Analysis 2020 2001 3000
Analysis 2020 2001 3000
Analysis 2020 2001 3000
Item Name : G.I. water pipes (cold and hot water, in ducts & in exposed condition)
Conforming to BS-1387 (1985), Medium Grade, I/c all fittings, wraping
glasswool thermal insulation with aluminium vapour barrier, making
holes in concrete or masonry and then repairing holes, supports and
hangers etc. of approved make of the following diameters, complete in
all respects:
(c) 1-1/2 inch
Detail Qty Unit
MATERIAL
Thermal Insulation tape 0.1 No.
Size 40 mm (1-1/2") 1.05 Rft
LABOUR
Mason 0.05 Day
Labourer 0.05 Day
Plumber 0.05 Day
Sundries (Labour Only):
2,001
Item Name : G.I. water pipes (in burried conditions) conforming to BS-1387, Medium
Grade, I/c all fittings, wraping polythene tape, giving anticorrosion
treatment, applying protective painting, making holes in concrete or
masonry and then repairing holes, flushing, disinfecting, testing and
commissioning etc. of approved make, of the following
diameters,complete in all respects.
3/4" (20 mm) Nominal Pipe Size (NPS)
LABOUR
Labourer 0.0057 Day
Painter / Polisher 0.006 Day
Plumber 0.0039 Day
Sundries (Labour Only):
2,002
Item Name : G.I. water pipes (in burried conditions) conforming to BS-1387, Medium
Grade, I/c all fittings, wraping polythene tape, giving anticorrosion
treatment, applying protective painting, making holes in concrete or
masonry and then repairing holes, flushing, disinfecting, testing and
commissioning etc. of approved make, of the following
diameters,complete in all respects.
1" ( 25 mm) Nominal Pipe Size (NPS)
LABOUR
Labourer 0.0057 Day
Painter / Polisher 0.006 Day
Plumber 0.0039 Day
Sundries (Labour Only):
2,003
Item Name : G.I. water pipes (in burried conditions) conforming to BS-1387, Medium
Grade, I/c all fittings, wraping polythene tape, giving anticorrosion
treatment, applying protective painting, making holes in concrete or
masonry and then repairing holes, flushing, disinfecting, testing and
commissioning etc. of approved make, of the following
diameters,complete in all respects.
1¼" ( 32 mm) Nominal Pipe Size (NPS)
LABOUR
Labourer 0.0067 Day
Painter / Polisher 0.0065 Day
Plumber 0.0043 Day
Sundries (Labour Only):
2,004
Item Name : G.I. water pipes (in burried conditions) conforming to BS-1387, Medium
Grade, I/c all fittings, wraping polythene tape, giving anticorrosion
treatment, applying protective painting, making holes in concrete or
masonry and then repairing holes, flushing, disinfecting, testing and
commissioning etc. of approved make, of the following
diameters,complete in all respects.
'1½" (40 mm) Nominal Pipe Size (NPS)
LABOUR
Labourer 0.0067 Day
Painter / Polisher 0.007 Day
Plumber 0.0043 Day
Sundries (Labour Only):
2,005
Item Name : uPVC Multi Floor Trap (110x75mm) including strainer; supports; making
required number of connections; breaking concrete or masonry work &
then making it good; etc.
MATERIAL
uPVC Multi Floor Trap 1 Each
(110 x 75mm)
LABOUR
Mason 0.1 Day
Labourer 0.1 Day
Plumber 0.1 Day
Sundries (Labour Only):
2,006
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : uPVC floor Cleanout including 2 No. 45o elbows, transition pipe, SS
screwed plug/cover assembly jointed air-tight with pipe, breaking
concrete or masonry work & then making it good, etc. complete in all
respects.
(i) 3" dia
LABOUR
Mason 0.1 Day
Labourer 0.1 Day
Plumber 0.1 Day
Sundries (Labour Only):
2,007
Item Name : uPVC floor Cleanout including 2 No. 45o elbows, transition pipe, SS
screwed plug/cover assembly jointed air-tight with pipe, breaking
concrete or masonry work & then making it good, etc. complete in all
respects.
(ii) 4" dia
LABOUR
Mason 0.1 Day
Labourer 0.1 Day
Plumber 0.1 Day
Sundries (Labour Only):
2,008
Item Name : Supply & installation of cast iron roof drain, including strainer,
flashing material, and all accessories for complete installation, as
per specifications.
4 inches dia
LABOUR
Labourer 0.06 Day
Plumber 0.06 Day
Sundries (Labour Only):
2,009
LABOUR
Plumber 0.01 Day
Sundries (Labour Only):
2,010
LABOUR
Plumber 0.01 Day
Sundries (Labour Only):
2,011
Item Name : Brass/Bronze swing type check valves on water supply pipes, conforming
to BS standards, including jointing arrangement of pipes on both ends
of valves; nuts, bolts etc. complete in all respects, of following
internal diameters.
(i) 1-1/4 "
LABOUR
Plumber 0.01 Day
Sundries (Labour Only):
2,012
Item Name : Air relief valves, of approved quality including jointing arrangement
with pipe; nuts, bolts etc. complete in all respects.
(i) 3/4 "
MATERIAL
Air relief valves 3/4" 1.02 No
LABOUR
Plumber 0.02 Day
Sundries (Labour Only):
2,013
LABOUR
Plumber 0.01 Day
Sundries (Labour Only):
2,014
Item Name : Suppling and fixing of bell mouth with collar including testing of
joint, complete in all respects as specified. 3" dia
LABOUR
Labourer 0.1 Day
Fitter Sewerage / Gas 0.1 Day
Pipe Fitter / Fitter II
Sundries (Labour Only):
2,015
Item Name : Suppling and fixing of bell mouth with collar including testing of
joint, complete in all respects as specified. 4" dia
LABOUR
Labourer 0.1 Day
Fitter Sewerage / Gas 0.1 Day
Pipe Fitter / Fitter II
Sundries (Labour Only):
2,016
Item Name : Supplying and fixing of Dry Chemical Powder Fire Extinguisher 6Kg
Capacity complete in all respect
LABOUR
Labourer 0.0625 Day
Sundries (Labour Only):
2,017
Item Name : Supplying and fixing of Foam Type fire extinguishers capacity 12 liters
complete in all respect
Detail Qty
MATERIAL
Foam Type fire 1
extinguishers 12 litre
capacity
LABOUR
Labourer 0.0625
Sundries (Labour Only):
2,018
Item Name : Providing & Laying 150 Micron thick Polythene Sheet as per instructions
of the Engineer-in-Charge, Complete in all respects.
LABOUR
Labourer 0.18 Day
Sundries (Labour Only):
2,019
DESCRIPTION OF ITEM :
LABOUR
Labourer 0.2 Day
Pipe Fitter 0.2 Day
Sundries (Labour Only):
2,020
Item Name : Provifing and fixing of teek wood water level gauge of approved quality
complete in all repects.
