) on 1st January 1974. BHEL with its corporate office at New Delhi caters to core sectors of the Indian economy viz. Power Generation and Transmission, Industry, Transportation, Renewable Energy, Defence etc. The wide network of BHELs 14 manufacturing divisions, 4 Power Sector regional centres, 8 Service Centres, 18 RODs and number of sites enable the company to promptly serve its customers. Human Resource Planning, Finance, Marketing, Erection and Commissioning are the responsibilities of respective corporate functions. International Operations, Power Sector marketing, Industry Sector and Regional Operation divisions (RODs) cater to marketing needs while Erection and Commissioning of Power project sites are accomplished by respective Power Sector groups. BHEL Bhopal designs and manufactures equipment for power, industry and transportation sector. BHEL, Bhopal delivers a wide spectrum of products and is a leader in Indian market in the operating segments. A profile of major products and customers is as below (Fig. O-1).
PRODUCT Traction Machines Electrical Machines (Motors) Switchgear , Control equipment and rectifiers MAJOR CUSTOMERS Indian Railways, (ICF, DCW, DLW, DMW, CLW, RCF, etc) M/S NTPC, Ingersoll Rand, Triveni Engineering Ltd, Tata Steel, SEBs, IOCL, etc, all leading cement manufacturers, Refineries. SEBs, Indian Railways, RPL, APCPDCL, IOCL, APGENCO, RRVUNL, UPRVUNL etc, all utilities. Contribution in turnover 23% Major Competitors Siemens, Bombardier, CGL CGL, ABB, TDPS, Dongfang, WEG, ILGIN Switchgear-Siemens, ABB, L & T, Areva Control Equipment & Rectifier- CGL, Bombardier, Nelco, Alstom, ABB ABB, Areva, CGL, Siemens VA TECH, Alstom, Siemens Voith Competitive Advantages Established Player, New Product development, 85 % Market Share Quality, Market share-71 %, Customer Preferred ProductBench Mark Design & Quality, Customer Preferred Product-Bench marked. OEM of oil rigs Market share Switchhgear-22 %, Control Equipment & Rectifier 40%, Technology leader in India, Supplied over 4100 transformers totalling 2,65,000 MVA, 45 % Market Share Low Conversion Cost, Modern Hydro Laboratory, 79 % Market Share Tie Up with Wartsila for DG sets, Inhouse facility for fabrication and feeders

17%

17%

Transformers

M/S NTPC, PGCIL, NPC, NHPC, SEBs, DVC, PPC GREECE, Zesco Zambia, TNB Malaysia etc, all utilities M/S NHPC, NTPC, NVDA, Sardar Sarovar, Kosti Sudan, Salma afganistan, NEEPCO, SEBs, HEG,TALA, APGENCO etc SEBs, Railways, NTPC Inhouse Products, etc

15%

Hydro Equipment (Turbine & Generator) Others- Thermal equipment DG Sets, BOP, Feeders etc

12%

16%

Fig. O-1: Product Profile & Major Customers

BHEL has been using five year Strategic Plans for planning its growth and setting of objectives since mid 70s. Vision, Mission and Values (Fig. O-2) were first identified in 1996 workshop and are reviewed in top management workshops every five years. Strategic Plan: 2007-2012 has been prepared in 2006 and rolled out in 2007. Strategic plans at Unit level are prepared to work out the corporate strategic plans and there after fine tuned to align with the corporate strategic plan. Unit level top management workshops Manthan are held annually to identify the key issues and challenges. In line with the companys vision, polestar statements for the unit and products/ functions have been formulated in the 2007 top management workshop.
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page O - 1

Overview

VISION A WorldClass Engineering Enterprise committed to Enhancing Stakeholder value. MISSION To be an Indian Multinational Engineering Enterprise providing Total Business Solutions through Quality Products, Systems and Services in the fields of Energy, Industry, Transportation, Infrastructure and other potential areas.

VALUES Zeal to Excel and Zest for Change Integrity and Fairness in all Matters Respect for Dignity and Potential of Individuals Strict Adherence to Commitments Ensure Speed of Response Foster Learning Creativity and Team-work Loyalty and Pride in the Company

POLE STAR STATEMENT To be a leading and creditable supplier of products and services ensuring adequate returns for growth in line with companys vision & mission Fig. O-2: Vision, Mission, Values & Pole Star Statement

The top leadership team - Chairman and Managing Director and Directors provide direction to the companys growth strategies which emerge from reviews of business environment and deliberations in Management Committee Meetings (MCM). Executive Director(ED) - Head of BHEL Bhopal unit is a member of Management Committee. The policies finalised at corporate level are cascaded down to unit level. The organisational interfaces are depicted in Fig. O-3

A Corporate Office CMTD


Policy & Strategy

B Key Vendors C

Finance Quality Materials

HR P&D Project Sites


Feedback

Sister Units
- BAP - EDN - Jhansi
Supply Chain

BHEL Bhopal

Customer

Supply Chain

Feedback
Order booking/ Approvals

Power Sector ROD

Industry Sector
SSBG

International Operations

PS- Regions Sites

Fig. O-3: Organisational Interface

Growth (CAGR above 20%) is the biggest challenge for the unit which led to adoption of Daily Works Management (DWM) by ED and this has facilitated in exceeding targets. DWM has also facilitated uniform quarterly production performance (Fig. 9.2b). ED designed his visual dashboard which facilitated online monitoring of important parameters on real time basis. CRISP boards are displayed in work areas for communication of plans, achievements and strategic initiatives. These initiatives facilitated more than 20% growth on all important financial and engineering parameters i.e. Turnover 22%, Value Added - 21%, PBT - 25%, EVA -30%, Customer Collections - 29%, Cash Receipts - 29%, Net Flow - 73%, Order Receipts - 54%, R & D Expenditure -106%, Patents - 88%, Capital Expenditure - 61% etc.

BHEL, BHOPAL

Application Document CII EXIM Bank Award for Business Excellence - 2008

Page O - 2

Overview

Organisation structure at BHEL, Bhopal has been designed product and function wise for a speedy response to the needs of both external and internal customers respectively. The present organisation structure is illustrated in Fig. O-6. The profile of the employee base and their educational profile are illustrated below respectively (Fig. O-4, Fig. O-5). As a strategic decision all core activities are manned Executives (E1-E8) Supervisors Others Total by regular employees and non core activities are being gradually outsourced through work contracts/ 1295 1272 5092 7659 sub-contracting. The core strengths of the organisation are engineering and manufacturing Fig. O-4: Manpower Position as on June 2008 technology.
Engg. In line with companys vision, 253 full time Grade PG/Doctrate Dip. ITI Others Total Grad. dedicated design engineers are involved in Exec. 694 239 174 5 183 1295 the process of product development. BHELs products are technology intensive Super. 6 102 290 640 234 1272 and almost all the products are specially Others 5 171 225 3040 1651 5092 engineered to customer requirements. Product technology is being continuously Total 705 512 689 3685 2068 7659 upgraded through inhouse developments, Fig. O-5: Educational Qualification of Employees technology collaborations, ToT, joint developments etc. The in-house development is facilitated through PIR mechanism supported by collaborative projects with leading educational institutes. Excellence in engineering is reflected through continuous thrust on R&D Expenditure, Commercialisation and protection of intellectual rights through patents & copyrights.

The key requirements of various customers and market segment are captured at product level by respective business sectors. Product Committee and Technical Committee of each product are the apex bodies that analyse the market scenario, emerging technologies, technology gaps and decide upon the specific product development needs. The products are directly delivered to customers and there are no distributors/ dealers for the same. Surveys conducted by independent Professional bodies capture Customer perception and provide insights into opportunities for improvement. Management Review meetings facilitate assessment of quality parameters and trigger system improvements. BHEL, Bhopal values the role of vendors in growth and considers them as partners in the business as materials constitute approximately 50% of shop turnover. BHEL, Bhopal has a strong base of more than 2500 vendors who are registered after a comprehensive assessment and are developed regularly through Vendor Performance Rating System. A B2B Portal ensures online availability of data such as Enquiries, Supply and Payment status etc. for vendors. The major input material is Steel, copper, insulations, Castings and forgings. In line with governments vision of Power for all by 2012, BHEL, Bhopal is positioning itself for meeting the growing demand. Accordingly, Capacity and Capability Augmentation has emerged as one of the critical success factors for the unit. BHEL Bhopal certified to ISO: 9001, ISO 14001 and OHSAS 18001, is moving towards excellence by adopting TQM as per EFQM/ CII model of Business Excellence. Movement towards Business Excellence, MBE was initiated on a pilot scale in two product areas namely Electrical Machines and Transformers in 1995. The movement now encompasses all products since 1998. The Top Management formulates the Excellence initiatives and identifies the Critical Success Factors. CSFs for the year 2007-08 have been uniform production, cost reduction, timely availability of skilled manpower, bridging technology gaps and capacity enhancement. A number of initiatives are being taken on continuous basis for fulfilment of organisations Vision. Some of the major initiatives taken over last five years include Balanced Score Card, Performance management System (e-MAP), Six Sigma, Design to Cost (DTC), Lean management, Daily works management (DWM), Capacity enhancement etc. An organisation wide repositioning exercise facilitated by M/S Mckinsey was undertaken in 2004 and the recommendations implemented.
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page O - 3

Corporate Unit BSC Strategic Capital InvestmentPlan Divisional Plan Strategic Plan

Overview

Design to Cost (DTC) strategy identified by Top management as a strategic cost reduction exercise had been piloted in Transformer product of BHEL Bhopal with McKinsey and further extended to Traction and Electrical Machines. LEAN has been introduced in Traction and Switchgear product groups. A diagnostic study has been completed in hydro product group and plans drawn for undertaking LEAN. BHEL Bhopal has also adopted Six Sigma methodology with Indian Statistical Institute. The concept of MOU with Corporate Office was replaced by Balanced Score Card (BSC) in 2003-04. BSC is now a strategic tool for policy deployment through e-MAP (Moving Ahead through Performance). The introduction of e-MAP is a strategic HR intervention through focused alignment of individual efforts with that of the department, unit and company as a whole. The initiatives, have led to improvement in business results, increased satisfaction level and morale of employees, share holders and customers. The sustained efforts have also brought laurels in the form of award of CII EXIM Strong Commitment towards Excellence in 2003 and CII EXIM- Significant Achievement towards business excellence in 2004, 2006 and 2007. BHEL, Bhopals Laboratories are accredited by NABL to ISO 17025. The Hydro Laboratory, Ultra High Voltage laboratory and Centre for Electric Transportation are the only laboratories of their kind in the entire Asian region. The unit has in-house Feeder and Fabrication Shops to cater to requirements of Tooling, Coils, Laminations, Castings and fabrication work. Data on various parameters viz. business, personnel etc. is shared across the unit through Intranet and across the organisation (Corporate Office, all major units and regions) through Virtual Private Network (VPN). ISMS certification has been obtained for standard ISO/IEC 27001:2005. BHEL, Bhopal believes in participative management and has three tier participative fora at workmen level. Executives and supervisors are represented through respective associations. Employees perception is regularly collected which forms the basis for formulating and implementing improvement plans. A number of initiatives such as Reward Scheme 2008, IPR Incentive scheme-2008, Revised Variable Plant performance Bonus and Special Incentives payments have been introduced as a result of feedback. As a sequel, the motivation and satisfaction level have improved over the years, which is also reflected in the dipstick surveys. BHEL, has a defined policy for CSR with 0.2% of PAT being earmarked for the purpose. In line with this policy BHEL, Bhopal takes up Environmental Improvement Projects every year. Surveys provide societys perception of the company operations and the satisfaction level is of the highest order. BHEL, Bhopal is committed to continuously make its customers successful and to realise organisations Vision and Mission.
Shri R.K.Singh - Executive Director Product Managers Shri M.K. Dube Shri S. Lomash Shri R. Krishnan Shri A.K. Dave Shri SK Seth Shri CK Shrikhande GM (Hydro) GM (TPTN & CET) GM (EM ) GM (TCB) GM (Thermal) GM (SCR) Functional Managers Shri C.K. Pani Shri R.K. Bhasin Shri Din Dayal GM (IT & PDX) GM (FBM) GM (CDC, Comm. Cord & CMG) Shri Prabhat Kumar Shri M.C. Prasad Dr. N.C. Agarwal Shri RW Chitale Shri SU Quidwai Shri MK Shakya Shri R K Dikshit Shri GD Verma Shri RR Yadav Shri U Chatterjee Functional Managers GM (P &D & BEX) GM (HR) CMS GM (MM) GM (EMT) GM (TR-NB) GM (CI) GM (Feeders & WEX) GM (F) GM (Q)

TPTN & CET: Transportation and Centre for Electric Transportation, EM: Electrical Machines, , TCB: Transformer, Capacitor & Bushing, SCR: Switchgear, Controlgear and Rectifier, IT : Information technology, PDX : Projects division, FBM: Fabrication, CDC : Central Despatch Cell, Comm. Cord. : Commercial Coordination, CMG: Contract Management Group, P&D: Planning & Development, BEX :Business Excellence, HR: Human Resource, CMS: Chief Med. Services, MM: Materials Management, EMT: Electrical Maintenance, TR-NB: Transformer New Block, WEX: Works Engineering & Services, F: Finance, Q: Quality

Fig. O-6: Organisation Structure (Unit Level) BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page O - 4

Leadership

1. 1a.

LEADERSHIP

Leaders develop the mission, vision, values and ethics and are role models of a culture of excellence: Executive Director and Top Management of the Company actively understand and analyze the drivers for the business growth and set the direction and behavioral norms for the organisation for sustainable success year after year. Vision, Mission and Values (VMV-Fig. O.2) for the corporation are developed and reviewed at corporate level once in five years. VMV were last revisited and reaffirmed in corporate level top management workshop (TMW) held at Ananda on 19th-20th May 2006. ED BHEL, Bhopal participates and represents the unit in these Top Management Workshops. Formulation of VMV is done through a preparatory exercise where a cross-section of leaders interacts with employees at all levels. At BHEL, Bhopal, unit level and group level workshops are held annually. ED leads the Top Management Workshop (TMW) also known as Manthan at unit level while GMs lead the same at group level. ED, GMs and Business Excellence (BE) leaders and Senior Executives deliberate upon strategic issues in TMW (Fig. 2.9). The outputs that emerge from group level workshops form the basis of deliberations in unit level workshops. The long term and short term CSFs are finalised by top management (Cr. 2c). Manthan facilitates identification of CSFs for the year e.g. In the TMW chaired by ED, held on 7-8 June08 and last years workshop facilitated by the then Director(HR), held on 2nd -3rd May07, the unit level CSFs and CSF champions (GMs), were identified for 2008-09 and 2007-08 respectively. Last year, the leadership felt a need of developing a guiding statement specific to the unit and emerging from corporate vision. This gave birth to concept of a Polestar Statement (Fig. 1.1). Modus operandi for development of group-wise Polestar statements was also deliberated and finalized last year in the workshop and subsequently polestar statements for all product and function group were finalised. During Manthan-2007 deliberations, it emerged that team work and customer success are the stepping stones for realization of Vision. This paradigm shift of leadership philosophy culminated in shifting the focus from customer satisfaction to customer success and employee satisfaction to passionate employees. This led to revision of earlier excellence slogan (Fig. 1.1) for effective and emotional involvement of all employees for adopting and exhibiting new philosophy.
To be a leading and creditable supplier of products and services ensuring adequate returns for growth in line with companys Vision & Mission. -Units Pole Star Statement Fig. 1.1: Units Pole Star Statement and Slogan Kadam Kadam Milana Hai Grahak Safal Banana Hai. - BHEL,Bhopals Slogan Marching Towards Business Excellence -Earlier Slogan

ED and GMs deliberated and finalized on the units definition of World class which the unit is striving to attain (Fig. 1.2). It was decided to include selected market in the concept of world class to emphasise the market segment applicable for each product. TMW facilitated by CII counsellors are also held annually in conjunction with Manthan to refine the approaches e.g. In the TMW held on 1st May08, the approach for identification of CSFs and critical issues was deliberated. In the TMW held on 12th May07, the action plan for the CSFs developed as sequel to earlier workshop were presented by respective champions and the approaches were refined based on learning from the workshop.
Units concept of world class Being a leading supplier of products and services in a selected market by successfully competing in quality, delivery, cost, customer services and innovation.

Fig. 1.2: Units Concept of World Class

GMs lead the Group level workshops which are held prior to Unit level TMW, for review of strategic plans. In these workshops, group-specific CSFs and gaps are identified and action plans are drawn to bridge the gaps.
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 1 - 1

Leadership

Leaders not only develop and advocate organisational values; they practice these as role models. Following examples reinforce this fact.

Zeal to Excel and Zest for Change- Change initiatives like LEAN, DTC, Six Sigma, DWM, Knowledge Worker, Multiskilling, etc. are patronised by the ED himself and are championed by GMs and HODs. IPR incentive Scheme 2008, Reward scheme 2008, BEAT, IMPRESS, BHEL Excel Awards promote individual and team excellence. Integrity and Fairness in all Matters- Well defined, documented, and transparent systems and processes such as Pay Scales, Perks, Benefits, Promotion policy etc. are put on intranet, thereby ensuring transparency. On line recruitment, transparent e-MAP system for appraisal are some example of fairness. Respect for Dignity and Potential of Individuals- GMs, AGMs, HODs personally participate and encourage participation of individuals in CFTs for improvements and recognise and reward peoples efforts and achievements. Strict adherence to commitments- BSC objectives, delivery schedules of customers are adhered to. The delivery commitments are a part of Balanced Score Card of ED, GMs, HODs. Ensure Speed of Response- Demonstrated through DWM by setting daily targets. Leaders obtain stake-holders perception in this regard through respective Perception Surveys. Foster learning, creativity and Team Work- Funding of R&D, change initiatives, training and development etc depicts commitment of top management to foster learning and creativity e.g. funds and dedicated teams are earmarked for DTC, Lean, six sigma, IPR etc. Loyalty and Pride in The Company- Leaders take pride in Common Uniform, BHEL Bhopal Anthem and Slogan. Leaders lead and participate whole heartedly in various company functions and celebrations. Significantly low level of Employee Turn-over is an indicator of loyalty. (Fig 7.8)

ED, GMs and HODs role model the culture of excellence through their personal involvement and participation in change initiatives with a missionary zeal e.g. Deliberations in Manthan 2007 led to several initiatives e.g. DWM, EDs Dash board etc. GMs and HODs participate in Inter Unit Functional Heads meet to capture and assimilate best practices of other units e.g. Product GM, TQ Manager and TQ co-ordinator participate in Inter Unit BE workshops held every year which are facilitated by Corporate Quality team. Similarly GMs and senior executives participate in inter unit meets of respective functions such as MM, P&D, Finance, HR etc. The top management identify, personally lead and participate in capability building initiatives based on CSFs and strategic Issues e.g. DTC, Lean , Six Sigma , Capacity Augmentation, Recruitment, Collaborative projects etc (Fig. 1.4, Fig. 1.5). The leadership team of BHEL, Bhopal demonstrates initiative of leading change initiatives in the corporation e.g. Most of these initiatives viz. DTC, Lean, Six Sigma, Collaborative projects were rolled out for first time at Bhopal. ED led DTC rollout in the corporation with an aim to make the products cost competitive and it was piloted by GM(TCB) in Transformer division with McKinsey as the Consultants in 2005 and was subsequently extended by GM (EM) and GM (TPTN) in 2006 in their respective products through inhouse efforts. LEAN was introduced for the first time in entire corporation in Switchgear and Transportation divisions in 2006. Project Teams with Champions were identified for implementation of DTC and LEAN concept and progress reviewed quarterly by Unit Steering Committee headed by ED. Introduction of LEAN in Hydro and Electrical Machines group in 2008-09 is a part of EDs BSC. Top Management launched Six Sigma initiative in 2005. ED and GMs have themselves identified, prioritised and championed more than 130 Six Sigma projects in first, second and third phase. HODs are Companion to the Six Sigma black belts while GMs are Champions. The entire top management team comprising of ED, GMs and HODs underwent two day training on DMAIC approach. The top management leads collaborative approach for technology leadership through projects with leading institutes like IITs/ IISc. These projects are steered by middle level executives. The top management team reviews the organisation structure from time to time and changes the same to deliver the desired results e.g. an exclusive and dedicated modernisation group headed by GM for capacity augmentation was created in 2005. Apex BE taskforce comprising of six GMs and two AGMs has been constituted as a sequel to Manthan 2007 for strengthening the business excellence movement. Rationalisation of functions and structure is also reviewed and changed from
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 1 - 2

Leadership

time to time for effective management of processes and functions e.g. PMG is now part of Hydro product group, Hydro Lab and Hydro Engineering of Hardwar unit are also a part of Hydro product group. Organisation restructuring is carried out regularly. (Fig. 1.3)
Year Department/ Function 1996 Contract Management Group 1998 Business Excellence Promotion Centre 2002 Project Management Group 2004 Central Dispatch Centre 2005 Modernisation department 2005 Projects Division PDX 2006 DTC 2007 Transformer New Block Fig 1.3 Examples of Organisation restructuring Purpose Single Point Contact for Customers of Thermal Projects Implementation of TQM related activities Project Management of Hydro Jobs Thrust on Timely despatch and on receipt at site Thrust on Modernisation of Hydro, EM , Transformer facilities Thrust on Small Hydro Business and Balance of plant orders Thrust on DTC Thrust on Transformer New Block

GMs are the Champions and HODs/ Functional heads are the chairpersons of CFTs for review of various systems/ processes. HODs and HOS plan for various improvement activities and schemes in the beginning of the year through e-MAP and take Capability Building initiatives in respective work streams. They also lead and involve themselves in improvement teams which number over 700 in different functional areas (Fig. 1.4, Fig. 1.5). Leaders encourage participation in improvement activities by leading improvement projects and also motivate Individuals and teams to participate in various improvement initiatives with collaborative approach (Fig. 1.6).
Leaders Six Sigma Champions (GMs/ DROs) TQ assessors (E4-E8) ISO 9001 assessors ( E3-E8) HSE assessors NABL assessors (E4-E7) Vendor assessors (E1-E7) Nos. 18 90 45 10 8 125 Leaders Six Sigma Companions (HODs) QC facilitators (E1-E7) 5S Facilitators BE Leaders (E4-E7) E MAP Champions & Review Facilitators (E1-E8) QC Co-ordinators (E5-E7) Nos. 40 152 29 18 65/13 25 113 Leaders Six Sigma Black Belts & Green Belts BSC Coordinators (E3-E7) Website Facilitators (E4-E7) CRISP process owners (E5-E7) Internal Faculty (E1-E8) Chairmen of Quality Councils, Shop Council, PQG, etc (E6-E7) KRA taskforce members Nos. 180 20 30 10 205 50 15

DTC Teams 98 Lean Teams Fig: 1.4: Involvement of Various Leaders (2007-2008)

The Leadership team provides all resources for the change initiatives e.g. The Product specific core teams for DTC and LEAN worked on the projects exclusively and were relieved from their work place and regular responsibilities during the period (six months each). A Centre for Excellence has been created with an environment which facilitates creativity and innovation. Leadership of BHEL Bhopal also ensures that funds are never a constraint for training and learning activities. All Product groups
Schemes
Purpose projects /persons Process Champion Levels involved

PIP

PIR

QCC

CFT

QIP

JIP

Six Sigma

DTC LEAN

RCA

Taskforces

Productivity Design Workers Specific Quality Quality Process Cost Root cause MIs Review Enhancement Improvement Involvement improvement Improvement Improvement Improvement Reduction analysis 138/414 GM (P &D) Executives & Supervisors 34/170 179/1582 24/252 72/288 GM (Q,) Executives & Supervisors 31/122 Product GM Senior executives 30/ 150 GMs /DROs 226/600 GMs 20/65 GM(Q) 13/110 GM(P & D)

GM (P & D) GM (P & D,) Need based Senior Executives Workers Senior Executives

Executives & Executives Executives Executives Supervisors Supervisors

Fig. 1.5: Various improvement projects (2007-2008)

are encouraged to spend at least 2% of group turnover on Product Development. Human Resource Development Centre (HRDC), Bhopal and Human Resource Development Institute (HRDI), NOIDA regularly organise a number of courses for training and development activities (Fig. 7.3a to Fig. 7.3d). Leaders undergo training periodically and also train others on their area of expertise. Over 200 senior executives act as regular faculty for various courses.
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 1 - 3

Leadership

External experts are engaged to impart training on specialised subjects like DTC, Lean Management, Oracle 9i, Six Sigma, OHSAS, Daily Work Management, etc.

Collaborative technological projects with IITs/IISc. DTC, Six Sigma, DWM, QTM, Quality circles, IMPRESS Inter-unit HR/MM/Quality/Finance functional meets GMs visit to Lucas TVS for 5S implementation Participation in CII Study Missions/Quality Summits TQ assessment (Internal/Other organizations) Surveillance/Certification audits for ISO systems Fig. 1.6: Examples of collaborative improvement initiatives

Advanced Management Program for GMs Strategic Management Programme for SDGMs and AGMs General Management Programme for Sr. Mgrs & DGMs Young Managers Programme for Managers & Dy Manager

Fig. 1.7: Leadership Development program

Improvement in leadership qualities is being pursued through the Management Development Programmes held at Hyderabad, Bhopal, HRDI Noida and IIMs (Fig. 1.7). Executive Director, GMs and AGMs also participate as faculty in SMP and GMP programme and interact with new recruits. Leadership Effectiveness is assessed periodically through surveys and other forums (Fig 1.8) to obtain feedback on leadership style of top management. Improvement in LES index, (Fig. 7.1c) is a measure of the effectiveness of the leadership of BHEL, Bhopal. Mentoring scheme launched by ED is in place to facilitate adaptation from academic institution to the commercial organisation for new Engineer Trainees. More than hundred middle level executives (EDs BSC objective) have volunteered to provide mentoring support. 1b. Leaders are personally involved in ensuring the organisations management system is developed, implemented and continuously improved:

Leadership effectiveness survey 2007 (Fig 7.1c) Leadership feedback from section of employees by ED BSC/e MAP assessment and Reviews TQ assessment feedback reports. Business Results Employee / Customer / Society perception surveys Formal/Informal meetings Fig. 1.8: Forums for feedback on leadership effectiveness

Leaders at various levels focus on strategic issues & direct the action plans commensurate with unit/ departmental BSCs so that systems are developed, improved and implemented, (Fig.2.6) as per framework of cascaded organizational goals. This process of translation of objectives from BSC to individual KRAs (e-MAP) helps in alignment so that products and services are delivered to the customer and other stakeholders needs are satisfied. VMV, Polestar, Policy documents and Manuals, BSC, Management Instructions govern the operations of BHEL, Bhopal. Corporate Top management with participation from all units develop various policies viz. Works Policy, Purchase Policy, Quality Policy, HSE Policy, Energy Policy etc and are finally approved in MCM. CFTs constituted by ED involving senior executives, develop Quality Manual, HSE Manual and Management Instructions which form the backbone of BHEL, Bhopals operations. Specific purpose CFTs are constituted for developing guidelines on specific subjects which are then institutionalised. The process measures (KPIs) and process owners (Cr. 5a) for all the processes are also identified by the CFTs and performance is monitored by GMs. The Policies, Manuals and Management Instructions (MIs) are reviewed and changes are effected for improvement in the system. New initiatives are piloted and subsequently the procedures for implementation across the unit are standardised e.g. a new MI has been developed for DTC. 13 standing taskforces (as against 6 earlier) comprising of senior executives have been constituted by ED for review of all MIs including those not covered in QMS. The standing taskforces have reviewed and revised all the MIs in 2007. As a sequel to review of current challenges by the Apex BE taskforce, a need was felt to review and revise the KPIs so that relevant process measures are tracked and monitored. Subsequently, the KPIs of all functions were reviewed and updated this year in April08 and provision has been made in the respective MIs for their annual review.

BHEL, BHOPAL

Application Document CII EXIM Bank Award for Business Excellence - 2008

Page 1 - 4

Leadership

BHELs Corporate Governance policy is based on the six principles (Fig.1.9) which demonstrate compliance with high degree of disclosure and transparency. ED took the lead and promptly appointed senior executive as CPIO in Nov.05 immediately after RTI Act 2005 came into effect. Till date more than 250 requests have been disposed within stipulated time limit of 30 days. ED, BHEL, Bhopal presents the data/ information in the monthly MCM (Fig. 1.10) which is further compiled and presented to board of Directors.
Independence and versatility of the Board; Integrity and ethical behavior of all personnel; Recognition of obligations towards all stakeholders
customers, employees and shareholders;

High degree of disclosure and transparency levels; Total compliance with laws in all environments Achievement of above goals with compassion for people
and environment. Fig. 1.9: Principles of Corporate Governance effectiveness

Review of Operations Project Review / Contract Closing / LD Status MOU Projects. Supply of Spares and age-wise analysis Review of Quality Related Aspects Engineering review - Tech. Development and Commercialization of R&D products BUSINESS OUTLOOK-Market Trends, Status of Order Book Fig 1.10: Typical MCM agenda

ED communicates the outcome of MCM meetings to UBC immediately. As an improvement in the earlier process, the agenda and data is now uploaded through VPN for deliberations in the meetings. Leadership has created a systematic structure for organisations focus towards excellence which is reviewed from time to time for its effectiveness e.g. the roles and responsibilities of BEX group have been revised to include all change initiatives under one umbrella. Similarly the structure of excellence councils at unit and group level have been revisited in TMW and revised from three tier to two tier. BE leaders steer business excellence ED chairs unit steering committee of LEAN & DTC activities at group level. Most of the GMs as champions and HODs as companions for six sigma projects present Product GMs are trained TQ Outsourcing Fabrication at site-championed by GM (FBM &Feeders) assessors (4 out of 7) and were earlier BE Championing system for Balance of Plant (BOP) orders by GM (IT & PDX) Leaders of their group. Similarly, unit Championing of DWM by all Product managers and HODs Fig. 1.10: Typical MCM Agenda Capacity enhancement by GMs - MOD, WEX and P&D steering committees are in place for review Outsourcing of non-core processes by Product Managers and refinement of approaches related to Ownership of CRISP Boards by HODs change initiatives such as DTC and LEAN. MECOM in support of communication strategy. Introduction and continuous review and Impress and Excel schemes for reward & recognition etc refinement of Balance Score Card and eMAP are few examples of involvement of Fig. 1.11: Examples of leadership involvement Leaders in development, implementation and improvement of the Management Systems of BHEL, Bhopal (Cr. 2c, Cr. 3a). ED and GMs themselves prepare their balanced score cards based on the Corporate and unit BSC respectively. In turn HODs and HOS prepare their BSC in alignment with GM level BSC. ED and GMs continuously refine systems of communication for units plans, objectives and targets. Based on review of communication channels, refinement has been done and CRISP Boards, Plasma Screens, LEDs, Visual Display Boards with ANDONs, Boards on BSC etc have been introduced. Leaders continuously stimulate excellence in various fields through capability building initiatives such as DTC, LEAN, Six Sigma and introduction of appropriate reward and recognition schemes e.g. In order to stimulate excellence in engineering and also protect intellectual property, a modified IPR incentive scheme has been launched by leadership. Also to encourage group dynamics, commitment and team work for uniform production (CSF of the unit) Revised Reward Scheme 2008 has been launched in Feb 08. IMPRESS and Excel Awards are some other examples. Some other examples of involvement of top leaders in development, implementation and review of management systems to support Units Plans and Product/ Function specific short term strategies (Cr. 2c) are illustrated in Fig. 1.11.

BHEL, BHOPAL

Application Document CII EXIM Bank Award for Business Excellence - 2008

Page 1 - 5

Leadership

1c. Leaders interact with customers, partners and representatives of society: The units customer focus is depicted through the slogan (Cr. 1a) which aims at the success of customers. Leadership has established a customer management process (Cr. 5e) through which ED, GMs and HODs continuously interact with the customers. In addition to these forums, ED, GMs and HODs regularly interact with the customers in a proactive manner during Non-Agenda Visits. Some of the examples are as follows:
GM EM visited KBL Pune and ACC Mumbai in Nov 07 and GACL Mumbai in Jan 08 ED and GM(TPTN) visited DLW in May 08 and April 07 and deliberated on various customer related issues. GM(Hydro) visited Koldam and Parbati Sites in Feb 07 and educated the customers on proper storage systems. GM(Q) visited PGCIL and NTPC headquarters in Feb. 2007 and deliberated on QAP customer hold points ED, GM (SCR) and GM(TPTN) visited GM(WR) in July 2006 and extended proactive support for restoration of Mumbai Suburban Services affected due to unprecedented rains and water logging. ED and AGM (STS) visited Sr. ED (Tech.) NPCIL/ Mumbai which converted a hostile customer into our brand Ambassador. ED, GM (TPTN) and AGM (TXS) visited Member (Electrical) and Member (Mechanical), Railway Board on 22nd and 31st May 06 respectively. The customer need of developing coaches and MOU for electrics emerged during the interactions. GM (TCB) and AGM (TRS) visited ED (Engg.) and ED (Operation Services) NTPC in Sept 2005. The customer need of developing facility for HV test at site for repair services emerged.

GMs and HODs lead Joint Improvement Projects (JIP) with Customers, Vendors and Partners. These JIPs (Fig. 1.12, Fig. 1.13, Fig. 9.21) are a part of GMs BSC and focus on customer success in line with units philosophy. EDs, GMs and HODs are associated with customers as member of various forums such as CBRR, RDSO, PGCIL etc which are responsible for framing their business strategies (Cr. 5c). This has helped in better understanding of customers future plans and business strategies thereby enabling alignment of BHEL, Bhopals product plans e.g. development of 765 kVA , 500 MVA auto transformer, 1200 kV class Transformers, 250 MW Hydro-generators, WEG and 145 kV GIS switchgear which have been taken up based on customers need for higher rating power systems. ED and GMs lead in organising customer meets where latest developments and industrial trends are shared and the needs and expectations of customer are captured. Periodic co-ordination meetings of GMs and senior executives are also a source for understanding project related customer needs and expectations. Such interactions have helped BHEL, Bhopal to create web-site for on-line manufacturing status of transformers where customers can directly access the up-to-date manufacturing status of their equipment. The status of traction motors is also made available to customer through the TPTN website. Bilingual instruction manuals for transformers on web-site are a result of feedback received through such periodic reviews and needs expressed by customers. Leadership has created a structure to facilitate day-to-day contact with customer representatives e.g. Resident representatives of major customers such as M/s. NTPC, POWERGRID, RDSO, NPC, KPCL, Indian Navy etc. have been provided office accommodation inside the plant and residential accommodation in the township. As a result, GMs, HODs and executives of Engineering, Quality, Commercial and Manufacturing divisions have regular interactions with these customers. Product Managers obtain perception of customers periodically in a structured manner. Product Managers lead CFTs comprising of senior executives for analysis of survey results and for drawing action plans for improvement. ED reviews the analysis of survey and implementation of action plans. BHEL leadership actively develops relationship with partners for harnessing business opportunities and formulating appropriate plans and strategies. In order to bridge the technology gap, engineering heads are constantly looking for partners and technology providers not only at premier institutional level but also at individual expert level e.g. Norwegian expert Mr H. Brekke for validation of existing profile for 300m Head Francis Turbine, Russian experts Prof GN Alexendrov for Controlled Shunt Reactor and Mr AK Lokhanin for transformer design, Prof. Joshi of GSITS, Indore and Prof Ravi of IIT, Mumbai for castings. Partnership with Toshiba and Railways for Delhi-Mumbai and Delhi-Howrah Freight Corridor project envisaging Transfer of Technology to BHEL, Bhopal. ED and GMs enter into partnership and regularly interact with institutions for mutually beneficial partnerships e.g. partnership approach and periodic structured reviews with McKinsey and Co. for DTC and Lean, ISI for Six-Sigma, IITs and IISc for collaborative projects. Senior Leaders continuously interact with the suppliers for sharing their needs and expectations. Unit level and
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 1 - 6

Leadership

Product group-wise Vendor Meets are organised to understand their concerns and to share units plan for future. HODs are involved in providing necessary technology, tools, jigs and fixtures for establishment and improvement of supplier-processes (Cr. 4c). Training and guidance on various subjects is imparted to suppliers by BHEL experts. In order to review the needs of suppliers and improve relationship, Head (MM) and Head (Finance) meet office bearers of supplier associations regularly. Similarly, the suppliers invite senior executives of BHEL in their associations meetings. Some major improvements made through supplier interactions are listed (Fig. 4.2, Fig. 4.3). The total approach of involvement with customers and suppliers is reviewed annually by the top management. As a sequel to reviews, all Product groups now take up JIPs (Fig. 1.13) as part of BSC objective.
Modified design of 6FRA 6068 with stator coil anchoring with RDSO AMR AR4500 for DE locomotive with DLW Solving leakage problems in turrent and inspection covers with Development of commutator hub with M/S SMPL Development of impellors with M/S UP Steel. Improvement in packaging of dial type thermometers

PGCIL Fig. 1.12: JIPs with Customers in 2007-08

with M/S PTCI


Fig. 1.13: JIPs with Suppliers in 2007-08

Top leadership of BHEL, Bhopal continuously interact with state government, local leaders and social groups to get inputs for strategic society related initiatives. ED on assuming the charge of the unit meets Hon. Governor and CM of the state to understand and capture the needs and expectations of the society in general and state in particular. ED, GM(HR), Head(P&PR) and Head(Township) interact with cross-section of society representatives such as MLAs, Mayor, Corporators, District Collector, SP, Business Associations etc. These Interactions help BHEL to address a number of social issues and improvement in the surroundings e.g. Relocation of more than 1200 shanties to a safer place. ED and GMs also lead society related initiatives such as championing the cause of environment and good health for future generation e.g ED and CMS have been instrumental in setting up of Yoga Research Centre in joint collaboration with Yog-Bharti, Munger. ED promoted study on effect of Yoga on various diseases and Head Kasturba Hospital took up specific research study and after thorough scrutiny by state level committee, the findings were shared with public. ED and GMs lead mass tree plantation drives where more than 10,000 trees are planted on a single day every year by cross section of society. An old age home Anandam established by BHEL Bhopal in April 2008, is an expression of the commitment of leadership towards society. This unique initiative was identified and lead by ED himself as a result of his interaction with retired employees. ED and GMs lead socio-cultural activities to bring freshness in otherwise mechanical industrial life e.g. Lecture series, Melas and socio-cultural programmes etc. are organised every year. Membership to golf club is extended to distinguished members of society as well. ED and GMs promote and contribute towards excellence by being chairman/ members of various bodies (Fig. 1.14, Fig. 1.15) and sponsoring and promoting various activities. ED, GMs and senior executives regularly participate in learning forums such as CII Quality summit, CII & NABL assessments, ELECRAMA, ELROMA, SWICON, IMTEX and other seminars and conferences to imbibe and implement best practices, identify state of art equipment for capacity enhancement (CSF of the unit).
Executive Director
Chairman - MP Chapter National Safety Council Vice Chairman of Board of Governor of Centre for Research

and Industrial Staff Performance Society


Member of Research Council of Regional Research Lab.

(RRL), Bhopal
Member, MPEB Regulating Body Member, Governing Council, BHEL, HRDI

General Managers and other Senior Executives Council Member, State of MP, Institution of Engineers Chairman Production Engineering India Board, IE(I) Honorary Secretary Institution of Engineers (MP Chapter) Vice Chairman Computer Society of India (Bhopal Chapter) Fellow members IE(I), Institute of Chartered Accountants of India. Member - ASME, IIPA, NSC, IIBA, IIMM, BIS. Assessors-NABL, CII etc

Fig 1.14:

Fig 1.15:

The leadership of BHEL believes in promoting excellence through sponsoring of such excellence events and also by sharing learning through presentation of technical papers. Last year 24 technical papers were presented in National/ International forums. Leaders also nominate workers and supervisors for participation in various conventions such as CII/ QCFI Quality Circle conventions.
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 1 - 7

Leadership

Leadership of BHEL, Bhopal is committed to support and advance ten principles of UNs Global Compact Programme on Human Rights, Labour Standards, Environment and anti-corruption. The organisation has formulated its Mission Statement on CSR keeping - Be a Committed Corporate Citizen, alive towards its Corporate Social Responsibility and eight thrust areas have been identified for action: Self-employment generation, Environment Protection, Community Development, Education, Health Management and Medical Aids, Orphanages & Old-age Homes, Infrastructural development and Disaster/ Calamity Management. As a policy, a budgetary allocation of 0.2% of PAT is made for CSR projects. Plant Environmental Committee headed by the Executive Director and GMs and DROs as members is in place for effective implementation of environmental systems (Cr. 2b & Cr. 8b). Salient activities for the year are taken up as EIPs in EDs BSC. Leaders encourage general members of society for creative and innovative work for betterment of the society. Sapna school for mentally disabled children is one such institution which is supported by BHEL leadership. 1d. Leaders reinforce a culture of Excellence with the organisations people:

The culture of excellence is imbibed by leaders through people related initiatives like promoting employees for National Awards, Excel Awards, e-MAP, IMPRESS etc. Communication- formal and informal with employees occupies prime niche in management priorities (Fig. 1.16) for alignment with VMV, BHEL, Bhopals Slogan and Polestar to reinforce Culture of Excellence. Every year, ED and GM(P&D) personally address cross-section of all employees, around 1000, on first day of the financial year and share the achievements of previous year, challenges ahead and the plans for the coming year. This is followed by EDs address to the media through a press conference. ED and GMs also share achievements and plans in JPC and with representatives of all unions and association meetings held on the same day. GMs share the achievement with their respective groups. It is also shared with all stakeholders through in house journal Sandesh. ED also personally communicates achievements of all divisions and plans with cross-section of all employees, family members and society on 15th August and 26th January every year. ED decides the theme of tableau for 26th January and Vishwakarma Puja on 17th Sept every year. The themes for these occasions are always based on culture of excellence focusing on key initiatives/ challenges for the respective year. In addition to this, the award winning tableau and Jhankis are displayed in Milap and Kamyabi Melas for communication of culture of excellence to people. ED and GMs directly communicate with cross-section of employees through MECOMs on current initiatives and challenges e.g. BHEL, Bhopals Slogan and Polestar Statement were personally communicated by ED immediately after TMW and GM (P&D) shared the strategic Plan 2007-12. Top management personally communicates and obtains feedback from employees on all major process changes/ initiatives e.g. GM(HR) communicated the new Reward Scheme 2008 to cross section of employees. Earlier, he communicated changes in e-Map process to the e-Map Champions. ED and respective GMs themselves shared the need and objectives of DTC and LEAN programmes when they were rolled out in the unit. The top management at BHEL Bhopal follows open door policy and GMs and HODs are accessible to all employees during their daily shop visits and also in their offices. Various formal forums (Fig. 1.16) and informal forums also provide access to senior leadership for all employees. Leadership team of BHEL, Bhopal has provided forums which further reinforce the culture of unity in diversity e.g. BHECNIS. BHEL Geet, BHEL, Bhopals Slogan inspire the employees while common uniform and canteen, clubs, community halls etc are some of the unifying factors. Same Gifts are given to all grades of employees on various occasions such as New Year, accomplishment of targets, Golden Jubilee etc. Leadership team has also provided for procedures to handle any representation from employees. A separate grievance handling mechanism has been institutionalised for SC/ST/OBC. A Committee also exist for addressing any issues on sexual harassment. EDs, GMs, HODs and HOS BSCs cascading to individual e-Map (Cr. 2c), facilitate in aligning individual targets with organisational goals. HODs and HOS are personally involved in facilitating the selection of KRAs and performance plan of the individuals for the year. They also review the planned activities and provide directions and resources to ensure achievement of desired results.
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 1 - 8

Leadership FORUM ED's Communication Input Review , Dispatch Review & Cash Collection Inventory Review Apex TQ Council Steering Committees Annual and Half Yearly Review Meetings Joint Council Meeting At Unit Level Plant Quality Committee Union/Association Meetings PQG//FG and Departmental Reviews Shop Councils FOCAL SUBJECT Business Related Production and Dispatches; Cash collection Inventory and Mat. Consumption Business Excellence initiatives DTC and LEAN Performance Parameters Union /Workers Related Quality and System Related Issues Employees Related Quality and System Related Issues Productivity, Quality And Safety Related CHAIRMAN ED ED ED GM(P & D) ED ED ED ED GM(HR) GMs PM/FM /HOD HOD MEMBERS GMs and DROs, PMs/FMs and HODs OF MFG, Engg. and Commercial PMs/FMs, HODs OF MFG and MM 5 GMs & 2 AGMs Core Teams GMs, DROs, HODs, all executives and other employees GM (HR), representative union members. GMs, DROs and nominated AGMs representative of employees , AGM (HR), HODs DROs TO PM/FM and nominated members / DROs to HOD Management and Union Representatives FREQUENCY Monthly Weekly Monthly Fortnightly Quarterly Half yearly Quarterly Six monthly Frequent/ need based Six monthly/ once in two months Monthly

Fig 1.16: Typical Examples of Accessibility and Review forums

As a sequel to the refinement of operations review process for meeting the stretched top line and cash targets, ED has introduced the concept of weekly review where in daily targets for the week are agreed upon and the same are monitored on daily basis by GM (P&D) for appraisal of ED. GMs and HODs analyse the DWM data and take course correction for day to day achievements. The IPR Incentive scheme for patents and copyrights has a provision of awards at three stages viz submission, filing and grant of patents/ copyrights. Reward scheme for workers and supervisors has been reviewed and revised to promote individual and team excellence. (Cr. 3e) In order to motivate and recognise efforts towards fulfilling BSC objectives, the Plant Performance Bonus scheme has been reviewed and is now calculated based on achievement level in 5 key performance parameters and Unit BSC score. BHEL Bhopal has adopted a three dimensional recognition approach for apt and timely recognition of individuals and teams resulting in positive change in Employees perception (Fig. 7.1a, Fig. 7.1b). Formal recognition: BHEL leadership has instituted a variety of awards to recognise excellence in the organisation (Fig. 1.17) ED and GMs personally give awards to persons/ groups for unit level achievements e.g. ED rewards employees for excellence on occasion of Republic Day celebrations. ED and GMs felicitate more than 150 employees during Quality month every year for their contribution towards Quality initiatives. BEAT award and IPR incentive are given by ED in presence of all GMs. ED personally gives certificates for Swasth Karmchari, LEAN and DTC CFTs, Lead auditors, Six Sigma black and Green belts etc.
IMPRESS winners eligible for Excel awards

at corporate level
Gunta Karmi award to outstanding

workmen
Outstanding Engineer Trainee award Ex CEO meet to honour Ex chief executives Sports complex named after late Shri J P

Narayanan, Ex GM of BHEL and international cricket commentator Award to project leaders & champions of Six Sigma project competition

Fig. 1.17: Examples of formal recognition Informal recognition: ED and GMs recognise individual and teams through a number of informal recognition platforms such as departmental Display Boards, Meeting and Photographic sessions with ED, remarks on project reports e.g. ED endorsed the contribution of DTC teams by putting a congratulatory remark on the DTC sign off report. Such achievements are also publicized through in-house journal Sandesh and Corporate monthly journal "Pratibimb".

Day to day recognition: ED, GMs and HOD believe in day to day recognition through verbal appreciation, Shabash scheme and pat on the back during formal and informal meetings, shop
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 1 - 9

Corporate Unit BSC Strategic Capital InvestmentPlan Divisional Plan Strategic Plan

Leadership

visits etc. Additionally, to foster cultural values in the organisation, employees and their wards are also recognised for their achievements in the field of education, cultural, sports etc. in public forums. The top leadership of BHEL, Bhopal believes in recognition of not only the serving employees but exemployees also e.g. all ex-EDs of Bhopal unit were felicitated along with their spouses in special function held in Dec.04 and Nov 06. 1e. Leaders identify and champion organisational change:
Taking cognizance of triggers from internal and external environmental drivers, excellence movement is spearheaded by the leaders through a structured change management process. Strategic Plans and Strategy Map provides trigger for change management. In order to meet the strategic objective of uniform production ED championed the methodology of DWM for effective planning, targeting and monitoring of operational, engineering and business excellence parameters. BHEL leadership carefully studies the business environment vis--vis opportunities and threats perceived and champion the organisational change to meet such challenge. Such studies are taken up in collaboration with professional experts in respective fields e.g. Top management partnered with Hewitt Associates for study of HR processes which resulted in launch of new performance Management System (e-Map). Similarly, a tie-up was entered into with Mckinsey in 2004 for repositioning study of entire corporation which resulted in identification of initiatives on Business Strategy, rganisational Effectiveness and Capability Building. These were further prioritised and decision taken to work on capability building initiatives. ED, BHEL, Bhopal took a lead in entire corporation and rolled out DTC and Lean initiatives (Cr. 4a, Cr. 5b). The need of cost competitiveness, a CSF of BHEL, Bhopal and cycle time reduction led to partnering with ISI for Six sigma initiative. Also, the need of technology acquisition and product developments identified by Product and Technical Committees led to concept of Collaborative projects with leading institutions (Cr. 4d). The growth envisaged in power and industry sector and growth envisaged in strategic plans called for systematic capacity enhancement initiatives (Cr. 2a, Cr. 2c) which has led to capacity enhancement of Hydro, Electrical Machines & Transformer Products and de-bottlenecking.

