Item Name : Supply & Installation, testing and commissioning of Solar Submersible
Pump (ISO - 9906 Certified) coupled with Submersible rewind-able
Electric Motor with AC winding and all accessories like Solar Pump
Controller, du/dt filter Complete in all accessories including cooling
jackets, NRV, Pressure Gauge, Sluice valves (02 Nos) except column pipe
and power cable for discharge greater than 3000 iGPH and output
capacity greater than 3 WHP and up to 6 WHP (As per Approved Technical
Specifications)
LABOUR
Labourer 3.2
Skilled Labour 1.6
Plumber 1.6
Electrician 1.6
Sundries (Labour Only):
4,001
Item Name : Supply & Installation, testing and commissioning of Solar Submersible
Pump (ISO - 9906 Certified) coupled with Submersible rewind-able
Electric Motor with AC winding and all accessories like Solar Pump
Controller, du/dt filter Complete in all accessories including cooling
jackets, NRV, Pressure Gauge, Sluice valves (02 Nos) except column pipe
and power cable for discharge greater than 3000 iGPH and output
capacity greater than 6 WHP and up to 10 WHP (As per Approved Technical
Specifications)
LABOUR
Labourer 2.8
Skilled Labour 1.4
Plumber 1.4
Electrician 1.4
Sundries (Labour Only):
4,002
LABOUR
Labourer 2.4
Skilled Labour 1.2
Plumber 1.2
Electrician 1.2
Sundries (Labour Only):
4,003
Item Name : Supply & Installation, testing and commissioning of Solar Submersible
Pump (ISO - 9906 Certified) coupled with Submersible rewind-able
Electric Motor with AC winding and all accessories like Solar Pump
Controller, du/dt filter Complete in all accessories including cooling
jackets, NRV, Pressure Gauge, Sluice valves (02 Nos) except column pipe
and power cable for discharge greater than 3000 iGPH and output
capacity greater than 15 WHP and up to 20 WHP (As per Approved
Technical Specifications)
LABOUR
Labourer 1.6
Skilled Labour 0.8
Plumber 0.8
Electrician 0.8
Sundries (Labour Only):
4,004
Item Name : Supply & Installation, testing and commissioning of Solar Submersible
Pump (ISO - 9906 Certified) coupled with Submersible rewind-able
Electric Motor with AC winding and all accessories like Solar Pump
Controller, du/dt filter Complete in all accessories including cooling
jackets, NRV, Pressure Gauge, Sluice valves (02 Nos) except column pipe
and power cable for discharge greater than 3000 iGPH and output
capacity greater than 20 WHP and upto 30 (As per Approved Technical
Specifications)
Detail Qty Unit
MATERIAL
Machinery and equipment 1 WHP
LABOUR
Labourer 1.2
Skilled Labour 0.6
Plumber 0.6
Electrician 0.6
Sundries (Labour Only):
4,005
Item Name : Supply & Installation, testing and commissioning of Solar Submersible
Pump (ISO - 9906 Certified) coupled with Submersible rewind-able
Electric Motor with AC winding and all accessories like Solar Pump
Controller, du/dt filter Complete in all accessories including cooling
jackets, NRV, Pressure Gauge, Sluice valves (02 Nos) except column pipe
and power cable for discharge greater than 3000 iGPH and output
capacity greater than 30 WHP (As per Approved Technical Specifications)
LABOUR
Labourer 0.8
Skilled Labour 0.4
Plumber 0.4
Electrician 0.4
Sundries (Labour Only):
4,006
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules ,Fixed Mounting
Structure and Foundation Civil work, Junction Boxes, Fuses, DC
Breakers, Wiring complete upto Solar Pump Inverter, sized at a sizing
factor of 1.75 capable of operating its intended solar pump having
discharge less than or equal to 3000 iGPH and output capacity up to 1
WHP (As per Approved Technical Specifications)
LABOUR
Mason 2
Labourer 4
Skilled Labour 2
Electrician 2
Sundries (Labour Only):
4,007
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules ,Fixed Mounting
Structure and Foundation Civil work, Junction Boxes, Fuses, DC
Breakers, Wiring complete upto Solar Pump Inverter, sized at a sizing
factor of 1.75 capable of operating its intended solar pump having
discharge less than or equal to 3000 iGPH and output capacity greater
than 1 WHP and up to 3 WHP (As per Approved Technical Specifications)
LABOUR
Mason 1.8
Labourer 3.6
Skilled Labour 1.8
Electrician 1.8
Sundries (Labour Only):
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules ,Fixed Mounting
Structure and Foundation Civil work, Junction Boxes, Fuses, DC
Breakers, Wiring complete upto Solar Pump Inverter, sized at a sizing
factor of 1.75 capable of operating its intended solar pump having
discharge less than or equal to 3000 iGPH and output capacity greater
than 3 WHP and up to 6 WHP (As per Approved Technical Specifications)
LABOUR
Mason 1.6
Labourer 3.2
Skilled Labour 1.6
Electrician 1.6
Sundries (Labour Only):
4,009
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules ,Fixed Mounting
Structure and Foundation Civil work, Junction Boxes, Fuses, DC
Breakers, Wiring complete upto Solar Pump Inverter, sized at a sizing
factor of 1.75 capable of operating its intended solar pump having
discharge less than or equal to 3000 iGPH and output capacity greater
than 6 WHP and up to 10 WHP (As per Approved Technical Specifications)
LABOUR
Mason 1.4
Labourer 2.8
Skilled Labour 1.4
Electrician 1.4
Sundries (Labour Only):
4,010
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules ,Fixed Mounting
Structure and Foundation Civil work, Junction Boxes, Fuses, DC
Breakers, Wiring complete upto Solar Pump Inverter, sized at a sizing
factor of 1.75 capable of operating its intended solar pump having
discharge less than or equal to 3000 iGPH and output capacity greater
than 10 WHP and up to 15 WHP (As per Approved Technical Specifications)
LABOUR
Mason 1.2
Labourer 2.4
Skilled Labour 1.2
Electrician 1.2
Sundries (Labour Only):
4,011
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules ,Fixed Mounting
Structure and Foundation Civil work, Junction Boxes, Fuses, DC
Breakers, Wiring complete upto Solar Pump Inerter, sized at a sizing
factor of 1.75 capable of operating its intended solar pump having
discharge less than or equal to 3000 iGPH and output capacity greater
than 15 WHP and up to 20 WHP (As per Approved Technical Specifications)
LABOUR
Mason 0.8
Labourer 1.6
Skilled Labour 0.8
Electrician 0.8
Sundries (Labour Only):
4,012
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules ,Fixed Mounting
Structure and Foundation Civil work, Junction Boxes, Fuses, DC
Breakers, Wiring complete upto Solar Pump Inverter, sized at a sizing
factor of 1.75 capable of operating its intended solar pump having
discharge less than or equal to 3000 iGPH and output capacity greater
than 20 WHP (As per Approved Technical Specifications)
4,013
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules ,Fixed Mounting
Structure and Foundation Civil work, Junction Boxes, Fuses, DC
Breakers, Wiring complete upto Solar Pump Inverter, sized at a sizing
factor of 1.75 capable of operating its intended solar pump having
discharge greater than 3000 iGPH and output capacity up to 1 WHP (As
per Approved Technical Specifications)
LABOUR
Mason 1.9
Labourer 3.8
Skilled Labour 1.9
Electrician 1.9
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per WHP Rs.
Labour Rates Per WHP Rs.
4,014
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules ,Fixed Mounting
Structure and Foundation Civil work, Junction Boxes, Fuses, DC
Breakers, Wiring complete upto Solar Pump Inverter, sized at a sizing
factor of 1.75 capable of operating its intended solar pump having
discharge greater than 3000 iGPH and output capacity greater than 1 WHP
and up to 3 WHP (As per Approved Technical Specifications)
LABOUR
Mason 1.8
Labourer 3.6
Skilled Labour 1.8
Electrician 1.8
Sundries (Labour Only):
4,015
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules ,Fixed Mounting
Structure and Foundation Civil work, Junction Boxes, Fuses, DC
Breakers, Wiring complete upto Solar Pump Inverter, sized at a sizing
factor of 1.75 capable of operating its intended solar pump having
discharge greater than 3000 iGPH and output capacity greater than 3 WHP
and up to 6 WHP (As per Approved Technical Specifications)
LABOUR
Mason 1.6
Labourer 3.2
Skilled Labour 1.6
Electrician 1.6
Sundries (Labour Only):
4,016
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules ,Fixed Mounting
Structure and Foundation Civil work, Junction Boxes, Fuses, DC
Breakers, Wiring complete upto Solar Pump Inverter, sized at a sizing
factor of 1.75 capable of operating its intended solar pump having
discharge greater than 3000 iGPH and output capacity greater than 6 WHP
and up to 10 WHP (As per Approved Technical Specifications)
LABOUR
Mason 1.4
Labourer 2.8
Skilled Labour 1.4
Electrician 1.4
Sundries (Labour Only):
4,017
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules ,Fixed Mounting
Structure and Foundation Civil work, Junction Boxes, Fuses, DC
Breakers, Wiring complete upto Solar Pump Inverter, sized at a sizing
factor of 1.75 capable of operating its intended solar pump having
discharge greater than 3000 iGPH and output capacity greater than 10
WHP and up to 15 WHP (As per Approved Technical Specifications)
LABOUR
Mason 1.2
Labourer 2.4
Skilled Labour 1.2
Electrician 1.2
Sundries (Labour Only):
4,018
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules ,Fixed Mounting
Structure and Foundation Civil work, Junction Boxes, Fuses, DC
Breakers, Wiring complete upto Solar Pump Inverter, sized at a sizing
factor of 1.75 capable of operating its intended solar pump having
discharge greater than 3000 iGPH and output capacity greater than 15
WHP and up to 20 WHP (As per Approved Technical Specifications)
LABOUR
Mason 0.8
Labourer 1.6
Skilled Labour 0.8
Electrician 0.8
Sundries (Labour Only):
4,019
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules ,Fixed Mounting
Structure and Foundation Civil work, Junction Boxes, Fuses, DC
Breakers, Wiring complete upto Solar Pump Inverter, sized at a sizing
factor of 1.75 capable of operating its intended solar pump having
discharge greater than 3000 iGPH and output capacity greater than 20
WHP and up to 30 WHP (As per Approved Technical Specifications)
4,020
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules ,Fixed Mounting
Structure and Foundation Civil work, Junction Boxes, Fuses, DC
Breakers, Wiring complete upto Solar Pump Inverter, sized at a sizing
factor of 1.75 capable of operating its intended solar pump having
discharge greater than 3000 iGPH and output capacity greater than 30
WHP (As per Approved Technical Specifications)
LABOUR
Mason 0.4
Labourer 0.8
Skilled Labour 0.4
Electrician 0.4
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per WHP Rs.
Labour Rates Per WHP Rs.
4,021
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules , Manual
Tracker Mounting Structure and Foundation Civil work, Junction Boxes,
Fuses, DC Breakers, Wiring complete upto Solar Pump Inerter, sized at a
sizing factor of 1.50 capable of operating its intended solar pump
having discharge less than or equal to 3000 iGPH and output capacity up
to 1 WHP (As per Approved Technical Specifications)
LABOUR
Mason 2
Labourer 4
Skilled Labour 2
Electrician 2
Sundries (Labour Only):
4,022
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules , Manual Tacker
Mounting Structure and Foundation Civil work, Junction Boxes, Fuses, DC
Breakers, Wiring complete upto Solar Pump Inerter, sized at a sizing
factor of 1.50 capable of operating its intended solar pump having
discharge less than or equal to 3000 iGPH and output capacity greater
than 1 WHP and up to 3 WHP (As per Approved Technical Specifications)
LABOUR
Mason 1.8
Labourer 3.6
Skilled Labour 1.8
Electrician 1.8
Sundries (Labour Only):
4,023
LABOUR
Mason 1.6
Labourer 3.2
Skilled Labour 1.6
Electrician 1.6
Sundries (Labour Only):
4,024
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules , Manual
Tracker Mounting Structure and Foundation Civil work, Junction Boxes,
Fuses, DC Breakers, Wiring complete upto Solar Pump Inerter, sized at a
sizing factor of 1.50 capable of operating its intended solar pump
having discharge less than or equal to 3000 iGPH and output capacity
greater than 6 WHP and up to 10 WHP (As per Approved Technical
Specifications)
LABOUR
Mason 1.4
Labourer 2.8
Skilled Labour 1.4
Electrician 1.4
Sundries (Labour Only):
4,025
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules , Manual
Tracker Mounting Structure and Foundation Civil work, Junction Boxes,
Fuses, DC Breakers, Wiring complete upto Solar Pump Inerter, sized at a
sizing factor of 1.50 capable of operating its intended solar pump
having discharge less than or equal to 3000 iGPH and output capacity
greater than 10 WHP and up to 15 WHP (As per Approved Technical
Specifications)
LABOUR
Mason 1.2
Labourer 2.4
Skilled Labour 1.2
Electrician 1.2
Sundries (Labour Only):
4,026
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules ,Manual Tracker
Mounting Structure and Foundation Civil work, Junction Boxes, Fuses, DC
Breakers, Wiring complete upto Solar Pump Inerter, sized at a sizing
factor of 1.50 capable of operating its intended solar pump having
discharge less than or equal to 3000 iGPH and output capacity greater
than 15 WHP and up to 20 WHP (As per Approved Technical Specifications)
4,027
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules ,Manual Tracker
Mounting Structure and Foundation Civil work, Junction Boxes, Fuses, DC
Breakers, Wiring complete upto Solar Pump Inerter, sized at a sizing
factor of 1.50 capable of operating its intended solar pump having
discharge less than or equal to 3000 iGPH and output capacity greater
than 20 (As per Approved Technical Specifications)
LABOUR
Mason 0.4
Labourer 0.8
Skilled Labour 0.4
Electrician 0.4
Sundries (Labour Only):
4,028
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules , Manual
Tracker Mounting Structure and Foundation Civil work, Junction Boxes,
Fuses, DC Breakers, Wiring complete upto Solar Pump Inerter, sized at a
sizing factor of 1.50 capable of operating its intended solar pump
having discharge greater than 3000 iGPH and output capacity up to 1 WHP
(As per Approved Technical Specifications)
LABOUR
Mason 1.9
Labourer 3.8
Skilled Labour 1.9
Electrician 1.9
Sundries (Labour Only):
4,029
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules , Manual Tacker
Mounting Structure and Foundation Civil work, Junction Boxes, Fuses, DC
Breakers, Wiring complete upto Solar Pump Inerter, sized at a sizing
factor of 1.50 capable of operating its intended solar pump having
discharge greater than 3000 iGPH and output capacity greater than 1 WHP
and up to 3 WHP (As per Approved Technical Specifications)
LABOUR
Mason 1.8
Labourer 3.6
Skilled Labour 1.8
Electrician 1.8
Sundries (Labour Only):
4,030
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules , Manual Tacker
Mounting Structure and Foundation Civil work, Junction Boxes, Fuses, DC
Breakers, Wiring complete upto Solar Pump Inerter, sized at a sizing
factor of 1.50 capable of operating its intended solar pump having
discharge greater than 3000 iGPH and output capacity greater than 3 WHP
and up to 6 WHP (As per Approved Technical Specifications)
LABOUR
Mason 1.6
Labourer 3.2
Skilled Labour 1.6
Electrician 1.6
Sundries (Labour Only):
4,031
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules , Manual
Tracker Mounting Structure and Foundation Civil work, Junction Boxes,
Fuses, DC Breakers, Wiring complete upto Solar Pump Inerter, sized at a
sizing factor of 1.50 capable of operating its intended solar pump
having discharge greater than 3000 iGPH and output capacity greater
than 6 WHP and up to 10 WHP (As per Approved Technical Specifications)
LABOUR
Mason 1.4
Labourer 2.8
Skilled Labour 1.4
Electrician 1.4
Sundries (Labour Only):
4,032
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules , Manual
Tracker Mounting Structure and Foundation Civil work, Junction Boxes,
Fuses, DC Breakers, Wiring complete upto Solar Pump Inerter, sized at a
sizing factor of 1.50 capable of operating its intended solar pump
having discharge greater than 3000 iGPH and output capacity greater
than 10 WHP and up to 15 WHP (As per Approved Technical Specifications)
LABOUR
Mason 1.2
Labourer 2.4
Skilled Labour 1.2
Electrician 1.2
Sundries (Labour Only):
4,033
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules ,Manual Tracker
Mounting Structure and Foundation Civil work, Junction Boxes, Fuses, DC
Breakers, Wiring complete upto Solar Pump Inerter, sized at a sizing
factor of 1.50 capable of operating its intended solar pump having
discharge greater than 3000 iGPH and output capacity greater than 15
WHP and up to 20 WHP (As per Approved Technical Specifications)
4,034
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules ,Manual Tracker
Mounting Structure and Foundation Civil work, Junction Boxes, Fuses, DC
Breakers, Wiring complete upto Solar Pump Inerter, sized at a sizing
factor of 1.50 capable of operating its intended solar pump having
discharge greater than 3000 iGPH and output capacity greater than 20
WHP and up to 30 WHP (As per Approved Technical Specifications)
LABOUR
Mason 0.4
Labourer 0.8
Skilled Labour 0.4
Electrician 0.4
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per WHP Rs.
Labour Rates Per WHP Rs.
4,035
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules ,Manual Tracker
Mounting Structure and Foundation Civil work, Junction Boxes, Fuses, DC
Breakers, Wiring complete upto Solar Pump Inerter, sized at a sizing
factor of 1.50 capable of operating its intended solar pump having
discharge greater than 3000 iGPH and output capacity greater than 30
WHP (As per Approved Technical Specifications)
LABOUR
Mason 0.4
Labourer 0.8
Skilled Labour 0.4
Electrician 0.4
Sundries (Labour Only):
4,036
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules , Auto sun
Tracker Mounting Structure and Foundation Civil work, Junction Boxes,
Fuses, DC Breakers, Wiring complete upto Solar Pump Inerter, sized at a
sizing factor of 1.50 capable of operating its intended solar pump
having discharge less than or equal to 3000 iGPH and output capacity up
to 1 WHP (As per Approved Technical Specifications)
LABOUR
Mason 2.2
Labourer 4.4
Skilled Labour 2.2
Electrician 2.2
Sundries (Labour Only):
4,037
LABOUR
Mason 2.1
Labourer 4.2
Skilled Labour 2.1
Electrician 2.1
Sundries (Labour Only):
4,038
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules , Auto sun
Tacker Mounting Structure and Foundation Civil work, Junction Boxes,
Fuses, DC Breakers, Wiring complete upto Solar Pump Inerter, sized at a
sizing factor of 1.50 capable of operating its intended solar pump
having discharge less than or eual to 3000 iGPH and output capacity
greater than 3 WHP and up to 6 WHP (As per Approved Technical
Specifications)
LABOUR
Mason 1.9
Labourer 3.8
Skilled Labour 1.9
Electrician 1.9
Sundries (Labour Only):
4,039
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules , Auto sun
Tacker Mounting Structure and Foundation Civil work, Junction Boxes,
Fuses, DC Breakers, Wiring complete upto Solar Pump Inerter, sized at a
sizing factor of 1.50 capable of operating its intended solar pump
having discharge less than or eual to 3000 iGPH and output capacity
greater than 6 WHP and up to 10 WHP (As per Approved Technical
Specifications)
Detail Qty Unit
MATERIAL
Machinery and equipment 1 WHP
LABOUR
Mason 1.7
Labourer 3.4
Skilled Labour 1.7
Electrician 1.7
Sundries (Labour Only):
4,040
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules , Auto sun
Tacker Mounting Structure and Foundation Civil work, Junction Boxes,
Fuses, DC Breakers, Wiring complete upto Solar Pump Inerter, sized at a
sizing factor of 1.50 capable of operating its intended solar pump
having discharge less than or eual to 3000 iGPH and output capacity
greater than 10 WHP and up to 15 WHP (As per Approved Technical
Specifications)
LABOUR
Mason 1.2
Labourer 2.4
Skilled Labour 1.2
Electrician 1.2
Sundries (Labour Only):
4,041
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules , Auto sun
Tacker Mounting Structure and Foundation Civil work, Junction Boxes,
Fuses, DC Breakers, Wiring complete upto Solar Pump Inerter, sized at a
sizing factor of 1.50 capable of operating its intended solar pump
having discharge less than or eual to 3000 iGPH and output capacity
greater than 15 WHP and up to 20 WHP (As per Approved Technical
Specifications)
4,042
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules , Auto sun
Tacker Mounting Structure and Foundation Civil work, Junction Boxes,
Fuses, DC Breakers, Wiring complete upto Solar Pump Inerter, sized at a
sizing factor of 1.50 capable of operating its intended solar pump
having discharge less than or eual to 3000 iGPH and output capacity
greater than 20 WHP (As per Approved Technical Specifications)
LABOUR
Mason 0.4
Labourer 0.8
Skilled Labour 0.4
Electrician 0.4
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per WHP Rs.
Labour Rates Per WHP Rs.
4,043
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules , Auto sun
Tracker Mounting Structure and Foundation Civil work, Junction Boxes,
Fuses, DC Breakers, Wiring complete upto Solar Pump Inerter, sized at a
sizing factor of 1.50 capable of operating its intended solar pump
having discharge greater than 3000 iGPH and output capacity up to 1 WHP
(As per Approved Technical Specifications)
LABOUR
Mason 2
Labourer 2.5
Skilled Labour 2
Electrician 2
Sundries (Labour Only):
4,044
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules , Auto sun
Tacker Mounting Structure and Foundation Civil work, Junction Boxes,
Fuses, DC Breakers, Wiring complete upto Solar Pump Inerter, sized at a
sizing factor of 1.50 capable of operating its intended solar pump
having discharge greater than 3000 iGPH and output capacity greater
than 1 WHP and up to 3 WHP (As per Approved Technical Specifications)
LABOUR
Mason 1.8
Labourer 3.6
Skilled Labour 1.8
Electrician 1.8
Sundries (Labour Only):
4,045
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules , Auto sun
Tacker Mounting Structure and Foundation Civil work, Junction Boxes,
Fuses, DC Breakers, Wiring complete upto Solar Pump Inerter, sized at a
sizing factor of 1.50 capable of operating its intended solar pump
having discharge greater than 3000 iGPH and output capacity greater
than 3 WHP and up to 6 WHP (As per Approved Technical Specifications)
LABOUR
Mason 1.6
Labourer 3.2
Skilled Labour 1.6
Electrician 1.6
Sundries (Labour Only):
4,046
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules , Auto sun
Tacker Mounting Structure and Foundation Civil work, Junction Boxes,
Fuses, DC Breakers, Wiring complete upto Solar Pump Inerter, sized at a
sizing factor of 1.50 capable of operating its intended solar pump
having discharge greater than 3000 iGPH and output capacity greater
than 6 WHP and up to 10 WHP (As per Approved Technical Specifications)
LABOUR
Mason 1.4
Labourer 2.8
Skilled Labour 1.4
Electrician 1.4
Sundries (Labour Only):
4,047
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules , Auto sun
Tacker Mounting Structure and Foundation Civil work, Junction Boxes,
Fuses, DC Breakers, Wiring complete upto Solar Pump Inerter, sized at a
sizing factor of 1.50 capable of operating its intended solar pump
having discharge greater than 3000 iGPH and output capacity greater
than 10 WHP and up to 15 WHP (As per Approved Technical Specifications)
LABOUR
Mason 1.2
Labourer 2.4
Skilled Labour 1.2
Electrician 1.2
Sundries (Labour Only):
4,048
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules , Auto sun
Tacker Mounting Structure and Foundation Civil work, Junction Boxes,
Fuses, DC Breakers, Wiring complete upto Solar Pump Inerter, sized at a
sizing factor of 1.50 capable of operating its intended solar pump
having discharge greater than 3000 iGPH and output capacity greater
than 15 WHP and up to 20 WHP (As per Approved Technical Specifications)
LABOUR
Mason 1
Labourer 2
Skilled Labour 1
Electrician 1
Sundries (Labour Only):
4,049
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules , Auto sun
Tacker Mounting Structure and Foundation Civil work, Junction Boxes,
Fuses, DC Breakers, Wiring complete upto Solar Pump Inerter, sized at a
sizing factor of 1.50 capable of operating its intended solar pump
having discharge greater than 3000 iGPH and output capacity greater
than 20 WHP and up to 30 WHP (As per Approved Technical Specifications)
LABOUR
Mason 0.8
Labourer 1.6
Skilled Labour 0.8
Electrician 0.8
Sundries (Labour Only):
4,050
Item Name : Supply & Installation, testing and commissioning of complete Solar PV
Generator including A-Grade Mono Crystalline PV Modules , Auto sun
Tacker Mounting Structure and Foundation Civil work, Junction Boxes,
Fuses, DC Breakers, Wiring complete upto Solar Pump Inerter, sized at a
sizing factor of 1.50 capable of operating its intended solar pump
having discharge greater than 3000 iGPH and output capacity greater
than 30 WHP (As per Approved Technical Specifications)
LABOUR
Mason 0.4
Labourer 0.8
Skilled Labour 0.4
Electrician 0.4
Sundries (Labour Only):
4,051
DESCRIPTION OF ITEM :
Item Code : 25-01
Item Name : Laying, linking and packing tramway line
Detail Qty Unit
LABOUR
Labourer 0.023 Day
Skilled Labour 0.0033 Day
Mate 0.0033 Day
Sundries (Labour Only):
4,052
DESCRIPTION OF ITEM :
Item Code : 25-02
Item Name : Dismantling tramway track
Detail Qty Unit
LABOUR
Labourer 0.008 Day
Skilled Labour 0.0008 Day
Mate 0.0008 Day
Sundries (Labour Only):
4,053
4,054
DESCRIPTION OF ITEM :
Item Code : 25-04
Item Name : Linking points and crossings, complete with fastening
Detail Qty Unit
LABOUR
Labourer 7.5 Day
Mate 0.5 Day
Sundries (Labour Only):
4,055
DESCRIPTION OF ITEM :
Item Code : 25-05
Item Name : Bending or straightening BG rail with jim crow
Detail Qty Unit
LABOUR
Labourer 0.5 Day
Black Smith 0.25 Day
Sundries (Labour Only):
4,056
DESCRIPTION OF ITEM :
Item Code : 25-06
Item Name : Fixing street lamp posts
Detail Qty Unit
LABOUR
Labourer 0.85 Day
Sundries (Labour Only):
4,057
4,058
Item Name : Opening stacks of sleepers & timber of all kinds and sizes,
including spreading for inspection
4,059
Item Name : Small iron work, such as gusset plates, knees, bends, stirrups, straps,
rings etc excluding erection
Detail Qty
MATERIAL
Steel (Struct. Sections) 1000
LABOUR
Labourer 80
Mate 8
Sundries (Labour Only):
4,060
Item Name : Fabrication of heavy steel work with angle, tees, sheet iron etc for
making trusses, girders etc
Detail Qty
MATERIAL
Welding Rod 2
Steel (Struct. Sections) 1000
LABOUR
Labourer 5
Black Smith 5
Sundries (Labour Only):
4,061
Item Name : Erection and fitting in position iron trusses, staging of water tanks,
etc
4,062
4,063
DESCRIPTION OF ITEM :
Item Code : 25-13
Item Name : Erecting corrugated iron sheet tanks, upto 20' height
Detail Qty Unit
LABOUR
Labourer 15.2 Day
Black Smith 3.2 Day
Sundries (Labour Only):
4,064
Item Name : Erecting rolled steel beams or old rails, in roof etc, erection &
fixing in position
4,065
Item Name : Erecting rolled steel beams or rails, erection for posts etc (other
than in roofs)
4,066
DESCRIPTION OF ITEM :
LABOUR
Labourer 0.035 Day
Black Smith 0.07 Day
Mason (Second Class) 0.035 Day
Sundries (Labour Only):
4,067
DESCRIPTION OF ITEM :
4,068
DESCRIPTION OF ITEM :
4,069
DESCRIPTION OF ITEM :
4,070
DESCRIPTION OF ITEM :
4,071
DESCRIPTION OF ITEM :
Item Code : 25-20
Item Name :
Detail Qty Unit
LABOUR
Labourer 0.0667 Day
Fitter Sewerage / Gas 0.0167 Day
Pipe Fitter / Fitter II
Sundries (Labour Only):
4,072
Item Name : Extra for drilling holes in plates upto 1/2" thick per inch dia, or
part thereof
Detail Qty Unit
LABOUR
Labourer 0.04 Day
Fitter Sewerage / Gas 0.0025 Day
Pipe Fitter / Fitter II
Sundries (Labour Only):
4,073
DESCRIPTION OF ITEM :
Item Code : 25-22
Item Name : Rivetting 1/8" dia
Detail Qty Unit
LABOUR
Labourer 0.005 Day
Fitter Sewerage / Gas 0.005 Day
Pipe Fitter / Fitter II
Sundries (Labour Only):
4,074
DESCRIPTION OF ITEM :
4,075
DESCRIPTION OF ITEM :
Item Code : 25-24
Item Name : Fitting and erection of gutters of sheet iron
Detail Qty Unit
LABOUR
Labourer 0.05 Day
Black Smith 0.005 Day
Fitter Sewerage / Gas 0.005 Day
Pipe Fitter / Fitter II
Sundries (Labour Only):
4,076
DESCRIPTION OF ITEM :
4,077
DESCRIPTION OF ITEM :
4,078
DESCRIPTION OF ITEM :
Item Code : 25-27
Item Name : Notching web or foot of rail posts for housing rail beams
Detail Qty Unit
MATERIAL
Coal 0.8333 Kg
LABOUR
Labourer 0.3333 Day
Fitter Sewerage / Gas 0.3333 Day
Pipe Fitter / Fitter II
Sundries (Labour Only):
4,079
DESCRIPTION OF ITEM :
LABOUR
Black Smith 0.0278 Day
Hammer Man 0.0278 Day
Sundries (Labour Only):
4,080
LABOUR
Labourer 0.0133 Day
Carpenter 0.0133 Day
Sundries (Labour Only):
4,081
Item Name : Providing and fixing steel grated doors, complete with locking
arrangement, angle iron frame 2"x2"x3/8" and 3/4" round bars 4" center
to center.
MATERIAL
Hold Fast With Bolt 0.2143 Kg
Paint : Enamel 0.036 Ltr
Steel (Struct. Sections) 5.78 Kg
Locking arrangements 0.0357 No.
steel
Rivets and Bolts 0.0804 Kg
LABOUR
Black Smith 0.1859 Day
Bellowman 0.1859 Day
Mason (Second Class) 0.1859 Day
Sundries (Labour Only):
4,082
Item Name : Providing and fixing steel grated doors, complete with locking
arrangement, angle iron frame 2"x2"x3/8" and 1" square bars 4" center
to center.
MATERIAL
Hold Fast With Bolt 0.2143 Kg
Paint : Enamel 0.036 Ltr
Steel (Struct. Sections) 6.52 Kg
Locking arrangements 0.0357 No.
steel
Rivets and Bolts 0.0804 Kg
LABOUR
Black Smith 0.1859 Day
Bellowman 0.1859 Day
Mason (Second Class) 0.1859 Day
Sundries (Labour Only):
4,083
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Providing and fixing steel grated doors, with 1/16" thick sheeting
including angle iron frame 2"x2"x3/8" and 3/4" square bars 4" center to
center with locking arrangement.
MATERIAL
Steel (bars/rods/section) 5.78 Kg
Iron Sheet 1.2 Kg
Hold Fast With Bolt 0.2143 Kg
Paint : Enamel 0.06 Ltr
Locking arrangements 0.0357 Kg
steel
Rivets and Bolts 0.0804 Kg
LABOUR
Black Smith 0.1859 Day
Hammer Man 0.1859 Day
Bellowman 0.1719 Day
Sundries (Labour Only):
4,084
Item Name : Providing and fixing grating in opening including fixing at site with
flat iron 2" x 3/8" and 3/4" round bars at 4" center to center.
LABOUR
Black Smith 0.05 Day
Hammer Man 0.05 Day
Black Smith Helper/ 0.05 Day
Bellow man
Sundries (Labour Only):
4,085
Item Name : Providing and fixing terrace railing 2" i/d conduit pipe 16 SWG, welded
with 5/8" x 5/8" square bar 2.75 ft. high fixed at 5" centre to centre,
in RCC slab with suitable arrangement, complete in all resppects as per
design and drawing.
LABOUR
Skilled Labour 0.025 Day
Black Smith 0.04 Day
Welder 0.05 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.