LABOUR
Labourer 0.2 Day
Sundries (Labour Only):
2,021
Item Name : Providing and fixing sluice valve of BSS quality (BS 5163) and weight
Class 'B' for Cast Iron & AC pipe line (including cost of jointing
material):-
a) 2.5" (75 mm) dia of Valve
LABOUR
Labourer 0.2 Day
Pipe Fitter 0.2 Day
Sundries (Labour Only):
2,022
DESCRIPTION OF ITEM :
LABOUR
Plumber 0.1 Day
Sundries (Labour Only):
2,023
DESCRIPTION OF ITEM :
Item Code : 14-177-b
Item Name : Providing and Fixing Wall Shower Set 4021/4023 C.P
Detail Qty Unit
MATERIAL
Wall Shower Set 4021/4023 1 No
C.P
LABOUR
Plumber 0.1 Day
Sundries (Labour Only):
2,024
DESCRIPTION OF ITEM :
LABOUR
Plumber 0.1 Day
Sundries (Labour Only):
2,025
DESCRIPTION OF ITEM :
LABOUR
Plumber 0.1 Day
Sundries (Labour Only):
2,026
Item Name : Supply and Erection MS conduit pipe for wiring purpose comp. on surface
including clamps etc: 1/2" i/d
Detail Qty
MATERIAL
MS CONDUIT (1/2") 1
Inspection Box for MS 0.03
CONDUIT (1/2")
Clamp for pipe 1/2" -1.5" 0.305
M.S. Bend ½" dia 0.0476
Screw for inspection Box 1
Gutties for inspection 1
Box
LABOUR
Electrician 0.012
Sundries (Labour Only):
2,027
Item Name : Supply and Erection MS conduit pipe for wiring purpose comp. On surface
including clamps etc: 3/4" i/d
Detail Qty
MATERIAL
Clamp for pipe 1/2" -1.5" 0.305
Screw for inspection Box 1
Gutties for inspection 1
Box
MS Conduit 3/4" 1
M.S. Bend ¾" 0.0476
Inspection Box MS CONDUIT 0.03
(3/4" - 1.5")
LABOUR
Electrician 0.012
Sundries (Labour Only):
2,028
Item Name : Supply and Erection MS conduit pipe for wiring purpose comp. On surface
including clamps etc: 1" i/d
Detail Qty
MATERIAL
Clamp for pipe 1/2" -1.5" 0.305
Screw for inspection Box 1
Gutties for inspection 1
Box
Inspection Box MS CONDUIT 0.03
(3/4" - 1.5")
MS Conduit 1" 1
M.S. Bend 1" dia 0.0476
LABOUR
Electrician 0.012
Sundries (Labour Only):
2,029
Item Name : Supply and Erection MS conduit pipe for wiring purpose comp. On surface
including clamps etc: 1.25" i/d
Detail Qty
MATERIAL
Clamp for pipe 1/2" -1.5" 0.305
Screw for inspection Box 1
Gutties for inspection 1
Box
Inspection Box MS CONDUIT 0.03
(3/4" - 1.5")
M.S. Conduit 1.25" 1
M.S. Conduit Bend 1¼" dia 0.0476
LABOUR
Electrician 0.012
Sundries (Labour Only):
2,030
Item Name : Supply and Erection MS conduit pipe for wiring purpose comp. On surface
including clamps etc: 1.5" i/d
Detail Qty
MATERIAL
Clamp for pipe 1/2" -1.5" 0.305
Screw for inspection Box 1
Gutties for inspection 1
Box
Inspection Box MS CONDUIT 0.03
(3/4" - 1.5")
1.5" MS CONDUIT 1
M.S. Bend 1½" dia 0.0476
LABOUR
Electrician 0.012
Sundries (Labour Only):
2,031
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Supply and Erection MS conduit pipe for wiring purpose comp. On surface
including clamps etc: 2" i/d
Detail Qty
MATERIAL
Screw for inspection Box 1
Gutties for inspection 1
Box
2" MS CONDUIT 1
M.S. Conduit Bend 2" dia 0.0476
Inspection Box for MS 0.03
CONDUIT (2")
Clamp for pipe 2" dia 0.305
LABOUR
Electrician 0.012 Day
Sundries (Labour Only):
2,032
Item Name : Supply and Erection MS conduit pipe for wiring purpose comp.
Recessed in walls including chase etc : 1/2" i/d
Detail Qty
MATERIAL
Ordinary Portland Cement 0.0022
Fine Sand 0.0123
MS CONDUIT (1/2") 1
Inspection Box for MS 0.03
CONDUIT (1/2")
Clamp for pipe 1/2" -1.5" 0.305
M.S. Bend ½" dia 0.0476
LABOUR
Electrician 0.03
Sundries (Labour Only):
2,033
Item Name : Supply and Erection MS conduit pipe for wiring purpose comp.
Recessed in walls including chase etc : 3/4" i/d
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,034
Item Name : Supply and Erection MS conduit pipe for wiring purpose comp.
Recessed in walls including chase etc : 1" i/d
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,035
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,036
Item Name : Supply and Erection MS conduit pipe for wiring purpose comp.
Recessed in walls including chase etc : 1.5" i/d
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,037
Item Name : Supply and Erection MS conduit pipe for wiring purpose comp.
Recessed in walls including chase etc : 2" i/d
Detail Qty
MATERIAL
Ordinary Portland Cement 0.0233
Fine Sand 0.0123
2" MS CONDUIT 1
M.S. Conduit Bend 2" dia 0.0476
Inspection Box for MS 0.03
CONDUIT (2")
Clamp for pipe 2" dia 0.305
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,038
Item Name : Supply and Erection PVC pipe for wiring purpose complete On surface
including clamps etc: 1/2" i/d
Detail Qty
MATERIAL
Clamp for pipe 1/2" -1.5" 0.305
Screw for inspection Box 1
Gutties for inspection 1
Box
PVC CONDUIT (1/2") 1
pvc bend 0.0667
Inspection Box for 1/2" 0.03
LABOUR
Electrician 0.006
Sundries (Labour Only):
2,039
Item Name : Supply and Erection PVC pipe for wiring purpose complete On surface
including clamps etc: 3/4" i/d
Detail Qty
MATERIAL
Clamp for pipe 1/2" -1.5" 0.305
Screw for inspection Box 1
Gutties for inspection 1
Box
PVC CONDUIT 3/4" 1
pvc bend 3/4" 0.0667
Inspection Box for 3/4" 0.03
LABOUR
Electrician 0.006
Sundries (Labour Only):
2,040
Item Name : Supply and Erection PVC pipe for wiring purpose complete On surface
including clamps etc: 1" i/d
Detail Qty
MATERIAL
Clamp for pipe 1/2" -1.5" 0.305
Screw for inspection Box 1
Gutties for inspection 1
Box
PVC CONDUIT 1" 1
pvc bend for PVC CONDUIT 0.0667
1"
Inspection Box for PVC 0.03
CONDUIT 1"
LABOUR
Electrician 0.006
Sundries (Labour Only):
2,041
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Supply and Erection PVC pipe for wiring purpose complete On surface
including clamps etc: 1.25" i/d
Detail Qty
MATERIAL
Clamp for pipe 1/2" -1.5" 0.305
Screw for inspection Box 1
Gutties for inspection 1
Box
PVC CONDUIT 1.25" 1
pvc bend for PVC CONDUIT 0.0667
1.25"
Inspection Box for PVC 0.03
CONDUIT 1.25"
LABOUR
Electrician 0.009
Sundries (Labour Only):
2,042
Item Name : Supply and Erection PVC pipe for wiring purpose complete On surface
including clamps etc: 1.5" i/d
Detail Qty
MATERIAL
Clamp for pipe 1/2" -1.5" 0.305
Screw for inspection Box 1
Gutties for inspection 1
Box
PVC CONDUIT 1.5" 1
pvc bend for PVC CONDUIT 0.0667
1.5"
Inspection Box for PVC 0.03
CONDUIT 1.5"
LABOUR
Electrician 0.012
Sundries (Labour Only):
2,043
Item Name : Supply and Erection PVC pipe for wiring purpose complete On surface
including clamps etc: 2" i/d
Detail Qty
MATERIAL
Screw for inspection Box 1
Gutties for inspection 1
Box
Clamp for pipe 2" dia 0.305
PVC CONDUIT 2" 1
pvc bend for PVC CONDUIT 0.0667
2"
Inspection Box for PVC 0.03
CONDUIT 2"
LABOUR
Electrician 0.008
Sundries (Labour Only):
2,044
Item Name : Supply and Erection PVC pipe for wiring purpose complete On surface
including clamps etc: 3" i/d
LABOUR
Electrician 0.009 Day
Sundries (Labour Only):
2,045
Item Name : Supply and Erection PVC pipe for wiring purpose complete On surface
including clamps etc: 4" i/d
LABOUR
Electrician 0.012 Day
Sundries (Labour Only):
2,046
Item Name : Supply and Erection PVC pipe for wiring purpose complete Recessed in
walls including chase etc : 1/2" i/d
Detail Qty
MATERIAL
Ordinary Portland Cement 0.0014
Fine Sand 0.004
PVC CONDUIT (1/2") 1
pvc bend 0.0667
M.S. Hook 0.3333
Inspection Box for 1/2" 0.03
LABOUR
Electrician 0.018
Sundries (Labour Only):
2,047
Item Name : Supply and Erection PVC pipe for wiring purpose complete Recessed in
walls including chase etc : 3/4" i/d
Detail Qty
MATERIAL
Ordinary Portland Cement 0.0021
Fine Sand 0.006
PVC CONDUIT 3/4" 1
pvc bend 3/4" 0.0667
M.S. Hook for 3/4" 0.3333
Inspection Box for 3/4" 0.305
LABOUR
Electrician 0.018
Sundries (Labour Only):
2,048
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Supply and Erection PVC pipe for wiring purpose complete Recessed in
walls including chase etc : 1" i/d
Detail Qty
MATERIAL
Ordinary Portland Cement 0.0021
Fine Sand 0.006
PVC CONDUIT 1" 1
pvc bend for PVC CONDUIT 0.0667
1"
M.S. Hook for PVC CONDUIT 0.3333
