ANEXO 3

METRADO IMPRENTA BARRANCO CASCO ESTRUCTURAL


PARTIDAS DE CONCRETO ARMADO

metrado presup
Descripción Und venta Metrado real 1er Piso 2do Piso 3ro Piso 4to Piso

LIMPIEZA m2 255 255 255 0 0 0


TRAZO m2 935.93 935.93 935.93 0 0 0
EXCAVACION m3 189.89 189.89 189.89 0 0 0
RELLENO m3 67.5 67.5 67.5 0 0 0
ELIMINACION DE MATERIAL EXCEDENTE m3 645.62 645.62 645.62 0 0 0
COMPACTAD m2 225 225 225 0 0 0
CIMENTACION
SOLADO m2 123.15 123.15 123.15 0 0 0
ACERO CIMIENTO REFORZA kg 428.064 428.064 428.064 0 0 0
ENCOFRAD m2 142.62 142.62 142.62 0 0 0
CONCRETO m3 87.62 87.62 87.62 0 0 0
ACERO ZAPATA kg 2351.89 2351.89 2351.89 0 0 0
ACERO VIGA DE CIMENTACION kg 731.57 731.57 731.57 0 0 0
DESENCOFRAD m2 142.62 142.62 142.62 0 0 0
FALSO PISO m2 225 225 225 0 0 0
ACERO kg 19875.07 19875.07 4968.7675 4968.7675 4968.7675 4968.7675
ENCOFRADO m2 2422.23 2422.23 605.5575 605.5575 605.5575 605.5575
VERTICALES
CONCRETO m3 150.66 150.66 37.665 37.665 37.665 37.665
DESENCOFRADO m2 2422.23 2422.23 605.5575 605.5575 605.5575 605.5575
ENCOFRADO m2 1065.64 1065.64 266.41 266.41 266.41 266.41
ACERO kg 16754.57 16754.57 4188.6425 4188.6425 4188.6425 4188.6425
HORIZONTALES
LADRILLO Und 6156 6156 1539 1539 1539 1539
CONCRETO m3 131.15 131.15 32.7875 32.7875 32.7875 32.7875
4 sectores primer piso METRADO DE SECTORES POR PISO
Metrado 1er
Descripción Und S1P1 S2P1 S3P1 S4P1 rend
Piso
LIMPIEZA m2 255 63.75 63.75 63.75 63.75
TRAZO m2 935.93 233.9825 233.9825 233.9825 233.9825
EXCAVACION m3 189.89 47.4725 47.4725 47.4725 47.4725
RELLENO m3 67.5 47.4725 47.4725 47.4725 47.4725
ELIMINACION DE MATERIAL EXCEDENTE m3 645.62 161.405 161.405 161.405 161.405 0.807025
COMPACTAD m2 225 56.25 56.25 56.25 56.25 1.40625
CIMENTACION
SOLADO m2 123.15 161.405 161.405 161.405 161.405 0.807025
ACERO CIMIENTO REFORZA kg 428.064 56.25 56.25 56.25 56.25 1.40625
ENCOFRAD m2 142.62 161.405 161.405 161.405 161.405 0.807025
CONCRETO m3 87.62 56.25 56.25 56.25 56.25 1.40625
ACERO ZAPATA kg 2351.89 161.405 161.405 161.405 161.405 0.807025
ACERO VIGA DE CIMENTACION kg 731.57 56.25 56.25 56.25 56.25 1.40625
DESENCOFRAD m2 142.62 161.405 161.405 161.405 161.405 0.807025
FALSO PISO m2 225 56.25 56.25 56.25 56.25 1.40625
ACERO kg 4968.7675 161.405 161.405 161.405 161.405 0.807025
ENCOFRADO m2 605.5575 56.25 56.25 56.25 56.25 1.40625
VERTICALES
CONCRETO m3 37.665 161.405 161.405 161.405 161.405 0.807025
DESENCOFRADO m2 605.5575 56.25 56.25 56.25 56.25 1.40625
ENCOFRADO m2 266.41 161.405 161.405 161.405 161.405 0.807025
ACERO kg 4188.6425 56.25 56.25 56.25 56.25 1.40625
HORIZONTALES
LADRILLO Und 1539 161.405 161.405 161.405 161.405 0.807025
CONCRETO m3 32.7875 56.25 56.25 56.25 56.25 1.40625

