GOVERNMENT OF KHYBER PAKHTUNKHWA

MRS CELL COMMUNICATION & WORKS DEPARTMENT


MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM : Spec. No :

Item Code : 14-162-c Unit

Item Name : G.I. water pipes (cold and hot water, in ducts & in exposed condition)
Conforming to BS-1387 (1985), Medium Grade, I/c all fittings, wraping
glasswool thermal insulation with aluminium vapour barrier, making
holes in concrete or masonry and then repairing holes, supports and
hangers etc. of approved make of the following diameters, complete in
all respects:
(c) 1-1/2 inch
Detail Qty Unit
MATERIAL
Thermal Insulation tape 0.1 No.
Size 40 mm (1-1/2") 1.05 Rft

Nominal Pipe Size (NPS)


Medium Quality Galvanized
Iron (G.I.)Pipe i/c cost
of accessories and
jointing material etc.
Aluminium Vapour Barrier 0.39 Sft

LABOUR
Mason 0.05 Day
Labourer 0.05 Day
Plumber 0.05 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,001

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM : Spec. No :

Item Code : 14-163-a Unit

Item Name : G.I. water pipes (in burried conditions) conforming to BS-1387, Medium
Grade, I/c all fittings, wraping polythene tape, giving anticorrosion
treatment, applying protective painting, making holes in concrete or
masonry and then repairing holes, flushing, disinfecting, testing and
commissioning etc. of approved make, of the following
diameters,complete in all respects.
3/4" (20 mm) Nominal Pipe Size (NPS)

Detail Qty Unit


MATERIAL
Size 20 mm (3/4") Nominal 1.05 RFT
Pipe Size (NPS) Medium
Quality Galvanized Iron
(G.I.) Pipe
Anti-Corrosion Paint 0.01 Litre

LABOUR
Labourer 0.0057 Day
Painter / Polisher 0.006 Day
Plumber 0.0039 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,002

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM : Spec. No :

Item Code : 14-163-b Unit

Item Name : G.I. water pipes (in burried conditions) conforming to BS-1387, Medium
Grade, I/c all fittings, wraping polythene tape, giving anticorrosion
treatment, applying protective painting, making holes in concrete or
masonry and then repairing holes, flushing, disinfecting, testing and
commissioning etc. of approved make, of the following
diameters,complete in all respects.
1" ( 25 mm) Nominal Pipe Size (NPS)

Detail Qty Unit


MATERIAL
Size 25 mm (1") Nominal 1.05 RFT
Pipe Size (NPS) Medium
Quality Galvanized Iron
(G.I.) Pipe
Anti-Corrosion Paint 0.012 Litre

LABOUR
Labourer 0.0057 Day
Painter / Polisher 0.006 Day
Plumber 0.0039 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,003

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM : Spec. No :

Item Code : 14-163-c Unit

Item Name : G.I. water pipes (in burried conditions) conforming to BS-1387, Medium
Grade, I/c all fittings, wraping polythene tape, giving anticorrosion
treatment, applying protective painting, making holes in concrete or
masonry and then repairing holes, flushing, disinfecting, testing and
commissioning etc. of approved make, of the following
diameters,complete in all respects.
1¼" ( 32 mm) Nominal Pipe Size (NPS)

Detail Qty Unit


MATERIAL
Size 32 mm (1-1/4") 1.05 RFT
Nominal Pipe Size (NPS)
Medium Quality Galvanized
Iron (G.I.)Pipe i/c cost
of accessories and
jointing material etc.
Anti-Corrosion Paint 0.014 Litre

LABOUR
Labourer 0.0067 Day
Painter / Polisher 0.0065 Day
Plumber 0.0043 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,004

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM : Spec. No :

Item Code : 14-163-d Unit

Item Name : G.I. water pipes (in burried conditions) conforming to BS-1387, Medium
Grade, I/c all fittings, wraping polythene tape, giving anticorrosion
treatment, applying protective painting, making holes in concrete or
masonry and then repairing holes, flushing, disinfecting, testing and
commissioning etc. of approved make, of the following
diameters,complete in all respects.
'1½" (40 mm) Nominal Pipe Size (NPS)

Detail Qty Unit


MATERIAL
Size 40 mm (1-1/2") 1.05 RFT
Nominal Pipe Size (NPS)
Medium Quality Galvanized
Iron (G.I.)Pipe i/c cost
of accessories and
jointing material etc.
Anti-Corrosion Paint 0.014 Litre

LABOUR
Labourer 0.0067 Day
Painter / Polisher 0.007 Day
Plumber 0.0043 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,005

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM : Spec. No :


Item Code : 14-164 Unit

Item Name : uPVC Multi Floor Trap (110x75mm) including strainer; supports; making
required number of connections; breaking concrete or masonry work &
then making it good; etc.

Detail Qty Unit

MATERIAL
uPVC Multi Floor Trap 1 Each
(110 x 75mm)

LABOUR
Mason 0.1 Day
Labourer 0.1 Day
Plumber 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,006
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM : Spec. No :


Item Code : 14-165-a Unit

Item Name : uPVC floor Cleanout including 2 No. 45o elbows, transition pipe, SS
screwed plug/cover assembly jointed air-tight with pipe, breaking
concrete or masonry work & then making it good, etc. complete in all
respects.
(i) 3" dia

Detail Qty Unit


MATERIAL
Tee Elbow Union heavy 2 Each
uPVC floor cleanout 3" 1 Each
Dia

LABOUR
Mason 0.1 Day
Labourer 0.1 Day
Plumber 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,007

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM : Spec. No :


Item Code : 14-165-b Unit

Item Name : uPVC floor Cleanout including 2 No. 45o elbows, transition pipe, SS
screwed plug/cover assembly jointed air-tight with pipe, breaking
concrete or masonry work & then making it good, etc. complete in all
respects.
(ii) 4" dia

Detail Qty Unit


MATERIAL
Tee Elbow Union heavy 2 Each
uPVC floor cleanout 4" 1 Each
Dia

LABOUR
Mason 0.1 Day
Labourer 0.1 Day
Plumber 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,008

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM : Spec. No :


Item Code : 14-166 Unit

Item Name : Supply & installation of cast iron roof drain, including strainer,
flashing material, and all accessories for complete installation, as
per specifications.
4 inches dia

Detail Qty Unit


MATERIAL
Grey Cast Iron (C.I) Spun 1.02 RFT
Pipes for soil Size 100
mm (4") ?

LABOUR
Labourer 0.06 Day
Plumber 0.06 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,009

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM : Spec. No :

Item Code : 14-167-a Unit

Item Name : Brass/Bronze Gate valves on water supply pipes, conforming to BS


standards of approved quality, including jointing arrangement of pipes
on both ends of valves; nuts, bolts etc. complete in all respects, of
following internal diameters.
(i) 3/4 "

Detail Qty Unit


MATERIAL
Brass/Bronze Gate Vlave 1.02 No
3/4"

LABOUR
Plumber 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,010

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM : Spec. No :

Item Code : 14-167-b Unit


Item Name : Brass/Bronze Gate valves on water supply pipes, conforming to BS
standards of approved quality, including jointing arrangement of pipes
on both ends of valves; nuts, bolts etc. complete in all respects, of
following internal diameters.
(i) 1-1/2 "

Detail Qty Unit


MATERIAL
Brass/Bronze Gate Vlave 1.02 No
1-1/2"

LABOUR
Plumber 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,011

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM : Spec. No :

Item Code : 14-168 Unit

Item Name : Brass/Bronze swing type check valves on water supply pipes, conforming
to BS standards, including jointing arrangement of pipes on both ends
of valves; nuts, bolts etc. complete in all respects, of following
internal diameters.
(i) 1-1/4 "

Detail Qty Unit


MATERIAL
Brass/Bronze swing type 1.02 No
check valve Vlave 1-1/4"

LABOUR
Plumber 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,012

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM : Spec. No :


Item Code : 14-169 Unit

Item Name : Air relief valves, of approved quality including jointing arrangement
with pipe; nuts, bolts etc. complete in all respects.
(i) 3/4 "

Detail Qty Unit

MATERIAL
Air relief valves 3/4" 1.02 No

LABOUR
Plumber 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,013

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM : Spec. No :

Item Code : 14-170 Unit

Item Name : Cowel on vent pipes of the following diameter.


(i) 3"
Detail Qty Unit
MATERIAL
Cowel 3" (Cast Iron) 1 No

LABOUR
Plumber 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,014

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM : Spec. No :

Item Code : 14-171-a Unit

Item Name : Suppling and fixing of bell mouth with collar including testing of
joint, complete in all respects as specified. 3" dia

Detail Qty Unit


MATERIAL
Cast Iron bell mouth with 1 No
collar 3" dia

LABOUR
Labourer 0.1 Day
Fitter Sewerage / Gas 0.1 Day
Pipe Fitter / Fitter II
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,015

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM : Spec. No :

Item Code : 14-171-b Unit

Item Name : Suppling and fixing of bell mouth with collar including testing of
joint, complete in all respects as specified. 4" dia

Detail Qty Unit


MATERIAL
Cast Iron bell mouth with 1 No
collar 4" dia

LABOUR
Labourer 0.1 Day
Fitter Sewerage / Gas 0.1 Day
Pipe Fitter / Fitter II
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,016

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM : Spec. No :


Item Code : 14-172-a Unit

Item Name : Supplying and fixing of Dry Chemical Powder Fire Extinguisher 6Kg
Capacity complete in all respect

Detail Qty Unit


MATERIAL
Fire Extinguisher 06 kg 1 Each
(Eurpion )

LABOUR
Labourer 0.0625 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,017

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM : Spec. No :


Item Code : 14-172-b Unit

Item Name : Supplying and fixing of Foam Type fire extinguishers capacity 12 liters
complete in all respect

Detail Qty
MATERIAL
Foam Type fire 1
extinguishers 12 litre
capacity

LABOUR
Labourer 0.0625
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each
Labour Rates Per Each

2,018

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM : Spec. No :


Item Code : 14-173 Unit

Item Name : Providing & Laying 150 Micron thick Polythene Sheet as per instructions
of the Engineer-in-Charge, Complete in all respects.

Detail Qty Unit


MATERIAL
Polythene Sheet of 150 1 Kg
Micron thickness

LABOUR
Labourer 0.18 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Kg Rs.
Labour Rates Per Kg Rs.

2,019

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM :

Item Code : 14-174


Item Name :
Detail Qty
MATERIAL
8" dia. MS filter Screen 1
pipe of 4.5mm thickness &
1/16" slot opening

LABOUR
Labourer 0.2 Day
Pipe Fitter 0.2 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,020

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM : Spec. No :

Item Code : 14-175 Unit

Item Name : Provifing and fixing of teek wood water level gauge of approved quality
complete in all repects.

Detail Qty Unit


MATERIAL
Teek Wood Water level 1 No.
gauge

LABOUR
Labourer 0.2 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Job Rs.
Labour Rates Per Job Rs.

2,021

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM : Spec. No :

Item Code : 14-176 Unit

Item Name : Providing and fixing sluice valve of BSS quality (BS 5163) and weight
Class 'B' for Cast Iron & AC pipe line (including cost of jointing
material):-
a) 2.5" (75 mm) dia of Valve

Detail Qty Unit


MATERIAL
C.I. Sluice Valve 2.5" 1 No
i/d
Rubber sheet 1/8" thick 0.46 Kg
M.S. Bolt & Nut 2" to 5" 4 No
dia

LABOUR
Labourer 0.2 Day
Pipe Fitter 0.2 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,022

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM :

Item Code : 14-177-a


Item Name : Providing and Fixing Wall Shower Set 151/153 C.P
Detail Qty Unit
MATERIAL
Wall Shower Set 151/153 1 No
C.P

LABOUR
Plumber 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,023

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM :
Item Code : 14-177-b
Item Name : Providing and Fixing Wall Shower Set 4021/4023 C.P
Detail Qty Unit
MATERIAL
Wall Shower Set 4021/4023 1 No
C.P

LABOUR
Plumber 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,024

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM :

Item Code : 14-177-c


Item Name :
Detail Qty Unit
MATERIAL
Wall Shower Set 981/83 1 No
C.P

LABOUR
Plumber 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,025

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 14 , PLUMBING

DESCRIPTION OF ITEM :

Item Code : 14-177-d


Item Name :
Detail Qty Unit
MATERIAL
Wall Shower Set 671/73 1 No
C.P

LABOUR
Plumber 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,026

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-01-a-01 Unit

Item Name : Supply and Erection MS conduit pipe for wiring purpose comp. on surface
including clamps etc: 1/2" i/d

Detail Qty
MATERIAL
MS CONDUIT (1/2") 1
Inspection Box for MS 0.03
CONDUIT (1/2")
Clamp for pipe 1/2" -1.5" 0.305
M.S. Bend ½" dia 0.0476
Screw for inspection Box 1
Gutties for inspection 1
Box

LABOUR
Electrician 0.012
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft
Labour Rates Per Rft

2,027

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-01-a-02 Unit

Item Name : Supply and Erection MS conduit pipe for wiring purpose comp. On surface
including clamps etc: 3/4" i/d

Detail Qty
MATERIAL
Clamp for pipe 1/2" -1.5" 0.305
Screw for inspection Box 1
Gutties for inspection 1
Box
MS Conduit 3/4" 1
M.S. Bend ¾" 0.0476
Inspection Box MS CONDUIT 0.03
(3/4" - 1.5")

LABOUR
Electrician 0.012
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,028

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM : Spec. No :
Item Code : 15-01-a-03 Unit

Item Name : Supply and Erection MS conduit pipe for wiring purpose comp. On surface
including clamps etc: 1" i/d

Detail Qty
MATERIAL
Clamp for pipe 1/2" -1.5" 0.305
Screw for inspection Box 1
Gutties for inspection 1
Box
Inspection Box MS CONDUIT 0.03
(3/4" - 1.5")
MS Conduit 1" 1
M.S. Bend 1" dia 0.0476

LABOUR
Electrician 0.012
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,029

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-01-a-04 Unit

Item Name : Supply and Erection MS conduit pipe for wiring purpose comp. On surface
including clamps etc: 1.25" i/d

Detail Qty
MATERIAL
Clamp for pipe 1/2" -1.5" 0.305
Screw for inspection Box 1
Gutties for inspection 1
Box
Inspection Box MS CONDUIT 0.03
(3/4" - 1.5")
M.S. Conduit 1.25" 1
M.S. Conduit Bend 1¼" dia 0.0476

LABOUR
Electrician 0.012
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,030

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-01-a-05 Unit

Item Name : Supply and Erection MS conduit pipe for wiring purpose comp. On surface
including clamps etc: 1.5" i/d

Detail Qty
MATERIAL
Clamp for pipe 1/2" -1.5" 0.305
Screw for inspection Box 1
Gutties for inspection 1
Box
Inspection Box MS CONDUIT 0.03
(3/4" - 1.5")
1.5" MS CONDUIT 1
M.S. Bend 1½" dia 0.0476

LABOUR
Electrician 0.012
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,031
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-01-a-06 Unit

Item Name : Supply and Erection MS conduit pipe for wiring purpose comp. On surface
including clamps etc: 2" i/d

Detail Qty
MATERIAL
Screw for inspection Box 1
Gutties for inspection 1
Box
2" MS CONDUIT 1
M.S. Conduit Bend 2" dia 0.0476
Inspection Box for MS 0.03
CONDUIT (2")
Clamp for pipe 2" dia 0.305

LABOUR
Electrician 0.012 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,032

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-01-b-01 Unit

Item Name : Supply and Erection MS conduit pipe for wiring purpose comp.
Recessed in walls including chase etc : 1/2" i/d
Detail Qty
MATERIAL
Ordinary Portland Cement 0.0022
Fine Sand 0.0123
MS CONDUIT (1/2") 1
Inspection Box for MS 0.03
CONDUIT (1/2")
Clamp for pipe 1/2" -1.5" 0.305
M.S. Bend ½" dia 0.0476

LABOUR
Electrician 0.03
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft
Labour Rates Per Rft

2,033

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-01-b-02 Unit

Item Name : Supply and Erection MS conduit pipe for wiring purpose comp.
Recessed in walls including chase etc : 3/4" i/d

Detail Qty Unit


MATERIAL
Ordinary Portland Cement 0.0033 Bag
Fine Sand 0.0123 Cft.
Clamp for pipe 1/2" -1.5" 0.305 No
MS Conduit 3/4" 1 Rft
M.S. Bend ¾" 0.0476 No
Inspection Box MS CONDUIT 0.03 No
(3/4" - 1.5")

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,034

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-01-b-03 Unit

Item Name : Supply and Erection MS conduit pipe for wiring purpose comp.
Recessed in walls including chase etc : 1" i/d

Detail Qty Unit


MATERIAL
Ordinary Portland Cement 0.005 Bag
Fine Sand 0.0123 Cft.
Clamp for pipe 1/2" -1.5" 0.305 No
Inspection Box MS CONDUIT 0.03 No
(3/4" - 1.5")
MS Conduit 1" 1 Rft
M.S. Bend 1" dia 0.0476 No

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,035

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-01-b-04 Unit
Item Name : Supply and Erection MS conduit pipe for wiring purpose comp.
Recessed in walls including chase etc : 1.25" i/d

Detail Qty Unit


MATERIAL
Ordinary Portland Cement 0.0067 Bag
Fine Sand 0.0123 Cft.
Clamp for pipe 1/2" -1.5" 0.305 No
Inspection Box MS CONDUIT 0.03 No
(3/4" - 1.5")
M.S. Conduit 1.25" 1 Rft
M.S. Conduit Bend 1¼" dia 0.0476 No

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,036

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-01-b-05 Unit

Item Name : Supply and Erection MS conduit pipe for wiring purpose comp.
Recessed in walls including chase etc : 1.5" i/d

Detail Qty Unit


MATERIAL
Ordinary Portland Cement 0.0167 Bag
Fine Sand 0.0123 Cft.
Clamp for pipe 1/2" -1.5" 0.305 No
Inspection Box MS CONDUIT 0.03 No
(3/4" - 1.5")
1.5" MS CONDUIT 1 Rft
M.S. Bend 1½" dia 0.0476 No

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,037

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-01-b-06 Unit

Item Name : Supply and Erection MS conduit pipe for wiring purpose comp.
Recessed in walls including chase etc : 2" i/d

Detail Qty
MATERIAL
Ordinary Portland Cement 0.0233
Fine Sand 0.0123
2" MS CONDUIT 1
M.S. Conduit Bend 2" dia 0.0476
Inspection Box for MS 0.03
CONDUIT (2")
Clamp for pipe 2" dia 0.305

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,038

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM : Spec. No :
Item Code : 15-02-a-01 Unit

Item Name : Supply and Erection PVC pipe for wiring purpose complete On surface
including clamps etc: 1/2" i/d

Detail Qty
MATERIAL
Clamp for pipe 1/2" -1.5" 0.305
Screw for inspection Box 1
Gutties for inspection 1
Box
PVC CONDUIT (1/2") 1
pvc bend 0.0667
Inspection Box for 1/2" 0.03

LABOUR
Electrician 0.006
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft
Labour Rates Per Rft

2,039

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-02-a-02 Unit

Item Name : Supply and Erection PVC pipe for wiring purpose complete On surface
including clamps etc: 3/4" i/d

Detail Qty
MATERIAL
Clamp for pipe 1/2" -1.5" 0.305
Screw for inspection Box 1
Gutties for inspection 1
Box
PVC CONDUIT 3/4" 1
pvc bend 3/4" 0.0667
Inspection Box for 3/4" 0.03

LABOUR
Electrician 0.006
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft
Labour Rates Per Rft

2,040

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-02-a-03 Unit

Item Name : Supply and Erection PVC pipe for wiring purpose complete On surface
including clamps etc: 1" i/d

Detail Qty
MATERIAL
Clamp for pipe 1/2" -1.5" 0.305
Screw for inspection Box 1
Gutties for inspection 1
Box
PVC CONDUIT 1" 1
pvc bend for PVC CONDUIT 0.0667
1"
Inspection Box for PVC 0.03
CONDUIT 1"

LABOUR
Electrician 0.006
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft
Labour Rates Per Rft

2,041
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-02-a-04 Unit

Item Name : Supply and Erection PVC pipe for wiring purpose complete On surface
including clamps etc: 1.25" i/d

Detail Qty
MATERIAL
Clamp for pipe 1/2" -1.5" 0.305
Screw for inspection Box 1
Gutties for inspection 1
Box
PVC CONDUIT 1.25" 1
pvc bend for PVC CONDUIT 0.0667
1.25"
Inspection Box for PVC 0.03
CONDUIT 1.25"

LABOUR
Electrician 0.009
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft
Labour Rates Per Rft

2,042

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-02-a-05 Unit

Item Name : Supply and Erection PVC pipe for wiring purpose complete On surface
including clamps etc: 1.5" i/d

Detail Qty
MATERIAL
Clamp for pipe 1/2" -1.5" 0.305
Screw for inspection Box 1
Gutties for inspection 1
Box
PVC CONDUIT 1.5" 1
pvc bend for PVC CONDUIT 0.0667
1.5"
Inspection Box for PVC 0.03
CONDUIT 1.5"

LABOUR
Electrician 0.012
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft
Labour Rates Per Rft

2,043

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-02-a-06 Unit

Item Name : Supply and Erection PVC pipe for wiring purpose complete On surface
including clamps etc: 2" i/d

Detail Qty
MATERIAL
Screw for inspection Box 1
Gutties for inspection 1
Box
Clamp for pipe 2" dia 0.305
PVC CONDUIT 2" 1
pvc bend for PVC CONDUIT 0.0667
2"
Inspection Box for PVC 0.03
CONDUIT 2"

LABOUR
Electrician 0.008
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft
Labour Rates Per Rft

2,044

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-02-a-07 Unit

Item Name : Supply and Erection PVC pipe for wiring purpose complete On surface
including clamps etc: 3" i/d

Detail Qty Unit


MATERIAL
Screw for inspection Box 1 No
Gutties for inspection 1 No
Box
PVC CONDUIT 3" 1 Rft
pvc bend for PVC CONDUIT 0.0667 No
3"
Inspection Box for PVC 0.03 No
CONDUIT 3"
Clamp for PVC CONDUIT 3" 0.305 No

LABOUR
Electrician 0.009 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,045

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-02-a-08 Unit

Item Name : Supply and Erection PVC pipe for wiring purpose complete On surface
including clamps etc: 4" i/d

Detail Qty Unit


MATERIAL
Screw for inspection Box 1 No
Gutties for inspection 1 No
Box
PVC CONDUIT 4" 1 Rft
Inspection Box for PVC 0.03 No
CONDUIT 4"
pvc bend for PVC CONDUIT 0.0667 No
4"
Clamp for PVC CONDUIT 4" 0.305 No

LABOUR
Electrician 0.012 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,046

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-02-b-01 Unit

Item Name : Supply and Erection PVC pipe for wiring purpose complete Recessed in
walls including chase etc : 1/2" i/d

Detail Qty
MATERIAL
Ordinary Portland Cement 0.0014
Fine Sand 0.004
PVC CONDUIT (1/2") 1
pvc bend 0.0667
M.S. Hook 0.3333
Inspection Box for 1/2" 0.03

LABOUR
Electrician 0.018
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft
Labour Rates Per Rft

2,047

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-02-b-02 Unit

Item Name : Supply and Erection PVC pipe for wiring purpose complete Recessed in
walls including chase etc : 3/4" i/d

Detail Qty
MATERIAL
Ordinary Portland Cement 0.0021
Fine Sand 0.006
PVC CONDUIT 3/4" 1
pvc bend 3/4" 0.0667
M.S. Hook for 3/4" 0.3333
Inspection Box for 3/4" 0.305

LABOUR
Electrician 0.018
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft
Labour Rates Per Rft

2,048
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-02-b-03 Unit

Item Name : Supply and Erection PVC pipe for wiring purpose complete Recessed in
walls including chase etc : 1" i/d

Detail Qty
MATERIAL
Ordinary Portland Cement 0.0021
Fine Sand 0.006
PVC CONDUIT 1" 1
pvc bend for PVC CONDUIT 0.0667
1"
M.S. Hook for PVC CONDUIT 0.3333
1"
Inspection Box for PVC 0.03
CONDUIT 1"

LABOUR
Electrician 0.018
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft
Labour Rates Per Rft

2,049

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-02-b-04 Unit

Item Name : Supply and Erection PVC pipe for wiring purpose complete Recessed in
walls including chase etc : 1.25" i/d
Detail
MATERIAL
Ordinary Portland Cement
Fine Sand
PVC CONDUIT 1.25"
pvc bend for PVC CONDUIT
1.25"
MS Hook for PVC CONDUIT
1.25"
Inspection Box for PVC
CONDUIT 1.25"

LABOUR
Electrician
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per
Labour Rates Per

2,050

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-02-b-05 Unit

Item Name : Supply and Erection PVC pipe for wiring purpose complete Recessed in
walls including chase etc : 1.5" i/d

Detail Qty
MATERIAL
Ordinary Portland Cement 0.0023
Fine Sand 0.0133
PVC CONDUIT 1.5" 1
pvc bend for PVC CONDUIT 0.0667
1.5"
MS Hook forPVC CONDUIT 0.3333
1.5"
Inspection Box for PVC 0.03
CONDUIT 1.5"

LABOUR
Electrician 0.024
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft
Labour Rates Per Rft

2,051

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-02-b-06 Unit

Item Name : Supply and Erection PVC pipe for wiring purpose complete Recessed in
walls including chase etc : 2" i/d

Detail
MATERIAL
Ordinary Portland Cement
Fine Sand
PVC CONDUIT 2"
pvc bend for PVC CONDUIT
2"
MS Hook for PVC CONDUIT
2"
Inspection Box for PVC
CONDUIT 2"

LABOUR
Electrician
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per
Labour Rates Per

2,052

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-02-b-07 Unit

Item Name : Supply and Erection PVC pipe for wiring purpose complete Recessed in
walls including chase etc : 3" i/d

Detail Qty Unit


MATERIAL
Ordinary Portland Cement 0.0033 Bag
Fine Sand 0.01 Cft
PVC CONDUIT 3" 1 Rft
pvc bend for PVC CONDUIT 0.0667 No
3"
Inspection Box for PVC 0.03 No
CONDUIT 3"
Clamp for PVC CONDUIT 3" 0.305 No

LABOUR
Electrician 0.037 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,053

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-02-b-08 Unit

Item Name : Supply and Erection PVC pipe for wiring purpose complete Recessed in
walls including chase etc : 4" i/d

Detail Qty Unit


MATERIAL
Ordinary Portland Cement 0.0047 Bag
Fine Sand 0.0133 Cft
PVC CONDUIT 4" 1 Rft
Inspection Box for PVC 0.03 No
CONDUIT 4"
pvc bend for PVC CONDUIT 0.0667 No
4"
Clamp for PVC CONDUIT 4" 0.305 No

LABOUR
Electrician 0.046 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,054

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-03-a Unit

Item Name : Supply and Erection GI flexible pipe for wiring purpose complete
1/2" i/d

Detail Qty Unit


MATERIAL
G.I Flexible pipe (0.5") 1 Rft
Socket ½" dia Light 0.067 No
Nipple ½" dia 0.067 No
Check Nuts ½" dia 0.067 No

LABOUR
Electrician 0.006 Day
Welder 0.001 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.
2,055

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-03-b Unit

Item Name : Supply and Erection GI flexible pipe for wiring purpose complete
3/4" i/d

Detail Qty Unit


MATERIAL
G I Flexible Pipe 3/4" 1 Rft
G.I. Socket ¾" dia Light 0.067 No
G.I. Nipple ¾" dia Light 0.067 No
Check Nuts ¾" dia 0.067 No

LABOUR
Electrician 0.006 Day
Welder 0.001 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,056

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-03-c
Item Name :
Detail Qty Unit
MATERIAL
G I Flexible Pipe 1" 1 Rft
Light
G.I. Socket 1" dia Light 0.067 No
G.I. Nipple 1" dia Light 0.067 No
Check Nuts 1" dia Light 0.067 No

LABOUR
Electrician 0.01 Day
Welder 0.002 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,057

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-03-d Unit

Item Name : Supply and Erection GI flexible pipe for wiring purpose complete
1.25" i/d

Detail Qty Unit


MATERIAL
G I Flexible Pipe 1.25" 1 Rft
Light
G.I. Socket 1¼" dia (32 0.067 No
mm) Light
G.I. Nipple 1¼" dia (32 0.067 No
mm) Light
Check Nuts 1¼" dia (32 0.067 No
mm) Light

LABOUR
Electrician 0.011 Day
Welder 0.002 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,058
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-03-e Unit

Item Name : Supply and Erection GI flexible pipe for wiring purpose complete
1.5" i/d

Detail Qty Unit


MATERIAL
G I Flexible Pipe 1.5" 1 Rft
Light
G.I. Socket 1½" dia (40 0.067 No
mm) Light
G.I. Nipple 1½" dia (40 0.067 No
mm) Light
Check Nuts 1½" dia (40 0.067 No
mm) Light

LABOUR
Electrician 0.011 Day
Welder 0.002 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,059

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-03-f Unit

Item Name : Supply and Erection GI flexible pipe for wiring purpose complete 2"
i/d
Detail Qty Unit
MATERIAL
G I Flexible Pipe 2" 1 Rft
Light
G.I. Socket 2" dia (50 0.067 No
mm) Light
G.I. Nipple 2" dia (50 0.067 No
mm) Light
Check Nuts 2" dia (50 mm) 0.067 No
Light

LABOUR
Electrician 0.017 Day
Welder 0.004 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,060

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-03-g Unit

Item Name : Supply and Erection GI flexible pipe for wiring purpose complete 3"
i/d

Detail Qty Unit


MATERIAL
G I Flexible Pipe 3" 1 Rft
Light
G.I. Socket 3" dia (80 0.067 No
mm) Light
G.I. Nipple 3" dia (80 0.067 No
mm) Light
Check Nuts 3" dia (80 mm) 0.067 No
Light

LABOUR
Electrician 0.018 Day
Welder 0.004 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,061

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-04-a
Item Name :
Detail Qty
MATERIAL
Batten (1/2") 1
Clips 0.016
Nails 0.002

LABOUR
Carpenter 0.003
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft
Labour Rates Per Rft

2,062

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-04-b
Item Name :
Detail Qty
MATERIAL
Batten (3/4") 1
Clips 0.016
Nails 0.002

LABOUR
Carpenter 0.003
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft
Labour Rates Per Rft

2,063

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-04-c
Item Name :
Detail Qty Unit
MATERIAL
Clips 0.016 Pkt
Nails 0.002 Kg
Batten 1" 1 Rft

LABOUR
Carpenter 0.003 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,064

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-05-a Unit
Item Name : Supply and Erection single core PVC insulated copper conductor
250/440 V grade cable : 3/0.029" 1/2" i/d

Detail Qty Unit


MATERIAL
Cable S/C 250V (3/0.029") 1 Rft

LABOUR
Electrician 0.004 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,065

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-05-b Unit

Item Name : Supply and Erection single core PVC insulated copper conductor
250/440 V grade cable : 3/0.036"

Detail Qty Unit


MATERIAL
Cable S/C 250V (3/0.036") 1 Rft

LABOUR
Electrician 0.004 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,066

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-05-c Unit

Item Name : Supply and Erection single core PVC insulated copper conductor
250/440 V grade cable : 7/0.029"

Detail Qty Unit


MATERIAL
Cable S/C 250V (7/0.029") 1 Rft

LABOUR
Electrician 0.004 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,067

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-05-d Unit

Item Name : Supply and Erection single core PVC insulated copper conductor
250/440 V grade cable : 7/0.036"

Detail Qty Unit


MATERIAL
Cable S/C 250V (7/0.036") 1 Rft

LABOUR
Electrician 0.004 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,068

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-05-e Unit

Item Name : Supply and Erection single core PVC insulated copper conductor
250/440 V grade cable : 7/0.044"

Detail Qty Unit


MATERIAL
Cable S/C 250V (7/0.044") 1 Rft

LABOUR
Electrician 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,069

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-05-f Unit

Item Name : Supply and Erection single core PVC insulated copper conductor
250/440 V grade cable : 7/0.064"

Detail Qty Unit


MATERIAL
Cable S/C 250V (7/0.064") 1 Rft

LABOUR
Electrician 0.015 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,070

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-05-g Unit

Item Name : Supply and Erection single core PVC insulated copper conductor
250/440 V grade cable : 19/0.064"

Detail Qty Unit


MATERIAL
Cable S/C 250V 1 Rft
(19/0.064")

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,071

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-06-a Unit

Item Name : Supply and Erection single core PVC insulated+sheathed copper
conductor 250/440 V grade cable : 3/0.029"

Detail Qty Unit


MATERIAL
Cable S/C SH 250V 1 Rft
(3/0.029")

LABOUR
Electrician 0.007 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,072

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-06-b Unit

Item Name : Supply and Erection single core PVC insulated+sheathed copper
conductor 250/440 V grade cable : 3/0.036"

Detail Qty Unit


MATERIAL
Cable S/C SH 250V 1 Rft
(3/0.036")

LABOUR
Electrician 0.007 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,073

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-06-c Unit

Item Name : Supply and Erection single core PVC insulated+sheathed copper
conductor 250/440 V grade cable : 7/0.029"

Detail Qty Unit


MATERIAL
Cable S/C SH 250V 1 Rft
(7/0.029")

LABOUR
Electrician 0.008 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,074

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-06-d Unit

Item Name : Supply and Erection single core PVC insulated+sheathed copper
conductor 250/440 V grade cable : 7/0.036"

Detail Qty Unit


MATERIAL
Cable S/C SH 250V 1 Rft
(7/0.036")

LABOUR
Electrician 0.008 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,075

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-06-e Unit

Item Name : Supply and Erection single core PVC insulated+sheathed copper
conductor 250/440 V grade cable : 7/0.044"

Detail Qty Unit


MATERIAL
Cable S/C SH 250V 1 Rft
(7/0.044")

LABOUR
Electrician 0.013 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,076

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-06-f Unit

Item Name : Supply and Erection single core PVC insulated+sheathed copper
conductor 250/440 V grade cable : 7/0.064"

Detail Qty Unit


MATERIAL
Cable S/C SH 250V 1 Rft
(7/0.064")

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,077

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-07-a Unit

Item Name : Supply and Erection single core PVC insulated & sheathed copper
conductor, 660/1100V cable : 7/0.064"

Detail Qty Unit


MATERIAL
Cable S/C 660V (7/0.064") 1 Rft

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,078

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-07-b Unit

Item Name : Supply and Erection single core PVC insulated & sheathed copper
conductor, 660/1100V cable : 19/0.052"

Detail Qty Unit


MATERIAL
Cable S/C 660V 1 Rft
(19/0.052")

LABOUR
Electrician 0.034 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,079

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-07-c Unit

Item Name : Supply and Erection single core PVC insulated & sheathed copper
conductor, 660/1100V cable : 19/0.064"

Detail Qty Unit


MATERIAL
Cable S/C 660V 1 Rft
(19/0.064")

LABOUR
Electrician 0.034 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,080
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-07-d Unit

Item Name : Supply and Erection single core PVC insulated & sheathed copper
conductor, 660/1100V cable : 19/0.083"

Detail Qty Unit


MATERIAL
Cable S/C 660V 1 Rft
(19/0.083")

LABOUR
Electrician 0.05 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,081

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-07-e Unit

Item Name : Supply and Erection single core PVC insulated & sheathed copper
conductor, 660/1100V cable : 37/0.072"

Detail Qty Unit


MATERIAL
Cable S/C 660V 1 Rft
(37/0.072")

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,082

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-07-f Unit

Item Name : Supply and Erection single core PVC insulated & sheathed copper
conductor, 660/1100V cable : 37/0.083"

Detail Qty Unit


MATERIAL
Cable S/C 660V 1 Rft
(37/0.083")

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,083

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-07-g Unit

Item Name : Supply and Erection single core PVC insulated & sheathed copper
conductor, 660/1100V cable : 37/0.103"
Detail Qty Unit
MATERIAL
Cable S/C 660V 1 Rft
(37/0.103")

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,084

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-08-a Unit

Item Name : Supply and Erection twin core PVC insulated & sheathed copper
conductor 250/440 V grade cable : 3/0.029"

Detail Qty Unit


MATERIAL
Cable 2/C 250V (3/0.029") 1 Rft

LABOUR
Electrician 0.005 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,085

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-08-b Unit

Item Name : Supply and Erection twin core PVC insulated & sheathed copper
conductor 250/440 V grade cable : 3/0.036"

Detail Qty Unit


MATERIAL
Cable 2/C 250V (3/0.036") 1 Rft

LABOUR
Electrician 0.005 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,086

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-08-c Unit

Item Name : Supply and Erection twin core PVC insulated & sheathed copper
conductor 250/440 V grade cable : 7/0.029"

Detail Qty Unit


MATERIAL
Cable 2/C 250V (7/0.029") 1 Rft

LABOUR
Electrician 0.007 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.
2,087

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-08-d Unit

Item Name : Supply and Erection twin core PVC insulated & sheathed copper
conductor 250/440 V grade cable : 7/0.036"

Detail Qty Unit


MATERIAL
Cable 2/C 250V (7/0.036") 1 Rft

LABOUR
Electrician 0.007 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,088

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-08-e Unit

Item Name : Supply and Erection twin core PVC insulated & sheathed copper
conductor 250/440 V grade cable : 7/0.044"

Detail Qty Unit


MATERIAL
Cable 2/C 250V (7/0.044") 1 Rft

LABOUR
Electrician 0.007 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,089

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-08-f Unit

Item Name : Supply and Erection twin core PVC insulated & sheathed copper
conductor 250/440 V grade cable : 7/0.064"

Detail Qty Unit


MATERIAL
Cable 2/C 250V (7/0.064") 1 Rft

LABOUR
Electrician 0.007 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,090

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-09-a Unit

Item Name : Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick
bakelite sheet top etc. complete : 4"x4"

Detail Qty Unit


MATERIAL
Ordinary Portland Cement 0.021 Cft
Fine Sand 0.0008 Cft
4x4" MS Sheet Box 1 No

LABOUR
Electrician 0.075 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,091

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-09-b Unit

Item Name : Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick
bakelite sheet top etc. complete : 7"x4"

Detail Qty
MATERIAL
Ordinary Portland Cement 0.026 Cft
Fine Sand 0.0009 Cft
7"x4" MS Sheet Box 1 No

LABOUR
Electrician 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,092

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-09-c Unit

Item Name : Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick
bakelite sheet top etc. complete : 9"x4"

Detail Qty
MATERIAL
Ordinary Portland Cement 0.032 Cft
Fine Sand 0.0008 Cft
9"x4" MS Sheet Box 1 No

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,093

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-09-d Unit

Item Name : Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick
bakelite sheet top etc. complete : 8"x10"

Detail Qty
MATERIAL
Ordinary Portland Cement 0.036 Cft
Fine Sand 0.0015 Cft
8"x10" MS Sheet Box 1 No

LABOUR
Electrician 0.15 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,094

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-09-e Unit

Item Name : Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick
bakelite sheet top etc. complete : 10"x12"

Detail Qty Unit


MATERIAL
Ordinary Portland Cement 0.047 Cft
Fine Sand 0.0016 Cft
10"x12" MS Sheet Box 1 No

LABOUR
Electrician 0.18 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,095

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-09-f Unit

Item Name : Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick
bakelite sheet top etc. complete : 12"x14"
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.052 Cft
Fine Sand 0.0018 Cft
12"x14" MS Sheet Box 1 No

LABOUR
Electrician 0.21 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,096

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-10-a
Item Name : Supply and Erection Sahl wood board, 1.75" deep : 3"x3" dia
Detail Qty Unit
MATERIAL
Screw for inspection Box 1 No
Wood Box 3"x3" dia 1 Rft
Wood. Gutti 1 No

LABOUR
Electrician 0.015 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,097

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM :
Item Code : 15-10-b
Item Name : Supply and Erection Sahl wood board, 1.75" deep : 4"x4"
Detail Qty Unit
MATERIAL
Screw for inspection Box 1 No
Wood. Gutti 1 No
Wood Box 4"x4" 1 Rft

LABOUR
Electrician 0.045 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,098

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-10-c
Item Name : Supply and Erection Sahl wood board, 1.75" deep : 7"x4"
Detail Qty Unit
MATERIAL
Screw for inspection Box 1 No
Wood. Gutti 1 No
Wood Box 7"x4" 1 Rft

LABOUR
Electrician 0.045 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,099

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-10-d
Item Name : Supply and Erection Sahl wood board, 1.75" deep : 8"x10"
Detail Qty Unit
MATERIAL
Screw for inspection Box 1 No
Wood. Gutti 1 No
Wood Box 8"x10" 1 Rft

LABOUR
Electrician 0.045 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,100

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-10-e
Item Name : Supply and Erection Sahl wood board, 1.75" deep : 10"x12"
Detail Qty Unit
MATERIAL
Screw for inspection Box 1 No
Wood. Gutti 1 No
Wood Box 10"x12" 1 Rft

LABOUR
Electrician 0.05 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,101

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-10-f
Item Name : Supply and Erection Sahl wood board, 1.75" deep : 12"x14"
Detail Qty Unit
MATERIAL
Screw for inspection Box 1 No
Wood. Gutti 1 No
Wood Box 12"x14" 1 Rft

LABOUR
Electrician 0.05 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,102

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-11-a-01 Unit

Item Name : Supply and Erection of iron/aluminium clad, 500V main switch Double
pole : 15/20 Amp.

Detail Qty Unit


MATERIAL
D.Pole (15/20A) 1 No

LABOUR
Electrician 0.1 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,103

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-11-a-02 Unit

Item Name : Supply and Erection of iron/aluminium clad, 500V main switch Double
pole : 30/35 Amp

Detail Qty Unit


MATERIAL
D.Pole 30/35A 1 Rft

LABOUR
Electrician 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,104

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-11-a-03 Unit

Item Name : Supply and Erection iron/aluminium clad 500 volts main switch
Double Pole : 60/65 Amp

Detail Qty Unit


MATERIAL
D.Pole 60/65A 1 Rft

LABOUR
Electrician 0.15 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,105

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-11-a-04 Unit

Item Name : Supply and Erection iron/aluminium clad 500 volts main switch
Double Pole : 100 Amp

Detail Qty Unit


MATERIAL
D.Pole 100A 1 Rft

LABOUR
Electrician 0.15 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,106

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-11-b-01 Unit

Item Name : Supply and Erection of iron/aluminium clad, 500V main switch Triple
pole with neutral link : 15/20 Amp.

Detail Qty Unit


MATERIAL
T.Pole (15/20A) 1 No

LABOUR
Electrician 0.2 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,107

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-11-b-02 Unit

Item Name : Supply and Erection of iron/aluminium clad, 500V main switch Triple
pole with neutral link : 30/35 Amp.

Detail Qty Unit


MATERIAL
T.Pole 30/35A 1 No

LABOUR
Electrician 0.2 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,108

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-11-b-03 Unit

Item Name : Supply and Erection of iron/aluminium clad, 500V main switch Triple
pole with neutral link : 60/65 Amp.

Detail Qty Unit


MATERIAL
T.Pole 60/65A 1 No

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,109

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-11-b-04 Unit

Item Name : Supply and Erection of iron/aluminium clad, 500V main switch Triple
pole with neutral link : 100 Amp.

Detail Qty Unit


MATERIAL
T.Pole 100A 1 No

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,110

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-11-b-05
Item Name : Supply & Erection of 200 Amp Main switch
Detail Qty Unit
MATERIAL
200 Amp Main switch 1 Each

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,111

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-11-b-06
Item Name : Supply & Erection of Change over switch 100 Amp
Detail Qty Unit
MATERIAL
Change over switch 100 1 Each
Amp (imported)

LABOUR
Electrician 0.2 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,112

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-11-b-07
Item Name : Supply & Erection of Change over switch 200 Amp
Detail Qty Unit
MATERIAL
Change over sv/itch 1 Each
200-Amp imported

LABOUR
Electrician 0.2 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,113

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-11-b-08
Item Name : Supply & Erection of Change over switch 600 Amp
Detail Qty Unit
MATERIAL
Change over switch 600 1 Each
Amp best quality

LABOUR
Electrician 0.2 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,114

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-11-b-09
Item Name : Supply & Erection of Change over switch 500 Amp
Detail Qty Unit
MATERIAL
Change over switch 500 1 Each
Amp (heavy duty)

LABOUR
Electrician 0.2 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,115

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-11-b-10
Item Name : Supply & Erection of 600 Amp main switch
Detail Qty Unit
MATERIAL
600 Amp main switch 1 Each

LABOUR
Electrician 0.2 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,116

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-11-b-11
Item Name : Supply & Erection of 400 Amp main switch
Detail Qty Unit
MATERIAL
400 Amp main switch 1 Each

LABOUR
Electrician 0.2 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,117

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-11-b-12
Item Name : Supply & Erection of 300 Amp main switch
Detail Qty Unit
MATERIAL
300 Amp main switch 1 Each

LABOUR
Electrician 0.2 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,118

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-12-a Unit

Item Name : Supply and Erection or iron/aluminium clad, 500V main switch with
triple pole, complete : 60 Amp.

Detail Qty Unit


MATERIAL
Bars 60 Amp W.4 Copper 1 No
Bar

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,119

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-12-b Unit

Item Name : Supply and Erection or iron/aluminium clad, 500V main switch with
triple pole, complete : 100 Amp.
Detail Qty Unit
MATERIAL
Bars 100 Amp W.4 Copper 1 No
Bar

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,120

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-12-c Unit

Item Name : Supply and Erection or iron/aluminium clad, 500V main switch with
triple pole, complete : 200 Amp.

Detail Qty Unit


MATERIAL
Bars 200 Amp 4 Copper Bar 1 No

LABOUR
Electrician 0.2 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,121

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-12-d Unit

Item Name : Supply and Erection or iron/aluminium clad, 500V main switch with
triple pole, complete : 300 Amp.

Detail Qty Unit


MATERIAL
Bars 300 Amp 4 Copper Bar 1 No

LABOUR
Electrician 0.2 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,122

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-12-e Unit

Item Name : Supply and Erection or iron/aluminium clad, 500V main switch with
triple pole, complete : 500 Amp.

Detail Qty Unit


MATERIAL
Bars 500 Amp 4 Copper Bar 1 No

LABOUR
Electrician 0.2 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,123

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-12-f
Item Name : Supply & Erection of Brass Bar 5000 Amp
Detail Qty Unit
MATERIAL
Brass Bar 5000 Amp 1 Each

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,124

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-12-g
Item Name : Supply & Erection of Brass Bar3000 Amp
Detail Qty Unit
MATERIAL
Brass Bar 3000 Amp 1 Each

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,125

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-13 Unit

Item Name : Supply and Erection plain pendent lamp holder, complete with
bakelite lamp holder & flexible twin wire of 2m

Detail Qty Unit


MATERIAL
Cable (23/0.0076) 2m 1 Mtr
length
Lamp Holder 1 No

LABOUR
Electrician 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,126

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-14 Unit

Item Name : Supply and Erection 9" long swan neck plain brass/steel/brass
oxidised bracket lamp holder, complete

Detail Qty Unit


MATERIAL
Swan Neck Holder 1 No
LABOUR
Electrician 0.019 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,127

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-15 Unit

Item Name : Supply and Erection wall/pole type bracket with double cover water
tight reflector, flexible wire & brass holder

Detail Qty Unit


MATERIAL
Flexible Brass Holder 1 No

LABOUR
Electrician 0.04 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,128

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-16 Unit

Item Name : Supply and Erection call bell 220/250V, fixed on Sahl wood board
7"x4"

Detail Qty Unit


MATERIAL
Wood Box 7"x4" 1 No
Push Bell 1 No

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,129

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-17 Unit

Item Name : Supply and Erection bell push or bed switch, with 5m. twin flexible
wire 23/0.0076"

Detail Qty Unit


MATERIAL
Flexible Wire (23/0.0076) 16.4 RFT
Push Bell 1 No

LABOUR
Electrician 0.007 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,130

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-18-a
Item Name : Supply and Erection switches 10/15 Amp : Open type
Detail Qty Unit
MATERIAL
Screw for inspection Box 2 No
Switch open (10/15A) 1 No

LABOUR
Electrician 0.015 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,131

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-18-b
Item Name :
Detail Qty
MATERIAL
Screw for inspection Box 2
Switch Recessed (10/15A) 1

LABOUR
Electrician 0.015
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each
Labour Rates Per Each

2,132
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-19-a
Item Name :
Detail Qty Unit
MATERIAL
Screw for inspection Box 2 No
Wall Socket (Open) 10/15 1 No

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,133

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-19-b
Item Name :
Detail Qty Unit
MATERIAL
Screw for inspection Box 2 No
Wall Socket Recess 10/15A 1 No

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,134

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-20-a Unit

Item Name : Supply and Erection 3 pin switch & plug combined recessed type : 5
Amp

Detail Qty Unit


MATERIAL
Screw for inspection Box 2 No
5A Three Pin Switch 1 No

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,135

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-20-b Unit

Item Name : Supply and Erection 3 pin switch & plug combined recessed type :
10/15 Amp

Detail Qty Unit


MATERIAL
Screw for inspection Box 2 No
recessed type 10/15A 1 No
Three Pin Switch
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,136

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-21
Item Name :
Detail Qty Unit
MATERIAL
Screw for inspection Box 2 No
open type 10/15A Three 1 No
Pin Switch

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,137

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-22-a
Item Name :
Detail Qty Unit
MATERIAL
Screw for inspection Box 2 No
Bakelite (Button Holder ) 1 No

LABOUR
Electrician 0.013 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,138

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-22-b
Item Name : Supply and Erection button holder/angle holder Brass
Detail Qty Unit
MATERIAL
Screw for inspection Box 2 No
Brass (Button Holder ) 1 No

LABOUR
Electrician 0.013 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,139

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-23-a Unit
Item Name : Supply and Erection porcelain fuses with plastic sheet
base on angle iron board : 10/15 Amp.

Detail Qty Unit


MATERIAL
fuse 10/15A 1 No

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,140

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-23-b Unit

Item Name : Supply and Erection porcelain fuses with plastic sheet
base on angle iron board : 30 Amp.

Detail Qty Unit


MATERIAL
30 Amp Fuse Proceline 1 No

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,141

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-23-c Unit

Item Name : Supply and Erection porcelain fuses with plastic sheet
base on angle iron board : 60 Amp.

Detail Qty Unit


MATERIAL
60 Amp Fuse Proceline 1 No

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,142

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-23-d Unit

Item Name : Supply and Erection porcelain fuses with plastic sheet
base on angle iron board 100 Amp.

Detail Qty Unit


MATERIAL
100 Amp Fuse Proceline 1 No

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,143

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-23-e Unit

Item Name : Supply and Erection porcelain fuses with plastic sheet
base on angle iron board : 200 Amp.

Detail Qty Unit


MATERIAL
200 Amp Fuse Proceline 1 No

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,144

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-24-a Unit

Item Name : Supply and Erection tube light, including rod, choke etc complete
Double rod (2x40 watts) with 2 chokes & 2 starters

Detail Qty Unit


MATERIAL
Tube rod 2 No
Chokes 2 No
Starters 2 No
Frame with holder 1 No
Flexible wire 6 Rft

LABOUR
Electrician 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Set Rs.
Labour Rates Per Set Rs.

2,145

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-24-b Unit

Item Name : Supply and Erection tube light, including rod, choke etc complete
Single rod (40 watts) with 1 choke & 1 starter

Detail Qty Unit


MATERIAL
Tube rod 1 No
Chokes 1 No
Starters 1 No
Flexible wire 6 Rft
Frame set 1 No

LABOUR
Electrician 0.075 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Set Rs.
Labour Rates Per Set Rs.

2,146

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-24-c Unit

Item Name : Supply and Erection tube light, including rod, choke etc complete
Round tube (32 watt) 1 choke + 1 starter w/o cover

Detail Qty Unit


MATERIAL
Chokes 1 No
Starters 1 No
Round tube 32 watts 1 No
Holder 1 No
Base 1 No
Flexeble wire 6 Rft
Hooks 1 No

LABOUR
Electrician 0.055 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,147

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-25 Unit

Item Name : Supply and Erection girder clamp hook, 5/8" dia.for hanging ceiling
fans

Detail Qty Unit


MATERIAL
Girder Clamp Hoook (5/8" 1 No
dia)

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,148

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-26-a Unit

Item Name : Supply and Erection circuit breaker (imported) on sahl wood board
complete : 2/5/15 Amp.

Detail Qty Unit


MATERIAL
2" MS CONDUIT 3.28 RFT
Circuit Breaker I 1 No
(2/5/15A)

LABOUR
Electrician 0.075 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,149

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-26-b Unit

Item Name : Supply and Erection circuit breaker (imported) on sahl wood board
complete : 20/25/30 Amp.

Detail Qty Unit


MATERIAL
Circuit Breaker I 1 No
(20/25/30A)
Board 1 No

LABOUR
Electrician 0.075 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,150

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-27 Unit

Item Name : Supply and Erection stay for house service pipe, erected with straining
screws and 7/14 SWG stay wire

Detail Qty Unit


MATERIAL
Stay Wire 7/14 SWG 1 RFT
Straining Screws 0.15 Pkt

LABOUR
Electrician 0.009 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,151
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-28-a Unit

Item Name : Supply and Erection of house service pipe Henley or pole, type 2" dia.
erected to install insulated wire etc

Detail Qty Unit


MATERIAL
G.I pipe (light) 2" 1 RFT
Shackle Insulator 0.063 No
Straining Device 0.006 No

LABOUR
Electrician 0.012 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,152

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-29
Item Name :
Detail Qty
MATERIAL
Nut Bolt for Shackle/Pin 0.25
Insulator
Shackle/Pin Insulator 1

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,153

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-30 Unit

Item Name : Supply and Erection bare copper conductor wire, No. 2 to 16 SWG,
including GI binding wire No. 16 SWG

Detail Qty Unit


MATERIAL
Binding Wire - 16 SWG 0.333 Kg
Copper Conductor 1 Kg

LABOUR
Electrician 0.013 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per kg Rs.
Labour Rates Per kg Rs.

2,154

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-31 Unit

Item Name : Supply and Erection GI wire of sizes, including binding wire No. 16 SWG
for support of rubber wire, pole to pole
Detail Qty Unit
MATERIAL
G.I Wire 16 SWG 1 Kg

LABOUR
Electrician 0.013 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per kg Rs.
Labour Rates Per kg Rs.

2,155

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-32-a Unit

Item Name : Wiring overhead line in 2 single core, PVC insulated cable with GI wire
#8 SWG : 3/0.029"

Detail Qty Unit


MATERIAL
Cable S/C 250V (3/0.029") 2 Rft
G.I Wire 8 SWG 0.305 kg

LABOUR
Electrician 0.007 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,156

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM : Spec. No :
Item Code : 15-32-b Unit

Item Name : Wiring overhead line in 2 single core, PVC insulated cable with GI
wire #8 SWG : 7/0.029"

Detail Qty Unit


MATERIAL
Cable S/C 250V (7/0.029") 2 Rft
G.I Wire 8 SWG 0.305 kg

LABOUR
Electrician 0.007 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,157

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-32-c Unit

Item Name : Wiring overhead line in 2 single core, PVC insulated cable with GI
wire #8 SWG : 7/0.036"

Detail Qty Unit


MATERIAL
Cable S/C 250V (7/0.036") 2 Rft
G.I Wire 8 SWG 0.305 kg

LABOUR
Electrician 0.007 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.
2,158

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-32-d Unit

Item Name : Wiring overhead line in 2 single core, PVC insulated cable with GI
wire #8 SWG : 7/0.044"

Detail Qty Unit


MATERIAL
Cable S/C 250V (7/0.044") 2 Rft
G.I Wire 8 SWG 0.305 kg

LABOUR
Electrician 0.007 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,159

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-33 Unit

Item Name : Supply and Erection street light pole bracket 1.25" GI pipe 2m. long,
complete with 2 pole clamps

Detail Qty Unit


MATERIAL
Street Light Pole Bracket 1 No.
Clamp 2 No
LABOUR
Electrician 0.225 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,160

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-34 Unit

Item Name : Supply and Fixing dust & weather proof street light fitting with
reflector, 400W mercury vapour lamp etc comp.

Detail Qty Unit


MATERIAL
Street Light fitting 1 No.

LABOUR
Electrician 0.4 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,161

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-35-a Unit

Item Name : Supply and Erection pole mounted street light complete for fitting
125/250 W mercury lamp : GEC make

Detail Qty Unit


MATERIAL
Pole Street Light GEC 1 No.
(125/200W)

LABOUR
Electrician 0.4 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,162

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-35-b Unit

Item Name : Supply and Erection pole mounted street light complete for fitting
125/250 W mercury lamp

Detail Qty Unit


MATERIAL
Pole Street Light 1 No.
(125/200W)

LABOUR
Electrician 0.4 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,163

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-35-c Unit

Item Name : Supply & erection of Road Light fixture with 250 watts Son lamp,
ballast and ignitor

Detail Qty Unit


MATERIAL
Road Light fixture IP 66 1 No
with 250 watts Son lamp,
ballast and ignitor.

LABOUR
Skilled Labour 0.125 Day
Electrician 0.125 Day
Sundries (Labour Only):

EQUIPMENT
Mobile Crane 10 Ton 1 hr

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,164

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-35-g Unit

Item Name : Providing and laying of cable route marker cast iron for all sort of
Road Light, Street Lights & Boundary Wall lights complete in all
respects with all installation material complete

Detail Qty Unit

MATERIAL
Cable route marker made 1 No
of cast iron for all sort
of Road Light,Street
Lights & Boundary Wall
lights

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,165

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-36-a
Item Name : Supply and Fixing 125 W mercury vapour lamp with choke
Detail Qty Unit
MATERIAL
125 W Mercury Vapour lamp 1 No.
Choke 125 W 1 No.

LABOUR
Electrician 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,166

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM :
Item Code : 15-36-b
Item Name : Supply and Fixing 250 W mercury vapour lamp with choke
Detail Qty Unit
MATERIAL
250 W mercury vapour lamp 1 No.
Choke 250 W 1 No.

LABOUR
Electrician 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,167

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-36-c
Item Name : Supply and Fixing 400 W mercury vapour lamp with choke
Detail Qty Unit
MATERIAL
400 W mercury vapour 1 No.
Choke 400 W 1 No.

LABOUR
Electrician 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,168

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-d Unit

Item Name : Supply and Fixing of Road Light fixture IP 66 with 250 watts Son lamp,
ballast and ignitor

Detail Qty Unit


MATERIAL
Road Light fixture IP 66 1 No.
with 250 watts Son lamp,
ballast and ignitor

LABOUR
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,169

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-36-e
Item Name :
Detail Qty Unit
MATERIAL
SMD Type LED Road light 1 No.
Fixture (120-130 watts)

LABOUR
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,170

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-36-f
Item Name :
Detail Qty Unit
MATERIAL
SMD Type LED Road light 1 No.
Fixture (90-100 watts)

LABOUR
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,171

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-36-g
Item Name :
Detail Qty Unit
MATERIAL
SMD Type LED Road light 1 No.
Fixture (60-70 watts)

LABOUR
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,172

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-h Unit

Item Name : Supply at site, installation and commissioning of Road light fixture
LED 72 Watt with 72 Watt LED lamp of approved equivalent including
cost of all necessary accessories, complete in all respects

Detail Qty Unit

MATERIAL
Road light fixture model 1 No
#IRONY LED 72 Watt with
72 Watt LED lamp

LABOUR
Skilled Labour 0.125 Day
Electrician 0.125 Day
Sundries (Labour Only):

EQUIPMENT
Mobile Crane 10 Ton 1 hr

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,173

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-i-1 Unit

Item Name : Supply, installation, testing and commissioning of 2x28 Watt


fluorescent light fixture, ceiling, recessed, wall mounted made of MS
body 22 SWG degreased and derusted with white enameled non yellowing
paint. Complete with internal wiring, Grounding terminal , complete in
all respects.

Detail Qty Unit


MATERIAL
2x28 Watt fluorescent 1 No
light fixture complete
with T5 lamps,

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,174

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-i-2 Unit

Item Name : Supply, installation, testing and commissioning of 1x28 Watt


fluorescent light fixture, ceiling, recessed, wall mounted made of MS
body 22 SWG degreased and derusted with white enameled non yellowing
paint. Complete with internal wiring, Grounding terminal , complete in
all respects.

Detail Qty Unit


MATERIAL
1x28 Watt fluorescent 1 No
light fixture complete
with T5 lamps
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,175

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-i-3 Unit

Item Name : Supply, installation, testing and commissioning of 2x28 Watt


fluorescent light fixture with T5 lamps & electronic ballast, ceiling,
recessed, wall mounted made of MS body 22 SWG degreased and derusted
with white enameled non yellowing paint. Complete with internal wiring,
Grounding terminal , complete in all respects.

Detail Qty Unit


MATERIAL
2x28 Watt fluorescent 1 No
light fixture complete
with T5 lamps,

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,176

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-i-4 Unit

Item Name : Supply, installation, testing and commissioning of 1x36 watt


fluorescent light fittings, ceiling, recessed, wall mounted made of
MS body 22 SWG degreased and derusted with white enameled non yellowing
paint. Complete with internal wiring, Grounding terminal , complete in
all respects.

Detail Qty Unit


MATERIAL
1x36 watt flourescent 1 No
light complete with lamp

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,177

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-36-i-5
Item Name :
fittings,
Flourescent lamp, complete in all respects.
Detail Qty Unit
MATERIAL
1x18 Watt fixture with 1 No
energy saver lamp

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,178

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-i-6 Unit

Item Name : Supply, installation, testing and commissioning of IP-44 rated, 2x3
Watt up/down light LED Light, complete in all respects.

Detail Qty Unit


MATERIAL
2x3 Watt up/down light 1 No
LED Light, IP-44 rated,

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,179

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-i-7 Unit

Item Name : Supply, installation, testing and commissioning of 1x23 Watt, E-27
base, wall bracket light, complete in all respects.

Detail Qty Unit


MATERIAL
1x23Watt, E-27 base, wall 1 No
bracket light complete
with 23Watt CFL,

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,180

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-i-8 Unit

Item Name : Supply, installation, testing and commissioning of 2x20 Watt "LED" DC
emergency spot light with 3hr backup, complete in all respects.

Detail Qty Unit


MATERIAL
2x20Watt "LED" DC 1 No
emergency spot light with
3hr backup ,
Non-maintained

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,181

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-i-9 Unit

Item Name : Supply, installation, testing and commissioning of 1x10 Watt


fluorescent exit light

Detail Qty Unit


MATERIAL
1x10Watt flourescent exit 1 No
light

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,182

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-i-10 Unit

Item Name : Supply, installation, testing and commissioning of 1x6 Watt LED
BULKHEAD light fixture, of best quality.

Detail Qty Unit


MATERIAL
1x6Watt LED BULKHEAD 1 No
light fixture .

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,183

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-i-11 Unit

Item Name : Supply, installation, testing and commissioning of 1x160 Watt, Highbay
LED light , complete in all respects.

Detail Qty Unit


MATERIAL
1x160Watt, Highbay LED 1 No
light with 160 Watt LED,

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,184

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-i-12 Unit

Item Name : Supply, installation, testing and commissioning of 3 chip SMD Strip
IP-65 rated, complete with12DC drive LED color as per approval of the
Engineer

Detail Qty Unit


MATERIAL
IP-65 rated, 3 chip SMD 1 No
Strip complete with12DC
drive LED color

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,185

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-i-13 Unit

Item Name : Supply, installation, testing and commissioning of High Purity Aluminum
Spinning Reflector Vertical lamp Installation Recessed down light with
CFL (1 X 13) watt Energy saver

Detail Qty Unit

MATERIAL
MEGNA High Purity 1 No

Aluminum Spinning
Reflector Vertical lamp
Installation Recessed
down light with CFL (1 X
13) watt Energy saver c

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,186

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-i-14 Unit

Item Name : Supply, installation, testing and commissioning of Recessed Down Light
with CFL (1 X 13) watt Energy saver and Convex Frosted Lens IP 54,
complete in all respects. .

Detail Qty Unit

MATERIAL
DOT-162 Recessed down 1 No

light(Pierlite) with CFL


(1 X 13) watt Energy
saver and A2-FT Convex
Frosted Lens IP 54 c

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,187

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-i-15 Unit

Item Name : Supply, installation, testing and commissioning of recessed Light of


best quality with CFL (13-17 watt) Energy saver and with Glass
Reflector

Detail Qty Unit

MATERIAL
Recessed Dawn Light with 1 No
CFL (13-17 watt) Energy
saver and with Glass
Reflector

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,188

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-i-16 Unit

Item Name : Supply, installation, testing and commissioning of Cylindrical


Incadescent Up/Down wall light with Dei-cast Aluminium construcation
Glass Diffuser ceramic Lampholder IP -44 With (2 x 100) watt ES Par 30
lamp

Detail Qty Unit


MATERIAL
Cylindrical Incadescent 1 No
Up/Down wall light with
Dei-cast Aluminium
construcation Glass
Diffuser ceramic
Lampholder IP -44 With (2
x 100) watt ES Par 30
lamp

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,189

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-i-17 Unit

Item Name : Supply, installation of outdoor Waterproof Light with 23 watt CFL with
Glass Reflector and with 1 Meter G.I pipe Support, complete in all
respects.

Detail Qty Unit

MATERIAL
Outdoor water proof light 1 No

(Pierlite) with 23 watt


Energy saver with Glass
Reflector and with 1
Meter G.I pipe Support

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,190

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-i-18 Unit

Item Name : Supply, installation, testing and commissioning of 1x5 watt reflector
surface mounted LED light fixture with frosted lens, complete with
driver

Detail Qty Unit

MATERIAL
1x5 watt reflector 1 No

surface mounted LED light


fixture with frosted
lens, complete with
driver,

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,191

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-j-1 Unit

Item Name : Supply, installation, & connecting up of light Fixture type 'D' surface
mounted fluorescent batten fitting (TMS-015/236) with 2 x 36W TLD lamp,
complete in all respects

Detail Qty Unit

MATERIAL
Fixture type 'D' surface 1 No

mounted fluorescent
batten fitting
(TMS-015/236) with 2 x
36W TLD lamp.

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,192

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-j-2 Unit

Item Name : Supply, installation, & connecting up of light Fixture type 'D' surface
mounted fluorescent batten fitting (.TMS-015/236) with 1 x 36W TLD lamp
complete in all respects

Detail Qty Unit

MATERIAL
Fixture type 'D' surface 1 No

mounted fluorescent
batten fitting
(.TMS-015/236) with 1 x
36W TLD lamp.
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,193

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-j-3 Unit

Item Name : Supply, installation, & connecting up of light Fixture type 'E' surface
mounted fluorescent batten fitting (TMS-012/136) with 1 x 36W TLD farm,
complete in all respects

Detail Qty Unit

MATERIAL
Fixture type 'E' surface 1 No

mounted fluorescent
batten fitting
(TMS-012/136) with 1 x
36W TLD farm

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,194

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-j-4 Unit

Item Name : Supply, installation, & connecting up of Industrial reflector 2 x 36W


complete in all respects

Detail Qty Unit


MATERIAL
Industrial reflector 2 x 1 No
36W Philips GKD-051/236
or Pierlite Pb236 GKD or
equivalent

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,195

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-j-5 Unit

Item Name : Supply, installation, & connecting up of light fixture High performance
luminar with M2 reflector 1 x 36W, complete in all respects

Detail Qty Unit


MATERIAL
High performance 1 No
luminar with M2 reflector
1 x 36W Philips TCS 133
or Pierlite PT136 S-M1 or
equivalent
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,196

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-j-6 Unit

Item Name : Supply, installation, & connecting up of light fixture High performance
luminar with M2 reflector 2 x 36W, complete in all respects

Detail Qty
MATERIAL
High performance luminar 1
with M2 reflector 2x
36W Philips TCS 135 or
Pierlite PT236 S-M1 or
equivalent

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,197

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-j-7 Unit

Item Name : Supply, installation, & connecting up of light fixture High performance
luminar with M6 reflector 2 x 36W, complete in all respects

Detail Qty
MATERIAL
High performance luminar 1
with M6 reflector 2x
36W Philips TCS 136 or
Pierlite PT236 S-M1 or
equivalent

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,198

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-j-8 Unit

Item Name : Supply, installation, & connecting up of lightFixture type T surface


mounted fluorescent fitting with 1 x 18W TLD lamp, complete in all
respects

Detail Qty Unit

MATERIAL
Fixture type T surface 1 No
mounted fluorescent
fitting with 1 x 18W TLD
lamp

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,199

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-j-9 Unit

Item Name : Supply, installation, & connecting up of light Fixture type T surface
mounted fluorescent fitting with 2 x 18W TLD lamp, complete in all
respects

Detail Qty Unit

MATERIAL
Fixture type T surface 1 No
mounted fluorescent
fitting with 2 x 18W TLD
lamp

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,200

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-j-10 Unit

Item Name : Supply, installation, & connecting up of light fixture TBS-088/236


Recessed Luminaires, with IP 20, complete in all respects

Detail Qty Unit


MATERIAL
TBS-088/236 ml Philips / 1 No
Dampa lighting or
equivalent

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,201

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-j-11 Unit

Item Name : Supply, installation, & connecting up of light fixture TBS-088/418


Recessed Luminaires, with IP 20, complete in all respects

Detail Qty Unit


MATERIAL
TBS-088/418 ml Philips 1 1 No
Dampa lighting or
equivalent

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,202

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-j-12 Unit

Item Name : Supply, installation, connecting, testing & commissioning of 10W LED
Down Light Fixture suitable for 1300 lux, as per instruction of
Engineer, surface mounted circular shape or equivalent.

Detail Qty Unit

MATERIAL
10W LED Down Light 1 No

Fixture suitable for 1300


lux, as per instruction
of Engineer, surface
mount ed circular shape
or equivalent.

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,203

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-k-01 Unit

Item Name : Supply, installation, connecting, testing and commissioning of Surface


mounting LED tube light with 2x2000 lumens, complete in all respects

Detail Qty Unit


MATERIAL
Surface mounting LED tube 1 No
light with 2x2000 lumens
output and fixture.

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,204

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-k-02 Unit

Item Name : Supply, installation, connecting, testing and commissioning of Surface


mounting LED tube light with 1x2000 lumens output and fixture, complete
in all respects

Detail Qty Unit

MATERIAL
Surface mounting LED tube 1 No
liqht with 1x2000 Iumens
output and fixture.

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,205

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-k-03 Unit

Item Name : Supply, installation, connecting, testing and commissioning of Wall


mounted Bulkhead light fixtures with LED retrofit lamp 540 Lumens
output, complete in all respects

Detail Qty Unit

MATERIAL
Wall mounted Bulkhead 1 No
light fixtures with LED
retrofit lamp 540 Lumens
output

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,206

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM : Spec. No :
Item Code : 15-36-k-04 Unit

Item Name : Supply & errection of down light fixture cylendrical type aluminium
reflection with lamp suitable for 1300 Lux, ceiling mounted

Detail Qty Unit


MATERIAL
Down light fixture 1 Each
cylendrical type
aluminium reflection with
lamp suitable for 1300
Lux, ceiling mounted

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,207

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-36-l-01 Unit

Item Name : Supply & Erection of candle flood light 150 watt complete in all
aspects

Detail Qty Unit


MATERIAL
candle flood light 150 1 Each
watt

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,208

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-36-l-02
Item Name : Supply & Erection of Candle bulb 60 watt(Pin/Scrcw typo)
Detail Qty Unit
MATERIAL
Candle bulb 60 1 Each
watt(Pin/Scrcw typo)

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,209

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-36-l-03
Item Name : Supply & Erection of Choke 125 watt
Detail Qty Unit
MATERIAL
Choke 125 watt 1 Each

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,210

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-36-l-04
Item Name : Supply & Erection of choko 20/40 watt
Detail Qty Unit
MATERIAL
choko 20/40 watt 1 Each

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,211

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-36-l-05
Item Name : Supply & Erection of Halogen rod 500 watt
Detail Qty Unit
MATERIAL
Halogen rod 500 watt 1 Each

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,212

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-36-l-06
Item Name : Supply & Erection of tube rod 4' long 40 watt
Detail Qty Unit
MATERIAL
Tube rod 4" long 40 watt 1 Each

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,213

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-36-l-07
Item Name : Supply & Erection of Tube rod 2' long 20 watt
Detail Qty Unit
MATERIAL
Tube rod 2' long 20 watt 1 Each

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,214

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-36-l-08
Item Name : Supply & Erection of 15 Watt Incandesent bulb
Detail Qty Unit
MATERIAL
bulb zero watt (15 Watt 1 Each
Incandesent bulb)

LABOUR
Electrician 0.004 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,215

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-36-l-09
Item Name : Supply & Erection of emergency light
Detail Qty Unit
MATERIAL
emergency light 1 Each

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,216

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-36-m-01
Item Name : Supply & Erection of 400-watt choke
Detail Qty Unit
MATERIAL
Security light 400-watt 1 Each
choke

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,217

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-36-m-02
Item Name :
Detail Qty Unit
MATERIAL
Spot light 120 /150 watt 1 Each
complete
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,218

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-36-m-03
Item Name : Supply & Erection of CFL 18 Watt
Detail Qty Unit
MATERIAL
CFL 18 Watt 1 Each

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,219

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-36-m-04
Item Name : Supply & Erection of CFL 23 Watt
Detail Qty Unit
MATERIAL
CFL 23 Watt 1 Each
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,220

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-36-m-05
Item Name : Supply & Erection of CFL 25 Watt
Detail Qty Unit
MATERIAL
CFL 25 Watt 1 Each

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,221

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-36-m-06
Item Name : Supply & Erection of CFL 45 Watt
Detail Qty Unit
MATERIAL
CFL 45 Watt 1 Each
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,222

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-36-n
Item Name : Supply & Erection of 150 watt Choke
Detail Qty Unit
MATERIAL
choke 150 watt for seach 1 Each
light

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,223

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-36-o
Item Name : Supply & Erection of Light Head cover for street light
Detail Qty Unit
MATERIAL
Light Head cover for 1 Each
street light

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,224

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-37 Unit

Item Name : Supply and Fixing mercury sodium lamp 360 Sunlux 400 W complete
with choke

Detail Qty Unit


MATERIAL
Mercury sodium lamp 360 1 No.
(Sunlux 400 W) with chowk

LABOUR
Electrician 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,225

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-38 Unit

Item Name : Supply and Fixing mercury blended lamp 160 W


with choke

Detail Qty Unit


MATERIAL
Mercury blended lamp 160 1 No.
W

LABOUR
Electrician 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,226

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-39 Unit

Item Name : Supply and Erection MS angle lattice structure pole 36' long 14"sq at
base & 8"sq. at top for elec. Distribution

Detail Qty Unit


MATERIAL
Street Pole MS 36' long 1 No.
14" Sq.

LABOUR
Electrician 6 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,227

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-40-a-01 Unit

Item Name : Supply and Fixing GI tubular street light pole, 8' of 5" dia, 7' 4"
dia, 5' of 3" dia, Single arm of 5' of 1.5" dia

Detail Qty Unit


MATERIAL
GI tubular street light 1 No.
pole, 8' of 5" dia, 7' 4"
dia, 5' of 3" dia, Single
arm of 5' of 1.5" dia
Miscellaneous IV 1 LS

LABOUR
Labourer 3 Day
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,228

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-40-a-02 Unit

Item Name : Supply and Fixing GI tubular street light pole, 8' of 5" dia, 7' 4"
dia, 5' of 3" dia, Double arm of 5' of 1.5" dia

Detail Qty Unit


MATERIAL
GI tubular street light 1 No.
pole, 8' of 5" dia, 7' 4"
dia, 5' of 3" dia, Double
arm of 5' of 1.5" dia
Miscellaneous IV 1 LS

LABOUR
Labourer 3 Day
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,229

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-40-b-01 Unit

Item Name : Supply and Fixing GI tubular street light pole, 8' of 4" dia, 7' 3"
dia, 5' of 2" dia, Single arm of 5' of 1.5" dia

Detail Qty Unit


MATERIAL
GI tubular street light 1 No.
pole, 8' of 4" dia, 7' 3"
dia, 5' of 2" dia, Single
arm of 5' of 1.5" dia
Miscellaneous IV 1 LS

LABOUR
Labourer 2.5 Day
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,230

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-40-b-02 Unit

Item Name : Supply and Fixing GI tubular street light pole, 8' of 4" dia, 7' 3"
dia, 5' of 2" dia, Double arm of 5' of 1.5" dia

Detail Qty Unit


MATERIAL
GI tubular street light 1 No.
pole, 8' of 4" dia, 7' 3"
dia, 5' of 2" dia, Double
arm of 5' of 1.5" dia
Miscellaneous IV 1 LS

LABOUR
Labourer 2.5 Day
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,231

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-40-b-03 Unit

Item Name : Providing street light poles of 40 ft height without arms including
fixing complete.

Detail Qty Unit


MATERIAL
Tubler Pole 40 ft without 1 No.
arms including fixing
Steel Jointing box 6"x9" 1 No.
Clamps (MS) 2 No.
Pre-cast concrete block 1 No.
2x2x4

LABOUR
Mason 0.1 Day
Skilled Labour 0.25 Day
Sundries (Labour Only):

EQUIPMENT
Dumper ( 10 T ) 0.01 Day
Excavator (Track Type) 0.1 Day
100 HP

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,232

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-41 Unit

Item Name : Earthing of iron clad/aluminium switches etc with GI wire #8 SWG in
GI pipe 0.5" dia

Detail Qty Unit


MATERIAL
G.I pipe (light) 2" 5.248 Rft
G.I pipe (light) 0.5" 27.991 Rft
G.I Wire 8 SWG 9.144 kg

LABOUR
Electrician 2 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Job Rs.
Labour Rates Per Job Rs.

2,233

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-42-a Unit

Item Name : Supply and Erection 2'x2'x1/8" copper plate including riveting to
copper tape & placing in mixture of salt and charcoal etc

Detail Qty Unit


MATERIAL
Copper Plate 24"x24"x1/4" 1 No
Copper Bolt 2 Each
Salt & Charcoal 1 Each

LABOUR
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,234

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-42-b
Item Name : Manhole For LT Cable Pulling
Detail Qty Unit
MATERIAL
25 X 3 mm bare copper 1 No
tape( 99% Cu)

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,235

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-42-c
Item Name : Supply and Erection of Test clamp
Detail Qty Unit
MATERIAL
Test clamp ( 99% Cu.) 1 No

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,236

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-42-d
Item Name : Supply and Erection of Fixing Clips
Detail Qty Unit
MATERIAL
Fixing Clips without PVC 1 No
covered

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,237

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-42-e Unit

Item Name : Supply, Installation, Testing and Commissioning of Air terminal or


arrester

Detail Qty Unit


MATERIAL
Air terminal or arrester 1 No
made up 99% Cu, rod
having 1000mm length,
15mm dia complete with
air rod base having
thread diameter 16mm,
lock nuts ,etc

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,238

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-42-f
Item Name :
Detail Qty
MATERIAL
T tape clamps and 1
square tape clamps of
(25x3)mm bare Cu.tape
complete with nuts,
washers, spacer and
fixing arrangement.

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,239

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-43-a Unit

Item Name : Supply and Erection copper tape, including copper staple & copper
nails/Screw etc : Size 1.5"x1/8"

Detail Qty Unit


MATERIAL
Staple & Nails 5.002 No
Copper Tape 1.5"x1/8" 1 Rft
LABOUR
Electrician 0.007 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,240

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-43-b Unit

Item Name : Supply and Erection copper tape, including copper staple & copper
nails etc : Size 2"x1/8"

Detail Qty Unit


MATERIAL
Staple & Nails 6.503 No
Copper Tape 2"x1/8" 1 Rft

LABOUR
Electrician 0.007 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,241

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-44 Unit
Item Name : Supply and Erection 1" dia & 1m long lightening conductor copper
rod with 5 spikes ball & base etc.

Detail Qty Unit


MATERIAL
Lightning Conductor 1 No

LABOUR
Electrician 1.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,242

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-45 Unit

Item Name : Wiring of light/fan/call-bell point in 3/0.029" PVC insulated &


sheathed cable on sahl wood strip

Detail Qty
MATERIAL
Batten (1/2") 29.991
Cable S/C 250V (3/0.029") 59.982
T-switch 1
Wire Clips & Nails 2
Round Block 1

LABOUR
Electrician 0.03
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each
Labour Rates Per Each
2,243

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-46 Unit

Item Name : Wiring of 2/3-pin 5-Amp plug point in 3/0.029" PVC insulated &
sheathed cable on sahl wood

Detail Qty
MATERIAL
Batten (1/2") 19.994
Cable S/C SH 250V 32.8
(3/0.029")
Wood Box 7"x4" 1
3Pin 2/3 A Wall Socket 1
T-switch 1
Wire Clips & Nails 1

LABOUR
Electrician 0.03
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each
Labour Rates Per Each

2,244

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-47-a Unit

Item Name : Wiring of main & sub-main in 2 single core PVC insulated & sheathed
cable : 3/0.029"

Detail Qty
MATERIAL
Batten (1/2") 1
Clips 0.015
Cable 2/C 250V (3/0.029") 2

LABOUR
Electrician 0.006
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft
Labour Rates Per Rft

2,245

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-47-b Unit

Item Name : Wiring of main & sub-main in 2 single core PVC insulated & sheathed
cable : 7/0.029"

Detail Qty
MATERIAL
Batten (1/2") 1
Clips 0.015
Cable 2/C 250V (7/0.029") 2

LABOUR
Electrician 0.006
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft
Labour Rates Per Rft

2,246

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-47-c Unit

Item Name : Wiring of main & sub-main in 2 single core PVC insulated & sheathed
cable : 7/0.044"

Detail Qty
MATERIAL
Batten (3/4") 1
Clips 0.015
Cable 2/C 250V (7/0.044") 2

LABOUR
Electrician 0.01
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft
Labour Rates Per Rft

2,247

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-47-d Unit

Item Name : Wiring of main & sub-main in 2 single core PVC insulated & sheathed
cable : 7/0.064"

Detail Qty
MATERIAL
Batten (3/4") 1
Clips 0.03
Cable 2/C 250V (7/0.064") 2

LABOUR
Electrician 0.018
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Rft
Labour Rates Per Rft

2,248

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-48-a Unit

Item Name : Wiring of sub main/earthing in 1 single core PVC insulated &
sheathed cable : 3/0.029"

Detail Qty
MATERIAL
Batten (1/2") 1
Clips 0.03
Cable S/C 250V (3/0.029") 1

LABOUR
Electrician 0.004
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft
Labour Rates Per Rft

2,249

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-48-b Unit

Item Name : Wiring of sub main/earthing in 1 single core PVC insulated &
sheathed cable : 7/0.029"
Detail Qty
MATERIAL
Batten (1/2") 1
Clips 0.03
Cable S/C 250V (7/0.029") 1

LABOUR
Electrician 0.004
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft
Labour Rates Per Rft

2,250

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-48-c Unit

Item Name : Wiring of sub main/earthing in 1 single core PVC insulated &
sheathed cable : 7/0.044"

Detail Qty
MATERIAL
Batten (3/4") 1
Clips 0.03
Cable S/C 250V (7/0.044") 1

LABOUR
Electrician 0.004
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft
Labour Rates Per Rft

2,251

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-48-d Unit

Item Name : Wiring of sub main/earthing in 1 single core PVC insulated &
sheathed cable : 7/0.064"

Detail Qty
MATERIAL
Batten (3/4") 1
Clips 0.03
Cable S/C 250V (7/0.064") 1

LABOUR
Electrician 0.007
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft
Labour Rates Per Rft

2,252

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-49 Unit

Item Name : Wiring of light point in 3/0.029" PVC insulated sheathed cable on sahl
wood strip batten with two Nos. of two way switches

Detail Qty
MATERIAL
Batten (1/2") 44.986
Clips 2
Cable S/C 250V (3/0.029") 134.959
Two Way Switch 2
Round Block 2

LABOUR
Electrician 0.048
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each
Labour Rates Per Each

2,253

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-50 Unit

Item Name : Wiring of light/fan/call-bell point in 3/0.029" PVC insulated bare


cable in PVC pipe recessed

Detail Qty
MATERIAL
PVC CONDUIT (1/2") 29.989
Cable S/C 250V (3/0.029") 59.981
Concealed Wooden Box 1
Piano Switch 1
Insulation Tape 3

LABOUR
Electrician 0.045
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each
Labour Rates Per Each

2,254

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-51 Unit

Item Name : Wiring of 2/3-pin 5-Amp. plug point in 3/0.029" PVC insulated bare
cable in PVC pipe recessed

Detail Qty
MATERIAL
PVC CONDUIT (1/2") 19.994
Cable S/C 250V (3/0.029") 7.188
Concealed Wooden Box 1
Wall Socket 1
Piano Switch 1
Insulation Tape 3

LABOUR
Electrician 0.022
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each
Labour Rates Per Each

2,255

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-52 Unit

Item Name : Wiring of light point in 3/0.029" PVC insulated bare cable in PVC
pipe recessed in wall comp.

Detail Qty
MATERIAL
PVC CONDUIT (1/2") 44.985
Cable S/C 250V (3/0.029") 134.959
Concealed Wooden Box 2
Piano Switch 2 way 2
Insulation Tape 3

LABOUR
Electrician 0.068
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each
Labour Rates Per Each

2,256

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-53 Unit

Item Name : Special earthing of iron/metal clad switches etc with copper wire
No. 8 SWG in GI pipe 1/2" dia

Detail Qty
MATERIAL
G.I pipe (light) 0.5" 31.99 Rft
Copper Wire 8 swg 4.25 Kg
Copper Plate 24"x24"x1/4" 1 No
salt and charcol 0.5

LABOUR
Electrician 0.8 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,257

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-54-a Unit

Item Name : Supply and Erection enclosed switch of bakelite DP 15/30


Amp. fixed on wooden board complete

Detail Qty Unit


MATERIAL
Wooden Board Box 1 No
Switch 1 No
Plastic Sheet 0.67 Kg

LABOUR
Electrician 0.05 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,258

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-54-b
Item Name : Supply & Erection of 5 Amp Piano type switch (PPI)
Detail Qty Unit
MATERIAL
5 Amp Piano type switch 1 Each
(PPI)

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,259

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-54-c
Item Name : Supply & Erection of 15 Amp Multi plug
Detail Qty Unit
MATERIAL
Mulli plug 15 Amp 1 Each

LABOUR
Electrician 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,260

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-54-d
Item Name : Supply & Erection of 5 Amp PPI plug
Detail Qty Unit
MATERIAL
5 Amp PPI Plug 1 Each

LABOUR
Electrician 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,261

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-54-e
Item Name : Supply & Erection of 5 Amp PPI switch
Detail Qty Unit
MATERIAL
5 Amp PPI switch 1 Each

LABOUR
Electrician 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,262

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-54-f
Item Name : Supply & Erection of 15 Amp Power Plug 3-Pin
Detail Qty Unit
MATERIAL
15 Amp Power Plug 3-Pin 1 Each

LABOUR
Electrician 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,263

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-55-a Unit

Item Name : Supply and erection of fancy wall type bracket with brass holder &
fancy shade : Single

Detail Qty Unit


MATERIAL
Fancy Wall Bracket Single 1 No

LABOUR
Electrician 0.04 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,264

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-55-b Unit

Item Name : Supply and erection of fancy wall type bracket with brass holder &
fancy shade : Double

Detail Qty Unit


MATERIAL
Fancy Wall Bracket Double 1 No

LABOUR
Electrician 0.04 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,265

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-56-a Unit

Item Name : Supply and Erection white round globe with holder, gallery & 100
Watt bulb complete : 6" dia.

Detail Qty Unit


MATERIAL
6" Round Globe with 1 No
Holder
Bulb(100W) 1 No

LABOUR
Electrician 0.05 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,266

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-56-b Unit

Item Name : Supply and Erection white round globe with holder, gallery & 100
Watt bulb complete : 8" dia.

Detail Qty Unit


MATERIAL
8" Round Globe with 1 No
Holder
Bulb(100W) 1 No

LABOUR
Electrician 0.05 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,267

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-56-c Unit

Item Name : Supply and Erection white round globe with holder, gallery & 100
Watt bulb complete : 10" dia.

Detail Qty Unit


MATERIAL
Globe 10" Round Globe 1 No
with Holder
Bulb(100W) 1 No

LABOUR
Electrician 0.05 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,268

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-57-a Unit

Item Name : Supply and Erection white flat globe with holder, gallery & 100 W
bulb complete : 8" dia

Detail Qty Unit


MATERIAL
8" Flat Globe with Holder 1 No
Bulb(100W) 1 No

LABOUR
Electrician 0.05 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,269

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-57-b Unit

Item Name : Supply and Erection white flat globe with holder, gallery & 100 W
bulb complete : 10" dia

Detail Qty Unit


MATERIAL
Globe 10" Round Globe 1 No
with Holder
Bulb(100W) 1 No

LABOUR
Electrician 0.05 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,270

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-57-c Unit

Item Name : Supply and Erection white flat globe with holder, gallery & 100 W
bulb complete : 12" dia

Detail Qty Unit


MATERIAL
12" Flat Globe with 1 No
Holder
Bulb(100W) 1 No

LABOUR
Electrician 0.05 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,271

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-58 Unit

Item Name : Supply and Erection white round globe 6" dia with angle type
bakelite gallery, holder & 60-W bulb complete
Detail Qty Unit
MATERIAL
6" Round Globe with 1 No
Holder
Bulb 60 W 1 No

LABOUR
Electrician 0.05 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,272

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-59 Unit

Item Name : Supply and Erection 1' long strip light fitting comp. with cover of
opalescent perspex in plain finish 10-Watt

Detail Qty Unit


MATERIAL
Strip Light Fitting 1 No

LABOUR
Electrician 0.05 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,273

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-60 Unit

Item Name : Supply and Erection double fluorescent tube light fitting 2 No. 4'
long, 40-W with 2 chokes & starters complete

Detail Qty Unit


MATERIAL
Double fluorescent tube 1 Set
light fitting 2 N 2 No.4'
long, 40-W with 2 chokes
& starters

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,274

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-61-a Unit

Item Name : Supply and Erection fluorescent tube light fitting including 4'
rod, choke, starter, flexible wire etc : Single

Detail Qty Unit


MATERIAL
Tube Light Phillips 1 Set
single

LABOUR
Electrician 0.1 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,275

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-61-b Unit

Item Name : Supply and Erection fluorescent tube light fitting including 4'
rod, choke, starter, flexible wire etc : Double

Detail Qty Unit


MATERIAL
Tube Light Phillips 1 Set
Double

LABOUR
Electrician 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,276

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-62 Unit

Item Name : Supply and Erection porch-light fitting round/square type with
gallery, holder & 40 W bulb
Detail Qty Unit
MATERIAL
Porch Light Complete-40 W 1 Set

LABOUR
Electrician 0.075 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,277

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-63-a Unit

Item Name : Supply and Erection gate-light fitting complete with holder &
160-Watt mercury blended lamp: Small

Detail Qty Unit


MATERIAL
Bulb 160W 1 No
Gate Light (Small) 160 W 1 No

LABOUR
Electrician 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,278

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM : Spec. No :
Item Code : 15-63-b Unit

Item Name : Supply and Erection gate-light fitting complete with holder &
160-Watt mercury blended lamp: Medium

Detail Qty
MATERIAL
Bulb 160W 1
Gate Light Medium 160 W 1

LABOUR
Electrician 0.1
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each
Labour Rates Per Each

2,279

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-63-c Unit

Item Name : Supply and Erection gate-light fitting complete with holder &
160-Watt mercury blended lamp: Large

Detail Qty Unit


MATERIAL
Bulb 160W 1 No
Gate Light Large 160 W 1 No

LABOUR
Electrician 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,280

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-64-a Unit

Item Name : Supply and Erection garden-light fitting with holder and 160 W
mercury blended lamp & choke : 18" dia

Detail Qty Unit


MATERIAL
Bulb 160W 1 No
Garden Light 18" 1 No

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,281

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-64-b Unit

Item Name : Supply and Erection garden-light fitting with holder and 160 W
mercury blended lamp & choke : 19" dia

Detail Qty Unit


MATERIAL
Bulb 160W 1 No
Garden Light 19" 1 No
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,282

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-64-c Unit

Item Name : Supply and Erection garden-light fitting with holder and 160 W
mercury blended lamp & choke : 22" dia

Detail Qty Unit


MATERIAL
Bulb 160W 1 No
Garden Light 22" 1 No

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,283

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-65-a Unit
Item Name : Supply and Erection garden-light fitting with porcelain holder 125
W mercury vapour lamp & choke : 18" dia

Detail Qty Unit


MATERIAL
Mercury Vapour lamp choke 1 No
Bulb125W 1 No
Garden Light Pore 18" 1 No

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,284

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-65-b Unit

Item Name : Supply and Erection garden-light fitting with porcelain holder 125
W mercury vapour lamp & choke : 19" dia

Detail Qty Unit


MATERIAL
Mercury Vapour lamp choke 1 No
Bulb125W 1 No
Garden Light Pore 19" 1 No

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,285
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-65-c Unit

Item Name : Supply and Erection garden-light fitting with porcelain holder 125
W mercury vapour lamp & choke : 22" dia

Detail Qty Unit


MATERIAL
Mercury Vapour lamp choke 1 No
Bulb125W 1 No
Garden Light pore 22" 1 No

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,286

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-65-d
Item Name :
Detail Qty Unit
MATERIAL
Garden light fixture with 1 No
LED 25-30 watts.

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,287

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-66-a Unit

Item Name : Supply and Erection flood-light fitting with holder, complete 14"
dia with 500-W lamp

Detail Qty Unit


MATERIAL
Flood Light 500 W (14") 1 No

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,288

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-66-b Unit

Item Name : Supply and Erection flood-light fitting with holder, complete 19«"
dia with 1000-W lamp

Detail Qty Unit


MATERIAL
Bulb 1000 W 1 No
Flood Light 1000 W (19") 1 No

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,289

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-67 Unit

Item Name : Making hole in wall with necessary masonry work for exhaust fan any
size complete

Detail Qty Unit


LABOUR
Electrician 0.15 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,290

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-68-a Unit

Item Name : Supply and Erection best quality AC ceiling fan complete with GI
rod, canopy, blades & regulator : 36" sweep

Detail Qty Unit


MATERIAL
Fan Ceiling 36" 1 No

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,291

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-68-b Unit

Item Name : Supply and Erection best quality AC ceiling fan complete with GI
rod, canopy, blades & regulator : 48" sweep

Detail Qty Unit


MATERIAL
Fan Ceiling 48" 1 No

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,292

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-68-c Unit

Item Name : Supply and Erection best quality AC ceiling fan complete with GI
rod, canopy, blades & regulator : 56" sweep

Detail Qty Unit


MATERIAL
Fan Ceiling 56" 1 No

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,293

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-68-d
Item Name :
Detail Qty Unit
MATERIAL
Pedestal fan 24" of appd 1 Each
quality

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,294

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-68-e Unit

Item Name : Supply, installation, testing & commissioning of Direct axial Wall
Bracket fan

Detail Qty Unit


MATERIAL
18" dia Direct axial Wall 1 No
Bracket fan,1450Rpm, Max
50db sound level Fan
shall be made with 99%
purity Copper windings

LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,295

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-68-f Unit

Item Name : Supply, installation, testing & commissioning of Direct axial Wall
Bracket fan

Detail Qty Unit


MATERIAL
24" dia Direct axial Wall 1 No
Bracket fan,1450Rpm, Max
50db sound level Fan
shall be made with 99%
purity Copper windings
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,296

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-69-a Unit

Item Name : Supply and Erection best quality exhaust fan complete with shutter
& regulator : 12"sweep

Detail Qty Unit


MATERIAL
Fan Exhaust 12" Metal 1 No
frame Body

LABOUR
Electrician 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,297

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-69-b Unit
Item Name : Supply and Erection best quality exhaust fan complete with shutter
& regulator : 16"sweep

Detail Qty Unit


MATERIAL
Fan Exhaust 16" Metal 1 No
frame Body

LABOUR
Electrician 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,298

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-69-c Unit

Item Name : Supply and Erection best quality exhaust fan complete with shutter
& regulator : 18"sweep

Detail Qty Unit


MATERIAL
Fan Exhaust 18" Metal 1 No
frame Body

LABOUR
Electrician 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,299
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-69-d
Item Name :
Detail Qty Unit
MATERIAL
Exhaust fan(round) upto 1 Each
6" dia (imported)

LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,300

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-70-a Unit

Item Name : Supply and Erection transpower auto circuit breaker 3-phase, 400V
fungus moisture proofing : 30 Amp.

Detail Qty Unit


MATERIAL
Auto C.Breaker 3P 30Amp 1 No

LABOUR
Electrician 0.4 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,301

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-70-b Unit

Item Name : Supply and Erection transpower auto circuit breaker 3-phase, 400V
fungus moisture proofing : 60 Amp.

Detail Qty Unit


MATERIAL
Auto C.Breaker 3P 60Amp 1 No

LABOUR
Electrician 0.4 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,302

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-70-c Unit

Item Name : Supply and Erection transpower auto circuit breaker 3-phase, 400V
fungus moisture proofing : 100 Amp.

