GENERAL:

1. SEE DRAWINGS 00-SD-0002 THROUGH 00-SD-0006 FOR STANDARD


SYMBOLS AND NOMENCLATURE.
XZL I XA
13 13 XZC XZO XZL 2. ALL INSTRUMENT NUMBERS AND PIPING SPECIALTY ITEMS ON THIS
E-1121 E-1131 PURGE RING 33 P&ID ARE PREFIXED BY WBS NUMBER " 11" UNLESS OTHERWISE NOTED.
1091A 0001 1097A
SECONDARY QUENCH EXCHANGER TERTIARY QUENCH EXCHANGER BF 1090A 1090A 1090A S
1/2" 1/2" DETAIL "B"
DESIGN DUTY: 5397.90 kW DESIGN DUTY: 5869.20 kW
011
LOST OF PANEL NOTES:
1/2" PURGE
HEAT TRANSFER AREA: 280.0 m^2 HEAT TRANSFER AREA: 592.0 m^2 S START STOP 3/4" DMDS 1. LOCATE SAMPLE CONNECTION OUTSIDE ANALYZER SHELTER.
SHELL TUBE SHELL TUBE DECOKE DECOKE INJECTION 2. PROVIDE 3” HPS, 300#RF FLANGE CONNECTION IN VERTICAL
HS XA XL HS BLIND 3"
DESIGN PRESS: 123(barg)/FV 10.4(barg)/FV DESIGN PRESS: 10.4barg)/FV 10.4(barg)/FV 1/2" 1/2" 011 HS HS I S POSITION OF TOP OF LINE IN HORIZONTAL SECTION OF TRANSFER
FLANGE LINE. SAMPLE PRE-CONDITIONER SHALL BE IN VERTICAL POSITION.
DESIGN TEMP: 343(degC) 414(degC) DESIGN TEMP: 414(degC) 414(degC) BF 1775A 1080A 1754A 1754A
1673A 1674A 0001 S 011 3. ELEVATED FUNNEL TO BE PROVIDED.
MATERIAL: C.S. 1 1/4 Cr-1/2Mo(inlet) MATERIAL: C.S. C.S. XZO I STOP/RESET TRANSFER POWER LAMP
1/2" 4. ALL MOTOR OPERATED VALVES WILL HAVE RED/GREEN/AMBER
TRIM 15CS1S02 3CJ1S01 TRIM 3CS2S01 3CJ1S01 CHANGEOVER TROUBLE SUPPLY TEST LIGHTS AT VALVE TO INDICATE OPEN 100% GREEN FULLY CLOSED-
1091A 0001 RED, TRAVELLING-AMBER.
HS I XZC XZC XZC XZC
XZSC XZSO XZSC XZSO 5. DISCRETE SIGNAL TO ANALYZER TO SHUT OFF DURING DECOKING.
1-1/2" 1784A 0001 1091A 1090A 1088A 1089A 6. DELETED.
XZC 1090AB 1090AA 1090AA 1090AB 7. LINE SHALL HAVE MINIMUM CHANGES OF DIRECTION. WHERE A
XZSC XZSO 45 deg.
DETAIL ''A'' SIDE VIEW 20% 0% 100% 45% 75 MM CHANGE IN DIRECTION CANNOT BE AVOIDED, USE A HARD TEE

24
1091A 1091AA 1091AA XZO XZO XZO XZO INSTEAD OF AN ELBOW.
DECOKING EFFLUENT PROCESS FLOW

7
11-P-1127-1CB1S02-30"-IS XV 8. TRANSFER LINE TO BE TAKEN OFF SIDE OF DECOKING LINE.
11-SD-2123 235 0% 100%
1090A 4 1091A 1090A 1088A 1089A
TO V-1110
FREE DRAINING NO POCKET
H2
15 15 9. LOCAL PANEL TO BE LOCATED IN VIEW OF OUTLET VALVES.
10 4 MIN. 10. TWO GC ARE PROVIDED FOR NINE (9) FURNACES AND ARE
35 CO HS HS HS HS
AI AA ASSIGNED AS FOLLOWS:
CH4 H-1111 : AI-1064A, H-1112 : AI-1064B, H-1117 : AI-1066G

31
27 C2H4 1784A 1673A 1674A 1783A
1066A 1066A XV H-1113 : AI-1064C, H-1114 : AI-1066D, H-1118 : AI-1066H
C2H6 20
1091A CLOSE/ START STOP CLOSE/ H-1115 : AI-1066E, H-1116 : AI-1066F, H-1119- : AI-1066J
10 C3H6

20
SC ATM 1-1/2"x1" EACH GC IS CAPABLE OF ANALYZING UP TO SIX STREAMS
C3H8 OPEN DECOKE DECOKE OPEN
AND CAN BE USED IN THIS MODE WHEN ONE ANALYZER

9
SC-1707/1807/1907 AT OUTLET MOV PANEL
TSO IS OUT OF SERVICE.
TYPE SC-1

3CS9S01
1CB1S02
1066A 10AS01 PI 11. DELETED.
29 XZL XZO XZC 12. TIE INTO TOP OF PIPE.

