GENERAL NOTES

1. Dimensions are to be read only and not


measured
2. Change in dimension are to be notified
3. The structural drawings shall be read in
conjuction with architectural drawings.
Discrepancies, if any shall be reported to the
site engineer
4. Contractor shall be responsible for checking
field dimensions and site conditions

GENERAL NOTES STRUCTURAL SPECIFICATION


1. Dimensions are to be read only and not A. FOUNDATION
measured · Foundation shall not rest on loose soil. If loose soil is encountered GENERAL NOTES
2. Change in dimension are to be notified at design depth, the consultant shall be informed as soon as 1. Dimensions are to be read only and not
3. The structural drawings shall be read in possible measured
conjuction with architectural drawings. 2. Change in dimension are to be notified
B. CONCRETE MIX 3. The structural drawings shall be read in
Discrepancies, if any shall be reported to the · Concrete mix for Columnsshall be M20 [1:1.5:3]
site engineer conjuction with architectural drawings.
· Concrete mix for Foundation,beam and Slab shall be at minimum Discrepancies, if any shall be reported to the
4. Contractor shall be responsible for checking M20 [1:1.5:3]
field dimensions and site conditions site engineer
4. Contractor shall be responsible for checking
C. CLEAR COVER field dimensions and site conditions
· Clear Cover of Concrete is recommended as follows
6.1 Slab 15mm
6.2 Staircase / RCC wall 20mm
6.3 Beam 25mm
6.4 Column 40mm
GENERAL NOTES 6.5 Footing 50-75mm
1. Dimensions are to be read only and not
measured D. LAP LENGTH./DEVELOPMENT LENGTH TO REINFORCEMENT GENERAL NOTES
2. Change in dimension are to be notified Dia [mm] Ld [mm - inches] 1. Dimensions are to be read only and not
3. The structural drawings shall be read in 8 480 19" measured
conjuction with architectural drawings. 10 600 24" 2. Change in dimension are to be notified
Discrepancies, if any shall be reported to the 12 720 28" 3. The structural drawings shall be read in
site engineer 16 960 38" conjuction with architectural drawings.
4. Contractor shall be responsible for checking 20 1200 48" Discrepancies, if any shall be reported to the
field dimensions and site conditions 25 1500 60" site engineer
E. OTHERS 4. Contractor shall be responsible for checking
Provide Adequate cover blocks, Chairs, stools to keep reinforcement field dimensions and site conditions
in position

GENERAL NOTES
1. Dimensions are to be read only and not
measured
2. Change in dimension are to be notified
3. The structural drawings shall be read in
conjuction with architectural drawings.
Discrepancies, if any shall be reported to the
site engineer
4. Contractor shall be responsible for checking
field dimensions and site conditions

You might also like