Detail Qty Unit


MATERIAL
Auto C.Breaker 3P 100Amp 1 No

LABOUR
Electrician 0.475 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,303

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-71-a Unit

Item Name : Supply and Erection single phase imported auto circuit breaker 6
Amp.

Detail Qty Unit


MATERIAL
Auto C.Breaker 1P 6 Amp 1 No

LABOUR
Electrician 0.075 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,304

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-71-b Unit

Item Name : Supply and Erection single phase imported auto circuit breaker 15
Amp.
Detail Qty Unit
MATERIAL
Auto C.Breaker 1P 15Amp 1 No

LABOUR
Electrician 0.075 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,305

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-71-c Unit

Item Name : Supply and Erection single phase imported auto circuit breaker 20
Amp.

Detail Qty Unit


MATERIAL
Auto C.Breaker 1P 20Amp 1 No

LABOUR
Electrician 0.075 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,306

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM : Spec. No :
Item Code : 15-71-d Unit

Item Name : Supply and Erection single phase imported auto circuit breaker 30
Amp.

Detail Qty
MATERIAL
Auto C.Breaker 1P 30Amp 1

LABOUR
Electrician 0.075
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each
Labour Rates Per Each

2,307

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-72-a Unit

Item Name : Supply and Erection of bus bars for 500 volts 3 phase AC S/W 4
copper bars 40 Amp with bar size 1 1/2" X 1/8"

Detail Qty Unit


MATERIAL
Porcelain Bridge 8 No
Copper strip 350x40x3mm 4 No
Box 450x300x40 mm 1 No
Rag bolt 225x16mm 4 No
Miscellaneous II 1 LS
L-iron II 1 No

LABOUR
Labourer 0.5 Day
Electrician 0.75 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,308

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-72-b Unit

Item Name : Supply and Erection of bus bars 500 volts 3 phase AC supply with 4
copper bars - 100 Amp with bar size1 1 1/2" X 1/8"

Detail Qty Unit


MATERIAL
Porcelain Bridge 8 No
Copper strip 350x40x3mm 4 No
Box 450x300x40 mm 1 No
Rag bolt 225x16mm 4 No
Miscellaneous II 1.5 LS
L-iron II 1 No

LABOUR
Labourer 0.5 Day
Electrician 0.75 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,309

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-72-c Unit
Item Name : Supply and Erection of bus bars 500 volts 3 phase AC supply with 4
copper bars - 200 Amp with bar size 2"X 1/8"

Detail Qty Unit


MATERIAL
Porcelain Bridge 8 No
Copper strip 350x50x4mm 4 No
Box 450x300x40 mm 1 No
Rag bolt 225x16mm 4 No
Miscellaneous II 1.5 LS
L-iron II 1 No

LABOUR
Labourer 1 Day
Electrician 1.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,310

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-72-d Unit

Item Name : Supply and Erection of bus bars 500 volts 3 phase AC supply with 4
copper bars - 300 Amp with bar size 2" X 3/16"

Detail Qty
MATERIAL
Porcelain Bridge 8
Copper strip 350x50x4mm 4
Box 450x300x40 mm 1
Rag bolt 225x16mm 4
Miscellaneous II 2.5
L-iron II 1

LABOUR
Labourer 1.25
Electrician 1.5
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,311

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-72-e Unit

Item Name : Supply and Erection of bus bars 500 volts 3 phase AC supply with 4
copper bars - 500 Amp with size 2" X 1/4"

Detail Qty
MATERIAL
Porcelain Bridge 8
Copper strip 350x50x6mm 4
Box 450x300x40 mm 1
Rag bolt 225x16mm 4
Miscellaneous II 3
L-iron II 1

LABOUR
Labourer 1
Electrician 2
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,312

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM :
Item Code : 15-72-f
Item Name : Supply & erection of Nut & Bolt (2''x5/8')
Detail Qty Unit
MATERIAL
Nut & bolt 2''x5/8''. 1 No

LABOUR
Skilled Labour 0.0208 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,313

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-72-g
Item Name : Supply & erection of Nut & Bolt 8'' or 9''x5/8''
Detail Qty Unit
MATERIAL
Nut & bolt 8'' or 1 No
9''x5/8''

LABOUR
Skilled Labour 0.0208 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,314

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-72-h
Item Name : Supply & erection of Nut & Bolt 10''x5/8''
Detail Qty Unit
MATERIAL
Nut & bolt 10''x5/8''. 1 No

LABOUR
Skilled Labour 0.0208 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,315

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-72-i
Item Name : Supply & erection of galvanized J-bolts
Detail Qty Unit
MATERIAL
25mm dia 1000 mm long 1 No
glavanized J-bolts with
8'' threads, 2 nuts and 2
washers.

LABOUR
Electrician 0.04 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,316
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-73-a Unit

Item Name : Supply and Erection of bracket of channel 3" X 1 1/2" X 1/4"
section 2' long for 2 lines

Detail Qty
MATERIAL
Nut & bolt 5/8" 2
Steel Plate 2 x 3/4 x 0.9
1/4
MS Channel 3 x 1.5 x 1/4 3.5

LABOUR
Electrician 0.04 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,317

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-73-b Unit

Item Name : Supply and Erection of bracket of MS channel 3" X 1 1/2" X 1/4"
Section:- 4' long for 4 lines

Detail Qty
MATERIAL
Nut & bolt 5/8" 4
Steel Plate 2 x 3/4 x 0.9
1/4
MS Channel 3 x 1.5 x 1/4 7

LABOUR
Electrician 0.04 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,318

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-74 Unit

Item Name : Supply and Erection of anchor rod honley type for poles i/e clamps
& 7/13 SWG stay wire straining screws PCC 1:3:6

Detail Qty Unit


MATERIAL
Stay Wire 7/12 SWG 1 Rft
Miscellaneous II 0.046 LS
Double clamp 8" 0.03 No.
Straining 0.03 No.
Eye batts 0.03 No.

LABOUR
Labourer 0.009 Day
Electrician 0.003 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,319

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-75-a Unit

Item Name : Supply and Erection cubical type factory fabricated floor/wall
mounting steel main board comp. : On surface

Detail Qty Unit


MATERIAL
Steel Main Electric Board 1 Each

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,320

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-75-b Unit

Item Name : Supply and Erection cubical type factory fabricated floor/wall
mounting steel main board comp. : Recessed

Detail Qty Unit


MATERIAL
Steel Main Electric Board 1 Each

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,321

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-76-a Unit

Item Name : Fluorescent tube lights fitting 2.5x2.5 feet square type suitable
for fixing in recess or direct on complete with 4 Nos 2 ft 20 watts
tubes, chokes, starters, holders complete in all respects in steel
body.

Detail Qty Unit


MATERIAL
Fluoresent tube light 1 No
2x2" com

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,322

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-76-b Unit

Item Name : Supply and Fixing of fluorescent tube fitting rectangular box types
housing made of 22 SWG stave enameled steel sheet having spring
load inner frame attachment with acrylic or polythene complete
with 2 No 4 ft 40 watts
Detail Qty Unit
MATERIAL
Fluoresent tube fitting 1 No
rectan

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,323

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-77-a Unit

Item Name : Supply and Fixing electric AC exhaust/fresh air circulation(double


way) 220/230 single phase plastic frame body and blade complete 8"x8"

Detail Qty Unit


MATERIAL
Exhaust Fan 8"x8" 1 No
Lasani (1/2") Thick 2.77 Sft
BEADING (2") 3.5 Rft

LABOUR
Carpenter 0.25 Day
Electrician 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,324

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-77-b Unit

Item Name : Supply and Fixing electric AC exhaust/fresh air circulation(double


way) 220/230 single phase plastic frame body and blade complete 10"x10"

Detail Qty Unit


MATERIAL
10"x10" Fan Exhaust 1 No
plastic frame body
Lasani (1/2") Thick 3.33 Sft
BEADING (2") 4 Rft

LABOUR
Carpenter 0.25 Day
Electrician 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,325

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-77-c Unit

Item Name : Supply and fixing electric AC exhaust/fresh air circulation(Double


way) 220/230 single phase plastic frame body and blade complete 12"x12"

Detail Qty Unit


MATERIAL
12"x12" Fan Exhaust 1 No
plastic frame body
Lasani (1/2") Thick 3.89 Sft
BEADING (2") 4.67 Rft
LABOUR
Carpenter 0.1 Day
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,326

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-77-d Unit

Item Name : Supply, installation, testing & commissioning of Exhaust Fan 10'' dia
with plastic body, fan blades and louvers, complete in all respects

Detail Qty Unit


MATERIAL
10 '' dia exhaust fan 1 No
with plastic body

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,327

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-77-e Unit
Item Name : Supply, installation, testing & commissioning of Exhaust Fan 18'' dia
with plastic body, fan blades and louvers, complete in all respects

Detail Qty Unit


MATERIAL
18 '' dia exhaust fan 1 No
with metallic body

LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,328

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-78 Unit

Item Name : Supply and Fixing of 18" dia Direct axial Wall Bracket fan,1450Rpm, Max
50db sound level Fan shall be made with 99% purity Copper windings

Detail Qty Unit


MATERIAL
18" dia Direct axial Wall 1 No.
Bracket fan,1450Rpm, Max
50db sound level Fan
shall be made with 99%
purity Copper windings

LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,329

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-79-a Unit

Item Name : Supply and Fixing PVC conduit for surface wiring (dura duct) 1/2"
including all charges for nail screws etc

Detail Qty Unit


MATERIAL
(1/2") (dura duct) 1 Rft
including nail screws

LABOUR
Electrician 0.009 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,330

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-79-b Unit

Item Name : Supply and Fixing PVC conduit for surface wiring (dura duct) 1"
including all charges for nail screws etc

Detail Qty Unit


MATERIAL
(1") (dura duct) 1 Rft
including nail screws
LABOUR
Electrician 0.009 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,331

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-79-c Unit

Item Name : PVC conduit for surface wiring (dura duct) 1.5" including all
charges for nail screws etc complete

Detail Qty Unit


MATERIAL
(1.5") (dura duct) 1 Rft
including nail screws

LABOUR
Electrician 0.009 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,332

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-79-d Unit
Item Name : PVC conduit for surface wiring (dura duct) 2" including all charges
for nail screws etc complete

Detail Qty Unit


MATERIAL
(2") (dura duct) 1 Rft
including nail screws

LABOUR
Electrician 0.009 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,333

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-79-e Unit

Item Name : Supply and Erection PVC duct for wiring purpose complete Recessed
in walls including chase etc. : 3"x3" I/d

Detail Qty Unit


MATERIAL
Inspection Box for PVC 0.03 No
CONDUIT 3"
3"x 3" dia Pvc Duct 1 RMtr
Clamp for 3" Pipe 0.305 No
Miscellaneous-I 0.305 LS

LABOUR
Electrician 0.018 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per RMtr Rs.
Labour Rates Per RMtr Rs.
2,334

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-79-f Unit

Item Name : Supply and Erection PVC duct for wiring purpose complete Recessed
in walls including chase etc. : 4"x4" I/d

Detail Qty Unit


MATERIAL
Inspection Box for PVC 0.03 No
CONDUIT 4"
4"x 4" dia Pvc Duct 1 RMtr
Clamp for 4" Pipe 0.305 No
Miscellaneous-III 0.305 LS

LABOUR
Electrician 0.018 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per RMtr Rs.
Labour Rates Per RMtr Rs.

2,335

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-80
Item Name : Supply and Fixing dimmer switch complete
Detail Qty
MATERIAL
Dimmer Switch 1

LABOUR
Electrician 0.04
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,336

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-81
Item Name : Supply and Fixing 20 Amp power plug
Detail Qty Unit
MATERIAL
Power plug 20 Amp 1 No.

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,337

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-82
Item Name : Supply and Fixing porcelain power plug 30 Amp
Detail Qty Unit
MATERIAL
Power plug 30 Amp 1 No.

LABOUR
Electrician 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,338

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-83
Item Name : Supply and fixing light plug 10 Amp
Detail Qty Unit
MATERIAL
light plug 10 Amp 1 No.

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,339

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-84
Item Name : Supply and fitting of capacitor 2.2 uf for ceiling fans
Detail Qty Unit
MATERIAL
Capacitor 2.2 uf 1 No.

LABOUR
Electrician 0.05 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,340

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-85 Unit

Item Name : Supply and fitting of ball bearing of size 6201, 6202 or 6203 for
ceiling fans

Detail Qty Unit


MATERIAL
Ball Bearing of size 1 No.

LABOUR
Electrician 0.063 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,341

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-86
Item Name : Supply and erection of cut out, bakelite open type
Detail Qty Unit
MATERIAL
Screw 1" 0.1667 Dose
Cut out bakelite open 1 Day
type

LABOUR
Electrician 0.011 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,342

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-87
Item Name :
Detail Qty Unit
MATERIAL
Screw 1" 2 Dose
Cut out bakelite recessed 1 Day
type

LABOUR
Electrician 0.011 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,343

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-88
Item Name : Supply and erection of kit kat 500 volts 15/20 Amp
Detail Qty Unit
MATERIAL
Screw 1" 0.1667 Dose
Kit Kat 500 volts 15/20 1 No
Amp

LABOUR
Labourer 0.004 Day
Electrician 0.016 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,344

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-89
Item Name : Supply and erection of kit kat 500 volts 30/35 Amp
Detail Qty Unit
MATERIAL
Screw 1" 0.1667 Dose
30/35Amp KIT KAT 1 No

LABOUR
Labourer 0.004 Day
Electrician 0.018 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,345

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-90
Item Name : Supply and erection of kit kat 500 volts 60/65 Amp
Detail Qty Unit
MATERIAL
Screw 1" 0.1667 Dose
60/65Amp KIT KAT 1 No

LABOUR
Labourer 0.004 Day
Electrician 0.027 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,346

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-91
Item Name : Supply and erection of kit kat 500 volts 100 Amp
Detail Qty Unit
MATERIAL
Screw 1" 0.1667 Dose
100Amp KIT KAT 1 No

LABOUR
Labourer 0.007 Day
Electrician 0.031 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,347

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-92
Item Name : Supply and erection of kit kat 500 volts 200 Amp
Detail Qty Unit
MATERIAL
Screw 1" 0.1667 Dose
200Amp KIT KAT 1 No

LABOUR
Labourer 0.009 Day
Electrician 0.036 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,348

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-93
Item Name : Supply and erection of kit kat 500 volts 300 Amp
Detail Qty Unit
MATERIAL
Screw 1" 0.1667 Dose
300Amp KIT KAT 1 No

LABOUR
Labourer 0.009 Day
Electrician 0.036 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,349

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-94
Item Name : Supply and erection of kit kat 500 volts 400 Amp
Detail Qty Unit
MATERIAL
Screw 1" 0.1667 Dose
400Amp KIT KAT 1 No

LABOUR
Labourer 0.02 Day
Electrician 0.04 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,350

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-95-a
Item Name :
Detail Qty Unit
MATERIAL
2.2 KVA Gernerator 1 No
Extension lead 10 Yard
Change over switch three 1 No
pole
Board, Power Plug & Power 1 Set
Cost of Oil (initial 10 Ltr
start)

LABOUR
Skilled Labour 0.5 Day
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,351

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-95-b
Item Name :
Detail Qty
MATERIAL
2.2 KVA Gernerator 1
Extension lead 10
Change over switch three 1
pole
Board, Power Plug & Power 1
Cost of Oil (initial 10
start)
Gas conversion kit 1

LABOUR
Skilled Labour 0.5 Day
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,352
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-95-c
Item Name :
Detail Qty
MATERIAL
3.1 KVA Gernerator 1
Extension lead 10
Change over switch three 1
pole
Board, Power Plug & Power 1
Cost of Oil (initial 10
start)
Gas conversion kit 1

LABOUR
Skilled Labour 0.5 Day
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,353

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-95-d
Item Name :
Detail Qty
MATERIAL
3.1 KVA Gernerator 1
Extension lead 10
Change over switch three 1
pole
Board, Power Plug & Power 1
Cost of Oil (initial 10
start)

LABOUR
Skilled Labour 0.5
Electrician 0.5
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,354

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-96-a
Item Name : Supply & erection of HT pole 36' High (Spun Type)
Detail Qty Unit
MATERIAL
HT pole (Spun Type 36 ft 1 No
High)

LABOUR
Skilled Labour 0.33 Day
Electrician 0.33 Day
Sundries (Labour Only):

EQUIPMENT
Mobile Crane 10 Ton 1 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,355

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-96-b
Item Name : Supply & erection of LT pole 31' High (Spun Type)
Detail Qty Unit
MATERIAL
Lt pole (Spun Type 31 ft 1 No
high)

LABOUR
Skilled Labour 0.33 Day
Electrician 0.33 Day
Sundries (Labour Only):

EQUIPMENT
Mobile Crane 10 Ton 1 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,356

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-97-a
Item Name : Supply & erection of HT pole 36' High(H-Type)
Detail Qty Unit
MATERIAL
HT PC pole (H-Type 36 ft 1 No
high)

LABOUR
Skilled Labour 0.33 Day
Electrician 0.33 Day
Sundries (Labour Only):

EQUIPMENT
Mobile Crane 10 Ton 1 Hour
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,357

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-97-b
Item Name : Supply & erection LT Pole 31' High (H-Type)
Detail Qty Unit
MATERIAL
LT PC pole (H-Type 31 ft 1 No
High)

LABOUR
Skilled Labour 0.33 Day
Electrician 0.33 Day
Sundries (Labour Only):

EQUIPMENT
Mobile Crane 10 Ton 1 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,358

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-98-a
Item Name : Supply & stringing of ACSR Osprey Conductor
Detail Qty Unit
MATERIAL
ACSR Osprey Conductor. 1 Rft
LABOUR
Skilled Labour 0.01 Day
Electrician 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,359

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-98-b
Item Name : Supply & stringing of ACSR Dog Conductor
Detail Qty Unit
MATERIAL
ACSR Dog Conductor 1 Rft
(7/0.186)

LABOUR
Skilled Labour 0.01 Day
Electrician 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,360

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-98-c
Item Name : Supply & stringing of ACSR Rabbit Conductor
Detail Qty Unit
MATERIAL
ACSR Rabbit Conductor 1 Rft
(7/0.132)

LABOUR
Skilled Labour 0.01 Day
Electrician 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,361

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-98-d
Item Name : Supply & stringing of AAC Wasp Conductor ( 7/0.173")
Detail Qty Unit
MATERIAL
AAC Wasp 1 Rft
Conductor.(7/0.173)

LABOUR
Skilled Labour 0.01 Day
Electrician 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,362

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM :
Item Code : 15-98-e
Item Name : Supply & stringing of AAC Ant Conductor ( 7/0.122" )
Detail Qty Unit
MATERIAL
AAC Ant 1 Rft
Conductor.(7/0.122)

LABOUR
Skilled Labour 0.01 Day
Electrician 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,363

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-99-a
Item Name : Supply & erection of 11 KV Disc Insulator
Detail Qty Unit
MATERIAL
11 KV Disc Insulator. 1 No

LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,364

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-99-b
Item Name : Supply & erection of 11 KV Pin Insulator
Detail Qty Unit
MATERIAL
11 KV Pin Insulator. 1 No

LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,365

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-99-c
Item Name : Supply & erection of 11 KV pin for Steel-x-arm
Detail Qty Unit
MATERIAL
11 KV pin for 1 No
Steel-x-arm.

LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,366

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-99-d
Item Name : Supply & erection of Spool Insulator
Detail Qty Unit
MATERIAL
Spool Insulator. 1 No

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,367

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-100-a
Item Name : Supply & erection of
Detail Qty Unit
MATERIAL
25 KVA, 11/0.4 KV 1 No
Transformer.

LABOUR
Skilled Labour 1 Day
Electrician 1 Day
Sundries (Labour Only):

EQUIPMENT
Mobile Crane 10 Ton 1 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.
2,368

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-100-b
Item Name : Supply & erection of 50 KVA, 11/0.4 KV Transformer
Detail Qty Unit
MATERIAL
50 KVA, 11/0.4 KV 1 No
Transformer.

LABOUR
Skilled Labour 1 Day
Electrician 1 Day
Sundries (Labour Only):

EQUIPMENT
Mobile Crane 10 Ton 1 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,369

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-100-c
Item Name : Supply & erection of 100 KVA, 11/0.4 KV Transformer
Detail Qty Unit
MATERIAL
100 KVA, 11/0.4 KV 1 No
Transformer.

LABOUR
Skilled Labour 1 Day
Electrician 1 Day
Sundries (Labour Only):

EQUIPMENT
Mobile Crane 10 Ton 1 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,370

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-100-d
Item Name : Supply & erection of 200 KVA, 11/0.4 KV Transformer
Detail Qty Unit
MATERIAL
200 KVA, 11/0.4 KV 1 No
Transformer.

LABOUR
Skilled Labour 1 Day
Electrician 1 Day
Sundries (Labour Only):

EQUIPMENT
Mobile Crane 10 Ton 1 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,371

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM :
Item Code : 15-101-a
Item Name : Supply & erection of Steel-X-Arm with braces
Detail Qty Unit
MATERIAL
11 KV Steel-X-Arm with 1 No
braces.

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,372

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-101-b
Item Name : Supply & erection of Steel-x-Arm / D-Fitting
Detail Qty Unit
MATERIAL
Steel-x-Arm / D-Fitting. 1 No

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,373

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM :
Item Code : 15-102
Item Name : Supply & erection of Stay set Complete
Detail Qty Unit
MATERIAL
Stay set Complete. 1 No

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,374

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-103
Item Name : Supply & erection of Stay Wire
Detail Qty Unit
MATERIAL
Stay Wire GSL 10 mm. 1 Kg

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Kg Rs.
Labour Rates Per Kg Rs.

2,375

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM :
Item Code : 15-104
Item Name : Supply & erection of Eye Nut
Detail Qty Unit
MATERIAL
eye nut. 1 No

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,376

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-105-a
Item Name : Supply & erection of Earth Rod
Detail Qty Unit
MATERIAL
Earth Rod 10' long. 1 No

LABOUR
Skilled Labour 0.25 Day
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,377

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-105-b
Item Name : Supply & erection of Earthing wire GSL 6 mm
Detail Qty
MATERIAL
Earthing wire GSL 6 mm. 1

LABOUR
Skilled Labour 0.0625
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Kg
Labour Rates Per Kg

2,378

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-105-c Unit

Item Name : Drilling of earth bore 3" dia 70 to 80 ft. deep or up to permanent
water table, back filling, ramming, complete in all respect. grounding
bores shall be made at 6 to 8 feet away from foundation and distance
between earth bore shall not be less than 10 feet

Detail Qty Unit


MATERIAL
Bore for grounding of 1 Kg
body of Transformer &
generator

LABOUR
Skilled Labour 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,379

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-105-d
Item Name :
Detail Qty
MATERIAL
Single Arm Pole. Having 1
step section 152.4mm :
127mm : 76.2 mm dia.
steel tubular pole
consisting of M.S. black
pipe 8 meter high
including 300mm high
service door with a 215
key lock , duly
degreased, derusted with
hot dipped galvanized,
having 2 coats of
aluminium paint, bottom
end welded to 20mm M.S.
plate 470mm x 470mm with
4 holes 28mm dia. and 4
nos. stiffener plates
20mm thick as shown on
drawing, including cost
of all necessary
materials, .

LABOUR
Skilled Labour 0.5 Day
Electrician 0.5 Day
Sundries (Labour Only):

EQUIPMENT
Mobile Crane 10 Ton 1 Hour

2,380
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,381

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-105-e Unit

Item Name : Supply, Installation & Connecting up of earth electrodes with 600mm x
600mm x 3.2mm conductors to main earth bar including all accessories,
in 50mm dia G.I. pipe / PVC pipe class D/E up inspection chamber, heavy
duty C.I. Cover etc.

Detail Qty Unit


MATERIAL
earth electrodes with 1 Job
600mm x 600mm x 3.2mm
conductors to main earth
bar including all
accessories, in 50mm dia
G.I. pipe / PVC pipe
class D/E up inspection
chamber, heavy duty C.I.
Cover etc.

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Job Rs.
Labour Rates Per Job Rs.

2,382

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-105-f
Item Name :
Detail Qty
MATERIAL
Supply of Grounding 1
connecting points
consisting of copper
plate 300mm long x50mm
wide x 6mm thick to be
installed, complete with
fixing arrangement, brass
nuts bolts, washers,
lugs, 12.5mm dia. holes
to facilitate connections
of Incoming copper
strips / copper
conductors.

LABOUR
Skilled Labour 0.5 Day
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,383

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM : Spec. No :
Item Code : 15-105-g Unit

Item Name : Providing & fixing of main earth bar, with 80mm x50mm x.20mm copper bar
with terminals, insulator supports, lugs, bolts, etc. including bonding
to rebars of structure.

Detail Qty Unit

MATERIAL
earth bar, with 80mm x 1 Job

50mm x.20mm copper bar


with terminals, insulator
supports, lugs, bolts,
etc. including bonding to
rebars of structure.

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Job Rs.
Labour Rates Per Job Rs.

2,384

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-105-h Unit

Item Name : Providing & fixing of Plate type Earthing commpressed with execveted
hole 6"up 63 feet,GI pipe 2"(50mm)with Tees , Sockets , Endcap of 60
(RFT) Copper Plate of 1/2"x 2"x 48", 2x 70mmsq S/Core copper bare
conductor 125 (Rft) Earth Connection Point of 1200 x 50 x 50mm (L x W x
T)
all respect
Detail Qty
MATERIAL
EARTHING SYSTEM: 1
Plate type Earthing
commpressed with
execveted hole 6"up 63
feet,GI pipe 2"(50mm)with
Tees , Sockets , Endcap
of 60 (RFT) Copper Plate
of 1/2"x 2"x 48", 2x
70mmsq S/Core copper bare
conductor 125 (Rft) Earth
Connection Point of 1200
x 50 x 50mm (L x W x T)
Inspection Pit of 300 x
300 x 450 mm (L x W x D)
complated with all
respect.

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Job Rs.
Labour Rates Per Job Rs.

2,385

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-105-i
Item Name :
Detail Qty
MATERIAL
Construction of water 1
tight brick type
Grounding inspection pit
with 9” thick walls 300mm
x 300mm x 300mm internal
size with cement mortar,
internal plaster 1:4, RCC
100 mm thick inspection
pit water tight removable
cover with lifting hooks,
copper test link, with
all necessary materials.

LABOUR
Skilled Labour 0.25 Day
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,386

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-106 Unit

Item Name : Supply, installation, testing & commissioning of Lightning Protection


System

Detail Qty
MATERIAL
LIGHTNING PROTECTION 1
SYSTEM:
Earth electrode for
lightning protection
system comprise 17.4mm
dia, 3000mm long Copper
deposited steel rod,
including appropriate
clamp for clamping of
the (25x3)mm tape. The
copper deposited steel
rod shall be hammered
into the ground to the
depth of twelve inches
below the ground surface.
The earth electrode
includes CC inspection
chamber with cover of
size 2'x2', excavation
backfilling, etc.making
the job

LABOUR
Skilled Labour 1 Day
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,387

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-107 Unit

Item Name : Supply, installation, testing & commissioning of Lightning Protection


System

Detail Qty Unit


MATERIAL
LIGHTNING PROTECTION 1 No
SYSTEM:
lightning protection
system compressed with
following items. GI Pipe
2" 50 feet GI Tee 2" with
Endcap 1 NO.S Copper
Clated Rod 0f 10 Feet X
20mm- one nose, 70mmsq
s/c bare copper conductor
= 24 Foot Excevated hole
4"x 30 Feet Inspection
Chamber 12"x 12"x 12"
Dicost Medium Duty
Inspection Chamber Cover
with frame 12" x 12"
LABOUR
Skilled Labour 2 Day
Electrician 2 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,388

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-108
Item Name : Supply & erection of double Arming Bolt
Detail Qty Unit
MATERIAL
double Arming Bolt. 1 No

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,389

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-109
Item Name : Supply & erection of D-Bracket along with cotter pin
Detail Qty Unit
MATERIAL
D-Bracket along with 1 No
cotter pin.

LABOUR
Electrician 0.0417 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,390

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-110-a
Item Name :
Detail Qty Unit
MATERIAL
double pole platform for 1 No
transformers.

LABOUR
Skilled Labour 0.5 Day
Electrician 0.5 Day
Sundries (Labour Only):

EQUIPMENT
Mobile Crane 10 Ton 1 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,391

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-110-b
Item Name :
Detail Qty Unit
MATERIAL
single pole platform for 1 No
transformers.

LABOUR
Skilled Labour 0.5 Day
Electrician 0.5 Day
Sundries (Labour Only):

EQUIPMENT
Mobile Crane 10 Ton 0.5 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,392

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-111
Item Name : Supply & erection of drop out cutouts
Detail Qty Unit
MATERIAL
drop out cutouts (11 KV 1 No
SY-II unit).

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,393

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-112-a
Item Name : Supply & erection of dead end clamp
Detail Qty Unit
MATERIAL
11 KV dead end clamp for 1 No
Osprey Conductor.

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,394

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-112-b
Item Name : Supply & erection of dead end clamp
Detail Qty Unit
MATERIAL
11 KV dead end clamp for 1 No
Dog Conductor.

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,395

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-112-c
Item Name : Supply & erection of dead end clamp
Detail Qty Unit
MATERIAL
11 KV dead end clamp for 1 No
Rabbit Conductor.

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,396

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-113-a
Item Name : Supply & erection of PG Connector
Detail Qty Unit
MATERIAL
PG Connector for Osprey 1 No
Conductor T-220.

LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,397

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-113-b
Item Name : Supply & erection of PG Connector
Detail Qty Unit
MATERIAL
PG Connector for Dog 1 No
Conductor T-150.

LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,398

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-113-c
Item Name : Supply & erection of PG Connector
Detail Qty Unit
MATERIAL
PG Connector for Rabbit 1 No
Conductor T-110.

LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,399

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-114-a
Item Name : Supply & erection of Loop dead end clamp
Detail Qty Unit
MATERIAL
Loop dead end clamp 1 No
LC-16.

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,400

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-114-b
Item Name : Supply & erection of Loop dead end clamp
Detail Qty Unit
MATERIAL
Loop dead end Clamp 1 No
LC-10.

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,401

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-115-a Unit

Item Name : Supply & erection of double arm GI round conical pole, hot dipped
galvanized (80 microns) 12 meters long overall thickness 4 mm, base dia
180 mm and top dia 62 with plate arrangement 450mm x 450mm x 25mm,
complete in all respects.

Detail Qty Unit


MATERIAL
double arm GI round 1 No
conical pole, hot dipped
galvanized 12 meters long
overall thickness 4 mm,
base dia 180 mm and top
dia 62 with plate
arrangement 450mm x 450mm
x 25mm, .

LABOUR
Skilled Labour 1.5 Day
Electrician 1.5 Day
Sundries (Labour Only):

EQUIPMENT
Mobile Crane 10 Ton 1

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,402

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-115-b Unit

Item Name : Supply & erection of Single arm GI round conical pole, hot dipped
galvanized (80 microns) 12 meters long overall thickness 4 mm, base dia
180 mm and top dia 62 with plate arrangement 450mm x 450mm x 25mm,
complete in all respects.

Detail Qty Unit


MATERIAL
single arm GI round 1 No
conical pole, hot dipped
galvanized 12 meters long
overall thickness 4 mm,
base dia 180 mm and top
dia 62 with plate
arrangement 450mm x 450mm
x 25mm, .

LABOUR
Skilled Labour 1.5 Day
Electrician 1.5 Day
Sundries (Labour Only):

EQUIPMENT
Mobile Crane 10 Ton 1

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,403

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-115-c Unit

Item Name : Supply & erection of Double arm GI round conical pole, hot dipped
galvanized (80 microns) 10 meters long overall thickness 4 mm, base dia
180 mm and top dia 62 with plate arrangement 450mm x 450mm x 25mm,
complete in all respects.

Detail Qty Unit


MATERIAL
double arm GI round 1 No
conical pole, hot dipped
galvanized 10 meters long
overall thickness 4 mm,
base dia 180 mm and top
dia 62 with plate
arrangement 450mm x 450mm
x 25mm, .

LABOUR
Skilled Labour 1.5 Day
Electrician 1.5 Day
Sundries (Labour Only):

EQUIPMENT
Mobile Crane 10 Ton 1

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,404

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-115-e Unit

Item Name : Supply & erection of Double arm GI round conical pole, hot dipped
galvanized (80 microns) 12 meters long overall thickness 5 mm, base dia
200 mm and top dia 100 with plate arrangement 450mm x 450mm x 25mm,
complete in all respects.

Detail Qty Unit


MATERIAL
double arm GI round 1 No
conical pole, hot dipped
galvanized 12 meters long
overall thickness 5 mm,
base dia 200 mm and top
dia 100 with plate
arrangement 450mm x 450mm
x 25mm, .

LABOUR
Skilled Labour 1.5 Day
Electrician 1.5 Day
Sundries (Labour Only):

EQUIPMENT
Mobile Crane 10 Ton 1

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,405

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-115-f Unit

Item Name : Supply & erection of Single arm GI round conical pole, hot dipped
galvanized (microns) 10 meters long overall thickness 5 mm, base dia
200 mm and top dia 100 with plate arrangement 450mm x 450mm x 25mm,
complete in all respects.

Detail Qty Unit


MATERIAL
single arm GI round 1 No
conical pole, hot dipped
galvanized 10 meters long
overall thickness 5 mm,
base dia 200 mm and top
dia 100 with plate
arrangement 450mm x 450mm
x 25mm, .

LABOUR
Skilled Labour 1.5 Day
Electrician 1.5 Day
Sundries (Labour Only):

EQUIPMENT
Mobile Crane 10 Ton 1

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,406

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-116
Item Name : Supply & erection of Timer TB 438
Detail Qty Unit
MATERIAL
Timer TB 438 or 1 No
equivalent (imported).

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,407
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-117
Item Name : Supply & erection of Magnetic contactor
Detail Qty Unit
MATERIAL
Magnetic contactor 30 1 No
amps 240V/440V (imported)

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,408

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-118
Item Name :
Detail Qty
MATERIAL
Providing and laying 1
pipe at a depth of 2-1/2'
including excavation and
back filling in
soft,graveling & hard
soil & at road crossing
and poles etc. including
reconditioning of road
for Road Lights Street
Lights & boundary Wall
Lights & as per
instruction of engineer
incharge & as specified
by the consultants of
following size:
a) 4"dia RCC Pipe

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,409

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-119
Item Name : Supply & erection of 2" PVC pipe flexible (weather proof)
Detail Qty Unit
MATERIAL
2" PVC pipe flexible 1m
(weather proof)

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per m Rs.
Labour Rates Per m Rs.

2,410

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM :
Item Code : 15-120
Item Name :
Detail Qty Unit
MATERIAL
weather proof flexible 1 No
PVC pipe 1.5" dia

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,411

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-121
Item Name : Supply & erection of DIN rail
Detail Qty Unit
MATERIAL
DIN rail (zinc elated) 1 No

LABOUR
Electrician 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,412

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM : Spec. No :
Item Code : 15-122-a Unit

Item Name : Supply at site, installation, testing and commissioning of PVC


insulated un-armoured copper conductor cable 600 / 1000 Volt grade (or
otherwise mentioned in cable description ) in prelaid conduits /
trenches to be installed as per routes shown on drawings including cost
of all necessary materials, connections, identification tags, cables
lugs properly crimped at
in all respects.
Detail Qty Unit
MATERIAL
06sq mm , 4 core PVC/PVC 1 RMtr
stranded copper conductor
cable

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per RMtr Rs.
Labour Rates Per RMtr Rs.

2,413

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-122-b Unit

Item Name : Supply at site, installation, testing and commissioning of PVC


insulated un-armoured copper conductor cable 600 / 1000 Volt grade (or
otherwise mentioned in cable description ) in prelaid conduits /
trenches to be installed as per routes shown on drawings including cost
of all necessary materials, connections, identification tags, cables
lugs properly crimped at
in all respects.
Detail Qty Unit
MATERIAL
10sq mm , 4 core PVC/PVC 1 No
stranded copper conductor
cable

LABOUR
Electrician 0.06 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per RMtr Rs.
Labour Rates Per RMtr Rs.

2,414

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-122-c Unit

Item Name : Supply at site, installation, testing and commissioning of PVC


insulated un-armoured copper conductor cable 600 / 1000 Volt grade (or
otherwise mentioned in cable description ) in prelaid conduits /
trenches to be installed as per routes shown on drawings including cost
of all necessary materials, connections, identification tags, cables
lugs properly crimped at
in all respects.
Detail Qty Unit
MATERIAL
16 sq mm , 4 core PVC/PVC 1 No
stranded copper conductor
cable

LABOUR
Electrician 0.08 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per RMtr Rs.
Labour Rates Per RMtr Rs.

2,415

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-122-d Unit

Item Name : Supply at site, installation, testing and commissioning of PVC


insulated un-armoured copper conductor cable 600 / 1000 Volt grade (or
otherwise mentioned in cable description ) in prelaid conduits /
trenches to be installed as per routes shown on drawings including cost
of all necessary materials, connections, identification tags, cables
lugs properly crimped at
in all respects.
Detail Qty Unit
MATERIAL
25 sq mm , 4 core PVC/PVC 1 No
stranded copper conductor
cable

LABOUR
Electrician 0.09 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per RMtr Rs.
Labour Rates Per RMtr Rs.

2,416

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-122-e Unit

Item Name : Supply at site, installation, testing and commissioning of PVC


insulated un-armoured copper conductor cable 600 / 1000 Volt grade (or
otherwise mentioned in cable description ) in prelaid conduits /
trenches to be installed as per routes shown on drawings including cost
of all necessary materials, connections, identification tags, cables
lugs properly crimped at
in all respects.
Detail Qty Unit
MATERIAL
35 sq mm , 4 core PVC/PVC 1 No
stranded copper conductor
cable

LABOUR
Electrician 0.12 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per RMtr Rs.
Labour Rates Per RMtr Rs.

2,417

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-122-f Unit

Item Name : Supply at site, installation, testing and commissioning of PVC


insulated un-armoured copper conductor cable 600 / 1000 Volt grade (or
otherwise mentioned in cable description ) in prelaid conduits /
trenches to be installed as per routes shown on drawings including cost
of all necessary materials, connections, identification tags, cables
lugs properly crimped at
in all respects.
Detail Qty Unit
MATERIAL
50 sq mm , 4 core PVC/PVC 1 No
stranded copper conductor
cable

LABOUR
Electrician 0.13 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per RMtr Rs.
Labour Rates Per RMtr Rs.

2,418
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-122-g Unit

Item Name : Supply at site, installation, testing and commissioning of PVC


insulated un-armoured copper conductor cable 600 / 1000 Volt grade (or
otherwise mentioned in cable description ) in prelaid conduits /
trenches to be installed as per routes shown on drawings including cost
of all necessary materials, connections, identification tags, cables
lugs properly crimped at
in all respects.
Detail Qty Unit
MATERIAL
70 sq mm , 4 core PVC/PVC 1 No
stranded copper conductor
cable

LABOUR
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per RMtr Rs.
Labour Rates Per RMtr Rs.

2,419

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-122-h Unit

Item Name : Supply at site, installation, testing and commissioning of PVC


insulated un-armoured copper conductor cable 600 / 1000 Volt grade (or
otherwise mentioned in cable description ) in prelaid conduits /
trenches to be installed as per routes shown on drawings including cost
of all necessary materials, connections, identification tags, cables
lugs properly crimped at
in all respects.
Detail Qty Unit
MATERIAL
120 sq mm , 4 core 1 No
PVC/PVC stranded copper
conductor cable

LABOUR
Electrician 0.75 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per RMtr Rs.
Labour Rates Per RMtr Rs.

2,420

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-122-i Unit

Item Name : Supply at site, installation, testing and commissioning of PVC


insulated un-armoured copper conductor cable 600 / 1000 Volt grade (or
otherwise mentioned in cable description ) in prelaid conduits /
trenches to be installed as per routes shown on drawings including cost
of all necessary materials, connections, identification tags, cables
lugs properly crimped at
in all respects.
Detail Qty
MATERIAL
150 sq mm , 4 core 1
PVC/PVC stranded copper
conductor cable

LABOUR
Electrician 1
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per RMtr Rs.
Labour Rates Per RMtr Rs.

2,421

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-122-j Unit

Item Name : Supply at site, installation, testing and commissioning of PVC


insulated un-armoured copper conductor cable 600 / 1000 Volt grade (or
otherwise mentioned in cable description ) in prelaid conduits /
trenches to be installed as per routes shown on drawings including cost
of all necessary materials, connections, identification tags, cables
lugs properly crimped at
in all respects.
Detail Qty
MATERIAL
185 sq mm , 4 core 1
PVC/PVC stranded copper
conductor cable

LABOUR
Electrician 1
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per RMtr Rs.
Labour Rates Per RMtr Rs.

2,422

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-122-k Unit

Item Name : Supply at site, installation, testing and commissioning of PVC


insulated un-armoured copper conductor cable 600 / 1000 Volt grade (or
otherwise mentioned in cable description ) in prelaid conduits /
trenches to be installed as per routes shown on drawings including cost
of all necessary materials, connections, identification tags, cables
lugs properly crimped at
in all respects.
Detail Qty
MATERIAL
300 sq mm , 4 core 1
PVC/PVC stranded copper
conductor cable

LABOUR
Electrician 1.25
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per RMtr Rs.
Labour Rates Per RMtr Rs.

2,423

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-123-a
Item Name : Supply & erection of
Detail Qty Unit
MATERIAL
3 Core Cable PVC/PVC '3 1 No
core 2.5 sqmm Cu/PVC/PVC

LABOUR
Electrician 0.007 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,424

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-123-b
Item Name : Supply & erection of 3 CORE FLXIBLE POWER CABLE 1
Detail Qty Unit
MATERIAL
POWER CABLE 1.5 mm2 ; 3 1 No
CORE FLXIBLE

LABOUR
Electrician 0.007 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,425

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-124-a
Item Name : Supply & erection of 2x10 mm2 Copper Cable
Detail Qty Unit
MATERIAL
2x10 mm2 copper cable. 1m

LABOUR
Electrician 0.008 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per m Rs.
Labour Rates Per m Rs.

2,426
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-124-b
Item Name : Supply & erection of 2 core 1.5mmsq Fire Resistant cable
Detail Qty Unit
MATERIAL
2 core 1.5mmsq Fire 1m
Resistant cable

LABOUR
Electrician 0.007 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per m Rs.
Labour Rates Per m Rs.

2,427

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-125
Item Name : Supply & erection of Flexible Copper Cable 1x4 mm2
Detail Qty Unit
MATERIAL
1x4 mm2 flexible copper 1 No
cable.

LABOUR
Electrician 0.007 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per RMtr Rs.
Labour Rates Per RMtr Rs.
2,428

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-126-a Unit

Item Name : Supply at site, installation, testing and commissioning of PVC


insulated un-armoured copper conductor cable 600 / 1000 Volt grade (or
otherwise mentioned in cable description ) in prelaid conduits /
trenches to be installed as per routes shown on drawings including cost
of all necessary materials, connections, identification tags, cables
lugs properly crimped at
in all respects.
Detail Qty
MATERIAL
10 sqmm, 1 core PVC 1
insulated stranded copper
conductor cable.

LABOUR
Electrician 0.03
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per m
Labour Rates Per m

2,429

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-126-b Unit

Item Name : Supply at site, installation, testing and commissioning of PVC


insulated un-armoured copper conductor cable 600 / 1000 Volt grade (or
otherwise mentioned in cable description ) in prelaid conduits /
trenches to be installed as per routes shown on drawings including cost
of all necessary materials, connections, identification tags, cables
lugs properly crimped at
in all respects.
Detail Qty
MATERIAL
16 sqmm, 1 core PVC 1
insulated stranded copper
conductor cable.

LABOUR
Electrician 0.06
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per m
Labour Rates Per m

2,430

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-126-c Unit

Item Name : Supply at site, installation, testing and commissioning of PVC


insulated un-armoured copper conductor cable 600 / 1000 Volt grade (or
otherwise mentioned in cable description ) in prelaid conduits /
trenches to be installed as per routes shown on drawings including cost
of all necessary materials, connections, identification tags, cables
lugs properly crimped at
in all respects.
Detail Qty
MATERIAL
25 sqmm, 1 core PVC 1
insulated stranded copper
conductor cable

LABOUR
Electrician 0.09
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per m
Labour Rates Per m

2,431

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-126-d Unit

Item Name : Supply at site, installation, testing and commissioning of PVC


insulated un-armoured copper conductor cable 600 / 1000 Volt grade (or
otherwise mentioned in cable description ) in prelaid conduits /
trenches to be installed as per routes shown on drawings including cost
of all necessary materials, connections, identification tags, cables
lugs properly crimped at
in all respects.
Detail Qty
MATERIAL
70 sqmm, 1 core PVC 1
insulated stranded copper
conductor cable

LABOUR
Electrician 0.25
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per m
Labour Rates Per m

2,432

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :

Item Code : 15-126-e Unit


Item Name : Supply and installation of four core copper conducter PVC/PVC power
cable (BS6400,BS6346,BS7629) in apropriete size of GI cable tray and
PVC condute surface mounted completed in all respect.

Detail Qty Unit

MATERIAL
Single Core PVC Insulated 1 Meter
400mm2

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Meter Rs.
Labour Rates Per Meter Rs.

2,433

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-127-a Unit

Item Name : Supply at site, installation, testing and commissioning of the One gang
light control switches 10 Amps, 250Volts one way, including appropriate
size concealed MS, powder coated back box, complete in all respects.

Detail Qty Unit

MATERIAL
10 Amps, 250Volts one 1 No

way, One gang light


control switches
including appropriate
size concealed MS, powder
coated back box.

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,434

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-127-b Unit

Item Name : Supply at site, installation, testing and commissioning of Two gang
light control switches 10 Amps, 250Volts one way, including appropriate
size concealed MS, powder coated back box, complete in all respects.

Detail Qty Unit

MATERIAL
10 Amps, 250Volts one 1 No

way, Two gang light


control switches
including appropriate
size concealed MS,
powder coated back box.

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,435

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-127-c Unit

Item Name : Supply at site, installation, testing and commissioning of Three gang
light control switches 10 Amps, 250Volts one way, including appropriate
size concealed MS, powder coated back box, complete in all respects.

Detail Qty Unit

MATERIAL
10 Amps, 250Volts one 1 No

way, Three gang light


control switches
including appropriate
size concealed MS,
powder coated back box.

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,436

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-127-d Unit

Item Name : Supply at site, installation, testing and commissioning of Four gang
light control switches 10 Amps, 250Volts one way, including appropriate
size concealed MS, powder coated back box, complete in all respects.

Detail Qty Unit


MATERIAL
10 Amps, 250Volts one 1 No

way, Four gang light


control switches
including appropriate
size concealed MS,
powder coated back box.

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,437

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-127-e Unit

Item Name : Supply at site, installation, testing and commissioning of Five gang
light control switches 10 Amps, 250Volts one way, including appropriate
size concealed MS, powder coated back box, complete in all respects.

Detail Qty Unit

MATERIAL
10 Amps, 250Volts one 1 No

way, Five gang light


control switches
including appropriate
size concealed MS,
powder coated back box.

LABOUR
Electrician 0.04 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,438

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-127-f Unit

Item Name : Supply at site, installation, testing and commissioning ofSix gang
light control switches 10 Amps, 250Volts one way, including appropriate
size concealed MS, powder coated back box, complete in all respects.

Detail Qty Unit

MATERIAL
10 Amps, 250Volts one 1 No

way, Six gang light


control switches
including appropriate
size concealed MS,
powder coated back box.

LABOUR
Electrician 0.04 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,439

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-127-g Unit

Item Name : Supply at site, installation, testing and commissioning of the Eight
gang light control switches 10 Amps, 250Volts one way, including
appropriate size concealed MS, powder coated back box, complete in all
respects.

Detail Qty Unit


MATERIAL
10 Amps, 250Volts one 1 No
way, Eight gang light
control switches
including appropriate
size concealed MS,
powder coated back box.

LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,440

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-127-h Unit

Item Name : Supply at site, installation, testing and commissioning of One gang
light control switches 10 Amps, 250Volts two way, including appropriate
size concealed MS, powder coated back box, complete in all respects.

Detail Qty Unit

MATERIAL
10 Amps, 250Volts two 1 No

way, one gang light


control switches
including appropriate
size concealed MS,
powder coatedback box.

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,441

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-127-i Unit

Item Name : Supply at site, installation, testing and commissioning of 2 & 3 pin
switched socket unit 5/10 Amps, 250Volts, round pin including
appropriate size MS, powder coated back box, complete in all respects.

Detail Qty Unit

MATERIAL
5 /10 Amps, 250Volts, 2 & 1 No

3 pin switched socket


unit round pin including
appropriate size MS,
powder coated back box.

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,442

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-127-j Unit

Item Name : Supply at site, installation, testing and commissioning of 3 pin


switched socket unit 13/15 Amps, 250Volts, round pin including
appropriate size MS, powder coated back box, complete in all respects.

Detail Qty Unit

MATERIAL
13 /15 Amps, 250Volts, 3 1 No

pin duplex switched


socket unit including
appropriate size MS,
powder coated back box.

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,443

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM : Spec. No :
Item Code : 15-127-k Unit

Item Name : Supply at site, installation, testing and commissioning of 3 pin


switched socket unit 20 Amps, 250Volts, round pin including appropriate
size MS, powder coated back box, complete in all respects.

Detail Qty Unit

MATERIAL
20 Amps, 250Volts, 3 pin 1 No

switch socket unit round


pin including appropriate
size MS, powder coated
back box.

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,444

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-127-l Unit

Item Name : Supply at site, installation, testing and commissioning of Push Button
10 Amps, 250Volts, including appropriate size MS, powder coated back
box, complete in all respects.

Detail Qty Unit

MATERIAL
10 Amps, 250Volts, push 1 No
button including
appropriate size MS,
powder coated back box.

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,445

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-127-m Unit

Item Name : Supply at site, installation, testing and commissioning of Fan Dimmer
with switch/ MS, powder coated back box with all associated
accessories, complete in all respects.

Detail Qty Unit

MATERIAL
Fan Dimmer with switch/ 1 No
MS, powder coated back
box with all associated
accessories.

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,446

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-127-n Unit

Item Name : Supply at site, installation, testing and commissioning of DP switch 20


Amps with neon indication lamp complete with MS, powder coated back
box, complete in all respects.

Detail Qty Unit

MATERIAL
20 Amps DP switch with 1 No
neon indication lamp
complete with MS, powder
coated back box.

LABOUR
Electrician 0.04 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,447

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-127-o Unit

Item Name : Supply at site, installation, testing and commissioning of Three Pin
220 V 05/10 Amp Switch socket, complete in all respects.

Detail Qty Unit


MATERIAL
Three Pin 220 V 05/10 Amp 1 No
Switch socket
LABOUR
Electrician 0.04 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,448

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-127-p Unit

Item Name : Supply at site, installation, testing and commissioning of Three Pin
220 V 20 Amps Switch socket, complete in all respects.

Detail Qty Unit


MATERIAL
Three Pin 220 V 20 Amps 1 No
Switch socket

LABOUR
Electrician 0.04 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,449

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-127-q Unit
Item Name : Supply at site, installation, testing and commissioning of Three Pin
Universal Switch socket, complete in all respects.

Detail Qty Unit


MATERIAL
3 pin Universal socket 1 No

LABOUR
Electrician 0.04 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,450

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-128-a Unit

Item Name : Supply and installation of Flush Face Plate One Way Switch 220V 10 Amps
Switch, complete in all respects

Detail Qty Unit


MATERIAL
One Way Switch 220V 10 1 Each
Amps

LABOUR
Electrician 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,451

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-128-b Unit

Item Name : Supply and installation of Flush Face Plate Two Way Switch 220V 10 Amps
switch, complete in all respects

Detail Qty Unit


MATERIAL
Two Way Switch 220V 10 1 Each
Amps

LABOUR
Electrician 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,452

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-129-a Unit

Item Name : Supply &. Installation of flush type switch (Single pole 220V 5 amps
switch 1 way) manufactured by fixed over sheet including appropriate
size outlet box of 16SWG black enameled MS sheet recessed in wall,
column etc. complete in all respects

Detail Qty Unit


MATERIAL
a) Single pole 220V 5 1 Each
amps switch 1 way

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,453

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-129-b Unit

Item Name : Supply &. Installation of flush type switch (Single pole 220V 10 amps
switch 2 way) manufactured by fixed over sheet including appropriate
size outlet box of 16SWG black enameled MS sheet recessed in wall,
column etc. complete in all respects

Detail Qty Unit


MATERIAL
b) Single pole 220V 10 1 Each
amps switch 2 way

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,454

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-129-c Unit
Item Name : Supply &. Installation of flush type switch (2-Pin 10 amps 220 V Switch
Socket) manufactured by fixed over sheet including appropriate size
outlet box of 16SWG black enameled MS sheet recessed in wall, column
etc. complete in all respects

Detail Qty Unit


MATERIAL
c) 2-Pin 10 amps 220 V 1 Each
Switch Socket

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,455

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-130-a Unit

Item Name : Supply, installation, testing and commissioning of 2 core 1.5 Sqmm
stranded copper conductor tin coated with drain PVC insulated wires
600/1000 V. grade, fire resistant, low smoke, zero halogen Cu conductor
to be pulled in already installed 20mm dia. heavy duty PVC conduit
recessed in wall, columns, slab, floor or above false ceiling with all
necessary fixing accessories

Detail Qty Unit


MATERIAL
wiring speakers, 1 No
amplifier & mic wired
with 2 core 1.5mm. Sqmm
stranded copper conductor
tin coated with drain PVC
insulated wires 600/1000
V. grade, fire resistant,
low smoke, zero halogen
Cu conductor to be pulled
in already installed
20mm dia. heavy duty PVC
conduit recessed in wall,
columns, slab, floor or
above false ceiling with
all necessary fixing
accessories as per site
conditions,

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Point Rs.
Labour Rates Per Point Rs.

2,456

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-130-b Unit

Item Name : Supply, installation, testing and commissioning of Mixer Amplifier


(240W); 6 MIC Input; complete in all respects.

Detail Qty Unit


MATERIAL
MIXER AMPLIFIER; 6 MIC 1 No
INPUT; .

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,457
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-130-c
Item Name :
Detail Qty Unit
MATERIAL
POWER AMPLIFIER, . 1 No

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,458

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-130-d
Item Name :
Detail Qty Unit
MATERIAL
120 watts Mixing 1 Each
Amplifier

LABOUR
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,459

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-130-e Unit

Item Name : Supply, installation, testing & commissioning of Back Ground Music
Player

Detail Qty Unit


MATERIAL
BACK GROUND MUSIC PLAYER, 1 No

LABOUR
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,460

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-130-f
Item Name :
Detail Qty
MATERIAL
Goose neck Microphone 1
with local floor stand
and Boom BOSCH Model
LBC-2900-15 .

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,461

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-130-g
Item Name :
Detail Qty Unit
MATERIAL
Table Stand Microphone 1 No
BOSCH Model LBB-1950. .

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,462

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-130-h Unit

Item Name : Supply, installation, testing & commissioning of Cordless MIC with
Receivers

Detail Qty Unit


MATERIAL
CORD LESS MIC WITH 1 No
RECEIVERS, .

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,463

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-130-i
Item Name :
Detail Qty Unit
MATERIAL
CEILING MOUNT SPEAKERS 1 No
6W, .

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,464

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-130-j
Item Name :
Detail Qty Unit
MATERIAL
WALL MOUNT SPEAKERS 60W, 1 No

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,465

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-130-k
Item Name :
Detail Qty Unit
MATERIAL
WALL MOUNT SPEAKERS 12W, 1 No

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,466

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-130-l
Item Name :
Detail Qty Unit
MATERIAL
BOSH 36Watts Column Loud 1 No
Speaker LAI-UW36-X

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,467

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-130-m Unit

Item Name : Supplying, installation, wiring, connection of speaker cable 37/0.0076


flexible cable for Audio speaker and pre laid 3A" PVC conduit

Detail Qty Unit


MATERIAL
speaker cable 37/..0076 1 Mtr
flexible cable for Audio
speaker and pre laid 3A"
PVC conduit as approved
by Engineer Incharge

LABOUR
Electrician 0.003 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per m Rs.
Labour Rates Per m Rs.

2,468
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-130-n Unit

Item Name : Supply, connecting, testing & commissioning of recessed mounting 8" dia
Speaker having cylinderical shape 5W operating voltage 12V suitable for
PA system, complete in all respects.

Detail Qty Unit

MATERIAL
recessed mounting 8" dia 1 No

Speaker having
cylinderical shape 5W
operating voltage 12V
suitable for PA system, .

LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,469

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-131-a Unit

Item Name : Supply, testing and commissioning of 2 core 1.5mm. Sqmm stranded copper
conductor tin coated with drain PVC insulated wires 600/1000 V. grade,
fire resistant, LSZH Cu Conductor to be pulled in already installed
20mm dia. heavy duty PVC conduit recessed in wall, columns, slab, floor
or above false ceiling with all necessary fixing accessories as per
site conditions.

Detail Qty Unit


MATERIAL
wiring of Manual 1 No
Stations, smoke
detectors, sounders and
FACP, wired with 2 core
1.5mm. Sqmm stranded
copper conductor tin
coated with drain PVC
insulated wires 600/1000
V. grade, fire resistant,
low smoke, zero halogen
Cu conductor to be pulled
in already installed
20mm dia. heavy duty PVC
conduit recessed in wall,
columns, slab, floor or
above false ceiling with
all necessary fixing
accessories as per site
conditions,

LABOUR
Skilled Labour 0.25 Day
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Point Rs.
Labour Rates Per Point Rs.

2,470

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-131-b Unit

Item Name : Supply, installation, testing & commissioning of Analogue Addressable


Manual Call Point / Pull Station with Base and Back Box with Key UL
Listed complete in all respects.

Detail Qty Unit

MATERIAL
ANALOGE ADDRESSABLE 1 No

MANUAL CALL POINT / PULL


STATION WITH BASE AND
BACK BOX with key; UL
LISTED .

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,471

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-131-c Unit

Item Name : Supply, installation, testing & commissioning of Analogue Addressable


Sounder with Flasher, 24 VDC, Mounting Base and with Base and Back Box
with Key UL Listed complete in all respects.

Detail Qty Unit

MATERIAL
ANALOGE ADDRESSABLE 1 No
SOUNDER WITH FLASHER; 24
VDC; MOUNTING BASE AND
BACK BOX; UL LISTED, .

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,472

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-131-d Unit

Item Name : Supply, installation, testing & commissioning of Analogue Addressable


Optical Smoke Detector with Base; 24 VDC; UL LISTED, low voltage,
solid state, Not Radio Active type, uni-polar and dual chamber with LED
alarm indication to be installed on RCC slab, complete in all respects.

Detail Qty Unit


MATERIAL
following ANALOGE 1 No
ADDRESSABLE OPTICAL SMOKE
DETECTOR WITH BASE; 24
VDC; UL LISTED, low
voltage, solid state, Not
Radio Active type,
uni-polar and dual
chamber with LED alarm
indication to be
installed on RCC slab, .

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,473
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-131-e Unit

Item Name : Supply, installation, testing & commissioning of Addressable Heat


Detector

Detail Qty Unit


MATERIAL
Addressable Heat detector 1 No
with base plate

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,474

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-131-f Unit

Item Name : Supply, installation, testing & commissioning of Wall mounted Sounder
complete in all respect .

Detail Qty Unit


MATERIAL
Wall mounted Sounder 1 No

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,475

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-131-g Unit

Item Name : Supply, installation, testing & commissioning of Micro processor based
Fire Alarm Control Panel, suppression consisting of loops and can
address around 125points, indicating circuits, including 2x12V VDC
Batteries, suppression zone built in power supply, including stand by
battery, alarm and trouble indication, silence alarm and reset system,
general alarm and reset system, general alarm facility, complete in all
respects.

Detail Qty Unit


MATERIAL
FACP (1 Loop Addressable 1 No
)

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,476

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM : Spec. No :
Item Code : 15-131-h Unit

Item Name : Supply, installation, connecting, testing and commissioning of


conventional type Fire Alarm Control Panel (FACP) having 2 zone
conventional type

Detail Qty Unit

MATERIAL
conventional type Fire 1 No
Alarm Control Panel
(FACP) having 2 zone
conventional type

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,477

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-132 Unit

Item Name : Supply, installation, testing & commissioning of Beam Detector, TX-RX,
50 meter Range, complete in all respects.

Detail Qty Unit


MATERIAL
Beam Detector, TX-RX, 50 1 No
meter Range, .

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,478

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :

Item Code : 15-133


Item Name :
Detail Qty Unit
MATERIAL
input module 24V DC, . 1 No

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,479

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-134 Unit

Item Name : Supply, installation, testing & commissioning of Manual call Point
completed in all respect.

Detail Qty Unit


MATERIAL
Manual call Point 1 No
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,480

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-135-a Unit

Item Name : Supply at site, fabrication and installation of GI perforated cable


tray 14 SWG 8 ft. to 10 ft. long with sides 3" high to be installed on
wall, or in vertical, or above false ceiling in horizontal position or
floor mounted or as shown on drawing, including cost of hanging
arrangement brackets made of angle iron 38mm x 38mm x 6mm installed at
every 3 ft., cost of all necessary fixing accessories, complete in all
respects.

Detail Qty Unit


MATERIAL
300mm x 75mm Cable Trays 1 No
(GI perforated cable tray
14 SWG 8 ft. to 10ft)

LABOUR
Skilled Labour 0.125 Day
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,481

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-135-b Unit

Item Name : Supply at site, fabrication and installation of GI perforated cable


tray 14 SWG 8 ft. to 10 ft. long with sides 3" high to be installed on
wall, or in vertical, or above false ceiling in horizontal position or
floor mounted or as shown on drawing, including cost of hanging
arrangement brackets made of angle iron 38mm x 38mm x 6mm installed at
every 3 ft., cost of all necessary fixing accessories, complete in all
respects.

Detail Qty Unit


MATERIAL
300mm x 100mm Cable Trays 1 No
(GI perforated cable tray
14 SWG 8 ft. to 10ft)

LABOUR
Skilled Labour 0.125 Day
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,482

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-135-c Unit

Item Name : Supply at site, fabrication and installation of GI perforated cable


tray 14 SWG 8 ft. to 10 ft. long with sides 3" high to be installed on
wall, or in vertical, or above false ceiling in horizontal position or
floor mounted or as shown on drawing, including cost of hanging
arrangement brackets made of angle iron 38mm x 38mm x 6mm installed at
every 3 ft., cost of all necessary fixing accessories, complete in all
respects.

Detail Qty Unit


MATERIAL
150mm x 75mmCable Trays 1 No
(GI perforated cable tray
14 SWG 8 ft. to 10ft)

LABOUR
Skilled Labour 0.125 Day
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,483

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-135-d Unit

Item Name : Supply at site, fabrication and installation of GI perforated cable


tray 14 SWG 8 ft. to 10 ft. long with sides 3" high to be installed on
wall, or in vertical, or above false ceiling in horizontal position or
floor mounted or as shown on drawing, including cost of hanging
arrangement brackets made of angle iron 38mm x 38mm x 6mm installed at
every 3 ft., cost of all necessary fixing accessories, complete in all
respects.

Detail Qty Unit


MATERIAL
150mm x 100mm Cable Trays 1 No
(GI perforated cable tray
14 SWG 8 ft. to 10ft)

LABOUR
Skilled Labour 0.125 Day
Electrician 0.125 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,484

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-135-e Unit

Item Name : Supply at site, fabrication and installation of GI perforated cable


tray 14 SWG 8 ft. to 10 ft. long with sides 3" high to be installed on
wall, or in vertical, or above false ceiling in horizontal position or
floor mounted or as shown on drawing, including cost of hanging
arrangement brackets made of angle iron 38mm x 38mm x 6mm installed at
every 3 ft., cost of all necessary fixing accessories, complete in all
respects.

Detail Qty Unit


MATERIAL
100mm x 75mm Cable Trays 1 No
(GI perforated cable tray
14 SWG 8 ft. to 10ft)

LABOUR
Skilled Labour 0.125 Day
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,485

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM : Spec. No :
Item Code : 15-136-a Unit
Item Name : Supply at site, installation, testing and commissioning ofLaye
(Core) Level Network Switch, Managable for Data Rack,
Ethernet (10/100/1000) with Copper & Fiber Uplink Ports Including Cost
of 02 Nos 10 Giga SFP Modules(Support 02 Nos 1.0 Giga SFP Modules)
having:min 4 combo Rj45/SFP ports supporting SX/LX/LH etc.
min 4 SFP+ ports support SX/LX/LH etc, complete in all respects.

Detail Qty
MATERIAL
Layer 3 (Core) Level 1
Network Switch, Managable
for Data Rack, 24 Port
Giga Ethernet
(10/100/1000) with Copper
& Fiber Uplink Ports
Including Cost of 02 Nos
10 Giga SFP
Modules(Support 02 Nos
1.0 Giga SFP Modules) min
4 combo Rj45/SFP ports
supporting SX/LX/LH etc
min 4 SFP+ ports support
SX/LX/LH etc expansion
slots for future growth
Support stacking of up to
4 members using 1G/10G
ports Min throughput
should be 88 mpps. Min
switching capacity should
be 120 Gbps, Support
static routing, Sflow,
DLDP Support jumbo frames
9k & Mac address table
size should be 16k, Max
active vlans should be 4k
and Support port security

LABOUR
Electrician 3 Day
Sundries (Labour Only):

2,486

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Job Rs.
Labour Rates Per Job Rs.

2,487

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-136-b Unit

Item Name : Supply at site, installation, testing and commissioning of Layer 2


(Edge) Level Network Switch, Manageable for Data Rack, 24 Port Giga
Ethernet (10/100/1000) with Copper & Fiber Uplink Ports (Support 04 Nos
1.0 Giga SFP Modules). 1.0 Gigabit uplink flexibility with Small
Form-Factor Pluggable Plus (SFP+). 8 ports of Gigabit Ethernet for
desktop connectivity, complete in all respects.

Detail Qty Unit


MATERIAL
Layer 2 (Edge) Level 1 No
Network Switch, Managable
for Data Rack, 24 Port
Giga Ethernet
(10/100/1000) with Copper
& Fiber Uplink Ports
(Support 02 Nos 1.0 Giga
SFP Modules), 1.0 Gigabit
uplink flexibility with
Small Form-Factor
Pluggable Plus (SFP+), 8
ports of Gigabit Ethernet
for desktop connectivity

LABOUR
Skilled Labour 3 Day
Electrician 3 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,488

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-136-c Unit
Item Name : Supply at site, installation, testing and commissioning of U/U
pair Cat 6a
Conduit , with pure copper conductor PVC insulated PVC sheathed
including cost of Single Shutter Face plate with UTP Cat-6a Keystone
Jack with Back Box to be installed on walls, from Data Cabinet to
Computer Points, PVC conduit & Cable tray. Complete in all respects.

Detail Qty Unit


MATERIAL
Wiring for each 1 No
data/computer point with
U/UTP, 4 pair Cat 6a
(500 Mhz ) Network Cable
supports (10 Giga) laid
in PVC Conduit , with
pure copper conducter PVC
insulated PVC sheathed
including cost of Single
Shutter Face palte with
UTP Cat-6a Keystone Jack
with Back Box to be
installed on walls, from
Data Cabinet to Computer
Points, PVC conduit &
Cable tray.

LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,489

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-136-d Unit

Item Name : Supply and erection of Cable for Voice Communication System from
communication rack to each work station / outlet in 25mm PVC conduit /
channel as per drawing including termination, tagging at both ends,
complete in all respects

Detail Qty Unit


MATERIAL
Cable for Voice 1 No
Communication System from
communication rack to
each work station /
outlet in 25mm PVC
conduit / channel as per
drawing including
termination, tagging at
both ends, .

LABOUR
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,490

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-136-e Unit

Item Name : Supply, installation, testing and commissioning of Wireless Access


Point (AP); 802.11 A/G/N; DUAL BAND, complete in all respects

Detail Qty Unit


MATERIAL
WIRE LESS ACCESS POINT 1 No
(AP); 802.11 A/G/N; DUAL
BAND, .

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,491

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-136-f Unit

Item Name : Supply at site, installation, testing and commissioning of data cabinet
of approximate size as mentioned below, powder coated, having lockable
glass door at front, 4 exhaust fans on top, suitable for under
mentioned patch panels, consisting of the following voice and data
points to be terminated on modular patch panel, including cost of power
bus bar, input / output RJ-45 connectors suitable for Cat. 6a cables
patch guides, patch cords, both for Voice and Data, all necessary
accessories / materials for active and passive equipment, 24 ports
switch. The data cabinet shall be complete in all respects including
cost of all necessary materials / accessories required for proper
functioning for the data cabinet. Data cabinet shall be installed after
obtaining necessary permission from the computer specialist of the
Client.
Detail Qty Unit
MATERIAL
DATA RACK 08U 600x 600; 1 No
PREFORATED; 02x FANS; 1x
4 WAY ALL PDU;, .

LABOUR
Skilled Labour 1 Day
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,492

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-136-g Unit

Item Name : Supply at site, installation, testing and commissioning of data cabinet
of approximate size as mentioned below, powder coated, having lockable
glass door at front, 4 exhaust fans on top, suitable for under
mentioned patch panels, consisting of the following voice and data
points to be terminated on modular patch panel, including cost of power
bus bar, input / output RJ-45 connectors suitable for Cat. 6a cables
patch guides, patch cords, both for Voice and Data, all necessary
accessories / materials for active and passive equipment, 24 ports
switch. The data cabinet shall be complete in all respects including
cost of all necessary materials / accessories required for proper
functioning for the data cabinet. Data cabinet shall be installed after
obtaining necessary permission from the computer specialist of the
Client.

Detail Qty Unit


MATERIAL
DATA RACK 27U 600x 800; 1 No
PREFORATED; 01x FIX, 01x
SLIDING TRAYS; 04 FANS;
1x 06 WAY ALL PDU;, .

LABOUR
Skilled Labour 1 Day
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,493

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-136-h Unit

Item Name : Supply, Installation, testing and commissioning of 42 port DATA cabinet
with 3 no’s cabinet tray, 4 no’s power socket and with flexi glass door

Detail Qty Unit


MATERIAL
Supply and installation, 1 No

testing and commissioning


of 42 port DATA cabinet
with 3 no’s cabinet tray,
4 no’s power socket and
with flexi glass door

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,494
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-136-i Unit

Item Name : Supply at site, installation, testing and commissioning of data cabinet
of approximate size as mentioned below, powder coated, having lockable
glass door at front, 4 exhaust fans on top, suitable for under
mentioned patch panels, consisting of the following voice and data
points to be terminated on modular patch panel, including cost of power
bus bar, input / output RJ-45 connectors suitable for Cat. 6a cables
patch guides, patch cords, both for Voice and Data, all necessary
accessories / materials for active and passive equipment, 24 ports
switch. The data cabinet shall be complete in all respects including
cost of all necessary materials / accessories required for proper
functioning for the data cabinet. Data cabinet shall be installed after
obtaining necessary permission from the computer specialist of the
Client.

Detail Qty Unit


MATERIAL
SERVER RACK 42U 1 No

800x1000; PERFORATED; 02x


FIX, 01x SLIDING TRAYS;
04 FAN; 2x 06 WAY ALL
PDU;, .

LABOUR
Skilled Labour 2 Day
Electrician 2 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,495

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-137-a Unit

Item Name : Supply and installation from computer outlet to 30 port patch panel
with CAT-6 DATA cable run in PVC conduit and complete in all respects
in walls including chase etc : 1.25" i/d

Detail Qty Unit

MATERIAL
From computer outlet to 1 Mtr
30 port patch panel with
CAT-6 DATA cable run in
PVC conduit and

LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per m Rs.
Labour Rates Per m Rs.

2,496

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-137-b Unit

Item Name : Supply and installation, testing and commissioning of 30 port data
patch panel surfaces mounted and complete in all respects

Detail Qty
MATERIAL
30 port data patch panel 1
surfaces mounted and
LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,497

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-137-c Unit

Item Name : Supply and installation of 30 ports 10/100-2 gaga uplink ports data
switch(CISCQ2960-24 TTL)

Detail Qty
MATERIAL
30 ports 10/100-2 gaga 1
uplink ports data
switch(CISCQ2960-24 TTL)

LABOUR
Electrician 3
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each
Labour Rates Per Each

2,498

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-a-01 Unit
Item Name : Supply and Installation of 10-Pair Telephone Junction Box with back
mounting frame and connection strip Recessed in wall Type where shown
on drawings, made of 16 SWG M.S. Sheet with hinged door. Completed in
all respects

Detail Qty Unit


MATERIAL
10 pair TJB PABX System 1 No

LABOUR
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,499

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-a-02 Unit

Item Name : Supply and Installation of 25-Pair Telephone Junction Box with back
mounting frame and connection strip Recessed in wall Type where shown
on drawings, made of 16 SWG M.S. Sheet with hinged door. Completed in
all respects

Detail Qty Unit


MATERIAL
25 pair TJB PABX System 1 No

LABOUR
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,500

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-a-03 Unit

Item Name : Supply and Installation of 50-Pair Telephone Junction Box with back
mounting frame and connection strip Recessed in wall Type where shown
on drawings, made of 16 SWG M.S. Sheet with hinged door. Completed in
all respects

Detail Qty Unit


MATERIAL
50 pair TJB PABX System 1 No

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,501

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-a-04 Unit

Item Name : Supply and Installation of 100-Pair Telephone Junction Box with back
mounting frame and connection strip Recessed in wall Type where shown
on drawings, made of 16 SWG M.S. Sheet with hinged door. Completed in
all respects

Detail Qty Unit


MATERIAL
100 pair TJB PABX System 1 No
LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,502

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-b Unit

Item Name : Supply and Installation of 500-Pair Telephone Junction Box with back
mounting frame and connection strip Recessed in wall Type where shown
on drawings, made of 16 SWG M.S. Sheet with hinged door. Completed in
all respects

Detail Qty Unit


MATERIAL
Main Telephone Junction 1 No
Boxes 500 Pair complate
with all respect

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,503

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-c-01 Unit

Item Name : Supply and Installation, testing and commissioning of 24-ports 10/100-2
giga uplink ports DATA switch completed in all respects

Detail Qty Unit


MATERIAL
3M 24-ports 10/100-2 giga 1 No
uplink ports DATA switch.

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,504

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-c-02 Unit

Item Name : Supply and Installation, testing and commissioning of 48-ports 10/100-2
giga uplink ports DATA switch, complete in all respects

Detail Qty Unit


MATERIAL
3M 48-ports 10/100-2 giga 1 No
uplink ports DATA switch

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,505

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-d Unit

Item Name : Supply, installation, connecting, testing and commissioning of 15 -Pair


telephone cable complete in all respects

Detail Qty Unit


MATERIAL
15 -Pair telephone cable 1 Rft

LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,506

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-e-01 Unit

Item Name : Supply, Installation, testing and commissioning of Single Port Data
outlet of 1 x RJ-45 I/Os for Cat-6 cable and with 16 SWG back box,
complete in all respects

Detail Qty Unit

MATERIAL
Single port Data outlet 1 No
of 1 x RJ-45 I/Os for
Cat-6 cable and with 16
SWG back box

LABOUR
Electrician 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,507

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-e-02 Unit

Item Name : Supply, Installation, testing and commissioning of Dual Port Data
outlet of 1 x RJ-45 I/Os for Cat-6 cable and with 16 SWG back box
completed in all respects

Detail Qty Unit

MATERIAL
Dual port Data outlet of 1 No
1 x RJ-45 I/Os for Cat-6
cable and with 16 SWG
back box

LABOUR
Electrician 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,508

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-f Unit

Item Name : Supply, Installation, testing and commissioning of Patch Cord CAT-6, 1m
for computer complete in all respects

Detail Qty Unit


MATERIAL
3M Patch Cord CAT-6, 1 1 No
Mtr for computer

LABOUR
Electrician 0.0313 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,509

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-g Unit

Item Name : Supply and Erection of 3M Cat-6 Cable in 3/4",1"pvc conduit, complete
in all respect

Detail Qty Unit


MATERIAL
Providing and fixing, 1 No
testing and commissioning
of 3M Cat-6 Cable in
3/4",1"pvc conduit
LABOUR
Electrician 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,510

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-h Unit

Item Name : Supply at site, testing, installation & commissioning of 12 Port Cat-3
Telephone Patch Panel installed in Data Cabinet

Detail Qty Unit


MATERIAL
12 Port Cat-3 Telephone 1 No
Patch Panel installed in
Data Cabinet if required
as per points mentioned
in drawing

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,511

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-i Unit

Item Name : Supply and Installation of Single Port Telephone outlet of CAT-5,1 x
RJ-45 I/Os and back box of 16 SWG, complete in all respects

Detail Qty Unit


MATERIAL
(Vivace, E 2000) single 1 No
Port Telephone outlet of
CAT-5,1 x RJ-45 I/Os back
box of 16 SWG

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,512

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-j Unit

Item Name : Supply and Installation of Double Port Telephone outlet of CAT-5,1 x
RJ-45 I/Os and back box of 16 SWG, complete in all respects

Detail Qty Unit


MATERIAL
Double Telephone outlet 1 No
of CAT-5,1 x RJ-45 I/Os

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,513

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-k-01 Unit

Item Name : Supply installation, connection, testing and Commissioning of Telephone


Exchange comparising 4 Trunk lines, 12 Digital Estentions, 200 Auto
Dial Extention and attendeant console with UPS builtin 16+ 34 Kx-Txa
600

Detail Qty Unit


MATERIAL
Telephone Exchange 1 Each
comprising 4 PTCL Trunk
lines, 12 Digital
Estentions, 200 Auto Dial
Extention and attendeant
console with UPS builtin
16+ 34 Kx-Txa 600. .

LABOUR
Electrician 7 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,514

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-k-02 Unit

Item Name : Supply and Installation of Telephone Exchange with 16 Trunk and 300
Extensions with UPS Built-in 16+304 KX-TDA 600, Consol Set, CLI Card,
UPS Cable with Batteries, complete in all respects

Detail Qty Unit

MATERIAL
Telephone Exchange with 1 No

16 Trunk and 300


Extentions with UPS
Builtin 16+304 KX-TDA
600

LABOUR
Skilled Labour 10
Electrician 10
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,515

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-l Unit

Item Name : Supply and Installation of DT 364 Consol Set complaeted with all
respect

Detail Qty Unit


MATERIAL
DT 364 Consol Set . 1 No
LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,516

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-m Unit

Item Name : Supply and Installation of KX-TDA 0193CLI Card for 16 Trunk complated
with all respect

Detail Qty Unit


MATERIAL
KX-TDA 0193CLI Card for 1 No
16 Trunk .

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,517

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-n Unit
Item Name : Supply and Installation of SKX-A228UPS Cable with Batteries.Copmlated
wih all respect

Detail Qty Unit


MATERIAL
SKX-A228UPS Cable with 1 No
Batteries

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,518

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-o Unit

Item Name : Supply, installation, connecting, testing and commissioning of Duplex


telephone outlets F C C standard

Detail Qty Unit


MATERIAL
Duplex telephone 1 No
outlets F C C standard .

LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,519

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-p Unit

Item Name : Supply, installation, connecting, testing and commissioning of


Telephone distribution board having 1 x 1 5 cair termination block

Detail Qty Unit


MATERIAL
Telephone distribution 1 No
board having 1x15
cair termination block.

LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,520

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-q Unit

Item Name : Supply, installation, connecting, testing and commissioning of PABX


suitable for 4 line & 15 extension

Detail Qty Unit


MATERIAL
PABX suitable for 4 line 1 No
& 15 extension,

LABOUR
Electrician 2 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,521

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-r Unit

Item Name : Providing & fixing 3 pair telephone cable (Pony make) in already
installed conduit

Detail Qty Unit


MATERIAL
Providing & fixing 3 pair 1 Rft
telephone cable in
already installed conduit

LABOUR
Electrician 0.002 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,522

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-138-s-01
Item Name : Supply & Erection of Telephone vrire 1 Pair
Detail Qty
MATERIAL
Telephone vrire 1 Pair 1

LABOUR
Electrician 0.025
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Yard Rs.
Labour Rates Per Yard Rs.

2,523

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-138-s-02
Item Name : Supply & Erection of Telephone vrire 2 Pair
Detail Qty
MATERIAL
Telephone wire 2 Pair 1

LABOUR
Electrician 0.025
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Yard Rs.
Labour Rates Per Yard Rs.

2,524

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-t Unit

Item Name : Providing fixing of telephone termination box including sheet steel
back box, complete in all respects
Detail Qty Unit
MATERIAL
telephone termination box 1 Each
including sheet steel
back box, .

LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,525

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-138-u Unit

Item Name : Providing & fixing polycarbonate flame retardant digital telephone
socket with lancy " lovory" gang plate fixed on die fabricate powder
coated metal board recessed in wall or column including connecting

Detail Qty Unit

MATERIAL
polycarbonate flame 1 Each

retardant digital
telephone socket with
lancy " lovory" gang
plate fixed on die
fabricate powder coated
metal board recessed in
wall or column including
connecting

LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,526

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-138-v
Item Name : Supply & Erection of telephone point with socket complete
Detail Qty Unit
MATERIAL
telephone point with 1 Each
socket complete.

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,527

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-139-a Unit

Item Name : Supply and Installation of Outdoor True Day & Night Color Camera 1/3"
CCD, 530TVL, 0 Lux, 49 IR LEDs, 2.8 to 10mm Auto Iris Varifocal Lens,
IP66 Rating Outdoor Weatherproof Housing, DC12V/ AC24V, PAL,
HCD-92534X-Honyewell completed in all respect
Detail Qty Unit
MATERIAL
Outdoor True Day & Night 1 No
Color Camera 1/3" CCD,
530TVL, 0 Lux, 49 IR
LEDs, 2.8 to 10mm Auto
Iris Varifocal Lens, IP66
Rating Outdoor
Weatherproof Housing,
DC12V/ AC24V, PAL,
HCD-92534X-Honyewell

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,528

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-139-b
Item Name : Supply and Installation of
CCD, 550TVL, Color 0.3Lux &
PAL, HCC-690P completed in all respect
Detail Qty Unit
MATERIAL
True Day & Night Color 1 No

Indoor Camera 1/3" CCD,


550TVL, Color 0.3Lux &
B/W 0.002Lux, Day/Night,
DC12V/ AC24V, PAL,
HCC-690P

LABOUR
Skilled Labour 1 Day
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,529

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-139-c Unit

Item Name : Supply, Installation, Testing and Commissioning of Wall bracket box
Camera, type PoE I.P camera with day and night feature having 1.3MP
Resolution with live/recording quality of min 15 fps, Varifocal Lens
2.8-12mm, along with all mounting accessories complete in all respect

Detail Qty Unit


MATERIAL
Wall bracket box Camera, 1 No
type PoE I.P camera with
day and night feature
having 1.3MP Resolution
with live/recording
quality of min 15 fps,
Varifocal Lens 2.8-12mm,
along with all mounting
accessories

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,530
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-139-d Unit

Item Name : Supply and Installation of Indoor Dome Camera,1/3" CCD, 550TV lines,
0.1lx (F2.0),Internal Sync., AWB / BLC / AGC Mirror On-Off Control,
varifocal lens 3.6mm, Gray color case, DC12V, PAL, HDC-890P-36
completed in all respect

Detail Qty Unit


MATERIAL
Indoor Dome Camera,1/3" 1 No
CCD, 550TV lines, 0.1lx
(F2.0),Internal Sync.,
AWB / BLC / AGC Mirror
On-Off Control, varifocal
lens 3.6mm, Gray color
case, DC12V, PAL,
HDC-890P-36

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,531

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-139-e Unit

Item Name : Supply of Installation Indoor, Outdoor Dome IR Camera,1/3"CCD, 530TV


lines, IR LEDs, 0.1lx (F2.0),Internal Sync., AWB / BLC / AGC Mirror
On-Off Control, varifocal lens 3.6mm, Gray color case, DC12V, PAL,
HDC-515PI-36 completed in all respect

Detail Qty Unit


MATERIAL
Indoor, Outdoor Dome IR 1 No
Camera,1/3"CCD, 530TV
lines, IR LEDs, 0.1lx
(F2.0),Internal Sync.,
AWB / BLC / AGC Mirror
On-Off Control, varifocal
lens 3.6mm, Gray color
case, DC12V, PAL,
HDC-515PI-36 .

LABOUR
Electrician 0.3 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,532

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-139-f Unit

Item Name : Supply Installation of 32-Channel Digital Video Recorder, real time
display 400ips andwith Built-in DVD writer,XtraStor/MPEG4
compression,1TB,HDD,SATA port with remoteviewing and management
software HNDR-E1648L-N-D-E,Honyewell.complated with all respect

Detail Qty Unit


MATERIAL
32-Channel Digital Video 1 No
Recorder, real time
display 400ips andwith
Built-in DVD
writer,XtraStor/MPEG4
compression,1TB,HDD,SATA
port with remoteviewing
and management software
HNDR-E1648L-N-D-E,Honyewe
ll. .

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,533

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-139-g Unit

Item Name : Supply, installation, Testing and commissioning of INDOOR DOME CAMERA;
2.0 MP FULL HD 1080P; 1/2.7" CMOS PROGRESSIVE SCAN; 3-10 mm VARIFOCAL
DC IRIS LENS; WDR > 100 dB; PoE; 12 VDC complete in all respects.

Detail Qty Unit

MATERIAL
INDOOR DOME CAMERA; 2.0 1 No

MP FULL HD 1080P; 1/2.7"


CMOS PROGRESSIVE SCAN;
3-10 mm VARIFOCAL DC IRIS
LENS; WDR > 100 dB; PoE;
12 VDC .

LABOUR
Electrician 0.3 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,534

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-139-h Unit

Item Name : Supply, installation, Testing and commissioning of CAMERA DOME; 1/2.7"
PS CMOS; 1.3 Mp HD-720P; 3-10 mm DC I V/F LENS; 76 DB WDR; PoE; 12 VDC.
complete in all respects.

Detail Qty Unit

MATERIAL
CAMERA DOME; 1/2.7" PS 1 No
CMOS; 1.3 Mp HD-720P;
3-10 mm DC I V/F LENS; 76
DB WDR; PoE; 12 VDC. .

LABOUR
Electrician 0.3 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,535

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-139-i Unit
Item Name : Supply and Installation of Video Management and Recording System
including media converter

Detail Qty Unit


MATERIAL
Video Management and 1 No
Recording System
including media converter

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,536

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-139-j Unit

Item Name : Supply and installation of 16 input to 01 output digital multiplexer


for CCTV system complete in all respect

Detail Qty
MATERIAL
16 input to 01 output 1
digital multiplexer for
CCTV system

LABOUR
Electrician 1
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,537
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-139-k Unit

Item Name : Installation and Cabling (RG-11 Coaxial Cable through approved 3A" PVC
conduit)

Detail Qty Unit


MATERIAL
Installation and Cabling 1 Mtr
(RG-11 Coaxial Cable
through approved 3A" PVC
conduit) as approved by
Engineer Incharge.

LABOUR
Electrician 0.001 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per m Rs.
Labour Rates Per m Rs.

2,538

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-139-l
Item Name : Supply and installation of 32" LCD monitor of best quality
Detail Qty Unit
MATERIAL
32" LCD monitor of best 1 Each
quality

LABOUR
Electrician 0.3 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,539

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-139-m Unit

Item Name : Supply & fixing of 1/3M Color Dome Cameras equipped with following
charactaristics. Built in Varifocal Lens (4.0mm - 9.0mm) Back Light
Compensation Built-in Flickerless Hiqh Resolution more than 470TV line
0.4 Lux at F1" 2 Compact Design Approval: FCC, CE

Detail Qty Unit


MATERIAL
Approval: FCC, CE 1 No

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,540

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-139-n Unit
Item Name : Supply, installation, connecting, testing & commissioning of ceiling
mounting Fixed position super high resolution color Dome Camera Day/
Night with Dynamic rang 12mm varifocal autoirise lens, 12/24V dual
operating voltage, complete in all respects

Detail Qty Unit


MATERIAL
ceiling mounting Fixed 1 No
position super high
resolution color Dome
Camera Day/ Night with
Dynamic rang 12mm
varifocal autoirise lens,
12/24V dual operating
voltage, and
satisfaction of the
owner, Philips equivalent

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,541

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-139-o Unit

Item Name : Supply, installation, connecting, testing & commissioning of


High-sensitivity, 1/3" Ex-View HAD CCD color Camera Day/ Night
(outdoor), 12//24V dual perating voltage with Motorized gear box,
complete in all respects or equivalent,

Detail Qty Unit


MATERIAL
High-sensitivity, 1/3" 1 No
Ex-View HAD CCD color
Camera Day/ Night
(outdoor), 12//24V dual
operating voltage with
Motorized gear box,
complete in all
respects or equivalent,

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,542

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-139-p Unit

Item Name : Supply, installation, connecting, testing & commissioning of CCTV


Digital vidio recorder "DVR" equipment, suitable for 16 channel,
including power supply distributer 12 volts with color 22" LCD,
complete in all respects

Detail Qty Unit


MATERIAL
CCTV Digital vidio 1 No
recorder "DVR" equipment,
suitable for 16 channel,
including power supply
distributer 12 volts with
color 22" LCD, best
equivalent

LABOUR
Electrician 1 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,543

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-140-a Unit

Item Name : Supply, installation, testing and commissioning of Patch Panel 12 Port
Loaded with RJ-45 I/Os Suitable for CAT-VI FTP CABLE; Rack Mount ,
complete in all respects.

Detail Qty Unit

MATERIAL
PATCH PANEL 12 PORT 1 No
LOADED WITH RJ-45 I/Os
SUITABLE FOR CAT-VI FTP
CABLE; RACK MOUNT , .

LABOUR
Electrician 0.06 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,544

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-140-b Unit
Item Name : Supply, installation, testing and commissioning of Patch Panel 24 Port
Loaded with RJ-45 I/Os Suitable for CAT-VI FTP CABLE; Rack Mount,
complete in all respects.

Detail Qty Unit

MATERIAL
PATCH PANEL 24 PORT 1 No
LOADED WITH RJ-45 I/Os
SUITABLE FOR CAT-VI FTP
CABLE; RACK MOUNT , .

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,545

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-141-a Unit

Item Name : Supply, installation, testing and commissioning of Cable Manager /


Organizer

Detail Qty Unit


MATERIAL
CABLE MANAGER/ORGANISER 1 No
RACK MOUNT , .

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,546

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-141-b Unit

Item Name : Supply, installation, Testing and commissioning of UTP Cat-6a Patch
Cords 1m (Supports 10 Giga Network) to be Installed in Data Cabinets

Detail Qty Unit


MATERIAL
U/UTP Cat-6a Patch Cord 1 1 No
Meter

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,547

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-141-c Unit

Item Name : Supply, installation, Testing and commissioning of UTP Cat-6a Patch
Cords 3m (Supports 10 Giga Network) to be Installed in Data Cabinets

Detail Qty Unit


MATERIAL
U/UTP Cat-6a Patch Cord 3 1 No
Meter

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,548

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-142-a Unit

Item Name : Supply, installation, Testing and commissioning of Single Shutter /


Port with 1x RJ-45 I/O & Back Box, complete in all respects.

Detail Qty Unit


MATERIAL
FACE PLATE SINGLE 1 No
SHUTTER/PORT WITH 1x
RJ-45 I/O & BACK BOX , .

LABOUR
Electrician 0.06 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,549

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM : Spec. No :
Item Code : 15-142-b Unit

Item Name : Supply, installation, Testing and commissioning of Double Shutter /


Port with 1x RJ-45 I/O & Back Box, complete in all respects

Detail Qty Unit


MATERIAL
FACE PLATE DUAL 1 No
SHUTTER/PORT WITH 2x
RJ-45 I/O & BACK BOX , .

LABOUR
Electrician 0.06 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,550

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-142-c Unit

Item Name : Supply and installion of Computer single port face plate CAT-6 RJ-JACK
with appropriate MS 16SWG enameled back box recessed in wall, column
etc… complete in all respects
in walls including chase etc : 1.5" i/d

Detail Qty Unit


MATERIAL
Computer single port face 1 Each
plate CAT-6 RJ-JACK with
appropriate MS 16SWG
enameled back box
recessed in wall, column
etc...

LABOUR
Electrician 0.024 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,551

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-142-d Unit

Item Name : Supply and installion of Computer double port face plate CAT-6 RJ-JACK
with appropriate MS 16SWG Orange enameled back box recessed in wall,
column etc.complete in all respects

Detail Qty Unit

MATERIAL
Computer double port face 1 Each

plate CAT-6 RJ-JACK with


appropriate MS 16SWG
Orange enameled back box
recessed in wall, column
etc.

LABOUR
Electrician 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,552

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-142-e Unit

Item Name : Supply and Installation, testing and commissioning of 42 port DATA
cabinet with 3 no's cabinet tray, 4 No's power socket and with flexi
glass door l

Detail Qty Unit

MATERIAL
42 port DATA cabinet with 1 Each

3 no's cabinet tray, 4


No's Clipsal power socket
and with flexi glass door
l

LABOUR
Electrician 3 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,553

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-143-a Unit

Item Name : Supply, installation, testing and commissioning of the following Fiber
Optic Cables to be installed in conduits, cable trays and dura duct
including cost of all necessary accessories/ materials complete in all
respects.

Detail Qty Unit


MATERIAL
Fiber Optical Cable (06 1 No
Core) Armored Single mode
9/125 Micron for UP-Link
between Floors

LABOUR
Electrician 0.007 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,554

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-143-b Unit

Item Name : Supply, installation, testing and commissioning of the following Fiber
Optic Cables to be installed in conduits, cable trays and dura duct
including cost of all necessary accessories/ materials complete in all
respects.

Detail Qty Unit


MATERIAL
Fiber Optical Cable (12C, 1 No
50/125 um Multi mode OM3
type Fiber Optic Cable
from Server to data
switch in 25mm dia PVC
conduit / already
installed Ladder/Cable
tray including
termination and tagging
at both ends

LABOUR
Electrician 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,555

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-143-c Unit

Item Name : Supply, installation, testing and commissioning of the following Fiber
Optic Cables to be installed in conduits, cable trays and dura duct
including cost of all necessary accessories/ materials complete in all
respects.

Detail Qty Unit


MATERIAL
Fiber Optical Cable (12C, 1 No
125 um Single mode OS2
type Fiber Optic Cable
from Server to each
communication rack in
25mm dia PVC conduit /
already installed
Ladder/Cable tray
including termination and
tagging at both ends

LABOUR
Electrician 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,556
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-143-d Unit

Item Name : Supply, installation, testing and commissioning of the following Fiber
Optic Patch cord to be installed in conduits, cable trays and dura duct
including cost of all necessary accessories/ materials complete in all
respects.

Detail Qty Unit


MATERIAL
Fiber Optic Patch cord mm 1 No
50/125U OM3 Aqua, 3 meter
long with LC/LC

LABOUR
Electrician 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,557

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-143-e Unit

Item Name : Supply, installation, testing and commissioning of the following Fiber
Optic Patch cord to be installed in conduits, cable trays and dura duct
including cost of all necessary accessories/ materials complete in all
respects.

Detail Qty Unit


MATERIAL
Fiber Optic Patch cord mm 1 No
50/125U OM3 Aqua, 6 meter
long with LC/LC

LABOUR
Electrician 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,558

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-143-f Unit

Item Name : Supply, installation, testing and commissioning of the following Fiber
Optic Patch cord to be installed in conduits, cable trays and dura duct
including cost of all necessary accessories/ materials complete in all
respects.

Detail Qty Unit


MATERIAL
Fiber Optic Patch cord mm 1 No
50/125U OM3 Aqua, 20
meter long with LC/LC

LABOUR
Electrician 0.007 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,559
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-144-a Unit

Item Name : Supply and Installation of 0.5 to 1mm2 Cat-5 cable laid in 1", 1-1/2"
or 2" pvc conduit or Cable Tray, complete in all respects including
clamps etc: 1.25" i/d

Detail Qty Unit

MATERIAL
10 Pair Cable 1 Mtr

LABOUR
Electrician 0.009 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per m Rs.
Labour Rates Per m Rs.

2,560

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-144-b Unit

Item Name : Supply and Installation of 0.5 to 1mm2 Cat-5 cable laid in 1", 1-1/2"
or 2" pvc conduit or Cable Tray, complete in all respects including
clamps etc: 1.25" i/d

Detail Qty Unit

MATERIAL
30 Pair Cable 1 Mtr

LABOUR
Electrician 0.009 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per m Rs.
Labour Rates Per m Rs.

2,561

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-144-c Unit

Item Name : Supply and Installation of 0.5 to 1mm2 Cat-5 cable laid in 1", 1-1/2"
or 2" pvc conduit or Cable Tray, complete in all respects
including clamps etc: 1.25" i/d

Detail Qty Unit

MATERIAL
50 Pair Cable 1 Mtr

LABOUR
Electrician 0.009 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per m Rs.
Labour Rates Per m Rs.

2,562

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-144-d Unit
Item Name : Supply and Installation of 0.5 to 1mm2 Cat-5 cable laid in 1", 1-1/2"
or 2" pvc conduit or Cable Tray, complete in all respects
including clamps etc: 1.25" i/d

Detail Qty Unit

MATERIAL
120 Pair Cable 1 Mtr

LABOUR
Electrician 0.009 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per m Rs.
Labour Rates Per m Rs.