ED and GMs create structures for such change initiatives and personally lead the change programmes. The objective behind identification of these initiatives and the planned results are communicated (Cr. 1a, Cr. 2c, Cr. 2d) e.g. Having identified DTC as a change initiative, ED formulated CFTs to carry out this activity which is monitored by the unit steering committee headed by ED himself. Similarly ED himself chairs the Unit Steering Committee meetings for driving Lean initiative in Switchgear and TPTN groups. A dedicated group has been created, headed by GM for modernisation and expansion activities. A structure comprising of e-Map Champions and KRA taskforces has been put in place to ensure effective communication, implementation and continuous refinement of this change initiative. The Six Sigma initiative is being led and facilitated by GMs and HODS who are the respective project Champions and Companions. The monitoring and review of change initiatives are part of strategic objectives of ED/GMs BSC. ED, Product GM, GM(P&D) and GM(CI) drive the capacity enhancement initiative through formulation of comprehensive investment plan including sensitivity and risk analysis. The investments are secured through corporate sanctions for which required supporting data/ presentations are made to the corporate investment committees. All investments are met through internal accruals (Cr. 4b). Leadership has drawn investment plans of around 1200 Cr during 2007-12 against total corporate plans of 3200 Cr. The salient improvements as sequel to assessment and review are illustrated (Fig. 1.18).
2004-2005 Divisional strategic Plan revisited & revised. Top Management workshops Review of Performance Management System 2005-2006 Review of Performance management system Six Sigma approach Initiated. Centre for Excellence for DTC and piloting in TCB Fig. 1.18: Improvements as sequel to A & R BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 1 - 10 2006-2007 Leadership effectiveness Survey Adoption of DWM . Group level workshops 2007-2008 Top Management workshops DWM institutionalised Lean manufacturing in SCR and TPTN divisions DTC in EM and TPTN group.

Policy and Strategy

2.

POLICY AND STRATEGY

2a. Policy and strategy are based on the present and future needs and expectations of stakeholders: The present and future needs and expectations of the stakeholders are collected through various means as given in fig 2.1, analysed and form the basis of policy and strategy formulation. The Unit P&D coordinates with Corporate P&D and various product and function groups of the unit in developing the policy and strategy for the unit. It is both an amalgam of topdown and bottom-up approaches. The policy documents include Strategic Plan (SP), Broad Objectives and Balanced Score Card at unit and group levels. Analysis by experts/ consultants groups form a crucial input in the formulation of strategic plans. For example M/S McKinsey was appointed to undertake a comprehensive study of business environment and recommend improvement approaches. Mckinsey in the repositioning study identified initiatives on Business Strategy, rganisational Effectiveness and Capability Building. These were further prioritised and a decision was taken to work on capability building initiatives. ED, BHEL, Bhopal took a lead in entire corporation and rolled out DTC and Lean initiatives at Bhopal. The other improvements in this direction are illustrated below (Fig. 2.2).
Sources / forums Shareholder Management Committee meeting Top management workshops-Corp Level Five year Strategic Plans Business Sector Projections Strategy map Corporate Strategic Plan Corporate Roadmaps (Strategy maps) Unit strategic Plan Business Sector Projections Unit Strategic Plan Business Sector Projections Order Book Unit Top Management workshop -Manthan MOU & Corp BSC Annual Budget Brain Storming Session MIRs /KPIs Competitive Analysis by marketing groups Product / Technical Committees Customer Surveys Customer training /Meets Customer visits Resident Inspection Agencies Policy guidelines and strategies Unit Strategic Plan and long term CSFs Used for

Functional Roadmaps Engg, Quality etc. Broad Objectives (3 years Rolling Plans) Annual Budget

Unit BSC, Challenges & CSFs Annual Investment Plan

Customer Product Specific strategies Challenges, CSF

In line with the governments vision of Power for all by 2012 and the projected demand of power plant equipment the need for capacity Fig. 2.1: Sources of information augmentation was triggered, which led to specific expansions in the unit (Fig. 2.8) and also setting up of Central Stamping Unit and Central Fabrication Unit at Jagdishpur and acquisition of Bharat Plates and Vessels Limited in line with corporate plan. The plan for synergising the strengths with major customers triggered JVs with NTPC and NPCIL for EPC contracts & power equipment.

Employees Joint Committee Corp level employee related strategies Joint Plant Committee Unit level employee related strategies Shop Councils Group level employee related strategies Union & Association feedback & interactions Corp & Unit level strategies Employee satisfaction surveys Opportunities for improvement Mecoms Unit level HR issues Vendors Vendor meets Vendor related strategies B2B portal Vendor Perception surveys Society Corp . MOU CSR Targets Society survey Opportunities for improvement, CSR initiatives

BHEL, BHOPAL

Application Document CII EXIM Bank Award for Business Excellence - 2008

Page 2 - 1

Policy and Strategy Stake holder Customer 2000-2002 Business Sector Customer surveys Customer meets, Customer visits, Customer Training, Competitor Data Employee perception Surveys, Structured CFTs as Feedback of Surveys, Exit Interviews Ten Years Digest, Facts at a glance, MOU Open House meetings, Discussion with representatives of associations Structured Survey 2002 - 2004 Customer Response Centre, Customer survey, Consultants inputs, Lost tender analysis Revision In Methodology Of Employee Perception, Focussed group discussions, MECOM Competitive Analysis, McKinsey report on repositioning Structured MM Heads Meets Structured Survey with wider level of respondents 2005-07 Customer surveys, Non agenda visits, Reports of consultants and experts, Product & Technical committee EPS, JCM, JPC, Plant Council AGM, Media reports, Consultants Vendor Meets, Industry Association Society Survey, Interaction associations, public officials with

Employee Share holder Supplier Society

Fig. 2.2: Improvements in methodology for collection of stakeholder Information

2b.

Policy and Strategy are based on information from performance measurement, research, learning and creativity related activities:

Corporate level Top Management workshops provide the appropriate forum for review of overall business scenario and challenges e.g. some of the key issues presented, discussed and analysed during the workshop are illustrated below (Fig. 2.3). The outcome of this workshop facilitates the formulation of unit level strategic plans commonly referred as divisional plans (Fig. 2.6).
Business Scenario 2002-07 Total planned capacity addition of 42000 MW by Govt. - out of which 22000 MW was actually achieved and BHELs contribution was in 18000 MW. Hydro business to double. Booking Capacity to 2500 MVA in Transformers and 3500 nos. in Switchgear. Business Scenario 2007-12 Total expected Capacity Addition - 68869 MW. Hydro - 15585 MW; Thermal - 50124 MW. In addition, during XI Plan, 12000 MW can come up under Captive Power Generation and 13,500 MW through NCES. Interregional Power network to grow from 16500 MW to 37000 MW. Railway freight and passenger traffic period to grow @ 10% and 7% P.A.. Dedicated freight corridors expected to come up fuelling demand for high capacity locos. Top Management Workshop agenda Growth patterns domestic / international. Economic indicators. Demands / consumption patterns. Electricity investments. Competitor activity/ technology. Energy Policies. Market projections. Benchmark analysis. Positioning.

Fig 2.3: Business Scenario and Top Management Workshop Agenda

The revenue budget, broad objectives as well as strategic plans have direct link with the previous performance indicators like turnover, value added, order booking, inventory, PBT, capital employed etc. This information is derived from internal MIS and as such provides a closer insight for future policy and strategies. Some of the performance parameters which are regularly measured and monitored are illustrated below (Fig. 2.4).
Stake Holder Share Holder Customer Employee Supplier Performance parameters Turnover, Gross Margin, Value added and PBT, Physical turnover, Market Share, Inventory, Cash flow, Capital Investment, M/c tool Utilisation, Order Book trend Confirmed and anticipated, Working Capital, Employee Productivity, PI to PO conversion, SRV clearance, Energy Consumption, inter-unit benchmarking data (42 parameters). Delivery performance, Delivery Indices, Customer Complaints, Customer training, Response Time, resolution Time etc. Training mandays, absenteeism, grievances, accidents, Involvement in improvement Plans. Vendor Ratings - performance on quality, delivery and service related parameters.

Society Expenditure on welfare measures, Support to charity, welfare, education etc, Fig. 2.4: Performance Parameters

These MIRs also provide comparison of performances against the budget for the year as well as the last years performance. In addition Business Parameters of last ten years compiled at unit level as Facts at a Glance and at corporate level as Ten Years Digest provide an intra and inter unit financial analysis and a base for product-wise analysis.
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 2 - 2

Policy and Strategy

Analysis of internal indicators viz. cycle time and process variations triggered the need for six sigma approach for process improvement in 2005 through a handholding approach with Indian Statistical Institute. Since then 130 projects have been completed (Cr. 5b, Fig. 9.32c) resulting in reduction in cycle time and variability. The competitive analysis triggered implementation of DTC in Transformers, Electrical Machines & Transportation groups , Lean in Switchgear and Transportation groups, capital investments in Hydro, Electrical machines and Transformer groups and adoption of on-site fabrication work. BHEL, Bhopal also gathers market research reports in related product lines and product development efforts worldwide through environmental scanning, Lean Management from McKinsey. internet and print media report. The status report is Six Sigma from Indian Statistical Institute. prepared and shared in MCMs and Product and Design to cost from McKinsey. Technical Committee meetings. A constant vigil on Reverse and Forward Auctions. the product development and emerging Fig. 2.5: Examples of Learning from Other Organisations technologies around the world is carried out by product engineering groups to keep them updated and plan strategies for development, acquisition, or collaboration. These are discussed at Product/ Technical Committee meeting (Cr. 4d) for final decision making e.g. development of 765 kVA , 500 MVA auto transformer, 1200 kv class Transformers, 250 MW of Hydro-generators and WEG motor which have been taken up based on customers need for higher rating power systems. The learning from others and pilot implementation is a continuous practice for improvement (Fig. 2.5). The performance analysis of competitors in respect of financial performance, technology, commercial terms and conditions is done by Business Sector marketing groups through tender analysis. Consolidated findings are discussed in Product and Technical Meetings and presented in MCM where appropriate decisions are taken and strategies are formulated. BHEL Bhopal is aware of its responsibilities towards society, environment, and legal issues. The relevant stake holder's ideas are analysed and incorporated in the strategy formulation. The company interacts with the stake holders at various forums e.g. shareholder meeting, discussion with ministries and other government departments, signing of MOU, interaction with major vendors and customers, Unions and other employee representatives. Policies of social welfare measures such as vocational training programmes (Cr. 8b), Ananadam (an old-age home) Massive Tree Plantation, Yoga Research Centre, adoption of Global Compact principles etc are some of the examples of using stake holder ideas. Targets are set for Environmental Improvement Projects (EIPs) as part of MOU and include projects like rain-water harvesting system, Tree plantation, Green Coverage, Energy savings system, Resource Conservation, wireless fire protection and state of art painting booths. 2c. Development, Review and Updation of Policy and Strategy: Policy and strategy is developed, reviewed and updated through a three tier system (Fig. 2.6).
Global Market Domestic Market Strategic Divisional Plan Capital Investment Plan Three year rolling planBroad objectives Annual Budget CSF Product Development Plan

National Plans and Policies Corporate Strategic Plan Strategic Divisional Plan Business Plan Systems Plan Product Plan Strategy Map Functional Plan

Corporate BSC

Unit BSC

GM BSC

HOD/ HOS BSC

BHEL, BHOPAL

Application Document CII EXIM Bank Award for Business Excellence - 2008

Page 2 - 3

Policy and Strategy

Enunciation of various policies such as Works Policy, Purchase policy, Quality Poicy, HSE Policy, Information Policy, AIDS Policy, KM policy, Polestar of HR is done at Corporate level to bring into focus and to clearly spell out direction and priorities in respective areas. Strategic Divisional Plan - Five Year Plans P&D Group at unit level interacts with Product groups to formulate product growth strategies and plans which are cascaded from the projections arrived at during the corporate Top Management Workshop. The comprehensive divisional plan is further discussed with ED and GMs and draft plan is submitted to Corporate P&D. Discussion at corporate level facilitates finalisation of draft plan. Divisional Plans are then finally revised in line with Corporate Strategic Plan. The first such long term strategic plan document was issued in 1997 as Perspectives for 2002 followed by Strategic Plan 2002-2007 and now Strategic Plan 2007- 2012. Product Plans Product plans emerging from strategic plans are prepared every five years and reviewed periodically. These contain the product profile, collaborations, business profile, technology and investment plans. Strategy Maps: These are drawn to spell out the strategies that the organisation shall adopt both at long term and short term basis. Functional Road map : Function wise roadmaps are drawn to meet strategic objectives for fulfilling the vision and mission of the organisation such as Engineering road map, Quality roadmap etc. Three Year Rolling Plan (Broad Objectives) Broad Objectives of the Unit are prepared based on a structured process in the month of Aug-Sept every year. P&D consolidates the Unit level Broad Objectives and organises a review with top management and finalises the same. The Annual Plan Budget and Short Term Specific Strategies The Annual Budget is guided by the growth objective of long term plans and the present business prospects. A crucial objective of budget exercise is to set stretched targets. The targets are stretched compared to Strategic Plan and Broad Objectives projections. It details out the information on revised estimates (RE) of current year, budget estimates (BE) for next years turnover, order book position, export turnover/ spares turnover, operating result, cash position, inventory position, etc. The Budget is discussed and reviewed with Corporate Team and Directors and finally approved by Board. Performance is reviewed every week at unit level - product group wise and monthly at corporate level (Management Committee) unit wise, for course correction strategies. Each product/ function group also plans the short term strategies for the year for achieving the budgeted targets depending on volumes, product mix and customer requirements specific for the period. In order to balance the long term and short term needs of the stakeholders and to effectively cascade and deploy the plans and strategies the Balanced Score Card have been effectively used in the organisation since 2003. It now forms the basis for Plant Performance Payment also. The BSC approach has been continuously reviewed and scope extended (Fig. 2.7). BSC has now been linked to individual e-MAP.
2003-04 Introduction at unit level 2004-05 Extended to Group level 2005-06 Further extended to HOD level 2006-07 Further extended upto HOS level

Fig. 2.7: Deployment of BSC approach

The Performance planning and Appraisal system was reviewed in 2001 and M/s. Hewitt associates were engaged for development of a new performance appraisal system (e-Map).

Product Projected CAGR (%) Capacity addition

Hydro 29 720 to 2500 MW

Transformer 26 12000 to 15000 and now planned upto 30000 MVA

Electrical machines 18 650 to 1350 Nos and now planned upto 2250 Nos.

Fig. 2.8: Major Expansion Plans

BHEL Bhopal identifies long term and short term Critical Success Factors (CSF). The long term CSFs are enunciated in Strategic plan of the unit while short term CSFs are deliberated and finalised every
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 2 - 4

Policy and Strategy

year in Manthan along with key processes which are based on strategic plan and the annual plans. For example, at national level, a power generation capacity addition of 78000 MW during the XIth plan is envisaged thereby opening up huge opportunity for BHEL. Thus, capacity augmentation (Fig 2.8) became one of the long term critical success factors for the organisation and the unit. In view of the high projected CAGR for Hydro, Transformer and Electrical Machines expansion of facilities in existing blocks and new manufacturing blocks have been set up for state of art manufacturing facilities. The following long term CSFs have been identified in strategic plan 2012 of the unit: Filling Technology gaps in engineering New Product Development Capacity Augmentation of Hydro / Transformer / Motor Retaining/ Lateral Induction of skilled manpower in High-tech area. Debtors minimisation & Inventory optimisation through Lean Manufacturing practices Improved Material handling system In order to meet the challenges i.e. CAGR of 20% and Profitability as enunciated in Strategic Plan 2012, CSFs were identified for year 2007-08 in Manthan 2007 (Fig. 2.9). Product/ function specific CSFs are also identified by respective product/ function groups in group wise workshops e.g. CSFs of EM group for 2007-08 were De-bottlenecking, new product development, cost reduction and capacity enhancement. Similarly CSFs for Hydro group were modernisation, strengthening of engineering capability, vendor development and technology upgradation. The CSFs for P&D group were uniform turnover, engineering excellence and capacity enhancement.
Sl. 1 CSF Key Processes Process Owners GM(P & D) Measure Monthly and quarterly performance Strategy Daily Works Management -Monthly weekly & daily handing over and dispatch plans Reverse auction, spot buying, competitive buying

Uniform Production Planning Material Procurement

Head, Material Material % GTO net of ED Management Head Commercial ,

Cost Reduction

Cash collection DTC Management

Cash collection, Collectible & Daily Works Management Monthly weekly & deferred debtors, Sundry daily handing over cash collection plans, Creditors-as No of days of T/O Sequential and complete supplies Partnering with McKinsey for Transformer product and in-house efforts for switchgear and Electrical Motors products Open Advertisement with e-enabled process Collaborative projects with leading institutes, Internal R&D, Hydro efficiency improvement plan, Joint Bidding. Capital Investment plans Retrofitting and Renovation Outsourcing of non critical processes Partnering with Mckinsey

Head-TCB, EM , Savings TPTN Head, human No. of Exec., supervisors, Resource artisans recruited PMs R&D commercialisation, R&D expenditure, Patents

3 4

Timely Availability Recruitment of Skilled Manpower Bridging Technology Gaps Product development

Augmentation Head MOD/ WEX / Capital Expenditure, No of and P&D machines upgraded Modernisation 5 Capacity enhancement Process outsourcing Lean Management PMs Head SCR, TPTN Personnel expenses as % of T/O Physical TO, OTIF, Warranty, First pass NC

Fig. 2.9: Critical success factors and key processes for 2007-08

Capital Investment Planning: Five year Plan and Annual Budget In line with the growth objective set in the strategic plan document, BHEL, Bhopal makes an assessment of product-wise resource requirements and prepares investment plans. Five year Plan of the company constitutes the preliminary programme of budgeted investment. These investments are planned against various categories viz. schemes under implementation, new schemes to be taken up, science and technology, modernisation and welfare facilities.
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 2 - 5

Policy and Strategy

Annual Plan Formulation of annual Investment proposals involves a detailed study in respect of identification of need for investment, market demand analysis, technological justification, equipment wise investments, plant layout for the product looking at the present scenario and future, additional associated investment in infrastructure, water and power, etc. The report carries out a detail financial viability analysis. Risk factors are considered by developing alternate scenarios and sensitivity analysis of investment proposals. Capacity Augmentation Plans based on the needs of the organisation are in various stages of completion (Fig. 2.8). The major policy initiatives of last three years are given in Fig 2.10
INITIATIVE Daily Works management Six Sigma Lean DTC ISO 9001, ISO 14001, OHSAS 18001, U-Stamp Facilities Modernisation /Upgradation Technology Top Management Summits - Manthan BEAT (Bhopal Excellence Award Trophy) OEE Inventory Control External Customer Perception Survey (M/S CSMM, M/s Metrics) Project / Contract Management groups. Balanced Unit/ Departmental Score Card & Action Plans / Pole Star On-line Focused Performance Planning, & Review (e-Map) Product based Reorganisation of MM Function Product Material Directories(PMD) IMPRESS / Suggestions Scheme B2B Portal for Suppliers / Long Term MOU with Vendors Cost of Rework & Rejection IT Initiatives Functional Web Sites, Benchmarking Engineering excellence Capital Investment Fig. 2.10: Major Initiatives ISSUES Uniform Production Improvement in processes Capacity augmentation Cost competitiveness Quality Systems in place Upgradation CSFs, Critical Issues Functional Business Excellence Availability enhancement Inventory Reduction Customer Feedback Customer Focus Performance Targeting & Improvements Executive Performance Material Cost Reduction, Material availability Vendor Selection Employee motivation for improvements Vendor Partnership Development In place Non Conformities On-line information, e-transactions in place Product benchmarking Patents & copyrights, collaborative projects Capacity augmentation MATURITY LEVEL Matured Matured Matured Matured Matured Matured Matured Matured Matured Matured Matured Matured Matured Matured Matured Matured Matured Matured Matured Being improved Being improved Matured Matured

2d.

Communication and Deployment of Policy and Strategy through a framework of key processes:

BHEL, Bhopal is a strong process-oriented organisation. Standard operating processes are documented as various function-wise Management Instructions (MIs), Departmental Working Instructions and Technical Documents such as Product Standards, Process Specifications, Technology document etc. A measurement system of all the processes in terms of key performance indicators, KPI is also documented in the MIs. Trends of KPI are regularly monitored in various review forums (Fig. 1.16). The Key Performance Indicators were reviewed and revised in April08 by system task forces and approved by Apex TQ taskforce. The evaluation of effectiveness of key processes is done by the process owners through monitoring of performance parameters and milestones at predetermined intervals viz. During last 3 years, the reduction in cycle time (Fig. 9.15) has been achieved through strategic reduction in PI to PO conversion time (Fig. 9.16) and engineering cycle time (Fig. 9.17). During last three years a thrust was given on cash collection (Fig. 9.26), continuous identification and completion of six sigma projects and DTC /Lean, completion of collaborative projects with leading institutes and engineering excellence. In order to build a commitment towards the BHEL Vision, Mission, Values, slogan and Bhopal Units strategic objectives and plans there is a well established communication system in place for relevant information to all stakeholders. The highlights of the same are given (Fig. 2.11).
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 2 - 6

DomesticBSC CorporatePlan Annual Budget Global Year ProductMarket Corporate Unit BSC Strategic Capital GMThreeMarket BSC InvestmentPlan Divisional Plan Strategic Plan Rolling Plan Broad Objectives

Policy and Strategy

Corporate values, vision, mission statements are widely displayed through posters and circulated through BHEL diary, pocket cards and

publishing in house journal Sandesh. These are also available on Central Planning and MBE website. Strategic Plans, MOUs, Balanced Score Card and excellence plans of all levels are available on Central Planning/ MBE Website. Strategic Plan of Corporate and Unit are personally shared by ED / GM(P &D) with all Executives during his annual address. All employees are made aware of the Unit Balanced Score Card through display boards and booklets. Targets, achievements and various performance indices are displayed through CRISP (Company related information sharing program). Three Year Rolling Plan and annual Budgets are made available to Respective product groups. All individual goals and targets are available as KRA on desktop through e-MAP Information on business plans and relevant initiatives like Six Sigma, DTC, product developments, possibility of joint projects are communicated to customers during customer meets. Information on business opportunities, new product developments, need for import substitution is given to vendors during vendor meets. Supplier related information viz vendor rating, payment status, material acceptance status etc on B2B website Information on achievements, plans, CSR initiatives, etc through EDs press conferences and regular press releases by P&PR

Fig. 2.11: Communication of policy and strategy

The Unit BSC is derived from the corporate BSC. The targets for the Unit BSC are agreed upon after discussion with respective corporate functions and are jointly signed. Further, the Unit Balanced Score Card is cascaded upto the individual level through the Product/ Functional BSC, HOD/ HOS BSC and the framework of e-MAP. Individual KRAs are agreed upon between appraise and appraiser at the performance planning stage Description Frequency Facilitator Reviewed by with a provision for mid year review. MCM Monthly P&D Board of Directors This three tier arrangement ensures Unit Highlights- DO alignment and integration of Monthly Unit Head CMD Letter individual goals and targets with the Balance Score Card Quarterly P&D Group Unit Head/ Corporate organizations business plans and Engineering Monthly Engg Coord Unit Head /CEPD strategies. A systematic reporting Excellence Operational Weekly mechanism (Fig. 2.12) ensures that P&D Group PM, Unit Head parameters On line MIS the various plans are continuously KRA Half Yearly Appraiser Reviewer tracked and reviewed. The approach of development, KPIs Monthly Function Head GM review, updation and communication Fig. 2.12: Reporting mechanism of Policy and Strategy is continuously reviewed and improved (Fig. 2.13) by P&D group and the Business Excellence group based on the performance reviews and inputs received from employee perception surveys. This has resulted in positive change in employees perception over the years (Fig. 7.1a) on this parameter.
2002-2004
System of Balanced Score Card reviewed

Excellence Initiatives

Milestone Dates

Process owner

Unit Head

2004-2006
System of Balanced Score Card integrated

and refined Card and Excellence Plans Integrated Strategic Divisional Plans-revisited E-MAP refined and KRAs rationalised
Score

with KRA
Six sigma implementation IMPRESS across all functions Collaborative projects with leading institutes Outsourcing of non core processes Design to cost (DTC)

2006-08 On-line Recruitment process Capacity augmentation BSC extended to HOS level DTC extended to more product groups LEAN introduced Six sigma second phase Evaluation of BSCs by Committees

Fig. 2.13: Improvements as sequel to A & R

BHEL, BHOPAL

Application Document CII EXIM Bank Award for Business Excellence - 2008

Page 2 - 7

People

3.

PEOPLE
To ensure availability of competent, motivated and effectively contributing human resources and to facilitate achievement of full potential of employees at all times to realize organizational mission

3a. Planning, Managing and Improving people resources:

The HR philosophy of BHEL has its root embedded in Companys Vision, Mission and Values (Fig.O-2) and HRM Polestar Statement (Fig 3.0) and is enshrined in the HR Manual HR policies, HR Plan (Fig 3.3) and HR BSC. The first HR manual was Fig. 3.0: HRM Polestar documented in 1976-77 after due deliberations of CFTs constituted for this purpose. Since then four editions of HR Manual have been issued, to include current policies and guidelines for HR management. The fourth edition was issued in 1997 and since then the manual has been made available online on the intranet and is updated continuously. HR Strategic Plans are prepared every five years, in line with the Companys Strategic Plan. The Unit reviews issues in participative manner and gives feedback to Corporate HR to bring about improvements in HR policies. HR strategies are triggered from objectives set in Strategic Plans, discussions and deliberations in three tier bipartite forums and discussions during MCM & HR Heads meet and unit level apex forums (UBC). The strategies are formulated both at corporate and unit level through deliberations in high level CFTs constituted specifically for the designated objective. The major strategies adopted during recent years are given (Fig. 3.1).
Source Perspective 2002 SP 2002-2007 Team CFTs with representation of Bhopal units formed Corporate CFT, senior executives from Bhopal unit Corporate CFT, senior officers from Bhopal unit Direction 17 thrust areas identified. Decided to focus on 7 area Reviewed HR Policies Thrust areas identified Employee representative & Management (syndicates formed to address various identified issues ) Production related issues Strategies PMS , VRS, Benefits & Incentives Focussed VRS, e-MAP Excel Awards& Impress A rolling plan for meeting manpower requirement in next two years, considering anticipated outflow Categorisation of core and non core areas Rational changes in Incentive and Reward schemes Review of HR systems and procedures to realign HR processes (SAP HR, PCMM ) Improving motivational level of employees Man power deployment for (24x7) for critical machines Multiskilling, Core non core processes Strengthening Bipartite fora Communication Redeployment Enhancing productive time of man and machines Utilisation of critical machines Daily works Management ETs training to be strengthened Assessing the motivation & commitment levels HR specific issues emanating form SP

HR Plan 2012

JPC

HRD Council

ED, GMs, GM(HRDI), Outside expert

Integrating HRD activities with business needs

Fig. 3.1 : HR Strategies

HR processes (Fig. 3.2) are periodically reviewed based on the need of the organization and feedback from employees and environment. Manpower requirements are worked out depending upon competency gaps. The process of recruitment is elaborated in HR Manual. During the last decade, the recruitment was done selectively to rationalise manpower through planned reduction i.e. natural wastages and VRS. Now to build up skills in line with present and future requirement of expansion and capacity enhancement (Fig 2.8) and to maintain its optimum level, recruitment has been identified as key process for the organisation. In line with the objectives of HR Strategic Plan (Fig. 3.3), recruitment is being done only for strengthening the core activities while non-core activities are being outsourced in phased manner. Retainership of retired employees and lateral entry is sought as and when required. Recruitment being identified as a key process, (Fig. 2.9) it was reviewed by GM(HR) and a need was felt to further strengthen it in terms of the elements of timeliness, fairness and transparency.

BHEL, BHOPAL

Application Document CII EXIM Bank Award for Business Excellence - 2008

Page 3 - 1

People Process Objective To ramp up manpower as required in core areas in a timely manner as per business requirement. Ensuring fairness in recruitment process. Building competence to suit changing business needs as reflected in the e-MAP and other business initiatives Process improvement training Aligning individual goals to organizational goals, planning and evaluating planned performance Recognizing high performers, motivating people to excel Earlier Process Trainees at workmen, supervisor and executive levels Recruitment of Specialists. Manual Recruitment process . Primarily induction training for skills Function based inputs Present Process Identification of core / non-core area Retraining/ redeployment -non core to core areas Timely recruitment & induction E-enabled on line recruitment of artisans Lateral recruitment for desired competencies Competency needs identified through e-MAP Up gradation of functional skills Multi-skilling and skill up gradation Process improvement training like DTC & Lean. Introduction of PCMM practice Balance Score card Performance Management system e-MAP Review of systems of Career & succession Planning (Job rotation, transfer & promotion) Criterion-based, transparent schemes (Awards of substantial value, e.g. Excel Awards, Impress) Increasing variable component of pay Reward Scheme 2008 BHEL IPR Incentive Scheme. Package based on comparable undertakings with additional perks reimbursements of varied types, post -retirement benefits. Rationalising performance related rewards. Linking to BSC. Differential benefits based on performance Review of system of welfare. Customised mementoes for retired employees, increase in amount under various schemes for eg. GIS .

Recruitment

Training and Development

Performance Management

Annual confidential reports Then PMS

Rewards and Recognition

Recognitions thru cash awards, certificates


Attracting, Retaining & rewarding talent Salary as per BPE / PSU norms, statutory bonus

Compensation & benefits (post retirement)

Communication

To involve employee to enhance their motivation

Memos & Circulars

CRISP, MECOM, Intranet, E-mails, special functions

Fig. 3.2: HR Processes

The salient changes introduced in the recruitment process include the following: Online recruitment of artisans. Bhopal Unit is the first amongst all BHEL Units to adopt this process. Results of both written test and interview announced the very next day. BHEL Bhopal is the first amongst all the PSUs to adopt this practice. Higher cut-off at various stages (application, short listing for entrance test/personal interview) to attract best talent
Core / non-core categorization PP payment with linkage to BSC Reconstitution of Joint Committee Assessment of Motivational levels Lateral recruitment in specialized areas Employee benefits ( differential based on performance & what the employee values) Corporate Social responsibility Career management ( movement to key positions Strengthening HR competencies

BHEL Bhopal has a full fledged Human Resource Development Centre (HRDC) which also includes skill Fig. 3.3: HR Strategic Plan 2012 training workshops, computer labs etc. A structured process of induction training for all levels includes class room training, rotational training, on-the job training, visit to customers, sister unit visits, industry visits etc. The training also includes regular evaluation through module tests, project completion followed by exhaustive absorption test. Meritorious trainees are suitably rewarded. Effectiveness of induction training programs is assessed through structured feed back. The analysis is shared in HRD Heads meets presided by Director(HR) and course corrective actions are taken to improve the process e.g. Dakshta the training module for ETs has been revisited and revised. With the aim of creating a sense of belongingness amongst the new inductees who are at a stage of transformation from an academic institute to organisation, a new mentoring scheme has been introduced for ETs. It is targeted to mentor 100 ETs in the current year. The mentors are executives of E4 to E6 level who have voluntarily committed their services under this scheme.

BHEL, BHOPAL

Application Document CII EXIM Bank Award for Business Excellence - 2008

Page 3 - 2

People

Career Development is taken care of through a system of time cum merit-based promotions at all levels and it provides for job enrichment and job rotation. The entire career development system is reviewed at corporate level in the MCM and considering the business scenario and future requirements changes are made and communicated to all employees. This year in line with the feedback and aspirations of employees the temporary period of service in case of workers joining as DR/CW has been reduced to 1 year from 2 years. Similar approach has been adopted for select grade of supervisors, wherein one year weightage in promotion has been granted. The promotions percentages at various levels are revised every year and depending on the Units performance and organisational requirements, the promotional avenues are decided. The HR manual documents the policies with respect to employment, perks and benefits. There is no distinction in remuneration, opportunities and no difference is made in allotment of jobs or terms of payment based on gender, religion or caste. The benefits such as loans, advances, accommodation in township etc. are given as per norms and transparency is maintained. The welfare benefits such as medical, canteen, transport, subsidies etc. are available equally to all. Pay packages and benefits are evolved through deliberations in three tier bipartite forums and anomalies are settled expeditiously. A Grievance procedure is in place to handle representation from employees. The data (Fig. 7.6) indicates prompt handling of grievances. BHEL Bhopal has three tier participation of workers- Joint committee at Corporate level, Plant Committee at Unit level and shop councils at shop floor levels. Quarterly interactions are held between HR and the employee representatives to discuss issues related to production optimisation and employee involvement. (Fig 7.10)

Survey Design Survey Administration Results Analysis FGD

The Employee Perception Surveys (EPS) are Action Planning being carried out periodically (Fig. 3.4). The questionnaire has been reviewed and revised Fig 3.4: EPS Process Fig. 3.5: FGD (2007-08) in 2000, 2003 and 2004. Focussed Group Discussions are held with a cross section of employees on issues of Online-Employee Centric Information on concern emerging from the survey (Fig. 3.5). As a result of various intranet & touch screen kiosks. actions taken (Fig 3.6) as sequel to surveys, there is a perceptible Working through CFTs positive shift in employees perception over the years (Fig. 7.1a). Modernisation of annexes Audio Video conferencing facility The approach for perception survey was reviewed in 2006 and in E-MAP, KRAs , Balance Score card order to allow initiatives taken as sequel to previous survey to Establishing Centre for Excellence mature, it has been decided to conduct survey once in two years. Mobiles provided to executives The methodology of capturing people perception was further reviewed and a decision taken to get the perception of cross section Fig. 3.6: Improvement in Working of employees on various HR initiatives through dip stick surveys (Fig 7.3). The results of dip stick surveys are analysed by Unit HR and a detailed feedback is also given to Corporate HR. Apart from the people perception survey, the forums (Fig. 1.16) provide useful feedback for improvement in HR plans. In line with the HR Strategic Plan 2012, all the departments have classified core and non-core activities and the non-core activities are being progressively outsourced including that of engineering divisions (such as drawing management, indenting etc.). The concept of Lean management has enabled the use of innovative methodology such as visual management, kitting methodology etc. 3b. Identification, Development and Sustenance of People Knowledge and Competencies: The process of identification, development and sustenance of the knowledge and competencies of the employee starts with the time he/ she enters the organisation and it continues throughout his service span. Identification, development and sustenance of people is a two way process (Fig. 3.7).
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 3 - 3

Improvement in work environment Holistic approach towards providing an contemporary working. Done in three blocks and is being extended Training & Re-training - Competency training of managerial & behavioural training, multi skilling training. Target Setting & Appraisal - Review on minimum no. and weightage of KRA HOD/ HOS BSC . Behavioural ratings Rewards & Recognition - Differential benefits based on performance, rewarding through Impress. Reward scheme, IPR Scheme Communication - Communication in various forms to be strengthened. MECOMs to be strengthened.

People

Competency sustenance and development process is continuously being improved based on feedback on discussions and deliberations in HRD heads meet e.g. managerial and functional need for training and development is also now being e-Map captured through e-MAP system and accordingly Induction thrust is being given to managerial and functional competency development. The training programmes are designed to include workshops and team building Identification of competency through management games. The method of providing the training is also reviewed and new methodologies are introduced e.g. adventure sports T&D Career Progression based program module for team building workshops, Knowledge workers etc. The Modules imparted are Fig. 3.7: Managing Employee Competency periodically reviewed for improvement by HRDC and also at HRD Heads meet. Leaders promote learning culture through self participation, acting as faculty and providing resources for same (Cr. 1a). BHEL, Bhopal facilitates continuous learning (Fig. 3.8), adopts new approaches (Fig. 3.9) and encourages the employees to upgrade their knowledge and professional competency in many ways (Fig. 3.10). Employees are regularly sent abroad to learn and absorb new skills and knowledge for keeping abreast with latest technology (Fig. 7.3c).
Approach Process Improvement Approach Skill enhancement approach Focussed Input Six Sigma DTC LEAN Knowledge Workers / Multiskilling Unique Feature Partnering with ISI Mckinsey Mckinsey Merging classroom and workplace learning No. Covered 180 32 60 4322
Membership fees of professional bodies Reimbursement of cost of news papers Magazine allowance introduced for executives Nominations for National & International seminars Reimbursement of internet expenditure E-mail access & Internet connectivity Product based portals Full fledged technical library & departmental library

Fig. 3.8: Facilitation for Learning

Initiative Knowledge Workers

Fig. 3.9: Approach adopted for T & D

Objective Understanding implication of own work on business. Multi skilling for inductee To make them competent on artisans work related skills. Leadership for excellence Training the Leaders Program for Transferee To equip with relevant Executives knowledge skill Training Evaluation Assess effectiveness of inputs Functional programs Functional skill enhancement Fig. 3.10: New Initiatives in T & D (2007-08)

The need of optimum utilization of Program Categorisation Tool Level of Evaluation manpower led to the concept of multiskilling the existing workforce in 2004Programs-more than 5 days Format Self & superior 05. Further refinement of the approach Competency Development Format Self & superior Programs has been done and now the inductee Program less than 5 days Format At the end of program artisans are also being multiskilled by Training on live project Degree of At each stage of training training them at ATIs. implementation The concept of knowledge worker was ETs Examination After each module introduced in 2005-06 with a view to Mass awareness NA No effectiveness educate artisans on the impact and assessment implication of their work on customers. Fig. 3.11: Training Effectiveness Evaluation In order to ensure the assimilation of knowledge through training, the system for evaluation of training effectiveness is in place. Different approaches for evaluation of training effectiveness are deployed for different programs (Fig. 3.11). This helps HRDC in reviewing the course content, duration, course material, lectures etc. The HR database of employee profile with qualification details, training details and work experience is used for HR management and planning job rotation. Job rotation at inter and intra departmental and function level is periodically done (Fig 7.12). Considering the job requirements, the employee
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 3 - 4

People

possessing the requisite skills are assigned the job, thus providing opportunities for development. Employees are given adequate responsibility and authority which increases as one progresses through hierarchy. The HR database has been integrated through SAP HR initiative for prompt analysis and triggers for fact based decisions and for elimination of routine manual processes. This has enabled HR to reach out to internal customers for their requirements on real time basis and also play an increasing role as strategic partner in the business. Similarly with PCMM (People Capability Maturity Model) being a part of HR Strategic Plan (2007-12), the Unit is gearing up to address its requirements with HR executives being trained for implementation of PCMM. This is also a strategic objective in Unit BSC 08-09. Opportunities are provided to employees to develop allied skills. Other than the core job, allied areas are also assigned to individuals which broaden the horizon of individuals growth eg. lead assessors for ISO:9001, assessors for TQM, NABL, OHSAS, ISO14001, members of various committees for BIS, members of QC, CFTs, assessors for CII EXIM Award etc. (Fig. 1.4) Training in concepts requiring team working like participative management, quality circle, shop council etc. is imparted and the concepts implemented. Team spirit is also built up through participation in socio-cultural activities viz. Kamyabi and Milap Melas, tree plantation etc. A Structured process of setting and cascading targets is in place (Cr 2c and 2d). HODs and HOS plan through BSC while all other executives develop a performance plan as part of e-MAP process in line with organisational requirements and targets (Fig. 2.6). The frame work of BSC and KRA enables the alignment of individual and team objectives with the organisational objectives. Mid term review of BSC and eMAP provides feedback to individuals and helps in taking corrective measures. The methodology of evaluation of HOD/HOS BSC was revised this year and modified. The self assessed BSCs are now evaluated by Committee formed at different levels and performance scores are introduced in eMAP. The shop supervisors and workers contribute for the attainment of weekly and monthly section targets through production planning and the DWM process. Performance feedback on daily basis is provided to the shop supervisors and the workers by the concerned Shop In-charges and course correction is taken. The performance appraisal of supervisors and workers is done through ACR and they are given the feedback if their performance falls below specified levels. The BSC/ eMAP evaluated scores are agreed upon between appraise and appraiser. Further a provision exists for request for review of final scores of BSC/eMAP awarded by reviewer. Developmental competencies are identified by appraisee in consultation with the appraiser and reviewer in tandem with the competencies required for effective discharge of the key performance areas jointly. HRDC and HRDI organises training on these developmental needs. eMAP system and KRAs are reviewed annually by 24 task forces and improvements brought about (Fig. 3.12). The updating of individual and team objectives, based on departmental targets, continuously takes place through structured reviews viz. In weekly review meetings of Product Manager, the performance of each section is reviewed and course correction is initiated.
2003-2004 -KRA process revised -Capability building KRAs, Operational KRAs, Functional Critical KRAs, Functional Support KRAs 2004-2005 -KRA Masters Created -Concept of Mother & Child KRA brought in 2005-2006 -Min. No. of KRA reviewed & reduced to 6 -Max weightage increased to 25 -E-Map Champions -System of capturing KRA measures. 2006-2007 -Concept of Stretch tool introduced -Identification of developmental needs during mid year review. 2007-08 BSC evaluation method reviewed and modified. Rating on behavioural traits Provision for review of final scores

Fig. 3.12: Development of Appraisal System in BHEL

3c.

Involvement and empowerment of people:

The delivery process of BHEL Bhopal products calls for team working at all levels of various processes such as engineering, manufacturing, testing, despatch etc. Further, BHEL Bhopal being a process oriented organisation the concept of CFTs working is encouraged for day to day working, problem resolution and improvement programs. As such HR management lays emphasis on team building programs (Cr. 3b). Forums/ initiatives such as quality circles, IMPRESS, Six Sigma, LEAN, DTC, RCA, PQC, PQG, DRC etc provide opportunities for team involvement at all levels (Fig. 1.4, Fig.
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 3 - 5

People

1.5) thereby promoting collective decision making. This CFT approach enables team building and coproblem solving. The involvement of workers in Quality Circles shows a positive trend (Fig. 7.5b) as a result of thrust given in top management reviews, motivation of area co-ordinators through introduction of best area co-ordinator awards in 2005 and increase in value of memento given to members of active Quality Circles (Fig. 7.5b). Six Sigma has been initiated in 2005-06 and since then 100 black belts and 80 green belts have been developed and have undergone training of 14 mandays and 5 mandays each respectively. The leaders and team members for six sigma projects are selectively picked up by the respective product/ function managers as change agents within the respective areas. In the process HODs are involved as Companions and team members are awarded green belts. Web enabled IMPRESS launched in 2004-05 with an objective of integration of all improvement initiatives, transparency of reward process, empowers the individuals and teams to take up improvement projects and register the same for rewards based on predefined criteria. As a sequel to review of participation levels and number of IMPRESS projects, the evaluation process has been decentralised and number of evaluation teams increased to fifteen from one earlier. This has been done to facilitate the evaluation by respective experts of product/ function group and also to speed up processing. With this improved process aggressive targets have been set for current year. Employees at all levels are extensively involved in improvement programs through self directed teams such as DTC, LEAN etc. (Fig. 1.4, Fig. 1.5). The entire movement of Business Excellence is steered through Business Councils concept (Cr 1a) both at unit level and product / functional level. Seventeen BE leaders representing all products and functions who are selectively chosen and trained on business excellence model steer the business excellence movement throughout the organisation. These leaders undergo refresher training programs at periodic intervals. Executives at individual level are involved in improvement programs by virtue of various allied assignments (Cr 3b). Almost all the executives are involved in one or the other CFTs. Suggestion scheme provides platform for individual involvement at all levels. This has been re-juvinated by introduction of token cash incentive on submission of suggestion which has led to ambitious target setting for the current year. JIPs with customers and suppliers provide co-creating opportunities. Joint improvement initiatives taken up with corporate R&D, corporate ARP, various institutions like IIT, IISc AMPRI, etc. also provide opportunities for co-creation. e.g. BHEL teams have worked with various consultants such as Hewitt for emap, TCS for SAP-HR, McKinsey for DTC/ LEAN etc. Policy guidelines and manuals such as Quality manual, MIs, DWIs, HSE Manual, Purchase policy and Delegation of Powers define empowerment of people. These are periodically reviewed and revised. The recently introduced Reward Scheme aims to encourage not only the individual excellence but also group dynamics and spirit of team work. The Scheme has two parts; part one being aimed at involving the individual to excel in his performance while the part two involves the whole group to accomplish targets with team spirit. The Company encourages and supports people involvement through in house conferences, ceremonies and community projects. Large scale involvement of employees in all celebrations like mass plantations, Kamyabi Mela, cleaning of the Upper lake of the Bhopal city, Golden Jubilee celebrations in 2006 etc. are all a testimony of the efforts in this direction. Ex-CEO conferences provide opportunity to learn from leaders of yester years. Employees through employee representatives and associations are involved in framing important schemes and policies e.g. employee representatives were called for their suggestions and their inputs played an important role in framing the Reward Scheme 2008. Mini Joint Committee Meetings are held at Unit level prior to meetings of JC at Corporate Level so that the needs and expectations of employees of the Unit can be properly captured and taken up at Corporate Level. Mini JPC is also held periodically to communicate achievements, concerns and the strategies to be adopted. The Company provides opportunities for stimulating creative and innovative behaviour. In order to motivate employees to strive for patentable inventions, BHEL IPR incentive scheme has been
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 3 - 6

People

introduced where in cash rewards are given for registration/ award of patents and copy rights. This has resulted in substantial increase in the no. of patents filed (Fig. 9.45). Employees participate very actively in various competitions organised by Rajbhasha, Quality, Safety, Productivity, Business Excellence and other departments where they show their creative ability in various forms. All this has resulted in a culture of working together in teams 3d. Dialogue between people and the organisation:
Communication Needs Business related Managed by P&D PMs HR Media of communication Access controlled intranet ED, GM(P&D) address to the unit, CRISP,LEDs, Daily/ weekly communication meeting etc Though employee representatives Intranet, touch screen, bipartite fora, Sandesh, MECOM, SMS etc

The employee communication needs are identified based on feedback from surveys, structured bipartite and other forums (Fig. 1.16). The needs are categorized and communication means determined for effective and meaningful communication (Fig 3.13).

Employee centric

ED and GM (P&D) communicate business plans Fig 3.13: Categories of communication Needs and Media and achievements to all employees at the beginning of the financial year. These are also shared with employee representatives and supervisor and executive associations. The business plans including strategic plans, annual budgets, quarterly production programs, monthly programs are communicated through access controlled intranet. The monthly and quarterly achievements are shared and communicated through shop councils at product level and joint plant council at unit level. A very strong media for all communication is through intranet which addresses most of the business related as well as employee centric communication needs. Home pages of various departments are also an important source of information. The process has been further refined and in order to enhance the depth of communication CRISP boards have been introduced in 05-06 for communication of monthly plans and other critical issues such as customer feedback, MCM feedback etc. to all employees. Each product manager has assigned a process owner for updation of CRISP Boards. CRISP Boards are being gradually replaced by plasma screens and LED displays. The learning from LEAN has lead to adoption of visual display boards and ANDONS for operational targets and performances. BHEL Bhopal has a structured three tier bipartite mechanism for dialogue on employee centric issues. Joint committee at corporate level, joint plant council at unit level and shop council at product / function level facilitate dialogue related to employee centric issues. The frequency, agenda and participation of these meetings is structured. All welfare and benefit related issues are mutually agreed upon in these forums. In addition, the supervisory and executive associations are involved in dialogue with issues specifically related to respective cadres. The seven advisory councils viz. PF Trust, Canteen management Committee, Township committee, Medical committee, Grievance Committee etc have representation from management and employees at all levels. These advisory councils oversee the functioning of respective areas and suggest for improvement based on employee feedback. A need of direct communication by employees with top management was felt based on feedback. Subsequently, MECOM, the direct forum for communication by employees to top management was launched in 04-05 and is now held quarterly with theme based subjects. The other important topdown and bottom-up communication forums are listed in Fig. 1.16. The BHEL Bhopal intranet home page and in-house magazines/ newsletter like BHEL Bharti & Sandesh, also serve to establish a dialogue with the employees. Various schemes, congratulation messages, achievements, appointments etc. covering a very wide spectrum of issues are published in these media. As a result of refinement in various communication approaches illustrated above, there is a perceptible positive change in employees perception on communication (Fig 7.1a).