1"
AE 13. THIS DWG SHOWS SECONDARY AND TERTIARY QUENCH
D 1055A

SS TUBING
1CB1S02 L 1088AB 1088AA 1088AA
CRACKED GAS SET AT DETAIL ''A'' EXCHANGERS FOR H-1111.
11-P-1122-3CJ1S01-24"-IH 1066A 3CS9S01
22.00 barg FOR OTHER FURNACES:
512 11-SD-2121-4
1D2 E-1122, E-1132 FOR H-1112 E-1126, E-1136 FOR H-1116
PT

11-SL-1025-3CS9S01-1"-IH

11-P-1127-3CS9S01-30"-IS
FROM E-1111 SC 1 DW 32 S I E-1123, E-1133 FOR H-1113 E-1127, E-1137 FOR H-1117
PSV
2"x1" 1055A E-1124, E-1134 FOR H-1114 E-1128, E-1138 FOR H-1118
1695A SC-1101~SC-1901 001 0001 E-1125, E-1135 FOR H-1115 E-1129, E-1139 FOR H-1119.
CRACKED GAS 11-P-1123-3CJ1S01-24"-IH "T1A" "T1B" TYPE SC-1 14. LINE NUMBER FOR NO. 1 PYROLYSIS FURNACE (H-1111) IS

1"x3/4"
483 11-SD-2121-2 FO MIN. ASSIGNED FROM 1001~1999.

1"
+
25

FROM E-1111 1281 AH OTHER FURNACES ARE ASSIGNED.


13 "S2" "S4" XZSO XZSO XZSC XZSC
11-RP-1010-1CS2S01-1-1/2"-IC H-1112 : 2001~2999 H-1116 : 6001~6999

CSO
CSO
3CS2S01 H-1113 : 3001~3999 H-1117: 7001~ 7999
1-1/2" 1088AA 1088AB 1088AA 1088AB
E-1121 1-1/2"x3/4"
1CS2S01 100% 45% 0% 20% C3R VAPOR
H-1114 : 4001~4999 H-1118 : 8001~8999
H-1115 : 5001~5999 H-1119 : 9001~9999
351 11-SD-2105 ALL LINE NUMBERS WILL BE THE SAME EXCEPT FOR THE FIRST
3/4"
3CS2S01 1CS2S01 TO V-1603 DIGIT.
25 15. MOVS TO BE DESIGNED TO WITHSTAND FULL STEAM PURGE
HS C3R LIQUID
11-RP-1002-3CS2S01-1"-IC DESIGN PRESSURE.
11-SD-2105 350 16. DELETED.
1777A (V)
11-SCH-1001-15CS1S02-8"-IH FROM E-1407 17. THIS DRAWING APPLIES TO PYROLYSIS FURNACE H-1111. SUFFIX A
5

11-SD-2127 256 XV AFTER THE INSTRUMENT LOOP NUMBER REPRESENTS


SUPPORT FOR SLUG FLOW +

TO V-1111 1092A HS HS INSTRUMENTATION FOR H-1111. FOR PYROLYSIS FURNACE H-1112


S
START STOP THROUGH H-1119 SUFFIX B THROUGH J SHOULD BE USED.

FC
011 DECOKE 1673A 1674A DECOKE 18. CONNECTION TO BE FROM SIDE OF HEADER.
25

19. DELETED.
25

TT TC H
S XZL XZO XZC 20. MOV'S XV-1088A AND XV-1090A TO BE ELECTRICALLY
I INTERLOCK FOR AUTOMATIC DECOKE OPERATION
11-SCH-1002-15CS1S02-6"-IH "S1" "S3A"1-1/2" 1016A 1016A
254 11-SD-2127 HS 011 1089 A 1089 A 1089 A THROUGH A SINGLE HAND SWITCH.
0001
FROM V-1111 "S3C" "S3B" 21. DELETED.
GL +24545 (V) MIN. 1783A 22. IN VIEW OF MOV LOCAL PANEL.

22
1-1/2" 1-1/2" TE XZSO XZSC I 23. DCS CONTROLLER AUTOMATICALLY PUT INTOMANUAL OUTPUT

22
(V) PDI MODE AND DRIVE THE OUTPUT TO PREDETERMINED VALUE WHEN
11-SCH-1040-15CS1S01-3"-IS 1016A (V) 1089 AA1089 AA 0001
XV 22 LOW FIRE TRIP AND/OR TOTAL S/D OCCURS.
RTD TV
+
PI 1593A PI I 0% 24. ALL FITTINGS IN THIS LINE TO BE SCHEDULED 30, MINIMUM.
15CS1S01 15CS1S02 + 1032A 100%
2

"T2" 1016A 0001 25. ASME B31.1 POWER PIPING.


11-SD-2127 244 3/4" 3/8" 1591A 1592A 26. INTERLOCK NUMBER S-011 IS FOR FURNACE
DRAIN TO V-1710 3"x1-1/2" PDT NO POCKET H-1111. INTERLOCK NUMBERS 11-S-012 THROUGH 11-S-019
FC PIP. INST. ANALYZER VAPOR
3/4" ARE FOR FURNACE H-1112 THROUGH H-1119.
PIP. INST.
25

1052A
MIN.