2,563

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-144-e Unit

Item Name : Supply and Installation of 0.5 to 1mm2 Cat-5 cable laid in 1", 1-1/2"
or 2" pvc conduit or Cable Tray, complete in all respects
including clamps etc: 1.25" i/d

Detail Qty Unit

MATERIAL
2 Pair cable 1 No

LABOUR
Electrician 0.007 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,564
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-145 Unit
Item Name : Supply, installation, testing and commissioning of the ODF;
Loaded with
1U Form Factor, complete in all respects.
Detail Qty Unit
MATERIAL
ODF; 12 PORT LOADED WITH 1 No

6x PIGTAILS MULTIMODE,
TRAY & OTHER ACCESSORIES;
RACK MOUNT 1U FORM FACTOR
,.

LABOUR
Skilled Labour 1 Day
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,565

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-146 Unit

Item Name : Supply, installation, testing and commissioning of OFC Patch Cord; 3m;
Multi Mode; Duplex Type, complete in all respects.

Detail Qty Unit


MATERIAL
OFC PATCH CORDS; 3 1 No
METER; MULTI MODE; DUPLEX
TYPR, .

LABOUR
Electrician 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,566

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-147 Unit

Item Name : Supply, Installation, Testing and Commissioning of Colour 59" HD Colour
LED Monitor with wall Hanging, complete in all respects

Detail Qty Unit


MATERIAL
59" HD Colour LED TV with 1 No
wall Hanging

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,567

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM : Spec. No :
Item Code : 15-148 Unit

Item Name : Supply, Installation, Testing and Commissioning of Core-i7; 8 GB RAM; 1


TB HDD; KB Mouse DVD R/W; Windows Graphic Card 4G Internal Tower Type
PC (Computer), complete in all respects

Detail Qty Unit

MATERIAL
Core-i7; 8 GB RAM; 1 TB 1 No
HDD; KB Mouse DVD R/W;
Windows Graphic Card 4G
Internal Tower Type, .

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,568

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-149 Unit

Item Name : Supply at site , insallation, testing and commissioning of


Polycarbonate junction box (250x250x150)mm to facilitate connection of
incoming and outgoing cables of maximum size 35sqmm complete with
terminal blocks,cables glands, one 6A Sp MCB , complete in all
respects.

Detail Qty Unit


MATERIAL
polycarbonate junction 1 No
box(250x250x150)mm to
facilitate connection of
incoming and outgoing
cables of maximum size
35sqmm complete with
terminal blocks,cables
glands, one 6A Sp MCB ,

LABOUR
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,569

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-150 Unit

Item Name : Supply, installation of Rubber mat 3 feet wide x 1/4" thick to be
placed all long the length of Main Panel Board in L.T. Panel Room

Detail Qty Unit


MATERIAL
Rubber mat 3 feet wide x 1 Rft
1/4" thick to be placed
all long the length of
Main Panel Board in L.T.
Panel Room.

LABOUR
Skilled Labour 0.0625 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.
2,570

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-151 Unit

Item Name : Supply, installation of Buckets made of M.S. sheet to be hung on hooks
and filled with sand as per Electric Inspectors requirements.

Detail Qty Unit


MATERIAL
Buckets made of M.S. 1 No
sheet to be hung on hooks
and filled with sand as
per Electric Inspectors
requirements.

LABOUR
Skilled Labour 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,571

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-152 Unit

Item Name : Supply of electric shock chart fixed on wooden board and hang on wall
as per the requirement of Electrical Inspector.

Detail Qty Unit


MATERIAL
electric shock chart 1 No
fixed on wooden board and
hang on wall as per the
requirement of Electrical
Inspector.

LABOUR
Skilled Labour 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,572

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-153 Unit

Item Name : supply,Insatallation, testing & commisioning of Single Phase KWH Energy
Meters from Main Service of LT Line to each building Complete in all
respect

Detail Qty Unit

MATERIAL
Single Phase KWH Energy 1 No
Meters from Main Service
of LT Line to each
building

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,573

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-154-a Unit

Item Name : Providing and fixing of point wiring (including circuit wiring with 2.5
mmsq conductors and 2.5 mmsq green / yellow CPC) with 1.5 mmsq single
core PVC insulated 450/750 volt grade copper conductors in PVC conduit
rigid / flexible (clipped to surface or concealed in structure or under
floor), complete in all respects.

Detail Qty Unit


MATERIAL
a) Liqht point, 1 No
controlled by one switch

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,574

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-154-b Unit

Item Name : Providing and fixing of Light point controlled by two way switch wiring
(including circuit wiring with 2.5 mmsq conductors and 2.5 mmsq green /
yellow CPC) with 1.5 mmsq single core PVC insulated 450/750 volt grade
copper conductors in PVC conduit rigid / flexible (clipped to surface
or concealed in structure or under floor), complete in all respects.
Detail Qty Unit
MATERIAL
b) Light point controlled 1 No
by two way switch

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,575

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-154-c Unit
Item Name : Providing and fixing of Light point controlled by two way sw
(including circuit wiring with 2.5 mmsq conductors and
/ yellow CPC) with 1.5 mmsq single core PVC insulated 450/750 volt
grade copper conductors in PVC conduit rigid / flexible (clipped to
surface or concealed in structure or under floor), complete in all
respects.

Detail Qty Unit


MATERIAL
c) 5 Amp socket outlet 1 No
point (Nearest ckt.
Available)

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.
2,576

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-155-a Unit

Item Name : Supply, installation, connecting, testing & commissioning of flush type
5Amp 3-pin switch & socket outlet with 3 pin switch and socket combine
unit with neon bulb fixed on plastic or fiber top covered, including 14
SWG metal board with earth

Detail Qty Unit


MATERIAL
a) 5Amp 3-pin switch & 1 No
socket outlet

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,577

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-155-b Unit

Item Name : Supply, installation, connecting, testing & commissioning of flush type
13 Amps 3-pin (Duplex) outlet with 3 pin switch and socket combine unit
with neon bulb fixed on plastic or fiber top covered, including 14 SWG
metal board with earth

Detail Qty Unit


MATERIAL
b) 13 Amps 3-pin (Duplex) 1 No
outlet

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,578

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-155-c Unit

Item Name : Supply, installation, connecting, testing & commissioning of flush type
13 Amps 3-pin simplex outlet with 3 pin switch and socket combine unit
with neon bulb fixed on plastic or fiber top covered, including 14 SWG
metal board with earth

Detail Qty Unit


MATERIAL
c) 13 Amps 3-pin simplex 1 No
outlet

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,579

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-155-d Unit

Item Name : Supply, installation, connecting, testing & commissioning of flush type
following 16 Amps Soko type switch & socket with 3 pin switch and
socket combine unit with neon bulb fixed on plastic or fiber top
covered, including 14 SWG metal board with earth

Detail Qty Unit


MATERIAL
d) 16 Amps Soko type 1 No
switch & socket

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,580

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-155-e Unit

Item Name : Supply, installation, connecting, testing & commissioning of flush type
20 Amps Soko type switch & socket with 3 pin switch and socket combine
unit with neon bulb fixed on plastic or fiber top covered, including 14
SWG metal board with earth

Detail Qty Unit


MATERIAL
e) 20 Amps disconnect 1 No
switch for AC unit

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,581

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-156 Unit

Item Name : Supply, Installation, Connecting, testing and commissioning of 400 watt
Fan dimmer, polycarbonate flame retardant with fancy gang plate fixed
on die fabricated poweder coated metal board recessed in wall or column
, complete in all respects.

Detail Qty Unit


MATERIAL
400 watt Fan dimmer, 1 No
polycarbonate flame
retardant with fancy gang
plate fixed on die
fabricated poweder coated
metal board recessed in
wall or column.

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,582

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-157-a Unit

Item Name : Providing and fixing of 3/4" dia PVC conduit as raceway, clipped to the
surface or concealed in structure, or under floor including all
accessories bends, boxes, etc as required for street light + telephone
+ power cable.

Detail Qty Unit


MATERIAL
a) 3/4" dia PVC conduit 1M
as raceway, clipped to
the surface or concealed
in structure, or under
floor including all
accessories bends, boxes,
etc. in the following
sizes as required for
street light + telephone

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per m Rs.
Labour Rates Per m Rs.

2,583

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-157-b Unit

Item Name : Providing and fixing of 1" dia PVC conduit as raceway, clipped to the
surface or concealed in structure, or under floor including all
accessories bends, boxes, etc.as required for street light + telephone
+ power cable.
Detail Qty Unit
MATERIAL
b) 1"dia PVC conduit as 1M
raceway, clipped to the
surface or concealed in
structure, or under floor
including all accessories
bends, boxes, etc. in the
following sizes as
required for street light
+ telephone

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per m Rs.
Labour Rates Per m Rs.

2,584

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-157-c Unit

Item Name : Providing and fixing of 1-1/4" dia PVC conduit as raceway, clipped to
the surface or concealed in structure, or under floor including all
accessories bends, boxes, as required for street light + telephone +
power cable.

Detail Qty Unit


MATERIAL
c) 1-1/4" dia PVC conduit 1M
as raceway, clipped to
the surface or concealed
in structure, or under
floor including all
accessories bends, boxes,
etc. in the following
sizes as required for
street light + telephone

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per m Rs.
Labour Rates Per m Rs.

2,585

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-157-d Unit

Item Name : Providing and fixing of 1-1/2" dia PVC conduit as raceway, clipped to
the surface or concealed in structure, or under floor including all
accessories bends, boxes, etc sizes as required for street light +
telephone + power cable.

Detail Qty Unit


MATERIAL
d) 1-1/2" dia PVC conduit 1M
as raceway, clipped to
the surface or concealed
in structure, or under
floor including all
accessories bends, boxes,
etc. in the following
sizes as required for
street light + telephone

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per m Rs.
Labour Rates Per m Rs.

2,586

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-158 Unit

Item Name : Providing and fixing of 150 mm dia RCC pipe for power cable, including
excavation, sand bedding, back-filling, accessories, manholes, etc

Detail Qty Unit


MATERIAL
150 mm dia RCC pipe for 1M
power cable

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per m Rs.
Labour Rates Per m Rs.

2,587

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-159 Unit

Item Name : Supply, Installation of Short-circuit ratings to IEC 947-2, Icuta at


415 V All components (ELCBs, Contractors et.) with backup protection &
incoming MCB suitable backup protection of ELECBs DBs of incoming size
100A or less may be Divided with cascading

Detail Qty Unit


MATERIAL
Short-circuit ratings to 1 No
IEC 947-2, Icuta at 415 V
All components (ELCBs,
Contractors et.) with
backup protection &
incoming MCB suitable
backup protection of
ELECBs DBs of incoming
size 100A or less may be
Divided with cascading

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,588

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-160 Unit

Item Name : Supply, Installation, connecting, testing & commissioning of Floor


mounted following submain distribution board SMDB (Block 7-11) power &
HVAC complete with all metering with indication lamps complete in all
respects.

Detail Qty Unit


MATERIAL
floor or wall mounted 1 No
Sub-main Distribution
Board equipment SMDB
(Stock 7-11) comprising
of Amrrfeter, Volt meter
equiped with Ct's Pt's
and seector switches.
LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,589

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-161 Unit

Item Name : Supply, Installation, connecting, testing & commissioning of Floor


mounted following submain distribution board SMDB (Block 7-11) as
required for lighting, power & HVAC as per revise: sngle line diagram,
complete with all metering with indication lamps complete in all
respects

Detail Qty Unit


MATERIAL
Floor mounted following 1 No
submain distribution
board SMDB (Block 7-11)
power & HVAC complete
with all metering with
indication lamps .

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,590

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-162-a Unit

Item Name : Supply, Installation, connecting, testing & commissioning of wall


mounted LPDB-B7-B1, LPDB-B7-B1/1 Distribution Boards, compes with all
metering with indication lamps complete win all respects

Detail Qty Unit

MATERIAL
LPDB-B7-B1, LPDB-B7-B1/1 1 No

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,591

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-162-b Unit

Item Name : Supply, Installation, connecting, testing & commissioning of wall


mounted LPDB-B7-G1, LPDB-B7-F1, LPDB-B"-31 Distribution Boards, compes
with all metering with indication lamps complete win all respects

Detail Qty Unit

MATERIAL
LPDB-B7-G1, LPDB-B7-F1, 1 No
LPDB-B"-31

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,592

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-162-c Unit

Item Name : Supply, Installation, connecting, testing & commissioning of wall


mounted ACDB-B7-G1, ACDB-B7-F1 Distribution Boards, compes with all
metering with indication lamps complete win all respects

Detail Qty Unit

MATERIAL
ACDB-B7-G1, ACDB-B7-F1 1 No

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,593

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-162-d Unit
Item Name : Supply, Installation, connecting, testing & commissioning of wall
mounted LPDB-B8-B1 Distribution Boards, compes with all metering with
indication lamps complete win all respects

Detail Qty Unit

MATERIAL
LPDB-B8-B1 1 No

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,594

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-162-e Unit

Item Name : Supply, Installation, connecting, testing & commissioning of wall


mounted LPDB-B8-G1, LPDB-B8-F1, LPDB-3:-31 Distribution Boards, compes
with all metering with indication lamps complete win all respects

Detail Qty Unit

MATERIAL
LPDB-B8-G1, LPDB-B8-F1, 1 No
LPDB-3:-31

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.
2,595

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-162-f Unit

Item Name : Supply, Installation, connecting, testing & commissioning of wall


mounted LPDB-B8-S1/1, LPDB-B8-S1/2 Distribution Boards, compes with all
metering with indication lamps complete win all respects

Detail Qty Unit

MATERIAL
LPDB-B8-S1/1, 1 No
LPDB-B8-S1/2

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,596

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-162-g Unit

Item Name : Supply, Installation, connecting, testing & commissioning of wall


mounted ACDB-B8-G1, ACDB-B8-F1. ACDB-5--51 Distribution Boards, compes
with all metering with indication lamps complete win all respects

Detail Qty Unit

MATERIAL
ACDB-B8-G1, ACDB-B8-F1. 1 No
ACDB-5--51 •

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,597

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-162-h Unit

Item Name : Supply, Installation, connecting, testing & commissioning of wall


mounted LPDB-B9-G1, LPDB-B9-F1, LPDB-E^S1 Distribution Boards, compes
with all metering with indication lamps complete win all respects

Detail Qty Unit

MATERIAL
LPDB-B9-G1, LPDB-B9-F1, 1 No
LPDB-E^S1

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,598

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-162-i Unit

Item Name : Supply, Installation, connecting, testing & commissioning of wall


mounted ACDB-B9-F1, ACDB-B9-S1 Distribution Boards, compes with all
metering with indication lamps complete win all respects

Detail Qty Unit

MATERIAL
ACDB-B9-F1, ACDB-B9-S1 1 No

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,599

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-162-j Unit

Item Name : Supply, Installation, connecting, testing & commissioning of wall


mounted LPDB-B10-G1, LPDB-B10-F1, LPD5-510-S1 Distribution Boards,
compes with all metering with indication lamps complete win all
respects

Detail Qty Unit


MATERIAL
LPDB-B10-G1, LPDB-B10-F1, 1 No
LPD5-510-S1

LABOUR
Electrician 1 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,600

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-162-k Unit

Item Name : Supply, Installation, connecting, testing & commissioning of wall


mounted ACDB-B10-G1, ACDB-B10-F1, ACD5-510-S1 Distribution Boards,
compes with all metering with indication lamps complete win all
respects

Detail Qty Unit


MATERIAL
ACDB-B10-G1, ACDB-B10-F1, 1 No
ACD5-510-S1

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,601

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-162-l Unit

Item Name : Supply, Installation, connecting, testing & commissioning of wall


mounted LPDB-B11-G1, LPDB-B11-F1 Distribution Boards, compes with all
metering with indication lamps complete win all respects

Detail Qty Unit

MATERIAL
LPDB-B11-G1, LPDB-B11-F1 1 No

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,602

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-162-m Unit

Item Name : Supply, Installation, connecting, testing & commissioning of wall


mounted ACDB-B11-G1, ACDB-B11-F1 Distribution Boards, compes with all
metering with indication lamps complete win all respects

Detail Qty Unit

MATERIAL
ACDB-B11-G1, ACDB-B11-F1 1 No

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,603

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-163 Unit

Item Name : Supply, Installation & Connecting up of floor or wall mounted Sub-main
Distribution Board equipment SMDB comprising of Ammeter, Volt meter
equiped with Ct's Pt's and selector switches.

Detail Qty Unit

MATERIAL
Floor or wall mounted 1 No

Sub-main Distribution
Board equipment SMDB
comprising of Ammeter,
Volt meter equiped with
Ct's Pt's and selector
switches.

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,604

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-164
Item Name :
Detail Qty
MATERIAL
Supply, installation, & 1
connecting of insect
killer

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,605

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-165-a Unit

Item Name : Supply, installation, of 3/4" dia PVC Conduit for NURSE CALL SYSTEM 1
CALL BELLS

Detail Qty Unit


MATERIAL
S/F of 3/4" dia PVC 1 Rft
Conduit

LABOUR
Electrician 0.0025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,606

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM : Spec. No :
Item Code : 15-165-b Unit

Item Name : Supply, installation, & connecting of 1.5 sq.m 4 core PVC Cable for
NURSE CALL SYSTEM 1 CALL BELLS

Detail Qty Unit


MATERIAL
S/F of 1.5 sq.m 4 core 1 Rft
PVC Cable

LABOUR
Electrician 0.005 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,607

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-166-a
Item Name : Providing and fixing of 10 zone panel for nurse call system
Detail Qty Unit
MATERIAL
10-zone panel 1 No

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,608

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-166-b
Item Name : Providing and fixing of 20 zone panel nurse call system
Detail Qty Unit
MATERIAL
20-zone panel 1 No

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,609

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-166-c
Item Name : Providing and fixing Door light indicator unit
Detail Qty Unit
MATERIAL
Door light indicator unit 1 No

LABOUR
Electrician 0.063 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,610

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-166-d
Item Name : Providing and fixing of S0X1.5mm sq. twisted Telephone Ca
Detail Qty Unit
MATERIAL
S0X1.5mm sq. twisted 1 No
Telephone Cable

LABOUR
Electrician 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,611

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-167 Unit

Item Name : Providing and fixing of call bells with push buttons including wiring
and all accessories

Detail Qty Unit


MATERIAL
Providing and fixing of 1 No
call bells with push
buttons including
wiring and all
accessories.

LABOUR
Electrician 1 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,612

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-168 Unit

Item Name : Supply, installation, connecting, testing and commissioning of


wall/recessed mounting typical DB for flat should be factory assembled
ready wired and complete (comprising of incoming & outgoing breaker
rupturing capacity 10 KA Terrasaki make) Incoming: 1 by 30 A.T.P mcb
with ph. Indications Outgoing One set: 15 by 10 Amps, 6 by 20 Amps
single pole 250 volt moulded case miniature ciruit breaker
(mcb) 7 No per phase coupled with one 60 Amps T.P mcb

Detail Qty Unit


MATERIAL
wall/recessed mounting 1 Set
typical DB for flat
should be factory
assembled ready wired and
complete (comprising of
incoming & outgoing
breaker rupturing
capacity 10 KA Terrasaki
make) Incoming: 1 by 30
A.T.P mcb with ph.
Indications
Outgoing One set: 15 by
10 Amps, 6 by 20 Amps
single pole 250 volt
moulded case miniature
ciruit breaker (mcb) 7 No
per phase coupled with
one 60 Amps T.P mcb

LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Set Rs.
Labour Rates Per Set Rs.

2,613

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-169 Unit

Item Name : Supply and fixing of Ready Made Fancy Sheet light plug (5-10 Amp) with
PVC box complete in all aspects

Detail Qty Unit


MATERIAL
Ready Made Fancy Sheet 1 Each
light plug (5-10 Amp)
with PVC box of approved
quality

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,614

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-170-a
Item Name : Precurement and Fixing of 10 Pin Kit with sheet
Detail Qty Unit
MATERIAL
10 Pin Kit switch /Plug 1 Each
kit

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,615

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-170-b
Item Name : Precurement and Fixing of 08 Pin Kit with sheet
Detail Qty Unit
MATERIAL
8 Pin Kit switch /Plug 1 Each
kit

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,616

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM :
Item Code : 15-170-c
Item Name : Precurement and Fixing of 06 Pin Kit with sheet
Detail Qty Unit
MATERIAL
6 Pin Kit switch /Plug 1 Each
kit

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,617

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-170-d
Item Name : Precurement and Fixing of 04 Pin Kit with sheet
Detail Qty Unit
MATERIAL
4 Pin Kit switch /Plug 1 Each
kit

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,618

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-170-e
Item Name : Precurement and Fixing of03 Pin Kit with sheet
Detail Qty Unit
MATERIAL
3 Pin Kit switch /Plug 1 Each
kit

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,619

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-170-f
Item Name : Precurement and Fixing of 02 Pin Kit with sheet
Detail Qty Unit
MATERIAL
2 Pin Kit switch /Plug 1 Each
kit

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,620

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-170-g
Item Name : Precurement and Fixing of 01 Pin Kit with sheet
Detail Qty Unit
MATERIAL
1 Pin Kit switch /Plug 1 Each
kit

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,621

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-171
Item Name : Supply & fixinng of China Kit for TV
Detail Qty Unit
MATERIAL
China Kit for TV best 1 Each
quality

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,622
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-172
Item Name : Supply and installation of Fan dimmer switch Clipcal made
Detail Qty Unit
MATERIAL
fan dimmer switch 1 Each

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,623

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-173
Item Name : Supply and installation of Bell Press
Detail Qty Unit
MATERIAL
Bell Press 1 Each

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,624
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-174
Item Name : Supply & Erection of 12 volt bulb with transformer
Detail Qty Unit
MATERIAL
12 volt bulb wilh 1 Each
transformer (imported)

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,625

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-175
Item Name : Supply & Erection of TV/satellite cable complete
Detail Qty Unit
MATERIAL
TV/satellite cable 1 Each
complete

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,626

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-176
Item Name : Supply & Erection of Telephone point with socket complete
Detail Qty Unit
MATERIAL
Telephone point with 1 Each
socket complete

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,627

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-177
Item Name : Supply & Erection of Telephone socket
Detail Qty Unit
MATERIAL
Telephone socket of 1 Each
approved quality

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,628

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-178
Item Name : Supply & Erection of TV socket
Detail Qty Unit
MATERIAL
TV Single Switch best 1 Each
quality

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,629

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-179
Item Name :
Detail Qty Unit
MATERIAL
Power Plug 15 Amp 1 Each
complete

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,630

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-180 Unit

Item Name : Supply & Erection of Swimming Pool Cascado lights direct 120/150 watt
complete

Detail Qty Unit


MATERIAL
Swimming Pcot Cascado 1 Each
lights direct 120/150
watt complete

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,631

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-181 Unit

Item Name : Supply and installation of structure cable as required for CAT-6 PVC
shielded cable in already installed Trunking/ conduit/ Channel ,
inducing Balun for vedio and power facility at both ends of cable to be
provided.
The CAT- 6 cable should be 3M complete in all respects

Detail Qty Unit


MATERIAL
structure cable as 1M
required for CAT-6 PVC
shielded cable in already
installed Trunking/
conduit/ Channel ,
inducing Balun for vedio
and power facility at
both ends of cable to be
provided. The CAT- 6
cable should be 3M.

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per m Rs.
Labour Rates Per m Rs.

2,632

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-182 Unit

Item Name : Provide & connect 14" color TV Monitor equiped with
following charactaristics
Microphone & Speaker built in for one way audio
VCR Connect for VCR record & play
Horizontal resolution 420V linees
NTSL/PAL
Free voltage (90-260VAC, 50/60Hz)
Approved UL,CE,CSA,DHHA
Computer Networks

Detail Qty Unit


MATERIAL
Provide & connect 14" 1 No
color TV Monitor equiped
with following
charactaristics

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,633

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-183 Unit

Item Name : Supply, installation, connecting, testing, and comissioning of duplex


computer outlet with RJ series

Detail Qty Unit


MATERIAL
duplex computer outlet 1 No
with RJ series

LABOUR
Electrician 0.125 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,634

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-184
Item Name :
Detail Qty Unit
MATERIAL
Acrylic boxes for switch 1 Each
4'x4'

LABOUR
Electrician 0.05 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,635

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-185
Item Name :
Detail Qty Unit
MATERIAL
Erection of Aciylic boxes 1 Each
for switch 7'x4'

LABOUR
Electrician 0.05 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,636
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-186
Item Name :
Detail Qty Unit
MATERIAL
Acrylic boxos for switch 1 Each
8"'x 10"

LABOUR
Electrician 0.05 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,637

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-187
Item Name : Supply & Erection of Acrylic or bakolite sheet 7 40 , 4x4
Detail Qty Unit
MATERIAL
Acrylic or bakelite sheet 1 Each
7 40 , 4x4

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,638

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-188
Item Name : Supply & Erection of bakolite sheet 4 x 2
Detail Qty Unit
MATERIAL
bakelite sheet 4 x 2 1 Each

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,639

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-189
Item Name : Supply & Erection of PVC board 7" x 4" with all aspects
Detail Qty Unit
MATERIAL
PVC board 7" x 4" 1 Each

LABOUR
Electrician 0.04 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,640

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-190
Item Name :
Detail Qty Unit
MATERIAL
Extention Board 1 Each

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,641

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-191
Item Name : Supply & Erection of glow starter
Detail Qty Unit
MATERIAL
glow starter 1 Each

LABOUR
Electrician 0.01 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,642

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-192
Item Name : Supply & Erection of Brass bulb holder
Detail Qty Unit
MATERIAL
Brass holder 1 Each

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,643

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-193
Item Name : Supply & Erection of Insulation tape
Detail Qty Unit
MATERIAL
insulation tape 1 Each

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,644

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-194
Item Name : Supply & Erection of Volt meter (heavy duty)
Detail Qty Unit
MATERIAL
Volt meter (heavy duty) 1 Each
best quality

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,645

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-195
Item Name : Supply & Erection of Capacitor 3.5 for ceiling fan
Detail Qty Unit
MATERIAL
P.VC capacitor 3.5 1 Each
(Japan) for ceiling fan

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,646
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-196
Item Name : Supply & Erection of TV Cable
Detail Qty Unit
MATERIAL
TV cable 1 Each

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,647

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-197
Item Name : Supply & Erection of Remote Cell
Detail Qty Unit
MATERIAL
Remote cell 1 Each

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,648
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-198
Item Name : Supply & Erection of Ding Dong call bell best quality
Detail Qty Unit
MATERIAL
Ding Dong call bell best 1 Each
quality

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,649

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-199
Item Name : Supply & Erection of Starter for Motor pump
Detail Qty Unit
MATERIAL
Starter for Motor pump 1 Each

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,650
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-200-a
Item Name : Supply & Installation of ASD strater for 10-20 HP
Detail Qty Unit
MATERIAL
10-20 HP ASD 1 No

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,651

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-200-b
Item Name : Supply & Installation of ASD strater for 21-30 HP
Detail Qty Unit
MATERIAL
21-30 HP ASD 1 No

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,652
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-200-c
Item Name : Supply & Installation of ASD strater for 31-40 HP
Detail Qty Unit
MATERIAL
31-40 HP ASD 1 No

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,653

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-201-a
Item Name : Supply & Installation of DOL strater for 10-20 HP
Detail Qty Unit
MATERIAL
10-20 HP DOL strater 1 No

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,654
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-201-b
Item Name : Supply & Installation of DOL strater for 21-30 HP
Detail Qty Unit
MATERIAL
21-30 HP DOL strater 1 No

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,655

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-201-c
Item Name : Supply & Installation of DOL strater for 31-40 HP
Detail Qty Unit
MATERIAL
31-40 HP DOL strater 1 No

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,656
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-202-a Unit

Item Name : S/Fixing 3-core flexible Copper cable for submersible electric motor
10mm.

Detail Qty Unit


MATERIAL
10 mm 3-core flexible 1 Each
Copper cable for
submersible electric
motor

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,657

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-202-b Unit

Item Name : S/Fixing 3-core flexible Copper cable for submersible electric motor
16mm.

Detail Qty Unit


MATERIAL
16 mm 3-core flexible 1 Each
Copper cable for
submersible electric
motor

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,658

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-202-c Unit

Item Name : S/Fixing 4-core flexible Aluminium cable for service of transformer to
main board (19/64)

Detail Qty Unit


MATERIAL
19/64 4-core flexible 1M
Aluminium cable

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per m Rs.
Labour Rates Per m Rs.

2,659

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM : Spec. No :
Item Code : 15-202-d Unit

Item Name : S/Fixing 4-core flexible Aluminium cable for service of transformer to
main board (19/83)

Detail Qty Unit


MATERIAL
19/83 4-core flexible 1M
Aluminium cable

LABOUR
Electrician 0.025 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per m Rs.
Labour Rates Per m Rs.

2,660

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-203
Item Name : S/Fixing protector magnet coil in strater
Detail Qty Unit
MATERIAL
protector magnet coil in 1 No
strater.

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,661
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-204-a
Item Name : S/Fixing strater overload relay 10-30 Amp
Detail Qty Unit
MATERIAL
10-30 AMP strater 1 No
overload relay

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,662

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-204-b
Item Name : S/Fixing strater overload relay 31-60 Amp
Detail Qty Unit
MATERIAL
31-60 AMP strater 1 No
overload relay

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.
2,663

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-204-c
Item Name : S/Fixing strater overload relay 61-100 Amp
Detail Qty Unit
MATERIAL
61-100 AMP strater 1 No
overload relay

LABOUR
Electrician 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,664

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-205-a Unit

Item Name : Repair of Transformer' HT leg (two -step) i/c of carriage from site to
workshop & back i/c onstalltion and Testing complete. 100-KVA
Trasformer

Detail Qty Unit

MATERIAL
HT leg two -step 100-KVA 1 No
Trasformer

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,665

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-205-b Unit

Item Name : Repair of Transformer' LT coil i/c of carriage from site to workshop &
back i/c onstalltion and Testing complete. 100-KVA Trasformer

Detail Qty Unit


MATERIAL
LT coil 100-KVA 1 No
Trasformer

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,666

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-205-c Unit

Item Name : Repair of Transformer' HT bush i/c of carriage from site to workshop &
back i/c onstalltion and Testing complete. 100-KVA Trasformer
Detail Qty Unit
MATERIAL
Ht bush 100-KVA 1 No
Trasformer

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,667

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-205-d Unit

Item Name : Repair of Transformer' LT bush i/c of carriage from site to workshop &
back i/c onstalltion and Testing complete. 100-KVA Trasformer

Detail Qty Unit


MATERIAL
Lt bush 100-KVA 1 No
Trasformer

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,668

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-206-a Unit

Item Name : Repair of Transformer' HT leg (two -step) i/c of carriage from site to
workshop & back i/c onstalltion and Testing complete. 50-KVA Trasformer

Detail Qty Unit


MATERIAL
HT leg two -step 50-KVA 1 No
TRANSFORMER

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,669

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-206-b Unit

Item Name : Repair of Transformer' LT Coil i/c of carriage from site to workshop &
back i/c onstalltion and Testing complete. 50-KVA Trasformer

Detail Qty Unit


MATERIAL
LT coil 50-KVA 1 No
TRANSFORMER

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,670

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-206-c Unit

Item Name : Repair of Transformer' HT bush i/c of carriage from site to workshop &
back i/c onstalltion and Testing complete. 50-KVA Trasformer

Detail Qty Unit


MATERIAL
Ht bush 50-KVA 1 No
TRANSFORMER

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,671

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-206-d Unit

Item Name : Repair of Transformer' LT Bush i/c of carriage from site to workshop &
back i/c onstalltion and Testing complete. 50-KVA Trasformer

Detail Qty Unit


MATERIAL
Lt bush 50-KVA 1 No
TRANSFORMER

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,672

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-206-e Unit

Item Name : Repair of Transformer body i/c of carriage from site to workshop & back
i/c onstalltion and Testing complete. 50-KVA Trasformer

Detail Qty
MATERIAL
Transformer body 50-KVA 1
TRANSFORMER

LABOUR
Electrician 1
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No
Labour Rates Per No

2,673

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-207-a Unit

Item Name : Repair of Transformer' HT leg (two -step) i/c of carriage from site to
workshop & back i/c onstalltion and Testing complete. 25-KVA Trasformer

Detail Qty Unit


MATERIAL
HT leg two -step 25-KVA 1 No
TRANSFORMER

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,674

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-207-b Unit

Item Name : Repair of Transformer' LT Coil i/c of carriage from site to workshop &
back i/c onstalltion and Testing complete. 25-KVA Trasformer

Detail Qty Unit


MATERIAL
LT coil 25-KVA 1 No
TRANSFORMER

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,675
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-207-c Unit

Item Name : Repair of Transformer' HT bush i/c of carriage from site to workshop &
back i/c onstalltion and Testing complete. 25-KVA Trasformer

Detail Qty Unit


MATERIAL
Ht bush 25-KVA 1 No
TRANSFORMER

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,676

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-207-d Unit

Item Name : Repair of Transformer' LT bush i/c of carriage from site to workshop &
back i/c onstalltion and Testing complete. 25-KVA Trasformer

Detail Qty Unit


MATERIAL
Lt bush 25-KVA 1 No
TRANSFORMER

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,677

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-207-e Unit

Item Name : Repair of Transformer body i/c of carriage from site to workshop & back
i/c onstalltion and Testing complete. 25-KVA Trasformer

Detail Qty Unit


MATERIAL
Transformer body 25-KVA 1 No
TRANSFORMER

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,678

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-208
Item Name :
Detail Qty Unit
MATERIAL
voltage Regulator plate 1 No
(Selector)

LABOUR
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,679

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-209
Item Name :
Detail Qty
MATERIAL
Rweinding of Voltage 1
Regulator Coil stablizer
coil

LABOUR
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,680

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-210
Item Name : Furnish & Install of Volt: meter upt to 500 volt.
Detail Qty Unit
MATERIAL
Volt: meter upt to 500 1 No
volt.

LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,681

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-211
Item Name : Furnish & Install of AMP meter up to 100 Amps
Detail Qty Unit
MATERIAL
AMP meter up to 100 Volt 1 No

LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,682

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM :
Item Code : 15-212
Item Name : S/Fixing of control circuit for automatic stabilizer
Detail Qty Unit
MATERIAL
control circuit for 1 No
automatic stabilizer

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,683

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-213-a
Item Name :
Detail Qty Unit
MATERIAL
10-25 Hp 1 No

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,684

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL


DESCRIPTION OF ITEM :
Item Code : 15-213-b
Item Name :
Detail Qty Unit
MATERIAL
30-50 Hp 1 No

LABOUR
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,685

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-214-a
Item Name :
Detail Qty Unit
MATERIAL
10 to 25 HP tapper 1 No
bearing for motor (V.H.S)

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,686

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-214-b
Item Name :
Detail Qty Unit
MATERIAL
30 to 50 HP tapper 1 No
bearing for motor (V.H.S)

LABOUR
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,687

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-215-a
Item Name :
Detail Qty Unit
MATERIAL
10 to 25 HP ball bearing 1 No
for motor (V.H.S)

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,688

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-215-b
Item Name :
Detail Qty Unit
MATERIAL
30 to 50 HP ball bearing 1 No
for motor (V.H.S)

LABOUR
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,689

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-216
Item Name : Supply and Filling of Transformer Oil.
Detail Qty Unit
MATERIAL
Transformer Oil. 1 Per Ltr

LABOUR
Skilled Labour 0.0104 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Per Ltr Rs.
Labour Rates Per Per Ltr Rs.

2,690

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-217
Item Name : Supply and Fixing of Voltage Regulator 30 KVA
Detail Qty Unit
MATERIAL
Voltage Regulator 30 KVA. 1 No

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,691

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-218
Item Name : Supply and Fixing of Voltage Regulator 50 KVA
Detail Qty Unit
MATERIAL
Voltage Regulator 50 KVA. 1 No

LABOUR
Electrician 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,692

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-219-a
Item Name : Pump with motor for pressure pump (0.5 HP)
Detail Qty Unit
MATERIAL
0.5 HP Pump with motor 1 No
for pressure pump

LABOUR
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,693

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-219-b
Item Name : Pump with motor for pressure pump (1 HP)
Detail Qty Unit
MATERIAL
1.00 HP Pump with motor 1 No
for pressure pump

LABOUR
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,694
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-219-c
Item Name : Pump with motor for pressure pump (1.5 HP)
Detail Qty Unit
MATERIAL
1.50 HP Pump with motor 1 No
for pressure pump

LABOUR
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,695

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-219-d
Item Name : Pump with motor for pressure pump (2 HP)
Detail Qty Unit
MATERIAL
2.00 HP Pump with motor 1 No
for pressure pump

LABOUR
Electrician 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.
2,696

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-220
Item Name : Supply and fixxing of 50 Litres Electric Geyser
Detail Qty Unit
MATERIAL
Electric Geyser 40-50 1 No
Litres

LABOUR
Electrician 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,697

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-220-a Unit

Item Name : Supply and fixxing of 40-50 Litres Electric Geyser including all
accessories and fittings

Detail Qty Unit


MATERIAL
Electric Geyser 40-50 1 No
Litres

LABOUR
Electrician I 0.25 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.

2,698

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-220-b Unit

Item Name : Supply and fixxing of 15-25 Litres Electric Geyser including all
accessories and fittings

Detail Qty Unit


MATERIAL
Electric Geyser 15-25 1 No
Litres

LABOUR
Electrician I 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,699

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM : Spec. No :


Item Code : 15-220-c Unit

Item Name : Supply and fixxing of 8-14 Litres Electric Geyser including all
accessories and fittings
Detail Qty Unit
MATERIAL
Electric Geyser 8-14 1 No
Litres

LABOUR
Electrician I 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,700

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 15 , ELECTRICAL

DESCRIPTION OF ITEM :
Item Code : 15-221
Item Name : Supply & Erection of element for electric water heater
Detail Qty Unit
MATERIAL
element for electric 1 Each
water heater

LABOUR
Electrician 0.06 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,701

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-01
Item Name :
Detail Qty Unit
MATERIAL
Coarse Sand 22 Cft
Burnt Brick 1350 No

LABOUR
Mason 0.5 Day
Labourer 1 Day
Water Man 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,702

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-02 Unit

Item Name : Providing and Laying sub-base course of brick aggregate, including
compaction to required camber, grade & density

Detail Qty Unit


MATERIAL
Brick Aggregate 100 Cft

LABOUR
Labourer 1 Day
Sundries (Labour Only):

EQUIPMENT
Tractor with blade / 0.1133 Hour
Plough
Water tank 1000g 0.02 Hour
Vibrator Roller 12 T 0.05 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,703

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-03
Item Name : Graded Crushed Aggregate Crack-Relief Layer
Detail Qty Unit
MATERIAL
Aggregate 3/4" - 3/8" 12.5 Cft
Aggregate 3/8" - No. 4 118.0556 Cft

LABOUR
Labourer 1.0226 Day
Sundries (Labour Only):

EQUIPMENT
Static Tandom Roller ( 8 0.1573 Hour
T)
Water Tank Tow Type ( 0.236 Hour
4000 l )
Tractor 50 HP 0.236 Hour
Pump 4" delivery (Diesel) 0.0787 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,704

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-04-a
Item Name : Granular Sub Base Course using Pit Run Gravel
Detail Qty Unit
MATERIAL
Pitrun Gravel 125 Cft

LABOUR
Labourer 1 Day
Dresser 0.5 Day
Sundries (Labour Only):

EQUIPMENT
Motor Grader 165 HP 0.07 Hour
Lab test 0.08 Job
Water tank 1000g 0.02 Hour
Vibrator Roller 12 T 0.05 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,705

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-04-b
Item Name : Granular Sub Base Using Crushed Stone Aggregate
Detail Qty Unit
MATERIAL
Crushed Aggregate GB 125 Cft

LABOUR
Labourer 0.6 Day
Dresser 0.3 Day
Sundries (Labour Only):

EQUIPMENT
Motor Grader 165 HP 0.013 Hour
Lab test 0.08 Job
Water tank 1000g 0.056 Hour
Vibrator Roller 12 T 0.056 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,706

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-05-a
Item Name : Aggregate Base Course
Detail Qty Unit
MATERIAL
Crushed Aggregate BC 125 1 Cft

LABOUR
Labourer 1.5 Day
Dresser 0.75 Day
Sundries (Labour Only):

EQUIPMENT
Motor Grader 165 HP 0.013 Hour
Static Tandom Roller ( 8 0.156 Hour
T)
Lab test 0.08 each
Water tank 1000g 0.04 Hour
Vibrator Roller 12 T 0.08 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,707

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-05-b
Item Name : Water Bound Macadam Base Course
Detail Qty Unit
MATERIAL
Stone Dust 22 Cft
Crushed Aggregate Base A 125 Cft

LABOUR
Labourer 0.6 Day
Dresser 0.3 Day
Sundries (Labour Only):

EQUIPMENT
Static Tandom Roller ( 8 0.156 Hour
T)
Lab test 0.08 Each
Tractor with blade / 0.113 Hour
Plough
Water tank 1000g 0.1415 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,708

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-06 Unit

Item Name : Providing and Laying road edging of 3" wide & 9" deep brick on end,
complete

Detail Qty Unit


MATERIAL
Coarse Sand 2.64 Cft
Burnt Brick 400 No

LABOUR
Mason 0.5 Day
Labourer 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,709

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-07 Unit

Item Name : Reflective Mirrors at Sharp Curves (900 mm dia) with post Complete in
all respects

Detail Qty Unit


MATERIAL
Ordinary Portland Cement 0.3 Bag
Coarse Sand 5.2972 Cft
G.I pipe (light) 2" 17.5 ft
Aggregate 3/4" - 3/8" 4.3543 Cft
Aggregate 3/8" - No. 4 6.3566 Cft
Reflective Mirror 900mm 1 No
dia

LABOUR
Mason 0.067 Day
Labourer 0.201 Day
Sundries (Labour Only):

EQUIPMENT
Concrete Static Mixer 0.133 Hour
0.19 m³ (1/4 Y³)
Water Tank Tow Type ( 0.133 Hour
4000 l )
Pump 4" delivery (Diesel) 0.0533 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,710

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-08 Unit

Item Name : Providing and Fixing Reflective Sheet Hi-intensity Grade Including
Foundation and steel Post complete in all respect

Detail Qty Unit


MATERIAL
Ordinary Portland Cement 0.176 Bag
Coarse Sand 0.44 Cft
Crushed Aggregate 0.88 Cft
Ref Sheet Hi-intensity 100 Sft
Grade
Sheath Pipe 17.5 ft

LABOUR
Reflective Sheet Fixer 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100SFT Rs.
Labour Rates Per 100SFT Rs.

2,711

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-09-a
Item Name : Bitumenous Prime Coat
Detail Qty Unit
MATERIAL
Fuel Wood 1.36 Kg
Asphalt 5.576 Kg
Kerosene Oil 5.576 Ltr

LABOUR
Labourer 0.2 Day
Sundries (Labour Only):

EQUIPMENT
Tar Boiler 0.0372 Hour
Tractor with trolly 0.0185 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,712

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-09-b
Item Name : Bitumenous Tack Coat
Detail Qty Unit
MATERIAL
Fuel Wood 1.2689 Kg
Asphalt 2.787 Kg

LABOUR
Labourer 0.2 Day
Sundries (Labour Only):

EQUIPMENT
Tar Boiler 0.0186 Hour
Tractor with trolly 0.0372 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,713

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES


DESCRIPTION OF ITEM :
Item Code : 16-10-a
Item Name : Single bitumenous Surface Treatment
Detail Qty Unit
MATERIAL
Asphalt 20.42 Kg
Crushed aggregate S 5.58 1 Cft

LABOUR
Labourer 0.0236 Day
Sundries (Labour Only):

EQUIPMENT
Static Tandom Roller ( 8 0.075 Hour
T)
Compressor 300 CFM 0.0114 Hour
Bitumen Dist. Tow Type 0.0114 Hour
(2000 Ltr.)

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,714

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-10-b
Item Name : Double bitumenous Surface Treatment
Detail Qty Unit
MATERIAL
Asphalt 28.71 Kg
Crushed aggregate D 7.4 Cft

LABOUR
Labourer 0.0236 Day
Sundries (Labour Only):

EQUIPMENT
Static Tandom Roller ( 8 0.149 Hour
T)
Compressor 300 CFM 0.0176 Hour
Bitumen Dist. Tow Type 0.0176 Hour
(2000 Ltr.)

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,715

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-10-c
Item Name : Triple bitumenous Surface Treatment
Detail Qty Unit
MATERIAL
Asphalt 38.26 Kg
Crushed Aggregate T 8.8 Cft

LABOUR
Labourer 0.0236 Day
Sundries (Labour Only):

EQUIPMENT
Static Tandom Roller ( 8 0.198 Hour
T)
Compressor 300 CFM 0.0217 Hour
Bitumen Dist. Tow Type 0.0217 Hour
(2000 Ltr.)

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,716

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES


DESCRIPTION OF ITEM : Spec. No :
Item Code : 16-11-a Unit

Item Name : Resurfacing of road complete with per 100sft : 22 Ibs. bitumen, 2.5"cft
bajri/crush aggregate

Detail Qty Unit


MATERIAL
Asphalt 10 Kg
Crushed Aggregate R 2.5 Cft

LABOUR
Labourer 0.08 Day
Skilled Labour 0.005 Day
Sundries (Labour Only):

EQUIPMENT
Static Tandom Roller ( 8 0.046 Hour
T)
Compressor 300 CFM 0.0114 Hour
Bitumen Dist. Tow Type 0.0114 Hour
(2000 Ltr.)

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,717

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-11-b Unit

Item Name : Resurfacing of road complete with per 100sft : 20 Ibs. bitumen, 2 cft
bajri/crush aggregate

Detail Qty Unit


MATERIAL
Asphalt 9.073 Kg
Crushed Aggregate R 2 Cft
LABOUR
Labourer 0.08 Day
Skilled Labour 0.0502 Day
Sundries (Labour Only):

EQUIPMENT
Static Tandom Roller ( 8 0.046 Hour
T)
Compressor 300 CFM 0.0114 Hour
Bitumen Dist. Tow Type 0.0114 Hour
(2000 Ltr.)

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,718

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-12
Item Name : Scarification Of Existing Road Pavement Structure
Detail Qty Unit
LABOUR
Labourer 0.0755 Day
Sundries (Labour Only):

EQUIPMENT
Bull Dozer 90 HP 0.6041 Hour
Front End Loader 2.5 m³ 0.6041 Hour
Dumper ( 10 T ) 1.2082 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 1000 Cft Rs.
Labour Rates Per 1000 Cft Rs.

2,719

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-13-a
Item Name :
Detail Qty
MATERIAL
Coarse Sand 5.46
Crushed Aggregate 10.92
Fuel Wood 4.4784
Asphalt 23.79
Kerosene Oil 0.115

LABOUR
Labourer 0.3
Skilled Labour 0.15
Rake Man 0.07
Sundries (Labour Only):

EQUIPMENT
Static Tandom Roller ( 8 0.11
T)
Mini Asphalt Mixer 0.11

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,720

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-13-b
Item Name :
Detail Qty
MATERIAL
Coarse Sand 8.216
Crushed Aggregate 16.432
Fuel Wood 0.7091
Asphalt 35.68
Kerosene Oil 0.172

LABOUR
Labourer 0.425
Skilled Labour 0.215
Rake Man 0.105
Sundries (Labour Only):

EQUIPMENT
Static Tandom Roller ( 8 0.155
T)
Mini Asphalt Mixer 0.155

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,721

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-13-c
Item Name :
Detail Qty
MATERIAL
Coarse Sand 10.92
Crushed Aggregate 21.84
Fuel Wood 0.933
Asphalt 47.58
Kerosene Oil 0.13

LABOUR
Labourer 0.55
Skilled Labour 0.28
Rake Man 0.14
Sundries (Labour Only):

EQUIPMENT
Static Tandom Roller ( 8 0.2
T)
Mini Asphalt Mixer 0.2
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,722

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-14-a Unit

Item Name : Asphaltic Base Course (Asphalt Batch Plant Hot Mixed) i/c
Transportation and Finishing complete

Detail Qty Unit


MATERIAL
Crushed Aggregate 143 Cft
Asphat in Bulk 244.62 Kg.
TOTAL
LABOUR
Labourer 0.5663 Day
Skilled Labour 0.2832 Day
Rake Man 0.2832 Day
Sundries (Labour Only):
TOTAL
EQUIPMENT
Lab test 0.08 Job
Procuring/Transport/Layin 6.795 Tonne
g/Com including
developing of JMF

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,723

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-14-b Unit

Item Name : Asphaltic Wearing Course (Asphalt Batch Plant Hot Mixed) i/c
Transportation and Finishing complete

Detail Qty Unit


MATERIAL
Crushed Aggregate 143 Cft
Asphat in Bulk 305.77499 Kg.
TOTAL
LABOUR
Labourer 0.5663 Day
Skilled Labour 0.2832 Day
Rake Man 0.2832 Day
Sundries (Labour Only):
TOTAL
EQUIPMENT
Lab test 0.08 1 No
Procuring/Transport/Layin 6.795 Tonne
g/Com including
developing of JMF

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,724

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-15 Unit

Item Name : Providing 3 feet high RCC railing (as per the drawing in
specifications) on bridges

Detail Qty
MATERIAL
RCC Railing 100

LABOUR
Mason 3.3527
Labourer 20
Water Man 4.8767
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,725

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-16
Item Name :
Detail Qty
MATERIAL
Steel (bars/rods/section) 66.77
Paint : Enamel 4
G.I pipe (light) 2" 330
Welding Rod 1

LABOUR
Mason 0.915
Labourer 6.45
Painter / Polisher 2
Welder 3
Sundries (Labour Only):

EQUIPMENT
Welding Plant Unit 6

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft/3 Rs.
Labour Rates Per 100 Rft/3 Rs.

2,726
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-17-a
Item Name : P&E at site : RCC km stone
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.5 Bag
Coarse Sand 6.7089 Cft
Crushed Aggregate 2 Cft
Rfcnt Steel : Plain/Local 0.008 Tonne
Wood - Partal 0.0035 Cft
Paint : Enamel 0.01 Ltr

LABOUR
Mason 0.355 Day
Labourer 1.782 Day
Carpenter 0.172 Day
Painter / Polisher 0.005 Day
Steel Binder / Cutter / 0.068 Day
Fixer
Pipe Layer 0.074 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,727

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-17-b
Item Name : P&E at site : RCC 1/10th km stone.
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.248 Bag
Coarse Sand 1.2 Cft
Crushed Aggregate 3.1 Cft
Rfcnt Steel : Plain/Local 0.00045 Tonne
Wood - Partal 0.0106 Cft
Paint : Enamel 0.01 Ltr

LABOUR
Mason 0.139 Day
Labourer 0.341 Day
Carpenter 0.052 Day
Painter / Polisher 0.003 Day
Steel Binder / Cutter / 0.04 Day
Fixer
Pipe Layer 0.009 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,728

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-17-c
Item Name : P&E at site : RCC boundry pillar.
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.329 Bag
Coarse Sand 0.56 Cft
Crushed Aggregate 1.5 Cft
Rfcnt Steel : Plain/Local 0.0053 Tonne
Paint : Enamel 0.01 Ltr

LABOUR
Mason 0.102 Day
Labourer 0.343 Day
Painter / Polisher 0.02 Day
Steel Binder / Cutter / 0.05 Day
Fixer
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,729

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-18-a Unit

Item Name : Road signs (not exceeding 1 m2) without reflection sheet & lettering :
Supply and Fixing at site with PCC 1:3:6 upto max 3' depth

Detail Qty
MATERIAL
Ordinary Portland Cement 7.9896
Coarse Sand 29.5429
Crushed Aggregate 59.086
Steel Structual Section 306.57999
Steel Sheet 125.4189
Brush II 0.25
Paint : Enamel 0.79

LABOUR
Labourer 9.29
Painter / Polisher 1.557
Welder 6.967
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,730

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES


DESCRIPTION OF ITEM : Spec. No :
Item Code : 16-18-b Unit

Item Name : Road signs (not exceeding 1 m2) without reflection sheet & lettering :
Supply to the C&W store/site of work

Detail Qty
MATERIAL
Steel Structual Section 306.57999
Steel Sheet 125.4189

LABOUR
Labourer 2.6451
Welder 6.9677
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,731

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-19-a Unit

Item Name : Road sign (any size) double pedestal 4"x2"x0.25" 11' long without
reflection sheet & lettering: Supply and Fixing at site with PCC 1:3:6
max 3' depth

Detail Qty Unit

MATERIAL
Ordinary Portland Cement 16.0722
Coarse Sand 59.0862
Crushed Aggregate 118.172
Steel Structual Section 401.98999
Steel Sheet 231.328
Welding Rod 0.33

LABOUR
Labourer 13.933
Painter / Polisher 2.787
Welder 9.2903
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,732

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-19-b Unit

Item Name : Road sign (any size) double pedestal 4"x2"x0.25" 11' long without
reflection sheet & lettering: Supply to the C&W store/site of work

Detail Qty
MATERIAL
Steel Structual Section 401.98999
Steel Sheet 231.328

LABOUR
Labourer 2.9677
Painter / Polisher 5.574
Welder 9.2903
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,733

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-20-a
Item Name : Traffic Road Sign Cat 1
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 1.0667 Bag
G.I pipe (light) 2" 0.2 Rft
Traffic Road Signs 1 No
Category 1, Size 900 mm
Aggregate 3/4" - 3/8" 0.0567 Cft
Aggregate 3/8" - No. 4 0.0667 Cft

LABOUR
Mason 0.0667 Day
Labourer 0.5667 Day
Carpenter 0.0667 Day
Sundries (Labour Only):

EQUIPMENT
Concrete Static Mixer 0.1333 Hour
0.19 m³ (1/4 Y³)
Water Tank Tow Type ( 0.1333 Hour
4000 l )
Pump 4" delivery (Diesel) 0.0667 Hour
Tractor with trolly 0.2667 Hour

2,734

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,735

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-20-b
Item Name : Traffic Road Signs Category 2, Size 900 mm
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 1.6 Bag
G.I pipe (light) 2" 0.9843 ft
Traffic Road Signs 1 No
Category 2, Size 900 mm
Aggregate 3/4" - 3/8" 3.0017 Cft
Aggregate 3/8" - No. 4 3.5315 Cft

LABOUR
Mason 0.005 Day
Labourer 0.0085 Day
Carpenter 0.005 Day
Sundries (Labour Only):

EQUIPMENT
Concrete Static Mixer 0.02 Hour
0.19 m³ (1/4 Y³)
Water Tank Tow Type ( 0.02 Hour
4000 l )
Pump 4" delivery (Diesel) 0.01 Hour
Tractor with trolly 0.04 Hour

2,736

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,737

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-20-c
Item Name : Traffic Road Signs Category 3a
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.3 Bag
Coarse Sand 5.2972 Cft
G.I pipe (light) 2" 17.5 ft
Traffic Road Signs 1 No
Category 3a
Aggregate 3/4" - 3/8" 4.3543 Cft
Aggregate 3/8" - No. 4 6.3566 Cft

LABOUR
Mason 0.067 Day
Labourer 2 Day
Carpenter 0.067 Day
Sundries (Labour Only):

EQUIPMENT
Concrete Static Mixer 0.133 Hour
0.19 m³ (1/4 Y³)
Water Tank Tow Type ( 0.133 Hour
4000 l )
Pump 4" delivery (Diesel) 0.533 Hour
Tractor with trolly 0.533 Hour

2,738

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,739

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES


DESCRIPTION OF ITEM :
Item Code : 16-20-d
Item Name : Traffic Road Signs Category 3b
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.3 Bag
Coarse Sand 5.2972 Cft
G.I pipe (light) 2" 17.5 ft
Traffic Road Signs 1 No
Category 3b
Aggregate 3/4" - 3/8" 4.3543 Cft
Aggregate 3/8" - No. 4 6.3566 Cft

LABOUR
Mason 0.067 Day
Labourer 2 Day
Carpenter 0.067 Day
Sundries (Labour Only):

EQUIPMENT
Concrete Static Mixer 0.133 Hour
0.19 m³ (1/4 Y³)
Water Tank Tow Type ( 0.133 Hour
4000 l )
Pump 4" delivery (Diesel) 0.533 Hour
Tractor with trolly 0.533 Hour

2,740

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,741

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES


DESCRIPTION OF ITEM :
Item Code : 16-21-a
Item Name :
Detail Qty
MATERIAL
Steel (bars/rods/section) 908.61328
Steel Sheet 177.8029
Brush II 1
Paint : Enamel 3.8
PCC (1:2:4) 8

LABOUR
Skilled Labour 2
Painter / Polisher 1.75
Welder 1.5
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,742

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-21-b
Item Name :
Detail Qty
MATERIAL
Steel (bars/rods/section) 2079
Steel Sheet 355.6059
Brush II 1
Paint : Enamel 7.6
PCC (1:2:4) 12.5

LABOUR
Labourer 2.65
Painter / Polisher 2
Welder 2
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,743

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-21-c
Item Name :
Detail Qty Unit
MATERIAL
Steel (bars/rods/section) 2987.61011 Kg
Steel Sheet 533.40881 Kg
Brush II 1 No
Paint : Enamel 11.4 Ltr
PCC (1:2:4) 18 Cft

LABOUR
Labourer 2.75 Day
Painter / Polisher 2.25 Day
Welder 2.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,744

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-21-d Unit

Item Name : Providing and Fixing gantry of structural steel sections as per design
/ drawings including foundation complete
Detail Qty
MATERIAL
Steel (bars/rods/section) 547.23218
Steel Sheet 155.57761
Brush II 1
Paint : Enamel 3.8
PCC (1:2:4) 8

LABOUR
Skilled Labour 1.75
Painter / Polisher 1.5
Welder 1.5
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,745

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-22-a Unit

Item Name : Supply and Fixing reflective sheet on MS/aluminium road signs etc
including lettering : Diamond grade

Detail Qty
MATERIAL
Ref Sheet Diamond Grade 100 Sft

LABOUR
Reflective Sheet Fixer 1.8581 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,746
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-22-b Unit

Item Name : Supply and Fixing reflective sheet on MS/aluminium road signs etc
including lettering : High intensity grade

Detail Qty
MATERIAL
Ref Sheet Hi-intensity 100 Sft
Grade

LABOUR
Reflective Sheet Fixer 1.8581 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,747

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-22-c Unit

Item Name : Supply and Fixing reflective sheet on MS/aluminium road signs etc
including lettering : Engineering grade

Detail Qty
MATERIAL
Ref Sheet Engineering 100 Sft
Grade

LABOUR
Reflective Sheet Fixer 1.8581 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,748

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-23
Item Name : Delineator Bi-directional (Diamond sheet)
Detail Qty Unit
MATERIAL
Delineator Bi-direction 1 Each
(Diamond sheet)

LABOUR
Labourer 0.35 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,749

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-24
Item Name : Plastic 3M Bi Direction
Detail Qty Unit
MATERIAL
Plastic 3M Bi Direction 1 No

LABOUR
Labourer 0.35 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,750

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-25-a-01 Unit

Item Name : Supply and Fixing aluminium alloy road studs as per specs Large, strip
146x30mm, 171 beads: Uni-direction

Detail Qty Unit


MATERIAL
Road Stud 210 x 100 x 40 1 No
Uni

LABOUR
Labourer 0.09 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,751

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-25-a-02 Unit

Item Name : Supply and Fixing aluminium alloy road studs as per specs Large, strip
146x30mm, 171 beads: Bi-direction

Detail Qty Unit


MATERIAL
Road Stud 210 x 100 x 40 1 No
Bi

LABOUR
Labourer 0.09 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,752

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-25-b-01 Unit

Item Name : Supply and Fixing aluminium alloy road studs as per specs Medium, strip
114x18mm, 74 beads: Uni-direction

Detail Qty Unit


MATERIAL
Road Stud 170 x 90 x 25 1 No
Uni

LABOUR
Labourer 0.09 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,753

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-25-b-02 Unit

Item Name : Supply and Fixing aluminium alloy road studs as per specs Medium, strip
114x18mm, 74 beads: Bi-direction

Detail Qty Unit


MATERIAL
Road Stud 170 x 90 x 25 1 No
Bi

LABOUR
Labourer 0.09 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,754

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-25-c-01 Unit

Item Name : Supply and Fixing aluminium alloy road studs as per specs Small, strip
75x14mm, 43 beads: Uni-directional

Detail Qty Unit


MATERIAL
Road Stud 100 x 80 x 20 1 No
Uni

LABOUR
Labourer 0.09 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,755

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-25-c-02 Unit

Item Name : Supply and Fixing aluminium alloy road studs as per specs Small, strip
75x14mm, 43 beads: Bi-directional

Detail Qty Unit


MATERIAL
Road Stud 100 x 80 x 20 1 No
Bi

LABOUR
Labourer 0.09 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,756

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-25-c-03 Unit

Item Name : Supply & Fixing of high Quality) 360 d Glass Road studs ( 4" Dia )
Including fixing at site in all respect

Detail Qty Unit


MATERIAL
Road Stud 210 x 100 x 40 1 No
Bi

LABOUR
Labourer 0.09 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,757

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-25-c-04
Item Name :
Detail Qty Unit
MATERIAL
Cats-eye Single (Raised 1 No
surface) Aluminium

LABOUR
Skilled Labour 0.0313 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,758

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-25-c-05
Item Name :
Detail Qty Unit
MATERIAL
Cats-eye Double (Raised 1 No
surface) Aluminium

LABOUR
Skilled Labour 0.0313 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,759

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-25-c-06
Item Name :
Detail Qty Unit
MATERIAL
Cats-eye Single (Flush 1 No
surface) Aluminium

LABOUR
Skilled Labour 0.0313 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,760

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-25-c-07
Item Name :
Detail Qty Unit
MATERIAL
Cats-eye Double (Flush 1 No
surface) Aluminium

LABOUR
Skilled Labour 0.0313 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,761

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-25-c-08
Item Name :
Detail Qty Unit
MATERIAL
Cats-eye Single (Raised 1 No
surface) Plastic

LABOUR
Skilled Labour 0.0313 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,762

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES


DESCRIPTION OF ITEM :
Item Code : 16-25-c-09
Item Name :
Detail Qty Unit
MATERIAL
Cats-eye Double (Raised 1 No
surface) Plastic

LABOUR
Skilled Labour 0.0313 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,763

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-25-c-10
Item Name :
Detail Qty Unit
MATERIAL
Cats-eye Single (Flush 1 No
surface) Plastic

LABOUR
Skilled Labour 0.0313 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,764

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-25-c-11
Item Name :
Detail Qty Unit
MATERIAL
Cats-eye Double (Flush 1 No
surface) Plastic

LABOUR
Skilled Labour 0.0313 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,765

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-26 Unit

Item Name : Providing and Laying dry brick pavement/soling in streets etc including
prep, water, compaction & sand cushion

Detail Qty
MATERIAL
Coarse Sand 22
Burnt Brick 1400

LABOUR
Mason 1
Labourer 2.65
Sundries (Labour Only):

EQUIPMENT
Water tank 1000g 0.125
Road Roller (Static) 12 T 0.25
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,766

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-27
Item Name :
Detail Qty
MATERIAL
Polythene Sheet 500 Gauge 110

LABOUR
Skilled Labour 0.0625
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft
Labour Rates Per 100 Sft

2,767

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-28 Unit

Item Name : Supply & spreading 1"-1.5" guage shingle on road surface including
compaction

Detail Qty Unit


MATERIAL
Shingle 122 Cft

LABOUR
Labourer 2 Day
Sundries (Labour Only):

EQUIPMENT
Tractor with blade / 0.0283 Hour
Plough
Water tank 1000g 0.0283 Hour
Road Roller (Static) 12 T 0.0566 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,768

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-29-a-i
Item Name : R.C.C. Pipe Culvert AASHTO M 170 Dia 310 mm
Detail Qty
MATERIAL
Ordinary Portland Cement 4.75
Coarse Sand 24.61
RCC Pipe Class II 310 mm 100
(AASHTO M-170)

LABOUR
Mason 1.524
Labourer 2.3622
Sundries (Labour Only):

EQUIPMENT
Water Tank Tow Type ( 4.572
4000 l )
Pump 4" delivery (Diesel) 1.524
Plate Compactor 12.326
Excavator 1.524

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.
2,769

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-29-a-ii
Item Name : R.C.C. Pipe Culvert Aashto M 170 Dia 380 Mm
Detail Qty
MATERIAL
Ordinary Portland Cement 6.79
Coarse Sand 32.45
RCC Pipe Class II 380 mm 100
(AASHTO M-170)

LABOUR
Mason 1.55
Labourer 2.65
Sundries (Labour Only):

EQUIPMENT
Water Tank Tow Type ( 4.572
4000 l )
Pump 4" delivery (Diesel) 1.524
Plate Compactor 12.581
Excavator 1.524

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,770

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-29-a-iii
Item Name :
Detail Qty
MATERIAL
Ordinary Portland Cement 9.14
Coarse Sand 53.65
Pipe RCC 18" Class-II "B" 99.9994

LABOUR
Mason 6.09
Labourer 18.29
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,771

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-29-b-i
Item Name :
Detail Qty
MATERIAL
Ordinary Portland Cement 15.24
Coarse Sand 80.48
Pipe RCC 24" Class-II "B" 100

LABOUR
Mason 7.6199
Labourer 22.859
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,772

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-29-b-ii
Item Name : R.C.C. Pipe Culvert Aashto M 170 Dia 610 mm.
Detail Qty
MATERIAL
Ordinary Portland Cement 15.24
Coarse Sand 80.48
Pipe RCC 24" Class-II "B" 100

LABOUR
Mason 1.3855
Labourer 2.127
Sundries (Labour Only):

EQUIPMENT
Water Tank Tow Type ( 5.5418
4000 l )
Pump 4" delivery (Diesel) 2.7709
Plate Compactor 13.29
Excavator 4.1564
Light Crane 10 T 0.5

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,773

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-29-c-i
Item Name :
Detail Qty
MATERIAL
Ordinary Portland Cement 18.37
Coarse Sand 107.62
Pipe RCC 30" Class-II "B" 100

LABOUR
Mason 9.1439
Labourer 27.432
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,774

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-29-c-ii
Item Name : R.C.C. Pipe Culvert Aashto M 170 Dia 760 mm
Detail Qty
MATERIAL
Ordinary Portland Cement 18.37
Coarse Sand 107.62
Pipe RCC 30" Class-II "B" 100

LABOUR
Mason 1.3855
Labourer 2.216
Sundries (Labour Only):

EQUIPMENT
Water Tank Tow Type ( 5.5418
4000 l )
Pump 4" delivery (Diesel) 2.7709
Plate Compactor 22.659
Excavator 4.1564
Light Crane 10 T 0.5

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,775

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-29-d-i
Item Name :
Detail Qty
MATERIAL
Ordinary Portland Cement 21.34
Coarse Sand 128.96001
Pipe RCC 36" Class-II "B" 100

LABOUR
Mason 10.667
Labourer 32
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,776

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-29-d-ii
Item Name : R.C.C. Pipe Culvert Aashto M 170 Dia 910 mm
Detail Qty
MATERIAL
Ordinary Portland Cement 21.34
Coarse Sand 128.96001
Pipe RCC 36" Class-II "B" 100

LABOUR
Mason 1.3855
Labourer 2.32
Sundries (Labour Only):

EQUIPMENT
Water Tank Tow Type ( 6.2
4000 l )
Pump 4" delivery (Diesel) 3.265
Plate Compactor 24.875
Excavator 4.95
Light Crane 10 T 0.5

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,777

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-29-e-i Unit
Item Name : Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 1
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 24.39 Bag
Coarse Sand 161.28 Cft
Pipe RCC 42" Class-II "B" 100 Rft
TOTAL
LABOUR
Mason 12.19 Day
Labourer 36.5759 Day
Sundries (Labour Only):
TOTAL
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,778

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-29-e-ii
Item Name : R.C.C. Pipe Culvert Aashto M 170 Dia 1070 mm
Detail Qty
MATERIAL
Ordinary Portland Cement 24.39
Coarse Sand 161.28
Pipe RCC 42" Class-II "B" 100

LABOUR
Mason 2.6894
Labourer 2.57
Sundries (Labour Only):

EQUIPMENT
Water Tank Tow Type ( 6.32
4000 l )
Pump 4" delivery (Diesel) 3.659
Plate Compactor 29.875
Excavator 5.26
Crane 20 T 0.5

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,779

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-29-f-i Unit
Item Name : Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 1
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 27.43 Bag
Coarse Sand 193.59 Cft
Pipe RCC 48" Class-II "B" 100 Rft
TOTAL
LABOUR
Mason 13.72 Day
Labourer 41.148 Day
Sundries (Labour Only):
TOTAL
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,780

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-29-f-ii
Item Name : R.C.C. Pipe Culvert AASHTO M 170 Dia 1220 mm
Detail Qty
MATERIAL
Ordinary Portland Cement 27.43
Coarse Sand 193.59
Pipe RCC 48" Class-II "B" 100

LABOUR
Mason 2.1771
Labourer 2.86
Sundries (Labour Only):

EQUIPMENT
Water Tank Tow Type ( 6.75
4000 l )
Pump 4" delivery (Diesel) 3.895
Plate Compactor 37.85
Excavator 5.487
Crane 20 T 0.5

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,781

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-29-g-i Unit
Item Name : Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 1
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 30.48 Bag
Coarse Sand 215.32001 Cft
Pipe RCC 60" Class-II "B" 100 Rft
TOTAL
LABOUR
Mason 15.2399 Day
Labourer 45.719 Day
Sundries (Labour Only):
TOTAL
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,782

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-29-g-ii
Item Name : R.C.C. Pipe Culvert Aashto M 170 Dia 1520 mm
Detail Qty
MATERIAL
Ordinary Portland Cement 30.48
Coarse Sand 215.32001
Pipe RCC 60" Class-II "B" 100

LABOUR
Mason 2.23
Labourer 2.98
Sundries (Labour Only):

EQUIPMENT
Water Tank Tow Type ( 6.895
4000 l )
Pump 4" delivery (Diesel) 4.33
Plate Compactor 44.256
Excavator 6.25
Crane 20 T 0.5

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,783

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-30
Item Name : Granular Material in Bed to RCC Pipe Culvert
Detail Qty Unit
MATERIAL
Coarse Sand 110.01 Cft

LABOUR
Labourer 0.9344 Day
Sundries (Labour Only):

EQUIPMENT
Water tank 1000g 0.1 Hour
Plate Compactor 0.9344 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,784

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-31
Item Name :
Detail Qty
MATERIAL
Ordinary Portland Cement 17.6194
Coarse Sand 44.2222
Aggregate 2"-1.5" 35.5522
Aggregate 3/4" - 3/8" 40.6633
Aggregate 3/8" - No. 4 12.2222
Curing Compound 3.1463

LABOUR
Mason 0.3146
Labourer 3.9329
Carpenter 1.2585
Sundries (Labour Only):

EQUIPMENT
Concrete Static Mixer 0.9439
0.19 m³ (1/4 Y³)
Concrete Vibrator (Pocker 0.9439
1.5")
Water Tank Tow Type ( 0.9439
4000 l )
Pump 4" delivery (Diesel) 0.3146
Tractor with trolly 0.9439

2,785

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,786

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-32-a Unit

Item Name : Confirmatory Boring including SPT's, samples, lab test bore-hole logs &
Report : Alluvial Soils

Detail Qty
LABOUR
Laboratory Staff Complete 100
Sundries (Labour Only):

EQUIPMENT
Boring Rig : Rotary #1 100

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,787

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-32-b Unit

Item Name : Confirmatory Boring including SPT's, samples, lab test, bore-hole logs,
report : in Gravelly Soil

Detail Qty Unit


LABOUR
Laboratory Staff Complete 100 Ft
Sundries (Labour Only):

EQUIPMENT
Boring Rig: Percussion # 100 Ft
1

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,788

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES


DESCRIPTION OF ITEM :
Item Code : 16-33
Item Name : Pile Load Test Upto 120 Ton
Detail Qty
MATERIAL
Coarse Sand 3107.68994 Cft

LABOUR
Labourer 4.25 Day
Sundries (Labour Only):

EQUIPMENT
Crane 20 T 2
Traile Loe bed 20 T 2

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Job Rs.
Labour Rates Per Job Rs.

2,789

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-34-a
Item Name : Pile Load Testing : Max Load up to 121-240 tonne
Detail Qty Unit
MATERIAL
Steel G-60 Deformed 0.613
Vertical B
Steel G-40 Deformed Helix 0.17
Boring for Cast-in-place 20 M
RCC Piles in Alluvial
Soils : Dia up to 760mm
(16-35-a)
RCC 1:1.5:3 Concrete of 9.7199 M3
Anchorage (06-07-a-02)

EQUIPMENT
Kentlage Load Test 1 Job
Charges upto 240 tonne
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Job Rs.
Labour Rates Per Job Rs.

2,790

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-34-b
Item Name : Pile Load Testing : Max Load 241 - 300 tonne
Detail Qty Unit
MATERIAL
Steel G-60 Deformed 0.613
Vertical B
Steel G-40 Deformed Helix 0.17
Boring for Cast-in-place 20 M
RCC Piles in Alluvial
Soils : Dia up to 760mm
(16-35-a)
RCC 1:1.5:3 Concrete of 9.7199 M3
Anchorage (06-07-a-02)

EQUIPMENT
Kentlage Load Test 1 Job
Charges for 240-300 tonne

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Job Rs.
Labour Rates Per Job Rs.

2,791

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-34-c
Item Name : Pile Load Testing : Max Load 301 - 360 tonne
Detail Qty Unit
MATERIAL
Steel G-60 Deformed 0.613
Vertical B
Steel G-40 Deformed Helix 0.17
Boring for Cast-in-place 20 M
RCC Piles in Alluvial
Soils : Dia up to 760mm
(16-35-a)
RCC 1:1.5:3 Concrete of 9.7199 M3
Anchorage (06-07-a-02)

EQUIPMENT
Kentlage Load Test 1 Job
Charges for 300-360 tonne

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Job Rs.
Labour Rates Per Job Rs.

2,792

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-34-d
Item Name : Pile Load Testing : Max Load 361 - 600 tonne
Detail Qty Unit
MATERIAL
Steel G-60 Deformed 0.613
Vertical B
Steel G-40 Deformed Helix 0.17
Boring for Cast-in-place 20 M
RCC Piles in Alluvial
Soils : Dia up to 760mm
(16-35-a)
RCC 1:1.5:3 Concrete of 9.7199 M3
Anchorage (06-07-a-02)

EQUIPMENT
Kentlage Load Test 1 Job
Charges for 300-600 tonne
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Job Rs.
Labour Rates Per Job Rs.

2,793

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-34-e
Item Name : Pile Load Test Upto 601-900 Ton
Detail Qty Unit
MATERIAL
Steel G-60 Deformed 0.613
Vertical B
Steel G-40 Deformed Helix 0.17
Boring for Cast-in-place 20 M
RCC Piles in Alluvial
Soils : Dia up to 760mm
(16-35-a)
RCC 1:1.5:3 Concrete of 9.7199 M3
Anchorage (06-07-a-02)

EQUIPMENT
Kentlage Load Test 1 Job
Charges for 600-900 tonne

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,794

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-34-f Unit
Item Name : Pile Load test using hydraulic Jack system (601-900) Tonne (Only
Kentlage Load test charges)

Detail Qty Unit


EQUIPMENT
Kentlage Load Test 1 Job
Charges for 600-900 tonne

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Job. Rs.
Labour Rates Per Job. Rs.

2,795

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-34-g Unit

Item Name : Pile load test: (Pre high Strain Dynamic load test as per ASTM D
4945-08 including field data analysis results with report etc complete
Max Load 1100 tons

Detail Qty Unit

MATERIAL
Steel G-60 Deformed 0.613 Tonne
Vertical B
Steel G-40 Deformed Helix 0.17 Tonne
Boring for Cast-in-place 20 M
RCC Piles in Alluvial
Soils : Dia up to 760mm
(16-35-a)
RCC 1:1.5:3 Concrete of 9.7199 M3
Anchorage (06-07-a-02)
TOTAL
EQUIPMENT
Kentlage Load Test 1 Job
Charges for 900-1200
tonne

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Job. Rs.
Labour Rates Per Job. Rs.

2,796

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-35-a
Item Name :
Detail Qty Unit
EQUIPMENT
Boring Rig : Rotary #1 100 Ft

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,797

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-35-b Unit

Item Name : Boring for Cast-in-place RCC Piles in Alluvial Soils : Dia 761 - 1220
mm

Detail Qty Unit


EQUIPMENT
Boring Rig : Rotary # 2 100 Ft

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,798
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-35-c Unit

Item Name : Boring for Cast-in-place RCC Piles in Alluvial Soils : Dia 1221 - 2000
mm

Detail Qty Unit


EQUIPMENT
Boring Rig : Rotary # 3 100 Ft

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,799

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-36-a
Item Name :
Detail Qty
EQUIPMENT
Boring Rig: Percussion # 100
1

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,800

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-36-c Unit

Item Name : Boring with temporary casing in gravely subsoil for 760-1220 mm
diameter pile.

Detail Qty
LABOUR
Laboratory Staff Complete 100
Sundries (Labour Only):

EQUIPMENT
Boring Rig : Percussion 100
#2

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,801

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-36-d Unit

Item Name : Boring with temporary casing in any type of Rock (till appropriate
degree of socket & RQD value not less than 90%) for 720-1220 mm
diameter pile.

Detail Qty Unit

LABOUR
Laboratory Staff Complete 100
Sundries (Labour Only):

EQUIPMENT
Boring Rig : Rotary #1 100
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,802

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :

Item Code : 16-37 Unit

Item Name : Supply fabricate & install welded MS lining in piles of thickness as
per specs/drwg

Detail Qty
MATERIAL
M.S Sheet 100

LABOUR
Labourer 1.5945
Skilled Labour 0.7874
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Kg Rs.
Labour Rates Per 100 Kg Rs.

2,803

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-38-a
Item Name :
Detail Qty Unit
MATERIAL
Bearing Pad (Elastomeric) 1
LABOUR
Labourer 0.0015 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Cubic Inc Rs.
Labour Rates Per Cubic Inc Rs.

2,804

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-38-b
Item Name :
Detail Qty
MATERIAL
Bearing Pad (Steel) 100 Kg

LABOUR
Labourer 1.4764 Day
Black Smith 0.6102 Day
Welder 0.6102 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Kg Rs.
Labour Rates Per 100 Kg Rs.

2,805

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-39 Unit

Item Name : Supply and Fixing spirally wound sheath of 50mm dia. For pre-stressing
of cables in precast conc. Girders

Detail Qty Unit


MATERIAL
Sheath Pipe 110 Ft

LABOUR
Steel Binder / Cutter / 0.9144 Day
Fixer
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,806

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-40 Unit

Item Name : Supply and Fixing stressing anchorages for high tensile steel wire
cables in precast girders

Detail Qty Unit


MATERIAL
Stress Anchor 1 No

LABOUR
Steel Binder / Cutter / 0.15 Day
Fixer
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Set Rs.
Labour Rates Per Set Rs.

2,807

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-41
Item Name :
Detail Qty Unit
LABOUR
Labourer 0.4878 Day
Skilled Labour 0.2439 Day
Mate 0.0305 Day
Sundries (Labour Only):

EQUIPMENT
PSC Girder Launching Test 0.0122 Job

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Ft Rs.
Labour Rates Per Ft Rs.

2,808

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-42
Item Name : Stressing Cable of High Tensile Steel Wire Strands
Detail Qty Unit
LABOUR
Helper 0.9 Day
Stressing Jack Operator 0.3 Day
for Ca
Sundries (Labour Only):

EQUIPMENT
Stressing Jack for Cable 0.333 1 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,809

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-43-a
Item Name :
Detail Qty Unit
MATERIAL
GI Steel Ropes 1/2" Dia 105 Rft

LABOUR
Labourer 1.8288 Day
Sundries (Labour Only):

EQUIPMENT
Pickup 800 CC. 4 x 2 1.524 Hour
Cable Winch (100 T 2.4384 Hour
Capacity)

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100Rft Rs.
Labour Rates Per 100Rft Rs.

2,810

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-43-b
Item Name :
Detail Qty Unit
MATERIAL
GI Steel Ropes 3/4" Dia 105 Rft

LABOUR
Labourer 1.8288 Day
Sundries (Labour Only):
EQUIPMENT
Pickup 800 CC. 4 x 2 1.524 Hour
Cable Winch (100 T 2.4384 Hour
Capacity)

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100Rft Rs.
Labour Rates Per 100Rft Rs.

2,811

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-43-c
Item Name : Providing and fixing GI Steel (Hamp core) Ropes 1" dia
Detail Qty
MATERIAL
GI Steel Ropes 1" Dia 105 Rft

LABOUR
Labourer 1.8288 Day
Sundries (Labour Only):

EQUIPMENT
Pickup 800 CC. 4 x 2 1.524
Cable Winch (100 T 2.4384
Capacity)

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100Rft Rs.
Labour Rates Per 100Rft Rs.

2,812

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-43-d
Item Name : Providing and fixing GI Steel U Grips 1.5" dia
Detail Qty Unit
MATERIAL
GI Steel U Grips 1.5" Dia 1 No

LABOUR
Labourer 0.25 Day
Sundries (Labour Only):

EQUIPMENT
Pickup 800 CC. 4 x 2 0.5 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,813

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-43-e
Item Name : Providing and fixing GI Steel U Grips 1" dia
Detail Qty Unit
MATERIAL
GI Steel U Grips 1" Dia 1 No

LABOUR
Labourer 0.25 Day
Sundries (Labour Only):

EQUIPMENT
Pickup 800 CC. 4 x 2 0.5 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,814

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-43-f
Item Name : Providing and fixing GI Steel U Grips 3/4" dia
Detail Qty Unit
MATERIAL
GI Steel U Grips 3/4" Dia 1 No

LABOUR
Labourer 0.25 Day
Sundries (Labour Only):

EQUIPMENT
Pickup 800 CC. 4 x 2 0.5 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,815

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-43-g
Item Name : Providing and fixing GI Steel Thimble plate 1.5" dia
Detail Qty Unit
MATERIAL
GI Steel Thimble Plate 1 No
1.5" Dia

LABOUR
Labourer 0.25 Day
Sundries (Labour Only):

EQUIPMENT
Pickup 800 CC. 4 x 2 0.5 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,816

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-43-h
Item Name : Providing and fixing GI Steel Thimble plate 1" dia
Detail Qty Unit
MATERIAL
GI Steel Thimble Plate 1" 1 No
Dia

LABOUR
Labourer 0.25 Day
Sundries (Labour Only):

EQUIPMENT
Pickup 800 CC. 4 x 2 0.5 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,817

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-43-i
Item Name : Providing and fixing GI Steel Thimble plate 3/4" dia
Detail Qty Unit
MATERIAL
GI Steel Thimble Plate 1 No
3/4" Dia
LABOUR
Labourer 0.25 Day
Sundries (Labour Only):

EQUIPMENT
Pickup 800 CC. 4 x 2 0.5 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,818

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-43-j
Item Name : Providing and fixing GI Steel Thimble plate 1/2" dia
Detail Qty Unit
MATERIAL
GI Steel Thimble Plate 1 No
1/2" Dia

LABOUR
Labourer 0.25 Day
Sundries (Labour Only):

EQUIPMENT
Pickup 800 CC. 4 x 2 0.5 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,819

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES


DESCRIPTION OF ITEM :
Item Code : 16-44
Item Name : Coupling machine for ropes
Detail Qty Unit
LABOUR
Labourer 1 Day
Sundries (Labour Only):

EQUIPMENT
Coupling Machine for 0.5 Hour
Ropes

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,820

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-45
Item Name : Saddle plate for ropes
Detail Qty Unit
LABOUR
Labourer 1 Day
Sundries (Labour Only):

EQUIPMENT
Saddle Plate for Ropes 1 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,821

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES


DESCRIPTION OF ITEM :
Item Code : 16-46
Item Name : Inject Cement Grout in Sheath Pipe after stressing
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.5 Bag
Coarse Sand 2 Cft

LABOUR
Labourer 1 Day
Stressing Jack Operator 0.3048 Day
for Ca
Sundries (Labour Only):

EQUIPMENT
Grouting Pump Set 0.3048 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,822

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-47
Item Name : Cement Stabilized Sub base
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 8.75 Bag
Aggregate 2"-1.5" 50.9231 Cft
Aggregate 3/4" - 3/8" 178.2308 Cft
Aggregate 3/8" - No. 4 152.7692 Cft
Aggregate No. 4 - No. 200 483.7692 Cft
Crushed aggregate 0.75" 127.3077 Cft
to 1.5

LABOUR
Labourer 0.1307 Day
Sundries (Labour Only):
EQUIPMENT
Static Tandom Roller ( 12 0.1743 Hour
T)
Dumper ( 10 T ) 0.3485 Hour
Batching plant 0.1743 Hour
Aggregate Spreader 4m 0.1743 Hour
wide

2,823

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 1000 Cft Rs.
Labour Rates Per 1000 Cft Rs.

2,824

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-48
Item Name : Liquid Asphalt For Curing Seal, Type Mc-250
Detail Qty Unit
MATERIAL
Asphalt MC 250 1 ton

LABOUR
Labourer 0.3333 Day
Sundries (Labour Only):

EQUIPMENT
Tractor 50 HP 1.3333 Hour
Power Broomer 0.3333 Hour
Bitumen Dist. Tow Type 1 Hour
(2000 Ltr.)

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Ton Rs.
Labour Rates Per Ton Rs.

2,825

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-49
Item Name : Emulsified Asphalt For Curing Seal, Type SS-1
Detail Qty
MATERIAL
Asphalt SS 1 1

LABOUR
Labourer 0.3333
Sundries (Labour Only):

EQUIPMENT
Tractor 50 HP 1.3333
Power Broomer 0.3333
Bitumen Dist. Tow Type 1
(2000 Ltr.)

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Ton Rs.
Labour Rates Per Ton Rs.

2,826

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-50
Item Name : Cement Stabilized Base
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 1.6 Bag
Furnace Oil 82.9117 Ltr
Aggregate 2"-1.5" 14 Cft
Aggregate 3/4" - 3/8" 68 Cft
Aggregate No. 4 - No. 200 16 Cft
Asphalt Grade 60/70 0.1937 Cft

LABOUR
Labourer 1.0194 Day
Sundries (Labour Only):

EQUIPMENT
Front End Loader 1.5 m³ 0.4531 Hour
Static Tandom Roller ( 8 0.9061 Hour
T)
Water Tank Tow Type ( 2.0388 Hour
4000 l )
Tractor 50 HP 0.1133 Hour
Compressor 300 CFM 0.1133 Hour
Asphalt Plant 20T 0.4531 Hour
Paver 2.5M wide 0.4531 Hour

2,827

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,828

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-51 Unit

Item Name : Repair to cracks to reinforced or plain cement concrete work by


grouting with cement gun in (1:2) cement sand mortar including cutting
the chase of required size

Detail Qty Unit

MATERIAL
Ordinary Portland Cement 1.05 Bag
Coarse Sand 2 Cft

LABOUR
Mason 1 Day
Labourer 1 Day
Water Man 0.25 Day
Chiseler 1 Day
Sundries (Labour Only):

EQUIPMENT
Hire Charges of cement 0.5 Hour
gun

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,829

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-52-a Unit

Item Name : Rock SN-Bolts (Grouted Bolts) 25mm dia - 2 m in length including fixing
and stregthening etc.

Detail Qty Unit


MATERIAL
Steel (bars/rods/section) 7.8945 kg
Cementitious Grout 1.6 kg

LABOUR
Skilled Labour 0.0625 Day
Driller 0.0625 Day
Sundries (Labour Only):
EQUIPMENT
Grouting Pump Set 0.2 Hour
Drill Machine 0.5 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,830

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-52-b Unit

Item Name : Rock SN-Bolts (Grouted Bolts) 25mm dia - 3 m in length including fixing
and stregthening etc.

Detail Qty Unit


MATERIAL
Steel (bars/rods/section) 11.8417 kg
Cementitious Grout 2 kg

LABOUR
Skilled Labour 0.0625 Day
Driller 0.0625 Day
Sundries (Labour Only):

EQUIPMENT
Grouting Pump Set 0.2 Hour
Drill Machine 0.5 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,831

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-52-c Unit

Item Name : Rock SN-Bolts (Grouted Bolts) 25mm dia - 4 m in length including fixing
and stregthening etc.

Detail Qty Unit


MATERIAL
Steel (bars/rods/section) 15.7889 kg
Cementitious Grout 2.8 kg

LABOUR
Skilled Labour 0.0625 Day
Driller 0.0625 Day
Sundries (Labour Only):

EQUIPMENT
Grouting Pump Set 0.2 Hour
Drill Machine 0.5 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,832

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-52-d Unit

Item Name : Rock SN-Bolts (Grouted Bolts) 25mm dia - 5 m in length including fixing
and stregthening etc.

Detail Qty Unit


MATERIAL
Steel (bars/rods/section) 19.7362 kg
Cementitious Grout 3.6 kg

LABOUR
Skilled Labour 0.0625 Day
Driller 0.0625 Day
Sundries (Labour Only):

EQUIPMENT
Grouting Pump Set 0.2 Hour
Drill Machine 0.5 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,833

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-53 Unit

Item Name : Cut off projecting wire ends of cables & make good anchorage recess
with 1:2:4 cem. conc.

Detail Qty Unit


MATERIAL
Ordinary Portland Cement 0.148 Bag
Coarse Sand 0.52 Cft
Crushed Aggregate 1.045 Cft

LABOUR
Mason 0.042 Day
Labourer 0.5 Day
Water Man 0.042 Day
Steel Binder / Cutter / 0.042 Day
Fixer
Sundries (Labour Only):

EQUIPMENT
Steel Cutter 0.0333 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,834

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-54 Unit

Item Name : Supply and place in position MS expansion joint assemblies as specified
& as per drawing

Detail Qty
MATERIAL
Steel (bars/rods/section) 104.9958

LABOUR
Mason 1
Labourer 2
Black Smith 1
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Kg Rs.
Labour Rates Per 100 Kg Rs.

2,835

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-55 Unit

Item Name : Supply and place in position galvanised steel 3" dia drain scuppers in
deck slab as per specs/drwg

Detail Qty Unit


MATERIAL
G.I Drain Scupper 1 Ft

LABOUR
Mason 0.05 Day
Labourer 0.1 Day
Steel Binder / Cutter / 0.05 Day
Fixer
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,836

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-56
Item Name : Providing and Fixing rain water outlet of AC pipe
Detail Qty Unit
MATERIAL
A.C.pipe (b) 3" 1.5 Ft

LABOUR
Mason 0.05 Day
Labourer 0.05 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,837

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-57 Unit

Item Name : Supply and Fixing polystrene fill in expansion joints & under
diaphragms at transoms.

Detail Qty Unit


MATERIAL
Polystyrene fill 100 Cft

LABOUR
Labourer 3.766 Day
Carpenter 1.9 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,838

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-58 Unit

Item Name : Providing and Laying expansion joint of neoprene strip 4"x1/4" and
plastic bitumen

Detail Qty Unit


MATERIAL
Neoprene Strip 100 Ft

LABOUR
Skilled Labour 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,839

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-59-a
Item Name : Deep Patching (0-15 Cm)
Detail Qty Unit
MATERIAL
Coarse Sand 500 Cft

LABOUR
Labourer 0.2477 Day
Sundries (Labour Only):

EQUIPMENT
Bull Dozer 90 HP 0.3097 Hour
Motor Grader 140 HP 0.3716 Hour
Water Tank Tow Type ( 1.4864 Hour
4000 l )
Pump 4" delivery (Diesel) 0.2477 Hour
Combination Roller 18T 0.991 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 1000 Sft Rs.
Labour Rates Per 1000 Sft Rs.

2,840

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-59-b
Item Name : Deep Patching (15-30 Cm)
Detail Qty Unit
MATERIAL
Coarse Sand 418 Cft

LABOUR
Labourer 0.2477 Day
Sundries (Labour Only):

EQUIPMENT
Bull Dozer 90 HP 0.3097 Hour
Motor Grader 140 HP 0.3716 Hour
Water Tank Tow Type ( 1.4864 Hour
4000 l )
Pump 4" delivery (Diesel) 0.2477 Hour
Combination Roller 18T 0.991 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 1000 Sft Rs.
Labour Rates Per 1000 Sft Rs.

2,841

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-60
Item Name : Providing and Laying

seal coat, as specified.


Detail Qty Unit
MATERIAL
Coarse Sand 2.5 Cft
1/2" size screened bajri 11.44 Cft
Liquid Asphalt 34 Kg
Wire Brush and Broom 1 No

LABOUR
Labourer 1.4 Day
Sundries (Labour Only):

EQUIPMENT
Static Tandom Roller ( 8 0.167 Hour
T)
Tar Boiler 0.167 Hour
Concrete Mixer 1 bag 0.167 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,842
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-61-a
Item Name : CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT
Detail Qty
MATERIAL
Asphalt MC 70 0.0948

LABOUR
Labourer 0.0387
Sundries (Labour Only):

EQUIPMENT
Water Tank Tow Type ( 0.0155
4000 l )
Tractor 50 HP 0.0619
Pump 4" delivery (Diesel) 0.0155
Power Broomer 0.0619
Bitumen Dist. Tow Type 0.1239
(2000 Ltr.)

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 1000 Sft Rs.
Labour Rates Per 1000 Sft Rs.

2,843

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-61-b
Item Name : CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT.
Detail Qty Unit
MATERIAL
Asphalt MC 70 0.0379 ton

LABOUR
Labourer 0.0155 Day
Sundries (Labour Only):

EQUIPMENT
Tractor 50 HP 0.0248 Hour
Power Broomer 0.0248 Hour
Bitumen Dist. Tow Type 0.0495 Hour
(2000 Ltr.)

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 1000 Sft Rs.
Labour Rates Per 1000 Sft Rs.

2,844

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-62
Item Name : Providing and Laying

coat as specified.
Detail Qty Unit
MATERIAL
Crushed Aggregate 26 Cft
1/2" size screened bajri 10 Cft
Liquid Asphalt 51 Kg
Wire Brush and Broom 1 No

LABOUR
Labourer 1.6 Day
Sundries (Labour Only):

EQUIPMENT
Static Tandom Roller ( 8 0.227 Hour
T)
Tar Boiler 0.227 Hour
Concrete Mixer 1 bag 0.227 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.
2,845

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-63
Item Name : Providing and Laying

coat as specified.
Detail Qty Unit
MATERIAL
Crushed Aggregate 39 Cft
Liquid Asphalt 76 Kg
Wire Brush and Broom 1 No

LABOUR
Labourer 2.2 Day
Sundries (Labour Only):

EQUIPMENT
Static Tandom Roller ( 8 0.394 Hour
T)
Tar Boiler 0.394 Hour
Concrete Mixer 1 bag 0.3939 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,846

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-64 Unit

Item Name : Surface dressing with bitumen 80/100 or any other approved grade on a
primary coat of liquid asphalt (cut backs) of any approved grade primer
at 22lbs&bituman at 35lbs with 5cft of 1/2 standard size bajri per %sft
of road surface complete with rolling.

Detail Qty Unit


MATERIAL
Crushed Aggregate 5.02 Cft
Liquid Asphalt 26 Kg
Wire Brush and Broom 1 No

LABOUR
Labourer 0.015 Day
Water Man 0.0379 Day
Sundries (Labour Only):

EQUIPMENT
Static Tandom Roller ( 8 0.12 Hour
T)
Tar Boiler 0.12 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,847

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-65 Unit

Item Name : Providing and Laying PVC pipe (b) 8" dia in foot path of bridge for
utilities.

Detail Qty Unit


MATERIAL
PVC Pipe (b) 8" 10 Rft

LABOUR
Pipe Layer 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 10 Rft Rs.
Labour Rates Per 10 Rft Rs.

2,848

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-66
Item Name :
Detail Qty Unit
MATERIAL
Coarse Sand 100 Cft

LABOUR
Labourer 2 Day
Dresser 0.2 Day
Water Sprinkler 0.12 Day
Sundries (Labour Only):

EQUIPMENT
Plate Compactor 0.5 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,849

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-67 Unit

Item Name : Formation of shoulder with permeable material Passing less than 7 %
from 200 seive and P.I less than 4 as specified.

Detail Qty Unit


MATERIAL
Pitrun Gravel 1250 Cft

LABOUR
Labourer 3 Day
Dresser 0.2 Day
Water Sprinkler 0.12 Day
Sundries (Labour Only):

EQUIPMENT
Static Tandom Roller ( 8 0.5 Hour
T)
Tractor with blade / 0.5 Hour
Plough

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 1000 Cft Rs.
Labour Rates Per 1000 Cft Rs.