BHEL, BHOPAL

Application Document CII EXIM Bank Award for Business Excellence - 2008

Page 3 - 7

People

3e. Rewarding, recognising and caring people: The remuneration package consists of mainly fixed and a variable component. A major initiative in 2008 has been the introduction of new Reward Scheme for individual and collective performance reward. A concept of Production Performance Index (PPI) has been introduced as a yardstick to measure group performance both in physical and financial terms. With the new scheme, the variable component of pay in respect of workers is to the tune of 20% of their basic pay as on date and for induction level workers it can be more than the fixed component of their gross pay. The remuneration packages for all level of employees are set as per Government of India Guidelines and as per the joint decisions taken in joint committee and association meetings. These are reviewed and revised periodically to attract and retain the talent. The perks at all levels are revised and upgraded from time to time in line with HR Strategic Plan (Fig. 3.3). The Plant Performance Payment which was earlier linked to volumes, quality and delivery has also been reviewed. The PP payment is now evaluated on a broader framework and has been linked to the BSC Score of the Company. Similarly the special incentive payment linked to profit and turnover growth and given to all levels of employees has been reviewed and increased substantially. Both SIP and PP have been made differential in order to retain the talent at higher grades for whom the opportunities are opening up. There has been a quantum increase in the PP and SIP amounts over the last two years (Fig 7.13a and 7.13b). BHEL, Bhopal has a well established recognition process to encourage peoples involvement in improvement activities and socio-cultural activities (Cr.1d). Some of the formal reward schemes are illustrated in Fig. 3.14. A major motivational step this year has been in the form of re-designation of employees in supervisor cadre as assistant/ deputy/ additional engineers. They now feel highly motivated with an increased self esteem as well as perceived social status. (Fig 7.3) IMPRESS introduced in 2004 enables people/ team to register and get recognised and rewarded through cash awards (Fig. 9.39b). BHEL Excel Awards Scheme introduced in 2000-01 recognises excellence on various values and initiatives such as quality, productivity, speed of response, R&D etc.
BHEL Excel Awards Scheme Recognition / reward Criteria Utkrishtha Puraskar All round excellence Gunvatta Puraskar Excellence in quality Tatparta Puraskar Timeliness & Speed of response Utpadakta Puraskar Productivity Takniki Lekh Puraskar Technical Paper Anusandhan Puraskar R&D Srijanatmakta Puraskar Creativity & innovation Grahak Santusthti Puraskar Customer service Paryavaran/Samaj seva / Contribution to environment, Sanskriti / Khel Puraskar culture & society Unit Level Awards Recognition / reward IMPRESS Quality circle award Safety awards Zero accident award Best safety steward Long service award Vishwakarma day award Suggestion awards Gunta Karmi Swasth Karmachari BEAT Award Reward Scheme 2008 IPR Incentive Scheme Criteria Improvement Projects Participation & Performance mini convention Least no. of accidents Zero accidents Contribution in safety activities 10 yrs. Of service Best Jhanki on the declared theme Accepted suggestion Contribution to quality Good Health Group business excellence Individual and group performance Patent filed and granted

Fig. 3.14 Recognition & reward schemes

A dinner is hosted by CMD every year in honour of award winners of BHEL Excel Awards. The recognition process at Corporate Level and at unit level are reviewed every year for the criteria and inclusion of further awards e.g. Scope of BHEL Excel Awards has also been enlarged to include awards for patents/ papers presented/ published in National/ International forums. BEAT (Bhopal Excellence Award Trophy) has been introduced in 2006 to recognise holistic excellence effort at product/ functional group. The BEAT trophies are awarded annually in Manthan. Employees superannuating are now given a BHEL customised memento that carries their name and period of service in BHEL on a gold plated plate in recognition of their long association. A long service award depicting the loyalty and pride in the company which is one of the values was reviewed and the value of cash amount has been enhanced. BHEL values environment and always strives for its protection and improvement. (Fig. 3.15, Fig. 8.9).

BHEL, BHOPAL

Application Document CII EXIM Bank Award for Business Excellence - 2008

Page 3 - 8

Corporate Unit BSC Strategic Capital InvestmentPlan Divisional Plan Strategic Plan

People

The awareness on related systems, implementation status and future plans is created through posters, banners, training programmes, essay competitions and lectures by eminent persons. Presently, over 200 executives representing all product and functions are involved in development, audit and establishment of Environment Management Systems. Every year, over 500 employees are trained in ISO:14001 and OHSAS 18001 certification safety-related issues and an equal number in health Trg. On Prevention of Aids awareness programmes. Positive effect of awareness on Trg. On First Aid, Stress Management safety is evident from data on declining accident rate (Fig. Environment Management Systems 7.7). Hazardous areas have been identified in the plant and Training of people working in hazardous areas Factory & Hospital are No Smoking Zone specific training inputs are provided to the employees Yoga Awareness Centre working in these areas. Sports club Kasturba hospital -a 350 bedded hospital is ISO 14001 and OHSAS 18001 certified, is recognised by Indian Medical Fig 3.15 Practices for healthy Organisation Council and empanelled for VVIPs. It has four peripheral dispensaries which cater to employees and their dependents. For specialised treatments, patients are referred to hospitals like Apollo, AIIMS, Escorts etc. and even abroad, if needed. A well-equipped and modern Occupational Health Services (OHS) Centre is operational inside the factory to meet the medical requirements within the Factory premises. As a major step towards care for people, employees undergo preventive medical check up at regular intervals. The examination is well planned and monitored through a roster wherein employees are medically examined department wise on scheduled dates. Awareness on Prevention of AIDS is provided in all training programs organised by OHS. Benefits administered to employees facilitating their general well being are illustrated in Fig. 3.16. BHEL, Bhopal has a full-fledged township (Cr. 8b) with all the amenities Pension, CPF & Gratuity (Fig. 3.17). As a major benefit the amount paid under Group Insurance Scheme GIS/ GSLIS/EDLI has been increased 20 times from an earlier range of Rs 10000 to Rs Education fee 50000 to a range of Rs 2 lakh to Rs 10 lakh. Beside the statutory Holiday home schemes, a gamut of schemes ranging from insurance schemes, Loan Subsidy accident schemes beyond duty time, death relief funds etc. exist in the company. To support the working parents, BHEL, Bhopal has Fig. 3.16: Caring Components established a crche inside the factory premises. Medical facility to retired employee is at par with the serving employee. Retired 5 community centres employees are entitled to retain the company accommodation at 11973 residential quarters subsidised rates for a specified period. The club and community centres Shopping centres, Libraries are also available to them at the rates applicable to serving employees. Schools and Colleges Theme based parks The well equipped Sports club is recognised by SAI. BHECNIS is the Places of worship apex body for promotion of social and cultural activities. Co-operative Society A Labour Welfare Supervisor is deputed every Sunday at EDs Yoga Centre & Sports Club residence to look into the problems raised by the retired employees/ widows and wards of deceased employees. nandam an old age Fig. 3.17: Amenities in Township home set up by company is a unique initiative towards employee care. Various HR approaches are reviewed from time to time based on feedbacks and various results obtained. Various improvements as a sequel to assessment and review are illustrated in Fig. 3.18.
,
2003-2005 CFT for KRA review, Review & communication of promotion policy , FGD for low score areas of EPS & Review of EPS, Competency development programs, Impress scheme, Evaluation of Shop Councils, HR Audit, Six Sigma 2006-2007 Knowledge Workers, MECOM Meeting, Evaluation of Training effectiveness, 360 degree feedback, Assessment of Competency Identification of core / non core functions, retraining & redeployment of suitable manpower from non core to core areas, functional competencies training, providing mobile to all executives. 2007-2008 Development of a rolling plan for meeting manpower requirements in next two years considering anticipated outflow Fig Rational changes in Incentive and Reward Schemes Fig 3.18: Improvements as a sequel to A & R BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 3 - 9 Maternity/ Paternity Leave

Partnership and Resources

4.

PARTNERSHIP AND RESOURCES

4a. External partnerships are managed: In line with companys strategic objectives partnership opportunities are identified both at corporate and unit level. The need of entering into partnerships which shall be beneficial to more than one unit are identified by concerned business groups/ functions and approved by Board of Directors. e.g. In line with the nations objective of Power for all by 2012 and analysis of the present capacities, BHEL took an initiative of entering into partnerships with major customers namely NTPC and NPCIL through JVs for harnessing core strengths. The need also led to acquisition of BHPV, Vizag which has now enabled capacity creation in the field of fabrication thus bridging the gap of approximately 10% of total fabrication requirement. Similarly, partnerships are entered into for support processes also, such as with TCS for SAP HR, Hewitt Associates for performance appraisal and McKinsey for capability building initiatives. At the unit level, BHEL Bhopal enters into strategic partnerships with world class organisations to enhance the core strengths of the organisation in the area of engineering and manufacturing. Partnership opportunities in line with CSFs are identified at product level in Product/ Technical committee meetings to bridge the technological gaps. Strategic partnership opportunities are also identified at unit level in the UBC and product specific partnerships are entered into. (Cr 2c) The value maximisation is accomplished by combining strengths of partners to create a better product or to increase the market share as below: Business sharing agreement with M/s Strukton Systems Netherlands for transportation business. Against specific requirement of POWERGRID for the largest rating 500 MVA, 765 kV HVDC transformer, BHEL has partnered with Siemens wherein the design strength of Siemens and manufacturing capabilities of BHEL are being leveraged. Similarly, partnership agreement has been signed with POWERGRID for field trials of 765 kV transformer and reactor. Collaborative projects with leading institutions like IISc, Bangalore and IITs are taken up for inhouse product developments as a part of capability building exercise. Examples of key partnerships in line with CSFs and other focus areas are illustrated in Fig. 4.1.
CSF Technology gaps in engineering New Product development Capacity augmentation Partners Collaborators Collaborators and Institutions Civil contractor Vendors Customers Transporters Partners Inspection Agencies and Consultants Research Labs Consultants Consultants Service Providers Transporters and service providers Financial Institutions Consultants Suppliers and service Providers Laboratories Specific Examples of Alliances / Partnership M/S Toshiba for Koldam project, M/S BBMB, Tala, Impsa, Turbo Atom etc- for Hydro stations, M/S Siemens-for Motors, M/S CVRDE for Gun Control Systems, M/S Easun Reyrolle for CRP, M/s Siemens for 765 KV HVDC transformer RRL, IISc, IITs, JVs with Hitachi, Fuji, Toshiba. Joint bidding with Siemens, M/s Strukton systems Netherlands Richardson & Crudas for hydro Block, ABCI Delhi for new transformer Block M/S Tandav Laxmi, Coimbatore Power Control Technology , Righill Pvt. Ltd. for oil rigs for onsite fabrication, M/s Bharat Yantra Nigam for fabrication JVs with NTPC & NPCIL for EPC & Power Equipment, Indian railways for Complete solutions PRC, ARC Specific Examples of Alliances / Partnership M/s ISI, Bangalore for Six Sigma, M/S BVQI for ISO 9001, M/S DNV for ISO 14001 and OHSAS 18001, M/S Llyods for ASME U Stamp, M/S CII for MBE, M/S Metric Consultancy for Customer Satisfaction Corporate R &D , Corporate ARP, M/S NPL, RRL, IISc, IITs etc. M/s Mckinsey Consulting, Indian Statistical Institute M/s IIM- A for AMP, IITs for technical training, M/s Hewitt Associates M/S BSNL, MOU with M/S SAIL for Steel and RC with M/S Sterlite, Hindalco, HCL and Metal Manufacturer Australia for Copper, Rate Contracts with vendors and transporters etc, e-auctions with M/S MSTC M/S SBI & IDBI- for all payments, M/S HDFC Bank & Standard Chartered Bank -for LC payments M/s CMS for Networking, M/S Cat Solutions for Drawing Management, M/S UGS for Design Automation, M/s STQC for ISMS, M/s KLG system for Primavera, Autodesk M/S WIPRO, M/s HCL, M/S HP & M/S ICIM for on site computer maintenance, M/S Jessops for Crane Maintenance, M/S HMT for Machine Tool Maintenance M/s NPL for Calibration of Instruments, M/S CPRI and M/S KEMA for SC tests on transformers, M/S ERDA

Logistics Other Focus Areas Improvement in Quality & Systems Knowledge enhancement DTC, Lean & Six Sigma HR initiatives Communication Supply Chain management Finance Informatics Equipment Maintenance Specialised Testing

Fig. 4.1: Strategic Partnerships

To achieve cost reduction DTC has been identified as a key process. For implementation of DTC M/s McKinsey was appointed as consulting agency in view of their leadership position in providing similar
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 4 - 1

Partnership and Resources

services to leading power equipment manufacturers in the world. M/s McKinsey and BHEL CFTs together worked on the DTC idea generation, idea evaluation and implementation process (Fig. 5.3, Fig. 5.4). This has resulted into cost reduction in Transformers, Motors and Traction machines (Fig. 9.32) enabling the products to meet the competition. Similarly for capacity enhancement, Lean Management has been identified as one of the key process and M/s McKinsey has been selected as partner for implementation of LEAN in SCR and Transportation division. (Fig 5.6) Implementation of LEAN ideas have resulted into improvements like capacity enhancement, reduction in first pass non conformance, OTIF etc. (Fig. 9.32b). To further accelerate the process of cost reduction, cycle time reduction and quality improvement, need for extensive implementation of Six Sigma approach was identified (Cr 5b). Indian Statistical Institute, ISI an identified best in class organisation having wide experience in training & implementation of Six Sigma approach in industry through out the world was chosen as the partner. BHEL & ISI entered into a handholding approach wherein ISI faculty not only trained BHEL engineers but also jointly ensured effective implementation of 130 sigma projects so far. Material constitutes around 50% of shop turnover; as such Vendors play an important role in the supply chain. There are detailed Material Management Instructions (MMI) for vendor enlistment/ development and performance evaluation. The approach for management of supplier relationships includes identification of new vendors, vendor assessment by qualified lead assessors, initial allotment of trial code and permanent code after minimum three successful trial orders. 25 Nos. of additional vendors have been developed in 2007-08. A similar system is in place for evaluation and registration of transporters providing logistics support. Some of the changes in approach towards suppliers are illustrated (Fig. 4.2a). The concept of online Vendor Performance Rating is in place since 200102 and target of graduation of C-class vendors to Bclass is a BSC Objective, e.g. 22.6% vendors were graduated from C class to B class in 2007-08. B2B portal provides supplier related information and the portal is upgraded continuously based on feedback of vendors. The special facilities available at BHEL, Bhopal and also the inputs on quality concepts are provided to suppliers (Fig. 4.2b). To reduce material procurement time and for assuring business to vendors rate contracts are entered into with regular suppliers. As an approach towards mutual development, technical and commercial terms are frozen with suppliers after discussions and decision taken to procure bulk (7080%) of requirement from supplier at L1 (lowest bidder)
Assessment by trained and certified assessors. Classification of items- Critical, major and minor Shift in approach -open tender to limited tender. Annual rate contract for procurement of materials Product material directory Concept. Automatic Vendor Performance Rating Feedback on performance rating to Vendors.

Fig. 4.2a: Supplier partnerships Tools, checking gauges and fixtures on loan. Special material made available. Training on ISO, 5S, NDT techniques, welding technology Improvement through audits at their works. B2B portal for vendors. Technical guidance to develop new materials and items.

Fig. 4.2b: Facilities provided to vendors

resulting into savings (Fig. 9.34).

Vendor meets are held product-wise for sharing future plans and challenges and also for obtaining their feedback. Improvements in working are also identified by MM and Finance through discussions with supplier associations. In addition to this, vendor perception surveys provide valuable feedback on the expectations of vendors. In the survey conducted for local vendors in 2006, 63 out of 130 vendors responded and the average satisfaction level was 84%. The survey sought response on 34 subprocesses in seven main processes. During the 2007 survey 106 out of 130 responded and satisfaction level was 81.2%. Electronic Fund Transfer (98%)
Material issue process Some of the improvements made based on the feedback received from vendors are listed (Fig. 4.3). JIPs, with suppliers and Reduction in Bank Guarantee Supplier related info on B2B customers are also taken up to add value to the customer/ supplier chain (Fig. 1.12, Fig 1.13) based on regular interactions with Fig. 4.3: Improvements based on customers and vendors during business visits and non-agenda feedback of vendors visits (Cr. 1c, Cr. 5e). Most of the new developments in traction machines are a result of joint developments with Indian Railways, a major customer. BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008

Page 4 - 2

Partnership and Resources

4b.

Finances are managed:

Financial management practices of BHEL, Bhopal supports growth, profitability, cost competitiveness, generation of cash surplus, capacity and capability enhancement. These are aligned with Policies and Strategies of the company (Fig. 4.4a).
Cash Collection by Units Centralized Cash Credit System (Corporate Pooling of Funds) Projection of Funds Requirements by Units

Working Capital Management

Judicious allocation to Units Investment Strategies for surplus funds

Investment Management

Special thrust to liquidate old & withheld outstanding Payment through LC against dispatch Reduction in slow-moving & nonmoving inventory by exploring alternative uses.

Cost Management Mechanism Budgetary Control. Product / Project wise monitoring of revenues. Monitoring of Expenditure

Discounted Cash Flow based IRR analysis .Sensitivity analysis. Payback period analysis. Post Appraisal analysis.

Target setting at product /individual levels, review and control

Corporate MoU with Govt. Unit MoU with Corporate /BSC.

Standard Accounting Manuals

Fig. 4.4a: Financial Resource Management

Finances are mobilised and provided from internal resources for JVs, M&A, capacity enhancement, modernisation, capability building initiatives, employee benefits, CSR etc. The financial data is available online through access control mechanism for operations management. Few examples are given below: Sales related information; gross billing, net billing, turnover, collectible debtors, deferred debts, cash collection on daily and cumulative basis. Supplier related information; LC status, status of bills, stock movement statements, S.I.T. and Material with Fabricators, bank guarantees issued by suppliers etc. Statutory Information; latest amendments under various tax laws like central excise, sales tax, VAT, Income tax and other statutes. Employee Centric: Pay slip, PF, Income Tax, TA/LTC, Loans etc. Revenue budget is prepared product wise/ function wise at unit level (Cr. 2c) and subsequently approved by the Board of Directors. This includes Turnover, Material consumption, Inventories, Gross Billing, Net Billing, Operating cost and margins, EVA, profitability, cash flows, working capital etc. The expenses vis--vis approved budget is monitored on-line for course corrective actions. Cash budget which takes into account the cash inflow and out flow, is prepared and monitored both at unit and corporate level on daily basis. BHEL is a debt free company (including foreign currency loans) and is gearing for opportunities to leverage its financial potential in new areas/ projects. (Cr 4a) Purchase proposals and Orders: Finance reviews the purchase proposals based on trade off between imports and indigenous, lease or buy (for capital items) and comparison with sale price. A comprehensive financial analysis for capital proposals using NPV, IRR techniques is done as per the norms laid out in the capital budget manual. Operating Results, Cash flow and Inventory reports are generated monthly and Turnover, Inventory, Billing and Cash Collection data are available on line.
BHEL, BHOPAL At Unit Level Production Review Meetings. Product Managers meetings with Head Commercial Coordination. EDs Cash Review meeting. Fig. 4.4b: Forums of Review At Corporate Level Board of Directors meetings. MCM capital budget meetings. Finance Heads Meeting

Application Document CII EXIM Bank Award for Business Excellence - 2008

Page 4 - 3

Partnership and Resources

The financial strategies and performance are reviewed both at unit level and corporate level (Fig. 4.4b). Net income data is published in accordance with both Indian GAAP and US GAAP. As a result of reviews and innovative techniques, following major benefits have accrued: Negotiating special insurance policies for specific needs L.C. opening commission reduced through negotiations with banks. Online Corporate Cash and Budget Management System. Accounting Standards AS 7 institutionalised. Web based debtors and forex management system institutionalised. On line monitoring of BGs Annual capital budget is prepared by P&D group based on long-term planning at unit and at corporate level (Cr. 2c). This is put up in the form of schemes/ feasibility reports, prepared by Industrial Engineering department as per capital budget manual. Capital expenditure of plant and equipment has grown continuously (Fig. 9.40) in line with the CSF of capacity enhancement. Investments in capability enhancement by training through deputation to seminars and conferences, training by an outside faculty at the unit or at collaborators works are evaluated qualitatively by the HRDC. Investments in socio-welfare projects like Anandam, tree plantations, parks, gardens for society, adoption of villages are evaluated qualitatively. Intangible investments, are approved by the head of finance and Head of Unit based on the qualitative and quantitative benefits proposed by the initiating department e.g. Partnership approaches for LEAN, DTC, Six Sigma etc. are approved by Head of Unit and funds provided for such initiatives. BHEL resources funds for temporary working capital only, for which cash credit facility has been worked out with banks at interest rate equal to or better than prime lending rate (PLR), which exhibits financial creditworthiness. During cash surplus period, inter corporate deposits are resorted to, thereby earning interest and vice versa. (Fig 9.25a) The exports and imports involve cross currencies like Euro, Pound, Dollar, Yen etc. as such, there is a risk of foreign exchange fluctuation. For this purpose, exposures are identified for exports and imports. Forecast and trends in foreign exchange rates are obtained from various banks on daily basis for this purpose and currency in which imports and exports shall be affected is selected. Foreign exchange risk is managed through a centralised web enabled system. In order to protect margins due to fluctuations in forex and base material prices, a three tier pricing mechanism for product pricing is resorted to manage risks and also PVC is part of commercial contracts. Customer out-standings are reviewed weekly to get the bills verified timely so as to liquidate sundry debtors (Fig. 9.27a, b) by tapping the various sources of funding, viz. bills discounting, Power Finance Corporation and arrangement of Packing Credit to ensure smooth cash inflow. This has enabled highest ever Cash Collection during the year (Fig. 9.26) and generation of cash surplus (Fig. 9.25) resulting into reduction in creditors. (Fig 9.28) As a result of prudent cash management (Fig 4.4a) the interest outflow to the corporate pool has continuously reduced over the years (Fig. 9.25a). 4c. Buildings, equipment and materials are managed: BHEL, Bhopal plant established in 1956 has continuously added upon its infrastructure and now has 12 manufacturing blocks with office annexes attached to each block, various specialised test labs and facilities, canteen, HRDC, administrative blocks etc. In line with expansion plans Golden Jubilee (Hydro) block was setup in 2007 and Transformer new block is 2002: Mechanized cleaning under advanced stage of completion. Primavera and DWM are 2003: Renovation of public utilities effectively used for Project Management of these blocks. 2004: Weather-coat of all blocks/ annexes Complete information on plant layout is available on Intranet. The 2005: Centre of excellence block layout also indicates location of critical machines with their 2006: Renovation of Offices/ Annexes, technical details. The building and offices are under renovation TBG, Pavements & roads 2007: Modernization of SCR Annexe in a phased manner (Fig. 4.5). As a pilot, a modern office named Centre for Excellence was created in 2005 and since then Fig 4.5 Building Modernisaton renovation has been extended to other annexes. Materials, consumables and bought out items are procured through an established Materials Management process and finances are planned during budget exercise (Cr. 4b). Continuous
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 4 - 4

Partnership and Resources

emphasis is laid on cost reduction through reduction in material consumption (Fig. 9.29), bulk purchase, rate contracts, engineering developments, reduction in physical contents through DTC etc. Equipment and building resources are planned well in advance through Capital budget Process (Cr. 2c). Structured systems viz. Purchase/ works Policy, Materials Management Instructions, Capital Budget Manual, and Delegation of Powers etc. are available for these processes. Bulk purchasing is resorted to where there is requirement from multi divisions. The requirement of such materials for the unit and corporation is pooled and assigned to a lead unit to achieve economies of scale. BHEL Bhopal is lead agency for procurement of CRGO and Copper for corporation. Since Copper and CRGO are the major (50% of total purchases) and most critical inputs, specific strategies are adopted to ensure availability of CRGO and competitive prices of copper. BHEL has rate contracts with Metal One, Japan for supply of high grade CRGO steel. A constant vigil is kept on demand and supply situation of critical materials and new vendors are developed e.g. M/s. POSCO Korea was developed and approved by major customers, NTPC & PGCIL, for supply of MOH grade CRGO to overcome the worldwide crisis of ZDKH CRGO. This alternative grade of easily available material was introduced as a result of DTC exercise which enabled cost competitiveness and securing orders of 6200 MVA transformers worth Rs 120 crores. Similarly M/s. Salzgitter, Germany and M/s. Reiner Brach, Germany have been developed for supply of Steel plates when M/s. Mobar, the leading supplier of Steel plates was closing its operations. Copper prices depend on LME prices (Fig. 9.31). In order to safeguard the operations from volatility of rates in the market and to protect itself from the risk of buying at the peak rates, the purchases are generally made through pricing, averaged over the fortnight. BHEL has rate contract with M/S Sterlite and Hindalco and the philosophy of Vendor Managed Inventory is practiced with no stocking at BHEL. The CC Rods are directly dispatched to fabricators by the vendors the day order is placed, thereby minimizing overall inventory levels and reducing inventory carrying cost. BHEL also enters into joint development with suppliers for material which can be indigenized. For example BHEL developed Jindal Steel as a source of SS415 grade of stainless steel there by leading to zero imports against 100% imports earlier. (Fig 9.43c) In line with the CSF of cost reduction the purchase processes have been reviewed and process of reverse e-auction is being effectively used. This has enabled savings of Rs 44.46 crores in 2007-08 in purchases worth RS.182.92 crores. A material coding system at BHEL, Bhopal helps in easier identification, faster information processing and avoids duplication of efforts. A Plant Standardization Committee headed by GM (P&D) reviews the status of addition and deletion of new codes for inventory control. The material indenting process involves automatic clearance of indents after confirmation of non availability of material elsewhere through the computerized system. This system facilitates disposal of non-moving materials (Fig. 9.33). An integrated inventory Dashboard facilitates online review and monitoring of inventory by ED, PMs and MPIC. This has led to improvement in inventory levels (Fig. 9.8c) and the targeted level of 89 days for 2011-12 as per SP 2007-12 has already been achieved. Maintenance function is managed at two levels, viz. unit level and product level (Fig. 4.6).
Unit level maintenance: Works Engineering & Central Services (WE & CS) is responsible for CNC and Electronics maintenance of machine tools and equipment, Test plant maintenance, Reconditioning, Centralised maintenance of cranes, pipelines for utility services , Erection and commissioning of M/c tools & equipments, Operation & maintenance of electrical power distribution system in the plant and Factory civil services like construction and maintenance of civil infrastructure. Product level maintenance: Periodical maintenance of all plant and machinery, Requirements of reconditioning and retrofitting are envisaged by product groups and executed by WEX (Fig 4.7) . Fig. 4.6: Unit and Product level maintenance

Various steps have been taken to improve the utilisation of machine tools and plants (Fig 4.8). The list of critical machine tools is reviewed annually at Apex level and updated based on the projected workload for the year. The system has been further matured by introducing the concept of OEE against the practice of monitoring only machine tool utilisation. Monitoring of machines under OEE is one of the objectives of BSC and the numbers of machines under OEE have increased from 8 to 45 in last four years and OEE has increased over the years (Fig. 9.42). Further, to meet the stretched
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 4 - 5

Partnership and Resources

target of shop turnover a strategic decision has been taken to maximize the utilization Activity / Year 03-04 04-05 05-06 06-07 07-08 Reconditioning of machine tools 33 35 37 37 37 of CNC and Critical machines. Reconditioning & CNC retrofitting 14 9 9 9 9 Subsequently 18 CNC and 30 critical Electronic upgradation 21 24 25 26 28 machines including plants and ovens have Upgradation of electrical installation 3 8 5 5 5 been identified for 24x7 operations. Renovation of plants 8 12 12 14 15 Reconditioning of cranes 16 12 13 15 15 All factory and block gates and critical Fig. 4.7: Reconditioning and modernisation activities in nos. locations are manned by CISF personnel to ensure security of assets. Material from the Reconditioning and retrofitting of ageing facilities (Fig.4.7). stores is issued against authorised material Monitoring of utilisation of high value machine tools as per well requisitions. All assets of the factory are established and documented system (Fig. 9.42). insured. Subsequent to the review of the Steam turbine machine and assembly shop where machines security system, issue of gate passes with on were idling because of lack of orders were utilised for machining spot image processing of visitors was of hydro orders in year 2001-2004 and IMM orders in 2005-06. Sharing Of Major Machine Tools for Optimum Utilisation and introduced in 2006. For sensitive areas such Labour Works Contracts. as informatics centre, smart card door access Online Maintenance Management system for Breakdown has been installed and Iris detection system is Analysis and spare management of machine tools. installed for server room. VPI plant of traction motor division was utilised for impregnation of Wind electric generators in 2007-08 There is a full fledged fire service unit of CISF Development of unmanned chip disposal system for improving to meet any emergency. Potential risks in machine availability areas like Gas & Power plant, LPG storage plants etc are covered through mock drills. Fig. 4.8: Improving Utilisation of machine tools and plants A state of art warning system has been installed in all sensitive locations in the factory for early warning and detection of hazardous situations. Dry type transformers have been installed in substations to prevent incidents of fire. Due consideration is given to prevent any adverse impact on the neighbourhood community and the employees due to operation of plant and machinery by the safety department through routine checks, audits and ensuring compliance to statutory and regulatory requirements. e.g. On-site/ Off site management plans are in place to take care of LPG hazards Effluents are treated and the resulting raw water and manure is used in the horticulture. Fire drills are carried out to train the employees and check for preparedness. (Cr. 3e) Auto water sprinkling system, closed circuit television and alarm system for LPG.

Occupational Health Services (OHS) group Practices followed for waste reduction plans and organises pathological, Optimum layout of item cut from plates/ sheets biochemical, biological and environment Design Improvements- e.g. Design of Box type spider instead of monitoring of emission levels in the working conventional star Type-led to Material Reduction by 27 %, Machining Less stator frame, variety reduction of hardware etc. areas. (Fig 8.7b) People working in Reprocessing of used transformer oil hazardous areas are subjected to periodical Recycling of waste generated medical examination. Those working in areas Copper waste used for drawing cooling tubes having X- ray exposure are given radiation Metallic waste is re-melted and reused exposure badges issued by BARC and Galvanised sheets received as packing is re cycled. (38 MT in 07-08) pocket dosimeter which measures the extent Wooden packing of purchased items is reused for packing of products. (20% of wood requirement every year) of exposure. Larger size cut-offs of CRGO are converted to cross flux & cheese core Consumption of utilities like Power, LPG, lamination used in transformers and reactors. Coal, Steam, Compressed Air and Furnace Large size cut offs are used for smaller components in Fabrication Oil are regularly monitored. A plant level Re-use of old press tool components for new tools. Energy Management Cell is responsible for Identification of projects for reducing utility Fig. 4.9: Waste Reduction & Recycling of waste consumption, identification, monitoring and implementation of energy conservation plans and education of people. An energy policy is the guiding light in these efforts. These efforts have resulted in reduction of Energy consumption (Fig 9.37a). With an objective to be an Energy Efficient Unit, BHEL Bhopal has partnered with CII. An extensive energy audit was conducted jointly in 2005-06 with CII experts and energy saving projects taken up and completed.
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 4 - 6

Partnership and Resources

Reduction in generation of waste is taken up at the stage of design of the product and while deciding the technology for manufacturing. Recycling of waste is done continuously (Fig. 4.9). Continuous efforts for reduction in consumption of the non-renewable resources are made or alternate material/ products are used to eliminate their consumption altogether. For Example: Reduction in consumption of water by modifying the cooling water system of boilers. Reduction in engine oil consumption by developing oil filtration system for reusing waste oil. Reduction In consumption of furnace oil through recovery from oil sludge Reduction in wastage of lubrication oil through return of used oil for recycling. 4d. Technology is managed: In line with organisations vision a sustained focus is given on engineering excellence. Technology gap being a CSF is managed through a structured approach of identification of gaps and bridging plans. Plant Engineering Committee (PEC) chaired by Director (E, R&D) and convened by GM(P&D) with all product managers and engineering heads as members is the apex body that steers development of long term engineering excellence plans. A five year engineering road map with year wise milestones is prepared by respective product managers and approved by ED. The five year plan is cascaded to year wise strategy maps and BSC. Specific plan based on the analysis of business environment, past performance and market forecasts product specific strategies are formulated at the corporate level and cascaded to unit level product plans (Cr. 2c). These inputs along with market trends are considered by PC and TC to decide on action plans culminating into approval of PIRs. A calendar of PC/ TC is prepared by CEPD in consultation with engineering and is finally approved by Director (ER&D). TC/PC steers the product development activities thus ensuring technological edge. Technical committee: Chaired by head of product engineering and having members from product marketing, corporate R&D, CEPD, P&D and invited members meet as per approved calendar. The TC deliberates on various issues related to Imminent market needs Examples technology to meet imminent and future Collaborations Siemens for Motors technological needs. Depending on Joint venture(JV) Hitachi, Fuji, Toshiba for Hydro products customer specifications and future market Transfer of Technology (ToT) EMD-USA, Traxis-Holland for traction needs specific strategic decisions whether Joint Bidding Siemens for Transformer, Toshiba for locomotive electrics to go for collaborations/ JV/ ToT or inFuture technological needs Examples house development through PIRs are In house R&D PIR 765 kV, 500MVA Transformer, 1200 KV CVT taken up (Fig. 4.10). Collaborative projects Simulation studies of IGBT based drives Product committee: Chaired by product Engineering order Prof. Dennis Allan from UK for consultancy GM and having members from Fig. 4.10: Technology management options engineering, commercial, manufacturing, quality, materials management, Corporate R&D, CEPD, P&D, Corporate marketing groups and Convenor of TC also meet as per approved calendar. The product committees analyse the product benchmarks (not in public domain, hence not presented), market share (Fig 9.10-9.12), market scenario, existing, alternate and emerging product, manufacturing and testing technologies keeping in view the strategic plan. Based on the analysis and customer relationships pricing and tender specific strategies are formulated to ensure customer retention. (Fig 6.15) The technologies of collaborators have been assimilated to enhance in depth understanding of world class products. Technology is also being improved in association with Corp R&D, Research and technical institutes and learning through customers feedbacks. BHEL, Bhopal lays emphasis on inhouse R&D efforts through PIRs and/ or collaborative projects (Cr. 4a). For management of such projects a well defined system as per EMI 3656 is followed which guides on the process of project initiation, project status and project completion. The focus on in house R&D to meet the future technological needs has resulted in increased R&D expenditure during last few years and is targeted to further increase in coming years (Fig. 9.43a). As a result there is an increase in commercialisation of R&D projects (Fig. 9.43b) and turn over from new products (Fig 9.5). In order to fulfil ever growing customer expectation, efficiency and performance improvement of all major products through in house R&D is planned and implemented by developing innovative technologies. The objective of such developments is to add value to the existing product profile and
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 4 - 7

Partnership and Resources

conserve energy and resources. Such technology development programs are identified in product plans and strategy maps and are cascaded through BSC objectives. For example in case of hydro turbines and generators, which is the most environmental friendly power generation system, there is a continual emphasis in improving equipment efficiency thereby generating more power and revenues for the customer. The need and status of manufacturing technology, processes and shop and testing facilities are deliberated in product committee meetings. Modernisation and upgradation of manufacturing facilities is carried out through modernisation schemes and capital investments (Fig. 9.40). In order to have a competitive edge, state of art testing facilities have been set up which includes: Centre for Electric Transportation, the only facility in India, where all types of rail transportation vehicles and combined system of locomotive are tested under simulated load conditions. Ultra High Voltage Laboratory- one of the seven prestigious laboratories in the world and only one in country for testing highest rating power transformers Hydro Lab- one of the few labs in the world where scaled models of hydro turbine are tested and proved prior to full scale manufacturing. Advance Technology Group is responsible for upgradation and improvements in manufacturing technology through development projects that are identified annually at the unit level, as per WMI 1109, in consultation with concerned manufacturing, engineering and technology groups. Every year around 15 projects are completed entailing an expenditure of around 1.2 Cr (Fig 4.11). Some of the major MTD projects implemented during last few years are: Introduction of PLC based control system and cross feed arrangement on the plano-miller. Introduction of self powered mobile beds for CNC Plasma arc cutting machine. Development of dedicated system for manufacturing of copper wire bars. Development of special purpose machine for ironing of insulation of stator coils. Development of battery powered mechanised trolley for LEM jobs.

BHEL Bhopal improves its business processes, manufacturing processes, engineering and maintenance processes using Information and Communication Technology (ICT). There are centralised Informatics and Communication groups, which are equipped with latest technology. ICT needs are regularly evaluated and appropriate technologies are identified during the Functional heads meet at the corporate level. The present network resources at BHEL Bhopal are given (Fig. 4.12). All major processes like HR, Finance, Purchase and Maintenance are IT enabled. A documented MI, is in place for users to request for IT Project category 03-04 04-05 05-06 06-07 07-08 enablement of processes. In addition to Low cost automation 5 5 4 6 4 this, DNC network of CNC machines Rretrofitting CNC / DRO, EPM 3 2 3 3 2 enables remote programming. SCADA Special purpose machines 7 7 7 7 10 system for power distribution for town Fig. 4.11: Manufacturing Technology Projects ship and remote control of cranes are some other examples of application of IT in improving operations.
Total Nodes 1339, Fiber Optic GB backbone Factory wide internal Block Network with a mix of Fiber Optic ( >20 Kms.), UTP media (>70 Kms.). Cisco Router, Backbone Switches Switched network with structured cabling. WAN Leased circuits for dedicated 2x2mbps connectivity for Internet / Email / VPN facility Heterogynous Network Operating systems Unix HP, IBM-AIX, LINUX, WIN 2000/NT etc. TCP/IP NetBEUI Environment.

260 nos. of Engineering PCs (with 4 GB RAM, 19 Flat Screen and High-end Graphics Card) and 12 Nos. of Xeon Workstations (16GB RAM, 19 Flat Screen) have been provided to Engineering divisions in 2006. This has facilitated in significant increase, (75-100%) in drawing generation through Autocad (Fig. 9.49b). A Common Bill of Material (BOM) system has been developed to Fig 4.12: Network resources at BHEL Bhopal facilitate Automation of Engineering Information Flow. A company wide Knowledge based Engineering System has also been formulated for holistic design automation. Design automation has been taken up in all engineering groups for flexibility, reduction in cycle time, automatic BOM generation and 3D modelling. The partners for design automation have been finalised through a structured process of selection on well defined parameters. Specific engineering software for simulation studies, modelling, design, layouts etc. are used resulting in continuous
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 4 - 8

Partnership and Resources

improvement in engineering cycle time (Fig 9.17) and its quality. For requirement of such engineering software an Engineering Software Committee regularly vets the requirement, reviews its utilisation and maintains an inventory of software in plant. Apart from standard engineering software, product specific engineering software is developed and continuously improved by designers. eg. Subsequent to DTC exercise, the existing transformer design software has been upgraded and Linear Programming tool for economic slitting of CRGO is being used. For better management centralised license server has been installed at IFX for on-line loading of engineering software e.g. Autocad, Ideas, SUG-NX3D. 4e. Information and knowledge are managed: The need for managing information and Stakeholder Information Media knowledge emerges from the CSFs and Customer Product Internet (Controlled New products BHEL Journal, News focus areas of the organization. The access) letter Information needs for each stakeholder Operation & maintenance Service bulletins are systematically categorized and Manufacturing status Internet & Hard copy organized (Fig 4.13) for providing access QAP, Drawings for approval Internet & Hard copy to them. Company wide IT network is Employees Operations related data: (Controlled Strategic plans, BSC Intranet effectively utilized for collecting, access) Results, Handing over, T/O, BSC Boards, CRISP structuring and managing information and cash etc knowledge. Most of the data is available in Product related: soft form and data requiring wider Drawings, product standards, Intranet & Hardcopies dissemination is available on intranet. The national international standards, Management Instructions data of common interest on intranet is in Employee centric: public domain and is freely accessible to Salary, leave, PF, bio data, Intranet everyone. Other sensitive data is directory, e MAP, property controlled through passwords. e.g. Real return, Income tax, circulars Survey results: People, time data on handing over, cash Customer, Society Intranet collection, dispatches, inventory etc is Knowledge: Product accessible to HODs and GMs through standards, Drawings, Intranet password for DWM. Visual Dashboards Specifications enable on line monitoring of operational Suppliers Tenders, Enquiries, PO status, B2B, Internet (Controlled Bill status, Payment status, parameters. The unit is accredited with access) VPR ISO/IEC 27001:2005 (upgradation from Drawings, Specifications Hard copies BS7799-2) for ISMS certification. Shareholder Company information BHEL website, Internet The validity, integrity and security of (Free access) Annual reports, News Hard copies, Press Business results release, bulletins information is ensured through structured Society Cultural events, welfare Newspapers, Newsletter, documentation. Various documents are (Free access) schemes, sports activities, Public announcements, reviewed and approved by the educational facilities, vocational hoardings departmental heads prior to issue. courses Data verification, check-listing, Fig. 4.13: Information needs reconciliation, built program validation for attributes such as value, range, limits, check digits etc. are operated rigorously to ensure reliability of data on electronic media. Procedure is in place for taking cold backups, users backup, incremental backup for all servers. Application software is secured through authorisation codes. Secured network access is ensured through a combination of hardware and network access security software. E-mails are analysed for any sensitive information exchange. Communication and IT resources have grown over the years (Fig. 9.47, Fig. 9.48) and have resulted in reduction in processing time. BHEL, Bhopal has a website and an intranet site which has portals of all departments for knowledge management and information exchange. Functional systems like Finance, Personnel, and Material Management are run on centralized main frame computer or servers. A LAN connecting all blocks of the factory and also hospital with transmission rate of 1 Gbps is laid and external connectivity is ensured through 2x2 Mbps leased lines. This enables development of integrated systems and seamless flow of information. The need of state of art communication network is identified in Functional Heads meet and as a sequel to same communication network has been upgraded in 2007 having a capacity of 3000 lines.
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 4 - 9

Corporate Unit BSC Strategic Capital InvestmentPlan Divisional Plan Strategic Plan

Partnership and Resources

The communication network provides services like Video Conferencing, Unified messaging system, Computer Telephony Integration (CTI), IP Telephony and Wireless system Integration and CUG mobile telephony amongst all executives in the grade of Senior Engineers and above (more than 1000 nos.). To protect the IPR patenting is encouraged through a structured system for filing of patents. A revised incentive scheme with provision for substantial cash awards for submission, filling, grant and opposition of patents and copyrights has been introduced with a focus on protection of IPRs and motivation/ recognition of individuals and teams. (Cr. 1d) IPR cell at unit level and Corporate R&D facilitates patent search and alerts on regular basis. Product standards, drawings and specifications, There has been a continuous increase in patents filed Collaborator documents over the years (Fig 9.45). BHEL Journal The knowledge in BHEL Bhopal is preserved and Product specific compilations enhanced in various ways as illustrated (Fig. 4.14). Product specific KM portals Product related knowledge is captured as product Monthly Engineering Highlights standards, drawings and purchase specifications. These Fig. 4.14: Knowledge preservation are accessible to employees for day to day operations, product & process improvements and development of new products. BHEL Journal and Engineering newsletter captures all technical Engineering server/ business papers and in house developments and is available through VPN. server consolidation Incentives are in place for contribution in BHEL Journal. Engineering In-house ERP Nirantar developments are captured and disseminated through Engineering Corporate Cash Management Highlights on monthly and annual basis. System A well maintained central library and internet facilities to all executives both at office and home are provided to facilitate knowledge acquisition. Creative work done and achievements are compiled in the form of booklets and also put on intranet e.g. booklets on six sigma projects, quality circle projects, engineering developments, technological development projects etc. Business parameters are compiled at Unit Level for last ten years as Facts at a Glance and at Corporate Level as TEN YEARS DIGEST to facilitate comparisons and benchmarking. Major achievements through information technology in last five years are given (Fig. 4.15).
2002-2003 2003-2005 2005-2007 Collaborative Projects for technology upgradation. Renovation of annexes ISMS -ISO/IEC 27001:2005 certification OEE concept extended to 30 machines Outsourcing of non core adding processes Traffic logistics system E-MAP Customer Complaint system Monitoring of loading advise WEB based MIR reporting for Wireless LAN connectivity 175 persons trained in UGNX On line inventory status Use of UG in Turniing/ milling On line BG monitoring

Fig 4.15: Improvements through IT

2007-2008

and reverse Building maintenance and auctions face lifting of public utilities Works Contract for effective Comprehensive supplier utilisation related information on intranet Onsite Fabrication for reduction in dispatch costs OEE initiatives Creative work done and Assessment of CMMI Engineering achievements preparedness compiled in form of booklets- Compilation of Engineering Anunaad & Ninaad highlights and Spandan. respectively Fig. 4.16: Improvements as a result of regular assessment and reviews

Forward

Introduction of special awards Holistic design automation. E-buying introduced Capacity augmentation schemes
scheme for patents/copyrights.

such as golden jubilee block for hydro and new block for transformer B2B portal

Approaches of partnerships and resources have been refined over the years (Fig. 4.16).

BHEL, BHOPAL

Application Document CII EXIM Bank Award for Business Excellence - 2008

Page 4 - 10

Processes

5. 5a.

PROCESSES Processes are systematically designed and managed:

Business processes are designed to fulfil QCD requirements of the customer. These business processes (Fig 5.1a) are supported by support processes such as HR and Finance related processes. In line with the strategic plan and CSFs some of the business process and support processes are defined as key processes (Fig 2.9). The business processes and their KPIs are identified in the apex level manual i.e. Quality Manual. Similarly, the support processes are documented in the respective manuals such as HR Manual. A structured system of Management Instructions (MIs) and Departmental Working Instructions (DWIs) ensure effective deployment of processes at all levels. The processes are developed and reviewed by 13 standing functional taskforces. The taskforces are empowered to incorporate process improvements as and when need arises or suggestions for improvements are received. Key performance Indicators (KPIs) and inputs and outputs of all processes (Fig. 5.1a) are identified by functional taskforces. KPIs of all functions are reviewed and revised every year and are specified in respective MIs. KPI targets are set as part of BSC objectives of product managers/ functional managers/ HOD, as the process owners. e.g. Head Commercial (EM) is the process owner of tendering and ordering process of Electrical Machines.
No. 1 2 3 Process Tender processing Order Processing Design and Development Inputs and specific resources Tender / Enquiry and statutory & regulatory requirements Customer order and technical offer Work order, customer spec., statutory and regulatory requirements PIs, PMD and Purchase policy Work order, design data, material and tooling Output Technical Offer and Price Work order Drawings, GES, MID, Test schedules, Product Standards, Shipping list, Material forecast and Purchase indents Material receipt at stores Product Key Performance Indicators Percentage of Order Booked Vs Offers Submitted Time for release of Work Order from receipt of customer/internal Order -Time for submission of technical offer -Engineering Cycle Time (Fig. 9.17) -Number of design changes -Number of new design / features developed -Cost reduction - PI to PO conversion time (Fig. 9.16) -- Vendor Performance rating -Physical Turnover / Target (Fig. 9.13) -Profit before Tax (Fig. 9.3) -Value added per employee (Fig. 9.22) -Inventory as No. of days of Turnover (Fig. 9.8c) -Non moving inventory (Fig. 9.33) -Cycle time (Fig. 9.15) -Cost of rework / rejection (Fig. 9.18,Fig. 9.19) -Delivery performance (Fig. 6.5) Non-conformities -Cost of Rework & Rejection(Fig. 9.18,Fig. 9.19) -% SRVs cleared within 5 days (Fig. 9.16) -Time taken from Handing over to Receipt at site - Transit Damage -Response Time & Resolution Time (Fig. 6.11)

4 5

Material Procurement Manufacturing

Inspection Testing Packing and Dispatch Services

and

Work order, Design data, Quality Plan, Inspection &Test Procedures/Standards/Instrument s, Equipments and Materials Product, PFR, Shipping List, Packing material, Transport, Packing & Dispatch Instructions Service request

Conforming Product

Product receipt at customers site Satisfactory Resolution

Fig. 5.1a: KPIs, Inputs and Outputs of Business Processes

The adoption of specific system standard(s) for BHEL, Bhopal is finalized by top management and responsibility assigned. BHEL Bhopal is certified for following system standards:

ISO 9001 system standard since January 94 upgraded to ISO9001:2000 in 2002. ISO/IEC:2005 for ISMS NABL accreditation as per ISO:17025 for all Calibration and Testing Laboratories ISO 14001 system standard for environmental management since 2001. OHSAS 18001 system standard since July 2002. ASME U Stamp for pressure vessels
Application Document CII EXIM Bank Award For Business Excellence 2008 Page 5 - 1

BHEL BHOPAL

Processes

The systems (MIs) have in-built mechanism for resolution of interface issues. The interface issues beyond the scope of MIs get resolved in various forums (Fig. 1.16). System for resolution of Internal Interface Issues: Process ownership is imbibed through BSC at GM level, HOD and HOS levels and e-MAP at individual level. The process owners manage the process to satisfy related process stakeholders and resolve the interface issues. The system for resolution of internal issues is as below:

Sister unit and issues related to corporate functions are resolved in project review and contract review meetings, issues needing escalation are taken up in pre MCM and MCM. The agenda of such issues is hosted in advance on MCM webpage and the concerned unit/ function head presents the status and the action plan. The thirteen task forces at unit level review MIs and resolve function specific issues. For cross functional issues cross functional teams are constituted by top management as per the needs (Fig 1.5) Employee related issues: These are discussed and resolved in three tier bipartite forums and advisory committees. Corporate Level CFTs with representation from Bhopal unit are also constituted for resolution of corporate level issues e.g. 24 function specific KRA taskforces.