INST. PIP. HOLD 27. FOR H-1117 TO H-1119.(SAMPLE CONNECTION).

18
4

31
(V) 3" XV FROM 10AS04
PT XV 28. FOR H-1119, CRACKED EFFLUENT SAMPLE GAS RETURN TO CRACKED
AX INST. PDI 15 1089A
1088A 1-1/2"x1" 11-P-0324-1CS2S01-1" GAS HEADER.
PIP. 1051A

2"
1066A 29. FOR H-1119 : 10AS04.
34 1052A L CRACKED GAS
30. DELETE.
346 11-SD-2105 31. FOR H-1119, THE MOV XV-1088J/1089J/1090J, THE PURGE STEAM INLET
11-P-1124-3CJ1S01-30"-IH MIN. FREE DRAINING
11-P-1128-3CS2S01-16"-IH TO C-1141 SIZE IS 1-1/2", THE REDUCER IS DELETED.

28
D
TE TI 11-P-1125-1CS2S01-30"-IS

8
2

32. FOR H-1119, THE MOV XV-1088J/1089J/1090J, THE PURGE STEAM OUTLET

11-SL-1024-1CS2S01-1"-IH
11-P-1125-3CS9S01-30"-IS

32 SIZE IS 1-1/2", THE RETURN LINE SIZE IS 1-1/2".


ETHANE FEED 32
1007A 1007A FO FO
11-SD-2120 439 33. FOR H-1119, THE MOV XV-1091J, THERE ARE 2 PURGE RINGS: UPSTREAM
TW TW H 1281 AC 1281 AD PURGE RING AND DOWN PURGE RING.
TO FEED CONTROL VALVE PI PDI
34. FOR H-1119, LINE NUMBER IS 11-P-9125X-3CS9S01-3"-IS.
1006A 1007A
1051A 1052AA 35. FOR H-1119, LINE NUMBER IS 11-P-9127X-1CB1S02-3/4"-IS.
TI TE TE TI

1005A 1006A 3CS9S01 3CS9S01


1005A 1006A
1CS2S01 1CS2S01
TW
"S2" 18"
1005A "T1"

1-1/2"x1"
"T2" FO

31
+

1279 A
GL +20240 PT PI PI
18" "S1"
1054A 1054A 1574A 1CS2S01
SEE DETAIL ''B'' L
E-1131 13 FO 1CS1S02
12

+
FO
+

11-KP-1001-3CS2S01-3/4"-IH 1281 AE 1281 AF


FO FO
3CS9S01

3 C S9 S01
+
SUPERHEATED ETHANE +

1CS1S02 1281 AI 1281 AG FO FO


FEED

11-SL-1251-1CS1S02-3/4"-IH
11-P-1001-3CS2S01-16"-IH + +

481 11-SD-2120 1281 AA 1281 AB


XA
FROM E-1103 3CS9S01 3CS9S01 3CS9S01
3CS9S01 3CS9S01
HS S 1087A 1CS1S02 1CS1S02 1CS1S02
1CS1S02 1CS1S02
11-SL-1006-1CS1S02-1-1/2"-IH

1CS1S02
11-SL-1003-1CS1S02-1-1/2"-IH

HA

11-SL-1012-1CS1S02-1-1/2"-IH
11-SL-1008-1CS1S02-3/4"-IH

11-SL-1023-1CS1S02-1-1/2"-IH
11-SL-1007-1CS1S02-3/4"-IH
11-SL-1002-1CS1S02-3/4"-IH

1782A S 011
XY XZL S
1071A +

1087A 1087A 011 PI


23

S
NO POCKET

NO POCKET

NO POCKET

NO POCKET

NO POCKET

NO POCKET
HZL S HC 1053A L
VENT IAS
1071A S 011 1071A DE

NO POCKET
HZSC HZSO SP/1116~SP/1916
XZSO XZSC PT
1071A 1071A HV 1087A 1087A 11-SL-1001-1CS1S02-1-1/2"-IH
SP/1115~SP/1915 +
XV 1053A
1071A +

1087A PURGE STEAM


DMDS SUPPLY 1" TSO 11-SD-2107 311
11-KP-1001-1CS2S01-3/4" 11 FI
348 11-SD-2105 FROM SL HEADER
FROM V-1104 1280A 1"x3/4" FC 1"x3/4"
TSO FC
INST. 300# NO POCKET 300# 1CS2S01 3CS2S01 SP/1117~SP/1917
3

3
PURGE STEAM
LPT 11-SL-1022-1CS1S02-3"-IH
DW DW 17-SD-2724 3874
FROM OUTLET
VALVE STEAM HEADER
3"

11-SL-1251-1CS1S02-3/4"-IH WISON ENGINEERING LTD.


1"x3/4"
11-SL-1013-1CS1S02-3/4"-IH 1"
11-SD-2121-2 482
NO POCKET
STEAM PURGE TO PI-1587A
3/4"

11-SL-1015-1CS1S02-3/4"-IH
11-SD-2121-4 513