1"
Inspection Box for PVC 0.03
CONDUIT 1"
LABOUR
Electrician 0.018
Sundries (Labour Only):
2,049
Item Name : Supply and Erection PVC pipe for wiring purpose complete Recessed in
walls including chase etc : 1.25" i/d
Detail
MATERIAL
Ordinary Portland Cement
Fine Sand
PVC CONDUIT 1.25"
pvc bend for PVC CONDUIT
1.25"
MS Hook for PVC CONDUIT
1.25"
Inspection Box for PVC
CONDUIT 1.25"
LABOUR
Electrician
Sundries (Labour Only):
2,050
Item Name : Supply and Erection PVC pipe for wiring purpose complete Recessed in
walls including chase etc : 1.5" i/d
Detail Qty
MATERIAL
Ordinary Portland Cement 0.0023
Fine Sand 0.0133
PVC CONDUIT 1.5" 1
pvc bend for PVC CONDUIT 0.0667
1.5"
MS Hook forPVC CONDUIT 0.3333
1.5"
Inspection Box for PVC 0.03
CONDUIT 1.5"
LABOUR
Electrician 0.024
Sundries (Labour Only):
2,051
Item Name : Supply and Erection PVC pipe for wiring purpose complete Recessed in
walls including chase etc : 2" i/d
Detail
MATERIAL
Ordinary Portland Cement
Fine Sand
PVC CONDUIT 2"
pvc bend for PVC CONDUIT
2"
MS Hook for PVC CONDUIT
2"
Inspection Box for PVC
CONDUIT 2"
LABOUR
Electrician
Sundries (Labour Only):
2,052
Item Name : Supply and Erection PVC pipe for wiring purpose complete Recessed in
walls including chase etc : 3" i/d
LABOUR
Electrician 0.037 Day
Sundries (Labour Only):
2,053
Item Name : Supply and Erection PVC pipe for wiring purpose complete Recessed in
walls including chase etc : 4" i/d
LABOUR
Electrician 0.046 Day
Sundries (Labour Only):
2,054
Item Name : Supply and Erection GI flexible pipe for wiring purpose complete
1/2" i/d
LABOUR
Electrician 0.006 Day
Welder 0.001 Day
Sundries (Labour Only):
Item Name : Supply and Erection GI flexible pipe for wiring purpose complete
3/4" i/d
LABOUR
Electrician 0.006 Day
Welder 0.001 Day
Sundries (Labour Only):
2,056
DESCRIPTION OF ITEM :
Item Code : 15-03-c
Item Name :
Detail Qty Unit
MATERIAL
G I Flexible Pipe 1" 1 Rft
Light
G.I. Socket 1" dia Light 0.067 No
G.I. Nipple 1" dia Light 0.067 No
Check Nuts 1" dia Light 0.067 No
LABOUR
Electrician 0.01 Day
Welder 0.002 Day
Sundries (Labour Only):
2,057
Item Name : Supply and Erection GI flexible pipe for wiring purpose complete
1.25" i/d
LABOUR
Electrician 0.011 Day
Welder 0.002 Day
Sundries (Labour Only):
2,058
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Supply and Erection GI flexible pipe for wiring purpose complete
1.5" i/d
LABOUR
Electrician 0.011 Day
Welder 0.002 Day
Sundries (Labour Only):
2,059
Item Name : Supply and Erection GI flexible pipe for wiring purpose complete 2"
i/d
Detail Qty Unit
MATERIAL
G I Flexible Pipe 2" 1 Rft
Light
G.I. Socket 2" dia (50 0.067 No
mm) Light
G.I. Nipple 2" dia (50 0.067 No
mm) Light
Check Nuts 2" dia (50 mm) 0.067 No
Light
LABOUR
Electrician 0.017 Day
Welder 0.004 Day
Sundries (Labour Only):
2,060
Item Name : Supply and Erection GI flexible pipe for wiring purpose complete 3"
i/d
LABOUR
Electrician 0.018 Day
Welder 0.004 Day
Sundries (Labour Only):
2,061
DESCRIPTION OF ITEM :
Item Code : 15-04-a
Item Name :
Detail Qty
MATERIAL
Batten (1/2") 1
Clips 0.016
Nails 0.002
LABOUR
Carpenter 0.003
Sundries (Labour Only):
2,062
DESCRIPTION OF ITEM :
Item Code : 15-04-b
Item Name :
Detail Qty
MATERIAL
Batten (3/4") 1
Clips 0.016
Nails 0.002
LABOUR
Carpenter 0.003
Sundries (Labour Only):
2,063
DESCRIPTION OF ITEM :
Item Code : 15-04-c
Item Name :
Detail Qty Unit
MATERIAL
Clips 0.016 Pkt
Nails 0.002 Kg
Batten 1" 1 Rft
LABOUR
Carpenter 0.003 Day
Sundries (Labour Only):
2,064
LABOUR
Electrician 0.004 Day
Sundries (Labour Only):
2,065
Item Name : Supply and Erection single core PVC insulated copper conductor
250/440 V grade cable : 3/0.036"
LABOUR
Electrician 0.004 Day
Sundries (Labour Only):
2,066
Item Name : Supply and Erection single core PVC insulated copper conductor
250/440 V grade cable : 7/0.029"
LABOUR
Electrician 0.004 Day
Sundries (Labour Only):
2,067
Item Name : Supply and Erection single core PVC insulated copper conductor
250/440 V grade cable : 7/0.036"
LABOUR
Electrician 0.004 Day
Sundries (Labour Only):
2,068
Item Name : Supply and Erection single core PVC insulated copper conductor
250/440 V grade cable : 7/0.044"
LABOUR
Electrician 0.01 Day
Sundries (Labour Only):
2,069
Item Name : Supply and Erection single core PVC insulated copper conductor
250/440 V grade cable : 7/0.064"
LABOUR
Electrician 0.015 Day
Sundries (Labour Only):
2,070
Item Name : Supply and Erection single core PVC insulated copper conductor
250/440 V grade cable : 19/0.064"
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,071
Item Name : Supply and Erection single core PVC insulated+sheathed copper
conductor 250/440 V grade cable : 3/0.029"
LABOUR
Electrician 0.007 Day
Sundries (Labour Only):
2,072
Item Name : Supply and Erection single core PVC insulated+sheathed copper
conductor 250/440 V grade cable : 3/0.036"
LABOUR
Electrician 0.007 Day
Sundries (Labour Only):
2,073
Item Name : Supply and Erection single core PVC insulated+sheathed copper
conductor 250/440 V grade cable : 7/0.029"
LABOUR
Electrician 0.008 Day
Sundries (Labour Only):
2,074
Item Name : Supply and Erection single core PVC insulated+sheathed copper
conductor 250/440 V grade cable : 7/0.036"
LABOUR
Electrician 0.008 Day
Sundries (Labour Only):
2,075
Item Name : Supply and Erection single core PVC insulated+sheathed copper
conductor 250/440 V grade cable : 7/0.044"
LABOUR
Electrician 0.013 Day
Sundries (Labour Only):
2,076
Item Name : Supply and Erection single core PVC insulated+sheathed copper
conductor 250/440 V grade cable : 7/0.064"
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,077
Item Name : Supply and Erection single core PVC insulated & sheathed copper
conductor, 660/1100V cable : 7/0.064"
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,078
Item Name : Supply and Erection single core PVC insulated & sheathed copper
conductor, 660/1100V cable : 19/0.052"
LABOUR
Electrician 0.034 Day
Sundries (Labour Only):
2,079
Item Name : Supply and Erection single core PVC insulated & sheathed copper
conductor, 660/1100V cable : 19/0.064"
LABOUR
Electrician 0.034 Day
Sundries (Labour Only):
2,080
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Supply and Erection single core PVC insulated & sheathed copper
conductor, 660/1100V cable : 19/0.083"
LABOUR
Electrician 0.05 Day
Sundries (Labour Only):
2,081
Item Name : Supply and Erection single core PVC insulated & sheathed copper
conductor, 660/1100V cable : 37/0.072"
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,082
Item Name : Supply and Erection single core PVC insulated & sheathed copper
conductor, 660/1100V cable : 37/0.083"
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,083
Item Name : Supply and Erection single core PVC insulated & sheathed copper
conductor, 660/1100V cable : 37/0.103"
Detail Qty Unit
MATERIAL
Cable S/C 660V 1 Rft
(37/0.103")
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,084
Item Name : Supply and Erection twin core PVC insulated & sheathed copper
conductor 250/440 V grade cable : 3/0.029"
LABOUR
Electrician 0.005 Day
Sundries (Labour Only):
2,085
Item Name : Supply and Erection twin core PVC insulated & sheathed copper
conductor 250/440 V grade cable : 3/0.036"
LABOUR
Electrician 0.005 Day
Sundries (Labour Only):
2,086
Item Name : Supply and Erection twin core PVC insulated & sheathed copper
conductor 250/440 V grade cable : 7/0.029"
LABOUR
Electrician 0.007 Day
Sundries (Labour Only):
Item Name : Supply and Erection twin core PVC insulated & sheathed copper
conductor 250/440 V grade cable : 7/0.036"
LABOUR
Electrician 0.007 Day
Sundries (Labour Only):
2,088
Item Name : Supply and Erection twin core PVC insulated & sheathed copper
conductor 250/440 V grade cable : 7/0.044"
LABOUR
Electrician 0.007 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.