4,086
Item Name : Providing and fixing steel square pipe size l-l/2" x l-l/2" of 16 gauge
including its welding, complete in all respect, as specified
LABOUR
Black Smith 0.01 Day
Welding Plant Charges 0.01 Day
Sundries (Labour Only):
4,087
LABOUR
Skilled Labour 0.0799 Day
Painter / Polisher 0.0401 Day
Black Smith 0.0799 Day
Fitter Sewerage / Gas 0.0799 Day
Pipe Fitter / Fitter II
Sundries (Labour Only):
4,088
Item Name : Providing and Fixing 24 SWG GI sheet rolling shutter of steel frame of
MS channel 2"x1.25"x1/8" complete
LABOUR
Skilled Labour 0.01 Day
Painter / Polisher 0.005 Day
Black Smith 0.01 Day
Fitter Sewerage / Gas 0.01 Day
Pipe Fitter / Fitter II
Sundries (Labour Only):
4,089
Item Name : Providing and Fixing MS angle iron 1"x1"x1/4" edge protector nozing of
steps of stairs, complete
LABOUR
Mason 0.02 Day
Labourer 0.02 Day
Black Smith 0.0025 Day
Sundries (Labour Only):
4,090
Item Name : Providing and Fixing stair railing of 2.5" i/d GI pipe, welded with
5/8"x5/8" MS bars 2'-9" high, fixed in each step
LABOUR
Mason 0.01 Day
Labourer 0.03 Day
Painter / Polisher 0.01 Day
Black Smith 0.04 Day
Hammer Man 0.04 Day
Black Smith Helper/ 0.04 Day
Bellow man
Sundries (Labour Only):
4,091
Item Name : Providing and Fixing GI wire gauze 24 SWG, (12x12) meshes per sq.in.,
fixed to steel windows or doors etc, complete in all respects
4,092
Item Name : Providing and fixing steel windows with openable glazed pannels, using
beam section for frame 1-1/2" x 1" x 5/8" x 1/8", z-section for leaves
3/4" x 1" x 3/4" x 1/8", T- section sashes 1"x1"x1/8", glass panes,
wooden screed for glazing embded over a thin layer of putty duly
screwed with leaves, brass fittings holdfast, duly painted, complete in
all respects, including all cost of material and labour etc. as per
approved design and as directed by the engineer - in -charge: Glass
pane 2mm thick
LABOUR
Labourer 0.01 Day
Painter / Polisher 0.01 Day
Black Smith 0.01 Day
Sundries (Labour Only):
Item Name : Providing and fixing steel windows with openable glazed pannels, using
beam section for frame 1-1/2" x 1" x 5/8" x 1/8", z-section for leaves
3/4" x 1" x 3/4" x 1/8", T- section sashes 1"x1"x1/8", glass panes,
wooden screed for glazing embded over a thin layer of putty duly
screwed with leaves, brass fittings holdfast, duly painted, complete in
all respects, including all cost of material and labour etc. as per
approved design and as directed by the engineer - in -charge Glass pane
2.5mm thick
LABOUR
Labourer 0.01 Day
Painter / Polisher 0.01 Day
Black Smith 0.01 Day
Sundries (Labour Only):
4,094
LABOUR
Labourer 0.01 Day
Painter / Polisher 0.01 Day
Black Smith 0.01 Day
Sundries (Labour Only):
4,095
Item Name : Providing and fixing steel windows with openable glazed pannels, using
beam section for frame 1-1/2" x 1" x 5/8" x 1/8", z-section for leaves
3/4" x 1" x 3/4" x 1/8", T- section sashes 1"x1"x1/8", glass panes,
wooden screed for glazing embded over a thin layer of putty duly
screwed with leaves, brass fittings holdfast, duly painted, complete in
all respects, including all cost of material and labour etc. as per
approved design and as directed by the engineer - in -charge: Glass
pane 4mm thick
LABOUR
Labourer 0.01 Day
Painter / Polisher 0.01 Day
Black Smith 0.01 Day
Sundries (Labour Only):
4,096
Item Name : Providing and fixing steel windows with openable glazed pannels, using
beam section for frame 1-1/2" x 1" x 5/8" x 1/8", z-section for leaves
3/4" x 1" x 3/4" x 1/8", T- section sashes 1"x1"x1/8", glass panes,
wooden screed for glazing embded over a thin layer of putty duly
screwed with leaves, brass fittings holdfast, duly painted, complete in
all respects, including all cost of material and labour etc. as per
approved design and as directed by the engineer - in -charge Glass pane
5mm thick
LABOUR
Labourer 0.01 Day
Painter / Polisher 0.01 Day
Black Smith 0.01 Day
Sundries (Labour Only):
4,097
Item Name : Providing and Fixing steel windows 18 gauge with openable glazed panels
With 22 SWG wire gauze : Glass pane 2mm
LABOUR
Labourer 0.01 Day
Painter / Polisher 0.0125 Day
Black Smith 0.01 Day
Sundries (Labour Only):
4,098
Item Name : Providing and Fixing steel windows 18 gauge with openable glazed panels
With 22 SWG wire gauze : Glass pane 2.5mm
LABOUR
Labourer 0.01 Day
Painter / Polisher 0.0125 Day
Black Smith 0.01 Day
Sundries (Labour Only):
4,099
Item Name : Providing and Fixing steel windows 18 gauge with openable glazed panels
With 22 SWG wire gauze : Glass pane 3mm
LABOUR
Labourer 0.01 Day
Painter / Polisher 0.0125 Day
Black Smith 0.01 Day
Sundries (Labour Only):
4,100
Item Name : Providing and Fixing steel windows 18 gauge with openable glazed panels
With 22 SWG wire gauze : Glass pane 4mm
LABOUR
Labourer 0.01 Day
Painter / Polisher 0.0125 Day
Black Smith 0.01 Day
Sundries (Labour Only):
4,101
Item Name : Providing and Fixing steel windows 18 gauge with openable glazed panels
With 22 SWG wire gauze : Glass pane 5mm
LABOUR
Labourer 0.01 Day
Painter / Polisher 0.0125 Day
Black Smith 0.01 Day
Sundries (Labour Only):
4,102
Item Name : Providing and Fixing steel windows 18 gauge with openable glazed panels
With 22 SWG wire gauze :
LABOUR
Labourer 0.5 Day
Fitter Sewerage / Gas 0.25 Day
Pipe Fitter / Fitter II
Sundries (Labour Only):
4,103
Item Name : Providing and Fixing angle iron railing with MS Pipe 2" dia at top and
at Mid-height, using 2.5"x2.5"x3/8" angle iron post 4.5' long, 5" to 6"
apart, complete
MATERIAL
Paint : Enamel 0.3501
Steel (Struct. Sections) 6.4517
U Bolt 1.5" Long 0.3
Conduit pipe 2" dia 2
LABOUR
Mason 0.075
Labourer 0.075
Black Smith 0.075
Fitter Sewerage / Gas 0.075
Pipe Fitter / Fitter II
Sundries (Labour Only):
4,104
DESCRIPTION OF ITEM :
Item Code : 25-42
Item Name :
1.5"x1.5"x3/16" angle iron post
LABOUR
Mason 0.0153 Day
Labourer 0.0153 Day
Painter / Polisher 0.0046 Day
Black Smith 0.0153 Day
Hammer Man 0.0153 Day
Sundries (Labour Only):
4,105
DESCRIPTION OF ITEM :
Item Code : 25-43
Item Name :
consisting of 1.5"x1.5"x3/16" angle iron post
all respects.
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.0048 Bag
Fine Sand 0.001 Cft
1/2" size screened bajri 0.0014 Cft
Barbed Wire 0.1515 Kg
Paint : Enamel 0.1067 Ltr
Steel (Struct. Sections) 0.427 Kg
LABOUR
Mason 0.0152 Day
Labourer 0.0198 Day
Painter / Polisher 0.0046 Day
Black Smith 0.0168 Day
Hammer Man 0.0152 Day
Sundries (Labour Only):
4,106
Item Name : Supplying and Fixing 18SWG Steel Almirah, 12" max depth including box
shelves, back, shelves, lock, spray paint complete
LABOUR
Labourer 0.0781 Day
Painter / Polisher 0.0156 Day
Black Smith 0.0156 Day
Welder 0.0313 Day
Sundries (Labour Only):
4,107
Item Name : Supplying and Fixing 18 SWG MS Sheet Door with angle iron frame
(1.5"x1.5"x1/8"), bolt, hinges, paint etc complete
LABOUR
Labourer 0.0089 Day
Painter / Polisher 0.0179 Day
Black Smith 0.0536 Day
Welder 0.0357 Day
Sundries (Labour Only):
4,108
Item Name : Supplying and Fixing 18 SWG MS Sheet Gate with angle iron frame
(2"x2"x3/16") with side window, lock, painting etc
LABOUR
Mason 0.0278 Day
Labourer 0.0972 Day
Painter / Polisher 0.0139 Day
Black Smith 0.0556 Day
Welder 0.0278 Day
Sundries (Labour Only):
4,109
4,110
Item Name : Supply and fixing of fancy type stainless steel chromium plate 2" dia
pipes stair railing 3/4" dia pipe fixed on specified space on steps in
horizontal positions, complete in all respects
MATERIAL
Stainless steel chromium 1 ft
plated 2" dia pipe
LABOUR
Labourer 0.2 Day
Black Smith 0.125 Day
Sundries (Labour Only):
4,111
Item Name : Removing & folding design paracutist cloth shade with steel rope size
85'×50' complete in all respects
4,112
Item Name : Providing and Fixing of Steel chowkat including GI sheet (heavy gauge)
with holdfast embedded in PCC 5" to 6" wide
LABOUR
Labourer 0.076 Day
Welder 0.02 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 25-50-a
Item Name :
Detail Qty Unit
MATERIAL
Steel Bracket with Nut, 1 No
bolt for AC Unit
LABOUR
Labourer 0.13 Day
Sundries (Labour Only):
4,114
DESCRIPTION OF ITEM :
Item Code : 25-50-b
Item Name : Supply and fixing of steel bracket for curtain pipe
Detail Qty Unit
MATERIAL
Steel bracket for curtain 2 Each
pipe
LABOUR
Labourer 0.05 Day
Sundries (Labour Only):
4,115
DESCRIPTION OF ITEM :
Item Code : 25-51
Item Name : Supply and Fixing of Tee Iron (2''x2''x1/8'')
Detail Qty Unit
MATERIAL
Tee Iron (2''x2''x1/8'') 1 Kg
LABOUR
Black Smith 0.02 Day
Hammer Man 0.02 Day
Sundries (Labour Only):
4,116
Item Name : Providing, making & fixing of Steel manhole cover i/c angle iron (1
1/2" x 1 1/4" x 1/8") frame with M.S. sheet'complete .
4,117
Item Name : Providing, making and fixing of steel grill of MS pipe (2"x1")
omamental design i/c cost of paiting complete.
LABOUR
Painter / Polisher 0.06 Day
Welder 0.08 Day
Sundries (Labour Only):
4,118
DESCRIPTION OF ITEM :
Item Code : 25-54
Item Name : Minor repair of steel joinery complete.
Detail Qty Unit
MATERIAL
Welding Rod 0.0063 Packet
LABOUR
Labourer 0.0208 Day
Welder 0.0167 Day
Sundries (Labour Only):
EQUIPMENT
Welding Plant Unit 0.047 hr
4,119
Item Name : Supply and Fixing of steel ladder 5' dia upto 15' height with umbrella
railing complete in all respect
LABOUR
Labourer 1 Day
Welder 2 Day
Sundries (Labour Only):
Item Name : Providing and fixing steel gate of 16-18 SWG MS Sheet Gate with angle
iron frame (2"x2"x3/16") with side window, lock, painting etc M.S.
sheet covering including hold fast, with or without rollers and track
arrangement including providing wicket shutter of required size with
all accessories and locking arrangement complete
LABOUR
Mason 0.01 Day
Labourer 0.0139 Day
Skilled Labour 0.0278 Day
Black Smith 0.1333 Day
Sundries (Labour Only):
4,121
Item Name : Providing & Fixing of M.S Girder (WF 10x30) Duly painted including red
oxide primer, complete in all respects.
LABOUR
Mason 0.4332 Day
Labourer 0.1375 Day
Painter / Polisher 0.08 Day
Sundries (Labour Only):
4,122
Item Name : Supply and Fixing of 27-SWG CGI sheets on existing truss frame complete
in all respect.
LABOUR
Labourer 0.08 Day
Black Smith 0.08 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Sft Rs.
Labour Rates Per Sft Rs.
4,123
Item Name : Providing and fixing of parking shed consisting of CGI Sheet, tubular
pipe frame (heavy) quality and circular columns excluding cost of
foundation.
MATERIAL
Welding Rod 0.0111 Packet
2.5" Nominal Pipe Size 0.22 Rft
-3/16" thick MS blind
pipe
3" Nominal Pipe Size 0.21 Rft
-3/16" thick MS blind
pipe
4" Nominal Pipe Size 0.1 Rft
-3/16" thick MS blind
pipe
Steel (Struct. Sections) 0.0944 kg
G.I. Plain sheet 27-SWG 1 Sft
LABOUR
Labourer 0.0111 Day
Welder 0.0111 Day
Sundries (Labour Only):
4,124
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Providing and fixing of parking shed consisting of fiber glass Sheet,
tubular pipe frame (heavy) quality and circular columns excluding cost
of foundation.
MATERIAL
Welding Rod 0.0111 Packet
2.5" Nominal Pipe Size 0.26 Rft
-3/16" thick MS blind
pipe
3" Nominal Pipe Size 0.22 Rft
-3/16" thick MS blind
pipe
4" Nominal Pipe Size 0.21 Rft
-3/16" thick MS blind
pipe
Steel (Struct. Sections) 0.0944 kg
Fiber Glass sheet 1 sft
LABOUR
Labourer 0.0111 Day
Welder 0.0111 Day
Sundries (Labour Only):
4,125
Item Name : Providing and fixing of cantiliver type parking shed consisting of
fiber glass sheet, tubular pipe frame (heavy) quality , triangular
frame supports excluding cost of foundation.
MATERIAL
Welding Rod 0.05 Pkt
2.5" Nominal Pipe Size 0.5 Rft
-3/16" thick MS blind
pipe
3" Nominal Pipe Size 0.32 Rft
-3/16" thick MS blind
pipe
4" Nominal Pipe Size 0.42 Rft
-3/16" thick MS blind
pipe
Steel (Struct. Sections) 0.25 KG
Fiber Glass sheet 1 sft
LABOUR
Labourer 0.011 Day
Welder 0.011 Day
Sundries (Labour Only):
4,126
Item Name : Making & Fixing of steel racks 1.5" depth i/e angle iron welding
jointing with 3- coats painting complete
LABOUR
Labourer 0.0026 Day
Painter / Polisher 0.0201 Day
Black Smith 0.0026 Day
Welder 0.0011 Day
Sundries (Labour Only):
4,127
Item Name : Supply and fixing razor wire (2'-0" dia) consisting of
1-1/2"X1-1/2"X3/16" angle iron Y post 2'-6" long 6' to 8' center to
center embedded in concrete block of size 3"X9"X6" (PCC 1:2:4), at top
of boundary wall including painting posts etc. Complete in all
respects.
4,128
Item Name : Supply and fixing razor wire (1'-6" dia) consisting of
1-1/2"X1-1/2"X3/16" angle iron Y post 2'-6" long 6' to 8' center to
center embedded in concrete block of size 3"X9"X6" (PCC 1:2:4), at top
of boundary wall including painting posts etc. Complete in all
respects.
LABOUR
Mason 0.01 Day
Labourer 0.02 Day
Black Smith 0.01 Day
Sundries (Labour Only):
4,129
Item Name : Supply and fixing razor wire (2'-0" dia) consisting of
1-1/2"X1-1/2"X3/16" angle iron Y post 2'-6" long 6' to 8' center to
center fixed with bolt anchorage, at top of boundary wall including
painting posts etc. Complete in all respects.
LABOUR
Mason 0.01 Day
Labourer 0.02 Day
Black Smith 0.01 Day
Sundries (Labour Only):
4,130
Item Name : Supply and fixing razor wire (1'-6" dia) consisting of
1-1/2"X1-1/2"X3/16" angle iron Y post 2'-6" long 6' to 8' center to
center fixed with bolt anchorage, at top of boundary wall including
painting posts etc. Complete in all respects.
LABOUR
Mason 0.01 Day
Labourer 0.02 Day
Black Smith 0.01 Day
Sundries (Labour Only):
4,131
Item Name : Supply and fixing of steel door comprising of steel pipe frame of size
1.25" x 2.5" & 1.25" x 2.5" square pipe at lock rail & devider above
and below lock rail using 28 SWG plain sheet on both sides injcluding
hold fast, hinges & painting complete.
LABOUR
Labourer 0.009 Day
Painter / Polisher 0.036 Day
Black Smith 0.054 Day
Sundries (Labour Only):
4,132
Item Name : Double arm round conical Pole, Hot dipped galvanized (80 microns) 6
meters overall thickness 4mm Arm length 1.5 meters each with OD 60 mm,
base dia 150 mm and top dia 75mm with base plate arrangement 350mm x
350 mm x 20mm, 4 No of Stiffners (150mm 75mm 13mm), Complete in all
respects
MATERIAL
Double arm round conical 1 No
Pole 6 meter long
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 1 Hour
4,133
Item Name : Single arm round conical Pole, hot dipped galvanized (80 microns) 6
meters overall thickness 4mm Arm length 1.5 meters each with OD 60 mm,
base dia 150 mm and top dia 75mm with base plate arrangement 350mm x
350 mm x 20mm, 4 No of Stiffners (150mm 75mm 13mm), Complete in all
respects
MATERIAL
Single arm round conical 1 No
pole 6 meter long
LABOUR
Skilled Labour 0.25 Day
Electrician 0.25 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 1 Hour
4,134
Item Name : Double arm round Conical Pole, hot dipped galvanized (80 microns) 8
meters overall thickness 4mm Arm length 1.5 meters each with OD 60 mm,
base dia 180 mm and top dia 75mm with base plate arrangement 400mm x
400 mm x 20mm, 4 No of Stiffners (200mm x 100mm x 20mm), complete in
all respects
LABOUR
Skilled Labour 0.33 Day
Electrician 0.33 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 1 Hour
4,135
Item Name : Single arm round conical Pole, hot dipped galvanized (80 microns) 8
meters overall thickness 4mm Arm length 1.5 meters each with OD 60 mm,
base dia 180 mm and top dia 75mm with base plate arrangement (400mm x
400 mm x 20mm), 4 No of Stiffners (200mm x 100mm x 20mm), complete in
all respects
EQUIPMENT
Mobile Crane 10 Ton 1 Hour
4,136
Item Name : Double arm round conical Pole, hot dipped galvanized 10m overall
thickness 5mm Arm length 1.5 meters each with OD 60 mm, base dia 200
mm and top dia 100mm with base plate arrangement 450mm x 450 mm x 25mm,
Stiffners size (250mm x 100mm x 20mm), complete in all respects
Detail Qty
MATERIAL
Double arm round conical 1
Pole 10 meter long
LABOUR
Skilled Labour 0.5
Electrician 0.5
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 1
Item Name : Single arm round conical Pole, hot dipped galvanized 10m overall
thickness 5mm Arm length 1.5 meters each with OD 60 mm, base dia 200
mm and top dia 100mm with base plate arrangement 450mm x 450 mm x 25mm,
Stiffners size (250mm x 100mm x 20mm), Complete in all respects
Detail Qty
MATERIAL
Single arm round conical 1
pole 10 meter long
LABOUR
Skilled Labour 0.5
Electrician 0.5
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 1
4,138
DESCRIPTION OF ITEM :
Item Code : 26-01-b-01
Item Name : Supply and Erection PVC flexible pipe
Detail Qty Unit
MATERIAL
1" dia PVC flexible pipe 1 Rft
LABOUR
Electrician 0.005 Day
Sundries (Labour Only):
4,139
DESCRIPTION OF ITEM :
Item Code : 26-01-b-02
Item Name : Supply and Erection PVC flexible pipe
Detail Qty Unit
MATERIAL
1.5" dia PVC flexible 1 Rft
pipe
LABOUR
Electrician 0.005 Day
Sundries (Labour Only):
4,140
DESCRIPTION OF ITEM :
Item Code : 26-01-b-03
Item Name : Supply and Erection PVC flexible pipe
Detail Qty Unit
MATERIAL
2" dia PVC flexible pipe 1 Rft
LABOUR
Electrician 0.005 Day
Sundries (Labour Only):
4,141
Item Name : Supply and Erection of pole mounted SMD type light road light fixture
in Aluminium dia cast body with corrosioresisted powder coated finish
(30-40 watts) with 12/24V DC LED
MATERIAL
LED road Light fixture 1 No
30-40 Watt
LABOUR
Electrician 0.0625 Day
Crane operator / Driver 0.0625 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 0.05 Hour
4,142
Item Name : Supply and Erection of pole mounted SMD type light road light fixture
in Aluminium dia cast body with corrosion resisted powder coated finish
(60-70 watts) with 12/24V DC LED
MATERIAL
LED road Light 1 No
fixture60-70 Watt
LABOUR
Electrician 0.0625 Day
Crane operator / Driver 0.0625 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 0.5 Hour
4,143
Item Name : Supply and Erection of pole mounted SMD type light road light fixture
in Aluminium dia cast body with corrosion resisted powder coated finish
(90-100) with 12/24V DC LED
LABOUR
Electrician 0.0625 Day
Crane operator / Driver 0.0625 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 0.5 Hour
4,144
Item Name : Supply and Erection of pole mounted SMD type light road light fixture
in Aluminium dia cast body with corrosion resisted powder coated finish
(120-130) with 12/24V DC LED
MATERIAL
LED road Light 1 No
fixture120-130 Watt
LABOUR
Electrician 0.0625 Day
Crane operator / Driver 0.0625 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 0.5 Hour
4,145
DESCRIPTION OF ITEM :
Item Code : 26-01-c-05
Item Name :
Detail Qty Unit
MATERIAL
AC ENERGY EFFICIENT LED 1 No
LIGHT BULBS (7-10W)
LABOUR
Electrician 0.063 Day
Sundries (Labour Only):
4,146
DESCRIPTION OF ITEM :
Item Code : 26-01-c-06
Item Name :
Detail Qty Unit
MATERIAL
AC ENERGY EFFICIENT LED 1 No
LIGHT BULBS (16-20W)
LABOUR
Electrician 0.063 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.
4,147
DESCRIPTION OF ITEM :
Item Code : 26-01-c-07
Item Name :
Detail Qty Unit
MATERIAL
AC ENERGY EFFICIENT LED 1 No
LIGHT BULBS (21-30W)
LABOUR
Electrician 0.063 Day
Sundries (Labour Only):
4,148
DESCRIPTION OF ITEM :
Item Code : 26-01-c-08
Item Name :
Detail Qty Unit
MATERIAL
AC ENERGY EFFICIENT LED 1 No
LIGHT BULBS (31-50W)
LABOUR
Electrician 0.063 Day
Sundries (Labour Only):
4,149
DESCRIPTION OF ITEM :
Item Code : 26-01-c-09
Item Name :
Detail Qty Unit
MATERIAL
DC ENERGY EFFICIENT LED 1 No
LIGHT BULBS (51-100 W)
LABOUR
Electrician 0.063 Day
Sundries (Labour Only):
4,150
DESCRIPTION OF ITEM :
Item Code : 26-01-c-10
Item Name :
Detail Qty Unit
MATERIAL
AC ENERGY EFFICIENT LED 1 No
LIGHT BULBS (11-15 W)
LABOUR
Electrician 0.063 Day
Sundries (Labour Only):
4,151
Item Name : Supply and Erection of Solar PV Module (Solar Panel) Mono-crystalline
A-Grade (per Watt) (As per Approved Specifications)
LABOUR
Electrician 0.0006 Day
Sundries (Labour Only):
4,152
LABOUR
Electrician 0.0006 Day
Sundries (Labour Only):
4,153
Item Name : Supply and Erection of MPPT Solar Light Charge Controller (10 Amps,
12/24 V) with all sort of electronic protections
LABOUR
Electrician 0.063 Day
Sundries (Labour Only):
4,154
Item Name : Supply and Erection of MPPT Solar Light Charge Controller (15 Amps,
12/24 V) with all sort of electronic protections
LABOUR
Electrician 0.063 Day
Sundries (Labour Only):
4,155
Item Name : Supply and Erection of MPPT Solar Light Charge Controller (20 Amps,
12/24 V) with all sort of electronic protections
LABOUR
Electrician 0.063 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.
4,156
Item Name : Supply and Erection of MPPT Solar Light Charge Controller (30 Amps,
12/24 V) with all sort of electronic protections
LABOUR
Electrician 0.063 Day
Sundries (Labour Only):
4,157
Item Name : Supply and Erection of MPPT Solar Light Charge Controller (40 Amps,
12/24 V) with all sort of electronic protections
LABOUR
Electrician 0.063 Day
Sundries (Labour Only):
4,158
Item Name : Supply and Erection of MPPT Solar Light Charge Controller (45 Amps,
12/24 V) with all sort of electronic protections
LABOUR
Electrician 0.063 Day
Sundries (Labour Only):
4,159
Item Name : Supply and Erection of MPPT Solar Light Charge Controller (50 Amps,
(12/24/48 V) with all sort of electronic protections
LABOUR
Electrician 0.063 Day
Sundries (Labour Only):
4,160
Item Name : Supply and Erection of MPPT Solar Light Charge Controller (60 Amps,
(12/24/48 V) with all sort of electronic protections
LABOUR
Electrician 0.063 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 26-01-f-01
Item Name : Supply and Erection of 12 V VRLA GEL battery per AH
Detail Qty Unit
MATERIAL
12 V VRLA GEL battery 1 AH
LABOUR
Electrician 0.003 Day
Sundries (Labour Only):
4,162
DESCRIPTION OF ITEM :
Item Code : 26-01-f-02
Item Name : Supply and Erection of 12 V VRLA AGM Battery per AH
Detail Qty Unit
MATERIAL
12 V VRLA AGM Battery 1 AH
LABOUR
Electrician 0.003 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 26-01-f-03
Item Name : Supply and Erection of 12 V Lead Carbon Battery per AH
Detail Qty Unit
MATERIAL
12 V Lead Carbon Battery 1 AH
LABOUR
Electrician 0.003 Day
Sundries (Labour Only):
4,164
DESCRIPTION OF ITEM :
Item Code : 26-01-f-04
Item Name : Supply and Erection of 12V OPzV battery per AH
Detail Qty Unit
MATERIAL
12V OPzV battery 1 AH
LABOUR
Electrician 0.003 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 26-01-f-05
Item Name : Supply and Erection of 12V OPzS battery per AH
Detail Qty Unit
MATERIAL
12V OPzS battery 1 AH
LABOUR
Electrician 0.003 Day
Sundries (Labour Only):
4,166
DESCRIPTION OF ITEM :
Item Code : 26-01-f-06
Item Name :
Detail Qty Unit
MATERIAL
Lithium LiFeP04 battery 1 AH
LABOUR
Electrician 1 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 26-01-f-07
Item Name : Supply and Erection of
Detail Qty Unit
MATERIAL
2 V OPzV battery 1 AH
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
4,168
DESCRIPTION OF ITEM :
Item Code : 26-01-f-08
Item Name : Supply and Erection of
Detail Qty Unit
MATERIAL
2 V OPzS battery 1 AH
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 26-01-g-01
Item Name : Supply and Erection 1x2.5 sq.mm flexible copper cable
Detail Qty Unit
MATERIAL
1x2.5 sq.mm flexible 1 Rft
copper cable
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
4,170
DESCRIPTION OF ITEM :
Item Code : 26-01-g-02
Item Name :
Detail Qty Unit
MATERIAL
1x4 sq.mm flexible copper 1 Rft
cable
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
4,171
Item Name : Supply and Erection 1x6 sq.mm single core (XPLE/XPLO insulated/PCV
sheathed) flexible copper cable
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
4,172
DESCRIPTION OF ITEM :
Item Code : 26-01-g-04
Item Name : Supply and Erection 1x10 sq.mm flexible copper cable
Detail Qty Unit
MATERIAL
1x10 sq.mm flexible 1 Rft
copper cable
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
4,173
DESCRIPTION OF ITEM :
Item Code : 26-01-g-05
Item Name : Supply and Erection 1x16 sq.mm Copper cable
Detail Qty Unit
MATERIAL
1x16 sq.mm Copper cable 1 Rft
DC
LABOUR
Electrician I 0.001 Day
Sundries (Labour Only):
4,174
DESCRIPTION OF ITEM :
Item Code : 26-01-g-06
Item Name : Supply and Erection 1x25sq.mm Copper cable
Detail Qty Unit
MATERIAL
1x25sq.mm Copper cable DC 1 Rft
LABOUR
Electrician I 0.001 Day
Sundries (Labour Only):
4,175
DESCRIPTION OF ITEM :
Item Code : 26-01-g-07
Item Name : Supply and Erection 1x35 sq.mm Copper cable
Detail Qty Unit
MATERIAL
1x35 sq.mm Copper cable 1 Rft
DC
LABOUR
Electrician I 0.001 Day
Sundries (Labour Only):
4,176
DESCRIPTION OF ITEM :
Item Code : 26-01-g-08
Item Name : Supply and Erection 2x2.5 sq.mm flexible copper cable
Detail Qty Unit
MATERIAL
2x2.5 sq.mm flexible 1 Rft
copper cable
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
4,177
DESCRIPTION OF ITEM :
Item Code : 26-01-g-09
Item Name : Supply and Erection 2x4 sq.mm flexible copper cable
Detail Qty Unit
MATERIAL
2x4 sq.mm flexible copper 1 Rft
cable
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
4,178
DESCRIPTION OF ITEM :
Item Code : 26-01-g-10
Item Name : Supply and Erection 2x6 sq.mm flexible copper cable
Detail Qty Unit
MATERIAL
2x6 sq.mm flexible copper 1 Rft
cable
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
4,179
DESCRIPTION OF ITEM :
Item Code : 26-01-g-11
Item Name : Supply and Erection 2x10 sq.mm flexible copper cable
Detail Qty Unit
MATERIAL
2x10 sq.mm flexible 1 Rft
copper cable
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
4,180
DESCRIPTION OF ITEM :
Item Code : 26-01-g-12
Item Name : Supply and Erection 2x16 sq.mm Copper cable
Detail Qty Unit
MATERIAL
2x16 sq.mm Copper cable 1 Rft
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
4,181
DESCRIPTION OF ITEM :
Item Code : 26-01-g-13
Item Name : Supply and Erection 2x25sq.mm Copper cable
Detail Qty Unit
MATERIAL
2x25sq.mm Copper cable 1 Rft
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
4,182
DESCRIPTION OF ITEM :
Item Code : 26-01-g-14
Item Name : Supply and Erection 2x35 sq.mm Copper cable
Detail Qty Unit
MATERIAL
2x35 sq.mm Copper cable 1 Rft
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
4,183
DESCRIPTION OF ITEM :
Item Code : 26-01-h-01
Item Name : Supply and Erection MC4 connector (TUV Approved)
Detail Qty Unit
MATERIAL
MC4 connector (TUV 1 Pair
Approved)
LABOUR
Electrician 0.0313 Day
Sundries (Labour Only):
4,184
DESCRIPTION OF ITEM :
Item Code : 26-01-h-02
Item Name : Supply and Erection MC4 Branch connector
Detail Qty Unit
MATERIAL
MC4 Branch connector 1 Pair
LABOUR
Electrician 0.0313 Day
Sundries (Labour Only):
4,185
Item Name : Supply and Erection of 3 Phase 220/380V Solar Pump inverter (MPPT) upto
1.1 KW
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
4,186
Item Name : Supply and Erection of 3 Phase 220/380V Solar Pump inverter (MPPT) 1.2
to 2.9 KW
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
4,187
Item Name : Supply and Erection of 3 Phase 220/380V Solar Pump inverter (MPPT) 3 KW
to 7 KW
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Per Watt Rs.
Labour Rates Per Per Watt Rs.
4,188
Item Name : Supply and Erection of 3 Phase 220/380V Solar Pump inverter (MPPT) 7.5
KW and above
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
4,189
DESCRIPTION OF ITEM :
Item Code : 26-01-i-05
Item Name : Supply and Erection of off Grid Hybrid inverter
Detail Qty Unit
MATERIAL
OFF Grid / Hybrid 1
Inverter
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
4,190
DESCRIPTION OF ITEM :
Item Code : 26-01-i-06
Item Name : Supply and Erection of On Grid Hybrid inverter
Detail Qty Unit
MATERIAL
On Grid Hybrid Inverter 1
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
4,191
DESCRIPTION OF ITEM :
Item Code : 26-01-i-03-a
Item Name :
Detail Qty
MATERIAL
GRID TIE INVERTER 1
(ON-Grid Inverter) (0-10
KW)
LABOUR
Electrician 0.0005 Day
Sundries (Labour Only):
4,192
DESCRIPTION OF ITEM :
Item Code : 26-01-i-03-b
Item Name :
Detail Qty
MATERIAL
GRID TIE INVERTER 1
(ON-Grid Inverter) (10-20
KW)
LABOUR
Electrician 0.0005 Day
Sundries (Labour Only):
4,193
DESCRIPTION OF ITEM :
Item Code : 26-01-i-03-c
Item Name :
Detail Qty
MATERIAL
GRID TIE INVERTER 1
(ON-Grid Inverter)
(20-30KW)
LABOUR
Electrician 0.0005 Day
Sundries (Labour Only):
4,194
Item Name : Supply and Erection of GRID TIE INVERTER (ON-Grid Inverter) (above 30
KW)
LABOUR
Electrician 0.0005 Day
Sundries (Labour Only):
4,195
DESCRIPTION OF ITEM :
Item Code : 26-01-j-01
Item Name :
Detail Qty Unit
MATERIAL
dV /dT or Sine Filters 11 1 No
KW to 18.5 KW
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
4,196
Item Name : Supply and Erection of dV /dT or Sine Filter or dV/dT filter 22 KW to
45 KW
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
4,197
LABOUR
Electrician 1 Day
Sundries (Labour Only):
4,198
LABOUR
Electrician 1 Day
Sundries (Labour Only):
4,199
LABOUR
Electrician 1 Day
Sundries (Labour Only):
4,200
LABOUR
Electrician 1 Day
Sundries (Labour Only):
4,201
Item Name : Supply installation and commissioning of DC Submersible (10 HP (10 kw),
140 meter head)
LABOUR
Electrician 2 Day
Sundries (Labour Only):
4,202
DESCRIPTION OF ITEM :
Item Code : 26-01-l-01
Item Name :
Detail Qty
MATERIAL
AC ENERGY EFFICIENT 1
CEILING FANS 56 inch, 50
W
LABOUR
Electrician 0.11 Day
Sundries (Labour Only):
4,203
DESCRIPTION OF ITEM :
Item Code : 26-01-l-02
Item Name : Supply and Erection of DC CEILING FANS 48 inch 30-36 W
Detail Qty Unit
MATERIAL
DC CEILING FANS 48 inch 1 No
30-36 W
LABOUR
Electrician 0.11 Day
Sundries (Labour Only):
4,204
DESCRIPTION OF ITEM :
Item Code : 26-01-l-03
Item Name : Supply and Erection of DC PEDISTAL FANS 18 inch 18-30
Detail Qty Unit
MATERIAL
DC PEDISTAL FANS 18 inch 1 No
18-30 W
LABOUR
Electrician 0.11 Day
Sundries (Labour Only):
4,205
Item Name : Supply and Erection of hot dipped (80 microns Average) galvanized steel
of minimum thickness of 12 SWG / 2.64 mm Channel / Pipe or 8 SWG / 4.06
mm Angle
Detail Qty Unit
MATERIAL
hot dipped (80 microns 1 Watt
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
4,206
DESCRIPTION OF ITEM :
Item Code : 26-01-n-01
Item Name : Supply and Erection of Copper Conductor of 10 AWG
Detail Qty Unit
MATERIAL
Copper Conductor of 10 1 Watt
AWG
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
4,207
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 26-01-n-02
Item Name :
Detail Qty
MATERIAL
Copper Earthing Plate of 1
appropriate size and
design
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
4,208
DESCRIPTION OF ITEM :
Item Code : 26-01-n-03
Item Name :
Detail Qty
MATERIAL
Copper Earthing Plate of 1
appropriate size and
design
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
4,209
Item Name : Supply and Erection of BOX / STAND for Batteries SHS Inverter & Charge
Controller
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
4,210
DESCRIPTION OF ITEM :
Item Code : 26-01-p-01
Item Name : Supply and Erection of INVERTER BASED SPLIT AC (01
Detail Qty Unit
MATERIAL
1 Ton 1 No
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
4,211
DESCRIPTION OF ITEM :
Item Code : 26-01-p-02
Item Name : Supply and Erection of INVERTER BASED SPLIT AC (1.5
Detail Qty Unit
MATERIAL
1.5 Ton 1 No
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
4,212
DESCRIPTION OF ITEM :
Item Code : 26-01-p-03
Item Name : Supply and Erection of INVERTER BASED SPLIT AC (02
Detail Qty Unit
MATERIAL
2 Ton 1 No
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
4,213
DESCRIPTION OF ITEM :
Item Code : 26-01-q
Item Name :
Detail Qty Unit
MATERIAL
SOLAR AUTO TRACKER for 1 No
3.6 KW PV system
LABOUR
Electrician 1 Day
Sundries (Labour Only):
4,214
DESCRIPTION OF ITEM :
Item Code : 26-01-r
Item Name :
Detail Qty Unit
MATERIAL
PV MOUNTING FRAME WITH 1 kW
MANUAL TRAKERING per kW
LABOUR
Electrician 0.031 Day
Sundries (Labour Only):
4,215
Item Name : Repair of leakages in valve of already laid pipe line in trenches /
building i/c cost of extractiion / exvacation, complete in all respect
of the following sizes.
a) 3" to 6" dia of Valve
LABOUR
Labourer 0.07 Day
Plumber 0.12 Day
Welder 0.11 Day
Sundries (Labour Only):
4,216
Item Name : Repair of leakages in valve of already laid pipe line in trenches /
building i/c cost of extractiion / exvacation, complete in all respect
of the following sizes.
a) 1" to 2.5" dia of Valve
LABOUR
Plumber 0.11 Day
Welder 0.1 Day
Sundries (Labour Only):
4,217
Item Name : Removing of existing damaged rusted & chocked G.I pipe from 1/2" to 4 "
Nominal Pipe Size (NPS)
4,218
Item Name : Repairing & re-fixing of steel main gate i/c hold fast, welding
complete in all respects
LABOUR
Labourer 0.0146 Day
Welder 0.0208 Day
Sundries (Labour Only):
4,219
LABOUR
Plumber 0.1 Day
Sundries (Labour Only):
4,220
Item Name : Repairing welding of suigas water heater 35-gallons capacity with
replacement of Centre pipe and Bottom sheet, complete In all respect
i/c carriage etc
MATERIAL
Size 20 mm (3/4") Nominal 6 RFT
Pipe Size (NPS) Medium
Quality Galvanized Iron
(G.I.) Pipe
Steel (Struct. Sections) 1 KG
LABOUR
Plumber 0.25 Day
Welder 0.06 Day
Sundries (Labour Only):
4,221
Item Name : Replacement of rusted/leaking G.I water tank with new for water geyser
30/35 gallens
Detail Qty
MATERIAL
G.I. Water Tank 1
LABOUR
Labourer 0.5
Plumber 0.45
Sundries (Labour Only):
4,222
Item Name : Removing of glazed earthen ware WC European type of approved make/size
including cost of double seat & cover (plastic & bakelite), complete in
all respects: All Colours
Accessories like
WC,WHB,WC
squatting,Mirror vanity,
Sink Soap Dish, Towel
Rail & Etc.