System of managing external interfaces is as per (Fig. 5.1b).


Review & resolution forum Contract reviews, customer meets, Non agenda visits, training programs and regular interactions. Tendering, finalization of offer, placement of order, receipt of supply etc. (Specific issues are taken up in vendor meets and/or meetings of supplier representatives with head finance and head System for resolution of external Interface Issues: MM (Cr. 4a) e.g. 98.3% payment through Electronic Fund Transfer Society Statutory requirements, Society Discussions by Publicity and Public Relations department, Town Administration department etc requirements eg Health, with various Government Departments in connection with fulfilment of statutory requirements. Society, Environment Fig. 5.1b: External interface issues Managing External Interface Issues Stakeholders Issues Customers Customer feedback, complaints Suppliers & Techno-commercial issues partners

5b. Processes are improved, as needed, using innovation in order to fully satisfy and generate increasing value for customer and other stakeholders: CSFs, KPI trends, stakeholders feedback, learning from assessment and audits etc drive the incremental or breakthrough improvements. The system for identification and implementation of improvement activities has been improvised and integrated with eMAP. It is mandatory for various level of executives to select capability building KRAs i.e. KRAc which are improvement oriented KRAs. Higher the level of executive, higher is the percentage of KRAc assigned.
Process improvement strategies Balance Score Card Six Sigma DTC (Design to Cost) Design automation BPR and ERP e-MAP LEAN IMPRESS DWM 5S Improvement quantum Breakthrough Breakthrough/ Incremental Breakthrough Breakthrough Breakthrough Breakthrough Breakthrough Incremental Incremental Incremental Deployment All products and functions since 03-04 All processes/ all functions since 05-06 Pilot in Transformer in 05-06, extended to EM in 05-06 & TPTN in 06-07, Thermal in 2007-08 Pilot in SCR in 04-05, Hydro & CDE 06-07 and extended to all products now Piloted in SCR in 03-04 All executives since 02 -03 Pilot in SCR and TPTN in 07-08, being extended to EM and Hydro in 08-09 All employees since 04-05 All products since 05-06, extended to functions in 07-08 All product and functions since 01-02 All employees since last 20 years All employees since last 20 years

HR processes are reviewed for Suggestion scheme Incremental improvement by three tier bipartite Quality Circle Incremental forums. The need of process Fig. 5.2: Process Improvement Strategies improvements and learning from different units are also shared and finalized in Functional Heads Meet viz. Planning, TQ, Engineering, IT, HR, Finance etc.
BHEL BHOPAL Application Document CII EXIM Bank Award For Business Excellence 2008 Page 5 - 2

Processes

The inputs from above are used to initiate process improvements viz. QIPs, PIPs, JIPs, TDP etc. which are now under the umbrella of IMPRESS. Keeping in view the various strategic requirements, Specific Process improvement strategies are formulated (Fig. 5.2). Breakthrough process improvements requiring deployment in many product and functional areas are planned and prioritized at the top management level.

Fig 5.3 DTC process

For cost reduction, DTC is one of the key processes that enable breakthrough changes in existing designs, materials and processes. Breakthrough improvements through DTC are being deployed, reviewed and monitored at unit level through unit steering committee. The DTC process is illustrated in Fig. 5.3. The tools used to enhance breadth and depth of ideas generated during formal interaction with vendors, customers, consultants, experts in the process of DTC exercise is illustrated in Fig. 5.4. First transformer of 315 MVA rating, developed with DTC recommendations has rolled out for POWERGRID, a major customer. The savings accrued as result of DTC exercise in transformers, traction machines and electrical machines are given in Fig. 9.32a. Six sigma approach for cost reduction, cycle time reduction and quality improvement, is being implemented by adopting a handholding approach with Indian Statistical Institute both for breakthrough and incremental process improvements in all product and function areas. BHEL Bhopal
DTC Design to cost, DTC, rigorously identifies and captures step change cost improvements through cross functional application of data driven tools to achieve cost transparency. Achieved through Product content review and functional benchmarking Design optimization of technical solution for chosen functionality Product specific purchasing optimization

Fig. 5.4: DTC Process and Tools

Fig. 5.5: DMAIC approach for Six Sigma

follows DMAIC approach for Six Sigma projects (Fig. 5.5) and this year DFSS projects have also been piloted. So far, more than 130 six sigma projects have been completed and pools of 100 Black Belts and 80 Green Belts have been developed as a resource. The savings accrued as a result of six

sigma implementation are illustrated in Fig. 9.32c. LEAN approach (Fig. 5.6) has been adopted in SCR and Traction Division in 2007-08 and various process improvement ideas have been implemented. (Fig 5.6a) This has resulted in quantum financial gains and improvement in capacity enhancement, first pass non conformance, OTIF etc. (Fig 9.32b)
BHEL BHOPAL Application Document CII EXIM Bank Award For Business Excellence 2008 Page 5 - 3

Processes

WHAT IS LEAN?

30-50% higher production volume with


same assets delivery

THREE ASPECTS OF LEAN


Operating system maturity The way physical assets and resources are configured and optimised to create value and minimize system inhibitors Management infrastructure maturity The formal structures, processes and systems through which human and organisational resources are managed and optimised to achieve shared goals

Reduced cycle time for on-time Reduced cost Improved quality


What is lean Make what the customer wants Make only the required quantity Delivery when customer wants it Do only what adds value to the work Continuous Improvement

Operating system

Management infrastructure

Possible benefits to you


Step Change

Improved safety Less fire fighting Less rework More clarity on what to do

Mindsets & capabilities

Mindsets, capabilities and behaviour maturity


Time

The way people think, feel and conduct themselves in the workplace, both individually and collectively

Fig. 5.6: LEAN approach

RCA methodology is applied in line with documented procedure (WMI-0832) for resolution of recurring shop/ site problems, RCA committees exist in all product areas for identification of the root cause and implementation of corrective &approach preventive actions. Fig. 5.6: lean

Product Groups

No. of ideas (Cumulative)

Total DTC- Trfr -315 MVA 33 DTC Trfr-200 MVA 32 DTC - Electrical M/c 46 DTC - Traction M/c 19 Lean - Switchgear 49 Lean - Traction M/c 80 Fig. 5.6a: DTC/ LEAN ideas

A unique on-line system IMPRESS (Improvement Projects Reward Scheme) is available to all employees for registration, evaluation and reward of improvement project (Cr. 3c). Suggestion Scheme and Quality Circle activities provide platforms for personnel even at lowest level to participate and contribute in improvements (Fig. 7.5b). Employees are rewarded for participation and involvement in process improvements (Cr. 3c). Some examples of breakthrough/ incremental improvement are listed in Fig. 5.7. For effective utilization of existing manpower, Core-Non-core activities have been identified and noncore activities are being out-sourced (Cr. 3a). SAP HR has been implemented for synergising and integration of HR processes thus reaching out to employees on real time basis (Cr. 3b). The identified Process changes are presented to the appropriate apex forums for review, approval and subsequent deployment e.g. in case of DTC - unit steering committee, in case of Six Sigma concerned PM. New or modified process is initially piloted and trial runs are undertaken. The results of piloting are reviewed and compared with set objectives by the process owner. Some examples of piloting carried out are LEAN and DTC.
Breakthrough improvements examples Design development of 765 kv, 500 MVA Auto transformer Reduction in Recruitment Cycle Time of ETs from 8 to 3 months Boltless core in transformers (DTC) Step-lap construction of cores (DTC) Use of LP in CRGO cutting (DTC) Reduction of leakage during hydro testing of BF Valves Assembly (SS) To control Hole size in Tube plate of HP Heaters (SS) Reduction of Leakage in Radiator elements (SS) Development of optimized design of 12 kV switchgear for distribution switchgear (SS) Reduction in commutator ovality of TM 4907 traction motor (SS) Welding mechanisation increased from 38% to 47% Incremental Improvements examples
Indigenization of SMT based gate drive card for auxiliary

Target 07-08 23 23 43 19 44 64

Impl. 23 23 46 4 40 60

converter
Reduction in testing time of Insulating Kraft Paper Development of stick type master controller with snap switches for

diesel electric locomotive


Reduction in rejection of Piston Insulators in shop and by

customer
Energy efficient techno/ axle generator test unit Purification of 1200 ltrs waste lube oil for reusing in air

compressors
Site fabrication expanded from one site to four major sites. Issue of materials such as steel plates, welding electrodes to

ancillaries through BHEL Co-operative Society for maintaining uniform quality and cost effective buying.

Fig. 5.7: Examples of Breakthrough and Incremental improvement

BHEL BHOPAL

Application Document CII EXIM Bank Award For Business Excellence 2008

Page 5 - 4

Processes

The process changes are communicated through amendments/ revisions in various documents and or communication in various forums (Fig. 1.16). For HR and financial matters, circulars are uploaded on intranet. Important information is included in Sandesh -the in-house magazine. This has reflected in perceptible change in communication process (Fig. 7.1a). Changes in processes affecting customer are communicated by service bulletins through product service cells. Changes in processes affecting vendors are communicated through vendor meets and meetings with supplier representatives. Training needs for the process change are identified by process owner in consultation with HRDC. Such needs are translated into training programs by HRDC (Fig. 3.9, Fig. 3.10). For example:

Training on six sigma (180), DTC (24) and LEAN (18) Vendor assessor Training-More than 200 assessors trained by BVQI. All employees have been trained on QMS, EMS, OHSAS & MBE concepts. Lead assessors training on ISO 9001:2000, ISO: 17025, ISO 14001, OHSAS 18001. Training to 100% executives on eMAP. Products and services are designed and developed based on customer needs and expectations.

5c.

Engineering is one of the core strengths of BHEL, Bhopal. All the products of BHEL Bhopal are customer specific and are engineered, manufactured and delivered to meet customers needs and expectations. The customer requirements are determined through customer meets, pre-tender and post tender discussions, contract review, training programmes, workshops, visits, customer satisfaction survey etc. (Fig 5.11). The requirements are then translated in form of new/ upgraded products. The design control process (Fig. 5.8) as stipulated in EMI3650 is subjected to continuous improvements through established review mechanisms. The design input includes the customer requirements and the product benchmark parameters.
Contract Review Design Input Design & Dev Planning Design Output Design Verification Design Validation

Design Review

Fig. 5.8: Design process of new product

Based on triggers received from various sources, new products and process improvements related to the core strengths of the organisation i.e. engineering and manufacturing are deliberated and finalized in Product/ Technical Committee meetings (Cr. 4d). For design development of new products options of joint developments with established players, development through collaborative projects with institutes and/ or PIR route is adopted. PIRs and collaborative projects with leading institutions (Cr. 4a) result in design and development of new products and/ or improvement in efficiency, performance and reliability of products. This also results in capability building of design engineers. The PIR system (Cr. 4d) for futuristic technologies is an established system and PIRs are reviewed monthly at product, unit and corporate level. The improvement and new development of products and technology are also reviewed in MCM. In order to give thrust to R&D activities, engineering reviews chaired by ED are now held monthly. As a result of sustained focus, unit spent 2% of turnover on R&D efforts in 2007-08 and has plans to spend Rs 2.3 % of turnover in 2008-09. (Fig 9.43a, 9.44) The futuristic technologies are also adopted through joint developments with suppliers and customers. eg. Looking into the need of high voltage transmission and plans of major players in the transmission sector such as POWERGRID, joint development of 765kV products has been undertaken. Similarly, use of futuristic AC technologies in transportation sector has led to joint development of IGBT technology with M/S Struckton, Netherlands. Controlled Shunt Reactor was proactively designed in association with a Russian Professor in order to meet power sector requirement of quality power transfer under varying load conditions. POWERGRID, a major customer of Transformers installed it
BHEL BHOPAL Application Document CII EXIM Bank Award For Business Excellence 2008 Page 5 - 5

Processes

for commercial operations and the successful results have brought in more commercial orders e.g. recent order from MAHAGENCO for the same. Where the existing design and technology does not exist to fulfill the customer requirement, BHEL goes for partnership agreement (Cr 4a) with the organizations having required technology e.g. IGBT based 3 phase drive system for 7000 HP locomotives. Control unit of Auto Recloser with M/s JVS Bangalore. Senior executives of BHEL are proactively associated with customers e.g. ED Bhopal is a member of Diesel Locomotive Works (Indian Railways) co-ordination Committee. Coordination committee meets at DLW, Varanasi/ BHEL Bhopal every year in the month of April /May. CMD, BHEL is a permanent member in Central Board of Railway Research (CBRR), an apex body of Indian Railways which annually deliberates and prepares program for research for future needs of Indian Railways. Some of the new products introduced as a result of above approaches are: Design of 250MW Hydro Generator World class Oil rig alternators with minimum THF inhouse Wind Electric generator H- Compact motor - inhouse 400 MVA highest ever rating transformer for ADANI power - inhouse Development of 80 MVAr, 765 kV, Shunt reactor. futuristic technology - PIR Development of 500 MVA, 765 kV, Auto transformer - futuristic technology - PIR Hotel Load alternator for traction application, thereby resulting in additional revenue for Railways. TM4701 traction motor with reduced weight and universal application. Dual winding traction alternator TA6303AZ for ballast cleaning machine application New products are also developed in association with customers and suppliers for meeting the needs and expectations of the customer in form of JIPs e.g.

Compact Alternator mounted rectifier for DE Locomotives. Alternator specifically for Wartsila Diesel Engines for D G Sets. 3MW LT alternator with M/S Triveni for sugar industry.

Some examples of new technology development are: Development of linear programming software on ILOG platform for optimized core cutting for transformers (one of the outcome of DTC exercise). IGBT based hotel load inverter for train lighting, air conditioning, pantry and auxiliary services. Some examples of product quality and value enhancement are: Development of cast-fabricated components for hydro turbines such as BF valve, spherical valve Reduction in variation in feather height of guide vane (Six Sigma Project). Reduction in rework level of cylinder assembly of 24 PC EP contractor of Diesel Electric Locomotive (Six Sigma Project). Noise level reduction in Traction Alternator TA7003BX from 113 db to 101db (Six sigma project). Indoor metal clad switchgear for MSEB with environmental temperature of 50 degrees against international norm of 40 degrees C. Some examples of services developed based on customer requirements: Site support services to cater for round the clock service requirement of Railways in Mumbai Computer based training package on CD for common site problem for Motors and OLTC. Computer system package for transferring drawings to customer on internet. Onsite fabrication of hydro assemblies. Customers pose confidence in BHEL because of its engineering capability in field of design and development of products to suit their needs. The increase in repeat business (Fig 6.13) and customer retention (Fig 6.15) is a resultant of customer loyalty. (Fig 6.13) The effectiveness of new developments is measured through turnover from Commercialisation of New Products (Fig 9.43b) and filing of Patents/ Copyrights (Fig 9.45) which are also tracked and monitored as BSC objectives at Unit level, Product Manager and HOD level. Product improvement and developments are compiled as a booklet Engineering Highlights which was published annually at the unit from 2003 to 2006. Learning from this practice of BHEL Bhopal,
BHEL BHOPAL Application Document CII EXIM Bank Award For Business Excellence 2008 Page 5 - 6

Processes

engineering highlights are now compiled for all units and published at corporate level since 2007. As a sequel to review in plant engineering committee meeting the Engineering highlights are now captured every month and uploaded on intranet for wider dissemination and learnings. In order to improve the design process, Design Automation Initiative (Cr 4d) in all products has been taken up. The number of drawings generated through Autocad is increasing manifold over the years (Fig. 9.49b). PIRs worth Rs11.35Crs have been approved for holistic design automation and further PIRs worth Rs20.93Crs are under approval. 5d. Products and services are produced, delivered and serviced:

BHELs operations are organized in three Business sectors viz. Power, Industry and International. The range of new and proven products and services is communicated and marketed by these sectors where as the selling of products and a service is done by respective product commercial groups at Bhopal. Details and features of products are available on Corporate and Bhopal sites i.e. www.bhel.com and www.bhelbhopal.com respectively. The improvements in products and services are communicated through media, press meets, customer meets, seminars and in-house journals. The in-house journals of Bhopal and Corporate are regularly sent to customers. Other methods of communication to new/ potential customers and existing customers include participation in the exhibition/ seminars at national levels e.g. ELECRAMA, ELORAMA etc. Product Commercial groups at BHEL, Bhopal receive the customer orders from the respective marketing divisions and in turn issue internal work-orders to the concerned product groups. The design (Fig. 5.8) and production processes get initiated after issue of work orders. The process of production, delivery and servicing is illustrated below (Fig. 5.9).
Work Order (Specification of customer and requirement) Customer Shipping Commissioning/ Servicing by service cell if required Fig 5.9: Production, Delivery and servicing process Engineering group evolves design Conversion of design into manufacturing drawings, GES, MID, test instructions etc. and material procurement information Technology group evolves Manufacturing process

Manufacturing/ testing and inspection

Planning and Material procurement

Conversion of engineered design into products is also a core strength of the organization and the production process are designed to facilitate production of varied product mix. The production blocks at BHEL Bhopal are product specific for facilitating optimum manufacturing process. The production blocks house conventional and CNC machine tools. The conventional machines are being upgraded to NC/ CNC in a phased manner (Fig. 4.7). Augmentation and modernization of the manufacturing facilities are underway (Cr. 2c) for capacity enhancement, a CSF of BHEL, Bhopal. Quality Assurance Plan is prepared in agreement with customer, subsequent to completion of design process and prior to beginning of actual manufacturing of product. Given the uniqueness and complexity of products the customer is involved at all stages of manufacturing through Customer Hold Points (CHP). This participative approach not only provides excellent interface with customer but also gives them the insight into the intricacies of product enabling them responsible use of the product BSC and CRISP boards are used for display of manufacturing targets/ status on the shop floor at prominent locations. The day to day goals are communicated through the DWM process and the deviations in the day to day achievements are periodically analyzed and reviewed for corrective actions. The manufacturing processes are continuously improved upon with an aim to reduce rework/ rejections and improve cycle time. Six Sigma approach has been extensively applied and it has resulted in containing cost of rework/ rejection this year (Fig. 9.18, Fig. 9.19).
BHEL BHOPAL Application Document CII EXIM Bank Award For Business Excellence 2008 Page 5 - 7

Processes

The transportation requirements from BHEL Bhopal to site/ customer premises are specifically designed and multimodal (rail, road, sea and air) transport logistics are employed as the products are unique not only in terms of size, weight, volume etc. but also with regards to site requirements and site accessibility. Rate contracts are entered into with the logistics providers based upon their competence and fleet availability. In order to overcome handling and transport limitations of hydro products to remote sites and also enable cost reduction a unique approach of fabrication at site has been adopted. Timely and safe delivery of products is monitored and is one of the parameters of service providers as well. Based on the customer feedback on delays in transportation the entire despatch process was reviewed by a CFT in 2007 which identified the reasons and also suggested for a total revamp of terms and conditions of existing transport contracts. This was based on the study of current market realities, contracts of other companies such as L&T, Siemens and some FMCG companies, transporters needs and expectations etc. Accordingly, the changes wrt segmentation of loads, area of destination, size of consignments, detention charges, minimum distances, etc were incorporated in the rate contracts. This enabled not only in timely delivery but also same day lifting of consignments resulting in improved cash collection (Fig 9.26) and resultant cash surplus. (Fig 9.25) Product-wise service groups and regional service centres (Fig. 5.11) cater to service requirements of customers. In addition to this, the service centres are also located at customers works viz. service centres for Traction equipment are located at ICF Chennai, DLW Varanasi, Kolkata and Mumbai. BHEL also provides need based round the clock services through outsourcing to competent service providers e.g. the specific requirement of Central Railways for maintaining their un-interrupted EMU services at Mumbai has been outsourced. These service providers were initially associated with BHEL engineers at site and trained to operate independently. Similarly the requirements of transformers are handled through servicing at site. To improve customers knowledge on operations of our products and to address common service problems, Audio-visual CDs have been prepared for multimedia training to customers on common site problems of HT motors, OLTC, Switchgears etc. The services group receives after sales service requests either directly or through marketing and sales divisions. These service groups monitor number of complaints received, response time and resolution time for corrective actions and improvements (Fig. 6.11). Service data is collected and analysed by service cell and is discussed in DRC/ PQG meetings and is used in design improvements. The efforts initiated for service support has resulted in improved perception of customers over the years. (Fig 6.1a) Customer trainings (Fig. 6.12) and RLA studies are also organized on proactive basis. Erection and commissioning services are offered as part of contract. For Projects, three level networks are prepared at corporate level, unit level and department level respectively and are available on line through VPN. Technical and commercial closure issues are available on line and are also part of BSC objectives. Contract Management Group, CMG, and Project Management Group, PMG, enable resolution of inter unit and business sector interface leading to sequential deliveries and project management. Project review meetings for hydro and thermal projects are held monthly to review timely deliveries. The need of holistic project management was identified in Manthan 2007 which led to development of an on line system of customer specific project monitoring by a CFT led by GM Hydro. This system enables availability of on line status of despatches to all concerned divisions and erection agencies. The result of the structured approach is evident from the improved delivery performance by all product areas (Fig 6.5). Targets for improvement in timely completion index and sequential delivery index are set and monitored leading to improvement in delivery indices (Fig 6.6). This has resulted in improvement in customer perception on all parameters of delivery. Fig (6.1a) 5e. Customer relationships are managed and enhanced: The resolution Kadam Kadam Milana Hai, Grahak Safal Banana Hai of BHEL Bhopal is the driver of customer relationship management. A network of offices spread through-out the country further facilitates management of customer relationships. It helps in day to day contact with different customers situated far and wide (Fig. 5.10). Customer Relationships are managed and enhanced at BHEL, Bhopal through well defined processes (Fig. 5.11). Since the products are customer specific, the specific requirements are captured during pre and post contract reviews and customers are involved at all stages.
BHEL BHOPAL Application Document CII EXIM Bank Award For Business Excellence 2008 Page 5 - 8

Processes

Technical and service support through services group and designers visits to site, prompt complaint resolution and nonagenda visits of senior management to customer works are other measures for building customer trust.

Service cells carry out the trend analysis of complaints and the data is monitored and presented for remedial actions. For example the six sigma project on reduction in site complaints for switchgear & traction products have resulted in significant improvements. Many such focused approaches have resulted Fig. 5.10: BHEL office network in continuous downtrend and containment of critical complaints (Fig. 6.7). Business Sector, ROD meets, PC/ TC meetings enable in understanding general customer requirements, expectations, concerns etc. This results in joint improvement projects (Fig 9.21) and/ or partnership opportunities (Cr 4a). Strategic decisions for support to existing and potential customers also emerge in these meetings. e.g. supply of spares and R&M of non BHEL sets of thermal equipment, repair of ABB make traction motors for rehabilitation of imported locos etc. and repair of Non BHEL equipment through reverse engineering methodology. Customer relationships are also enhanced by fulfilling specific customer needs e.g vendors are jointly developed and approved for specific projects.
PROCESS Pre-Contract Review Pre-award meetings and discussions Post-Contract Review Contractexecution Review Routine interaction with Customer Resolution of Customer Complaints. Customer training Programmes, symposium Interaction with Business Sectors OBJECTIVE Capturing Customer needs and expectation Capturing Customer needs and expectation Understanding Customer needs & expectations Monitoring progress Determining day-to-day Customer requirement Redressal of Customer Complaints SPECIFIC TOOLS Pre-Contract Review (CMI:3305C) Pre-award meetings Post-Contract Review (CMI:3305C) Contract Review (CMI:3305C) Phone, Fax, Email, Web-Site, Customer visits, meetings Customer Complaint registration and handling system Customer training Programs/Seminar s/Symposium/ Plant Visits Business Sectors meets, Product Committee Meetings REVIEW MECHANISM Check-list as per DWI Review of Cust. Reqmts vis--vis offered Comments/Deviation Contract Review meetings & exchanges Periodical Check-list Monitoring Day-to-day review by Commercial Executives / Group Heads / HOD Commercial Customer Complaint analysis, Response Time & Resolution Time index Structured inputs on product attributes with interactive feed-back sessions Discussions & analysis OUTCOME Customer requirements against tender enquiries are noted, understood and informed to Engineering and others Customer requirements are proactively understood, discussed and clarified before Contract finalisation All Customer needs and expectations are fully understood and translated by all concerned Divisions. Progress of Contract is continuously monitored for meeting Customer expectations and customer updated. Day to day Customer requirements are catered through PSCM/SAS/IS/ISBG/ISG/RODs/IOD as front-end Customers (CMI:3001) as also by Product Commercial Group. Complaints/site feed-backs are registered, analysed and resolved. Response Time & Resolution time indices Complaints are graded on 10 point scale Structured Customer Training Programs (ref6b) Customer expectations are understood through targeted Symposiums Business Sector Meets cater to Customer Feedbacks in different market segments. Product/ Technical Committee Meetings for evolving mid-term & long-term strategies.

Service centres - 15 Major cities Service centres - Customer premises Regional operations division, ROD 18 cities Repair shops EMRP Mumbai & HERPVaranasi Power Sectors, PS 4 regions Industry sector, IS New Delhi International Operations Division, IO, New Delhi Customer offices in BHEL Bhopal premise

Interaction with Customer on product attributes, services, and new product s Interaction with frontend Customers (Business Sectors)

Fig 5.11 Customer Relationship Management

Structured system for capturing customer perception and improving the same has been in place since 2000. The External customer perception surveys were initiated on a pilot scale in 2000 for two products and have been extended to all products since 2003 with defined objectives. (Fig. 5.12) covered all products. The survey findings are presented to Top Management and all product groups and action plans for improvement are prepared in workshops facilitated by the consultant. Implementation of action plans (Fig 6.3) as a sequel to Customer Surveys has resulted in improvements in the customer perception index (Fig. 6.1a, b). Some of the actions completed as a sequel to surveys are illustrated (Fig. 5.13). Specific customer oriented web portals have been developed by product groups to provide product specific details e.g TPTN Division has a portal for
BHEL BHOPAL Application Document CII EXIM Bank Award For Business Excellence 2008 Page 5 - 9

Corporate Unit BSC Strategic Capital InvestmentPlan Divisional Plan Strategic Plan

Processes

easy access of service bulletins, maintenance manuals and also to register online feedback/ complaints.
Assess the needs, requirements and the expectations that In order to educate customers on use and customers of BHEL Bhopal have across product categories Assess the current satisfaction levels maintenance of equipment, structured training Determine the relative impact of these expectations on the programmes are planned on O & M aspects of overall customer satisfaction & loyalty products. (Fig 6.12) Major customers have been Identify the strength and weakness vis--vis competition Provide strategic directions for improvement in the critical provided fully equipped offices within the areas and identify leverage able opportunities premises to enable continuous association in all Calculate the CSI (Customer Satisfaction Index) To provide baseline for future monitoring stages. Complete transparency is maintained in Fig: 5.12 Objectives of Customer satisfaction survey manufacturing processes and these are open for audit by the customers e.g. Railways, POWERGRID and NTPC conduct regular audits. In addition to this, regular structured meets with customers like DLW, CLW, EMU & DEMU coordination meetings with Railways, meetings with NHPC, NTPC, POWERGRID, PSNR, PSER etc are held and feedback is utilized in improving products and services. The approach for managing and improving processes and customer relation management is reviewed and improved continuously (Fig 5.14) resulting into customer continued relationship with all major customers. (Fig 6.15)

Transformers Ensuring manufacturing status transparency through web based system. Prioritisation of manufacturing based on customer requirements. Weekly monitoring of completeness of dispatches. Online monitoring of drawings and documents submitted for customer approval. Improvement in customer co-ordination at site by training of contracted staff, deputation of expert service engineer and montly visit of senior officers.

Transportation Accurate forecast of by commercial department about month wise customer requirement. Advance material planning. Manufacturing scheduling to meet delivery commitments. Monitoring of assembly, testing and handing over on daily basis. Submission of 3D models of machines to customer for ensuring correct fitment in locomotive.

Electrical Machines Completion of on-going capacity augmentation plan. Policy for spares pricing and periodicity of review to be finalised in co-ordination with EMRP & SSBG. All major failures to be discussed in RCA/DRC and the action to be communicated to customer. System for expediting issue of WO to engineering and monitoring of dispatch.

Switchgear A customized comprehensive system in Nirantar software put in place for complaint recording, resolution, analysis and region wise categorisation. Latest drafting software are now being used to obtain quality output documents, i.e. project drawings and instruction manuals. Bar charts is being furnished to customers for close monitoring of all activities to bring transparency in status of manufacturing. Regular meetings are being held with customers for status review. A separate cell has been constituted in SCS to address the issue related to service after sales.

Hydro All customer correspondences are responded within 3 days. Only white prints (not ammonia prints) are sent to customer. Design review of all major assemblies are done. Contract review done before taking up design work.

Fig. 5.13: Actions completed as sequel to external customer survey: 2007

2001-2002 Process Mapping completed in EM, HG and TCB KPIs identified ISO 14001 certification CDs on Switchgears, OLTC and Motors System for Capturing Cost Of Quality put in place

2003-2005 System for CSMM put in place ISO 9001: 2000 & OHSAS 18001 certification KRA Library formulated from roles of various functions External Customer survey for all products BSC and eMAP for policy deployment

2005-2007 Design to Cost implemented Lean management Six sigma implemented BPR prior to ERP IMPRESS for all employees e-MAP refined

2007-08 DWM(daily works management) SAP HR Mentoring for engineer trainees Customer web portal Uniform production to meet delivery schedule.

Fig. 5.14: Improvements as sequel to A & R

BHEL BHOPAL

Application Document CII EXIM Bank Award For Business Excellence 2008

Page 5 - 10

Customer Results

6.

CUSTOMER RESULTS

6a. Perception measures: The slogan of BHEL, Bhopal (Cr. 1a) Kadam Kadam Milana Hai, Grahak Safal Banana Hai signifies the perception towards customer. Strict adherence to commitments and Ensure speed of response are values of BHEL. Major customers like Indian Railways, POWERGRID, NTPC, NHPC, PGCIL, SEBs, IOC, ONGC, Tata steel, Grasim, Ultratech, JP Cement etc. have been regular customers since their inception and have continued to remain loyal with BHEL in spite of liberalisation and presence of multinationals. The impressions of some of the valued customers as given below indicate BHEL Bhopals commitment to its philosophy of customers success. Project Manager CSEB, Korba in his letter dated 19.03.08 addressed to GM(EM) we are pleased to place on record the appreciation for the excellent job done by you in the concluding part of the financial year when the entire attention is on regular production. This effort has helped the people of Chattisgarh to overcome the power crisis in the coming summer months. Shri S.M. Bhardwaj, GM-DLW and his team has highly appreciated BHELs effort for remarkable improvement in supply position (98% on-time delivery) of traction machines in year 2007-08 and also resolution of technical points during the meeting with ED,BHEL, Bhopal and GM(TPTN & CET) held at DLW, Varanasi on 20-05-2008. Shri P. Krishna Rao, General Manager of ONGC in his letter dated 6th Feb08 to ED BHEL Bhopal acknowledged commendable site services provided by control equipment engineering of SCR group in trouble shooting of imported control system from National Oilwell Varco (NOV), USA. He has termed this as a mark of excellent quality services provided by BHEL. Perception of the customers is being captured both directly (customer survey) and indirectly (appreciations, repeat orders etc) (Cr 5e). External Customer Survey: External Customer Survey BHEL- Bhopal Index BM/2nd Best CSI was conducted first time Parameters 2000 2003 2005 2007 2000 2003 2005 2007 by external consultant in Price 47 38 57.6 66 57 38 64.2 60 2000-01 for Projects and Equipment Quality Transformer and Motor - Engineering & Manufacturing 67 67 68.4 71.6 72 74 67.7 74.5 products. Since then, - Equipment & System Performance 63 63 64.8 61.2 72 78 67.4 74.7 external surveys covering Delivery all products are being - Project Coord. & Mgmt. 56 56 64.7 71.7 63 70 67.3 77.9 - Erection & Commissioning 65 65 70.7 70.6 63 69 68.4 75.5 conducted every alternate - Delivery 54 54 63.1 66.3 67 71 63.7 76.4 year (Fig. 6.1a, Fig. 6.1b). Service after sales 49 55 62.0 62.0 64 65 58.6 74.5 The customers are CSI 55 63.6 68.9 65 63 65.8 76.4 selected and chosen for CSI Target 50 60 65 survey based on certain Fig. 6.1a: Customer Satisfaction index External survey parameters such as volume of business, criticality and potential of business etc. The results and feedback of the survey are showing encouraging trend. Product-wise follow-up workshops are held to understand the finer issues of outcome of survey. The areas for improvement are identified, prioritised; action plans are made and reviewed. Targets are set for improvement and validation is done through results of next survey and also through indirect indicators and measures (Cr. 6b). Customer Satisfaction Index (CSI) is arrived at by weightages given by customers to identified factors. Positive trend (Fig 6.1a, 6.1b) exceeding the set targets of CSI indicates effectiveness of actions taken as sequel to surveys e.g. inspite of intense competition in Switchgear, the product has reemerged as a benchmark product (it was benchmark product in 2003 survey also). The leading market share of switchgear (Fig. 9.12) corroborates the customer preference. 81% customers favour continuing the relationship with BHEL, Bhopal (Fig. 6.1c).
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 6 - 1

Customer Results

80 70 60 50 40 30 20 10 0 2000 2003 2005 2007

80 60 40 20 0 2000 2003 2005

80 70 60 50 40 30 20 10 0 2000 2003 2005 2007

2007

Hydro
80 70 60 50 40 30 20 10 0 2000 2003 2005 2007

Electrical machines

Transformer
Can not say 15% No response 3%

80 70 60 50 40 30 20 10 0 2000 2003 2005

No 1%

2007

Switch gear, control gear and rectifier


15000

Transportation

Yes 81%

Fig: 6.1b Product wise CSI 5000


0

10000

Act Tar

Fig. 6.1c: Customers view on continuing relationship with BHEL, Bhopal.

Action plan based on results of external survey: 95- 96- 97- 98- 99Based on the survey, the strengths and the opportunities for improvement are identified (Fig. 6.2) and product group-wise short & long term action plans for improvements are formulated.
Survey 2003 Strengths
Ordering /
96 97 98 99 2K

Survey 2005 Strengths Areas for Improvement Delivery Service after sales: Timely availability of spares. Quality of O & M manual. Project Management Price Strengths

Survey 2007 Manufacturingtesting , measuring facilities, in-house manufacturing Pre contract Technical Capability, Adherence to specification Areas for Improvement Performance & warranty-site maintenance trg., responsiveness. Service after Sales Price of service supervision, availability of old design spares

Technical tendering process capability Engineering and Reliability of Manufacturing equipment. Erection and Safety aspect commissioning of design. Leaders in the Confidence of Industry-BM in support beyond switchgear warranty products period. Ethical/ follow fair practices Fig. 6.2: Strengths & Opportunities for Improvement

Areas for Improvement Delivery Contract execution / project management Service After Sales

Internal Customer Survey: Prior to external surveys, internal customer surveys were conducted in 1998, 1999, 2001 and 2002. Perception was collected from business sectors, marketing divisions, sister units, regions and internal departments who were in direct contact with customers. Based on the findings of earlier survey of 2005, productwise actions needing attention were identified and actions taken (Cr. 5e). The product group wise implementation status of action plans is illustrated in Fig. 6.3. As a result, the CSI has improved in 2007 (Fig. 6.1a).
Group Hydro Traction Motors SWGR TRFR TOTAL Total Issues 10 19 10 20 10 69 Target 4 3 5 16 8 36

07-08
Implemented

08-09
In progress

4 3 5 16 8 36

6 16 5 4 2 32

Fig. 6.3: Implementation Status of Action plans) Application Document CII EXIM Bank Award for Business Excellence - 2008

BHEL, BHOPAL

Page 6 - 2

Customer Results

Other measures to get customer perception:


Through continuous interactions with resident customer representatives posted at the works. Through interaction during customer training programmes and formal and informal customer visits. 37 such training programmes were organised during last year which were attended by nearly 874 customer representatives (Fig. 6.12). Repeat orders/ new orders from new customers/ new business and appreciation (Fig. 6.4).
Electrical Machines Appreciation letter from Project Manager, CSEB, Korba for speedy repairing work of PA fan motor of 2x 250 MW power unit. Repeat orders from IOCL, power utilities, Bangladesh etc Order from Kosti, Sudan Hydro Turbine/Generator Order for 4 nos. of turbines of 130 MW each for Parbati Stage -3 project. Order for 5 nos. turbines of 30 MW each for Kalwakurthy Stage -3 project. Repeat orders for spare runners for Dehar, Rangit and Kopili projects. Switchgear & Control equipments Appreciation letter Surat Lignite customer, Ethoipa customer Repeat orders received for following power projects from same customers Parli, Paras, Kothagudam, Santaldih, Rayal Seem ,DVC Mejia,HEG Mandideep, Bellary Khaperkheda, Bhusawal. Performance certificate showing confidence in BHEL issued by IOCL for digital AVR. Repeat orders for AVR from HPGCL,IOCL , Large current rectifier from GACL, Oil rig controls from OIL India, Aux converter from CLW. Transformers New Orders from TATA Project Ltd. for 80 MVAr Shunt Reactor, from AHPCL Secunderabad for 12 X 35 MVA Generator Transformers Export Order from Azerbaizan for 2X 240 MVA ICT Order from Adani Power Ltd. for 2 no 400 MVA GT (highest ever rating ), 2 nos. 315 MVA ICT and 3 nos. 50 MVAr Shunt Reactor Repeat Order from APGENCO for 240 MVA GTand 31.5 MVA Station transformer, KPCL Bellary for 4 nos 207 MVA Generator Transformers and from CSEB Korba West for 250 MVA GT Transportation Appreciation letter from RITES for commissioning of cape gauge DEMU at CSM,Lubango, Angola Railways. Appreciation letter from chief of Senegal Railway delegation for customer training provided at DLW,Varanasi. Repeat orders from Indian Railways for 5 sets of Traction Equipment of High HP DEMU for J & K. 5 sets of Traction Electrics for DEMU and 11 sets of Traction Electrics for 2300 HP loco for Angolan Railways. Repeat order of 173 sets of electrics for 25 kV AC EMU for Indian Railways. Fig. 6.4: Examples of Repeat/ New orders, Customers appreciation received

Performance indicators: BHEL, Bhopal has put in place various internal performance indicators of Customer satisfaction for which the targets are set and monitored at product/ unit level. Product benchmarking The Product Bench- Marking data are maintained by respective Engineering Heads (Cr.4d) and are not in public domain e.g. based on Power generation capacity, head and RPM of hydro turbine, the efficiency of this equipment becomes the benchmark parameter. Similarly for transformer, iron loss, noise level and short circuit test etc are benchmarking parameters. This data confirms the benchmark status of BHEL products or near par status with best in class. Timely Delivery

Delivery performance: The data on delivery performance indicates positive trend over the years (Fig. 6.5). It is the ratio of No. of packages delivered on or before time to total no. of packages due for delivery.

BHEL, BHOPAL

Application Document CII EXIM Bank Award for Business Excellence - 2008

Page 6 - 3

Customer Results

Delivery performance of Transportation and Hydro groups has been 100% or more and there is marked improvement in case of Switchgear and Transformer products over the years. This has been possible due to thrust given on improvement of cycle time with help of Six Sigma projects and through timely completion and sequential delivery. Improvement in processes such as material procurement, engineering information and manufacturing information system has also contributed to improvement in delivery performance (Cr. 4e, Cr. 9b). Indices for Timely Completion, Sequential delivery and incomplete supply: Timely Completion is a measure of on time supply of each physical unit while sequential delivery is a measure of sequential delivery of each physical unit and is applicable in case of Hydro product only (Fig. 6.6a & 6.6b).

100 80 60 40 20 0
03-04 04-05 05-06 06-07 07-08 Hydro Act EM-Act TCB-Act SCR-Act TPTN-Act

Fig. 6.5: Delivery Performance (%)

Product/ Year

Timely Completion 07-08 0.02 0.06 0.17

03-04 04-05 05-06 06-07 EM 0.02 0.02 0.03 0.03 TCB 0.08 0.08 0.06 0.06 SCR 0.35 0.25 0.20 0.18 TPTN 100 % Delivery on Time Fig. 6.6a: Delivery indices-(lower the better) Sequential Delivery

Product/ Year

Timely Completion 06-07 0.020 07-08 0.018 03-04 0.052 04-05 0.069

03-04 04-05 05-06 Hydro 0.011 0.021 0.022 Fig. 6.6b: Delivery indices - (lower the better)

05-06 0.044

06-07 0.03

07-08 0.028

Complaints and complaint handling Trend of customer complaints:

The critical customer complaint data (Fig. 6.7) indicates robust performance of design and manufacturing processes. Involvement of customers at all stages (Cr. 5e, Fig. 5.11) and customer training on maintenance and upkeep of equipment etc has also helped in trouble free service of equipment. Numbers of customer focussed special initiatives have been taken to provide better After Sales Support (Fig. 6.8).

Service in a day for Railways to reduce downtime of Locomotives at Ghaziabad and Ajni. Subcontracting site support service to cater for round the clock (24x7) service requirement for Railways in Mumbai. Escorting transformers during transportation to site for continuous monitoring of Nitrogen pressure. Free service in many cases even after expiry of warranty period. Residual life assessment (RLA) and Conditioning Assessment (CA) of thermal power plants Enhancement of Life expectancy of transformer through planned visit. Outsourcing of service supports to experts developed by BHEL e.g. in case of SCR, Motors & TPTN.

Product 03-04 04-05 05-06 06-07 Hydro 2 2 1 2 EM 0 1 1 1 TCB 2 0 1 2 SCR 4 4 3 2 TPTN 2 0 2 0 Fig. 6.7: Critical Customer Complaints (nos.)

07-08 2 0 1 1 0

Fig. 6.8: Special Initiatives having customer focus

Failure Analysis of BHEL Bhopal make Transformers: Transformer is a star product of BHEL, Bhopal and massive investments are underway for capacity enhancement as the present capacity is totally booked and Customer orders for repeat and new business (reflecting customer confidence in the quality and service of the product) are to be adhered to. The failure vis--vis CIGRE norms and acceptance in Short Circuit tests at KEMA, Netherlands vis--vis KEMA records are a testimony to the preference of the customer (Fig. 6.9, Fig. 6.10).

BHEL, BHOPAL

Application Document CII EXIM Bank Award for Business Excellence - 2008

Page 6 - 4

Customer Results Percentage failure of Transformers in operation International Transformer Failure Rate-2% -CIGRE Report Percentage Failure of Generator Transformers in operation CIGRE Norms Failure Rate 3 % Fig. 6.9: Transformer Failure rates 03-04 0.3 0.59 04-05 0.11 0.37 05-06 0.18 0.71 06-07 0.25 0.30 07-08 0.2 0

BHEL-Bhopal sets the Benchmark In 2005-06, Out of 17 Transformers, 11 nos. passed in first go %age success - 64.5%. In 2006-07, Out of 18 Transformers, 11 nos. passed in first go %age success - 61.1%. 6 Transformers were tested for Short Circuit forces at KEMA Laboratory, Netherlands / CPRI Bangaore in 2007-08, 5 have passed the test based on the % impedance value. Success rate 83.3%. As per KEMA, 10 out of 36 transformers passed in first go. Hence %age success rate is 27.8% internationally. Fig. 6.10: SC Tests Acceptance Rate

After sales supportResponse time and resolution time: The data on average response time and resolution time (Fig. 6.11) shows substantial improvement. It is the result of several customer focussed initiatives. IT enablement of registration and response process has helped in reduction in response time.
Product/ Year Hydro EM TCB SCR 03-04 1.25 2 1.5 2 04-05 1 1.7 1.3 2 Response time 05-06 06-07 1 1 1.4 1.2 1.2 1.4 1.0 1.25 07-08 1.0 1.3 1.0 1.5 1.17 03-04 155 12 12 25 45 04-05 140 9.5 11 59 67 Resolution time 05-06 06-07 123 62 11 10 51 53 10 8 48 41 07-08 58 10 8 70 40

3.6 3.3 2.0 1.9 TPTN Fig. 6.11 Average response and resolution time (no. of days)

Training programmes for customers: Training programmes are organised regularly on proactive basis for Product Nos. giving inputs on use and Trg. programmes EM maintenance of equipment to the Persons trained customer (Fig. 6.12). Training Trg. programmes TCB Persons trained imparted to Senegal Railway Trg. programmes delegation for traction products and SCR Persons trained PGCIL engineers for TCB products Trg. programmes TPTN were highly appreciated by the Persons trained customer. Training material is now Hydro Trg. programmes made available in electronic media Persons trained to all participants. Fig. 6.12 Customer training Customer loyalty Repeat business and new business:

03-04 3 96 3 85 5 150 4 60 2 23

04-05 3 86 5 98 5 135 5 60 1 22

05-06 4 125 4 72 6 155 9 65 1 9

06-07 4 120 1 15 10 201 4 107 6 90

07-08 6 187 6 150 14 240. 10 250 1 47

Repeat Business (Fig. 6.13) is defined as business obtained from those customers who go for expansion or have recurring requirements for previously ordered product(s). Business obtained from new customer and/ or existing customer, for the product previously not ordered on BHEL is taken as New Business(Fig. 6.14). BHEL Bhopal, has been able to continuously capture additional business by adopting strategy of flexible pricing. Groups have secured repeat orders due to quality of the products and prompt After Sales Service. The groups have been able to capture new orders due to proactive marketing efforts and due to the trust of the customer in engineering capability of BHEL, Bhopal.
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 6 - 5

Corporate Unit BSC Strategic Capital InvestmentPlan Divisional Plan Strategic Plan

Customer Results

The repeat and new business has been given for TCB products in physical terms as the current prices of these products are much lower and not comparable to earlier years due to cut-throat competition in this field. There is increase in both Repeat business and new business in most of the products as compared to last year.
4500 4000 3500 3000 2500 2000 1500 1000 500 0 03-04 04-05
51000

46000 41000 36000 31000 26000

Act

Tar

12000 10000 8000 6000 4000 2000 0 03-04 04-05 05-06 06-07 07-08

Act

Tar

Act

Tar

21000 16000 11000

05-06

06-07

07-08

6000 03-04 04-05 05-06 06-07 07-08

Hydro
40000 35000 30000 25000 20000 15000 10000 5000 0 03-04 04-05

Electrical machines

Transformer in MVA

60000 50000 40000 30000

Act

Tar

20000 10000 0

Act

Tar

05-06

06-07

07-08

03-04

04-05

05-06

06-07

07-08

Switch gear, control gear and rectifier Fig: 6.13 Product wise Repeat Business in Rs. Lakhs
15000 10000 5000 140000
120000 100000 80000 60000 40000 20000 0 03-04 04-05 05-06 06-07 07-08

Transportation

Act Tar

Act
95- 96- 97- 98- 99Tar 96 97 98 99 2K

8000 7000 6000 5000 4000 3000 2000 1000 0 03-04

Act Tar

3500 3000 2500 2000 1500 1000 500 0

Act Tar

04-05

05-06

06-07

07-08

03-04

04-05

05-06

06-07

07-08

Hydro
15000 13000 11000 9000 7000 5000 3000 1000 03-04 04-05 05-06 06-07 07-08

Electrical machines
14000

2500 2000 1500

Transformer in MVAAct

Tar.