5 sectores de 1er piso METRADO DE SECTORES POR PISO


Metrado 1er
Descripción EN FASES Und S1P1 S1P2 S1P3 S1P4 S1P5
Piso
LIMPIEZA m2 255 51 51 51 51 51
TRAZO m2 935.93 187.186 187.186 187.186 187.186 187.186
EXCAVACION m3 189.89 37.978 37.978 37.978 37.978 37.978
RELLENO m3 67.5 13.5 13.5 13.5 13.5 13.5
ELIMINACION DE MATERIAL EXCEDENTE m3 645.62 129.124 129.124 129.124 129.124 129.124
COMPACTAD m2 225 45 45 45 45 45
CIMENTACION
SOLADO m2 123.15 24.63 24.63 24.63 24.63 24.63
ACERO CIMIENTO REFORZA kg 428.064 85.6128 85.6128 85.6128 85.6128 85.6128
ENCOFRAD m2 142.62 28.524 28.524 28.524 28.524 28.524
CONCRETO m3 87.62 17.524 17.524 17.524 17.524 17.524
ACERO ZAPATA kg 2351.89 470.378 470.378 470.378 470.378 470.378
ACERO VIGA DE CIMENTACION kg 731.57 146.314 146.314 146.314 146.314 146.314
DESENCOFRAD m2 142.62 28.524 28.524 28.524 28.524 28.524
FALSO PISO m2 225 45 45 45 45 45
ACERO kg 4968.7675 993.7535 993.7535 993.7535 993.7535 993.7535
ENCOFRADO m2 605.5575 121.1115 121.1115 121.1115 121.1115 121.1115
VERTICALES
CONCRETO m3 37.665 7.533 7.533 7.533 7.533 7.533
DESENCOFRADO m2 605.5575 121.1115 121.1115 121.1115 121.1115 121.1115
ENCOFRADO m2 266.41 53.282 53.282 53.282 53.282 53.282
ACERO kg 4188.6425 837.7285 837.7285 837.7285 837.7285 837.7285
HORIZONTALES
LADRILLO Und 1539 307.8 307.8 307.8 307.8 307.8
CONCRETO m3 32.7875 6.5575 6.5575 6.5575 6.5575 6.5575

2 sectores de 1er piso METRADO DE SECTORES POR PISO


Descripción Und Metrado 1er S1P1 S2P1
Piso
LIMPIEZA m2 255 127.5 127.5
TRAZO m2 935.93 233.9825 233.9825
EXCAVACION m3 189.89 94.945 94.945
RELLENO m3 67.5 33.75 67.5
ELIMINACION DE MATERIAL EXCEDENTE m3 645.62 322.81 322.81
CIMENTACION
COMPACTAD m2 225 56.25 56.25
SOLADO m2 123.15 30.7875 30.7875
ACERO CIMIENTO REFORZA kg 428.064 214.032 214.032
ENCOFRAD m2 142.62 56.25 56.25
CONCRETO m3 87.62 30.7875 30.7875
ACERO ZAPATA kg 2351.89 1175.945 1175.945
ACERO VIGA DE CIMENTACION kg 731.57 56.25 56.25
DESENCOFRAD m2 142.62 30.7875 30.7875
FALSO PISO m2 225 112.5 112.5
ACERO kg 4968.7675 56.25 56.25
VERTICALES
ENCOFRADO m2 605.5575 30.7875 30.7875
CONCRETO m3 37.665 18.8325 18.8325
DESENCOFRADO m2 605.5575 56.25 56.25
ENCOFRADO m2 266.41 30.7875 30.7875
HORIZONTALES
ACERO kg 4188.6425 2094.32125 2094.32125
LADRILLO Und 1539 56.25 56.25
CONCRETO m3 32.7875 30.7875 30.7875

6 sectores de 1er piso METRADO DE SECTORES POR PISO


Descripción EN FASES Und Metrado 1er S1P1 S1P2 S1P3 S1P4 S1P5 S1P6
Piso
LIMPIEZA m2 255 51 51 51 51 51 10.2
TRAZO m2 935.93 187.186 187.186 187.186 187.186 187.186 37.4372
EXCAVACION m3 189.89 37.978 37.978 37.978 37.978 37.978 7.5956
RELLENO m3 67.5 13.5 13.5 13.5 13.5 13.5 2.7
ELIMINACION DE MATERIAL EXCEDENTE m3 645.62 129.124 129.124 129.124 129.124 129.124 25.8248
COMPACTAD m2 225 45 45 45 45 45 9
CIMENTACION
SOLADO m2 123.15 24.63 24.63 24.63 24.63 24.63 4.926
ACERO CIMIENTO REFORZA kg 428.064 85.6128 85.6128 85.6128 85.6128 85.6128 17.12256
ENCOFRAD m2 142.62 28.524 28.524 28.524 28.524 28.524 5.7048
CONCRETO m3 87.62 17.524 17.524 17.524 17.524 17.524 3.5048
ACERO ZAPATA kg 2351.89 470.378 470.378 470.378 470.378 470.378 94.0756
ACERO VIGA DE CIMENTACION kg 731.57 146.314 146.314 146.314 146.314 146.314 29.2628
DESENCOFRAD m2 142.62 28.524 28.524 28.524 28.524 28.524 5.7048
FALSO PISO m2 225 45 45 45 45 45 9
ACERO kg 4968.7675 993.7535 993.7535 993.7535 993.7535 993.7535 198.7507
ENCOFRADO m2 605.5575 121.1115 121.1115 121.1115 121.1115 121.1115 24.2223
VERTICALES
CONCRETO m3 37.665 7.533 7.533 7.533 7.533 7.533 1.5066
DESENCOFRADO m2 605.5575 121.1115 121.1115 121.1115 121.1115 121.1115 24.2223
ENCOFRADO m2 266.41 53.282 53.282 53.282 53.282 53.282 10.6564
ACERO kg 4188.6425 837.7285 837.7285 837.7285 837.7285 837.7285 167.5457
HORIZONTALES
LADRILLO Und 1539 307.8 307.8 307.8 307.8 307.8 61.56
CONCRETO m3 32.7875 6.5575 6.5575 6.5575 6.5575 6.5575 1.3115