2,850

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-68-a
Item Name : Cold Milling of asphalt concrete 0-30 mm
Detail Qty Unit
LABOUR
Labourer 0.06 Day
Sundries (Labour Only):

EQUIPMENT
Tractor with blade / 0.05 Hour
Plough
Milling Machine / Milling 0.09 1 Hour
Drum

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,851
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-68-b
Item Name : Cold Milling of asphalt concrete 31-50 mm
Detail Qty Unit
LABOUR
Labourer 0.04 Day
Sundries (Labour Only):

EQUIPMENT
Tractor with blade / 0.04 Hour
Plough
Milling Machine / Milling 0.07 1 Hour
Drum

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,852

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-68-c
Item Name : Cold Milling of asphalt concrete 51-70 mm
Detail Qty Unit
LABOUR
Labourer 0.05 Day
Sundries (Labour Only):

EQUIPMENT
Tractor with blade / 0.04 Hour
Plough
Milling Machine / Milling 0.07 1 Hour
Drum

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,853

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-69
Item Name : Seal Coat / Pad Coat
Detail Qty Unit
MATERIAL
Crushed Aggregate 0.75 Cft
Fuel Wood 18.66 Kg
Bitumen (in drums) 6.3 Kg

LABOUR
Labourer 0.36 Day
Skilled Labour 0.03 Day
Sundries (Labour Only):

EQUIPMENT
Static Tandom Roller ( 8 0.08 Hour
T)
Tar Boiler 0.03 Hour
Tractor with trolly 0.03 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,854

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-70 Unit
Item Name : Providing and Laying Asphalt concrete in pot holes/ deep patching upto
30 cm including ramming completel

Detail Qty
MATERIAL
Crushed Aggregate 143.58
Fuel Wood 37.32
Bitumen (in drums) 285

LABOUR
Labourer 5
Skilled Labour 1
Sundries (Labour Only):

EQUIPMENT
Plate Compactor 2
Mini Asphalt Mixer 0.5

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,855

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-71
Item Name : Grooving in existing BT road of size 4x4 cm @ 2 meter c/c.
Detail Qty Unit
LABOUR
Labourer 0.5 Day
Skilled Labour 0.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,856

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-72 Unit

Item Name : Leveling dressing and compaction with power roller of existing base
coarse layer after asphalt scarification.

Detail Qty Unit


LABOUR
Labourer 1.25 Day
Skilled Labour 0.025 Day
Water Sprinkler 0.5 Day
Sundries (Labour Only):

EQUIPMENT
Static Tandom Roller ( 8 0.25 Hour
T)
Tractor with blade / 0.25 Hour
Plough

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,857

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-73-a Unit

Item Name : Providing and fixing kerb stone (12"x18"x6") in cement sand mortar 1:3
in center media or round about as specified.

Detail Qty
MATERIAL
Ordinary Portland Cement 0.89
Coarse Sand 3.4
CC Kerb Block Factory 100
made 12"x 18'' x 6''

LABOUR
Mason 1
Labourer 1.5
Water Man 0.5
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,858

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-73-b Unit

Item Name : Providing and fixing kerb stone (12"x14"x6") in cement sand mortar 1:3
in center media or round about as specified.

Detail Qty
MATERIAL
Ordinary Portland Cement 0.89
Coarse Sand 3.4
CC Kerb Block Factory 100
made 12"x 14'' x 6''

LABOUR
Mason 1
Labourer 1.5
Water Man 0.5
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,859

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-73-c Unit

Item Name : Providing and fixing kerb stone (12"x12"x6") in cement sand mortar 1:3
in center media or round about as specified.

Detail Qty
MATERIAL
Ordinary Portland Cement 0.89
Coarse Sand 3.4
CC Kerb Block Factory 100
made 12"x 12'' x 6''

LABOUR
Mason 1
Labourer 1.5
Water Man 0.5
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,860

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-74-a
Item Name : Bailing out standing water by Mechanical mean.
Detail Qty Unit
LABOUR
Labourer 0.015 Day
Skilled Labour 0.005 Day
Sundries (Labour Only):

EQUIPMENT
Diesel Dewatering Pump 0.05 Hour
1/2 Cs

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,861

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-74-b
Item Name : Bailing out running water by Mechanical mean.
Detail Qty Unit
LABOUR
Labourer 0.015 Day
Skilled Labour 0.005 Day
Sundries (Labour Only):

EQUIPMENT
Diesel Dewatering Pump 0.1 Hour
1/2 Cs

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Cusec Rs.
Labour Rates Per Cusec Rs.

2,862

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-75-a Unit

Item Name : Pavement marking in reflective thermoplast paint with glass beads for
line 15 cm width.

Detail Qty Unit


MATERIAL
Reflective Thermoplast 50 Sft
Paint

LABOUR
Labourer 0.55 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,863

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-75-b Unit

Item Name : Pavement marking in reflective thermoplast paint with glass beads for
line 20 cm width.

Detail Qty Unit


MATERIAL
Reflective Thermoplast 67 Sft
Paint

LABOUR
Labourer 0.733 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,864

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES


DESCRIPTION OF ITEM : Spec. No :
Item Code : 16-75-c Unit

Item Name : Pavement marking in non-reflective thermoplast paint for line 15 cm


width.

Detail Qty Unit


MATERIAL
Thermoplast Paint 50 Sft
(Non-Reflective)

LABOUR
Labourer 0.55 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,865

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-75-d Unit

Item Name : Pavement marking in non-reflective thermoplast paint for line 20 cm


width.

Detail Qty Unit


MATERIAL
Thermoplast Paint 67 Sft
(Non-Reflective)

LABOUR
Labourer 0.7333 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.
2,866

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-76-a Unit

Item Name : Pavement marking in reflective chlorinated rubber paint with glass
beads for line 15 cm width.

Detail Qty Unit


MATERIAL
Chlorinated Rubber Paint 50 Sft
with glass beads

LABOUR
Labourer 0.55 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,867

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-76-b Unit

Item Name : Pavement marking in reflective chlorinated rubber paint with glass
beads for line 20 cm width.

Detail Qty Unit


MATERIAL
Chlorinated Rubber Paint 67 Sft
with glass beads
LABOUR
Labourer 0.733 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,868

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-77-a Unit

Item Name : Pavement marking in reflective chlorinated rubber paint for line 15 cm
width.

Detail Qty Unit


MATERIAL
Non Reflective 50 Sft
Chlorinated Rubber Paint

LABOUR
Labourer 0.55 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,869

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-77-b Unit
Item Name : Pavement marking in reflective chlorinated rubber paint for line 20 cm
width.

Detail Qty Unit


MATERIAL
Non Reflective 67 Sft
Chlorinated Rubber Paint

LABOUR
Labourer 0.733 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,870

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-78
Item Name : Right of Way Marker
Detail Qty Unit
MATERIAL
Rfcnt Steel: Grd-40 KSM 116.6667 Kg
Lean Concrete (06-49-f) 2.1 Cft
Concrete Class A1 39.275 Cft
(06-49-a)

LABOUR
Labourer 5 Day
Sundries (Labour Only):

EQUIPMENT
Tractor with trolly 8 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Each Rs.
Labour Rates Per 100 Each Rs.

2,871
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-79 Unit

Item Name : Providing & laying stone soling in water logged area including granular
filling & compaction complete.

Detail Qty
MATERIAL
Coarse Sand 15
Quarried Stone 100

LABOUR
Mason 0.25
Labourer 1.5
Sundries (Labour Only):

EQUIPMENT
Static Tandom Roller ( 8 1
T)

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,872

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-80 Unit

Item Name : P/L 1" thick Gravel flat stone slabs in pavement with earth filling in
voids

Detail Qty
MATERIAL
Loose Earth 10
Gravel flate stone slab 100
(1" thick)

LABOUR
Mason 3
Labourer 2
Sundries (Labour Only):

EQUIPMENT
Water tank 1000g 0.125
Road Roller (Static) 12 T 0.25

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100Cft Rs.
Labour Rates Per 100Cft Rs.

2,873

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-81
Item Name : Saw Cutting of Asphaltic Layers
Detail Qty
LABOUR
Plumber 0.08
Sundries (Labour Only):

EQUIPMENT
Saw / Wood Cutter Machine 0.25
(Petrol) 45 cc

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Per Cut
Labour Rates Per Per Cut

2,874

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :

Item Code : 16-82


Item Name :
Detail Qty
MATERIAL
Crushed Aggregate 143.58
Asphalt 285

LABOUR
Labourer 0.506
Skilled Labour 0.253
Rake Man 0.23
Sundries (Labour Only):

EQUIPMENT
Procuring/Transport/Layin 5.93
g/Com including
developing of JMF

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft
Labour Rates Per 100 Cft

2,875

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-83-a Unit

Item Name : Jack Anchorage For 20 to 24 Wires 0.5" Strand (Comprising Trumpet,
Stressing Block & Wedges Complete)

Detail Qty Unit


MATERIAL
Jack Anchorage For 20 to 1 Set
24 Wires 0.5" Strand

LABOUR
Steel Binder / Cutter / 0.15 Day
Fixer
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,876

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-83-b Unit

Item Name : Jack Anchorage For 16 to 19 Wires 0.5" Strand (Comprising Trumpet,
Stressing Block & Wedges Complete)

Detail Qty Unit


MATERIAL
Jack Anchorage For 16 to 1 Set
19 Wires 0.5" Strand

LABOUR
Steel Binder / Cutter / 0.119 Day
Fixer
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,877

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-83-c Unit
Item Name : Jack Anchorage For 10 to 12 Wires 0.5" Strand (Comprising Trumpet,
Stressing Block & Wedges Complete)

Detail Qty Unit


MATERIAL
Jack Anchorage For 10 to 1 Set
12 Wires 0.5" Strand

LABOUR
Steel Binder / Cutter / 0.075 Day
Fixer
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,878

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-83-d Unit

Item Name : Jack Anchorage For 13 to 15 Wires 0.5" Strand (Comprising Trumpet,
Stressing Block & Wedges Complete)

Detail Qty Unit


MATERIAL
Jack Anchorage For 13 to 1 Set
15 Wires 0.5" Strand

LABOUR
Steel Binder / Cutter / 0.0938 Day
Fixer
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,879

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-83-e Unit

Item Name : Jack Anchorage For 8 to 9 Wires 0.5" Strand (Comprising Trumpet,
Stressing Block & Wedges Complete)

Detail Qty Unit


MATERIAL
Jack Anchorage For 8 to 9 1 Set
Wires 0.5" Strand

LABOUR
Steel Binder / Cutter / 0.0563 Day
Fixer
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,880

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-83-f Unit

Item Name : Jack Anchorage For 5 to 7 Wires 0.5" Strand (Comprising Trumpet,
Stressing Block & Wedges Complete)

Detail Qty Unit


MATERIAL
Jack Anchorage For 5 to 7 1 Set
Wires 0.5" Strand
LABOUR
Steel Binder / Cutter / 0.0438 Day
Fixer
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,881

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-83-g Unit

Item Name : Jack Anchorage For upto 4 Wires 0.5" Strand (Comprising Trumpet,
Stressing Block & Wedges Complete)

Detail Qty Unit


MATERIAL
Jack Anchorage For upto 4 1 Set
Wires 0.5" Strand

LABOUR
Steel Binder / Cutter / 0.025 Day
Fixer
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,882

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-84-a
Item Name :
Detail Qty
MATERIAL
Un-galvanized Sheath for 1
20 to 24 Wires 0.5"
Strand Cable

LABOUR
Steel Binder / Cutter / 0.0091 Day
Fixer
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,883

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-84-b
Item Name :
Detail Qty
MATERIAL
Un-galvanized Sheath for 1
16 to 19 Wires 0.5"
Strand Cable

LABOUR
Steel Binder / Cutter / 0.0071 Day
Fixer
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,884
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-84-c
Item Name :
Detail Qty
MATERIAL
Un-galvanized Sheath for 1
13 to 15 Wires 0.5"
Strand Cable

LABOUR
Steel Binder / Cutter / 0.0056 Day
Fixer
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,885

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-84-d
Item Name :
Detail Qty
MATERIAL
Un-galvanized sheath for 1
10 to 12 wires 0.5"
Strand cable

LABOUR
Steel Binder / Cutter / 0.0045 Day
Fixer
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,886

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-84-e
Item Name :
Detail Qty
MATERIAL
Un-galvanized Sheath for 1
8 to 9 Wires 0.5" Strand
Cable

LABOUR
Steel Binder / Cutter / 0.0038 Day
Fixer
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,887

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-84-f
Item Name :
Detail Qty
MATERIAL
Un-galvanized Sheath for 1
5 to 7 Wires 0.5" Strand
Cable

LABOUR
Steel Binder / Cutter / 0.0026 Day
Fixer
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,888

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-84-g
Item Name :
Detail Qty
MATERIAL
Un-galvanized Sheath for 1
upto 4 Wires 0.5" Strand
Cable

LABOUR
Steel Binder / Cutter / 0.0015 Day
Fixer
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,889

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-84-h
Item Name :
Detail Qty Unit
LABOUR
Helper 0.9 Day
Stressing Jack Operator 0.25 Day
for St
Sundries (Labour Only):

EQUIPMENT
Stressing Jack for Strand 2 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,890

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-84-i Unit

Item Name : Stressing and Grouting for Cables ranging from 13/0.5" to 24/.05"
(Single End Stressing).

Detail Qty Unit


LABOUR
Helper 0.6 Day
Stressing Jack Operator 0.2 Day
for St
Sundries (Labour Only):

EQUIPMENT
Stressing Jack for Strand 1.4 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,891

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-84-j
Item Name :
Detail Qty Unit
LABOUR
Helper 0.4 Day
Stressing Jack Operator 0.15 Day
for St
Sundries (Labour Only):

EQUIPMENT
Stressing Jack for Strand 1.05 Hour

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,892

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-85-a Unit

Item Name : Supply of High Tensile Pre-stressed concrete steel wire strand Grade
270K 0.5" dia. Packed in standard reeless/weldless coils of two 2000
kgs approximately binded and wraped in Hessian Cloth.

Detail Qty Unit

MATERIAL
Supply of High Tensile 1 Tonne
Pre-stressed concrete
steel wire strand

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Tonne Rs.
Labour Rates Per Tonne Rs.

2,893

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-85-b Unit

Item Name : Supply of P.C Steel wire Dia 4 mm and 5 mm. Packed in reeless coils of
600 kgs to 800kgs properly binded.

Detail Qty Unit


MATERIAL
High Tensile Steel 1000 Kg

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per tonne Rs.
Labour Rates Per tonne Rs.

2,894

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-85-c Unit

Item Name : Supply of P.C Steel wire Dia 4 mm and 5 mm. Packed in reeless coils of
600 kgs to 800kgs properly binded.

Detail Qty Unit


MATERIAL
Supply of P.C Steel wire 1 Tonne
Dia 4 mm and 5 mm.

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Tonne Rs.
Labour Rates Per Tonne Rs.

2,895

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-86-a
Item Name :
Detail Qty
MATERIAL
Galvanized Sheath for 20 1
to 24 Wires 0.5" Strand
Cable

LABOUR
Steel Binder / Cutter / 0.0091 Day
Fixer
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,896

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-86-b
Item Name :
Detail Qty
MATERIAL
Galvanized Sheath for 16 1
to 19 Wires 0.5" Strand
Cable

LABOUR
Steel Binder / Cutter / 0.0071 Day
Fixer
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,897

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-86-c
Item Name :
Detail Qty
MATERIAL
Galvanized Sheath for 13 1
to 15 Wires 0.5" Strand
Cable

LABOUR
Steel Binder / Cutter / 0.0056 Day
Fixer
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,898

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-86-d
Item Name :
Detail Qty
MATERIAL
Galvanized Sheath for 10 1
to 12 Wires 0.5" Strand
Cable

LABOUR
Steel Binder / Cutter / 0.0045 Day
Fixer
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,899

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-86-e
Item Name :
Detail Qty
MATERIAL
Galvanized Sheath for 8 1
to 9 Wires 0.5" Strand
Cable

LABOUR
Steel Binder / Cutter / 0.0038 Day
Fixer
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,900

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-86-f
Item Name :
Detail Qty
MATERIAL
Galvanized Sheath for 5 1
to 7 Wires 0.5" Strand
Cable

LABOUR
Steel Binder / Cutter / 0.0026 Day
Fixer
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,901

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-86-g
Item Name :
Detail Qty
MATERIAL
Galvanized Sheath for 1
upto 4 Wires 0.5" Strand
Cable
LABOUR
Steel Binder / Cutter / 0.0015 Day
Fixer
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,902

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-87-a Unit

Item Name : Precast Reinfored Concrete Kerb New Jersy Barrier for Median (Double
Face)

Detail Qty
MATERIAL
Form Work with M.S. Pipe 51.04 Sft
scaffolding & M.S Plates
(Material) on Rental
Basis - Horizontal
Steel G-60 Deformed Bars 69.088 Kg
PCC (1:4:8) 7.77 Cft
PCC (1:2:4) 24.036 Cft

LABOUR
Mason 1.5 Day
Labourer 1.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 8 Rft Rs.
Labour Rates Per 8 Rft Rs.

2,903

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-87-b Unit

Item Name : Precast Reinforced Concrete Kerb New Jersy Barrier for Bridge (Single
Face)

Detail Qty
MATERIAL
Form Work With M.S. Pipe 51.04
scaffolding & M.S Plates
(Material) on Rental
Basis - Vertical
Steel G-60 Deformed Bars 52.324
PCC (1:4:8) 5.83
PCC (1:2:4) 15.71

LABOUR
Mason 1.5
Labourer 1.25
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 8 Rft
Labour Rates Per 8 Rft

2,904

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-88-a
Item Name : Metal Guard Rail
Detail Qty Unit
MATERIAL
Metal Guard Rail 1 1 Rft

LABOUR
Helper 0.023 Day
Welder 0.024 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,905

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-88-b
Item Name : Metal Guard Rail End Pieces
Detail Qty Unit
MATERIAL
Metal Guard Rail End 1 1 Rft
Pieces

LABOUR
Helper 0.03 Day
Welder 0.03 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,906

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-88-c
Item Name : Steel Post of Metal Guard Rail
Detail Qty Unit
MATERIAL
Steel Post C 150 x 100 x 27.1 Kg
5

LABOUR
Labourer 0.2 Day
Sundries (Labour Only):

EQUIPMENT
Tractor with trolly 0.1 Hour
Tractor with blade / 0.4 Hour
Plough

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,907

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-89-a
Item Name :
Detail Qty
MATERIAL
Ordinary Portland Cement 0.2166
Coarse Sand 0.41
Rfcnt Steel: Grd-40 KSM 3.3085
Aggregate 3/8" - No. 4 0.4
Aggregate No. 4 - No. 200 0.485
Curing Compound 0.0637

LABOUR
Mason 0.0142
Labourer 0.1557
Carpenter 0.0142
Black Smith 0.0035
Sundries (Labour Only):

EQUIPMENT
Concrete Static Mixer 0.0283
0.19 m³ (1/4 Y³)
Water Tank Tow Type ( 0.0142
4000 l )
Tractor 50 HP 0.0142
Pump 4" delivery (Diesel) 0.0071

2,908

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Cft Rs.
Labour Rates Per Cft Rs.

2,909

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM :
Item Code : 16-89-b
Item Name : Concrete Post For Guardrail
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.2166 Bag
Coarse Sand 0.41 Cft
Rfcnt Steel: Grd-40 KSM 3.3085 Kg
Aggregate 3/8" - No. 4 0.4 Cft
Aggregate No. 4 - No. 200 0.485 Cft
Curing Compound 0.0637 Ltr

LABOUR
Mason 0.0142 Day
Labourer 0.1557 Day
Carpenter 0.0142 Day
Black Smith 0.0035 Day
Sundries (Labour Only):

EQUIPMENT
Concrete Static Mixer 0.0283 Hour
0.19 m³ (1/4 Y³)
Water Tank Tow Type ( 0.0142 Hour
4000 l )
Pump 4" delivery (Diesel) 0.0071 Hour

TOTAL EQUIPMENT 5.21

2,910

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Cft Rs.
Labour Rates Per Cft Rs.

2,911

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-90-a Unit

Item Name : Sand Asphalt (Plant Mixed) layer for sealing cracked road surface
(Asphalt content 6.3%) having average thickness 1.25 cm

Detail Qty Unit


MATERIAL
Bitumen 401.03 kg
Stone Dust (Sand 175.50999 Cft
Equivalent >75)
TOTAL
LABOUR
Labourer 0.566 Day
Skilled Labour 0.283 Day
Rake Man 0.283 Day
Sundries (Labour Only):
TOTAL
EQUIPMENT
Procuring/Transport/Layin 6.37 Tonne
g/Com including
developing of JMF

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,912

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 16 , ROADS AND BRIDGES

DESCRIPTION OF ITEM : Spec. No :


Item Code : 16-90-b Unit

Item Name : Sand Asphalt (Plant Mixed) layer for sealing cracked road surface
(Asphalt content 6.3%) having average thickness 1.25 cm

Detail Qty Unit


MATERIAL
Bitumen 16.449 kg
Stone Dust (Sand 7.199 Cft
Equivalent >75)
TOTAL
LABOUR
Labourer 0.0232 Day
Skilled Labour 0.0116 Day
Rake Man 0.0116 Day
Sundries (Labour Only):
TOTAL
EQUIPMENT
Procuring/Transport/Layin 0.2613 Tonne
g/Com including
developing of JMF

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,913

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM :
Item Code : 17-01-a
Item Name : Formation, dressing and preparing sub-grade in bed
Detail Qty Unit
LABOUR
Labourer 0.616 Day
Dresser 0.264 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,914

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM :
Item Code : 17-01-b
Item Name : Formation, dressing and preparing sub-grade on slope
Detail Qty Unit
LABOUR
Labourer 0.8 Day
Dresser 0.4 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,915

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS


DESCRIPTION OF ITEM :
Item Code : 17-02
Item Name :
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.5 Bag
Fine Sand 18 Cft

LABOUR
Mason 0.4 Day
Labourer 1.2 Day
Water Man 0.4 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,916

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM :
Item Code : 17-03-a
Item Name : 1/2" thick plaster of cement, sand motar 1:10 in bed
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.34 Bag
Fine Sand 4.2 Cft

LABOUR
Mason 0.264 Day
Labourer 0.8 Day
Water Man 0.4 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,917
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM :
Item Code : 17-03-b
Item Name : 1/2" thick plaster of cement, sand motar 1:10 On slope
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.34 Bag
Fine Sand 4.2 Cft

LABOUR
Mason 0.4 Day
Labourer 1 Day
Water Man 0.4 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,918

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM :
Item Code : 17-04-a
Item Name : 1«" thick plaster of cement, sand mortar 1:6 in bed
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 1.65 Bag
Fine Sand 11.7 Cft

LABOUR
Mason 0.4 Day
Labourer 1 Day
Water Man 0.4 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,919

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM :
Item Code : 17-04-b
Item Name : 1" thick plaster of cement, sand mortar 1:6 On slope
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 1.65 Bag
Fine Sand 11.7 Cft

LABOUR
Mason 0.6 Day
Labourer 1.2 Day
Water Man 0.4 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,920

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM :
Item Code : 17-05-a
Item Name : 3/8" thick plaster of cement, sand mortar 1:3 in bed
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.71 Bag
Fine Sand 2.5 Cft
LABOUR
Labourer 0.8 Day
Water Man 0.4 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,921

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM :
Item Code : 17-05-b
Item Name : 3/8" thick plaster of cement, sand mortar 1:3 On slope
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.71 Bag
Fine Sand 2.5 Cft

LABOUR
Mason 0.5 Day
Labourer 1.25 Day
Water Man 0.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,922

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM : Spec. No :


Item Code : 17-06-a Unit
Item Name : Lining with Brick tiles 12"x6"x2", in c/s mortar 1:6 over a layer of
1/8" thick c/s mortar 1:6 (in bed)

Detail Qty
MATERIAL
Ordinary Portland Cement 3.44
Fine Sand 25.7
Brick Tile (12"x6"x2") 1200

LABOUR
Mason 2.5
Labourer 5
Water Man 0.75
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,923

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM : Spec. No :


Item Code : 17-06-b Unit

Item Name : Lining with Brick tiles 12"x6"x2", in c/s mortar 1:6 over a layer of
1/8" thick c/s mortar 1:6 (On slope)

Detail Qty
MATERIAL
Ordinary Portland Cement 3.44
Fine Sand 25.7
Brick Tile (12"x6"x2") 1200

LABOUR
Mason 2.75
Labourer 6
Water Man 0.75
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,924

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM : Spec. No :


Item Code : 17-07-a Unit

Item Name : Lining with Brick tiles 12"x6"x2", in c/s mortar 1:3 over a layer of
1/8" thick c/s mortar 1:3 (in bed)

Detail Qty
MATERIAL
Ordinary Portland Cement 6
Fine Sand 22.5
Brick Tile (12"x6"x2") 1200

LABOUR
Mason 2.5
Labourer 5
Water Man 0.75
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,925

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM : Spec. No :


Item Code : 17-07-b Unit

Item Name : Lining with Brick tiles 12"x6"x2", in c/s mortar 1:3 over a layer of
1/8" thick c/s mortar 1:3 (On slope)
Detail Qty
MATERIAL
Ordinary Portland Cement 6
Fine Sand 22.5
Brick Tile (12"x6"x2") 1200

LABOUR
Mason 2.75
Labourer 6
Water Man 0.75
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,926

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM : Spec. No :


Item Code : 17-08-a Unit

Item Name : Lining with bricks 9"x4.5"x3" (First Class) in c/s mort. 1:6 ove a
layer of 1/8" thick c/s mortar 1:6 (in bed)

Detail Qty
MATERIAL
Ordinary Portland Cement 3.44
Fine Sand 25.7
Burnt Brick 1350

LABOUR
Mason 2.5
Labourer 5
Water Man 0.75
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.
2,927

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM : Spec. No :


Item Code : 17-08-b Unit

Item Name : Lining with bricks 9"x4.5"x3" (First Class), in c/s mort. 1:6 over a
layer of 1/8" thick c/s mortar 1:6 (On slope)

Detail Qty
MATERIAL
Ordinary Portland Cement 3.44
Fine Sand 25.7
Burnt Brick 1350

LABOUR
Mason 2.75
Labourer 6
Water Man 0.75
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,928

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM : Spec. No :


Item Code : 17-09-a Unit

Item Name : Lining with bricks 9"x4.5"x3" (First Class), in c/s mort. 1:3 over a
layer of 1/8" thick c/s mortar 1:3 (in bed)

Detail Qty
MATERIAL
Ordinary Portland Cement 6
Fine Sand 22.5
Burnt Brick 1350

LABOUR
Mason 2.5
Labourer 5
Water Man 0.75
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,929

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM : Spec. No :


Item Code : 17-09-b Unit

Item Name : Lining with bricks 9"x4.5"x3" (First Class), in c/s mort. 1:3 over a
layer of 1/8" thick c/s mortar 1:3 (On slope)

Detail Qty
MATERIAL
Ordinary Portland Cement 6
Fine Sand 22.5
Burnt Brick 1350

LABOUR
Mason 2.75
Labourer 6
Water Man 0.75
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,930

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM : Spec. No :

Item Code : 17-10-a-01 Unit

Item Name : 4" thick PCC lining, using washed screened & graded/curshed stone
aggregate : in bed : Ratio 1:2:4

Detail Qty
MATERIAL
Ordinary Portland Cement 17.62
Fine Sand 44
1/2" size screened bajri 88

LABOUR
Mason 1
Labourer 6
Water Man 0.5
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,931

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM : Spec. No :

Item Code : 17-10-a-02 Unit

Item Name : 4" thick PCC lining, using washed screened & graded/curshed stone
aggregate : in bed : Ratio 1:3:6

Detail Qty
MATERIAL
Ordinary Portland Cement 13
Fine Sand 46
1/2" size screened bajri 92

LABOUR
Mason 1
Labourer 6
Water Man 0.5
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,932

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM : Spec. No :

Item Code : 17-10-a-03 Unit

Item Name : 4" thick PCC lining, using washed screened & graded/curshed stone
aggregate : in bed : Ratio 1:4:8

Detail Qty
MATERIAL
Ordinary Portland Cement 9
Fine Sand 48
1/2" size screened bajri 96

LABOUR
Mason 1
Labourer 6
Water Man 0.5
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,933

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM : Spec. No :

Item Code : 17-10-b-01 Unit

Item Name : 4" thick PCC lining, using washed screened & graded/curshed stone
aggregate : On slope : Ratio 1:2:4

Detail Qty
MATERIAL
Ordinary Portland Cement 17.62
Fine Sand 44
1/2" size screened bajri 88

LABOUR
Mason 1.25
Labourer 7
Water Man 0.5
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,934

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM : Spec. No :

Item Code : 17-10-b-02 Unit

Item Name : 4" thick PCC lining, using washed screened & graded/curshed stone
aggregate : On slope : Ratio 1:3:6

Detail Qty
MATERIAL
Ordinary Portland Cement 13
Fine Sand 46
1/2" size screened bajri 92

LABOUR
Mason 1.25
Labourer 7
Water Man 0.5
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,935

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM : Spec. No :

Item Code : 17-10-b-03 Unit

Item Name : 4" thick PCC lining, using washed screened & graded/curshed stone
aggregate : On slope : Ratio 1:4:8

Detail Qty
MATERIAL
Ordinary Portland Cement 9
Fine Sand 48
1/2" size screened bajri 96

LABOUR
Labourer 0.5
Carpenter 1.25
Hammer Man 7
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,936

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM : Spec. No :


Item Code : 17-11-a Unit

Item Name : Providing and laying Pre-cast parabolic segments, moulded with cement
concrete 1:1-1/2:3, including lowering in water channels to correct
alignment and grade, jointing, finishing where necessary, complete in
all respects:- Top width- 14" (360mm) & Total Depth- 9"(225mm)

Detail Qty
MATERIAL
Ordinary Portland Cement 0.0083
Fine Sand 0.0833
Pre-Cast Parabolic 1
Segments(3' Length)
360mm x 225mm (14"x9")

LABOUR
Mason 0.03 Day
Labourer 0.04 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,937

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM : Spec. No :


Item Code : 17-11-b Unit

Item Name : Providing and laying Pre-cast parabolic segments, moulded with cement
concrete 1:1-1/2:3, including lowering in water channels to correct
alignment and grade, jointing, finishing where necessary,excluding
carriage, complete in all respects:- Top width- 18" (457mm) & Total
Depth- 12"(305mm)
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.013 Bag
Fine Sand 0.125 Cft
Pre-Cast Parabolic 1 RFT
Segments(3' Length)
457mm x 305mm (18"x12")

LABOUR
Mason 0.035 Day
Labourer 0.045 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,938

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM : Spec. No :


Item Code : 17-11-c Unit

Item Name : Providing and laying Pre-cast parabolic segments, moulded with cement
concrete 1:1-1/2:3, including lowering in water channels to correct
alignment and grade, jointing, finishing where necessary, etc. complete
in all respects:- Top width- 24" (600mm) & Total Depth- 14"(360mm)

Detail Qty Unit


MATERIAL
Ordinary Portland Cement 0.02 Bag
Fine Sand 0.17 Cft
Pre-Cast Parabolic 1 RFT
Segments(3' Length)
600mm x 360mm (24"x14")

LABOUR
Mason 0.04 Day
Labourer 0.05 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,939

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM : Spec. No :


Item Code : 17-11-d Unit

Item Name : Providing and laying Pre-cast parabolic segments, moulded with cement
concrete 1:1-1/2:3,including lowering in water channels to correct
alignment and grade, jointing, finishing where necessary, etc. complete
in all respects:- Top width- 25.5" (640mm) & Total Depth- 18"(460mm)

Detail Qty Unit


MATERIAL
Ordinary Portland Cement 0.03 Bag
Fine Sand 0.25 Cft
Pre-Cast Parabolic 1 RFT
Segments(3' Length)
640mm x 460mm (24" x 18")

LABOUR
Mason 0.05 Day
Labourer 0.06 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,940

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS


DESCRIPTION OF ITEM : Spec. No :
Item Code : 17-11-e Unit

Item Name : Providing and laying Pre-cast parabolic segments, moulded with cement
concrete 1:1-1/2:3, excluding carriage, lowering in water channels to
correct alignment and grade, jointing, finishing where necessary, etc.
complete in all respects:- Top width- 27" (675mm) & Total Depth-
19"(480mm)

Detail Qty Unit


MATERIAL
Ordinary Portland Cement 0.04 Bag
Fine Sand 0.35 Cft
Pre-Cast Parabolic 1 RFT
Segments(3' Length)
675mm x 480mm (27" x 18")

LABOUR
Mason 0.06 Day
Labourer 0.07 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,941

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 17 , LINING OF CANALS

DESCRIPTION OF ITEM : Spec. No :


Item Code : 17-11-f Unit

Item Name : Providing and laying Pre-cast parabolic segments, moulded with cement
concrete 1:1-1/2:3, excluding carriage, lowering in water channels to
correct alignment and grade, jointing, finishing where necessary, etc.
complete in all respects:- Top width- 30" (760mm) & Total Depth-
21"(525mm)

Detail Qty Unit


MATERIAL
Ordinary Portland Cement 0.055 Bag
Fine Sand 0.5 Cft
Pre-Cast Parabolic 1 RFT
Segments(3' Length)
760mm x 530mm (30" x 21")

LABOUR
Mason 0.075 Day
Labourer 0.09 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,942

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 18 , SHEET PILING

DESCRIPTION OF ITEM :
Item Code : 18-01
Item Name : Cutting Ransome & Larson piles.
Detail Qty Unit
LABOUR
Black Smith 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,943

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 18 , SHEET PILING

DESCRIPTION OF ITEM :
Item Code : 18-02
Item Name : Cutting universal piles
Detail Qty Unit
LABOUR
Black Smith 0.375 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,944

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 18 , SHEET PILING

DESCRIPTION OF ITEM :
Item Code : 18-03-a
Item Name : Driving steel piles to depth of: Upto 15'
Detail Qty Unit
LABOUR
Labourer 0.016 Day
Skilled Labour 0.02 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,945

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 18 , SHEET PILING

DESCRIPTION OF ITEM :
Item Code : 18-03-b
Item Name : Driving steel piles to depth of: More than 15' to 25'
Detail Qty Unit
LABOUR
Labourer 0.016 Day
Skilled Labour 0.032 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,946

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 18 , SHEET PILING

DESCRIPTION OF ITEM :
Item Code : 18-03-c
Item Name : Driving steel piles to depth of: More than 25' to 30'
Detail Qty Unit
LABOUR
Labourer 0.016 Day
Skilled Labour 0.034 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.

2,947

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 18 , SHEET PILING

DESCRIPTION OF ITEM :
Item Code : 18-04
Item Name : Dolleying piles upto 5'
Detail Qty Unit
LABOUR
Labourer 0.22 Day
Dolleyman 0.27 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,948

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 18 , SHEET PILING

DESCRIPTION OF ITEM :
Item Code : 18-05
Item Name : Drilling holes in piles by hand
Detail Qty Unit
LABOUR
Black Smith 0.033 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,949

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 18 , SHEET PILING

DESCRIPTION OF ITEM :
Item Code : 18-06
Item Name : Raising and lowering machine
Detail Qty Unit
LABOUR
Labourer 4.38 Day
Skilled Labour 8.75 Day
Fitter 2.19 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,950

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 18 , SHEET PILING

DESCRIPTION OF ITEM :
Item Code : 18-07-a
Item Name : Turning Machine : 90
Detail Qty Unit
LABOUR
Labourer 4 Day
Skilled Labour 2.4 Day
Fitter 0.8 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Job Rs.
Labour Rates Per Job Rs.

2,951

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 18 , SHEET PILING

DESCRIPTION OF ITEM :
Item Code : 18-07-b
Item Name : Turning Machine : 135
Detail Qty Unit
LABOUR
Labourer 4 Day
Skilled Labour 4 Day
Fitter 0.8 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Job Rs.
Labour Rates Per Job Rs.

2,952

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 18 , SHEET PILING

DESCRIPTION OF ITEM :
Item Code : 18-07-c
Item Name : Turning Machine : 180
Detail Qty Unit
LABOUR
Labourer 5.6 Day
Skilled Labour 5.6 Day
Fitter 0.8 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Job Rs.
Labour Rates Per Job Rs.

2,953

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 18 , SHEET PILING

DESCRIPTION OF ITEM :
Item Code : 18-08
Item Name : Travelling machine (light)
Detail Qty Unit
LABOUR
Labourer 5.7912 Day
Skilled Labour 9.6317 Day
Fitter 1.9202 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,954

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 18 , SHEET PILING


DESCRIPTION OF ITEM :
Item Code : 18-09
Item Name : Loading and unloading piles
Detail Qty Unit
LABOUR
Labourer 0.433 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per tonne Rs.
Labour Rates Per tonne Rs.

2,955

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 18 , SHEET PILING

DESCRIPTION OF ITEM :
Item Code : 18-10
Item Name : Carriage of piling machine under different conditions
Detail Qty Unit
LABOUR
Labourer 2.4079 Day
Skilled Labour 3.9929 Day
Fitter 0.7925 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.

2,956

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 18 , SHEET PILING

DESCRIPTION OF ITEM :
Item Code : 18-11
Item Name : Erecting piling machines
Detail Qty Unit
LABOUR
Labourer 15.613 Day
Skilled Labour 26.105 Day
Fitter 5.203 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,957

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 18 , SHEET PILING

DESCRIPTION OF ITEM :
Item Code : 18-12
Item Name : Dismantling piling machine
Detail Qty Unit
LABOUR
Labourer 14.87 Day
Skilled Labour 24.862 Day
Fitter 4.956 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,958

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 18 , SHEET PILING

DESCRIPTION OF ITEM : Spec. No :


Item Code : 18-13 Unit

Item Name : Hire charges of piling plant with accessories including fuel, pay of
operator and other mechanical staff, mobilization, demobilization and
idle time

Detail Qty Unit

EQUIPMENT
Piling plant including 1 Day

fuel, pay of operator and


other mechanical staff,
mobilization,
demobilization and idle
time

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per per day Rs.
Labour Rates Per per day Rs.

2,959

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-01 Unit

Item Name : Cutting pilchi, frash or sarkanda including carriage within one mile.
(1.6 km.)

Detail Qty Unit


LABOUR
Labourer 1.52 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,960

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM :
Item Code : 19-02
Item Name : Weaving matresses
Detail Qty Unit
LABOUR
Labourer 3.6 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,961

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-03-a Unit

Item Name : Supply & filling used synthetic fibre/plastic bags 1.25cft capacity
with sand or earth, sewing & stacking : in dry

Detail Qty Unit


MATERIAL
Used Synthetic 1 No
fibre/Plastic Bags

LABOUR
Labourer 0.081 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,962

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-03-b Unit

Item Name : Supply & filling used synthetic fibre/plastic bags 1.25cft capacity
with sand or earth, sewing & stacking : Under water

Detail Qty Unit


MATERIAL
Used Synthetic 1 No
fibre/Plastic Bags

LABOUR
Labourer 0.101 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,963

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-03-c Unit

Item Name : Supplying and filling used jute bags, 1.25 cft capacity with sand or
earth, sewing and stacking: in dry.

Detail Qty Unit


MATERIAL
Used Jute bags 1.25 cft 1 No

LABOUR
Labourer 0.081 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,964

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-03-d Unit

Item Name : Supplying and filling used jute bags 1.25 cft capacity with sand or
earth, sewing & stacking : Under Water

Detail Qty Unit


MATERIAL
Used Jute bags 1.25 cft 1 No

LABOUR
Labourer 0.101 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,965

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-04-a Unit

Item Name : Supply & filling new synthetic fibre/plastic bags 4-5cft capacity with
sand or earth,sewing, stacking : in dry

Detail Qty Unit


MATERIAL
New Synthetic 1 No
fibre/plastic Bag 4-5 cft
capacity

LABOUR
Labourer 0.324 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,966

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-04-b Unit

Item Name : Supply & filling new synthetic fibre/plastic bags 4-5cft capacity with
sand or earth,sewing, stacking : Under water

Detail Qty Unit


MATERIAL
New Synthetic 1 No
fibre/plastic Bag 4-5 cft
capacity

LABOUR
Labourer 0.404 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,967

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION


DESCRIPTION OF ITEM : Spec. No :
Item Code : 19-04-c Unit

Item Name : Supply & filling used jute bags 4-5 cft capacity with sand or earth,
sewing & stacking : in dry

Detail Qty Unit


MATERIAL
Used Jute bags (Cotton 1 No
Bags) 4-5 cft

LABOUR
Labourer 0.324 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,968

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-04-d Unit

Item Name : Supply & filling used jute bags 4-5 capacity with sand or earth, sewing
& stacking : Under Water

Detail Qty Unit


MATERIAL
Used Jute bags (Cotton 1 No
Bags) 4-5 cft

LABOUR
Labourer 0.404 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,969

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-05-a Unit

Item Name : Carriage of synthetic fibre/plastic bags 1.25 cft capacity filled with
sand / earth : 1st 50 m

Detail Qty Unit


LABOUR
Labourer 0.41 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 No. Rs.
Labour Rates Per 100 No. Rs.

2,970

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-05-b Unit

Item Name : Carriage of synthetic fibre/plastic bags 1.25 cft capacity filled with
sand / earth : 2nd & 3rd 50 m

Detail Qty Unit


LABOUR
Labourer 0.31 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100No/50m Rs.
Labour Rates Per 100No/50m Rs.
2,971

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-05-c Unit

Item Name : Carriage of synthetic fibre/plastic bags 1.25 cft capacity filled with
sand / earth : 4th and subsequent 50 m

Detail Qty Unit


LABOUR
Labourer 0.034 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100No/50m Rs.
Labour Rates Per 100No/50m Rs.

2,972

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-06-a Unit

Item Name : Carriage of new synthetic fibre/plastic bags 4-5 cft capacity filled
with sand/earth : 1st 50 m

Detail Qty Unit


LABOUR
Labourer 1.64 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100No/50m Rs.
Labour Rates Per 100No/50m Rs.
2,973

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-06-b Unit

Item Name : Carriage of new synthetic fibre/plastic bags 4-5 cft capacity filled
with sand/earth : 2nd & 3rd 50 m

Detail Qty Unit


LABOUR
Labourer 1.24 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100No/50m Rs.
Labour Rates Per 100No/50m Rs.

2,974

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-06-c Unit

Item Name : Carriage of new synthetic fibre/plastic bags 4-5 cft capacity filled
with sand/earth : 4th & subsequent 50 m

Detail Qty Unit


LABOUR
Labourer 0.136 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100No/50m Rs.
Labour Rates Per 100No/50m Rs.
2,975

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-07-a Unit

Item Name : Rolling matresses to river edge & floating, after unrolling with area :
Upto 200 m2

Detail Qty Unit


LABOUR
Labourer 1.1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,976

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-07-b Unit

Item Name : Rolling matresses to river edge & floating, after unrolling with area :
Over 200 to 250 m2

Detail Qty Unit


LABOUR
Labourer 1.75 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.
2,977

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-07-c Unit

Item Name : Rolling matresses to river edge & floating, after unrolling with area :
Over 250 m2

Detail Qty Unit


LABOUR
Labourer 2.09 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,978

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM :
Item Code : 19-08
Item Name : Sewing empty cement bags in sheets
Detail Qty Unit
MATERIAL
Jute String 0.91 Kg

LABOUR
Labourer 1.45 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 No. Rs.
Labour Rates Per 100 No. Rs.
2,979

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-09 Unit

Item Name : Making compact round pilchi, frash or sarkanda round bundles of
specified size for the work

Detail Qty Unit


LABOUR
Labourer 1.95 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,980

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-10 Unit

Item Name : Launching the bundles mentioned in Item 19-09 above & placing in
position

Detail Qty Unit


LABOUR
Labourer 1.2 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.
2,981

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-11-a Unit

Item Name : Supply and staking within 150m (500 feet) : Boulders 9" (225 m) and
above

Detail Qty Unit


LABOUR
Labourer 2.896 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,982

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM :
Item Code : 19-11-b
Item Name : Supply within 150m (500 feet) : Over size shingle 3" to 9"
Detail Qty Unit
LABOUR
Labourer 1.936 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,983

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM :
Item Code : 19-11-c
Item Name : Supply within 150m (500 feet): Mixed graded shingle
Detail Qty Unit
LABOUR
Labourer 2.288 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,984

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-12 Unit

Item Name : Supplying and stacking munj or patha trungers (6" mesh to hold 3 cft)
stones/boulders

Detail Qty Unit


MATERIAL
Baan 0.905 Kg

LABOUR
Labourer 0.25 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.

2,985

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-13-a-01 Unit

Item Name : Provide & weave GI wire netting for wire crates 6"x9" mesh : 15 SWG
wire

Detail Qty Unit


MATERIAL
G.I Wire 15 SWG 4 Kg

LABOUR
Labourer 0.75 Day
Black Smith 0.75 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,986

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-13-a-02 Unit

Item Name : Provide & weave GI wire netting for wire crates 6"x9" mesh : 10 SWG
wire

Detail Qty Unit


MATERIAL
G.I Wire 10 SWG 12.97 Kg

LABOUR
Labourer 0.75 Day
Black Smith 0.75 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,987

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM :
Item Code : 19-13-a-03
Item Name :
Detail Qty Unit
MATERIAL
G.I wire 8 SWG 15.65 Kg

LABOUR
Labourer 0.75 Day
Black Smith 0.75 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,988

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-13-b-01 Unit

Item Name : Provide & weave GI wire netting for wire crates 6"x6" mesh : 15 SWG
wire

Detail Qty Unit


MATERIAL
G.I Wire 15 SWG 3.08 Kg
LABOUR
Labourer 0.9 Day
Black Smith 0.9 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,989

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-13-b-02 Unit

Item Name : Provide & weave GI wire netting for wire crates 6"x6" mesh : 10 SWG
wire

Detail Qty Unit


MATERIAL
G.I Wire 10 SWG 9.98 Kg

LABOUR
Labourer 0.9 Day
Black Smith 0.9 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,990

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM :
Item Code : 19-13-b-03
Item Name :
Detail Qty Unit
MATERIAL
G.I wire 8 SWG 20.42 Kg

LABOUR
Labourer 0.9 Day
Black Smith 0.9 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,991

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-13-c-01 Unit

Item Name : Provide & weave GI wire netting for wire crates 4"x4" mesh : 15 SWG
wire

Detail Qty Unit


MATERIAL
G.I Wire 15 SWG 4.63 Kg

LABOUR
Labourer 1 Day
Black Smith 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,992

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-13-c-02 Unit

Item Name : Provide & weave GI wire netting for wire crates 4"x4" mesh : 10 SWG
wire

Detail Qty Unit


MATERIAL
G.I Wire 10 SWG 14.97 Kg

LABOUR
Labourer 1 Day
Black Smith 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.

2,993

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM :
Item Code : 19-13-c-03
Item Name :
Detail Qty Unit
MATERIAL
G.I wire 8 SWG 23.47 Kg

LABOUR
Labourer 1 Day
Black Smith 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.
2,994

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-14 Unit

Item Name : Providing and Laying shingle on top of bund, including handling of
materials within 100 m.

Detail Qty Unit


MATERIAL
Crushed Aggregate 100 Cft

LABOUR
Labourer 1 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,995

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-15-a Unit

Item Name : Supply & dump at site, without boat, including handling within 100m :
Stone

Detail Qty Unit


MATERIAL
Dressed Stone 100 Cft

LABOUR
Labourer 2 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,996

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-15-a-01 Unit

Item Name : Supply & dump at site, without boat, including handling within 100m:
boulders

Detail Qty Unit


MATERIAL
Boulder (Screened/Washed) 100 Cft

LABOUR
Labourer 2 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,997

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-15-b Unit

Item Name : Supply & dump at site, without boat, including handling within 100m :
Shingle or spawls

Detail Qty Unit


MATERIAL
Crushed Aggregate 100 Cft

LABOUR
Labourer 2 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,998

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-15-c Unit

Item Name : Supply & dump at site, without boat, including handling within 100m :
Brick bats

Detail Qty Unit


MATERIAL
Rubble Or Broken Brick 100 Cft

LABOUR
Labourer 1.5 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

2,999

GOVERNMENT OF KHYBER PAKHTUNKHWA


MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK

CHAPTER NO. 19 , PROTECTION & DIVERSION

DESCRIPTION OF ITEM : Spec. No :


Item Code : 19-16-a Unit

Item Name : Supplying and dumping by boat, including loading within 100m lead :
Stone or boulder

Detail Qty Unit


MATERIAL
Boulder (Screened/Washed) 100 Cft

LABOUR
Labourer 1 Day
Boat man 2 Day
Sundries (Labour Only):

Contractor Profit 10% + Over Heads on(M+L+E) 2% +


Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.

3,000
14.6.2, 14.8.3
, 14.8.4
(British) : Rft

Rate (Rs)

62.00 1 No.
164.40 1 Rft

13.00 1 Sft

TOTAL MATERIAL 42.68

1,200.00 1
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 37.82
19.50

403.50 Per Meter : Rs 1,323.48


183.75 Per Meter : Rs 602.70
14.6.2, 14.8.3
, 14.8.4
(British) : Rft

Rate (Rs)

69.50 1 RFT

500.00 1 Litre

TOTAL MATERIAL 64.79

600.00 1
1,200.00 1
1,200.00 1
3.00
TOTAL LABOUR 15.71
19.50

111.92 Per Meter : Rs 367.11


18.74 Per Meter : Rs 61.48

14.6.2, 14.8.3
, 14.8.4
(British) : Rft
Rate (Rs)

98.70 1 RFT

500.00 1 Litre

TOTAL MATERIAL 68.01

600.00 1
1,200.00 1
1,200.00 1
3.00
TOTAL LABOUR 12.49
19.50

149.76 Per Meter : Rs 491.20


18.74 Per Meter : Rs 61.48

14.6.2, 14.8.3
, 14.8.4
(British) : Rft

Rate (Rs)
128.90 1 RFT

500.00 1 Litre

TOTAL MATERIAL 69.24

600.00 1
1,200.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.26
19.50

190.90 Per Meter : Rs 626.16


20.80 Per Meter : Rs 68.23

14.6.2, 14.8.3
, 14.8.4
(British) : Rft

Rate (Rs)

164.40 1 RFT
500.00 1 Litre

TOTAL MATERIAL 70.59

600.00 1
1,200.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.91
19.50

236.18 Per Meter : Rs 774.67


21.54 Per Meter : Rs 70.64

14.6.3 , 14.8.3
(British) : Each

Rate (Rs) Amount

1,240.00 1

TOTAL MATERIAL 62.40

1,200.00 1
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 18.10
19.50

1,849.30 Cost Per Each: 1,849.30


367.50 Cost Per Each: 367.50
14.6.3 , 14.8.3
(British) : Each

Rate (Rs)

140.00 1
576.00 1

TOTAL MATERIAL 57.39

1,200.00 1
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 23.11
19.50

1,390.42 Cost Per Each: 1,390.42


367.50 Cost Per Each: 367.50

14.6.3 , 14.8.3
(British) : Each
Rate (Rs)

140.00 1
1,231.00 1

TOTAL MATERIAL 64.66

1,200.00 1
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 15.84
19.50

2,173.15 Cost Per Each: 2,173.15


367.50 Cost Per Each: 367.50

14.6.1
(British) : Rft

Rate (Rs)

419.00 1 RFT

TOTAL MATERIAL 61.87

600.00 1
1,200.00 1
3.00
TOTAL LABOUR 18.63
19.50
643.02 Per Meter : Rs 2,109.10
132.30 Per Meter : Rs 433.94

14.4 , 14.6,
14.7.21 , 14.8
(British) : Each

Rate (Rs)

1,250.00 1

TOTAL MATERIAL 76.78

1,200.00 1
3.00
TOTAL LABOUR 3.72
19.50

1,538.33 Cost Per Each: 1,538.33


14.70 Cost Per Each: 14.70

14.4 , 14.6,
14.7.21 , 14.8
(British) : Each
Rate (Rs)

1,930.00 1

TOTAL MATERIAL 77.03

1,200.00 1
3.00
TOTAL LABOUR 3.47
19.50

2,367.18 Cost Per Each: 2,367.18


14.70 Cost Per Each: 14.70

14.4 , 14.6,
14.7.21 , 14.8
(British) : Each

Rate (Rs)

3,500.00 1

TOTAL MATERIAL 77.24

1,200.00 1
3.00
TOTAL LABOUR 3.26
19.50
4,280.85 Cost Per Each: 4,280.85
14.70 Cost Per Each: 14.70

14.7.21
(British) : Each

Rate (Rs) Amount

1,350.00 1
TOTAL MATERIAL 76.17

1,200.00 1
3.00
TOTAL LABOUR 4.33
19.50

1,674.92 Cost Per Each: 1,674.92


29.40 Cost Per Each: 29.40

14.4 , 14.6,
14.7.21 , 14.8
(British) : Each
Rate (Rs)

575.00 1
TOTAL MATERIAL 75.92

1,200.00 1
3.00
TOTAL LABOUR 4.58
19.50

701.83 Cost Per Each: 701.83


14.70 Cost Per Each: 14.70

14.4 , 14.6,
14.7.21 , 14.8
(British) : No

Rate (Rs)

2,370.00 1

TOTAL MATERIAL 73.32

600.00 1
750.00 1

3.00
TOTAL LABOUR 7.18
19.50

2,997.53 Cost Per No: 2,997.53


165.38 Cost Per No: 165.38
14.4 , 14.6,
14.7.21 , 14.8
(British) : No

Rate (Rs)

2,890.00 1

TOTAL MATERIAL 74.04

600.00 1
750.00 1

3.00
TOTAL LABOUR 6.46
19.50

3,618.93 Cost Per No: 3,618.93


165.38 Cost Per No: 165.38

14.4, 14.5
(British) : Each

Rate (Rs)

6,500.00 1

TOTAL MATERIAL 77.06

600.00 1
3.00
TOTAL LABOUR 3.44
19.50

7,813.44 Cost Per Each: 7,813.44


45.94 Cost Per Each: 45.94

14.4, 14.5
(British) : Each

Unit Rate (Rs)

Each 9,500.00

TOTAL MATERIAL

Day 600.00

TOTAL LABOUR

Rs. 11,398.44
Rs. 45.94

14.4, 14.5
(British) : Kg
Rate (Rs)

250.00 1

TOTAL MATERIAL 54.12

600.00 1
3.00
TOTAL LABOUR 26.38
19.50

431.05 Cost Per Kg: 431.05


132.30 Cost Per Kg: 132.30

Spec. No :

Unit (British) : Rft


8" dia. MS filter Screen pipe of 4.5mm thickness & 1/16" slot opening
Unit Rate (Rs)

Rft 1,200.00 1

TOTAL MATERIAL 60.78

600.00 1
1,050.00 1
3.00
TOTAL LABOUR 19.72
19.50

1,838.25 Per Meter : Rs 6,029.46


404.25 Per Meter : Rs 1,325.94
14.4 , 14.6,
14.7.21 , 14.8
(British) : Job

Rate (Rs)

21,500.00 1

TOTAL MATERIAL 77.07

600.00 1
3.00
TOTAL LABOUR 3.43
19.50

25,839.50 Cost Per Job: 25,839.50


147.00 Cost Per Job: 147.00

24.3.5.6.2 ,
24.3.6.18
(British) : Each

Rate (Rs)

10,400.00 1

120.00 1
30.00 1

TOTAL MATERIAL 75.15

600.00 1
1,050.00 1
3.00
TOTAL LABOUR 5.35
19.50

13,041.61 Cost Per Each: 13,041.61


404.25 Cost Per Each: 404.25

Spec. No :

Unit (British) : Each


all Shower Set 151/153 C.P
Rate (Rs)

19,650.00 1

TOTAL MATERIAL 77.03

1,200.00 1
3.00
TOTAL LABOUR 3.47
19.50

23,628.75 Cost Per Each: 23,628.75


147.00 Cost Per Each: 147.00

Spec. No :
Unit (British) : Each
all Shower Set 4021/4023 C.P
Rate (Rs)

13,500.00 1

TOTAL MATERIAL 76.82

1,200.00 1
3.00
TOTAL LABOUR 3.68
19.50

16,279.50 Cost Per Each: 16,279.50


147.00 Cost Per Each: 147.00

Spec. No :

Unit (British) : Each


Providing and Fixing Best Quality Wall Shower Set 981/83 C.P
Rate (Rs)

28,103.00 1

TOTAL MATERIAL 77.17

1,200.00 1
3.00
TOTAL LABOUR 3.33
19.50

33,730.09 Cost Per Each: 33,730.09


147.00 Cost Per Each: 147.00
Spec. No :

Unit (British) : Each


Providing and Fixing Best Quality Wall Shower Set 671/73 C.P
Rate (Rs)

29,657.00 1

TOTAL MATERIAL 77.19

1,200.00 1
3.00
TOTAL LABOUR 3.31
19.50

35,587.12 Cost Per Each: 35,587.12


147.00 Cost Per Each: 147.00

15.2.3
(British) : Rft

Unit Rate (Rs)

Rft 20.00
No 30.00

No 7.00
No 10.00
No 1.00
No 1.00

TOTAL MATERIAL

Day 1,200.00
TOTAL LABOUR

Rs. 48.13
Rs. 17.64

15.2.3
(British) : Rft

Unit Rate (Rs)

No 7.00 1
No 1.00 1
No 1.00 1

Rft 25.00 1
No 18.00 1
No 60.00 1

TOTAL MATERIAL 53.34

Day 1,200.00 1
3.00
TOTAL LABOUR 27.16
19.50

55.63 Per Meter : Rs 182.47


17.64 Per Meter : Rs 57.86
15.2.3
(British) : Rft

Unit Rate (Rs)

No 7.00 1
No 1.00 1
No 1.00 1

No 60.00 1

Rft 35.00 1
No 24.00 1
TOTAL MATERIAL 57.74

Day 1,200.00 1
3.00
TOTAL LABOUR 22.76
19.50

67.92 Per Meter : Rs 222.79


17.64 Per Meter : Rs 57.86

15.2.3
(British) : Rft

Unit Rate (Rs)

No 7.00 1
No 1.00 1
No 1.00 1

No 60.00 1
Rft 40.00 1
No 26.00 1
TOTAL MATERIAL 59.38

Day 1,200.00 1
3.00
TOTAL LABOUR 21.12
19.50

74.01 Per Meter : Rs 242.76


17.64 Per Meter : Rs 57.86

15.2.3
(British) : Rft

Unit Rate (Rs)

No 7.00 1
No 1.00 1
No 1.00 1

No 60.00 1

Rft 45.00 1
No 45.00 1
TOTAL MATERIAL 60.96

Day 1,200.00 1
3.00
TOTAL LABOUR 19.54
19.50

81.07 Per Meter : Rs 265.90


17.64 Per Meter : Rs 57.86
15.2.3
(British) : Rft

Unit Rate (Rs)

No 1.00 1
No 1.00 1

Rft 60.00 1
No 54.00 1
No 75.00 1

No 10.00 1

TOTAL MATERIAL 64.26

1,200.00 1
3.00
TOTAL LABOUR 16.24
19.50

101.14 Per Meter : Rs 331.72


17.64 Per Meter : Rs 57.86

15.2.3
(British) : Rft
Unit Rate (Rs)

Bag 550.00
Cft. 2,000.00
Rft 20.00
No 30.00

No 7.00
No 10.00
TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR

Rs. 103.04
Rs. 44.10

15.2.3
(British) : Rft

Rate (Rs)

550.00 1
2,000.00 1
7.00 1
25.00 1
18.00 1
60.00 1

TOTAL MATERIAL 47.24

1,200.00 1
3.00
TOTAL LABOUR 33.26
19.50
111.27 Per Meter : Rs 364.96
44.10 Per Meter : Rs 144.65

15.2.3
(British) : Rft

Rate (Rs)

550.00 1
2,000.00 1
7.00 1
60.00 1

35.00 1
24.00 1
TOTAL MATERIAL 50.52

1,200.00 1
3.00
TOTAL LABOUR 29.98
19.50

124.68 Per Meter : Rs 408.94


44.10 Per Meter : Rs 144.65

15.2.3
(British) : Rft
Rate (Rs)

550.00 1
2,000.00 1
7.00 1
60.00 1

40.00 1
26.00 1
TOTAL MATERIAL 52.01

1,200.00 1
3.00
TOTAL LABOUR 28.49
19.50

131.88 Per Meter : Rs 432.57


44.10 Per Meter : Rs 144.65

15.2.3
(British) : Rft

Rate (Rs)

550.00 1
2,000.00 1
7.00 1
60.00 1

45.00 1
45.00 1
TOTAL MATERIAL 54.42

1,200.00 1
3.00
TOTAL LABOUR 26.08
19.50

145.51 Per Meter : Rs 477.27


44.10 Per Meter : Rs 144.65

15.2.3
(British) : Rft

Unit Rate (Rs)

Bag 550.00 1
Cft. 2,000.00 1
Rft 60.00 1
No 54.00 1
No 75.00 1

No 10.00 1

TOTAL MATERIAL 57.75

1,200.00 1
3.00
TOTAL LABOUR 22.75
19.50

169.92 Per Meter : Rs 557.32


44.10 Per Meter : Rs 144.65
15.2.4
(British) : Rft

Unit Rate (Rs)

No 7.00
No 1.00
No 1.00

Rft 10.00
No 4.00
No 12.00
TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR

Rs. 26.46
Rs. 8.82

15.2.4
(British) : Rft

Unit Rate (Rs)

No 7.00
No 1.00
No 1.00

Rft 14.00
No 6.00
No 15.00
TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR

Rs. 31.51
Rs. 8.82

15.2.4
(British) : Rft

Unit Rate (Rs)

No 7.00
No 1.00
No 1.00

Rft 18.00
No 8.00

No 20.00

TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR

Rs. 36.63
Rs. 8.82
15.2.4
(British) : Rft

Unit Rate (Rs)

No 7.00
No 1.00
No 1.00

Rft 22.67
No 12.00

No 30.00

TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR

Rs. 47.29
Rs. 13.23

15.2.4
(British) : Rft

Unit Rate (Rs)


No 7.00
No 1.00
No 1.00

Rft 25.67
No 15.00

No 32.00

TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR

Rs. 55.60
Rs. 17.64

15.2.4
(British) : Rft

Unit Rate (Rs)

No 1.00
No 1.00

No 10.00
Rft 30.00
No 30.00

No 45.00

TOTAL MATERIAL

Day 1,200.00
TOTAL LABOUR

Rs. 57.65
Rs. 11.76

15.2.4
(British) : Rft

Rate (Rs)

1.00 1 No
1.00 1 No

35.00 1 Rft
45.00 1 No

60.00 1 No

11.00 1 No

TOTAL MATERIAL 62.54

1,200.00 1
3.00
TOTAL LABOUR 17.96
19.50

67.19 Per Meter : Rs 220.39


13.23 Per Meter : Rs 43.39
15.2.4
(British) : Rft

Rate (Rs)

1.00 1 No
1.00 1 No

50.33 1 Rft
60.00 1 No

100.00 1 No

11.00 1 No

TOTAL MATERIAL 63.29

1,200.00 1
3.00
TOTAL LABOUR 17.21
19.50

94.31 Per Meter : Rs 309.32


17.64 Per Meter : Rs 57.86

15.2.4
(British) : Rft

Unit Rate (Rs)

Bag 550.00
Cft 2,000.00
Rft 10.00
No 4.00
No 10.00
No 12.00
TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR

Rs. 53.62
Rs. 26.46

15.2.4
(British) : Rft

Unit Rate (Rs)

Bag 550.00
Cft. 2,000.00
Rft 14.00
No 6.00
No 10.00
No 15.00
TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR

Rs. 68.84
Rs. 26.46
15.2.4
(British) : Rft

Unit Rate (Rs)

Bag 550.00
Cft. 2,000.00
Rft 18.00
No 8.00

No 10.00

No 20.00

TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR

Rs. 69.03
Rs. 26.46

15.2.4
(British) : Rft
Qty Unit

0.0022 Bag
0.0123 Cft.
1 Rft
0.0667 No

0.3333 No

0.03 No

TOTAL

0.018 Day

TOTAL
Over Heads on(M+L+E) 2% +

Rft Rs. 90.41


Rft Rs. 26.46

15.2.4
(British) : Rft

Unit Rate (Rs)

Bag 550.00
Cft 2,000.00
Rft 25.67
No 15.00

No 10.00

No 32.00

TOTAL MATERIAL
Day 1,200.00

TOTAL LABOUR

Rs. 105.58
Rs. 35.28

15.2.4
(British) : Rft

Qty Unit

0.0028 Bag
0.008 Cft
1 Rft
0.0667 No

0.3333 No

0.03 No

TOTAL

0.03 Day

TOTAL
Over Heads on(M+L+E) 2% +

Rft Rs. 108.90


Rft Rs. 44.10
15.2.4
(British) : Rft

Rate (Rs)

550.00 1 Bag
2,000.00 1 Cft
35.00 1 Rft
45.00 1 No

60.00 1 No

11.00 1 No

TOTAL MATERIAL 46.04

1,200.00 1
3.00
TOTAL LABOUR 34.46
19.50

132.03 Per Meter : Rs 433.06


54.39 Per Meter : Rs 178.40

15.2.4
(British) : Rft

Rate (Rs)

550.00 1 Bag
2,000.00 1 Cft
50.33 1 Rft
60.00 1 No

100.00 1 No

11.00 1 No

TOTAL MATERIAL 48.31

1,200.00 1
3.00
TOTAL LABOUR 32.19
19.50

176.77 Per Meter : Rs 579.81


67.62 Per Meter : Rs 221.79

15.2.5
(British) : Rft

Rate (Rs)

40.00 1
10.00 1
10.00 1
8.00 1
TOTAL MATERIAL 64.74

1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 15.76
19.50

60.15 Per Meter : Rs 197.29


10.11 Per Meter : Rs 33.15
15.2.5
(British) : Rft

Rate (Rs)

35.00 1
12.00 1
12.00 1
10.00 1
TOTAL MATERIAL 63.46

1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 17.04
19.50

54.65 Per Meter : Rs 179.26


10.11 Per Meter : Rs 33.15

Spec. No :
Unit (British) : Rft
Supply and Erection GI flexible pipe for wiring purpose complete 1" i/d
Rate (Rs)

40.00 1

20.00 1
18.00 1
15.00 1
TOTAL MATERIAL 58.55

1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 21.95
19.50

69.32 Per Meter : Rs 227.36


17.27 Per Meter : Rs 56.65

15.2.5
(British) : Rft

Rate (Rs)

48.00 1

25.00 1

22.00 1

20.00 1

TOTAL MATERIAL 60.01

1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 20.49
19.50

81.47 Per Meter : Rs 267.21


18.74 Per Meter : Rs 61.48
15.2.5
(British) : Rft

Rate (Rs)

55.00 1

35.00 1

38.00 1

25.00 1

TOTAL MATERIAL 62.07

1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 18.43
19.50

92.31 Per Meter : Rs 302.79


18.74 Per Meter : Rs 61.48

15.2.5
(British) : Rft
Rate (Rs)

70.00 1

50.00 1

50.00 1

30.00 1

TOTAL MATERIAL 59.05

1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 21.45
19.50

124.19 Per Meter : Rs 407.35


30.14 Per Meter : Rs 98.84

15.2.5
(British) : Rft

Rate (Rs)

100.00 1

100.00 1

160.00 1

35.00 1

TOTAL MATERIAL 63.76

1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 16.74
19.50

174.72 Per Meter : Rs 573.10


31.60 Per Meter : Rs 103.66

Spec. No :
Unit (British) :
Supply and Erection Sahl wood strip batten for wiring complete 1/2"
Unit Rate (Rs)

Rft 5.00
Pkt 7.00
Kg 150.00
TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR
Over Heads on(M+L+E) 2% +

Rs. 10.88
Rs. 4.41

Spec. No :
Unit (British) :
Supply and Erection Sahl wood strip batten for wiring complete 3/4"
Unit Rate (Rs)

Rft 6.00
Pkt 7.00
Kg 150.00
TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR
Over Heads on(M+L+E) 2% +

Rs. 12.07
Rs. 4.41

Spec. No :
Unit (British) : Rft
Supply and Erection Sahl wood strip batten for wiring complete 1"
Rate (Rs)

7.00 1
150.00 1
14.00 1
TOTAL MATERIAL 62.01

1,200.00 1
3.00
TOTAL LABOUR 18.49
19.50

21.63 Per Meter : Rs 70.95


4.41 Per Meter : Rs 14.46

15.3.1
(British) : Rft
Rate (Rs)

7.01 1
TOTAL MATERIAL 46.00

1,200.00 1
3.00
TOTAL LABOUR 34.50
19.50

14.26 Per Meter : Rs 46.76


5.88 Per Meter : Rs 19.29

15.3.1
(British) : Rft

Rate (Rs)

13.58 1
TOTAL MATERIAL 57.26

1,200.00 1
3.00
TOTAL LABOUR 23.24
19.50

22.11 Per Meter : Rs 72.51


5.88 Per Meter : Rs 19.29
15.3.1
(British) : Rft

Rate (Rs)

15.24 1
TOTAL MATERIAL 58.94

1,200.00 1
3.00
TOTAL LABOUR 21.56
19.50

24.09 Per Meter : Rs 79.02


5.88 Per Meter : Rs 19.29

15.3.1
(British) : Rft

Rate (Rs)

19.51 1
TOTAL MATERIAL 62.20

1,200.00 1
3.00
TOTAL LABOUR 18.30
19.50

29.19 Per Meter : Rs 95.76


5.88 Per Meter : Rs 19.29

15.3.1
(British) : Rft

Rate (Rs)

28.66 1
TOTAL MATERIAL 54.63

1,200.00 1
3.00
TOTAL LABOUR 25.87
19.50

48.95 Per Meter : Rs 160.55


14.70 Per Meter : Rs 48.22

15.3.1
(British) : Rft

Rate (Rs)

73.77 1
TOTAL MATERIAL 62.30
1,200.00 1
3.00
TOTAL LABOUR 18.20
19.50

110.21 Per Meter : Rs 361.47


22.05 Per Meter : Rs 72.32

15.3.1
(British) : Rft

Rate (Rs)

182.90 1

TOTAL MATERIAL 66.58

1,200.00 1
3.00
TOTAL LABOUR 13.92
19.50

255.32 Per Meter : Rs 837.43


36.75 Per Meter : Rs 120.54

15.3.1
(British) : Rft
Rate (Rs)

6.71 1

TOTAL MATERIAL 34.42

1,200.00 1
3.00
TOTAL LABOUR 46.08
19.50

18.31 Per Meter : Rs 60.05


10.29 Per Meter : Rs 33.75

15.3.1
(British) : Rft

Rate (Rs)

8.84 1

TOTAL MATERIAL 39.74

1,200.00 1
3.00
TOTAL LABOUR 40.76
19.50

20.85 Per Meter : Rs 68.40


10.29 Per Meter : Rs 33.75
15.3.1
(British) : Rft

Rate (Rs)

14.94 1

TOTAL MATERIAL 47.18

1,200.00 1
3.00
TOTAL LABOUR 33.32
19.50

29.61 Per Meter : Rs 97.13


11.76 Per Meter : Rs 38.57

15.3.1
(British) : Rft

Rate (Rs)

19.20 1

TOTAL MATERIAL 51.67

1,200.00 1
3.00
TOTAL LABOUR 28.83
19.50
34.70 Per Meter : Rs 113.83
11.76 Per Meter : Rs 38.57

15.3.1
(British) : Rft

Rate (Rs)

28.66 1

TOTAL MATERIAL 50.18

1,200.00 1
3.00
TOTAL LABOUR 30.32
19.50

53.36 Per Meter : Rs 175.02


19.11 Per Meter : Rs 62.68

15.3.1
(British) : Rft

Rate (Rs)
74.38 1

TOTAL MATERIAL 58.59

1,200.00 1
3.00
TOTAL LABOUR 21.91
19.50

118.28 Per Meter : Rs 387.97


29.40 Per Meter : Rs 96.43

15.3.1
(British) : Rft

Rate (Rs)

60.97 1
TOTAL MATERIAL 55.61

1,200.00 1
3.00
TOTAL LABOUR 24.89
19.50

102.26 Per Meter : Rs 335.41


29.40 Per Meter : Rs 96.43

15.3.1
(British) : Rft

Rate (Rs)

132.61 1

TOTAL MATERIAL 59.27

1,200.00 1
3.00
TOTAL LABOUR 21.23
19.50

208.45 Per Meter : Rs 683.71


49.98 Per Meter : Rs 163.93

15.3.1
(British) : Rft

Rate (Rs)

182.90 1

TOTAL MATERIAL 63.36

1,200.00 1
3.00
TOTAL LABOUR 17.14
19.50

268.55 Per Meter : Rs 880.83


49.98 Per Meter : Rs 163.93
15.3.1
(British) : Rft

Rate (Rs)

289.60 1

TOTAL MATERIAL 64.20

1,200.00 1
3.00
TOTAL LABOUR 16.30
19.50

419.57 Per Meter : Rs 1,376.20


73.50 Per Meter : Rs 241.08

15.3.1
(British) : Rft

Rate (Rs)

378.00 1

TOTAL MATERIAL 55.48

1,200.00 1
3.00
TOTAL LABOUR 25.02
19.50

635.46 Per Meter : Rs 2,084.31


183.75 Per Meter : Rs 602.70

15.3.1
(British) : Rft

Rate (Rs)

487.75 1

TOTAL MATERIAL 59.27

1,200.00 1
3.00
TOTAL LABOUR 21.23
19.50

766.61 Per Meter : Rs 2,514.48


183.75 Per Meter : Rs 602.70

15.3.1
(British) : Rft
Rate (Rs)

713.33 1

TOTAL MATERIAL 64.03

1,200.00 1
3.00
TOTAL LABOUR 16.47
19.50

1,036.18 Per Meter : Rs 3,398.67


183.75 Per Meter : Rs 602.70

15.3.1
(British) : Rft

Rate (Rs)

25.91 1
TOTAL MATERIAL 62.93

1,200.00 1
3.00
TOTAL LABOUR 17.57
19.50

38.31 Per Meter : Rs 125.66


7.35 Per Meter : Rs 24.11
15.3.1
(British) : Rft

Rate (Rs)

37.20 1
TOTAL MATERIAL 66.74

1,200.00 1
3.00
TOTAL LABOUR 13.76
19.50

51.80 Per Meter : Rs 169.92


7.35 Per Meter : Rs 24.11

15.3.1
(British) : Rft

Rate (Rs)

37.20 1
TOTAL MATERIAL 63.22

1,200.00 1
3.00
TOTAL LABOUR 17.28
19.50

54.74 Per Meter : Rs 179.56


10.29 Per Meter : Rs 33.75
15.3.1
(British) : Rft

Rate (Rs)

48.17 1
TOTAL MATERIAL 65.99

1,200.00 1
3.00
TOTAL LABOUR 14.51
19.50

67.85 Per Meter : Rs 222.56


10.29 Per Meter : Rs 33.75

15.3.1
(British) : Rft

Rate (Rs)

68.29 1
TOTAL MATERIAL 69.01

1,200.00 1
3.00
TOTAL LABOUR 11.49
19.50

91.90 Per Meter : Rs 301.42


10.29 Per Meter : Rs 33.75

15.3.1
(British) : Rft

Rate (Rs)

165.24 1
TOTAL MATERIAL 73.75

1,200.00 1
3.00
TOTAL LABOUR 6.75
19.50

207.75 Per Meter : Rs 681.43


10.29 Per Meter : Rs 33.75

15.3.1, 15.3.2
(British) : Each

Rate (Rs)
550.00 1
2,000.00 1
47.50 1
TOTAL MATERIAL 31.20

1,200.00 1
3.00
TOTAL LABOUR 49.30
19.50

182.73 Cost Per Each: 182.73


110.25 Cost Per Each: 110.25

15.3.1, 15.3.2
(British) : Each

Unit Rate (Rs)

550.00 1
2,000.00 1
65.00 1
TOTAL MATERIAL 31.25

1,200.00 1
3.00
TOTAL LABOUR 49.25
19.50

243.91 Cost Per Each: 243.91


147.00 Cost Per Each: 147.00
15.3.1, 15.3.2
(British) : Each

Unit Rate (Rs)

550.00 1
2,000.00 1
75.00 1
TOTAL MATERIAL 29.90

1,200.00 1
3.00
TOTAL LABOUR 50.60
19.50

296.32 Cost Per Each: 296.32


183.75 Cost Per Each: 183.75

15.3.1, 15.3.2
(British) : Each

Unit Rate (Rs)

550.00 1
2,000.00 1
130.00 1
TOTAL MATERIAL 35.58

1,200.00 1
3.00
TOTAL LABOUR 44.92
19.50

403.10 Cost Per Each: 403.10


220.50 Cost Per Each: 220.50

15.3.1, 15.3.2
(British) : Each

Rate (Rs)

550.00 1
2,000.00 1
150.00 1
TOTAL MATERIAL 35.13

1,200.00 1
3.00
TOTAL LABOUR 45.37
19.50

478.56 Cost Per Each: 478.56


264.60 Cost Per Each: 264.60

15.3.1, 15.3.2
(British) : Each
Rate (Rs)

550.00 1
2,000.00 1
150.00 1
TOTAL MATERIAL 32.52

1,200.00 1
3.00
TOTAL LABOUR 47.98
19.50

526.43 Cost Per Each: 526.43


308.70 Cost Per Each: 308.70

Spec. No :
Unit (British) : Rft
wood board, 1.75" deep : 3"x3" dia
Rate (Rs)

1.00 1
30.00 1
1.00 1
TOTAL MATERIAL 49.60

1,200.00 1
3.00
TOTAL LABOUR 30.90
19.50

60.29 Per Meter : Rs 197.75


22.05 Per Meter : Rs 72.32
Spec. No :
Unit (British) : Each
wood board, 1.75" deep : 4"x4"
Rate (Rs)

1.00 1
1.00 1
40.00 1
TOTAL MATERIAL 33.91

1,200.00 1
3.00
TOTAL LABOUR 46.59
19.50

116.34 Cost Per Each: 116.34


66.15 Cost Per Each: 66.15

Spec. No :
Unit (British) : Each
wood board, 1.75" deep : 7"x4"
Rate (Rs)

1.00 1
1.00 1
50.00 1
TOTAL MATERIAL 38.02

1,200.00 1
3.00
TOTAL LABOUR 42.48
19.50

128.29 Cost Per Each: 128.29


66.15 Cost Per Each: 66.15
Spec. No :
Unit (British) : Each
wood board, 1.75" deep : 8"x10"
Rate (Rs)

1.00 1
1.00 1
60.00 1
TOTAL MATERIAL 41.42

1,200.00 1
3.00
TOTAL LABOUR 39.08
19.50

140.24 Cost Per Each: 140.24


66.15 Cost Per Each: 66.15

Spec. No :
Unit (British) : Each
wood board, 1.75" deep : 10"x12"
Rate (Rs)

1.00 1
1.00 1
80.00 1
TOTAL MATERIAL 44.75

1,200.00 1
3.00
TOTAL LABOUR 35.75
19.50

171.49 Cost Per Each: 171.49


73.50 Cost Per Each: 73.50
Spec. No :
Unit (British) : Each
wood board, 1.75" deep : 12"x14"
Rate (Rs)

1.00 1
1.00 1
120.00 1
TOTAL MATERIAL 51.95

1,200.00 1
3.00
TOTAL LABOUR 28.55
19.50

219.29 Cost Per Each: 219.29


73.50 Cost Per Each: 73.50

15.4.1, 15.4.5
(British) : Each

Rate (Rs)

436.67 1
TOTAL MATERIAL 60.79

1,200.00 1
3.00
TOTAL LABOUR 19.71
19.50

668.82 Cost Per Each: 668.82


147.00 Cost Per Each: 147.00

15.4.1, 15.4.5
(British) : Each

Rate (Rs)

666.67 1
TOTAL MATERIAL 65.68

1,200.00 1
3.00
TOTAL LABOUR 14.82
19.50

943.67 Cost Per Each: 943.67


147.00 Cost Per Each: 147.00

15.4.1, 15.4.5
(British) : Each

Rate (Rs)
1,066.67 1
TOTAL MATERIAL 66.31

1,200.00 1
3.00
TOTAL LABOUR 14.19
19.50

1,495.17 Cost Per Each: 1,495.17


220.50 Cost Per Each: 220.50

15.4.1, 15.4.5
(British) : Each

Rate (Rs)

3,133.33 1
TOTAL MATERIAL 73.29

1,200.00 1
3.00
TOTAL LABOUR 7.21
19.50

3,964.83 Cost Per Each: 3,964.83


220.50 Cost Per Each: 220.50

15.4.1, 15.4.5
(British) : Each

Rate (Rs)

666.67 1
TOTAL MATERIAL 56.99

1,200.00 1
3.00
TOTAL LABOUR 23.51
19.50

1,090.67 Cost Per Each: 1,090.67


294.00 Cost Per Each: 294.00

15.4.1, 15.4.5
(British) : Each

Rate (Rs)

766.67 1
TOTAL MATERIAL 59.02

1,200.00 1
3.00
TOTAL LABOUR 21.48
19.50

1,210.17 Cost Per Each: 1,210.17


294.00 Cost Per Each: 294.00
15.4.1, 15.4.5
(British) : Each

Rate (Rs)

1,933.33 1
TOTAL MATERIAL 67.09

1,200.00 1
3.00
TOTAL LABOUR 13.41
19.50

2,677.83 Cost Per Each: 2,677.83


367.50 Cost Per Each: 367.50

15.4.1, 15.4.5
(British) : Each

Rate (Rs)

3,800.00 1
TOTAL MATERIAL 71.83

1,200.00 1
3.00
TOTAL LABOUR 8.67
19.50
4,908.50 Cost Per Each: 4,908.50
367.50 Cost Per Each: 367.50

Spec. No :
Unit (British) : Each
0 Amp Main switch
Rate (Rs)

8,000.00 1
TOTAL MATERIAL 74.70

1,200.00 1
3.00
TOTAL LABOUR 5.80
19.50

9,927.50 Cost Per Each: 9,927.50


367.50 Cost Per Each: 367.50

Spec. No :
Unit (British) : Each
ange over switch 100 Amp
Rate (Rs)

10,000.00 1

TOTAL MATERIAL 75.68

1,200.00 1
3.00
TOTAL LABOUR 4.82
19.50
12,244.00 Cost Per Each: 12,244.00
294.00 Cost Per Each: 294.00

Spec. No :
Unit (British) : Each
ange over switch 200 Amp
Rate (Rs)

20,000.00 1

TOTAL MATERIAL 76.58

1,200.00 1
3.00
TOTAL LABOUR 3.92
19.50

24,194.00 Cost Per Each: 24,194.00


294.00 Cost Per Each: 294.00

Spec. No :
Unit (British) : Each
ange over switch 600 Amp
Rate (Rs)

30,000.00 1

TOTAL MATERIAL 76.88

1,200.00 1
3.00
TOTAL LABOUR 3.62
19.50

36,144.00 Cost Per Each: 36,144.00


294.00 Cost Per Each: 294.00

Spec. No :
Unit (British) : Each
ange over switch 500 Amp
Rate (Rs)

28,000.00 1

TOTAL MATERIAL 76.84

1,200.00 1
3.00
TOTAL LABOUR 3.66
19.50

33,754.00 Cost Per Each: 33,754.00


294.00 Cost Per Each: 294.00

Spec. No :
Unit (British) : Each
0 Amp main switch
Rate (Rs)

25,000.00 1
TOTAL MATERIAL 76.76

1,200.00 1
3.00
TOTAL LABOUR 3.74
19.50

30,169.00 Cost Per Each: 30,169.00


294.00 Cost Per Each: 294.00

Spec. No :
Unit (British) : Each
0 Amp main switch
Rate (Rs)

20,000.00 1
TOTAL MATERIAL 76.58

1,200.00 1
3.00
TOTAL LABOUR 3.92
19.50

24,194.00 Cost Per Each: 24,194.00


294.00 Cost Per Each: 294.00

Spec. No :
Unit (British) : Each
0 Amp main switch
Rate (Rs)

15,000.00 1
TOTAL MATERIAL 76.28

1,200.00 1
3.00
TOTAL LABOUR 4.22
19.50

18,219.00 Cost Per Each: 18,219.00


294.00 Cost Per Each: 294.00

15.4.1, 15.4.5
(British) : Each

Rate (Rs)

2,500.00 1

TOTAL MATERIAL 69.20

1,200.00 1
3.00
TOTAL LABOUR 11.30
19.50

3,355.00 Cost Per Each: 3,355.00


367.50 Cost Per Each: 367.50

15.4.1, 15.4.5
(British) : Each
Rate (Rs)

2,750.00 1

TOTAL MATERIAL 69.88

1,200.00 1
3.00
TOTAL LABOUR 10.62
19.50

3,653.75 Cost Per Each: 3,653.75


367.50 Cost Per Each: 367.50

15.4.1, 15.4.5
(British) : Each

Rate (Rs)

4,500.00 1
TOTAL MATERIAL 73.58

1,200.00 1
3.00
TOTAL LABOUR 6.92
19.50

5,671.50 Cost Per Each: 5,671.50


294.00 Cost Per Each: 294.00
15.4.1, 15.4.5
(British) : Each

Rate (Rs)

5,850.00 1
TOTAL MATERIAL 74.45

1,200.00 1
3.00
TOTAL LABOUR 6.05
19.50

7,284.75 Cost Per Each: 7,284.75


294.00 Cost Per Each: 294.00

15.4.1, 15.4.5
(British) : Each

Rate (Rs)

10,000.00 1
TOTAL MATERIAL 75.68

1,200.00 1
3.00
TOTAL LABOUR 4.82
19.50

12,244.00 Cost Per Each: 12,244.00


294.00 Cost Per Each: 294.00
Spec. No :
Unit (British) : Each

Rate (Rs)

10,000.00 1
TOTAL MATERIAL 77.27

1,200.00 1
3.00
TOTAL LABOUR 3.23
19.50

11,986.75 Cost Per Each: 11,986.75


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each

Rate (Rs)

8,000.00 1
TOTAL MATERIAL 77.21

1,200.00 1
3.00
TOTAL LABOUR 3.29
19.50

9,596.75 Cost Per Each: 9,596.75


36.75 Cost Per Each: 36.75
15.4.15
(British) : Each

Rate (Rs)

486.00 1 Mtr

42.78 1 No

TOTAL MATERIAL 75.78

1,200.00 1
3.00
TOTAL LABOUR 4.72
19.50

646.59 Cost Per Each: 646.59


14.70 Cost Per Each: 14.70

15.4.15
(British) : Each

Rate (Rs)

40.00 1
TOTAL MATERIAL 49.36
1,200.00 1
3.00
TOTAL LABOUR 31.14
19.50

75.73 Cost Per Each: 75.73


27.93 Cost Per Each: 27.93

15.4.15
(British) : Each

Rate (Rs)

180.00 1
TOTAL MATERIAL 61.18

1,200.00 1
3.00
TOTAL LABOUR 19.32
19.50

273.90 Cost Per Each: 273.90


58.80 Cost Per Each: 58.80

15.4.1
(British) : Each
Rate (Rs)

50.00 1
40.56 1
TOTAL MATERIAL 58.21

1,200.00 1
3.00
TOTAL LABOUR 22.29
19.50

144.97 Cost Per Each: 144.97


36.75 Cost Per Each: 36.75

15.4.1
(British) : Each

Rate (Rs)

10.00 1
40.56 1
TOTAL MATERIAL 74.44

1,200.00 1
3.00
TOTAL LABOUR 6.06
19.50

254.74 Cost Per Each: 254.74


10.29 Cost Per Each: 10.29
Spec. No :
Unit (British) : Each
ches 10/15 Amp : Open type
Rate (Rs)

1.00 1
30.00 1
TOTAL MATERIAL 49.60

1,200.00 1
3.00
TOTAL LABOUR 30.90
19.50

60.29 Cost Per Each: 60.29


22.05 Cost Per Each: 22.05

Spec. No :
Unit (British) :
Supply and Erection switches 10/15 Amp : Recessed type
Unit Rate (Rs)

No 1.00
No 80.00
TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR

Rs. 120.04
Rs. 22.05
Spec. No :
Unit (British) : Each
Supply and Erection 3 pin 10/15 Amp. wall socket : Open type
Rate (Rs)

1.00 1
35.00 1
TOTAL MATERIAL 42.80

1,200.00 1
3.00
TOTAL LABOUR 37.70
19.50

80.97 Cost Per Each: 80.97


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each
Supply and Erection 3 pin 10/15 Amp. wall socket : Recessed
Rate (Rs)

1.00 1
90.00 1
TOTAL MATERIAL 58.44

1,200.00 1
3.00
TOTAL LABOUR 22.06
19.50

146.69 Cost Per Each: 146.69


36.75 Cost Per Each: 36.75
15.4.1, 15.4.5
(British) : Each

Rate (Rs)

1.00 1
450.00 1
TOTAL MATERIAL 72.68

1,200.00 1
3.00
TOTAL LABOUR 7.82
19.50

576.89 Cost Per Each: 576.89


36.75 Cost Per Each: 36.75

15.4.1, 15.4.5
(British) : Each

Rate (Rs)

1.00 1
500.00 1

TOTAL MATERIAL 73.13


1,200.00 1
3.00
TOTAL LABOUR 7.37
19.50

636.64 Cost Per Each: 636.64


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each
Supply and Erection 3 pin 10/15 Amp. wall socket with shoe open type
Rate (Rs)

1.00 1
500.00 1

TOTAL MATERIAL 73.13

1,200.00 1
3.00
TOTAL LABOUR 7.37
19.50

636.64 Cost Per Each: 636.64


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each
Supply and Erection button holder/angle holder Bakelite large size
Rate (Rs)
1.00 1
40.00 1
TOTAL MATERIAL 56.51

1,200.00 1
3.00
TOTAL LABOUR 23.99
19.50

69.30 Cost Per Each: 69.30


19.11 Cost Per Each: 19.11

Spec. No :
Unit (British) : Each
on holder/angle holder Brass
Rate (Rs)

1.00 1
120.00 1
TOTAL MATERIAL 68.71

1,200.00 1
3.00
TOTAL LABOUR 11.79
19.50

164.90 Cost Per Each: 164.90


19.11 Cost Per Each: 19.11

15.4.2
(British) : Each
Rate (Rs)

100.00 1
TOTAL MATERIAL 59.62

1,200.00 1
3.00
TOTAL LABOUR 20.88
19.50

156.25 Cost Per Each: 156.25


36.75 Cost Per Each: 36.75

15.4.2
(British) : Each

Rate (Rs)

150.00 1
TOTAL MATERIAL 64.58

1,200.00 1
3.00
TOTAL LABOUR 15.92
19.50

216.00 Cost Per Each: 216.00


36.75 Cost Per Each: 36.75
15.4.2
(British) : Each

Rate (Rs)

430.00 1
TOTAL MATERIAL 72.45

1,200.00 1
3.00
TOTAL LABOUR 8.05
19.50

550.60 Cost Per Each: 550.60


36.75 Cost Per Each: 36.75

15.4.2
(British) : Each

Rate (Rs)

920.00 1
TOTAL MATERIAL 75.05

1,200.00 1
3.00
TOTAL LABOUR 5.45
19.50

1,136.15 Cost Per Each: 1,136.15


36.75 Cost Per Each: 36.75
15.4.2
(British) : Each

Rate (Rs)

1,020.00 1
TOTAL MATERIAL 75.29

1,200.00 1
3.00
TOTAL LABOUR 5.21
19.50

1,255.65 Cost Per Each: 1,255.65


36.75 Cost Per Each: 36.75

15.6.4
(British) : Set

Rate (Rs)

110.00 1
350.00 1
30.00 1
400.00 1
50.00 1
TOTAL MATERIAL 72.33

1,200.00 1
3.00
TOTAL LABOUR 8.17
19.50

2,154.60 Cost Per Set: 2,154.60


147.00 Cost Per Set: 147.00

15.6.4
(British) : Set

Rate (Rs)

110.00 1
350.00 1
30.00 1
50.00 1
350.00 1
TOTAL MATERIAL 71.83

1,200.00 1
3.00
TOTAL LABOUR 8.67
19.50

1,472.55 Cost Per Set: 1,472.55


110.25 Cost Per Set: 110.25
15.6.4
(British) : Each

Rate (Rs)

350.00 1
30.00 1
120.00 1
80.00 1
95.00 1
50.00 1
20.00 1
TOTAL MATERIAL 72.68

1,200.00 1
3.00
TOTAL LABOUR 7.82
19.50

1,269.88 Cost Per Each: 1,269.88


80.85 Cost Per Each: 80.85

15.5.1
(British) : Each

Rate (Rs)

240.00 1

TOTAL MATERIAL 68.89

1,200.00 1
3.00
TOTAL LABOUR 11.61
19.50

323.55 Cost Per Each: 323.55


36.75 Cost Per Each: 36.75

(British) : Each

Rate (Rs)

60.00 1
450.00 1

TOTAL MATERIAL 68.03

1,200.00 1
3.00
TOTAL LABOUR 12.47
19.50

883.18 Cost Per Each: 883.18


110.25 Cost Per Each: 110.25

(British) : Each
Rate (Rs)

450.00 1 No

40.00 1 No

TOTAL MATERIAL 65.47

1,200.00 1
3.00
TOTAL LABOUR 15.03
19.50

695.80 Cost Per Each: 695.80


110.25 Cost Per Each: 110.25

15.2.10
(British) : Rft

Rate (Rs)

250.00 1
70.00 1
TOTAL MATERIAL 74.41

1,200.00 1
3.00
TOTAL LABOUR 6.09
19.50

324.53 Per Meter : Rs 1,064.45


13.23 Per Meter : Rs 43.39
15.6.6
(British) : Rft

Rate (Rs)

187.25 1
91.67 1
1,000.00 1
TOTAL MATERIAL 72.27

1,200.00 1
3.00
TOTAL LABOUR 8.23
19.50

255.48 Per Meter : Rs 837.96


17.64 Per Meter : Rs 57.86

Spec. No :
Unit (British) : Each
Supply and Erection shackle/pin insulator, medium size
Unit Rate (Rs)

Kg 150.00 1

No 120.00 1

TOTAL MATERIAL 65.10

1,200.00 1
3.00
TOTAL LABOUR 15.40
19.50

224.96 Cost Per Each: 224.96


36.75 Cost Per Each: 36.75

15.4.25
(British) : kg

Rate (Rs)

112.33 1
750.00 1
TOTAL MATERIAL 75.99

1,200.00 1
3.00
TOTAL LABOUR 4.51
19.50

960.06 Cost Per kg: 960.06


19.11 Cost Per kg: 19.11

15.2.10
(British) : kg
Rate (Rs)

150.00 1
TOTAL MATERIAL 70.20

1,200.00 1
3.00
TOTAL LABOUR 10.30
19.50

198.36 Cost Per kg: 198.36


19.11 Cost Per kg: 19.11

15.2.10, 15.3.1
(British) : Rft

Rate (Rs)

7.01 1
120.00 1
TOTAL MATERIAL 66.47

1,200.00 1
3.00
TOTAL LABOUR 14.03
19.50

70.78 Per Meter : Rs 232.16


10.29 Per Meter : Rs 33.75
15.2.10, 15.3.1
(British) : Rft

Rate (Rs)

15.24 1
120.00 1
TOTAL MATERIAL 68.88

1,200.00 1
3.00
TOTAL LABOUR 11.62
19.50

90.45 Per Meter : Rs 296.68


10.29 Per Meter : Rs 33.75

15.2.10, 15.3.1
(British) : Rft

Rate (Rs)

19.51 1
120.00 1
TOTAL MATERIAL 69.75

1,200.00 1
3.00
TOTAL LABOUR 10.75
19.50

100.66 Per Meter : Rs 330.15


10.29 Per Meter : Rs 33.75
15.2.10, 15.3.1
(British) : Rft

Rate (Rs)

28.66 1
120.00 1
TOTAL MATERIAL 71.14

1,200.00 1
3.00
TOTAL LABOUR 9.36
19.50

122.52 Per Meter : Rs 401.88


10.29 Per Meter : Rs 33.75

15.5.6
(British) : Each

Rate (Rs)

328.75 1
55.00 1
TOTAL MATERIAL 47.98
1,200.00 1
3.00
TOTAL LABOUR 32.52
19.50

855.06 Cost Per Each: 855.06


330.75 Cost Per Each: 330.75

15.6.1
(British) : Each

Rate (Rs)

1,600.00 1
TOTAL MATERIAL 59.62

1,200.00 1
3.00
TOTAL LABOUR 20.88
19.50

2,500.00 Cost Per Each: 2,500.00


588.00 Cost Per Each: 588.00

15.6.1
(British) : Each
Rate (Rs)

1,426.00 1

TOTAL MATERIAL 57.98

1,200.00 1
3.00
TOTAL LABOUR 22.52
19.50

2,292.07 Cost Per Each: 2,292.07


588.00 Cost Per Each: 588.00

15.6.1
(British) : Each

Rate (Rs)

3,200.00 1

TOTAL MATERIAL 67.39

1,200.00 1
3.00
TOTAL LABOUR 13.11
19.50

4,412.00 Cost Per Each: 4,412.00


588.00 Cost Per Each: 588.00
15.6.5
(British) : No

Rate (Rs)

22,050.00 1

TOTAL MATERIAL 71.02

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.83

1,756.18 1
TOTAL EQUIPMENT 5.66
19.50

28,762.29 Cost Per No: 28,762.29


313.91 Cost Per No: 313.91

15.3.1.5
(British) : Each

Rate (Rs) Amount

700.00 1 No
TOTAL MATERIAL 54.25

1,200.00 1
3.00
TOTAL LABOUR 26.25
19.50

1,204.00 Cost Per Each: 1,204.00


367.50 Cost Per Each: 367.50

Spec. No :
Unit (British) : Each
W mercury vapour lamp with choke
Rate (Rs)