Act Tar

12000 10000 8000 6000 4000 2000 0 03-04

Act

Tar

1000 500 0

01-02

02-03

03-04

04-05

05-06

06-07

07-08

Switch gear, control gear and rectifier Transportation 15000 Fig: 6.14 Product wise New Business in Rs. Lakhs
10000 Act Tar 5000 Customer retention, duration of relationship 0 & effective recommendations 95- 96- 97- 98- 9996 97 98 99 2K

Customer Railways

Products

Customer loyalty is also reflected through retention of all major customers (Fig 6.15) eg. Indian Railways, NTPC, POWERGRID, ACC, Jaypee are major customer since their inception. Trust of customers is reflected through effective recommendation by customers eg. NTPC Hydro business reflected its trust BHEL Bhopal by placing orders for its maiden venture based on its experience of products for thermal stations.
BHEL, BHOPAL

Traction machines, control gear Transformers, motors, switchgear, NTPC >30 Hydro equipment Powergrid Transformers, switchgear >15 NHPC Hydro equipment >30 SEBs Transformers, switchgear >40 ACC Motors >40 Grasim Motors >15 Jaypee Motors >15 Fig. 6.15: Customer retention & duration of relationship

Duration of relationship (Yrs) >45

Application Document CII EXIM Bank Award for Business Excellence - 2008

Page 6 - 6

People Results

7. PEOPLE RESULTS 7a. Perception measures: A system is in place to capture feedback of employees through employee perception survey which are conducted regularly (Cr 3a). The segmented results are presented in Fig 7.1a.
Average Merit Score (AMS) Parameters Working Environment. Communication Tar. setting & Appraisal Training and Retraining Career Dev. Reward & Recognition 0203 5.67 5.98 5.67 4.93 5.14 5.34 0304 6.60 6.69 6.44 5.70 5.44 6.19 Executives 040505 06 5.41 5.06 6.19 6.35 5.12 5.26 5.17 5.55 5.46 5.70 5.74 5.91 0708 5.72 6.74 5.74 5.24 6.35 5.42 0203 5.56 5.55 5.65 5.02 5.10 5.41 Supervisors 03040504 05 06 6.06 6.77 6.69 5.79 7.04 6.69 5.69 6.87 6.76 5.36 6.69 6.40 5.19 7.08 6.57 5.26 6.9 6.43 0708 6.7 6.72 6.59 6.77 6.46 6.39 0203 5.08 5.39 5.56 4.95 4.89 5.12 0304 5.99 5.58 5.53 3.35 5.00 5.33 Others 0405 5.67 5.67 5.53 5.24 5.7 5.84 0506 6.11 6.36 6.54 6.23 6.56 6.17 0708 6.12 6.4 6.62 6.5 6.21 6.22

As a result of planned efforts, there has Average Merit Score (AMS)- Overall Parameters been an overall improvement in average 02-03 03-04 04-05 05-06 07-08 satisfaction index. Working Working Environment 5.25 6.22 5.95 6.13 6.18 Environment, Target Setting & Communication 5.51 6.02 6.30 6.55 6.62 Appraisal, Training & Retraining and Target setting & Appraisal 5.59 5.89 5.84 6.18 6.32 Rewards & Recognition were taken as Training and Retraining 4.96 4.80 5.70 6.06 6.17 area of improvement, based on 2005-06 Career Development 4.96 5.21 6.08 6.27 6.34 survey results. Communication, being Reward and Recognition 5.20 5.59 6.16 6.17 6.01 considered as a very important process Avg. Satisfaction Index 5.17 5.71 6.01 6.22 6.27 for improving employee morale, has Target 5.5 5.8 6.0 6.2 been kept as an area for focussed Fig 7.1a : Analysis of survey response improvement. The survey of 2007-08 shows improvement in all the six identified areas compared to the last measurement. The actions planned as sequel to 2007-08 survey are illustrated in Fig. 7.1b.
Improvement in work environment - Upgradation of annexes and work places, improving aesthetics and up-gradation of public utilities, centralisation of functions like all HR services at one place, modernisation of canteens, Training & Re-training - Competency based training both on functional & managerial competency, multiskilling of inductee artisans in addition to regular employees, knowledge worker training, adventure based outbound module for Sr. DGMs & AGMs, sponsoring employees for technical training & seminars, Personality Development and English spoken courses for employees. Target Setting & Appraisal - Balance Scorecard concept extended to sectional head level, identification of developmental needs, BSC evaluation method reviewed and modified, behavioural traits rating introduced Reward & Recognition Reward Scheme for individual and group excellence, BHEL IPR incentive Scheme, Differential performance payment introduced, Re-designation of supervisors, Reduction in eligibility period of promotions, Ad-hoc payments, linking PP payment with BSC, Impress Scheme, recognising efforts through display of photographs on CRISP Board, Communication - Employee centric information alert messages through SMS/email in addition to access through Intranet, E mail & internet facility to all executives, PCs for all executives, Mobile provided to executives, CRISP Boards, MECOM etc. Fig. 7.1b: Actions taken as sequel to survey, feedback and FGDs

Leadership Effectiveness Survey (LES) is conducted periodically to provide feedback to Top Management on Leadership style (Cr. 1a). The results of recent survey show an improvement over the previous year (Fig. 7.1c).

Year % Respondents Score 2005 13.84 6.98 2007 18.16 7.11 Fig. 7.1c: Leadership Effectiveness Survey

BHEL is included in benchmark studies conducted independently by Business Magazines. The results (Fig. 7.2) indicate show the high recognition levels.
Recognised as Star PSU Company 3rd best company (infrastructural group) 7th Best Employer (Nation wide survey representing all sectors) Fig. 7.2: Benchmark study conducted by business magazines Study Source Business Standard (March 2007) Business World (5th June 06) Business Today & Hewitt Associates (Business Today 5th March 02)

BHEL, BHOPAL

Application Document CII EXIM Bank Award for Business Excellence - 2008

Page 7 - 1

People Results

In addition to the regular perception surveys, a dipstick survey has been done on major HR initiatives undertaken in recent times. The results show a high level of satisfaction on the initiatives taken. Based on this survey segmented analysis has been done and opportunities for improvements identified.
Parameters- workers Period of DR/CW service Increase in reward amount Interest subsidy on car loan Increase in amount of PP & SIP Increase in group insurance amount Increase in amount of new year gift Increase in amount of gift cheque % 97 99 98 98 98 98 95 Parameters Supervisors Re-designation Weightage in promotions Reduction in period of absorption Interest subsidy on car loan Increase in amount of PP &SIP Increase in reward amount Increase in amount of new year gift Increase in group insurance amount Increase in amount of gift cheque % 95 77 71 96 72 86 85 89 87 84.22 Parameters Executives Magazine allowance BHEL IPR incentive scheme Differential & Higher PP &SIP mobile facility Clubbing of telephone charges Mentoring scheme for ETs Increase in amount of new year gift Increase in group insurance amount Increase in amount of gift % 92 94 87 77 77 94 66 97 88 86

SATISFACTION LEVEL 97.57 Fig 7.3 : Dipstick survey ( % satisfaction)

7b. Performance indicators: Levels of Training and Development: The need for training and development is identified through a well established process (Cr. 3b).
11 6 1
Target Actual

12 10 8 6 4

03-04 1.6 1.83

04-05 2.4 3.23

05-06 3 3.63

06-07 3.2 3.86

07-08 7 8.95

2 0 Upto 03-04 4.32 Upto 04-05 4.96 Upto 05-06 5.26 Upto 06-07 6.82 Upto 07-08 11.17

Fig. 7.3a: Training mandays/ employee

Fig. 7.3b: Multiskilling - Cumulative TMD/ Employee

Training & Development has also been identified as an area for improvement as sequel to employee perception survey of previous years. (Fig 7.3a) Ambitious targets were set for 07-08 and these have also been exceeded as a result of focussed training on new initiatives such as DTC, LEAN, multiskilling etc. The cumulative training mandays for multiskiling is showing an increasing trend over the years (Fig. 7.3b). The Knowledge Worker program has brought the 165 classroom teaching to workplace since 2005-06. Till now 4322 workers/ supervisors have participated in the 115 programs and all the work centres have been covered. 65 All employees are trained on MBE, ISO 9001 and 15 03-04 04-05 05-06 06-07 07-08 OHSAS. These efforts have resulted in continuous 40 34 45 54 114 improvement of scores on training and retraining in Fig. 7.3c: Nos. of Employees sent abroad for training employee perception. Employees are regularly sent abroad to learn and absorb Year 03-04 04-05 05-06 06-07 07-08 new skills and knowledge for keeping abreast with latest Bud. 30 35 35 50 55.66 technology (Fig. 7.3c). The entire data (segmented division wise, category wise etc.) related to training is Act 24.75 25.12 46.39 54.56 56.65 available on intranet. This year 224 employees were Fig. 7.3d: Training investments (Rs. Lakhs) deputed for specialised training to various programmes in institutes spread across the country. Special programmes are organised for focused groups for eg. training on life planning for workers and supervisors (05 Programme covering 434 employees) were organised this year. The programmes aimed at preparing employees for leading a better life post retirement. They were trained on management of retirement benefits for sustained income. Training investments in BHEL Bhopal has been increasing over the years as a result of focus on training and development (Fig. 7.3d) and technology absorption and/or training for operations and maintenance of plant and equipment procured for capacity enhancement, a CSF of the unit.
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 7 - 2

People Results

Recognition of Individuals and Teams: Employees of BHEL Bhopal are motivated for developing their skills and improving their performance. They are encouraged to participate in all India / state level awards. The recognition by Government of India (Fig 7.4a) and State Government not only brings pride to the company but also speaks of the effort put in by the organisation.
Award Padam Shri - Shri B L Chouksey Best Disabled Employee - Lt. Shri R C parakh Prime Ministers Shram Veer Award - Shri B L Dhruv and Shri S K Soni Shram Shree Award - R K Tripathi Vishwakarma Rashtriya Award - Shri Jitendra Singh Uttam Shramik Award - Shri V.K. Pagare Fig. 7.4a: National Awards won by employees Year 2005 2005 2004-05 2005 2006 2004-05
4000 3000 2000 1000 0

2003 753

2004 13 2 5

2005 2 12 4

2006 3030

2007 3 73 0

Fig. 7.4b: Persons awarded as Swasth Karmchari (Cumm.)

Employee suggestions are invited and based on their merit suggestions are implemented and rewarded. The Suggestion Scheme has been awarded 2nd Prize under INSAAN award for excellence in year 2004-05. The saving accrued through suggestions is illustrated in Fig. 9.39a. Swasth Karamchari Samman was instituted for creating awareness towards healthy living by rewarding employees on predefined criteria. (Fig. 7.4b) Involvement in improvement programmes: Impress projects are taken up every year since 2004-05 (Fig. 9.39b). 534 projects have been registered in 2007-08 and preevaluation award of Rs. 48500 has been given to 485 projects and Rs. 59000 has been awarded to 24 projects, which led to the accrued savings of Rs. 48.18 crores.
500 400 300 200 100 0 No. of executives involved No. of PIPs 03-04 214 177 04-05 322 248 05-06 278 174 06-07 299 188 07-08 414 138

Fig 7.5a: PIPs

Productivity Improvement Projects(Fig. 7.5a) are 03-04 04-05 05-06 06-07 Year Nos Of QCs 148 152 169 171 identified every year by all the product/ function No Of individuals 1282 1352 1502 1515 groups along with envisaged tangible and intangible benefits. Instead of going in for higher number of Prizes (Rs. Lakhs) 1.41 1.83 2.2 2.46 projects, emphasis is laid on selecting projects Fig. 7.5b: Quality Circles focussed on higher savings. Since most of the projects are getting registered in the Impress scheme, PIPs have decreased since 2005-06.

07-08

179 1582 2.46

Quality Circles The QC concept was pioneered by BHEL in the country in early eighties. The movement has taken deep roots with the commitment and involvement of top management (Fig 7.5b, Fig 7.5c). The data for saving accrued through quality circle projects are given in Fig. 9.39a. A unique feature of quality circle movement in the unit is the creation and active participation of a large number of circles from Functional areas, Medical group and also from Town Administration, Canteen, Publicity department, Finance department etc.
2007-08 Quality Circle No. 541 of Pathology department and Quality Circle No. 125 of PRM department participated in National Convention of Quality Circles of QCFI held at Kolkata from 26th to 30th Dec.07. Both were placed in Distinguished category. Quality Circle no. 236 of SCR, Quality Circle no. 12 of TAD and Quality Circle No. 14 of TRM participated in Regional Quality Circle Convention of CII organised at Bhopal on 26th Oct.07. Quality Circle no 236 of SCR won second prize in the convention. 2006-07 Quality Circle No. 88 of FBM was placed in Excellent category, Quality Circle No.236 of SCR , Quality Circle No. 12 of TAD and Quality Circle No. 260 of SCR were placed in Distinguished category, while Quality Circle No. 524 of QC-TCB and Quality Circle No. 601 of Fin. were placed in Meritorious category in the National Convention of Quality Circle Forum of India (QCFI) Quality Circle No. 541 of Pathology department was declared winner in Support Services category in Quality Circle Convention organized by Bhopal Chapter of CII. Fig 7.5c: Achievements of Quality Circles BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 7 - 3

People Results

Grievances: A structured procedure exists for receipt and disposal of grievances. The number of grievances in terms of numbers per employee is quite insignificant. A major feature of this system has been hundred percent redressal of grievances raised and the nature of grievances relate to very few areas such as re20000 designation and promotion which are governed by well 10000 defined norms. Accident levels: There has been no fatal incident in the 0 03-04 04-05 05-06 06-07 07-08 last five years and there is a continuous decline in no. of 355 373 423 547 652 Canteen reportable accidents (Fig. 7.7). Overall there is increased 3562 3289 4756 5086 5333 Medical facilities awareness and involvement of people in safety related 1662 2109 2897 4074 4279 Township, Education, Social, Transport. issues through health and safety awareness programmes, periodic safety audits by respective departments, quarterly Fig. 7.6: Grievances in nos. audits by safety department and planned training on safety related aspects (Cr. 3e). 80 Employee turnover: The negligible number of employees 60 (Fig 7.8) resigning from BHEL, Bhopal indicates excellent 40 level of people satisfaction (Cr. 7a) and the care of 20 0 employees taken by the organisation. The exit interviews 03-04 04-05 05-06 06-07 07-08 indicate that in most of the cases, the individuals have left 0 0 0 0 0 Fatal the organisation on personal grounds. Even though a few 16 4 5 3 1 Reportable more employees have resigned in recent years but it is not 36 59 48 45 49 Minor an area of concern as the percentage of employee 52 63 53 48 50 Total resigned is still negligible and the skill is retained. Fig. 7.7: Accidents in Nos. In 2007 BHEL introduced the re-employment scheme for those of its executives who resigned from BHEL. This was done in view of the requests made by many ex-employees to join back the BHEL fold. The Scheme found a big success with more than 100 ex-employees applying to join BHEL again. The applications are being processed and individuals are being invited for interview. These applicants included employees at ET level who had resigned very recently and employees who had resigned 10-12 years back. This demonstrates their affinity towards BHEL. Expenditure on welfare: Besides pay and perks, BHEL, Bhopal extends various other benefits and incentives to its employees such as crche, LTC, Group insurance, Interest subsidies (housing and vehicle), Holiday Homes etc. The data on welfare expenditure indicates managements approach towards employees welfare(Fig.7.9). The expenditure on welfare measures is a benchmark as compared to other units (Fig. 8.4). Bipartite Fora: Regular structured meetings are organized with various employee representatives and associations e.g. 22 shop councils from various departments meet monthly to discuss and resolve the quality, productivity & safety issues. Data on bipartite fora for year 2006-07 is given (Fig. 7.10). *Presently there is hold on conduct of structured meetings as the issue of representation of employee representation is sub-judice. However
BHEL, BHOPAL
50

03-04 7

04-05 10

05-06 13

06-07 27

07-08 17

Fig. 7.8: Employee turnover (in nos.)

20000 10000 0
Canteen Medical facilities Township, Education, Social, Transport. 03-04 355 3562 1662 04-05 373 3289 2109 05-06 423 4756 2897 06-07 547 5086 4074 07-08 652 5333 4279

Fig 7.9: Welfare Expenditure (Rs./Employee/month) Bipartite fora Plant council Employee representatives Medical advisory com. PF Trust com. Grievance com. Canteen mgmt. com. Total Fig. 7.10: Bipartite fora No. of meetings Held Held Scheduled (06-07) (07-08) 04 09 *01 28 70 49 02 01 * Need based 04 03 Need based 03 * 04 01 * 38 107

Application Document CII EXIM Bank Award for Business Excellence - 2008

Page 7 - 4

Corporate Unit BSC Strategic Capital InvestmentPlan Divisional Plan Strategic Plan

People Results

unstructured meetings are being held with the employee representatives. More than 400 unstructured interaction/meetings were held with employee representatives. 49 structured meetings were held with the employee representatives on issues of PP/SIP/ selection of New Year gift, uniform items, sharing of performance results.

Level 2006 Workers 215 Supervisors 74 Executives 03 Fig 7.11 Recruitment

2007 430 120 175

Recruitment trends: Induction has been done at all levels during last two years as per HR plans. The trends are illustrated in Fig 7.11 Strikes: The participative management approach has enabled healthier industrial relations and not even a single man day has been lost (due to strike) during last 20 years. Job Rotation: Keeping in mind the organisational needs and orientation and expectations of employees, job rotation is used as a developmental tool. Data on job rotation indicates units approach towards employee development. (Fig 7.12)
300 250 200 150

Employee productivity personnel administration:

and

accuracy

of

100 50 0

2005-06 2006-07 2007-08 Value added per employee, a measure of employee June'08) productivity; indicate an increasing trend over the 49 23 86 16 Worker years (Fig. 9.22). This has been possible due to 13 14 48 7 Supervisor prudent HR policies and financial strategies. 68 67 132 68 Executive HR processes and data are online thus enabling 130 104 266 91 Total Issue of circulars, promotion orders, processing and Fig. 7.12. Job rotation (Nos.) disbursement of personnel payments/ loans/ advances etc. on the stipulated day/ date. Modules of SAP HR relating to various HR processes have been implemented and the processes having a pay roll interface are under implementation.

08-09 (till

Employee Care: Many new benefits and incentive schemes have been introduced for the welfare of not only serving but retired employees as well (Cr. 3e). Data on PP and SIP payments shows that variable component of package is being increased and is made differential to meet the expectations of various cadres of employees. (Fig. 7.13a & 7.13b) All perks and incentive related issues of retired employees are addressed at single window cell. Life long free medical facility is provided to retired employees along with their spouses on nominal charges. This year an old age home nandam has been established for retired employees. Increase in welfare expenditure and improvement in employee satisfaction over the years are some of the indicators of employee care. The employee care issues are regularly reviewed with employees representatives both at Corporate and Unit level resulting into new/revised employee welfare measures for eg. the amount of group insurance has been revised upwards by 20 times without any change in employee part of premium.
40000 30000 20000 10000 0

40000 30000 20000 10000 0

2003-04 2004-05 2005-06 2006-07 2007-08 Worker Supervisor Executive 9148 9148 9148 9669 9669 9669 13952 13952 13952 18635 22067 28442 22000 24500 35000

2003-04 Worker Supervisor Executive 8000 8000 8000

2004-05 10000 10000 10000

2005-06 15000 15000 17000

2006-07 20000 23500 30000

Fig. 7.13a BHEL, BHOPAL

PP Payments

Fig. 7.13b SIP Payments Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 7 - 5

Society Results

8.

SOCIETY RESULTS

8a. Perception measures: BHEL, Bhopal is committed to CSR and has discharged its social responsibility as a worthy corporate citizen since its inception. This is evident from the observations, statements and the remarks of various eminent social personalities and the reports and articles as they appear in media-both print and electronic.

Shri S.N. Dash, Secretary, Ministry of Heavy Industries, GOI BHEL is capable enough to meet the ambitious power generation programme of the Govt. of India during present and coming five years plans. Country is proud of Navratna company BHEL which has played a crucial role in the development and growth of the country. People in the country have high expectations from BHEL and expert team of BHEL would definitely meet peoples expectations Shri Santosh Mohan Dev on the occasion of Golden jubilee of the unit said that BHEL is a national treasure and a jewel in the crown of DHI. BHEL has paved the way for establishment of a modern electro- technical Industry in the country. Setting up of this mother plant at Bhopal showed the path towards developing an integrated heavy electrical equipment capability, which very few countries in the world possess. Smt. Kanti Singh, Hon Minister of State for Heavy Industries, GOI, BHEL is a role model for other PSUs. Hon. Labour Minister of M.P., Shri Diwan Chandra Bhan Singh-BHEL efforts towards environment, safety and occupational health is a model for industries.

Society survey: Structured surveys are carried out every alternate year to capture the perception of society. It is also obtained through interaction with officials and through press releases in local press. Structured society survey (Fig. 8.1) helps the unit to understand the expectations of society, impact of operations of BHEL, Bhopal on community and the impact of efforts made by the unit for larger socioeconomic causes. Formal society perception survey is conducted regularly. The questionnaire contains 41 questions on 5 important areas of impact. The survey covers respondents from various walks of life, viz. government officials, principals of schools and colleges, office bearers of cultural associations, officials of professional bodies, gram panchayats etc. The surveys were conducted annually till 2003-04. The frequency was reviewed subsequently and thereafter it was decided to conduct the surveys once in two years. The Average Merit Score is above the targeted level of 8.5 since 2003-04 which indicates very high satisfaction levels. Many suggestions were received during capturing of perception and have been implemented (Fig. 8.3). The unit spends highest amount towards social welfare as compared to other sister units. Also with a view to capture perception of family members of employees of BHEL, Bhopal living in the township, a survey was conducted in 2005 by M G School of Communication Management, New Delhi in which 774 persons responded. The results indicate very good level of satisfaction (Fig. 8.2).
Area of Impact Performance as a responsible corporate citizen Involvement in the community Effect of operations on environment and society Preservation and sustainability of resources Accolades and awards Average Index Average Merit Score (Max.-10) 02-03 03-04 05-06 07-08 7.36 6.98 7.15 8.08 8.57 7.43 8.77 8.63 8.57 9.03 8.97 8.59 8.82 8.34 8.32 8.66 9.16 8.66 8.62 8.56 8.58 8.61 8.84 8.60 8.5 Area of Impact Satisfied with time spent with Family Free from Mental Stress Satisfied with the Salary Satisfaction with Bonus Satisfied with Promotion Satisfied with Career Development Satisfaction with Medical Facilities Respectability with Society while working with BHEL Average Index (Out of 100) Fig. 8.2: Results of Perception Survey of Family Members of Employees of BHEL, BHOPAL Index 87.00 76.70 86.00 82.10 76.70 62.40 73.00 93.50 79.68

Target 8.5 8.5 Fig. 8.1: Results of Society Perception Survey

Right to Information Act: The organization is committed to promote transparency and under Right to Information Act, a CPIO has been appointed to deal with the information requested by general public. More than 250 cases have been received since 2005-06 and Information in all cases has been provided within 30 days.

BHEL, BHOPAL

Application Document CII EXIM Bank Award for Business Excellence - 2008

Page 8 - 1

Society Results

Setting up of Anandam- an old age home for senior citizens. Re-metalling of roads Waste water treatment through root zone Check dams for water conservation Mass Plantation Drives to maintain the greenery. Health Related Awareness Programmes. Provision of allotment of community hall and gardens to general public for marriage, picnic, party etc. Opening up of Kasturba hospital for general public-as there are no govt. hospitals in the area. Shifting of slums located near hazardous Gas Plant area, 1250 shanties located near Gas Plant area have been shifted to Bag Sevania and Shiv Nagar Locality and their complete rehabilitation taken care of.

Fig. 8.3: Suggestions implemented as sequel to surveys

8b. Performance Indicators: BHEL, Bhopal has taken several initiatives in Units 03-04 04-05 05-06 06-07 adopted villages under social welfare under CSR BHEL - Bhopal 5579 5557 7486 8754 (library, scholarships, educational tours, uniform for students, tube-wells, furniture, medical camps, BHEL - Trichy 5524 3911 4424 5537 vocational courses and repair of schools in schools BHEL - Hyderabad 4028 3877 4936 5346 of adopted villages) and Environmental BHEL - Hardwar 3779 3923 4955 6064 Improvement Projects inside and around the factory Fig. 8.4: Expenditure on Welfare measures (in Rs. Lacs) (rain water harvesting, water conservation, energy savings systems, resource conservation, wireless fire protection warning system and massive tree plantation) . There is provision of spending 0.2% of PAT on CSR initiatives. BHEL, Bhopal incurs substantially more expenditure on welfare measures as compared to other major sister units (Fig 8.4). The same is also increasing over the years. In 2007-2008, there were more than 1000 press-releases related to the unit in all the leading newspapers (more than 15 newspapers) published in this region, which indicates a positive impact of BHEL, Bhopal in and around the township. The unit follows all statutory and regulatory requirements of central, state and local bodies. There is not even a single case of violation with respect to certification, clearance, import, export etc. The measures taken by BHEL, Bhopal for improving the satisfaction of the society are as follows (Fig 8.5, 8.6, 8.7a).

Support for charity, welfare, Education, Training and Leisure:


Loomba Trust Scholarship scheme where by 100 students of widows were provided scholarship worth Rs 500 P.M. Specialized training imparted to unemployed youth in the fields of Tie & Die (women) and NDT (employees wards), Jardoji (women),

Beauticians course (women) etc. to promote self employment.


BHECNIS arranges lectures by eminent personalities every year of the interest to society e.g. lectures delivered by Swami Sukhbodhanand on

Stress Management and Mr. Rajendra Singh (Magsaysay award winner) on conservation of water.
BHEL has provided land for rehabilitation of 1250 shanties with water, sewage system & constructed roads. Sports arena of 64.62 Acres with flood lights and well equipped athletic track and provisions for Indoor and Outdoor games such as

Badminton, Tennis, Squash, Hockey, Football, Cricket, Basketball and Golf etc.
National Billiards and Snooker Selection Tournament for Asian Games 2006 held at BHEL Senior Club in March06. Melas are organised every year. Working models/ exhibitions depicting contribution of BHEL to the society & nation. Adoption of 5 villages (Padaria, Kolua, Adampur, Khajuri and Kanha-Saiyya) under PMs 20 point programme. Opening up of library in Padaria

Village School in 2007. Tube-wells in adopted villages. Educational Tour and dress to students of adopted villages.
Provision of funds for maintenance of working womens hostel ( a joint venture of BHEL and MP govt.), various centres run by HELPING

HANDS, welfare wing of BHEL ladies club, such as Masala Papad Kendra, Chapati Kendra, BLEW Computer centre etc.
BHEL, Bhopal purchases greeting cards from charitable institutions such as CRY (Child Relief and You), UNICEF, WWF and Helping Hands

(Sapna Special school for the welfare of the children) etc. The expenditure on Year 2003-04 purchase of greeting cards Rupees 98,000 Fig. 8.5: Charity, Welfare, Education, Training and Leisure BHEL, BHOPAL

2004-05 98,000

2005-06 1,13,000

2006-07 1,15,000

2007-08 1.16,000

Application Document CII EXIM Bank Award for Business Excellence - 2008

Page 8 - 2

Society Results

Support for Medical and Welfare:


BHELs Kasturba Hospital is the most reputed hospital of M.P. Some of the actions planned as sequel to survey conducted and feedback

obtained, have already been completed viz. outsourcing of sanitation function has resulted in perceptible change. More new deluxe wards and new Operation Theatre have been added. New Dialysis facility has been added. Setting up of Sound proof Audiometry lab. New equipments / machines like C-Arm Image Intensifier, Electrolyte analyser, auto clave, Colour Doppler, Blood Collection Monitor etc. have been installed and used. Setting up of YOGA Research Centre and study of effect of YOGA on prevention and cure of diseases. On 25th April08, research study results on effects of Yoga on Asthma, Hypertension and Diabetes were shared with general public. HE Yoga Mitra Mandal imparts Yoga training through out the year and arranges special training programmes. Release of HIV AIDs Policy after due deliberations in workshop and Awareness Programmes. An intranet site Health care On-line provides valuable information about common diseases, status of critically ill patients and has notable feature of Ask the Expert. Kasturba Hospital organises various health clinics in collaboration with external agencies such as IMA, Indian Red Cross Society, WHO, UNICEF, FPAI etc. e.g. Health camps are organised regularly at village Bhojpur, Bagh Mughalia, Narela Shankari etc where patients are examined and treated. Special camps on specific days like Tuberculosis day, Leprosy day, handicap day, WHO day, Blood Donation day, AIDS day etc. are also organised. CME Programmes are organised in which in-house and guest speakers gave lectures. Health awareness programmes on various topics such as Diabetic Foot,, Nutrition in pregnancy, Epilepsy, Aljimeiers Disease, AIDS, Ergonomics & Musculoskeletal Disorders, Breast Feeding, Hazards of Tobacco use, Early Detection and Prevention of cancer, Heart Attack Prevention etc were organised this year which were open for public and were attended by people from all walks of life. Immunisation and vaccinations for Pulse Polio, Typhoid, Cholera, Tetanus etc. to non-entitled population is also carried out In school health programme, nearly 40,000 children of 42 schools have been examined for various infections, vision etc. Plastic and Laparoscopic surgery has been started.

Fig. 8.6: Medical and Welfare Environment, Ecology and Safety:


Manufacturing processes in BHEL, Bhopal and its products and services are non polluting. BHEL, Bhopal has been accredited to ISO 9001, ISO14001 and OHSAS 18001. Entire factory area has been declared as no smoking zone. Helmets are made compulsory for every person driving two wheeler in factory area. For water harvesting and conservation, 9 check-dams have been built on nearly 200 acres of area. Waste water treatment through root zone. Renovation of Buildings, parking area, public utilities. BHEL has joined Global Compact initiated by United Nations and has committed to observe its principles. Use of plastic containers for transportation of specific materials such as coils, instruments etc. All waste including chemical waste is treated before release, e.g. cyanide salt is neutralised before disposal. A plant has been established for treating used coolant which can again be recycled. Township has two sewage treatment plants of 2.0 and 0.5 MGD capacity installed at cost of Rs 160 lakhs. Bio-gas produced in sewage treatment plants is used in Chapati kendra and hospital and water from these plants is used for watering the parks and plants. The leftover is used as manure by horticulture department. Plantation of 782 acres with nine lakh trees including more than 75,500 fruit bearing trees in township. Executive Director led the plantation drive and employees, school children, unions and associations voluntarily planted more than 50000 saplings in last three years. 14 beautiful parks are a matter of pride for BHEL Bhopal. National safety day and Road safety week are celebrated every year to create awareness on related issues. ED, BHEL, Bhopal is the chairman of M.P. Chapter of National safety council. A Children traffic Park has been set up in township.

Fig. 8.7a: Environment, Ecology and Safety

For environmental monitoring, Stack and Ambient air data are monitored regularly in every 3 months and are much below the permissible limits (Fig. 8.7b). BHEL Bhopals contribution towards local economy and for conservation of natural resources is given in Fig 8.8 & Fig 8.9 respectively.
BHEL, BHOPAL

Ambient Air Monitoring (g/M3) Parameters Permissible Ach-0607 Ach07-08

Stack Monitoring (mg/NM3) PermiAch-06Achssible 07 07-08 96 131 NA 48 68 58 67

Suspended Particulate Matter 500 155 315 150 310 150 95 132 (SPM) Respirable Suspended 150 55 95 52 97 NA NA Particulate Matter Sulphur Dioxide 120 16 22 18 23 120 48 68 Oxides of Nitrogen 120 10 20 11 21 120 56 65 Fig. 8.7b: Status of Air Pollution (Stack & Ambient air monitoring) -2008

Application Document CII EXIM Bank Award for Business Excellence - 2008

Page 8 - 3

Corporate Unit BSC Strategic Capital InvestmentPlan Divisional Plan Strategic Plan

Society Results Contribution towards local employment and local economy:


BHEL, Bhopal Supports the local economy by placing orders worth Rs. 200 crores on 375 industries in and around Bhopal. These industries directly employ around 6000 people. Maintains 1396 shops spread over 2 Main shopping centres and 14 sector-wise shopping centres. Provided pucca Haat markets in all 4 neighbourhoods and maintains 166.9 km of asphalted roads and 12.9 km of dual carriage roads. BHE Credit and Thrift Cooperative society has set up showrooms to offer certain items to the public at marginal profit. Provided land and/ or building to 9 branches of different banks and 6 P&T offices.

Fig. 8.8: Contribution towards Local Economy Conservation of Natural resources and Energy conservation:

8 MGD of water is sourced from recycling process. Modification and relining of boilers. Use of Solar water heating system in canteens, hospital and guest house. To save on cost of electrical energy, transparent sheets on roofs and side walls of manufacturing blocks and stores have been used. Modification in gas plant for efficient power distribution system Energy efficient CFL street lights

Fig. 8.9: Conservation of Natural Resources

Accolades and awards: BHEL, Bhopal has been receiving various accolades and awards every year from various outside organisations. Employees of BHEL, Bhopal have also been winning various awards from time to time. Some of the major awards received are as given (Fig. 8.10). The unit organises district, state and national level sports competitions.

2007-08: National Level First Prize to BHEL Bhopal by ICWAI for Excellence in Cost Management in the Manufacturing Sector (above 1000 Cr Turnover) category. The unit won CIIs Commendation Certificate for Significant Achievement. Shri Jitendra Singh Artisan of SCR Division was conferred Class-B Vishwakarma Rashtriya Puraskar -2006 for his suggestion Shri A. Sinha of FYM and Shri D.C. Patnayak of Medical department have been conferred Hindi Sevi Samman by Govt. of M.P. Shri Haridas Mistry of Hydro received ttam Shramik Puraskar, Padmashri B.L. Chouksey of BEX received Shramik Sahitya and Shri S. Sonepure of P & PR received Shramik Sahitya award of M.P Shram Kalyan Mandal. Mr. Sachin Bhartiya, of FBM was conferred prestigious Young Technologist Award 2007 at the International Welding Symposium -2008 held at Pragati Maidan, New Delhi . 2006-07: Engineering Export Promotion Council (EEPC)s Top Export Award to BHEL for the seventeenth year in succession, for outstanding export performance. The unit won CIIs Commendation Certificate for Significant Achievement. Business Standards Star Public Sector Company Award - 2006 given by Planning Commission Chairman to CMD, BHEL for exceptional high growth performance. Second best award to BHEL Enterprise for Women Development Activities by WIPS under the aegis of SCOPE. First prize in Essay contest -2007 organised by INSSAN -NIC to Shri R.K. Tripathi. Second prize on paper presented on Winning strategy through harnessing employer creativity organised by INSSAN to Dr. Sarla menon. 2005-06: Udyog Ratna Award to Shri P.T. Deo, ED- BHEL, Bhopal from Hon. Chief Minister of M.P. National Award for Best Disabled Employee 2005 to Shri R.C. Parakh by honble President of India. Uttam Shramik Award to Shri V.K. Pagare. National Udyog Award to Shri M.M. Khare. Business Today magazine listed BHEL as 6th in top 20 companies to Watch based on performance and as most valuable companies at National level. 2004-05: Padma Shree to Shri B.L. Choksey by honble President of India. The unit won CIIs Commendation Certificate for Significant Achievement. Prime Minsters Shram Veer Award to Shri B.L. Dhruv and Shri S.K. Soni. BHEL-Bhopal has been awarded second prize for promotion of suggestion scheme by INSAAN.

Fig. 8.10: Accolades and awards

BHEL, BHOPAL

Application Document CII EXIM Bank Award for Business Excellence - 2008

Page 8 - 4

Key Performance Results

9.

KEY PERFORMANCE RESULTS

9a. Key performance outcomes: Financial outcomes: DWM, a role model initiative, facilitated more than 20% growth on all important financial and R&D related parameters in 2007-08. The unit has entered into new business of BOP (Balance of Plant) to meet targeted CAGR of 20%. The BOP business has increased from Rs. 5 Cr. in 2006-07 to 93 Cr. in 2007-08 and target has been set to achieve 140 Cr. in 2008-09. A meaningful and logical comparison of financial parameters with competitors is not possible as the product profile of BHEL, Bhopal and competitors are not similar e.g. the turnover of ABB from products similar to BHEL corporation is around 61 % of its total turnover. Similarly for Siemens it is 25%, CGL 41%, L&T 85% and Alstom 100%. These ratios will be still less if compared with product range of BHEL, Bhopal products only. However comparison on most important parameter of Profit/ sales ratio with International Power Plant Equipment Manufacturers is illustrated (Fig. 9.1). The data indicates that Bhopal unit is on consistent growth path. Turnover: Turnover trend of BHEL Bhopal vis--vis projections of Strategic Plan and targets (Fig. 9.2a) clearly indicate the soundness of planning process. The unit has been surpassing SP projections and targets since 2006-07. Uniform production throughout the year was achieved by the implementation of DWM. This has enabled in reduction in last quarter production to 39% from a level of around 50% in earlier years. (Fig 9.2b) Fig. 9.2c indicates Units achievement at the end of Strategic plan 2002-07 and the targeted growth at the end of next strategic Plan 2007-12. Direct material % has gone up due to unprecedented hike in basic material prices worldwide such as Steel & Copper (Fig 9.31) which constitute approx. 50% of the total materials (Cr. 4b) affecting the value addition. ROCE projections have been exceeded as a result of focus on top line and stretched targets have been set for Turnover and ROCE. Profit and Gross Margin: The Unit clocked a growth of 25% in PBT (Fig 9.3) over previous year and also exceeded the set targets by 22% in 07-08 as a result of focus on top line growth. The targets of PBT could not be met in the earlier years because of shortfall in turnover due to deferments and slippages of governments five year plan.
Sl. No. 1 BHEL Corp. 11.7 15.3 17.2 19.8 20.3 BHEL Bhopal 9.0 10.2 12.9 17.9 17.95

Year

CGL

ABB

Alstom -9.5 -4.8 5.8 4.9 9

2003 4.5 -3.7 2004 5.8 1.3 2005 7.1 5.4 2006 8.4 7.9 2007 5.26 7.7 Fig. 9.1: Profit / Sales in %
4000 3000 2000 1000 Projection(SP) Target Act

03-04 04-05 05-06 06-07 07-08 08-09 1512 1460 1452 1679 1613 1535 1893 1956 1840 2100 2284 2296 2750 2750 2804 3500 3303

Achievement as % 96 of Projection (SP)

91

97

109

102

Fig. 9.2a: Total Turnover (Rs. Crores)

100 80 60 40 20 0
20 17 7 22 19 7 23 18
11

56

52

48

52

39

26 22 16 10 21
14

2003-04 2004-05 2005-06 2006-07 2007-08


Q1 Q2 Q3 Q4

Quarter 03-04 04-05 05-06 06-07 07-08 Q1 102 103 196 234 391 Q2 246 297 334 369 575 Q3 297 342 425 504 737 Q4 807 793 885 1189 1105 Fig. 9.2b: Quarter wise Turnover (% and Rs. Crores)

Parameters

Projections 06-07 (SP)

Actual 06-07

Target 11-12

Turnover 2100 2296 5700 (Rs. Crores) CAGR % (at base of 2 11.6 14.2 19.6 02-03) ROCE % (PBT/Cap 3 40.5 44.0 59.3 Employed) Direct Material as % of 4 47.5 51.2 52.40 GTO-ED 5 VA as % GTO-ED 49.5 46.0 45.1 Fig. 9.2c: Financial Parameters Projections (SP) vs. Actual & Targets and Projections 2011-12 Page 9 - 1

BHEL, BHOPAL

Application Document CII EXIM Bank Award for Business Excellence - 2008

Key Performance Results

The Gross margin (Fig. 9.4) was marginally impacted due to higher material prices but measures such as competitive buying, DTC and waste reduction (Cr. 4c) since 2006-07 have resulted in surpassing the targets.
700 350 0 Target Actual 03-04 04-05 05-06 06-07 07-08 08-09 168 131 228 156 276 236 324 410 418 511 608

22 18 14 10 Tar

03-04 04-05 05-06 06-07 07-08 08-09 15.8 17 13.3 16.9 15.3 16.8 19.8 17.68 19.65 20.3

Act 15.49

Fig. 9.3: Profit Before Tax (Rs. Crores)

Fig. 9.4: Gross Margin as % of Turnover


15 10 5 0 Target Actual 03-04 11.3 7.4 04-05 13.2 10 05-06 11.1 10.6 06-07 7.9 8.4 07-08 9.77 11.07

New Product Turnover: The business from new products (Fig. 9.5) has recorded highest ever turnover and has also exceeded the target. In order to increase the business from new products thrust has been given on in- house R&D i.e. Patents, PIRs, collaborative projects (Cr. 4d) and R&D Commercialisation (Cr 4d). The R&D expenditure (Fig. 9.43a) on this account has grown by 106% as compared to last year. Order Book: The percentage of firm orders (long cycle and short cycle) at the time of budget finalisation each year (Fig. 9.6a) is continuously growing through strategic decisions of competitive and differential pricing and focus on order booking by continuously reducing the delivery cycle (Fig 9.15, Fig. 9.17). Strategic pricing, customer confidence and engineering capability has resulted in excellent order book position (Fig. 9.6b) and order book is full for 2008-09 for long cycle products.

Fig. 9.5: New Product Turnover as % of Total Turnover

150 100 50 0 Long Short

03-04 39 23

04-05 77 47

05-06 95 42

06-07 94 52

07-08 89 60

08-09 100 74

Fig. 9.6a: % of Confirmed orders at the time of budget finalization (Short Cycle / Long Cycle Product)

Dividend and Share-price: 5000 700 4000 BHEL is a debt 550 3000 free company. It 400 2000 believes in 250 1000 100 03-04 04-05 05-06 06-07 07-08 08-09 sharing its 03-04 04-05 05-06 06-07 07-08 prosperity with 1246 1639 1709 2056 2704 3538 Target its share 147 196 355 600 746 Actual 1272 2472 1522 2947 4521 holders. It has Fig. 9.7a: Dividends paid (Rs. Crores) Fig. 9.6b: Order Receipts (Rs. Crores) been generous in paying dividends to its shareholders (Fig. 9.7a) and dividend has been increased nearly 500% since 2003-04. The shareholders were rewarded with a 1:1 bonus this year and a dividend of 152.5% was paid on enhanced equity. The share-price and net worth per share show improvement over the years (Fig. 9.7b, Fig. 9.7c).
3000 1500 0 Shareprice-high Shareprice-low 03-04 686 251 04-05 877 375 05-06 2050 755 06-07 2668 1531 07-08 2930 1301

500 400 300 200 03-04 216 04-05 246 05-06 298 06-07 359 07-08 440

Fig. 9.7b: Share-price of BHEL (Rs.) BHEL, BHOPAL

Fig. 9.7c: Net worth per share (Rs.) Page 9 - 2

Application Document CII EXIM Bank Award for Business Excellence - 2008

Key Performance Results

Inter unit Comparisons: The product mix 60 55 of all units is 50 unique and 45 hence 40 performance 35 comparison is 30 not logical and 25 20 meaningful. The 03-04 04-05 05-06 06-07 07-08 data and trends 41.8 38.4 39.6 41.8 41.5 BPL on important 46.8 46.3 46.0 44.5 HWR 54.09 parameters is 39.3 39.3 38.1 38.6 HYD 33.73 shared in MCM 36.36 33.2 30.5 29.3 43.5 TRY for learnings and improvement in Fig. 9.8a: Value added as % of Turnover relevant processes. Inter unit comparisons are done on important parameters such as value added, current ratio, inventory and direct material consumption. (Fig 9.8a, b, c & 9.29) BHEL Bhopal is on consistent growth path. Inventory is lowest amongst all units.
2.4 1.9 1.4 0.9 BPL HWR HYD TRY

03-04 2.02 1.24 2.2 1.1

04-05 1.85 1.15 1.65 1.03

05-06 1.74 1.26 1.64 1.02

06-07 1.64 1.13 1.37 0.97

07-08 1.34 0.95 1.43 1.94

Fig. 9.8b: Current Ratio


200 150 100

Non - financial outcomes: 50 Balanced Score Card Scores: 0 Final Score of Balanced Score Card of Unit of all Product 03-04 04-05 05-06 06-07 07-08 and Functional groups is illustrated in Fig. 9.9. In spite of 78 89 97 90 88 BPL stretched targets, the Unit has consistently scored above 140 151 155 123 100 HWR 90% in BSC which indicates that the all the groups and the 131 133 95 103 131 HYD unit are balancing all strategic perspectives. 75 136 120 120 152 TRY Market share: BHEL Bhopal is leader in Indian market in entire product Fig. 9.8c: Inventory (No. of Days of Turnover) range as indicated by the data on market share for the major products vis--vis competitors (Fig. O-1, Fig. 9.10, Fig. 9.11, Fig. 9.12).
BSC Score in % 2004-05 2005-06 2006-07 Hydro 76 97.4 94.8 EM 77 97.8 93 TPTN 79 97.4 91 TCB 85 98.2 94.6 SCR 84 98.1 90.2 Thermal 77 97.5 93.2 97.4 Fdrs 87 97.6 94.6 97.2 Fab. 89 97.4 92.8 97 HR 83 95.8 90.8 97 Quality 91 96.4 93 96.8 WEX 95 97.4 95.4 97 MM 85 96.6 90.6 97.2 Unit 92 95 93 96.2

2007-08 98 99 98.2 97 98.4 Fig. 9.9: Balanced Score Card Scores for last four years

50 40 30 20 10 0 BHEL CGL ABB Telk+Alst+Emco 03-04 44.41 21.35 4.32 20.24 04-05 45.5 11.29 13.16 16.62 05-06 40.4 13.59 13.26 20 06-07 46 8 15 22.6 07-08 45 7 13 35

72 54 36 18 0 BHEL CGL ABB Others 03-04 72 15 8 5 04-05 72 17 9 2 05-06 72 16 10 2 06-07 71 13 11 1 07-08 71 13 11 1

Fig. 9.10: Market Share (%) for Transformers BHEL, BHOPAL

Fig 9.11: Market share (%) for Electrical Machines Page 9 - 3

Application Document CII EXIM Bank Award for Business Excellence - 2008

Key Performance Results

Physical turnover (Volumes) There has been substantial growth in achievement in physical terms over the years due to improvement in technology and by strategic initiatives of outsourcing and vendor developments (Fig. 9.13). The actual achievements are in line with SP targets and the gap in Hydro is because of deferment of projects by customers. The contribution of Fabrication division (Fig 9.14) has enabled timely delivery and achievements of product targets.
Target
Fabrication Output (M. Tons)

35 30 25 20 15 10 5 0
BHEL Megawin CGL Siemens 04-05 20 9 6 9 13 24 05-06 18 14 10 9 9 14 06-07 22 3.8 13 1.2 7.1 19 07-08 25 6 21 18 30

03-04 11000 12710

04-05 11750 12648

05-06 12000 13101

06-07 13150 14500

07-08 14150 16600

08-09 20200 -

Stelmec Areva+Jyoti+ABB

Fig. 9.14: Contribution of Fabrication


200304 (Act) 760 12 955 13 335 116 1667 9252 2431 410 175 602 200405 (SP) 750 11 750 11 550 120 2500 12000 3400 550 180 830 200506 (SP) 1000 12 1000 12 570 135 2600 12000 3450 550 190 840

Fig 9.12: Market share (%) MV Switchgear

Product Hydro Turbine Hydro Generator Industrial Machines Large Electrical Machines Traction Machines Transformer Switchgear Control gear Traction Control gear Rectifier

Unit/ Nos. MW Nos. MW Nos. Nos. Nos. Nos. MVA Nos. Nos. Sets Nos.

2004-05 (Act) 683 4 745 10 527 138 2269 9366 3400 907 200 832

2005-06 (Act) 607 7 547 10 605 164 2608 10672 4201 576 276 1160

200607 (SP) 978 12 835 12 600 150 2800 12500 3500 600 200 850

200607 (Act) 649 12 497 9 856 280 2556 12672 3721 601 228 1006

200708 (SP) 1296 17 887 14 1050 360 2850 15102 4600 640 231 900

200708 (Act) 1284 17 869 12 970 333 2920 14049 4000 405 231 1184

200809 (Tar) 1002 24 806 24 1150 375 3150 20134 3500 350 136 1050

201112 (SP) 2756 21 2361 15 1300 400 2700 33100 5500 700 300 1200

Fig. 9.13: Physical Turnover

Physical turnover alone may not be a right indicator of volumes in case of some of the products as the ratings are site/ customer specific eg. In case of Hydro products the rating may vary from 4MW (Serlui) to 200MW (Koldam) but the process demands almost same amount of engineering and manufacturing effort in terms of time and labour. Similarly, in case of switchgear, a strategic decision has been taken to concentrate on value addition rather than numbers. Accordingly, orders have been booked for indoor switchgear of higher value rather than higher number of outdoor switchgear with lower value.

BHEL, BHOPAL

Application Document CII EXIM Bank Award for Business Excellence - 2008

Page 9 - 4

Key Performance Results

9b. Key performance indicators: Cycle time reduction: Inspite of increase in volumes over the years, product cycle time (Fig. 9.15) has been sustained through continuous reduction in engineering cycle time (Fig. 9.17) and changes in the process of production and material planning (Cr. 4c, Cr. 4e). The use of IT enabled processes in engineering, material, production planning and regular monitoring of operations (Cr. 1d) has further helped in cycle time reduction. PI to PO conversion and SRV clearance process has shown steady improvement (Fig. 9.16) over the years.
78

24 21 18 15 12 9 6 3 0
Ind.motors Large elect machines Transformer ( 400 Kv) Transformers (220 KV) Traction macines Switchgear (VM12 project) Hydro Turbines (Small) 03-04 4 6 9 7 5 6.5 12 23 04-05 4 6 9 7 5 6 11.5 22 05-06 4 6 9 7 5 5.5 11.5 22 06-07 4 6 9 7 5 5.3 11 21 07-08 4 6 9 7 5 5.25 10.5 20

68

03-04 70 72 72 73

04-05 75 76 74 78

05-06 77 79 76 77.6

06-07 80 80.1 78 78.5

07-08 80 79.4 80 80.8

Fig. 9.15: Product Cycle time (No. of months) Deptt. 03-04 04-05 05-06

Hydro Turbines (large)

PI tp PO (Tar) PI to PO (Act) SRV (Target) SRV (Act)

06-07 137 20.5 29 100 240 170

07-08 135 19.4 26 98 230 161

Fig. 9.16: % PI to PO conversion in 75 days & % SRV clearance within 5 days

Cost of Rework Rejection: Cost of Rework Rejection (Fig. 9.18, Fig. 9.19) has been contained as a result of thrust on quality, improvement in processes and JIPs with customers and suppliers. Percentage weld defects are also within reasonable level of control due to welding automation (Fig. 9.20). In 2007-08, weld automation has increased from 32% to 45% and a target set for 60% for 2008-09.

