Earthwork & Roads
Earthwork & Roads
1
C/S OF CONCRETE ROAD
P.Q.C. 300mm(M40)
D.L.C. 150mm
W.M.M. 150mm
G.S.B. 200mm
EMBANKMENT 500mm
B.C. 40mm
D.B.M. 140mm
W.M.M. 250mm
G.S.B. 200mm
SUB GRADE 500mm
EMBANKMENT CBR>8%
4.010
4.005
4.000
1 2 5
10
15
20
A A
OGL TBM
A A
OGL TBM
A A
OGL TBM
A A
OGL TBM
PCC
WORKING AREA
C17(Y)-9809
C13(Y)-9682
C1(Y)-225 C4(Y)-225
C1(X)-100 C4(X)-11885
PLOT EXCAVATION
APAHA TRAINERS AND CONSULTANTS PVT LTD
12
AN ISO CERTIFIED 9001:2015 COMPANY
1037.5 925
C17(Y)-9809
C13(Y)-9682
9457 11 9584
C1(Y)-225 C4(Y)-225
1037.5 1150
11532 PLOT EXCAVATION 11659
APAHA TRAINERS AND CONSULTANTS PVT LTD
12
AN ISO CERTIFIED 9001:2015 COMPANY
925 C13(X)-100 13620.5 C17(X)-11758 1037.5
11658
101.900
102
101.900
101.670
102
101.900
101.670
101.440
P.Q.C. 300mm(M40) 15
D.L.C. 150mm
W.M.M. 150mm 10
G.S.B. 200mm
5
EMBANKMENT 500mm
0
7500mm 2500mm 7500mm
LEFT CARRIAGE WAY MEDIAN
RIGHT CARRIAGE WAY
A5
=450*2 =450*2
=900 A4
=900
=600*2 =600*2
=1200 A3
=1200
=800*2 =1600+17500+1600 =800*2
=1600 A2 =20700 =1600
A1 22.7
=1300*2 =7500+2500+7500 =1300*2
=2600 =17500mm =2600
=2600+17500+2600
=22700mm
1:2
V:H
1300
2600
C/S A1=((20.7+22.7)/2)*0.5
= 10.85Sqm
Volume of A1= C/S Area * Chainage Length
= 10.855 * 10
= 108.5 Cum
APAHA TRAINERS AND CONSULTANTS PVT LTD
12
AN ISO CERTIFIED 9001:2015 COMPANY
TRAPEZOIDAL VOLUME PER KM
C/S A1=((20.7+22.7)/2)*0.525
= 11.392qm
Volume of A1= C/S Area * 1000Rmt
= 11.392 * 1000
= 11392 Cum