2,089
Item Name : Supply and Erection twin core PVC insulated & sheathed copper
conductor 250/440 V grade cable : 7/0.064"
LABOUR
Electrician 0.007 Day
Sundries (Labour Only):
2,090
Item Name : Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick
bakelite sheet top etc. complete : 4"x4"
LABOUR
Electrician 0.075 Day
Sundries (Labour Only):
2,091
Item Name : Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick
bakelite sheet top etc. complete : 7"x4"
Detail Qty
MATERIAL
Ordinary Portland Cement 0.026 Cft
Fine Sand 0.0009 Cft
7"x4" MS Sheet Box 1 No
LABOUR
Electrician 0.1 Day
Sundries (Labour Only):
2,092
Item Name : Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick
bakelite sheet top etc. complete : 9"x4"
Detail Qty
MATERIAL
Ordinary Portland Cement 0.032 Cft
Fine Sand 0.0008 Cft
9"x4" MS Sheet Box 1 No
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,093
Item Name : Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick
bakelite sheet top etc. complete : 8"x10"
Detail Qty
MATERIAL
Ordinary Portland Cement 0.036 Cft
Fine Sand 0.0015 Cft
8"x10" MS Sheet Box 1 No
LABOUR
Electrician 0.15 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,094
Item Name : Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick
bakelite sheet top etc. complete : 10"x12"
LABOUR
Electrician 0.18 Day
Sundries (Labour Only):
2,095
Item Name : Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick
bakelite sheet top etc. complete : 12"x14"
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.052 Cft
Fine Sand 0.0018 Cft
12"x14" MS Sheet Box 1 No
LABOUR
Electrician 0.21 Day
Sundries (Labour Only):
2,096
DESCRIPTION OF ITEM :
Item Code : 15-10-a
Item Name : Supply and Erection Sahl wood board, 1.75" deep : 3"x3" dia
Detail Qty Unit
MATERIAL
Screw for inspection Box 1 No
Wood Box 3"x3" dia 1 Rft
Wood. Gutti 1 No
LABOUR
Electrician 0.015 Day
Sundries (Labour Only):
2,097
LABOUR
Electrician 0.045 Day
Sundries (Labour Only):
2,098
DESCRIPTION OF ITEM :
Item Code : 15-10-c
Item Name : Supply and Erection Sahl wood board, 1.75" deep : 7"x4"
Detail Qty Unit
MATERIAL
Screw for inspection Box 1 No
Wood. Gutti 1 No
Wood Box 7"x4" 1 Rft
LABOUR
Electrician 0.045 Day
Sundries (Labour Only):
2,099
DESCRIPTION OF ITEM :
Item Code : 15-10-d
Item Name : Supply and Erection Sahl wood board, 1.75" deep : 8"x10"
Detail Qty Unit
MATERIAL
Screw for inspection Box 1 No
Wood. Gutti 1 No
Wood Box 8"x10" 1 Rft
LABOUR
Electrician 0.045 Day
Sundries (Labour Only):
2,100
DESCRIPTION OF ITEM :
Item Code : 15-10-e
Item Name : Supply and Erection Sahl wood board, 1.75" deep : 10"x12"
Detail Qty Unit
MATERIAL
Screw for inspection Box 1 No
Wood. Gutti 1 No
Wood Box 10"x12" 1 Rft
LABOUR
Electrician 0.05 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 15-10-f
Item Name : Supply and Erection Sahl wood board, 1.75" deep : 12"x14"
Detail Qty Unit
MATERIAL
Screw for inspection Box 1 No
Wood. Gutti 1 No
Wood Box 12"x14" 1 Rft
LABOUR
Electrician 0.05 Day
Sundries (Labour Only):
2,102
Item Name : Supply and Erection of iron/aluminium clad, 500V main switch Double
pole : 15/20 Amp.
LABOUR
Electrician 0.1 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,103
Item Name : Supply and Erection of iron/aluminium clad, 500V main switch Double
pole : 30/35 Amp
LABOUR
Electrician 0.1 Day
Sundries (Labour Only):
2,104
Item Name : Supply and Erection iron/aluminium clad 500 volts main switch
Double Pole : 60/65 Amp
LABOUR
Electrician 0.15 Day
Sundries (Labour Only):
2,105
Item Name : Supply and Erection iron/aluminium clad 500 volts main switch
Double Pole : 100 Amp
LABOUR
Electrician 0.15 Day
Sundries (Labour Only):
2,106
Item Name : Supply and Erection of iron/aluminium clad, 500V main switch Triple
pole with neutral link : 15/20 Amp.
LABOUR
Electrician 0.2 Day
Sundries (Labour Only):
2,107
Item Name : Supply and Erection of iron/aluminium clad, 500V main switch Triple
pole with neutral link : 30/35 Amp.
LABOUR
Electrician 0.2 Day
Sundries (Labour Only):
2,108
Item Name : Supply and Erection of iron/aluminium clad, 500V main switch Triple
pole with neutral link : 60/65 Amp.
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,109
Item Name : Supply and Erection of iron/aluminium clad, 500V main switch Triple
pole with neutral link : 100 Amp.
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,110
DESCRIPTION OF ITEM :
Item Code : 15-11-b-05
Item Name : Supply & Erection of 200 Amp Main switch
Detail Qty Unit
MATERIAL
200 Amp Main switch 1 Each
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,111
DESCRIPTION OF ITEM :
Item Code : 15-11-b-06
Item Name : Supply & Erection of Change over switch 100 Amp
Detail Qty Unit
MATERIAL
Change over switch 100 1 Each
Amp (imported)
LABOUR
Electrician 0.2 Day
Sundries (Labour Only):
2,112
DESCRIPTION OF ITEM :
Item Code : 15-11-b-07
Item Name : Supply & Erection of Change over switch 200 Amp
Detail Qty Unit
MATERIAL
Change over sv/itch 1 Each
200-Amp imported
LABOUR
Electrician 0.2 Day
Sundries (Labour Only):
2,113
DESCRIPTION OF ITEM :
Item Code : 15-11-b-08
Item Name : Supply & Erection of Change over switch 600 Amp
Detail Qty Unit
MATERIAL
Change over switch 600 1 Each
Amp best quality
LABOUR
Electrician 0.2 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,114
DESCRIPTION OF ITEM :
Item Code : 15-11-b-09
Item Name : Supply & Erection of Change over switch 500 Amp
Detail Qty Unit
MATERIAL
Change over switch 500 1 Each
Amp (heavy duty)
LABOUR
Electrician 0.2 Day
Sundries (Labour Only):
2,115
DESCRIPTION OF ITEM :
Item Code : 15-11-b-10
Item Name : Supply & Erection of 600 Amp main switch
Detail Qty Unit
MATERIAL
600 Amp main switch 1 Each
LABOUR
Electrician 0.2 Day
Sundries (Labour Only):
2,116
DESCRIPTION OF ITEM :
Item Code : 15-11-b-11
Item Name : Supply & Erection of 400 Amp main switch
Detail Qty Unit
MATERIAL
400 Amp main switch 1 Each
LABOUR
Electrician 0.2 Day
Sundries (Labour Only):
2,117
DESCRIPTION OF ITEM :
Item Code : 15-11-b-12
Item Name : Supply & Erection of 300 Amp main switch
Detail Qty Unit
MATERIAL
300 Amp main switch 1 Each
LABOUR
Electrician 0.2 Day
Sundries (Labour Only):
2,118
Item Name : Supply and Erection or iron/aluminium clad, 500V main switch with
triple pole, complete : 60 Amp.