LABOUR
Skilled Labour 0.125 Day
Plumber 0.125 Day
Sundries (Labour Only):
4,223
Item Name : Removing of glazed earthen ware WC squatting type, complete in all
respects: All Colours
LABOUR
Skilled Labour 0.15 Day
Plumber 0.15 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
4,224
Item Name : Removing of glazed earthen ware wash hand basin (WHB), complete in all
respects: All colours
LABOUR
Skilled Labour 0.125 Day
Plumber 0.175 Day
Sundries (Labour Only):
4,225
Item Name : Removing of stainless steel sink with drain board, complete in all
respect.
LABOUR
Labourer 0.275 Day
Plumber 0.2 Day
Sundries (Labour Only):
4,226
Item Name : Removing terrazzo concrete sink, with drain board of mosaic, complete
in all respect
4,227
Item Name : Removing chorimum plated (CP) shower rose of approved quality complete
:
Size 1/2"x4" (15 mm x 100 mm)
Accessories like
WC,WHB,WC
squatting,Mirror vanity,
Sink Soap Dish, Towel
Rail & Etc.
LABOUR
Plumber 0.07 Day
Sundries (Labour Only):
4,228
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Furnishing and Installation thrust bearing for motor (10-25 H.P)
(V.H.S.) turbine
LABOUR
Labourer 0.25 Day
Black Smith 0.25 Day
Sundries (Labour Only):
4,229
Item Name : Furnishing and Installation thrust bearing for motor (30-50 H.P)
(V.H.S.) turbine
LABOUR
Labourer 0.25 Day
Black Smith 0.25 Day
Sundries (Labour Only):
4,230
Item Name : Furnishing and Installation ball bearing for Hollow Shaft Vertical
Elec. / Motor Turbine (10-25 H.P)
LABOUR
Labourer 0.25 Day
Black Smith 0.25 Day
Sundries (Labour Only):
4,231
LABOUR
Labourer 0.25 Day
Black Smith 0.25 Day
Sundries (Labour Only):
4,232
Item Name : Rewinding of Submersible electric motor i/c carriage from site of work
and back i/c testing installation complete with all respects: From 0.75
to 20 H.P
MATERIAL
Rewinding of Submersible 1 HP
Pump
From 0.75 to 20 H.P
LABOUR
Labourer 0.25 Day
Electrician 0.35 Day
Sundries (Labour Only):
4,233
Item Name : Rewinding of Submersible electric motor i/c carriage from site of work
and back i/c testing installation complete with all respects: Above 20
H.P
MATERIAL
Rewinding of Submersible 1 HP
Pump
Above 20 HP
LABOUR
Labourer 0.3 Day
Electrician 0.4 Day
Sundries (Labour Only):
4,234
MATERIAL
Rewinding of Submersible 1 HP
Pump
From 0.75 to 20 H.P
LABOUR
Labourer 0.25 Day
Electrician 0.35 Day
Sundries (Labour Only):
4,235
Item Name : Rewinding of turbine electric motor i/c carriage from site of work and
back i/c testing installation complete with all respects: Above 20 H.P
LABOUR
Labourer 0.3 Day
Electrician 0.4 Day
Sundries (Labour Only):
4,236
DESCRIPTION OF ITEM :
Item Code : 27-17
Item Name : Supply and fixing of C.T Coil for Ampere meter
Detail Qty Unit
MATERIAL
C.T Coil 1 Each
LABOUR
Labourer 0.1 Day
Electrician 0.15 Day
Sundries (Labour Only):
4,237
Detail Qty
MATERIAL
Extraction of Submersible 1
Pump
(0 to 200 ft)
LABOUR
Labourer 0.4
Plumber 0.5
Sundries (Labour Only):
4,238
Detail Qty
MATERIAL
Extraction of Submersible 1
Pump
(Above 200 ft)
LABOUR
Labourer 0.5
Plumber 0.75
Sundries (Labour Only):
4,239
LABOUR
Plumber 0.04 Day
Sundries (Labour Only):
4,240
DESCRIPTION OF ITEM :
Item Code : 27-20
Item Name : S/Fixing of Top shaft any size (Turbine/Submersible)
Detail Qty Unit
MATERIAL
Top shaft any size 1 Each
(Turbine/Submersible)
LABOUR
Plumber 0.5 Day
Sundries (Labour Only):
4,241
DESCRIPTION OF ITEM :
Item Code : 27-21
Item Name : S/Fixing of staffing box gland
Detail Qty Unit
MATERIAL
Staffing box gland 1 Each
LABOUR
Plumber 0.5 Day
Sundries (Labour Only):
4,242
DESCRIPTION OF ITEM :
Item Code : 27-22
Item Name : S/Fixing of threaded coupling
Detail Qty Unit
MATERIAL
threaded coupling 1 Each
LABOUR
Plumber 0.1 Day
Sundries (Labour Only):
4,243
DESCRIPTION OF ITEM :
Item Code : 27-23-a
Item Name : Supply and Fixing for Coloumn Pipe Turbine
Detail Qty Unit
MATERIAL
Coloumn Pipe Turbine 1 Rft
LABOUR
Plumber 0.25 Day
Sundries (Labour Only):
4,244
DESCRIPTION OF ITEM :
Item Code : 27-23-b
Item Name : For Stage (Turbine/Submersible)
Detail Qty Unit
MATERIAL
Stage 1 Rft
(Turbine/Submersible)
LABOUR
Plumber 0.2 Day
Sundries (Labour Only):
4,245
DESCRIPTION OF ITEM :
Item Code : 27-24-a
Item Name :
Detail Qty Unit
MATERIAL
Rewinding of Voltage 1 Job
Regulator 3 Coil
LABOUR
Electrician 1 Day
Sundries (Labour Only):
4,246
DESCRIPTION OF ITEM :
Item Code : 27-24-b
Item Name :
Detail Qty Unit
MATERIAL
Rewinding Voltage 1 No.
Regulator coil
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
4,247
DESCRIPTION OF ITEM :
Item Code : 27-25
Item Name : Repair of Voltage regulator point control machine
Detail Qty Unit
MATERIAL
Repair of Voltage 1 Job
regulator point
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
4,248
DESCRIPTION OF ITEM :
Item Code : 27-26
Item Name : Repair of Voltage regulator point control machine
Detail Qty Unit
MATERIAL
Repair of Voltage 1 Job
regulator point
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
4,249
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 27-27
Item Name : Replacement of pump shaft stainless steel
Detail Qty
MATERIAL
Replacement of pump shaft 1
stainless steel
LABOUR
Plumber 0.6
Sundries (Labour Only):
4,250
DESCRIPTION OF ITEM :
Item Code : 27-28
Item Name : Replacement of Impellar
Detail Qty Unit
MATERIAL
Impellar 1 No
LABOUR
Plumber 0.6 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 27-29
Item Name : Supply and Fixing of Column shaft Sleeve 20 to 30 mm
Detail Qty Unit
MATERIAL
Column shaft Sleeve 20 to 1 No
30 mm
LABOUR
Plumber 0.15 Day
Sundries (Labour Only):
4,252
DESCRIPTION OF ITEM :
Item Code : 27-30
Item Name : Replacement of Column pipe socket 3" to 6" i/d
Detail Qty Unit
MATERIAL
Column pipe socket 3" to 1 No
6" i/d
LABOUR
Plumber 0.3 Day
Sundries (Labour Only):
4,253
DESCRIPTION OF ITEM :
Item Code : 27-31
Item Name : Replacement of column shaft any size
Detail Qty Unit
MATERIAL
column shaft any size 1 No
LABOUR
Plumber 0.5 Day
Sundries (Labour Only):
4,254
DESCRIPTION OF ITEM :
Item Code : 27-32
Item Name : Replacement of wearing ring
Detail Qty Unit
MATERIAL
Replacement of wearing 1 No
ring
LABOUR
Plumber 0.15 Day
Sundries (Labour Only):
4,255
DESCRIPTION OF ITEM :
Item Code : 27-33
Item Name : Replacement of studs for intermediate bowl
Detail Qty Unit
MATERIAL
Studs for intermediate 1 No
bowl
LABOUR
Plumber 0.016 Day
Sundries (Labour Only):
4,256
DESCRIPTION OF ITEM :
Item Code : 27-34
Item Name : Replacement of nut, bolts of any size
Detail Qty Unit
MATERIAL
Nut, bolts of any size 1 No
LABOUR
Plumber 0.018 Day
Sundries (Labour Only):
4,257
DESCRIPTION OF ITEM :
Item Code : 27-35
Item Name : Repair/reconditioning of impellars
Detail Qty Unit
MATERIAL
Repair/reconditioning of 1 LS
impellars
LABOUR
Black Smith 0.275 Day
Sundries (Labour Only):
4,258
DESCRIPTION OF ITEM :
Item Code : 27-36
Item Name : Replacing the Submersible motor thrust bearing and disc
Detail Qty Unit
MATERIAL
motor thrust bearing and 1 No
disc
LABOUR
Labourer 0.25 Day
Electrician 0.75 Day
Sundries (Labour Only):
4,259
Item Name : Replacing the carbon bushes / steel bushes for submersible motor
complete
LABOUR
Labourer 0.25 Day
Black Smith 0.5 Day
Sundries (Labour Only):
4,260
DESCRIPTION OF ITEM :
Item Code : 27-38
Item Name : Replacing of brass bush any size
Detail Qty Unit
MATERIAL
carbon bushes / steel 1 No
bushes
LABOUR
Black Smith 0.2 Day
Sundries (Labour Only):
4,261
DESCRIPTION OF ITEM :
Item Code : 27-39
Item Name : Replacing of bearing bushes/houseing
Detail Qty Unit
MATERIAL
bearing bushes/houseing 1 per set
LABOUR
Black Smith 0.22 Day
Sundries (Labour Only):
4,262
DESCRIPTION OF ITEM :
Item Code : 27-40
Item Name : Replacing of rubber packing 3" to 6"i/d
Detail Qty Unit
MATERIAL
ubber packing 3" to 6"i/d 1 Pair
LABOUR
Labourer 0.05 Day
Sundries (Labour Only):
4,263
DESCRIPTION OF ITEM :
Item Code : 27-41-a
Item Name : Rewinding of H.T Coil 25 KVA
Detail Qty Unit
MATERIAL
Rewinding H.T Coil 25 KVA 1 No
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
4,264
DESCRIPTION OF ITEM :
Item Code : 27-41-b
Item Name : Rewinding of H.T Coil 50 KVA
Detail Qty Unit
MATERIAL
Rewinding of H.T Coil 50 1 No
KVA
LABOUR
Electrician 0.35 Day
Sundries (Labour Only):
4,265
DESCRIPTION OF ITEM :
Item Code : 27-41-c
Item Name : Rewinding of H.T Coil 100 KVA
Detail Qty Unit
MATERIAL
Rewinding H.T Coil 100 1 No
KVA
LABOUR
Electrician 0.7 Day
Sundries (Labour Only):
4,266
DESCRIPTION OF ITEM :
Item Code : 27-42-a
Item Name : Rewinding of L.T Coil 25 KVA
Detail Qty Unit
MATERIAL
Rewinding of L.T Coil 25 1 No
KVA
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
4,267
DESCRIPTION OF ITEM :
Item Code : 27-42-b
Item Name : Rewinding of L.T Coil 50 KVA
Detail Qty Unit
MATERIAL
Rewinding of L.T Coil 50 1 No
KVA
LABOUR
Electrician 0.35 Day
Sundries (Labour Only):
4,268
LABOUR
Electrician 0.7 Day
Sundries (Labour Only):
4,269
DESCRIPTION OF ITEM :
Item Code : 27-43
Item Name : Replacement of insulator (HT) Bush for 25 to 50 KVA
Detail Qty Unit
MATERIAL
(HT) Bush for 25 to 50 1 No
KVA
LABOUR
Black Smith 0.275 Day
Sundries (Labour Only):
4,270
DESCRIPTION OF ITEM :
Item Code : 27-44-a
Item Name : Replacement of Transformer L.T bush for 25 to 50 KVA
Detail Qty Unit
MATERIAL
L.T bush for 25 to 50 1 No
KVA
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
4,271
DESCRIPTION OF ITEM :
Item Code : 27-44-b
Item Name : Replacement of transfomer link of different KVS
Detail Qty Unit
MATERIAL
Transfomer link different 1 No
Kvs
LABOUR
Electrician 0.3 Day
Sundries (Labour Only):
4,272
DESCRIPTION OF ITEM :
Item Code : 27-45
Item Name : Replacement of S-Y-II unit for 25 to 100 KVA
Detail Qty Unit
MATERIAL
S-Y-II unit for 25 to 1 No
100 KVA
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
4,273
DESCRIPTION OF ITEM :
Item Code : 27-46
Item Name : Replacement of transformer oil
Detail Qty Unit
MATERIAL
Transformer oil 1 No
LABOUR
Electrician 0.07 Day
Sundries (Labour Only):
4,274
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
LABOUR
Electrician 1 Day
Sundries (Labour Only):
4,275
DESCRIPTION OF ITEM :
Item Code : 27-48
Item Name : Rubber packing 1/32" to 1/16"thick
Detail Qty Unit
MATERIAL
Rubber packing 1/32" to 1 No
1/16"thick
LABOUR
Labourer 0.036 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per No. Rs.
Labour Rates Per No. Rs.
4,276
DESCRIPTION OF ITEM :
Item Code : 27-49
Item Name : Replacement of gland dori
Detail Qty Unit
MATERIAL
gland dori 1 Rft
LABOUR
Labourer 0.03 Day
Sundries (Labour Only):
4,277
DESCRIPTION OF ITEM :
Item Code : 27-50
Item Name : Replacing of Kit kat grips 60 to 200 Amp
Detail Qty Unit
MATERIAL
Kit kat grips 60 to 200 1 No
Amp
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
4,278
DESCRIPTION OF ITEM :
Item Code : 27-51
Item Name : Replacing of pressure gauge 0 to 500
Detail Qty Unit
MATERIAL
Pressure gauge 0 to 500 1 No
LABOUR
Black Smith 0.1458 Day
Sundries (Labour Only):
4,279
DESCRIPTION OF ITEM :
Item Code : 27-52
Item Name : Flexsible conduct pipe 1-1/2" to 2"dia
Detail Qty Unit
MATERIAL
Flexsible Conduct pipe 1 Rft
1-1/2" to 2"dia
LABOUR
Plumber 0.0417 Day
Sundries (Labour Only):
4,280
DESCRIPTION OF ITEM :
Item Code : 27-53
Item Name : Replacing of clamps 3" to 6"s ize
Detail Qty Unit
MATERIAL
clamps 3" to 6"s ize 1 No
LABOUR
Labourer 0.25 Day
Sundries (Labour Only):
4,281
DESCRIPTION OF ITEM :
Item Code : 27-54
Item Name : Submersible plate
Detail Qty Unit
MATERIAL
Submersiblepump plate 1 No
LABOUR
Labourer 0.25 Day
Sundries (Labour Only):
4,282
DESCRIPTION OF ITEM :
Item Code : 27-55
Item Name : Cutting & threading MS column pipe of various size
Detail Qty Unit
MATERIAL
Miscelleaous items for 1 No
cutting & Threading
LABOUR
Black Smith 0.7 Day
Sundries (Labour Only):
4,283
Item Name : Replacing of single core cable of the following gauge (Cupper):
PVC Cable 7/064
LABOUR
Electrician 0.0313 Day
Sundries (Labour Only):
4,284
Item Name : Replacing of single core cable of the following gauge (Cupper):
PVC Cable 7/052
LABOUR
Electrician 0.0313 Day
Sundries (Labour Only):
4,285
Item Name : Replacing of single core cable of the following gauge (Cupper):
PVC Cable 19/052
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
4,286
Item Name : Replacing of single core cable of the following gauge (Cupper):
PVC Cable 19/064
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
Item Name : Replacing of 3 core submersible cable (cupper) of the following gauge.
14/16mm.
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
4,288
Item Name : Replacing of 3 core submersible cable (cupper) of the following gauge.
25 mm
4,289
LABOUR
Electrician 0.0938 Day
Sundries (Labour Only):
4,290
LABOUR
Electrician 0.0938 Day
Sundries (Labour Only):
4,291
Item Name : Test & develope tubewell of size 6" & above continously up to 1.5 cuse
cs (Air compressor)
LABOUR
Electrician 0.125 Day
Black Smith 0.125 Day
Sundries (Labour Only):
4,292
DESCRIPTION OF ITEM :
Item Code : 27-60
Item Name :
Detail Qty Unit
LABOUR
Skilled Labour 0.31 Day
Plumber 0.5 Day
Sundries (Labour Only):
4,293
Item Name : Making holes upto 3" dia, 18" depth in cement concrete or stone masonry
walls and repairing
4,294
DESCRIPTION OF ITEM :
Item Code : 27-62
Item Name : Replacing kallar eaten bricks
Detail Qty Unit
MATERIAL
Burnt Brick 1 No
LABOUR
Mason 0.02 Day
Labourer 0.02 Day
Sundries (Labour Only):
4,295
DESCRIPTION OF ITEM :
Item Code : 27-63
Item Name :
Detail Qty Unit
LABOUR
Mason 0.25 Day
Labourer 0.25 Day
Sundries (Labour Only):
4,296
Item Name : Rubbing and polishing old grit/mosaic floor, including repairing voids,
uneven surface, complete
EQUIPMENT
Polisher with Machine 1 Sft
(Chemical)
4,297
Item Name : Rubbing & polishing grit floor, including repairing voids, uneven
surface, complete
EQUIPMENT
Polisher with Machine 1 Sft
(Chemical)
4,298
DESCRIPTION OF ITEM :
Item Code : 27-66
Item Name : Racking and washing joints of stone masonry (old work)
Detail Qty Unit
LABOUR
Labourer 1 Day
Water Man 0.25 Day
Sundries (Labour Only):
4,299
DESCRIPTION OF ITEM :
Item Code : 27-67
Item Name : Racking and washing joints of brick masonry (old work)
Detail Qty Unit
LABOUR
Labourer 0.5 Day
Water Man 0.25 Day
Sundries (Labour Only):
4,300
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 27-68-a
Item Name : Petty repairs to Fire Place
Detail Qty Unit
MATERIAL
Petty Items of Repair 1 LS
LABOUR
Mason 0.14 Day
Skilled Labour 0.14 Day
Sundries (Labour Only):
4,301
DESCRIPTION OF ITEM :
Item Code : 27-68-b
Item Name : Petty repairs to Floor
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.03 Bag
Coarse Sand 0.08 Cft
Crushed Aggregate 0.15 Cft
LABOUR
Mason 0.025 Day
Labourer 0.0313 Day
Sundries (Labour Only):
4,302
Item Name : Removing and Fixing new approved heavy safety brass handle with
necessary screws of the same metal : 6''-7" Size
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,303
Item Name : Removing and Fixing new approved heavy safety brass handle with
necessary screws of the same metal : 5" Size
4,304
Item Name : Removing and Fixing new approved heavy safety brass handle with
necessary screws of the same metal : 4" Size
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,305
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,306
Item Name : Removing and Fixing new approved heavy safety iron handle with
necessary screws of the same metal : 4" Size
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,307
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Removing and Fixing new approved heavy safety iron handle with
necessary screws of the same metal : 6''-7" Size (Chromium Plated)
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,308
Item Name : Prfoviding and Fixing approved curved or circular 5/8" dia rod handle
upto 5" size with brass screws : Brass Handle
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
4,309
Item Name : Prfoviding and Fixing approved curved or circular 5/8" dia rod handle
upto 4" size with brass screws : Chromium Plated Handle
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,310
Item Name : Prfoviding and Fixing approved 6" size Fancy Brass Heavy Type door
handle with plate and screws.
Detail Qty Unit
MATERIAL
Brass handle with plate 1 No
Brass screw 1.25" size 6 No
LABOUR
Carpenter 0.25 Day
Sundries (Labour Only):
4,311
DESCRIPTION OF ITEM :
Item Code : 27-72-a-i
Item Name :
Detail Qty Unit
MATERIAL
Brass hook & eye 6" 1 No
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,312
DESCRIPTION OF ITEM :
Item Code : 27-72-a-ii
Item Name :
Detail Qty Unit
MATERIAL
Brass hook & eye 4" 1 No
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,313
Item Name : Removing and Fixing new approved section hook and eye : Galvanized Iron
6"
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,314
Item Name : Removing and Fixing new approved section hook and eye : Galvanized Iron
4"
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,315
DESCRIPTION OF ITEM :
Item Code : 27-73
Item Name : Replacement of Aluminum door closer of approved quality
Detail Qty Unit
MATERIAL
Door closer of approved 1 No
quality
LABOUR
Carpenter 0.075 Day
Sundries (Labour Only):
4,316
Item Name : Removing & refixing cleats for doors & windows including hinges and
screws.
LABOUR
Carpenter 0.05 Day
Sundries (Labour Only):
4,317
DESCRIPTION OF ITEM :
Item Code : 27-74-b
Item Name :
Detail Qty Unit
MATERIAL
Wood - Deodar 0.001 Cft
Nails 0.02 Kg
Brass Hook 1 No
LABOUR
Carpenter 0.05 Day
Sundries (Labour Only):
4,318
DESCRIPTION OF ITEM :
Item Code : 27-74-c
Item Name : Removing & refixing Door stops of 1.5" dia rubber block
Detail Qty Unit
MATERIAL
Magnet Door Stop 1 No
LABOUR
Carpenter 0.0083 Day
Sundries (Labour Only):
4,319
DESCRIPTION OF ITEM :
Item Code : 27-74-d
Item Name : Removing & refixing GI hook with clamps for doors
Detail Qty Unit
MATERIAL
G.I Hook With Clamps 1 No
LABOUR
Carpenter 0.0027 Day
Sundries (Labour Only):
4,320
DESCRIPTION OF ITEM :
Item Code : 27-75
Item Name : Making deodar punkha pole 10'x6"x6"
Detail Qty Unit
MATERIAL
Wood - Deodar 2.5 Cft
Iron Hooks 24 No
LABOUR
Labourer 0.1 Day
Carpenter 0.2 Day
Sundries (Labour Only):
4,321
DESCRIPTION OF ITEM :
Item Code : 27-76
Item Name : Dismantling and refixing eave boards
Detail Qty Unit
LABOUR
Labourer 0.0167 Day
Carpenter 0.0167 Day
Sundries (Labour Only):
4,322
DESCRIPTION OF ITEM :
Item Code : 27-77
Item Name : Removing old paint from woodwork/steel with paint remove
Detail Qty Unit
MATERIAL
Paint Remover 0.25 Litre
LABOUR
Skilled Labour 0.2 Day
Sundries (Labour Only):
4,323
DESCRIPTION OF ITEM :
Item Code : 27-78
Item Name : Brushing & scraping blisters of old paints from woodwork
Detail Qty Unit
LABOUR
Labourer 0.418 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 27-79
Item Name :
Detail Qty Unit
LABOUR
Labourer 2 Day
Sundries (Labour Only):
4,325
DESCRIPTION OF ITEM :
Item Code : 27-80
Item Name :
Detail Qty Unit
MATERIAL
Kerosene Oil 3.4 Ltr
LABOUR
Labourer 1 Day
Skilled Labour 0.25 Day
Sundries (Labour Only):
4,326
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 27-81
Item Name : Removing with caustic soda,old paint from wood work
Detail Qty Unit
MATERIAL
Caustic Soda 0.5 Kg
LABOUR
Labourer 0.5 Day
Sundries (Labour Only):
4,327
DESCRIPTION OF ITEM :
Item Code : 27-82
Item Name : Removing paint or varnish from wall
Detail Qty Unit
LABOUR
Labourer 1 Day
Sundries (Labour Only):
4,328
DESCRIPTION OF ITEM :
Item Code : 27-83-a
Item Name : Scraping of Khanki paint from barrage gates
Detail Qty Unit
MATERIAL
Scraping Material 0.5 Doz
LABOUR
Labourer 0.12 Day
Sundries (Labour Only):
4,329
DESCRIPTION OF ITEM :
Item Code : 27-83-b
Item Name : Scraping of Aluminium paint from barrage headworks
Detail Qty Unit
MATERIAL
Scraping Material 0.5 Doz
LABOUR
Labourer 0.25 Day
Sundries (Labour Only):
4,330
DESCRIPTION OF ITEM :
Item Code : 27-84
Item Name : Scraping rust from old rails or girders
Detail Qty Unit
MATERIAL
Scraping Material 0.5 Doz
LABOUR
Labourer 1.5 Day
Sundries (Labour Only):
4,331
DESCRIPTION OF ITEM :
Item Code : 27-85
Item Name : Chiselling old paint from brick work
Detail Qty Unit
MATERIAL
Scraping Material 0.5 Doz
LABOUR
Labourer 2 Day
Sundries (Labour Only):
4,332
DESCRIPTION OF ITEM :
Item Code : 27-86
Item Name : Cleaning glasses with chalk and spirit etc
Detail Qty Unit
MATERIAL
Scraping Material 0.5 Doz
LABOUR
Labourer 1 Day
Sundries (Labour Only):
4,333
DESCRIPTION OF ITEM :
Item Code : 27-87
Item Name : Cleaning and oiling rafter or rolled steel beams
Detail Qty Unit
MATERIAL
Diesel Oil 0.222 Ltr
LABOUR
Labourer 0.5 Day
Sundries (Labour Only):
4,334
DESCRIPTION OF ITEM :
Item Code : 27-88
Item Name : Cleaning and painting punkha poles, including fixing hooks
Detail Qty Unit
MATERIAL
Brush II 0.013 No
Paint : Enamel 0.038 Ltr
LABOUR
Labourer 0.25 Day
Sundries (Labour Only):
4,335
Item Name : Repainting of ceiling fan (all sizes & types) incl painting of blades,
canopy etc with syn. Enamel
LABOUR
Painter / Polisher 0.07 Day
Sundries (Labour Only):
Item Name : Repainting of iron poles with cross arms, with bitumen or other
approved paint
LABOUR
Labourer 0.5 Day
Painter / Polisher 0.166 Day
Sundries (Labour Only):
4,337
Item Name : Repainting of pipes and specials of GI, MS or PVC conduit etc : Upto
1.5" i/d
4,338
Item Name : Repainting of pipes and specials of GI, MS or PVC conduit etc : From
1.5" to 2" i/d
LABOUR
Painter / Polisher 1 Day
Sundries (Labour Only):
4,339
LABOUR
Painter / Polisher 1.66 Day
Sundries (Labour Only):
4,340
Item Name : Repainting main switches & branch distribution boards of all sizes &
types with approved paint
LABOUR
Painter / Polisher 0.03 Day
Sundries (Labour Only):
4,341
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Scarifying old road surface, including removal of debris within one
chain
4,342
MATERIAL
Ordinary Portland Cement 1.05 Bag
Coarse Sand 2 Cft
LABOUR
Mason 1 Day
Labourer 1 Day
Water Man 0.25 Day
Chiseler 1 Day
Sundries (Labour Only):
EQUIPMENT
Hire Charges of cement 0.5 Hour
gun
4,343
Item Name : Dismantling bitumen carpet of any description from existing roads
surface including its removal and disposal within 3 chains lead as
desired.
LABOUR
Labourer 1 Day
Sundries (Labour Only):
4,344
MATERIAL
Coarse Sand 2.5
1/2" size screened bajri 10
Liquid Asphalt 34
Wire Brush and Broom 1
LABOUR
Labourer 2.15
Sundries (Labour Only):
EQUIPMENT
Static Tandom Roller ( 8 0.167
T)
Tar Boiler 0.167
Concrete Mixer 1 bag 0.167
4,345
Item Name : Removing the existing worn out bitumanious surface pot holes and ruts
in patches of regular shape brushing and re-carpeting with 2"
thick(consolidated) asphalt macadam as per specificaiton complete
MATERIAL
Crushed Aggregate 26
Liquid Asphalt 43.2
Wire Brush and Broom 2
Lock of approved quality 5
LABOUR
Labourer 2.35
Sundries (Labour Only):
EQUIPMENT
Static Tandom Roller ( 8 0.227
T)
Tar Boiler 0.227
Concrete Mixer 1 bag 0.227
4,346
Item Name : Removing of existing worn out bitumanious surface pot holes and ruts in
patches and re-carpeting with 3" thick(consolidated) asphalt macadam
as per specifiedcomplete including disposal of excavated stuff within
one chain
Detail Qty
MATERIAL
Crushed Aggregate 38
Liquid Asphalt 51
Wire Brush and Broom 3
G.I. tee hinges 12" 7.5
LABOUR
Labourer 2.95
Sundries (Labour Only):
EQUIPMENT
Static Tandom Roller ( 8 0.394
T)
Tar Boiler 0.394
Concrete Mixer 1 bag 0.3939
4,347
LABOUR
Water Man 0.12 Day
Skilled Labour 0.23 Day
Sundries (Labour Only):
4,348
Item Name : Tucking and chipping of road surface before hot surface dressing over
existing road.
4,349
Item Name : Repair to pot holes including cleaning, brushing, removal of loose
material and filling of the same with clean stone of size 0.75" to 1.5"
with hot bitumen manual compaction with rammer (water bound 3% biutmen)
MATERIAL
Fuel Wood 9.33 Kg
Wire Brush and Broom 1 No
Crushed aggregate 0.75" 20 Cft
to 1.5
Crushed aggregate 0.25" 9.5143 Cft
to 0.5
Bitumen 3 % (in Drums) 30 Kg
LABOUR
Labourer 3.04 Day
Water Man 0.25 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 27-102
Item Name : Repairs to hand pump, pulling out & refitting
Detail Qty Unit
LABOUR
Labourer 0.012 Day
Black Smith 0.05 Day
Sundries (Labour Only):
4,351
DESCRIPTION OF ITEM :
Item Code : 27-103-a
Item Name : Recaning of chairs/stools : With plastic cane.
Detail Qty Unit
MATERIAL
Plastic Cane 0.75 Kg
LABOUR
Canner 1.2 Day
Sundries (Labour Only):
4,352
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 27-103-b
Item Name : Recaning of chairs/stools : With willow cane.
Detail Qty Unit
MATERIAL
Cane 1.916 Kg
LABOUR
Canner 0.35 Day
Sundries (Labour Only):
4,353
Item Name : Dismantling removing and stacking of heavy design steel grill from
compound wall & re-fixing painting complete.
4,354
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
LABOUR
Carpenter 0.0125 Day
Sundries (Labour Only):
4,355
4,356
DESCRIPTION OF ITEM :
Item Code : 27-105-a
Item Name : Cleaning of choked manhole
Detail Qty Unit
LABOUR
Labourer 0.75 Day
Sundries (Labour Only):
4,357
DESCRIPTION OF ITEM :
Item Code : 27-105-b
Item Name : Cleaning of septic tank including disposal of waste
Detail Qty Unit
LABOUR
Labourer 0.094 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Cft Rs.
Labour Rates Per Cft Rs.
4,358
Item Name : Preparing surface using chemical and applying lacquer polish finish
with 3-coats on existing wooden joinery complete in all respects.
