Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

BEIER MACHINERY

To:Mr. Adoniyas A. Negash


Offer No.: BEIER210701J
Date: July 1, 2021
Validity of quotation: 1 month

江苏贝尔机械有限公司
BEIER MACHINERY CO., LTD
110mm HDPE Double-wall Corrugated PIPE
Production Line

(The picture only for reference)

Add: North Second Ring Road and City Avenue intersection, Jiangsu prov., China.

Contact person: Jessie Mobile: +86-13921996900


Tel: +86 (512)5817-2862 Fax: +86 (512)5817-2860
E-mail: jessie@beierpm.com Website: www.beierpm.com

Page 1 of 9
BEIER MACHINERY

Thank you very much for your inquiry. We are pleased to offer you as follows on basis of our general
enclosed terms and conditions of delivery and sale.

1. Project evaluation
1.1 General information:
Raw material & formulation HDPE resin for outer and inner layer

Melt capacity& Extrusion speed SJ65/33 (motor 55KW) extrusion capacity: 150-180kg/h

Central height 1000mm

Operation direction From right to left (face to the operation panel)

Machine color Standard color: RAL9007 ( Silvery Grey)

Final product

1.2Main commercial terms


Project 110mm HDPE double wall corrugated pipe production line
30% as deposit by T/T;
Payment term
70% by T/T before delivery and after inspection;
Delivery time 90 working days since the date of receiving down payment;

Packing Wood pallet covered by plastic film;

Warranty period 13 months since date of bill of loading;

1.3 Machine list and unit price:


No. Name Qty. Unit Price(USD)

1 Vacuum Loader 300kg/h 1set 950


2 Hopper Dryer 300kg/h 1set 1,000
3 SJ65/33 Single Screw Extruder (55KW) 1set 19,200

4 SJ25 Color Stripe Co-Extruder 1set 3,200

5 110mm Die head for two layers 1set 7,100

6 110mm Forming mold ( 50 pairs) 1set 10,500

Page 2 of 9
BEIER MACHINERY

7 110mm Forming machine 1set 16,000

8 BR-CF110 Chipless Cutter 1set 6,000

9 30W Laser Printer 1set 4,300

Total amount in EX Works 68,250

Packing cost and inland transportation cost to Shanghai port (2×40’GP) 2,000

Total amount in FOB Shanghai,China 70,250

1. Technical data
1. Vacuum loader 300kg/h

Rated transmission
Motor power: 1.5kW
Hopper capacity: 24L
Conveying pipe dia.: 1.5 inch
Air suction pipe dia.: 1.5 inch
Conveying capacity: 300kg/h
Hopper: stainless steel
2. Hopper dryer 300kg/h

Volume: 300kg per batch


Hopper volume: 12L
Power of air-blower: 0.18KW
Heating power: 10KW

3. SJ65/33 single screw extruder

Electrical cabinet

Screw :
Diameter of screw: Ф65mm; L/D: 33/1;
Material of screw: 38CrMoAlA
Surface treatment: Nitrided processing, thickness: 0.4~0.7mm, Polishing
Barrel:

Page 3 of 9
BEIER MACHINERY

Material of Barrel: 38CrMoAlA


Inner processing: Nitrided with thickness: 0.4 ~ 0.7mm
Heating zones: 5pcs
Heating mode: Ceramic heater + stainless steel covering; New energy saving heater
Heating power: 4kW×5pcs
Blower: 0.18kW×5pcs;
Method of cooling: air cooling;
Thermocouple: K type or J type
Driving motor:
Motor power: 55kW
Type of motor: AC
Brand: Siemens or WEG brand
Gear box:
Type: Vertical
High torque design
Chinese brand
Main electric part supplier:
Inverter: ABB :Switzerland brand:
Air Switch: LG: South Korea brand
Contactor: Schneider: France brand
Relay: Omron: Japan brand
Electrical Cabinet:
Digital Button control
Temperature control: Omron
Self protective system:
Over current protective of motor
Over heating protective of motor
Over pressure protective of screw

4. SJ25 Color Stripe Co-Extruder

Page 4 of 9
BEIER MACHINERY

Screw:
Diameter of screw: 25mm
L/D: 25:1
Material of screw: 38CrMoAlA.
Surface treatment: Nitrided processing,
Thickness: 0.4~0,7mm, Polishing
Barrel:
Material of Barrel: 38CrMoAlA
Inner processing: Nitrided with thickness: 0.4 ~ 0.7mm
Heating zones: 2 zones
Heating mode: Cast Aluminum with stainless steel cover
Heating power: 1.2kW×2zones
Method of cooling: air cooling
Cooling power: 0.04kW×2zones
Driving motor:
Motor power: AC 1.5 kW
Output :1.5kg/h