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,119
Item Name : Supply and Erection or iron/aluminium clad, 500V main switch with
triple pole, complete : 100 Amp.
Detail Qty Unit
MATERIAL
Bars 100 Amp W.4 Copper 1 No
Bar
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,120
Item Name : Supply and Erection or iron/aluminium clad, 500V main switch with
triple pole, complete : 200 Amp.
LABOUR
Electrician 0.2 Day
Sundries (Labour Only):
2,121
Item Name : Supply and Erection or iron/aluminium clad, 500V main switch with
triple pole, complete : 300 Amp.
LABOUR
Electrician 0.2 Day
Sundries (Labour Only):
2,122
Item Name : Supply and Erection or iron/aluminium clad, 500V main switch with
triple pole, complete : 500 Amp.
LABOUR
Electrician 0.2 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 15-12-f
Item Name : Supply & Erection of Brass Bar 5000 Amp
Detail Qty Unit
MATERIAL
Brass Bar 5000 Amp 1 Each
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,124
DESCRIPTION OF ITEM :
Item Code : 15-12-g
Item Name : Supply & Erection of Brass Bar3000 Amp
Detail Qty Unit
MATERIAL
Brass Bar 3000 Amp 1 Each
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
Item Name : Supply and Erection plain pendent lamp holder, complete with
bakelite lamp holder & flexible twin wire of 2m
LABOUR
Electrician 0.01 Day
Sundries (Labour Only):
2,126
Item Name : Supply and Erection 9" long swan neck plain brass/steel/brass
oxidised bracket lamp holder, complete
2,127
Item Name : Supply and Erection wall/pole type bracket with double cover water
tight reflector, flexible wire & brass holder
LABOUR
Electrician 0.04 Day
Sundries (Labour Only):
2,128
Item Name : Supply and Erection call bell 220/250V, fixed on Sahl wood board
7"x4"
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,129
Item Name : Supply and Erection bell push or bed switch, with 5m. twin flexible
wire 23/0.0076"
LABOUR
Electrician 0.007 Day
Sundries (Labour Only):
2,130
DESCRIPTION OF ITEM :
Item Code : 15-18-a
Item Name : Supply and Erection switches 10/15 Amp : Open type
Detail Qty Unit
MATERIAL
Screw for inspection Box 2 No
Switch open (10/15A) 1 No
LABOUR
Electrician 0.015 Day
Sundries (Labour Only):
2,131
DESCRIPTION OF ITEM :
Item Code : 15-18-b
Item Name :
Detail Qty
MATERIAL
Screw for inspection Box 2
Switch Recessed (10/15A) 1
LABOUR
Electrician 0.015
Sundries (Labour Only):
2,132
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 15-19-a
Item Name :
Detail Qty Unit
MATERIAL
Screw for inspection Box 2 No
Wall Socket (Open) 10/15 1 No
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,133
DESCRIPTION OF ITEM :
Item Code : 15-19-b
Item Name :
Detail Qty Unit
MATERIAL
Screw for inspection Box 2 No
Wall Socket Recess 10/15A 1 No
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
Item Name : Supply and Erection 3 pin switch & plug combined recessed type : 5
Amp
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,135
Item Name : Supply and Erection 3 pin switch & plug combined recessed type :
10/15 Amp
2,136
DESCRIPTION OF ITEM :
Item Code : 15-21
Item Name :
Detail Qty Unit
MATERIAL
Screw for inspection Box 2 No
open type 10/15A Three 1 No
Pin Switch
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,137
DESCRIPTION OF ITEM :
Item Code : 15-22-a
Item Name :
Detail Qty Unit
MATERIAL
Screw for inspection Box 2 No
Bakelite (Button Holder ) 1 No
LABOUR
Electrician 0.013 Day
Sundries (Labour Only):
2,138
DESCRIPTION OF ITEM :
Item Code : 15-22-b
Item Name : Supply and Erection button holder/angle holder Brass
Detail Qty Unit
MATERIAL
Screw for inspection Box 2 No
Brass (Button Holder ) 1 No
LABOUR
Electrician 0.013 Day
Sundries (Labour Only):
2,139
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,140
Item Name : Supply and Erection porcelain fuses with plastic sheet
base on angle iron board : 30 Amp.
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,141
Item Name : Supply and Erection porcelain fuses with plastic sheet
base on angle iron board : 60 Amp.
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,142
Item Name : Supply and Erection porcelain fuses with plastic sheet
base on angle iron board 100 Amp.
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
Item Name : Supply and Erection porcelain fuses with plastic sheet
base on angle iron board : 200 Amp.
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,144
Item Name : Supply and Erection tube light, including rod, choke etc complete
Double rod (2x40 watts) with 2 chokes & 2 starters
LABOUR
Electrician 0.1 Day
Sundries (Labour Only):
2,145
Item Name : Supply and Erection tube light, including rod, choke etc complete
Single rod (40 watts) with 1 choke & 1 starter
LABOUR
Electrician 0.075 Day
Sundries (Labour Only):
2,146
Item Name : Supply and Erection tube light, including rod, choke etc complete
Round tube (32 watt) 1 choke + 1 starter w/o cover
LABOUR
Electrician 0.055 Day
Sundries (Labour Only):
2,147
Item Name : Supply and Erection girder clamp hook, 5/8" dia.for hanging ceiling
fans
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,148
Item Name : Supply and Erection circuit breaker (imported) on sahl wood board
complete : 2/5/15 Amp.
LABOUR
Electrician 0.075 Day
Sundries (Labour Only):
2,149
Item Name : Supply and Erection circuit breaker (imported) on sahl wood board
complete : 20/25/30 Amp.
LABOUR
Electrician 0.075 Day
Sundries (Labour Only):
2,150
Item Name : Supply and Erection stay for house service pipe, erected with straining
screws and 7/14 SWG stay wire
LABOUR
Electrician 0.009 Day
Sundries (Labour Only):
2,151
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Supply and Erection of house service pipe Henley or pole, type 2" dia.
erected to install insulated wire etc
LABOUR
Electrician 0.012 Day
Sundries (Labour Only):
2,152
DESCRIPTION OF ITEM :
Item Code : 15-29
Item Name :
Detail Qty
MATERIAL
Nut Bolt for Shackle/Pin 0.25
Insulator
Shackle/Pin Insulator 1
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,153
Item Name : Supply and Erection bare copper conductor wire, No. 2 to 16 SWG,
including GI binding wire No. 16 SWG
LABOUR
Electrician 0.013 Day
Sundries (Labour Only):
2,154
Item Name : Supply and Erection GI wire of sizes, including binding wire No. 16 SWG
for support of rubber wire, pole to pole
Detail Qty Unit
MATERIAL
G.I Wire 16 SWG 1 Kg
LABOUR
Electrician 0.013 Day
Sundries (Labour Only):
2,155
Item Name : Wiring overhead line in 2 single core, PVC insulated cable with GI wire
#8 SWG : 3/0.029"
LABOUR
Electrician 0.007 Day
Sundries (Labour Only):
2,156
Item Name : Wiring overhead line in 2 single core, PVC insulated cable with GI
wire #8 SWG : 7/0.029"
LABOUR
Electrician 0.007 Day
Sundries (Labour Only):
2,157
Item Name : Wiring overhead line in 2 single core, PVC insulated cable with GI
wire #8 SWG : 7/0.036"
LABOUR
Electrician 0.007 Day
Sundries (Labour Only):
Item Name : Wiring overhead line in 2 single core, PVC insulated cable with GI
wire #8 SWG : 7/0.044"
LABOUR
Electrician 0.007 Day
Sundries (Labour Only):
2,159
Item Name : Supply and Erection street light pole bracket 1.25" GI pipe 2m. long,
complete with 2 pole clamps
2,160
Item Name : Supply and Fixing dust & weather proof street light fitting with
reflector, 400W mercury vapour lamp etc comp.
LABOUR
Electrician 0.4 Day
Sundries (Labour Only):
2,161
Item Name : Supply and Erection pole mounted street light complete for fitting
125/250 W mercury lamp : GEC make
LABOUR
Electrician 0.4 Day
Sundries (Labour Only):
2,162
Item Name : Supply and Erection pole mounted street light complete for fitting
125/250 W mercury lamp
LABOUR
Electrician 0.4 Day
Sundries (Labour Only):
2,163
Item Name : Supply & erection of Road Light fixture with 250 watts Son lamp,
ballast and ignitor
LABOUR
Skilled Labour 0.125 Day
Electrician 0.125 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 1 hr
2,164
Item Name : Providing and laying of cable route marker cast iron for all sort of
Road Light, Street Lights & Boundary Wall lights complete in all
respects with all installation material complete
MATERIAL
Cable route marker made 1 No
of cast iron for all sort
of Road Light,Street
Lights & Boundary Wall
lights
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,165
DESCRIPTION OF ITEM :
Item Code : 15-36-a
Item Name : Supply and Fixing 125 W mercury vapour lamp with choke
Detail Qty Unit
MATERIAL
125 W Mercury Vapour lamp 1 No.
Choke 125 W 1 No.