LABOUR
Painter / Polisher 0.0125 Day
Sundries (Labour Only):
4,359
Item Name : Removing, Repairing & Fixing of aluminium joinery i/c opening of frame
with rubber packing complete
LABOUR
Aluminum Fixer 0.125 Day
Sundries (Labour Only):
4,360
Item Name : Removing & re-fixing of wooden joinery (doors & windows) i/e addition
and alteration complete
LABOUR
Carpenter 0.01 Day
Sundries (Labour Only):
4,361
Item Name : Removing of existing wire guaze & re-fixing GI wire gauze of 22 guage
and 12 mesh per square inch complete in all respects
LABOUR
Carpenter 0.075 Day
Sundries (Labour Only):
4,362
Item Name : Removing of existing wire guaze & re-fixing plastic wire gauze with 22
mesh per square inch complete in all respects
LABOUR
Carpenter 0.075 Day
Sundries (Labour Only):
4,363
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Removing of existing aluminum wire guaze & re-fixing Aluminum wire
gauze of 30 guage and 14 mesh per square inch complete in all respects
LABOUR
Carpenter 0.075 Day
Sundries (Labour Only):
4,364
Item Name : Removing, repairing and re-Fixing of wooden (heavy) sheesham railing
i/c rawal bolts, painting complete in all respects
LABOUR
Carpenter 0.1 Day
Painter / Polisher 0.085 Day
Sundries (Labour Only):
4,365
DESCRIPTION OF ITEM :
Item Code : 27-111
Item Name : Removing and Re-Fixing of aluminium windows
Detail Qty
LABOUR
Labourer 1.25
Aluminum Fixer 0.25
Sundries (Labour Only):
4,366
Item Name : Repair of aluminium door/windows, fly sutter screen openable door or
window R/q handle rubber, silicon complete in all respects
LABOUR
Aluminum Fixer 0.015 Day
Sundries (Labour Only):
4,367
Item Name : Repair of wooden wardrobe =of required wooden batten, hinges, hasp
staple or commercial ply 3/4" shelf
LABOUR
Labourer 0.05 Day
Carpenter 0.05 Day
Sundries (Labour Only):
4,368
Item Name : Removing, repairing, cleaning, washing of vertical blind curtain &
re-fixing complete
LABOUR
Labourer 0.0625 Day
Skilled Labour 0.0625 Day
Sundries (Labour Only):
4,369
DESCRIPTION OF ITEM :
Item Code : 27-113
Item Name : Repair of doors/windows complete
Detail Qty Unit
MATERIAL
Iron Holdfasts 1-1/2x1/4 0.0015 kg
Wood - Deodar 0.001 Cft
Nails 0.0072 Kg
Screw 0.0268 Pkt
Hinges 5" 0.0179 Doz
Hinger Chocks / Lock 0.0715 No
Handles 6" 0.1071 No
Door Stops 6 " 0.012 1 No
Glass 3mm Local 0.11 Sft
Tower bolt 9" 0.014 No
LABOUR
Labourer 0.015 Day
Carpenter 0.015 Day
Sundries (Labour Only):
4,370
DESCRIPTION OF ITEM :
Item Code : 27-114
Item Name : Reinstatement Of Road Surface
Detail Qty
LABOUR
Labourer 0.1239
Helper 0.1239
Sundries (Labour Only):
EQUIPMENT
Bull Dozer 90 HP 0.3716
Front End Loader 2.5 m³ 0.3716
Motor Grader 140 HP 0.2477
Dumper ( 10 T ) 1.8581
Pump 4" delivery (Diesel) 0.2477
Water Tank Bowser Type 0.3716
12000 l
Combination Roller 18T 0.6194
4,371
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Repair / refixing of kitchen wall cabinet i/c commercial ply, new
drawers, fancy handle, shutter etc required for painting.
LABOUR
Labourer 0.125 Day
Carpenter 0.125 Day
Sundries (Labour Only):
4,372
Item Name : Repairs to plaster of thickness 1/2" to 3/4" in cement sand mortar 1:4
patches of area 27 Sft and under, including cutting the patch in proper
shape, raking out joints and preparing and plastering the surface of
the walls complete, including disposal of rubbish to the dumping ground
within 30 metres lead.
LABOUR
Mason 1 Day
Labourer 1.25 Day
Water Man 0.5 Day
Sundries (Labour Only):
4,373
LABOUR
Mason 0.0132 Day
Labourer 0.0465 Day
Sundries (Labour Only):
4,374
Item Name : Making the opening in brick masonry including dismantling in floor or
walls by cutting masonry and making good the damages to walls and jambs
complete, to match existing surface i/c disposal of debris to the
nearest municipal dumping ground.
LABOUR
Mason 0.0238 Day
Labourer 0.0762 Day
Sundries (Labour Only):
4,375
Item Name : Renewing wooden battens in roofs, including making good the holes in
wall and painting with oil type wood preservative of approved brand and
manufacture complete, including removal of rubbish to the dumping
ground within 30 metres lead:
LABOUR
Labourer 0.1968 Day
Carpenter 0.0451 Day
Painter / Polisher 0.0165 Day
Sundries (Labour Only):
4,376
Item Name : Raking out joints in lime or cement mortar and preparing the surface
for re-pointing or replastering,including disposal of rubbish to the
dumping ground within 50 metres lead.
LABOUR
Labourer 0.5269 Day
Water Man 0.0605 Day
Sundries (Labour Only):
4,377
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Removing white or colour wash by scrapping and sand papering and
preparing the surface smooth including necessary repairs to scratches
etc. complete.
LABOUR
Labourer 0.0012 Day
Sundries (Labour Only):
4,378
Item Name : Removing distemper, water proofing cement paint and the like by
scrapping, sand papering and preparing the surface smooth including
necessary repairs to scratches etc. complete.
MATERIAL
Sand Paper 0.0048 Doz
LABOUR
Labourer 0.0015 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Sft Rs.
Labour Rates Per Sft Rs.
4,379
Item Name : Painting on old G.I. sheet with synthetic enamel paint of approved
quality of required colour to give an even shade:
Detail Qty
MATERIAL
Paint : Enamel 0.0043
LABOUR
Labourer 0.0033
Painter / Polisher 0.0033
Sundries (Labour Only):
4,380
Item Name : Providing and fixing deodar wood First class wooden curtain rods 1" to
1.25" (25mm to 32mm) dia with end stay.
LABOUR
Labourer 0.0134 Day
Carpenter 0.0067 Day
Sundries (Labour Only):
4,381
Item Name : Providing and fixing 3/4" (19mm) dia. approved Brass tubes with Brass
sockets as curtain rods.
LABOUR
Carpenter 0.0089 Day
Sundries (Labour Only):
4,382
Item Name : Providing and fixing 3/4" (19mm) dia. approved Chromium Plated Brass
tubes with Chromium Plated Brass sockets as curtain rods.
LABOUR
Carpenter 0.0089 Day
Sundries (Labour Only):
4,383
Item Name : Providing and fixing Chromium Plated curtain rails with double roller
runners, clamps, including cost of Chromium Plated brass screws and
rawl plugs.
MATERIAL
C.P. brass screw (1.5" ) 1.2857 No
C.P. brass curtain rail 1 Rft
Brass rollers 3.2143 No
C.P. brass clamp 1.4286 No
Rawal plug 1" long 1.0714 No
Brass stopper 0.6429 No
LABOUR
Labourer 0.0179 Day
Carpenter 0.0357 Day
Sundries (Labour Only):
4,384
Item Name : Providing and fixing Aluminium curtain rails with double roller
runners, clamps, including cost of screws and rawl plugs.
LABOUR
Labourer 0.0179 Day
Carpenter 0.0357 Day
Sundries (Labour Only):
4,385
Item Name : Replacement of existing door lock with new door lock. : Rim Lock
(Local)
LABOUR
Carpenter 0.25 Day
Sundries (Labour Only):
4,386
Item Name : Replacement of existing door lock with new door lock. : Heavy Duty Rim
Lock
LABOUR
Carpenter 0.25 Day
Sundries (Labour Only):
4,387
Item Name : Replacement of existing door lock with new door handle lock of imported
quality heavy duty
LABOUR
Carpenter 0.25 Day
Sundries (Labour Only):
4,388
Item Name : Replacement of existing floor hinges with new floor hinges. : Floor
Hinges
LABOUR
Carpenter 0.5 Day
Sundries (Labour Only):
4,389
Item Name : Replacement of existing brass drawer and cupboard lock with brass
screws.
LABOUR
Carpenter 0.125 Day
Sundries (Labour Only):
4,390
Item Name : Replacement of existing finger plate with screws. : Aluminium finger
plate 6" x 2.25"
LABOUR
Carpenter 0.0938 Day
Sundries (Labour Only):
4,391
Item Name : Replacement of existing finger plate with screws. : Brass finger plate
6" x 2.25"
LABOUR
Carpenter 0.0938 Day
Sundries (Labour Only):
4,392
Item Name : Replacement of existing approved helical brass spring hinges 6" (150mm)
size with brass screws. : Single action
LABOUR
Carpenter 0.0813 Day
Sundries (Labour Only):
4,393
Item Name : Replacement of existing helical brass spring hinges 6" (150mm) size
with brass screws. : Double action
LABOUR
Carpenter 0.1 Day
Sundries (Labour Only):
4,394
Item Name : Replacement of existing helical iron spring hinges 6" (150mm) size
with iron screws. : Single action
LABOUR
Carpenter 0.0813 Day
Sundries (Labour Only):
4,395
Item Name : Replacement of existing helical iron spring hinges 6" (150mm) size
with iron screws. : Double action
LABOUR
Carpenter 0.1 Day
Sundries (Labour Only):
4,396
Item Name : Replacement of existing piano hinges of sheet 3/4" (19mm) wide with
brass screws. : Brass piano hinges
LABOUR
Carpenter 0.25 Day
Sundries (Labour Only):
4,397
Item Name : Replacement of existing piano hinges of sheet 3/4" (19mm) wide with
brass screws. : Iron piano hinges
LABOUR
Carpenter 0.25 Day
Sundries (Labour Only):
4,398
LABOUR
Carpenter 0.075 Day
Sundries (Labour Only):
4,399
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,400
LABOUR
Carpenter 0.075 Day
Sundries (Labour Only):
4,401
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
4,402
Item Name : Replacement of existing heavy type G.I tee hinges with screws. : Tee
hinges 18"
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,403
Item Name : Replacement of existing heavy type G.I tee hinges with screws. : Tee
hinges 12"
Detail Qty Unit
MATERIAL
Iron screw 1.5" 6 No
G.I. tee hinges 12" 1 No
LABOUR
Carpenter 0.075 Day
Sundries (Labour Only):
4,404
Item Name : Replacement of existing heavy type G.I tee hinges with screws. : Tee
hinges 10"
LABOUR
Carpenter 0.075 Day
Sundries (Labour Only):
4,405
Item Name : Replacement of existing tower bolts with screws of same metal. : Brass
tower bolts of 6" Size
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,406
Item Name : Replacement of existing tower bolts with screws of same metal. : Brass
tower bolts of 9" Size
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,407
Item Name : Replacement of existing tower bolts with screws of same metal. : Brass
tower bolts of 12" Size
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,408
Item Name : Replacement of existing tower bolts with screws of same metal.
:Chromium plated brass tower bolts of 6" Size
4,409
Item Name : Replacement of existing tower bolts with screws of same metal.
:Chromium plated brass tower bolts of 9" Size
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,410
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,411
Item Name : Replacement of existing tower bolts with screws of same metal. :
Aluminium tower bolts of 4" Size
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,412
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Replacement of existing tower bolts with screws of same metal. :
Aluminium tower bolts of 6" Size
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,413
Item Name : Replacement of existing tower bolts with screws of same metal. :
Aluminium tower bolts of 8" Size
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
4,414
Item Name : Replacement of existing heavy duty safety hasp and staple with
necessary screws of the same metal. : Brass hasp and staple of Size 5"
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,415
Item Name : Replacement of existing heavy duty safety hasp and staple with
necessary screws of the same metal. : Brass hasp and staple of Size 4"
Detail Qty Unit
MATERIAL
Brass screw 3/4" size 7 No
Brass hasp & staple 4" 1 No
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,416
Item Name : Replacement of existing heavy duty safety hasp and staple with
necessary screws of the same metal. : Brass hasp and staple of Size 3"
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,417
Item Name : Replacement of existing heavy duty safety hasp and staple with
necessary screws of the same metal. : Brass hasp and staple of Size 2"
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,418
Item Name : Replacement of existing heavy duty safety hasp and staple with
necessary screws of the same metal. : Iron hasp and staple of Size 5"
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,419
Item Name : Replacement of existing heavy duty safety hasp and staple with
necessary screws of the same metal. : Iron hasp and staple of Size 4"
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,420
Item Name : Replacement of existing heavy duty safety hasp and staple with
necessary screws of the same metal. : Iron hasp and staple of Size 3"
4,421
Item Name : Replacement of existing heavy duty safety hasp and staple with
necessary screws of the same metal. : Iron hasp and staple of Size 2"
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,422
MATERIAL
C.P. hasp & staple 5" 1 No
C.P. brass screw (1.5" ) 6 No
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,423
Item Name : Replacement of existing heavy duty safety hasp and staple with
necessary screws of the same metal. : Chromium plated hasp and staple
of Size 4"
MATERIAL
C.P. brass screw (1.5" ) 6 No
C.P. hasp & staple 4" 1 No
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,424
Item Name : Replacement of existing heavy duty safety hasp and staple with
necessary screws of the same metal. : Chromium plated hasp and staple
of Size 3"
MATERIAL
C.P. brass screw (1.5" ) 6 No
C.P. hasp & staple 3" 1 No
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,425
Item Name : Replacement of existing heavy duty safety hasp and staple with
necessary screws of the same metal. : Chromium plated hasp and staple
of Size 2"
LABOUR
Carpenter 0.0625 Day
Sundries (Labour Only):
4,426
DESCRIPTION OF ITEM :
Item Code : 27-140-a
Item Name : Servicing of window type AC
Detail Qty Unit
MATERIAL
Servicing material for 1 Job
Window AC
LABOUR
AC Mechanic 0.25 Day
Sundries (Labour Only):
4,427
DESCRIPTION OF ITEM :
Item Code : 27-141-i
Item Name :
Detail Qty Unit
MATERIAL
Gas charging to 2.0 Ton 1 1 Job
Split AC
LABOUR
AC Mechanic 0.25 Day
Sundries (Labour Only):
4,428
DESCRIPTION OF ITEM :
Item Code : 27-141-a
Item Name : Servicing for floor stand AC unit
Detail Qty Unit
MATERIAL
Servicing material for 1 Job
floor stand AC
LABOUR
AC Mechanic 0.25 Day
Sundries (Labour Only):
4,429
LABOUR
Labourer 0.5 Day
AC Mechanic 0.5 Day
Sundries (Labour Only):
4,430
DESCRIPTION OF ITEM :
Item Code : 27-141-c
Item Name :
Detail Qty Unit
MATERIAL
Compressor for 1.5 Ton 1 1 No
Split AC
LABOUR
Labourer 0.6 Day
AC Mechanic 0.6 Day
Sundries (Labour Only):
4,431
DESCRIPTION OF ITEM :
Item Code : 27-141-d
Item Name :
Detail Qty Unit
MATERIAL
Compressor for 2.0 Ton 1 1 No
Split AC
LABOUR
Labourer 0.6 Day
test electrcian 0.6 Day
Sundries (Labour Only):
4,432
DESCRIPTION OF ITEM :
Item Code : 27-141-e
Item Name :
Detail Qty Unit
MATERIAL
Compressor for 1.5 Ton 1 1 No
Window AC
LABOUR
Labourer 0.5 Day
AC Mechanic 0.5 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 27-141-f
Item Name :
Detail Qty Unit
MATERIAL
Compressor for 2.0 Ton 1 1 No
Window AC
LABOUR
Labourer 0.5 Day
AC Mechanic 0.5 Day
Sundries (Labour Only):
4,434
DESCRIPTION OF ITEM :
Item Code : 27-141-g
Item Name : Supply and fixing of compressor for Electric Water Cooler
Detail Qty Unit
MATERIAL
Compressor for Electric 1 1 No
Water Cooler
LABOUR
AC Mechanic 0.25 Day
Sundries (Labour Only):
4,435
DESCRIPTION OF ITEM :
Item Code : 27-141-h
Item Name :
Detail Qty Unit
MATERIAL
Gas charging to 1.5 Ton 1 1 Job
Split AC
LABOUR
AC Mechanic 0.25 Day
Sundries (Labour Only):
4,436
DESCRIPTION OF ITEM :
Item Code : 27-141-j
Item Name :
Detail Qty Unit
MATERIAL
Gas charging to 1.5 Ton 1 1 Job
Window AC
LABOUR
AC Mechanic 0.25 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Job Rs.
Labour Rates Per Job Rs.
4,437
DESCRIPTION OF ITEM :
Item Code : 27-141-k
Item Name :
Detail Qty Unit
MATERIAL
Gas charging to 2.0 Ton 1 1 Job
Window AC
LABOUR
AC Mechanic 0.25 Day
Sundries (Labour Only):
4,438
DESCRIPTION OF ITEM :
Item Code : 27-141-l
Item Name :
Detail Qty Unit
MATERIAL
Gas charging for Electric 1 1 Job
water cooler
LABOUR
AC Mechanic 0.25 Day
Sundries (Labour Only):
4,439
DESCRIPTION OF ITEM :
Item Code : 27-141-m
Item Name :
Detail Qty Unit
MATERIAL
Gas charging for floor 1 1 Job
stand AC
LABOUR
Labourer 0.2 Day
AC Mechanic 0.2 Day
Sundries (Labour Only):
4,440
DESCRIPTION OF ITEM :
Item Code : 27-141-n
Item Name :
Detail Qty
MATERIAL
Repair of PC Circuit 1
Board complete for Split
AC
LABOUR
Labourer 0.2 Day
AC Mechanic 0.2 Day
Sundries (Labour Only):
4,441
DESCRIPTION OF ITEM :
Item Code : 27-142-a
Item Name :
Detail Qty Unit
MATERIAL
PC Circuit Board complete 1 1 No
for Split AC
LABOUR
Labourer 0.2 Day
AC Mechanic 0.2 Day
Sundries (Labour Only):
4,442
LABOUR
Labourer 0.2 Day
AC Mechanic 0.2 Day
Sundries (Labour Only):
4,443
DESCRIPTION OF ITEM :
Item Code : 27-142-c
Item Name : Supply and Replacement of running capacitor
Detail Qty Unit
MATERIAL
Running Capacitor 1 1 No
LABOUR
AC Mechanic 0.2 Day
Sundries (Labour Only):
4,444
LABOUR
AC Mechanic 0.1 Day
Sundries (Labour Only):
4,445
DESCRIPTION OF ITEM :
Item Code : 27-142-e
Item Name : Supply and providing of Remote Control for Split AC unit
Detail Qty Unit
MATERIAL
Remote Control for split 1 1 No
AC unit
4,446
DESCRIPTION OF ITEM :
Item Code : 27-142-f
Item Name :
Detail Qty Unit
MATERIAL
Drain pipe flexible for 1 1 No
outdoor unit of split AC
LABOUR
AC Mechanic 0.05 Day
Sundries (Labour Only):
4,447
DESCRIPTION OF ITEM :
Item Code : 27-142-g
Item Name : Supply and fixing of fan motor for outdoor unit of split AC
Detail Qty Unit
MATERIAL
Fan motor for outdoor 1 1 No
unit of split AC
LABOUR
AC Mechanic 0.2 Day
Sundries (Labour Only):
4,448
LABOUR
AC Mechanic 0.15 Day
Sundries (Labour Only):
4,449
DESCRIPTION OF ITEM :
Item Code : 27-143
Item Name : Supply and fixing of fan motor for Electric Water Cooler
Detail Qty Unit
MATERIAL
Fan motor for Electric 1 1 No
water cooler
LABOUR
AC Mechanic 0.15 Day
Sundries (Labour Only):
4,450
DESCRIPTION OF ITEM :
Item Code : 27-144-a
Item Name :
Detail Qty Unit
MATERIAL
Set of steel brackets 1 1 No
with rawal bolts for AC
LABOUR
AC Mechanic 0.1 Day
Sundries (Labour Only):
4,451
DESCRIPTION OF ITEM :
Item Code : 27-144-b
Item Name : Supply and fixing of 110/76 - 3 core wire for split AC
Detail Qty Unit
MATERIAL
110/76 - 3 core wire for 1 1 No
split AC
LABOUR
AC Mechanic 0.03 Day
Sundries (Labour Only):
4,452
DESCRIPTION OF ITEM :
Item Code : 27-145-a
Item Name : Removing of window AC
Detail Qty Unit
LABOUR
Labourer 0.25 Day
AC Mechanic 0.25 Day
Sundries (Labour Only):
4,453
DESCRIPTION OF ITEM :
Item Code : 27-145-b
Item Name : Refixing of window AC
Detail Qty Unit
LABOUR
Labourer 0.25 Day
AC Mechanic 0.25 Day
Sundries (Labour Only):
4,454
4,455
DESCRIPTION OF ITEM :
Item Code : 27-145-d
Item Name : Refixing of Split AC complete
Detail Qty Unit
LABOUR
Labourer 0.5 Day
AC Mechanic 0.5 Day
Sundries (Labour Only):
4,456
DESCRIPTION OF ITEM :
Item Code : 27-146
Item Name : Providing and fixing of contact relay for split AC complete
Detail Qty Unit
MATERIAL
Contact relay for split 1 1 No
AC
LABOUR
AC Mechanic 0.1 Day
Sundries (Labour Only):
4,457
Item Name : Supplying bamboo jhandies 10' to 12' with iron shoes and flags 15"
square
LABOUR
Labourer 0.05 Day
Carpenter 0.04 Day
Sundries (Labour Only):
4,458
DESCRIPTION OF ITEM :
Item Code : 28-02
Item Name : Supplying wooden pegs for levelling 1.5" square 6" long
Detail Qty Unit
MATERIAL
Wood - Kiker 3.1815 Cft
LABOUR
Labourer 0.25 Day
Carpenter 0.25 Day
Sundries (Labour Only):
4,459
DESCRIPTION OF ITEM :
Item Code : 28-03
Item Name :
Detail Qty Unit
MATERIAL
Wood - Kiker 4.6875 Cft
LABOUR
Labourer 0.25 Day
Carpenter 0.4 Day
Sundries (Labour Only):
4,460
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 28-04
Item Name :
Detail Qty Unit
MATERIAL
Hook 0.5 No
LABOUR
Mason 0.0418 Day
Labourer 0.0418 Day
Sundries (Labour Only):
4,461
DESCRIPTION OF ITEM :
Item Code : 28-05
Item Name :
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.1786 Bag
Coarse Sand 0.446 Cft
Crushed Aggregate 0.8932 Cft
LABOUR
Labourer 0.5
Sundries (Labour Only):
Item Name : Fixing main line type distance mark in position including making 1:3:6
cement concrete base block
LABOUR
Labourer 0.3 Day
Painter / Polisher 0.045 Day
Sundries (Labour Only):
4,463
DESCRIPTION OF ITEM :
Item Code : 28-07-a
Item Name : Boring and fixing 1.5" dia pressure pipe in ordinary soil
Detail Qty Unit
LABOUR
Labourer 0.116 Day
Fitter 0.0305 Day
Sundries (Labour Only):
4,464
DESCRIPTION OF ITEM :
Item Code : 28-07-b
Item Name : Boring and fixing 1.5 dia pressure pipe in clay
Detail Qty Unit
LABOUR
Labourer 0.267 Day
Fitter 0.0305 Day
Sundries (Labour Only):
4,465
DESCRIPTION OF ITEM :
Item Code : 28-07-c
Item Name : Boring and fixing 1.5" dia pressure pipe in shingle
Detail Qty Unit
LABOUR
Labourer 0.416 Day
Fitter 0.0305 Day
Sundries (Labour Only):
4,466
DESCRIPTION OF ITEM :
Item Code : 28-08
Item Name : Fixing hand pump (machine only)
Detail Qty Unit
LABOUR
Fitter 0.4 Day
Sundries (Labour Only):
4,467
DESCRIPTION OF ITEM :
Item Code : 28-09-a
Item Name : Washing of Durries / Synthetic Matting
Detail Qty Unit
MATERIAL
Washing powder 1 kg
LABOUR
Skilled Labour 1 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 28-09-b
Item Name : Washing of Bed Sheets
Detail Qty Unit
MATERIAL
Washing powder 0.5 kg
LABOUR
Skilled Labour 0.432 Day
Sundries (Labour Only):
4,469
DESCRIPTION OF ITEM :
Item Code : 28-09-c
Item Name : Washing of Table Cloth / Napkins / Dusters etc
Detail Qty Unit
MATERIAL
Washing powder 0.1 kg
LABOUR
Skilled Labour 0.063 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 28-10
Item Name : Sweeping chimneys
Detail Qty Unit
MATERIAL
Rope 3.28 Rft
LABOUR
Labourer 0.25 Day
Sundries (Labour Only):
4,471
DESCRIPTION OF ITEM :
Item Code : 28-11
Item Name : Cleaning of water tanks per gallon capacity
Detail Qty
MATERIAL
Washing powder 0.01
Cleaning Bleach 0.001
LABOUR
Labourer 0.0006
Sundries (Labour Only):
4,472
Item Name : Cleaning and washing of bath rooms / toilets by using recommended
chemicals i/c refilling of joints with grout material.
LABOUR
Labourer 0.151 Days
Sundries (Labour Only):
4,473
DESCRIPTION OF ITEM :
Item Code : 28-13
Item Name : Supplying manure
Detail Qty Unit
MATERIAL
Manure 100 Cft
LABOUR
Labourer 0.4 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.
4,474
Item Name : Spraying anti-termite liquid on Wood mixed with water of mixing ratio
as per the manufacturer's certified manual (1 Spray = 10 Litre mixture)
LABOUR
Skilled Labour 0.1 Day
Sundries (Labour Only):
EQUIPMENT
Anti Termite Spray 0.0313 Day
machine
4,475
LABOUR
Skilled Labour 0.0174 Day
Sundries (Labour Only):
EQUIPMENT
Anti Termite Spray 0.1389 Hour
machine
4,476
Item Name : Post anti Termite Treatment in the building mixed with water of mixing
ratio as per the manufacturer's certified manual including boreholes as
specified
MATERIAL
Post Anti Termite Liquid 100 Sft
including water
LABOUR
Skilled Labour 0.0174 Day
Sundries (Labour Only):
EQUIPMENT
Anti Termite Spray 0.1389 Hour
machine
4,477
Item Name : Providing and Fixing barbed wire fencing with 4 horizontal & 2 cross
wires : Without PCC base
LABOUR
Labourer 0.2647 Day
Black Smith 0.1176 Day
Sundries (Labour Only):
4,478
Item Name : Providing and Fixing barbed wire fencing with 4 horizontal & 2 cross
wires : With PCC 1:4:8 base 12"x12"x21"
LABOUR
Labourer 0.2647 Day
Black Smith 0.1176 Day
Sundries (Labour Only):
4,479
MATERIAL
22 SWG Chicken Wire Mesh 1 Sft
Steel Nails and Washers
LABOUR
Skilled Labour 0.015 Day
Sundries (Labour Only):
4,480
DESCRIPTION OF ITEM :
Item Code : 28-19
Item Name :
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 1.5 Bag
Coarse Sand 6 Cft
LABOUR
Mason 0.75 Day
Labourer 1 Day
Sundries (Labour Only):
4,481
DESCRIPTION OF ITEM :
Item Code : 28-20
Item Name : Binding office books/registers.
Detail Qty Unit
MATERIAL
Soft Board 1 Sft
Covering Sheet 1 No
Gum Bottle 1 No
LABOUR
Book Binder 0.05 Day
Sundries (Labour Only):
4,482
DESCRIPTION OF ITEM :
Item Code : 28-21
Item Name : Cutting of Pipes upto 2" Dia
Detail Qty Unit
LABOUR
Plumber 0.08 Days
Sundries (Labour Only):
4,483
DESCRIPTION OF ITEM :
Item Code : 28-22
Item Name : Cutting of Pipes above 2" Dia upto 4" dia
Detail Qty
LABOUR
Plumber 0.151
Sundries (Labour Only):
4,484
Item Name : Providing and fixing of 1-1/2" thick Thermopore in cavity wall,
including all necessary fittings complete in all respect .
LABOUR
Labourer 0.75 Day
Sundries (Labour Only):
4,485
Item Name : Providing and fixing hot dipped galvanized fully glazed fixed steel sky
light of Z section 1.25" (32.5 mm) width or as approved by Engineer
incharge including iron lugs, cutting holes and making good the damages
to walls.
LABOUR
Mason 0.0268 Day
Labourer 0.0714 Day
Glazier 0.0179 Day
Sundries (Labour Only):
4,486
Item Name : Providing and placing of geotextile fabric as shown in the drawings as
directed by the Engineer.
LABOUR
Painter / Polisher 0.33 Day
Sundries (Labour Only):
4,487
Item Name : Providing and fixing 25 mm dia. 3 m long deformed steel dowel bars
(Grade 60) with one end driven into 38 mm diameter 1.50 m deep hole
drilled in bed rock and other end provided with L-bend for embedding in
concrete / masonry of over flow / non-over flow blocks and other
appurtenant works including cost of all materials, machinery, labour,
drilling and cleaning hole, filling hole with specified cement mortar,
driving anchor rod etc. complete with all lead and lifts.
LABOUR
Mason 0.25 Day
Labourer 0.25 Day
Skilled Labour 0.25 Day
Sundries (Labour Only):
EQUIPMENT
Rock Driller 3.5 Day
4,488
Item Name : Providing and fixing 25 mm dia. 2.75 m long ribbed/deformed steel bars
(Grade 60) with one end split and driven firmly using steel wedge into
38 mm diameter 1.25 m deep hole drilled in bed rock and other end
provided with L-bend for embedding in concrete / masonry for spillway
and appurtenant works including cost of all materials, machinery,
labour, steel wedge, drilling and cleaning hole, filling hole with
thick cement slurry, driving anchor rod etc. complete with all lead and
lifts.
LABOUR
Mason 0.25 Day
Labourer 0.4 Day
Skilled Labour 0.25 Day
Sundries (Labour Only):
EQUIPMENT
Rock Driller 3.4 Day
4,489
Item Name : Drilling approximately 75 mm dia. holes by calyx or any other rotary
process (except diamond drilling) through over burden providing black
steel or suitable casing pipe, using casing shoe bit, vertical or
inclined upto 10 degrees to vertical as directed including cost of all
materials, machinery, labour, water charges, reaming, collection of
wash samples/disturbed samples at suitable intervals, logging and
labelling, supplying wooden core box, fixing casing pipes etc.
complete. from depth (0 to 50 m), excluding cost of mobilization &
demobilization.
EQUIPMENT
Drilling of Boreholes 1 Rft
with boring bailer/Rotary
rig, Generator set light
arrangement etc. for
collection of disturbed
soil samples
4,490
EQUIPMENT
Drilling of Boreholes 1 Rft
with boring bailer/Rotary
rig, Generator set light
arrangement etc. for
collection of disturbed
soil samples
4,491
EQUIPMENT
Drilling of Boreholes 1 Rft
using diamond bit with
boring bailer/Rotary rig,
Generator set light
arrangement etc, for
collection of undisturbed
soil samples
4,492
4,493
EQUIPMENT
Drilling of Boreholes 1 Rft
using diamond bit with
boring bailer/Rotary rig,
Generator set light
arrangement etc. for
collection of undisturbed
soil samples
4,494
Item Name : Topographic and cadastral survey for head works/Dams & other irrigation
projects by using Total station GPS, etc. with minimum 30 number of
point reading per acre, to generate 15mx15m grid and 0.5 m interval
contours including transfer of entire data to computer system in
different geo-referenced layers / themes using features of standard
software, compatible with design software packages, including supply of
soft and hard copies of point readings, including digitizing village
maps and super imposing the contours on village map (scale 1 in 4000)
including marking all permanent features like roads, cart tracks,
existing canals, mosques, tanks, forest boundary and electric poles,
etc. including marking of ridges and valleys on survey sheet including
supply of 4 soft copies and 4 hard copies after approval of competent
authority, preparation & submission of grid and L-section nallah etc.
complete
EQUIPMENT
Total station GPS, 0.02 Day
including computer,
Printers etc
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Acre Rs.
Labour Rates Per Acre Rs.