5. 110mm Extrusion die head

Die head: 1set for 110mm


Material: 40Cr
Hardness: Nitride processing
Heater: Stainless steel heating ring

6. Forming mold & 7. Forming machine

Page 5 of 9
BEIER MACHINERY

Forming block

Forming mold
For diameter: 110mm
Block qty.: 50 pairs
Material: 40Cr
Forming machine
Driving method: Pinion and rack
Motor power: 5.5Kw
Speed: up to 5 m/min
Inverter control: ABB
Moving rail material: #45 steel
Cooling method: Air and water
Blower: 0.18KW*4sets

8.BR-CF 110 Chipless Cutter

Cutter:
Cutting pipe: diameter 110mm
Fixed length cutting:6m
Blade rotates around pipe and cut off pipe with smooth surface

Page 6 of 9
BEIER MACHINERY

Cutter motor: 1.5KW


Outside diameter of blade: 72mm
Hard alloy blade design
Automatic synchronization
Electric system:
Siemens PLC
Inverter : ABB
9. 50W Laser Printer

Fiber, 30W
Run control: PLC control
For pipe max. speed: 10m/min
Pipe color: white, grey, green, multi color
Marking area: 110mm*110mm (optional)
Marking depth: 0.01mm-0.2mm
Marking line width: 0.01mm-0.1mm
Power supply: AC220V, 50HZ

Spare Part list for each line (free of charge)


No Name Qty Application

Mechanical part:

1 Oil seal of high speed axis of gearbox 1pc

2 Screw unload tools 1set

3 Heating coil for die head 3pcs


Extruder
4 Thermocouples 4units

5 Plug of die head heating 3pcs

6 Plug of thermocouple 3pcs

Electrical part:

1 S.S. Relay: Kudom, UK 2pcs.

2 Small type breaker 2pcs Extruder

3 Intermediate relay 3pcs

3.1 Work condition (provide by customer)


Supply of cranes, fork-lifts or other lifting equipment; Mounting
Warehouse/Workshop
materials and tools;

Page 7 of 9
BEIER MACHINERY

Temperature & Humidity ≤40℃, ≤95%

Supply voltage: 3×380V+N+PE;


Voltage tolerance: +5%/-5%;
Power supply
Control voltage: 24VDC+220VAC;
Frequency: 50HZ+-2%

Power cable from power distribution to control cabinet


Power cable from control cabinet to each motor of machines
Power cable
(Note:Signal cable from control cabinet to each motor of machines
supplied by Beier)
Inflow temperature T1: ≤20℃, ≥0.3Mpa, ~15~16 M3/hr
Cooling Water Outflow temperature T2: T1+5℃;
Hardness: 5-8odH;
Compressor 0.3m3/min, 0.4Mpa-0.8Mpa

Ancillary staff 2 Persons


3.2 After service

Technical documentation

All symbols on the equipment will be in English. BEIER is responsible for providing the Buyer with a
general layout plan, electrical plan, installation orientation and manuals, in English.

Arrangements for inspection, installation and testing of the equipment

a. After all of the equipment is delivered to the customer’s factory, the Buyer shall be responsible for
all preparation work, e.g. electricity supply, water supply, cranes and labor, etc.
b. BEIER will prepare visa applications for their engineers, who will assist in the equipment
installation and testing at the Buyer’s factory.
c. The Buyer will buy a round-trip air ticket for the engineer(s) after the visa application is approved.
The Buyer is responsible for all expenses generated, e.g. visa application fees, meals,
accommodation and an allowance of $100.00 per day for each engineer.
d. The engineer(s) will provide free training for the operators and maintenance people, in Buyer’s
factory.
e. If the Buyer does not request commissioning by BEIER’s engineer(s) within four months from the
date of the bill of lading, it will be accepted that all the equipment has been successfully tested and
approved by the Buyer.
Quantity and quality guarantee

Page 8 of 9
BEIER MACHINERY

a. In cases of quantity discrepancies or equipment damage, at the destination, the Buyer will file a
claim within 30 days after the arrival of the goods at its destination. The insurance company and the
shipping company will be responsible for all discrepancies and damage caused by the shipping
company or other transportation companies.
b. Guarantee period and after-sales services: 13 months from the date of the bill of lading.
During this guarantee period, if there is a quality issue, BEIER will provide spare parts without
charge. If malfunctions are caused by the Buyer’s improper operation of equipment, BEIER will
provide the Buyer with spare parts at cost prices.
c. Long-term service:
Beyond one year, BEIER will provide the Buyer with spare parts at reasonable prices and provide
long-term technical guidance.
Validity

Three months from the quotation date.

Thank you for your inquiry

Beier Machinery

Page 9 of 9