LABOUR
Electrician 0.1 Day
Sundries (Labour Only):
2,166
LABOUR
Electrician 0.1 Day
Sundries (Labour Only):
2,167
DESCRIPTION OF ITEM :
Item Code : 15-36-c
Item Name : Supply and Fixing 400 W mercury vapour lamp with choke
Detail Qty Unit
MATERIAL
400 W mercury vapour 1 No.
Choke 400 W 1 No.
LABOUR
Electrician 0.1 Day
Sundries (Labour Only):
2,168
Item Name : Supply and Fixing of Road Light fixture IP 66 with 250 watts Son lamp,
ballast and ignitor
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
2,169
DESCRIPTION OF ITEM :
Item Code : 15-36-e
Item Name :
Detail Qty Unit
MATERIAL
SMD Type LED Road light 1 No.
Fixture (120-130 watts)
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 15-36-f
Item Name :
Detail Qty Unit
MATERIAL
SMD Type LED Road light 1 No.
Fixture (90-100 watts)
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
2,171
DESCRIPTION OF ITEM :
Item Code : 15-36-g
Item Name :
Detail Qty Unit
MATERIAL
SMD Type LED Road light 1 No.
Fixture (60-70 watts)
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
2,172
Item Name : Supply at site, installation and commissioning of Road light fixture
LED 72 Watt with 72 Watt LED lamp of approved equivalent including
cost of all necessary accessories, complete in all respects
MATERIAL
Road light fixture model 1 No
#IRONY LED 72 Watt with
72 Watt LED lamp
LABOUR
Skilled Labour 0.125 Day
Electrician 0.125 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 1 hr
2,173
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,174
2,175
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,176
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,177
DESCRIPTION OF ITEM :
Item Code : 15-36-i-5
Item Name :
fittings,
Flourescent lamp, complete in all respects.
Detail Qty Unit
MATERIAL
1x18 Watt fixture with 1 No
energy saver lamp
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,178
Item Name : Supply, installation, testing and commissioning of IP-44 rated, 2x3
Watt up/down light LED Light, complete in all respects.
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,179
Item Name : Supply, installation, testing and commissioning of 1x23 Watt, E-27
base, wall bracket light, complete in all respects.
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,180
Item Name : Supply, installation, testing and commissioning of 2x20 Watt "LED" DC
emergency spot light with 3hr backup, complete in all respects.
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,181
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,182
Item Name : Supply, installation, testing and commissioning of 1x6 Watt LED
BULKHEAD light fixture, of best quality.
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,183
Item Name : Supply, installation, testing and commissioning of 1x160 Watt, Highbay
LED light , complete in all respects.
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,184
Item Name : Supply, installation, testing and commissioning of 3 chip SMD Strip
IP-65 rated, complete with12DC drive LED color as per approval of the
Engineer
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,185
Item Name : Supply, installation, testing and commissioning of High Purity Aluminum
Spinning Reflector Vertical lamp Installation Recessed down light with
CFL (1 X 13) watt Energy saver
MATERIAL
MEGNA High Purity 1 No
Aluminum Spinning
Reflector Vertical lamp
Installation Recessed
down light with CFL (1 X
13) watt Energy saver c
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,186
Item Name : Supply, installation, testing and commissioning of Recessed Down Light
with CFL (1 X 13) watt Energy saver and Convex Frosted Lens IP 54,
complete in all respects. .
MATERIAL
DOT-162 Recessed down 1 No
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,187
MATERIAL
Recessed Dawn Light with 1 No
CFL (13-17 watt) Energy
saver and with Glass
Reflector
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,188
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,189
Item Name : Supply, installation of outdoor Waterproof Light with 23 watt CFL with
Glass Reflector and with 1 Meter G.I pipe Support, complete in all
respects.
MATERIAL
Outdoor water proof light 1 No
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
Item Name : Supply, installation, testing and commissioning of 1x5 watt reflector
surface mounted LED light fixture with frosted lens, complete with
driver
MATERIAL
1x5 watt reflector 1 No
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,191
Item Name : Supply, installation, & connecting up of light Fixture type 'D' surface
mounted fluorescent batten fitting (TMS-015/236) with 2 x 36W TLD lamp,
complete in all respects
MATERIAL
Fixture type 'D' surface 1 No
mounted fluorescent
batten fitting
(TMS-015/236) with 2 x
36W TLD lamp.
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,192
Item Name : Supply, installation, & connecting up of light Fixture type 'D' surface
mounted fluorescent batten fitting (.TMS-015/236) with 1 x 36W TLD lamp
complete in all respects
MATERIAL
Fixture type 'D' surface 1 No
mounted fluorescent
batten fitting
(.TMS-015/236) with 1 x
36W TLD lamp.
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,193
Item Name : Supply, installation, & connecting up of light Fixture type 'E' surface
mounted fluorescent batten fitting (TMS-012/136) with 1 x 36W TLD farm,
complete in all respects
MATERIAL
Fixture type 'E' surface 1 No
mounted fluorescent
batten fitting
(TMS-012/136) with 1 x
36W TLD farm
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,194
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,195
Item Name : Supply, installation, & connecting up of light fixture High performance
luminar with M2 reflector 1 x 36W, complete in all respects
2,196
Item Name : Supply, installation, & connecting up of light fixture High performance
luminar with M2 reflector 2 x 36W, complete in all respects
Detail Qty
MATERIAL
High performance luminar 1
with M2 reflector 2x
36W Philips TCS 135 or
Pierlite PT236 S-M1 or
equivalent
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,197
Item Name : Supply, installation, & connecting up of light fixture High performance
luminar with M6 reflector 2 x 36W, complete in all respects
Detail Qty
MATERIAL
High performance luminar 1
with M6 reflector 2x
36W Philips TCS 136 or
Pierlite PT236 S-M1 or
equivalent
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,198
MATERIAL
Fixture type T surface 1 No
mounted fluorescent
fitting with 1 x 18W TLD
lamp
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,199
Item Name : Supply, installation, & connecting up of light Fixture type T surface
mounted fluorescent fitting with 2 x 18W TLD lamp, complete in all
respects
MATERIAL
Fixture type T surface 1 No
mounted fluorescent
fitting with 2 x 18W TLD
lamp
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,200
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,201
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,202
Item Name : Supply, installation, connecting, testing & commissioning of 10W LED
Down Light Fixture suitable for 1300 lux, as per instruction of
Engineer, surface mounted circular shape or equivalent.
MATERIAL
10W LED Down Light 1 No
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,203
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,204
MATERIAL
Surface mounting LED tube 1 No
liqht with 1x2000 Iumens
output and fixture.