4,495
(British) : WHP
Rate (Rs)
78,000.00 1 WHP
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 9.48
19.50
Rate (Rs)
55,000.00 1 WHP
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 10.89
19.50
(British) : WHP
Rate (Rs)
44,600.00 1 WHP
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 11.29
19.50
(British) : WHP
Rate (Rs)
38,500.00 1 WHP
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 9.56
19.50
(British) : WHP
Rate (Rs)
37,000.00 1 WHP
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 8.22
19.50
(British) : WHP
Rate (Rs)
34,500.00 1 WHP
TOTAL MATERIAL 73.70
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 6.80
19.50
(British) : WHP
Rate (Rs)
315,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 5.13
19.50
(British) : WHP
Rate (Rs)
294,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 5.06
19.50
Rate (Rs)
262,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 5.05
19.50
Rate (Rs)
174,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 5.68
19.50
(British) : WHP
Rate (Rs)
169,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 5.37
19.50
(British) : WHP
Rate (Rs)
161,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 4.68
19.50
(British) : WHP
Rate (Rs)
157,000.00 1 WHP
TOTAL MATERIAL 76.63
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 3.87
19.50
(British) : WHP
Rate (Rs)
213,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 5.96
19.50
(British) : WHP
Rate (Rs)
207,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 5.89
19.50
Rate (Rs)
190,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 5.80
19.50
Rate (Rs)
176,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 5.65
19.50
(British) : WHP
Rate (Rs)
163,500.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 5.45
19.50
(British) : WHP
Rate (Rs)
155,000.00 1 WHP
TOTAL MATERIAL 75.76
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 4.74
19.50
(British) : WHP
Rate (Rs)
152,000.00 1 WHP
(British) : WHP
Rate (Rs)
148,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 3.92
19.50
(British) : WHP
Rate (Rs)
325,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 5.07
19.50
Rate (Rs)
320,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 4.89
19.50
(British) : WHP
Rate (Rs)
270,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 4.99
19.50
(British) : WHP
Rate (Rs)
164,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 5.84
19.50
(British) : WHP
Rate (Rs)
152,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 5.63
19.50
(British) : WHP
Rate (Rs)
150,000.00 1 WHP
TOTAL MATERIAL 75.70
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 4.80
19.50
(British) : WHP
Rate (Rs)
147,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 3.93
19.50
(British) : WHP
Rate (Rs)
227,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 5.78
19.50
Rate (Rs)
215,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 5.78
19.50
Rate (Rs)
190,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 5.80
19.50
(British) : WHP
Rate (Rs)
151,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 6.07
19.50
(British) : WHP
Rate (Rs)
145,000.00 1 WHP
TOTAL MATERIAL 74.75
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 5.75
19.50
(British) : WHP
Rate (Rs)
141,000.00 1 WHP
(British) : WHP
Rate (Rs)
138,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 3.99
19.50
(British) : WHP
Rate (Rs)
135,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 4.01
19.50
Rate (Rs)
404,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 4.83
19.50
(British) : WHP
Rate (Rs)
397,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 4.78
19.50
(British) : WHP
Rate (Rs)
349,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 4.83
19.50
(British) : WHP
Rate (Rs)
220,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 5.58
19.50
(British) : WHP
Rate (Rs)
209,000.00 1 WHP
TOTAL MATERIAL 75.57
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 4.93
19.50
(British) : WHP
Rate (Rs)
198,000.00 1 WHP
TOTAL MATERIAL 76.13
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 4.37
19.50
(British) : WHP
Rate (Rs)
193,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 3.71
19.50
(British) : WHP
Rate (Rs)
304,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 4.99
19.50
Rate (Rs)
295,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 5.05
19.50
Rate (Rs)
265,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 5.03
19.50
(British) : WHP
Rate (Rs)
216,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 5.17
19.50
(British) : WHP
Rate (Rs)
196,000.00 1 WHP
TOTAL MATERIAL 75.44
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 5.06
19.50
(British) : WHP
Rate (Rs)
178,000.00 1 WHP
(British) : WHP
Rate (Rs)
174,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 4.55
19.50
212,291.00 Cost Per 746 HW: 212,291.00
4,361.00 Cost Per 746 HW: 4,361.00
(British) : WHP
Rate (Rs)
170,000.00 1 WHP
Day 1,200.00 1
Day 600.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 3.80
19.50
600.00 1
850.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : Rft
Rate (Rs)
600.00 1
850.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Rate (Rs)
600.00 1
850.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : Each
ngs, complete with fastening
Rate (Rs)
600.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
25.3 , 25.4
(British) : Each
Rate (Rs)
600.00 1
600.00 1
750.00 1
3.00
TOTAL LABOUR 80.50
19.50
(British) : Each
Rate (Rs)
600.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Kg 110.00 1
TOTAL MATERIAL 52.36
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 28.14
19.50
25.3 , 25.4
(British) : Tonne
Pkt 464.10 1
Kg 110.00 1
TOTAL MATERIAL 72.14
Day 600.00 1
Day 1,050.00 1
3.00
TOTAL LABOUR 8.36
19.50
142,665.45 Per Tonne : Rs 142,665.45
10,106.25 Per Tonne : Rs 10,106.25
25.3 , 25.4
(British) : Tonne
Rate (Rs)
600.00 1
750.00 1
3.00
TOTAL LABOUR 80.50
19.50
25.3 , 25.4
(British) : Sft
Rate (Rs)
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : Tonne
sheet tanks, upto 20' height
Rate (Rs)
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 80.50
19.50
25.3 , 25.4
(British) : Tonne
Rate (Rs)
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 80.50
19.50
25.3 , 25.4
(British) : Tonne
Rate (Rs)
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : Kg
Rate (Rs)
110.00 1
TOTAL MATERIAL 30.68
600.00 1
1,050.00 1
850.00 1
3.00
TOTAL LABOUR 49.82
19.50
Spec. No :
600.00 1
750.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
600.00 1
750.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
600.00 1
750.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Rate (Rs)
53.60 1
TOTAL MATERIAL 66.36
600.00 1
750.00 1
3.00
TOTAL LABOUR 14.14
19.50
Spec. No :
Unit (British) : Each hole
Drilling holes,in plates over 1/2" thick per inch dia. or part thereof
Rate (Rs)
600.00 1
750.00 1
3.00
TOTAL LABOUR 80.50
19.50
25.4.2.3
(British) : Each hole
Rate (Rs)
600.00 1
750.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
600.00 1
750.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
25.4.5
Unit (British) : Each
Rate (Rs)
600.00 1
750.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No : 25.4.8
Unit (British) : Rft
tters of sheet iron
Rate (Rs)
600.00 1
1,050.00 1
750.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
25.4.8
Unit (British) : Each
ars, for barred windows
Rate (Rs)
600.00 1
1,200.00 1
750.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
25.4.8
Unit (British) : Each
Rate (Rs)
600.00 1
750.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : Each cut
rail posts for housing rail beams
Rate (Rs)
53.60 1
TOTAL MATERIAL 7.00
600.00 1
750.00 1
3.00
TOTAL LABOUR 73.50
19.50
Spec. No :
130.00 1
TOTAL MATERIAL 3.02
1,050.00 1
600.00 1
3.00
TOTAL LABOUR 77.48
19.50
130.00 1
TOTAL MATERIAL 2.05
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 78.45
19.50
25.3, 25.4.2,
25.4.3,
(British) : Sft 25.4.13 , 25.5
194.00 1 Kg
401.22 1 Ltr
110.00 1 Kg
157.50 1 No.
120.00 1 Kg
1,050.00 1
700.00 1
850.00 1
3.00
TOTAL LABOUR 34.47
19.50
25.3, 25.4.2,
25.4.3,
(British) : Sft 25.4.13 , 25.5
194.00 1 Kg
401.22 1 Ltr
110.00 1 Kg
157.50 1 No.
120.00 1 Kg
1,050.00 1
700.00 1
850.00 1
3.00
TOTAL LABOUR 32.45
19.50
120.00 1 Kg
143.20 1 Kg
194.00 1 Kg
401.22 1 Ltr
157.50 1 Kg
120.00 1 Kg
1,050.00 1
600.00 1
700.00 1
3.00
TOTAL LABOUR 27.10
19.50
25.3, 25.4.2,
25.4.3 ,
(British) : Sft 25.4.13
Rate (Rs)
53.60 1
110.00 1
TOTAL MATERIAL 58.68
1,050.00 1
600.00 1
600.00 1
3.00
TOTAL LABOUR 21.82
19.50
25.7.4
(British) : Rft
Rate (Rs)
120.00 1
45.00 1
TOTAL MATERIAL 63.93
850.00 1
1,050.00 1
1,050.00 1
3.00
TOTAL LABOUR 16.57
19.50
25.7.4
(British) : Rft
Rate (Rs)
464.10 1 Pack
85.00 1 Rft
1,050.00 1
2,000.00 1
3.00
TOTAL LABOUR 17.99
19.50
(British) : Sft
Rate (Rs)
401.22 1
525.00 1
TOTAL MATERIAL 52.48
850.00 1
1,200.00 1
1,050.00 1
750.00 1
3.00
TOTAL LABOUR 28.02
19.50
25.3 , 25.4
(British) : Sft
Rate (Rs)
401.22 1
165.00 1
95.00 1
TOTAL MATERIAL 66.41
850.00 1
1,200.00 1
1,050.00 1
750.00 1
3.00
TOTAL LABOUR 14.09
19.50
25.3 , 25.4
(British) : Rft
Rate (Rs)
120.00 1
TOTAL MATERIAL 64.85
1,200.00 1
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 15.65
19.50
Rate (Rs)
120.00 1
401.22 1
187.25 1
464.10 1
TOTAL MATERIAL 53.85
1,200.00 1
600.00 1
1,200.00 1
1,050.00 1
600.00 1
600.00 1
3.00
TOTAL LABOUR 26.65
19.50
25.3 , 25.4
(British) : Sft
Rate (Rs)
120.00 1
464.10 1
55.00 1
TOTAL MATERIAL 37.13
1,200.00 1
600.00 1
3.00
TOTAL LABOUR 43.37
19.50
25.3 , 25.4
(British) : Sft
Rate (Rs)
401.22 1
35.00 1
437.00 1
TOTAL MATERIAL 73.63
600.00 1
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 6.87
19.50
Rate (Rs)
401.22 1
40.00 1
437.00 1
TOTAL MATERIAL 73.67
600.00 1
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 6.83
19.50
(British) : Sft
Rate (Rs)
401.22 1
48.00 1
437.00 1
TOTAL MATERIAL 73.72
600.00 1
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 6.78
19.50
(British) : Sft
Rate (Rs)
401.22 1
55.00 1
437.00 1
TOTAL MATERIAL 73.76
600.00 1
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 6.74
19.50
(British) : Sft
Rate (Rs)
401.22 1
62.50 1
437.00 1
TOTAL MATERIAL 73.81
600.00 1
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 6.69
19.50
716.44 Per SQM : Rs 7,708.89
34.91 Per SQM : Rs 375.66
(British) : Sft
Rate (Rs)
401.22 1
55.00 1
35.00 1
437.00 1
TOTAL MATERIAL 73.76
600.00 1
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 6.74
19.50
(British) : Sft
Rate (Rs)
401.22 1
55.00 1
35.00 1
437.00 1
TOTAL MATERIAL 73.76
600.00 1
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 6.74
19.50
(British) : Sft
Rate (Rs)
401.22 1
55.00 1
48.00 1
437.00 1
TOTAL MATERIAL 73.83
600.00 1
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 6.67
19.50
796.70 Per SQM : Rs 8,572.53
38.59 Per SQM : Rs 415.20
(British) : Sft
Rate (Rs)
401.22 1
55.00 1
55.00 1
437.00 1
TOTAL MATERIAL 73.87
600.00 1
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 6.63
19.50
(British) : Sft
Rate (Rs)
401.22 1
55.00 1
62.50 1
437.00 1
TOTAL MATERIAL 73.91
600.00 1
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 6.59
19.50
(British) : Sft
Rate (Rs)
120.00 1
60.00 1
TOTAL MATERIAL 35.87
600.00 1
750.00 1
3.00
TOTAL LABOUR 44.63
19.50
25.7.4
(British) : Rft
Ltr 401.22
Kg 110.00
No 45.00
Rft 45.00
TOTAL MATERIAL
Day 1,200.00
Day 600.00
Day 1,050.00
Day 750.00
TOTAL LABOUR
Over Heads on(M+L+E) 2% +
Rs. 1,470.37
Rs. 330.75
Spec. No :
Unit (British) : Rft
Providing and fixing barbed wire (12 Guage) fencing consisting of
3.25 ft long, 5 to 6 ft centre to
centre embedded in cement concrete 1:2:4 base of size 9"x9"x12", and 3
rows of barbed wire, painting posts, etc. complete in all respects.
Rate (Rs)
550.00 1
2,000.00 100 Cft
3,290.00 100 Cft
167.00 1
401.22 1
110.00 1
TOTAL MATERIAL 49.30
1,200.00 1
600.00 1
1,200.00 1
1,050.00 1
600.00 1
3.00
TOTAL LABOUR 31.20
19.50
Spec. No : 25.7.4
Unit (British) : Rft
Providing and fixing barbed (22 SWG) wire fence on compound wall,
/16" angle iron post 3 ft long, 4 ft apart
embedded in cement concrete 1:2:4 base of size 6"x6"x9", and 4 rows of
barbed wire, including binding wire, painting posts, etc. complete in
Rate (Rs)
550.00 1
2,000.00 100 Cft
3,290.00 100 Cft
167.00 1
401.22 1
110.00 1
TOTAL MATERIAL 50.66
1,200.00 1
600.00 1
1,200.00 1
1,050.00 1
600.00 1
3.00
TOTAL LABOUR 29.84
19.50
(British) : Sft
Rate (Rs)
143.20 1
401.22 1
464.10 1
146.00 1
101.00 1
80.00 1
600.00 1
1,200.00 1
1,050.00 1
1,050.00 1
3.00
TOTAL LABOUR 14.62
19.50
918.79 Per SQM : Rs 9,886.13
140.66 Per SQM : Rs 1,513.51
(British) : Sft
Rate (Rs)
143.20 1
194.00 1
401.22 1
464.10 1
146.00 1
80.00 1
494.00 1
66.00 1
TOTAL MATERIAL 60.20
600.00 1
1,200.00 1
1,050.00 1
1,050.00 1
3.00
TOTAL LABOUR 20.30
19.50
Rate (Rs)
143.20 1
194.00 1
401.22 1
464.10 1
146.00 1
110.00 1
66.00 1
535.00 1
TOTAL MATERIAL 56.94
1,200.00 1
600.00 1
1,200.00 1
1,050.00 1
1,050.00 1
3.00
TOTAL LABOUR 23.56
19.50
25.4.2
(British) : Rft
Rate (Rs)
230.00 1
TOTAL MATERIAL 33.05
600.00 1
1,050.00 1
600.00 1
3.00
TOTAL LABOUR 47.45
19.50
25.7.4
(British) : Rft
900.00 1
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 19.91
19.50
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
25.4.8
(British) : Kg
Rate (Rs)
145.00 1
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 27.39
19.50
500.00 1
600.00 1
3.00
TOTAL LABOUR 13.46
19.50
Spec. No :
Unit (British) : Each
l bracket for curtain pipe
Rate (Rs)
50.00 1
600.00 1
3.00
TOTAL LABOUR 20.88
19.50
156.25 Cost Per Each: 156.25
36.75 Cost Per Each: 36.75
Spec. No : 25.3.8
Unit (British) : RFT
Iron (2''x2''x1/8'')
Rate (Rs)
110.00 1
TOTAL MATERIAL 59.62
1,050.00 1
600.00 1
3.00
TOTAL LABOUR 20.88
19.50
(British) : Each
Rate (Rs)
95.00 1
120.00 1
(British) : Sft
Rate (Rs)
401.22 1
300.00 1
TOTAL MATERIAL 53.13
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 27.37
19.50
Spec. No :
Unit (British) : Sft
Rate (Rs)
464.10 1
TOTAL MATERIAL 5.22
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 56.64
221.90 1
TOTAL EQUIPMENT 18.64
19.50
(British) : Each
Rate (Rs)
9,000.00 1
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 20.88
19.50
Rate (Rs)
550.00 1 bag
2,000.00 1 cft
164.00 1 ft
110.00 1 Kg
131.75 1 Kg
1,500.00 1 no.
1,200.00 1
600.00 1
850.00 1
1,050.00 1
3.00
TOTAL LABOUR 34.35
19.50
Rate (Rs)
140.00 1 Rft
1,500.00 1 ltr
1,200.00 1
600.00 1
1,200.00 2
3.00
TOTAL LABOUR 56.60
19.50
(British) : Sft
Rate (Rs)
110.00 1
TOTAL MATERIAL 35.23
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 45.27
19.50
(British) : Sft
464.10 1
370.00 1
440.00 1
580.00 1
110.00 1
110.00 1
TOTAL MATERIAL 73.72
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 6.78
19.50
464.10 1
370.00 1
440.00 1
580.00 1
110.00 1
100.00 1
TOTAL MATERIAL 74.34
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 6.16
19.50
464.10 1
370.00 1
440.00 1
580.00 1
110.00 1
100.00 1
TOTAL MATERIAL 75.59
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 4.91
19.50
(British) : Sft
Rate (Rs)
401.22 1 Ltr
464.10 1 Pack
122.00 1 Rft
110.00 1 Sft
600.00 1
1,200.00 1
1,050.00 1
1,050.00 1
3.00
TOTAL LABOUR 9.68
19.50
(British) : Rft
Rate (Rs)
550.00 1
2,000.00 100 Cft
3,438.00 100 Cft
122.00 1
91.60 1
250.00 1
TOTAL MATERIAL 65.02
1,200.00 1
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 15.48
19.50
(British) : Rft
Rate (Rs)
550.00 1
2,000.00 100 Cft
3,438.00 100 Cft
122.00 1
91.60 1
160.00 1
TOTAL MATERIAL 59.59
1,200.00 1
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 20.91
19.50
179.44 Per Meter : Rs 588.55
42.26 Per Meter : Rs 138.62
(British) : Rft
Rate (Rs)
122.00 1
91.60 1
110.00 1
250.00 1
TOTAL MATERIAL 65.59
1,200.00 1
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 14.91
19.50
Rate (Rs)
122.00 1
91.60 1
110.00 1
160.00 1
TOTAL MATERIAL 60.75
1,200.00 1
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 19.75
19.50
(British) : Sft
Rate (Rs)
346.00 1
464.10 1
116.13 1
75.00 1
70.00 1
267.00 1
140.00 1
TOTAL MATERIAL 61.56
600.00 1
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 18.94
19.50
26.6.6
(British) : No
26,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.83
1,756.18 1
TOTAL EQUIPMENT 4.85
19.50
33,536.14 Cost Per No: 33,536.14
367.50 Cost Per No: 367.50
26.6.6
(British) : No
24,000.00 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.51
1,756.18 1
TOTAL EQUIPMENT 5.18
19.50
Rate (Rs)
37,000.00 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.33
1,756.18 1
TOTAL EQUIPMENT 3.45
19.50
26.6.6
(British) : No
Rate (Rs)
35,000.00 1
TOTAL MATERIAL 72.46
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.40
1,756.18 1
TOTAL EQUIPMENT 3.64
19.50
26.6.6
(British) : No
No 50,000.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 4.51
Hour 1,756.18 1
TOTAL EQUIPMENT 2.58
19.50
No 48,000.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 4.56
Hour 1,756.18 1
TOTAL EQUIPMENT 2.68
19.50
Spec. No :
Unit (British) : Rft
: 1" i/d
Rate (Rs)
65.00 1
TOTAL MATERIAL 70.95
1,200.00 1
3.00
TOTAL LABOUR 9.55
19.50
Spec. No :
Unit (British) : Rft
: 1.5" i/d
Rate (Rs)
85.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.11
19.50
Spec. No :
Unit (British) : Rft
: 2" i/d
Rate (Rs)
95.00 1
TOTAL MATERIAL 72.90
1,200.00 1
3.00
TOTAL LABOUR 7.60
19.50
15.6.1
(British) : No
23,000.00 1
1,200.00 1
1,250.00 1
3.00
TOTAL LABOUR 3.51
1,756.18 1
TOTAL EQUIPMENT 0.29
19.50
31,000.00 1
1,200.00 1
1,250.00 1
3.00
TOTAL LABOUR 3.37
1,756.18 1
TOTAL EQUIPMENT 2.12
19.50
15.6.1
(British) : No
1,200.00 1
1,250.00 1
3.00
TOTAL LABOUR 3.28
1,756.18 1
TOTAL EQUIPMENT 1.58
19.50
15.6.1
(British) : No
55,000.00 1
1,200.00 1
1,250.00 1
3.00
TOTAL LABOUR 3.21
1,756.18 1
TOTAL EQUIPMENT 1.21
19.50
66,961.90 Cost Per No: 66,961.90
187.58 Cost Per No: 187.58
Spec. No :
Unit (British) : No
Supply and Erection of AC ENERGY EFFICIENT LED LIGHT BULBS (7-10 W)
Rate (Rs)
500.00 1
1,200.00 1
3.00
TOTAL LABOUR 13.18
19.50
Spec. No :
Unit (British) : No
Supply and Erection of AC ENERGY EFFICIENT LED LIGHT BULBS (16-20 W)
Rate (Rs)
650.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.07
19.50
Spec. No :
Unit (British) : No
Supply and Erection of AC ENERGY EFFICIENT LED LIGHT BULBS (21-30 W)
Rate (Rs)
800.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.69
19.50
Spec. No :
Unit (British) : No
Supply and Erection of AC ENERGY EFFICIENT LED LIGHT BULBS (31-50 W)
Rate (Rs)
1,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.45
19.50
Spec. No :
Unit (British) : No
Supply and Erection of DC ENERGY EFFICIENT LED LIGHT BULBS (51-100 W)
Rate (Rs)
2,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.82
19.50
Spec. No : 26.34
Unit (British) : No
Supply and Erection of AC ENERGY EFFICIENT LED LIGHT BULBS (11-15 W)
Rate (Rs)
595.00 1
26.10
(British) : Watt
Rate (Rs)
60.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.92
19.50
26.10
(British) : Watt
Rate (Rs)
58.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.95
19.50
26.41
(British) : No
Rate (Rs)
9,325.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.62
19.50
Rate (Rs)
13,385.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.44
19.50
26.41
(British) : No
Rate (Rs)
9,750.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.60
19.50
26.41
(British) : No
Rate (Rs)
19,925.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.29
19.50
26.41
(British) : No
Rate (Rs)
28,490.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.21
19.50
26.42
(British) : No
Rate (Rs)
30,550.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.19
19.50
Rate (Rs)
34,625.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.17
19.50
26.44
(British) : No
Rate (Rs)
39,530.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.15
19.50
258.00 1
TOTAL MATERIAL 76.43
1,200.00 1
3.00
TOTAL LABOUR 4.07
19.50
Spec. No :
Unit (British) : AH
2 V VRLA AGM Battery per AH
Rate (Rs)
242.00 1
TOTAL MATERIAL 76.36
1,200.00 1
3.00
TOTAL LABOUR 4.14
19.50
274.00 1
TOTAL MATERIAL 76.49
1,200.00 1
3.00
TOTAL LABOUR 4.01
19.50
Spec. No :
Unit (British) : AH
2V OPzV battery per AH
Rate (Rs)
266.00 1
TOTAL MATERIAL 76.47
1,200.00 1
3.00
TOTAL LABOUR 4.03
19.50
200.00 1
TOTAL MATERIAL 76.13
1,200.00 1
3.00
TOTAL LABOUR 4.37
19.50
Spec. No :
Unit (British) : AH
Supply and Erection of 12 V Lithium LiFeP04 battery per AH
Rate (Rs)
56,220.00 1
TOTAL MATERIAL 75.88
1,200.00 1
3.00
TOTAL LABOUR 4.62
19.50
80.70 1
TOTAL MATERIAL 76.36
1,200.00 1
3.00
TOTAL LABOUR 4.14
19.50
Spec. No :
Unit (British) : AH
2 V OPzS battery per AH
Rate (Rs)
68.40 1
TOTAL MATERIAL 76.16
1,200.00 1
3.00
TOTAL LABOUR 4.34
19.50
28.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.18
19.50
Spec. No :
Unit (British) : Rft
Supply and Erection 1x4 sq.mm double insulated flexible copper cable
Rate (Rs)
42.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.15
19.50
51.66 Per Meter : Rs 169.44
1.47 Per Meter : Rs 4.82
26.2, 26.43
(British) : Rft
Rate (Rs)
57.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.60
19.50
Spec. No :
Unit (British) : Rft
0 sq.mm flexible copper cable
Rate (Rs)
88.00 1
Spec. No :
Unit (British) : Rft
Rate (Rs)
137.00 1
1,000.00 1
3.00
TOTAL LABOUR 3.56
19.50
Spec. No :
Unit (British) : Rft
Rate (Rs)
195.00 1
TOTAL MATERIAL 77.10
1,000.00 1
3.00
TOTAL LABOUR 3.40
19.50
Spec. No :
Unit (British) : Rft
5 sq.mm Copper cable
Rate (Rs)
268.00 1
1,000.00 1
3.00
TOTAL LABOUR 3.29
19.50
Spec. No :
Unit (British) : Rft
5 sq.mm flexible copper cable
Rate (Rs)
51.50 1
TOTAL MATERIAL 75.74
1,200.00 1
3.00
TOTAL LABOUR 4.76
19.50
Spec. No :
Unit (British) : Rft
sq.mm flexible copper cable
Rate (Rs)
77.50 1
1,200.00 1
3.00
TOTAL LABOUR 4.18
19.50
Spec. No :
Unit (British) : Rft
sq.mm flexible copper cable
Rate (Rs)
108.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.85
19.50
Spec. No :
Unit (British) : Rft
0 sq.mm flexible copper cable
Rate (Rs)
154.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.60
19.50
Spec. No :
Unit (British) : Rft
6 sq.mm Copper cable
Rate (Rs)
320.00 1
TOTAL MATERIAL 77.21
1,200.00 1
3.00
TOTAL LABOUR 3.29
19.50
Spec. No :
Unit (British) : Rft
5sq.mm Copper cable
Rate (Rs)
450.00 1
TOTAL MATERIAL 77.29
1,200.00 1
3.00
TOTAL LABOUR 3.21
19.50
Spec. No :
Unit (British) : Rft
5 sq.mm Copper cable
Rate (Rs)
650.00 1
TOTAL MATERIAL 77.36
1,200.00 1
3.00
TOTAL LABOUR 3.14
19.50
Spec. No : 26.20
Unit (British) : Pair
4 connector (TUV Approved)
Rate (Rs)
187.50 1
1,200.00 1
3.00
TOTAL LABOUR 15.93
19.50
Spec. No :
Unit (British) : Pair
4 Branch connector
Rate (Rs)
900.00 1
TOTAL MATERIAL 74.40
1,200.00 1
3.00
TOTAL LABOUR 6.10
19.50
26.28
(British) : Per Watt
Rate (Rs)
64.36 1
1,200.00 1
3.00
TOTAL LABOUR 4.42
19.50
Rate (Rs)
33.30 1
1,200.00 1
3.00
TOTAL LABOUR 5.70
19.50
26.28
(British) : Per Watt
Rate (Rs)
21.12 1
1,200.00 1
3.00
TOTAL LABOUR 7.17
19.50
26.38
(British) : Per Watt
Rate (Rs)
12.95 1
1,200.00 1
3.00
TOTAL LABOUR 9.57
19.50
Spec. No : 26.28
Unit (British) : Per Watt
ff Grid Hybrid inverter
Rate (Rs)
per Watt 17.45 1
1,200.00 1
3.00
TOTAL LABOUR 7.99
19.50
Spec. No : 26.28
Unit (British) : Per Watt
n Grid Hybrid inverter
Rate (Rs)
1,200.00 1
3.00
TOTAL LABOUR 5.26
19.50
Spec. No : 26.37
Unit (British) : Per Watt
Supply and Erection of GRID TIE INVERTER (ON-Grid Inverter) (0-10 KW)
Unit Rate (Rs)
Watt 21.13 1
1,200.00 1
3.00
TOTAL LABOUR 5.14
19.50
Spec. No : 26.37
Unit (British) : Per Watt
Supply and Erection of GRID TIE INVERTER (ON-Grid Inverter) (10-20 KW)
Unit Rate (Rs)
Watt 19.50 1
1,200.00 1
3.00
TOTAL LABOUR 5.31
19.50
Watt 17.87 1
1,200.00 1
3.00
TOTAL LABOUR 5.52
19.50
26.37
(British) : Per Watt
Rate (Rs)
16.23 1
1,200.00 1
3.00
TOTAL LABOUR 5.76
19.50
20.13 Cost Per Per Watt: 20.13
0.74 Cost Per Per Watt: 0.74
Spec. No : 26.29
Unit (British) : No
Supply and Erection of dV /dT or Sine Filters 11 KW to 18.5 KW
Rate (Rs)
73,550.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.63
19.50
26.29
(British) : No
Rate (Rs)
111,000.00 1
26.23
(British) : No
Rate (Rs)
65,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.40
19.50
26.23
(British) : No
Rate (Rs)
100,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.92
19.50
26.23
(British) : No
Rate (Rs)
200,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.46
19.50
Rate (Rs)
320,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.29
19.50
26.24
(British) : No
Rate (Rs)
600,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.31
19.50
719,940.00 Cost Per No: 719,940.00
2,940.00 Cost Per No: 2,940.00
Spec. No :
Unit (British) : No
Supply and Erection of AC ENERGY EFFICIENT CEILING FANS 56 inch, 50 W
Unit Rate (Rs)
No 4,668.00
1,200.00 1
3.00
TOTAL LABOUR 5.13
19.50
Spec. No :
Unit (British) : No
C CEILING FANS 48 inch 30-36 W
Rate (Rs)
3,700.00 1
Spec. No :
Unit (British) : No
C PEDISTAL FANS 18 inch 18-30 W
Rate (Rs)
3,900.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.54
19.50
15.6.6
(British) : Per Watt
Rate (Rs) Amount
17.03 1 Watt
1,200.00 1
3.00
TOTAL LABOUR 8.10
19.50
Spec. No :
Unit (British) : Watt
opper Conductor of 10 AWG
Rate (Rs)
7.00 1
1,200.00 1
3.00
TOTAL LABOUR 14.34
19.50
No 2.00 1
1,200.00 1
3.00
TOTAL LABOUR 32.06
19.50
Spec. No : 0.00
Unit (British) : Watt
Supply and Erection of Stainless Steel Nuts and Bolts
Unit Rate (Rs)
Watt 2.00 1
1,200.00 1
3.00
TOTAL LABOUR 32.06
19.50
3.86 Cost Per Watt: 3.86
1.47 Cost Per Watt: 1.47
26.10
(British) : Watt
Rate (Rs)
4.00 1
1,200.00 1
3.00
TOTAL LABOUR 20.88
19.50
Spec. No : 26.17
Unit (British) : No
NVERTER BASED SPLIT AC (01 Ton)
Rate (Rs)
65,000.00 1
TOTAL MATERIAL 76.79
1,200.00 1
3.00
TOTAL LABOUR 3.71
19.50
Spec. No : 26.17
Unit (British) : No
NVERTER BASED SPLIT AC (1.5 Ton)
Rate (Rs)
70,000.00 1
TOTAL MATERIAL 76.84
1,200.00 1
3.00
TOTAL LABOUR 3.66
19.50
Spec. No : 26.17
Unit (British) : No
NVERTER BASED SPLIT AC (02 Ton)
Rate (Rs)
75,000.00 1
TOTAL MATERIAL 76.88
1,200.00 1
3.00
TOTAL LABOUR 3.62
19.50
Spec. No : 26.33
Unit (British) : No
Supply and Erection of SOLAR AUTO TRACKER for 3.6 KW installation
Rate (Rs)
223,800.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.41
19.50
Spec. No :
Unit (British) : kW
Supply and Erection of PV MOUNTING FRAME WITH MANUAL TRAKERING
Rate (Rs)
24,461.00 1
TOTAL MATERIAL 77.38
1,200.00 1
3.00
TOTAL LABOUR 3.12
19.50
(British) : Each
Rate (Rs)
130.00 1
464.10 1
TOTAL MATERIAL 22.28
600.00 1
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 58.22
19.50
Rate (Rs)
130.00 1
30.00 1
TOTAL MATERIAL 13.39
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 67.11
19.50
(British) : Rft
Rate (Rs)
2.00 1 RFT
(British) : Sft
Rate (Rs)
Packet 464.10 1
TOTAL MATERIAL 18.59
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 61.91
19.50
(British) : each
Rate (Rs) Amount
1,200.00 1
3.00
TOTAL LABOUR 80.50
19.50
(British) : Job
69.50 1 RFT
110.00 1 KG
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 34.61
19.50
1,074.44 Cost Per Job: 1,074.44
444.68 Cost Per Job: 444.68
(British) : Job
No. 11,000.00 1
TOTAL MATERIAL 72.00
Day 600.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 8.50
19.50
(British) : Each
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 65.80
19.50
(British) : Each
Rate (Rs)
60.00 1 Each
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 67.85
19.50
(British) : Each
Rate (Rs)
60.00 1 Each
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 68.14
19.50
Rate (Rs)
60.00 1 Each
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 70.50
19.50
(British) : Each
Rate (Rs)
60.00 1 Each
TOTAL MATERIAL 8.38
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 72.12
19.50
(British) : Each
Rate (Rs)
60.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 48.21
19.50
Rate (Rs)
9,500.00 1
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 6.23
19.50
(British) : Each
Rate (Rs)
11,250.00 1
(British) : Each
Rate (Rs)
5,500.00 1
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 8.41
19.50
(British) : Each
Rate (Rs)
6,250.00 1
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 7.80
19.50
(British) : H.P
650.00 1 HP
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 39.21
19.50
1,475.00 Cost Per H.P: 1,475.00
698.25 Cost Per H.P: 698.25
(British) : H.P
775.00 1 HP
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 38.64
19.50
(British) : H.P
Rate (Rs) Amount
650.00 1 HP
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 39.21
19.50
(British) : H.P
Rate (Rs)
775.00 1
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 38.64
19.50
1,734.63 Cost Per H.P: 1,734.63
808.50 Cost Per H.P: 808.50
Spec. No :
Unit (British) : Each
Coil for Ampere meter
Rate (Rs)
250.00 1
TOTAL MATERIAL 39.54
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 40.96
19.50
(British) : Job
Each 3,500.00 1
TOTAL MATERIAL 62.50
Day 600.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 18.00
19.50
(British) : Job
Each 5,600.00 1
Day 600.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 16.68
19.50
Rate (Rs)
210.00 1
TOTAL MATERIAL 63.08
1,200.00 1
3.00
TOTAL LABOUR 17.42
19.50
Spec. No :
Unit (British) : Each
y size (Turbine/Submersible)
Rate (Rs)
4,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 12.12
19.50
Rate (Rs)
3,600.00 1
TOTAL MATERIAL 66.43
1,200.00 1
3.00
TOTAL LABOUR 14.07
19.50
Spec. No :
Unit (British) : Set
Rate (Rs)
320.00 1
TOTAL MATERIAL 56.36
1,200.00 1
3.00
TOTAL LABOUR 24.14
19.50
490.00 1
TOTAL MATERIAL 48.07
1,200.00 1
3.00
TOTAL LABOUR 32.43
19.50
Spec. No :
Unit (British) : Rft
Rate (Rs)
380.00 1
1,200.00 1
3.00
TOTAL LABOUR 33.00
19.50
13,800.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.20
19.50
Spec. No :
Unit (British) : No.
Rewinding of Voltage Regulator coil complete in all respect:
Rate (Rs)
4,450.00 1
1,200.00 1
3.00
TOTAL LABOUR 12.21
19.50
3,580.00 1
1,200.00 1
3.00
TOTAL LABOUR 14.12
19.50
Spec. No :
Unit (British) : Job
or point control machine
Rate (Rs)
3,580.00 1
1,200.00 1
3.00
TOTAL LABOUR 14.12
19.50
No 4,400.00
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Rs. 6,140.00
Rs. 882.00
Spec. No :
Unit (British) : No.
Rate (Rs)
1,450.00 1
TOTAL MATERIAL 51.79
1,200.00 1
3.00
TOTAL LABOUR 28.71
19.50
590.00 1
1,200.00 1
3.00
TOTAL LABOUR 21.12
19.50
Spec. No :
Unit (British) : No.
pipe socket 3" to 6" i/d
Rate (Rs)
1,350.00 1
1,200.00 1
3.00
TOTAL LABOUR 19.32
19.50
Spec. No :
Unit (British) : No.
Rate (Rs)
1,150.00 1
TOTAL MATERIAL 50.93
1,200.00 1
3.00
TOTAL LABOUR 29.57
19.50
Spec. No :
Unit (British) : No.
Rate (Rs)
500.00 1
1,200.00 1
3.00
TOTAL LABOUR 23.51
19.50
818.00 Cost Per No.: 818.00
220.50 Cost Per No.: 220.50
Spec. No :
Unit (British) : No.
Rate (Rs)
25.00 1
1,200.00 1
3.00
TOTAL LABOUR 36.67
19.50
Spec. No :
Unit (British) : No.