350.00 1
1,500.00 1
TOTAL MATERIAL 72.78

1,200.00 1
3.00
TOTAL LABOUR 7.72
19.50

2,357.75 Cost Per Each: 2,357.75


147.00 Cost Per Each: 147.00
Spec. No :
Unit (British) : Each
W mercury vapour lamp with choke
Rate (Rs)

800.00 1
2,000.00 1
TOTAL MATERIAL 74.32

1,200.00 1
3.00
TOTAL LABOUR 6.18
19.50

3,493.00 Cost Per Each: 3,493.00


147.00 Cost Per Each: 147.00

Spec. No :
Unit (British) : Each
W mercury vapour lamp with choke
Rate (Rs)

1,250.00 1
3,000.00 1
TOTAL MATERIAL 75.37

1,200.00 1
3.00
TOTAL LABOUR 5.13
19.50

5,225.75 Cost Per Each: 5,225.75


147.00 Cost Per Each: 147.00
15.6.1
(British) : Each

Rate (Rs)

14,000.00 1

TOTAL MATERIAL 74.32

1,200.00 1
3.00
TOTAL LABOUR 6.18
19.50

17,465.00 Cost Per Each: 17,465.00


735.00 Cost Per Each: 735.00

Spec. No :
Unit (British) : Each
Supply and Fixing SMD Type LED Road light Fixture (120-130 watts)
Rate (Rs)

24,000.00 1

TOTAL MATERIAL 75.61

1,200.00 1
3.00
TOTAL LABOUR 4.89
19.50

29,415.00 Cost Per Each: 29,415.00


735.00 Cost Per Each: 735.00
Spec. No :
Unit (British) : Each
Supply and Fixing SMD Type LED Road light Fixture (90-100 watts)
Rate (Rs)

20,000.00 1

TOTAL MATERIAL 75.24

1,200.00 1
3.00
TOTAL LABOUR 5.26
19.50

24,635.00 Cost Per Each: 24,635.00


735.00 Cost Per Each: 735.00

Spec. No :
Unit (British) : Each
Supply and Fixing SMD Type LED Road light Fixture (60-70 watts)
Rate (Rs)

11,800.00 1

TOTAL MATERIAL 73.75

1,200.00 1
3.00
TOTAL LABOUR 6.75
19.50
14,836.00 Cost Per Each: 14,836.00
735.00 Cost Per Each: 735.00

(British) : No

Rate (Rs) Amount

55,000.00 1 No

TOTAL MATERIAL 74.76

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.35

1,756.18 1
TOTAL EQUIPMENT 2.39
19.50

68,137.54 Cost Per No: 68,137.54


313.91 Cost Per No: 313.91
(British) : Each

Rate (Rs)

1,900.00 1 No

TOTAL MATERIAL 76.06

1,200.00 1
3.00
TOTAL LABOUR 4.44
19.50

2,314.60 Cost Per Each: 2,314.60


44.10 Cost Per Each: 44.10

(British) : Each

Rate (Rs)

1,700.00 1 No

TOTAL MATERIAL 75.89


1,200.00 1
3.00
TOTAL LABOUR 4.61
19.50

2,075.60 Cost Per Each: 2,075.60


44.10 Cost Per Each: 44.10

(British) : Each

Rate (Rs)

5,000.00 1 No

TOTAL MATERIAL 76.95

1,200.00 1
3.00
TOTAL LABOUR 3.55
19.50

6,019.10 Cost Per Each: 6,019.10


44.10 Cost Per Each: 44.10
(British) : Each

Rate (Rs)

2,100.00 1

TOTAL MATERIAL 76.19

1,200.00 1
3.00
TOTAL LABOUR 4.31
19.50

2,553.60 Cost Per Each: 2,553.60


44.10 Cost Per Each: 44.10

Spec. No :
Unit (British) : Each
Supply, installation, testing and commissioning of following light
1x18 Watt Impact Resistant Lamp fixture with Compact
ete in all respects.
Rate (Rs)

2,300.00 1

TOTAL MATERIAL 76.31

1,200.00 1
3.00
TOTAL LABOUR 4.19
19.50
2,792.60 Cost Per Each: 2,792.60
44.10 Cost Per Each: 44.10

(British) : Each

Rate (Rs)

12,600.00 1

TOTAL MATERIAL 77.28

1,200.00 1
3.00
TOTAL LABOUR 3.22
19.50

15,101.10 Cost Per Each: 15,101.10


44.10 Cost Per Each: 44.10

(British) : Each

Rate (Rs)
3,700.00 1

TOTAL MATERIAL 76.75

1,200.00 1
3.00
TOTAL LABOUR 3.75
19.50

4,465.60 Cost Per Each: 4,465.60


44.10 Cost Per Each: 44.10

(British) : Each

Rate (Rs)

8,400.00 1 No

TOTAL MATERIAL 77.17

1,200.00 1
3.00
TOTAL LABOUR 3.33
19.50

10,082.10 Cost Per Each: 10,082.10


44.10 Cost Per Each: 44.10
(British) : Each

Rate (Rs)

27,000.00 1

TOTAL MATERIAL 77.40

1,200.00 1
3.00
TOTAL LABOUR 3.10
19.50

32,309.10 Cost Per Each: 32,309.10


44.10 Cost Per Each: 44.10

(British) : Each

Rate (Rs)

5,000.00 1

TOTAL MATERIAL 76.95

1,200.00 1
3.00
TOTAL LABOUR 3.55
19.50
6,019.10 Cost Per Each: 6,019.10
44.10 Cost Per Each: 44.10

(British) : Each

Rate (Rs)

50,000.00 1

TOTAL MATERIAL 77.44

1,200.00 1
3.00
TOTAL LABOUR 3.06
19.50

59,794.10 Cost Per Each: 59,794.10


44.10 Cost Per Each: 44.10

(British) : No

Rate (Rs) Amount


5,000.00 1 No

TOTAL MATERIAL 76.95

1,200.00 1
3.00
TOTAL LABOUR 3.55
19.50

6,019.10 Cost Per No: 6,019.10


44.10 Cost Per No: 44.10

(British) : Each

Rate (Rs) Amount

650.00 1 No

TOTAL MATERIAL 73.43

1,200.00 1
3.00
TOTAL LABOUR 7.07
19.50
820.85 Cost Per Each: 820.85
44.10 Cost Per Each: 44.10

(British) : Each

Rate (Rs) Amount

850.00 1 No

TOTAL MATERIAL 74.35

1,200.00 1
3.00
TOTAL LABOUR 6.15
19.50

1,059.85 Cost Per Each: 1,059.85


44.10 Cost Per Each: 44.10
(British) : Each

Rate (Rs) Amount

1,450.00 1 No

TOTAL MATERIAL 75.62

1,200.00 1
3.00
TOTAL LABOUR 4.88
19.50

1,776.85 Cost Per Each: 1,776.85


44.10 Cost Per Each: 44.10

(British) : Each

Rate (Rs)

750.00 1 No
TOTAL MATERIAL 73.95

1,200.00 1
3.00
TOTAL LABOUR 6.55
19.50

940.35 Cost Per Each: 940.35


44.10 Cost Per Each: 44.10

(British) : Each

Rate (Rs) Amount

840.00 1 No

TOTAL MATERIAL 74.32

1,200.00 1
3.00
TOTAL LABOUR 6.18
19.50

1,047.90 Cost Per Each: 1,047.90


44.10 Cost Per Each: 44.10
(British) : Each

Rate (Rs) Amount

4,400.00 1 No

TOTAL MATERIAL 76.87

1,200.00 1
3.00
TOTAL LABOUR 3.63
19.50

5,302.10 Cost Per Each: 5,302.10


44.10 Cost Per Each: 44.10

(British) : No
Rate (Rs) Amount

1,200.00 1 No

TOTAL MATERIAL 68.89

1,200.00 1
3.00
TOTAL LABOUR 11.61
19.50

1,617.75 Cost Per No: 1,617.75


183.75 Cost Per No: 183.75

(British) : No

Rate (Rs) Amount

1,800.00 1 No

TOTAL MATERIAL 71.54


1,200.00 1
3.00
TOTAL LABOUR 8.96
19.50

2,334.75 Cost Per No: 2,334.75


183.75 Cost Per No: 183.75

(British) : No

Rate (Rs) Amount

1,400.00 1 No

TOTAL MATERIAL 70.00

1,200.00 1
3.00
TOTAL LABOUR 10.50
19.50

1,856.75 Cost Per No: 1,856.75


183.75 Cost Per No: 183.75
(British) : No

Rate (Rs)

1,500.00 1 No

TOTAL MATERIAL 70.45

1,200.00 1
3.00
TOTAL LABOUR 10.05
19.50

1,976.25 Cost Per No: 1,976.25


183.75 Cost Per No: 183.75

(British) : No

Rate (Rs)

2,100.00 1 No
TOTAL MATERIAL 72.33

1,200.00 1
3.00
TOTAL LABOUR 8.17
19.50

2,693.25 Cost Per No: 2,693.25


183.75 Cost Per No: 183.75

(British) : No

Unit Rate (Rs)

No 2,800.00 1

TOTAL MATERIAL 73.56

1,200.00 1
3.00
TOTAL LABOUR 6.94
19.50

3,529.75 Cost Per No: 3,529.75


183.75 Cost Per No: 183.75
(British) : No

Unit Rate (Rs)

No 3,200.00 1

TOTAL MATERIAL 74.03

1,200.00 1
3.00
TOTAL LABOUR 6.47
19.50

4,007.75 Cost Per No: 4,007.75


183.75 Cost Per No: 183.75

(British) : No

Rate (Rs) Amount

1,200.00 1 No
TOTAL MATERIAL 68.89

1,200.00 1
3.00
TOTAL LABOUR 11.61
19.50

1,617.75 Cost Per No: 1,617.75


183.75 Cost Per No: 183.75

(British) : No

Rate (Rs) Amount

1,600.00 1 No

TOTAL MATERIAL 70.86

1,200.00 1
3.00
TOTAL LABOUR 9.64
19.50

2,095.75 Cost Per No: 2,095.75


183.75 Cost Per No: 183.75
(British) : No

Rate (Rs)

3,400.00 1

TOTAL MATERIAL 74.23

1,200.00 1
3.00
TOTAL LABOUR 6.27
19.50

4,246.75 Cost Per No: 4,246.75


183.75 Cost Per No: 183.75

(British) : No

Rate (Rs)

3,400.00 1

TOTAL MATERIAL 74.23

1,200.00 1
3.00
TOTAL LABOUR 6.27
19.50

4,246.75 Cost Per No: 4,246.75


183.75 Cost Per No: 183.75

(British) : No

Rate (Rs) Amount

2,650.00 1 No

TOTAL MATERIAL 73.35

1,200.00 1
3.00
TOTAL LABOUR 7.15
19.50

3,350.50 Cost Per No: 3,350.50


183.75 Cost Per No: 183.75
(British) : No

Rate (Rs)

5,800.00 1

TOTAL MATERIAL 75.55

1,200.00 1
3.00
TOTAL LABOUR 4.95
19.50

7,114.75 Cost Per No: 7,114.75


183.75 Cost Per No: 183.75

(British) : No

Rate (Rs) Amount

3,200.00 1 No

TOTAL MATERIAL 74.03


1,200.00 1
3.00
TOTAL LABOUR 6.47
19.50

4,007.75 Cost Per No: 4,007.75


183.75 Cost Per No: 183.75

(British) : No

Rate (Rs) Amount

3,456.00 1 No

TOTAL MATERIAL 74.28

1,200.00 1
3.00
TOTAL LABOUR 6.22
19.50

4,313.67 Cost Per No: 4,313.67


183.75 Cost Per No: 183.75
(British) : Each

Rate (Rs)

2,400.00 1 Each

TOTAL MATERIAL 72.94

1,200.00 1
3.00
TOTAL LABOUR 7.56
19.50

3,051.75 Cost Per Each: 3,051.75


183.75 Cost Per Each: 183.75

(British) : Each

Rate (Rs)

4,500.00 1

TOTAL MATERIAL 76.99

1,200.00 1
3.00
TOTAL LABOUR 3.51
19.50

5,414.25 Cost Per Each: 5,414.25


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each
ndle bulb 60 watt(Pin/Scrcw typo)
Rate (Rs)

1,200.00 1

TOTAL MATERIAL 75.61

1,200.00 1
3.00
TOTAL LABOUR 4.89
19.50

1,470.75 Cost Per Each: 1,470.75


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each

Rate (Rs)

250.00 1
TOTAL MATERIAL 69.20

1,200.00 1
3.00
TOTAL LABOUR 11.30
19.50

335.50 Cost Per Each: 335.50


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each

Rate (Rs)

250.00 1
TOTAL MATERIAL 69.20

1,200.00 1
3.00
TOTAL LABOUR 11.30
19.50

335.50 Cost Per Each: 335.50


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each
logen rod 500 watt
Rate (Rs)

60.00 1
TOTAL MATERIAL 51.67

1,200.00 1
3.00
TOTAL LABOUR 28.83
19.50

108.45 Cost Per Each: 108.45


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each
e rod 4' long 40 watt
Rate (Rs)

110.00 1
TOTAL MATERIAL 60.89

1,200.00 1
3.00
TOTAL LABOUR 19.61
19.50

168.20 Cost Per Each: 168.20


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each
be rod 2' long 20 watt
Rate (Rs)

80.00 1
TOTAL MATERIAL 56.36

1,200.00 1
3.00
TOTAL LABOUR 24.14
19.50

132.35 Cost Per Each: 132.35


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each
Watt Incandesent bulb
Rate (Rs)

20.00 1

TOTAL MATERIAL 62.50

1,200.00 1
3.00
TOTAL LABOUR 18.00
19.50

29.78 Cost Per Each: 29.78


5.88 Cost Per Each: 5.88

Spec. No :
Unit (British) : Each

Rate (Rs)

800.00 1
TOTAL MATERIAL 75.24

1,200.00 1
3.00
TOTAL LABOUR 5.26
19.50

985.40 Cost Per Each: 985.40


29.40 Cost Per Each: 29.40

Spec. No :
Unit (British) : Each

Rate (Rs)

800.00 1

TOTAL MATERIAL 74.70

1,200.00 1
3.00
TOTAL LABOUR 5.80
19.50

992.75 Cost Per Each: 992.75


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each
Supply & Erection of Spot light 120 /150 watt complete in all aspects
Rate (Rs)

1,400.00 1

TOTAL MATERIAL 75.87


1,200.00 1
3.00
TOTAL LABOUR 4.63
19.50

1,709.75 Cost Per Each: 1,709.75


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each

Rate (Rs)

150.00 1
TOTAL MATERIAL 64.58

1,200.00 1
3.00
TOTAL LABOUR 15.92
19.50

216.00 Cost Per Each: 216.00


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each

Rate (Rs)

240.00 1
TOTAL MATERIAL 68.89
1,200.00 1
3.00
TOTAL LABOUR 11.61
19.50

323.55 Cost Per Each: 323.55


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each

Rate (Rs)

280.00 1
TOTAL MATERIAL 70.00

1,200.00 1
3.00
TOTAL LABOUR 10.50
19.50

371.35 Cost Per Each: 371.35


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each

Rate (Rs)

450.00 1
TOTAL MATERIAL 72.66
1,200.00 1
3.00
TOTAL LABOUR 7.84
19.50

574.50 Cost Per Each: 574.50


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each

Rate (Rs)

1,400.00 1

TOTAL MATERIAL 76.19

1,200.00 1
3.00
TOTAL LABOUR 4.31
19.50

1,702.40 Cost Per Each: 1,702.40


29.40 Cost Per Each: 29.40

Spec. No :
Unit (British) : Each
ht Head cover for street light
Rate (Rs)

350.00 1
TOTAL MATERIAL 54.25

1,200.00 1
3.00
TOTAL LABOUR 26.25
19.50

602.00 Cost Per Each: 602.00


183.75 Cost Per Each: 183.75

15.6.1
(British) : Each

Rate (Rs)

3,400.00 1

TOTAL MATERIAL 74.86

1,200.00 1
3.00
TOTAL LABOUR 5.64
19.50

4,210.00 Cost Per Each: 4,210.00


147.00 Cost Per Each: 147.00

15.6.1
(British) : Each

Rate (Rs)

350.00 1 No.

TOTAL MATERIAL 57.71

1,200.00 1
3.00
TOTAL LABOUR 22.79
19.50

565.25 Cost Per Each: 565.25


147.00 Cost Per Each: 147.00

15.6.7
(British) : Each

Rate (Rs)

13,000.00 1

TOTAL MATERIAL 49.88

1,200.00 1
3.00
TOTAL LABOUR 30.62
19.50

24,355.00 Cost Per Each: 24,355.00


8,820.00 Cost Per Each: 8,820.00
15.6.6
(British) : Each

Rate (Rs)

14,000.00 1 No.

300.00 1 LS

TOTAL MATERIAL 67.58

600.00 1
1,200.00 1
3.00
TOTAL LABOUR 12.92
19.50

19,661.00 Cost Per Each: 19,661.00


2,572.50 Cost Per Each: 2,572.50

15.6.6
(British) : Each

Rate (Rs)
22,000.00 1 No.

300.00 1 LS

TOTAL MATERIAL 70.83

600.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.67
19.50

29,221.00 Cost Per Each: 29,221.00


2,572.50 Cost Per Each: 2,572.50

15.6.6
(British) : Each

Rate (Rs)

12,000.00 1 No.

300.00 1 LS

TOTAL MATERIAL 67.61

600.00 1
1,200.00 1
3.00
TOTAL LABOUR 12.89
19.50
16,903.50 Cost Per Each: 16,903.50
2,205.00 Cost Per Each: 2,205.00

15.6.6
(British) : Each

Rate (Rs)

20,000.00 1 No.

300.00 1 LS

TOTAL MATERIAL 71.19

600.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.31
19.50

26,463.50 Cost Per Each: 26,463.50


2,205.00 Cost Per Each: 2,205.00

15.6.6, 15.7.4
(British) : Each
Rate (Rs)

28,800.00 1

15,000.00 1
90.00 1
2,500.00 1

TOTAL MATERIAL 76.21

1,200.00 1
850.00 1
3.00
TOTAL LABOUR 3.55

1,500.00 1
4,377.87 1

TOTAL EQUIPMENT 0.74


19.50

56,491.99 Cost Per Each: 56,491.99


407.31 Cost Per Each: 407.31

15.6.6
(British) : Job

Rate (Rs)

187.25 1
48.40 1
120.00 1
TOTAL MATERIAL 45.62

1,200.00 1
3.00
TOTAL LABOUR 34.88
19.50

7,044.51 Cost Per Job: 7,044.51


2,940.00 Cost Per Job: 2,940.00

15.13.2
(British) : Each

Rate (Rs)

7,000.00 1
200.00 1
120.00 1
TOTAL MATERIAL 71.77

1,200.00 1
3.00
TOTAL LABOUR 8.73
19.50

9,721.40 Cost Per Each: 9,721.40


735.00 Cost Per Each: 735.00

Spec. No :
Unit (British) : Each

Rate (Rs)
1,000.00 1

TOTAL MATERIAL 59.62

1,200.00 1
3.00
TOTAL LABOUR 20.88
19.50

1,562.50 Cost Per Each: 1,562.50


367.50 Cost Per Each: 367.50

Spec. No :
Unit (British) : Each

Rate (Rs)

650.00 1
TOTAL MATERIAL 74.74

1,200.00 1
3.00
TOTAL LABOUR 5.76
19.50

806.15 Cost Per Each: 806.15


29.40 Cost Per Each: 29.40

Spec. No :
Unit (British) : Each
Rate (Rs)

460.00 1

TOTAL MATERIAL 73.66

1,200.00 1
3.00
TOTAL LABOUR 6.84
19.50

579.10 Cost Per Each: 579.10


29.40 Cost Per Each: 29.40

15.14.4
(British) : Each

Rate (Rs)

10,200.00 1 No

TOTAL MATERIAL 75.29

1,200.00 1
3.00
TOTAL LABOUR 5.21
19.50

12,556.50 Cost Per Each: 12,556.50


367.50 Cost Per Each: 367.50
Spec. No :
Unit (British) : Each
Supply and Erection of T tape clamps and square tape clamps
Unit Rate (Rs)

No 280.00 1

TOTAL MATERIAL 71.38

1,200.00 1
3.00
TOTAL LABOUR 9.12
19.50

364.00 Cost Per Each: 364.00


29.40 Cost Per Each: 29.40

15.13.2
(British) : Rft

Rate (Rs)

20.00 1
200.00 1
TOTAL MATERIAL 75.39

1,200.00 1
3.00
TOTAL LABOUR 5.11
19.50

368.84 Per Meter : Rs 1,209.79


10.29 Per Meter : Rs 33.75

15.13.2
(British) : Rft

Rate (Rs)

20.00 1
150.00 1
TOTAL MATERIAL 75.24

1,200.00 1
3.00
TOTAL LABOUR 5.26
19.50

344.96 Per Meter : Rs 1,131.47


10.29 Per Meter : Rs 33.75

(British) : Rft
Rate (Rs)

2,500.00 1
TOTAL MATERIAL 48.44

1,200.00 1
3.00
TOTAL LABOUR 32.06
19.50

4,825.00 Per Meter : Rs 15,826.00


1,837.50 Per Meter : Rs 6,027.00

15.3.1
(British) : Each

Unit Rate (Rs)

Rft 5.00
Rft 7.01
No. 28.67
Pkt 25.00
No. 20.00
TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR
Over Heads on(M+L+E) 2% +

Rs. 843.67
Rs. 44.10
15.3.1
(British) : Each

Unit Rate (Rs)

Rft 5.00
Rft 6.71

No. 50.00
No. 75.00
No. 28.67
Pkt 25.00
TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR

Rs. 640.08
Rs. 44.10

15.3.1
(British) : Rft

Unit Rate (Rs)


Rft 5.00
Pkt 7.00
Rft 25.91
TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR
Over Heads on(M+L+E) 2% +

Rs. 76.85
Rs. 8.82

15.3.1
(British) : Rft

Unit Rate (Rs)

Rft 5.00
Pkt 7.00
Rft 37.20
TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR
Over Heads on(M+L+E) 2% +

Rs. 103.83
Rs. 8.82
15.3.1
(British) : Rft

Unit Rate (Rs)

Rft 6.00
Pkt 7.00
Rft 68.29
TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR
Over Heads on(M+L+E) 2% +

Rs. 185.21
Rs. 14.70

15.3.1
(British) : Rft

Unit Rate (Rs)

Rft 6.00
Pkt 7.00
Rft 165.24
TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR
Over Heads on(M+L+E) 2% +

Rs. 428.80
Rs. 26.46

15.3.1
(British) : Rft

Unit Rate (Rs)

Rft 5.00
Pkt 7.00
Rft 7.01
TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR
Over Heads on(M+L+E) 2% +

Rs. 20.48
Rs. 5.88

15.3.1
(British) : Rft
Unit Rate (Rs)

Rft 5.00
Pkt 7.00
Rft 15.24
TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR
Over Heads on(M+L+E) 2% +

Rs. 30.32
Rs. 5.88

15.3.1
(British) : Rft

Unit Rate (Rs)

Rft 6.00
Pkt 7.00
Rft 28.66
TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR
Over Heads on(M+L+E) 2% +

Rs. 47.55
Rs. 5.88
15.3.1
(British) : Rft

Unit Rate (Rs)

Rft 6.00
Pkt 7.00
Rft 73.77
TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR
Over Heads on(M+L+E) 2% +

Rs. 105.87
Rs. 10.29

15.3.1
(British) : Each

Unit Rate (Rs)

Rft 5.00
Pkt 7.00
Rft 7.01
No. 120.00
No. 20.00
TOTAL MATERIAL
Day 1,200.00

TOTAL LABOUR
Over Heads on(M+L+E) 2% +

Rs. 1,821.23
Rs. 70.56

15.3.1
(British) : Each

Unit Rate (Rs)

Rft 10.00
Rft 7.01
No. 40.00
No. 30.00
No. 21.67
TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR
Over Heads on(M+L+E) 2% +

Rs. 1,088.31
Rs. 66.15

15.3.1
(British) : Each

Unit Rate (Rs)

Rft 10.00
Rft 7.01
No. 40.00
No. 30.00
No. 30.00
No. 21.67
TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR
Over Heads on(M+L+E) 2% +

Rs. 528.67
Rs. 32.34

15.3.1
(British) : Each

Unit Rate (Rs)

Rft 10.00
Rft 7.01
No. 40.00
No. 40.00
No. 21.67
TOTAL MATERIAL

Day 1,200.00
TOTAL LABOUR
Over Heads on(M+L+E) 2% +

Rs. 2,036.96
Rs. 99.96

15.3.2
(British) : Each

Unit Rate (Rs)

48.40 1
900.00 1
7,000.00 1
Each 60.00 1
TOTAL MATERIAL 71.93

1,200.00 1
3.00
TOTAL LABOUR 8.57
19.50

15,997.96 Cost Per Each: 15,997.96


1,176.00 Cost Per Each: 1,176.00

15.4.5
(British) : Each
Rate (Rs)

50.00 1
50.00 1
83.33 1
TOTAL MATERIAL 55.96

1,200.00 1
3.00
TOTAL LABOUR 24.54
19.50

259.72 Cost Per Each: 259.72


73.50 Cost Per Each: 73.50

Spec. No :
Unit (British) : Each
Amp Piano type switch (PPI)
Rate (Rs)

35.00 1

TOTAL MATERIAL 45.97

1,200.00 1
3.00
TOTAL LABOUR 34.53
19.50

71.23 Cost Per Each: 71.23


29.40 Cost Per Each: 29.40
Spec. No :
Unit (British) : Each

Rate (Rs)

70.00 1
TOTAL MATERIAL 66.16

1,200.00 1
3.00
TOTAL LABOUR 14.34
19.50

98.35 Cost Per Each: 98.35


14.70 Cost Per Each: 14.70

Spec. No :
Unit (British) : Each

Rate (Rs)

30.00 1
TOTAL MATERIAL 55.36

1,200.00 1
3.00
TOTAL LABOUR 25.14
19.50

50.55 Cost Per Each: 50.55


14.70 Cost Per Each: 14.70
Spec. No :
Unit (British) : Each

Rate (Rs)

30.00 1
TOTAL MATERIAL 55.36

1,200.00 1
3.00
TOTAL LABOUR 25.14
19.50

50.55 Cost Per Each: 50.55


14.70 Cost Per Each: 14.70

Spec. No :
Unit (British) : Each
Amp Power Plug 3-Pin
Rate (Rs)

200.00 1
TOTAL MATERIAL 73.11

1,200.00 1
3.00
TOTAL LABOUR 7.39
19.50

253.70 Cost Per Each: 253.70


14.70 Cost Per Each: 14.70
15.6.3
(British) : Each

Rate (Rs)

1,000.00 1
TOTAL MATERIAL 73.95

1,200.00 1
3.00
TOTAL LABOUR 6.55
19.50

1,253.80 Cost Per Each: 1,253.80


58.80 Cost Per Each: 58.80

15.6.3
(British) : Each

Rate (Rs)

3,000.00 1
TOTAL MATERIAL 76.28

1,200.00 1
3.00
TOTAL LABOUR 4.22
19.50

3,643.80 Cost Per Each: 3,643.80


58.80 Cost Per Each: 58.80
15.6.3
(British) : Each

Rate (Rs)

150.00 1 No

30.00 1 No

TOTAL MATERIAL 58.13

1,200.00 1
3.00
TOTAL LABOUR 22.38
19.50

288.60 Cost Per Each: 288.60


73.50 Cost Per Each: 73.50

15.6.3
(British) : Each

Rate (Rs)

200.00 1 No
30.00 1 No

TOTAL MATERIAL 61.47

1,200.00 1
3.00
TOTAL LABOUR 19.03
19.50

348.35 Cost Per Each: 348.35


73.50 Cost Per Each: 73.50

15.6.3
(British) : Each

Rate (Rs)

250.00 1 No

30.00 1 No

TOTAL MATERIAL 63.82

1,200.00 1
3.00
TOTAL LABOUR 16.68
19.50

408.10 Cost Per Each: 408.10


73.50 Cost Per Each: 73.50
15.6.3
(British) : Each

Rate (Rs)

500.00 1
30.00 1
TOTAL MATERIAL 69.62

1,200.00 1
3.00
TOTAL LABOUR 10.88
19.50

706.85 Cost Per Each: 706.85


73.50 Cost Per Each: 73.50

15.6.3
(British) : Each

Rate (Rs)

250.00 1 No

30.00 1 No

TOTAL MATERIAL 63.82

1,200.00 1
3.00
TOTAL LABOUR 16.68
19.50
408.10 Cost Per Each: 408.10
73.50 Cost Per Each: 73.50

15.6.3
(British) : Each

Rate (Rs)

850.00 1 No

30.00 1 No

TOTAL MATERIAL 72.55

1,200.00 1
3.00
TOTAL LABOUR 7.95
19.50

1,125.10 Cost Per Each: 1,125.10


73.50 Cost Per Each: 73.50

15.6.3
(British) : Each
Rate (Rs)

150.00 1 No

25.00 1 No

TOTAL MATERIAL 57.71

1,200.00 1
3.00
TOTAL LABOUR 22.79
19.50

282.63 Cost Per Each: 282.63


73.50 Cost Per Each: 73.50

15.6.1
(British) : Each

Rate (Rs)

250.00 1
TOTAL MATERIAL 62.50

1,200.00 1
3.00
TOTAL LABOUR 18.00
19.50

372.25 Cost Per Each: 372.25


73.50 Cost Per Each: 73.50
15.6.1
(British) : Each

Rate (Rs)

1,900.00 1 Set

TOTAL MATERIAL 71.83

1,200.00 1
3.00
TOTAL LABOUR 8.67
19.50

2,454.25 Cost Per Each: 2,454.25


183.75 Cost Per Each: 183.75

15.6.1
(British) : Each

Rate (Rs)

1,350.00 1

TOTAL MATERIAL 71.17

1,200.00 1
3.00
TOTAL LABOUR 9.33
19.50

1,760.25 Cost Per Each: 1,760.25


147.00 Cost Per Each: 147.00

15.6.1
(British) : Each

Rate (Rs)

1,000.00 1

TOTAL MATERIAL 69.20

1,200.00 1
3.00
TOTAL LABOUR 11.30
19.50

1,342.00 Cost Per Each: 1,342.00


147.00 Cost Per Each: 147.00

15.6.1
(British) : Each
Rate (Rs)

550.00 1
TOTAL MATERIAL 66.60

1,200.00 1
3.00
TOTAL LABOUR 13.90
19.50

767.50 Cost Per Each: 767.50


110.25 Cost Per Each: 110.25

15.6.1
(British) : Each

Rate (Rs)

60.00 1
550.00 1
TOTAL MATERIAL 64.76

1,200.00 1
3.00
TOTAL LABOUR 15.74
19.50

875.95 Cost Per Each: 875.95


147.00 Cost Per Each: 147.00
15.6.1
(British) : Each

Unit Rate (Rs)

No 60.00
No 550.00
TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR

Rs. 875.95
Rs. 147.00

15.6.1
(British) : Each

Rate (Rs)

60.00 1
550.00 1
TOTAL MATERIAL 64.76

1,200.00 1
3.00
TOTAL LABOUR 15.74
19.50

875.95 Cost Per Each: 875.95


147.00 Cost Per Each: 147.00
15.6.1
(British) : Each

Rate (Rs)

60.00 1
250.00 1
TOTAL MATERIAL 39.39

1,200.00 1
3.00
TOTAL LABOUR 41.11
19.50

737.95 Cost Per Each: 737.95


367.50 Cost Per Each: 367.50

15.6.1
(British) : Each

Rate (Rs)

60.00 1
300.00 1
TOTAL MATERIAL 42.27
1,200.00 1
3.00
TOTAL LABOUR 38.23
19.50

797.70 Cost Per Each: 797.70


367.50 Cost Per Each: 367.50

15.6.1
(British) : Each

Rate (Rs)

60.00 1
350.00 1
TOTAL MATERIAL 44.75

1,200.00 1
3.00
TOTAL LABOUR 35.75
19.50

857.45 Cost Per Each: 857.45


367.50 Cost Per Each: 367.50

15.6.1
(British) : Each
Rate (Rs)

1,850.00 1
40.00 1
950.00 1
TOTAL MATERIAL 70.10

1,200.00 1
3.00
TOTAL LABOUR 10.40
19.50

3,761.30 Cost Per Each: 3,761.30


367.50 Cost Per Each: 367.50

15.6.1
(British) : Each

Rate (Rs)

1,850.00 1
40.00 1
340.00 1
TOTAL MATERIAL 68.31

1,200.00 1
3.00
TOTAL LABOUR 12.19
19.50

3,032.35 Cost Per Each: 3,032.35


367.50 Cost Per Each: 367.50
15.6.1
(British) : Each

Rate (Rs)

1,850.00 1
40.00 1
2,800.00 1
TOTAL MATERIAL 72.84

1,200.00 1
3.00
TOTAL LABOUR 7.66
19.50

5,972.05 Cost Per Each: 5,972.05


367.50 Cost Per Each: 367.50

Spec. No :
Unit (British) : Each
Supply & erection of Garden light fixture with LED 25-30 watts
Rate (Rs)

14,823.00 1

TOTAL MATERIAL 77.31

1,200.00 1
3.00
TOTAL LABOUR 3.19
19.50

17,757.59 Cost Per Each: 17,757.59


44.10 Cost Per Each: 44.10

15.6.1
(British) : Each

Rate (Rs)

920.00 1
TOTAL MATERIAL 58.44

1,200.00 1
3.00
TOTAL LABOUR 22.06
19.50

1,466.90 Cost Per Each: 1,466.90


367.50 Cost Per Each: 367.50

15.6.1
(British) : Each

Rate (Rs)
200.00 1
1,520.00 1
TOTAL MATERIAL 65.99

1,200.00 1
3.00
TOTAL LABOUR 14.51
19.50

2,422.90 Cost Per Each: 2,422.90


367.50 Cost Per Each: 367.50

15.13.1
(British) : Each

Rate (Rs)

1,200.00 1
3.00
TOTAL LABOUR 80.50
19.50

220.50 Cost Per Each: 220.50


220.50 Cost Per Each: 220.50

15.5.1
(British) : Each
Rate (Rs)

2,740.00 1
TOTAL MATERIAL 73.48

1,200.00 1
3.00
TOTAL LABOUR 7.02
19.50

3,458.05 Cost Per Each: 3,458.05


183.75 Cost Per Each: 183.75

15.5.1
(British) : Each

Rate (Rs)

3,400.00 1
TOTAL MATERIAL 74.23

1,200.00 1
3.00
TOTAL LABOUR 6.27
19.50

4,246.75 Cost Per Each: 4,246.75


183.75 Cost Per Each: 183.75
15.5.1
(British) : Each

Rate (Rs)

3,500.00 1
TOTAL MATERIAL 74.32

1,200.00 1
3.00
TOTAL LABOUR 6.18
19.50

4,366.25 Cost Per Each: 4,366.25


183.75 Cost Per Each: 183.75

Spec. No :
Unit (British) : Each
Supply & Erection of 24" Pedestal fan complete in all aspects
Rate (Rs)

3,500.00 1

TOTAL MATERIAL 77.50


19.50

4,182.50 Cost Per Each: 4,182.50


0.00 Cost Per Each: 0.00
15.5.2
(British) : Each

Rate (Rs)

4,400.00 1 No

TOTAL MATERIAL 76.20

1,200.00 1
3.00
TOTAL LABOUR 4.30
19.50

5,349.88 Cost Per Each: 5,349.88


91.88 Cost Per Each: 91.88

15.5.2
(British) : Each

Rate (Rs)

7,000.00 1 No
TOTAL MATERIAL 76.68

1,200.00 1
3.00
TOTAL LABOUR 3.82
19.50

8,456.88 Cost Per Each: 8,456.88


91.88 Cost Per Each: 91.88

15.5.3
(British) : Each

Rate (Rs)

1,900.00 1

TOTAL MATERIAL 72.90

1,200.00 1
3.00
TOTAL LABOUR 7.60
19.50

2,417.50 Cost Per Each: 2,417.50


147.00 Cost Per Each: 147.00

15.5.3
(British) : Each
Rate (Rs)

2,566.00 1

TOTAL MATERIAL 74.04

1,200.00 1
3.00
TOTAL LABOUR 6.46
19.50

3,213.37 Cost Per Each: 3,213.37


147.00 Cost Per Each: 147.00

15.5.3
(British) : Each

Rate (Rs)

3,909.00 1

TOTAL MATERIAL 75.19

1,200.00 1
3.00
TOTAL LABOUR 5.31
19.50

4,818.26 Cost Per Each: 4,818.26


147.00 Cost Per Each: 147.00
Spec. No : 15.5.3
Unit (British) : Each
Supply & Erection of Exhaust fan(round) upto 6" dia (imported)
Rate (Rs)

1,400.00 1

TOTAL MATERIAL 73.56

1,200.00 1
3.00
TOTAL LABOUR 6.94
19.50

1,764.88 Cost Per Each: 1,764.88


91.88 Cost Per Each: 91.88

15.7.12
(British) : Each

Rate (Rs)

2,400.00 1
TOTAL MATERIAL 64.58

1,200.00 1
3.00
TOTAL LABOUR 15.92
19.50

3,456.00 Cost Per Each: 3,456.00


588.00 Cost Per Each: 588.00

15.7.12
(British) : Each

Rate (Rs)

2,900.00 1
TOTAL MATERIAL 66.49

1,200.00 1
3.00
TOTAL LABOUR 14.01
19.50

4,053.50 Cost Per Each: 4,053.50


588.00 Cost Per Each: 588.00

15.7.12
(British) : Each

Rate (Rs)

6,200.00 1
TOTAL MATERIAL 70.97
1,200.00 1
3.00
TOTAL LABOUR 9.53
19.50

8,107.25 Cost Per Each: 8,107.25


698.25 Cost Per Each: 698.25

15.7.12
(British) : Each

Rate (Rs)

450.00 1
TOTAL MATERIAL 64.58

1,200.00 1
3.00
TOTAL LABOUR 15.92
19.50

648.00 Cost Per Each: 648.00


110.25 Cost Per Each: 110.25

15.7.12
(British) : Each
Rate (Rs)

450.00 1
TOTAL MATERIAL 64.58

1,200.00 1
3.00
TOTAL LABOUR 15.92
19.50

648.00 Cost Per Each: 648.00


110.25 Cost Per Each: 110.25

15.7.12
(British) : Each

Rate (Rs)

690.00 1
TOTAL MATERIAL 68.56

1,200.00 1
3.00
TOTAL LABOUR 11.94
19.50

934.80 Cost Per Each: 934.80


110.25 Cost Per Each: 110.25
15.7.12
(British) : Each

Unit Rate (Rs)

No 690.00
TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR

Rs. 934.80
Rs. 110.25

15.14.5
(British) : Each

Rate (Rs)

75.00 1
850.00 1
1,450.00 1
50.00 1
50.00 1
400.00 1
TOTAL MATERIAL 64.76

600.00 1
1,200.00 1
3.00
TOTAL LABOUR 15.74
19.50

8,759.50 Cost Per Each: 8,759.50


1,470.00 Cost Per Each: 1,470.00

15.14.5
(British) : Each

Rate (Rs)

75.00 1
850.00 1
1,450.00 1
50.00 1
50.00 1
400.00 1
TOTAL MATERIAL 64.80

600.00 1
1,200.00 1
3.00
TOTAL LABOUR 15.70
19.50

8,789.38 Cost Per Each: 8,789.38


1,470.00 Cost Per Each: 1,470.00

15.14.5
(British) : Each
Rate (Rs)

75.00 1
850.00 1
1,450.00 1
50.00 1
50.00 1
400.00 1
TOTAL MATERIAL 57.71

600.00 1
1,200.00 1
3.00
TOTAL LABOUR 22.79
19.50

9,891.88 Cost Per Each: 9,891.88


2,572.50 Cost Per Each: 2,572.50

15.14.5
(British) : Each

Unit Rate (Rs)

No 75.00 1
No 850.00 1
No 1,450.00 1
No 50.00 1
LS 50.00 1
No 400.00 1
TOTAL MATERIAL 54.85

Day 600.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 25.65
19.50

10,502.88 Cost Per Each: 10,502.88


3,123.75 Cost Per Each: 3,123.75

15.4.5
(British) : Each

Unit Rate (Rs)

No 75.00 1
No 1,000.00 1
No 1,450.00 1
No 50.00 1
LS 50.00 1
No 400.00 1
TOTAL MATERIAL 53.78

Day 600.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 26.72
19.50

11,801.00 Cost Per Each: 11,801.00


3,675.00 Cost Per Each: 3,675.00
Spec. No :
Unit (British) : Each
& Bolt (2''x5/8')
Rate (Rs)

160.00 1
TOTAL MATERIAL 69.79

850.00 1
3.00
TOTAL LABOUR 10.71
19.50

212.86 Cost Per Each: 212.86


21.66 Cost Per Each: 21.66

Spec. No :
Unit (British) : Each
& Bolt 8'' or 9''x5/8''
Rate (Rs)

161.00 1

TOTAL MATERIAL 69.83

850.00 1
3.00
TOTAL LABOUR 10.67
19.50

214.05 Cost Per Each: 214.05


21.66 Cost Per Each: 21.66
Spec. No :
Unit (British) : Each
& Bolt 10''x5/8''
Rate (Rs)

179.00 1
TOTAL MATERIAL 70.53

850.00 1
3.00
TOTAL LABOUR 9.97
19.50

235.56 Cost Per Each: 235.56


21.66 Cost Per Each: 21.66

Spec. No :
Unit (British) : Each

Rate (Rs)

1,164.00 1

TOTAL MATERIAL 74.43

1,200.00 1
3.00
TOTAL LABOUR 6.07
19.50

1,449.78 Cost Per Each: 1,449.78


58.80 Cost Per Each: 58.80
15.8.11
(British) : Each

Unit Rate (Rs)

No 15.00 1
kg 55.00 1

kg 50.00 1

TOTAL MATERIAL 65.20

1,200.00 1
3.00
TOTAL LABOUR 15.30
19.50

362.93 Cost Per Each: 362.93


58.80 Cost Per Each: 58.80

15.8.11
(British) : Each

Unit Rate (Rs)

No. 15.00 1
kg 55.00 1
kg 50.00 1

TOTAL MATERIAL 70.17

1,200.00 1
3.00
TOTAL LABOUR 10.33
19.50

607.90 Cost Per Each: 607.90


58.80 Cost Per Each: 58.80

15.2.10
(British) : Each

Rate (Rs)

75.00 1
50.00 1
250.00 1
110.00 1
50.00 1
TOTAL MATERIAL 70.43

600.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.07
19.50

118.10 Cost Per Each: 118.10


11.03 Cost Per Each: 11.03
(British) : Each

Rate (Rs)

2,033.00 1
TOTAL MATERIAL 67.53

1,200.00 1
3.00
TOTAL LABOUR 12.97
19.50

2,796.94 Cost Per Each: 2,796.94


367.50 Cost Per Each: 367.50

(British) : Each

Rate (Rs)

2,033.00 1
TOTAL MATERIAL 67.53

1,200.00 1
3.00
TOTAL LABOUR 12.97
19.50

2,796.94 Cost Per Each: 2,796.94


367.50 Cost Per Each: 367.50

(British) : Each

Rate (Rs)

1,900.00 1

TOTAL MATERIAL 66.93

1,200.00 1
3.00
TOTAL LABOUR 13.57
19.50

2,638.00 Cost Per Each: 2,638.00


367.50 Cost Per Each: 367.50

(British) : Each
Rate (Rs)

500.00 1

TOTAL MATERIAL 48.44

1,200.00 1
3.00
TOTAL LABOUR 32.06
19.50

965.00 Cost Per Each: 965.00


367.50 Cost Per Each: 367.50

15.5.3
(British) : Each

Rate (Rs)

1,650.00 1
50.00 1
120.00 1
TOTAL MATERIAL 65.12

1,200.00 1
1,200.00 1
3.00
TOTAL LABOUR 15.38
19.50

3,153.66 Cost Per Each: 3,153.66


514.50 Cost Per Each: 514.50
15.5.3
(British) : Each

Rate (Rs)

1,800.00 1

50.00 1
120.00 1
TOTAL MATERIAL 66.14

1,200.00 1
1,200.00 1
3.00
TOTAL LABOUR 14.36
19.50

3,438.07 Cost Per Each: 3,438.07


514.50 Cost Per Each: 514.50

15.5.3
(British) : Each

Rate (Rs)

1,900.00 1

50.00 1
120.00 1
TOTAL MATERIAL 73.20
1,200.00 1
1,200.00 1
3.00
TOTAL LABOUR 7.30
19.50

3,363.71 Cost Per Each: 3,363.71


191.10 Cost Per Each: 191.10

15.5.3
(British) : Each

Rate (Rs)

2,559.00 1

TOTAL MATERIAL 76.42

1,200.00 1
3.00
TOTAL LABOUR 4.08
19.50

3,102.11 Cost Per Each: 3,102.11


44.10 Cost Per Each: 44.10

15.5.3
(British) : Each
Rate (Rs)

3,909.12 1

TOTAL MATERIAL 76.04

1,200.00 1
3.00
TOTAL LABOUR 4.46
19.50

4,763.27 Cost Per Each: 4,763.27


91.88 Cost Per Each: 91.88

15.5.2
(British) : Each

Rate (Rs)

4,400.00 1 No.

TOTAL MATERIAL 76.20

1,200.00 1
3.00
TOTAL LABOUR 4.30
19.50

5,349.88 Cost Per Each: 5,349.88


91.88 Cost Per Each: 91.88

(British) : Rft

Rate (Rs)

8.00 1

TOTAL MATERIAL 32.98

1,200.00 1
3.00
TOTAL LABOUR 47.52
19.50

22.79 Per Meter : Rs 74.75


13.23 Per Meter : Rs 43.39

(British) : Rft

Rate (Rs)

15.00 1
TOTAL MATERIAL 45.06

1,200.00 1
3.00
TOTAL LABOUR 35.44
19.50

31.15 Per Meter : Rs 102.19


13.23 Per Meter : Rs 43.39

(British) : Rft

Rate (Rs)

25.00 1

TOTAL MATERIAL 54.12

1,200.00 1
3.00
TOTAL LABOUR 26.38
19.50

43.10 Per Meter : Rs 141.38


13.23 Per Meter : Rs 43.39

(British) : Rft
Rate (Rs)

50.00 1

TOTAL MATERIAL 63.73

1,200.00 1
3.00
TOTAL LABOUR 16.77
19.50

72.98 Per Meter : Rs 239.37


13.23 Per Meter : Rs 43.39

15.2.4
(British) : RMtr

Rate (Rs)

60.00 1

850.00 1
11.00 1
10.00 1
TOTAL MATERIAL 75.60

1,200.00 1
3.00
TOTAL LABOUR 4.90
19.50

1,052.01 Cost Per RMtr: 1,052.01


26.46 Cost Per RMtr: 26.46
15.2.4
(British) : RMtr

Rate (Rs)

60.00 1

1,100.00 1
11.00 1
10.00 1
TOTAL MATERIAL 76.02

1,200.00 1
3.00
TOTAL LABOUR 4.48
19.50

1,350.76 Cost Per RMtr: 1,350.76


26.46 Cost Per RMtr: 26.46

Spec. No :
Unit (British) : Each
er switch complete
Unit Rate (Rs)

No. 150.00 1
TOTAL MATERIAL 58.71
Day 1,200.00 1
3.00
TOTAL LABOUR 21.79
19.50

238.05 Cost Per Each: 238.05


58.80 Cost Per Each: 58.80

Spec. No :
Unit (British) : Each

Rate (Rs)

200.00 1
TOTAL MATERIAL 69.20

1,200.00 1
3.00
TOTAL LABOUR 11.30
19.50

268.40 Cost Per Each: 268.40


29.40 Cost Per Each: 29.40

Spec. No :
Unit (British) : Each
lain power plug 30 Amp
Rate (Rs)

450.00 1
TOTAL MATERIAL 61.18
1,200.00 1
3.00
TOTAL LABOUR 19.32
19.50

684.75 Cost Per Each: 684.75


147.00 Cost Per Each: 147.00

Spec. No :
Unit (British) : Each

Rate (Rs)

150.00 1
TOTAL MATERIAL 66.81

1,200.00 1
3.00
TOTAL LABOUR 13.69
19.50

208.65 Cost Per Each: 208.65


29.40 Cost Per Each: 29.40

Spec. No :
Unit (British) : Each
acitor 2.2 uf for ceiling fans
Rate (Rs)

56.00 1
TOTAL MATERIAL 37.41
1,200.00 1
3.00
TOTAL LABOUR 43.09
19.50

140.42 Cost Per Each: 140.42


73.50 Cost Per Each: 73.50

(British) : Each

Rate (Rs)

220.00 1
TOTAL MATERIAL 57.68

1,200.00 1
3.00
TOTAL LABOUR 22.82
19.50

355.51 Cost Per Each: 355.51


92.61 Cost Per Each: 92.61

Spec. No :
Unit (British) : Each
ut out, bakelite open type
Rate (Rs)
50.00 1
23.50 1

TOTAL MATERIAL 54.78

1,200.00 1
3.00
TOTAL LABOUR 25.72
19.50

54.21 Cost Per Each: 54.21


16.17 Cost Per Each: 16.17

Spec. No :
Unit (British) : Each
Supply and erection of cut out bakelite Recessed type cut out
Rate (Rs)

50.00 1
24.00 1

TOTAL MATERIAL 70.04

1,200.00 1
3.00
TOTAL LABOUR 10.46
19.50

164.35 Cost Per Each: 164.35


16.17 Cost Per Each: 16.17

Spec. No :
Unit (British) : Each
t kat 500 volts 15/20 Amp
Rate (Rs)

50.00 1
51.00 1

TOTAL MATERIAL 56.82

600.00 1
1,200.00 1
3.00
TOTAL LABOUR 23.68
19.50

97.37 Cost Per Each: 97.37


26.46 Cost Per Each: 26.46

Spec. No :
Unit (British) : Each
t kat 500 volts 30/35 Amp
Rate (Rs)

50.00 1
97.00 1
TOTAL MATERIAL 63.12

600.00 1
1,200.00 1
3.00
TOTAL LABOUR 17.38
19.50

155.28 Cost Per Each: 155.28


29.40 Cost Per Each: 29.40
Spec. No :
Unit (British) : Each
t kat 500 volts 60/65 Amp
Rate (Rs)

50.00 1
210.00 1
TOTAL MATERIAL 66.85

600.00 1
1,200.00 1
3.00
TOTAL LABOUR 13.65
19.50

303.54 Cost Per Each: 303.54


42.63 Cost Per Each: 42.63

Spec. No :
Unit (British) : Each
t kat 500 volts 100 Amp
Rate (Rs)

50.00 1
420.00 1
TOTAL MATERIAL 70.67

600.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.83
19.50

562.58 Cost Per Each: 562.58


50.72 Cost Per Each: 50.72
Spec. No :
Unit (British) : Each
t kat 500 volts 200 Amp
Rate (Rs)

50.00 1
655.00 1
TOTAL MATERIAL 72.21

600.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.29
19.50

852.22 Cost Per Each: 852.22


59.53 Cost Per Each: 59.53

Spec. No :
Unit (British) : Each
t kat 500 volts 300 Amp
Rate (Rs)

50.00 1
460.00 1
TOTAL MATERIAL 70.21

600.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.29
19.50
619.20 Cost Per Each: 619.20
59.53 Cost Per Each: 59.53

Spec. No :
Unit (British) : Each
t kat 500 volts 400 Amp
Rate (Rs)

50.00 1
475.00 1
TOTAL MATERIAL 68.94

600.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.56
19.50

651.09 Cost Per Each: 651.09


73.50 Cost Per Each: 73.50

Spec. No :
Unit (British) : Each
Providing & Fixing Generator 2.2 KVA Petrol driven of best quaity
Rate (Rs)

77,500.00 1
300.00 1
2,500.00 1

250.00 1
220.00 1

TOTAL MATERIAL 76.58

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.92
19.50

103,368.38 Cost Per Each: 103,368.38


1,255.63 Cost Per Each: 1,255.63

Spec. No :
Unit (British) : Each
Providing & Fixing Generator , 2.2 KVA Petrol-cum-Gas driven
Unit Rate (Rs)

No 77,500.00
Yard 300.00
No 2,500.00

Set 250.00
Ltr 220.00

No 650.00

TOTAL MATERIAL 76.59

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.91
19.50

104,145.13 Cost Per Each: 104,145.13


1,255.63 Cost Per Each: 1,255.63
Spec. No :
Unit (British) : Each
Providing & Fixing Generator, 3.1 KVA Petrol-cum-Gas driven.
Unit Rate (Rs)

No 91,500.00
Yard 300.00
No 2,500.00

Set 250.00
Ltr 220.00

No 650.00

TOTAL MATERIAL 76.71

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.79
19.50

120,875.13 Cost Per Each: 120,875.13


1,255.63 Cost Per Each: 1,255.63

Spec. No :
Unit (British) : Each
Providing & Fixing Generator , 3.1 KVA Petrol driven.
Unit Rate (Rs)

No 91,500.00 1
Yard 300.00 1
No 2,500.00 1
Set 250.00 1
Ltr 220.00 1

TOTAL MATERIAL 76.71

Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 3.79
19.50

120,098.38 Cost Per Each: 120,098.38


1,255.63 Cost Per Each: 1,255.63

Spec. No :
Unit (British) : No
pole 36' High (Spun Type)
Rate (Rs)

26,730.00 1

TOTAL MATERIAL 71.04

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.80

1,756.18 1
TOTAL EQUIPMENT 4.67
19.50

34,869.70 Cost Per No: 34,869.70


828.71 Cost Per No: 828.71
Spec. No :
Unit (British) : No
pole 31' High (Spun Type)
Rate (Rs)

20,124.00 1

TOTAL MATERIAL 69.14

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.32

1,756.18 1
TOTAL EQUIPMENT 6.03
19.50

26,975.53 Cost Per No: 26,975.53


828.71 Cost Per No: 828.71

Spec. No :
Unit (British) : No

Rate (Rs)

23,070.00 1

TOTAL MATERIAL 70.11

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.06

1,756.18 1
TOTAL EQUIPMENT 5.34
19.50

30,496.00 Cost Per No: 30,496.00


828.71 Cost Per No: 828.71

Spec. No :
Unit (British) : No

Rate (Rs)

16,663.00 1

TOTAL MATERIAL 67.63

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.75

1,756.18 1
TOTAL EQUIPMENT 7.13
19.50

22,839.63 Cost Per No: 22,839.63


828.71 Cost Per No: 828.71

Spec. No :
Unit (British) : Rft
CSR Osprey Conductor
Rate (Rs)

440.00 1
TOTAL MATERIAL 74.05

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.45
19.50

550.91 Per Meter : Rs 1,806.99


25.11 Per Meter : Rs 82.37

Spec. No :
Unit (British) : Rft

Rate (Rs)

183.00 1

TOTAL MATERIAL 69.69

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.81
19.50

243.80 Per Meter : Rs 799.66


25.11 Per Meter : Rs 82.37

Spec. No :
Unit (British) : Rft
CSR Rabbit Conductor (7/0.132")
Rate (Rs)

93.00 1

TOTAL MATERIAL 63.50

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 17.00
19.50

136.25 Per Meter : Rs 446.89


25.11 Per Meter : Rs 82.37

Spec. No :
Unit (British) : Rft
AC Wasp Conductor ( 7/0.173")
Rate (Rs)

152.00 1

TOTAL MATERIAL 68.29

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 12.21
19.50

206.75 Per Meter : Rs 678.15


25.11 Per Meter : Rs 82.37
Spec. No :
Unit (British) : Rft
AC Ant Conductor ( 7/0.122" )
Rate (Rs)

76.00 1

TOTAL MATERIAL 61.04

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 19.46
19.50

115.93 Per Meter : Rs 380.26


25.11 Per Meter : Rs 82.37

Spec. No :
Unit (British) : Each
KV Disc Insulator
Rate (Rs)

2,495.00 1
TOTAL MATERIAL 75.24

1,200.00 1
3.00
TOTAL LABOUR 5.26
19.50

3,073.40 Cost Per Each: 3,073.40


91.88 Cost Per Each: 91.88
Spec. No :
Unit (British) : Each
KV Pin Insulator
Rate (Rs)

1,047.00 1
TOTAL MATERIAL 72.32

1,200.00 1
3.00
TOTAL LABOUR 8.18
19.50

1,343.04 Cost Per Each: 1,343.04


91.88 Cost Per Each: 91.88

Spec. No :
Unit (British) : Each
KV pin for Steel-x-arm
Rate (Rs)

540.00 1

TOTAL MATERIAL 68.05

1,200.00 1
3.00
TOTAL LABOUR 12.45
19.50

737.18 Cost Per Each: 737.18


91.88 Cost Per Each: 91.88
Spec. No :
Unit (British) : Each

Rate (Rs)

135.00 1
TOTAL MATERIAL 61.18

1,200.00 1
3.00
TOTAL LABOUR 19.32
19.50

205.43 Cost Per Each: 205.43


44.10 Cost Per Each: 44.10

Spec. No :
Unit (British) : No
25 KVA, 11/0.4 KV Transformer
Rate (Rs)

170,000.00 1

TOTAL MATERIAL 75.80

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.91

1,756.18 1
TOTAL EQUIPMENT 0.78
19.50

207,759.89 Cost Per No: 207,759.89


2,511.25 Cost Per No: 2,511.25
Spec. No :
Unit (British) : No
KVA, 11/0.4 KV Transformer
Rate (Rs)

280,000.00 1

TOTAL MATERIAL 76.46

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.56

1,756.18 1
TOTAL EQUIPMENT 0.48
19.50

339,209.89 Cost Per No: 339,209.89


2,511.25 Cost Per No: 2,511.25

Spec. No :
Unit (British) : No
KVA, 11/0.4 KV Transformer
Rate (Rs)

380,000.00 1

TOTAL MATERIAL 76.73

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.41

1,756.18 1
TOTAL EQUIPMENT 0.35
19.50

458,709.89 Cost Per No: 458,709.89


2,511.25 Cost Per No: 2,511.25

Spec. No :
Unit (British) : No
KVA, 11/0.4 KV Transformer
Rate (Rs)

860,412.00 1

TOTAL MATERIAL 77.16

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.18

1,756.18 1
TOTAL EQUIPMENT 0.16
19.50

1,032,802.23 Cost Per No: 1,032,802.23


2,511.25 Cost Per No: 2,511.25
Spec. No :
Unit (British) : Each
el-X-Arm with braces
Rate (Rs)

7,916.00 1

TOTAL MATERIAL 77.15

1,200.00 1
3.00
TOTAL LABOUR 3.35
19.50

9,503.72 Cost Per Each: 9,503.72


44.10 Cost Per Each: 44.10

Spec. No :
Unit (British) : Each
el-x-Arm / D-Fitting
Rate (Rs)

6,993.00 1
TOTAL MATERIAL 77.10

1,200.00 1
3.00
TOTAL LABOUR 3.40
19.50

8,400.74 Cost Per Each: 8,400.74


44.10 Cost Per Each: 44.10
Spec. No :
Unit (British) : Each

Rate (Rs)

1,472.00 1
TOTAL MATERIAL 75.65

1,200.00 1
3.00
TOTAL LABOUR 4.85
19.50

1,803.14 Cost Per Each: 1,803.14


44.10 Cost Per Each: 44.10

Spec. No :
Unit (British) : Kg

Rate (Rs)

150.00 1
TOTAL MATERIAL 62.50

1,200.00 1
3.00
TOTAL LABOUR 18.00
19.50

223.35 Cost Per Kg: 223.35


44.10 Cost Per Kg: 44.10
Spec. No :
Unit (British) : Each

Rate (Rs)

164.00 1
TOTAL MATERIAL 63.55

1,200.00 1
3.00
TOTAL LABOUR 16.95
19.50

240.08 Cost Per Each: 240.08


44.10 Cost Per Each: 44.10

Spec. No :
Unit (British) : Each

Rate (Rs)

1,011.00 1
TOTAL MATERIAL 57.05

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 23.45
19.50

1,652.21 Cost Per Each: 1,652.21


444.06 Cost Per Each: 444.06
Spec. No :
Unit (British) :
thing wire GSL 6 mm
Unit Rate (Rs)

Kg 105.00
TOTAL MATERIAL

Day 850.00

TOTAL LABOUR

Rs. 190.55
Rs. 65.08

15.12.1
(British) : Each

Rate (Rs)

8,000.00 1 Kg

TOTAL MATERIAL 70.06

850.00 1
3.00
TOTAL LABOUR 10.44
19.50

10,601.25 Cost Per Each: 10,601.25


1,041.25 Cost Per Each: 1,041.25

Spec. No : 15.6.6
Unit (British) : Each
Supply at site, hoisting and installation of Single Arm Pole
Unit Rate (Rs)

No 45,000.00 1

TOTAL MATERIAL 72.99

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.66

1,756.18 1
TOTAL EQUIPMENT 2.85
19.50 %

57,129.26 Cost Per Each: 57,129.26


1,255.63 Cost Per Each: 1,255.63

(British) : Job

Rate (Rs)

35,000.00 1 Job

TOTAL MATERIAL 77.45

1,200.00 1
3.00
TOTAL LABOUR 3.05
19.50

41,854.40 Cost Per Job: 41,854.40


29.40 Cost Per Job: 29.40

Spec. No :
Unit (British) : Each
Supply and errection of Grounding connecting points
Unit Rate (Rs)

No 6,100.00

TOTAL MATERIAL 66.35

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 14.15
19.50

8,545.13 Cost Per Each: 8,545.13


1,255.63 Cost Per Each: 1,255.63
(British) : Job

Rate (Rs) Amount

25,000.00 1 Job

TOTAL MATERIAL 77.43

1,200.00 1
3.00
TOTAL LABOUR 3.07
19.50

29,904.40 Cost Per Job: 29,904.40


29.40 Cost Per Job: 29.40

(British) : Job

Inspection Pit of 300 x 300 x 450 mm (L x W x D) complated with

Unit Rate (Rs)

Job 102,500.00 1
TOTAL MATERIAL 77.48

1,200.00 1
3.00
TOTAL LABOUR 3.02
19.50

122,516.90 Cost Per Job: 122,516.90


29.40 Cost Per Job: 29.40

Spec. No :
Unit (British) : Each
Construction of water tight brick type Grounding inspection pit.
Unit Rate (Rs)

No 4,000.00 1
TOTAL MATERIAL 68.70

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.80
19.50

5,407.81 Cost Per Each: 5,407.81


627.81 Cost Per Each: 627.81

15.18.8
(British) : Each

Unit Rate (Rs)

No 26,000.00 1
TOTAL MATERIAL 71.84

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.66
19.50

33,581.25 Cost Per Each: 33,581.25


2,511.25 Cost Per Each: 2,511.25

15.18.8
(British) : Each

Rate (Rs)

90,000.00 1 No
TOTAL MATERIAL 74.12

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.38
19.50

112,572.50 Cost Per Each: 112,572.50


5,022.50 Cost Per Each: 5,022.50

Spec. No :
Unit (British) : Each

Rate (Rs)

600.00 1
TOTAL MATERIAL 62.00

1,200.00 1
3.00
TOTAL LABOUR 18.50
19.50

900.75 Cost Per Each: 900.75


183.75 Cost Per Each: 183.75

Spec. No :
Unit (British) : Each
Bracket along with cotter pin
Rate (Rs)
450.00 1

TOTAL MATERIAL 69.74

1,200.00 1
3.00
TOTAL LABOUR 10.76
19.50

599.05 Cost Per Each: 599.05


61.30 Cost Per Each: 61.30

Spec. No :
Unit (British) : Each
Supply & erection of double pole platform for transformers
Rate (Rs)

11,000.00 1

TOTAL MATERIAL 61.86

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.76

1,756.18 1
TOTAL EQUIPMENT 9.88
19.50

16,499.26 Cost Per Each: 16,499.26


1,255.63 Cost Per Each: 1,255.63
Spec. No :
Unit (British) : Each
Supply & erection of Single pole platform for transformers
Rate (Rs)

10,000.00 1

TOTAL MATERIAL 65.11

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.67

1,756.18 1
TOTAL EQUIPMENT 5.72
19.50

14,254.94 Cost Per Each: 14,254.94


1,255.63 Cost Per Each: 1,255.63

Spec. No :
Unit (British) : Each

Rate (Rs)

8,500.00 1

TOTAL MATERIAL 74.86

1,200.00 1
3.00
TOTAL LABOUR 5.64
19.50

10,525.00 Cost Per Each: 10,525.00


367.50 Cost Per Each: 367.50
Spec. No :
Unit (British) : Each

Rate (Rs)

650.00 1

TOTAL MATERIAL 62.97

1,200.00 1
3.00
TOTAL LABOUR 17.53
19.50

960.50 Cost Per Each: 960.50


183.75 Cost Per Each: 183.75

Spec. No :
Unit (British) : Each

Rate (Rs)

300.00 1

TOTAL MATERIAL 51.67

1,200.00 1
3.00
TOTAL LABOUR 28.83
19.50

542.25 Cost Per Each: 542.25


183.75 Cost Per Each: 183.75

Spec. No :
Unit (British) : Each

Rate (Rs)

300.00 1

TOTAL MATERIAL 51.67

1,200.00 1
3.00
TOTAL LABOUR 28.83
19.50

542.25 Cost Per Each: 542.25


183.75 Cost Per Each: 183.75

Spec. No :
Unit (British) : Each

Rate (Rs)

350.00 1

TOTAL MATERIAL 63.82

1,200.00 1
3.00
TOTAL LABOUR 16.68
19.50
510.13 Cost Per Each: 510.13
91.88 Cost Per Each: 91.88

Spec. No :
Unit (British) : Each

Rate (Rs)

160.00 1

TOTAL MATERIAL 52.77

1,200.00 1
3.00
TOTAL LABOUR 27.73
19.50

283.08 Cost Per Each: 283.08


91.88 Cost Per Each: 91.88

Spec. No :
Unit (British) : Each

Rate (Rs)

145.00 1

TOTAL MATERIAL 51.08

1,200.00 1
3.00
TOTAL LABOUR 29.42
19.50

265.15 Cost Per Each: 265.15


91.88 Cost Per Each: 91.88

Spec. No :
Unit (British) : Each
op dead end clamp
Rate (Rs)

135.00 1

TOTAL MATERIAL 61.18

1,200.00 1
3.00
TOTAL LABOUR 19.32
19.50

205.43 Cost Per Each: 205.43


44.10 Cost Per Each: 44.10

Spec. No :
Unit (British) : Each
op dead end clamp
Rate (Rs)

125.00 1

TOTAL MATERIAL 60.17


1,200.00 1
3.00
TOTAL LABOUR 20.33
19.50

193.48 Cost Per Each: 193.48


44.10 Cost Per Each: 44.10

(British) : Each

Rate (Rs)

52,000.00 1 No

TOTAL MATERIAL 70.91

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 7.19

Hour 1,756.18 1
TOTAL EQUIPMENT 2.39
19.50

68,005.51 Cost Per Each: 68,005.51


3,766.88 Cost Per Each: 3,766.88
(British) : Each

Rate (Rs)

51,000.00 1 No

TOTAL MATERIAL 70.79

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 7.27

Hour 1,756.18 1
TOTAL EQUIPMENT 2.44
19.50

66,810.51 Cost Per Each: 66,810.51


3,766.88 Cost Per Each: 3,766.88
(British) : Each

Rate (Rs)

50,000.00 1 No

TOTAL MATERIAL 70.67

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 7.35

Hour 1,756.18 1
TOTAL EQUIPMENT 2.48
19.50

65,615.51 Cost Per Each: 65,615.51


3,766.88 Cost Per Each: 3,766.88

(British) : Each
Rate (Rs)

62,000.00 1 No

TOTAL MATERIAL 71.90

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.57

Hour 1,756.18 1
TOTAL EQUIPMENT 2.04
19.50

79,955.51 Cost Per Each: 79,955.51


3,766.88 Cost Per Each: 3,766.88

(British) : Each

Rate (Rs)

48,000.00 1 No
TOTAL MATERIAL 70.41

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 7.51

Hour 1,756.18 1
TOTAL EQUIPMENT 2.58
19.50

63,225.51 Cost Per Each: 63,225.51


3,766.88 Cost Per Each: 3,766.88

Spec. No :
Unit (British) : Each

Rate (Rs)

11,000.00 1

TOTAL MATERIAL 76.46

1,200.00 1
3.00
TOTAL LABOUR 4.04
19.50

13,328.75 Cost Per Each: 13,328.75


183.75 Cost Per Each: 183.75
Spec. No :
Unit (British) : Each

Rate (Rs)

4,288.00 1

TOTAL MATERIAL 74.88

1,200.00 1
3.00
TOTAL LABOUR 5.62
19.50

5,307.91 Cost Per Each: 5,307.91


183.75 Cost Per Each: 183.75

Spec. No :
Unit (British) : Rft
Providing and laying pipe at a depth of 2-1/2'
Unit Rate (Rs)

Rft 601.00 1
TOTAL MATERIAL 51.70

1,200.00 1
3.00
TOTAL LABOUR 28.80
19.50

1,085.70 Per Meter : Rs 3,561.08


367.50 Per Meter : Rs 1,205.40

Spec. No :
Unit (British) : m
PVC pipe flexible (weather proof)
Rate (Rs)

376.00 1

TOTAL MATERIAL 70.73

1,200.00 1
3.00
TOTAL LABOUR 9.77
19.50

493.42 Cost Per Meter: 493.42


44.10 Cost Per Meter: 44.10
Spec. No :
Unit (British) : Each
Supply & erection of weather proof flexible PVC pipe 1.5" dia
Rate (Rs)

220.00 1

TOTAL MATERIAL 69.88

1,200.00 1
3.00
TOTAL LABOUR 10.62
19.50

292.30 Cost Per Each: 292.30


29.40 Cost Per Each: 29.40

Spec. No :
Unit (British) : Rft

Rate (Rs)

207.00 1
TOTAL MATERIAL 73.25

1,200.00 1
3.00
TOTAL LABOUR 7.25
19.50

262.07 Per Meter : Rs 859.57


14.70 Per Meter : Rs 48.22
15.18.8
(British) : RMtr

both ends for the following sizes complete

Rate (Rs)

455.00 1

TOTAL MATERIAL 71.82

1,200.00 1
3.00
TOTAL LABOUR 8.68
19.50

587.83 Cost Per RMtr: 587.83


44.10 Cost Per RMtr: 44.10

15.18.8
(British) : RMtr

both ends for the following sizes complete

Rate (Rs)

736.00 1
TOTAL MATERIAL 70.59

1,200.00 1
3.00
TOTAL LABOUR 9.91
19.50

967.72 Cost Per RMtr: 967.72


88.20 Cost Per RMtr: 88.20

15.18.8
(British) : RMtr

both ends for the following sizes complete

Rate (Rs)

976.00 1

TOTAL MATERIAL 70.56

1,200.00 1
3.00
TOTAL LABOUR 9.94
19.50

1,283.92 Cost Per RMtr: 1,283.92


117.60 Cost Per RMtr: 117.60
15.18.1
(British) : RMtr

both ends for the following sizes complete

Rate (Rs)

1,501.00 1

TOTAL MATERIAL 72.30

1,200.00 1
3.00
TOTAL LABOUR 8.20
19.50

1,926.00 Cost Per RMtr: 1,926.00


132.30 Cost Per RMtr: 132.30

15.18.1
(British) : RMtr

both ends for the following sizes complete

Rate (Rs)
1,950.00 1

TOTAL MATERIAL 72.17

1,200.00 1
3.00
TOTAL LABOUR 8.33
19.50

2,506.65 Cost Per RMtr: 2,506.65


176.40 Cost Per RMtr: 176.40

15.18.1
(British) : RMtr

both ends for the following sizes complete

Rate (Rs)

2,700.00 1

TOTAL MATERIAL 73.27

1,200.00 1
3.00
TOTAL LABOUR 7.23
19.50

3,417.60 Cost Per RMtr: 3,417.60


191.10 Cost Per RMtr: 191.10
15.18.1
(British) : RMtr

both ends for the following sizes complete

Rate (Rs)

3,983.00 1

TOTAL MATERIAL 67.35

1,200.00 1
3.00
TOTAL LABOUR 13.15
19.50

5,494.69 Cost Per RMtr: 5,494.69


735.00 Cost Per RMtr: 735.00

15.18.1
(British) : RMtr
both ends for the following sizes complete

Rate (Rs)

6,967.00 1

TOTAL MATERIAL 68.63

1,200.00 1
3.00
TOTAL LABOUR 11.87
19.50

9,428.07 Cost Per RMtr: 9,428.07


1,102.50 Cost Per RMtr: 1,102.50

15.18.1
(British) : RMtr

both ends for the following sizes complete

Unit Rate (Rs)

No 8,200.00 1

TOTAL MATERIAL 67.61

Day 1,200.00 1
3.00
TOTAL LABOUR 12.89
19.50

11,269.00 Cost Per RMtr: 11,269.00


1,470.00 Cost Per RMtr: 1,470.00

15.18.1
(British) : RMtr

both ends for the following sizes complete

Unit Rate (Rs)

No 9,800.00 1

TOTAL MATERIAL 69.05

Day 1,200.00 1
3.00
TOTAL LABOUR 11.45
19.50

13,181.00 Cost Per RMtr: 13,181.00


1,470.00 Cost Per RMtr: 1,470.00

15.18.1
(British) : RMtr
both ends for the following sizes complete

Unit Rate (Rs)

No 17,000.00 1

TOTAL MATERIAL 71.22

Day 1,200.00 1
3.00
TOTAL LABOUR 9.28
19.50

22,152.50 Cost Per RMtr: 22,152.50


1,837.50 Cost Per RMtr: 1,837.50

Spec. No :
Unit (British) : Rft
3 Core Cable PVC/PVC '3 core 2.5 sqmm Cu/PVC/PVC
Rate (Rs)

65.00 1

TOTAL MATERIAL 68.63

1,200.00 1
3.00
TOTAL LABOUR 11.87
19.50

87.97 Per Meter : Rs 288.53


10.29 Per Meter : Rs 33.75
Spec. No :
Unit (British) : Rft
ORE FLXIBLE POWER CABLE 1.5 mm2
Rate (Rs)

60.00 1

TOTAL MATERIAL 67.98

1,200.00 1
3.00
TOTAL LABOUR 12.52
19.50

81.99 Per Meter : Rs 268.93


10.29 Per Meter : Rs 33.75

Spec. No :
Unit (British) : m

Rate (Rs)

387.00 1
TOTAL MATERIAL 75.62

1,200.00 1
3.00
TOTAL LABOUR 4.88
19.50

474.23 Cost Per Meter: 474.23


11.76 Cost Per Meter: 11.76
Spec. No :
Unit (British) : m
ore 1.5mmsq Fire Resistant cable
Rate (Rs)

185.00 1

TOTAL MATERIAL 74.13

1,200.00 1
3.00
TOTAL LABOUR 6.37
19.50

231.37 Cost Per Meter: 231.37


10.29 Cost Per Meter: 10.29

Spec. No :
Unit (British) : RMtr
xible Copper Cable 1x4 mm2
Rate (Rs)

99.00 1

TOTAL MATERIAL 71.44

1,200.00 1
3.00
TOTAL LABOUR 9.06
19.50

128.60 Cost Per RMtr: 128.60


10.29 Cost Per RMtr: 10.29
15.18.1
(British) : m

both ends for the following sizes complete

Unit Rate (Rs)

No 432.56

TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR

Rs. 561.01
Rs. 44.10

15.18.1
(British) : m
both ends for the following sizes complete

Unit Rate (Rs)

No 691.44

TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR

Rs. 914.47
Rs. 88.20

15.18.1
(British) : m

both ends for the following sizes complete

Unit Rate (Rs)

No 1,372.11

TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR
Over Heads on(M+L+E) 2% +
Rs. 1,771.97
Rs. 132.30

15.18.1
(British) : m

both ends for the following sizes complete

Unit Rate (Rs)

No 2,521.49

TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR

Rs. 3,380.68
Rs. 367.50

15.4.5, 15.2.4
, 15.3.2.1
(British) : Meter
Rate (Rs) Amount

4,880.00 1

TOTAL MATERIAL 73.01

1,200.00 1
3.00
TOTAL LABOUR 7.49
19.50

6,199.10 Cost Per Meter: 6,199.10


367.50 Cost Per Meter: 367.50

15.4.5
(British) : Each

Rate (Rs) Amount

590.00 1 No

TOTAL MATERIAL 74.47

1,200.00 1
3.00
TOTAL LABOUR 6.03
19.50

734.45 Cost Per Each: 734.45


29.40 Cost Per Each: 29.40

15.4.5
(British) : Each

Rate (Rs) Amount

670.00 1 No

TOTAL MATERIAL 74.82

1,200.00 1
3.00
TOTAL LABOUR 5.68
19.50

830.05 Cost Per Each: 830.05


29.40 Cost Per Each: 29.40
15.4.5
(British) : Each

Rate (Rs) Amount

500.00 1 No

TOTAL MATERIAL 72.29

1,200.00 1
3.00
TOTAL LABOUR 8.21
19.50

641.60 Cost Per Each: 641.60


44.10 Cost Per Each: 44.10

15.4.5
(British) : Each

Rate (Rs) Amount


710.00 1 No

TOTAL MATERIAL 73.76

1,200.00 1
3.00
TOTAL LABOUR 6.74
19.50

892.55 Cost Per Each: 892.55


44.10 Cost Per Each: 44.10

15.4.5
(British) : Each

Rate (Rs) Amount

767.25 1 No

TOTAL MATERIAL 72.94

1,200.00 1
3.00
TOTAL LABOUR 7.56
19.50

975.66 Cost Per Each: 975.66


58.80 Cost Per Each: 58.80

15.4.5
(British) : Each

Rate (Rs) Amount

958.25 1 No

TOTAL MATERIAL 73.80

1,200.00 1
3.00
TOTAL LABOUR 6.70
19.50

1,203.91 Cost Per Each: 1,203.91


58.80 Cost Per Each: 58.80
15.4.5
(British) : Each

Rate (Rs)

1,183.00 1 No

TOTAL MATERIAL 72.88

1,200.00 1
3.00
TOTAL LABOUR 7.62
19.50

1,505.56 Cost Per Each: 1,505.56


91.88 Cost Per Each: 91.88

15.4.5
(British) : Each

Rate (Rs) Amount


720.00 1 No

TOTAL MATERIAL 75.00

1,200.00 1
3.00
TOTAL LABOUR 5.50
19.50

889.80 Cost Per Each: 889.80


29.40 Cost Per Each: 29.40

15.4.5
(British) : Each

Rate (Rs) Amount

650.06 1 No

TOTAL MATERIAL 74.74

1,200.00 1
3.00
TOTAL LABOUR 5.76
19.50

806.22 Cost Per Each: 806.22


29.40 Cost Per Each: 29.40

15.4.5
(British) : Each

Rate (Rs) Amount

970.10 1 No

TOTAL MATERIAL 74.73

1,200.00 1
3.00
TOTAL LABOUR 5.77
19.50

1,203.37 Cost Per Each: 1,203.37


44.10 Cost Per Each: 44.10
15.4.5
(British) : Each

Rate (Rs) Amount

575.05 1 No

TOTAL MATERIAL 72.93

1,200.00 1
3.00
TOTAL LABOUR 7.57
19.50

731.28 Cost Per Each: 731.28


44.10 Cost Per Each: 44.10

15.4.7
(British) : Each

Rate (Rs) Amount

1,482.45 1 No
TOTAL MATERIAL 75.66

1,200.00 1
3.00
TOTAL LABOUR 4.84
19.50

1,815.63 Cost Per Each: 1,815.63


44.10 Cost Per Each: 44.10

15.4.12
(British) : Each

Rate (Rs) Amount

750.00 1 No

TOTAL MATERIAL 73.95

1,200.00 1
3.00
TOTAL LABOUR 6.55
19.50

940.35 Cost Per Each: 940.35


44.10 Cost Per Each: 44.10
15.4.12
(British) : Each

Rate (Rs) Amount

1,040.00 1 No

TOTAL MATERIAL 74.08

1,200.00 1
3.00
TOTAL LABOUR 6.42
19.50

1,301.60 Cost Per Each: 1,301.60


58.80 Cost Per Each: 58.80

15.4.12
(British) : Each

Rate (Rs)

450.00 1
TOTAL MATERIAL 70.03

1,200.00 1
3.00
TOTAL LABOUR 10.47
19.50

596.55 Cost Per Each: 596.55


58.80 Cost Per Each: 58.80

(British) : Each

Rate (Rs)

510.00 1

TOTAL MATERIAL 70.83

1,200.00 1
3.00
TOTAL LABOUR 9.67
19.50

668.25 Cost Per Each: 668.25


58.80 Cost Per Each: 58.80

15.4.6
(British) : Each
Rate (Rs)

135.00 1
TOTAL MATERIAL 57.17

1,200.00 1
3.00
TOTAL LABOUR 23.33
19.50

220.13 Cost Per Each: 220.13


58.80 Cost Per Each: 58.80

15.4.5
(British) : Each

Rate (Rs)

68.00 1

TOTAL MATERIAL 65.88

1,200.00 1
3.00
TOTAL LABOUR 14.63
19.50

95.96 Cost Per Each: 95.96


14.70 Cost Per Each: 14.70
15.4.5
(British) : Each

Rate (Rs)

87.00 1

TOTAL MATERIAL 68.11

1,200.00 1
3.00
TOTAL LABOUR 12.39
19.50

118.67 Cost Per Each: 118.67


14.70 Cost Per Each: 14.70

15.4.5
(British) : Each

Rate (Rs)

190.00 1

TOTAL MATERIAL 68.81

1,200.00 1
3.00
TOTAL LABOUR 11.69
19.50

256.45 Cost Per Each: 256.45


29.40 Cost Per Each: 29.40

15.4.5
(British) : Each

Rate (Rs)

170.00 1

TOTAL MATERIAL 67.91

1,200.00 1
3.00
TOTAL LABOUR 12.59
19.50

232.55 Cost Per Each: 232.55


29.40 Cost Per Each: 29.40

15.4.5
(British) : Each
Rate (Rs)

225.00 1

TOTAL MATERIAL 70.03

1,200.00 1
3.00
TOTAL LABOUR 10.47
19.50

298.28 Cost Per Each: 298.28


29.40 Cost Per Each: 29.40

15.18.8
(British) : Point

Rate (Rs)

3,547.76 1 No
TOTAL MATERIAL 74.36

1,200.00 1
3.00
TOTAL LABOUR 6.14
19.50

4,423.32 Cost Per Point: 4,423.32


183.75 Cost Per Point: 183.75

15.16.3
(British) : Each

Rate (Rs)

68,451.76 1

TOTAL MATERIAL 77.16

1,200.00 1
3.00
TOTAL LABOUR 3.34
19.50

82,167.35 Cost Per Each: 82,167.35


367.50 Cost Per Each: 367.50
Spec. No :
Unit (British) : Each
Supply, installation, testing and commissioning of Power Amplifier
Rate (Rs)

136,903.52 1
TOTAL MATERIAL 77.33

1,200.00 1
3.00
TOTAL LABOUR 3.17
19.50

163,967.20 Cost Per Each: 163,967.20


367.50 Cost Per Each: 367.50

Spec. No :
Unit (British) : Each
Supply and installation of plena easy line 120 Watt mixer amplifier
Rate (Rs)

45,000.00 1

TOTAL MATERIAL 76.48

1,200.00 1
3.00
TOTAL LABOUR 4.02
19.50

54,510.00 Cost Per Each: 54,510.00


735.00 Cost Per Each: 735.00
(British) : Each

Rate (Rs)

63,703.52 1
TOTAL MATERIAL 76.78

1,200.00 1
3.00
TOTAL LABOUR 3.72
19.50

76,860.71 Cost Per Each: 76,860.71


735.00 Cost Per Each: 735.00

Spec. No :
Unit (British) : Each
Supply, installation, testing & commissioning of Goose Neck Microphone
Unit Rate (Rs)

No 15,850.00 1

TOTAL MATERIAL 76.06

1,200.00 1
3.00
TOTAL LABOUR 4.44
19.50

19,308.25 Cost Per Each: 19,308.25


367.50 Cost Per Each: 367.50

Spec. No :
Unit (British) : Each
Supply, installation, testing & commissioning of Table Stand Microphone
Rate (Rs)

15,850.00 1

TOTAL MATERIAL 76.06

1,200.00 1
3.00
TOTAL LABOUR 4.44
19.50

19,308.25 Cost Per Each: 19,308.25


367.50 Cost Per Each: 367.50

15.16.4
(British) : Each

Rate (Rs)
63,665.09 1

TOTAL MATERIAL 77.14

1,200.00 1
3.00
TOTAL LABOUR 3.36
19.50

76,447.28 Cost Per Each: 76,447.28


367.50 Cost Per Each: 367.50

Spec. No :
Unit (British) : Each
Supply, installation, testing & commissioning of Ceiling Mount Speakers
Rate (Rs)

1,916.01 1

TOTAL MATERIAL 71.87

1,200.00 1
3.00
TOTAL LABOUR 8.63
19.50

2,473.38 Cost Per Each: 2,473.38


183.75 Cost Per Each: 183.75

Spec. No :
Unit (British) : Each
Supply, installation, testing & commissioning of Wall Mount Speakers
Rate (Rs)

41,702.65 1
TOTAL MATERIAL 77.22

1,200.00 1
3.00
TOTAL LABOUR 3.28
19.50

50,018.41 Cost Per Each: 50,018.41


183.75 Cost Per Each: 183.75

Spec. No :
Unit (British) : Each
Supply, installation, testing & commissioning of Wall Mount Speakers
Rate (Rs)

4,910.38 1
TOTAL MATERIAL 75.20

1,200.00 1
3.00
TOTAL LABOUR 5.30
19.50

6,051.65 Cost Per Each: 6,051.65


183.75 Cost Per Each: 183.75

Spec. No :
Unit (British) : Each
Supply, installation, testing & commissioning of Column Loud Speakers
Rate (Rs)

18,720.00 1

TOTAL MATERIAL 76.88

1,200.00 1
3.00
TOTAL LABOUR 3.62
19.50

22,554.15 Cost Per Each: 22,554.15


183.75 Cost Per Each: 183.75

(British) : m

Rate (Rs)

70.00 1 Mtr

TOTAL MATERIAL 73.71

1,200.00 1
3.00
TOTAL LABOUR 6.79
19.50

88.06 Cost Per Meter: 88.06


4.41 Cost Per Meter: 4.41
15.16.7
(British) : No

Rate (Rs) Amount

3,000.00 1 No

TOTAL MATERIAL 75.61

1,200.00 1
3.00
TOTAL LABOUR 4.89
19.50

3,676.88 Cost Per No: 3,676.88


91.88 Cost Per No: 91.88

15.18.8
(British) : Point
Rate (Rs)

4,472.98 1 No

TOTAL MATERIAL 69.53

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.97
19.50

5,973.02 Cost Per Point: 5,973.02


627.81 Cost Per Point: 627.81

(British) : Each
Rate (Rs) Amount

7,235.06 1 No

TOTAL MATERIAL 75.93

1,200.00 1
3.00
TOTAL LABOUR 4.57
19.50

8,829.65 Cost Per Each: 8,829.65


183.75 Cost Per Each: 183.75

(British) : Each

Rate (Rs) Amount

14,371.14 1 No

TOTAL MATERIAL 76.70


1,200.00 1
3.00
TOTAL LABOUR 3.80
19.50

17,357.26 Cost Per Each: 17,357.26


183.75 Cost Per Each: 183.75

15.17.4
(British) : Each

Rate (Rs)

10,727.05 1 No

TOTAL MATERIAL 76.43

1,200.00 1
3.00
TOTAL LABOUR 4.07
19.50

13,002.57 Cost Per Each: 13,002.57


183.75 Cost Per Each: 183.75
15.17.4
(British) : Each

Rate (Rs)

6,400.00 1

TOTAL MATERIAL 75.73

1,200.00 1
3.00
TOTAL LABOUR 4.77
19.50

7,831.75 Cost Per Each: 7,831.75


183.75 Cost Per Each: 183.75

15.16.7
(British) : Each

Rate (Rs)

10,850.00 1
TOTAL MATERIAL 76.44

1,200.00 1
3.00
TOTAL LABOUR 4.06
19.50

13,149.50 Cost Per Each: 13,149.50


183.75 Cost Per Each: 183.75

15.17.8
(British) : Each

Rate (Rs)

263,030.78 1 No

TOTAL MATERIAL 77.46

1,200.00 1
3.00
TOTAL LABOUR 3.04
19.50

314,505.53 Cost Per Each: 314,505.53


183.75 Cost Per Each: 183.75
(British) : No

Rate (Rs) Amount

75,000.00 1 No

TOTAL MATERIAL 77.35

1,200.00 1
3.00
TOTAL LABOUR 3.15
19.50

89,808.75 Cost Per No: 89,808.75


183.75 Cost Per No: 183.75

(British) : Each

Rate (Rs)

57,193.14 1

TOTAL MATERIAL 77.30

1,200.00 1
3.00
TOTAL LABOUR 3.20
19.50

68,529.55 Cost Per Each: 68,529.55


183.75 Cost Per Each: 183.75

Spec. No :

Unit (British) : Each


Supply, installation, testing & commissioning of input module
Rate (Rs)

10,414.22 1
TOTAL MATERIAL 76.40

1,200.00 1
3.00
TOTAL LABOUR 4.10
19.50

12,628.74 Cost Per Each: 12,628.74


183.75 Cost Per Each: 183.75

(British) : Each

Rate (Rs)

6,750.00 1
TOTAL MATERIAL 75.82
1,200.00 1
3.00
TOTAL LABOUR 4.68
19.50

8,250.00 Cost Per Each: 8,250.00


183.75 Cost Per Each: 183.75

(British) : Rft

Rate (Rs)

2,521.13 1

TOTAL MATERIAL 70.35

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.15
19.50

3,326.66 Per Meter : Rs 10,911.43


313.91 Per Meter : Rs 1,029.61
(British) : Rft

Rate (Rs)

3,000.00 1

TOTAL MATERIAL 71.40

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.10
19.50

3,898.91 Per Meter : Rs 12,788.41


313.91 Per Meter : Rs 1,029.61

(British) : Rft
Rate (Rs)

1,890.39 1

TOTAL MATERIAL 68.25

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 12.25
19.50

2,572.92 Per Meter : Rs 8,439.19


313.91 Per Meter : Rs 1,029.61

(British) : Rft

Rate (Rs)

2,000.00 1

TOTAL MATERIAL 68.70

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.80
19.50

2,703.91 Per Meter : Rs 8,868.81


313.91 Per Meter : Rs 1,029.61

(British) : Rft

Rate (Rs)

1,290.15 1

TOTAL MATERIAL 64.66

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 15.84
19.50

1,855.64 Per Meter : Rs 6,086.48


313.91 Per Meter : Rs 1,029.61
(British) : Job
n, testing and commissioning ofLayer 3
witch, Managable for Data Rack, 24 Port Giga

Unit Rate (Rs)

No 285,794.16 1

TOTAL MATERIAL 76.54

1,200.00 1
3.00
TOTAL LABOUR 3.96
19.50 %

345,934.02 Cost Per Job: 345,934.02


4,410.00 Cost Per Job: 4,410.00

(British) : Each

Rate (Rs)

64,290.95 1 No

TOTAL MATERIAL 70.73

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.77
19.50

84,361.43 Cost Per Each: 84,361.43


7,533.75 Cost Per Each: 7,533.75

(British) : Each
n, testing and commissioning of U/UTP, 4
(500 MHz) Network Cable supports (10 Giga) laid in PVC

Rate (Rs)

4,384.07 1 No

TOTAL MATERIAL 68.17

1,200.00 1
3.00
TOTAL LABOUR 12.33
19.50

5,973.96 Cost Per Each: 5,973.96


735.00 Cost Per Each: 735.00

(British) : Each

Rate (Rs)

4,384.07 1 No

TOTAL MATERIAL 68.17

1,200.00 1
3.00
TOTAL LABOUR 12.33
19.50

5,973.96 Cost Per Each: 5,973.96


735.00 Cost Per Each: 735.00
(British) : Each

Rate (Rs)

57,153.95 1

TOTAL MATERIAL 77.45

1,200.00 1
3.00
TOTAL LABOUR 3.05
19.50

68,343.07 Cost Per Each: 68,343.07


44.10 Cost Per Each: 44.10

(British) : Each
Rate (Rs)

17,189.19 1 No

TOTAL MATERIAL 69.24

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.26
19.50

23,052.33 Cost Per Each: 23,052.33


2,511.25 Cost Per Each: 2,511.25

(British) : Each

Rate (Rs)

92,930.45 1 No
TOTAL MATERIAL 75.83

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.67
19.50

113,563.14 Cost Per Each: 113,563.14


2,511.25 Cost Per Each: 2,511.25

(British) : Each

Rate (Rs)

50,000.00 1 No

TOTAL MATERIAL 75.68

1,200.00 1
3.00
TOTAL LABOUR 4.82
19.50

61,220.00 Cost Per Each: 61,220.00


1,470.00 Cost Per Each: 1,470.00
15.20.4
(British) : Each

Rate (Rs)

142,797.95 1 No

TOTAL MATERIAL 75.34

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.16
19.50

175,666.05 Cost Per Each: 175,666.05


5,022.50 Cost Per Each: 5,022.50
(British) : m

Rate (Rs) Amount

72.00 1 Mtr

TOTAL MATERIAL 37.96

1,200.00 1
3.00
TOTAL LABOUR 42.54
19.50

177.92 Cost Per Meter: 177.92


91.88 Cost Per Meter: 91.88

(British) : Each

Unit Rate (Rs)

Each 18,000.00 1

TOTAL MATERIAL 72.66


1,200.00 1
3.00
TOTAL LABOUR 7.84
19.50

22,980.00 Cost Per Each: 22,980.00


1,470.00 Cost Per Each: 1,470.00

(British) : Each

Unit Rate (Rs)

Each 65,000.00

TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR

Rs. 82,085.00
Rs. 4,410.00

15.2.3
(British) : Each
Rate (Rs)

6,000.00 1
TOTAL MATERIAL 70.45

1,200.00 1
3.00
TOTAL LABOUR 10.05
19.50

7,905.00 Cost Per Each: 7,905.00


735.00 Cost Per Each: 735.00

15.2.3
(British) : Each

Rate (Rs)

15,000.00 1
TOTAL MATERIAL 74.52

1,200.00 1
3.00
TOTAL LABOUR 5.98
19.50

18,660.00 Cost Per Each: 18,660.00


735.00 Cost Per Each: 735.00
15.2.3
(British) : Each

Rate (Rs)

22,000.00 1
TOTAL MATERIAL 73.49

1,200.00 1
3.00
TOTAL LABOUR 7.01
19.50

27,760.00 Cost Per Each: 27,760.00


1,470.00 Cost Per Each: 1,470.00

15.2.3
(British) : Each

Rate (Rs)

70,000.00 1
TOTAL MATERIAL 76.19

1,200.00 1
3.00
TOTAL LABOUR 4.31
19.50

85,120.00 Cost Per Each: 85,120.00


1,470.00 Cost Per Each: 1,470.00

15.2.3
(British) : Each

Rate (Rs)

125,000.00 1 No

TOTAL MATERIAL 76.76

1,200.00 1
3.00
TOTAL LABOUR 3.74
19.50

150,845.00 Cost Per Each: 150,845.00


1,470.00 Cost Per Each: 1,470.00
(British) : Each

Rate (Rs)

19,500.00 1

TOTAL MATERIAL 73.01

1,200.00 1
3.00
TOTAL LABOUR 7.49
19.50

24,772.50 Cost Per Each: 24,772.50


1,470.00 Cost Per Each: 1,470.00

(British) : Each

Rate (Rs)

19,500.00 1 No

TOTAL MATERIAL 73.01

1,200.00 1
3.00
TOTAL LABOUR 7.49
19.50
24,772.50 Cost Per Each: 24,772.50
1,470.00 Cost Per Each: 1,470.00

(British) : Rft

Rate (Rs)

70.00 1
TOTAL MATERIAL 37.41

1,200.00 1
3.00
TOTAL LABOUR 43.09
19.50

175.53 Per Meter : Rs 575.72


91.88 Per Meter : Rs 301.35

15.4.19
(British) : Each

Rate (Rs) Amount


500.00 1 No

TOTAL MATERIAL 75.68

1,200.00 1
3.00
TOTAL LABOUR 4.82
19.50

612.20 Cost Per Each: 612.20


14.70 Cost Per Each: 14.70

15.4.19
(British) : Each

Rate (Rs) Amount

550.00 1 No

TOTAL MATERIAL 75.85

1,200.00 1
3.00
TOTAL LABOUR 4.65
19.50

671.95 Cost Per Each: 671.95


14.70 Cost Per Each: 14.70
(British) : Each

Rate (Rs)

530.00 1

TOTAL MATERIAL 72.37

1,200.00 1
3.00
TOTAL LABOUR 8.13
19.50

679.36 Cost Per Each: 679.36


46.01 Cost Per Each: 46.01

(British) : Rft

Rate (Rs)