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,205
MATERIAL
Wall mounted Bulkhead 1 No
light fixtures with LED
retrofit lamp 540 Lumens
output
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,206
Item Name : Supply & errection of down light fixture cylendrical type aluminium
reflection with lamp suitable for 1300 Lux, ceiling mounted
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,207
Item Name : Supply & Erection of candle flood light 150 watt complete in all
aspects
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,208
DESCRIPTION OF ITEM :
Item Code : 15-36-l-02
Item Name : Supply & Erection of Candle bulb 60 watt(Pin/Scrcw typo)
Detail Qty Unit
MATERIAL
Candle bulb 60 1 Each
watt(Pin/Scrcw typo)
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,209
DESCRIPTION OF ITEM :
Item Code : 15-36-l-03
Item Name : Supply & Erection of Choke 125 watt
Detail Qty Unit
MATERIAL
Choke 125 watt 1 Each
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,210
DESCRIPTION OF ITEM :
Item Code : 15-36-l-04
Item Name : Supply & Erection of choko 20/40 watt
Detail Qty Unit
MATERIAL
choko 20/40 watt 1 Each
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,211
DESCRIPTION OF ITEM :
Item Code : 15-36-l-05
Item Name : Supply & Erection of Halogen rod 500 watt
Detail Qty Unit
MATERIAL
Halogen rod 500 watt 1 Each
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,212
DESCRIPTION OF ITEM :
Item Code : 15-36-l-06
Item Name : Supply & Erection of tube rod 4' long 40 watt
Detail Qty Unit
MATERIAL
Tube rod 4" long 40 watt 1 Each
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,213
DESCRIPTION OF ITEM :
Item Code : 15-36-l-07
Item Name : Supply & Erection of Tube rod 2' long 20 watt
Detail Qty Unit
MATERIAL
Tube rod 2' long 20 watt 1 Each
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,214
DESCRIPTION OF ITEM :
Item Code : 15-36-l-08
Item Name : Supply & Erection of 15 Watt Incandesent bulb
Detail Qty Unit
MATERIAL
bulb zero watt (15 Watt 1 Each
Incandesent bulb)
LABOUR
Electrician 0.004 Day
Sundries (Labour Only):
2,215
DESCRIPTION OF ITEM :
Item Code : 15-36-l-09
Item Name : Supply & Erection of emergency light
Detail Qty Unit
MATERIAL
emergency light 1 Each
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,216
DESCRIPTION OF ITEM :
Item Code : 15-36-m-01
Item Name : Supply & Erection of 400-watt choke
Detail Qty Unit
MATERIAL
Security light 400-watt 1 Each
choke
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,217
DESCRIPTION OF ITEM :
Item Code : 15-36-m-02
Item Name :
Detail Qty Unit
MATERIAL
Spot light 120 /150 watt 1 Each
complete
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,218
DESCRIPTION OF ITEM :
Item Code : 15-36-m-03
Item Name : Supply & Erection of CFL 18 Watt
Detail Qty Unit
MATERIAL
CFL 18 Watt 1 Each
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,219
DESCRIPTION OF ITEM :
Item Code : 15-36-m-04
Item Name : Supply & Erection of CFL 23 Watt
Detail Qty Unit
MATERIAL
CFL 23 Watt 1 Each
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,220
DESCRIPTION OF ITEM :
Item Code : 15-36-m-05
Item Name : Supply & Erection of CFL 25 Watt
Detail Qty Unit
MATERIAL
CFL 25 Watt 1 Each
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,221
DESCRIPTION OF ITEM :
Item Code : 15-36-m-06
Item Name : Supply & Erection of CFL 45 Watt
Detail Qty Unit
MATERIAL
CFL 45 Watt 1 Each
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,222
DESCRIPTION OF ITEM :
Item Code : 15-36-n
Item Name : Supply & Erection of 150 watt Choke
Detail Qty Unit
MATERIAL
choke 150 watt for seach 1 Each
light
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,223
DESCRIPTION OF ITEM :
Item Code : 15-36-o
Item Name : Supply & Erection of Light Head cover for street light
Detail Qty Unit
MATERIAL
Light Head cover for 1 Each
street light
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,224
Item Name : Supply and Fixing mercury sodium lamp 360 Sunlux 400 W complete
with choke
LABOUR
Electrician 0.1 Day
Sundries (Labour Only):
2,225
LABOUR
Electrician 0.1 Day
Sundries (Labour Only):
2,226
Item Name : Supply and Erection MS angle lattice structure pole 36' long 14"sq at
base & 8"sq. at top for elec. Distribution
LABOUR
Electrician 6 Day
Sundries (Labour Only):
Item Name : Supply and Fixing GI tubular street light pole, 8' of 5" dia, 7' 4"
dia, 5' of 3" dia, Single arm of 5' of 1.5" dia
LABOUR
Labourer 3 Day
Electrician 0.25 Day
Sundries (Labour Only):
2,228
Item Name : Supply and Fixing GI tubular street light pole, 8' of 5" dia, 7' 4"
dia, 5' of 3" dia, Double arm of 5' of 1.5" dia
LABOUR
Labourer 3 Day
Electrician 0.25 Day
Sundries (Labour Only):
2,229
Item Name : Supply and Fixing GI tubular street light pole, 8' of 4" dia, 7' 3"
dia, 5' of 2" dia, Single arm of 5' of 1.5" dia
LABOUR
Labourer 2.5 Day
Electrician 0.25 Day
Sundries (Labour Only):
2,230
Item Name : Supply and Fixing GI tubular street light pole, 8' of 4" dia, 7' 3"
dia, 5' of 2" dia, Double arm of 5' of 1.5" dia
LABOUR
Labourer 2.5 Day
Electrician 0.25 Day
Sundries (Labour Only):
2,231
Item Name : Providing street light poles of 40 ft height without arms including
fixing complete.
LABOUR
Mason 0.1 Day
Skilled Labour 0.25 Day
Sundries (Labour Only):
EQUIPMENT
Dumper ( 10 T ) 0.01 Day
Excavator (Track Type) 0.1 Day
100 HP
2,232
Item Name : Earthing of iron clad/aluminium switches etc with GI wire #8 SWG in
GI pipe 0.5" dia
LABOUR
Electrician 2 Day
Sundries (Labour Only):
2,233
Item Name : Supply and Erection 2'x2'x1/8" copper plate including riveting to
copper tape & placing in mixture of salt and charcoal etc
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
2,234
DESCRIPTION OF ITEM :
Item Code : 15-42-b
Item Name : Manhole For LT Cable Pulling
Detail Qty Unit
MATERIAL
25 X 3 mm bare copper 1 No
tape( 99% Cu)
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,235
DESCRIPTION OF ITEM :
Item Code : 15-42-c
Item Name : Supply and Erection of Test clamp
Detail Qty Unit
MATERIAL
Test clamp ( 99% Cu.) 1 No
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,236
DESCRIPTION OF ITEM :
Item Code : 15-42-d
Item Name : Supply and Erection of Fixing Clips
Detail Qty Unit
MATERIAL
Fixing Clips without PVC 1 No
covered
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,237
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 15-42-f
Item Name :
Detail Qty
MATERIAL
T tape clamps and 1
square tape clamps of
(25x3)mm bare Cu.tape
complete with nuts,
washers, spacer and
fixing arrangement.
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,239
Item Name : Supply and Erection copper tape, including copper staple & copper
nails/Screw etc : Size 1.5"x1/8"
2,240
Item Name : Supply and Erection copper tape, including copper staple & copper
nails etc : Size 2"x1/8"
LABOUR
Electrician 0.007 Day
Sundries (Labour Only):
2,241
LABOUR
Electrician 1.25 Day
Sundries (Labour Only):
2,242
Detail Qty
MATERIAL
Batten (1/2") 29.991
Cable S/C 250V (3/0.029") 59.982
T-switch 1
Wire Clips & Nails 2
Round Block 1
LABOUR
Electrician 0.03
Sundries (Labour Only):
Item Name : Wiring of 2/3-pin 5-Amp plug point in 3/0.029" PVC insulated &
sheathed cable on sahl wood
Detail Qty
MATERIAL
Batten (1/2") 19.994
Cable S/C SH 250V 32.8
(3/0.029")
Wood Box 7"x4" 1
3Pin 2/3 A Wall Socket 1
T-switch 1
Wire Clips & Nails 1
LABOUR
Electrician 0.03
Sundries (Labour Only):
2,244
Item Name : Wiring of main & sub-main in 2 single core PVC insulated & sheathed
cable : 3/0.029"
Detail Qty
MATERIAL
Batten (1/2") 1
Clips 0.015
Cable 2/C 250V (3/0.029") 2
LABOUR
Electrician 0.006
Sundries (Labour Only):
2,245
Item Name : Wiring of main & sub-main in 2 single core PVC insulated & sheathed
cable : 7/0.029"
Detail Qty
MATERIAL
Batten (1/2") 1
Clips 0.015
Cable 2/C 250V (7/0.029") 2
LABOUR
Electrician 0.006
Sundries (Labour Only):
2,246
Item Name : Wiring of main & sub-main in 2 single core PVC insulated & sheathed
cable : 7/0.044"
Detail Qty
MATERIAL
Batten (3/4") 1
Clips 0.015
Cable 2/C 250V (7/0.044") 2
LABOUR
Electrician 0.01
Sundries (Labour Only):
2,247
Item Name : Wiring of main & sub-main in 2 single core PVC insulated & sheathed
cable : 7/0.064"
Detail Qty
MATERIAL
Batten (3/4") 1
Clips 0.03
Cable 2/C 250V (7/0.064") 2
LABOUR
Electrician 0.018
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Rft
Labour Rates Per Rft
2,248
Item Name : Wiring of sub main/earthing in 1 single core PVC insulated &
sheathed cable : 3/0.029"
Detail Qty
MATERIAL
Batten (1/2") 1
Clips 0.03
Cable S/C 250V (3/0.029") 1
LABOUR
Electrician 0.004
Sundries (Labour Only):
2,249
Item Name : Wiring of sub main/earthing in 1 single core PVC insulated &
sheathed cable : 7/0.029"
Detail Qty
MATERIAL
Batten (1/2") 1
Clips 0.03
Cable S/C 250V (7/0.029") 1
LABOUR
Electrician 0.004
Sundries (Labour Only):
2,250
Item Name : Wiring of sub main/earthing in 1 single core PVC insulated &
sheathed cable : 7/0.044"
Detail Qty
MATERIAL
Batten (3/4") 1
Clips 0.03
Cable S/C 250V (7/0.044") 1
LABOUR
Electrician 0.004
Sundries (Labour Only):
2,251
Item Name : Wiring of sub main/earthing in 1 single core PVC insulated &
sheathed cable : 7/0.064"
Detail Qty
MATERIAL
Batten (3/4") 1
Clips 0.03
Cable S/C 250V (7/0.064") 1
LABOUR
Electrician 0.007
Sundries (Labour Only):
2,252
Item Name : Wiring of light point in 3/0.029" PVC insulated sheathed cable on sahl
wood strip batten with two Nos. of two way switches
Detail Qty
MATERIAL
Batten (1/2") 44.986
Clips 2
Cable S/C 250V (3/0.029") 134.959
Two Way Switch 2
Round Block 2
LABOUR
Electrician 0.048
Sundries (Labour Only):
2,253
Detail Qty
MATERIAL
PVC CONDUIT (1/2") 29.989
Cable S/C 250V (3/0.029") 59.981
Concealed Wooden Box 1
Piano Switch 1
Insulation Tape 3
LABOUR
Electrician 0.045
Sundries (Labour Only):
2,254
Item Name : Wiring of 2/3-pin 5-Amp. plug point in 3/0.029" PVC insulated bare
cable in PVC pipe recessed
Detail Qty
MATERIAL
PVC CONDUIT (1/2") 19.994
Cable S/C 250V (3/0.029") 7.188
Concealed Wooden Box 1
Wall Socket 1
Piano Switch 1
Insulation Tape 3
LABOUR
Electrician 0.022
Sundries (Labour Only):
2,255
Item Name : Wiring of light point in 3/0.029" PVC insulated bare cable in PVC
pipe recessed in wall comp.