CEE 160 155 150 AME 27 25 22 SWE 37 35 32 TRE 110 112 106 HGE 330 297 270 TME 216 205 185 Fig. 9.17: Engineering Cycle time (No. of days)

Description 03-04 04-05 05-06 06-07 Rejection / 178 95 36 27 Rework Cost Site Debit 82 106 57 303 No charge 1005 1511 1013 2227 orders Freight 214 174 140 66 Total 1479 1886 1246 2623 Fig. 9.18: Rework rejection cost (Rs. Lakhs)
3

07-08 3 106 700 107 916

JIPs: GMs & HODs take up JIPs with Customers and suppliers (Cr. 1c, Cr. 4a, Fig. 9.21) which is also an objective of GMs BSC. Financial:

2 1 0 03-04 1.02 04-05 1.23 05-06 0.68 06-07 1.14 07-08 0.33
2.5 2

03-04 2.77

04-05 2.9

05-06 2.8

06-07 2.76

07-08 2.6

Fig. 9.19: Rework rejection cost as % of Turnover

Fig. 9.20: % Weld defects

Turnover and Value added per employee Year 04-05 05-06 06-07 07-08 Value added per employee and Turnover per With suppliers 5 7 7 6 employee (Fig. 9.22), has more than doubled in last With customers 4 3 12 25 five years and also targets exceeded as a result of Fig. 9.21: JIPs (Nos.) with Suppliers and Customers outsourcing of non core activities (Cr. 3a), proactive material management (Fig. 9.29, Fig. 9.30) and prudent financial management (Cr. 4b).
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 9 - 5

Key Performance Results

Economic Value added: EVA (Fig. 9.23) has been continuously monitored and improved upon and targets exceeded by management of working capital and sundry debtors. In year 07-08 a stretched target was set for EVA and the growth of more than 30% over last year has been achieved. Working capital: Working capital as number of days of Turnover over the years (Fig. 9.24) has continuously being brought down through reduction in production cycle time, effective material management and production planning. The targets of working capital could not be met due to deferment of some projects by customers resulting in higher WIP.

50 40 30 20 10 0 VA/Emp(target) VA/Emp(actual) To/Emp(target) To/Emp(actual) 03-04 7.08 7.3 17.13 17.47 04-05 8.7 7.4 21.2 19.1 05-06 10.4 9.4 25.3 23.8 06-07 12.2 12.7 29.5 30.3 07-08 14.52 15.02 35.26 36.28 42.25 08-09 17.66

Fig. 9.22: Value added and Turnover per employee (Rs. Lakhs)
200 150 100 50 0 Target Actual

Net Cash flow, Sundry Debtors and Cash collection: Operational cash surplus is managed through generation of net cash flow (Fig. 9.25) and controlled cash outflow through inventory management (Fig. 9.8c). Cash collection has been a key process for cost reduction. Aggressive targets for cash collection are set related to turnover targets. Cash collection is focused on present supplies, collectible debtors and deferred debtors. Performance on Cash collection has improved over the years (Fig. 9.26) as a result of improvement in timely supplies, completeness of supply (Cr. 6b), and linkage of dispatches with advances/ LC. Due to prudent financial management (Cr. 4b), interest outflow to corporate office has been reduced over the years (Fig. 9.25a).

03-04 43 12

04-05 60 9

05-06 69 35

06-07 107 146

07-08 158 190

Fig. 9.23: Economic Value Added (Rs Crores)

200 100 0
02-03 03-04 04-05 05-06 06-07 07-08

56 Target 118 134 131 134 101 A thrust has been given for reduction of debtors which has 80 Actual 202 173 168 161 131 resulted in reduction of Collectible debtors from 185 days in 04-05 to 151 days (Fig. 9.27a) and deferred debtors from Fig. 9.24: Net Working capital (days of Turnover) 88 to 78 days (Fig. 9.27b). This enabled a cash surplus of Rs. 657 Crores (Fig. 9.25), which is around 2.5 times compared to last year and highest ever. This has helped in reducing creditors significantly from 82 days in 05-06 to 63 days in 07-08 (Fig. 9.28).

1000 500 0 Target Actual 03-04 04-05 05-06 06-07 07-08 08-09 209 183 284 156 164 97 370 243 556 616 987

30 20 10 0 Target Actual

04-05 26.17 16.03

05-06 17.2 14.4

06-07 17.71 12.69

07-08 13.55 8.35

08-09 1.59

Fig. 9.25: Net Cash flow (Rs. Crores)


4000 2000 0
Tar Act 03-04 1516 1418 04-05 1709 1581 05-06 1953 1868 06-07 2476 2337 07-08 2881 3025 08-09 3698

Fig. 9.25a: Interest Outflow (Rs. Crores)


200 150 100 50 Target Actual

03-04 95 171

04-05 99 185

05-06 97 169

06-07 99 160

07-08 81 151

08-09 74

Fig. 9.26: Cash collection (in Rs. Crores) BHEL, BHOPAL

Fig. 9.27a: Collectible Debtors as no. of days of Turnover Page 9 - 6

Application Document CII EXIM Bank Award for Business Excellence - 2008

Key Performance Results

Cost Reduction: Cost reduction, a CSF, is managed through cost reduction in Materials (Fig 9.29, Fig 9.30) & Personnel Payment (Fig. 9.38). Material consumption: The product mix of BHEL Bhopal has a very high material content. Inspite of abnormal hike in prices, (Fig 9.31) the material consumption (Fig. 9.29 & 9.30) has continuously been contained through focussed engineering efforts such as DTC and competitive buying (Cr. 4a, Cr. 4c). Bhopal is operating with least material consumption compared to sister units (Fig. 9.29) except Hardwar Unit, where the product mix is not as broad as of Bhopal. Initiatives have also being taken for containment of Indirect Material Consumption (Fig. 9.30), personnel expenses (Fig 9.38) and power & fuel expenses (Fig 9.37a). Realisation of revenue from Scrap sales (Fig 9.36) and competitive buying (Cr.4b, Fig 9.34) has resulted in further growth in bottom line. Improvement in cash collection process has enabled in reduction in payment time to vendors from 180 days to 90 days which has also enabled vendors to quote competitive prices. Savings through Six Sigma, DTC & LEAN DTC the major cost reduction exercise (Cr.2c, Cr.5b) has been launched with a view to control the material cost and the actual / projected savings are illustrated in Fig. 9.32a. It has started yielding results. Lean has resulted in improving productivity and OTIF (On Time In Full) and reduction in defect rate and Inventory (Fig. 9.32b) and also in controlling cost. Six sigma efforts led to
2.5

90 70 50 30 Actual 03-04 85 04-05 87 05-06 88 06-07 88 07-08 78

Fig. 9.27b: Deferred Debtors as no. of days of Turnover


90 80 70 60 05-06 82 06-07 70 07-08 63

Year 05-06 06-07 07-08 Purchases 1165 1311 1656 (Rs. Crores) Creditors 263 251 285 (Rs. Crores) Fig. 9.28: Creditors Nos. of days of Purchase
70 65 60 55 50 45 40 Bhopal 03-04 50.4 41.3 58.82 54.4 04-05 55.3 52 58 59 05-06 55 48.5 57.1 68.1 06-07 51.9 47.4 57.3 64.0 07-08 52.6 48.5 60.5 53.5

2 Target Actual

Hardwar
03-04 04-05 05-06 06-07 07-08 08-09 2.16 2.07 2.05 2.35 2.12 2.28 2.4 2.27 2.22 2.33 2.18

Hyderabad Trichy

Fig 9.30: Indirect Material consumption (%of Turnover)

Fig. 9.29: Direct material consumption as % of GTO (Net of excise)

improvements in processes and savings accrued are indicated in Fig. 9.32c.


LM E R A T E ( US $ / M T ) F R O M D E C .0 6 T O A P R .0 8
( M A X LM E =8 8 8 4 . 5 0 ON 10 . 0 4 . 0 8 & M I N LM E = 5 2 9 0 . 0 0 ON 05.02.07)
9000 8500 8000 7500 7000 6500 6000 5500 5000 4500 4000 8685 7766 6675 5669 6452 5676 7682 7973 7648 7513 7475 8008 8439 7887 7061 6587

40000

40000 38950 37900 33500 33500 32500 31 500 3600036000 35000 34000

35000

30000
29000 29000 28500 28000

29000 28000 27000 25000 24000 23000

31 500 29500 30500 28500 27900 29500 29500 26200 27000 26700 24000 28000

31 500

6966

Line 1

25000

20000
APRIL, 2005 O CT., 2005

22000
JAN., 2006 JUNE'2006 S EP, 2006 APR, 2007 O CT, 2007 F EB, 2008 APR, 2008

.0 6

.0 7

.0 7

B. 07

.0 7

EC

PR

T. 0

EC

B' 08

.0 7

JU N

FA

UG

FA

< 10 MM

11 TO 2 0 MM

2 1 TO 4 0 MM

> 4 0 MM

Fig. 9.31: Steel and Copper material price trend BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 9 - 7

PR

'0 8

Key Performance Results

Inventory: The increasing trend in Inventory (Fig. 9.8c) has been arrested and reversed in 06-07 through rigorous monitoring in Inventory review committee meetings (Cr. 4c) chaired by ED and reduction in Non moving inventory (Fig. 9.33). Continuous support provided to suppliers (Cr. 4a) has resulted in control of rejection of items (Fig. 9.35) received on Stores Receipt Vouchers (SRVs) at a reasonable level. Energy conservation: Transportation Key Metric Although Energy Baseline Actual Unit 2005-06 2007-08 consumption Production Vol. Units 1826 2096 constitutes a small OTIF % 21 98 percentage of First Pass NCs % 3.2 0.5 turnover even then a Inventory Months 2-2.5 1.2 focused attention is Switchgears paid to conservation Key Metric Baseline Actual Unit 2005-06 2007-08 of energy with a view Lead Time Months 23-24 14 of cost reduction & Defects/ Unit Nos. 10.1 5 environment OTIF % 33 80 considerations. Fig. 9.32b: Examples of Lean Metrics Energy conservation projects are identified & implemented (Fig. 9.37b, Cr. 4c).
900 650 400 150 NM 03-04 260 04-05 421 05-06 763 06-07 300 07-08 153

Initiatives

Target 07-08

Savings (Rs./ Crs.) Accrual Target 08-09

DTC8 7.5 9 Transformers DTC - EM 8.5 8.65 9.5 DTC -TPTN 1 0.8 3.81 Lean - SCR 5.0 4.5 9 Lean - TPTN 8.62 8.60 9.05 Fig. 9.32a: Savings through DTC and Lean
9.00 6.00 3.00 0.00 05-06 06-07 07-08 3.47 7.40

5.90

Year 05-06 06-07 07-08 Cumulative savings 3.47 5.90 7.40 (Rs. Crores) Cumulative projects 60 100 130 (Nos.) Fig 9.32c: Savings through Six Sigma (Rs. Crores)

8000 5600 3200 800

03-04 1682

04-05 1106

05-06 1300

06-07 1378

07-08 8100

Fig. 9.33: Non-moving inventory (Rs.Lakhs)

Fig 9.34: Savings due to competitive buying (Rs Lakhs)

In spite of steep hike in 4 2 3 prices of 2 1.5 Power & 1 0 1 various fuels, 03-04 04-05 05-06 06-07 07-08 03-04 04-05 05-06 06-07 07-08 the efforts 3.2 3 2.16 2.14 Target 3.38 initiated for 1.7 1.25 1.21 1.70 1.65 3.39 3.18 2.43 2.33 2.05 Actual energy Fig 9.35: No. of rejections over total SRVs (%) Fig.9. 37a: Power fuel expenses (% of Shop Turnover) conservation have resulted in continuous reduction in power & fuel consumption as % of shop Years 03-04 04-05 05-06 06-07 07-08 turnover (Fig. 9.37a). Personal Expenses Scrap Revenue (Rs. Lacs) 1589 2069 2220 3868 3909 as ratio of Turnover has been Fig. 9.36: Scrap Revenue continuously reduced (Fig. 9.38) as a
20

Energy Conservation Projects implemented


10 Target Actual

Annual Savings (Rs. Lakhs)

03-04 04-05 05-06 06-07 07-08 08-09 18.5 19.1 16.4 18.1 15.8 17 14.2 15.5 13.89 13.73 14.41

Fig. 9.38: Personal payments as % of Turnover BHEL, BHOPAL

Replacement of metallic Fan Blades of Man coolers by FRP 10 Blades (200 nos.) Installation of Portable Compressors at point of use 14 (TCB, FBM & FYM) Renovation of old Pumping system for Cooling Water in 1.5 Compressor Pumps 52 HP to 30 HP (saving of 22 HP). Fig. 9.37b: Some examples of Savings through energy conservation projects Page 9 - 8

Application Document CII EXIM Bank Award for Business Excellence - 2008

Key Performance Results

result of a strategic decision of reduced intake of employees in proportion to wastages due to natural retirement and further outsourcing of non core activities. However the targets have not been met due to unprecedented rise in inflation with corresponding rise in CPI resulting in higher payments on account of dearness allowances. Productivity and Quality Circle measures: The savings accrued through Suggestions and Quality circles are indicated in Fig. 9.39a. From 05-06 all improvement projects are being registered as Impress projects (Cr. 3c, Fig. 9.39b).
Year / savings 03-04 04-05 05-06 06-07 07-08 Suggestions 428 462 402 412 141 Quality Circles 722 698 1138 1245 2200 Fig 9.39a: Suggestions & Quality Circles (Savings in Rs. Lakhs) Year 04-05 05-06 06-07 07-08 534

Capital investments: The approach (Cr. 4b, Cr. 4c) of holistic modernisation and expansion of facilities 200 for capacity enhancement a CSF 100 (Fig. 2.8) has resulted in continuous increase in 0 capital expenditure over 03-04 04-05 05-06 06-07 07-08 the last five years (Fig. 8 11 31 101 163 9.40). This has also Fig. 9.40: Capital Expenditure (Rs. Crores) resulted in improvement in fixed assets (Fig. 9.41). Overall Equipment Effectiveness: As a result of various initiatives (Cr. 4c) taken, OEE has improved over the years (Fig. 9.42). Technology: The focus on in house developments (Cr. 4d) and need for product developments has resulted in increase in number of Patents, PIRs (Fig. 9.44) and R&D expenditure (Fig 9.43a) which is at an all time high. This thrust has also resulted in increase in R&D commercialisation (Fig. 9.43b) and Indigenisation (Fig 9.43c) and exceeding the targets. Both of these parameters are part of EDs BSC objectives. A number of new products have been developed and commercialised for customer specific applications. (Cr5c)
800 400 0 Target Actual 03-04 160 250 04-05 260 422 05-06 280 380 06-07 350 500 07-08 379 443 08-09 799

Projects 17 621 591 Fig. 9.39b: Impress Projects (Nos.)


750 500 250 0 484 498 503 554

594

Fig. 9.41: Fixed assets (Rs. Crores)

80 60 40 20 0

04-05 50

05-06 52

06-07 57

07-08 63

Fig. 9.42: Overall Equipment Effectiveness (%)


12000 8000 4000 0 Target Actual 03-04 750 220 04-05 1050 1050 05-06 1815 2074 06-07 3530 4488 07-08 6060 6400 08-09 7700

Fig. 9.43a: R & D Expenditure (Rs. lakhs)

6000 4000 2000

Fig. 9.43b: R & D Commercialization (Rs Crores) Year Number Value (Rs. Crores) Fig. 9.44: PIRs BHEL, BHOPAL 03-04 25 12.6 04-05 32 15.15 05-06 25 6.41 06-07 30 6.16 07-08 34 53.08
03-04 2200 2500 04-05 2400 3750 05-06 3600 4038 06-07 4700 5432 07-08 5943 5999 08-09 5960

Target Actual

Fig. 9.43c: Indigenisation (Rs. lakhs) Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 9 - 9

Key Performance Results

Patents: The efforts on R&D (Cr. 4d) and the enabling IPR Year 04-05 05-06 06-07 07-08 08-09 incentive scheme has enabled the unit to meet the Target 4 5 10 15 21 Patents target (Fig. 9.45) which was almost double as Actual 4 6 8 15 compared to last year and stretched targets are set Fig. 9.45: Patents filed for 2008-09. Information and knowledge: BHEL Bhopal puts in continuous efforts for availability of 03-04 04-05 05-06 06-07 07-08 timely and accurate information to all stakeholders (Cr.3d, Flash 1451 1533 1825 2286 2808 Actual 1452 1535 1840 2296 2804 Cr. 4e). One of the examples of availability of timely information is the declaration of financial flash results on Total Turnover (Rs. Crores) the 1st working day of financial year by the Unit head and 1 followed by the Press conference & JPC meeting on the same day. The comparison between Flash results and 0.5 audited results (Fig. 9.46) is an indicator of the accuracy of the information. The deviation in 05-06 is attributed to the 0 introduction of new accounting standard AS-7. With the 03-04 04-05 05-06 06-07 07-08 better understanding of AS-7 this deviation has been 0.07 0.13 0.82 0.44 0.1 controlled in subsequent years. Fig. 9.46: Deviation of Audited from Flash T/O in % Communication Facilities: The unit is continuously upgrading communication facilities DWM (Cr. 4e, Fig 9.47).

the

Telephone Lines Internal Direct Communication 3000 280 facilities in nos. Fig 9.47: Communication Facilities

Fax 60

Mobile 1200

IT- Facilities: The IT infrastructure and Resources/Year 03-04 04-05 05-06 equipment has also been PCs (nos.) 942 1139 1339 upgraded & modernised Servers(nos.) 17 17 17 regularly (Cr. 4e, Fig. Work Stations 7 7 7 9.48). Fig. 9.49a indicates (nos.) generation of various Plotters 17 17 17 Network documents through the IT Fiber optic cable 26 26 42 based applications which (km) results in Cycle time UTP cable(km) 81 85 95 reduction. Fig 9.49b Online 86 79 74 indicates department wise application (nos.) year wise drawing Email users 1500 1550 1600 Internet 394 850 1250 generation on AUTOCAD. connection (nos) Some of the new IT Peak time user 300 350 500 initiatives are: No.of persons 2.5 2 2 Executive Dash Board System PC/terminal Electronic Fund Transfer System Intranet 60 67 84 applications Engineering & Business Server Consolidation Fig. 9.48: IT Resources IRIS Detection for server room Centralized Authentication of licences for Engineering Dept 05-06 06-07 Software AME 7000 8800 Smart Card Door Access HGE 21200 37214 175 persons trained in UG-NX TRE 9151 11481 CDE 5424 5112 UG-NX projects taken up by HTE, TRE, CDE SWE 21780 23300 Turning & Milling operations using UG Completed

WO & Shipping list Pink factory receipt Packing list Dispatch advice note Excise invoice Commercial invoice Supplier Bill Stock Status Inventory Employee Bio-data Training Details Material requisition Indent Enquiry Purchase Order Store receipt voucher Pay slip Fig. 9.49a: IT based Applications

06-07 2085 19 17 28 42 140 112 1857 1274 800 1.2 120

07-08 2227 19 17 28 46 150 128 1900 1300 850 1.09 137

Note: Most of the data presented for Cr 6, 7, 9 is segmented. For the parameters which have been presented for unit as a whole the segmented data is available with respective product / function / process owners.
BHEL, BHOPAL Application Document CII EXIM Bank Award for Business Excellence - 2008 Page 9 - 10

07-08 15220 35500 14135 5136 15558 CEE 4500 7500 8500 HSE 6500 9200 12000 Fig. 9.49b: AUTOCAD- Drawing generation

EXECUTIVE SUMMARY
Introduction
Bharat Heavy Electricals Limited, a Navratna Public Sector Undertaking, is engaged in designing, manufacturing, supply, erection and commissioning of power plant equipment having 14 manufacturing divisions (Units), 4 power sector regions and 18 regional offices in India. Heavy Electricals (India), Limited, Bhopal, established in 1956, was merged with BHEL in 1974. It is one of the 14 manufacturing Units. The unit designs, manufactures and supplies equipment for power, industry and transportation sectors catering to Indian Railways, NTPC, SEBs, NHPC, TATA Steel and Overseas customers. It achieved a turnover of Rs 2296 Crore in '06 - 07. Its main products are: Traction machines -- 23%, Electrical machines -- 17%, Switchgear, Control equipment & Rectifiers -17%, Transformers -- 15%, Thermal equipment -- DG sets, BOP, Feeders etc -- 16%, Hydro equipment -- 12%. It has 7000 plus regular employees and 3000 plus contract employees. Corporate supports the units in include the areas of Strategic Planning, Domestic & International Marketing, HR, Finance, Management of Data & Analysis and Technical Know How.

Leadership
Top leaders of BHEL at corporate level develop & review the vision, mission and strategic plans once in five years involving the leaders and employees of all the Units / divisions. The current VMV, evolved in 2002 focusing enhancement of stakeholder value and last review was made in 2006. It has translated these into business policy, cascading down further to functional pole star statements and CSFs. The leadership has developed appropriate relationship with the key input providers and long-standing customers with a win - win approach. It also displays a caring and welfare oriented approach to people who are given opportunities to come out with innovative ideas in improving manufacturing capability. The Unit leadership drives a number of change initiatives viz; DTC, Lean, IMPRESS and DWM to further excel in all its operations. It carries out operational reviews through an improved structure viz DWM and EDs dash board with a view to inculcate result orientation and enhance performance through closer monitoring and control. The Unit leadership promotes a culture of quality & reliability in products & services and manufacturing processes. It maintains relationship with customers through transactional / non-agenda meetings as well as by providing quick service. Although GMs and HODs participate in Inter Unit Functional Heads' Meet, to capture best practices of other Units, it is not evident how the leadership uses such information and data for driving improvement in the unit in an integrated manner. The leadership may like to focus, as a process, on bringing and adopting best practices from sister units, best in class and best in world to enhance agility and competitiveness of the organisation to realise its mission. Also leaders have scope for evaluating and improving their personal leadership behaviour. While change management has addressed enhancing organisational capability and effectiveness along with people performance management system (e-map), it does not appear to address critical processes, related to people competence, training & development and involvement - at every level to enhance people capability. HR change plan addresses only numbers. While focus is seen in technical, manufacturing areas, similar thrust is not strongly visible in nurturing excellence in rest of the organisation.
CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

21

Policy and Strategy


Over a period of time, from seventies to date, the strategic planning process of BHEL has been evolved, improved and has matured into a defined process based activity. Policies and Strategies are communicated and cascaded down through Corporate Strategic Plan, Strategic Divisional Plan, Three Year Rolling Plan, Annual Budget and deployed through BSC at Unit, GM & HOD level and finally through individual KRA / e-Map. These are deployed / achieved through a number of key processes and sub processes with appropriate process measures, derived from CSFs and owned by CSF champions. Although excellence in product is a highly focused area and product benchmark data is used in strategic planning (Transformers made by the Unit are perceived as best in the world), process benchmarking needs to be addressed to enable BHEL Bhopal becoming a world class MNC. While needs of various stakeholders are considered during planning process, the same is not apparent for about 2500 vendors having significant roles to play in fructifying strategic plan 2012. The use of data from research & learning activities including foreign visits, product life cycle analysis and core competency of partners is not seen.

People
The Unit HR plans are developed & cascaded from Corporate Vision, Mission & Values, Corporate HR policy / Personnel Manual, HR Pole Stars etc. Feedback from employees through 3 tier participative management forums is taken for developing HR policies / plans. Improvements have been brought in - based on employee feedback. Competency mapping, related to Technical / Engineering and Management Skills requirements have been done. The Unit has many improvement initiatives for involving employees such as CFTs, Quality circles, Six Sigma teams, self-directed teams for DTC & LEAN, suggestion schemes etc. A process is demonstrated for ensuring employee care & welfare, involvement, providing opportunities for learning & development and for recognising & rewarding individual and team performers to inculcate a culture of excellence. While succession planning is addressed at senior management level, it is not evident at middle management level. It does not appear that effectiveness of a critical process like training & development is measured. Though competency mapping has been done for individuals in management level, it is not evident if gap analysis has been done and the outcome has been acted upon to enhance competence. While employee involvement approaches address the employees at all levels, it does not appear to address contract workmen, numbering more than 3000 and noninvolvement may not be conducive to desired human relations and work ambience in the Unit. Although the Unit is certified to OHSAS and lot of awareness programmes are held, it is difficult to assess the effectiveness of such initiatives, as use of PPE appears to be adhoc in various plants of the Unit.

Partnerships and Resources


The Unit has developed various strategic alliances, for product and technology development with organizations like Toshiba, Siemens, Strukton Systems, CVRDE etc. It has also JVs with customers like NTPC, NPCIL, and Railways etc. The Unit holds product wise supplier meets. It also has some JIPs with vendors to develop components like commutator & impeller and for packaging improvement. The Unit has established financial a management process. Various revenue and cost budgets are prepared specifying the cash flow and working capital requirements. Financial
CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

22

analysis is carried out for all new investments proposals in terms of NPV & IRR. The financial management practices of the Unit support growth, profitability, cost competitiveness and capacity & capability enhancement. These are aligned with company P&S and are reviewed at Unit and corporate levels in important meetings like ED's cash review meetings, MCM, capital budget meetings, Finance head meetings. A five year engineering road map with year wise milestone has been prepared by respective product managers and approved by ED. Technology is being continuously improved in association with Corp R&D, Research & Technical Institutes and learning through customer feedbacks. The Unit also improves its processes using Information and Communication technology (ICT) and all major processes are IT enabled. IT enabled automation is also used in manufacturing (CNC machines, cranes) as well as in design. Even though the Unit has vendor-rating system, JIPs with vendors and organises vendor meets, there is little evidence of recognition by any form of these important partners. It is not clear how the Unit provides financial resources towards investing into non tangible assets, like Brand Building and Intellectual Properties. Though implementation of 5S is in the plan, it is still in the very early stage of implementation. While international technology leaders appear set to become competitors and may be reluctant in providing technology know how, the Units approach towards strategic / business & technology sharing / tie up along with focus on more self reliance is in a very initial stage.

Processes
Operational processes are designed to fulfill QCD requirement of customer and these are documented in Quality Manual along with the KPI details. Support processes are documented in the respective manuals such as HR manual. Various process improvement strategies are used to achieve breakthroughs and incremental improvement. IMPRESS is the common umbrella used for various improvement initiatives such as QIPs, PIPs, JIPs, and TDP etc. DTC is one of the key tools used for breakthrough changes in existing designs, materials and processes. Various tools / initiatives such as DWM, Six sigmas, CRISP boards are used to monitor and control the process variations to reduce the defects and rework. On site fabrication facilities are also extended to customers as per requirement. The Unit has established many practices to enhance customer relationships such as pre and post contract reviews, Pre award meetings, Contract execution review, Routine inspection, Complaints resolution and Customer trainings. The Unit has identified nine processes viz. from Planning to Lean Management as Key Processes for the year 2007 - '08. It has also identified nine other processes viz. as Business Processes. Tender Processing, Manufacturing, Inspection and Testing to Services as Business Processes. At the same time, Marketing & Sales, Project Management and Materials Management as Business Processes. Hence it is not clear what framework, of key processes, has been identified, designed and communicated to all concerned to deliver its policy & strategy and enable its people to have uniform understanding across the organisation. While targets / stretch targets are set in most processes, the Unit may like to evolve a robust target setting process, taking into consideration customer / next process requirement, past performance, process capability, benchmark and integrated with MIS for review, enabling the Unit towards becoming a world class MNC.

Customer Results
The Unit has received customer accolades and the customer satisfaction index is improving, compared to own performance, over the years for most of the attributes. Product wise CSI has also
CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

23

been improving and is more than the target set. Customer accolades appreciate import substitution efforts, improvement in supply position and customer training provided. The failure rate of Generator Transformers in operation at customer end has come down to zero over the years and BHEL Bhopal has attained best in class benchmark in Test Acceptance rates. The results of perception measures related to image in terms of flexibility, transparency, proactive behavior and responsiveness are captured in survey are lower than the competition (2007). Cause and Effect analysis was not available. Though delivery performance trend is showing improvement, it is still lower vis--vis the competition. It is not evident what actions have been taken. No data has been provided on Overseas Customer Satisfaction.

People Results
Feedback results through employee perception survey show that Average Merit Score is showing improving trend for workmen. Overall AMS for various attributes have improved over the years. The score on Leadership Index conducted during 2007 has been higher than the previous survey of 2005. The training man-days / employee have been improving over the years. The investment in training has been increasing and number of employee sent abroad for training has also been going up. Employees have been awarded the national recognition on individual basis and the number of persons awarded as Swasth Karamchari has been going up. The employee involvement in suggestion schemes, Quality Circles and PIPs is increasing over the years. Quality Circles have received accolades in various competitions. Employee Perception Survey results, pertaining to empowerment, satisfaction scores related to employment conditions, facilities and services, health and safety conditions, pay and benefits, peer relationships, management of change, job security, are not presented. The satisfaction index of supervisors and executives has marginally dropped in last three surveys, for all attributes except training and retraining. No comparative data is available vis--vis group, domestic industry benchmark. The results for indicators related to competency requirement vs. available, success rate of training, measurement of training effectiveness, communication effectiveness, and speed of response to enquiries are not tracked to facilitate comprehensive evaluation of different HR practices/processes.

Society Results
The positive remarks made by the eminent social personalities provide perception about the company's image towards social responsibilities. Results of society perception survey show improvement in overall score. There has been continuous increase in expenditure on welfare measures by BHEL Bhopal, which is the highest in comparison to other units. BHEL provides support for welfare education, training & leisure, medical and welfare to the community. Besides social welfare activities, Bhopal unit supports society by carrying out activities like health clinics, health camps, and special camps on days like TB Day. WHO day, Blood donation day etc. The unit also conducts various health awareness programmes on Diabetes, Epilepsy, Alzimers, AIDS, Nutrition, Tobacco hazards -- etc. BHEL Bhopal has taken many initiatives towards improving the Environment, Ecology and safety. Air and Stack Emission have been kept much below the statutory norms. While the unit has many societal approaches an initiatives this have not been compared with any other organizations approaches for identifying opportunities to improve.
CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

24

Key Performance Results


There are positive trends in the financial indicators such as Profit / Sales, Turnover, Quarterly turnover, PBT, Gross Margin as % of Turnover, Current Ratio. The value added as % of TO have been improving over the years, being 2nd best in BHEL group. New product TO as % of total TO is highest in last 5 years. The inventory has been coming down in number of days of TO and is lowest among BHEL Units. There are improving trends in case of reduction in cycle time for Engg. Product cycle time, rework, % weld defects. There has been improvement in EVA, Value added and turnover / employee, net cash flow and cash collection. The working capital in days of turnover has come down and achieved lower interest and drop in debtors. Cost reduction has been achieved through cost reduction in material and personnel payments. There had been reduction in energy consumption, Power, Fuel expenses. Savings through suggestions and Quality circle have been improving. No result data have been provided on process performance, time to market, and success rate related to marketing efforts. No marketing results data related to export is available. While the Unit has number of product segments as well as market segments, segmented results are not provided. No comparison is done with the competitors for many performance results. No result data is available on performance of various Key and Support Processes in terms of process indicators. No targets, benchmarks and competitive data have been given in the results for most of the parameters.

Conclusion BHEL Bhopal, as it has been said, is changing from a slow moving stoic elephant to an agile leopard. It is transcending from product excellence to organisational excellence. The Unit leadership is driving this journey of changing mindset, ably supported by Business Excellence Group. The HR strategy and approaches need to be redefined to enhance organisational capability through people capability. Appropriate HR approaches can facilitate excellence touching hearts of the people and in turn bring agility in the organisation, hand in hand with Business Excellence Group. Process benchmarking with best in class needs to be institutionalised to hasten the transformation process.
Senior Assessor Mr Nilay Kumar Ghosh Assessors Mr A S Kulkarni Mr Manoj Yadav Mr P N Gupta Mr S K Srivastava Mr Sivaprakasam

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

25

THE SCORE SHEET

% Score

0-10

11-20,

21-30

31-40

41-50

51-60

61-70

71-80

81-90

91-100

Criterion Leadership Policy & Strategy People Management Partnership & Resources Processes Customer Results People Results Society Results Key Performance Results

* * * * * * * * *
Score awarded to your company

Legend :

*
Overall Score:

Highest score awarded to any applicant so far

Score Range

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

26

950-1000

301-349

350-399

400-449

450-499

500-549

550-599

600-649

650-699

700-749

750-799

800-849

850-899

900-949

<300

CIIEXIM BANK AWARD FOR BUSINESS EXCELLENCE 2008


INTRODUCTION
It has been a privilege to be given an opportunity to assess your organisation for the Award in the year 2008. Your application document was assigned to a team of trained assessors who worked very hard to evaluate the document fairly and objectively. One of the benefits of applying for the CII-EXIM Bank Award for Business Excellence is the feedback report all applicants receive on the findings of the team of assessors. The purpose of the feedback is to bring out the main strengths and the opportunities for improvement along with the score given to your organisation as perceived by the team of assessors. The feedback report is aimed primarily, to provide inputs for improvements and we hope you will find the comments made are constructive and in the spirit of continuous improvement which is at the core of Excellence. The feedback report is divided into four sections. The first section is a brief overview of the process followed for assessing all the applications for the year 2008 Award. This is to facilitate you to understand the work on your application leading up to the feedback report. The second section describes how the feedback report may be used for reviewing and developing improvement strategy and action plan for the company. The third section gives an executive summary of assessors findings on the strengths and opportunities for improvement against the award criteria for the organisation as a whole, the score achieved in bands of 10 percentage points for each of the nine criteria and the overall score achieved in intervals of 50 points on 0-1000 scale. The highest score awarded to any applicant of CII-EXIM Bank Award for Business Excellence, so far is also given as a benchmark. The fourth section describes in detail the Strengths and Opportunities for Improvement in respect of each of the thirty-two sub-criteria of the Business Excellence Model, which can form a basis for developing an organisations strategy for improvement. The management team may use this feedback report for prioritising improvement actions in their organization towards achieving Business Excellence. A repeat of assessment exercise after about a year helps in measuring the progress on improvement actions and also to review the strategy for improvement.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

SECTION 1 OVERVIEW OF THE ASSESSMENT PROCESS

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

OVERVIEW OF THE ASSESSMENT PROCESS


Your application has been assessed for the CII-EXIM Bank Award for Business Excellence for the year 2008 as per the award criteria. A team of trained assessors worked 800-1000 man-hours in the evaluation of your application and documented their findings in this feedback report. The process of assessment of your application is described on page 8. Signifying the milestones in the journey of Excellence, there are four levels of recognitions, starting from Commendation Certificate for Strong Commitment to Excel and going upto the Award.

Award

Prize Commendation for Significant Achievement Commendation for Strong Commitment to Excel

A team of jurors have set the following qualifying criteria for the four levels of recognition, for 2008. Award Prize Significant Achievement Strong Commitment to Excel : : : : 600 points and above and the Role Model. 600 points and above. 500 to 599 points. 400 to 499 points.

The team of jurors has reviewed the findings of the assessment team and made their decision about the applicants for different levels of recognition.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

Winners Profile Year 2008


The following applicants were recommended by the Jury for different levels of recognition as they make progress on their journey towards excellence.

Company

Main Products/ Services


Prize Winner

Sales (Rs. Crores)

No. of Employees

Large Organisation

The Tinplate Company of India Limited

Electrolytic Tinplate, Tin Free Steel in Sheet Form and Cold Rolled Products in Coil Form

410 Cr

1680

Significant Achievement Certificate for Small and Medium Businesses

Aditya Auto Products & Engineering India Private Limited, Bangalore

Auto Products

98 Cr

366

IP Rings Limited, Maraimalai Nagar

Manufacturers of Steel Piston Rings & Orbital Cold Formed Components

63 Cr

264

PSG Institute of Management, Coimbatore

MBA & Executive Programme

5 Cr

33

Susira Industries Limited, Chennai

Manufacturers of Valve-Train Components & Other Assemblies

20 Cr

215

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

Company

Main Products/ Services

Sales (Rs. Crores)

No. of Employees

Significant Achievement Certificate for Large Organisations Transformer, Capacitor, Bushings, Switchgear, Control gear, Rectifier, Traction Machines, Motors, Alternators, Hydro Turbines and Generators, Thermal Equipments and Diesel Generator Sets

Heavy Electricals Plant, Bharat Heavy Electricals Limited, Bhopal

2808 Cr

7741

Power Sector Northern Region, Bharat Heavy Electricals Limited

Erection and Commissioning of Power Sector Equipment and related services

645 Cr

534

Exide Industries Limited

VRLA and Automotive Batteries

869 Cr

532

Locks Division, Godrej & Boyce Mfg. Co. Ltd.

Locks, Latches, Locking Solutions & Accessories

211 Cr

837

Vijayanagar Works, JSW Steel Limited Ramagundam Super Thermal Power Station, NTPC Limited

HR Coils & Pellets

9850 Cr

4155

Power Generation

2788 Cr

1631

Rallis India Limited

Pesticides, Seeds & Special Fertilisers

750 Cr

1014

Diesel Systems business, Bangalore, Bosch Limited

Diesel Fuel Injection System

985 Cr

4274

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

Company

Main Products/ Services

Sales (Rs. Crores)

No. of Employees

Significant Achievement Certificate for Small and Medium Businesses


Bunts Tools Company, Nashik Connoisseur Infotech Private Limited, Mohali Eastman Cast and Forge Limited, Ludhiana Eastman Industries Limited, Ludhiana Precision Machines Components B2B Services & Development of Products 7 Cr 45

5 Cr

42

Hand & Power Tools

70 Cr

175

Bicycle Components & Accessories

99 Cr

93

Pravin Masalewale, Pune

Manufacturers & Marketers of Pure Indian Spices & Curries

94 Cr

700

TTK Healthcare TPA Private Limited, Bangalore

Payment Processing & Customer Service on behalf of the Health Insurance Industry

36 Cr

519

T V Super Filter Industries, Jammu Village Financial Services Private Limited, Kolkata Vir Electro Engineering Private Limited, Nashik

Oil, Fuel & Air Filters

5 Cr

50

Micro Finance

30 Cr

192

Fabrication, Shot Blasting, Zinc Spray Painting & Hot Dip Galvanizing

13 Cr

70

Weir Minerals India Private Limited, Bangalore

Slurry Handling Equipments

35 Cr

122

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

Company

Main Products/ Services

Sales (Rs. Crores)

No. of Employees

Strong Commitment Certificate for Large Organisations


Ace Designers Limited Badarpur Thermal Power Station NTPC Limited Balasore Alloys Limited Wide Range of CNC Lathes 245 Cr 277

Power Generation

1052 Cr

1444

Manufacturing of HC Ferro Chrome Communication Equipments, Integrated Fire Detection & Suppression System and related turnkey projects

291 Cr

600

Bharat Electronics Limited, Kotdwara

72 Cr

630

Bharat Electronics Limited, Pune

Design, Manufacture and Servicing of Electro-optics Equipments & Systems, Batteries & X-ray Tubes

62 Cr

321

Bharat Heavy Electricals Limited, Jhansi

Design, Manufacturing, Servicing & Commissioning of Transformers, Bus Duct & Locomotives

603 Cr

1744

Birla White White Cement Division, Grasim Industries Limited

Manufacturing of White Cement and Surface Finishing Products

576 Cr

539

Bosch Limited, Jaipur Coromandel Fertilisers Limited, Ennore

Fuel Injection Equipment Distributor Pump Phosphatic Fertilisers, Speciality Nutrients and Farming Services

969 Cr

1341

3800 Cr

2287

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

Company
Coromandel Fertilisers Limited, Kakinada Coromandel Fertilisers Limited, Visakhapatnam Components Strategic Business Unit Bharat Electronics Limited

Main Products/ Services


Phosphatic Fertilisers, Speciality Nutrients and Farming Services Phosphatic Fertilisers, Speciality Nutrients and Farming Services Professional Electronic Components, Solar Photo Voltaic Systems and Projects & Consultancy

Sales (Rs. Crores)

No. of Employees
2287

3800 Cr

3800 Cr

2287

241 Cr

1092

Finacle Business Unit from Infosys

Core Banking, e-Banking, CRM, Treasury, Mobile Solutions, Alerts, Web Based Cash Management, Wealth Management Radars, Sonars & Communication Systems for Navy Erection & Commissioning of Power Sector Equipment and Related Services

600 Cr

3403

Naval Systems Strategic Business Unit, Bharat Electronics Limited Power Sector Eastern Region, Bharat Heavy Electricals Limited GAIL (India) Limited, Pata Godrej Consumer Products Limited ISPAT Industries Limited Lakshmi Precision Screws Limited Plant 2 L & T - Komatsu Limited, Bangalore

376 Cr

767

1175 Cr

534

Polymers, LPG, Propane & Other By Products

3190 Cr

832

Soaps & Personal Care Products

800 Cr

1229

Hot Rolled Coils

9400 Cr

2560

High Tensile Precision Fasteners and Cold Forged Products

125 Cr

623

Hydraulic Excavators, Hydraulic Products & Equipment

1295 Cr

680

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

10

Company
Max New York Life Insurance Company Limited

Main Products/ Services

Sales (Rs. Crores)

No. of Employees

Life & Health Insurance, Retirement Solutions Steel Products including Plates, HR Coils/Plates, CR Sheets/Coils, Galvanising Sheets, Pipes, Tin Plates and Silicon Steel Sheets Manufacture and Supply of Copper Cathodes and Rods Manufacturing and Sale of Pig Iron Power and Heat Solutions in Steam Based Power Generation, includes Design, Manufacturing, Installation, Commissioning & servicing of Steam Turbines Manufacturing of Multi Point Fuel Injection

1598 Cr

7648

Rourkela Steel Plant

7400 Cr

21105

Sterlite Industries (India ) Limited

12569 Cr

1233

Tata Metaliks Limited

764 Cr

314

Turbine Business Group Triveni Engineering & Industries Limited

461 Cr

479

UCAL Fuel Systems Limited Vindhyachal Super Thermal Power Station , NTPC Limited

100 Cr

230

Power Generation

3630 Cr

1645

Award recipients are not eligible to re-apply for the award for a period of five years. However Award recipients can apply for the assessment and feedback any year. Its application will proceed through the award assessment process and will receive only a feedback report. Last date for sending Letter of Intent, for CII EXIM Bank Award for Business Excellence 2009, is 30th April 2009 and the application document should reach CII before 15th June 2009. Two representatives from the Top / Senior Management will be invited free of cost, to participate in the Quality Summit.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

11

Award Assessment Process - 2008

Companies order Application Brochure

Potential applicants check eligibility criteria for entry and requirements of Award Secretariat.

Selection of Assessors

Senior Managers from industry are selected as Assessors. They go through four-day training programme on understanding the award criteria and assessment process.

Applicant Submits Documents

Applicants submit documents to CII.

75

page

(maximum)

application

Assessment and Consensus

Assessor Team appointed for each applicant. Assessors individually list strengths, opportunities for improvement and score. Team meeting to reach consensus score.

First Jury meeting

Distinguished individuals (about 12) from business and academia appointed as Jurors. Jurors trained on The Award model and the process. On the basis of Assessor team reports, Jurors decide on applicants to be site-visited.

Site Visits

Assessor teams appointed make site visits. Assessors meet to plan site visits. Site visits (4 to 6 days typically) are made to check validity of application and clarify issues. Applications are re-scored and reports are finalised.

Final Jury Meeting

Based on reports from site-visited teams, Jurors decide on the Winners of the Award, Prizes and Commendation Certificates. The CII-EXIM Bank Commendations are presented to the winning applicants during the inaugural session of Quality Summit, mostly held during November. Senior Assessors (Leaders of the Assessment Team) write Feedback Reports to all applicants identifying their strengths/opportunities for improvement. Score-ranges are also given for each criterion. On request, Senior Assessor visits applicant to discuss feedback report.

Award Presentation

Feedback Report

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

12

SECTION 2

GUIDELINES TO USE FEEDBACK REPORT

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

13

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

14

GUIDELINES TO USE FEEDBACK REPORT


The Feedback Report reflects the consensus view of the assessor team on the status of Business Management Practices (Enablers) and Achievements (Results) against the nine criteria of the model. The Feedback Report has three components: (a) EXECUTIVE SUMMARY (Section 3) It is meant for the CEO and Top Management and gives a brief overview of company's status against the nine criteria of the Model. (b) SCORING PROFILE (Section 3) The scores are given in 10% band for each of the nine criteria (not for sub criteria) and the overall score in 50 point band. The scoring profile reflects the degree of implementation in quantitative terms. (c) ASSESSMENT (Section 4) It is basically meant for the management team that is responsible for making improvements in the organisation. Against each sub criterion, main Strengths and Opportunities for Improvement are given. The Feedback Report (Assessment Report and Scoring Profile) can benefit the organisation in many ways. For example: A means to educate people in the organisation on the Strengths and Opportunities for Improvement of the company. To diagnose what is lacking in the organisation and focus the improvement in the areas where these are most needed. A means of developing continuous improvement programme and measure progress on it over time through periodic Self Assessments. A means to benchmark against other companies using the same model both in domestic as well as overseas markets. A means to recognise both progress and outstanding levels of achievement through internal awards. (d) PLAN FOR IMPROVEMENT: The Feedback Report provides inputs to management decision-making process. Each organization can use it in a manner it deems fit. It is suggested that the findings of the Feedback Report be shared amongst the members of Senior Management. In order to facilitate this, copies of the Feedback Report may be distributed to members of Senior Management team. (CD of Feedback Report is sent by CII along with hardcopy to the organization.) CEO could facilitate a discussion to develop common understanding of the findings of the Feedback Report. Senior Assessor may be invited, for an interaction with the senior management team to provide clarifications/elaborations, through CII. CEO along with senior management team, to develop consensus on priority areas for improvements in a systematic manner. While the management can choose an appropriate approach and adapt it to their needs depending on the progress made on its journey towards Excellence, the following approaches are suggested for prioritising the action points for improvement.
CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

15

Approach I (a) Identify Key Result parameters and set targets for achievements. Examine Strengths and Opportunities for Improvement (OFIs) in Customer Satisfaction, Business Results, People Satisfaction and Impact on Society. Benchmarking against competitors/World Class companies is helpful in setting targets. Identify Key Business Processes to achieve the above Results. Look into Process criterion for working out an approach to do this in an effective manner. Strengths and OFIs in this category should provide guidance to prioritise the actions. Examine the Strengths and OFIs of other Enablers e.g. Leadership, Policy and Strategy, Resources, and People Management. Identify key Strengths and OFIs, which are required to support the effective implementation of Key Business Processes, identified at step (b) for achieving the Results at step (a).

(b)

(c)

Approach II (a) Identify the areas where performance (see Result Categories) has been below targets/competition. Prioritise based on scoring profile and the Policy and Strategy requirements of the company (if defined). Establish the linkages between the desired Results and the Strengths and OFIs in Enablers, through brainstorming sessions with management team. Identify 5 Strengths and 5 OFIs against each Enabler category inclusive of all criterion parts (5 x 5 = 25 Strengths and 25 OFIs) which have major impact on the Results. Short-list 5 Strengths and 5 OFIs out of 25 Strengths and OFIs. Plan your improvement activities based on the findings at step (d).

(b) (c) (d) (e)

Approach III (a) Prioritise the Strengths and OFIs of the nine criteria using a selection matrix based on the following: Impact on Customer Impact on business bottom line Problem severity Teams ability to solve Teams ability to solve quickly Teams ability to solve with low cost Linkage with organisations Long Term Plans Give score on a scale of 1 to 5 (1 being the least and 5 being the highest). Total the score and determine the priority number for each Strength and OFI. Work on the high priority issues. All issues getting scores equal to or higher than 25 points must be attended to without hesitation. The issues scoring less than 25 points may or may not be acted on this point.