155.00 1 No
TOTAL MATERIAL 71.93

1,200.00 1
3.00
TOTAL LABOUR 8.57
19.50

199.93 Per Meter : Rs 655.75


14.70 Per Meter : Rs 48.22

(British) : Each

Rate (Rs)

9,400.00 1 No

TOTAL MATERIAL 76.28

1,200.00 1
3.00
TOTAL LABOUR 4.22
19.50

11,416.75 Cost Per Each: 11,416.75


183.75 Cost Per Each: 183.75
(British) : Each

Rate (Rs)

500.00 1 No

TOTAL MATERIAL 72.29

1,200.00 1
3.00
TOTAL LABOUR 8.21
19.50

641.60 Cost Per Each: 641.60


44.10 Cost Per Each: 44.10

(British) : Each

Rate (Rs)

550.00 1

TOTAL MATERIAL 72.74

1,200.00 1
3.00
TOTAL LABOUR 7.76
19.50

701.35 Cost Per Each: 701.35


44.10 Cost Per Each: 44.10

(British) : Each

Rate (Rs)

400,000.00 1 Each

TOTAL MATERIAL 75.91

1,200.00 1
3.00
TOTAL LABOUR 4.59
19.50

488,290.00 Cost Per Each: 488,290.00


10,290.00 Cost Per Each: 10,290.00
(British) : Each

Rate (Rs) Amount

1,275,000.00 1 No

TOTAL MATERIAL 76.27

Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 4.23
19.50

1,548,737.50 Cost Per Each: 1,548,737.50


25,112.50 Cost Per Each: 25,112.50

15.7.4
(British) : Each

Rate (Rs)

21,500.00 1
TOTAL MATERIAL 73.40
1,200.00 1
3.00
TOTAL LABOUR 7.10
19.50

27,162.50 Cost Per Each: 27,162.50


1,470.00 Cost Per Each: 1,470.00

(British) : Each

Rate (Rs)

42,300.00 1

TOTAL MATERIAL 75.36

1,200.00 1
3.00
TOTAL LABOUR 5.14
19.50

52,018.50 Cost Per Each: 52,018.50


1,470.00 Cost Per Each: 1,470.00

(British) : Each
Rate (Rs)

17,500.00 1

TOTAL MATERIAL 76.84

1,200.00 1
3.00
TOTAL LABOUR 3.66
19.50

21,096.25 Cost Per Each: 21,096.25


183.75 Cost Per Each: 183.75

(British) : No

Rate (Rs)

650.00 1

TOTAL MATERIAL 69.48

1,200.00 1
3.00
TOTAL LABOUR 11.02
19.50

868.63 Cost Per No: 868.63


91.88 Cost Per No: 91.88
15.7.4
(British) : No

Rate (Rs)

4,200.00 1

TOTAL MATERIAL 76.14

1,200.00 1
3.00
TOTAL LABOUR 4.36
19.50

5,110.88 Cost Per No: 5,110.88


91.88 Cost Per No: 91.88

(British) : No

Rate (Rs)

95,000.00 1

TOTAL MATERIAL 75.59

1,200.00 1
3.00
TOTAL LABOUR 4.91
19.50

116,465.00 Cost Per No: 116,465.00


2,940.00 Cost Per No: 2,940.00

(British) : Rft

Rate (Rs)

35.00 1

TOTAL MATERIAL 72.53

1,200.00 1
3.00
TOTAL LABOUR 7.97
19.50

44.77 Per Meter : Rs 146.83


2.94 Per Meter : Rs 9.64

Spec. No :
Unit (British) : Yard
ephone vrire 1 Pair
Unit Rate (Rs)
Yard 50.00 1
TOTAL MATERIAL 48.44

Day 1,200.00 1
3.00
TOTAL LABOUR 32.06
19.50

96.50 Cost Per Yard: 96.50


36.75 Cost Per Yard: 36.75

Spec. No :
Unit (British) : Yard
ephone vrire 2 Pair
Unit Rate (Rs)

Yard 100.00 1
TOTAL MATERIAL 59.62

Day 1,200.00 1
3.00
TOTAL LABOUR 20.88
19.50

156.25 Cost Per Yard: 156.25


36.75 Cost Per Yard: 36.75

(British) : Each
Rate (Rs)

2,500.00 1

TOTAL MATERIAL 75.24

1,200.00 1
3.00
TOTAL LABOUR 5.26
19.50

3,079.38 Cost Per Each: 3,079.38


91.88 Cost Per Each: 91.88

(British) : Each

Rate (Rs) Amount

650.00 1 Each

TOTAL MATERIAL 69.48

1,200.00 1
3.00
TOTAL LABOUR 11.02
19.50

868.63 Cost Per Each: 868.63


91.88 Cost Per Each: 91.88

Spec. No :
Unit (British) : Each
ephone point with socket complete
Rate (Rs)

370.00 1

TOTAL MATERIAL 71.69

1,200.00 1
3.00
TOTAL LABOUR 8.81
19.50

478.90 Cost Per Each: 478.90


36.75 Cost Per Each: 36.75

15.20.2
(British) : Each
Rate (Rs)

42,500.00 1 No

TOTAL MATERIAL 75.37

1,200.00 1
3.00
TOTAL LABOUR 5.13
19.50

52,257.50 Cost Per Each: 52,257.50


1,470.00 Cost Per Each: 1,470.00

Spec. No : 15.2.3
Unit (British) : Each
True Day & Night Color Indoor Camera 1/3"
B/W 0.002Lux, Day/Night, DC12V/ AC24V,

Rate (Rs)

21,800.00 1

TOTAL MATERIAL 70.84

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.66
19.50

28,562.25 Cost Per Each: 28,562.25


2,511.25 Cost Per Each: 2,511.25

15.20.2
(British) : Each

Rate (Rs)

21,800.00 1 No

TOTAL MATERIAL 73.46

1,200.00 1
3.00
TOTAL LABOUR 7.04
19.50

27,521.00 Cost Per Each: 27,521.00


1,470.00 Cost Per Each: 1,470.00
(British) : Each

Rate (Rs)

16,750.00 1 No

TOTAL MATERIAL 77.33

1,200.00 1
3.00
TOTAL LABOUR 3.17
19.50

20,060.35 Cost Per Each: 20,060.35


44.10 Cost Per Each: 44.10

(British) : Each
Rate (Rs)

18,800.00 1 No

TOTAL MATERIAL 76.04

1,200.00 1
3.00
TOTAL LABOUR 4.46
19.50

22,907.00 Cost Per Each: 22,907.00


441.00 Cost Per Each: 441.00

(British) : Each

Rate (Rs)

350,000.00 1 No
TOTAL MATERIAL 77.24

1,200.00 1
3.00
TOTAL LABOUR 3.26
19.50

419,720.00 Cost Per Each: 419,720.00


1,470.00 Cost Per Each: 1,470.00

(British) : Each

Rate (Rs) Amount

70,000.00 1 No

TOTAL MATERIAL 77.10

1,200.00 1
3.00
TOTAL LABOUR 3.40
19.50
84,091.00 Cost Per Each: 84,091.00
441.00 Cost Per Each: 441.00

(British) : Each

Rate (Rs) Amount

65,000.00 1 No

TOTAL MATERIAL 77.07

1,200.00 1
3.00
TOTAL LABOUR 3.43
19.50

78,116.00 Cost Per Each: 78,116.00


441.00 Cost Per Each: 441.00

(British) : Each
Rate (Rs)

350,000.00 1

TOTAL MATERIAL 77.24

1,200.00 1
3.00
TOTAL LABOUR 3.26
19.50

419,720.00 Cost Per Each: 419,720.00


1,470.00 Cost Per Each: 1,470.00

15.7.4
(British) : Each

Unit Rate (Rs)

No 18,800.00 1

TOTAL MATERIAL 72.85

Day 1,200.00 1
3.00
TOTAL LABOUR 7.65
19.50

23,936.00 Cost Per Each: 23,936.00


1,470.00 Cost Per Each: 1,470.00
(British) : m

Rate (Rs)

95.00 1 Mtr

TOTAL MATERIAL 76.53

1,200.00 1
3.00
TOTAL LABOUR 3.97
19.50

115.00 Cost Per Meter: 115.00


1.47 Cost Per Meter: 1.47

Spec. No :
Unit (British) : Each
f 32" LCD monitor of best quality
Rate (Rs)

45,000.00 1

TOTAL MATERIAL 76.88


1,200.00 1
3.00
TOTAL LABOUR 3.62
19.50

54,216.00 Cost Per Each: 54,216.00


441.00 Cost Per Each: 441.00

(British) : No

Rate (Rs)

20,500.00 1
TOTAL MATERIAL 73.21

1,200.00 1
3.00
TOTAL LABOUR 7.29
19.50

25,967.50 Cost Per No: 25,967.50


1,470.00 Cost Per No: 1,470.00

15.20.2
(British) : No
Rate (Rs)

35,000.00 1 No

TOTAL MATERIAL 74.93

1,200.00 1
3.00
TOTAL LABOUR 5.57
19.50

43,295.00 Cost Per No: 43,295.00


1,470.00 Cost Per No: 1,470.00

15.20.2
(British) : No

Rate (Rs)

32,000.00 1 No
TOTAL MATERIAL 74.70

1,200.00 1
3.00
TOTAL LABOUR 5.80
19.50

39,710.00 Cost Per No: 39,710.00


1,470.00 Cost Per No: 1,470.00

15.20.4
(British) : No

Rate (Rs)

300,000.00 1 No

TOTAL MATERIAL 77.19

1,200.00 1
3.00
TOTAL LABOUR 3.31
19.50

359,970.00 Cost Per No: 359,970.00


1,470.00 Cost Per No: 1,470.00

(British) : Each

Rate (Rs) Amount

3,627.67 1 No

TOTAL MATERIAL 75.99

1,200.00 1
3.00
TOTAL LABOUR 4.51
19.50

4,423.27 Cost Per Each: 4,423.27


88.20 Cost Per Each: 88.20

(British) : Each
Rate (Rs) Amount

7,482.87 1 No

TOTAL MATERIAL 75.98

1,200.00 1
3.00
TOTAL LABOUR 4.52
19.50

9,125.78 Cost Per Each: 9,125.78


183.75 Cost Per Each: 183.75

(British) : Each

Rate (Rs)

4,055.89 1

TOTAL MATERIAL 72.16

1,200.00 1
3.00
TOTAL LABOUR 8.34
19.50
5,214.29 Cost Per Each: 5,214.29
367.50 Cost Per Each: 367.50

15.18.6
(British) : Each

Rate (Rs)

531.16 1

TOTAL MATERIAL 74.15

1,200.00 1
3.00
TOTAL LABOUR 6.35
19.50

664.14 Cost Per Each: 664.14


29.40 Cost Per Each: 29.40

15.18.6
(British) : Each

Rate (Rs)

1,500.00 1
TOTAL MATERIAL 76.28

1,200.00 1
3.00
TOTAL LABOUR 4.22
19.50

1,821.90 Cost Per Each: 1,821.90


29.40 Cost Per Each: 29.40

(British) : Each

Rate (Rs)

1,273.07 1

TOTAL MATERIAL 73.35

1,200.00 1
3.00
TOTAL LABOUR 7.15
19.50

1,609.52 Cost Per Each: 1,609.52


88.20 Cost Per Each: 88.20
(British) : Each

Rate (Rs)

2,101.30 1

TOTAL MATERIAL 74.93

1,200.00 1
3.00
TOTAL LABOUR 5.57
19.50

2,599.25 Cost Per Each: 2,599.25


88.20 Cost Per Each: 88.20

(British) : Each

Rate (Rs)

480.00 1 Each

TOTAL MATERIAL 73.11


1,200.00 1
3.00
TOTAL LABOUR 7.39
19.50

608.88 Cost Per Each: 608.88


35.28 Cost Per Each: 35.28

(British) : Each

Rate (Rs) Amount

530.00 1 Each

TOTAL MATERIAL 72.57

1,200.00 1
3.00
TOTAL LABOUR 7.93
19.50

677.45 Cost Per Each: 677.45


44.10 Cost Per Each: 44.10
15.16.10
(British) : Each

Rate (Rs) Amount

50,000.00 1 Each

TOTAL MATERIAL 72.29

1,200.00 1
3.00
TOTAL LABOUR 8.21
19.50

64,160.00 Cost Per Each: 64,160.00


4,410.00 Cost Per Each: 4,410.00

(British) : Rft

Rate (Rs)
20.00 1 No

TOTAL MATERIAL 54.58

1,200.00 1
3.00
TOTAL LABOUR 25.92
19.50

34.19 Per Meter : Rs 112.14


10.29 Per Meter : Rs 33.75

(British) : Rft

Rate (Rs)

40.00 1 No

TOTAL MATERIAL 59.62

1,200.00 1
3.00
TOTAL LABOUR 20.88
19.50

62.50 Per Meter : Rs 205.00


14.70 Per Meter : Rs 48.22

(British) : Rft

Rate (Rs)

60.00 1 No

TOTAL MATERIAL 64.58

1,200.00 1
3.00
TOTAL LABOUR 15.92
19.50

86.40 Per Meter : Rs 283.39


14.70 Per Meter : Rs 48.22
15.18.6
(British) : Rft

Rate (Rs)

80.00 1 No

TOTAL MATERIAL 67.39

1,200.00 1
3.00
TOTAL LABOUR 13.11
19.50

110.30 Per Meter : Rs 361.78


14.70 Per Meter : Rs 48.22

15.18.6
(British) : Rft

Rate (Rs)
100.00 1 No

TOTAL MATERIAL 69.20

1,200.00 1
3.00
TOTAL LABOUR 11.30
19.50

134.20 Per Meter : Rs 440.18


14.70 Per Meter : Rs 48.22

15.18.6
(British) : Rft

Rate (Rs)

300.00 1 No

TOTAL MATERIAL 75.39

1,200.00 1
3.00
TOTAL LABOUR 5.11
19.50

368.79 Per Meter : Rs 1,209.63


10.29 Per Meter : Rs 33.75
(British) : m

Rate (Rs) Amount

90.00 1
TOTAL MATERIAL 69.20

1,200.00 1
3.00
TOTAL LABOUR 11.30
19.50

120.78 Cost Per Meter: 120.78


13.23 Cost Per Meter: 13.23

(British) : m

Rate (Rs) Amount

120.00 1
TOTAL MATERIAL 71.10
1,200.00 1
3.00
TOTAL LABOUR 9.40
19.50

156.63 Cost Per Meter: 156.63


13.23 Cost Per Meter: 13.23

(British) : m

Rate (Rs) Amount

180.00 1
TOTAL MATERIAL 73.11

1,200.00 1
3.00
TOTAL LABOUR 7.39
19.50

228.33 Cost Per Meter: 228.33


13.23 Cost Per Meter: 13.23

(British) : m
Rate (Rs) Amount

250.00 1
TOTAL MATERIAL 74.29

1,200.00 1
3.00
TOTAL LABOUR 6.21
19.50

311.98 Cost Per Meter: 311.98


13.23 Cost Per Meter: 13.23

15.7.4
(British) : Each

Rate (Rs) Amount

40.00 1
TOTAL MATERIAL 64.05

1,200.00 1
3.00
TOTAL LABOUR 16.45
19.50

58.09 Cost Per Each: 58.09


10.29 Cost Per Each: 10.29
(British) : Each
ng and commissioning of the ODF; 12 Port
6x Pigtails Multimode Tray & Other Accessories, Rack Mount

Rate (Rs)

100,102.22 1 No

TOTAL MATERIAL 75.94

850.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.56
19.50

122,133.40 Cost Per Each: 122,133.40


2,511.25 Cost Per Each: 2,511.25

15.18.6
(British) : Each

Rate (Rs)
1,743.84 1

TOTAL MATERIAL 76.97

1,200.00 1
3.00
TOTAL LABOUR 3.53
19.50

2,098.59 Cost Per Each: 2,098.59


14.70 Cost Per Each: 14.70

(British) : Each

Rate (Rs)

75,000.00 1

TOTAL MATERIAL 77.19

1,200.00 1
3.00
TOTAL LABOUR 3.31
19.50

89,992.50 Cost Per Each: 89,992.50


367.50 Cost Per Each: 367.50
15.20.4
(British) : Each

Rate (Rs) Amount

150,000.00 1 No

TOTAL MATERIAL 77.35

1,200.00 1
3.00
TOTAL LABOUR 3.15
19.50

179,617.50 Cost Per Each: 179,617.50


367.50 Cost Per Each: 367.50

(British) : Each

Rate (Rs)

4,682.97 1 No
TOTAL MATERIAL 68.70

1,200.00 1
3.00
TOTAL LABOUR 11.80
19.50

6,331.15 Cost Per Each: 6,331.15


735.00 Cost Per Each: 735.00

(British) : Rft

Rate (Rs)

321.47 1 Rft

TOTAL MATERIAL 66.51

850.00 1
3.00
TOTAL LABOUR 13.99
19.50

449.23 Per Meter : Rs 1,473.49


65.08 Per Meter : Rs 213.46
(British) : Each

Rate (Rs)

2,012.39 1 No

TOTAL MATERIAL 76.85

850.00 1
3.00
TOTAL LABOUR 3.65
19.50

2,425.63 Cost Per Each: 2,425.63


20.83 Cost Per Each: 20.83

(British) : Each

Rate (Rs)
1,725.69 1 No

TOTAL MATERIAL 76.74

850.00 1
3.00
TOTAL LABOUR 3.76
19.50

2,083.02 Cost Per Each: 2,083.02


20.83 Cost Per Each: 20.83

(British) : Each

Rate (Rs) Amount

16,000.00 1 No

TOTAL MATERIAL 76.07

1,200.00 1
3.00
TOTAL LABOUR 4.43
19.50

19,487.50 Cost Per Each: 19,487.50


367.50 Cost Per Each: 367.50
(British) : No

Rate (Rs)

876.00 1

TOTAL MATERIAL 75.43

1,200.00 1
3.00
TOTAL LABOUR 5.07
19.50

1,076.22 Cost Per No: 1,076.22


29.40 Cost Per No: 29.40

(British) : No
Rate (Rs)

1,593.00 1

TOTAL MATERIAL 76.35

1,200.00 1
3.00
TOTAL LABOUR 4.15
19.50

1,933.04 Cost Per No: 1,933.04


29.40 Cost Per No: 29.40

(British) : No
ight point controlled by two way switch wiring
with 2.5 mmsq conductors and 2.5 mmsq green

Rate (Rs)

1,433.00 1 No

TOTAL MATERIAL 76.22

1,200.00 1
3.00
TOTAL LABOUR 4.28
19.50

1,741.84 Cost Per No: 1,741.84


29.40 Cost Per No: 29.40
15.4.5
(British) : No

Rate (Rs)

650.00 1

TOTAL MATERIAL 74.74

1,200.00 1
3.00
TOTAL LABOUR 5.76
19.50

806.15 Cost Per No: 806.15


29.40 Cost Per No: 29.40

15.18.8
(British) : No

Rate (Rs)
550.00 1

TOTAL MATERIAL 74.26

1,200.00 1
3.00
TOTAL LABOUR 6.24
19.50

686.65 Cost Per No: 686.65


29.40 Cost Per No: 29.40

15.18.8
(British) : No

Rate (Rs)

750.00 1

TOTAL MATERIAL 75.10

1,200.00 1
3.00
TOTAL LABOUR 5.40
19.50

925.65 Cost Per No: 925.65


29.40 Cost Per No: 29.40
15.18.8
(British) : No

Rate (Rs)

790.00 1

TOTAL MATERIAL 75.21

1,200.00 1
3.00
TOTAL LABOUR 5.29
19.50

973.45 Cost Per No: 973.45


29.40 Cost Per No: 29.40

15.4.5
(British) : No

Rate (Rs)

750.00 1

TOTAL MATERIAL 75.10

1,200.00 1
3.00
TOTAL LABOUR 5.40
19.50

925.65 Cost Per No: 925.65


29.40 Cost Per No: 29.40

15.4.7
(British) : No

Rate (Rs)

900.00 1 No

TOTAL MATERIAL 75.49

1,200.00 1
3.00
TOTAL LABOUR 5.01
19.50

1,104.90 Cost Per No: 1,104.90


29.40 Cost Per No: 29.40
15.2.4
(British) : m

Rate (Rs)

116.00 1M

TOTAL MATERIAL 64.21

1,200.00 1
3.00
TOTAL LABOUR 16.29
19.50

168.02 Cost Per Meter: 168.02


29.40 Cost Per Meter: 29.40

15.2.4
(British) : m
Rate (Rs)

131.00 1M

TOTAL MATERIAL 65.50

1,200.00 1
3.00
TOTAL LABOUR 15.00
19.50

185.95 Cost Per Meter: 185.95


29.40 Cost Per Meter: 29.40

15.2.4
(British) : m

Rate (Rs)

176.00 1M
TOTAL MATERIAL 68.20

1,200.00 1
3.00
TOTAL LABOUR 12.30
19.50

239.72 Cost Per Meter: 239.72


29.40 Cost Per Meter: 29.40

15.2.4
(British) : m

Rate (Rs)

170.00 1M

TOTAL MATERIAL 67.91

1,200.00 1
3.00
TOTAL LABOUR 12.59
19.50

232.55 Cost Per Meter: 232.55


29.40 Cost Per Meter: 29.40

(British) : m

Rate (Rs)

500.00 1

TOTAL MATERIAL 73.95

1,200.00 1
3.00
TOTAL LABOUR 6.55
19.50

626.90 Cost Per Meter: 626.90


29.40 Cost Per Meter: 29.40

15.7.4
(British) : No

Rate (Rs)
30,000.00 1 No

TOTAL MATERIAL 74.52

1,200.00 1
3.00
TOTAL LABOUR 5.98
19.50

37,320.00 Cost Per No: 37,320.00


1,470.00 Cost Per No: 1,470.00

15.7.4
(British) : No

Rate (Rs)

220,000.00 1 No

TOTAL MATERIAL 77.08


1,200.00 1
3.00
TOTAL LABOUR 3.42
19.50

264,370.00 Cost Per No: 264,370.00


1,470.00 Cost Per No: 1,470.00

15.7.4
(British) : No

Rate (Rs)

575,000.00 1 No

TOTAL MATERIAL 77.34

1,200.00 1
3.00
TOTAL LABOUR 3.16
19.50

688,595.00 Cost Per No: 688,595.00


1,470.00 Cost Per No: 1,470.00
15.7.4
(British) : No

Rate (Rs) Amount

75,000.00 1
TOTAL MATERIAL 76.28

1,200.00 1
3.00
TOTAL LABOUR 4.22
19.50

91,095.00 Cost Per No: 91,095.00


1,470.00 Cost Per No: 1,470.00

15.7.4
(British) : No

Rate (Rs) Amount

85,000.00 1

TOTAL MATERIAL 76.42


1,200.00 1
3.00
TOTAL LABOUR 4.08
19.50

103,045.00 Cost Per No: 103,045.00


1,470.00 Cost Per No: 1,470.00

15.7.4
(British) : No

Rate (Rs) Amount

85,000.00 1
TOTAL MATERIAL 76.42

1,200.00 1
3.00
TOTAL LABOUR 4.08
19.50

103,045.00 Cost Per No: 103,045.00


1,470.00 Cost Per No: 1,470.00

15.7.4
(British) : No
Rate (Rs) Amount

75,000.00 1
TOTAL MATERIAL 76.28

1,200.00 1
3.00
TOTAL LABOUR 4.22
19.50

91,095.00 Cost Per No: 91,095.00


1,470.00 Cost Per No: 1,470.00

15.7.4
(British) : No

Rate (Rs) Amount

85,000.00 1

TOTAL MATERIAL 76.42

1,200.00 1
3.00
TOTAL LABOUR 4.08
19.50

103,045.00 Cost Per No: 103,045.00


1,470.00 Cost Per No: 1,470.00
15.7.4
(British) : No

Rate (Rs) Amount

75,000.00 1

TOTAL MATERIAL 76.28

1,200.00 1
3.00
TOTAL LABOUR 4.22
19.50

91,095.00 Cost Per No: 91,095.00


1,470.00 Cost Per No: 1,470.00

15.7.4
(British) : No

Rate (Rs) Amount


850,000.00 1

TOTAL MATERIAL 77.39

1,200.00 1
3.00
TOTAL LABOUR 3.11
19.50

1,017,220.00 Cost Per No: 1,017,220.00


1,470.00 Cost Per No: 1,470.00

15.7.4
(British) : No

Rate (Rs) Amount

75,000.00 1

TOTAL MATERIAL 76.28

1,200.00 1
3.00
TOTAL LABOUR 4.22
19.50

91,095.00 Cost Per No: 91,095.00


1,470.00 Cost Per No: 1,470.00
15.7.4
(British) : No

Rate (Rs) Amount

85,000.00 1
TOTAL MATERIAL 76.42

1,200.00 1
3.00
TOTAL LABOUR 4.08
19.50

103,045.00 Cost Per No: 103,045.00


1,470.00 Cost Per No: 1,470.00

15.7.4
(British) : No

Rate (Rs)

75,000.00 1

TOTAL MATERIAL 76.28

1,200.00 1
3.00
TOTAL LABOUR 4.22
19.50

91,095.00 Cost Per No: 91,095.00


1,470.00 Cost Per No: 1,470.00

15.7.4
(British) : No

Rate (Rs)

85,000.00 1

TOTAL MATERIAL 76.42

1,200.00 1
3.00
TOTAL LABOUR 4.08
19.50

103,045.00 Cost Per No: 103,045.00


1,470.00 Cost Per No: 1,470.00

15.7.4
(British) : No
Rate (Rs) Amount

75,000.00 1
TOTAL MATERIAL 76.28

1,200.00 1
3.00
TOTAL LABOUR 4.22
19.50

91,095.00 Cost Per No: 91,095.00


1,470.00 Cost Per No: 1,470.00

15.7.4
(British) : No

Rate (Rs) Amount

85,000.00 1
TOTAL MATERIAL 76.42

1,200.00 1
3.00
TOTAL LABOUR 4.08
19.50

103,045.00 Cost Per No: 103,045.00


1,470.00 Cost Per No: 1,470.00
15.7.4
(British) : No

Rate (Rs) Amount

300,000.00 1 No

TOTAL MATERIAL 77.19

1,200.00 1
3.00
TOTAL LABOUR 3.31
19.50

359,970.00 Cost Per No: 359,970.00


1,470.00 Cost Per No: 1,470.00

Spec. No :
Unit (British) : No
Supply, installation, & connecting of Insect killer
Unit Rate (Rs)

No 6,500.00
TOTAL MATERIAL 75.75

1,200.00 1
3.00
TOTAL LABOUR 4.75
19.50

7,951.25 Cost Per No: 7,951.25


183.75 Cost Per No: 183.75

15.2.4
(British) : Rft

Rate (Rs)

36.00 1

TOTAL MATERIAL 71.54

1,200.00 1
3.00
TOTAL LABOUR 8.96
19.50

46.70 Per Meter : Rs 153.16


3.68 Per Meter : Rs 12.05
15.2.4
(British) : Rft

Rate (Rs)

65.00 1

TOTAL MATERIAL 70.95

1,200.00 1
3.00
TOTAL LABOUR 9.55
19.50

85.03 Per Meter : Rs 278.88


7.35 Per Meter : Rs 24.11

Spec. No :
Unit (British) : No
0 zone panel for nurse call system
Rate (Rs)

2,400.00 1
TOTAL MATERIAL 72.94

1,200.00 1
3.00
TOTAL LABOUR 7.56
19.50

3,051.75 Cost Per No: 3,051.75


183.75 Cost Per No: 183.75
Spec. No :
Unit (British) : No
0 zone panel nurse call system
Rate (Rs)

65,000.00 1
TOTAL MATERIAL 77.32

1,200.00 1
3.00
TOTAL LABOUR 3.18
19.50

77,858.75 Cost Per No: 77,858.75


183.75 Cost Per No: 183.75

Spec. No :
Unit (British) : No
or light indicator unit
Rate (Rs)

800.00 1
TOTAL MATERIAL 70.81

1,200.00 1
3.00
TOTAL LABOUR 9.69
19.50

1,048.61 Cost Per No: 1,048.61


92.61 Cost Per No: 92.61
Spec. No :
Unit (British) : No
0X1.5mm sq. twisted Telephone Cable
Rate (Rs)

15.00 1

TOTAL MATERIAL 43.06

1,200.00 1
3.00
TOTAL LABOUR 37.44
19.50

32.63 Cost Per No: 32.63


14.70 Cost Per No: 14.70

(British) : No

Rate (Rs)

2,676.00 1 No

TOTAL MATERIAL 53.51

1,200.00 1
3.00
TOTAL LABOUR 26.99
19.50

4,667.82 Cost Per No: 4,667.82


1,470.00 Cost Per No: 1,470.00

15.7.4
(British) : Set

Rate (Rs)

35,000.00 1 Set

TOTAL MATERIAL 77.33


1,200.00 1
3.00
TOTAL LABOUR 3.17
19.50

41,916.88 Cost Per Set: 41,916.88


91.88 Cost Per Set: 91.88

(British) : Each

Rate (Rs)

250.00 1 Each

TOTAL MATERIAL 69.20

1,200.00 1
3.00
TOTAL LABOUR 11.30
19.50

335.50 Cost Per Each: 335.50


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each
of 10 Pin Kit with sheet
Rate (Rs)

1,400.00 1

TOTAL MATERIAL 75.87

1,200.00 1
3.00
TOTAL LABOUR 4.63
19.50

1,709.75 Cost Per Each: 1,709.75


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each
of 08 Pin Kit with sheet
Rate (Rs)

1,200.00 1

TOTAL MATERIAL 75.61

1,200.00 1
3.00
TOTAL LABOUR 4.89
19.50

1,470.75 Cost Per Each: 1,470.75


36.75 Cost Per Each: 36.75
Spec. No :
Unit (British) : Each
of 06 Pin Kit with sheet
Rate (Rs)

1,000.00 1

TOTAL MATERIAL 75.24

1,200.00 1
3.00
TOTAL LABOUR 5.26
19.50

1,231.75 Cost Per Each: 1,231.75


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each
of 04 Pin Kit with sheet
Rate (Rs)

800.00 1

TOTAL MATERIAL 74.70

1,200.00 1
3.00
TOTAL LABOUR 5.80
19.50

992.75 Cost Per Each: 992.75


36.75 Cost Per Each: 36.75
Spec. No :
Unit (British) : Each
of03 Pin Kit with sheet
Rate (Rs)

750.00 1

TOTAL MATERIAL 74.52

1,200.00 1
3.00
TOTAL LABOUR 5.98
19.50

933.00 Cost Per Each: 933.00


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each
of 02 Pin Kit with sheet
Rate (Rs)

600.00 1

TOTAL MATERIAL 73.81

1,200.00 1
3.00
TOTAL LABOUR 6.69
19.50

753.75 Cost Per Each: 753.75


36.75 Cost Per Each: 36.75
Spec. No :
Unit (British) : Each
of 01 Pin Kit with sheet
Rate (Rs)

500.00 1

TOTAL MATERIAL 73.11

1,200.00 1
3.00
TOTAL LABOUR 7.39
19.50

634.25 Cost Per Each: 634.25


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each

Rate (Rs)

1,500.00 1

TOTAL MATERIAL 70.45

1,200.00 1
3.00
TOTAL LABOUR 10.05
19.50

1,976.25 Cost Per Each: 1,976.25


183.75 Cost Per Each: 183.75
Spec. No :
Unit (British) : Each
f Fan dimmer switch Clipcal made
Rate (Rs)

60.00 1
TOTAL MATERIAL 51.67

1,200.00 1
3.00
TOTAL LABOUR 28.83
19.50

108.45 Cost Per Each: 108.45


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each

Rate (Rs)

750.00 1
TOTAL MATERIAL 74.52

1,200.00 1
3.00
TOTAL LABOUR 5.98
19.50

933.00 Cost Per Each: 933.00


36.75 Cost Per Each: 36.75
Spec. No :
Unit (British) : Each
volt bulb with transformer
Rate (Rs)

300.00 1

TOTAL MATERIAL 70.45

1,200.00 1
3.00
TOTAL LABOUR 10.05
19.50

395.25 Cost Per Each: 395.25


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each
/satellite cable complete
Rate (Rs)

100.00 1

TOTAL MATERIAL 59.62

1,200.00 1
3.00
TOTAL LABOUR 20.88
19.50

156.25 Cost Per Each: 156.25


36.75 Cost Per Each: 36.75
Spec. No :
Unit (British) : Each
ephone point with socket complete
Rate (Rs)

370.00 1

TOTAL MATERIAL 71.69

1,200.00 1
3.00
TOTAL LABOUR 8.81
19.50

478.90 Cost Per Each: 478.90


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each

Rate (Rs)

370.00 1

TOTAL MATERIAL 71.69

1,200.00 1
3.00
TOTAL LABOUR 8.81
19.50
478.90 Cost Per Each: 478.90
36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each

Rate (Rs)

400.00 1

TOTAL MATERIAL 72.09

1,200.00 1
3.00
TOTAL LABOUR 8.41
19.50

514.75 Cost Per Each: 514.75


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each
Supply & Erection of Power Plug 15 Amp complete in all aspects
Rate (Rs)

200.00 1

TOTAL MATERIAL 67.39

1,200.00 1
3.00
TOTAL LABOUR 13.11
19.50

275.75 Cost Per Each: 275.75


36.75 Cost Per Each: 36.75

(British) : Each

Rate (Rs)

5,000.00 1

TOTAL MATERIAL 75.24

1,200.00 1
3.00
TOTAL LABOUR 5.26
19.50

6,158.75 Cost Per Each: 6,158.75


183.75 Cost Per Each: 183.75

(British) : m
Rate (Rs)

95.00 1M

TOTAL MATERIAL 30.05

1,200.00 1
3.00
TOTAL LABOUR 50.45
19.50

297.28 Cost Per Meter: 297.28


183.75 Cost Per Meter: 183.75

15.20.6
(British) : No

Rate (Rs)
35,000.00 1 No

TOTAL MATERIAL 77.17

1,200.00 1
3.00
TOTAL LABOUR 3.33
19.50

42,008.75 Cost Per No: 42,008.75


183.75 Cost Per No: 183.75

(British) : No

Rate (Rs)

650.00 1

TOTAL MATERIAL 62.97

1,200.00 1
3.00
TOTAL LABOUR 17.53
19.50

960.50 Cost Per No: 960.50


183.75 Cost Per No: 183.75
Spec. No :
Unit (British) : Each
Acrylic boxes for 4"x4" Switchboard Complete with all aspects
Rate (Rs)

35.00 1

TOTAL MATERIAL 28.55

1,200.00 1
3.00
TOTAL LABOUR 51.95
19.50

115.33 Cost Per Each: 115.33


73.50 Cost Per Each: 73.50

Spec. No :
Unit (British) : Each
Acrylic boxes for 7"x4" Switchboard Complete with all aspects
Rate (Rs)

45.00 1

TOTAL MATERIAL 33.21

1,200.00 1
3.00
TOTAL LABOUR 47.29
19.50

127.28 Cost Per Each: 127.28


73.50 Cost Per Each: 73.50
Spec. No :
Unit (British) : Each
Acrylic boxes for 8"x10" Switchboard Complete with all aspects
Rate (Rs)

50.00 1

TOTAL MATERIAL 35.23

1,200.00 1
3.00
TOTAL LABOUR 45.27
19.50

133.25 Cost Per Each: 133.25


73.50 Cost Per Each: 73.50

Spec. No :
Unit (British) : Each
rylic or bakolite sheet 7 40 , 4x4
Rate (Rs)

65.00 1

TOTAL MATERIAL 56.60

1,200.00 1
3.00
TOTAL LABOUR 23.90
19.50

107.08 Cost Per Each: 107.08


29.40 Cost Per Each: 29.40
Spec. No :
Unit (British) : Each
kolite sheet 4 x 2
Rate (Rs)

45.00 1
TOTAL MATERIAL 50.54

1,200.00 1
3.00
TOTAL LABOUR 29.96
19.50

83.18 Cost Per Each: 83.18


29.40 Cost Per Each: 29.40

Spec. No :
Unit (British) : Each
C board 7" x 4" with all aspects
Rate (Rs)

40.00 1
TOTAL MATERIAL 35.23

1,200.00 1
3.00
TOTAL LABOUR 45.27
19.50

106.60 Cost Per Each: 106.60


58.80 Cost Per Each: 58.80
Spec. No :
Unit (British) : Each
Supply & Erection ofExtention Board complete in all aspects
Rate (Rs)

180.00 1
TOTAL MATERIAL 66.43

1,200.00 1
3.00
TOTAL LABOUR 14.07
19.50

251.85 Cost Per Each: 251.85


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each

Rate (Rs)

20.00 1
TOTAL MATERIAL 48.44

1,200.00 1
3.00
TOTAL LABOUR 32.06
19.50

38.60 Cost Per Each: 38.60


14.70 Cost Per Each: 14.70
Spec. No :
Unit (British) : Each

Rate (Rs)

80.00 1
TOTAL MATERIAL 56.36

1,200.00 1
3.00
TOTAL LABOUR 24.14
19.50

132.35 Cost Per Each: 132.35


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each

Rate (Rs)

30.00 1
TOTAL MATERIAL 77.50
19.50

35.85 Cost Per Each: 35.85


0.00 Cost Per Each: 0.00
Spec. No :
Unit (British) : Each
lt meter (heavy duty)
Rate (Rs)

420.00 1

TOTAL MATERIAL 72.33

1,200.00 1
3.00
TOTAL LABOUR 8.17
19.50

538.65 Cost Per Each: 538.65


36.75 Cost Per Each: 36.75

Spec. No :
Unit (British) : Each
pacitor 3.5 for ceiling fan
Rate (Rs)

50.00 1

TOTAL MATERIAL 52.36

1,200.00 1
3.00
TOTAL LABOUR 28.14
19.50

89.15 Cost Per Each: 89.15


29.40 Cost Per Each: 29.40
Spec. No :
Unit (British) : Each

Rate (Rs)

35.00 1
TOTAL MATERIAL 45.97

1,200.00 1
3.00
TOTAL LABOUR 34.53
19.50

71.23 Cost Per Each: 71.23


29.40 Cost Per Each: 29.40

Spec. No :
Unit (British) : Each

Rate (Rs)

180.00 1
TOTAL MATERIAL 68.38

1,200.00 1
3.00
TOTAL LABOUR 12.12
19.50

244.50 Cost Per Each: 244.50


29.40 Cost Per Each: 29.40
Spec. No :
Unit (British) : Each
ng Dong call bell best quality
Rate (Rs)

700.00 1

TOTAL MATERIAL 74.93

1,200.00 1
3.00
TOTAL LABOUR 5.57
19.50

865.90 Cost Per Each: 865.90


29.40 Cost Per Each: 29.40

Spec. No :
Unit (British) : Each
rter for Motor pump
Rate (Rs)

6,000.00 1
TOTAL MATERIAL 77.19

1,200.00 1
3.00
TOTAL LABOUR 3.31
19.50

7,199.40 Cost Per Each: 7,199.40


29.40 Cost Per Each: 29.40
Spec. No :
Unit (British) : No
ASD strater for 10-20 HP
Rate (Rs)

2,500.00 1
TOTAL MATERIAL 76.58

1,200.00 1
3.00
TOTAL LABOUR 3.92
19.50

3,024.25 Cost Per No: 3,024.25


36.75 Cost Per No: 36.75

Spec. No :
Unit (British) : No
ASD strater for 21-30 HP
Rate (Rs)

4,000.00 1
TOTAL MATERIAL 76.92

1,200.00 1
3.00
TOTAL LABOUR 3.58
19.50

4,816.75 Cost Per No: 4,816.75


36.75 Cost Per No: 36.75
Spec. No :
Unit (British) : No
ASD strater for 31-40 HP
Rate (Rs)

5,000.00 1
TOTAL MATERIAL 77.04

1,200.00 1
3.00
TOTAL LABOUR 3.46
19.50

6,011.75 Cost Per No: 6,011.75


36.75 Cost Per No: 36.75

Spec. No :
Unit (British) : No
DOL strater for 10-20 HP
Rate (Rs)

2,500.00 1
TOTAL MATERIAL 76.58

1,200.00 1
3.00
TOTAL LABOUR 3.92
19.50

3,024.25 Cost Per No: 3,024.25


36.75 Cost Per No: 36.75
Spec. No :
Unit (British) : No
DOL strater for 21-30 HP
Rate (Rs)

4,000.00 1
TOTAL MATERIAL 76.92

1,200.00 1
3.00
TOTAL LABOUR 3.58
19.50

4,816.75 Cost Per No: 4,816.75


36.75 Cost Per No: 36.75

Spec. No :
Unit (British) : No
DOL strater for 31-40 HP
Rate (Rs)

5,000.00 1
TOTAL MATERIAL 77.04

1,200.00 1
3.00
TOTAL LABOUR 3.46
19.50

6,011.75 Cost Per No: 6,011.75


36.75 Cost Per No: 36.75
15.3.1
(British) : Each

Rate (Rs)

140.00 1 Each

TOTAL MATERIAL 63.82

1,200.00 1
3.00
TOTAL LABOUR 16.68
19.50

204.05 Cost Per Each: 204.05


36.75 Cost Per Each: 36.75

15.3.1
(British) : Each

Rate (Rs)

200.00 1 Each
TOTAL MATERIAL 67.39

1,200.00 1
3.00
TOTAL LABOUR 13.11
19.50

275.75 Cost Per Each: 275.75


36.75 Cost Per Each: 36.75

15.3.1
(British) : m

Rate (Rs)

2,000.00 1

TOTAL MATERIAL 76.35

1,200.00 1
3.00
TOTAL LABOUR 4.15
19.50

2,426.75 Cost Per Meter: 2,426.75


36.75 Cost Per Meter: 36.75
15.3.1
(British) : m

Rate (Rs)

3,500.00 1

TOTAL MATERIAL 76.84

1,200.00 1
3.00
TOTAL LABOUR 3.66
19.50

4,219.25 Cost Per Meter: 4,219.25


36.75 Cost Per Meter: 36.75

Spec. No :
Unit (British) : No

Rate (Rs)

2,000.00 1

TOTAL MATERIAL 76.58

1,200.00 1
3.00
TOTAL LABOUR 3.92
19.50

2,419.40 Cost Per No: 2,419.40


29.40 Cost Per No: 29.40
Spec. No :
Unit (British) : No

Rate (Rs)

3,000.00 1

TOTAL MATERIAL 76.88

1,200.00 1
3.00
TOTAL LABOUR 3.62
19.50

3,614.40 Cost Per No: 3,614.40


29.40 Cost Per No: 29.40

Spec. No :
Unit (British) : No

Rate (Rs)

6,000.00 1

TOTAL MATERIAL 77.19

1,200.00 1
3.00
TOTAL LABOUR 3.31
19.50

7,199.40 Cost Per No: 7,199.40


29.40 Cost Per No: 29.40
Spec. No :
Unit (British) : No

Rate (Rs)

9,000.00 1

TOTAL MATERIAL 77.29

1,200.00 1
3.00
TOTAL LABOUR 3.21
19.50

10,784.40 Cost Per No: 10,784.40


29.40 Cost Per No: 29.40

(British) : No

Rate (Rs) Amount

10,000.00 1

TOTAL MATERIAL 69.20

1,200.00 1
3.00
TOTAL LABOUR 11.30
19.50

13,420.00 Cost Per No: 13,420.00


1,470.00 Cost Per No: 1,470.00

(British) : No

Rate (Rs)

8,000.00 1

TOTAL MATERIAL 67.39

1,200.00 1
3.00
TOTAL LABOUR 13.11
19.50

11,030.00 Cost Per No: 11,030.00


1,470.00 Cost Per No: 1,470.00

(British) : No
Rate (Rs)

7,500.00 1

TOTAL MATERIAL 66.81

1,200.00 1
3.00
TOTAL LABOUR 13.69
19.50

10,432.50 Cost Per No: 10,432.50


1,470.00 Cost Per No: 1,470.00

(British) : No

Rate (Rs)

5,000.00 1

TOTAL MATERIAL 62.50

1,200.00 1
3.00
TOTAL LABOUR 18.00
19.50

7,445.00 Cost Per No: 7,445.00


1,470.00 Cost Per No: 1,470.00
(British) : No

Rate (Rs)

8,000.00 1

TOTAL MATERIAL 67.39

1,200.00 1
3.00
TOTAL LABOUR 13.11
19.50

11,030.00 Cost Per No: 11,030.00


1,470.00 Cost Per No: 1,470.00

(British) : No

Rate (Rs)

7,500.00 1

TOTAL MATERIAL 66.81

1,200.00 1
3.00
TOTAL LABOUR 13.69
19.50
10,432.50 Cost Per No: 10,432.50
1,470.00 Cost Per No: 1,470.00

(British) : No

Rate (Rs)

6,500.00 1

TOTAL MATERIAL 65.42

1,200.00 1
3.00
TOTAL LABOUR 15.08
19.50

9,237.50 Cost Per No: 9,237.50


1,470.00 Cost Per No: 1,470.00

(British) : No

Rate (Rs)

6,000.00 1
TOTAL MATERIAL 64.58

1,200.00 1
3.00
TOTAL LABOUR 15.92
19.50

8,640.00 Cost Per No: 8,640.00


1,470.00 Cost Per No: 1,470.00

(British) : No

Unit Rate (Rs)

No 5,000.00

TOTAL MATERIAL

Day 1,200.00

TOTAL LABOUR

Rs. 7,445.00
Rs. 1,470.00
(British) : No

Rate (Rs)

7,000.00 1

TOTAL MATERIAL 66.16

1,200.00 1
3.00
TOTAL LABOUR 14.34
19.50

9,835.00 Cost Per No: 9,835.00


1,470.00 Cost Per No: 1,470.00

(British) : No

Rate (Rs)

6,800.00 1

TOTAL MATERIAL 65.88

1,200.00 1
3.00
TOTAL LABOUR 14.63
19.50

9,596.00 Cost Per No: 9,596.00


1,470.00 Cost Per No: 1,470.00
(British) : No

Rate (Rs)

6,500.00 1

TOTAL MATERIAL 65.42

1,200.00 1
3.00
TOTAL LABOUR 15.08
19.50

9,237.50 Cost Per No: 9,237.50


1,470.00 Cost Per No: 1,470.00

(British) : No

Rate (Rs)

6,000.00 1

TOTAL MATERIAL 64.58

1,200.00 1
3.00
TOTAL LABOUR 15.92
19.50

8,640.00 Cost Per No: 8,640.00


1,470.00 Cost Per No: 1,470.00

(British) : No

Rate (Rs)

5,000.00 1

TOTAL MATERIAL 62.50

1,200.00 1
3.00
TOTAL LABOUR 18.00
19.50

7,445.00 Cost Per No: 7,445.00


1,470.00 Cost Per No: 1,470.00

Spec. No :
Unit (British) : No
S/Fixing voltage Regulator plate (Selector) complete in all respect
Rate (Rs)
3,000.00 1

TOTAL MATERIAL 64.58

1,200.00 1
3.00
TOTAL LABOUR 15.92
19.50

4,320.00 Cost Per No: 4,320.00


735.00 Cost Per No: 735.00

Spec. No :
Unit (British) : No
Rweinding of Voltage Regulator Coil stablizer coil
Unit Rate (Rs)

No 1,500.00

TOTAL MATERIAL 55.36

1,200.00 1
3.00
TOTAL LABOUR 25.14
19.50

2,527.50 Cost Per No: 2,527.50


735.00 Cost Per No: 735.00

Spec. No :
Unit (British) : No
meter upt to 500 volt.
Rate (Rs)

750.00 1

TOTAL MATERIAL 70.45

1,200.00 1
3.00
TOTAL LABOUR 10.05
19.50

988.13 Cost Per No: 988.13


91.88 Cost Per No: 91.88

Spec. No :
Unit (British) : No
P meter up to 100 Amps
Rate (Rs)

750.00 1
TOTAL MATERIAL 70.45

1,200.00 1
3.00
TOTAL LABOUR 10.05
19.50

988.13 Cost Per No: 988.13


91.88 Cost Per No: 91.88
Spec. No :
Unit (British) : No
t for automatic stabilizer
Rate (Rs)

3,000.00 1

TOTAL MATERIAL 70.45

1,200.00 1
3.00
TOTAL LABOUR 10.05
19.50

3,952.50 Cost Per No: 3,952.50


367.50 Cost Per No: 367.50

Spec. No :
Unit (British) : No
S/Fixing trust bearing for i/c disk of 10-25 Hp Submersible moter
Rate (Rs)

1,000.00 1
TOTAL MATERIAL 59.62

1,200.00 1
3.00
TOTAL LABOUR 20.88
19.50

1,562.50 Cost Per No: 1,562.50


367.50 Cost Per No: 367.50
Spec. No :
Unit (British) : No
S/Fixing trust bearing for i/c disk of 30-50 Hp Submersible moter
Rate (Rs)

1,500.00 1
TOTAL MATERIAL 55.36

1,200.00 1
3.00
TOTAL LABOUR 25.14
19.50

2,527.50 Cost Per No: 2,527.50


735.00 Cost Per No: 735.00

Spec. No :
Unit (British) : No
Furnish & Install of tapper bearing for motor (V.H.S) of 10-25 HP
Rate (Rs)

1,000.00 1

TOTAL MATERIAL 59.62

1,200.00 1
3.00
TOTAL LABOUR 20.88
19.50

1,562.50 Cost Per No: 1,562.50


367.50 Cost Per No: 367.50
Spec. No :
Unit (British) : No
Furnish & Install of tapper bearing for 30-50 HP motor (V.H.S)
Rate (Rs)

1,500.00 1

TOTAL MATERIAL 55.36

1,200.00 1
3.00
TOTAL LABOUR 25.14
19.50

2,527.50 Cost Per No: 2,527.50


735.00 Cost Per No: 735.00

Spec. No :
Unit (British) : No
Furnish & Install of Ball bearing for 10-25 HP motor (V.H.S)
Rate (Rs)

1,000.00 1

TOTAL MATERIAL 59.62

1,200.00 1
3.00
TOTAL LABOUR 20.88
19.50

1,562.50 Cost Per No: 1,562.50


367.50 Cost Per No: 367.50
Spec. No :
Unit (British) : No
Furnish & Install of ball bearing for 30-50 HP motor (V.H.S)
Rate (Rs)

1,500.00 1

TOTAL MATERIAL 55.36

1,200.00 1
3.00
TOTAL LABOUR 25.14
19.50

2,527.50 Cost Per No: 2,527.50


735.00 Cost Per No: 735.00

Spec. No :
Unit (British) : Per Ltr

Rate (Rs)

300.00 1
TOTAL MATERIAL 75.28

850.00 1
3.00
TOTAL LABOUR 5.22
19.50

369.33 Cost Per Per Ltr: 369.33


10.83 Cost Per Per Ltr: 10.83
Spec. No :
Unit (British) : No
tage Regulator 30 KVA
Rate (Rs)

150,000.00 1
TOTAL MATERIAL 76.88

1,200.00 1
3.00
TOTAL LABOUR 3.62
19.50

180,720.00 Cost Per No: 180,720.00


1,470.00 Cost Per No: 1,470.00

Spec. No :
Unit (British) : No
tage Regulator 50 KVA
Rate (Rs)

285,000.00 1
TOTAL MATERIAL 77.18

1,200.00 1
3.00
TOTAL LABOUR 3.32
19.50

342,045.00 Cost Per No: 342,045.00


1,470.00 Cost Per No: 1,470.00
Spec. No :
Unit (British) : No

Rate (Rs)

5,000.00 1

TOTAL MATERIAL 69.20

1,200.00 1
3.00
TOTAL LABOUR 11.30
19.50

6,710.00 Cost Per No: 6,710.00


735.00 Cost Per No: 735.00

Spec. No :
Unit (British) : No

Rate (Rs)

6,000.00 1

TOTAL MATERIAL 70.45

1,200.00 1
3.00
TOTAL LABOUR 10.05
19.50

7,905.00 Cost Per No: 7,905.00


735.00 Cost Per No: 735.00
Spec. No :
Unit (British) : No

Rate (Rs)

8,000.00 1

TOTAL MATERIAL 72.09

1,200.00 1
3.00
TOTAL LABOUR 8.41
19.50

10,295.00 Cost Per No: 10,295.00


735.00 Cost Per No: 735.00

Spec. No :
Unit (British) : No

Rate (Rs)

10,000.00 1

TOTAL MATERIAL 73.11

1,200.00 1
3.00
TOTAL LABOUR 7.39
19.50

12,685.00 Cost Per No: 12,685.00


735.00 Cost Per No: 735.00
Spec. No :
Unit (British) : No
Litres Electric Geyser
Rate (Rs)

25,000.00 1

TOTAL MATERIAL 76.58

1,200.00 1
3.00
TOTAL LABOUR 3.92
19.50

30,242.50 Cost Per No: 30,242.50


367.50 Cost Per No: 367.50

(British) : No

Rate (Rs)

25,000.00 1

TOTAL MATERIAL 76.73

1,000.00 1
3.00
TOTAL LABOUR 3.77
19.50

30,181.25 Cost Per no: 30,181.25


306.25 Cost Per no: 306.25

(British) : Each

Rate (Rs)

20,000.00 1

TOTAL MATERIAL 76.54

1,000.00 1
3.00
TOTAL LABOUR 3.96
19.50

24,206.25 Cost Per each: 24,206.25


306.25 Cost Per each: 306.25

(British) : Each
Rate (Rs)

15,000.00 1

TOTAL MATERIAL 76.23

1,000.00 1
3.00
TOTAL LABOUR 4.27
19.50

18,231.25 Cost Per each: 18,231.25


306.25 Cost Per each: 306.25

Spec. No :
Unit (British) : Each
ment for electric water heater
Rate (Rs)

150.00 1

TOTAL MATERIAL 52.36

1,200.00 1
3.00
TOTAL LABOUR 28.14
19.50

267.45 Cost Per Each: 267.45


88.20 Cost Per Each: 88.20

Spec. No :
Unit (British) : 100 Cft
Providing and Laying sub-base course of brick on edge 4.5" thick
Rate (Rs)

2,600.00 100 Cft


9,900.00 1,000 No
TOTAL MATERIAL 68.64

1,200.00 1
600.00 1
600.00 1
3.00
TOTAL LABOUR 11.86
19.50

18,859.72 Per CUM : Rs 6,660.25


2,205.00 Per CUM : Rs 778.69

16.3.1
(British) : 100 Cft

Rate (Rs)

2,170.00 100 Cft


TOTAL MATERIAL 56.56

600.00 1
3.00
TOTAL LABOUR 18.64

769.00 1

420.00 1
2,156.00 1
TOTAL EQUIPMENT 5.30
19.50
3,571.13 Per CUM : Rs 1,261.13
735.00 Per CUM : Rs 259.56

Spec. No :
Unit (British) : 100 Cft
ate Crack-Relief Layer
Rate (Rs)

3,260.00 100 Cft


2,520.00 100 Cft
TOTAL MATERIAL 58.40

600.00 1
3.00
TOTAL LABOUR 13.59

1,210.00 1

591.77 1

481.01 1
625.00 1
TOTAL EQUIPMENT 8.51
19.50

5,382.47 Per CUM : Rs 1,900.80


751.61 Per CUM : Rs 265.43

Spec. No :
Unit (British) : 100 Cft
e using Pit Run Gravel
Rate (Rs)
1,575.00 100 Cft
TOTAL MATERIAL 45.27

600.00 1
600.00 1
3.00
TOTAL LABOUR 23.69

4,830.00 1
595.00 1
420.00 1
2,156.00 1
TOTAL EQUIPMENT 11.54
19.50

4,054.93 Per CUM : Rs 1,431.99


1,102.50 Per CUM : Rs 389.34

Spec. No :
Unit (British) : 100 Cft
Crushed Stone Aggregate
Rate (Rs)

3,400.00 100 Cft


TOTAL MATERIAL 65.29

600.00 1
600.00 1
3.00
TOTAL LABOUR 11.30

4,830.00 1
595.00 1
420.00 1
2,156.00 1
TOTAL EQUIPMENT 3.91
19.50

6,044.55 Per CUM : Rs 2,134.62


661.50 Per CUM : Rs 233.61

Spec. No :
Unit (British) : 100 Cft

Rate (Rs)

3,700.00 100 1 Cft


TOTAL MATERIAL 55.46

600.00 1
600.00 1
3.00
TOTAL LABOUR 19.19

4,830.00 1
1,210.00 1

595.00 1
420.00 1
2,156.00 1
TOTAL EQUIPMENT 5.86
19.50

7,764.30 Per CUM : Rs 2,741.94


1,653.75 Per CUM : Rs 584.02

Spec. No :
Unit (British) : 100 Cft

Rate (Rs)
2,330.00 100 Cft
3,590.00 100 Cft
TOTAL MATERIAL 65.43

600.00 1
600.00 1
3.00
TOTAL LABOUR 10.07

1,210.00 1

595.00 1
769.00 1

420.00 1

TOTAL EQUIPMENT 5.01


19.50

7,093.93 Per CUM : Rs 2,505.20


661.50 Per CUM : Rs 233.61

16.3.7
(British) : 100 Rft

Rate (Rs)

2,600.00
9,900.00 1,000 No
TOTAL MATERIAL 59.71

1,200.00 1
600.00 1
3.00
TOTAL LABOUR 20.79
19.50
6,284.22 Per Meter : Rs 206.12
1,470.00 Per Meter : Rs 48.22

16.8.12
(British) : Each

Rate (Rs)

550.00 1
2,600.00 100 Cft
187.25 1
3,260.00 100 Cft
2,520.00 100 Cft
738.00 1

TOTAL MATERIAL 70.16

1,200.00 1
600.00 1
3.00
TOTAL LABOUR 6.05

1,282.27 1

591.77 1

625.00 1

TOTAL EQUIPMENT 4.29


19.50

6,104.47 Cost Per Each: 6,104.47


246.23 Cost Per Each: 246.23
16.8.12
(British) : 100SFT

Rate (Rs)

550.00 1 Bag
2,600.00 100 Cft
3,438.00 100 Cft
326.00 1 Sft

60.00 1 ft

TOTAL MATERIAL 75.60

850.00 1
3.00
TOTAL LABOUR 4.90
19.50

41,418.50 Per SQM : Rs 4,456.63


1,041.25 Per SQM : Rs 112.04

Spec. No :
Unit (British) : 100 Sft

Rate (Rs)

18.38 1
85.50 1
146.60 1
TOTAL MATERIAL 69.65
600.00 1
3.00
TOTAL LABOUR 9.34

400.00 1
742.02 1
TOTAL EQUIPMENT 1.51
19.50

1,757.61 Per SQM : Rs 189.12


147.00 Per SQM : Rs 15.82

Spec. No :
Unit (British) : 100 Sft

Rate (Rs)

18.38 1
85.50 1
TOTAL MATERIAL 48.66

600.00 1
3.00
TOTAL LABOUR 25.32

400.00 1
742.02 1
TOTAL EQUIPMENT 6.52
19.50

501.50 Per SQM : Rs 53.96


147.00 Per SQM : Rs 15.82
Spec. No :
Unit (British) : 100 Sft

Rate (Rs)

85.50 1
3,750.00 100 1 Cft
TOTAL MATERIAL 72.33

600.00 1
3.00
TOTAL LABOUR 3.52

1,210.00 1

1,650.00 1
1,404.00 1

TOTAL EQUIPMENT 4.65


19.50

2,503.81 Per SQM : Rs 269.41


17.35 Per SQM : Rs 1.87

Spec. No :
Unit (British) : 100 Sft

Rate (Rs)

85.50 1
3,900.00 100 Cft
TOTAL MATERIAL 71.07

600.00 1
3.00
TOTAL LABOUR 3.37

1,210.00 1
1,650.00 1
1,404.00 1

TOTAL EQUIPMENT 6.06


19.50

3,575.27 Per SQM : Rs 384.70


17.35 Per SQM : Rs 1.87

Spec. No :
Unit (British) : 100 Sft

Rate (Rs)

85.50 1
3,730.00 100 Cft
TOTAL MATERIAL 71.17

600.00 1
3.00
TOTAL LABOUR 3.28

1,210.00 1

1,650.00 1
1,404.00 1

TOTAL EQUIPMENT 6.05


19.50

4,684.21 Per SQM : Rs 504.02


17.35 Per SQM : Rs 1.87
16.4
(British) : 100 Sft

Rate (Rs)

85.50 1
3,750.00 100 Cft
TOTAL MATERIAL 67.37

600.00 1
850.00 1
3.00
TOTAL LABOUR 6.71

1,210.00 1

1,650.00 1
1,404.00 1

TOTAL EQUIPMENT 6.42


19.50

1,305.88 Per SQM : Rs 140.51


64.01 Per SQM : Rs 6.89

16.9
(British) : 100 Sft

Rate (Rs)

85.50 1
3,750.00 100 Cft
TOTAL MATERIAL 63.90
600.00 1
850.00 1
3.00
TOTAL LABOUR 9.81

1,210.00 1

1,650.00 1
1,404.00 1

TOTAL EQUIPMENT 6.80


19.50

1,235.83 Per SQM : Rs 132.97


111.07 Per SQM : Rs 11.95

Spec. No :
Unit (British) : 1000 Cft
Road Pavement Structure
Rate (Rs)

600.00 1
3.00
TOTAL LABOUR 3.71

1,245.26 1
3,828.00 1
1,500.00 1
TOTAL EQUIPMENT 76.79
19.50

5,883.57 Per CUM : Rs 207.78


55.49 Per CUM : Rs 1.96
Spec. No :
Unit (British) : 100 Sft
Dense Graded Hot Bitmac (Mobile Asphalt Mixer) 1" Thick
Unit Rate (Rs)

Cft 2,600.00 100 Cft


Cft 3,438.00 100 Cft
Kg 18.38 1
Kg 85.50 1
Ltr 146.60 1
TOTAL MATERIAL 62.81

Day 600.00 1
Day 850.00 1
Day 600.00 1
3.00
TOTAL LABOUR 11.28

Hour 1,210.00 1

Hour 1,250.00 1

TOTAL EQUIPMENT 6.41


19.50

3,918.98 Per SQM : Rs 421.68


428.14 Per SQM : Rs 46.07

Spec. No :
Unit (British) : 100 Sft
Dense Graded Hot Bitmac (Mobile Asphalt Mixer) 1.5" Thick
Unit Rate (Rs)

Cft 2,600.00 100 Cft


Cft 3,438.00 100 Cft
Kg 18.38 1
Kg 85.50 1
Ltr 146.60 1
TOTAL MATERIAL 63.11

Day 600.00 1
Day 850.00 1
Day 600.00 1
3.00
TOTAL LABOUR 11.17

Hour 1,210.00 1

Hour 1,250.00 1

TOTAL EQUIPMENT 6.22


19.50

5,690.66 Per SQM : Rs 612.31


613.42 Per SQM : Rs 66.00

Spec. No :
Unit (British) : 100 Sft
Dense Graded Hot Bitmac (Mobile Asphalt Mixer) 2" Thick
Unit Rate (Rs)

Cft 2,600.00 100 Cft


Cft 3,438.00 100 Cft
Kg 18.38 1
Kg 85.50 1
Ltr 146.60 1
TOTAL MATERIAL 63.39

Day 600.00 1
Day 850.00 1
Day 600.00 1
3.00
TOTAL LABOUR 11.04

Hour 1,210.00 1

Hour 1,250.00 1
TOTAL EQUIPMENT 6.07
19.50

7,527.84 Per SQM : Rs 810.00


798.70 Per SQM : Rs 85.94

16.4.8
(British) : 100 Cft

Rate (Rs)

3,438.00 100 Cft


85.50 1 Kg.
MATERIAL 51.27 %

600.00 1 Day
850.00 1 Day
600.00 1 Day
3.00 %
LABOUR 4.49 %

595.00 1 Job
1,827.00 1 Tonne

TOTAL EQUIPMENT 24.74


19.50

46,679.89 Per CUM : Rs 16,484.86


919.26 Per CUM : Rs 324.64
16.4.10
(British) : 100 Cft

Rate (Rs)

3,438.00 100 Cft


85.50 1 Kg.
MATERIAL 54.37 %

600.00 1 Day
850.00 1 Day
600.00 1 Day
3.00 %
LABOUR 4.31 %

595.00 1 1 No
1,827.00 1 Tonne

TOTAL EQUIPMENT 21.82


19.50

52,928.25 Per CUM : Rs 18,691.45


919.26 Per CUM : Rs 324.64

16.8.6
(British) : 100 Rft

Unit Rate (Rs)


Rft 526.00 1
TOTAL MATERIAL 56.97

Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 23.53
19.50

86,069.84 Per Meter : Rs 2,823.09


23,212.84 Per Meter : Rs 761.38

Spec. No :
Unit (British) : 100 Rft/3row
Providing and fixing GI pipe railing (3 feet high)
Unit Rate (Rs)

Kg 120.00 1
Ltr 401.22 1
Ft 187.25 1
Pkt 464.10 1
TOTAL MATERIAL 66.53

Day 1,200.00 1
Day 600.00 1
Day 1,200.00 1
Day 1,050.00 1
3.00
TOTAL LABOUR 12.74

Hour 221.90 1
TOTAL EQUIPMENT 1.23
19.50

100,364.86 Cost Per m/3row: 3,292.81


12,884.55 Cost Per m/3row: 422.72
Spec. No :
Unit (British) : Each

Rate (Rs)

550.00 1
2,600.00 100 Cft
3,438.00 100 Cft
122,000.00 1
1,600.00 1
401.22 1
TOTAL MATERIAL 34.87

1,200.00 1
600.00 1
1,200.00 1
1,200.00 1
950.00 1

900.00 1
3.00
TOTAL LABOUR 45.63
19.50

4,049.58 Cost Per Each: 4,049.58


2,252.53 Cost Per Each: 2,252.53

Spec. No :
Unit (British) : Each

Rate (Rs)

550.00 1
2,600.00 100 Cft
3,438.00 100 Cft
122,000.00 1
1,600.00 1
401.22 1
TOTAL MATERIAL 32.55

1,200.00 1
600.00 1
1,200.00 1
1,200.00 1
950.00 1

900.00 1
3.00
TOTAL LABOUR 47.95
19.50

1,010.60 Cost Per Each: 1,010.60


592.29 Cost Per Each: 592.29

Spec. No :
Unit (British) : Each

Rate (Rs)

550.00 1
2,600.00 100 Cft
3,438.00 100 Cft
122,000.00 1
401.22 1
TOTAL MATERIAL 53.62

1,200.00 1
600.00 1
1,200.00 1
950.00 1

3.00
TOTAL LABOUR 26.88
19.50

1,562.37 Cost Per Each: 1,562.37


489.63 Cost Per Each: 489.63

16.8.7
(British) : 100 Sft

Unit Rate (Rs)

Bag 550.00 1
Cft 2,600.00
Cft 3,438.00
Kg 137.00 1
Kg 128.00 1
No 130.00 1
Ltr 401.22 1
TOTAL MATERIAL 63.27

Day 600.00 1
Day 1,200.00 1
Day 1,050.00 1
3.00
TOTAL LABOUR 17.23
19.50

96,468.23 Per SQM : Rs 10,379.98


18,078.24 Per SQM : Rs 1,945.22
16.8.7
(British) : 100 Sft

Unit Rate (Rs)

Kg 137.00 1
Kg 128.00 1
TOTAL MATERIAL 67.20

Day 600.00 1
Day 1,050.00 1
3.00
TOTAL LABOUR 13.30
19.50

80,282.17 Per SQM : Rs 8,638.36


10,906.35 Per SQM : Rs 1,173.52

16.8.7
(British) : 100 Sft

Rate (Rs) Amount

Bag 550.00 1
Cft 2,600.00
Cft 3,438.00
Kg 137.00 1
Kg 128.00 1
Pkt 464.10 1
TOTAL MATERIAL 63.73

Day 600.00 1
Day 1,200.00 1
Day 1,050.00 1
3.00
TOTAL LABOUR 16.77
19.50

144,920.29 Per SQM : Rs 15,593.42


26,287.29 Per SQM : Rs 2,828.51

16.8.7
(British) : 100 Sft

Unit Rate (Rs)

Kg 137.00 1
Kg 128.00 1
TOTAL MATERIAL 63.78

Day 600.00 1
Day 1,200.00 1
Day 1,050.00 1
3.00
TOTAL LABOUR 16.72
19.50

123,520.41 Per SQM : Rs 13,290.80


22,324.69 Per SQM : Rs 2,402.14

Spec. No :
Unit (British) : Each

Rate (Rs)

550.00 1
187.25 1
8,220.00 1

3,260.00 100 Cft


2,520.00 100 Cft
TOTAL MATERIAL 69.70

1,200.00 1
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.94

1,282.27 1

591.77 1

625.00 1
742.02 1
TOTAL EQUIPMENT 3.86

19.50 %

11,770.41 Cost Per Each: 11,770.41


612.62 Cost Per Each: 612.62

Spec. No :
Unit (British) : Each

Rate (Rs)

550.00 1
187.25 1
8,540.00 1

3,260.00 100 Cft


2,520.00 100 Cft
TOTAL MATERIAL 76.79

1,200.00 1
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.13

1,282.27 1

591.77 1

625.00 1
742.02 1
TOTAL EQUIPMENT 0.58

19.50 %

11,809.11 Cost Per Each: 11,809.11


20.95 Cost Per Each: 20.95

Spec. No :
Unit (British) : Each

Rate (Rs)

550.00 1
2,600.00 100 Cft
187.25 1
16,600.00 1

3,260.00 100 Cft


2,520.00 100 Cft
TOTAL MATERIAL 69.56

1,200.00 1
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 7.62

1,282.27 1

591.77 1

625.00 1
742.02 1
TOTAL EQUIPMENT 3.32

19.50 %

27,311.21 Cost Per Each: 27,311.21


1,666.98 Cost Per Each: 1,666.98
Spec. No :
Unit (British) : Each

Rate (Rs)

550.00 1
2,600.00 100 Cft
187.25 1
34,600.00 1

3,260.00 100 Cft


2,520.00 100 Cft
TOTAL MATERIAL 75.01

1,200.00 2
600.00 5
1,200.00 4
3.00
TOTAL LABOUR 3.59

1,282.27 1

591.77 1

625.00 1
742.02 1
TOTAL EQUIPMENT 1.91

19.50 %

47,522.10 Cost Per Each: 47,522.10


367.87 Cost Per Each: 367.87
Spec. No :
Unit (British) : Each
Overhead Gantry Beam/ Information Sign for Single Carriageway
Unit Rate (Rs)

Kg 120.00 1
Kg 128.00 1
No 130.00 1
Ltr 401.22 1
Cft 23,667.98
TOTAL MATERIAL 74.54

Day 850.00 1
Day 1,200.00 1
Day 1,050.00 1
3.00
TOTAL LABOUR 5.96
19.50

168,316.20 Cost Per Each: 168,316.20


6,584.38 Cost Per Each: 6,584.38

Spec. No :
Unit (British) : Each
Overhead Gantry Beam/ Information Sign for Dual Carriageway
Unit Rate (Rs)

Kg 120.00 1
Kg 128.00 1
No 130.00 1
Ltr 401.22 1
Cft 23,667.98
TOTAL MATERIAL 75.96

Day 600.00 1
Day 1,200.00 1
Day 1,050.00 1
3.00
TOTAL LABOUR 4.54
19.50

367,316.96 Cost Per Each: 367,316.96


7,460.25 Cost Per Each: 7,460.25

Spec. No :
Unit (British) : Each
Overhead Gantry Beam/ Information Sign for Six Lane Carriageway
Rate (Rs)

120.00 1
128.00 1
130.00 1
401.22 1
23,667.98 100 Cft
TOTAL MATERIAL 76.32

600.00 1
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 4.18
19.50

528,948.47 Cost Per Each: 528,948.47


8,222.81 Cost Per Each: 8,222.81

16.8.7
(British) : Each
Unit Rate (Rs)

Kg 120.00 1
Kg 128.00 1
No 130.00 1
Ltr 401.22 1
Cft 23,667.98
TOTAL MATERIAL 73.49

Day 850.00 1
Day 1,200.00 1
Day 1,050.00 1
3.00
TOTAL LABOUR 7.01
19.50

112,466.75 Cost Per Per Each: 112,466.75


5,956.56 Cost Per Per Each: 5,956.56

16.8.7.2.2
(British) : 100 Sft

Unit Rate (Rs)

522.00 1
TOTAL MATERIAL 75.22

850.00 1
3.00
TOTAL LABOUR 5.28
19.50

64,313.75 Per SQM : Rs 6,920.16


1,934.75 Per SQM : Rs 208.18
16.8.7.2.2
(British) : 100 Sft

Unit Rate (Rs)

326.00 1

TOTAL MATERIAL 73.92

850.00 1
3.00
TOTAL LABOUR 6.58
19.50

40,891.75 Per SQM : Rs 4,399.95


1,934.75 Per SQM : Rs 208.18

16.8.7.2.2
(British) : 100 Sft

Unit Rate (Rs)

198.00 1

TOTAL MATERIAL 71.77

850.00 1
3.00
TOTAL LABOUR 8.73
19.50

25,595.75 Per SQM : Rs 2,754.10


1,934.75 Per SQM : Rs 208.18

Spec. No :
Unit (British) : Each

Rate (Rs)

250.00 1

TOTAL MATERIAL 42.12

600.00 1
3.00
TOTAL LABOUR 38.38
19.50

556.00 Cost Per Each: 556.00


257.25 Cost Per Each: 257.25

Spec. No :
Unit (British) : Each

Rate (Rs)

336.00 1
TOTAL MATERIAL 47.69
600.00 1
3.00
TOTAL LABOUR 32.81
19.50

658.77 Cost Per Each: 658.77


257.25 Cost Per Each: 257.25

16.8.10
(British) : Each

Rate (Rs)

444.00 1

TOTAL MATERIAL 69.10

600.00 1
3.00
TOTAL LABOUR 11.40
19.50

596.73 Cost Per Each: 596.73


66.15 Cost Per Each: 66.15

16.8.10
(British) : Each
Rate (Rs)

458.00 1

TOTAL MATERIAL 69.33

600.00 1
3.00
TOTAL LABOUR 11.17
19.50

613.46 Cost Per Each: 613.46


66.15 Cost Per Each: 66.15

16.8.10
(British) : Each

Rate (Rs)

361.00 1

TOTAL MATERIAL 67.42

600.00 1
3.00
TOTAL LABOUR 13.08
19.50

497.55 Cost Per Each: 497.55


66.15 Cost Per Each: 66.15
16.8.10
(British) : Each

Rate (Rs)

370.00 1

TOTAL MATERIAL 67.63

600.00 1
3.00
TOTAL LABOUR 12.87
19.50

508.30 Cost Per Each: 508.30


66.15 Cost Per Each: 66.15

16.8.10
(British) : Each

Rate (Rs)

234.00 1

TOTAL MATERIAL 62.97

600.00 1
3.00
TOTAL LABOUR 17.53
19.50
345.78 Cost Per Each: 345.78
66.15 Cost Per Each: 66.15

16.8.10
(British) : Each

Rate (Rs)

240.00 1

TOTAL MATERIAL 63.27

600.00 1
3.00
TOTAL LABOUR 17.23
19.50

352.95 Cost Per Each: 352.95


66.15 Cost Per Each: 66.15

16.8.10
(British) : Each

Rate (Rs)
458.00 1

TOTAL MATERIAL 69.33

600.00 1
3.00
TOTAL LABOUR 11.17
19.50

613.46 Cost Per Each: 613.46


66.15 Cost Per Each: 66.15

Spec. No :
Unit (British) : Each
Reflectorized Aluminium Pavement Stud (Raised Profile Type - Single)
Rate (Rs)

400.00 1

TOTAL MATERIAL 72.67

850.00 1
3.00
TOTAL LABOUR 7.83
19.50

510.59 Cost Per Each: 510.59


32.59 Cost Per Each: 32.59

Spec. No :
Unit (British) : Each
Reflectorized Aluminium Pavement Stud (Raised Profile Type - Double)
Rate (Rs)

425.00 1

TOTAL MATERIAL 72.93

850.00 1
3.00
TOTAL LABOUR 7.57
19.50

540.47 Cost Per Each: 540.47


32.59 Cost Per Each: 32.59

Spec. No :
Unit (British) : Each
Reflectorized Aluminium Pavement Stud (Flushed Profile Type - Single)
Rate (Rs)

375.00 1

TOTAL MATERIAL 72.37

850.00 1
3.00
TOTAL LABOUR 8.13
19.50

480.72 Cost Per Each: 480.72


32.59 Cost Per Each: 32.59

Spec. No :
Unit (British) : Each
Reflectorized Aluminium Pavement Stud (Flushed Profile Type - Double)
Rate (Rs)

400.00 1

TOTAL MATERIAL 72.67

850.00 1
3.00
TOTAL LABOUR 7.83
19.50

510.59 Cost Per Each: 510.59


32.59 Cost Per Each: 32.59

Spec. No :
Unit (British) : Each
Reflectorized Plastic Pavement Stud (Raised Profile Type - Single)
Rate (Rs)

300.00 1

TOTAL MATERIAL 71.19

850.00 1
3.00
TOTAL LABOUR 9.31
19.50

391.09 Cost Per Each: 391.09


32.59 Cost Per Each: 32.59
Spec. No :
Unit (British) : Each
Reflectorized Plastic Pavement Stud (Raised Profile Type - Double)
Rate (Rs)

325.00 1

TOTAL MATERIAL 71.64

850.00 1
3.00
TOTAL LABOUR 8.86
19.50

420.97 Cost Per Each: 420.97


32.59 Cost Per Each: 32.59

Spec. No :
Unit (British) : Each
Reflectorized Plastic Pavement Stud (Flushed Profile Type - Single)
Rate (Rs)

275.00 1

TOTAL MATERIAL 70.66

850.00 1
3.00
TOTAL LABOUR 9.84
19.50

361.22 Cost Per Each: 361.22


32.59 Cost Per Each: 32.59
Spec. No :
Unit (British) : Each
Reflectorized Plastic Pavement Stud (Flushed Profile Type - Double)
Rate (Rs)

325.00 1

TOTAL MATERIAL 71.64

850.00 1
3.00
TOTAL LABOUR 8.86
19.50

420.97 Cost Per Each: 420.97


32.59 Cost Per Each: 32.59

16.3.15
(British) : 100 Cft

Unit Rate (Rs)

Cft 2,600.00
No 9,900.00 1,000 No
TOTAL MATERIAL 63.37

Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 15.25

Hour 420.00 1
Hour 1,500.00 1
TOTAL EQUIPMENT 1.88
19.50

21,174.85 Per CUM : Rs 7,477.84


3,417.75 Per CUM : Rs 1,206.97

Spec. No :
Unit (British) :
Provide and Lay Polythene Sheet under Rigid Pavement
Unit Rate (Rs)

Sft 24.38
TOTAL MATERIAL

Day 850.00

TOTAL LABOUR

Rs. 3,269.83
Rs. 65.08

(British) : 100 Cft

Rate (Rs)

1,470.00 100 Cft


TOTAL MATERIAL 44.66
600.00 1
3.00
TOTAL LABOUR 32.88

769.00 1

420.00 1
1,500.00 1
TOTAL EQUIPMENT 2.95
19.50

3,754.78 Per CUM : Rs 1,325.99


1,470.00 Per CUM : Rs 519.13

Spec. No :
Unit (British) : 100 Rft
SHTO M 170 Dia 310 mm
Unit Rate (Rs)

Bag 550.00 1
Cft 2,600.00 100 Cft
Rft 316.00 1

TOTAL MATERIAL 53.79

Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 8.01

Hour 591.77 1

Hour 625.00 1
Hour 302.99 1
Hour 3,100.00 1
TOTAL EQUIPMENT 18.70
19.50

60,105.03 Per Meter : Rs 1,971.45


3,976.50 Per Meter : Rs 130.43
Spec. No :
Unit (British) : 100 Rft
hto M 170 Dia 380 Mm
Unit Rate (Rs)

Bag 550.00 1
Cft 2,600.00 100 Cft
Rft 368.00 1

TOTAL MATERIAL 56.24

Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 7.69

Hour 591.77 1

Hour 625.00 1
Hour 302.99 1
Hour 3,100.00 1
TOTAL EQUIPMENT 16.57
19.50

68,245.50 Per Meter : Rs 2,238.45


4,226.25 Per Meter : Rs 138.62

Spec. No :
Unit (British) : 100 Rft
Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 460mm
Unit Rate (Rs)
Bag 550.00 1
Cft 2,600.00
Rft 480.83 1
TOTAL MATERIAL 58.03

Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 22.47
19.50

87,528.46 Per Meter : Rs 2,870.93


22,395.45 Per Meter : Rs 734.57

Spec. No :
Unit (British) : 100 Rft
Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 610mm
Unit Rate (Rs)

Bag 550.00 1
Cft 2,600.00
Rft 654.17 1
TOTAL MATERIAL 59.56

Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 20.94
19.50

118,692.94 Per Meter : Rs 3,893.13


28,002.62 Per Meter : Rs 918.49
Spec. No :
Unit (British) : 100 Rft
hto M 170 Dia 610 mm.
Unit Rate (Rs)

Bag 550.00 1
Cft 2,600.00 100 Cft
Rft 654.17 1
TOTAL MATERIAL 58.02

Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 5.25

Hour 591.77 1

Hour 625.00 1
Hour 302.99 1
Hour 3,100.00 1
Hour 1,250.00 1
TOTAL EQUIPMENT 17.24
19.50

121,235.04 Per Meter : Rs 3,976.51


3,600.03 Per Meter : Rs 118.08

Spec. No :
Unit (British) : 100 Rft
Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 760mm
Unit Rate (Rs)

Bag 550.00 1
Cft 2,600.00
Rft 1,067.75 1
TOTAL MATERIAL 63.05

Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 17.45
19.50

176,617.61 Per Meter : Rs 5,793.06


33,604.05 Per Meter : Rs 1,102.21

Spec. No :
Unit (British) : 100 Rft
hto M 170 Dia 760 mm
Unit Rate (Rs)

Bag 550.00 1
Cft 2,600.00 100 Cft
Rft 1,067.75 1
TOTAL MATERIAL 62.65

Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 4.57

Hour 591.77 1

Hour 625.00 1
Hour 302.99 1
Hour 3,100.00 1
Hour 1,250.00 1
TOTAL EQUIPMENT 13.29
19.50

177,015.96 Per Meter : Rs 5,806.12


3,665.45 Per Meter : Rs 120.23
Spec. No :
Unit (British) : 100 Rft
Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 910mm
Unit Rate (Rs)

Bag 550.00 1
Cft 2,600.00
Rft 2,075.00 1
TOTAL MATERIAL 67.76

Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 12.74
19.50

305,195.49 Per Meter : Rs 10,010.41


39,200.49 Per Meter : Rs 1,285.78

Spec. No :
Unit (British) : 100 Rft
hto M 170 Dia 910 mm
Unit Rate (Rs)

Bag 550.00 1
Cft 2,600.00 100 Cft
Rft 2,075.00 1
TOTAL MATERIAL 67.69

Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 3.93

Hour 591.77 1

Hour 625.00 1
Hour 302.99 1
Hour 3,100.00 1
Hour 1,250.00 1
TOTAL EQUIPMENT 8.88
19.50

304,650.57 Per Meter : Rs 9,992.54


3,741.89 Per Meter : Rs 122.73

16.7.2
(British) : 100 Rft
e Culvert (AASHTO M-170) Dia: 1070mm
Rate (Rs)

550.00 1 Bag
2,600.00 100 Cft
2,047.50 1 Rft
MATERIAL 66.55 %

1,200.00 1 Day
600.00 1 Day
3.00 %
LABOUR 13.95 %
19.50 %

310,520.13 Per Meter : Rs 10,185.06


44,802.59 Per Meter : Rs 1,469.52

Spec. No :
Unit (British) : 100 Rft
hto M 170 Dia 1070 mm
Unit Rate (Rs)
Bag 550.00 1
Cft 2,600.00 100 Cft
Rft 2,047.50 1
TOTAL MATERIAL 66.02

Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 4.42

Hour 591.77 1

Hour 625.00 1
Hour 302.99 1
Hour 3,100.00 1
Hour 5,000.00 1
TOTAL EQUIPMENT 10.06
19.50

312,052.12 Per Meter : Rs 10,235.31


5,842.37 Per Meter : Rs 191.63

16.7.2
(British) : 100 Rft
e Culvert (AASHTO M-170) Dia: 1220mm
Rate (Rs)

550.00 1 Bag
2,600.00 100 Cft
2,365.00 1 Rft
MATERIAL 66.79 %

1,200.00 1 Day
600.00 1 Day
3.00 %
LABOUR 13.71 %
19.50 %

357,072.89 Per Meter : Rs 11,711.99


50,412.18 Per Meter : Rs 1,653.52

Spec. No :
Unit (British) : 100 Rft
SHTO M 170 Dia 1220 mm
Unit Rate (Rs)

Bag 550.00 1
Cft 2,600.00 100 Cft
Rft 2,365.00 1
TOTAL MATERIAL 66.66

Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 4.12

Hour 591.77 1

Hour 625.00 1
Hour 302.99 1
Hour 3,100.00 1
Hour 5,000.00 1
TOTAL EQUIPMENT 9.72
19.50

356,664.14 Per Meter : Rs 11,698.58


5,302.44 Per Meter : Rs 173.92

16.7.2
(British) : 100 Rft
e Culvert (AASHTO M-170) Dia: 1520mm
Rate (Rs)

550.00 1 Bag
2,600.00 100 Cft
6,500.00 1 Rft
MATERIAL 72.57 %

1,200.00 1 Day
600.00 1 Day
3.00 %
LABOUR 7.93 %
19.50 %

859,479.09 Per Meter : Rs 28,190.91


56,006.12 Per Meter : Rs 1,837.00

Spec. No :
Unit (British) : 100 Rft
hto M 170 Dia 1520 mm
Unit Rate (Rs)

Bag 550.00 1
Cft 2,600.00 100 Cft
Rft 6,500.00 1
TOTAL MATERIAL 72.48

Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 3.48

Hour 591.77 1

Hour 625.00 1
Hour 302.99 1
Hour 3,100.00 1
Hour 5,000.00 1
TOTAL EQUIPMENT 4.54
19.50
859,215.77 Per Meter : Rs 28,182.28
5,468.40 Per Meter : Rs 179.36

Spec. No :
Unit (British) : 100 Cft
to RCC Pipe Culvert
Rate (Rs)

2,600.00 100 Cft


TOTAL MATERIAL 59.17

600.00 1
3.00
TOTAL LABOUR 14.60

420.00 1
302.99 1
TOTAL EQUIPMENT 6.73
19.50

4,493.31 Per CUM : Rs 1,586.80


686.78 Per CUM : Rs 242.54

Spec. No :
Unit (British) : 100 Cft
Concrete Class B in Bedding and Encasement of Concrete Pipe Culvert
Unit Rate (Rs)

Bag 550.00 1
Cft 2,600.00 100 Cft
Cft 3,820.00 100 Cft
Cft 3,260.00 100 Cft
Cft 2,520.00 100 Cft
Ltr 640.00 1
TOTAL MATERIAL 53.57

Day 1,200.00 1
Day 600.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 17.36

Hour 1,282.27 1

Hour 175.00 1

Hour 591.77 1

Hour 625.00 1
Hour 742.02 1
TOTAL EQUIPMENT 9.57

19.50 %

27,522.04 Per CUM : Rs 9,719.32


5,203.14 Per CUM : Rs 1,837.47

18.1.4.9
(British) : 100 Rft

Unit Rate (Rs)


Ft 810.00 1
3.00
TOTAL LABOUR 27.91

Ft 1,710.00 1
TOTAL EQUIPMENT 52.59
19.50

303,570.00 Per Meter : Rs 9,957.10


99,225.00 Per Meter : Rs 3,254.58

18.1.4.9
(British) : 100 Rft

Rate (Rs)

810.00 1
3.00
TOTAL LABOUR 30.18

1,500.00 1

TOTAL EQUIPMENT 50.32


19.50

278,475.00 Per Meter : Rs 9,133.98


99,225.00 Per Meter : Rs 3,254.58
Spec. No :
Unit (British) : Job

Unit Rate (Rs)

2,600.00
TOTAL MATERIAL 59.16

600.00 1
3.00
TOTAL LABOUR 4.87

Hour 5,000.00 1
Hour 6,250.00 1
TOTAL EQUIPMENT 16.47
19.50

126,567.18 Cost Per Job: 126,567.18


3,123.75 Cost Per Job: 3,123.75

Spec. No :
Unit (British) : Job
Load up to 121-240 tonne
Rate (Rs)

Tonne 125,000.00 1

Tonne 122,000.00 1
6,872.54 1

10,995.05 1

TOTAL MATERIAL 59.68

102,000.00 1

TOTAL EQUIPMENT 17.82


19.50

530,205.47 Cost Per Job: 530,205.47


0.00 Cost Per Job: 0.00

Spec. No :
Unit (British) : Job
Load 241 - 300 tonne
Rate (Rs)

Tonne 125,000.00 1

Tonne 122,000.00 1
6,872.54 1

10,995.05 1

TOTAL MATERIAL 56.44

127,500.00 1

TOTAL EQUIPMENT 21.06


19.50

560,677.97 Cost Per Job: 560,677.97


0.00 Cost Per Job: 0.00

Spec. No :
Unit (British) : Job
Load 301 - 360 tonne
Rate (Rs)

Tonne 125,000.00 1

Tonne 122,000.00 1
6,872.54 1

10,995.05 1

TOTAL MATERIAL 53.53

153,000.00 1

TOTAL EQUIPMENT 23.97


19.50

591,150.47 Cost Per Job: 591,150.47


0.00 Cost Per Job: 0.00

Spec. No :
Unit (British) : Job
Load 361 - 600 tonne
Rate (Rs)

Tonne 125,000.00 1

Tonne 122,000.00 1
6,872.54 1

10,995.05 1

TOTAL MATERIAL 51.75

170,000.00 1

TOTAL EQUIPMENT 25.75


19.50

611,465.47 Cost Per Job: 611,465.47


0.00 Cost Per Job: 0.00

Spec. No :
Unit (British) : Each

Rate (Rs)

Tonne 125,000.00 1

Tonne 122,000.00 1
6,872.54 1

10,995.05 1

TOTAL MATERIAL 50.28

185,000.00 1

TOTAL EQUIPMENT 27.22


19.50

629,390.47 Cost Per Each: 629,390.47


0.00 Cost Per Each: 0.00

18.1.4.7
(British) : Job.
Rate (Rs)

185,000.00 1

TOTAL EQUIPMENT 77.50


19.50

221,075.00 Cost Per Job: 221,075.00


0.00 Cost Per Job: 0.00

18.1.4.7
(British) : Job.

