This document outlines the check plan for the preparation of solutions and cements in the mixer at Horizon Addis Tyre Share Company. It lists the following key checks:
1) The operator must validate weight calibration and check the zero position of the balance before every shift.
2) The operator must check the identification, release dates, and expiration dates of chemicals and raw materials before each production run.
3) The laboratory worker must check all prepared solutions and cements by performing laboratory tests and recording results in a test book and protocol.
4) The shift technologist must check the release of cements and solutions and their containers every time a new cement or solution is prepared.
This document outlines the check plan for the preparation of solutions and cements in the mixer at Horizon Addis Tyre Share Company. It lists the following key checks:
1) The operator must validate weight calibration and check the zero position of the balance before every shift.
2) The operator must check the identification, release dates, and expiration dates of chemicals and raw materials before each production run.
3) The laboratory worker must check all prepared solutions and cements by performing laboratory tests and recording results in a test book and protocol.
4) The shift technologist must check the release of cements and solutions and their containers every time a new cement or solution is prepared.
This document outlines the check plan for the preparation of solutions and cements in the mixer at Horizon Addis Tyre Share Company. It lists the following key checks:
1) The operator must validate weight calibration and check the zero position of the balance before every shift.
2) The operator must check the identification, release dates, and expiration dates of chemicals and raw materials before each production run.
3) The laboratory worker must check all prepared solutions and cements by performing laboratory tests and recording results in a test book and protocol.
4) The shift technologist must check the release of cements and solutions and their containers every time a new cement or solution is prepared.
This document outlines the check plan for the preparation of solutions and cements in the mixer at Horizon Addis Tyre Share Company. It lists the following key checks:
1) The operator must validate weight calibration and check the zero position of the balance before every shift.
2) The operator must check the identification, release dates, and expiration dates of chemicals and raw materials before each production run.
3) The laboratory worker must check all prepared solutions and cements by performing laboratory tests and recording results in a test book and protocol.
4) The shift technologist must check the release of cements and solutions and their containers every time a new cement or solution is prepared.
Check Plan for Preparation of Solutions and Cements(Mixer) 01 Page 1 of 1
Checking activity Record of checking activity
Method of Reference Action to be taken Contents Responsibility Frequency Document Frequency checking document
Validity check of Before start
operator - - Visual checking WI/HAT/028 weight calibration every shift
Check of the zero Stop production &,
operator Continiously - - Visual checking WI/HAT/028 position of balance Inform to shift foreman and shift technologist Check of identification, release and Before start During polister expiration date of chemicals , and & operator - - WI/HAT/028 every production cord rubberizing raw materials Stop production & , All prepared All prepared Check of prepared cements Test book , Laboratory Test inform to shitf Laboratory worker solutions and solutions and WI/HAT/028 and solutions Protocol from technologist cements cements tests
Laboratory Stop of using it for
Every cement Check of releasing of cements and Shift technologist All prepared , production .Next and solutions & WI/HAT/028 solutions Protocol solutions and accompanying decision will be given conteners from tests cements slip by R & D technologist shift inspector
Shift technologist when non
Randomly , Check of storage conditions Dailly report conforming During polister stop, Inform to shift min. once WI/HAT/028 of cements and solutions preparetion book cement and cord rubberizing foreman shift inspector per week solutions is found
Prepared By Challa Dosso___________ Approved By Alemayehu Emiru _______________
PLEASE MAKE SURE THAT THIS IS THE CORRECT ISSUE BEFORE USE