(b) (c)

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

16

ACTION PLAN An organisation should work on the few OFIs that will improve the business most and work on the one or two Strengths, which, if made better, would put it into a Best in Class or World Class Category. Based on the above, now develop the improvement strategy and identify key initiatives to bring the desired improvement in the organisation. It is suggested that the following activities should be considered for an implementation plan for continuous improvement. Managements acceptance and involvement should be obtained on the organisations strategy for improvement and implementation plan. (a) (b) (c) (d) (e) Schedule and budget for the improvement areas (projects). Integration of selected Strengths and OFIs into business plans. Selection and allocation of teams/task forces for specific projects. Use of problem solving process to attack the root cause(s), and working out a solution for implementation. The team may need to do the following for working out a solution: Conducting a pilot Benchmarking against World Class Process from another company or for a multi-unit organisation, internal benchmarks can also be considered as appropriate in the early part of Excellence journey. Assigning a separate expert team to come with solution Undergo training on specific tools and techniques for improvement. (f) (g) Management reviews on the status of the project teams and implementation of the solution. Conduct self-assessment as per the model in 9-12 month intervals to track the progress.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

17

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

18

SECTION 3 EXECUTIVE SUMMARY AND SCORE SHEET

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

19

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

20

SECTION 4 ASSESSMENT REPORT Strengths and Opportunities for Improvement

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

27

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

28

Strengths and Opportunities for Improvement (Sub Criterion wise)

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

29

1. Leadership : Excellent Leaders develop and facilitate the achievement of the mission and vision. They develop organisational values and systems required for sustainable success and implement these via their actions and behaviours. During periods of change they retain a constancy of purpose. Where required, such leaders are able to change the direction of the organisation and inspire others to follow. 1a Leaders develop the mission, vision, values and ethics and are role models of a culture of Excellence They may include : developing the organisations mission, vision and culture; developing and role modelling values, ethics and public responsibilities that support the culture; reviewing and improving the effectiveness of personal leadership behaviours; being actively involved in improvement activities; stimulating and encouraging empowerment, creativity and innovation, e.g. by changing the organisations structure, funding learning and improvement activities; encouraging, supporting and acting upon the findings of learning activities; prioritising improvement activities; stimulating and encouraging collaboration within the organization
Score Attributes Sound: approach has a clear rationale approach has defined processes approach focuses on stakeholder needs Integrated: approach supports policy and strategy approach is linked to other approaches as appropriate Total Score Attributes Implemented: approach is implemented 0% No results or anecdotal 25% Some Evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

Elements Approach

No evidence or anecdotal

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Implemented in about 1/4 of relevant areas Some evidence 50% Implemented in about 1/2 of relevant areas Evidence 75% Implemented in about 3/4 of relevant areas Clear evidence 100% Implemented in all relevant areas

Elements Deployment

No evidence implementation

Systematic: approach is deployed in a structured way with the method used for deployment being planned and executed soundly Total Elements Attributes Assessment Measurement: & Review regular measurement of the effectiveness of the approach and deployment is carried out. Learning: is used to: identify best practice and improvement opportunities Improvement: Output from measurement and learning is analysed and used to: identify, prioritise, plan and implement improvements Total Score No evidence or anecdotal Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Some evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

No evidence or anecdotal

No evidence or anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 5 0 5 Anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

Overall Total

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Basic Competitive Advanced World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

30

1. 1a

Leadership

Strengths
1. Top leaders of BHEL develop vision, mission and strategic plans once in five years, involving the leaders and employees of all the units. During the last review, undertaken in 2006, the company has developed the current VMV, focusing enhancement of stakeholder value. 2. Senior leaders like GMs and Product Chiefs are personally involved in championing and reviewing improvement activities deployed to improve organizational performance viz. PIP, PIR, QCC, CFT, QIP, SIX SIGMA, DTC, LEAN. Manthan 2007 led to evolving DWM, ED's Dashboard etc. 3. ED and GMs personally communicate relevant policies and strategies to union members and other employees through various committee meetings, MECOM, Shop Councils and other fora.

Opportunities for Improvement


1. Although GMs and HODs participate in Inter Unit Functional Heads' Meet, to capture best practices of other units, it is not clear how the leadership uses such information and data for bringing improvement in the unit in an integrated manner. 2. Although leaders are reported to practice the values as role models, it is still not very clear how the code of conduct and ethics are practiced. 3. Although leadership effectiveness has been assessed through two sample surveys to obtain feedback on leadership style of Top Mgmt, it is not evident how it has been used in enhancing effectiveness of personal leadership behaviour

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

31

1.

Leadership : Excellent Leaders develop and facilitate the achievement of the mission and vision. They develop organisational values and systems required for sustainable success and implement these via their actions and behaviours. During periods of change they retain a constancy of purpose. Where required, such leaders are able to change the direction of the organisation and inspire others to follow. Leaders are personally involved in ensuring the organisation's management system is developed, implemented and continuously improved This may include : aligning the organisations structure to support delivery of its policy and strategy; ensuring a system for managing processes is developed and implemented; establishing clear ownership of processes; ensuring a process for the development, deployment and updating of policy and strategy is developed and implemented; ensuring a process for the effective governance of the organisation is developed and implemented; ensuring a process for the measurement, review and improvement of key results is developed and implemented; ensuring a process, or processes, for stimulating, identifying, planning and implementing improvements to enabling approaches, e.g. through creativity, innovation and learning activities, is developed and implemented.
Score Attributes Sound: approach has a clear rationale approach has defined processes approach focuses on stakeholder needs Integrated: approach supports policy and strategy approach is linked to other approaches as appropriate Total Score Attributes Implemented: approach is implemented 0% No results or anecdotal 25% Some Evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

1b

Elements Approach

No evidence or anecdotal 0 0% No evidence implementation 5

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Implemented in about 1/4 of relevant areas Some evidence 50% Implemented in about 1/2 of relevant areas Evidence 75% Implemented in about 3/4 of relevant areas Clear evidence 100% Implemented in all relevant areas

Elements Deployment

Systematic: approach is deployed in a structured way with the method used for deployment being planned and executed soundly Total Elements Attributes Assessment Measurement: & Review regular measurement of the effectiveness of the approach and deployment is carried out. Learning: is used to: identify best practice and improvement opportunities Improvement: Output from measurement and learning is analysed and used to: identify, prioritise, plan and implement improvements Total Score No evidence or anecdotal Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Some evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

No evidence or anecdotal

No evidence or anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 5 0 5 Anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

Overall Total

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Basic Competitive Advanced World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

32

1. 1b

Leadership

Strengths
1. The Unit's organisation structure is aligned with the BHEL Corporate with CMD and the Directors providing policy guidelines. The ED, a member of the Corporate Management Committee, runs the unit with the support of Product and Functional Managers. ED monitors key performance parameters through on line Visual Dashboard and reviews through a review process. 2. The Leadership has established documented SOPs, MIS, DWIs, Product Standards, Process Specifications, defined KPOs and measures as KPIs for managing processes like Tendering, Order Processing, Design & Development, Procurement, Manufacturing, Inspection & Testing, Packing & Despatch and Services. 3. Leaders at corporate and Unit level develop policy and strategy in a participative manner viz. Works Policy, Purchase Policy, AIDs Policy, KM Policy etc are evolved at Corporate. P&D Group at Unit level formulates product growth strategies and plans. This evolution has gone through as ""Perspective for 2002,"" ""Strategic Plan 2002 - 2007"" and presently as ""Strategic Plan 2007 - 2012.""

Opportunities for Improvement


1. The business plans and improvement initiatives of the unit are cascaded down through BSC and KRAs, which are reviewed once in six months. It is not so evident what were the findings of these reviews followed by refinements in the same and also whether this review frequency is adequate to make course corrections and improvement. 2. While the leaders at BHEL Bhopal implement and review the management system through review of key processes, improvement initiatives, BSC -- etc., it is not evident that adequacy and effectiveness of various fora are evaluated towards involvement of stakeholders like customers, vendors, strategic planners -- etc. for improvement in management systems as related with them.
3.

Although the Unit leadership has provided a number of structured platforms and opportunities for planning and implementing improvement projects, it is not evident how the leadership assesses effectiveness of these towards capturing and utilising creative and innovative ideas of people at all levels across the Unit beyond the manufacturing area.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

33

1.

Leadership : Excellent Leaders develop and facilitate the achievement of the mission and vision. They develop organisational values and systems required for sustainable success and implement these via their actions and behaviours. During periods of change they retain a constancy of purpose. Where required, such leaders are able to change the direction of the organisation and inspire others to follow.

1c

Leaders are involved with customers, partners and representatives of society This may include : meeting, understanding and responding to needs and expectations; establishing and participating in partnerships; establishing and participating in joint improvement activity; recognizing individuals and teams of stakeholders for their contribution to the business, for loyalty etc; participating in professional bodies, conferences and seminars, particularly promoting and supporting excellence; promoting, supporting and engaging in activities that aim to improve the global environment and the organisations contribution to society with the view to respecting the rights and interests of future generations.
Score Attributes Sound: approach has a clear rationale approach has defined processes approach focuses on stakeholder needs Integrated: approach supports policy and strategy approach is linked to other approaches as appropriate Total Score 0% No results or anecdotal 25% Some Evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

Elements Approach

No evidence or anecdotal 0 0% No evidence implementation 5

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Implemented in about 1/4 of relevant areas Some evidence 50% Implemented in about 1/2 of relevant areas Evidence 75% Implemented in about 3/4 of relevant areas Clear evidence 100% Implemented in all relevant areas

Attributes Deploymen Implemented: t approach is implemented

Elements

Systematic: approach is deployed in a structured way with the method used for deployment being planned and executed soundly Total Score No evidence or anecdotal Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Some evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

Elements Attributes Assessment Measurement: & Review regular measurement of the

effectiveness of the approach and deployment is carried out. Learning: is used to: identify best practice and improvement opportunities Improvement: Output from measurement and learning is analysed and used to: identify, prioritise, plan and implement improvements Total

No evidence or anecdotal

No evidence or anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 5 0 5 Anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

Overall Total

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Basic Competitive Advanced World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

34

1. 1c

Leadership

Strengths
1. ED, Product Heads, GMs and other senior managers meet customers in pre tenders, pre orders and kick off meetings for projects, to discuss project related issues and understand their needs and expectations. 2. Heads of several groups participate in joint improvement projects for design changes, problem solving, component development and improvement. The leadership also interacts with vendors, technology providers, premier institutions, suppliers and individual experts towards collaboration for mutual benefits. 3. Senior leaders participate in number of professional bodies viz. NSC, RRL, IIMM etc, and contribute to learning through presentation of papers on technology to promote excellence. They also actively associate themselves with these bodies as chairmen / members. 4. Leadership addresses the needs of society through structured approaches and activities in the areas of health, education, environment, community development etc. Leadership also supports the ten principles of UN's global compact programme on human rites, labour standards etc

Opportunities for Improvement


1. While the Unit Leadership interacts and collaborates with different stakeholders, it is not evident how it recognises its loyal customers or performing vendors / suppliers for contribution to the business

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

35

1.

Leadership : Excellent Leaders develop and facilitate the achievement of the mission and vision. They develop organisational values and systems required for sustainable success and implement these via their actions and behaviours. During periods of change they retain a constancy of purpose. Where required, such leaders are able to change the direction of the organisation and inspire others to follow. Leaders reinforce a culture of Excellence with the organisations people This may include : personally communicating the organisations mission, vision, values, policy and strategy, plans, objectives and targets to people; being accessible, actively listening inspiring, uniting and responding to people; helping and supporting people to achieve their plans, objectives and targets; motivating and enabling people to participate in improvement activity; recognizing both team and individual efforts, at all levels within the organisation, in a timely and appropriate manner; promoting and encouraging equal opportunities and diversity.

1d

Elements Approach

Score Attributes Sound: approach has a clear rationale approach has defined processes approach focuses on stakeholder needs Integrated: approach supports policy and strategy approach is linked to other approaches as appropriate Total Score

0% No results or anecdotal

25% Some Evidence

50% Evidence

75% Clear evidence

100% Comprehensive evidence

No evidence or anecdotal 0 0% No evidence implementation 5

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Implemented in about 1/4 of relevant areas Some evidence 50% Implemented in about 1/2 of relevant areas Evidence 75% Implemented in about 3/4 of relevant areas Clear evidence 100% Implemented in all relevant areas

Attributes Deploymen Implemented: t approach is implemented

Elements

Systematic: approach is deployed in a structured way with the method used for deployment being planned and executed soundly Total Score No evidence or anecdotal Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Some evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

Elements Attributes Assessment Measurement: & Review regular measurement of the

effectiveness of the approach and deployment is carried out. Learning: is used to: identify best practice and improvement opportunities Improvement: Output from measurement and learning is analysed and used to: identify, prioritise, plan and implement improvements Total

No evidence or anecdotal

No evidence or anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 5 0 5 Anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

Overall Total

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Basic Competitive Advanced World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

36

1. 1d

Leadership

Strengths
1. The Unit Leadership, comprising ED, GMs, PMs, HODs personally communicate various short term plans, objectives and targets to employees through forums like plant council, shop council, IR meeting with recognised union, particularly on 26th January, 15th August and first day of financial year etc. Achievements of other Units also are shared.
2.

GMs, PMs & HODs motivate employees to participate in improvement activities like, IMPRESS, QCs, Six Sigma through institutionalised recognition and reward scheme. They also encourage people by being champions of improvement initiatives like LEAN, DTC etc.

Opportunities for Improvement

1. Although senior leadership focuses excellence in product, manufacturing processes as well as in operational performance and communicates & reviews these in a very structured manner, yet key people processes, overall house keeping across the Unit as well as safety practices need specific attention to demonstrate overall excellence.
2.

Although mentorship is practised at senior leadership level, it is not evident how managers play the role of mentor, coach, counsellor and trainer effectively.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

37

1.

Leadership : Excellent Leaders develop and facilitate the achievement of the mission and vision. They develop organisational values and systems required for sustainable success and implement these via their actions and behaviours. During periods of change they retain a constancy of purpose. Where required, such leaders are able to change the direction of the organisation and inspire others to follow. Leaders identify and champion organisational change This may include : understanding the internal and external drivers of change for the organisation; identifying and selecting changes that need to be made within the organisation, to the organisation model and in its external relationships; leading the development of change plans; securing investment, resources and support for change; managing the delivery and risks of the overall portfolio of change programmers; ensuring the effective delivery of change and managing stakeholders; communicating changes and the reasons for them to the organisations people and other stakeholders; supporting and enabling people to manage change; measuring and reviewing the effectiveness of changes and sharing the knowledge gained.
Score Attributes Sound: approach has a clear rationale approach has defined processes approach focuses on stakeholder needs Integrated: approach supports policy and strategy approach is linked to other approaches as appropriate Total Score 0% No results or anecdotal 25% Some Evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

1e

Elements Approach

No evidence or anecdotal 0 0% No evidence implementation 5

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Implemented in about 1/4 of relevant areas Some evidence 50% Implemented in about 1/2 of relevant areas Evidence 75% Implemented in about 3/4 of relevant areas Clear evidence 100% Implemented in all relevant areas

Attributes Deploymen Implemented: t approach is implemented

Elements

Systematic: approach is deployed in a structured way with the method used for deployment being planned and executed soundly Total Score No evidence or anecdotal Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Some evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

Elements Attributes Assessment Measurement: & Review regular measurement of the

effectiveness of the approach and deployment is carried out. Learning: is used to: identify best practice and improvement opportunities Improvement: Output from measurement and learning is analysed and used to: identify, prioritise, plan and implement improvements Total

No evidence or anecdotal

No evidence or anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 5 0 5 Anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

Overall Total

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Basic Competitive Advanced World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

38

1. 1e

Leadership

Strengths
1. The leadership has endeavoured to bring change in the Unit to meet operational challenges like i) Filling technology gaps in engineering ii) New product development, iii) Capacity augmentation of hydro / transformer/ motor. iv) Improved material handling system. 2. The Unit leadership has drawn up an investment plan of Rs 1200 Crores during 2007 - 2012, have taken the services of reputed consultants to launch new performance management system like e-map as well as change in strategy planning. 3. Based on the recommendations of the external consultants the leaders have focused on some key changes viz: reposition the organisation, improve the business strategy, and enhance organisational effectiveness and capability. The leadership is addressing these through a planned approach viz., with time bound change plan and perceived risks.

Opportunities for Improvement


1. While change management has addressed enhancing organisational capability and effectiveness along with people performance management system (e-map), it does not appear to address critical processes related to people competence, training & development and involvement at every level to enhance people capability. HR change plan addresses only numbers.
2.

It is not evident if the intent of change needed is communicated to stakeholders such as customers, and suppliers through a structured approach.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

39

2.

Policy and Strategy : Excellent Organisations implement their mission and vision by developing a stakeholder focused strategy that takes account of the market and sector in which it operates. Policies, plans, objectives, and processes are developed and deployed to deliver the strategy.

2a

Policy and Strategy are based on the present and future needs and expectations of stakeholders This may include : gathering and understanding information to define the markets and market segments the organisation will operate in both now and in the future; identifying, understanding and anticipating the needs and expectations of current and future stakeholders including customers, employees, partners, society and shareholders; identifying, understanding and anticipating developments in the market place, including competitor activity.

Elements Approach

Score Attributes Sound: approach has a clear rationale approach has defined processes approach focuses on stakeholder needs Integrated: approach supports policy and strategy approach is linked to other approaches as appropriate Total Score

0% No results or anecdotal

25% Some Evidence

50% Evidence

75% Clear evidence

100% Comprehensive evidence

No evidence or anecdotal 0 0% No evidence implementation 5

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Implemented in about 1/4 of relevant areas Some evidence 50% Implemented in about 1/2 of relevant areas Evidence 75% Implemented in about 3/4 of relevant areas Clear evidence 100% Implemented in all relevant areas

Attributes Deploymen Implemented: t approach is implemented

Elements

Systematic: approach is deployed in a structured way with the method used for deployment being planned and executed soundly Total Score No evidence or anecdotal Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Some evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

Elements Attributes Assessment Measurement: & Review regular measurement of the

effectiveness of the approach and deployment is carried out. Learning: is used to: identify best practice and improvement opportunities Improvement: Output from measurement and learning is analysed and used to: identify, prioritise, plan and implement improvements Total

No evidence or anecdotal

No evidence or anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 5 0 5 Anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

Overall Total

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Basic Competitive Advanced World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

40

2. 2a

Policy and Strategy

Strengths
1. The Unit and the corporate, as relevant, capture needs of various stakeholders like shareholders, customers and employees through management meetings, surveys, meet, feedbacks and reports from external agencies.
2.

BHEL has used professional facilitation from agencies like m/s McKinsey for providing inputs on business environment, thus enabling the organisation to take fresh initiatives on business strategy, organisational effectiveness and capability building. of the senior leaders of Bhopal unit played a lead role in rolling out DTC and LEAN as support initiatives. BHEL has an established process, for understanding the future scenario of the industry, for different time horizons and different business segments as well as on competition as part of the Policy & Strategy development process.

3.

Opportunities for Improvement


1. Although excellence in product is a highly focused area and product benchmark data is collected and used in strategic planning, process benchmarking is not given the similar attention, which could enable BHEL Bhopal becoming a world class MNC. 2. While needs of various stakeholders are considered during planning process, the same is not apparent in the case of vendors having significant roles to play in fructifying strategic plan 2012. In last year's survey only 130 vendors out of total about 2500 vendors were covered in the perception survey, it is not evident that the sample selected is on statistical basis and could represents the population. 3. While the company has 15% export sales, in the absence of data it is not evident how needs and expectations of current and potential overseas customers are captured and used in formulation of policy and strategy.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

41

2.

Policy and Strategy : Excellent Organisations implement their mission and vision by developing a stakeholder focused strategy that takes account of the market and sector in which it operates. Policies, plans, objectives, and processes are developed and deployed to deliver the strategy. Policy and Strategy are based on information from performance measurement, research, learning and external related activities This may include : analyzing output from internal performance indicators; analyzing output from learning activities; analyzing external image and brand awareness data; analyzing the performance of competitors and best in class organisations; analyzing data regarding existing /potential partners core competencies; analyzing data for both long and short term social, environmental, safety and legal issues; analyzing data on the effects of products and services throughout their entire life-cycle; identifying and understanding economic and demographic indicators; analyzing data to determine the impact of new technologies and business models on the performance of the organisation.
Score Attributes Sound: approach has a clear rationale approach has defined processes approach focuses on stakeholder needs Integrated: approach supports policy and strategy approach is linked to other approaches as appropriate Total Score 0% No results or anecdotal 25% Some Evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

2b

Elements Approach

No evidence or anecdotal 0 0% No evidence implementation 5

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Implemented in about 1/4 of relevant areas Some evidence 50% Implemented in about 1/2 of relevant areas Evidence 75% Implemented in about 3/4 of relevant areas Clear evidence 100% Implemented in all relevant areas

Attributes Deploymen Implemented: t approach is implemented

Elements

Systematic: approach is deployed in a structured way with the method used for deployment being planned and executed soundly Total Score No evidence or anecdotal Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Some evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

Elements Attributes Assessment Measurement: & Review regular measurement of the

effectiveness of the approach and deployment is carried out. Learning: is used to: identify best practice and improvement opportunities Improvement: Output from measurement and learning is analysed and used to: identify, prioritise, plan and implement improvements Total

No evidence or anecdotal

No evidence or anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 5 0 5 Anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

Overall Total

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Basic Competitive Advanced World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

42

2. 2b

Policy and Strategy

Strengths
1. Ten-year digest of internal performance is used for financial analysis and a base for product - wise analysis. The market research reports related to product lines and product developments are discussed in MCM and decisions are taken for formulation of strategies 2. Outputs from TMWs at corporate level are considered as one of the inputs for P&S by Bhopal unit. Information about growth, economy, demand patterns, Govt. policies, competitor data -- etc., is used for Unit level strategic plans. 3. Various data on economic & demographic changes, Govt. policies, investment projections, market projections, demand and consumption pattern, competition related etc., are analysed using SWOT analysis, Product Portfolio analysis, Growth - Share Matrix, Dupont Chart methodology etc as part of the Strategy development process.

Opportunities for Improvement


1. While various customers related data are collected and analysed, the use of data from research & learning activities including foreign visits, product life cycle analysis etc. is not seen.
2.

There is not enough evidence on how core competencies of existing and potential partners are assessed & analysed and how these influence Units policy & strategy.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

43

2.

Policy and Strategy : Excellent Organisations implement their mission and vision by developing a stakeholder focused strategy that takes account of the market and sector in which it operates. Policies, plans, objectives, and processes are developed and deployed to deliver the strategy. Policy and Strategy are developed, reviewed and updated This may include: developing, reviewing and updating policy and strategy consistent with the organisations mission, vision and concepts of Excellence; balancing both long and short-term needs and expectations of stakeholders; assessing risks and identifying ways of addressing these risks; identifying present and future competitive advantage; identifying core capabilities and needs for partnerships/alliances to deliver policy and strategy; reaffirming presence in established markets or requirement to change market approach; aligning strategy with those of partners and alliances; identifying critical success factors; aligning and continuously developing social and environmental standards with partners; evaluating the relevance and effectiveness of policy and strategy.
Score Attributes Sound: approach has a clear rationale approach has defined processes approach focuses on stakeholder needs Integrated: approach supports policy and strategy approach is linked to other approaches as appropriate Total 0% 25% 50% 75% 100%

2c

Elements Approach

No results or anecdotal

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 0% No evidence implementation 5

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Implemented in about 1/4 of relevant areas Some evidence 50% Implemented in about 1/2 of relevant areas Evidence 75% Implemented in about 3/4 of relevant areas Clear evidence 100% Implemented in all relevant areas

Attributes Deploymen Implemented: t approach is implemented

Elements

Score

Systematic: approach is deployed in a structured way with the method used for deployment being planned and executed soundly Total Score No evidence or anecdotal Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Some evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

Elements Attributes Assessment Measurement: & Review regular measurement of the

effectiveness of the approach and deployment is carried out. Learning: is used to: identify best practice and improvement opportunities Improvement: Output from measurement and learning is analysed and used to: identify, prioritise, plan and implement improvements Total

No evidence or anecdotal

No evidence or anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 5 0 5 Anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

Overall Total

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Basic Competitive Advanced World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

44

2. 2c

Policy and Strategy

Strengths
1. The Unit associates itself in the strategy development process at the corporate level to fine tune the units strategies keeping in view the overall company wide targets and strategic directions. This process has been refined over the past 30 years and currently integrates all the Units in the process to ensure the needs of its customers. 2. P&D Group, at the Unit level, prepares the draft strategy in consultation with the product group owners considering the corporate product strategies and growth plans from corporate level. P&D Group prepares a five-year strategic plan after discussion with ED and GMs. This is finally approved by corp. office.
3.

Policies and Strategies are deployed across the company through Corporate Strategic Plan, Strategic Divisional Plan, Three Year Rolling Plan, Annual Budget and deployed through BSC at Unit, GM & HOD level and finally through individual KRA / e-Map. These are deployed / achieved through a number of key processes and sub processes with appropriate process measures, derived from CSFs and owned by CSF champions. Current strategic plan is '2007-12'. Top management reviews Three year rolling plan on an annual basis.

Opportunities for Improvement


1. While the unit has identified long term CSFs for 2012 and also CSFs for 2007-08, there are no CSFs identified, which address major stakeholders like vendors and society.
2.

While the Unit is keeping its existing customers happy, in certain segments, by renovation and modernisation of the existing equipment, it is not evident how the risk of technological obsolescence is addressed.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

45

2.

Policy and Strategy : Excellent Organisations implement their mission and vision by developing a stakeholder focused strategy that takes account of the market and sector in which it operates. Policies, plans, objectives, and processes are developed and deployed to deliver the strategy. Policy and Strategy are communicated and deployed through a framework of key processes This may include : identifying and designing and communicating the framework of key processes needed to deliver the organisations policy and strategy; communicating policy and strategy to stakeholders and evaluating the awareness of it; aligning, prioritising, agreeing, cascading and communicating plans, objectives and targets as well as following up achievements; establishing organisation wide reporting mechanisms to track progress.

2d

Elements Approach

Score Attributes Sound: approach has a clear rationale approach has defined processes approach focuses on stakeholder needs Integrated: approach supports policy and strategy approach is linked to other approaches as appropriate Total

0%

25%

50%

75%

100%

No results or anecdotal

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 0% No evidence implementation 5

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Implemented in about 1/4 of relevant areas Some evidence 50% Implemented in about 1/2 of relevant areas Evidence 75% Implemented in about 3/4 of relevant areas Clear evidence 100% Implemented in all relevant areas

Attributes Deploymen Implemented: t approach is implemented

Elements

Score

Systematic: approach is deployed in a structured way with the method used for deployment being planned and executed soundly Total Score No evidence or anecdotal Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Some evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

Elements Attributes Assessment Measurement: & Review regular measurement of the

effectiveness of the approach and deployment is carried out. Learning: is used to: identify best practice and improvement opportunities Improvement: Output from measurement and learning is analysed and used to: identify, prioritise, plan and implement improvements Total

No evidence or anecdotal

No evidence or anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 5 0 5 Anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

Overall Total

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Basic Competitive Advanced World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

46

2. 2d

Policy and Strategy

Strengths
1. The Unit has documented its SOPs, MIs, and DWIs etc along with respective owners and measures. CSFs, identified for 2007 - 08 are linked to various Unit level key processes viz. Planning, Material Procurement, Cash Collection etc., with defined output measures. 2. All unit level goals and targets, for the year, are cascaded down and linked to employees through their annual KRAs. These are monitored and reviewed under BSC, through e-map. A unit wide reporting mechanism is established with set frequency, along with identified facilitators and reviewers. Senior leaders and departmental meetings communicate the strategic targets across all levels of employees through various means such as display boards, address.

Opportunities for Improvement


1. The Unit has identified nine processes viz. from planning... to Lean Management as Key Processes for the year 2007 - '08. It has identified another nine processes viz., from Tender Processing, Manufacturing, Inspection and Testing ... to Services as Business Processes. At the same time, Marketing & Sales, Project Management and Materials Management have been cited as Business Processes. However, it is not clear what framework, of key processes, has been identified, designed and communicated to all concerned to deliver its policy & strategy and enable its people to have uniform understanding across the organisation. 2. Although BSC is cascaded and KRAs of individuals are monitored, it is not evident how the action plans to achieve KRA are formulated and reviewed effectively for its progress.

3. It is not evident how the Unit evaluates the awareness of action plans against long term
CSFs at all levels as applicable.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

47

3.

People : Excellent organisations manage, develop and release the full potential of their people at an individual, team-based and organisational level. They promote fairness and equality and involve and empower their people. They care for, communicate, reward and recognize, in a way that motivates staff and builds commitment to using their skills and knowledge for the benefit of the organisation. People resources are planned, managed and improved This may include : developing human resource policies, strategies and plans; involving employees, and their representatives, in developing human resource policies, strategies and plans; aligning the human resource plans with policy and strategy, the organisational structure and the framework of key processes; managing recruitment, career development and succession planning; promoting and ensuring fairness in all terms of employment including equal opportunities policies, strategies and plans; using people surveys and other forms of employee feedback to improve human resource policies, strategies and plans; using innovative organisation methodologies to improve the way of working, e.g. restructuring the supply chain, flexible team working.
Score Attributes Sound: approach has a clear rationale approach has defined processes approach focuses on stakeholder needs Integrated: approach supports policy and strategy approach is linked to other approaches as appropriate Total 0% 25% 50% 75% 100%

3a

Elements Approach

No results or anecdotal

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 0% No evidence implementation 5

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Implemented in about 1/4 of relevant areas Some evidence 50% Implemented in about 1/2 of relevant areas Evidence 75% Implemented in about 3/4 of relevant areas Clear evidence 100% Implemented in all relevant areas

Attributes Deploymen Implemented: t approach is implemented

Elements

Score

Systematic: approach is deployed in a structured way with the method used for deployment being planned and executed soundly Total Score No evidence or anecdotal Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Some evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

Elements Attributes Assessment Measurement: & Review regular measurement of the

effectiveness of the approach and deployment is carried out. Learning: is used to: identify best practice and improvement opportunities Improvement: Output from measurement and learning is analysed and used to: identify, prioritise, plan and implement improvements Total

No evidence or anecdotal

No evidence or anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 5 0 5 Anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

Overall Total

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Basic Competitive Advanced World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

48

3. 3a

People

Strengths
1. The Unit HR plans are developed & cascaded from Corporate Vision, Mission & Values, Corporate HR policy / Personnel Manual, HR Pole Stars etc. Feedback from employees through 3 tier participative management forums is taken for developing HR policies / plans. Improvements have been brought in - based on employee feedback. 2. BHEL has prepared HR Manual containing policies related to employment, perks and benefits. The manual is updated every five years through deliberations in high level CFTs constituted specifically. The strategies are formulated both at corporate level as well as at unit level.
3.

There is a grievance procedure and three-tier participation of workers-joint committee at corporate level to discuss various issues. Employee perception surveys are conducted periodically, once in two years since 2005.

Opportunities for Improvement


1. The unit has an approach of employee career development, however its soundness and systematic implementation in terms of categorizing number of employees identified based on their potential with career development plans chalked out for them as per organization's future needs is not so evident. This is important in view of two CSFs, 'Bridging gaps 'and' Capacity enhancement'. 2. Though EPS is being conducted since 1998, with the questionnaire having been revised thrice, response rate being low (less than 20%) and average satisfaction level showing marginal improvement (from 5.6 to 6.2), the effectiveness of this employee feedback process itself appears to be low. 3. Although employees go through leadership development programme at various levels, it is not evident how effectiveness of such training & development programme is measured and acted upon.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

49

3.

People : Excellent organisations manage, develop and release the full potential of their people at an individual, team-based and organisational level. They promote fairness and equality and involve and empower their people. They care for, communicate, reward and recognize, in a way that motivates staff and builds commitment to using their skills and knowledge for the benefit of the organisation. Peoples knowledge and competencies are identified, developed and sustained This may include : identifying, classifying and matching peoples knowledge and competencies with the organisations needs; developing and using training and development plans to help ensure people match the present and future capability needs of the organisation; Developing, mentoring and training all people to help them realise and attain their full potential; designing and promoting individual, team and organisational learning opportunities; developing people through work experience; developing team skills; aligning individual and team objectives with the organisations targets; reviewing and updating individual and team objectives; appraising and helping people improve their performance.
Score Attributes Sound: approach has a clear rationale approach has defined processes approach focuses on stakeholder needs Integrated: approach supports policy and strategy approach is linked to other approaches as appropriate Total 0% 25% 50% 75% 100%

3b

Elements Approach

No results or anecdotal

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 0% No evidence implementation 5

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Implemented in about 1/4 of relevant areas Some evidence 50% Implemented in about 1/2 of relevant areas Evidence 75% Implemented in about 3/4 of relevant areas Clear evidence 100% Implemented in all relevant areas

Attributes Deploymen Implemented: t approach is implemented

Elements

Score

Systematic: approach is deployed in a structured way with the method used for deployment being planned and executed soundly Total Score No evidence or anecdotal Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Some evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

Elements Attributes Assessment Measurement: & Review regular measurement of the

effectiveness of the approach and deployment is carried out. Learning: is used to: identify best practice and improvement opportunities Improvement: Output from measurement and learning is analysed and used to: identify, prioritise, plan and implement improvements Total

No evidence or anecdotal

No evidence or anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 5 0 5 Anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

Overall Total

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Basic Competitive Advanced World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

50

3. 3b

People

Strengths
1. The Unit has a system for training and development of employees at entry level, through emap (PMS), and depending on the needs of function / activity they are associated with. Various training programmes are ' Dakshata ' for ETs, multiskilling and knowledge worker for artisans, Six Sigma, DTC, LEAN -- etc. Opportunities are also provided to employees to develop allied skills by using them as assessors in various systems. 2. The Unit supports and encourages the employees for enrolling as members of professional bodies, subscription for magazines, participation in national / international seminars, Internet - etc., to facilitate the learning process.
3.

HR Data base having employee profile is used for job rotation at inter and intra dept level as per need. HR executives are being trained for PCMM as a part of their future plan. The perfromance at executive level is measured through BSC and e-MAP and appraisal of supervisors and workers is done through ACR. They are given the feedback on inferior performance. Appraiser in consultation with the appraisee identifies developmental competencies and training is provided for improvement

Opportunities for Improvement


1. It is not evident how the job description of the employees is analysed, reviewed and kept updated. Though competency mapping has been done for individuals in management level, it is not evident if gap analysis has been done and the outcome has been acted upon to enhance competence. 2. Though feedbacks are taken at the end of induction training and various training programme, it does not appear that effectiveness of a critical process like training & development is measured. Nor these are compared with any benchmark.
3.

Although feedback is taken at the end of training programme and subsequently from self and superior, it is not evident how effectiveness of training is measured at different levels.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

51

3.

People : Excellent organisations manage, develop and release the full potential of their people at an individual, team-based and organisational level. They promote fairness and equality and involve and empower their people. They care for, communicate, reward and recognize, in a way that motivates staff and builds commitment to using their skills and knowledge for the benefit of the organisation. People are involved and empowered This may include : encouraging and supporting individual and team participation in improvement activities; encouraging and supporting peoples involvement e.g. through in-house conferences, ceremonies and community projects; providing opportunities that stimulate involvement and support innovative and creative behavior; training managers to develop and implement guidelines empowering people to take action; encouraging people to work together in teams

3c

Elements Approach

Score Attributes Sound: approach has a clear rationale approach has defined processes approach focuses on stakeholder needs Integrated: approach supports policy and strategy approach is linked to other approaches as appropriate Total

0%

25%

50%

75%

100%

No results or anecdotal

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 0% No evidence implementation 5

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Implemented in about 1/4 of relevant areas Some evidence 50% Implemented in about 1/2 of relevant areas Evidence 75% Implemented in about 3/4 of relevant areas Clear evidence 100% Implemented in all relevant areas

Elements Deployment

Score Attributes Implemented: approach is implemented

Systematic: approach is deployed in a structured way with the method used for deployment being planned and executed soundly Total Elements Attributes Assessment Measurement: & Review regular measurement of the effectiveness of the approach and deployment is carried out. Learning: is used to: identify best practice and improvement opportunities Improvement: Output from measurement and learning is analysed and used to: identify, prioritise, plan and implement improvements Total Score No evidence or anecdotal Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Some evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

No evidence or anecdotal

No evidence or anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 5 0 5 Anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

Overall Total

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Basic Competitive Advanced World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

52

3. 3c

People

Strengths
1. The Unit has been implementing improvement initiatives by involving employees to form CFTs, Quality circles, Six Sigma teams, Self directed teams for DTC and LEAN, Suggestion Schemes etc. Web based IMPRESS was launched in 2004-05 to integrate all improvement initiatives The Business excellence movement is steered through Business councils at unit level, Product/ functional level
2.

The Unit involves its employees through JIP involving customers and partners as part of improvement projects. There is also involvement through in-house conferences, seminars, community projects, and large-scale celebrations. Innovations are encouraged from employees through IPR incentive scheme. Employees are empowered through various delegations of powers.

Opportunities for Improvement


1. While there are number of platforms for employee involvement and the end result is monitored through savings accrued, prizes given, it is not evident how employee involvement as a process is measured and improved in the absence of defined KPIs, facilitating evaluating the effectiveness. 2. While employee involvement approaches address management staff, supervisors and workmen, it does not appear to address contract workmen, which is more than 3000 in number and non involvement may not be conducive to desired human relations and work ambience in the Unit.
3.

It is not evident that the Unit provides training to its managers to facilitate development of guidelines for people empowerment.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

53

3.

People : Excellent organisations manage, develop and release the full potential of their people at an individual, team-based and organisational level. They promote fairness and equality and involve and empower their people. They care for, communicate, reward and recognize, in a way that motivates staff and builds commitment to using their skills and knowledge for the benefit of the organisation. People and the organisation have a dialogue This may include: identifying communication needs; developing communications policies, strategies and plans based on communications needs; developing and using top down, bottom up and horizontal communication channels; identifying and ensuring opportunities to share best practice and knowledge.

3d

Elements Approach

Score Attributes Sound: approach has a clear rationale approach has defined processes approach focuses on stakeholder needs Integrated: approach supports policy and strategy approach is linked to other approaches as appropriate Total

0%

25%

50%

75%

100%

No results or anecdotal

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 0% No evidence implementation 5

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Implemented in about 1/4 of relevant areas Some evidence 50% Implemented in about 1/2 of relevant areas Evidence 75% Implemented in about 3/4 of relevant areas Clear evidence 100% Implemented in all relevant areas

Attributes Deploymen Implemented: t approach is implemented

Elements

Score

Systematic: approach is deployed in a structured way with the method used for deployment being planned and executed soundly Total Score No evidence or anecdotal Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Some evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

Elements Attributes Assessment Measurement: & Review regular measurement of the

effectiveness of the approach and deployment is carried out. Learning: is used to: identify best practice and improvement opportunities Improvement: Output from measurement and learning is analysed and used to: identify, prioritise, plan and implement improvements Total

No evidence or anecdotal

No evidence or anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 5 0 5 Anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

Overall Total

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Basic Competitive Advanced World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

54

3. 3d

People

Strengths
1. Communication needs are identified through surveys, structured bipartite meetings and other forums of communication. Sr. leaders communicate the business plan at the beginning of every year to executives and employee representatives. In house magazines and newsletter are also used for communication.
2.

There are seven advisory councils like PF trust, canteen committee, grievance committee, medical committee etc., where employee representation is there and they express and exchange their views, opinions and needs with management.

Opportunities for Improvement

1.

Although there are number of channels for communication, it is not evident how effectiveness of these channels is measured, even as issues addressed are mostly operations related and not the change process which will enable the Unit to become world class enterprise.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

55

3.

People : Excellent organisations manage, develop and release the full potential of their people at an individual, team-based and organisational level. They promote fairness and equality and involve and empower their people. They care for, communicate, reward and recognize, in a way that motivates staff and builds commitment to using their skills and knowledge for the benefit of the organisation. People are rewarded, recognised and cared for This may include : aligning remuneration, redeployment, redundancy and other terms of employment with policy and strategy; recognising people in order to promote and sustain their involvement and empowerment; promoting awareness and involvement in health, safety, the environment and issues on social responsibility; setting the levels of benefits, e.g. pension plan, health care, childcare; recognising and taking account of diversity and different cultural backgrounds promoting social and cultural activities; providing resources and services that meet legal essentials and in some cases, exceed these requirements.
Score Attributes Sound: approach has a clear rationale approach has defined processes approach focuses on stakeholder needs Integrated: approach supports policy and strategy approach is linked to other approaches as appropriate Total 0% 25% 50% 75% 100%

3e

Elements Approach

No results or anecdotal

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 0% No evidence implementation 5

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Implemented in about 1/4 of relevant areas Some evidence 50% Implemented in about 1/2 of relevant areas Evidence 75% Implemented in about 3/4 of relevant areas Clear evidence 100% Implemented in all relevant areas

Attributes Deploymen Implemented: t approach is implemented

Elements

Score

Systematic: approach is deployed in a structured way with the method used for deployment being planned and executed soundly Total Score No evidence or anecdotal Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Some evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

Elements Attributes Assessment Measurement: & Review regular measurement of the

effectiveness of the approach and deployment is carried out. Learning: is used to: identify best practice and improvement opportunities Improvement: Output from measurement and learning is analysed and used to: identify, prioritise, plan and implement improvements Total

No evidence or anecdotal

No evidence or anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 5 0 5 Anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

Overall Total

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Basic Competitive Advanced World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

56

3. 3e

People

Strengths
1. The compensation of the employees is made through New Reward Scheme using PIP as a yardstick to measure both physical and financial performance. It is linked to BSC score of the company. There has been substantial increase in reward with PP and SIP system. CMD hosts a dinner every year to recognise the award winners. 2. In 2008, a new reward scheme has been introduced for recognition of individual and collective performance. A significant rise is made in PP and SIP payments to employees to encourage them for better performance and to retain talent. 3. There are various awards, at unit level and co. level, to recognize people for their meritorious performance. Some of these are IMPRESS, Quality Circle award, Safety award, Suggestion award, BEAT, IPR incentive -- etc. at unit level and Utkrishtha Puraskar, Gunavatta Puraskar, Utpadakata Puraskar, Anusandhan Puraskar at corporate level.
4.

The factory and hospital are ISO 14001 and OHSAS 18001 certified. Employees are trained on first aid, stress management, prevention of AIDS -- etc., Medical facilities like 350 bed hospital, yoga centre, sports club etc., are provided to all employees

Opportunities for Improvement

1. It is not evident whether the unit's leadership has any approach towards the work life balance of employees.
2.

Although the Unit is certified to OHSAS and lot of awareness programmes is held, the deployment and effectiveness of such initiatives is not being pursued, as seen from the use of PPE in an adhoc manner, in various plants of the Unit.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

57

4.

Partnerships and Resources : Excellent organisations plan and manage external partnerships, suppliers and internal resources in order to support policy and strategy and the effective operation of processes. During planning and whilst managing partnerships and resources they balance the current and future needs of the organisation, the community and the environment. External partnerships are managed This may include : identifying key organisation and community partnership opportunities in line with policy and strategy and the organisations mission; structuring partnership and supplier relationships to create and maximise value; forming supply chain partnerships that add value to customers; Identifying and leveraging core competencies of partners and supporting mutual development; ensuring cultural compatibility and the sharing of knowledge with partner organisations; generating and supporting innovative and creative thinking through the use of partnerships; creating synergy in working together to improve processes and add value to the customer/supplier chain.
Score Attributes Sound: approach has a clear rationale approach has defined processes approach focuses on stakeholder needs Integrated: approach supports policy and strategy approach is linked to other approaches as appropriate Total 0% 25% 50% 75% 100%

4a

Elements Approach

No results or anecdotal

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 0% No evidence implementation 5

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Implemented in about 1/4 of relevant areas Some evidence 50% Implemented in about 1/2 of relevant areas Evidence 75% Implemented in about 3/4 of relevant areas Clear evidence 100% Implemented in all relevant areas

Attributes Deploymen Implemented: t approach is implemented

Elements

Score

Systematic: approach is deployed in a structured way with the method used for deployment being planned and executed soundly Total Score No evidence or anecdotal Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Some evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

Elements Attributes Assessment Measurement: & Review regular measurement of the

effectiveness of the approach and deployment is carried out. Learning: is used to: identify best practice and improvement opportunities Improvement: Output from measurement and learning is analysed and used to: identify, prioritise, plan and implement improvements Total

No evidence or anecdotal

No evidence or anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 5 0 5 Anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

Overall Total

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Basic Competitive Advanced World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

58

4. 4a

Partnerships and Resources :

Strengths
1. BHEL identifies the opportunities of JV and alliances in line with the strategic objectives, considering present capacities and capabilities. . 2. The Unit has developed various strategic alliances, for product and technology development. These are with organizations like Toshiba, Siemens, Strukton Systems, CVRDE -- etc. It has also JVs with customers like NTPC, NPCIL, and Railways etc. 3. The Unit has a vendor base, 2500 nos., which play a vital role in supply chain. The unit supports some of them by providing technical guidance, trainings, tools, gauges -- etc. They are also helped to upgrade themselves through assessment, audits and performance rating.
4.

The Unit holds product wise supplier meets. It also has some JIPs with vendors to develop components like commutator & impeller and for packaging improvement.

Opportunities for Improvement


1.

Even though the Unit has vendor rating system, has JIPs with vendors and meets, there is little evidence of recognition by any form to these important partners.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

59

4.

Partnerships and Resources : Excellent organisations plan and manage external partnerships, suppliers and internal resources in order to support policy and strategy and the effective operation of processes. During planning and whilst managing partnerships and resources they balance the current and future needs of the organisation, the community and the environment. Finances are managed This may include : developing and implementing financial strategies and processes for using financial resources in support of overall policy and strategy; designing the financial planning and reporting to cascade the financial stakeholders expectations throughout the organisation; establishing reporting mechanisms; evaluating investment in and divestment of both tangible and non tangible assets; using financial mechanisms and parameters to ensure an efficient and effective resourcing structure; developing and introducing methodologies for managing risks to financial resources to all appropriate levels in the organisation; establishing and implementing core governance processes at all appropriate levels in the organisation.
Score Attributes Sound: approach has a clear rationale approach has defined processes approach focuses on stakeholder needs Integrated: approach supports policy and strategy approach is linked to other approaches as appropriate Total 0% 25% 50% 75% 100%

4b

Elements Approach

No results or anecdotal

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 0% No evidence implementation 5

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Implemented in about 1/4 of relevant areas Some evidence 50% Implemented in about 1/2 of relevant areas Evidence 75% Implemented in about 3/4 of relevant areas Clear evidence 100% Implemented in all relevant areas

Attributes Deploymen Implemented: t approach is implemented

Elements

Score

Systematic: approach is deployed in a structured way with the method used for deployment being planned and executed soundly Total Score No evidence or anecdotal Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Some evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

Elements Attributes Assessment Measurement: & Review regular measurement of the

effectiveness of the approach and deployment is carried out. Learning: is used to: identify best practice and improvement opportunities Improvement: Output from measurement and learning is analysed and used to: identify, prioritise, plan and implement improvements Total

No evidence or anecdotal

No evidence or anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 5 0 5 Anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

Overall Total

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Basic Competitive Advanced World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

60

4. 4b

Partnerships and Resources :

Strengths
1. The Unit has established and deployed a financial management process. Various revenue and cost budgets are prepared specifying the cash flow and working capital requirements. Financial analysis is carried out for all new investments proposals in terms of NPV & IRR. 2. The financial management practices of the Unit support growth, profitability, cost competitiveness and capacity & capability enhancement. These are aligned with company P&S and are reviewed at Unit level and corporate level in important meetings like ED's cash review meetings, MCM, capital budget meetings, Finance head meetings etc. 3. Revenue budget including turnover, material Consumption, gross billing, margins, EVA, cash flows, profitability -- etc., is prepared product wise / function wise at unit level. Capital budget in the form of schemes / feasibility reports is prepared by P&D group at unit and at corporate level. 4. Reports containing financial data are available online through access control mechanism. These contain information as regards gross billing, turnover, debtors, cash collection, LC status, stock movement statements, and materials with suppliers, tax laws etc.

Opportunities for Improvement


1. It is not clear how the Unit provides financial resources towards investing into non tangible assets, like Brand Building and Intellectual Properties.
2.

Though financial strategies and performance are reviewed at the Unit level and at corporate, it is not evident how financial and accounting processes or departmental practices are reviewed and improved.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

61

4.