Rate (Rs) Amount

125,000.00 1 Tonne

122,000.00 1 Tonne
6,872.54 1M

10,995.05 1 M3

MATERIAL 49.34 %

195,000.00 1 Job

TOTAL EQUIPMENT 28.16


19.50
641,340.47 Cost Per Job: 641,340.47
0.00 Cost Per Job: 0.00

Spec. No :
Unit (British) : 100 Rft
Boring for Cast-in-place RCC Piles in Alluvial Soils : Dia up to 760mm
Rate (Rs)

1,710.00 1
TOTAL EQUIPMENT 77.50
19.50

204,345.00 Per Meter : Rs 6,702.52


0.00 Per Meter : Rs 0.00

18.1.4.9
(British) : 100 Rft

Rate (Rs)

1,530.00 1
TOTAL EQUIPMENT 77.50
19.50

182,835.00 Per Meter : Rs 5,996.99


0.00 Per Meter : Rs 0.00
18.1.4.2.3
(British) : 100 Cft

Rate (Rs)

1,700.00 1
TOTAL EQUIPMENT 77.50
19.50

203,150.00 Per Meter : Rs 6,663.32


0.00 Per Meter : Rs 0.00

Spec. No :
Unit (British) : 100 Rft
Boring for Cast-in-place RCC Piles in Gravelly Soils : Dia up to 660mm
Unit Rate (Rs)

Ft 1,500.00 1

TOTAL EQUIPMENT 77.50


19.50

179,250.00 Per Meter : Rs 5,879.40


0.00 Per Meter : Rs 0.00
18.1.4.2.3
(British) : 100 Rft

Unit Rate (Rs)

Ft 810.00 1
3.00
TOTAL LABOUR 29.83

Ft 1,530.00 1

TOTAL EQUIPMENT 50.67


19.50

282,060.00 Per Meter : Rs 9,251.57


99,225.00 Per Meter : Rs 3,254.58

18.1.4.2.3
(British) : 100 Rft

Rate (Rs) Amount

Ft 810.00 1
3.00
TOTAL LABOUR 27.91

Ft 1,710.00 1
TOTAL EQUIPMENT 52.59
19.50

303,570.00 Per Meter : Rs 9,957.10


99,225.00 Per Meter : Rs 3,254.58

18.1.4.2.2 ,
18.3.3.2
(British) : 100 Kg

Unit Rate (Rs)

Kg 150.00 1
TOTAL MATERIAL 69.92

Day 600.00 1
Day 850.00 1
3.00
TOTAL LABOUR 10.58
19.50

19,916.84 Cost Per kg: 199.17


1,991.84 Cost Per kg: 19.92

Spec. No :
Unit (British) : Cubic Inch
Supply and Fixing Neoprene Bearing Pad as per specs & design
Rate (Rs)

Cubic I 54.00 1
TOTAL MATERIAL 76.23

600.00 1
3.00
TOTAL LABOUR 4.27
19.50

65.63 Cost Per cm3: 4.01


1.10 Cost Per cm3: 0.07

Spec. No :
Unit (British) : 100 Kg
Supply and Fixing Steel Bearing Pads as per specs & design
Unit Rate (Rs)

161.00 1
TOTAL MATERIAL 68.31

600.00 1
1,050.00 1
1,050.00 1
3.00
TOTAL LABOUR 12.19
19.50

21,894.39 Cost Per kg: 218.94


2,654.89 Cost Per kg: 26.55

16.6.7
(British) : 100 Rft
Rate (Rs)

60.00 1
TOTAL MATERIAL 68.49

950.00 1

3.00
TOTAL LABOUR 12.01
19.50

8,951.13 Per Meter : Rs 293.60


1,064.13 Per Meter : Rs 34.90

16.6.7
(British) : Set

Rate (Rs)

650.00 1
TOTAL MATERIAL 63.56

950.00 1

3.00
TOTAL LABOUR 16.94
19.50

951.31 Cost Per Set: 951.31


174.56 Cost Per Set: 174.56
Spec. No :
Unit (British) : Ft
Launching girders in place, including lifting & handling if any
Rate (Rs)

600.00 1
850.00 1
600.00 1
3.00
TOTAL LABOUR 67.58

8,500.00 1
TOTAL EQUIPMENT 12.92
19.50

758.83 Per Meter : Rs 2,488.97


634.91 Per Meter : Rs 2,082.51

Spec. No : 16.6.7
Unit (British) : Each
Tensile Steel Wire Strands
Rate (Rs)

600.00 1
900.00 1

3.00
TOTAL LABOUR 57.92

1,000.00 1
TOTAL EQUIPMENT 22.58
19.50

1,390.19 Cost Per Each: 1,390.19


992.25 Cost Per Each: 992.25
Spec. No :
Unit (British) : 100Rft
Providing and fixing GI Steel (Hamp core) Ropes 1/2" dia
Rate (Rs)

207.00 1
TOTAL MATERIAL 64.27

600.00 1
3.00
TOTAL LABOUR 6.24

216.35 1
1,250.00 1

TOTAL EQUIPMENT 9.99


19.50

31,353.87 Per Meter : Rs 1,028.41


1,344.17 Per Meter : Rs 44.09

Spec. No :
Unit (British) : 100Rft
Providing and fixing GI Steel (Hamp core) Ropes 3/4" dia
Rate (Rs)

269.00 1
TOTAL MATERIAL 66.90

600.00 1
3.00
TOTAL LABOUR 5.60
216.35 1
1,250.00 1

TOTAL EQUIPMENT 8.00


19.50

39,133.32 Per Meter : Rs 1,283.57


1,344.17 Per Meter : Rs 44.09

Spec. No :
Unit (British) : 100Rft
Steel (Hamp core) Ropes 1" dia
Unit Rate (Rs)

314.00 1
TOTAL MATERIAL 68.24

600.00 1
3.00
TOTAL LABOUR 5.27

Hour 216.35 1
Hour 1,250.00 1

TOTAL EQUIPMENT 6.99


19.50

44,779.69 Per Meter : Rs 1,468.77


1,344.17 Per Meter : Rs 44.09

Spec. No : 16.12
Unit (British) : Each
Steel U Grips 1.5" dia
Rate (Rs)

131.00 1
TOTAL MATERIAL 26.09

600.00 1
3.00
TOTAL LABOUR 32.87

216.35 1
TOTAL EQUIPMENT 21.54
19.50

469.56 Cost Per Each: 469.56


183.75 Cost Per Each: 183.75

Spec. No : 16.12
Unit (British) : Each
Steel U Grips 1" dia
Rate (Rs)

113.60 1
TOTAL MATERIAL 23.68

600.00 1
3.00
TOTAL LABOUR 34.27

216.35 1
TOTAL EQUIPMENT 22.55
19.50

448.77 Cost Per Each: 448.77


183.75 Cost Per Each: 183.75
Spec. No : 16.12
Unit (British) : Each
Steel U Grips 3/4" dia
Rate (Rs)

131.00 1
TOTAL MATERIAL 26.09

600.00 1
3.00
TOTAL LABOUR 32.87

216.35 1
TOTAL EQUIPMENT 21.54
19.50

469.56 Cost Per Each: 469.56


183.75 Cost Per Each: 183.75

Spec. No : 16.11
Unit (British) : Each
Steel Thimble plate 1.5" dia
Rate (Rs)

1,146.00 1

TOTAL MATERIAL 63.25

600.00 1
3.00
TOTAL LABOUR 11.28

216.35 1
TOTAL EQUIPMENT 5.97
19.50
1,682.49 Cost Per Each: 1,682.49
183.75 Cost Per Each: 183.75

Spec. No :
Unit (British) : Each
Steel Thimble plate 1" dia
Rate (Rs)

1,146.00 1

TOTAL MATERIAL 63.25

600.00 1
3.00
TOTAL LABOUR 11.28

216.35 1
TOTAL EQUIPMENT 5.97
19.50

1,682.49 Cost Per Each: 1,682.49


183.75 Cost Per Each: 183.75

Spec. No : 16.11
Unit (British) : Each
Steel Thimble plate 3/4" dia
Rate (Rs)

1,146.00 1

TOTAL MATERIAL 63.25


600.00 1
3.00
TOTAL LABOUR 11.28

216.35 1
TOTAL EQUIPMENT 5.97
19.50

1,682.49 Cost Per Each: 1,682.49


183.75 Cost Per Each: 183.75

Spec. No : 16.11
Unit (British) : Each
Steel Thimble plate 1/2" dia
Rate (Rs)

1,146.00 1

TOTAL MATERIAL 63.25

600.00 1
3.00
TOTAL LABOUR 11.28

216.35 1
TOTAL EQUIPMENT 5.97
19.50

1,682.49 Cost Per Each: 1,682.49


183.75 Cost Per Each: 183.75
Spec. No :
Unit (British) : Each

Rate (Rs)

600.00 1
3.00
TOTAL LABOUR 33.24

1,875.00 1

TOTAL EQUIPMENT 47.26


19.50

1,855.31 Cost Per Each: 1,855.31


735.00 Cost Per Each: 735.00

Spec. No : 16.12
Unit (British) : Each

Rate (Rs)

600.00 1
3.00
TOTAL LABOUR 40.96

625.00 1
TOTAL EQUIPMENT 39.54
19.50

1,481.88 Cost Per Each: 1,481.88


735.00 Cost Per Each: 735.00
Spec. No :
Unit (British) : 100 Rft
heath Pipe after stressing
Rate (Rs)

550.00 1
2,600.00 100 Cft
TOTAL MATERIAL 20.02

600.00 1
900.00 1

3.00
TOTAL LABOUR 56.52

212.50 1
TOTAL EQUIPMENT 3.96
19.50

1,539.21 Per Meter : Rs 50.49


1,071.04 Per Meter : Rs 35.13

Spec. No :
Unit (British) : 1000 Cft

Rate (Rs)

550.00 1
3,820.00 100 Cft
3,260.00 100 Cft
2,520.00 100 Cft
1,210.00 100 Cft
3,100.00 100 Cft

TOTAL MATERIAL 70.34

600.00 1
3.00
TOTAL LABOUR 3.21
1,935.71 1

1,500.00 1
4,776.03 1
5,159.11 1

TOTAL EQUIPMENT 6.95

19.50 %

34,523.84 Per CUM : Rs 1,219.20


96.06 Per CUM : Rs 3.39

Spec. No :
Unit (British) : Ton
g Seal, Type Mc-250
Rate (Rs)

89,000.00 1
TOTAL MATERIAL 75.54

600.00 1
3.00
TOTAL LABOUR 3.17

481.01 1
192.31 1
1,404.00 1

TOTAL EQUIPMENT 1.79


19.50
109,120.74 Cost Per Ton: 109,120.74
244.98 Cost Per Ton: 244.98

Spec. No :
Unit (British) : Ton
Curing Seal, Type SS-1
Unit Rate (Rs)

ton 70,200.00 1
TOTAL MATERIAL 75.03

Day 600.00 1
3.00
TOTAL LABOUR 3.21

Hour 481.01 1
Hour 192.31 1
Hour 1,404.00 1

TOTAL EQUIPMENT 2.25


19.50

86,654.74 Cost Per Ton: 86,654.74


244.98 Cost Per Ton: 244.98

Spec. No :
Unit (British) : 100 Cft

Rate (Rs)

550.00 1
93.48 1
3,820.00 100 Cft
3,260.00 100 Cft
1,210.00 100 Cft
85,200.00 100 Cft
TOTAL MATERIAL 39.36

600.00 1
3.00
TOTAL LABOUR 5.05

1,258.21 1
1,210.00 1

591.77 1

481.01 1
1,650.00 1
14,000.00 1
2,884.62 1
TOTAL EQUIPMENT 36.09

19.50 %

27,643.52 Per CUM : Rs 9,762.23


749.26 Per CUM : Rs 264.60

16.6.7.3.9
(British) : 100 Rft
Rate (Rs) Amount

550.00 1
2,600.00 100 Cft
TOTAL MATERIAL 13.82

1,200.00 1
600.00 1
600.00 1
600.00 1
3.00
TOTAL LABOUR 58.99

700.00 1

TOTAL EQUIPMENT 7.69


19.50

4,294.25 Per Meter : Rs 140.85


3,123.75 Per Meter : Rs 102.46

16.6.9
(British) : Each

Rate (Rs)

120.00 1
46.60 1
TOTAL MATERIAL 66.13

850.00 1
800.00 1
3.00
TOTAL LABOUR 9.67
212.50 1
60.00 1
TOTAL EQUIPMENT 4.69
19.50

1,434.14 Cost Per Each: 1,434.14


126.33 Cost Per Each: 126.33

16.6.9
(British) : Each

Rate (Rs)

120.00 1
46.60 1
TOTAL MATERIAL 69.45

850.00 1
800.00 1
3.00
TOTAL LABOUR 7.73

212.50 1
60.00 1
TOTAL EQUIPMENT 3.33
19.50

2,022.44 Cost Per Each: 2,022.44


126.33 Cost Per Each: 126.33
16.6.9
(British) : Each

Rate (Rs)

120.00 1
46.60 1
TOTAL MATERIAL 71.32

850.00 1
800.00 1
3.00
TOTAL LABOUR 6.63

212.50 1
60.00 1
TOTAL EQUIPMENT 2.55
19.50

2,633.02 Cost Per Each: 2,633.02


126.33 Cost Per Each: 126.33

16.6.9
(British) : Each

Rate (Rs)

120.00 1
46.60 1
TOTAL MATERIAL 72.48

850.00 1
800.00 1
3.00
TOTAL LABOUR 5.95

212.50 1
60.00 1
TOTAL EQUIPMENT 2.07
19.50

3,243.61 Cost Per Each: 3,243.61


126.33 Cost Per Each: 126.33

16.6.7
(British) : Each

Rate (Rs)

550.00 1
2,600.00 100 Cft
3,438.00 100 Cft
TOTAL MATERIAL 18.49

1,200.00 1
600.00 1
600.00 1
950.00 1

3.00
TOTAL LABOUR 61.72

60.00 1
TOTAL EQUIPMENT 0.28
19.50

667.74 Cost Per Each: 667.74


508.99 Cost Per Each: 508.99
6.9
(British) : 100 Kg

Unit Rate (Rs)

Kg 120.00 1
TOTAL MATERIAL 60.84

Day 1,200.00 1
Day 600.00 1
Day 1,050.00 1
3.00
TOTAL LABOUR 19.66
19.50

19,282.65 Cost Per kg: 192.83


4,226.25 Cost Per kg: 42.26

16.7.12
(British) : Each

Rate (Rs)

254.00 1
TOTAL MATERIAL 46.70
1,200.00 1
600.00 1
950.00 1

3.00
TOTAL LABOUR 33.80
19.50

508.72 Cost Per Each: 508.72


205.19 Cost Per Each: 205.19

Spec. No :
Unit (British) : Each
n water outlet of AC pipe
Rate (Rs)

39.40 1
TOTAL MATERIAL 30.72

1,200.00 1
600.00 1
3.00
TOTAL LABOUR 49.78
19.50

180.87 Cost Per Each: 180.87


110.25 Cost Per Each: 110.25

6.9
(British) : 100 Cft
Rate (Rs)

32.00 1
TOTAL MATERIAL 32.04

600.00 1
1,200.00 1
3.00
TOTAL LABOUR 48.46
19.50

9,385.01 Per CUM : Rs 3,314.29


5,561.01 Per CUM : Rs 1,963.85

16.6.8
(British) : 100 Rft

Rate (Rs)

145.00 1
TOTAL MATERIAL 77.05

850.00 1
3.00
TOTAL LABOUR 3.45
19.50

17,431.63 Per Meter : Rs 571.76


104.13 Per Meter : Rs 3.42
Spec. No :
Unit (British) : 1000 Sft

Rate (Rs)

2,600.00 100 Cft


TOTAL MATERIAL 54.78

600.00 1
3.00
TOTAL LABOUR 3.63

1,245.26 1
1,758.00 1
591.77 1

625.00 1
3,200.00 1
TOTAL EQUIPMENT 22.10
19.50

21,984.30 Per SQM : Rs 236.55


182.06 Per SQM : Rs 1.96

Spec. No :
Unit (British) : 1000 Sft

Rate (Rs)

2,600.00 100 Cft


TOTAL MATERIAL 51.80

600.00 1
3.00
TOTAL LABOUR 3.71

1,245.26 1
1,758.00 1
591.77 1

625.00 1
3,200.00 1
TOTAL EQUIPMENT 25.00
19.50

19,436.56 Per SQM : Rs 209.14


182.06 Per SQM : Rs 1.96

Spec. No :
Unit (British) : 100 Sft
1" thick(consolidated) asphalt macadam with
liquid asphalt (cut backs) of any approved grade with premixed sand

Rate (Rs)

2,600.00 100 Cft


3,290.00 100 Cft
85.50 1
112.00 1
TOTAL MATERIAL 57.70

600.00 1
3.00
TOTAL LABOUR 17.01

1,210.00 1

400.00 1
471.80 1
TOTAL EQUIPMENT 5.80
19.50

5,579.60 Per SQM : Rs 600.37


1,029.00 Per SQM : Rs 110.72
Spec. No :
Unit (British) : 1000 Sft
FOR BITUMINOUS PRIME COAT
Unit Rate (Rs)

ton 85.00 1
TOTAL MATERIAL 2.35

Day 600.00 1
3.00
TOTAL LABOUR 9.77

Hour 591.77 1

Hour 481.01 1
Hour 625.00 1
Hour 192.31 1
Hour 1,404.00 1

TOTAL EQUIPMENT 68.38


19.50

318.29 Per SQM : Rs 3.42


28.44 Per SQM : Rs 0.31

Spec. No :
Unit (British) : 1000 Sft

Rate (Rs)

85.00 1
TOTAL MATERIAL 2.53

600.00 1
3.00
TOTAL LABOUR 10.30

481.01 1
192.31 1
1,404.00 1

TOTAL EQUIPMENT 67.67


19.50

118.25 Per SQM : Rs 1.27


11.39 Per SQM : Rs 0.12

Spec. No :
Unit (British) : 100 Sft
2" thick (consolidated) asphalt macadam with
liquid asphalt(cut backs) of approved grade with precoated bajri seal

Rate (Rs)

3,438.00 100 Cft


3,290.00 100 Cft
85.50 1
112.00 1
TOTAL MATERIAL 61.92

600.00 1
3.00
TOTAL LABOUR 13.44

1,210.00 1

400.00 1
471.80 1
TOTAL EQUIPMENT 5.14
19.50

8,546.70 Per SQM : Rs 919.62


1,176.00 Per SQM : Rs 126.54
Spec. No :
Unit (British) : 100 Sft
3" thick (consolidated) asphalt macadam with
liquid asphalt(cut backs) of approved grade with precoated bajri seal

Rate (Rs)

3,438.00
85.50 1
112.00 1
TOTAL MATERIAL 61.06

600.00 1
3.00
TOTAL LABOUR 13.14

1,210.00 1

400.00 1
471.80 1
TOTAL EQUIPMENT 6.30
19.50

12,098.35 Per SQM : Rs 1,301.78


1,617.00 Per SQM : Rs 173.99

16.4.3
(British) : 100 Sft
Rate (Rs)

3,438.00 100 Cft


85.50 1
112.00 1
TOTAL MATERIAL 71.12

600.00 1
600.00 1
3.00
TOTAL LABOUR 3.90

1,210.00 1

400.00 1

TOTAL EQUIPMENT 5.48


19.50

3,266.32 Per SQM : Rs 351.46


38.88 Per SQM : Rs 4.18

16.7.12
(British) : 10 Rft

Rate (Rs)

230.60 1
TOTAL MATERIAL 74.59

900.00 1
3.00
TOTAL LABOUR 5.91
19.50
2,865.92 Per Meter : Rs 940.02
110.25 Per Meter : Rs 36.16

Spec. No :
Unit (British) : 100 Cft
Providing and filling sand behind abutment of bridges, culverts.
Rate (Rs)

2,600.00 100 Cft


TOTAL MATERIAL 48.43

600.00 1
600.00 1
740.00 1
3.00
TOTAL LABOUR 29.24

302.99 1
TOTAL EQUIPMENT 2.82
19.50

5,013.82 Per CUM : Rs 1,770.61


1,725.78 Per CUM : Rs 609.45

16.2.7
(British) : 1000 Cft

Rate (Rs)
1,575.00
TOTAL MATERIAL 67.26

600.00 1
600.00 1
740.00 1
3.00
TOTAL LABOUR 9.86

1,210.00 1

769.00 1

TOTAL EQUIPMENT 3.38


19.50

27,169.79 Per CUM : Rs 959.49


2,460.78 Per CUM : Rs 86.90

Spec. No :
Unit (British) : 100 Sft

Rate (Rs)

600.00 1
3.00
TOTAL LABOUR 8.13

769.00 1

5,212.00 1

TOTAL EQUIPMENT 72.37


19.50

650.60 Per SQM : Rs 70.00


44.10 Per SQM : Rs 4.75
Spec. No :
Unit (British) : 100 Sft

Rate (Rs)

600.00 1
3.00
TOTAL LABOUR 7.43

769.00 1

5,212.00 1

TOTAL EQUIPMENT 73.07


19.50

502.14 Per SQM : Rs 54.03


29.40 Per SQM : Rs 3.16

Spec. No :
Unit (British) : 100 Sft

Rate (Rs)

600.00 1
3.00
TOTAL LABOUR 8.46

769.00 1

5,212.00 1

TOTAL EQUIPMENT 72.04


19.50
509.49 Per SQM : Rs 54.82
36.75 Per SQM : Rs 3.95

Spec. No :
Unit (British) : 100 Sft

Rate (Rs)

3,438.00 100 Cft


18.38 1
85.50 1
TOTAL MATERIAL 54.94

600.00 1
850.00 1
3.00
TOTAL LABOUR 17.62

1,210.00 1

400.00 1
742.02 1
TOTAL EQUIPMENT 7.94
19.50

1,536.80 Per SQM : Rs 165.36


295.84 Per SQM : Rs 31.83

16.4.10
(British) : 100 Cft
Unit Rate (Rs)

Cft 3,438.00
Kg 18.38 1
Kg 85.50 1
TOTAL MATERIAL 66.27

Day 600.00 1
Day 850.00 1
3.00
TOTAL LABOUR 11.51

Hour 302.99 1
Hour 1,250.00 1
TOTAL EQUIPMENT 2.72
19.50

42,024.99 Per CUM : Rs 14,841.00


4,716.25 Per CUM : Rs 1,665.53

Spec. No : 3.9.3
Unit (British) : 100 Sft
road of size 4x4 cm @ 2 meter c/c.
Rate (Rs)

600.00 1
850.00 1
3.00
TOTAL LABOUR 80.50
19.50

471.63 Per SQM : Rs 50.75


471.63 Per SQM : Rs 50.75
3.9.3 , 16.3
(British) : 100 Sft

Rate (Rs)

600.00 1
850.00 1
740.00 1
3.00
TOTAL LABOUR 57.06

1,210.00 1

769.00 1

TOTAL EQUIPMENT 23.44


19.50

1,989.26 Per SQM : Rs 214.04


1,398.03 Per SQM : Rs 150.43

16.8.2
(British) : 100 Rft

Unit Rate (Rs)

Bag 550.00 1
Cft 2,600.00
No 145.00 1
TOTAL MATERIAL 66.86

Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 13.64
19.50

20,958.09 Per Meter : Rs 687.43


2,940.00 Per Meter : Rs 96.43

16.8.2
(British) : 100 Rft

Unit Rate (Rs)

Bag 550.00 1
Cft 2,600.00
No 114.00 1

TOTAL MATERIAL 64.56

Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 15.94
19.50

17,253.59 Per Meter : Rs 565.92


2,940.00 Per Meter : Rs 96.43
16.8.2
(British) : 100 Rft

Unit Rate (Rs)

Bag 550.00 1
Cft 2,600.00
No 108.00 1

TOTAL MATERIAL 64.00

Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 16.50
19.50

16,536.59 Per Meter : Rs 542.40


2,940.00 Per Meter : Rs 96.43

Spec. No :
Unit (British) : 100 Cft
r by Mechanical mean.
Rate (Rs)

600.00 1
850.00 1
3.00
TOTAL LABOUR 14.64

1,500.00 1
TOTAL EQUIPMENT 65.86
19.50

105.86 Per CUM : Rs 37.38


16.23 Per CUM : Rs 5.73

Spec. No :
Unit (British) : Cusec
r by Mechanical mean.
Rate (Rs)

600.00 1
850.00 1
3.00
TOTAL LABOUR 9.29

1,500.00 1

TOTAL EQUIPMENT 71.21


19.50

195.48 Cost Per Cumec: 6,903.37


16.23 Cost Per Cumec: 573.20

16.8.10
(British) : 100 Rft

Rate (Rs)
45.50 1

TOTAL MATERIAL 67.68

600.00 1
3.00
TOTAL LABOUR 12.82
19.50

3,122.88 Per Meter : Rs 102.43


404.25 Per Meter : Rs 13.26

16.8.10
(British) : 100 Rft

Rate (Rs)

45.50 1

TOTAL MATERIAL 67.73

600.00 1
3.00
TOTAL LABOUR 12.77
19.50

4,181.71 Per Meter : Rs 137.16


538.75 Per Meter : Rs 17.67
16.8.10
(British) : 100 Rft

Rate (Rs)

43.00 1

TOTAL MATERIAL 67.19

600.00 1
3.00
TOTAL LABOUR 13.31
19.50

2,973.50 Per Meter : Rs 97.53


404.25 Per Meter : Rs 13.26

16.8.10
(British) : 100 Rft

Rate (Rs)

43.00 1

TOTAL MATERIAL 67.23

600.00 1
3.00
TOTAL LABOUR 13.27
19.50

3,981.77 Per Meter : Rs 130.60


538.98 Per Meter : Rs 17.68
16.8.10
(British) : 100 Rft

Rate (Rs)

15.50 1

TOTAL MATERIAL 54.36

600.00 1
3.00
TOTAL LABOUR 26.14
19.50

1,330.38 Per Meter : Rs 43.64


404.25 Per Meter : Rs 13.26

16.8.10
(British) : 100 Rft

Rate (Rs)

15.50 1

TOTAL MATERIAL 54.44


600.00 1
3.00
TOTAL LABOUR 26.06
19.50

1,779.76 Per Meter : Rs 58.38


538.75 Per Meter : Rs 17.67

16.8.10
(British) : 100 Rft

Rate (Rs)

13.50 1

TOTAL MATERIAL 52.05

600.00 1
3.00
TOTAL LABOUR 28.45
19.50

1,210.88 Per Meter : Rs 39.72


404.25 Per Meter : Rs 13.26

16.8.10
(British) : 100 Rft
Rate (Rs)

13.50 1

TOTAL MATERIAL 52.15

600.00 1
3.00
TOTAL LABOUR 28.35
19.50

1,619.63 Per Meter : Rs 53.12


538.75 Per Meter : Rs 17.67

Spec. No :
Unit (British) : 100 Each

Rate (Rs)

110.00 1
22,179.23
32,174.11

TOTAL MATERIAL 57.64

600.00 1
3.00
TOTAL LABOUR 9.67

742.02 1
TOTAL EQUIPMENT 13.19
19.50

41,761.61 Cost Per Each: 417.62


3,675.00 Cost Per Each: 36.75
16.3.15
(British) : 100 Cft

Unit Rate (Rs)

Cft 2,600.00 100 Cft


Cft 3,000.00 100 Cft
TOTAL MATERIAL 45.30

Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 19.03

Hour 1,210.00 1

TOTAL EQUIPMENT 16.17


19.50

6,967.00 Per CUM : Rs 2,460.38


1,470.00 Per CUM : Rs 519.13

(British) : 100Cft

Unit Rate (Rs)


Cft 1,300.00
Cft 45.80 1

TOTAL MATERIAL 36.73

Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 40.43

Hour 420.00 1
Hour 1,500.00 1
TOTAL EQUIPMENT 3.33
19.50

12,019.31 Per CUM : Rs 4,244.58


5,880.00 Per CUM : Rs 2,076.50

Spec. No :
Unit (British) :

Unit Rate (Rs)

Days 1,200.00

TOTAL LABOUR

Hour 686.15

TOTAL EQUIPMENT

Rs. 322.59
Rs. 117.60
Spec. No :

Unit (British) :
Leveling wearing course on existing surface of road.
Unit Rate (Rs)

Cft 3,438.00
Kg 85.50
TOTAL MATERIAL

Day 600.00
Day 850.00
Day 600.00

TOTAL LABOUR

Tonne 1,827.00

TOTAL EQUIPMENT

Rs. 48,769.17
Rs. 804.40

16.6.7
(British) : Each

Rate (Rs)

11,400.00 1

TOTAL MATERIAL 76.54


950.00 1

3.00
TOTAL LABOUR 3.96
19.50

13,797.56 Cost Per Each: 13,797.56


174.56 Cost Per Each: 174.56

16.6.7
(British) : Each

Rate (Rs)

9,120.00 1

TOTAL MATERIAL 76.55

950.00 1

3.00
TOTAL LABOUR 3.95
19.50

11,036.89 Cost Per Each: 11,036.89


138.49 Cost Per Each: 138.49

16.6.7
(British) : Each
Rate (Rs)

7,000.00 1

TOTAL MATERIAL 76.72

950.00 1

3.00
TOTAL LABOUR 3.78
19.50

8,452.28 Cost Per Each: 8,452.28


87.28 Cost Per Each: 87.28

16.6.7
(British) : Each

Rate (Rs)

7,800.00 1

TOTAL MATERIAL 76.62

950.00 1

3.00
TOTAL LABOUR 3.88
19.50

9,430.16 Cost Per Each: 9,430.16


109.16 Cost Per Each: 109.16
16.6.7
(British) : Each

Rate (Rs)

5,000.00 1

TOTAL MATERIAL 76.68

950.00 1

3.00
TOTAL LABOUR 3.82
19.50

6,040.52 Cost Per Each: 6,040.52


65.52 Cost Per Each: 65.52

16.6.7
(British) : Each

Rate (Rs)

4,500.00 1

TOTAL MATERIAL 76.79


950.00 1

3.00
TOTAL LABOUR 3.71
19.50

5,428.47 Cost Per Each: 5,428.47


50.97 Cost Per Each: 50.97

16.6.7
(British) : Each

Rate (Rs)

3,200.00 1

TOTAL MATERIAL 76.93

950.00 1

3.00
TOTAL LABOUR 3.57
19.50

3,853.09 Cost Per Each: 3,853.09


29.09 Cost Per Each: 29.09

Spec. No :
Unit (British) : Rft
Un-galvanized Sheath for 20 to 24 Wires 0.5" Strand Cable
Unit Rate (Rs)

Rft 75.00 1

TOTAL MATERIAL 69.49

950.00 1

3.00
TOTAL LABOUR 11.01
19.50

100.22 Per Meter : Rs 328.71


10.59 Per Meter : Rs 34.74

Spec. No :
Unit (British) : Rft
Un-galvanized Sheath for 16 to 19 Wires 0.5" Strand Cable
Unit Rate (Rs)

Rft 65.00 1

TOTAL MATERIAL 70.21

950.00 1

3.00
TOTAL LABOUR 10.29
19.50

85.94 Per Meter : Rs 281.88


8.26 Per Meter : Rs 27.10
Spec. No :
Unit (British) : Rft
Un-galvanized Sheath for 13 to 15 Wires 0.5" Strand Cable
Unit Rate (Rs)

Rft 35.00 1

TOTAL MATERIAL 67.27

950.00 1

3.00
TOTAL LABOUR 13.23
19.50

48.34 Per Meter : Rs 158.56


6.52 Per Meter : Rs 21.38

Spec. No :
Unit (British) : Rft
Un-galvanized Sheath for 10 to 12 Wires 0.5" Strand Cable
Unit Rate (Rs)

Rft 32.00 1

TOTAL MATERIAL 68.37

950.00 1
3.00
TOTAL LABOUR 12.13
19.50

43.48 Per Meter : Rs 142.60


5.24 Per Meter : Rs 17.18

Spec. No :
Unit (British) : Rft
Un-galvanized Sheath for 8 to 9 Wires 0.5" Strand Cable
Unit Rate (Rs)

Rft 30.00 1

TOTAL MATERIAL 69.18

950.00 1

3.00
TOTAL LABOUR 11.32
19.50

40.27 Per Meter : Rs 132.09


4.42 Per Meter : Rs 14.50

Spec. No :
Unit (British) : Rft
Un-galvanized Sheath for 5 to 7 Wires 0.5" Strand Cable
Unit Rate (Rs)
Rft 29.00 1

TOTAL MATERIAL 71.42

950.00 1

3.00
TOTAL LABOUR 9.08
19.50

37.68 Per Meter : Rs 123.59


3.03 Per Meter : Rs 9.92

Spec. No :
Unit (British) : Rft
Un-galvanized Sheath for upto 4 Wires 0.5" Strand Cable
Unit Rate (Rs)

Rft 26.00 1

TOTAL MATERIAL 73.47

950.00 1

3.00
TOTAL LABOUR 7.03
19.50

32.82 Per Meter : Rs 107.64


1.75 Per Meter : Rs 5.73
Spec. No :
Unit (British) : Each
Stressing and Grouting for Cables above 24/0.5" (Single End Stressing).
Rate (Rs)

600.00 1
720.00 1

3.00
TOTAL LABOUR 16.54

1,700.00 1
TOTAL EQUIPMENT 63.96
19.50

4,945.00 Cost Per Each: 4,945.00


882.00 Cost Per Each: 882.00

16.6.7.3.9
(British) : Each

Rate (Rs)

600.00 1
720.00 1

3.00
TOTAL LABOUR 16.54

1,700.00 1
TOTAL EQUIPMENT 63.96
19.50

3,461.50 Cost Per Each: 3,461.50


617.40 Cost Per Each: 617.40

Spec. No :
Unit (British) : Each
Stressing and Grouting for Cable below 13/0.5" (Single End Stressing).
Rate (Rs)

600.00 1
720.00 1

3.00
TOTAL LABOUR 15.64

1,700.00 1
TOTAL EQUIPMENT 64.86
19.50

2,559.37 Cost Per Each: 2,559.37


426.30 Cost Per Each: 426.30

16.6.7
(British) : Tonne

Rate (Rs) Amount

159,000.00 1 Tonne
TOTAL MATERIAL 77.50
19.50

190,005.00 Cost Per ton: 193,054.01


0.00 Cost Per ton: 0.00

16.6.7
(British) : tonne

Rate (Rs)

118.00 1
TOTAL MATERIAL 77.50
19.50

141,010.00 Cost Per ton: 143,302.84


0.00 Cost Per ton: 0.00

16.6.7
(British) : Tonne

Rate (Rs)

91,000.00 1
TOTAL MATERIAL 77.50
19.50

108,745.00 Cost Per ton: 110,490.03


0.00 Cost Per ton: 0.00

Spec. No :
Unit (British) : Rft
Galvanized Sheath for 20 to 24 Wires 0.5" Strand Cable
Unit Rate (Rs)

Rft 218.00 1

TOTAL MATERIAL 74.54

950.00 1

3.00
TOTAL LABOUR 5.96
19.50

271.10 Per Meter : Rs 889.21


10.59 Per Meter : Rs 34.74

Spec. No :
Unit (British) : Rft
Galvanized Sheath for 16 to 19 Wires 0.5" Strand Cable
Unit Rate (Rs)
Rft 210.00 1

TOTAL MATERIAL 75.09

950.00 1

3.00
TOTAL LABOUR 5.41
19.50

259.21 Per Meter : Rs 850.22


8.26 Per Meter : Rs 27.10

Spec. No :
Unit (British) : Rft
Galvanized Sheath for 13 to 15 Wires 0.5" Strand Cable
Unit Rate (Rs)

Rft 187.00 1

TOTAL MATERIAL 75.36

950.00 1

3.00
TOTAL LABOUR 5.14
19.50

229.98 Per Meter : Rs 754.34


6.52 Per Meter : Rs 21.38
Spec. No :
Unit (British) : Rft
Galvanized Sheath for 10 to 12 Wires 0.5" Strand Cable
Unit Rate (Rs)

Rft 148.00 1

TOTAL MATERIAL 75.32

950.00 1

3.00
TOTAL LABOUR 5.18
19.50

182.10 Per Meter : Rs 597.28


5.24 Per Meter : Rs 17.18

Spec. No :
Unit (British) : Rft
Galvanized Sheath for 8 to 9 Wires 0.5" Strand Cable
Unit Rate (Rs)

Rft 134.00 1

TOTAL MATERIAL 75.47

950.00 1

3.00
TOTAL LABOUR 5.03
19.50
164.55 Per Meter : Rs 539.73
4.42 Per Meter : Rs 14.50

Spec. No :
Unit (British) : Rft
Galvanized Sheath for 5 to 7 Wires 0.5" Strand Cable
Unit Rate (Rs)

Rft 127.00 1

TOTAL MATERIAL 76.02

950.00 1

3.00
TOTAL LABOUR 4.48
19.50

154.79 Per Meter : Rs 507.71


3.03 Per Meter : Rs 9.92

Spec. No :
Unit (British) : Rft
Galvanized Sheath for upto 4 Wires 0.5" Strand Cable
Unit Rate (Rs)

Rft 112.20 1
TOTAL MATERIAL 76.53

950.00 1

3.00
TOTAL LABOUR 3.97
19.50

135.82 Per Meter : Rs 445.50


1.75 Per Meter : Rs 5.73

16.8.2
(British) : 8 Rft

Unit Rate (Rs)

30.00 1

125.00 1
18,006.74
23,667.98
TOTAL MATERIAL 67.52

1,200.00 1
600.00 1
3.00
TOTAL LABOUR 12.98
19.50

23,743.67 Per Meter : Rs 9,734.90


3,123.75 Per Meter : Rs 1,280.74
16.8.2
(British) : 8 Rft

Unit Rate (Rs)

Sft 33.00

Kg 125.00
Cft 18,006.74
Cft 23,667.98
TOTAL MATERIAL

Day 1,200.00
Day 600.00

TOTAL LABOUR
Over Heads on(M+L+E) 2% +

Rs. 18,650.21
Rs. 3,123.75

Spec. No :
Unit (British) : Rft

Rate (Rs)

742.40 1
TOTAL MATERIAL 73.63

600.00 1
1,050.00 1
3.00
TOTAL LABOUR 6.87
19.50

934.94 Per Meter : Rs 3,066.61


47.78 Per Meter : Rs 156.70

Spec. No :
Unit (British) : Each

Rate (Rs)

2,690.00 1

TOTAL MATERIAL 76.10

600.00 1
1,050.00 1
3.00
TOTAL LABOUR 4.40
19.50

3,275.19 Cost Per Each: 3,275.19


60.64 Cost Per Each: 60.64

Spec. No :
Unit (British) : Each

Rate (Rs)

135.00 1
TOTAL MATERIAL 68.15

600.00 1
3.00
TOTAL LABOUR 5.24

742.02 1
769.00 1

TOTAL EQUIPMENT 7.11


19.50

4,975.16 Cost Per Each: 4,975.16


147.00 Cost Per Each: 147.00

Spec. No :
Unit (British) : Cft
Concrete Beam Guardrail (including reinforcement)
Unit Rate (Rs)

Bag 550.00 1
Cft 2,600.00 100 Cft
Kg 110.00 1
Cft 2,520.00 100 Cft
Cft 1,210.00 100 Cft
Ltr 640.00 1
TOTAL MATERIAL 57.84

Day 1,200.00 1
Day 600.00 1
Day 1,200.00 1
Day 1,050.00 1
3.00
TOTAL LABOUR 16.78

Hour 1,282.27 1

Hour 591.77 1
Hour 481.01 1
Hour 625.00 1
TOTAL EQUIPMENT 5.88

19.50 %

885.34 Per CUM : Rs 31,265.45


160.69 Per CUM : Rs 5,674.70

Spec. No :
Unit (British) : Cft
(Incl. Reinforcement)
Rate (Rs)

550.00 1
2,600.00 100 Cft
110.00 1
2,520.00 100 Cft
1,210.00 100 Cft
640.00 1
TOTAL MATERIAL 58.38

1,200.00 1
600.00 1
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 16.91

1,282.27 1
591.77 1

625.00 1

% 49.13

19.50 %

877.18 Per CUM : Rs 30,977.21


160.69 Per CUM : Rs 5,674.70

(British) : 100 Cft

Rate (Rs)

85.50 1 kg
2,600.00 100 Cft

MATERIAL 58.76 %

600.00 1 Day
850.00 1 Day
600.00 1 Day
3.00 %
LABOUR 4.13 %

1,827.00 1 Tonne
TOTAL EQUIPMENT 17.60
19.50

61,253.42 Per CUM : Rs 21,631.46


918.69 Per CUM : Rs 324.43

(British) : 100 Sft

Rate (Rs)

85.50 1 kg
2,600.00 100 Cft

MATERIAL 58.76 %

600.00 1 Day
850.00 1 Day
600.00 1 Day
3.00 %
LABOUR 4.13 %

1,827.00 1 Tonne

TOTAL EQUIPMENT 17.60


19.50

2,512.45 Per SQM : Rs 270.34


37.66 Per SQM : Rs 4.05
Spec. No :
Unit (British) : 100 Sft
preparing sub-grade in bed
Rate (Rs)

600.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50

646.80 Per SQM : Rs 69.60


646.80 Per SQM : Rs 69.60

Spec. No :
Unit (British) : 100 Sft
preparing sub-grade on slope
Rate (Rs)

600.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50

882.00 Per SQM : Rs 94.90


882.00 Per SQM : Rs 94.90
Spec. No :
Unit (British) : 100 Sft
Stabilized layer of cement, sand mortar 1:30 2" thick on slope
Rate (Rs)

550.00 1
2,000.00 100 Cft
TOTAL MATERIAL 23.72

1,200.00 1
600.00 1
600.00 1
3.00
TOTAL LABOUR 56.78
19.50

2,522.83 Per SQM : Rs 271.46


1,764.00 Per SQM : Rs 189.81

Spec. No :
Unit (British) : 100 Sft
ent, sand motar 1:10 in bed
Rate (Rs)

550.00 1
2,000.00 100 Cft
TOTAL MATERIAL 16.06

1,200.00 1
600.00 1
600.00 1
3.00
TOTAL LABOUR 64.44
19.50

1,593.92 Per SQM : Rs 171.51


1,270.08 Per SQM : Rs 136.66
Spec. No :
Unit (British) : 100 Sft
ent, sand motar 1:10 On slope
Rate (Rs)

550.00 1
2,000.00 100 Cft
TOTAL MATERIAL 13.20

1,200.00 1
600.00 1
600.00 1
3.00
TOTAL LABOUR 67.30
19.50

1,940.85 Per SQM : Rs 208.83


1,617.00 Per SQM : Rs 173.99

Spec. No :
Unit (British) : 100 Sft
nt, sand mortar 1:6 in bed
Rate (Rs)

550.00 1
2,000.00 100 Cft
TOTAL MATERIAL 35.94

1,200.00 1
600.00 1
600.00 1
3.00
TOTAL LABOUR 44.56
19.50

2,981.09 Per SQM : Rs 320.77


1,617.00 Per SQM : Rs 173.99

Spec. No :
Unit (British) : 100 Sft
t, sand mortar 1:6 On slope
Rate (Rs)

550.00 1
2,000.00 100 Cft
TOTAL MATERIAL 31.35

1,200.00 1
600.00 1
600.00 1
3.00
TOTAL LABOUR 49.15
19.50

3,422.09 Per SQM : Rs 368.22


2,058.00 Per SQM : Rs 221.44

Spec. No :
Unit (British) : 100 Sft
ent, sand mortar 1:3 in bed
Rate (Rs)

550.00 1
2,000.00 100 Cft
TOTAL MATERIAL 29.42
600.00 1
600.00 1
3.00
TOTAL LABOUR 51.08
19.50

1,408.40 Per SQM : Rs 151.54


882.00 Per SQM : Rs 94.90

Spec. No :
Unit (British) : 100 Sft
ent, sand mortar 1:3 On slope
Rate (Rs)

550.00 1
2,000.00 100 Cft
TOTAL MATERIAL 16.33

1,200.00 1
600.00 1
600.00 1
3.00
TOTAL LABOUR 64.17
19.50

2,547.65 Per SQM : Rs 274.13


2,021.25 Per SQM : Rs 217.49

17.3.7
(British) : 100 Sft
Unit Rate (Rs)

Bag 550.00 1
Cft 2,000.00
No 14,000.00 1,000 No
TOTAL MATERIAL 58.02

Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 22.48
19.50

30,852.42 Per SQM : Rs 3,319.72


7,901.25 Per SQM : Rs 850.17

17.3.7
(British) : 100 Sft

Unit Rate (Rs)

Bag 550.00 1
Cft 2,000.00
No 14,000.00 1,000 No
TOTAL MATERIAL 56.05

Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 24.45
19.50
31,954.92 Per SQM : Rs 3,438.35
9,003.75 Per SQM : Rs 968.80

17.3.7
(British) : 100 Sft

Unit Rate (Rs)

Bag 550.00 1
Cft 2,000.00
No 14,000.00 1,000 No
TOTAL MATERIAL 58.99

Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 21.51
19.50

32,458.50 Per SQM : Rs 3,492.53


7,901.25 Per SQM : Rs 850.17

17.3.7
(British) : 100 Sft
Unit Rate (Rs)

Bag 550.00 1
Cft 2,000.00
No 14,000.00 1,000 No
TOTAL MATERIAL 57.08

Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 23.42
19.50

33,561.00 Per SQM : Rs 3,611.16


9,003.75 Per SQM : Rs 968.80

17.3.7
(British) : 100 Sft

Unit Rate (Rs)

Bag 550.00 1
Cft 2,000.00
No 9,900.00 1,000 No
TOTAL MATERIAL 55.00

Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 25.50
19.50

26,747.60 Per SQM : Rs 2,878.04


7,901.25 Per SQM : Rs 850.17
17.3.7
(British) : 100 Sft

Unit Rate (Rs)

Bag 550.00 1
Cft 2,000.00
No 9,900.00 1,000 No
TOTAL MATERIAL 52.86

Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 27.64
19.50

27,850.10 Per SQM : Rs 2,996.67


9,003.75 Per SQM : Rs 968.80

17.3.7
(British) : 100 Sft

Unit Rate (Rs)

Bag 550.00 1
Cft 2,000.00
No 9,900.00 1,000 No
TOTAL MATERIAL 56.29

Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 24.21
19.50

28,353.68 Per SQM : Rs 3,050.86


7,901.25 Per SQM : Rs 850.17

17.3.7
(British) : 100 Sft

Unit Rate (Rs)

Bag 550.00 1
Cft 2,000.00
No 9,900.00 1,000 No
TOTAL MATERIAL 54.22

Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 26.28
19.50

29,456.18 Per SQM : Rs 3,169.48


9,003.75 Per SQM : Rs 968.80
17.2.7,
17.3.8.2
(British) : 100 Cft

Unit Rate (Rs)

Bag 550.00 1
Cft 2,000.00
Cft 3,290.00
TOTAL MATERIAL 56.21

Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 24.29
19.50

22,339.61 Per CUM : Rs 7,889.17


6,247.50 Per CUM : Rs 2,206.29

17.2.7,
17.3.8.2
(British) : 100 Cft

Unit Rate (Rs)

Bag 550.00 1
Cft 2,000.00
Cft 3,290.00
TOTAL MATERIAL 53.10

Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 27.40
19.50

19,508.18 Per CUM : Rs 6,889.25


6,247.50 Per CUM : Rs 2,206.29

17.2.7,
17.3.8.2
(British) : 100 Cft

Unit Rate (Rs)

Bag 550.00 1
Cft 2,000.00
Cft 3,290.00
TOTAL MATERIAL 49.60

Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 30.90
19.50

17,084.24 Per CUM : Rs 6,033.25


6,247.50 Per CUM : Rs 2,206.29
17.2.7,
17.3.8.2
(British) : 100 Cft

Unit Rate (Rs)

Bag 550.00 1
Cft 2,000.00
Cft 3,290.00
TOTAL MATERIAL 53.61

Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 26.89
19.50

23,442.11 Per CUM : Rs 8,278.51


7,350.00 Per CUM : Rs 2,595.63

17.2.7,
17.3.8.2
(British) : 100 Cft

Unit Rate (Rs)

Bag 550.00 1
Cft 2,000.00
Cft 3,290.00
TOTAL MATERIAL 50.30

Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 30.20
19.50

20,610.68 Per CUM : Rs 7,278.60


7,350.00 Per CUM : Rs 2,595.63

17.2.7,
17.3.8.2
(British) : 100 Cft

Unit Rate (Rs)

Bag 550.00 1
Cft 2,000.00
Cft 3,290.00
TOTAL MATERIAL 46.64

Day 600.00 1
Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 33.86
19.50

18,186.74 Per CUM : Rs 6,422.59


7,350.00 Per CUM : Rs 2,595.63
17.3.5
(British) : Rft

Unit Rate (Rs)

Bag 550.00 1
Cft 2,000.00 100 Cft
RFT 168.30 1

TOTAL MATERIAL 57.67

1,200.00 1
600.00 1
3.00
TOTAL LABOUR 22.83
19.50

282.06 Per Meter : Rs 925.17


73.50 Per Meter : Rs 241.08

17.3.5
(British) : Rft
Rate (Rs)

550.00 1
2,000.00 100 Cft
191.10 1

TOTAL MATERIAL 57.68

1,200.00 1
600.00 1
3.00
TOTAL LABOUR 22.82
19.50

324.42 Per Meter : Rs 1,064.10


84.53 Per Meter : Rs 277.24

17.3.5
(British) : Rft

Rate (Rs)

550.00 1 Bag
2,000.00 100 Cft
226.50 1 RFT

TOTAL MATERIAL 58.54

1,200.00 1
600.00 1
3.00
TOTAL LABOUR 21.96
19.50

383.43 Per Meter : Rs 1,257.64


95.55 Per Meter : Rs 313.40

17.3.5
(British) : Rft

Rate (Rs)

550.00 1 Bag
2,000.00 100 Cft
288.30 1 RFT

TOTAL MATERIAL 59.17

1,200.00 1
600.00 1
3.00
TOTAL LABOUR 21.33
19.50

487.81 Per Meter : Rs 1,600.02


117.60 Per Meter : Rs 385.73
17.3.5
(British) : Rft

Rate (Rs)

550.00 1
2,000.00 100 Cft
298.20 1

TOTAL MATERIAL 57.48

1,200.00 1
600.00 1
3.00
TOTAL LABOUR 23.02
19.50

530.65 Per Meter : Rs 1,740.55


139.65 Per Meter : Rs 458.05

17.3.5
(British) : Rft

Rate (Rs)

550.00 1
2,000.00 100 Cft
383.40 1

TOTAL MATERIAL 57.84

1,200.00 1
600.00 1
3.00
TOTAL LABOUR 22.66
19.50

682.66 Per Meter : Rs 2,239.13


176.40 Per Meter : Rs 578.59

Spec. No :
Unit (British) : Each

Rate (Rs)

1,050.00 1
3.00
TOTAL LABOUR 80.50
19.50

321.56 Cost Per Cut: 321.56


321.56 Cost Per Cut: 321.56

Spec. No :
Unit (British) : Each

Rate (Rs)
1,050.00 1
3.00
TOTAL LABOUR 80.50
19.50

482.34 Cost Per Cut: 482.34


482.34 Cost Per Cut: 482.34

Spec. No :
Unit (British) : Rft

Rate (Rs)

600.00 1
850.00 1
3.00
TOTAL LABOUR 80.50
19.50

32.59 Per Meter : Rs 106.88


32.59 Per Meter : Rs 106.88

Spec. No :
Unit (British) : Rft
th of: More than 15' to 25'
Rate (Rs)

600.00 1
850.00 1
3.00
TOTAL LABOUR 80.50
19.50

45.08 Per Meter : Rs 147.86


45.08 Per Meter : Rs 147.86

Spec. No :
Unit (British) : Rft
th of: More than 25' to 30'
Rate (Rs)

600.00 1
850.00 1
3.00
TOTAL LABOUR 80.50
19.50

47.16 Per Meter : Rs 154.69


47.16 Per Meter : Rs 154.69

Spec. No :
Unit (British) : Each

Rate (Rs)

600.00 1
540.00 1
3.00
TOTAL LABOUR 80.50
19.50

340.31 Cost Per Each: 340.31


340.31 Cost Per Each: 340.31
Spec. No :
Unit (British) : Each

Rate (Rs)

1,050.00 1
3.00
TOTAL LABOUR 80.50
19.50

42.45 Cost Per Each: 42.45


42.45 Cost Per Each: 42.45

Spec. No :
Unit (British) : Each

Rate (Rs)

600.00 1
850.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50

13,939.89 Cost Per Each: 13,939.89


13,939.89 Cost Per Each: 13,939.89
Spec. No :
Unit (British) : Job

Rate (Rs)

600.00 1
850.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50

6,027.00 Cost Per Job: 6,027.00


6,027.00 Cost Per Job: 6,027.00

Spec. No :
Unit (British) : Job

Rate (Rs)

600.00 1
850.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50

7,693.00 Cost Per Job: 7,693.00


7,693.00 Cost Per Job: 7,693.00
Spec. No :
Unit (British) : Job

Rate (Rs)

600.00 1
850.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50

10,535.00 Cost Per Job: 10,535.00


10,535.00 Cost Per Job: 10,535.00

Spec. No :
Unit (British) : 100 Rft

Rate (Rs)

600.00 1
850.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50

15,696.89 Per Meter : Rs 514.86


15,696.89 Per Meter : Rs 514.86
Spec. No :
Unit (British) : tonne

Rate (Rs)

600.00 1
3.00
TOTAL LABOUR 80.50
19.50

318.25 Per Tonne : Rs 318.25


318.25 Per Tonne : Rs 318.25

Spec. No :
Unit (British) : 100 Rft
ne under different conditions
Rate (Rs)

600.00 1
850.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50

6,509.90 Per Meter : Rs 213.52


6,509.90 Per Meter : Rs 213.52

Spec. No :
Unit (British) : Each
Rate (Rs)

600.00 1
850.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50

42,481.59 Cost Per Each: 42,481.59


42,481.59 Cost Per Each: 42,481.59

Spec. No :
Unit (British) : Each

Rate (Rs)

600.00 1
850.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50

40,459.67 Cost Per Each: 40,459.67


40,459.67 Cost Per Each: 40,459.67

18.1.4.2
(British) : per day
Rate (Rs) Amount

5,000.00 1 Day

TOTAL EQUIPMENT 77.50


19.50

5,975.00 Cost Per per day: 5,975.00


0.00 Cost Per per day: 0.00

(British) : 100 Cft

Rate (Rs)

600.00 1
3.00
TOTAL LABOUR 80.50
19.50

1,117.20 Per CUM : Rs 394.54


1,117.20 Per CUM : Rs 394.54
Spec. No :
Unit (British) : 100 Sft

Rate (Rs)

600.00 1
3.00
TOTAL LABOUR 80.50
19.50

2,646.00 Per SQM : Rs 284.71


2,646.00 Per SQM : Rs 284.71

19.3.4
(British) : Each

Rate (Rs)

30.00 1

TOTAL MATERIAL 29.58

600.00 1
3.00
TOTAL LABOUR 50.92
19.50

95.38 Cost Per Each: 95.38


59.53 Cost Per Each: 59.53
19.3.4
(British) : Each

Rate (Rs)

30.00 1

TOTAL MATERIAL 25.66

600.00 1
3.00
TOTAL LABOUR 54.84
19.50

110.09 Cost Per Each: 110.09


74.24 Cost Per Each: 74.24

19.3.4
(British) : Each

Rate (Rs)

90.00 1
TOTAL MATERIAL 50.32

600.00 1
3.00
TOTAL LABOUR 30.18
19.50
167.08 Cost Per Each: 167.08
59.53 Cost Per Each: 59.53

19.3.4
(British) : Each

Rate (Rs)

90.00 1
TOTAL MATERIAL 46.31

600.00 1
3.00
TOTAL LABOUR 34.19
19.50

181.79 Cost Per Each: 181.79


74.24 Cost Per Each: 74.24

19.3.4
(British) : Each

Rate (Rs)

49.00 1
TOTAL MATERIAL 15.60

600.00 1
3.00
TOTAL LABOUR 64.90
19.50

296.69 Cost Per Each: 296.69


238.14 Cost Per Each: 238.14

19.3.4
(British) : Each

Rate (Rs)

49.00 1

TOTAL MATERIAL 13.03

600.00 1
3.00
TOTAL LABOUR 67.47
19.50

355.50 Cost Per Each: 355.50


296.94 Cost Per Each: 296.94
19.3.4
(British) : Each

Rate (Rs)

150.00 1

TOTAL MATERIAL 33.75

600.00 1
3.00
TOTAL LABOUR 46.75
19.50

417.39 Cost Per Each: 417.39


238.14 Cost Per Each: 238.14

19.3.4
(British) : Each

Rate (Rs)

150.00 1

TOTAL MATERIAL 29.63

600.00 1
3.00
TOTAL LABOUR 50.87
19.50

476.19 Cost Per Each: 476.19


296.94 Cost Per Each: 296.94
19.3.4
(British) : 100 No.

Rate (Rs)

600.00 1
3.00
TOTAL LABOUR 80.50
19.50

301.35 Cost Per 100 No.: 301.35


301.35 Cost Per 100 No.: 301.35

19.3.4
(British) : 100No/50m

Rate (Rs)

600.00 1
3.00
TOTAL LABOUR 80.50
19.50

227.85 Cost Per 100No/50m: 227.85


227.85 Cost Per 100No/50m: 227.85
19.3.4
(British) : 100No/50m

Rate (Rs)

600.00 1
3.00
TOTAL LABOUR 80.50
19.50

24.99 Cost Per 100No/50m: 24.99


24.99 Cost Per 100No/50m: 24.99

19.3.4
(British) : 100No/50m

Rate (Rs)

600.00 1
3.00
TOTAL LABOUR 80.50
19.50

1,205.40 Cost Per 100No/50m: 1,205.40


1,205.40 Cost Per 100No/50m: 1,205.40
19.3.4
(British) : 100No/50m

Rate (Rs)

600.00 1
3.00
TOTAL LABOUR 80.50
19.50

911.40 Cost Per 100No/50m: 911.40


911.40 Cost Per 100No/50m: 911.40

19.3.4
(British) : 100No/50m

Rate (Rs)

600.00 1
3.00
TOTAL LABOUR 80.50
19.50

99.96 Cost Per 100No/50m: 99.96


99.96 Cost Per 100No/50m: 99.96
19.3.4
(British) : 100 Sft

Rate (Rs)

600.00 1
3.00
TOTAL LABOUR 80.50
19.50

808.50 Per SQM : Rs 86.99


808.50 Per SQM : Rs 86.99

19.3.4
(British) : 100 Sft

Rate (Rs)

600.00 1
3.00
TOTAL LABOUR 80.50
19.50

1,286.25 Per SQM : Rs 138.40


1,286.25 Per SQM : Rs 138.40
19.3.4
(British) : 100 Sft

Rate (Rs)

600.00 1
3.00
TOTAL LABOUR 80.50
19.50

1,536.15 Per SQM : Rs 165.29


1,536.15 Per SQM : Rs 165.29

Spec. No :
Unit (British) : 100 No.

Rate (Rs)

47.00 1
TOTAL MATERIAL 3.63

600.00 1
3.00
TOTAL LABOUR 76.87
19.50

1,116.86 Cost Per 100 No.: 1,116.86


1,065.75 Cost Per 100 No.: 1,065.75
19.2.1 , 19.3.1
(British) : 100 Cft

Rate (Rs)

600.00 1
3.00
TOTAL LABOUR 80.50
19.50

1,433.25 Per CUM : Rs 506.15


1,433.25 Per CUM : Rs 506.15

19.2.1 , 19.3.1
(British) : 100 Cft

Rate (Rs)

600.00 1
3.00
TOTAL LABOUR 80.50
19.50

882.00 Per CUM : Rs 311.48


882.00 Per CUM : Rs 311.48
19.3.2
(British) : 100 Cft

Rate (Rs)

600.00 1
3.00
TOTAL LABOUR 80.50
19.50

2,128.56 Per CUM : Rs 751.69


2,128.56 Per CUM : Rs 751.69

Spec. No :
Unit (British) : 100 Cft
feet) : Over size shingle 3" to 9"
Rate (Rs)

600.00 1
3.00
TOTAL LABOUR 80.50
19.50

1,422.96 Per CUM : Rs 502.51


1,422.96 Per CUM : Rs 502.51
Spec. No :
Unit (British) : 100 Cft
feet): Mixed graded shingle
Rate (Rs)

600.00 1
3.00
TOTAL LABOUR 80.50
19.50

1,681.68 Per CUM : Rs 593.88


1,681.68 Per CUM : Rs 593.88

19.2.1
(British) : Each

Rate (Rs)

57.00 1
TOTAL MATERIAL 19.83

600.00 1
3.00
TOTAL LABOUR 60.67
19.50

245.39 Cost Per Each: 245.39


183.75 Cost Per Each: 183.75
19.3.4.9
(British) : 100 Sft

Rate (Rs)

168.00 1
TOTAL MATERIAL 27.27

600.00 1
1,050.00 1
3.00
TOTAL LABOUR 53.23
19.50

2,318.98 Per SQM : Rs 249.52


1,515.94 Per SQM : Rs 163.11

19.3.4.9
(British) : 100 Sft

Rate (Rs)

161.00 1
TOTAL MATERIAL 48.66

600.00 1
1,050.00 1
3.00
TOTAL LABOUR 31.84
19.50

4,011.30 Per SQM : Rs 431.62


1,515.94 Per SQM : Rs 163.11

Spec. No :
Unit (British) : 100 Sft
Provide & weave GI wire netting for wire crates 6"x9" mesh : 8 SWG wire
Rate (Rs)

152.00 1
TOTAL MATERIAL 50.98

600.00 1
1,050.00 1
3.00
TOTAL LABOUR 29.52
19.50

4,358.60 Per SQM : Rs 468.99


1,515.94 Per SQM : Rs 163.11

19.3.4.9
(British) : 100 Sft

Rate (Rs)

168.00 1
TOTAL MATERIAL 20.03
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 60.47
19.50

2,437.47 Per SQM : Rs 262.27


1,819.13 Per SQM : Rs 195.74

19.3.4.9
(British) : 100 Sft

Rate (Rs)

161.00 1
TOTAL MATERIAL 40.28

600.00 1
1,050.00 1
3.00
TOTAL LABOUR 40.22
19.50

3,739.23 Per SQM : Rs 402.34


1,819.13 Per SQM : Rs 195.74

Spec. No :
Unit (British) : 100 Sft
Provide & weave GI wire netting for wire crates 6"x6" mesh : 8 SWG wire
Rate (Rs)

152.00 1
TOTAL MATERIAL 52.42

600.00 1
1,050.00 1
3.00
TOTAL LABOUR 28.08
19.50

5,528.21 Per SQM : Rs 594.84


1,819.13 Per SQM : Rs 195.74

19.3.4.9
(British) : 100 Sft

Rate (Rs)

168.00 1
TOTAL MATERIAL 24.83

600.00 1
1,050.00 1
3.00
TOTAL LABOUR 55.67
19.50

2,950.77 Per SQM : Rs 317.50


2,021.25 Per SQM : Rs 217.49
19.3.4.9
(British) : 100 Sft

Rate (Rs)

161.00 1
TOTAL MATERIAL 46.01

600.00 1
1,050.00 1
3.00
TOTAL LABOUR 34.49
19.50

4,901.40 Per SQM : Rs 527.39


2,021.25 Per SQM : Rs 217.49

Spec. No :
Unit (British) : 100 Sft
Provide & weave GI wire netting for wire crates 4"x4" mesh : 8 SWG wire
Rate (Rs)

152.00 1
TOTAL MATERIAL 52.99

600.00 1
1,050.00 1
3.00
TOTAL LABOUR 27.51
19.50

6,284.34 Per SQM : Rs 676.20


2,021.25 Per SQM : Rs 217.49
19.3.2
(British) : 100 Cft

Rate (Rs)

3,438.00
TOTAL MATERIAL 65.98

600.00 1
3.00
TOTAL LABOUR 14.52
19.50

4,843.41 Per CUM : Rs 1,710.44


735.00 Per CUM : Rs 259.56

19.3.5.3
(British) : 100 Cft

Rate (Rs)

3,800.00
TOTAL MATERIAL 58.90

600.00 1
3.00
TOTAL LABOUR 21.60
19.50

6,011.00 Per CUM : Rs 2,122.77


1,470.00 Per CUM : Rs 519.13

19.3.5.3
(British) : 100 Cft

Rate (Rs)

1,520.00
TOTAL MATERIAL 43.31

600.00 1
3.00
TOTAL LABOUR 37.19
19.50

3,286.40 Per CUM : Rs 1,160.58


1,470.00 Per CUM : Rs 519.13

19.3.5.3
(British) : 100 Cft

Rate (Rs)
3,438.00
TOTAL MATERIAL 57.45

600.00 1
3.00
TOTAL LABOUR 23.05
19.50

5,578.41 Per CUM : Rs 1,970.00


1,470.00 Per CUM : Rs 519.13

19.3.5.3
(British) : 100 Cft

Rate (Rs)

4,000.00
TOTAL MATERIAL 63.27

600.00 1
3.00
TOTAL LABOUR 17.23
19.50

5,882.50 Per CUM : Rs 2,077.39


1,102.50 Per CUM : Rs 389.34

19.3.5.3
(British) : 100 Cft

Rate (Rs)

1,520.00 100 Cft


TOTAL MATERIAL 30.84

600.00 1
850.00 1
3.00
TOTAL LABOUR 49.66
19.50

4,633.90 Per CUM : Rs 1,636.45


2,817.50 Per CUM : Rs 994.99
Amount

6.20
172.62

5.07

% 183.89

Day 60.00
Day 30.00
Day 60.00
% 4.50
% 154.50
% 65.11
Amount

72.97

5.00

% 77.97

Day 3.42
Day 7.20
Day 4.68
% 0.46
% 15.76
% 18.19
Amount

103.63

6.00

% 109.63

Day 3.42
Day 7.20
Day 4.68
% 0.46
% 15.76
% 24.36

Amount
135.34

7.00

% 142.34

Day 4.02
Day 7.80
Day 5.16
% 0.51
% 17.49
% 31.07

Amount

172.62
7.00

% 179.62

Day 4.02
Day 8.40
Day 5.16
% 0.53
% 18.11
% 38.45

Each 1,240.00

% 1,240.00

Day 120.00
Day 60.00
Day 120.00
% 9.00
% 309.00
% 300.30
Amount

Each 280.00
Each 576.00

% 856.00

Day 120.00
Day 60.00
Day 120.00
% 9.00
% 309.00
% 225.42
Amount

Each 280.00
Each 1,231.00

% 1,511.00

Day 120.00
Day 60.00
Day 120.00
% 9.00
% 309.00
% 353.15

Amount

427.38

% 427.38

Day 36.00
Day 72.00
% 3.24
% 111.24
% 104.40
Amount

No 1,275.00

% 1,275.00

Day 12.00
% 0.36
% 12.36
% 250.97
Amount

No 1,968.60

% 1,968.60

Day 12.00
% 0.36
% 12.36
% 386.22

Amount

No 3,570.00

% 3,570.00

Day 12.00
% 0.36
% 12.36
% 698.49
No 1,377.00
% 1,377.00

Day 24.00
% 0.72
% 24.72
% 273.20
Amount

No 575.00
% 575.00

Day 12.00
% 0.36
% 12.36
% 114.47

Amount

No 2,370.00

% 2,370.00

Day 60.00
Day 75.00

% 4.05
% 139.05
% 488.48
Amount

No 2,890.00

% 2,890.00

Day 60.00
Day 75.00

% 4.05
% 139.05
% 589.88

Amount

Each 6,500.00

% 6,500.00

Day 37.50
% 1.13
% 38.63
% 1,274.81

Amount

1 Each 9,500.00

77.20 % 9,500.00

1 Day 37.50
3.00 % 1.13
3.30 % 38.63
19.50 % 1,859.81

Cost Per Each: 11,398.44


Cost Per Each: 45.94
Amount

Kg 250.00

% 250.00

Day 108.00
% 3.24
% 111.24
% 69.81

14.4 , 14.6,
14.7.21 , 14.8

Amount

Rft 1,200.00

% 1,200.00

Day 120.00
Day 210.00
% 9.90
% 339.90
% 298.35
Amount

No. 21,500.00

% 21,500.00

Day 120.00
% 3.60
% 123.60
% 4,215.90

Amount

No 10,400.00

Kg 55.20
No 120.00

% 10,575.20

Day 120.00
Day 210.00
% 9.90
% 339.90
% 2,126.51

14.4 , 14.6,
14.7.21 , 14.8

Amount

No 19,650.00

% 19,650.00

Day 120.00
% 3.60
% 123.60
% 3,855.15

14.4 , 14.6,
14.7.21 , 14.8

Amount

No 13,500.00

% 13,500.00

Day 120.00
% 3.60
% 123.60
% 2,655.90

14.4 , 14.6,
14.7.21 , 14.8

Amount

No 28,103.00

% 28,103.00

Day 120.00
% 3.60
% 123.60
% 5,503.49
14.4 , 14.6,
14.7.21 , 14.8

Amount

No 29,657.00

% 29,657.00

Day 120.00
% 3.60
% 123.60
% 5,806.52

Amount

1 Rft 20.00
1 No 0.90

1 No 2.13
1 No 0.48
1 No 1.00
1 No 1.00

49.54 % 25.51

1 Day 14.40
3.00 % 0.43
30.96 % 14.83
19.50 % 7.78

Per Meter : Rs 157.85


Per Meter : Rs 57.86

Amount

No 2.13
No 1.00
No 1.00

Rft 25.00
No 0.86
No 1.80

% 31.79

Day 14.40
% 0.43
% 14.83
% 9.01
Amount

No 2.13
No 1.00
No 1.00

No 1.80

Rft 35.00
No 1.14
% 42.08

Day 14.40
% 0.43
% 14.83
% 11.01

Amount

No 2.13
No 1.00
No 1.00

No 1.80
Rft 40.00
No 1.24
% 47.17

Day 14.40
% 0.43
% 14.83
% 12.01

Amount

No 2.13
No 1.00
No 1.00

No 1.80

Rft 45.00
No 2.14
% 53.08

Day 14.40
% 0.43
% 14.83
% 13.16
Amount

No 1.00
No 1.00

Rft 60.00
No 2.57
No 2.25

No 3.05

% 69.87

Day 14.40
% 0.43
% 14.83
% 16.43
Amount

1 Bag 1.21
1 Cft. 24.60
1 Rft 20.00
1 No 0.90

1 No 2.13
1 No 0.48
44.80 % 49.32

1 Day 36.00
3.00 % 1.08
35.70 % 37.08
19.50 % 16.64

Per Meter : Rs 337.97


Per Meter : Rs 144.65

Amount

Bag 1.81
Cft. 24.60
No 2.13
Rft 25.00
No 0.86
No 1.80

% 56.21

Day 36.00
% 1.08
% 37.08
% 17.98
Amount

Bag 2.75
Cft. 24.60
No 2.13
No 1.80

Rft 35.00
No 1.14
% 67.43

Day 36.00
% 1.08
% 37.08
% 20.17
Amount

Bag 3.68
Cft. 24.60
No 2.13
No 1.80

Rft 40.00
No 1.24
% 73.46

Day 36.00
% 1.08
% 37.08
% 21.34

Amount

Bag 9.18
Cft. 24.60
No 2.13
No 1.80

Rft 45.00
No 2.14
% 84.86

Day 36.00
% 1.08
% 37.08
% 23.57

Amount

Bag 12.81
Cft. 24.60
Rft 60.00
No 2.57
No 2.25

No 3.05

% 105.29

Day 36.00
% 1.08
% 37.08
% 27.55
Amount

1 No 2.13
1 No 1.00
1 No 1.00

1 Rft 10.00
1 No 0.27
1 No 0.36
52.09 % 14.76

1 Day 7.20
3.00 % 0.22
28.41 % 7.42
19.50 % 4.28

Per Meter : Rs 86.79


Per Meter : Rs 28.93

Amount

1 No 2.13
1 No 1.00
1 No 1.00

1 Rft 14.00
1 No 0.40
1 No 0.45
56.19 % 18.99

1 Day 7.20
3.00 % 0.22
24.31 % 7.42
19.50 % 5.11

Per Meter : Rs 103.34


Per Meter : Rs 28.93

Amount

1 No 2.13
1 No 1.00
1 No 1.00

1 Rft 18.00
1 No 0.53

1 No 0.60

59.19 % 23.27

1 Day 7.20
3.00 % 0.22
21.31 % 7.42
19.50 % 5.94

Per Meter : Rs 120.13


Per Meter : Rs 28.93
Amount

1 No 2.13
1 No 1.00
1 No 1.00

1 Rft 22.67
1 No 0.80

1 No 0.90

56.21 % 28.51

1 Day 10.80
3.00 % 0.32
24.29 % 11.12
19.50 % 7.66

Per Meter : Rs 155.12


Per Meter : Rs 43.39

Amount
1 No 2.13
1 No 1.00
1 No 1.00

1 Rft 25.67
1 No 1.00

1 No 0.96

53.33 % 31.77

1 Day 14.40
3.00 % 0.43
27.17 % 14.83
19.50 % 9.00

Per Meter : Rs 182.37


Per Meter : Rs 57.86

Amount

1 No 1.00
1 No 1.00

1 No 3.05
1 Rft 30.00
1 No 2.00

1 No 1.35

62.00 % 38.40

1 Day 9.60
3.00 % 0.29
18.50 % 9.89
19.50 % 9.36

Per Meter : Rs 189.09


Per Meter : Rs 38.57

Amount

1.00
1.00

35.00
3.00

1.80

3.36

% 45.16

Day 10.80
% 0.32
% 11.12
% 10.91
Amount

1.00
1.00

50.33
1.80

6.67

3.36

% 64.16

Day 14.40
% 0.43
% 14.83
% 15.32

Amount

1 Bag 0.77
1 Cft 8.00
1 Rft 10.00
1 No 0.27
1 No 3.33
1 No 0.36
39.74 % 22.73

1 Day 21.60
3.00 % 0.65
40.76 % 22.25
19.50 % 8.64

Per Meter : Rs 175.88


Per Meter : Rs 86.79

Amount

1 Bag 1.15
1 Cft. 12.00
1 Rft 14.00
1 No 0.40
1 No 3.33
1 No 4.58
48.16 % 35.46

1 Day 21.60
3.00 % 0.65
32.34 % 22.25
19.50 % 11.13

Per Meter : Rs 225.79


Per Meter : Rs 86.79
Amount

1 Bag 1.15
1 Cft. 12.00
1 Rft 18.00
1 No 0.53

1 No 3.33

1 No 0.60

48.25 % 35.62

1 Day 21.60
3.00 % 0.65
32.25 % 22.25
19.50 % 11.16

Per Meter : Rs 226.41


Per Meter : Rs 86.79
Rate (Rs) Amount

550.00 1 Bag 1.21


2,000.00 1 Cft. 24.60
22.67 1 Rft 22.67
12.00 1 No 0.80

10.00 1 No 3.33

30.00 1 No 0.90

MATERIAL 55.21 % 53.51

1,200.00 1 Day 21.60


3.00 % 0.65
LABOUR 25.29 % 22.25
19.50 % 14.65

Per Meter : Rs 296.54


Per Meter : Rs 86.79

Amount

1 Bag 1.26
1 Cft 26.60
1 Rft 25.67
1 No 1.00

1 No 3.33

1 No 0.96

52.03 % 58.83
1 Day 28.80
3.00 % 0.86
28.47 % 29.66
19.50 % 17.09

Per Meter : Rs 346.30


Per Meter : Rs 115.72

Rate (Rs) Amount

550.00 1 Bag 1.54


2,000.00 1 Cft 16.00
30.00 1 Rft 30.00
30.00 1 No 2.00

10.00 1 No 3.33

45.00 1 No 1.35

MATERIAL 46.58 % 54.22

1,200.00 1 Day 36.00


3.00 % 1.08
LABOUR 33.92 % 37.08
19.50 % 17.59

Per Meter : Rs 357.18


Per Meter : Rs 144.65
Amount

1.81
20.00
35.00
3.00

1.80

3.36

% 64.97

Day 44.40
% 1.33
% 45.73
% 21.33

Amount

2.59
26.60
50.33
1.80

6.67

3.36

% 91.34

Day 55.20
% 1.66
% 56.86
% 28.58

Amount

Rft 40.00
No 0.67
No 0.67
No 0.54
% 41.88

Day 7.20
Day 1.05
% 0.25
% 8.50
% 9.77
Amount

Rft 35.00
No 0.80
No 0.80
No 0.67
% 37.28

Day 7.20
Day 1.05
% 0.25
% 8.50
% 8.88

15.2.5

Amount

Rft 40.00

No 1.34
No 1.21
No 1.00
% 43.55

Day 12.00
Day 2.10
% 0.42
% 14.52
% 11.24

Amount

Rft 48.00

No 1.68

No 1.47

No 1.34

% 52.49

Day 13.20
Day 2.10
% 0.46
% 15.76
% 13.22
Amount

Rft 55.00

No 2.35

No 2.55

No 1.68

% 61.57

Day 13.20
Day 2.10
% 0.46
% 15.76
% 14.99
Amount

Rft 70.00

No 3.35

No 3.35

No 2.01

% 78.71

Day 20.40
Day 4.20
% 0.74
% 25.34
% 20.15

Amount

Rft 100.00

No 6.70

No 10.72

No 2.35

% 119.77

Day 21.60
Day 4.20
% 0.77
% 26.57
% 28.39

15.2.6
Rft

Amount

1 Rft 5.00
1 Pkt 0.11
1 Kg 0.30
46.54 % 5.41

1 Day 3.60
3.00 % 0.11
33.96 % 3.71
19.50 % 1.76

Per Meter : Rs 35.68


Per Meter : Rs 14.46

15.2.6
Rft

Amount

1 Rft 6.00
1 Pkt 0.11
1 Kg 0.30
49.63 % 6.41

1 Day 3.60
3.00 % 0.11
30.87 % 3.71
19.50 % 1.95

Per Meter : Rs 39.60


Per Meter : Rs 14.46

15.2.6

Amount

Pkt 0.11
Kg 0.30
Rft 14.00
% 14.41

Day 3.60
% 0.11
% 3.71
% 3.51
Amount

Rft 7.01
% 7.01

Day 4.80
% 0.14
% 4.94
% 2.30

Amount

Rft 13.58
% 13.58

Day 4.80
% 0.14
% 4.94
% 3.58
Amount

Rft 15.24
% 15.24

Day 4.80
% 0.14
% 4.94
% 3.91

Amount

Rft 19.51
% 19.51

Day 4.80
% 0.14
% 4.94
% 4.74
Amount

Rft 28.66
% 28.66

Day 12.00
% 0.36
% 12.36
% 7.93

Amount

Rft 73.77
% 73.77
Day 18.00
% 0.54
% 18.54
% 17.90

Amount

Rft 182.90

% 182.90

Day 30.00
% 0.90
% 30.90
% 41.52
Amount

Rft 6.71

% 6.71

Day 8.40
% 0.25
% 8.65
% 2.95

Amount

Rft 8.84

% 8.84

Day 8.40
% 0.25
% 8.65
% 3.36
Amount

Rft 14.94

% 14.94

Day 9.60
% 0.29
% 9.89
% 4.79

Amount

Rft 19.20

% 19.20

Day 9.60
% 0.29
% 9.89
% 5.62
Amount

Rft 28.66

% 28.66

Day 15.60
% 0.47
% 16.07
% 8.63

Amount
Rft 74.38

% 74.38

Day 24.00
% 0.72
% 24.72
% 19.18

Amount

Rft 60.97
% 60.97

Day 24.00
% 0.72
% 24.72
% 16.57
Amount

Rft 132.61

% 132.61

Day 40.80
% 1.22
% 42.02
% 33.81

Amount

Rft 182.90

% 182.90

Day 40.80
% 1.22
% 42.02
% 43.62
Amount

Rft 289.60

% 289.60

Day 60.00
% 1.80
% 61.80
% 68.17

Amount

Rft 378.00

% 378.00

Day 150.00
% 4.50
% 154.50
% 102.96

Amount

Rft 487.75

% 487.75

Day 150.00
% 4.50
% 154.50
% 124.36
Amount

Rft 713.33

% 713.33

Day 150.00
% 4.50
% 154.50
% 168.35

Amount

Rft 25.91
% 25.91

Day 6.00
% 0.18
% 6.18
% 6.22
Amount

Rft 37.20
% 37.20

Day 6.00
% 0.18
% 6.18
% 8.42

Amount

Rft 37.20
% 37.20

Day 8.40
% 0.25
% 8.65
% 8.89
Amount

Rft 48.17
% 48.17

Day 8.40
% 0.25
% 8.65
% 11.03

Amount

Rft 68.29
% 68.29

Day 8.40
% 0.25
% 8.65
% 14.95

Amount

Rft 165.24
% 165.24

Day 8.40
% 0.25
% 8.65
% 33.86

Amount
Cft 11.55
Cft 1.60
No 47.50
% 60.65

Day 90.00
% 2.70
% 92.70
% 29.38

Amount

Cft 14.30
Cft 1.80
No 65.00
% 81.10

Day 120.00
% 3.60
% 123.60
% 39.21
Amount

Cft 17.60
Cft 1.60
No 75.00
% 94.20

Day 150.00
% 4.50
% 154.50
% 47.62

Amount

Cft 19.80
Cft 3.00
No 130.00
% 152.80

Day 180.00
% 5.40
% 185.40
% 64.90

Amount

Cft 25.85
Cft 3.20
No 150.00
% 179.05

Day 216.00
% 6.48
% 222.48
% 77.03
Amount

Cft 28.60
Cft 3.60
No 150.00
% 182.20

Day 252.00
% 7.56
% 259.56
% 84.67

15.3.1, 15.3.2

Amount

No 1.00
Rft 30.00
No 1.00
% 32.00

Day 18.00
% 0.54
% 18.54
% 9.75
15.3.1, 15.3.2

Amount

No 1.00
No 1.00
Rft 40.00
% 42.00

Day 54.00
% 1.62
% 55.62
% 18.72

15.3.1, 15.3.2

Amount

No 1.00
No 1.00
Rft 50.00
% 52.00

Day 54.00
% 1.62
% 55.62
% 20.67
15.3.1, 15.3.2

Amount

No 1.00
No 1.00
Rft 60.00
% 62.00

Day 54.00
% 1.62
% 55.62
% 22.62

15.3.1, 15.3.2

Amount

No 1.00
No 1.00
Rft 80.00
% 82.00

Day 60.00
% 1.80
% 61.80
% 27.69
15.3.1, 15.3.2

Amount

No 1.00
No 1.00
Rft 120.00
% 122.00

Day 60.00
% 1.80
% 61.80
% 35.49

Amount

No 436.67
% 436.67

Day 120.00
% 3.60
% 123.60
% 108.55

Amount

Rft 666.67
% 666.67

Day 120.00
% 3.60
% 123.60
% 153.40

Amount
Rft 1,066.67
% 1,066.67

Day 180.00
% 5.40
% 185.40
% 243.10

Amount

Rft 3,133.33
% 3,133.33

Day 180.00
% 5.40
% 185.40
% 646.10
Amount

No 666.67
% 666.67

Day 240.00
% 7.20
% 247.20
% 176.80

Amount

No 766.67
% 766.67

Day 240.00
% 7.20
% 247.20
% 196.30
Amount

No 1,933.33
% 1,933.33

Day 300.00
% 9.00
% 309.00
% 435.50

Amount

No 3,800.00
% 3,800.00

Day 300.00
% 9.00
% 309.00
% 799.50
15.4.5

Amount

Each 8,000.00
% 8,000.00

Day 300.00
% 9.00
% 309.00
% 1,618.50

15.4.5

Amount

Each 10,000.00

% 10,000.00

Day 240.00
% 7.20
% 247.20
% 1,996.80
15.4.5

Amount

Each 20,000.00

% 20,000.00

Day 240.00
% 7.20
% 247.20
% 3,946.80

15.4.5

Amount

Each 30,000.00

% 30,000.00

Day 240.00
% 7.20
% 247.20
% 5,896.80

15.4.5

Amount

Each 28,000.00

% 28,000.00

Day 240.00
% 7.20
% 247.20
% 5,506.80

15.4.5

Amount

Each 25,000.00
% 25,000.00

Day 240.00
% 7.20
% 247.20
% 4,921.80

15.4.5

Amount

Each 20,000.00
% 20,000.00

Day 240.00
% 7.20
% 247.20
% 3,946.80

15.4.5

Amount

Each 15,000.00
% 15,000.00

Day 240.00
% 7.20
% 247.20
% 2,971.80

Amount

No 2,500.00

% 2,500.00

Day 300.00
% 9.00
% 309.00
% 546.00
Amount

No 2,750.00

% 2,750.00

Day 300.00
% 9.00
% 309.00
% 594.75

Amount

No 4,500.00
% 4,500.00

Day 240.00
% 7.20
% 247.20
% 924.30
Amount

No 5,850.00
% 5,850.00

Day 240.00
% 7.20
% 247.20
% 1,187.55

Amount

No 10,000.00
% 10,000.00

Day 240.00
% 7.20
% 247.20
% 1,996.80
15.4.25

Amount

Each 10,000.00
% 10,000.00

Day 30.00
% 0.90
% 30.90
% 1,955.85

15.4.25

Amount

Each 8,000.00
% 8,000.00

Day 30.00
% 0.90
% 30.90
% 1,565.85
Amount

486.00

42.78

% 528.78

Day 12.00
% 0.36
% 12.36
% 105.45

Amount

No 40.00
% 40.00
Day 22.80
% 0.68
% 23.48
% 12.25

Amount

No 180.00
% 180.00

Day 48.00
% 1.44
% 49.44
% 44.46
Amount

No 50.00
No 40.56
% 90.56

Day 30.00
% 0.90
% 30.90
% 23.51

Amount

RFT 164.00
No 40.56
% 204.56

Day 8.40
% 0.25
% 8.65
% 41.53
15.4.1, 15.4.5

Amount

No 2.00
No 30.00
% 32.00

Day 18.00
% 0.54
% 18.54
% 9.75

15.4.1, 15.4.5
Each

Amount

1 No 2.00
1 No 80.00
63.55 % 82.00

1 Day 18.00
3.00 % 0.54
16.95 % 18.54
19.50 % 19.50

Cost Per Each: 120.04


Cost Per Each: 22.05
15.4.1, 15.4.5

Amount

No 2.00
No 35.00
% 37.00

Day 30.00
% 0.90
% 30.90
% 13.07

15.4.1

Amount

No 2.00
No 90.00
% 92.00

Day 30.00
% 0.90
% 30.90
% 23.79
Amount

No 2.00
No 450.00
% 452.00

Day 30.00
% 0.90
% 30.90
% 93.99

Amount

No 2.00
No 500.00

% 502.00
Day 30.00
% 0.90
% 30.90
% 103.74

15.4.1, 15.4.5

Amount

No 2.00
No 500.00

% 502.00

Day 30.00
% 0.90
% 30.90
% 103.74

15.4.1, 15.4.5

Amount
No 2.00
No 40.00
% 42.00

Day 15.60
% 0.47
% 16.07
% 11.23

15.4.1

Amount

No 2.00
No 120.00
% 122.00

Day 15.60
% 0.47
% 16.07
% 26.83
Amount

No 100.00
% 100.00

Day 30.00
% 0.90
% 30.90
% 25.35

Amount

No 150.00
% 150.00

Day 30.00
% 0.90
% 30.90
% 35.10
Amount

No 430.00
% 430.00

Day 30.00
% 0.90
% 30.90
% 89.70

Amount

No 920.00
% 920.00

Day 30.00
% 0.90
% 30.90
% 185.25
Amount

No 1,020.00
% 1,020.00

Day 30.00
% 0.90
% 30.90
% 204.75

Amount

No 220.00
No 700.00
No 60.00
No 400.00
Rft 300.00
% 1,680.00

Day 120.00
% 3.60
% 123.60
% 351.00

Amount

No 110.00
No 350.00
No 30.00
Rft 300.00
No 350.00
% 1,140.00

Day 90.00
% 2.70
% 92.70
% 239.85
Amount

No 350.00
No 30.00
No 120.00
No 80.00
No 95.00
Rft 300.00
No 20.00
% 995.00

Day 66.00
% 1.98
% 67.98
% 206.90

Amount

No 240.00

% 240.00

Day 30.00
% 0.90
% 30.90
% 52.65

Amount

RFT 196.80
No 450.00

% 646.80

Day 90.00
% 2.70
% 92.70
% 143.68
Amount

450.00

40.00

% 490.00

Day 90.00
% 2.70
% 92.70
% 113.10

Amount

RFT 250.00
Pkt 10.50
% 260.50

Day 10.80
% 0.32
% 11.12
% 52.90
Amount

RFT 187.25
No 5.78
No 6.00
% 199.03

Day 14.40
% 0.43
% 14.83
% 41.62

15.9.1

Amount

Kg 37.50

No 120.00

% 157.50

Day 30.00
% 0.90
% 30.90
% 36.56

Amount

Kg 37.41
Kg 750.00
% 787.41

Day 15.60
% 0.47
% 16.07
% 156.59
Amount

Kg 150.00
% 150.00

Day 15.60
% 0.47
% 16.07
% 32.29

Amount

Rft 14.02
kg 36.60
% 50.62

Day 8.40
% 0.25
% 8.65
% 11.51
Amount

Rft 30.48
kg 36.60
% 67.08

Day 8.40
% 0.25
% 8.65
% 14.72

Amount

Rft 39.02
kg 36.60
% 75.62

Day 8.40
% 0.25
% 8.65
% 16.38
Amount

Rft 57.32
kg 36.60
% 93.92

Day 8.40
% 0.25
% 8.65
% 19.95

Amount

No. 328.75
No 110.00
% 438.75
Day 270.00
% 8.10
% 278.10
% 138.21

Amount

No. 1,600.00
% 1,600.00

Day 480.00
% 14.40
% 494.40
% 405.60
Amount

No. 1,426.00

% 1,426.00

Day 480.00
% 14.40
% 494.40
% 371.67

Amount

No. 3,200.00

% 3,200.00

Day 480.00
% 14.40
% 494.40
% 717.60
Amount

No 22,050.00

% 22,050.00

Day 106.25
Day 150.00
% 7.69
% 263.94

hr 1,756.18
% 1,756.18
% 4,692.17

700.00
% 700.00

Day 300.00
% 9.00
% 309.00
% 195.00

15.6.1

Amount

No. 350.00
No. 1,500.00
% 1,850.00

Day 120.00
% 3.60
% 123.60
% 384.15
15.6.1

Amount

No. 800.00
No. 2,000.00
% 2,800.00

Day 120.00
% 3.60
% 123.60
% 569.40

15.6.1

Amount

No. 1,250.00
No. 3,000.00
% 4,250.00

Day 120.00
% 3.60
% 123.60
% 852.15
Amount

No. 14,000.00

% 14,000.00

Day 600.00
% 18.00
% 618.00
% 2,847.00

15.6.1

Amount

No. 24,000.00

% 24,000.00

Day 600.00
% 18.00
% 618.00
% 4,797.00
15.6.1

Amount

No. 20,000.00

% 20,000.00

Day 600.00
% 18.00
% 618.00
% 4,017.00

15.6.1

Amount

No. 11,800.00

% 11,800.00

Day 600.00
% 18.00
% 618.00
% 2,418.00
55,000.00

% 55,000.00

Day 106.25
Day 150.00
% 7.69
% 263.94

hr 1,756.18
% 1,756.18
% 11,117.42
Amount

1,900.00

% 1,900.00

Day 36.00
% 1.08
% 37.08
% 377.52

Amount

1,700.00

% 1,700.00
Day 36.00
% 1.08
% 37.08
% 338.52

Amount

5,000.00

% 5,000.00

Day 36.00
% 1.08
% 37.08
% 982.02
Amount

No 2,100.00

% 2,100.00

Day 36.00
% 1.08
% 37.08
% 416.52

Amount

No 2,300.00

% 2,300.00

Day 36.00
% 1.08
% 37.08
% 455.52
Amount

No 12,600.00

% 12,600.00

Day 36.00
% 1.08
% 37.08
% 2,464.02

Amount
No 3,700.00

% 3,700.00

Day 36.00
% 1.08
% 37.08
% 728.52

Amount

8,400.00

% 8,400.00

Day 36.00
% 1.08
% 37.08
% 1,645.02
Amount

No 27,000.00

% 27,000.00

Day 36.00
% 1.08
% 37.08
% 5,272.02

Amount

No 5,000.00

% 5,000.00

Day 36.00
% 1.08
% 37.08
% 982.02
Amount

No 50,000.00

% 50,000.00

Day 36.00
% 1.08
% 37.08
% 9,757.02
5,000.00

% 5,000.00

Day 36.00
% 1.08
% 37.08
% 982.02

650.00

% 650.00

Day 36.00
% 1.08
% 37.08
% 133.77
850.00

% 850.00

Day 36.00
% 1.08
% 37.08
% 172.77
1,450.00

% 1,450.00

Day 36.00
% 1.08
% 37.08
% 289.77

Amount

750.00
% 750.00

Day 36.00
% 1.08
% 37.08
% 153.27

840.00

% 840.00

Day 36.00
% 1.08
% 37.08
% 170.82
4,400.00

% 4,400.00

Day 36.00
% 1.08
% 37.08
% 865.02
1,200.00

% 1,200.00

Day 150.00
% 4.50
% 154.50
% 263.25

1,800.00

% 1,800.00
Day 150.00
% 4.50
% 154.50
% 380.25

1,400.00

% 1,400.00

Day 150.00
% 4.50
% 154.50
% 302.25
Amount

1,500.00

% 1,500.00

Day 150.00
% 4.50
% 154.50
% 321.75

Amount

2,100.00
% 2,100.00

Day 150.00
% 4.50
% 154.50
% 438.75

Amount

No 2,800.00

% 2,800.00

Day 150.00
% 4.50
% 154.50
% 575.25
Amount

No 3,200.00

% 3,200.00

Day 150.00
% 4.50
% 154.50
% 653.25

1,200.00
% 1,200.00

Day 150.00
% 4.50
% 154.50
% 263.25

1,600.00

% 1,600.00

Day 150.00
% 4.50
% 154.50
% 341.25
Amount

No 3,400.00

% 3,400.00

Day 150.00
% 4.50
% 154.50
% 692.25

Amount

No 3,400.00

% 3,400.00

Day 150.00
% 4.50
% 154.50
% 692.25

2,650.00

% 2,650.00

Day 150.00
% 4.50
% 154.50
% 546.00
Amount

No 5,800.00

% 5,800.00

Day 150.00
% 4.50
% 154.50
% 1,160.25

3,200.00

% 3,200.00
Day 150.00
% 4.50
% 154.50
% 653.25

3,456.00

% 3,456.00

Day 150.00
% 4.50
% 154.50
% 703.17
Amount

2,400.00

% 2,400.00

Day 150.00
% 4.50
% 154.50
% 497.25

Amount

Each 4,500.00

% 4,500.00

Day 30.00
% 0.90
% 30.90
% 883.35

Amount

Each 1,200.00

% 1,200.00

Day 30.00
% 0.90
% 30.90
% 239.85

Amount

Each 250.00
% 250.00

Day 30.00
% 0.90
% 30.90
% 54.60

Amount

Each 250.00
% 250.00

Day 30.00
% 0.90
% 30.90
% 54.60

Amount

Each 60.00
% 60.00

Day 30.00
% 0.90
% 30.90
% 17.55

Amount

Each 110.00
% 110.00

Day 30.00
% 0.90
% 30.90
% 27.30

Amount

Each 80.00
% 80.00

Day 30.00
% 0.90
% 30.90
% 21.45

Amount

Each 20.00

% 20.00

Day 4.80
% 0.14
% 4.94
% 4.84

Amount

Each 800.00
% 800.00

Day 24.00
% 0.72
% 24.72
% 160.68

Amount

Each 800.00

% 800.00

Day 30.00
% 0.90
% 30.90
% 161.85

Amount

Each 1,400.00

% 1,400.00
Day 30.00
% 0.90
% 30.90
% 278.85

Amount

Each 150.00
% 150.00

Day 30.00
% 0.90
% 30.90
% 35.10

Amount

Each 240.00
% 240.00
Day 30.00
% 0.90
% 30.90
% 52.65

Amount

Each 280.00
% 280.00

Day 30.00
% 0.90
% 30.90
% 60.45

Amount

Each 450.00
% 450.00
Day 30.00
% 0.90
% 30.90
% 93.60

Amount

Each 1,400.00

% 1,400.00

Day 24.00
% 0.72
% 24.72
% 277.68

Amount

Each 350.00
% 350.00

Day 150.00
% 4.50
% 154.50
% 97.50

Amount

No. 3,400.00

% 3,400.00

Day 120.00
% 3.60
% 123.60
% 686.40
Amount

350.00

% 350.00

Day 120.00
% 3.60
% 123.60
% 91.65

Amount

No. 13,000.00

% 13,000.00

Day 7,200.00
% 216.00
% 7,416.00
% 3,939.00
Amount

14,000.00

300.00

% 14,300.00

Day 1,800.00
Day 300.00
% 63.00
% 2,163.00
% 3,198.00

Amount
22,000.00

300.00

% 22,300.00

Day 1,800.00
Day 300.00
% 63.00
% 2,163.00
% 4,758.00

Amount

12,000.00

300.00

% 12,300.00

Day 1,500.00
Day 300.00
% 54.00
% 1,854.00
% 2,749.50
Amount

20,000.00

300.00

% 20,300.00

Day 1,500.00
Day 300.00
% 54.00
% 1,854.00
% 4,309.50
Amount

No. 28,800.00

No. 15,000.00
No. 180.00
No. 2,500.00

% 46,480.00

Day 120.00
Day 212.50
% 9.98
% 342.48

Day 15.00
Day 437.79

% 452.79
% 9,216.73

Amount

Rft 982.69
Rft 1,354.76
kg 1,097.28
% 3,434.73

Day 2,400.00
% 72.00
% 2,472.00
% 1,137.77

Amount

No 7,000.00
Each 400.00
Each 120.00
% 7,520.00

Day 600.00
% 18.00
% 618.00
% 1,583.40

Amount
No 1,000.00

% 1,000.00

Day 300.00
% 9.00
% 309.00
% 253.50

Amount

No 650.00
% 650.00

Day 24.00
% 0.72
% 24.72
% 131.43
Amount

No 460.00

% 460.00

Day 24.00
% 0.72
% 24.72
% 94.38

Amount

10,200.00

% 10,200.00

Day 300.00
% 9.00
% 309.00
% 2,047.50
Amount

No 280.00

% 280.00

Day 24.00
% 0.72
% 24.72
% 59.28

Amount

No 100.04
Rft 200.00
% 300.04

Day 8.40
% 0.25
% 8.65
% 60.15

Amount

No 130.06
Rft 150.00
% 280.06

Day 8.40
% 0.25
% 8.65
% 56.25
Amount

No 2,500.00
% 2,500.00

Day 1,500.00
% 45.00
% 1,545.00
% 780.00

Amount

1 Rft 149.96
1 Rft 420.47
1 No. 28.67
1 Pkt 50.00
1 No. 20.00
73.54 % 669.10

1 Day 36.00
3.00 % 1.08
6.96 % 37.08
19.50 % 137.49

Cost Per Each: 843.67


Cost Per Each: 44.10
Amount

1 Rft 99.97
1 Rft 220.09

1 No. 50.00
1 No. 75.00
1 No. 28.67
1 Pkt 25.00
72.28 % 498.73

1 Day 36.00
3.00 % 1.08
8.22 % 37.08
19.50 % 104.27

Cost Per Each: 640.08


Cost Per Each: 44.10

Amount
1 Rft 5.00
1 Pkt 0.10
1 Rft 51.82
68.80 % 56.92

1 Day 7.20
3.00 % 0.22
11.70 % 7.42
19.50 % 12.50

Per Meter : Rs 252.05


Per Meter : Rs 28.93

Amount

1 Rft 5.00
1 Pkt 0.10
1 Rft 74.40
71.06 % 79.51

1 Day 7.20
3.00 % 0.22
9.44 % 7.42
19.50 % 16.91

Per Meter : Rs 340.56


Per Meter : Rs 28.93
Amount

1 Rft 6.00
1 Pkt 0.10
1 Rft 136.58
71.49 % 142.69

1 Day 12.00
3.00 % 0.36
9.01 % 12.36
19.50 % 30.16

Per Meter : Rs 607.48


Per Meter : Rs 48.22

Amount

1 Rft 6.00
1 Pkt 0.21
1 Rft 330.48
72.83 % 336.69

1 Day 21.60
3.00 % 0.65
7.67 % 22.25
19.50 % 69.87

Per Meter : Rs 1,406.48


Per Meter : Rs 86.79

Amount

1 Rft 5.00
1 Pkt 0.21
1 Rft 7.01
55.64 % 12.22

1 Day 4.80
3.00 % 0.14
24.86 % 4.94
19.50 % 3.32

Per Meter : Rs 67.18


Per Meter : Rs 19.29
Amount

1 Rft 5.00
1 Pkt 0.21
1 Rft 15.24
62.77 % 20.45

1 Day 4.80
3.00 % 0.14
17.73 % 4.94
19.50 % 4.92

Per Meter : Rs 99.44


Per Meter : Rs 19.29

Amount

1 Rft 6.00
1 Pkt 0.21
1 Rft 28.66
68.12 % 34.87

1 Day 4.80
3.00 % 0.14
12.38 % 4.94
19.50 % 7.74

Per Meter : Rs 155.96


Per Meter : Rs 19.29
Amount

1 Rft 6.00
1 Pkt 0.21
1 Rft 73.77
70.13 % 79.98

1 Day 8.40
3.00 % 0.25
10.37 % 8.65
19.50 % 17.23

Per Meter : Rs 347.24


Per Meter : Rs 33.75

Amount

1 Rft 224.93
1 Pkt 14.00
1 Rft 946.06
1 No. 240.00
1 No. 40.00
74.57 % 1,464.99
1 Day 57.60
3.00 % 1.73
5.93 % 59.33
19.50 % 296.91