Rate (Rs)
65.00 1
TOTAL MATERIAL 58.17
1,200.00 1
3.00
TOTAL LABOUR 22.33
19.50
104.13 Cost Per No.: 104.13
26.46 Cost Per No.: 26.46
Spec. No :
Unit (British) : No.
Rate (Rs)
80.00 1
1,050.00 1
3.00
TOTAL LABOUR 63.69
19.50
Spec. No :
Unit (British) : No.
le motor thrust bearing and disc
Rate (Rs)
9,750.00 1
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.53
19.50
(British) : Job
Rate (Rs)
3,350.00 1
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 16.00
19.50
Spec. No :
Unit (British) : Job
Rate (Rs)
575.00 1
1,050.00 1
3.00
TOTAL LABOUR 23.73
19.50
Spec. No :
Unit (British) : Job
Rate (Rs)
550.00 1
TOTAL MATERIAL 54.58
1,050.00 1
3.00
TOTAL LABOUR 25.92
19.50
Spec. No :
Unit (British) : Pair
Rate (Rs)
100.00 1
TOTAL MATERIAL 59.62
600.00 1
3.00
TOTAL LABOUR 20.88
19.50
Spec. No :
Unit (British) : Job
Rate (Rs)
6,300.00 1
TOTAL MATERIAL 73.98
1,200.00 1
3.00
TOTAL LABOUR 6.52
19.50
Spec. No :
Unit (British) : Job
Rate (Rs)
7,820.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.95
19.50
Spec. No :
Unit (British) : Job
Rate (Rs)
15,700.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.94
19.50
Spec. No :
Unit (British) : Job
Rate (Rs)
3,025.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.99
19.50
Spec. No :
Unit (British) : Job
Rate (Rs)
3,750.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.81
19.50
Rate (Rs)
4,200.00 1
1,200.00 1
3.00
TOTAL LABOUR 15.92
19.50
Spec. No :
Unit (British) : No.
(HT) Bush for 25 to 50 KVA
Rate (Rs)
1,300.00 1
1,050.00 1
3.00
TOTAL LABOUR 17.09
19.50
1,550.00 1
1,200.00 1
3.00
TOTAL LABOUR 24.63
19.50
Spec. No :
Unit (British) : No.
er link of different KVS
Rate (Rs)
1,350.00 1
1,200.00 1
3.00
TOTAL LABOUR 19.32
19.50
1,150.00 1
1,200.00 1
3.00
TOTAL LABOUR 29.57
19.50
Spec. No :
Unit (British) : Liter
Rate (Rs)
175.00 1
TOTAL MATERIAL 52.36
1,200.00 1
3.00
TOTAL LABOUR 28.14
19.50
Rate (Rs)
500.00 1 LS
3,600.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 20.55
19.50
Spec. No :
Unit (British) : No.
Rate (Rs)
60.00 1
600.00 1
3.00
TOTAL LABOUR 23.51
19.50
Spec. No :
Unit (British) : Rft
Rate (Rs)
35.00 1
TOTAL MATERIAL 51.18
600.00 1
3.00
TOTAL LABOUR 29.32
19.50
Spec. No :
Unit (British) : No.
Rate (Rs)
1,100.00 1
1,200.00 1
3.00
TOTAL LABOUR 12.30
19.50
Spec. No :
Unit (British) : No.
Rate (Rs)
240.00 1
TOTAL MATERIAL 47.32
1,050.00 1
3.00
TOTAL LABOUR 33.18
19.50
Spec. No :
Unit (British) : Rft
Rate (Rs)
35.00 1
Spec. No :
Unit (British) : No.
Rate (Rs)
700.00 1
TOTAL MATERIAL 63.82
600.00 1
3.00
TOTAL LABOUR 16.68
19.50
Spec. No :
Unit (British) : No.
Rate (Rs)
1,480.00 1
TOTAL MATERIAL 70.37
600.00 1
3.00
TOTAL LABOUR 10.13
19.50
Spec. No :
Unit (British) : Job
column pipe of various size
Rate (Rs)
200.00 1
1,050.00 1
3.00
TOTAL LABOUR 63.92
19.50
(British) : Rft
Rate (Rs)
56.00 1
1,200.00 1
3.00
TOTAL LABOUR 34.11
19.50
(British) : Rft
Rate (Rs)
45.00 1
1,200.00 1
3.00
TOTAL LABOUR 38.26
19.50
Rate (Rs)
90.00 1
1,200.00 1
3.00
TOTAL LABOUR 38.23
19.50
(British) : Rft
Rate (Rs)
100.00 1
1,200.00 1
3.00
TOTAL LABOUR 36.21
19.50
Rate (Rs)
87.00 1
1,200.00 1
3.00
TOTAL LABOUR 38.88
19.50
(British) : Rft
Rate (Rs)
280.00 1
(British) : Rft
Rate (Rs)
205.00 1
TOTAL MATERIAL 50.03
1,200.00 1
3.00
TOTAL LABOUR 30.47
19.50
(British) : Rft
Rate (Rs)
155.00 1
TOTAL MATERIAL 44.90
1,200.00 1
3.00
TOTAL LABOUR 35.60
19.50
(British) : Hr
Rate (Rs)
350.00 1
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 37.53
19.50
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 80.50
19.50
6.1
(British) : Per Job
Rate (Rs)
1,200.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Rate (Rs)
9,900.00 1,000 No
TOTAL MATERIAL 16.72
1,200.00 1
600.00 1
3.00
TOTAL LABOUR 63.78
19.50
Spec. No :
Unit (British) : Each
Repairing corners of bridges & other hydraulic masonry works
Rate (Rs)
1,200.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Rate (Rs)
550.00 1
40.00 1
TOTAL MATERIAL 23.27
10.00 1
10.9
(British) : 100 Sft
Rate (Rs)
550.00 1
40.00 1
TOTAL MATERIAL 34.14
10.00 1
Spec. No :
Unit (British) : 100 Sft
nts of stone masonry (old work)
Rate (Rs)
600.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : 100 Sft
nts of brick masonry (old work)
Rate (Rs)
600.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Rate (Rs)
476.00 1
TOTAL MATERIAL 48.35
1,200.00 1
850.00 1
3.00
TOTAL LABOUR 32.15
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
550.00 1
2,600.00 100 Cft
3,438.00 100 Cft
TOTAL MATERIAL 25.37
1,200.00 1
600.00 1
3.00
TOTAL LABOUR 55.13
19.50
12.19.20
(British) : Each
Rate (Rs)
400.00 1
1.20 1
TOTAL MATERIAL 65.45
1,200.00 1
3.00
TOTAL LABOUR 15.05
19.50
12.19.20
(British) : Each
Rate (Rs)
280.00 1
1.20 1
TOTAL MATERIAL 61.40
1,200.00 1
3.00
TOTAL LABOUR 19.10
19.50
12.19.20
(British) : Each
Rate (Rs)
120.00 1
1.20 1
TOTAL MATERIAL 48.58
1,200.00 1
3.00
TOTAL LABOUR 31.92
19.50
12.19.20
(British) : Each
Rate (Rs)
30.00 1
0.80 1
TOTAL MATERIAL 24.56
1,200.00 1
3.00
TOTAL LABOUR 55.94
19.50
12.19.20
(British) : Each
Rate (Rs)
25.00 1
0.80 1
TOTAL MATERIAL 21.61
1,200.00 1
3.00
TOTAL LABOUR 58.89
19.50
Rate (Rs)
80.00 1
6.00 1
TOTAL MATERIAL 47.07
1,200.00 1
3.00
TOTAL LABOUR 33.43
19.50
12.19.20
(British) : Each
Rate (Rs)
60.00 1
6.00 1
TOTAL MATERIAL 42.27
1,200.00 1
3.00
TOTAL LABOUR 38.23
19.50
12.19.20
(British) : Each
Rate (Rs)
50.00 1
6.00 1
TOTAL MATERIAL 40.00
1,200.00 1
3.00
TOTAL LABOUR 40.50
19.50
12.19.20
(British) : Each
Rate (Rs)
120.00 1
1.20 1
TOTAL MATERIAL 23.08
1,200.00 1
3.00
TOTAL LABOUR 57.42
19.50
Spec. No :
Unit (British) : Each
Removing and Fixing new approved section hook and eye : Brass 6"
Rate (Rs)
600.00 1
TOTAL MATERIAL 68.89
1,200.00 1
3.00
TOTAL LABOUR 11.61
19.50
Spec. No :
Unit (British) : Each
Removing and Fixing new approved section hook and eye : Brass 4"
Rate (Rs)
350.00 1
TOTAL MATERIAL 63.82
1,200.00 1
3.00
TOTAL LABOUR 16.68
19.50
12.19.20
(British) : Each
Rate (Rs)
175.00 1
TOTAL MATERIAL 54.25
1,200.00 1
3.00
TOTAL LABOUR 26.25
19.50
Rate (Rs)
150.00 1
TOTAL MATERIAL 51.67
1,200.00 1
3.00
TOTAL LABOUR 28.83
19.50
Spec. No :
Unit (British) : Each
m door closer of approved quality
Rate (Rs)
2,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.69
19.50
Rate (Rs)
5,000.00 1
137.80 1
8.57 1
TOTAL MATERIAL 59.15
1,200.00 1
3.00
TOTAL LABOUR 21.35
19.50
Spec. No :
Unit (British) : Each
Removing & refixing cleats with brass hooks for roof ventilators
Rate (Rs)
5,000.00 1
137.80 1
182.00 1
TOTAL MATERIAL 58.88
1,200.00 1
3.00
TOTAL LABOUR 21.62
19.50
300.26 Cost Per Each: 300.26
73.50 Cost Per Each: 73.50
Spec. No : 12.2
Unit (British) : Each
or stops of 1.5" dia rubber block
Rate (Rs)
596.00 1
TOTAL MATERIAL 76.23
1,200.00 1
3.00
TOTAL LABOUR 4.27
19.50
Spec. No : 12.2
Unit (British) : Each
hook with clamps for doors
Rate (Rs)
148.00 1
TOTAL MATERIAL 75.84
1,200.00 1
3.00
TOTAL LABOUR 4.66
19.50
180.83 Cost Per Each: 180.83
3.97 Cost Per Each: 3.97
Spec. No : 12.1
Unit (British) : Each
Rate (Rs)
5,000.00 1
82.00 1
TOTAL MATERIAL 75.93
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.57
19.50
Spec. No : 4.1
Unit (British) : Rft
Rate (Rs)
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 80.50
19.50
36.82 Per Meter : Rs 120.78
36.82 Per Meter : Rs 120.78
Spec. No :
Unit (British) : 100 Sft
woodwork/steel with paint remover
Rate (Rs)
210.00 1
TOTAL MATERIAL 18.29
850.00 1
3.00
TOTAL LABOUR 62.21
19.50
Spec. No :
Unit (British) : 100 Sft
ters of old paints from woodwork
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No : 13.3
Unit (British) : 100 Sft
Burning off or rubbing down with pumice stone, old paint from wood work
Rate (Rs)
146.60 1
TOTAL MATERIAL 29.47
600.00 1
850.00 1
3.00
TOTAL LABOUR 51.03
19.50
165.00 1
TOTAL MATERIAL 16.72
600.00 1
3.00
TOTAL LABOUR 63.78
19.50
Spec. No :
Unit (British) : 100 Sft
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
289.00 1
TOTAL MATERIAL 51.73
600.00 1
3.00
TOTAL LABOUR 28.77
19.50
Spec. No :
Unit (British) : 100 Sft
paint from barrage headworks
Rate (Rs)
289.00 1
TOTAL MATERIAL 38.03
600.00 1
3.00
TOTAL LABOUR 42.47
19.50
Rate (Rs)
289.00 1
TOTAL MATERIAL 10.72
600.00 1
3.00
TOTAL LABOUR 69.78
19.50
Spec. No :
Unit (British) : 100 Sft
Rate (Rs)
289.00 1
TOTAL MATERIAL 8.33
600.00 1
3.00
TOTAL LABOUR 72.17
19.50
Rate (Rs)
289.00 1
TOTAL MATERIAL 15.04
600.00 1
3.00
TOTAL LABOUR 65.46
19.50
Spec. No :
Unit (British) : 100 Sft
r or rolled steel beams
Rate (Rs)
111.82 1
TOTAL MATERIAL 5.92
600.00 1
3.00
TOTAL LABOUR 74.58
19.50
130.00 1
401.22 1
TOTAL MATERIAL 7.86
600.00 1
3.00
TOTAL LABOUR 72.64
19.50
13.9
(British) : Job
Rate (Rs)
130.00 1
401.22 1
TOTAL MATERIAL 35.27
1,200.00 1
3.00
TOTAL LABOUR 45.23
19.50
Rate (Rs)
130.00 1
401.22 1
TOTAL MATERIAL 26.02
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 54.48
19.50
13.1 , 13.9
(British) : 100 RFT
Rate (Rs)
130.00 1
401.22 1
TOTAL MATERIAL 43.90
1,200.00 1
3.00
TOTAL LABOUR 36.60
19.50
13.1 , 13.9
(British) : 100 RFT
Rate (Rs)
130.00 1
401.22 1
TOTAL MATERIAL 41.25
1,200.00 1
3.00
TOTAL LABOUR 39.25
19.50
13.1 , 13.9
(British) : 100 RFT
Rate (Rs)
130.00 1
401.22 1
TOTAL MATERIAL 39.01
1,200.00 1
3.00
TOTAL LABOUR 41.49
19.50
13.1 , 13.9
(British) : Job
Rate (Rs)
130.00 1
401.22 1
TOTAL MATERIAL 57.14
1,200.00 1
3.00
TOTAL LABOUR 23.36
19.50
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
16.9
(British) : 100 Rft
550.00 1
2,600.00 100 Cft
TOTAL MATERIAL 13.82
1,200.00 1
600.00 1
600.00 1
600.00 1
3.00
TOTAL LABOUR 58.99
700.00 1
3.9.3
(British) : 100 Sft
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
3.9.3 , 16.4.7
(British) : 100 Sft
Rate (Rs) Amount
Day 600.00 1
3.00
TOTAL LABOUR 22.79
Hour 1,210.00 1
Hour 400.00 1
Hour 471.80 1
TOTAL EQUIPMENT 5.33
19.50
3.9.3 , 16.4.7
(British) : 100 Sft
Day 600.00 1
3.00
TOTAL LABOUR 19.28
Hour 1,210.00 1
Hour 400.00 1
Hour 471.80 1
TOTAL EQUIPMENT 5.46
19.50
3.9.3 , 16.4.7
(British) : 100 Sft
Cft 3,438.00
Kg 85.50 1
No 112.00 1
Cft 70.00
TOTAL MATERIAL 54.15
Day 600.00 1
3.00
TOTAL LABOUR 18.95
Hour 1,210.00 1
Hour 400.00 1
Hour 471.80 1
TOTAL EQUIPMENT 7.39
19.50
3.9.3
(British) : 100 Sft
Rate (Rs)
9.14 1
165.00 1
TOTAL MATERIAL 23.93
600.00 1
850.00 1
3.00
TOTAL LABOUR 56.57
19.50
3.9.3
(British) : 100 Sft
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
16.9
(British) : 100 Sft
18.38 1 Kg
112.00 1 No
3,100.00 100 Cft
70.18 1 Kg
600.00 1
600.00 1
3.00
TOTAL LABOUR 32.35
19.50
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : kg
: With plastic cane.
Rate (Rs)
310.00 1
TOTAL MATERIAL 12.58
1,000.00 1
3.00
TOTAL LABOUR 67.92
19.50
750.00 1
TOTAL MATERIAL 62.32
1,000.00 1
3.00
TOTAL LABOUR 18.18
19.50
4.1
(British) : Ton
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Rate (Rs)
5,000.00 1
137.80 1
179.00 1
TOTAL MATERIAL 68.75
1,200.00 1
3.00
TOTAL LABOUR 11.75
19.50
12.25.1.3
(British) : Sft
Rate (Rs)
5,000.00 1
137.80 1
132.00 1
494.00 1
TOTAL MATERIAL 70.91
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.59
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : Cft
ncluding disposal of waste
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
13.1.5
(British) : Sft
Rate (Rs)
556.74 1
TOTAL MATERIAL 52.02
1,200.00 1
3.00
TOTAL LABOUR 28.48
19.50
12.15
(British) : Each
Rate (Rs)
132.00 1
53.00 1
TOTAL MATERIAL 46.73
1,200.00 1
3.00
TOTAL LABOUR 33.77
19.50
12.2 , 12.14
(British) : Sft
Rate (Rs)
5,000.00 1
137.80 1
179.00 1
TOTAL MATERIAL 62.89
1,200.00 1
3.00
TOTAL LABOUR 17.61
19.50
Rate (Rs)
60.00 1
TOTAL MATERIAL 31.00
1,200.00 1
3.00
TOTAL LABOUR 49.50
19.50
4.1 ,12.12
(British) : Sft
Rate (Rs)
26.40 1
TOTAL MATERIAL 17.58
1,200.00 1
3.00
TOTAL LABOUR 62.92
19.50
Rate (Rs)
20.00 1
TOTAL MATERIAL 14.09
1,200.00 1
3.00
TOTAL LABOUR 66.41
19.50
12.28
(British) : Rft
Rate (Rs)
137.80 1
20.33 1
346.00 1
556.74 1
TOTAL MATERIAL 42.29
1,200.00 1
1,200.00 1
3.00
TOTAL LABOUR 38.21
19.50
Spec. No : 12.26
Unit (British) : Each
of aluminium windows
Unit Rate (Rs)
Day 600.00 2
Day 1,200.00 1
3.00
TOTAL LABOUR 80.50
19.50
12.26
(British) : Sft
Rate (Rs)
132.00 1
231.00 1
53.00 1
TOTAL MATERIAL 58.81
1,200.00 1
3.00
TOTAL LABOUR 21.69
19.50
12.25.1.3
(British) : Sft
Rate (Rs)
19.12 1
137.80 1
132.00 1
494.00 1
62.00 1
TOTAL MATERIAL 10.78
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 69.72
19.50
Rate (Rs)
132.00 1
100.00 1
80.00 1
21.18 1
TOTAL MATERIAL 59.70
600.00 1
850.00 1
3.00
TOTAL LABOUR 20.80
19.50
Spec. No :
Unit (British) : Sft
Rate (Rs)
118.40 1
5,000.00 1
137.80 1
132.00 1
494.00 1
26.07 1
37.00 1
150.00 1
64.00 1
80.00 1
TOTAL MATERIAL 43.39
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 37.11
19.50
Spec. No :
Unit (British) :
Day 600.00
Day 600.00
TOTAL LABOUR
Hour 1,245.26
Hour 3,828.00
Hour 1,758.00
Hour 1,500.00
Hour 625.00
Hour 1,500.00
Hour 3,200.00
Rate (Rs)
5,000.00 1
48.95 1
137.80 1
217.50 1
182.00 1
TOTAL MATERIAL 50.54
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 29.96
19.50
11.1.2.4
(British) : 100 Sft
Rate (Rs)
600.00 100 Sft
20,844.72 100 Cft
1,200.00 1
600.00 1
600.00 1
3.00
TOTAL LABOUR 51.14
19.50
12.2.1.5,
12.2.1.7,
(British) : Each 12.2.1.8,
12.2.1.9
xisting opening including embedding chowkat in
Rate (Rs)
550.00 1
2,600.00 100 Cft
3,438.00 100 Cft
TOTAL MATERIAL 60.38
1,200.00 1
600.00 1
3.00
TOTAL LABOUR 20.12
19.50
237.98 Cost Per Each: 237.98
53.58 Cost Per Each: 53.58
4.5.6, 4.4.5
(British) : Sft
Rate (Rs)
1,200.00 1
600.00 1
3.00
TOTAL LABOUR 77.68
19.50
12.4.1.3
(British) : Cft
Rate (Rs)
5,000.00 1
556.74 1
TOTAL MATERIAL 74.67
600.00 1
1,200.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.83
19.50
11.2.2
(British) : 100 Sft
600.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
11.8.2
(British) : Sft
346.00 1
TOTAL MATERIAL 50.26
600.00 1
3.00
TOTAL LABOUR 30.24
19.50
13.9
(British) : Sft
Ltr 401.22 1
TOTAL MATERIAL 17.44
Day 600.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 63.06
19.50
12.19.26
(British) : Rft
Rate (Rs)
5,000.00 1
TOTAL MATERIAL 61.44
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 19.06
19.50
12.19.26
(British) : Rft
Rate (Rs)
0.75 1
50.00 1
80.00 1
TOTAL MATERIAL 69.79
1,200.00 1
3.00
TOTAL LABOUR 10.71
19.50
Rate (Rs)
6.00 1
50.00 1
80.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.25
19.50
12.19.26
(British) : Rft
6.00 1
155.00 1
24.00 1
200.00 1
4.31 1
250.00 1
TOTAL MATERIAL 71.92
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.58
19.50
12.19.26
(British) : Rft
Rate (Rs)
6.00 1
155.00 1
24.00 1
200.00 1
4.31 1
250.00 1
TOTAL MATERIAL 71.92
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.58
19.50
Rate (Rs)
132.00 1
375.00 1
TOTAL MATERIAL 43.62
1,200.00 1
3.00
TOTAL LABOUR 36.88
19.50
12.18
(British) : Each
Rate (Rs)
132.00 1
1,200.00 1
TOTAL MATERIAL 62.36
1,200.00 1
3.00
TOTAL LABOUR 18.14
19.50
1,844.52 Cost Per Each: 1,844.52
367.50 Cost Per Each: 367.50
12.18
(British) : Each
Rate (Rs)
132.00 1
2,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 12.85
19.50
12.2.1.14
(British) : Each
Rate (Rs)
132.00 1
5,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.09
19.50
12.19.18
(British) : Each
Rate (Rs)
132.00 1
375.00 1
TOTAL MATERIAL 55.82
1,200.00 1
3.00
TOTAL LABOUR 24.68
19.50
Rate (Rs)
155.00 1
1.20 1
TOTAL MATERIAL 45.75
1,200.00 1
3.00
TOTAL LABOUR 34.75
19.50
12.19.25
(British) : Each
Rate (Rs)
300.00 1
0.75 1
TOTAL MATERIAL 56.58
1,200.00 1
3.00
TOTAL LABOUR 23.92
19.50
12.19.6
(British) : Each
Rate (Rs)
430.00 1 No
1.20 1 No
1,200.00 1
3.00
TOTAL LABOUR 17.04
19.50
12.19.6
(British) : Each
Rate (Rs)
625.00 1 No
1.20 1 No
1,200.00 1
3.00
TOTAL LABOUR 15.30
19.50
12.19.6
(British) : Each
Rate (Rs)
0.80 1
195.00 1
1,200.00 1
3.00
TOTAL LABOUR 28.22
19.50
Rate (Rs)
0.80 1
245.00 1
1,200.00 1
3.00
TOTAL LABOUR 27.99
19.50
12.19.7
(British) : Each
Rate (Rs)
0.75 1
8.57 1
TOTAL MATERIAL 11.00
1,200.00 1
3.00
TOTAL LABOUR 69.50
19.50
426.77 Cost Per Each: 426.77
367.50 Cost Per Each: 367.50
12.19.7
(British) : Each
Rate (Rs)
17.14 1
0.80 1
TOTAL MATERIAL 18.32
1,200.00 1
3.00
TOTAL LABOUR 62.18
19.50
12.19.5
(British) : Each
Rate (Rs)
125.00 1 No
4.80 1 No
1,200.00 1
3.00
TOTAL LABOUR 28.59
19.50
12.19.5
(British) : Each
Rate (Rs)
4.80 1
350.00 1
1,200.00 1
3.00
TOTAL LABOUR 15.04
19.50
Rate (Rs)
60.00 1 No
1.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 46.06
19.50
12.19.5
(British) : Each
Rate (Rs)
1.00 1
50.00 1
1,200.00 1
3.00
TOTAL LABOUR 45.43
19.50
12.19.8
(British) : Each
Rate (Rs)
1.00 1
80.00 1
TOTAL MATERIAL 41.40
1,200.00 1
3.00
TOTAL LABOUR 39.10
19.50
12.19.8
(British) : Each
Rate (Rs)
1.00 1
70.00 1
TOTAL MATERIAL 35.48
1,200.00 1
3.00
TOTAL LABOUR 45.02
19.50
12.19.8
(British) : Each
Rate (Rs)
1.00 1
50.00 1
TOTAL MATERIAL 29.73
1,200.00 1
3.00
TOTAL LABOUR 50.77
19.50
Rate (Rs)
0.75 1
50.00 1
TOTAL MATERIAL 32.62
1,200.00 1
3.00
TOTAL LABOUR 47.88
19.50
12.19.10
(British) : Each
Rate (Rs)
0.75 1
80.00 1
TOTAL MATERIAL 41.40
1,200.00 1
3.00
TOTAL LABOUR 39.10
19.50
12.19.10
(British) : Each
Rate (Rs)
0.75 1
120.00 1
TOTAL MATERIAL 49.01
1,200.00 1
3.00
TOTAL LABOUR 31.49
19.50
12.19.10
(British) : Each
Rate (Rs)
0.75 1
280.00 1
TOTAL MATERIAL 61.33
1,200.00 1
3.00
TOTAL LABOUR 19.17
19.50
12.19.10
(British) : Each
Rate (Rs)
0.75 1
340.00 1
TOTAL MATERIAL 63.69
1,200.00 1
3.00
TOTAL LABOUR 16.81
19.50
12.19.10
(British) : Each
Rate (Rs)
0.75 1
500.00 1
TOTAL MATERIAL 67.55
1,200.00 1
3.00
TOTAL LABOUR 12.95
19.50
12.19.10
(British) : Each
Rate (Rs)
0.75 1
60.00 1
TOTAL MATERIAL 35.83
1,200.00 1
3.00
TOTAL LABOUR 44.67
19.50
Rate (Rs)
0.75 1
80.00 1
TOTAL MATERIAL 41.06
1,200.00 1
3.00
TOTAL LABOUR 39.44
19.50
12.19.10
(British) : Each
Rate (Rs)
0.75 1
120.00 1
TOTAL MATERIAL 48.36
1,200.00 1
3.00
TOTAL LABOUR 32.14
19.50
12.19.18
(British) : Each
Rate (Rs)
0.75 1
350.00 1
TOTAL MATERIAL 63.99
1,200.00 1
3.00
TOTAL LABOUR 16.51
19.50
12.19.18
(British) : Each
Rate (Rs)
0.75 1
280.00 1
TOTAL MATERIAL 61.37
1,200.00 1
3.00
TOTAL LABOUR 19.13
19.50
12.19.18
(British) : Each
Rate (Rs)
0.75 1
200.00 1
TOTAL MATERIAL 56.76
1,200.00 1
3.00
TOTAL LABOUR 23.74
19.50
Rate (Rs)
0.75 1
180.00 1
TOTAL MATERIAL 55.17
1,200.00 1
3.00
TOTAL LABOUR 25.33
19.50
12.19.18
(British) : Each
Rate (Rs)
0.80 1
40.00 1
TOTAL MATERIAL 29.30
1,200.00 1
3.00
TOTAL LABOUR 51.20
19.50
12.19.18
(British) : Each
Rate (Rs)
0.80 1
35.00 1
TOTAL MATERIAL 27.22
1,200.00 1
3.00
TOTAL LABOUR 53.28
19.50
12.19.18
(British) : Each
Rate (Rs)
0.80 1
30.00 1
TOTAL MATERIAL 24.95
1,200.00 1
3.00
TOTAL LABOUR 55.55
19.50
12.19.18
(British) : Each
Rate (Rs)
0.80 1
25.00 1
TOTAL MATERIAL 22.46
1,200.00 1
3.00
TOTAL LABOUR 58.04
19.50
12.19.18
(British) : Each
Rate (Rs) Amount
80.00 1
6.00 1
TOTAL MATERIAL 47.07
1,200.00 1
3.00
TOTAL LABOUR 33.43
19.50
12.19.18
(British) : Each
6.00 1
70.00 1
TOTAL MATERIAL 45.39
1,200.00 1
3.00
TOTAL LABOUR 35.11
19.50
12.19.18
(British) : Each
6.00 1
60.00 1
TOTAL MATERIAL 43.51
1,200.00 1
3.00
TOTAL LABOUR 36.99
19.50
12.19.18
(British) : Each
1,200.00 1
3.00
TOTAL LABOUR 39.10
19.50
Spec. No :
Unit (British) : Job
Rate (Rs)
500.00 1
1,200.00 1
3.00
TOTAL LABOUR 32.06
19.50
Spec. No :
Unit (British) : Job
Gas charging for 2.0 Ton Split AC with R410 or equivalent gas
Rate (Rs)
4,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.41
19.50
Spec. No :
Unit (British) : Job
Rate (Rs)
400.00 1
1,200.00 1
3.00
TOTAL LABOUR 36.21
19.50
Rate (Rs)
600.00 1
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 49.50
19.50
Spec. No :
Unit (British) : Job
Supply and Replacement of compressor for 1.5 Ton Split AC
Rate (Rs)
13,000.00 1
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.94
19.50
16,000.00 1
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 7.90
19.50
Spec. No :
Unit (British) : Job
Supply and Replacement of compressor for 1.5 T Window AC
Rate (Rs)
13,000.00 1
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.02
19.50
16,000.00 1
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 7.13
19.50
Spec. No :
Unit (British) : Job
pressor for Electric Water Cooler
Rate (Rs)
9,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.37
19.50
11,720.00 Cost Per job: 11,720.00
367.50 Cost Per job: 367.50
Spec. No :
Unit (British) : Job
Gas charging for 1.5 Ton Split AC with R410 or equivalent gas
Rate (Rs)
3,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.12
19.50
Spec. No :
Unit (British) : Job
Gas changing for 1.5 Ton Window AC with R410 or equivalent gas
Rate (Rs)
3,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.12
19.50
Spec. No :
Unit (British) : Job
Gas changing for 2.0 Ton Window AC with R410 or equivalent gas
Rate (Rs)
4,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.41
19.50
Spec. No :
Unit (British) : Job
Gas charging for Electric Water Cooler with R410 or equivalent gas
Rate (Rs)
3,500.00 1
Spec. No :
Unit (British) : Job
Gas charging for floor stand AC unit with R410 or equivalent gas
Rate (Rs)
4,000.00 1
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.40
19.50
Spec. No :
Unit (British) : Job
Repairing of PC Circuit Board complete for Split AC unit
Unit Rate (Rs)
1 No 3,500.00 1
TOTAL MATERIAL 70.27
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.23
19.50
Spec. No :
Unit (British) : Job
Supply and replacement of PC Circuit Board complete for Split AC unit
Rate (Rs)
3,000.00 1
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.30
19.50
900.00 1
TOTAL MATERIAL 55.36
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 25.14
19.50
Spec. No :
Unit (British) : Job
of running capacitor
Rate (Rs)
500.00 1
TOTAL MATERIAL 52.36
1,200.00 1
3.00
TOTAL LABOUR 28.14
19.50
300.00 1
1,200.00 1
3.00
TOTAL LABOUR 25.14
19.50
Spec. No :
Unit (British) : No
Remote Control for Split AC unit
Rate (Rs)
1,500.00 1
Spec. No :
Unit (British) : Job
Supply and fixing of drain pipe flexible for outdoor unit of split AC
Rate (Rs)
30.00 1
1,200.00 1
3.00
TOTAL LABOUR 54.67
19.50
Spec. No :
Unit (British) : Job
motor for outdoor unit of split AC
Rate (Rs)
1,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 13.69
19.50
1,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.30
19.50
Spec. No :
Unit (British) : Job
motor for Electric Water Cooler
Rate (Rs)
1,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.30
19.50
1,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.30
19.50
Spec. No :
Unit (British) : Job
/76 - 3 core wire for split AC
Rate (Rs)
80.00 1
1,200.00 1
3.00
TOTAL LABOUR 27.05
19.50
Rate (Rs)
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : Job
Rate (Rs)
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 80.50
19.50
Rate (Rs)
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : Job
Rate (Rs)
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : Job
ontact relay for split AC complete
Rate (Rs)
3,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.57
19.50
16.8.16
(British) : Each
Rate (Rs)
83.00 1
9.14 1
186.00 1
TOTAL MATERIAL 60.77
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 19.73
19.50
1,333.33 1
TOTAL MATERIAL 70.07
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.43
19.50
Spec. No :
Unit (British) : 100 No.
