Rosa Mærsk Machinery Operating Manual

Connection to Sewage
Illustration 2.4.1a Main and Auxiliary Sea Water Systems To/From Deck Valve Hydraulic System
Treatment Tank
RD23 RD20
Emergency Hand Pumps
To Deck Seal To Fresh Water (Mid Deck Level Forward)
Sea Chest Deck Seal Fresh Water Generator
Vent Line Sea Water QA25 QA24 Generator
Steam Blow QE115 QT58 Pumps 3m3/h Ejector Pump
Connection 42m3/h TG13

QA15
Sea Chest
QA14 TG14 Vent Line
QA27 QA2 To Fire Hydrant
From System QD12 To Bilge Pump
High Sea Chest QD28 QD27 QT58 QE114
Fresh QA1 Steam Blow
To Sludge
Water QA28 Connection
QD26 Pump
Tanks TT
QD37 QD39 Low
Sea Chest QA43
Locked Closed QD26
QD95
QD25 Locked QA8 QA29
Closed Bilge, Ballast and No.1
Fire Pump Central
QD23 160/280m3/h Cooler TI
Locked
QD31 Closed QA42
Main Fire Pump QD30 QD35 QD34 QA9
160/280m3/h

To/From QD32 QD33


Aft Peak QD42
QD40 QD29
QA11

QD45 No.2
QA38
Central
Cooler
QD20 1 TI
QA7 QA21
Main Cooling
Bilge Main QA42
Sea Water Pumps
Suction QA10
390m3/h

QA37

2
Direct Bilge Suction QA6 QA20
Port Forward Well

QA36
Key
3
QA5 QA19
Sea Water Priming
RK133 Unit To IGG Unit
LT Cooling Water QA23
Inert Gas Direct Bilge
Bilges
Scrubbing Injection
Pump QA17
Air
280m3/h
Hydraulic Oil
QA16 QA32 QA39 QA18
Cross Connection
Fire Hydrant Line
From Fire Pump

Issue: Provisional Issue 1 July 2006 Section 2.4.1 - Page 1 of 4