Cost Per Each: 1,821.23


Cost Per Each: 70.56

Amount

1 Rft 299.89
1 Rft 420.47
1 No. 40.00
1 No. 30.00
1 No. 65.01
72.90 % 855.37

1 Day 54.00
3.00 % 1.62
7.60 % 55.62
19.50 % 177.33

Cost Per Each: 1,088.31


Cost Per Each: 66.15
Amount

1 Rft 199.94
1 Rft 50.39
1 No. 40.00
1 No. 30.00
1 No. 30.00
1 No. 65.01
72.87 % 415.34

1 Day 26.40
3.00 % 0.79
7.63 % 27.19
19.50 % 86.14

Cost Per Each: 528.67


Cost Per Each: 32.34

Amount

1 Rft 449.85
1 Rft 946.06
1 No. 80.00
1 No. 80.00
1 No. 65.01
73.79 % 1,620.92

1 Day 81.60
3.00 % 2.45
6.71 % 84.05
19.50 % 331.99

Cost Per Each: 2,036.96


Cost Per Each: 99.96

Amount

Rft 1,548.32
Kg 3,825.00
No 7,000.00
Each 30.00
% 12,403.32

Day 960.00
% 28.80
% 988.80
% 2,605.85
Amount

No 50.00
No 50.00
Kg 55.83
% 155.83

Day 60.00
% 1.80
% 61.80
% 42.09

15.5.4

Amount

Each 35.00

% 35.00

Day 24.00
% 0.72
% 24.72
% 11.51
15.4.5

Amount

Each 70.00
% 70.00

Day 12.00
% 0.36
% 12.36
% 15.99

15.4.4

Amount

Each 30.00
% 30.00

Day 12.00
% 0.36
% 12.36
% 8.19
15.4.5

Amount

Each 30.00
% 30.00

Day 12.00
% 0.36
% 12.36
% 8.19

15.4.5

Amount

Each 200.00
% 200.00

Day 12.00
% 0.36
% 12.36
% 41.34
Amount

No 1,000.00
% 1,000.00

Day 48.00
% 1.44
% 49.44
% 204.36

Amount

No 3,000.00
% 3,000.00

Day 48.00
% 1.44
% 49.44
% 594.36
Amount

150.00

30.00

% 180.00

Day 60.00
% 1.80
% 61.80
% 46.80

Amount

200.00
30.00

% 230.00

Day 60.00
% 1.80
% 61.80
% 56.55

Amount

250.00

30.00

% 280.00

Day 60.00
% 1.80
% 61.80
% 66.30
Amount

No 500.00
No 30.00
% 530.00

Day 60.00
% 1.80
% 61.80
% 115.05

Amount

250.00

30.00

% 280.00

Day 60.00
% 1.80
% 61.80
% 66.30
Amount

850.00

30.00

% 880.00

Day 60.00
% 1.80
% 61.80
% 183.30
Amount

150.00

25.00

% 175.00

Day 60.00
% 1.80
% 61.80
% 45.83

Amount

No 250.00
% 250.00

Day 60.00
% 1.80
% 61.80
% 60.45
Amount

1,900.00

% 1,900.00

Day 150.00
% 4.50
% 154.50
% 399.75

Amount

Set 1,350.00

% 1,350.00

Day 120.00
% 3.60
% 123.60
% 286.65

Amount

Set 1,000.00

% 1,000.00

Day 120.00
% 3.60
% 123.60
% 218.40
Amount

Set 550.00
% 550.00

Day 90.00
% 2.70
% 92.70
% 124.80

Amount

No 60.00
No 550.00
% 610.00

Day 120.00
% 3.60
% 123.60
% 142.35
Amount

1 No 60.00
1 No 550.00
64.76 % 610.00

1 Day 120.00
3.00 % 3.60
15.74 % 123.60
19.50 % 142.35

Cost Per Each: 875.95


Cost Per Each: 147.00

Amount

No 60.00
No 550.00
% 610.00

Day 120.00
% 3.60
% 123.60
% 142.35
Amount

No 60.00
No 250.00
% 310.00

Day 300.00
% 9.00
% 309.00
% 118.95

Amount

No 60.00
No 300.00
% 360.00
Day 300.00
% 9.00
% 309.00
% 128.70

Amount

No 60.00
No 350.00
% 410.00

Day 300.00
% 9.00
% 309.00
% 138.45
Amount

No 1,850.00
No 40.00
No 950.00
% 2,840.00

Day 300.00
% 9.00
% 309.00
% 612.30

Amount

No 1,850.00
No 40.00
No 340.00
% 2,230.00

Day 300.00
% 9.00
% 309.00
% 493.35
Amount

No 1,850.00
No 40.00
No 2,800.00
% 4,690.00

Day 300.00
% 9.00
% 309.00
% 973.05

15.6.3 , 15.6.4

Amount

No 14,823.00

% 14,823.00

Day 36.00
% 1.08
% 37.08
% 2,897.51

Amount

No 920.00
% 920.00

Day 300.00
% 9.00
% 309.00
% 237.90

Amount
No 200.00
No 1,520.00
% 1,720.00

Day 300.00
% 9.00
% 309.00
% 393.90

Amount

Day 180.00
% 5.40
% 185.40
% 35.10
Amount

No 2,740.00
% 2,740.00

Day 150.00
% 4.50
% 154.50
% 563.55

Amount

No 3,400.00
% 3,400.00

Day 150.00
% 4.50
% 154.50
% 692.25
Amount

No 3,500.00
% 3,500.00

Day 150.00
% 4.50
% 154.50
% 711.75

Amount

Each 3,500.00

% 3,500.00
% 682.50
Amount

4,400.00

% 4,400.00

Day 75.00
% 2.25
% 77.25
% 872.63

Amount

7,000.00
% 7,000.00

Day 75.00
% 2.25
% 77.25
% 1,379.63

Amount

No 1,900.00

% 1,900.00

Day 120.00
% 3.60
% 123.60
% 393.90
Amount

No 2,566.00

% 2,566.00

Day 120.00
% 3.60
% 123.60
% 523.77

Amount

No 3,909.00

% 3,909.00

Day 120.00
% 3.60
% 123.60
% 785.66
Amount

Each 1,400.00

% 1,400.00

Day 75.00
% 2.25
% 77.25
% 287.63

Amount

No 2,400.00
% 2,400.00

Day 480.00
% 14.40
% 494.40
% 561.60
Amount

No 2,900.00
% 2,900.00

Day 480.00
% 14.40
% 494.40
% 659.10

Amount

No 6,200.00
% 6,200.00
Day 570.00
% 17.10
% 587.10
% 1,320.15

Amount

No 450.00
% 450.00

Day 90.00
% 2.70
% 92.70
% 105.30
Amount

No 450.00
% 450.00

Day 90.00
% 2.70
% 92.70
% 105.30

Amount

No 690.00
% 690.00

Day 90.00
% 2.70
% 92.70
% 152.10
Amount

1 No 690.00
68.56 % 690.00

1 Day 90.00
3.00 % 2.70
11.94 % 92.70
19.50 % 152.10

Cost Per Each: 934.80


Cost Per Each: 110.25

Amount

No 600.00
No 3,400.00
No 1,450.00
No 200.00
LS 50.00
No 400.00
% 6,100.00

Day 300.00
Day 900.00
% 36.00
% 1,236.00
% 1,423.50

Amount

No 600.00
No 3,400.00
No 1,450.00
No 200.00
LS 75.00
No 400.00
% 6,125.00

Day 300.00
Day 900.00
% 36.00
% 1,236.00
% 1,428.38
Amount

No 600.00
No 3,400.00
No 1,450.00
No 200.00
LS 75.00
No 400.00
% 6,125.00

Day 600.00
Day 1,500.00
% 63.00
% 2,163.00
% 1,603.88

Amount

No 600.00
No 3,400.00
No 1,450.00
No 200.00
LS 125.00
No 400.00
% 6,175.00

Day 750.00
Day 1,800.00
% 76.50
% 2,626.50
% 1,701.38

Amount

No 600.00
No 4,000.00
No 1,450.00
No 200.00
LS 150.00
No 400.00
% 6,800.00

Day 600.00
Day 2,400.00
% 90.00
% 3,090.00
% 1,911.00
Amount

No 160.00
% 160.00

Day 17.68
% 0.53
% 18.21
% 34.65

Amount

No 161.00

% 161.00

Day 17.68
% 0.53
% 18.21
% 34.84
Amount

No 179.00
% 179.00

Day 17.68
% 0.53
% 18.21
% 38.35

Amount

No 1,164.00

% 1,164.00

Day 48.00
% 1.44
% 49.44
% 236.34
Amount

No 30.00
kg 49.50

kg 175.00

% 254.50

Day 48.00
% 1.44
% 49.44
% 58.99

Amount

No. 60.00
kg 49.50
kg 350.00

% 459.50

Day 48.00
% 1.44
% 49.44
% 98.96

Amount

Rft 75.00
LS 2.30
No. 7.50
No. 3.30
No. 1.50
% 89.60

Day 5.40
Day 3.60
% 0.27
% 9.27
% 19.23
Amount

Each 2,033.00
% 2,033.00

Day 300.00
% 9.00
% 309.00
% 454.94

Amount

Each 2,033.00
% 2,033.00

Day 300.00
% 9.00
% 309.00
% 454.94
Amount

No 1,900.00

% 1,900.00

Day 300.00
% 9.00
% 309.00
% 429.00
Amount

No 500.00

% 500.00

Day 300.00
% 9.00
% 309.00
% 156.00

Amount

No 1,650.00
Sft 138.50
Rft 420.00
% 2,208.50

Day 300.00
Day 120.00
% 12.60
% 432.60
% 512.56
Amount

No 1,800.00

Sft 166.50
Rft 480.00
% 2,446.50

Day 300.00
Day 120.00
% 12.60
% 432.60
% 558.97

Amount

No 1,900.00

Sft 194.50
Rft 560.40
% 2,654.90
Day 120.00
Day 36.00
% 4.68
% 160.68
% 548.13

Amount

No 2,559.00

% 2,559.00

Day 36.00
% 1.08
% 37.08
% 506.03
Amount

No 3,909.12

% 3,909.12

Day 75.00
% 2.25
% 77.25
% 776.90

Amount

4,400.00

% 4,400.00

Day 75.00
% 2.25
% 77.25
% 872.63
Amount

Rft 8.00

% 8.00

Day 10.80
% 0.32
% 11.12
% 3.67

Amount

Rft 15.00
% 15.00

Day 10.80
% 0.32
% 11.12
% 5.03

Amount

Rft 25.00

% 25.00

Day 10.80
% 0.32
% 11.12
% 6.98
Amount

Rft 50.00

% 50.00

Day 10.80
% 0.32
% 11.12
% 11.86

Amount

No 1.80

RMtr 850.00
No 3.36
LS 3.05
% 858.21

Day 21.60
% 0.65
% 22.25
% 171.56
Amount

No 1.80

RMtr 1,100.00
No 3.36
LS 3.05
% 1,108.21

Day 21.60
% 0.65
% 22.25
% 220.31

15.4.7

Amount

No. 150.00
% 150.00
Day 48.00
% 1.44
% 49.44
% 38.61

15.4.6

Amount

No. 200.00
% 200.00

Day 24.00
% 0.72
% 24.72
% 43.68

15.4.6

Amount

No. 450.00
% 450.00
Day 120.00
% 3.60
% 123.60
% 111.15

15.4.6

Amount

No. 150.00
% 150.00

Day 24.00
% 0.72
% 24.72
% 33.93

15.6.4

Amount

No. 56.00
% 56.00
Day 60.00
% 1.80
% 61.80
% 22.62

Amount

No. 220.00
% 220.00

Day 75.60
% 2.27
% 77.87
% 57.64

Amount
Dose 8.34
Day 23.50

% 31.84

Day 13.20
% 0.40
% 13.60
% 8.78

Amount

Dose 100.00
Day 24.00

% 124.00

Day 13.20
% 0.40
% 13.60
% 26.75
Amount

Dose 8.34
No 51.00

% 59.34

Day 2.40
Day 19.20
% 0.65
% 22.25
% 15.78

Amount

Dose 8.34
No 97.00
% 105.34

Day 2.40
Day 21.60
% 0.72
% 24.72
% 25.22
Amount

Dose 8.34
No 210.00
% 218.34

Day 2.40
Day 32.40
% 1.04
% 35.84
% 49.36

Amount

Dose 8.34
No 420.00
% 428.34

Day 4.20
Day 37.20
% 1.24
% 42.64
% 91.60
Amount

Dose 8.34
No 655.00
% 663.34

Day 5.40
Day 43.20
% 1.46
% 50.06
% 138.83

Amount

Dose 8.34
No 460.00
% 468.34

Day 5.40
Day 43.20
% 1.46
% 50.06
% 100.80
Amount

Dose 8.34
No 475.00
% 483.34

Day 12.00
Day 48.00
% 1.80
% 61.80
% 105.95

Amount

No 77,500.00
Yard 3,000.00
No 2,500.00

Set 250.00
Ltr 2,200.00

% 85,450.00

Day 425.00
Day 600.00
% 30.75
% 1,055.75
% 16,862.63

Amount

1 No 77,500.00
1 Yard 3,000.00
1 No 2,500.00

1 Set 250.00
1 Ltr 2,200.00

1 No 650.00

% 86,100.00

Day 425.00
Day 600.00
% 30.75
% 1,055.75
% 16,989.38
Amount

1 No 91,500.00
1 Yard 3,000.00
1 No 2,500.00

1 Set 250.00
1 Ltr 2,200.00

1 No 650.00

% 100,100.00

Day 425.00
Day 600.00
% 30.75
% 1,055.75
% 19,719.38

Amount

No 91,500.00
Yard 3,000.00
No 2,500.00
Set 250.00
Ltr 2,200.00

% 99,450.00

Day 425.00
Day 600.00
% 30.75
% 1,055.75
% 19,592.63

15.6.6

Amount

No 26,730.00

% 26,730.00

Day 280.50
Day 396.00
% 20.30
% 696.80

Hour 1,756.18
% 1,756.18
% 5,686.72
15.6.6

Amount

No 20,124.00

% 20,124.00

Day 280.50
Day 396.00
% 20.30
% 696.80

Hour 1,756.18
% 1,756.18
% 4,398.55

15.6.6

Amount

No 23,070.00

% 23,070.00

Day 280.50
Day 396.00
% 20.30
% 696.80

Hour 1,756.18
% 1,756.18
% 4,973.02

15.6.6

Amount

No 16,663.00

% 16,663.00

Day 280.50
Day 396.00
% 20.30
% 696.80

Hour 1,756.18
% 1,756.18
% 3,723.66

Amount

Rft 440.00
% 440.00

Day 8.50
Day 12.00
% 0.62
% 21.12
% 89.80

Amount

Rft 183.00

% 183.00

Day 8.50
Day 12.00
% 0.62
% 21.12
% 39.68
Amount

Rft 93.00

% 93.00

Day 8.50
Day 12.00
% 0.62
% 21.12
% 22.13

Amount

Rft 152.00

% 152.00

Day 8.50
Day 12.00
% 0.62
% 21.12
% 33.64
Amount

Rft 76.00

% 76.00

Day 8.50
Day 12.00
% 0.62
% 21.12
% 18.82

Amount

No 2,495.00
% 2,495.00

Day 75.00
% 2.25
% 77.25
% 501.15
Amount

No 1,047.00
% 1,047.00

Day 75.00
% 2.25
% 77.25
% 218.79

Amount

No 540.00

% 540.00

Day 75.00
% 2.25
% 77.25
% 119.93
Amount

No 135.00
% 135.00

Day 36.00
% 1.08
% 37.08
% 33.35

Amount

No 170,000.00

% 170,000.00

Day 850.00
Day 1,200.00
% 61.50
% 2,111.50

Hour 1,756.18
% 1,756.18
% 33,892.21
Amount

No 280,000.00

% 280,000.00

Day 850.00
Day 1,200.00
% 61.50
% 2,111.50

Hour 1,756.18
% 1,756.18
% 55,342.21

Amount

No 380,000.00

% 380,000.00

Day 850.00
Day 1,200.00
% 61.50
% 2,111.50

Hour 1,756.18
% 1,756.18
% 74,842.21

Amount

No 860,412.00

% 860,412.00

Day 850.00
Day 1,200.00
% 61.50
% 2,111.50

Hour 1,756.18
% 1,756.18
% 168,522.55
Amount

No 7,916.00

% 7,916.00

Day 36.00
% 1.08
% 37.08
% 1,550.64

Amount

No 6,993.00
% 6,993.00

Day 36.00
% 1.08
% 37.08
% 1,370.66
15.2.10

Amount

No 1,472.00
% 1,472.00

Day 36.00
% 1.08
% 37.08
% 294.06

15.2.10

Amount

Kg 150.00
% 150.00

Day 36.00
% 1.08
% 37.08
% 36.27
Amount

No 164.00
% 164.00

Day 36.00
% 1.08
% 37.08
% 39.00

15.11.6

Amount

No 1,011.00
% 1,011.00

Day 212.50
Day 150.00
% 10.88
% 373.38
% 267.83
15.12.1
Kg

Amount

1 Kg 105.00
51.46 % 105.00

1 Day 53.13
3.00 % 1.59
29.04 % 54.72
19.50 % 30.83

Cost Per Kg: 190.55


Cost Per Kg: 65.08

Amount

8,000.00

% 8,000.00

Day 850.00
% 25.50
% 875.50
% 1,725.75
Amount

No 45,000.00

% 45,000.00

Day 425.00
Day 600.00
% 30.75
% 1,055.75

Hour 1,756.18
% 1,756.18
9,317.33

Amount

35,000.00

% 35,000.00

Day 24.00
% 0.72
% 24.72
% 6,829.68
15.18.8

Amount

1 No 6,100.00

% 6,100.00

Day 425.00
Day 600.00
% 30.75
% 1,055.75
% 1,389.38
25,000.00

% 25,000.00

Day 24.00
% 0.72
% 24.72
% 4,879.68

Amount

Job 102,500.00
% 102,500.00

Day 24.00
% 0.72
% 24.72
% 19,992.18

Amount

No 4,000.00
% 4,000.00

Day 212.50
Day 300.00
% 15.38
% 527.88
% 879.94

Amount

No 26,000.00
% 26,000.00

Day 850.00
Day 1,200.00
% 61.50
% 2,111.50
% 5,469.75

Amount

90,000.00
% 90,000.00

Day 1,700.00
Day 2,400.00
% 123.00
% 4,223.00
% 18,349.50

Amount

No 600.00
% 600.00

Day 150.00
% 4.50
% 154.50
% 146.25

Amount
No 450.00

% 450.00

Day 50.04
% 1.50
% 51.54
% 97.51

Amount

No 11,000.00

% 11,000.00

Day 425.00
Day 600.00
% 30.75
% 1,055.75

Hour 1,756.18
% 1,756.18
% 2,687.33
Amount

No 10,000.00

% 10,000.00

Day 425.00
Day 600.00
% 30.75
% 1,055.75

Hour 878.09
% 878.09
% 2,321.10

Amount

No 8,500.00

% 8,500.00

Day 300.00
% 9.00
% 309.00
% 1,716.00
Amount

No 650.00

% 650.00

Day 150.00
% 4.50
% 154.50
% 156.00

Amount

No 300.00

% 300.00

Day 150.00
% 4.50
% 154.50
% 87.75
Amount

No 300.00

% 300.00

Day 150.00
% 4.50
% 154.50
% 87.75

Amount

No 350.00

% 350.00

Day 75.00
% 2.25
% 77.25
% 82.88
Amount

No 160.00

% 160.00

Day 75.00
% 2.25
% 77.25
% 45.83

Amount

No 145.00

% 145.00

Day 75.00
% 2.25
% 77.25
% 42.90

Amount

No 135.00

% 135.00

Day 36.00
% 1.08
% 37.08
% 33.35

Amount

No 125.00

% 125.00
Day 36.00
% 1.08
% 37.08
% 31.40

Amount

52,000.00

% 52,000.00

Day 1,275.00
Day 1,800.00
% 92.25
% 3,167.25

Hour 1,756.18
% 1,756.18
% 11,082.08
Amount

51,000.00

% 51,000.00

Day 1,275.00
Day 1,800.00
% 92.25
% 3,167.25

Hour 1,756.18
% 1,756.18
% 10,887.08
Amount

50,000.00

% 50,000.00

Day 1,275.00
Day 1,800.00
% 92.25
% 3,167.25

Hour 1,756.18
% 1,756.18
% 10,692.08
Amount

62,000.00

% 62,000.00

Day 1,275.00
Day 1,800.00
% 92.25
% 3,167.25

Hour 1,756.18
% 1,756.18
% 13,032.08

Amount

48,000.00
% 48,000.00

Day 1,275.00
Day 1,800.00
% 92.25
% 3,167.25

Hour 1,756.18
% 1,756.18
% 10,302.08

Amount

No 11,000.00

% 11,000.00

Day 150.00
% 4.50
% 154.50
% 2,174.25
Amount

No 4,288.00

% 4,288.00

Day 150.00
% 4.50
% 154.50
% 865.41

Amount

Rft 601.00
% 601.00

Day 300.00
% 9.00
% 309.00
% 175.70

Amount

m 376.00

% 376.00

Day 36.00
% 1.08
% 37.08
% 80.34
Amount

No 220.00

% 220.00

Day 24.00
% 0.72
% 24.72
% 47.58

Amount

No 207.00
% 207.00

Day 12.00
% 0.36
% 12.36
% 42.71
Amount

RMtr 455.00

% 455.00

Day 36.00
% 1.08
% 37.08
% 95.75

Amount

No 736.00
% 736.00

Day 72.00
% 2.16
% 74.16
% 157.56

Amount

No 976.00

% 976.00

Day 96.00
% 2.88
% 98.88
% 209.04
Amount

No 1,501.00

% 1,501.00

Day 108.00
% 3.24
% 111.24
% 313.76

Amount
No 1,950.00

% 1,950.00

Day 144.00
% 4.32
% 148.32
% 408.33

Amount

No 2,700.00

% 2,700.00

Day 156.00
% 4.68
% 160.68
% 556.92
Amount

No 3,983.00

% 3,983.00

Day 600.00
% 18.00
% 618.00
% 893.69
Amount

No 6,967.00

% 6,967.00

Day 900.00
% 27.00
% 927.00
% 1,534.07

Amount

No 8,200.00

% 8,200.00

Day 1,200.00
% 36.00
% 1,236.00
% 1,833.00
Amount

No 9,800.00

% 9,800.00

Day 1,200.00
% 36.00
% 1,236.00
% 2,145.00
Amount

No 17,000.00

% 17,000.00

Day 1,500.00
% 45.00
% 1,545.00
% 3,607.50

15.18.8

Amount

No 65.00

% 65.00

Day 8.40
% 0.25
% 8.65
% 14.31
15.18.8

Amount

No 60.00

% 60.00

Day 8.40
% 0.25
% 8.65
% 13.34

15.18.8

Amount

m 387.00
% 387.00

Day 9.60
% 0.29
% 9.89
% 77.34
15.18.8

Amount

m 185.00

% 185.00

Day 8.40
% 0.25
% 8.65
% 37.71

15.18.8

Amount

No 99.00

% 99.00

Day 8.40
% 0.25
% 8.65
% 20.94
Amount

1 No 432.56

71.55 % 432.56

1 Day 36.00
3.00 % 1.08
8.95 % 37.08
19.50 % 91.37

Cost Per Meter: 561.01


Cost Per Meter: 44.10
Amount

1 No 691.44

70.19 % 691.44

1 Day 72.00
3.00 % 2.16
10.31 % 74.16
19.50 % 148.87

Cost Per Meter: 914.47


Cost Per Meter: 88.20

Amount

1 No 1,372.11

71.85 % 1,372.11

1 Day 108.00
3.00 % 3.24
8.65 % 111.24
19.50 % 288.62
Cost Per Meter: 1,771.97
Cost Per Meter: 132.30

Amount

1 No 2,521.49

69.26 % 2,521.49

1 Day 300.00
3.00 % 9.00
11.24 % 309.00
19.50 % 550.19

Cost Per Meter: 3,380.68


Cost Per Meter: 367.50
Meter 4,880.00

% 4,880.00

Day 300.00
% 9.00
% 309.00
% 1,010.10

590.00

% 590.00

Day 24.00
% 0.72
% 24.72
% 119.73

670.00

% 670.00

Day 24.00
% 0.72
% 24.72
% 135.33
500.00

% 500.00

Day 36.00
% 1.08
% 37.08
% 104.52
710.00

% 710.00

Day 36.00
% 1.08
% 37.08
% 145.47

767.25

% 767.25

Day 48.00
% 1.44
% 49.44
% 158.97

958.25

% 958.25

Day 48.00
% 1.44
% 49.44
% 196.22
Amount

1,183.00

% 1,183.00

Day 75.00
% 2.25
% 77.25
% 245.31
720.00

% 720.00

Day 24.00
% 0.72
% 24.72
% 145.08

650.06

% 650.06

Day 24.00
% 0.72
% 24.72
% 131.44

970.10

% 970.10

Day 36.00
% 1.08
% 37.08
% 196.19
575.05

% 575.05

Day 36.00
% 1.08
% 37.08
% 119.15

1,482.45
% 1,482.45

Day 36.00
% 1.08
% 37.08
% 296.10

750.00

% 750.00

Day 36.00
% 1.08
% 37.08
% 153.27
1,040.00

% 1,040.00

Day 48.00
% 1.44
% 49.44
% 212.16

Amount

No 450.00
% 450.00

Day 48.00
% 1.44
% 49.44
% 97.11

Amount

No 510.00

% 510.00

Day 48.00
% 1.44
% 49.44
% 108.81
Amount

No 135.00
% 135.00

Day 48.00
% 1.44
% 49.44
% 35.69

Amount

Each 68.00

% 68.00

Day 12.00
% 0.36
% 12.36
% 15.60
Amount

Each 87.00

% 87.00

Day 12.00
% 0.36
% 12.36
% 19.31

Amount

Each 190.00

% 190.00

Day 24.00
% 0.72
% 24.72
% 41.73

Amount

Each 170.00

% 170.00

Day 24.00
% 0.72
% 24.72
% 37.83
Amount

Each 225.00

% 225.00

Day 24.00
% 0.72
% 24.72
% 48.56

Amount

3,547.76
% 3,547.76

Day 150.00
% 4.50
% 154.50
% 721.06

Amount

No 68,451.76

% 68,451.76

Day 300.00
% 9.00
% 309.00
% 13,406.59
15.16.3

Amount

No 136,903.52
% 136,903.52

Day 300.00
% 9.00
% 309.00
% 26,754.69

Amount

Each 45,000.00

% 45,000.00

Day 600.00
% 18.00
% 618.00
% 8,892.00
Amount

No 63,703.52
% 63,703.52

Day 600.00
% 18.00
% 618.00
% 12,539.19

15.16.4

Amount

No 15,850.00

% 15,850.00

Day 300.00
% 9.00
% 309.00
% 3,149.25

15.16.4

Amount

No 15,850.00

% 15,850.00

Day 300.00
% 9.00
% 309.00
% 3,149.25

Amount
No 63,665.09

% 63,665.09

Day 300.00
% 9.00
% 309.00
% 12,473.19

15.16.7

Amount

No 1,916.01

% 1,916.01

Day 150.00
% 4.50
% 154.50
% 402.87

15.16.7
Amount

No 41,702.65
% 41,702.65

Day 150.00
% 4.50
% 154.50
% 8,161.27

15.16.7

Amount

No 4,910.38
% 4,910.38

Day 150.00
% 4.50
% 154.50
% 986.77

15.16.7
Amount

No 18,720.00

% 18,720.00

Day 150.00
% 4.50
% 154.50
% 3,679.65

Amount

70.00

% 70.00

Day 3.60
% 0.11
% 3.71
% 14.35
3,000.00

% 3,000.00

Day 75.00
% 2.25
% 77.25
% 599.63
Amount

4,472.98

% 4,472.98

Day 212.50
Day 300.00
% 15.38
% 527.88
% 972.17
7,235.06

% 7,235.06

Day 150.00
% 4.50
% 154.50
% 1,440.09

14,371.14

% 14,371.14
Day 150.00
% 4.50
% 154.50
% 2,831.62

Amount

10,727.05

% 10,727.05

Day 150.00
% 4.50
% 154.50
% 2,121.02
Amount

No 6,400.00

% 6,400.00

Day 150.00
% 4.50
% 154.50
% 1,277.25

Amount

No 10,850.00
% 10,850.00

Day 150.00
% 4.50
% 154.50
% 2,145.00

Amount

263,030.78

% 263,030.78

Day 150.00
% 4.50
% 154.50
% 51,320.25
75,000.00

% 75,000.00

Day 150.00
% 4.50
% 154.50
% 14,654.25

Amount

No 57,193.14

% 57,193.14

Day 150.00
% 4.50
% 154.50
% 11,181.91

15.16.4 ,
15.16.5

Amount

No 10,414.22
% 10,414.22

Day 150.00
% 4.50
% 154.50
% 2,060.02

Amount

No 6,750.00
% 6,750.00
Day 150.00
% 4.50
% 154.50
% 1,345.50

Amount

No 2,521.13

% 2,521.13

Day 106.25
Day 150.00
% 7.69
% 263.94
% 541.59
Amount

No 3,000.00

% 3,000.00

Day 106.25
Day 150.00
% 7.69
% 263.94
% 634.97
Amount

No 1,890.39

% 1,890.39

Day 106.25
Day 150.00
% 7.69
% 263.94
% 418.59

Amount

No 2,000.00

% 2,000.00

Day 106.25
Day 150.00
% 7.69
% 263.94
% 439.97

Amount

No 1,290.15

% 1,290.15

Day 106.25
Day 150.00
% 7.69
% 263.94
% 301.55
Amount

No 285,794.16

% 285,794.16

Day 3,600.00
% 108.00
% 3,708.00
56,431.86

Amount

64,290.95

% 64,290.95

Day 2,550.00
Day 3,600.00
% 184.50
% 6,334.50
% 13,735.99

Amount

4,384.07

% 4,384.07

Day 600.00
% 18.00
% 618.00
% 971.89

Amount

4,384.07

% 4,384.07

Day 600.00
% 18.00
% 618.00
% 971.89
Amount

No 57,153.95

% 57,153.95

Day 36.00
% 1.08
% 37.08
% 11,152.04
Amount

17,189.19

% 17,189.19

Day 850.00
Day 1,200.00
% 61.50
% 2,111.50
% 3,751.64

Amount

92,930.45
% 92,930.45

Day 850.00
Day 1,200.00
% 61.50
% 2,111.50
% 18,521.19

Amount

50,000.00

% 50,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 9,984.00
Amount

142,797.95

% 142,797.95

Day 1,700.00
Day 2,400.00
% 123.00
% 4,223.00
% 28,645.10
72.00

% 72.00

Day 75.00
% 2.25
% 77.25
% 28.67

Amount

Each 18,000.00

% 18,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 3,744.00

Amount

1 Each 65,000.00

73.43 % 65,000.00

1 Day 3,600.00
3.00 % 108.00
7.07 % 3,708.00
19.50 % 13,377.00

Cost Per Each: 82,085.00


Cost Per Each: 4,410.00
Amount

No 6,000.00
% 6,000.00

Day 600.00
% 18.00
% 618.00
% 1,287.00

Amount

No 15,000.00
% 15,000.00

Day 600.00
% 18.00
% 618.00
% 3,042.00
Amount

No 22,000.00
% 22,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 4,524.00

Amount

No 70,000.00
% 70,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 13,884.00

Amount

125,000.00

% 125,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 24,609.00
Amount

No 19,500.00

% 19,500.00

Day 1,200.00
% 36.00
% 1,236.00
% 4,036.50

Amount

19,500.00

% 19,500.00

Day 1,200.00
% 36.00
% 1,236.00
% 4,036.50
Amount

Rft 70.00
% 70.00

Day 75.00
% 2.25
% 77.25
% 28.28
500.00

% 500.00

Day 12.00
% 0.36
% 12.36
% 99.84

550.00

% 550.00

Day 12.00
% 0.36
% 12.36
% 109.59
Amount

No 530.00

% 530.00

Day 37.56
% 1.13
% 38.69
% 110.67

Amount

155.00
% 155.00

Day 12.00
% 0.36
% 12.36
% 32.57

Amount

9,400.00

% 9,400.00

Day 150.00
% 4.50
% 154.50
% 1,862.25
Amount

500.00

% 500.00

Day 36.00
% 1.08
% 37.08
% 104.52

Amount

No 550.00

% 550.00

Day 36.00
% 1.08
% 37.08
% 114.27

Amount

400,000.00

% 400,000.00

Day 8,400.00
% 252.00
% 8,652.00
% 79,638.00
1,275,000.00

% 1,275,000.00

Day 8,500.00
Day 12,000.00
% 615.00
% 21,115.00
% 252,622.50

Amount

No 21,500.00
% 21,500.00
Day 1,200.00
% 36.00
% 1,236.00
% 4,426.50

Amount

No 42,300.00

% 42,300.00

Day 1,200.00
% 36.00
% 1,236.00
% 8,482.50
Amount

No 17,500.00

% 17,500.00

Day 150.00
% 4.50
% 154.50
% 3,441.75

Amount

No 650.00

% 650.00

Day 75.00
% 2.25
% 77.25
% 141.38
Amount

No 4,200.00

% 4,200.00

Day 75.00
% 2.25
% 77.25
% 833.63

Amount

No 95,000.00

% 95,000.00

Day 2,400.00
% 72.00
% 2,472.00
% 18,993.00

Amount

Rft 35.00

% 35.00

Day 2.40
% 0.07
% 2.47
% 7.29

Amount
Yard 50.00
% 50.00

Day 30.00
% 0.90
% 30.90
% 15.60

Amount

Yard 100.00
% 100.00

Day 30.00
% 0.90
% 30.90
% 25.35
Amount

Each 2,500.00

% 2,500.00

Day 75.00
% 2.25
% 77.25
% 502.13

650.00

% 650.00

Day 75.00
% 2.25
% 77.25
% 141.38

Amount

Each 370.00

% 370.00

Day 30.00
% 0.90
% 30.90
% 78.00
Amount

42,500.00

% 42,500.00

Day 1,200.00
% 36.00
% 1,236.00
% 8,521.50

Amount

No 21,800.00

% 21,800.00

Day 850.00
Day 1,200.00
% 61.50
% 2,111.50
% 4,650.75

Amount

21,800.00

% 21,800.00

Day 1,200.00
% 36.00
% 1,236.00
% 4,485.00
Amount

16,750.00

% 16,750.00

Day 36.00
% 1.08
% 37.08
% 3,273.27
Amount

18,800.00

% 18,800.00

Day 360.00
% 10.80
% 370.80
% 3,736.20

Amount

350,000.00
% 350,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 68,484.00

70,000.00

% 70,000.00

Day 360.00
% 10.80
% 370.80
% 13,720.20
65,000.00

% 65,000.00

Day 360.00
% 10.80
% 370.80
% 12,745.20
Amount

No 350,000.00

% 350,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 68,484.00

Amount

No 18,800.00

% 18,800.00

Day 1,200.00
% 36.00
% 1,236.00
% 3,900.00
Amount

95.00

% 95.00

Day 1.20
% 0.04
% 1.24
% 18.76

15.20.6

Amount

Each 45,000.00

% 45,000.00
Day 360.00
% 10.80
% 370.80
% 8,845.20

Amount

No 20,500.00
% 20,500.00

Day 1,200.00
% 36.00
% 1,236.00
% 4,231.50
Amount

35,000.00

% 35,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 7,059.00

Amount

32,000.00
% 32,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 6,474.00

Amount

300,000.00

% 300,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 58,734.00

3,627.67

% 3,627.67

Day 72.00
% 2.16
% 74.16
% 721.44
7,482.87

% 7,482.87

Day 150.00
% 4.50
% 154.50
% 1,488.41

Amount

No 4,055.89

% 4,055.89

Day 300.00
% 9.00
% 309.00
% 849.40
Amount

No 531.16

% 531.16

Day 24.00
% 0.72
% 24.72
% 108.26

Amount

No 1,500.00
% 1,500.00

Day 24.00
% 0.72
% 24.72
% 297.18

Amount

No 1,273.07

% 1,273.07

Day 72.00
% 2.16
% 74.16
% 262.29
Amount

No 2,101.30

% 2,101.30

Day 72.00
% 2.16
% 74.16
% 423.79

Amount

480.00

% 480.00
Day 28.80
% 0.86
% 29.66
% 99.22

530.00

% 530.00

Day 36.00
% 1.08
% 37.08
% 110.37
50,000.00

% 50,000.00

Day 3,600.00
% 108.00
% 3,708.00
% 10,452.00

Amount
20.00

% 20.00

Day 8.40
% 0.25
% 8.65
% 5.54

Amount

40.00

% 40.00

Day 12.00
% 0.36
% 12.36
% 10.14

Amount

60.00

% 60.00

Day 12.00
% 0.36
% 12.36
% 14.04
Amount

80.00

% 80.00

Day 12.00
% 0.36
% 12.36
% 17.94

Amount
100.00

% 100.00

Day 12.00
% 0.36
% 12.36
% 21.84

Amount

300.00

% 300.00

Day 8.40
% 0.25
% 8.65
% 60.14
Mtr 90.00
% 90.00

Day 10.80
% 0.32
% 11.12
% 19.66

Mtr 120.00
% 120.00
Day 10.80
% 0.32
% 11.12
% 25.51

Mtr 180.00
% 180.00

Day 10.80
% 0.32
% 11.12
% 37.21
Mtr 250.00
% 250.00

Day 10.80
% 0.32
% 11.12
% 50.86

No 40.00
% 40.00

Day 8.40
% 0.25
% 8.65
% 9.44
Amount

100,102.22

% 100,102.22

Day 850.00
Day 1,200.00
% 61.50
% 2,111.50
% 19,919.68

Amount
No 1,743.84

% 1,743.84

Day 12.00
% 0.36
% 12.36
% 342.39

Amount

No 75,000.00

% 75,000.00

Day 300.00
% 9.00
% 309.00
% 14,683.50
150,000.00

% 150,000.00

Day 300.00
% 9.00
% 309.00
% 29,308.50

Amount

4,682.97
% 4,682.97

Day 600.00
% 18.00
% 618.00
% 1,030.18

Amount

321.47

% 321.47

Day 53.13
% 1.59
% 54.72
% 73.05
Amount

2,012.39

% 2,012.39

Day 17.00
% 0.51
% 17.51
% 395.73

Amount
1,725.69

% 1,725.69

Day 17.00
% 0.51
% 17.51
% 339.82

16,000.00

% 16,000.00

Day 300.00
% 9.00
% 309.00
% 3,178.50
Amount

No 876.00

% 876.00

Day 24.00
% 0.72
% 24.72
% 175.50
Amount

No 1,593.00

% 1,593.00

Day 24.00
% 0.72
% 24.72
% 315.32

Amount

1,433.00

% 1,433.00

Day 24.00
% 0.72
% 24.72
% 284.12
Amount

No 650.00

% 650.00

Day 24.00
% 0.72
% 24.72
% 131.43

Amount
No 550.00

% 550.00

Day 24.00
% 0.72
% 24.72
% 111.93

Amount

No 750.00

% 750.00

Day 24.00
% 0.72
% 24.72
% 150.93
Amount

No 790.00

% 790.00

Day 24.00
% 0.72
% 24.72
% 158.73

Amount

No 750.00

% 750.00

Day 24.00
% 0.72
% 24.72
% 150.93

Amount

900.00

% 900.00

Day 24.00
% 0.72
% 24.72
% 180.18
Amount

116.00

% 116.00

Day 24.00
% 0.72
% 24.72
% 27.30
Amount

131.00

% 131.00

Day 24.00
% 0.72
% 24.72
% 30.23

Amount

176.00
% 176.00

Day 24.00
% 0.72
% 24.72
% 39.00

Amount

170.00

% 170.00

Day 24.00
% 0.72
% 24.72
% 37.83
Amount

M 500.00

% 500.00

Day 24.00
% 0.72
% 24.72
% 102.18

Amount
30,000.00

% 30,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 6,084.00

Amount

220,000.00

% 220,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 43,134.00

Amount

575,000.00

% 575,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 112,359.00
No 75,000.00
% 75,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 14,859.00

No 85,000.00

% 85,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 16,809.00

No 85,000.00
% 85,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 16,809.00
No 75,000.00
% 75,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 14,859.00

No 85,000.00

% 85,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 16,809.00
No 75,000.00

% 75,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 14,859.00
No 850,000.00

% 850,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 165,984.00

No 75,000.00

% 75,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 14,859.00
No 85,000.00
% 85,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 16,809.00

Amount

No 75,000.00

% 75,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 14,859.00

Amount

No 85,000.00

% 85,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 16,809.00
No 75,000.00
% 75,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 14,859.00

No 85,000.00
% 85,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 16,809.00
300,000.00

% 300,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 58,734.00

Amount

1 No 6,500.00
% 6,500.00

Day 150.00
% 4.50
% 154.50
% 1,296.75

Amount

Rft 36.00

% 36.00

Day 3.00
% 0.09
% 3.09
% 7.61
Amount

Rft 65.00

% 65.00

Day 6.00
% 0.18
% 6.18
% 13.85

Amount

No 2,400.00
% 2,400.00

Day 150.00
% 4.50
% 154.50
% 497.25
Amount

No 65,000.00
% 65,000.00

Day 150.00
% 4.50
% 154.50
% 12,704.25

Amount

No 800.00
% 800.00

Day 75.60
% 2.27
% 77.87
% 170.74
Amount

No 15.00

% 15.00

Day 12.00
% 0.36
% 12.36
% 5.27

Amount

2,676.00

% 2,676.00

Day 1,200.00
% 36.00
% 1,236.00
% 755.82

Amount

35,000.00

% 35,000.00
Day 75.00
% 2.25
% 77.25
% 6,839.63

Amount

250.00

% 250.00

Day 30.00
% 0.90
% 30.90
% 54.60
Amount

Each 1,400.00

% 1,400.00

Day 30.00
% 0.90
% 30.90
% 278.85

Amount

Each 1,200.00

% 1,200.00

Day 30.00
% 0.90
% 30.90
% 239.85
Amount

Each 1,000.00

% 1,000.00

Day 30.00
% 0.90
% 30.90
% 200.85

Amount

Each 800.00

% 800.00

Day 30.00
% 0.90
% 30.90
% 161.85
Amount

Each 750.00

% 750.00

Day 30.00
% 0.90
% 30.90
% 152.10

Amount

Each 600.00

% 600.00

Day 30.00
% 0.90
% 30.90
% 122.85
Amount

Each 500.00

% 500.00

Day 30.00
% 0.90
% 30.90
% 103.35

Amount

Each 1,500.00

% 1,500.00

Day 150.00
% 4.50
% 154.50
% 321.75
15.5.1

Amount

Each 60.00
% 60.00

Day 30.00
% 0.90
% 30.90
% 17.55

Amount

Each 750.00
% 750.00

Day 30.00
% 0.90
% 30.90
% 152.10
Amount

Each 300.00

% 300.00

Day 30.00
% 0.90
% 30.90
% 64.35

Amount

Each 100.00

% 100.00

Day 30.00
% 0.90
% 30.90
% 25.35
Amount

Each 370.00

% 370.00

Day 30.00
% 0.90
% 30.90
% 78.00

Amount

Each 370.00

% 370.00

Day 30.00
% 0.90
% 30.90
% 78.00
Amount

Each 400.00

% 400.00

Day 30.00
% 0.90
% 30.90
% 83.85

Amount

Each 200.00

% 200.00

Day 30.00
% 0.90
% 30.90
% 44.85

Amount

Each 5,000.00

% 5,000.00

Day 150.00
% 4.50
% 154.50
% 1,004.25
Amount

95.00

% 95.00

Day 150.00
% 4.50
% 154.50
% 47.78

Amount
35,000.00

% 35,000.00

Day 150.00
% 4.50
% 154.50
% 6,854.25

Amount

No 650.00

% 650.00

Day 150.00
% 4.50
% 154.50
% 156.00
Amount

Each 35.00

% 35.00

Day 60.00
% 1.80
% 61.80
% 18.53

Amount

Each 45.00

% 45.00

Day 60.00
% 1.80
% 61.80
% 20.48
Amount

Each 50.00

% 50.00

Day 60.00
% 1.80
% 61.80
% 21.45

Amount

Each 65.00

% 65.00

Day 24.00
% 0.72
% 24.72
% 17.36
Amount

Each 45.00
% 45.00

Day 24.00
% 0.72
% 24.72
% 13.46

15.2.4

Amount

Each 40.00
% 40.00

Day 48.00
% 1.44
% 49.44
% 17.16
Amount

Each 180.00
% 180.00

Day 30.00
% 0.90
% 30.90
% 40.95

Amount

Each 20.00
% 20.00

Day 12.00
% 0.36
% 12.36
% 6.24
Amount

Each 80.00
% 80.00

Day 30.00
% 0.90
% 30.90
% 21.45

Amount

Each 30.00
% 30.00
% 5.85
Amount

Each 420.00

% 420.00

Day 30.00
% 0.90
% 30.90
% 87.75

Amount

Each 50.00

% 50.00

Day 24.00
% 0.72
% 24.72
% 14.43
Amount

Each 35.00
% 35.00

Day 24.00
% 0.72
% 24.72
% 11.51

Amount

Each 180.00
% 180.00

Day 24.00
% 0.72
% 24.72
% 39.78
Amount

Each 700.00

% 700.00

Day 24.00
% 0.72
% 24.72
% 141.18

Amount

Each 6,000.00
% 6,000.00

Day 24.00
% 0.72
% 24.72
% 1,174.68
Amount

No 2,500.00
% 2,500.00

Day 30.00
% 0.90
% 30.90
% 493.35

Amount

No 4,000.00
% 4,000.00

Day 30.00
% 0.90
% 30.90
% 785.85
Amount

No 5,000.00
% 5,000.00

Day 30.00
% 0.90
% 30.90
% 980.85

Amount

No 2,500.00
% 2,500.00

Day 30.00
% 0.90
% 30.90
% 493.35
Amount

No 4,000.00
% 4,000.00

Day 30.00
% 0.90
% 30.90
% 785.85

Amount

No 5,000.00
% 5,000.00

Day 30.00
% 0.90
% 30.90
% 980.85
Amount

140.00

% 140.00

Day 30.00
% 0.90
% 30.90
% 33.15

Amount

200.00
% 200.00

Day 30.00
% 0.90
% 30.90
% 44.85

Amount

M 2,000.00

% 2,000.00

Day 30.00
% 0.90
% 30.90
% 395.85
Amount

M 3,500.00

% 3,500.00

Day 30.00
% 0.90
% 30.90
% 688.35

Amount

No 2,000.00

% 2,000.00

Day 24.00
% 0.72
% 24.72
% 394.68
Amount

No 3,000.00

% 3,000.00

Day 24.00
% 0.72
% 24.72
% 589.68

Amount

No 6,000.00

% 6,000.00

Day 24.00
% 0.72
% 24.72
% 1,174.68
Amount

No 9,000.00

% 9,000.00

Day 24.00
% 0.72
% 24.72
% 1,759.68

No 10,000.00

% 10,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 2,184.00

Amount

No 8,000.00

% 8,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 1,794.00
Amount

No 7,500.00

% 7,500.00

Day 1,200.00
% 36.00
% 1,236.00
% 1,696.50

Amount

No 5,000.00

% 5,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 1,209.00
Amount

No 8,000.00

% 8,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 1,794.00

Amount

No 7,500.00

% 7,500.00

Day 1,200.00
% 36.00
% 1,236.00
% 1,696.50
Amount

No 6,500.00

% 6,500.00

Day 1,200.00
% 36.00
% 1,236.00
% 1,501.50

Amount

No 6,000.00
% 6,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 1,404.00

Amount

1 No 5,000.00

62.50 % 5,000.00

1 Day 1,200.00
3.00 % 36.00
18.00 % 1,236.00
19.50 % 1,209.00

Cost Per No: 7,445.00


Cost Per No: 1,470.00
Amount

No 7,000.00

% 7,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 1,599.00

Amount

No 6,800.00

% 6,800.00

Day 1,200.00
% 36.00
% 1,236.00
% 1,560.00
Amount

No 6,500.00

% 6,500.00

Day 1,200.00
% 36.00
% 1,236.00
% 1,501.50

Amount

No 6,000.00

% 6,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 1,404.00

Amount

No 5,000.00

% 5,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 1,209.00

Amount
No 3,000.00

% 3,000.00

Day 600.00
% 18.00
% 618.00
% 702.00

Amount

1 No 1,500.00

% 1,500.00

Day 600.00
% 18.00
% 618.00
% 409.50
Amount

No 750.00

% 750.00

Day 75.00
% 2.25
% 77.25
% 160.88

Amount

No 750.00
% 750.00

Day 75.00
% 2.25
% 77.25
% 160.88
Amount

No 3,000.00

% 3,000.00

Day 300.00
% 9.00
% 309.00
% 643.50

Amount

No 1,000.00
% 1,000.00

Day 300.00
% 9.00
% 309.00
% 253.50
Amount

No 1,500.00
% 1,500.00

Day 600.00
% 18.00
% 618.00
% 409.50

Amount

No 1,000.00

% 1,000.00

Day 300.00
% 9.00
% 309.00
% 253.50
Amount

No 1,500.00

% 1,500.00

Day 600.00
% 18.00
% 618.00
% 409.50

Amount

No 1,000.00

% 1,000.00

Day 300.00
% 9.00
% 309.00
% 253.50
Amount

No 1,500.00

% 1,500.00

Day 600.00
% 18.00
% 618.00
% 409.50

Amount

Per Ltr 300.00


% 300.00

Day 8.84
% 0.27
% 9.11
% 60.22
Amount

No 150,000.00
% 150,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 29,484.00

Amount

No 285,000.00
% 285,000.00

Day 1,200.00
% 36.00
% 1,236.00
% 55,809.00
Amount

No 5,000.00

% 5,000.00

Day 600.00
% 18.00
% 618.00
% 1,092.00

Amount

No 6,000.00

% 6,000.00

Day 600.00
% 18.00
% 618.00
% 1,287.00
Amount

No 8,000.00

% 8,000.00

Day 600.00
% 18.00
% 618.00
% 1,677.00

Amount

No 10,000.00

% 10,000.00

Day 600.00
% 18.00
% 618.00
% 2,067.00
Amount

No 25,000.00

% 25,000.00

Day 300.00
% 9.00
% 309.00
% 4,933.50

Amount

No 25,000.00

% 25,000.00

Day 250.00
% 7.50
% 257.50
% 4,923.75

Amount

No 20,000.00

% 20,000.00

Day 250.00
% 7.50
% 257.50
% 3,948.75
Amount

No 15,000.00

% 15,000.00

Day 250.00
% 7.50
% 257.50
% 2,973.75

Amount

Each 150.00

% 150.00

Day 72.00
% 2.16
% 74.16
% 43.29

16.3.1
Amount

572.00
13,365.00
% 13,937.00

Day 600.00
Day 600.00
Day 600.00
% 54.00
% 1,854.00
% 3,068.72

Amount

2,170.00
% 2,170.00

Day 600.00
% 18.00
% 618.00

Hour 87.13

Hour 8.40
Hour 107.80
% 203.33
% 579.80
16.3.5

Amount

407.50
2,975.00
% 3,382.50

Day 613.56
% 18.41
% 631.97

Hour 190.33

Hour 139.66

Hour 113.52
Hour 49.19
% 492.70
% 875.31

16.3.1

Amount
1,968.75
% 1,968.75

Day 600.00
Day 300.00
% 27.00
% 927.00

Hour 338.10
Job 47.60
Hour 8.40
Hour 107.80
% 501.90
% 657.28

16.3.1

Amount

4,250.00
% 4,250.00

Day 360.00
Day 180.00
% 16.20
% 556.20

Hour 62.79
Job 47.60
Hour 23.52
Hour 120.74
% 254.65
% 983.71
16.3.2

Amount

4,625.00
% 4,625.00

Day 900.00
Day 450.00
% 40.50
% 1,390.50

Hour 62.79
Hour 188.76

each 47.60
Hour 16.80
Hour 172.48
% 488.43
% 1,260.37

16.3.6

Amount
512.60
4,487.50
% 5,000.10

Day 360.00
Day 180.00
% 16.20
% 556.20

Hour 188.76

Each 47.60
Hour 86.90

Hour 59.43

% 382.69
% 1,154.94

Amount

100 Cft 68.64


3,960.00
% 4,028.64

Day 600.00
Day 600.00
% 36.00
% 1,236.00
% 1,019.58
Amount

Bag 165.00
137.73
ft 3,276.88
141.95
160.19
No 738.00

% 4,619.74

Day 80.40
Day 120.60
% 6.03
% 207.03

Hour 170.54

Hour 78.71

Hour 33.31

% 282.56
% 995.14
Amount

96.80
11.44
30.25
32,600.00

1,050.00

% 33,788.49

Day 850.00
% 25.50
% 875.50
% 6,754.51

16.4.3

Amount

Kg 25.00
Kg 476.75
Ltr 817.44
% 1,319.19
Day 120.00
% 3.60
% 123.60

Hour 14.88
Hour 13.73
% 28.61
% 286.22

16.4.4

Amount

Kg 23.32
Kg 238.29
% 261.61

Day 120.00
% 3.60
% 123.60

Hour 7.44
Hour 27.60
% 35.04
% 81.25
16.4.5

Amount

Kg 1,745.91
209.25
% 1,955.16

Day 14.16
% 0.42
% 14.58

Hour 90.75

Hour 18.81
Hour 16.01

% 125.57
% 408.50

16.4.5

Amount

Kg 2,454.70
288.60
% 2,743.30

Day 14.16
% 0.42
% 14.58

Hour 180.29
Hour 29.04
Hour 24.71

% 234.04
% 583.34

16.4.5

Amount

Kg 3,271.23
328.24
% 3,599.47

Day 14.16
% 0.42
% 14.58

Hour 239.58

Hour 35.81
Hour 30.47

% 305.85
% 764.30
Amount

Kg 855.00
93.75
% 948.75

Day 48.00
Day 4.25
% 1.57
% 53.82

Hour 55.66

Hour 18.81
Hour 16.01

% 90.48
% 212.84

Amount

Kg 775.74
75.00
% 850.74
Day 48.00
Day 42.67
% 2.72
% 93.39

Hour 55.66

Hour 18.81
Hour 16.01

% 90.48
% 201.22

3.9.3

Amount

Day 45.30
% 1.36
% 46.66

Hour 752.26
Hour 2,312.49
Hour 1,812.30
% 4,877.06
% 959.86
16.4.13

Amount

141.96
375.43
Kg 82.31
Kg 2,034.05
Ltr 16.86
% 2,650.61

Day 180.00
Day 127.50
Day 42.00
% 10.49
% 359.99

Hour 133.10

Hour 137.50

% 270.60
% 637.79

16.4.13

Amount

213.62
564.93
Kg 13.03
Kg 3,050.64
Ltr 25.22
% 3,867.44

Day 255.00
Day 182.75
Day 63.00
% 15.02
% 515.77

Hour 187.55

Hour 193.75

% 381.30
% 926.15

16.4.13

Amount

283.92
750.86
Kg 17.15
Kg 4,068.09
Ltr 19.06
% 5,139.08

Day 330.00
Day 238.00
Day 84.00
% 19.56
% 671.56

Hour 242.00

Hour 250.00
% 492.00
% 1,225.20

Amount

4,916.34
20,915.01
25,831.35

339.78
240.72
169.92
22.51
772.93

47.60
12,414.46

% 12,462.06
% 7,613.55
Amount

4,916.34
26,143.76
31,060.10

339.78
240.72
169.92
22.51
772.93

47.60
12,414.46

% 12,462.06
% 8,633.15

Amount
Rft 52,600.00
% 52,600.00

Day 4,023.24
Day 12,000.00
Day 2,926.02
% 568.48
% 19,517.74
% 13,952.11

16.8.6 , 25.7.4

Amount

Kg 8,012.40
Ltr 1,604.88
Ft 61,792.50
Pkt 464.10
% 71,873.88

Day 1,098.00
Day 3,870.00
Day 2,400.00
Day 3,150.00
% 315.54
% 10,833.54

Hour 1,331.40
% 1,331.40
% 16,326.04
16.8.15

Amount

Bag 275.00
174.43
68.76
Tonne 976.00
Cft 5.60
Ltr 4.01
% 1,503.80

Day 426.00
Day 1,069.20
Day 206.40
Day 6.00
Day 64.60

Day 66.60
% 55.16
% 1,893.96
% 651.81

16.8.15

Amount

Bag 136.40
31.20
106.58
Tonne 54.90
Cft 16.96
Ltr 4.01
% 350.05

Day 166.80
Day 204.60
Day 62.40
Day 3.60
Day 38.00

Day 8.10
% 14.51
% 498.00
% 162.54

16.8.14

Amount

Bag 180.95
14.56
51.57
Tonne 646.60
Ltr 4.01
% 897.69

Day 122.40
Day 205.80
Day 24.00
Day 47.50

% 11.99
% 411.69
% 252.99

Amount

Bag 4,394.28
100 Cft 768.12
100 Cft 2,031.38
Kg 42,001.46
Kg 16,053.62
No 32.50
Ltr 316.96
% 65,598.31

Day 5,574.00
Day 1,868.40
Day 7,315.35
% 442.73
% 15,200.48
% 15,669.43
Amount

Kg 42,001.46
Kg 16,053.62
% 58,055.08

Day 1,587.06
Day 7,316.08
% 267.09
% 9,170.24
% 13,056.85

Bag 8,839.71
100 Cft 1,536.24
100 Cft 4,062.75
Kg 55,072.63
Kg 29,609.98
Pkt 153.15
% 99,274.47

Day 8,359.80
Day 3,344.40
Day 9,754.82
% 643.77
% 22,102.79
% 23,543.03

Amount

Kg 55,072.63
Kg 29,609.98
% 84,682.61

Day 1,780.62
Day 6,688.80
Day 9,754.82
% 546.73
% 18,770.96
% 20,066.84

16.8.7
Amount

Bag 586.68
Rft 37.45
No 8,220.00

1.85
1.68
% 8,847.66

Day 80.04
Day 340.02
Day 80.04
% 15.00
% 515.10

Hour 170.93

Hour 78.88

Hour 41.69
Hour 197.90
% 489.39

1,918.25

16.8.7
Amount

Bag 880.00
ft 184.31
No 8,540.00

97.86
88.99
% 9,791.16

Day 6.00
Day 5.10
Day 6.00
% 0.51
% 17.61

Hour 25.65

Hour 11.84

Hour 6.25
Hour 29.68
% 73.41

1,926.93

16.8.7
Amount

Bag 165.00
137.73
ft 3,276.88
No 16,600.00

141.95
160.19
% 20,481.74

Day 80.40
Day 1,200.00
Day 80.40
% 40.82
% 1,401.62

Hour 170.54

Hour 78.71

Hour 333.13
Hour 395.50
% 977.87

4,449.98
16.8.7

Amount

Bag 165.00
137.73
ft 3,276.88
No 34,600.00

141.95
160.19
% 38,481.74

Day 40.20
Day 240.00
Day 20.10
% 9.01
% 309.31

Hour 170.54

Hour 78.71

Hour 333.13
Hour 395.50
% 977.87

7,753.18
16.8.7

Amount

Kg 109,033.59
Kg 22,758.77
No 130.00
Ltr 1,524.64
100 Cft 1,893.44
% 135,340.44

Day 1,700.00
Day 2,100.00
Day 1,575.00
% 161.25
% 5,536.25
% 27,439.51

16.8.7

Amount

Kg 249,480.00
Kg 45,517.55
No 130.00
Ltr 3,049.27
100 Cft 2,958.50
% 301,135.32

Day 1,590.00
Day 2,400.00
Day 2,100.00
% 182.70
% 6,272.70
% 59,908.94

16.8.7

Amount

Kg 358,513.22
Kg 68,276.33
No 130.00
Ltr 4,573.91
4,260.24
% 435,753.69

Day 1,650.00
Day 2,700.00
Day 2,362.50
% 201.38
% 6,913.88
% 86,280.91
Amount

Kg 65,667.86
Kg 19,913.93
No 130.00
Ltr 1,524.64
100 Cft 1,893.44
% 89,129.87

Day 1,487.50
Day 1,800.00
Day 1,575.00
% 145.88
% 5,008.38
% 18,328.51

Amount

Sft 52,200.00
% 52,200.00

Day 1,579.39
% 47.38
% 1,626.77
% 10,486.98
Amount

Sft 32,600.00

% 32,600.00

Day 1,579.39
% 47.38
% 1,626.77
% 6,664.98

Amount

Sft 19,800.00

% 19,800.00

Day 1,579.39
% 47.38
% 1,626.77
% 4,168.98

16.8.12

Amount

Each 250.00

% 250.00

Day 210.00
% 6.30
% 216.30
% 89.70

16.8.12

Amount

No 336.00
% 336.00
Day 210.00
% 6.30
% 216.30
% 106.47

Amount

No 444.00

% 444.00

Day 54.00
% 1.62
% 55.62
% 97.11
Amount

No 458.00

% 458.00

Day 54.00
% 1.62
% 55.62
% 99.84

Amount

No 361.00

% 361.00

Day 54.00
% 1.62
% 55.62
% 80.93
Amount

No 370.00

% 370.00

Day 54.00
% 1.62
% 55.62
% 82.68

Amount

No 234.00

% 234.00

Day 54.00
% 1.62
% 55.62
% 56.16
Amount

No 240.00

% 240.00

Day 54.00
% 1.62
% 55.62
% 57.33

Amount
No 458.00

% 458.00

Day 54.00
% 1.62
% 55.62
% 99.84

16.8.12

Amount

No 400.00

% 400.00

Day 26.61
% 0.80
% 27.40
% 83.19

16.8.12
Amount

No 425.00

% 425.00

Day 26.61
% 0.80
% 27.40
% 88.06

16.8.12

Amount

No 375.00

% 375.00

Day 26.61
% 0.80
% 27.40
% 78.31

16.8.12
Amount

No 400.00

% 400.00

Day 26.61
% 0.80
% 27.40
% 83.19

16.8.10

Amount

No 300.00

% 300.00

Day 26.61
% 0.80
% 27.40
% 63.69
16.8.10

Amount

No 325.00

% 325.00

Day 26.61
% 0.80
% 27.40
% 68.56

16.8.10

Amount

No 275.00

% 275.00

Day 26.61
% 0.80
% 27.40
% 58.81
16.8.10

Amount

No 325.00

% 325.00

Day 26.61
% 0.80
% 27.40
% 68.56

Amount

100 Cft 572.00


13,860.00
% 14,432.00

Day 1,200.00
Day 1,590.00
% 83.70
% 2,873.70

Hour 52.50
Hour 375.00
% 427.50
% 3,441.65

16.5.2.2.3
100 Sft

Amount

1 Sft 2,681.80
75.99 % 2,681.80

1 Day 53.13
3.00 % 1.59
4.51 % 54.72
19.50 % 533.31

Per SQM : Rs 351.83


Per SQM : Rs 7.00

Amount

1,793.40
% 1,793.40
Day 1,200.00
% 36.00
% 1,236.00

Hour 21.76

Hour 11.89
Hour 84.90
% 118.55
% 606.83

16.7.2

Amount

Bag 2,612.50
639.86
Rft 31,600.00

% 34,852.36

Day 1,828.80
Day 1,417.32
% 97.38
% 3,343.50

Hour 2,705.57

Hour 952.50
Hour 3,734.65
Hour 4,724.40
% 12,117.13
% 9,792.04
16.7.2

Amount

Bag 3,734.50
843.70
Rft 36,800.00

% 41,378.20

Day 1,860.00
Day 1,590.00
% 103.50
% 3,553.50

Hour 2,705.57

Hour 952.50
Hour 3,811.92
Hour 4,724.40
% 12,194.39
% 11,119.41

16.7.2

Amount
Bag 5,027.00
100 Cft 1,394.90
Rft 48,082.71
% 54,504.61

Day 7,308.00
Day 10,974.00
% 548.46
% 18,830.46
% 14,193.39

16.7.2

Amount

Bag 8,382.00
100 Cft 2,092.48
Rft 65,417.00
% 75,891.48

Day 9,143.88
Day 13,715.40
% 685.78
% 23,545.06
% 19,256.40
16.7.2

Amount

Bag 8,382.00
2,092.48
Rft 65,417.00
% 75,891.48

Day 1,662.60
Day 1,276.20
% 88.16
% 3,026.96

Hour 3,279.47

Hour 1,731.81
Hour 4,026.74
Hour 12,884.84
Hour 625.00
% 22,547.86
% 19,768.74

16.7.2

Amount

Bag 10,103.50
100 Cft 2,798.12
Rft 106,775.00
% 119,676.62

Day 10,972.68
Day 16,459.20
% 822.96
% 28,254.84
% 28,686.16

16.7.2

Amount

Bag 10,103.50
2,798.12
Rft 106,775.00
% 119,676.62

Day 1,662.60
Day 1,329.60
% 89.77
% 3,081.97

Hour 3,279.47

Hour 1,731.81
Hour 6,865.45
Hour 12,884.84
Hour 625.00
% 25,386.57
% 28,870.80
16.7.2

Amount

Bag 11,737.00
100 Cft 3,352.96
Rft 207,500.00
% 222,589.96

Day 12,800.40
Day 19,200.00
% 960.01
% 32,960.41
% 49,645.12

16.7.2

Amount

Bag 11,737.00
3,352.96
Rft 207,500.00
% 222,589.96

Day 1,662.60
Day 1,392.00
% 91.64
% 3,146.24

Hour 3,668.97

Hour 2,040.63
Hour 7,536.88
Hour 15,345.00
Hour 625.00
% 29,216.47
% 49,697.90

Amount

13,414.50
4,193.28
204,750.00
222,357.78

14,628.00
21,945.54
1,097.21
37,670.75
50,491.61

16.7.2

Amount
Bag 13,414.50
4,193.28
Rft 204,750.00
% 222,357.78

Day 3,227.28
Day 1,542.00
% 143.08
% 4,912.36

Hour 3,739.99

Hour 2,286.88
Hour 9,051.83
Hour 16,306.00
Hour 2,500.00
% 33,884.69
% 50,897.29

Amount

15,086.50
5,033.34
236,500.00
256,619.84

16,464.00
24,688.80
1,234.58
42,387.38
58,065.66
16.7.2

Amount

Bag 15,086.50
5,033.34
Rft 236,500.00
% 256,619.84

Day 2,612.52
Day 1,716.00
% 129.86
% 4,458.38

Hour 3,994.45

Hour 2,434.38
Hour 11,468.17
Hour 17,009.70
Hour 2,500.00
% 37,406.69
% 58,179.24
Amount

16,764.00
5,598.32
650,000.00
672,362.32

18,287.88
27,431.40
1,371.58
47,090.86
140,025.91

16.7.2

Amount

Bag 16,764.00
5,598.32
Rft 650,000.00
% 672,362.32

Day 2,676.00
Day 1,788.00
% 133.92
% 4,597.92

Hour 4,080.25

Hour 2,706.25
Hour 13,409.13
Hour 19,375.00
Hour 2,500.00
% 42,070.63
% 140,184.91
16.7.2

Amount

2,860.26
% 2,860.26

Day 560.64
% 16.82
% 577.46

Hour 42.00
Hour 283.11
% 325.11
% 730.47

16.7.3.2.2

Amount

Bag 9,690.67
1,149.78
1,358.09
1,325.62
308.00
Ltr 2,013.63
% 15,845.80

Day 377.52
Day 2,359.74
Day 1,510.20
% 127.42
% 4,374.88

Hour 1,210.33

Hour 165.18

Hour 558.57

Hour 196.63
Hour 700.39
% 2,831.11

4,470.25

Amount
Ft 81,000.00
% 2,430.00
% 83,430.00

Ft 171,000.00
% 171,000.00
% 49,140.00

Amount

Ft 81,000.00
% 2,430.00
% 83,430.00

Ft 150,000.00

% 150,000.00
% 45,045.00
18.1.4.7

Amount

100 Cft 80,799.94


% 80,799.94

Day 2,550.00
% 76.50
% 2,626.50

Hour 10,000.00
Hour 12,500.00
% 22,500.00
% 20,640.74

18.1.4.7

Amount

Tonne 76,625.00

Tonne 20,740.00
M 137,450.80

M3 106,870.79

% 341,686.59

Job 102,000.00

% 102,000.00
% 86,518.88

18.1.4.7

Amount

Tonne 76,625.00

Tonne 20,740.00
M 137,450.80

M3 106,870.79

% 341,686.59

Job 127,500.00

% 127,500.00
% 91,491.38

18.1.4.7
Amount

Tonne 76,625.00

Tonne 20,740.00
M 137,450.80

M3 106,870.79

% 341,686.59

Job 153,000.00

% 153,000.00
% 96,463.88

18.1.4.7

Amount

Tonne 76,625.00

Tonne 20,740.00
M 137,450.80

M3 106,870.79

% 341,686.59

Job 170,000.00

% 170,000.00
% 99,778.88

18.1.4.7

Amount

Tonne 76,625.00

Tonne 20,740.00
M 137,450.80

M3 106,870.79

% 341,686.59

Job 185,000.00

% 185,000.00
% 102,703.88
Amount

Job 185,000.00

% 185,000.00
% 36,075.00

76,625.00

20,740.00
137,450.80

106,870.79

341,686.59

195,000.00

% 195,000.00
% 104,653.88
18.1.4.9

Amount

Ft 171,000.00
% 171,000.00
% 33,345.00

Amount

Ft 153,000.00
% 153,000.00
% 29,835.00
Amount

Ft 170,000.00
% 170,000.00
% 33,150.00

18.1.4.2.3

Amount

Ft 150,000.00

% 150,000.00
% 29,250.00
Amount

Ft 81,000.00
% 2,430.00
% 83,430.00

Ft 153,000.00

% 153,000.00
% 45,630.00

Ft 81,000.00
% 2,430.00
% 83,430.00

Ft 171,000.00
% 171,000.00
% 49,140.00

Amount

Kg 15,000.00
% 15,000.00

Day 956.70
Day 669.29
% 48.78
% 1,674.77
% 3,242.07

16.6.8

Amount

Cubic I 54.00
% 54.00

Day 0.90
% 0.03
% 0.93
% 10.71

16.6.8

Amount

Kg 16,100.00
% 16,100.00

Day 885.84
Day 640.71
Day 640.71
% 65.02
% 2,232.28
% 3,562.12
Amount

Ft 6,600.00
% 6,600.00

Day 868.68

% 26.06
% 894.74
% 1,456.39

Amount

No 650.00
% 650.00

Day 142.50

% 4.28
% 146.78
% 154.54
Amount

Day 292.68
Day 207.32
Day 18.30
% 15.55
% 533.84

Job 103.70
% 103.70
% 121.29

Amount

Day 540.00
Day 270.00

% 24.30
% 834.30

1 Hour 333.00
% 333.00
% 222.89
16.10

Amount

Rft 21,735.00
% 21,735.00

Day 1,097.28
% 32.92
% 1,130.20

Hour 329.72
Hour 3,048.00

% 3,377.72
% 5,110.95

16.10

Amount

Rft 28,245.00
% 28,245.00

Day 1,097.28
% 32.92
% 1,130.20
Hour 329.72
Hour 3,048.00

% 3,377.72
% 6,380.40

16.10

Amount

Rft 32,970.00
% 32,970.00

Day 1,097.28
% 32.92
% 1,130.20

Hour 329.72
Hour 3,048.00

% 3,377.72
% 7,301.77
Amount

No 131.00
% 131.00

Day 150.00
% 4.50
% 154.50

Hour 108.18
% 108.18
% 75.89

Amount

No 113.60
% 113.60

Day 150.00
% 4.50
% 154.50

Hour 108.18
% 108.18
% 72.50
Amount

No 131.00
% 131.00

Day 150.00
% 4.50
% 154.50

Hour 108.18
% 108.18
% 75.89

Amount

No 1,146.00

% 1,146.00

Day 150.00
% 4.50
% 154.50

Hour 108.18
% 108.18
% 273.81
16.11

Amount

No 1,146.00

% 1,146.00

Day 150.00
% 4.50
% 154.50

Hour 108.18
% 108.18
% 273.81

Amount

No 1,146.00

% 1,146.00
Day 150.00
% 4.50
% 154.50

Hour 108.18
% 108.18
% 273.81

Amount

No 1,146.00

% 1,146.00

Day 150.00
% 4.50
% 154.50

Hour 108.18
% 108.18
% 273.81
Amount

Day 600.00
% 18.00
% 618.00

Hour 937.50

% 937.50
% 299.81

Amount

Day 600.00
% 18.00
% 618.00

Hour 625.00
% 625.00
% 238.88
16.5.2.3.10.3

Amount

Bag 275.00
52.00
% 327.00

Day 600.00
Day 274.32

% 26.23
% 900.55

Hour 64.77
% 64.77
% 246.89

16.3.4

Amount

Bag 4,812.50
1,945.26
5,810.32
3,849.78
5,853.61
3,946.54

% 26,218.02

Day 78.42
% 2.35
% 80.77
Hour 337.39

Hour 522.75
Hour 832.46
Hour 899.23

% 2,591.84

5,633.21

16.4.12

Amount

ton 89,000.00
% 89,000.00

Day 199.98
% 6.00
% 205.98

Hour 641.33
Hour 64.10
Hour 1,404.00

% 2,109.43
% 17,805.33
16.4.12

Amount

ton 70,200.00
% 70,200.00

Day 199.98
% 6.00
% 205.98

Hour 641.33
Hour 64.10
Hour 1,404.00

% 2,109.43
% 14,139.33

16.3.4

Amount

Bag 880.00
Ltr 7,750.59
534.80
2,216.80
193.60
165.03
% 11,740.82

Day 611.64
% 18.35
% 629.99

Hour 570.09
Hour 1,096.38

Hour 1,206.50

Hour 54.50
Hour 186.95
Hour 6,343.40
Hour 1,307.02
% 10,764.84

4,507.87
Bag 577.50
52.00
% 629.50

Day 1,200.00
Day 600.00
Day 150.00
Day 600.00
% 76.50
% 2,626.50

Hour 350.00

% 350.00
% 688.25

Amount

kg 947.34
kg 74.56
% 1,021.90

Day 53.13
Day 50.00
% 3.09
% 106.22
Hour 42.50
Hour 30.00
% 72.50
% 233.52

Amount

kg 1,421.00
kg 93.20
% 1,514.20

Day 53.13
Day 50.00
% 3.09
% 106.22

Hour 42.50
Hour 30.00
% 72.50
% 329.52
Amount

kg 1,894.67
kg 130.48
% 2,025.15

Day 53.13
Day 50.00
% 3.09
% 106.22

Hour 42.50
Hour 30.00
% 72.50
% 429.15

Amount

kg 2,368.34
kg 167.76
% 2,536.10

Day 53.13
Day 50.00
% 3.09
% 106.22

Hour 42.50
Hour 30.00
% 72.50
% 528.79

Amount

Bag 81.40
13.52
35.93
% 130.85

Day 50.40
Day 300.00
Day 25.20
Day 39.90

% 12.47
% 427.96

Hour 2.00
% 2.00
% 106.93
Amount

Kg 12,599.50
% 12,599.50

Day 1,200.00
Day 1,200.00
Day 1,050.00
% 103.50
% 3,553.50
% 3,129.65

Amount

Ft 254.00
% 254.00
Day 60.00
Day 60.00
Day 47.50

% 5.03
% 172.53
% 82.19

16.7.4

Amount

Ft 59.10
% 59.10

Day 60.00
Day 30.00
% 2.70
% 92.70
% 29.07
Amount

Cft 3,200.00
% 3,200.00

Day 2,259.60
Day 2,280.00
% 136.19
% 4,675.79
% 1,509.22

Amount

Ft 14,500.00
% 14,500.00

Day 85.00
% 2.55
% 87.55
% 2,844.08
16.3.7

Amount

13,000.00
% 13,000.00

Day 148.62
% 4.46
% 153.08

Hour 385.66
Hour 653.27
Hour 879.61

Hour 154.81
Hour 3,171.20
% 5,244.55
% 3,586.67

16.3.7

Amount

10,868.00
% 10,868.00

Day 148.62
% 4.46
% 153.08

Hour 385.66
Hour 653.27
Hour 879.61

Hour 154.81
Hour 3,171.20
% 5,244.55
% 3,170.93

16.4.7

Amount

65.00
376.38
Kg 2,907.00
No 112.00
% 3,460.38

Day 840.00
% 25.20
% 865.20

Hour 202.07

Hour 66.80
Hour 78.79
% 347.66
% 906.37
16.4.3

Amount

ton 8.06
% 8.06

Day 23.22
% 0.70
% 23.92

Hour 9.17

Hour 29.77
Hour 9.69
Hour 11.90
Hour 173.96

% 234.49
% 51.83

16.4.4

Amount

ton 3.22
% 3.22

Day 9.30
% 0.28
% 9.58

Hour 11.93
Hour 4.77
Hour 69.50

% 86.20
% 19.25

16.4.7

Amount

893.88
329.00
Kg 4,360.50
No 112.00
% 5,695.38

Day 960.00
% 28.80
% 988.80

Hour 274.67

Hour 90.80
Hour 107.10
% 472.57
% 1,389.95
16.4.7

Amount

100 Cft 1,340.82


Kg 6,498.00
No 112.00
% 7,950.82

Day 1,320.00
% 39.60
% 1,359.60

Hour 476.74

Hour 157.60
Hour 185.84
% 820.18
% 1,967.75
Amount

172.59
Kg 2,223.00
No 112.00
% 2,507.59

Day 9.00
Day 22.74
% 0.95
% 32.69

Hour 145.20

Hour 48.00

% 193.20
% 532.84

Amount

Rft 2,306.00
% 2,306.00

Day 90.00
% 2.70
% 92.70
% 467.22
3.9.6.2

Amount

2,600.00
% 2,600.00

Day 1,200.00
Day 120.00
Day 88.80
% 42.26
% 1,451.06

Hour 151.49
% 151.49
% 811.26

Amount
100 Cft 19,687.50
% 19,687.50

Day 1,800.00
Day 120.00
Day 88.80
% 60.26
% 2,069.06

Hour 605.00

Hour 384.50

% 989.50
% 4,423.73

16.4.15

Amount

Day 36.00
% 1.08
% 37.08

Hour 38.45

1 Hour 469.08

% 507.53
% 105.99
16.4.15

Amount

Day 24.00
% 0.72
% 24.72

Hour 30.76

1 Hour 364.84

% 395.60
% 81.82

16.4.15

Amount

Day 30.00
% 0.90
% 30.90

Hour 30.76

1 Hour 364.84

% 395.60
% 82.99
16.4.5.3.9

Amount

25.78
Kg 342.97
Kg 538.65
% 907.41

Day 216.00
Day 25.50
% 7.25
% 248.75

Hour 96.80

Hour 12.00
Hour 22.26
% 131.06
% 249.59
Amount

100 Cft 4,936.28


Kg 685.94
Kg 24,367.50
% 29,989.72

Day 3,000.00
Day 850.00
% 115.50
% 3,965.50

Hour 605.98
Hour 625.00
% 1,230.98
% 6,838.79

Amount

Day 300.00
Day 85.00
% 11.55
% 396.55
% 75.08
Amount

Day 750.00
Day 21.25
Day 370.00
% 34.24
% 1,175.49

Hour 302.50

Hour 192.25

% 494.75
% 319.02

Amount

Bag 489.50
100 Cft 88.40
No 14,500.00
% 15,077.90

Day 1,200.00
Day 900.00
Day 300.00
% 72.00
% 2,472.00
% 3,408.19

Amount

Bag 489.50
100 Cft 88.40
No 11,400.00

% 11,977.90

Day 1,200.00
Day 900.00
Day 300.00
% 72.00
% 2,472.00
% 2,803.69
Amount

Bag 489.50
100 Cft 88.40
No 10,800.00

% 11,377.90

Day 1,200.00
Day 900.00
Day 300.00
% 72.00
% 2,472.00
% 2,686.69

24.2.2

Amount

Day 9.00
Day 4.25
% 0.40
% 13.65

Hour 75.00
% 75.00
% 17.21

24.2.2

Amount

Day 9.00
Day 4.25
% 0.40
% 13.65

Hour 150.00

% 150.00
% 31.83

Amount
Sft 2,275.00

% 2,275.00

Day 330.00
% 9.90
% 339.90
% 507.98

Amount

Sft 3,048.50

% 3,048.50

Day 439.80
% 13.19
% 452.99
% 680.22
Amount

Sft 2,150.00

% 2,150.00

Day 330.00
% 9.90
% 339.90
% 483.60

Amount

Sft 2,881.00

% 2,881.00

Day 439.98
% 13.20
% 453.18
% 647.59
Amount

Sft 775.00

% 775.00

Day 330.00
% 9.90
% 339.90
% 215.48

Amount

Sft 1,038.50

% 1,038.50
Day 439.80
% 13.19
% 452.99
% 288.27

Amount

Sft 675.00

% 675.00

Day 330.00
% 9.90
% 339.90
% 195.98
Amount

Sft 904.50

% 904.50

Day 439.80
% 13.19
% 452.99
% 262.14

16.8.9

Amount

Kg 12,833.34
100 Cft 465.76
100 Cft 12,636.38

% 25,935.48

Day 3,000.00
% 90.00
% 3,090.00

Hour 5,936.16
% 5,936.16
% 6,799.97
Amount

390.00
3,000.00
% 3,390.00

Day 300.00
Day 900.00
% 36.00
% 1,236.00

Hour 1,210.00

% 1,210.00
% 1,131.00

Amount
100 Cft 130.00
Cft 4,580.00

% 4,710.00

Day 3,600.00
Day 1,200.00
% 144.00
% 4,944.00

Hour 52.50
Hour 375.00
% 427.50
% 1,937.81

16.9.4
Per Cut

Amount

1 Days 96.00
3.00 % 2.88
30.81 % 98.88

1 Hour 171.54

49.69 % 171.54
19.50 % 52.17

Cost Per Per Cut: 322.59


Cost Per Per Cut: 117.60
16.2.1.1.6,
16.4.13.3.3 ,
100 Cft 16.6.13.3.8

Amount

100 Cft 4,936.28


1 Kg 24,367.50
55.67 % 29,303.78

1 Day 303.60
1 Day 215.05
1 Day 138.00
3.00 % 19.70
4.25 % 676.35

1 Tonne 10,834.11

20.58 % 10,834.11
19.50 % 7,954.94

Per CUM : Rs 17,222.69


Per CUM : Rs 284.07

Amount

Set 11,400.00

% 11,400.00
Day 142.50

% 4.28
% 146.78
% 2,250.79

Amount

Set 9,120.00

% 9,120.00

Day 113.05

% 3.39
% 116.44
% 1,800.44
Amount

Set 7,000.00

% 7,000.00

Day 71.25

% 2.14
% 73.39
% 1,378.89

Amount

Set 7,800.00

% 7,800.00

Day 89.11

% 2.67
% 91.78
% 1,538.38
Amount

Set 5,000.00

% 5,000.00

Day 53.49

% 1.60
% 55.09
% 985.43

Amount

Set 4,500.00

% 4,500.00
Day 41.61

% 1.25
% 42.86
% 885.61

Amount

Set 3,200.00

% 3,200.00

Day 23.75

% 0.71
% 24.46
% 628.63

16.6.7
Amount

Rft 75.00

% 75.00

Day 8.65

% 0.26
% 8.90
% 16.31

16.6.7

Amount

Rft 65.00

% 65.00

Day 6.74

% 0.20
% 6.95
% 13.99
16.6.7

Amount

Rft 35.00

% 35.00

Day 5.32

% 0.16
% 5.48
% 7.86

16.6.7

Amount

Rft 32.00

% 32.00

Day 4.27
% 0.13
% 4.40
% 7.07

16.6.7

Amount

Rft 30.00

% 30.00

Day 3.61

% 0.11
% 3.72
% 6.55

16.6.7

Amount
Rft 29.00

% 29.00

Day 2.47

% 0.07
% 2.54
% 6.14

16.6.7

Amount

Rft 26.00

% 26.00

Day 1.43

% 0.04
% 1.47
% 5.35
16.6.7.3.9

Amount

Day 540.00
Day 180.00

% 21.60
% 741.60

Hour 3,400.00
% 3,400.00
% 803.40

Amount

Day 360.00
Day 144.00

% 15.12
% 519.12

Hour 2,380.00
% 2,380.00
% 562.38
16.6.7.3.9

Amount

Day 240.00
Day 108.00

% 10.44
% 358.44

Hour 1,785.00
% 1,785.00
% 415.93

159,000.00
% 159,000.00
% 31,005.00

Amount

Kg 118,000.00
% 118,000.00
% 23,010.00

Amount

Tonne 91,000.00
% 91,000.00
% 17,745.00

16.6.7

Amount

Rft 218.00

% 218.00

Day 8.65

% 0.26
% 8.90
% 44.20

16.6.7

Amount
Rft 210.00

% 210.00

Day 6.74

% 0.20
% 6.95
% 42.27

16.6.7

Amount

Rft 187.00

% 187.00

Day 5.32

% 0.16
% 5.48
% 37.50
16.6.7

Amount

Rft 148.00

% 148.00

Day 4.27

% 0.13
% 4.40
% 29.69

16.6.7

Amount

Rft 134.00

% 134.00

Day 3.61

% 0.11
% 3.72
% 26.83
16.6.7

Amount

Rft 127.00

% 127.00

Day 2.47

% 0.07
% 2.54
% 25.25

16.6.7

Amount

Rft 112.20
% 112.20

Day 1.43

% 0.04
% 1.47
% 22.16

Amount

Sft 1,531.20

Kg 8,636.00
100 Cft 1,399.12
100 Cft 5,688.84
% 17,255.16

Day 1,800.00
Day 750.00
% 76.50
% 2,626.50
% 3,862.01
Amount

1 Sft 1,684.32

1 Kg 6,540.50
100 Cft 1,049.79
100 Cft 3,718.24
64.79 % 12,992.85

1 Day 1,800.00
1 Day 750.00
3.00 % 76.50
15.71 % 2,626.50
19.50 % 3,030.86

Per Meter : Rs 7,646.59


Per Meter : Rs 1,280.74

16.8.4

Amount

1 Rft 742.40
% 742.40

Day 13.80
Day 25.20
% 1.17
% 40.17
% 152.37

16.8.4

Amount

1 Rft 2,690.00

% 2,690.00

Day 18.00
Day 31.50
% 1.49
% 50.99
% 534.20

16.8.4

Amount

Kg 3,658.50
% 3,658.50

Day 120.00
% 3.60
% 123.60

Hour 74.20
Hour 307.60

% 381.80
% 811.26

16.8.5

Amount

Bag 119.13
10.66
Kg 363.93
10.08
5.87
Ltr 40.77
% 550.44

Day 17.04
Day 93.42
Day 17.04
Day 3.68
% 3.94
% 135.11

Hour 36.29

Hour 8.40
Hour 6.83
Hour 4.44
% 55.96

143.83

16.8.5.2.2

Amount

Bag 119.13
10.66
Kg 363.93
10.08
5.87
Ltr 40.77
% 550.44

Day 17.04
Day 93.42
Day 17.04
Day 3.68
% 3.94
% 135.11

Hour 36.29
Hour 8.40

Hour 4.44

142.50

Amount

34,288.07
4,563.26

38,851.33

339.60
240.55
169.80
22.50
772.45

11,637.99
% 11,637.99
% 9,991.66

Amount

1,406.39
187.17

1,593.56

13.92
9.86
6.96
0.92
31.66

477.40

% 477.40
% 409.83
17.3.1, 17.3.3

Amount

Day 369.60
Day 158.40
% 15.84
% 543.84
% 102.96

17.3.1, 17.3.3

Amount

Day 480.00
Day 240.00
% 21.60
% 741.60
% 140.40
17.2.5

Amount

Bag 275.00
360.00
% 635.00

Day 480.00
Day 720.00
Day 240.00
% 43.20
% 1,483.20
% 404.63

17.2.5

Amount

Bag 187.00
84.00
% 271.00

Day 316.80
Day 480.00
Day 240.00
% 31.10
% 1,067.90
% 255.02
17.2.5

Amount

Bag 187.00
84.00
% 271.00

Day 480.00
Day 600.00
Day 240.00
% 39.60
% 1,359.60
% 310.25

17.2.5

Amount

Bag 907.50
234.00
% 1,141.50

Day 480.00
Day 600.00
Day 240.00
% 39.60
% 1,359.60
% 479.99

17.2.5

Amount

Bag 907.50
234.00
% 1,141.50

Day 720.00
Day 720.00
Day 240.00
% 50.40
% 1,730.40
% 550.19

17.2.5

Amount

Bag 390.50
50.00
% 440.50
Day 480.00
Day 240.00
% 21.60
% 741.60
% 226.30

17.2.5

Amount

Bag 390.50
50.00
% 440.50

Day 600.00
Day 750.00
Day 300.00
% 49.50
% 1,699.50
% 407.65
Amount

Bag 1,892.00
100 Cft 514.00
16,800.00
% 19,206.00

Day 3,000.00
Day 3,000.00
Day 450.00
% 193.50
% 6,643.50
% 5,002.92

Amount

Bag 1,892.00
100 Cft 514.00
16,800.00
% 19,206.00

Day 3,300.00
Day 3,600.00
Day 450.00
% 220.50
% 7,570.50
% 5,178.42
Amount

Bag 3,300.00
100 Cft 450.00
16,800.00
% 20,550.00

Day 3,000.00
Day 3,000.00
Day 450.00
% 193.50
% 6,643.50
% 5,265.00
Amount

Bag 3,300.00
100 Cft 450.00
16,800.00
% 20,550.00

Day 3,300.00
Day 3,600.00
Day 450.00
% 220.50
% 7,570.50
% 5,440.50

Amount

Bag 1,892.00
100 Cft 514.00
13,365.00
% 15,771.00

Day 3,000.00
Day 3,000.00
Day 450.00
% 193.50
% 6,643.50
% 4,333.10
Amount

Bag 1,892.00
100 Cft 514.00
13,365.00
% 15,771.00

Day 3,300.00
Day 3,600.00
Day 450.00
% 220.50
% 7,570.50
% 4,508.60

Amount

Bag 3,300.00
100 Cft 450.00
13,365.00
% 17,115.00

Day 3,000.00
Day 3,000.00
Day 450.00
% 193.50
% 6,643.50
% 4,595.18

Amount

Bag 3,300.00
100 Cft 450.00
13,365.00
% 17,115.00

Day 3,300.00
Day 3,600.00
Day 450.00
% 220.50
% 7,570.50
% 4,770.68
Amount

Bag 9,691.00
100 Cft 880.00
100 Cft 2,895.20
% 13,466.20

Day 1,200.00
Day 3,600.00
Day 300.00
% 153.00
% 5,253.00
% 3,620.41

Amount

Bag 7,150.00
100 Cft 920.00
100 Cft 3,026.80
% 11,096.80

Day 1,200.00
Day 3,600.00
Day 300.00
% 153.00
% 5,253.00
% 3,158.38

Amount

Bag 4,950.00
100 Cft 960.00
100 Cft 3,158.40
% 9,068.40

Day 1,200.00
Day 3,600.00
Day 300.00
% 153.00
% 5,253.00
% 2,762.84
Amount

Bag 9,691.00
100 Cft 880.00
100 Cft 2,895.20
% 13,466.20

Day 1,500.00
Day 4,200.00
Day 300.00
% 180.00
% 6,180.00
% 3,795.91

Amount

Bag 7,150.00
100 Cft 920.00
100 Cft 3,026.80
% 11,096.80

Day 1,500.00
Day 4,200.00
Day 300.00
% 180.00
% 6,180.00
% 3,333.88

Amount

Bag 4,950.00
100 Cft 960.00
100 Cft 3,158.40
% 9,068.40

Day 300.00
Day 1,500.00
Day 4,200.00
% 180.00
% 6,180.00
% 2,938.34
Amount

Bag 4.57
1.67
RFT 168.30

% 174.53

Day 36.00
Day 24.00
% 1.80
% 61.80
% 45.73
Amount

Bag 7.15
2.50
RFT 191.10

% 200.75

Day 42.00
Day 27.00
% 2.07
% 71.07
% 52.60

Amount

11.00
3.40
226.50

% 240.90

Day 48.00
Day 30.00
% 2.34
% 80.34
% 62.19

Amount

16.50
5.00
288.30

% 309.80

Day 60.00
Day 36.00
% 2.88
% 98.88
% 79.13
Amount

Bag 22.00
7.00
RFT 298.20

% 327.20

Day 72.00
Day 42.00
% 3.42
% 117.42
% 86.03

Amount

Bag 30.25
10.00
RFT 383.40

% 423.65

Day 90.00
Day 54.00
% 4.32
% 148.32
% 110.69

18.1.4.1.3

Amount

Day 262.50
% 7.88
% 270.38
% 51.19

18.1.4.1.3

Amount
Day 393.75
% 11.81
% 405.56
% 76.78

18.1.4.1

Amount

Day 9.60
Day 17.00
% 0.80
% 27.40
% 5.19

18.1.4.1

Amount

Day 9.60
Day 27.20
% 1.10
% 37.90
% 7.18

18.1.4.1

Amount

Day 9.60
Day 28.90
% 1.16
% 39.66
% 7.51

18.1.4.1.3

Amount

Day 132.00
Day 145.80
% 8.33
% 286.13
% 54.17
18.1.4.1.3

Amount

Day 34.65
% 1.04
% 35.69
% 6.76

18.1.4.1.3

Amount

Day 2,628.00
Day 7,437.50
Day 1,314.00
% 341.39
% 11,720.89
% 2,219.00
18.1.4.1.3

Amount

Day 2,400.00
Day 2,040.00
Day 480.00
% 147.60
% 5,067.60
% 959.40

18.1.4.1.3

Amount

Day 2,400.00
Day 3,400.00
Day 480.00
% 188.40
% 6,468.40
% 1,224.60
18.1.4.1.3

Amount

Day 3,360.00
Day 4,760.00
Day 480.00
% 258.00
% 8,858.00
% 1,677.00

18.1.4.1

Amount

Day 3,474.72
Day 8,186.94
Day 1,152.12
% 384.41
% 13,198.20
% 2,498.69
18.3.3

Amount

Day 259.80
% 7.79
% 267.59
% 50.66

18.1.4.1.3

Amount

Day 1,444.74
Day 3,393.96
Day 475.50
% 159.43
% 5,473.63
% 1,036.27

18.1.4.1.3
Amount

Day 9,367.80
Day 22,189.25
Day 3,121.80
% 1,040.37
% 35,719.22
% 6,762.38

18.1.4.1.3

Amount

Day 8,922.00
Day 21,132.70
Day 2,973.60
% 990.85
% 34,019.15
% 6,440.52
5,000.00

% 5,000.00
% 975.00

Amount

Day 912.00
% 27.36
% 939.36
% 177.84
Amount

Day 2,160.00
% 64.80
% 2,224.80
% 421.20

Amount

No 30.00

% 30.00

Day 48.60
% 1.46
% 50.06
% 15.33
Amount

No 30.00

% 30.00

Day 60.60
% 1.82
% 62.42
% 17.67

Amount

No 90.00
% 90.00

Day 48.60
% 1.46
% 50.06
% 27.03
Amount

No 90.00
% 90.00

Day 60.60
% 1.82
% 62.42
% 29.37

Amount

No 49.00
% 49.00

Day 194.40
% 5.83
% 200.23
% 47.46

Amount

No 49.00

% 49.00

Day 242.40
% 7.27
% 249.67
% 56.82
Amount

No 150.00

% 150.00

Day 194.40
% 5.83
% 200.23
% 67.16

Amount

No 150.00

% 150.00

Day 242.40
% 7.27
% 249.67
% 76.52
Amount

Day 246.00
% 7.38
% 253.38
% 47.97

Amount

Day 186.00
% 5.58
% 191.58
% 36.27
Amount

Day 20.40
% 0.61
% 21.01
% 3.98

Amount

Day 984.00
% 29.52
% 1,013.52
% 191.88
Amount

Day 744.00
% 22.32
% 766.32
% 145.08

Amount

Day 81.60
% 2.45
% 84.05
% 15.91
Amount

Day 660.00
% 19.80
% 679.80
% 128.70

Amount

Day 1,050.00
% 31.50
% 1,081.50
% 204.75
Amount

Day 1,254.00
% 37.62
% 1,291.62
% 244.53

Amount

Kg 42.77
% 42.77

Day 870.00
% 26.10
% 896.10
% 177.99
Amount

Day 1,170.00
% 35.10
% 1,205.10
% 228.15

Amount

Day 720.00
% 21.60
% 741.60
% 140.40
Amount

Day 1,737.60
% 52.13
% 1,789.73
% 338.83

19.2.2 , 19.3.2

Amount

Day 1,161.60
% 34.85
% 1,196.45
% 226.51
19.2.2 , 19.3.3

Amount

Day 1,372.80
% 41.18
% 1,413.98
% 267.70

Amount

Kg 51.58
% 51.58

Day 150.00
% 4.50
% 154.50
% 39.31
Amount

Kg 672.00
% 672.00

Day 450.00
Day 787.50
% 37.13
% 1,274.63
% 372.35

Amount

Kg 2,088.17
% 2,088.17

Day 450.00
Day 787.50
% 37.13
% 1,274.63
% 648.51

19.3.4.9

Amount

Kg 2,378.80
% 2,378.80

Day 450.00
Day 787.50
% 37.13
% 1,274.63
% 705.18

Amount

Kg 517.44
% 517.44
Day 540.00
Day 945.00
% 44.55
% 1,529.55
% 390.48

Amount

Kg 1,606.78
% 1,606.78

Day 540.00
Day 945.00
% 44.55
% 1,529.55
% 602.90

19.3.4.9
Amount

Kg 3,103.84
% 3,103.84

Day 540.00
Day 945.00
% 44.55
% 1,529.55
% 894.82

Amount

Kg 777.84
% 777.84

Day 600.00
Day 1,050.00
% 49.50
% 1,699.50
% 473.43
Amount

Kg 2,410.17
% 2,410.17

Day 600.00
Day 1,050.00
% 49.50
% 1,699.50
% 791.73

19.3.4.9

Amount

Kg 3,567.44
% 3,567.44

Day 600.00
Day 1,050.00
% 49.50
% 1,699.50
% 1,017.40
Amount

100 Cft 3,438.00


% 3,438.00

Day 600.00
% 18.00
% 618.00
% 787.41

Amount

100 Cft 3,800.00


% 3,800.00

Day 1,200.00
% 36.00
% 1,236.00
% 975.00

Amount

100 Cft 1,520.00


% 1,520.00

Day 1,200.00
% 36.00
% 1,236.00
% 530.40

Amount
100 Cft 3,438.00
% 3,438.00

Day 1,200.00
% 36.00
% 1,236.00
% 904.41

Amount

100 Cft 4,000.00


% 4,000.00

Day 900.00
% 27.00
% 927.00
% 955.50
Amount

1,520.00
% 1,520.00

Day 600.00
Day 1,700.00
% 69.00
% 2,369.00
% 744.90