Supplying wooden pegs for alignment, 2" to 3" square, 9" long
Rate (Rs)
1,333.33 1
TOTAL MATERIAL 70.40
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.10
19.50
23.00 1
TOTAL MATERIAL 10.27
1,200.00 1
600.00 1
3.00
TOTAL LABOUR 70.23
19.50
Spec. No :
Unit (British) : Each
Supply & fix boundry pillars in position, including digging pits
Rate (Rs)
550.00 1
2,600.00 100 Cft
3,438.00 100 Cft
TOTAL MATERIAL 24.72
600.00 1
3.00
TOTAL LABOUR 55.78
19.50
Rate (Rs)
550.00 1
2,600.00 100 Cft
3,438.00 100 Cft
110.00 1
129.00 1
130.00 1
TOTAL MATERIAL 49.01
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 31.49
19.50
Spec. No :
Unit (British) : Rft
a pressure pipe in ordinary soil
Rate (Rs)
600.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : Rft
pressure pipe in clay
Rate (Rs)
600.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : Rft
a pressure pipe in shingle
Rate (Rs)
600.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
328.18 Per Meter : Rs 1,076.42
328.18 Per Meter : Rs 1,076.42
Spec. No :
Unit (British) : Each
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : 100 Sft
Rate (Rs)
100.00 1
TOTAL MATERIAL 8.16
850.00 1
3.00
TOTAL LABOUR 72.34
19.50
Rate (Rs)
100.00 1
TOTAL MATERIAL 9.29
850.00 1
3.00
TOTAL LABOUR 71.21
19.50
Spec. No :
Unit (British) : Each
Napkins / Dusters etc
Rate (Rs)
100.00 1
TOTAL MATERIAL 12.20
850.00 1
3.00
TOTAL LABOUR 68.30
19.50
Rate (Rs)
47.00 1
TOTAL MATERIAL 39.28
600.00 1
3.00
TOTAL LABOUR 41.22
19.50
Spec. No :
Unit (British) : Per Gallon
per gallon capacity
Unit Rate (Rs)
kg 100.00 1
Ltr 40.00 1
TOTAL MATERIAL 57.57
Day 600.00 1
3.00
TOTAL LABOUR 22.93
19.50
(British) : Each
Rate (Rs)
80.00 1
TOTAL MATERIAL 14.01
600.00 1
3.00
TOTAL LABOUR 66.49
19.50
Spec. No :
Unit (British) : 100 Cft
Rate (Rs)
11.00 1
TOTAL MATERIAL 63.62
600.00 1
3.00
TOTAL LABOUR 16.88
19.50
3.11
(British) : per spray
Rate (Rs)
2,000.00 1
850.00 1
3.00
TOTAL LABOUR 6.16
85.00 1
3.11.4
(British) : 100 Sft
Rate (Rs)
7.00 1
850.00 1
3.00
TOTAL LABOUR 4.58
85.00 1
3.11.4
(British) : 100 Sft
9.00 1
850.00 1
3.00
TOTAL LABOUR 4.24
85.00 1
TOTAL EQUIPMENT 0.99
19.50
16.8.11
(British) : Rft
Rate (Rs)
120.00 1 Kg
167.00 1 Kg
91.60 1 Doz
40.00 1 Kg
27,789.20 100 Cft
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 56.95
19.50
Rate (Rs)
120.00 1 Kg
167.00 1 Kg
91.60 1 Doz
40.00 1 Kg
27,789.20 100 Cft
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 52.43
19.50
(British) : Sft
Rate (Rs) Amount
56.82 1
850.00 1
3.00
TOTAL LABOUR 17.20
19.50
Spec. No :
Unit (British) : 100 Sft
Making notice board 1/2" thick of c/s mortar 1:3 with 2"x1/2" beading
Rate (Rs)
550.00 1
2,600.00 100 Cft
TOTAL MATERIAL 30.64
1,200.00 1
600.00 1
3.00
TOTAL LABOUR 49.86
19.50
Rate (Rs)
55.00 1
56.00 1
57.00 1
TOTAL MATERIAL 62.60
800.00 1
3.00
TOTAL LABOUR 17.90
19.50
Spec. No :
Unit (British) : Per Cut
Rate (Rs)
1,200.00 1
3.00
TOTAL LABOUR 80.50
19.50
Days 1,200.00 1
3.00
TOTAL LABOUR 80.50
19.50
7.17
(British) : 100 Sft
Rate (Rs)
3.23 1
TOTAL MATERIAL 33.31
600.00 1
3.00
TOTAL LABOUR 47.19
19.50
Rate (Rs)
550.00 1
2,600.00 1
1,600.00 1
60.00 1
90.00 1
8.40 1
240.00 1
TOTAL MATERIAL 65.88
1,200.00 1
600.00 1
630.00 1
3.00
TOTAL LABOUR 14.62
19.50
Rate (Rs)
130.00 1
508.00 1
TOTAL MATERIAL 43.05
1,200.00 1
3.00
TOTAL LABOUR 37.45
19.50
(British) : Each
Rate (Rs)
550.00 1
2,600.00 1
120.00 1
TOTAL MATERIAL 24.24
1,200.00 1
600.00 1
850.00 1
3.00
TOTAL LABOUR 13.19
800.00 1
TOTAL EQUIPMENT 43.07
19.50
6,040.52 Cost Per Each: 6,040.52
811.56 Cost Per Each: 811.56
(British) : Each
Rate (Rs)
550.00 1
2,600.00 1
120.00 1
TOTAL MATERIAL 22.89
1,200.00 1
600.00 1
850.00 1
3.00
TOTAL LABOUR 14.83
800.00 1
TOTAL EQUIPMENT 42.77
19.50
Rate (Rs)
600.00 1
600.00 1
3.00
TOTAL LABOUR 13.69
2,250.00 1
(British) : Rft
Rate (Rs)
600.00 1
600.00 1
3.00
TOTAL LABOUR 18.00
2,250.00 1
(British) : Rft
Rate (Rs)
600.00 1
600.00 1
3.00
TOTAL LABOUR 11.30
3,000.00 1
(British) : Rft
Rate (Rs)
600.00 1
600.00 1
3.00
TOTAL LABOUR 11.51
3,500.00 1
(British) : Rft
Rate (Rs)
600.00 1
600.00 1
3.00
TOTAL LABOUR 11.83
3,500.00 1
TOTAL EQUIPMENT 68.67
19.50
(British) : Acre
Rate (Rs)
850.00 1
2,500.00 1
5,000.00 1
3.00
TOTAL LABOUR 59.94
5,000.00 1
78,000.00
% 78,000.00
Day 1,920.00
Day 1,360.00
Day 1,920.00
Day 1,920.00
% 213.60
% 7,333.60
% 16,598.40
Amount
55,000.00
% 55,000.00
Day 1,680.00
Day 1,190.00
Day 1,680.00
Day 1,680.00
% 186.90
% 6,416.90
% 11,939.85
Amount
44,600.00
% 44,600.00
Day 1,440.00
Day 1,020.00
Day 1,440.00
Day 1,440.00
% 160.20
% 5,500.20
% 9,738.30
Amount
38,500.00
% 38,500.00
Day 960.00
Day 680.00
Day 960.00
Day 960.00
% 106.80
% 3,666.80
% 8,201.70
Amount
37,000.00
% 37,000.00
Day 720.00
Day 510.00
Day 720.00
Day 720.00
% 80.10
% 2,750.10
% 7,735.65
Amount
34,500.00
% 34,500.00
Day 480.00
Day 340.00
Day 480.00
Day 480.00
% 53.40
% 1,833.40
% 7,074.60
Amount
315,000.00
% 315,000.00
Day 2,400.00
Day 2,400.00
Day 1,700.00
Day 2,400.00
% 267.00
% 9,167.00
% 63,160.50
Amount
294,000.00
% 294,000.00
Day 2,160.00
Day 2,160.00
Day 1,530.00
Day 2,160.00
% 240.30
% 8,250.30
% 58,891.95
Amount
262,000.00
% 262,000.00
Day 1,920.00
Day 1,920.00
Day 1,360.00
Day 1,920.00
% 213.60
% 7,333.60
% 52,478.40
Amount
174,000.00
% 174,000.00
Day 1,680.00
Day 1,680.00
Day 1,190.00
Day 1,680.00
% 186.90
% 6,416.90
% 35,144.85
Amount
169,000.00
% 169,000.00
Day 1,440.00
Day 1,440.00
Day 1,020.00
Day 1,440.00
% 160.20
% 5,500.20
% 33,996.30
Amount
161,000.00
% 161,000.00
Day 960.00
Day 960.00
Day 680.00
Day 960.00
% 106.80
% 3,666.80
% 32,089.20
Amount
157,000.00
% 157,000.00
Day 480.00
Day 480.00
Day 340.00
Day 480.00
% 53.40
% 1,833.40
% 30,962.10
Amount
213,000.00
% 213,000.00
Day 2,280.00
Day 2,280.00
Day 1,615.00
Day 2,280.00
% 253.65
% 8,708.65
% 43,183.73
Amount
207,000.00
% 207,000.00
Day 2,160.00
Day 2,160.00
Day 1,530.00
Day 2,160.00
% 240.30
% 8,250.30
% 41,926.95
Amount
190,000.00
% 190,000.00
Day 1,920.00
Day 1,920.00
Day 1,360.00
Day 1,920.00
% 213.60
% 7,333.60
% 38,438.40
Amount
176,000.00
% 176,000.00
Day 1,680.00
Day 1,680.00
Day 1,190.00
Day 1,680.00
% 186.90
% 6,416.90
% 35,534.85
Amount
163,500.00
% 163,500.00
Day 1,440.00
Day 1,440.00
Day 1,020.00
Day 1,440.00
% 160.20
% 5,500.20
% 32,923.80
Amount
155,000.00
% 155,000.00
Day 960.00
Day 960.00
Day 680.00
Day 960.00
% 106.80
% 3,666.80
% 30,919.20
Amount
152,000.00
% 152,000.00
Day 720.00
Day 720.00
Day 510.00
Day 720.00
% 80.10
% 2,750.10
% 30,160.65
Amount
148,000.00
% 148,000.00
Day 480.00
Day 480.00
Day 340.00
Day 480.00
% 53.40
% 1,833.40
% 29,207.10
Amount
325,000.00
% 325,000.00
Day 2,400.00
Day 2,400.00
Day 1,700.00
Day 2,400.00
% 267.00
% 9,167.00
% 65,110.50
Amount
320,000.00
% 320,000.00
Day 2,160.00
Day 2,160.00
Day 1,530.00
Day 2,160.00
% 240.30
% 8,250.30
% 63,961.95
Amount
270,000.00
% 270,000.00
Day 1,920.00
Day 1,920.00
Day 1,360.00
Day 1,920.00
% 213.60
% 7,333.60
% 54,038.40
Amount
164,000.00
% 164,000.00
Day 1,680.00
Day 1,680.00
Day 1,190.00
Day 1,680.00
% 186.90
% 6,416.90
% 33,194.85
Amount
152,000.00
% 152,000.00
Day 1,440.00
Day 1,440.00
Day 1,020.00
Day 1,440.00
% 160.20
% 5,500.20
% 30,681.30
Amount
150,000.00
% 150,000.00
Day 960.00
Day 960.00
Day 680.00
Day 960.00
% 106.80
% 3,666.80
% 29,944.20
Amount
147,000.00
% 147,000.00
Day 480.00
Day 480.00
Day 340.00
Day 480.00
% 53.40
% 1,833.40
% 29,012.10
Amount
227,000.00
% 227,000.00
Day 2,280.00
Day 2,280.00
Day 1,615.00
Day 2,280.00
% 253.65
% 8,708.65
% 45,913.73
Amount
215,000.00
% 215,000.00
Day 2,160.00
Day 2,160.00
Day 1,530.00
Day 2,160.00
% 240.30
% 8,250.30
% 43,486.95
Amount
190,000.00
% 190,000.00
Day 1,920.00
Day 1,920.00
Day 1,360.00
Day 1,920.00
% 213.60
% 7,333.60
% 38,438.40
Amount
151,000.00
% 151,000.00
Day 1,680.00
Day 1,680.00
Day 1,190.00
Day 1,680.00
% 186.90
% 6,416.90
% 30,659.85
Amount
145,000.00
% 145,000.00
Day 1,440.00
Day 1,440.00
Day 1,020.00
Day 1,440.00
% 160.20
% 5,500.20
% 29,316.30
Amount
141,000.00
% 141,000.00
Day 960.00
Day 960.00
Day 680.00
Day 960.00
% 106.80
% 3,666.80
% 28,189.20
Amount
138,000.00
% 138,000.00
Day 480.00
Day 480.00
Day 340.00
Day 480.00
% 53.40
% 1,833.40
% 27,257.10
Amount
135,000.00
% 135,000.00
Day 480.00
Day 480.00
Day 340.00
Day 480.00
% 53.40
% 1,833.40
% 26,672.10
Amount
404,000.00
% 404,000.00
Day 2,640.00
Day 2,640.00
Day 1,870.00
Day 2,640.00
% 293.70
% 10,083.70
% 80,689.05
Amount
397,000.00
% 397,000.00
Day 2,520.00
Day 2,520.00
Day 1,785.00
Day 2,520.00
% 280.35
% 9,625.35
% 79,237.27
Amount
349,000.00
% 349,000.00
Day 2,280.00
Day 2,280.00
Day 1,615.00
Day 2,280.00
% 253.65
% 8,708.65
% 69,703.73
Amount
220,000.00
% 220,000.00
Day 2,040.00
Day 2,040.00
Day 1,445.00
Day 2,040.00
% 226.95
% 7,791.95
% 44,375.18
Amount
209,000.00
% 209,000.00
Day 1,440.00
Day 1,440.00
Day 1,020.00
Day 1,440.00
% 160.20
% 5,500.20
% 41,796.30
Amount
198,000.00
% 198,000.00
Day 960.00
Day 960.00
Day 680.00
Day 960.00
% 106.80
% 3,666.80
% 39,304.20
Amount
193,000.00
% 193,000.00
Day 480.00
Day 480.00
Day 340.00
Day 480.00
% 53.40
% 1,833.40
% 37,982.10
Amount
304,000.00
% 304,000.00
Day 2,400.00
Day 1,500.00
Day 1,700.00
Day 2,400.00
% 240.00
% 8,240.00
% 60,840.00
Amount
295,000.00
% 295,000.00
Day 2,160.00
Day 2,160.00
Day 1,530.00
Day 2,160.00
% 240.30
% 8,250.30
% 59,086.95
Amount
265,000.00
% 265,000.00
Day 1,920.00
Day 1,920.00
Day 1,360.00
Day 1,920.00
% 213.60
% 7,333.60
% 53,063.40
Amount
216,000.00
% 216,000.00
Day 1,680.00
Day 1,680.00
Day 1,190.00
Day 1,680.00
% 186.90
% 6,416.90
% 43,334.85
Amount
196,000.00
% 196,000.00
Day 1,440.00
Day 1,440.00
Day 1,020.00
Day 1,440.00
% 160.20
% 5,500.20
% 39,261.30
Amount
178,000.00
% 178,000.00
Day 1,200.00
Day 1,200.00
Day 850.00
Day 1,200.00
% 133.50
% 4,583.50
% 35,577.75
Amount
174,000.00
% 174,000.00
Day 960.00
Day 960.00
Day 680.00
Day 960.00
% 106.80
% 3,666.80
% 34,624.20
Amount
170,000.00
% 170,000.00
Day 480.00
Day 480.00
Day 340.00
Day 480.00
% 53.40
% 1,833.40
% 33,497.10
25.3 , 25.4
Amount
Day 13.80
Day 2.81
Day 1.98
% 0.56
% 19.14
% 3.62
25.3 , 25.4
Amount
Day 4.80
Day 0.68
Day 0.48
% 0.18
% 6.14
% 1.16
Amount
Day 36.00
Day 8.50
Day 6.00
% 1.52
% 52.02
% 9.85
25.3 , 25.4
Amount
Day 4,500.00
Day 300.00
% 144.00
% 4,944.00
% 936.00
25.3 , 25.4
Amount
Day 300.00
Day 262.50
% 16.88
% 579.38
% 109.69
25.3 , 25.4
Amount
Day 510.00
% 15.30
% 525.30
% 99.45
Amount
Day 45.00
Day 3.00
Day 15.00
% 1.89
% 64.89
% 12.29
Amount
Day 6.90
Day 0.48
% 0.22
% 7.60
% 1.44
Amount
Kg 110,000.00
% 110,000.00
Day 48,000.00
Day 4,800.00
% 1,584.00
% 54,384.00
% 31,746.00
Amount
Pkt 928.20
Kg 110,000.00
% 110,928.20
Day 3,000.00
Day 5,250.00
% 247.50
% 8,497.50
% 23,239.75
Amount
Day 3,809.40
Day 4,761.75
% 257.13
% 8,828.28
% 1,671.37
Amount
Day 4.80
Day 8.40
% 0.40
% 13.60
% 2.57
25.3 , 25.4
Amount
Day 9,120.00
Day 3,360.00
% 374.40
% 12,854.40
% 2,433.60
Amount
Day 696.00
Day 42.00
% 22.14
% 760.14
% 143.91
Amount
Day 324.00
Day 42.00
% 10.98
% 376.98
% 71.37
25.3.2, 25.3.5
, 25.3.6
Amount
Kg 81.40
% 81.40
Day 21.00
Day 73.50
Day 29.75
% 3.73
% 127.98
% 40.10
25.3.2, 25.3.3,
25.4.21 25.4.17
Amount
Day 100.02
Day 125.03
% 6.75
% 231.80
% 43.88
25.3.2, 25.3.3,
25.4.21 25.4.17
Amount
Day 150.00
Day 187.50
% 10.13
% 347.63
% 65.81
25.3.2, 25.3.3,
25.4.21 25.4.17
Amount
Day 49.98
Day 62.48
% 3.37
% 115.83
% 21.93
25.3.2, 25.3.3,
25.4.21 25.4.17
Amount
Kg 1,148.59
% 1,148.59
Day 85.74
Day 107.18
% 5.79
% 198.70
% 261.59
25.4.2.3
Amount
Day 40.02
Day 12.52
% 1.58
% 54.12
% 10.25
Amount
Day 24.00
Day 1.88
% 0.78
% 26.65
% 5.05
25.4.5
Amount
Day 3.00
Day 3.75
% 0.20
% 6.95
% 1.32
25.4.2.2 ,
Amount
Day 8.34
Day 10.43
% 0.56
% 19.33
% 3.66
Amount
Day 30.00
Day 5.25
Day 3.75
% 1.17
% 40.17
% 7.61
25.4.2.2 ,
Amount
Day 19.98
Day 20.04
Day 12.52
% 1.58
% 54.12
% 10.25
25.4.2.2 ,
Amount
Day 10.02
Day 12.52
% 0.68
% 23.22
% 4.40
25.4.2.2
Amount
Kg 44.66
% 44.66
Day 199.98
Day 249.97
% 13.50
% 463.45
% 96.45
25.4.4, 25.4.8,
25.4.9 ,
25.4.13
Amount
Kg 1.86
% 1.86
Day 29.19
Day 16.68
% 1.38
% 47.25
% 9.31
25.4.4, 25.4.8,
25.4.9 ,
25.4.13
Amount
Kg 0.65
% 0.65
Day 7.98
Day 15.96
% 0.72
% 24.66
% 4.80
41.57
14.44
635.80
5.62
9.65
% 707.09
Day 195.20
Day 130.13
Day 158.01
% 14.50
% 497.84
% 232.13
41.57
14.44
717.20
5.62
9.65
% 788.49
Day 195.20
Day 130.13
Day 158.01
% 14.50
% 497.84
% 248.01
693.60
171.84
41.57
24.07
5.62
9.65
% 946.36
Day 195.20
Day 111.54
Day 120.33
% 12.81
% 439.88
% 267.82
Amount
Kg 5.36
Kg 345.40
% 350.76
Day 52.50
Day 30.00
Day 30.00
% 3.38
% 115.88
% 90.34
Amount
Kg 500.52
Rft 45.00
% 545.52
Day 21.25
Day 42.00
Day 52.50
% 3.47
% 119.22
% 128.95
Amount
42.23
85.00
% 127.23
Day 10.50
Day 20.00
% 0.92
% 31.42
% 30.76
Amount
Ltr 20.06
Sft 525.00
% 545.06
Day 67.91
Day 48.12
Day 83.89
Day 59.92
% 7.80
% 267.65
% 156.96
Amount
Ltr 20.06
Sft 165.00
No 9.50
% 194.56
Day 8.50
Day 6.00
Day 10.50
Day 7.50
% 0.98
% 33.48
% 44.28
Amount
Kg 198.06
% 198.06
Day 24.00
Day 12.00
Day 2.63
% 1.16
% 39.78
% 46.15
Amount
Kg 145.25
Ltr 18.05
RFT 132.95
Pack 4.32
% 300.57
Day 12.00
Day 18.00
Day 12.00
Day 42.00
Day 24.00
Day 24.00
% 3.96
% 135.96
% 84.35
Amount
KG 9.60
Pack 24.78
RFT 55.00
% 89.38
Day 67.20
Day 30.00
% 2.92
% 100.12
% 36.38
Amount
Ltr 70.82
SFT 35.00
SFT 437.00
% 542.82
Day 6.00
Day 12.00
Day 10.50
% 0.86
% 29.36
% 111.41
Amount
Ltr 70.82
SFT 40.00
SFT 437.00
% 547.82
Day 6.00
Day 12.00
Day 10.50
% 0.86
% 29.36
% 112.38
Amount
Ltr 70.82
SFT 48.00
SFT 437.00
% 555.82
Day 6.00
Day 12.00
Day 10.50
% 0.86
% 29.36
% 113.94
Amount
Ltr 70.82
SFT 55.00
SFT 437.00
% 562.82
Day 6.00
Day 12.00
Day 10.50
% 0.86
% 29.36
% 115.31
Amount
Ltr 70.82
SFT 62.50
SFT 437.00
% 570.32
Day 6.00
Day 12.00
Day 10.50
% 0.86
% 29.36
% 116.77
Amount
Ltr 94.41
SFT 55.00
SFT 35.00
SFT 437.00
% 621.41
Day 6.00
Day 15.00
Day 10.50
% 0.95
% 32.45
% 127.32
Amount
Ltr 94.41
SFT 55.00
SFT 35.00
SFT 437.00
% 621.41
Day 6.00
Day 15.00
Day 10.50
% 0.95
% 32.45
% 127.32
Amount
Ltr 94.41
SFT 55.00
SFT 48.00
SFT 437.00
% 634.41
Day 6.00
Day 15.00
Day 10.50
% 0.95
% 32.45
% 129.85
Amount
Ltr 94.41
SFT 55.00
SFT 55.00
SFT 437.00
% 641.41
Day 6.00
Day 15.00
Day 10.50
% 0.95
% 32.45
% 131.22
Amount
Ltr 94.41
SFT 55.00
SFT 62.50
SFT 437.00
% 648.91
Day 6.00
Day 15.00
Day 10.50
% 0.95
% 32.45
% 132.68
Amount
Kg 360.00
Sft 60.00
% 420.00
Day 300.00
Day 187.50
% 14.63
% 502.13
% 176.96
1 Ltr 140.47
1 Kg 709.69
1 No 13.50
1 Rft 90.00
60.40 % 953.65
1 Day 90.00
1 Day 45.00
1 Day 78.75
1 Day 56.25
3.00 % 8.10
20.10 % 278.10
19.50 % 238.61
25.7.4
Amount
Bag 6.43
0.04
0.13
Kg 18.99
Ltr 42.81
Kg 33.55
% 101.95
Day 18.36
Day 9.18
Day 5.52
Day 16.07
Day 9.18
% 1.75
% 60.05
% 31.25
Amount
Bag 2.64
0.02
0.05
Kg 25.30
Ltr 42.81
Kg 46.97
% 117.79
Day 18.24
Day 11.88
Day 5.52
Day 17.64
Day 9.12
% 1.87
% 64.27
% 35.14
Amount
Kg 549.77
Ltr 25.08
Pack 46.41
Ltr 13.58
No 6.31
No 10.00
% 651.15
Day 46.86
Day 18.72
Day 16.38
Day 32.87
% 3.44
% 118.27
% 149.37
Amount
Kg 292.13
Kg 27.70
Ltr 14.32
Pack 58.01
Ltr 5.21
No 8.55
Doz 8.84
No 4.71
% 419.49
Day 5.34
Day 21.48
Day 56.28
Day 37.49
% 3.62
% 124.20
% 105.31
Amount
Kg 292.13
Kg 10.77
Ltr 11.15
Pack 58.01
Ltr 4.06
Kg 157.32
No 1.83
No 7.44
% 542.71
Day 33.36
Day 58.32
Day 16.68
Day 58.38
Day 29.19
% 5.88
% 201.81
% 144.04
Amount
Rft 230.00
% 230.00
Day 82.50
Day 144.38
Day 82.50
% 9.28
% 318.66
% 105.18
ft 900.00
% 900.00
Day 120.00
Day 131.25
% 7.54
% 258.79
% 224.49
Amount
Day 300.00
% 9.00
% 309.00
% 58.50
Amount
Kg 145.00
% 145.00
Day 45.60
Day 21.00
% 2.00
% 68.60
% 41.26
Amount
No 500.00
% 500.00
Day 78.00
% 2.34
% 80.34
% 112.71
25.7.4
Amount
Each 100.00
% 100.00
Day 30.00
% 0.90
% 30.90
% 25.35
Amount
Kg 110.00
% 110.00
Day 21.00
Day 12.00
% 0.99
% 33.99
% 27.89
Amount
Kg 209.00
Kg 114.00
% 323.00
Day 240.00
% 7.20
% 247.20
% 109.79
Amount
kg 40.12
sft 300.00
% 340.12
Day 72.00
Day 84.00
% 4.68
% 160.68
% 96.74
Amount
Packet 2.92
% 2.92
Day 12.48
Day 17.53
% 0.90
% 30.92
hr 10.43
% 10.43
% 8.46
Amount
Each 9,000.00
% 9,000.00
Day 600.00
Day 2,100.00
% 81.00
% 2,781.00
% 2,281.50
Amount
1.60
13.80
19.14
89.57
104.99
41.70
% 270.80
Day 12.00
Day 8.34
Day 23.63
Day 139.97
% 5.52
% 189.45
% 88.67
Amount
140.00
150.00
% 290.00
Day 519.84
Day 82.50
Day 48.00
% 19.51
% 669.85
% 183.37
Amount
Sft 110.00
% 110.00
Day 48.00
Day 84.00
% 3.96
% 135.96
% 47.19
Packet 5.15
Rft 81.40
Rft 92.40
Rft 58.00
kg 10.38
Sft 110.00
% 357.34
Day 6.66
Day 11.65
% 0.55
% 18.86
% 73.25
Packet 5.15
Rft 96.20
Rft 96.80
Rft 121.80
kg 10.38
sft 100.00
% 430.34
Day 6.66
Day 11.65
% 0.55
% 18.86
% 87.49
Pkt 23.20
Rft 185.00
Rft 140.80
Rft 243.60
KG 27.50
sft 100.00
% 720.10
Day 6.60
Day 11.55
% 0.54
% 18.69
% 143.96
Amount
17.09
5.94
180.46
110.00
% 313.49
Day 1.56
Day 24.12
Day 2.73
Day 1.15
% 0.89
% 30.45
% 66.90
Amount
Bag 2.20
0.16
0.55
Kg 24.40
Kg 27.48
Kg 125.00
% 179.79
Day 12.00
Day 12.00
Day 10.50
% 1.04
% 35.54
% 41.79
Amount
Bag 2.20
0.16
0.55
Kg 24.40
Kg 27.48
Kg 60.00
% 114.79
Day 12.00
Day 12.00
Day 10.50
% 1.04
% 35.54
% 29.11
Amount
Kg 24.40
Kg 27.48
Kg 13.20
Kg 125.00
% 190.08
Day 12.00
Day 12.00
Day 10.50
% 1.04
% 35.54
% 43.79
Amount
Kg 24.40
Kg 27.48
Kg 13.20
Kg 60.00
% 125.08
Day 12.00
Day 12.00
Day 10.50
% 1.04
% 35.54
% 31.12
Amount
Job 12.35
Pack 58.01
Rft 161.76
Sft 150.00
No. 10.00
No. 9.53
No. 5.00
% 406.66
Day 5.40
Day 43.20
Day 56.70
% 3.16
% 108.46
% 99.83
No 26,000.00
% 26,000.00
Day 300.00
% 9.00
% 309.00
Hour 1,756.18
% 1,756.18
% 5,470.96
No 24,000.00
% 24,000.00
Day 212.50
Day 300.00
% 15.38
% 527.88
Hour 1,756.18
% 1,756.18
% 5,122.39
Amount
No 37,000.00
% 37,000.00
Day 280.50
Day 396.00
% 20.30
% 696.80
Hour 1,756.18
% 1,756.18
% 7,689.37
Amount
No 35,000.00
% 35,000.00
Day 280.50
Day 396.00
% 20.30
% 696.80
Hour 1,756.18
% 1,756.18
% 7,299.37
Amount
No 50,000.00
% 50,000.00
Day 425.00
Day 600.00
% 30.75
% 1,055.75
Hour 1,756.18
% 1,756.18
% 10,292.33
Amount
No 48,000.00
% 48,000.00
Day 425.00
Day 600.00
% 30.75
% 1,055.75
Hour 1,756.18
% 1,756.18
% 9,902.33
26.2.4
Amount
Rft 65.00
% 65.00
Day 6.00
% 0.18
% 6.18
% 13.85
15.2.4
Amount
Rft 85.00
% 85.00
Day 6.00
% 0.18
% 6.18
% 17.75
15.2.4
Amount
Rft 95.00
% 95.00
Day 6.00
% 0.18
% 6.18
% 19.70
No 23,000.00
% 23,000.00
Day 75.00
Day 78.13
% 4.59
% 157.72
Hour 87.81
% 87.81
% 4,531.98
No 31,000.00
% 31,000.00
Day 75.00
Day 78.13
% 4.59
% 157.72
Hour 878.09
% 878.09
% 6,246.09
No 42,000.00
% 42,000.00
Day 75.00
Day 78.13
% 4.59
% 157.72
Hour 878.09
% 878.09
% 8,391.09
No 55,000.00
% 55,000.00
Day 75.00
Day 78.13
% 4.59
% 157.72
Hour 878.09
% 878.09
% 10,926.09
15.6.1
Amount
No 500.00
% 500.00
Day 75.60
% 2.27
% 77.87
% 112.24
15.6.1
Amount
No 650.00
% 650.00
Day 75.60
% 2.27
% 77.87
% 141.49
26.6.1
Amount
No 800.00
% 800.00
Day 75.60
% 2.27
% 77.87
% 170.74
26.6.1
Amount
No 1,000.00
% 1,000.00
Day 75.60
% 2.27
% 77.87
% 209.74
15.6.1
Amount
No 2,000.00
% 2,000.00
Day 75.60
% 2.27
% 77.87
% 404.74
Amount
No 595.00
% 595.00
Day 75.60
% 2.27
% 77.87
% 130.77
Amount
Watt 60.00
% 60.00
Day 0.72
% 0.02
% 0.74
% 11.84
Amount
Watt 58.00
% 58.00
Day 0.72
% 0.02
% 0.74
% 11.45
Amount
No 9,325.00
% 9,325.00
Day 75.60
% 2.27
% 77.87
% 1,833.12
Amount
No 13,385.00
% 13,385.00
Day 75.60
% 2.27
% 77.87
% 2,624.82
Amount
No. 9,750.00
% 9,750.00
Day 75.60
% 2.27
% 77.87
% 1,915.99
Amount
No. 19,925.00
% 19,925.00
Day 75.60
% 2.27
% 77.87
% 3,900.12
Amount
No 28,490.00
% 28,490.00
Day 75.60
% 2.27
% 77.87
% 5,570.29
Amount
No. 30,550.00
% 30,550.00
Day 75.60
% 2.27
% 77.87
% 5,971.99
Amount
No 34,625.00
% 34,625.00
Day 75.60
% 2.27
% 77.87
% 6,766.62
Amount
No 39,530.00
% 39,530.00
Day 75.60
% 2.27
% 77.87
% 7,723.09
26.60
Amount
AH 258.00
% 258.00
Day 3.60
% 0.11
% 3.71
% 51.01
25.50
Amount
AH 242.00
% 242.00
Day 3.60
% 0.11
% 3.71
% 47.89
26.70
Amount
AH 274.00
% 274.00
Day 3.60
% 0.11
% 3.71
% 54.13
26.80
Amount
AH 266.00
% 266.00
Day 3.60
% 0.11
% 3.71
% 52.57
26.80
Amount
AH 200.00
% 200.00
Day 3.60
% 0.11
% 3.71
% 39.70
26.90
Amount
AH 56,220.00
% 56,220.00
Day 1,200.00
% 36.00
% 1,236.00
% 11,196.90
26.80
Amount
AH 80.70
% 80.70
Day 1.20
% 0.04
% 1.24
% 15.97
26.80
Amount
AH 68.40
% 68.40
Day 1.20
% 0.04
% 1.24
% 13.57
26.2, 26.43
Amount
Rft 28.00
% 28.00
Day 1.20
% 0.04
% 1.24
% 5.69
26.2, 26.43
Amount
Rft 42.00
% 42.00
Day 1.20
% 0.04
% 1.24
% 8.42
Amount
Rft 57.00
% 57.00
Day 1.20
% 0.04
% 1.24
% 11.35
26.2, 26.43
Amount
Rft 88.00
% 88.00
Day 1.20
% 0.04
% 1.24
% 17.39
26.2, 26.43
Amount
Rft 137.00
% 137.00
Day 1.00
% 0.03
% 1.03
% 26.91
26.2, 26.43
Amount
Rft 195.00
% 195.00
Day 1.00
% 0.03
% 1.03
% 38.22
26.2, 26.43
Amount
Rft 268.00
% 268.00
Day 1.00
% 0.03
% 1.03
% 52.46
26.2, 26.43
Amount
Rft 51.50
% 51.50
Day 1.20
% 0.04
% 1.24
% 10.28
26.2, 26.43
Amount
Rft 77.50
% 77.50
Day 1.20
% 0.04
% 1.24
% 15.35
26.2, 26.43
Amount
Rft 108.00
% 108.00
Day 1.20
% 0.04
% 1.24
% 21.29
26.2, 26.43
Amount
Rft 154.00
% 154.00
Day 1.20
% 0.04
% 1.24
% 30.26
26.2, 26.43
Amount
Rft 320.00
% 320.00
Day 1.20
% 0.04
% 1.24
% 62.63
26.2, 26.43
Amount
Rft 450.00
% 450.00
Day 1.20
% 0.04
% 1.24
% 87.98
26.2, 26.43
Amount
Rft 650.00
% 650.00
Day 1.20
% 0.04
% 1.24
% 126.98
Amount
Pair 187.50
% 187.50
Day 37.56
% 1.13
% 38.69
% 43.89
26.20
Amount
Pair 900.00
% 900.00
Day 37.56
% 1.13
% 38.69
% 182.82
Amount
Watt 64.36
% 64.36
Day 1.20
% 0.04
% 1.24
% 12.78
Amount
Watt 33.30
% 33.30
Day 1.20
% 0.04
% 1.24
% 6.73
Amount
per 21.12
Watt
% 21.12
Day 1.20
% 0.04
% 1.24
% 4.35
Amount
Per 12.95
Watt
% 12.95
Day 1.20
% 0.04
% 1.24
% 2.76
Amount
per 17.45
Watt
% 17.45
Day 1.20
% 0.04
% 1.24
% 3.64
Amount
Per 39.89
Watt
% 39.89
Day 1.20
% 0.04
% 1.24
% 8.01
Amount
Watt 21.13
% 21.13
Day 0.60
% 0.02
% 0.62
% 4.24
Amount
Watt 19.50
% 19.50
Day 0.60
% 0.02
% 0.62
% 3.92
Amount
Watt 17.87
% 17.87
Day 0.60
% 0.02
% 0.62
% 3.60
Amount
Watt 16.23
% 16.23
Day 0.60
% 0.02
% 0.62
% 3.28
Amount
No 73,550.00
% 73,550.00
Day 600.00
% 18.00
% 618.00
% 14,459.25
Amount
No 111,000.00
% 111,000.00
Day 600.00
% 18.00
% 618.00
% 21,762.00
Amount
No 65,000.00
% 65,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 12,909.00
Amount
No 100,000.00
% 100,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 19,734.00
Amount
No 200,000.00
% 200,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 39,234.00
Amount
No 320,000.00
% 320,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 62,634.00
Amount
No 600,000.00
% 600,000.00
Day 2,400.00
% 72.00
% 2,472.00
% 117,468.00
26.13
Amount
1 No 4,668.00
% 4,668.00
Day 132.00
% 3.96
% 135.96
% 936.00
26.15
Amount
No 3,700.00
% 3,700.00
Day 132.00
% 3.96
% 135.96
% 747.24
26.16
Amount
No 3,900.00
% 3,900.00
Day 132.00
% 3.96
% 135.96
% 786.24
17.03
% 17.03
Day 1.20
% 0.04
% 1.24
% 3.55
15.1.2
Amount
Watt 7.00
% 7.00
Day 1.20
% 0.04
% 1.24
% 1.60
Amount
No 2.00
% 2.00
Day 1.20
% 0.04
% 1.24
% 0.62
Amount
Watt 2.00
% 2.00
Day 1.20
% 0.04
% 1.24
% 0.62
Amount
Watt 4.00
% 4.00
Day 1.20
% 0.04
% 1.24
% 1.01
Amount
No 65,000.00
% 65,000.00
Day 600.00
% 18.00
% 618.00
% 12,792.00
Amount
No 70,000.00
% 70,000.00
Day 600.00
% 18.00
% 618.00
% 13,767.00
Amount
No 75,000.00
% 75,000.00
Day 600.00
% 18.00
% 618.00
% 14,742.00
Amount
No 223,800.00
% 223,800.00
Day 1,200.00
% 36.00
% 1,236.00
% 43,875.00
26.34
Amount
kW 24,461.00
% 24,461.00
Day 37.20
% 1.12
% 38.32
% 4,777.15
Amount
Kg 52.00
Pack 69.62
% 121.62
Day 42.00
Day 144.00
Day 115.50
% 9.05
% 310.55
% 82.51
Amount
Kg 39.00
Pack 10.50
% 49.50
Day 132.00
Day 105.00
% 7.11
% 244.11
% 55.87
Amount
2.00
% 2.00
Day 2.34
Day 3.00
% 0.16
% 5.50
% 1.43
Amount
Packet 9.65
% 9.65
Day 8.76
Day 21.84
% 0.92
% 31.52
% 7.85
Day 120.00
% 3.60
% 123.60
% 23.40
417.00
110.00
% 527.00
Day 300.00
Day 63.00
% 10.89
% 373.89
% 173.55
Amount
No. 11,000.00
% 11,000.00
Day 300.00
Day 540.00
% 25.20
% 865.20
% 2,308.80
60.00
% 60.00
Day 106.25
Day 150.00
% 7.69
% 263.94
% 61.67
Amount
60.00
% 60.00
Day 127.50
Day 180.00
% 9.23
% 316.73
% 71.66
Amount
60.00
% 60.00
Day 106.25
Day 210.00
% 9.49
% 325.74
% 73.37
Amount
60.00
% 60.00
Day 165.00
Day 240.00
% 12.15
% 417.15
% 90.68
Amount
60.00
% 60.00
Day 255.00
Day 240.00
% 14.85
% 509.85
% 108.23
Amount
60.00
% 60.00
Day 84.00
% 2.52
% 86.52
% 28.08
Amount
No. 9,500.00
% 9,500.00
Day 150.00
Day 262.50
% 12.38
% 424.88
% 1,932.94
Amount
No. 11,250.00
% 11,250.00
Day 150.00
Day 262.50
% 12.38
% 424.88
% 2,274.19
Amount
No. 5,500.00
% 5,500.00
Day 150.00
Day 262.50
% 12.38
% 424.88
% 1,152.94
Amount
No. 6,250.00
% 6,250.00
Day 150.00
Day 262.50
% 12.38
% 424.88
% 1,299.19
650.00
% 650.00
Day 150.00
Day 420.00
% 17.10
% 587.10
% 237.90
775.00
% 775.00
Day 180.00
Day 480.00
% 19.80
% 679.80
% 279.83
650.00
% 650.00
Day 150.00
Day 420.00
% 17.10
% 587.10
% 237.90
Amount
HP 775.00
% 775.00
Day 180.00
Day 480.00
% 19.80
% 679.80
% 279.83
Amount
Each 250.00
% 250.00
Day 60.00
Day 180.00
% 7.20
% 247.20
% 95.55
Amount
Each 3,500.00
% 3,500.00
Day 240.00
Day 600.00
% 25.20
% 865.20
% 846.30
Amount
Each 5,600.00
% 5,600.00
Day 300.00
Day 900.00
% 36.00
% 1,236.00
% 1,326.00
Amount
Each 210.00
% 210.00
Day 48.00
% 1.44
% 49.44
% 50.31
Amount
Each 4,500.00
% 4,500.00
Day 600.00
% 18.00
% 618.00
% 994.50
Amount
Each 3,600.00
% 3,600.00
Day 600.00
% 18.00
% 618.00
% 819.00
Amount
Each 320.00
% 320.00
Day 120.00
% 3.60
% 123.60
% 85.80
Amount
Rft 490.00
% 490.00
Day 300.00
% 9.00
% 309.00
% 154.05
Amount
Rft 380.00
% 380.00
Day 240.00
% 7.20
% 247.20
% 120.90
Amount
Job 13,800.00
% 13,800.00
Day 1,200.00
% 36.00
% 1,236.00
% 2,925.00
Amount
No. 4,450.00
% 4,450.00
Day 600.00
% 18.00
% 618.00
% 984.75
Amount
Job 3,580.00
% 3,580.00
Day 600.00
% 18.00
% 618.00
% 815.10
Amount
Job 3,580.00
% 3,580.00
Day 600.00
% 18.00
% 618.00
% 815.10
No.