Partnerships and Resources : Excellent organisations plan and manage external partnerships, suppliers and internal resources in order to support policy and strategy and the effective operation of processes. During planning and whilst managing partnerships and resources they balance the current and future needs of the organisation, the community and the environment. Buildings, equipment and materials are managed This may include : developing a strategy for managing buildings, equipment and materials that supports the organisations policy and strategy; managing the maintenance and utilization of assets to improve total life cycle performance; managing the security of assets; measuring and managing any adverse effects of the organisations assets on the community and employees (including ergonomics, health and safety); utilising resources in an environmentally sound manner throughout the entire lifecycle of a product; optimising material inventories; optimising consumption of utilities; reducing and recycling waste; minimising any adverse global impact of products, production processes and services;
Score Attributes Sound: approach has a clear rationale approach has defined processes approach focuses on stakeholder needs Integrated: approach supports policy and strategy approach is linked to other approaches as appropriate Total 0% 25% 50% 75% 100%

4c

Elements Approach

No results or anecdotal

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 0% No evidence implementation 5

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Implemented in about 1/4 of relevant areas Some evidence 50% Implemented in about 1/2 of relevant areas Evidence 75% Implemented in about 3/4 of relevant areas Clear evidence 100% Implemented in all relevant areas

Attributes Deploymen Implemented: t approach is implemented

Elements

Score

Systematic: approach is deployed in a structured way with the method used for deployment being planned and executed soundly Total Score No evidence or anecdotal Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Some evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

Elements Attributes Assessment Measurement: & Review regular measurement of the

effectiveness of the approach and deployment is carried out. Learning: is used to: identify best practice and improvement opportunities Improvement: Output from measurement and learning is analysed and used to: identify, prioritise, plan and implement improvements Total

No evidence or anecdotal

No evidence or anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 5 0 5 Anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

Overall Total

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Basic Competitive Advanced World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

62

4. 4c

Partnerships and Resources :

Strengths
1. The Unit has started repairing / modernising its buildings. There had been continuous reduction in material consumption and cost through import substitution. Bulk purchasing of materials (such as copper) are centralised keeping in view the advantages in the price negotiations. 2. The Unit monitors the list of critical equipment at apex level based on projected load. OEE is used for measuring machine utilisation in critical CNC and new machines. OEE is improving. The critical installations are under tight security-by-security personnel, entry through gate pass and smart card controlled door access. 3. The Unit has an established emergency preparedness system and mock drills are carried out. OHS group monitors the environment and emission levels and people working in hazardous areas are subjected to periodical medical examination. Consumption of utilities is regularly monitored with a view to conserve these through various audits and utilise experts for bringing consumption further down.

Opportunities for Improvement


1. Though implementation of 5S is in the plan, it is still in the very early stage of implementation. 2. It is not evident that the Unit adopts use of world-class approaches on technology in new building and equipment, whenever opportunity arises.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

63

4.

Partnerships and Resources : Excellent organisations plan and manage external partnerships, suppliers and internal resources in order to support policy and strategy and the effective operation of processes. During planning and whilst managing partnerships and resources they balance the current and future needs of the organisation, the community and the environment. Technology is managed This may include : developing a strategy for managing technology that supports the organisations policy and strategy; identifying and evaluating alternative and emerging technologies in the light of their impact on business and the society; managing the technology portfolio including the identification and replacement of out dated technology; exploiting existing technology; developing innovative and environmentally friendly technology (i.e. conserving energy and resources, minimization of waste and emissions, encouraging recycling and re-use); Using Information and Communication Technologies to support and improve the effective operation of the organisation; using technology to support improvement.
Score Attributes Sound: approach has a clear rationale approach has defined processes approach focuses on stakeholder needs Integrated: approach supports policy and strategy approach is linked to other approaches as appropriate Total 0% 25% 50% 75% 100%

4d

Elements Approach

No results or anecdotal

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 0% No evidence implementation 5

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Implemented in about 1/4 of relevant areas Some evidence 50% Implemented in about 1/2 of relevant areas Evidence 75% Implemented in about 3/4 of relevant areas Clear evidence 100% Implemented in all relevant areas

Attributes Deploymen Implemented: t approach is implemented

Elements

Score

Systematic: approach is deployed in a structured way with the method used for deployment being planned and executed soundly Total Score No evidence or anecdotal Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Some evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

Elements Attributes Assessment Measurement: & Review regular measurement of the

effectiveness of the approach and deployment is carried out. Learning: is used to: identify best practice and improvement opportunities Improvement: Output from measurement and learning is analysed and used to: identify, prioritise, plan and implement improvements Total

No evidence or anecdotal

No evidence or anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 5 0 5 Anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

Overall Total

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Basic Competitive Advanced World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

64

4. 4d

Partnerships and Resources :

Strengths
1. Technical committee deliberates on various issues related to technology to meet current as well as future needs. A five year engineering road map with year wise milestone is prepared by respective product managers and approved by ED. Technology is being continuously improved in association with Corp R&D, Research & Technical Institutes and learning through customer feedbacks. 2. Advance technology group is responsible for up gradation and improvements in manufacturing technology through development projects. The Unit also improves its processes using Information and Communication technology (ICT) and all major processes are IT enabled. IT enabled automation is also used in manufacturing (CNC machines, cranes) as well as in design (3D Modelling, Auto CAD) etc. 3. The unit has set up some state of the art testing facilities like centre for electric transportation, ultra high voltage laboratory and Hydro lab to have a competitive edge. Advance technology group takes care of up gradation facilities e.g.. PLC based control system for Plano miller, SPM for ironing of stator coils insulation etc.

Opportunities for Improvement


1.

While international technology leaders appear to becoming competitors for the company and may be reluctant in providing technology know how, the Units approach towards strategic / business & technology sharing / tie up along with focus on more self reliance is in a very initial stage.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

65

4.

Partnerships and Resources : Excellent organisations plan and manage external partnerships, suppliers and internal resources in order to support policy and strategy and the effective operation of processes. During planning and whilst managing partnerships and resources they balance the current and future needs of the organisation, the community and the environment. Information and knowledge are managed This may include : developing a strategy for managing information and knowledge that supports the organisations policy and strategy; identifying the organisations information and knowledge requirements; collecting, structuring and managing information and knowledge in support of policy and strategy; providing appropriate access, for both internal and external users, to relevant information and knowledge; using information technology to support internal communication and information and knowledge management; assuring and improving information validity, integrity and security; cultivating, developing and protecting unique intellectual property in order to maximise customer value; seeking to acquire, increase and use knowledge effectively; generating innovative and creative thinking within the organisation through the use of relevant information and knowledge resources.
Score Attributes Sound: approach has a clear rationale approach has defined processes approach focuses on stakeholder needs Integrated: approach supports policy and strategy approach is linked to other approaches as appropriate Total 0% 25% 50% 75% 100%

4e

Elements Approach

No results or anecdotal

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 0% No evidence implementation 5

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Implemented in about 1/4 of relevant areas Some evidence 50% Implemented in about 1/2 of relevant areas Evidence 75% Implemented in about 3/4 of relevant areas Clear evidence 100% Implemented in all relevant areas

Attributes Deploymen Implemented: t approach is implemented

Elements

Score

Systematic: approach is deployed in a structured way with the method used for deployment being planned and executed soundly Total Score No evidence or anecdotal Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Some evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

Elements Attributes Assessment Measurement: & Review regular measurement of the

effectiveness of the approach and deployment is carried out. Learning: is used to: identify best practice and improvement opportunities Improvement: Output from measurement and learning is analysed and used to: identify, prioritise, plan and implement improvements Total

No evidence or anecdotal

No evidence or anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 5 0 5 Anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

Overall Total

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Basic Competitive Advanced World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

66

4. 4e

Partnerships and Resources :

Strengths
1. The Unit's IT networks is utilised for collecting, structuring and managing information and knowledge. The sensitive data is controlled through passwords. The validity, integrity and security of information are ensured through structured documentation. Procedures are in place for taking cold backups, users backups and incremental backup for all servers. 2. The Unit has an intranet website which has portals of all departments for knowledge management and information exchange using LAN connectivity. The knowledge in the Unit is preserved and enhanced. Some other initiatives used for knowledge sharing, are contribution in BHEL Journal booklets on achievements, Ten Years Digest. IPR patenting is encouraged through a structured approach for filing of patents. There are incentives for submission of patents.
3.

At Bhopal Unit, knowledge is acquired through own experience and development, central library and Internet facility provided to all executives. The knowledge thus gained is preserved through product specific document, drawing, specifications, collaborator documents, journals, portals, monthly highlights etc.

Opportunities for Improvement


1. While a lot of work has been done in knowledge management area both IT enabled and non IT enabled, it is not evident that a system has been evolved to assess the usage of this organised knowledge as well as how to enhance such usage to add more value to the organisation, particularly towards making the Unit World Class.
2.

It is not evident how the Information and knowledge requirements are aligned to short term and long term action plans and these are prioritised. It is also not evident how the IT infrastructure has enabled the access to all stakeholders.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

67

5.

Processes : Excellent organisations design, manage and improve processes in order to fully satisfy, and generate increasing value for, customers and other stakeholders. Processes are systematically designed and managed This may include : designing the organisations processes, including those key processes needed to deliver policy and strategy; identifying process stakeholders and managing interface issues inside the organization and with external partners for the effective management of end-to-end processes; establishing the process management system; applying systems standards covering, for example, quality management systems, environmental systems, occupational health and safety systems in process management; implementing process indicators and setting performance targets; reviewing the effectiveness of the process framework in delivering the organizations policy and strategy.
Score Attributes Sound: approach has a clear rationale approach has defined processes approach focuses on stakeholder needs Integrated: approach supports policy and strategy approach is linked to other approaches as appropriate Total 0% 25% 50% 75% 100%

5a

Elements Approach

No results or anecdotal

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 0% No evidence implementation 5

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Implemented in about 1/4 of relevant areas Some evidence 50% Implemented in about 1/2 of relevant areas Evidence 75% Implemented in about 3/4 of relevant areas Clear evidence 100% Implemented in all relevant areas

Attributes Deploymen Implemented: t approach is implemented

Elements

Score

Systematic: approach is deployed in a structured way with the method used for deployment being planned and executed soundly Total Score No evidence or anecdotal Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Some evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

Elements Attributes Assessment Measurement: & Review regular measurement of the

effectiveness of the approach and deployment is carried out. Learning: is used to: identify best practice and improvement opportunities Improvement: Output from measurement and learning is analysed and used to: identify, prioritise, plan and implement improvements Total

No evidence or anecdotal

No evidence or anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 5 0 5 Anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

Overall Total

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Basic Competitive Advanced World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

68

5. 5a

Processes :

Strengths
1. Operational processes are designed to fulfill QCD requirement of customer and these are documented in Quality Manual along with the KPI details. Support processes are documented in the respective manuals such as HR manual. Deployment of these processes is done through DWI and reviewed by 13 standing task forces along with the KPIs requiring updating. 2. The systems have in-built mechanisms for resolutions of interface issues. There are thirteen task forces and cross-functional teams are formed to resolve the interface issues. Employee related issues are resolved in three tier bipartite forums
3.

The Unit, for systems and processes is certified for various standards viz., ISO 9001, 14001, OHSAS 18001, ISO / IEC: 27001: 2005, NABL etc.

Opportunities for Improvement


1. It is not clear what framework, of key processes, has been identified, designed and communicated to all concerned to deliver its policy & strategy and enable its people to have uniform understanding across the organisation. 2. While the Unit has taken initiatives to enhance organisational capacity and capability, there is no evidence to suggest that process capability / machine capability studies are made, as applicable, and are used for bringing improvement. 3. While targets / stretch targets are set in most processes, the Unit may like to evolve a robust target setting process, taking into consideration customer / next process requirement, past performance, process capability, and benchmark and integrated with MIS for review, setting direction for process improvement and enabling the Unit towards becoming world class.
4.

It is not evident how the processes, particularly support processes are controlled using related measures. DTC initiative is in early stage of deployment.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

69

5. Processes : Excellent organisations design, manage and improve processes in order to fully satisfy, and generate increasing value for, customers and other stakeholders. 5b Processes are improved, as needed, using innovation in order to fully satisfy and generate increasing value for customers and other stakeholders This may include : identifying and prioritising opportunities for improvement, and other changes, both incremental and breakthrough; using performance and perception results and information from learning activities to set priorities and targets for improvement and improved methods of operation; stimulating and bringing to bear the creative and innovative talents of employees, customers and partners in incremental and breakthrough improvements; discovering and using new process designs, operating philosophies and enabling technology; establishing appropriate methods for implementing change; piloting and controlling the implementation of new or changed processes; communicating process changes to all appropriate stakeholders; ensuring people are trained to operate new or changed processes prior to implementation; ensuring process changes achieve predicted results.
Score Attributes Sound: approach has a clear rationale approach has defined processes approach focuses on stakeholder needs Integrated: approach supports policy and strategy approach is linked to other approaches as appropriate Total Elements Score 0% 25% 50% 75% 100%

Elements Approach

No results or anecdotal

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 0% No evidence implementation 5

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Implemented in about 1/4 of relevant areas Some evidence 50% Implemented in about 1/2 of relevant areas Evidence 75% Implemented in about 3/4 of relevant areas Clear evidence 100% Implemented in all relevant areas

Attributes Deploymen Implemented: t approach is implemented

Systematic: approach is deployed in a structured way with the method used for deployment being planned and executed soundly Total Score No evidence or anecdotal Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Some evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

Elements Attributes Assessment Measurement: & Review regular measurement of the

effectiveness of the approach and deployment is carried out. Learning: is used to: identify best practice and improvement opportunities Improvement: Output from measurement and learning is analysed and used to: identify, prioritise, plan and implement improvements Total

No evidence or anecdotal

No evidence or anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 5 0 5 Anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

Overall Total

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Basic Competitive Advanced World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

70

5. 5b

Processes :

Strengths
1. Various process improvement strategies are used to achieve breakthroughs and incremental improvement. IMPRESS is the common umbrella used for various improvement initiatives such as QIPs, PIPs, JIPs and TDP etc. DTC is one of the key tools used for breakthrough changes in existing designs, materials and processes. 2. Six sigma (DMAIC) approach is used for reduction in cost, cycle time and quality improvement. LEAN approach has been adopted in SCR and Traction Division in 2007-08 and various other process improvements are implemented. RCA methodology is applied in product areas for identification of root cause and implementmethodology is applied in product areas for identification of root cause and implement preventive actions.
3.

The process changes are communicated through various forums and amendments/ revisions are made in various documents. Changes affecting customers are communicated through service bulletins and suppliers are communicated through vendor meets.

Opportunities for Improvement


1. Though improvements are being achieved in products and processes along with customers as well as suppliers, a structured approach is yet to be evolved.
2.

Though number of improvement projects are taken over the years, yet it is not evident if there is a defined improvement process to identify and target specific areas of operations / processes and how it is reviewed and improved

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

71

5.

Processes : Excellent organisations design, manage and improve processes in order to fully satisfy, and generate increasing value for, customers and other stakeholders. Products and Services are designed and developed based on customer needs and expectations This may include : using market research, customer surveys and other forms of feedback to determine customer current needs and expectations for products and services; anticipating and identifying improvements aimed at enhancing products and services in line with customers, and other stakeholders, future needs and expectations; designing and developing new products and services together with customers and partners that add value for the customers; understanding and anticipating the impact and potential of new technologies on products and services; developing new products and services for both the current established market and to gain access to other markets; using creativity, innovation and key competencies of both internal people and external partners to design and develop competitive products and services.
Score Attributes Sound: approach has a clear rationale approach has defined processes approach focuses on stakeholder needs Integrated: approach supports policy and strategy approach is linked to other approaches as appropriate Total 0% 25% 50% 75% 100%

5c

Elements Approach

No results or anecdotal

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 0% No evidence implementation 5

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Implemented in about 1/4 of relevant areas Some evidence 50% Implemented in about 1/2 of relevant areas Evidence 75% Implemented in about 3/4 of relevant areas Clear evidence 100% Implemented in all relevant areas

Attributes Deploymen Implemented: t approach is implemented

Elements

Score

Systematic: approach is deployed in a structured way with the method used for deployment being planned and executed soundly Total Score No evidence or anecdotal Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Some evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

Elements Attributes Assessment Measurement: & Review regular measurement of the

effectiveness of the approach and deployment is carried out. Learning: is used to: identify best practice and improvement opportunities Improvement: Output from measurement and learning is analysed and used to: identify, prioritise, plan and implement improvements Total

No evidence or anecdotal

No evidence or anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 5 0 5 Anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

Overall Total

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Basic Competitive Advanced World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

72

5. 5c

Processes :

Strengths
1. BHEL products are mostly designed, manufactured and delivered to meet specific customer's requirements. These requirements are then translated in the form of new/upgraded products. Product / Technical committee regularly review and finalise the new product requirements. These are also reviewed in MCM. 2. The Unit has many examples of development of products in collaboration with the customers, new technology development, product quality and value enhancement and also development of new services for customers. The effectiveness of new developments is measured through turnover from commercialisation of products, filing of Patents / copyrights and these are part of BSC measures. A booklet "Engineering Highlights" is published to disseminate the knowledge and improve the capability of the organisation 3. The Unit has developed special services to meet customer requirements. Some of these) Round the clock service for Railways in Mumbai. 2) Training package on CD for common problems of motors and OLTC 3) Computer system package for drawings transfer to customer etc.

Opportunities for Improvement


1.

Although initiatives are taken to develop the products and services, it is not evident how these are recognised to encourage creative & innovative ideas from the employees and also evaluated in terms of its technology impact.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

73

5.

Processes : Excellent organisations design, manage and improve processes in order to fully satisfy, and generate increasing value for, customers and other stakeholders.

5d

Products and Services are produced, delivered and serviced This may include : producing or acquiring products and services in line with designs and developments; marketing, communicating the value proposition, and selling products and services to existing and potential customers; delivering products and services to customers; servicing products and services, including recycling where appropriate.

Elements Approach

Score Attributes Sound: approach has a clear rationale approach has defined processes approach focuses on stakeholder needs Integrated: approach supports policy and strategy approach is linked to other approaches as appropriate Total

0%

25%

50%

75%

100%

No results or anecdotal

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 0% No evidence implementation 5

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Implemented in about 1/4 of relevant areas Some evidence 50% Implemented in about 1/2 of relevant areas Evidence 75% Implemented in about 3/4 of relevant areas Clear evidence 100% Implemented in all relevant areas

Attributes Deploymen Implemented: t approach is implemented

Elements

Score

Systematic: approach is deployed in a structured way with the method used for deployment being planned and executed soundly Total Score No evidence or anecdotal Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Some evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

Elements Attributes Assessment Measurement: & Review regular measurement of the

effectiveness of the approach and deployment is carried out. Learning: is used to: identify best practice and improvement opportunities Improvement: Output from measurement and learning is analysed and used to: identify, prioritise, plan and implement improvements Total

No evidence or anecdotal

No evidence or anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 5 0 5 Anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

Overall Total

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Basic Competitive Advanced World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

74

5. 5d

Processes :

Strengths
1. The Unit keeps its customer informed about the improvements in products through various mechanisms such as in house news letters, web site, seminars/exhibitions etc. The customer orders are sent as internal orders to respective product groups for manufacturing and delivery to the customers after joint quality checks. 2. Various tools / initiatives such as DWM, Six sigmas, CRISP boards are used to monitor and control the process variations to reduce the defects and rework. Special task force was constituted for study of logistics requirements of customers and the transporters contract was revamped. On site fabrication facilities are also extended to customers as per requirement. 3. The service group provides the support for after sales service and gets the feedback directly or through marketing and sales. For projects, CMG and project management group take care of the sequential deliveries and project management. 4. The unit involves its customer in various stages of product manufacture, through CHP system. This participative approach of Unit is mutually beneficial has helped in better understanding of the customer needs.

Opportunities for Improvement


1. While customers appreciate the Unit's ability to reach fast in case of any problem, delivery itself is still an issue, in spite of improvement in OTIF for Transportation and Switchgear. In the absence of data, status of OTIF is not evident for other product segments. Nor it is evident that process improvements have been brought in. 2. In the absence of data and information, it is not evident how recycling of materials, consumables and scrap is carried out.
3.

It is not evident how the Unit is addressing the issue of communicating the value proposition to its potential domestic and international customers.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

75

5. 5e

Processes : Excellent organisations design, manage and improve processes in order to fully satisfy, and generate increasing value for, customers and other stakeholders. Customer relationships are managed and enhanced This may include : determining and meeting customers day to day contact requirements; handling feedback received from day to day contacts including complaints; proactive involvement with customers in order to discuss and address their needs, expectations and concerns; following up on sales, servicing and other contacts in order to determine levels of satisfaction with products, services and other customer sales and servicing processes; seeking to maintain creativity and innovation in the customer sales and servicing relationship; establishing partnerships with customers which add value to the supply chain; using regular surveys, other forms of structured data gathering and data gathered during day to day customer contacts in order to determine and enhance customer relationship satisfaction levels; advising customers on the responsible use of products.
Score Attributes Sound: approach has a clear rationale approach has defined processes approach focuses on stakeholder needs Integrated: approach supports policy and strategy approach is linked to other approaches as appropriate Total 0% 25% 50% 75% 100%

Elements Approach

No results or anecdotal

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 0% No evidence implementation 5

Some Evidence

Evidence

Clear evidence

Comprehensive evidence

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Implemented in about 1/4 of relevant areas Some evidence 50% Implemented in about 1/2 of relevant areas Evidence 75% Implemented in about 3/4 of relevant areas Clear evidence 100% Implemented in all relevant areas

Attributes Deploymen Implemented: t approach is implemented

Elements

Score

Systematic: approach is deployed in a structured way with the method used for deployment being planned and executed soundly Total Score No evidence or anecdotal Comprehensive evidence

0 0%

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 25% Some evidence 50% Evidence 75% Clear evidence 100% Comprehensive evidence

Elements Attributes Assessment Measurement: & Review regular measurement of the

effectiveness of the approach and deployment is carried out. Learning: is used to: identify best practice and improvement opportunities Improvement: Output from measurement and learning is analysed and used to: identify, prioritise, plan and implement improvements Total

No evidence or anecdotal

No evidence or anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

No evidence or anecdotal 0 5 0 5 Anecdotal

Some evidence

Evidence

Clear evidence

Comprehensive evidence

Overall Total

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Basic Competitive Advanced World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

76

5. 5e

Processes :

Strengths
1. At BHEL, customers' day-to-day contract requirements are met through company's various offices and establishments located countrywide. These are service centres, RODs, Repair shops, Power sectors, Industry sector, and IOD and customer offices in BHEL premises. 2. The Unit has established many avenues to enhance customer relationships, such as: pre and post contract reviews, Pre-award meetings, Contract execution review, Routine inspection, and Complaints resolution and customer trainings. Through these avenues the unit, has been able to strengthen the bond with them. 3. The Unit has a structured approach of capturing customer perceptions through survey. Initiated in 2000, it is carried out every alternate year through an external professional agency. Survey findings are suitably acted upon to improve customer perceptions. 4. Service staff handles customer complaints and Service Cells carry out the trend analysis of complaints. These are further taken up with concerned departments for suitable remedial measures.

Opportunities for Improvement


1. Even though it is stated that the Unit has a practice of senior management members paying non agenda visits to customers, it is not evident how many such visits are made to customers, by whom and what is the value addition to customer relationship management. 2. It is not apparent how creativity and innovation approach is used in customer sales and servicing relationship.
3.

The Unit has structured customer perception survey conducted since the year 2000. However, it is not evident as to what are the progressive improvements made in its methodology, in terms of coverage (sample size and spread) and attributes. Perceptions are not captured on important aspects like image and loyalty. This may be helpful in strengthening customer relationship management.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

77

6.

Customer Results : What Excellent organisations comprehensively measure and achieve outstanding results with respect to their customers.. Perception Measures These measures are of the customers perceptions of the organisation (obtained, for example, from customer surveys, focus groups, vendor ratings, compliments and complaints). Depending on the purpose of the organization examples of measures that may be made include: Image: accessibility; communication; transparency; flexibility; pro-active behaviour; responsiveness. Products and services: quality; value; reliability; design innovation; delivery; environmental profile.
Score Attributes Trends: trends are positive and/or there is sustained good performance No results or anecdotal information Positive trends an/or satisfactory performance for about of results over at least 3 years Positive trends Positive trends Positive trends and/or sustained an/or sustained an/or sustained good performance good performance good performance for about of results for all results over at for about 1/2 of least 3 years results over at least 3 over at least 3 years years Achieved and appropriate for about of results Favourable comparisons for about results Achieved and appropriate for about of results Favourable comparisons for about results Achieved and appropriate for all results Favourable comparisons for all results

6a

Sales and after sales support: capabilities and behaviour of employees; advice and support; customer literature and technical documentation; handling complaints; product training; response time; technical support; warranty and guarantee provisions. Loyalty: intention to repurchase; willingness to purchase other products and services from the organisation; willingness to recommend the organisation.
50% 75% 100%

Elements Results

0%

25%

Targets: targets are achieved targets are appropriate No results or anecdotal information No results or anecdotal information Achieved and appropriate for about of results Favourable comparisons for about results

Comparisons: results compare well with others and/or results compare well with acknowledge World Class results are caused by approach

Causes: No results or anecdotal information 0 Score Attributes Scope: results address relevant areas results are appropriately segmented e.g. by customer, by business No results or anecdotal information 0 5 10 Results address of Results address of Results address of Results address all of relevant areas and relevant areas and relevant areas and relevant areas and activities activities activities activities 15 15 20 25 30 35 35 40 45 50 55 60 65 70 75 80 85 90 90 95 100 0% 5 10 Cause and effect visible for about results 15 20 25 30 25% 35 Cause and effect visible for about results 40 45 50 50% Cause and effect visible for about results Cause and effect visible for all results 100 100%

Total Elements Results

55 60 65 70

75 80 85 90 95 75%

Total Overall Total

0 5 10 Anecdotal

20 25 30 Basic

40 45 50 55 60 65 70 75 80 85 Competitive Advanced

95 100 World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

78

6. 6a

Customer Results :

Strengths
1. The Unit has received customer accolades and the customer satisfaction index is improving, over the years in most of the attributes. Product wise CSI has also been improving and is more than the target set. 2. Segment wise analysis of CSI shows that CSI has significantly improved over last time (2005) in two segments viz. Switchgear, control gear & rectifier and Transportation, backed up by Internal Customer Feedback. 3. Customer accolades appreciate import substitution efforts, improvement in supply position and customer training provided.
4.

The results related to perceptions on warranty and guarantee provisions, willingness to recommend the organisation and capability and behaviour of employees are better than competition in 2007 survey.

Opportunities for Improvement


1. The results of perception measures related to image in terms of flexibility, transparency, proactive behavior and responsiveness are lower than the competition (2007). C&E analysis not available. 2. Results on CS through Customer Audit, Executive visits, Customer Meets are not presented. 3. Customer perception data for overseas customers are not available.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

79

6. 6b

Customer Results : What Excellent organisations comprehensively measure and achieve outstanding results with respect to their customers. Performance Indicators These measures are the internal ones used by the organisation in order to monitor, understand, predict and improve the performance of the organisation and to predict perceptions of its external customers. Depending on the purpose of the organization examples of measures that may be made include: Image: number of customer accolades and nominations for awards; press coverage. Products and services: competitiveness; defect, error and rejection rates; seals of approval, environmental labels; guarantee provisions and warranty provisions; complaints; logistic indicators; product life cycle; innovation in design; time to market.
Score Attributes Trends: trends are positive and/or there is sustained good performance No results or anecdotal information Positive trends an/or satisfactory performance for about of results over at least 3 years Positive trends Positive trends Positive trends an/or sustained and/or sustained an/or sustained good performance good performance good performance for about of results for all results over at for about 1/2 of least 3 years results over at least 3 over at least 3 years years Achieved and appropriate for about of results Favourable comparisons for about results Achieved and appropriate for about of results Favourable comparisons for about results Achieved and appropriate for all results Favourable comparisons for all results

Sales and after sales support: demand for training; handling of complaints; response rates. Loyalty: duration of relationship; effective recommendations; frequency/value of orders; lifetime value; numbers of complaints and compliments; new and/or lost business; customer retention.

Elements Results

0%

25%

50%

75%

100%

Targets: targets are achieved targets are appropriate No results or anecdotal information No results or anecdotal information Achieved and appropriate for about of results Favourable comparisons for about results

Comparisons: results compare well with others and/or results compare well with acknowledge World Class results are caused by approach

Causes: No results or anecdotal information 0 Score Attributes Scope: results address relevant areas results are appropriately segmented e.g. by customer, by business No results or anecdotal information 0 5 10 Results address of Results address of Results address of Results address all of relevant areas and relevant areas and relevant areas and relevant areas and activities activities activities activities 15 15 20 25 30 35 35 40 45 50 55 60 65 70 75 80 85 90 90 95 100 0% 5 10 Cause and effect visible for about results 15 20 Cause and effect visible for about results 50 50% Cause and effect visible for about results Cause and effect visible for all results 100 100%

Total Elements Results

25 30 35 40 45 25%

55 60 65 70

75 80 85 90 95 75%

Total Overall Total

0 5 10 Anecdotal

20 25 30 Basic

40 45 50 55 60 65 70 75 80 85 Competitive Advanced

95 100 World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

80

6. 6b

Customer Results :

Strengths
1. The failure rate of Generator Transformers in operation at customer end has come down to zero over the years and BHEL Bhopal has attained best in class benchmark in Test Acceptance rates. Repeat business and new business have been improving over the years in all products. BHEL Bhopal has relationship with many customers for more than 15 to 45 yrs.
2.

The results pertaining to competitiveness, defect, error and rejection rates, guarantee provisions & warranty provisions, product life cycle are showing positive trend.

Opportunities for Improvement


1.

Though delivery performance trend is showing improvement, it is still lower vis--vis the competition. Not evident what actions have been taken or planned?

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

81

7.

People Results : Excellent organisations comprehensively measure and achieve outstanding results with respect to their people

7a

Perception Measures These measures are of the peoples perception of the organisation (obtained, for example, from surveys, focus groups, interviews, structured appraisals). Depending on the purpose of the organization examples of measures that may be made include: Motivation career development; communication; empowerment; equal opportunities; involvement; leadership; opportunity to learn and achieve; recognition; target setting and appraisal; the organisations values, mission, vision, policy and strategy; training and development. Satisfaction organisations administration; employment conditions; facilities and services; health and safety conditions; job security; pay and benefits; peer relationships; the management of change; the organisations environmental policy and impact; the organisations role in the community and society; working environment.
50% 75% 100%

Elements Results

Score Attributes Trends: trends are positive and/or there is sustained good performance

0%

25%

No results or anecdotal information

Positive trends an/or satisfactory performance for about of results over at least 3 years

Positive trends Positive trends Positive trends an/or sustained and/or sustained an/or sustained good performance good performance good performance for about of results for all results over at for about 1/2 of least 3 years results over at least 3 over at least 3 years years Achieved and appropriate for about of results Favourable comparisons for about results Achieved and appropriate for about of results Favourable comparisons for about results Achieved and appropriate for all results Favourable comparisons for all results

Targets: targets are achieved targets are appropriate No results or anecdotal information No results or anecdotal information Achieved and appropriate for about of results Favourable comparisons for about results

Comparisons: results compare well with others and/or results compare well with acknowledge World Class results are caused by approach

Causes: No results or anecdotal information 0 Score Attributes Scope: results address relevant areas results are appropriately segmented e.g. by customer, by business No results or anecdotal information 0 5 10 Results address of Results address of Results address of Results address all of relevant areas and relevant areas and relevant areas and relevant areas and activities activities activities activities 15 15 20 25 30 35 35 40 45 50 55 60 65 70 75 80 85 90 90 95 100 0% 5 10 Cause and effect visible for about results 15 20 Cause and effect visible for about results 50 50% Cause and effect visible for about results Cause and effect visible for all results 100 100%

Total Elements Results

25 30 35 40 45 25%

55 60 65 70

75 80 85 90 95 75%

Total Overall Total

0 5 10 Anecdotal

20 25 30 Basic

40 45 50 55 60 65 70 75 80 85 Competitive Advanced

95 100 World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

82

7. 7a

People Results :

Strengths
1. Feedback results through employee perception survey show that Average Merit Score is showing improving trend for workmen. Overall AMS for various attributes have improved over the years.
2.

The score on Leadership Index conducted during 2005 and 2007 has been higher than the previous survey. BHEL has been recognised as Star PSU Company by Business Standards in March'07 and 3rd Best Company by Business world.

Opportunities for Improvement


1. People perception results pertaining to empowerment, satisfaction scores related to employment conditions, facilities and services, health and safety conditions, pay benefits, peer relationships, management of change, job security are not presented. 2. The satisfaction index of supervisors and executives has marginally dropped in last three surveys, for all attributes except training and retraining. Index for supervisors in the dipstick survey on HR initiatives is also low compared to workers and executives.
3.

The Unit has not presented comparative results of employee perceptions w.r.t. Other BHEL units.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

83

7.

People Results: Excellent organisations comprehensively measure and achieve outstanding results with respect to their people Performance Indicators These measures are the internal ones used by the organisation in order to monitor, understand, predict and improve the performance of the organisations people and to predict their perceptions. Depending on the purpose of the organization examples of measures that may be made include:
Elements

7b

Achievements: Competency requirements versus competencies available; Productivity; success rates of training and development to meet objectives; external awards and recognition. Motivation and involvement: involvement in improvement teams; involvement in suggestion schemes; levels of training and development; measurable benefits of team work; recognition of individuals and teams; response rates to people surveys.
Score 0% 25%

Satisfaction: absenteeism and sickness levels; accident levels; grievances; recruitment trends; staff turnover and loyalty; strikes; use of organisation provided facilities and benefits. Services provided to the organisations people: accuracy of personnel administration; communication effectiveness; speed of response to enquiries; training evaluation.

Attributes Trends: trends are positive and/or there is sustained good performance

50%

75%

100%

Results

No results or anecdotal information

Positive trends an/or satisfactory performance for about of results over at least 3 years

Positive trends Positive trends Positive trends an/or sustained an/or sustained and/or sustained good performance good performance good performance for about 1/2 of for about of results for all results over at results over at least 3 over at least 3 years least 3 years years Achieved and appropriate for about of results Favourable comparisons for about results Achieved and appropriate for about of results Favourable comparisons for about results Achieved and appropriate for all results Favourable comparisons for all results

Targets: targets are achieved targets are appropriate No results or anecdotal information No results or anecdotal information Achieved and appropriate for about of results Favourable comparisons for about results

Comparisons: results compare well with others and/or results compare well with acknowledge World Class results are caused by approach

Causes: No results or anecdotal information 0 Score Attributes Scope: results address relevant areas results are appropriately segmented e.g. by customer, by business No results or anecdotal information 0 0 5 5 10 10 Results address of Results address of Results address of Results address all of relevant areas and relevant areas and relevant areas and relevant areas and activities activities activities activities 15 15 20 25 20 25 30 30 35 35 40 45 40 45 50 50 55 55 60 65 70 60 65 70 75 75 80 85 80 85 90 90 95 95 100 100 0% 5 10 Cause and effect visible for about results 15 20 Cause and effect visible for about results 50 50% Cause and effect visible for about results Cause and effect visible for all results 100 100%

Total Elements Results

25 30 35 40 45 25%

55 60 65 70

75 80 85 90 95 75%

Total Overall Total

Anecdotal

Basic

Competitive

Advanced

World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

84

7. 7b

People Results :

Strengths
1. The training mandays / employee have been improving over the years. The cumulative mandays for multiskilling training is going up over the years. The investment in training has been increasing and number of employee sent abroad for training has also been going up. 2. Employees have been awarded the national recognition on individual basis and the number of persons awarded as Swasth Karamchari has been going up. The employee involvement in suggestion schemes, Quality circles and PIPs is increasing over the years. Quality Circles have received accolades in various competitions.
3.

There is a substantial rise in 2007-08 in no. of cases of job rotation for workers, supervisors, and executives, 266 against 104 in 2006-07 indicating efforts towards people development by enriching them through varied work experience and exposure.

Opportunities for Improvement


1.

The results for indicators related to competency requirement v/s available, success rate of training, measurement of training effectiveness, absenteeism and sickness levels, communication effectiveness, training evaluation and speed of response to enquiries are not indicated.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

85

8. 8a

Society Results: Excellent organisations comprehensively measure and achieve outstanding results with respect to society. Perception Measures These measures are of the societys perception of the organisation (obtained, for example, from surveys, reports, press articles, public meetings, public representatives, governmental authorities). Some of the measures contained in the guidance for Perception Measures may be applicable to Performance Indicators and vice versa. Depending on the purpose of the organization examples of measures that may be made include:

Image: responsiveness to contacts; as an employer; as a responsible member of the community. Performance as a responsible citizen: disclosures of information relevant to the community; equal opportunities practices; impact on local regional, national and global economies; relationships with relevant authorities; ethical behaviour. Involvement in the communities where it operates: involvement in education and training; involvement of community bodies in relevant activities; support for medical and welfare provision;

support for sport and leisure; voluntary work and philanthropy. Reduction and prevention of nuisance and harm from its operations and/or throughout the lifecycle of its products and services: health risks and accidents; noise and odour; hazards (safety); pollution and toxic emission; analysis of the supply chain; environmental performance evaluation/lifecycle evaluation. Reporting on activities to assist in the preservation and sustainability of resources: choice of transport; ecological impact; reduction and elimination of waste and packaging; substitution of raw materials or other inputs; usage of utilities e.g. gases, water, electricity, recycling
25% 50% 75% 100%

Elements Results

Score Attributes Trends: trends are positive and/or

0%

No results or there is sustained good performance anecdotal information

Positive trends an/or Positive trends an/or Positive trends an/or Positive trends and/or satisfactory sustained good sustained good sustained good performance for about performance for about performance for about performance for all of results over at 1/2 of results over at of results over at results over at least 3 least 3 years least 3 years least 3 years years Achieved and appropriate for about of results Achieved and appropriate for about of results Achieved and appropriate for about of results Achieved and appropriate for all results Favourable comparisons for all results

Targets: targets are achieved targets are appropriate No results or anecdotal information

Comparisons: results compare well with others and/or results compare well with acknowledge World Class results are caused by approach No results or Favourable Favourable Favourable anecdotal information comparisons for about comparisons for about comparisons for about results results results

Causes: No results or anecdotal information 0 Score Attributes Scope: No results or results address relevant areas results are appropriately segmented anecdotal information e.g. by customer, by business 0 5 10 Results address of relevant areas and activities 15 20 25 30 35 Results address of relevant areas and activities 40 45 50 55 60 Results address of relevant areas and activities 65 70 75 80 85 Results address all of relevant areas and activities 90 95 100 0% 5 10 Cause and effect visible for about results 15 20 25 25% 30 35 Cause and effect visible for about results 40 45 50 50% 55 60 Cause and effect visible for about results 65 70 75 75% 80 85 Cause and effect visible for all results 90 95 100 100%

Total Elements Results

Total

Overall Total

0 5 10 Anecdotal

15

20 25 30 Basic

35

40 45 50 55 60 65 70 75 80 85 Competitive Advanced

90

95 100 World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

86

8. 8a

Society Results :

Strengths
1. The positive remarks made by the eminent social personalities provide perception about the company's image towards social responsibilities. Results of society perception survey show improvement in overall score.

Opportunities for Improvement

1.

The results related to perception measures such as ethical behaviour, involvement in education and training, support for sports and leisure, voluntary work and philanthropy are not indicated.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

87

8.
8b

Society Results : Excellent organisations comprehensively measure and achieve outstanding results with respect to society. Performance Indicators These measures are the internal ones used by the organisation in order to monitor, understand, predict and improve the performance of the organisation and to predict perceptions of society. Depending on the purpose of the organisation examples of measures that may be made include: Handling changes in employment levels; Dealings with authorities on issues such as: certification; clearances; import/export; planning; product release. Accolades and awards received. Exchange of information in relation to Social Responsibility good practices, auditing and social reporting.
Score Attributes Trends: trends are positive and/or there is sustained good performance No results or anecdotal information Positive trends an/or satisfactory performance for about of results over at least 3 years Positive trends Positive trends Positive trends an/or sustained an/or sustained and/or sustained good performance good performance good performance for about 1/2 of for about of results for all results over at results over at least 3 over at least 3 years least 3 years years Achieved and appropriate for about of results Favourable comparisons for about results Achieved and appropriate for about of results Favourable comparisons for about results Achieved and appropriate for all results Favourable comparisons for all results

Elements Results

0%

25%

50%

75%

100%

Targets: targets are achieved targets are appropriate No results or anecdotal information No results or anecdotal information Achieved and appropriate for about of results Favourable comparisons for about results

Comparisons: results compare well with others and/or results compare well with acknowledge World Class results are caused by approach

Causes: No results or anecdotal information 0 Score Attributes Scope: results address relevant areas results are appropriately segmented e.g. by customer, by business No results or anecdotal information 0 0 5 5 10 10 Results address of Results address of Results address of Results address all of relevant areas and relevant areas and relevant areas and relevant areas and activities activities activities activities 15 15 20 25 20 25 30 30 35 35 40 45 40 45 50 50 55 55 60 65 70 60 65 70 75 75 80 85 80 85 90 90 95 95 100 100 0% 5 10 Cause and effect visible for about results 15 20 Cause and effect visible for about results 50 50% Cause and effect visible for about results Cause and effect visible for all results 100 100%

Total Elements Results

25 30 35 40 45 25%

55 60 65 70

75 80 85 90 95 75%

Total Overall Total

Anecdotal

Basic

Competitive

Advanced

World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

88

8. 8b

Society Results :

Strengths
1. There had been continuous increase in expenditure on welfare measures by BHEL Bhopal, which is the highest in comparison to other units. The unit provides support for charity, welfare education, training & leisure and welfare to the community. 2. Besides social welfare activities, the unit supports society by providing medical facilities like Kasturba hospital, Yoga research centre and training programmes, internet site ' Health care online etc. and carrying out activities like health clinics, health camps, special camps on days like TB day. WHO day, Blood donation day -- etc. The unit also conducts various health awareness programmes on Diabetes, Epilepsy, Alzimers, AIDS, Nutrition, Tobacco hazards -- etc.
3.

BHEL has taken many initiatives towards improving the Environment, Ecology and safety. Continuous monitoring of Air and Stack Emission keep these much below the statutory norms. There are initiatives taken towards local employment and local economy and conservation of Natural resources and Energy conservation. BHEL has been awarded as Star Public Sector Company in 2006, second best award for women development activities and Udyog Ratna award by chief minister apart from individual accolades.

Opportunities for Improvement

1. The results pertaining to dealing with authorities on issues such as certification, clearances, import/export, and planning product release are not indicated. This may be important for achieving the mission of becoming an Indian multinational enterprise.
2.

Though the unit has many societal approaches and initiatives, these have not been compared with any other organisation's such approaches so as to compare and bring about improvements in its efforts.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

89

9.
9a

Key Performance Results : Excellent organisations comprehensively measure and achieve outstanding results with respect to the key elements of their policy and strategy. Key Performance Outcomes These measures are key results defined by the organisation and agreed in their policy and strategies. Depending on the purpose and objectives of the organisation some of the measures contained in the guidance for Key Performance Outcomes may be applicable to Key Performance Indicators and vice versa: Financial outcomes may include Market related and general data (sales, share price, dividends etc); Profitability (gross margins, earnings per share, earnings before interest and tax, contribution margin etc); Investment and asset related information (Return on invested capital, Return on net assets, Return on capital employed etc); Budgetary Performance (Performance against organisation or unit budgets). Non-Financial outcomes may include: Market Share; Time to market; Success rates; Volumes; Process performance.
Score Attributes Trends: trends are positive and/or there is sustained good performance No results or anecdotal information Positive trends an/or satisfactory performance for about of results over at least 3 years Positive trends Positive trends Positive trends an/or sustained an/or sustained and/or sustained good performance good performance good performance for about 1/2 of for about of results for all results over at results over at least 3 over at least 3 years least 3 years years Achieved and appropriate for about of results Favourable comparisons for about results Achieved and appropriate for about of results Favourable comparisons for about results Achieved and appropriate for all results Favourable comparisons for all results

Elements Results

0%

25%

50%

75%

100%

Targets: targets are achieved targets are appropriate No results or anecdotal information No results or anecdotal information Achieved and appropriate for about of results Favourable comparisons for about results

Comparisons: results compare well with others and/or results compare well with acknowledge World Class results are caused by approach

Causes: No results or anecdotal information 0 Score Attributes Scope: results address relevant areas results are appropriately segmented e.g. by customer, by business No results or anecdotal information 0 0 5 5 10 10 Results address of Results address of Results address of Results address all of relevant areas and relevant areas and relevant areas and relevant areas and activities activities activities activities 15 15 20 25 20 25 30 30 35 35 40 45 40 45 50 50 55 55 60 65 70 60 65 70 75 75 80 85 80 85 90 90 95 95 100 100 0% 5 10 Cause and effect visible for about results 15 20 Cause and effect visible for about results 50 50% Cause and effect visible for about results 75 80 75% 85 Cause and effect visible for all results 90 95 100 100%

Total Elements Results

25 30 35 40 45 25%

55 60 65 70

Total Overall Total

Anecdotal

Basic

Competitive

Advanced

World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

90

9. 9a

Key Performance Results :

Strengths
1. There are positive trends in the financial indicators such as Profit / Sales, Turnover, Quarterly turnover, PBT, Gross Margin as % of Turnover, Current Ratio. The value added as % of TO have been improving over the years, being 2nd best in BHEL group. New product TO as % of total TO is highest in last 5 years. The inventory has been coming down in no. of days of turnover and is lowest among BHEL Units. 2. BSC Score is improving and is above 95% for all the groups in the Unit. 3. The Unit is having sustained market leadership in its most product range. TO has also been improving as indicated in addressing most of the products.

Opportunities for Improvement


1. No result data provided on process performance, time to market, success rate related to marketing efforts. No marketing results data related to export was available. 2. While the Unit has number of product segments as well as market segments, segmented results are not being compiled and used for identifying opportunities for improvement in specific segments.

3. No comparison with the competitors for many performance results.

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

91

9.

Key Performance Results : Excellent organisations comprehensively measure and achieve outstanding results with respect to the key elements of their policy and strategy. Key Performance Indicators These measures are the operational ones used in order to monitor and understand the processes and predict and improve the organisations likely key performance outcomes. Depending on the purpose of the organisation examples of measures that may be made include;
Financial: Cash flow Depreciation; Maintenance costs; Project costs; Credit ratings. Non Financial: Processes (performance; assessments; innovations; cycle times); External resources including partnerships (supplier performance: supplier price; number and value added of partnerships; number and value added of joint improvements with partners); Buildings, equipment and materials: (defect rates; inventory turnover; utilisation); Technology: (innovation rate; value of intellectual property; patents; royalties); Information and knowledge: (accessibility; integrity; value of intellectual capital) number and value added of partnerships; number and value added of innovative products and services solutions generated by partners;
Score Attributes Trends: trends are positive and/or there is sustained good performance No results or anecdotal information Positive trends an/or satisfactory performance for about of results over at least 3 years Positive trends Positive trends Positive trends an/or sustained an/or sustained and/or sustained good performance good performance good performance for about 1/2 of for about of results for all results over at results over at least 3 over at least 3 years least 3 years years Achieved and appropriate for about of results Favourable comparisons for about results Achieved and appropriate for about of results Favourable comparisons for about results Achieved and appropriate for all results Favourable comparisons for all results 0% 25% 50% 75% 100%

9b

Elements Results

Targets: targets are achieved targets are appropriate No results or anecdotal information No results or anecdotal information Achieved and appropriate for about of results Favourable comparisons for about results

Comparisons: results compare well with others and/or

results compare well with acknowledge World Class Causes: results are caused by approach

No results or anecdotal information 0 5 10

Cause and effect visible for about results 15 20 25 30 25% 35

Cause and effect visible for about results 40 45 50 50% 55 60

Cause and effect visible for about results 65 70

Cause and effect visible for all results 100 100%

Total Elements Results Score Attributes Scope: results address relevant areas results are appropriately segmented e.g. by customer, by business

75 80 85 90 95 75%

0%

No results or anecdotal information 0 0 5 5 10 10

Results address of Results address of Results address of Results address all of relevant areas and relevant areas and relevant areas and relevant areas and activities activities activities activities 15 15 20 25 20 25 30 30 35 35 40 45 40 45 50 50 55 55 60 65 70 60 65 70 75 75 80 85 80 85 90 90 95 95 100 100

Total Overall Total

Anecdotal

Basic

Competitive

Advanced

World Class

CII-EXIM Bank Award for Business Excellence: Feedback Report 2008

92

9. 9b

Key Performance Results :

Strengths
1. There are improving trends in case of reduction in cycle time for Engineering, Product cycle time, rework, % weld defects. There has been improvement in EVA, Value added and turnover / employee, net cash flow and cash collection. The working capital in days of turnover has come down and achieved lower interest and drop in debtors. 2. Cost reduction has been achieved through cost reduction in material and personnel payments. Six-sigma, DTC and Lean have resulted in improving productivity and OTIF and reduction in defect rate and inventory. 3. There had been reduction in energy consumption, Power, Fuel expenses. Savings through suggestions and Quality circle have been improving. R&D expenditure show upward trend including the commercialisation and indigenisation. No. of patents filed have been going up. 4. There had been improvement in provision of IT resources over the years, increase in number of drawings generated using AUTO CAD.

Opportunities for Improvement


1. No result data available on performance of various Key and Support Processes in terms of process indicators.
2.

No targets, benchmarks and competitive data are given in the results for most of the parameters, which could help the Unit in identifying the opportunities for improvement.