Amount
1 No 4,400.00
66.60 % 4,400.00
1 Day 720.00
3.00 % 21.60
13.90 % 741.60
19.50 % 998.40
Amount
No 1,450.00
% 1,450.00
Day 720.00
% 21.60
% 741.60
% 423.15
Amount
No 590.00
% 590.00
Day 180.00
% 5.40
% 185.40
% 150.15
Amount
No 1,350.00
% 1,350.00
Day 360.00
% 10.80
% 370.80
% 333.45
Amount
No 1,150.00
% 1,150.00
Day 600.00
% 18.00
% 618.00
% 341.25
Amount
No 500.00
% 500.00
Day 180.00
% 5.40
% 185.40
% 132.60
Amount
No 25.00
% 25.00
Day 19.20
% 0.58
% 19.78
% 8.62
Amount
No 65.00
% 65.00
Day 21.60
% 0.65
% 22.25
% 16.89
Amount
LS 80.00
% 80.00
Day 288.75
% 8.66
% 297.41
% 71.91
Amount
No 9,750.00
% 9,750.00
Day 150.00
Day 900.00
% 31.50
% 1,081.50
% 2,106.00
Amount
% 3,350.00
Day 150.00
Day 525.00
% 20.25
% 695.25
% 784.88
Amount
No 575.00
% 575.00
Day 210.00
% 6.30
% 216.30
% 153.08
Amount
Day 231.00
% 6.93
% 237.93
% 152.30
Amount
Pair 100.00
% 100.00
Day 30.00
% 0.90
% 30.90
% 25.35
Amount
No 6,300.00
% 6,300.00
Day 300.00
% 9.00
% 309.00
% 1,287.00
Amount
No 7,820.00
% 7,820.00
Day 420.00
% 12.60
% 432.60
% 1,606.80
Amount
No 15,700.00
% 15,700.00
Day 840.00
% 25.20
% 865.20
% 3,225.30
Amount
No 3,025.00
% 3,025.00
Day 300.00
% 9.00
% 309.00
% 648.38
Amount
No 3,750.00
% 3,750.00
Day 420.00
% 12.60
% 432.60
% 813.15
Amount
No 4,200.00
% 4,200.00
Day 840.00
% 25.20
% 865.20
% 982.80
Amount
No 1,300.00
% 1,300.00
Day 288.75
% 8.66
% 297.41
% 309.81
Amount
No 1,550.00
% 1,550.00
Day 600.00
% 18.00
% 618.00
% 419.25
Amount
No 1,350.00
% 1,350.00
Day 360.00
% 10.80
% 370.80
% 333.45
Amount
No 1,150.00
% 1,150.00
Day 600.00
% 18.00
% 618.00
% 341.25
Amount
No 175.00
% 175.00
Day 84.00
% 2.52
% 86.52
% 50.51
Amount
500.00
3,600.00
% 4,100.00
Day 1,200.00
% 36.00
% 1,236.00
% 1,033.50
Amount
No 60.00
% 60.00
Day 21.60
% 0.65
% 22.25
% 15.91
Amount
Rft 35.00
% 35.00
Day 18.00
% 0.54
% 18.54
% 10.34
Amount
No 1,100.00
% 1,100.00
Day 150.00
% 4.50
% 154.50
% 243.75
Amount
No 240.00
% 240.00
Day 153.09
% 4.59
% 157.68
% 76.65
Amount
Rft 35.00
% 35.00
Day 50.04
% 1.50
% 51.54
% 16.58
Amount
No 700.00
% 700.00
Day 150.00
% 4.50
% 154.50
% 165.75
Amount
No 1,480.00
% 1,480.00
Day 150.00
% 4.50
% 154.50
% 317.85
Amount
No 200.00
% 200.00
Day 735.00
% 22.05
% 757.05
% 182.33
Amount
Rft 56.00
% 56.00
Day 37.56
% 1.13
% 38.69
% 18.24
Amount
Rft 45.00
% 45.00
Day 37.56
% 1.13
% 38.69
% 16.10
Amount
Rft 90.00
% 90.00
Day 75.00
% 2.25
% 77.25
% 32.18
Amount
Rft 100.00
% 100.00
Day 75.00
% 2.25
% 77.25
% 34.13
Amount
Rft 87.00
% 87.00
Day 75.00
% 2.25
% 77.25
% 31.59
Amount
Rft 280.00
% 280.00
Day 112.56
% 3.38
% 115.94
% 76.55
Amount
Rft 205.00
% 205.00
Day 112.56
% 3.38
% 115.94
% 61.92
Amount
Rft 155.00
% 155.00
Day 112.56
% 3.38
% 115.94
% 52.17
Amount
Hr 350.00
% 350.00
Day 150.00
Day 131.25
% 8.44
% 289.69
% 123.09
Amount
Day 263.50
Day 600.00
% 25.91
% 889.41
% 168.38
Amount
Day 171.48
Day 85.74
% 7.72
% 264.94
% 50.16
7.2.1.4
Amount
9.90
% 9.90
Day 24.00
Day 12.00
% 1.08
% 37.08
% 8.95
Amount
Day 300.00
Day 150.00
% 13.50
% 463.50
% 87.75
Amount
Bag 3.85
Bag 0.44
% 4.29
Sft 10.00
% 10.00
% 2.79
Amount
Bag 6.88
Bag 1.00
% 7.88
Sft 10.00
% 10.00
% 3.49
7.1.14
Amount
Day 600.00
Day 150.00
% 22.50
% 772.50
% 146.25
7.1.14
Amount
Day 300.00
Day 150.00
% 13.50
% 463.50
% 87.75
Amount
LS 476.00
% 476.00
Day 168.00
Day 119.00
% 8.61
% 295.61
% 148.79
Amount
Bag 16.50
2.08
5.16
% 23.74
Day 30.00
Day 18.78
% 1.46
% 50.24
% 14.14
Amount
No 400.00
No 7.20
% 407.20
Day 75.00
% 2.25
% 77.25
% 94.03
Amount
No 280.00
No 6.00
% 286.00
Day 75.00
% 2.25
% 77.25
% 70.40
Amount
No 120.00
No 6.00
% 126.00
Day 75.00
% 2.25
% 77.25
% 39.20
Amount
No 30.00
No 4.80
% 34.80
Day 75.00
% 2.25
% 77.25
% 21.41
Amount
No 25.00
No 4.00
% 29.00
Day 75.00
% 2.25
% 77.25
% 20.28
Amount
No 80.00
No 36.00
% 116.00
Day 75.00
% 2.25
% 77.25
% 37.25
Amount
No 60.00
No 30.00
% 90.00
Day 75.00
% 2.25
% 77.25
% 32.18
Amount
No 50.00
No 30.00
% 80.00
Day 75.00
% 2.25
% 77.25
% 30.23
Amount
No 120.00
No 7.20
% 127.20
Day 300.00
% 9.00
% 309.00
% 83.30
12.19.20
Amount
No 600.00
% 600.00
Day 75.00
% 2.25
% 77.25
% 131.63
12.19.20
Amount
No 350.00
% 350.00
Day 75.00
% 2.25
% 77.25
% 82.88
Amount
No 175.00
% 175.00
Day 75.00
% 2.25
% 77.25
% 48.75
Amount
No 150.00
% 150.00
Day 75.00
% 2.25
% 77.25
% 43.88
12.19.22
Amount
No 2,500.00
% 2,500.00
Day 90.00
% 2.70
% 92.70
% 505.05
Amount
Cft 176.50
Kg 8.27
No 8.57
% 193.34
Day 60.00
% 1.80
% 61.80
% 49.40
12.2
Amount
Cft 5.00
Kg 2.76
No 182.00
% 189.76
Day 60.00
% 1.80
% 61.80
% 48.70
Amount
No 596.00
% 596.00
Day 9.96
% 0.30
% 10.26
% 118.16
Amount
No 148.00
% 148.00
Day 3.24
% 0.10
% 3.34
% 29.49
Amount
Cft 12,500.00
No 1,968.00
% 14,468.00
Day 60.00
Day 240.00
% 9.00
% 309.00
% 2,879.76
Amount
Day 10.02
Day 20.04
% 0.90
% 30.96
% 5.86
13.3.1
Amount
Litre 52.50
% 52.50
Day 170.00
% 5.10
% 175.10
% 43.39
13.3.1
Amount
Day 250.80
% 7.52
% 258.32
% 48.91
13.3.1
Amount
Day 1,200.00
% 36.00
% 1,236.00
% 234.00
Amount
Ltr 498.44
% 498.44
Day 600.00
Day 212.50
% 24.38
% 836.88
% 255.63
Amount
Kg 82.50
% 82.50
Day 300.00
% 9.00
% 309.00
% 74.59
13.1.5
Amount
Day 600.00
% 18.00
% 618.00
% 117.00
Amount
Doz 144.50
% 144.50
Day 72.00
% 2.16
% 74.16
% 42.22
13.1.5
Amount
Doz 144.50
% 144.50
Day 150.00
% 4.50
% 154.50
% 57.43
13.1.5
Amount
Doz 144.50
% 144.50
Day 900.00
% 27.00
% 927.00
% 203.68
13.1.5
Amount
Doz 144.50
% 144.50
Day 1,200.00
% 36.00
% 1,236.00
% 262.18
Amount
Doz 144.50
% 144.50
Day 600.00
% 18.00
% 618.00
% 145.18
Amount
Ltr 24.82
% 24.82
Day 300.00
% 9.00
% 309.00
% 63.34
Amount
No 1.69
Ltr 15.25
% 16.94
Day 150.00
% 4.50
% 154.50
% 32.55
Amount
No 15.60
Ltr 54.57
% 70.17
Day 84.00
% 2.52
% 86.52
% 30.06
Amount
No 15.60
Ltr 236.72
% 252.32
Day 300.00
Day 199.20
% 14.98
% 514.18
% 146.55
Amount
No 222.30
Ltr 561.71
% 784.01
Day 600.00
% 18.00
% 618.00
% 269.88
Amount
No 222.30
Ltr 1,143.48
% 1,365.78
Day 1,200.00
% 36.00
% 1,236.00
% 500.33
Amount
No 334.23
Ltr 1,685.12
% 2,019.35
Day 1,992.00
% 59.76
% 2,051.76
% 782.21
Amount
No 20.80
Ltr 80.24
% 101.04
Day 36.00
% 1.08
% 37.08
% 26.72
Amount
Day 300.00
% 9.00
% 309.00
% 58.50
Bag 577.50
52.00
% 629.50
Day 1,200.00
Day 600.00
Day 150.00
Day 600.00
% 76.50
% 2,626.50
Hour 350.00
% 350.00
% 688.25
Day 600.00
% 18.00
% 618.00
% 117.00
65.00
329.00
Kg 2,907.00
No 112.00
% 3,413.00
Day 1,290.00
% 38.70
% 1,328.70
Hour 202.07
Hour 66.80
Hour 78.79
% 347.66
% 984.88
893.88
Kg 3,693.60
No 224.00
18.75
% 4,830.23
Day 1,410.00
% 42.30
% 1,452.30
Hour 274.67
Hour 90.80
Hour 107.10
% 472.57
% 1,309.00
Amount
Day 1,770.00
% 53.10
% 1,823.10
Hour 476.74
Hour 157.60
Hour 185.84
% 820.18
% 1,676.68
Amount
Rft 45.26
Kg 74.25
% 119.51
Day 72.00
Day 195.50
% 8.03
% 275.53
% 75.47
Amount
Day 300.00
% 9.00
% 309.00
% 58.50
171.49
112.00
620.00
229.29
2,105.40
% 3,238.18
Day 1,824.00
Day 150.00
% 59.22
% 2,033.22
% 1,016.38
Amount
Day 7.20
Day 52.50
% 1.79
% 61.49
% 11.64
Amount
Kg 232.50
% 232.50
Day 1,200.00
% 36.00
% 1,236.00
% 279.34
Amount
Kg 1,437.00
% 1,437.00
Day 350.00
% 10.50
% 360.50
% 348.47
Amount
Day 136.80
% 4.10
% 140.90
% 26.68
Amount
Dft 105.00
Kg 11.02
Kg 1.79
% 117.81
Day 15.00
% 0.45
% 15.45
% 25.90
Amount
Cft 18.00
Kg 0.03
Kg 0.12
Doz 1.24
% 19.38
Day 0.48
Day 1.32
% 0.05
% 1.85
% 4.13
14.5.6
Amount
Day 450.00
% 13.50
% 463.50
% 87.75
14.5.6
Amount
Day 56.40
% 1.69
% 58.09
% 11.00
Amount
Ltr 30.62
% 30.62
Day 15.00
% 0.45
% 15.45
% 8.90
Amount
Kg 15.84
Rft 212.00
% 227.84
Day 150.00
% 4.50
% 154.50
% 73.68
Amount
Cft 25.00
Kg 9.65
Kg 17.00
% 51.65
Day 12.00
% 0.36
% 12.36
% 12.41
Amount
Sft 60.00
% 60.00
Day 90.00
% 2.70
% 92.70
% 29.25
Amount
Sft 26.40
% 26.40
Day 90.00
% 2.70
% 92.70
% 22.70
Amount
Sft 20.00
% 20.00
Day 90.00
% 2.70
% 92.70
% 21.45
Amount
Kg 9.65
No 81.32
Doz 8.65
Ltr 167.02
% 266.64
Day 120.00
Day 102.00
% 6.66
% 228.66
% 95.28
Amount
Day 375.00
Day 300.00
% 20.25
% 695.25
% 131.63
Amount
Pkt 1.32
Ltr 2.31
Rft 53.00
% 56.63
Day 18.00
% 0.54
% 18.54
% 14.55
Amount
Sft 3.82
Kg 0.99
Pkt 3.54
1 Doz 4.94
No 1.24
% 14.53
Day 30.00
Day 60.00
% 2.70
% 92.70
% 20.38
Amount
Kg 9.24
Kg 50.00
No 160.00
Rft 84.72
% 303.96
Day 37.50
Day 53.13
% 2.72
% 93.34
% 76.94
12.1 , 12.2
Amount
kg 0.18
Cft 5.00
Kg 0.99
Pkt 3.54
Doz 8.84
No 1.86
No 3.96
1 No 1.80
Sft 7.04
No 1.12
% 34.34
Day 9.00
Day 18.00
% 0.81
% 27.81
% 11.96
16.9.5
1000 Cft
Amount
1 Day 74.34
1 Day 74.34
3.00 % 4.46
4.45 % 153.14
1 Hour 462.74
1 Hour 1,422.48
1 Hour 435.46
1 Hour 2,787.15
1 Hour 154.81
1 Hour 557.40
1 Hour 1,982.08
% 7,802.12
% 1,550.41
Amount
Cft 250.00
sft 48.95
Kg 5.79
No 26.10
No 91.00
% 421.84
Day 75.00
Day 150.00
% 6.75
% 231.75
% 126.13
Amount
120.00
1,252.04
% 1,372.04
Day 1,200.00
Day 750.00
Day 300.00
% 67.50
% 2,317.50
% 706.30
Amount
Bag 72.60
12.95
68.76
% 154.31
Day 15.84
Day 27.90
% 1.31
% 45.05
% 38.62
Amount
2.81
% 2.81
Day 28.56
Day 45.72
% 2.23
% 76.51
% 15.03
Amount
Cft 5,000.00
Ltr 61.24
% 5,061.24
Day 118.08
Day 54.12
Day 19.80
% 5.76
% 197.76
% 1,024.38
Day 316.14
Day 36.30
% 10.57
% 363.01
% 68.73
Day 0.72
% 0.02
% 0.74
% 0.14
Doz 1.66
% 1.66
Day 0.90
% 0.03
% 0.93
% 0.50
Amount
Ltr 1.73
% 1.73
Day 1.98
Day 3.96
% 0.18
% 6.12
% 1.49
Amount
Cft 61.50
% 61.50
Day 8.04
Day 8.04
% 0.48
% 16.56
% 15.13
Amount
No 0.96
Rft 50.00
No 45.71
% 96.68
Day 10.68
% 0.32
% 11.00
% 20.93
Amount
No 7.71
Rft 50.00
No 45.71
% 103.43
Day 10.68
% 0.32
% 11.00
% 22.25
No 7.71
Rft 155.00
No 77.14
No 285.72
No 4.62
No 160.72
% 690.92
Day 10.74
Day 42.84
% 1.61
% 55.19
% 145.18
Amount
No 7.71
Rft 155.00
No 77.14
No 285.72
No 4.62
No 160.72
% 690.92
Day 10.74
Day 42.84
% 1.61
% 55.19
% 145.18
Amount
Kg 11.25
No 375.00
% 386.25
Day 300.00
% 9.00
% 309.00
% 133.82
Amount
Kg 36.00
No 1,200.00
% 1,236.00
Day 300.00
% 9.00
% 309.00
% 299.52
Amount
Kg 59.99
No 2,000.00
% 2,059.99
Day 300.00
% 9.00
% 309.00
% 460.20
Amount
Kg 150.00
No 5,000.00
% 5,150.00
Day 600.00
% 18.00
% 618.00
% 1,121.25
Amount
Kg 11.25
No 375.00
% 386.25
Day 150.00
% 4.50
% 154.50
% 104.57
Amount
No 155.00
No 7.20
% 162.20
Day 112.56
% 3.38
% 115.94
% 53.58
Amount
No 300.00
No 4.50
% 304.50
Day 112.56
% 3.38
% 115.94
% 81.33
Amount
430.00
10.80
% 440.80
Day 97.56
% 2.93
% 100.49
% 104.98
Amount
625.00
10.80
% 635.80
Day 120.00
% 3.60
% 123.60
% 147.38
Amount
No 7.20
No 195.00
% 202.20
Day 97.56
% 2.93
% 100.49
% 58.45
Amount
No 7.20
No 245.00
% 252.20
Day 120.00
% 3.60
% 123.60
% 72.58
Amount
No 6.75
No 42.85
% 49.60
Day 300.00
% 9.00
% 309.00
% 68.17
Amount
No 85.70
No 7.20
% 92.90
Day 300.00
% 9.00
% 309.00
% 76.62
Amount
125.00
57.60
% 182.60
Day 90.00
% 2.70
% 92.70
% 53.16
Amount
No 57.60
No 350.00
% 407.60
Day 75.00
% 2.25
% 77.25
% 94.11
Amount
60.00
12.00
% 72.00
Day 90.00
% 2.70
% 92.70
% 31.59
Amount
No 12.00
No 50.00
% 62.00
Day 75.00
% 2.25
% 77.25
% 26.72
Amount
No 6.00
No 80.00
% 86.00
Day 75.00
% 2.25
% 77.25
% 31.40
Amount
No 6.00
No 70.00
% 76.00
Day 90.00
% 2.70
% 92.70
% 32.37
Amount
No 6.00
No 50.00
% 56.00
Day 90.00
% 2.70
% 92.70
% 28.47
Amount
No 4.50
No 50.00
% 54.50
Day 75.00
% 2.25
% 77.25
% 25.25
Amount
No 6.00
No 80.00
% 86.00
Day 75.00
% 2.25
% 77.25
% 31.40
Amount
No 9.00
No 120.00
% 129.00
Day 75.00
% 2.25
% 77.25
% 39.78
Amount
No 4.50
No 280.00
% 284.50
Day 75.00
% 2.25
% 77.25
% 70.10
Amount
No 6.00
No 340.00
% 346.00
Day 75.00
% 2.25
% 77.25
% 82.10
Amount
No 9.00
No 500.00
% 509.00
Day 75.00
% 2.25
% 77.25
% 113.88
Amount
No 4.50
No 60.00
% 64.50
Day 75.00
% 2.25
% 77.25
% 27.20
Amount
No 4.50
No 80.00
% 84.50
Day 75.00
% 2.25
% 77.25
% 31.10
Amount
No 4.50
No 120.00
% 124.50
Day 75.00
% 2.25
% 77.25
% 38.90
Amount
No 5.25
No 350.00
% 355.25
Day 75.00
% 2.25
% 77.25
% 83.90
Amount
No 5.25
No 280.00
% 285.25
Day 75.00
% 2.25
% 77.25
% 70.25
Amount
No 5.25
No 200.00
% 205.25
Day 75.00
% 2.25
% 77.25
% 54.65
Amount
No 5.25
No 180.00
% 185.25
Day 75.00
% 2.25
% 77.25
% 50.75
Amount
No 5.60
No 40.00
% 45.60
Day 75.00
% 2.25
% 77.25
% 23.52
Amount
No 5.60
No 35.00
% 40.60
Day 75.00
% 2.25
% 77.25
% 22.54
Amount
No 5.60
No 30.00
% 35.60
Day 75.00
% 2.25
% 77.25
% 21.57
Amount
No 5.60
No 25.00
% 30.60
Day 75.00
% 2.25
% 77.25
% 20.59
No 80.00
No 36.00
% 116.00
Day 75.00
% 2.25
% 77.25
% 37.25
No 36.00
No 70.00
% 106.00
Day 75.00
% 2.25
% 77.25
% 35.30
No 36.00
No 60.00
% 96.00
Day 75.00
% 2.25
% 77.25
% 33.35
No 36.00
No 50.00
% 86.00
Day 75.00
% 2.25
% 77.25
% 31.40
Amount
Job 500.00
% 500.00
Day 300.00
% 9.00
% 309.00
% 156.00
Amount
1 Job 4,000.00
% 4,000.00
Day 300.00
% 9.00
% 309.00
% 838.50
Amount
Job 400.00
% 400.00
Day 300.00
% 9.00
% 309.00
% 136.50
Amount
Job 600.00
% 600.00
Day 300.00
Day 600.00
% 27.00
% 927.00
% 292.50
Amount
1 No 13,000.00
% 13,000.00
Day 360.00
Day 720.00
% 32.40
% 1,112.40
% 2,745.60
Amount
1 No 16,000.00
% 16,000.00
Day 360.00
Day 720.00
% 32.40
% 1,112.40
% 3,330.60
Amount
1 No 13,000.00
% 13,000.00
Day 300.00
Day 600.00
% 27.00
% 927.00
% 2,710.50
Amount
1 No 16,000.00
% 16,000.00
Day 300.00
Day 600.00
% 27.00
% 927.00
% 3,295.50
Amount
1 No 9,500.00
% 9,500.00
Day 300.00
% 9.00
% 309.00
% 1,911.00
Amount
1 Job 3,500.00
% 3,500.00
Day 300.00
% 9.00
% 309.00
% 741.00
Amount
1 Job 3,500.00
% 3,500.00
Day 300.00
% 9.00
% 309.00
% 741.00
Amount
1 Job 4,000.00
% 4,000.00
Day 300.00
% 9.00
% 309.00
% 838.50
Amount
1 Job 3,500.00
% 3,500.00
Day 300.00
% 9.00
% 309.00
% 741.00
Amount
1 Job 4,000.00
% 4,000.00
Day 120.00
Day 240.00
% 10.80
% 370.80
% 850.20
Amount
1 No 3,500.00
% 3,500.00
Day 120.00
Day 240.00
% 10.80
% 370.80
% 752.70
Amount
1 No 3,000.00
% 3,000.00
Day 120.00
Day 240.00
% 10.80
% 370.80
% 655.20
Amount
1 No 900.00
% 900.00
Day 120.00
Day 240.00
% 10.80
% 370.80
% 245.70
Amount
1 No 500.00
% 500.00
Day 240.00
% 7.20
% 247.20
% 144.30
Amount
1 No 300.00
% 300.00
Day 120.00
% 3.60
% 123.60
% 81.90
Amount
1 No 1,500.00
% 1,500.00
% 292.50
Amount
1 No 30.00
% 30.00
Day 60.00
% 1.80
% 61.80
% 17.55
Amount
1 No 1,500.00
% 1,500.00
Day 240.00
% 7.20
% 247.20
% 339.30
Amount
1 No 1,500.00
% 1,500.00
Day 180.00
% 5.40
% 185.40
% 327.60
Amount
1 No 1,500.00
% 1,500.00
Day 180.00
% 5.40
% 185.40
% 327.60
Amount
1 No 1,000.00
% 1,000.00
Day 120.00
% 3.60
% 123.60
% 218.40
Amount
1 No 80.00
% 80.00
Day 36.00
% 1.08
% 37.08
% 22.62
Amount
Day 150.00
Day 300.00
% 13.50
% 463.50
% 87.75
Amount
Day 150.00
Day 300.00
% 13.50
% 463.50
% 87.75
Amount
Day 240.00
Day 480.00
% 21.60
% 741.60
% 140.40
Amount
Day 300.00
Day 600.00
% 27.00
% 927.00
% 175.50
Amount
1 No 3,500.00
% 3,500.00
Day 120.00
% 3.60
% 123.60
% 705.90
Amount
No 83.00
Sft 14.29
No 186.00
% 283.29
Day 30.00
Day 48.00
% 2.34
% 80.34
% 70.45
16.8.16
Amount
Cft 4,241.99
% 4,241.99
Day 150.00
Day 300.00
% 13.50
% 463.50
% 914.94
16.8.16
Amount
Cft 6,249.98
% 6,249.98
Day 150.00
Day 480.00
% 18.90
% 648.90
% 1,341.60
Amount
No 11.50
% 11.50
Day 50.16
Day 25.08
% 2.26
% 77.50
% 16.91
16.8.14
Amount
Bag 98.23
11.60
30.71
% 140.53
300.00
% 9.00
% 309.00
% 85.90
Amount
Bag 166.21
19.65
51.95
kg 4.40
sft 30.32
No 130.00
% 402.52
Day 180.00
Day 54.00
% 7.02
% 241.02
% 124.12
24.3.4, 24.3.5
Amount
Day 69.60
Day 18.30
% 2.64
% 90.54
% 17.14
24.3.4, 24.3.5
Amount
Day 160.20
Day 18.30
% 5.36
% 183.85
% 34.81
24.3.4, 24.3.5
Amount
Day 249.60
Day 18.30
% 8.04
% 275.94
% 52.24
Amount
Day 240.00
% 7.20
% 247.20
% 46.80
Amount
kg 100.00
% 100.00
Day 850.00
% 25.50
% 875.50
% 185.25
Amount
kg 50.00
% 50.00
Day 367.20
% 11.02
% 378.22
% 81.35
Amount
kg 10.00
% 10.00
Day 53.55
% 1.61
% 55.16
% 12.39
Amount
Rft 154.16
% 154.16
Day 150.00
% 4.50
% 154.50
% 59.31
Amount
kg 1.00
Ltr 0.04
% 1.04
Day 0.36
% 0.01
% 0.37
% 0.27
Amount
pkt 20.00
% 20.00
Days 90.60
% 2.72
% 93.32
% 21.57
Amount
Cft 1,100.00
% 1,100.00
Day 240.00
% 7.20
% 247.20
% 261.30
Amount
Job 2,000.00
% 2,000.00
Day 85.00
% 2.55
% 87.55
Day 2.66
% 2.66
% 407.09
Amount
Sft 700.00
% 700.00
Day 14.79
% 0.44
% 15.23
Hour 11.81
% 11.81
% 141.69
Sft 900.00
% 900.00
Day 14.79
% 0.44
% 15.23
Hour 11.81
% 11.81
% 180.69
Amount
0.52
14.55
25.14
3.30
79.70
% 123.20
Day 158.82
Day 123.48
% 8.47
% 290.77
% 79.07
Amount
0.52
14.55
25.14
3.30
79.70
% 160.28
Day 158.82
Day 123.48
% 8.47
% 290.77
% 86.30
Sft 56.82
% 56.82
Day 12.75
% 0.38
% 13.13
% 13.57
Amount
Bag 825.00
156.00
% 981.00
Day 900.00
Day 600.00
% 45.00
% 1,545.00
% 483.80
Amount
Sft 55.00
No 56.00
No 57.00
% 168.00
Day 40.00
% 1.20
% 41.20
% 40.56
24.3.6.4
Amount
Days 96.00
% 2.88
% 98.88
% 18.72
24.3.6.4
Amount
Days 181.20
% 5.44
% 186.64
% 35.33
Amount
Sft 339.15
% 339.15
Day 450.00
% 13.50
% 463.50
% 153.88
Amount
bag 2.14
Cft 50.44
cft 68.64
Sft 42.86
kg 1.29
No 84.00
Sft 240.00
% 489.37
Day 32.16
Day 42.84
Day 11.28
% 2.59
% 88.87
% 112.25
Amount
No 32.50
Ltr 462.28
% 494.78
Day 396.00
% 11.88
% 407.88
% 173.70
Amount
Bag 16.50
100 Cft 130.00
Kg 1,429.20
% 1,575.70
Day 300.00
Day 150.00
Day 212.50
% 19.88
% 682.38
Day 2,800.00
% 2,800.00
% 982.45
Amount
Bag 16.50
100 Cft 130.00
Kg 1,309.20
% 1,455.70
Day 300.00
Day 240.00
Day 212.50
% 22.58
% 775.08
Day 2,720.00
% 2,720.00
% 961.00
Amount
Day 240.00
Day 120.00
% 10.80
% 370.80
Rft 2,250.00
% 2,250.00
% 508.95
Amount
Day 420.00
Day 120.00
% 16.20
% 556.20
Rft 2,250.00
% 2,250.00
% 544.05
Amount
Day 240.00
Day 120.00
% 10.80
% 370.80
Rft 3,000.00
% 3,000.00
% 655.20
Amount
Day 288.00
Day 144.00
% 12.96
% 444.96
Rft 3,500.00
% 3,500.00
% 766.74
Amount
Day 300.00
Day 150.00
% 13.50
% 463.50
Rft 3,500.00
% 3,500.00
% 770.25
Amount
Day 102.00
Day 100.00
Day 75.00
% 8.31
% 285.31
Day 100.00
% 100.00
% 73.52