Detail Qty
MATERIAL
PVC CONDUIT (1/2") 44.985
Cable S/C 250V (3/0.029") 134.959
Concealed Wooden Box 2
Piano Switch 2 way 2
Insulation Tape 3
LABOUR
Electrician 0.068
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each
Labour Rates Per Each
2,256
Item Name : Special earthing of iron/metal clad switches etc with copper wire
No. 8 SWG in GI pipe 1/2" dia
Detail Qty
MATERIAL
G.I pipe (light) 0.5" 31.99 Rft
Copper Wire 8 swg 4.25 Kg
Copper Plate 24"x24"x1/4" 1 No
salt and charcol 0.5
LABOUR
Electrician 0.8 Day
Sundries (Labour Only):
2,257
LABOUR
Electrician 0.05 Day
Sundries (Labour Only):
2,258
DESCRIPTION OF ITEM :
Item Code : 15-54-b
Item Name : Supply & Erection of 5 Amp Piano type switch (PPI)
Detail Qty Unit
MATERIAL
5 Amp Piano type switch 1 Each
(PPI)
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,259
DESCRIPTION OF ITEM :
Item Code : 15-54-c
Item Name : Supply & Erection of 15 Amp Multi plug
Detail Qty Unit
MATERIAL
Mulli plug 15 Amp 1 Each
LABOUR
Electrician 0.01 Day
Sundries (Labour Only):
2,260
DESCRIPTION OF ITEM :
Item Code : 15-54-d
Item Name : Supply & Erection of 5 Amp PPI plug
Detail Qty Unit
MATERIAL
5 Amp PPI Plug 1 Each
LABOUR
Electrician 0.01 Day
Sundries (Labour Only):
2,261
DESCRIPTION OF ITEM :
Item Code : 15-54-e
Item Name : Supply & Erection of 5 Amp PPI switch
Detail Qty Unit
MATERIAL
5 Amp PPI switch 1 Each
LABOUR
Electrician 0.01 Day
Sundries (Labour Only):
2,262
DESCRIPTION OF ITEM :
Item Code : 15-54-f
Item Name : Supply & Erection of 15 Amp Power Plug 3-Pin
Detail Qty Unit
MATERIAL
15 Amp Power Plug 3-Pin 1 Each
LABOUR
Electrician 0.01 Day
Sundries (Labour Only):
2,263
Item Name : Supply and erection of fancy wall type bracket with brass holder &
fancy shade : Single
LABOUR
Electrician 0.04 Day
Sundries (Labour Only):
2,264
Item Name : Supply and erection of fancy wall type bracket with brass holder &
fancy shade : Double
LABOUR
Electrician 0.04 Day
Sundries (Labour Only):
Item Name : Supply and Erection white round globe with holder, gallery & 100
Watt bulb complete : 6" dia.
LABOUR
Electrician 0.05 Day
Sundries (Labour Only):
2,266
Item Name : Supply and Erection white round globe with holder, gallery & 100
Watt bulb complete : 8" dia.
LABOUR
Electrician 0.05 Day
Sundries (Labour Only):
2,267
Item Name : Supply and Erection white round globe with holder, gallery & 100
Watt bulb complete : 10" dia.
LABOUR
Electrician 0.05 Day
Sundries (Labour Only):
2,268
Item Name : Supply and Erection white flat globe with holder, gallery & 100 W
bulb complete : 8" dia
LABOUR
Electrician 0.05 Day
Sundries (Labour Only):
2,269
Item Name : Supply and Erection white flat globe with holder, gallery & 100 W
bulb complete : 10" dia
LABOUR
Electrician 0.05 Day
Sundries (Labour Only):
2,270
Item Name : Supply and Erection white flat globe with holder, gallery & 100 W
bulb complete : 12" dia
LABOUR
Electrician 0.05 Day
Sundries (Labour Only):
2,271
Item Name : Supply and Erection white round globe 6" dia with angle type
bakelite gallery, holder & 60-W bulb complete
Detail Qty Unit
MATERIAL
6" Round Globe with 1 No
Holder
Bulb 60 W 1 No
LABOUR
Electrician 0.05 Day
Sundries (Labour Only):
2,272
Item Name : Supply and Erection 1' long strip light fitting comp. with cover of
opalescent perspex in plain finish 10-Watt
LABOUR
Electrician 0.05 Day
Sundries (Labour Only):
2,273
Item Name : Supply and Erection double fluorescent tube light fitting 2 No. 4'
long, 40-W with 2 chokes & starters complete
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,274
Item Name : Supply and Erection fluorescent tube light fitting including 4'
rod, choke, starter, flexible wire etc : Single
LABOUR
Electrician 0.1 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,275
Item Name : Supply and Erection fluorescent tube light fitting including 4'
rod, choke, starter, flexible wire etc : Double
LABOUR
Electrician 0.1 Day
Sundries (Labour Only):
2,276
Item Name : Supply and Erection porch-light fitting round/square type with
gallery, holder & 40 W bulb
Detail Qty Unit
MATERIAL
Porch Light Complete-40 W 1 Set
LABOUR
Electrician 0.075 Day
Sundries (Labour Only):
2,277
Item Name : Supply and Erection gate-light fitting complete with holder &
160-Watt mercury blended lamp: Small
LABOUR
Electrician 0.1 Day
Sundries (Labour Only):
2,278
Item Name : Supply and Erection gate-light fitting complete with holder &
160-Watt mercury blended lamp: Medium
Detail Qty
MATERIAL
Bulb 160W 1
Gate Light Medium 160 W 1
LABOUR
Electrician 0.1
Sundries (Labour Only):
2,279
Item Name : Supply and Erection gate-light fitting complete with holder &
160-Watt mercury blended lamp: Large
LABOUR
Electrician 0.1 Day
Sundries (Labour Only):
Item Name : Supply and Erection garden-light fitting with holder and 160 W
mercury blended lamp & choke : 18" dia
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,281
Item Name : Supply and Erection garden-light fitting with holder and 160 W
mercury blended lamp & choke : 19" dia
2,282
Item Name : Supply and Erection garden-light fitting with holder and 160 W
mercury blended lamp & choke : 22" dia
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,283
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,284
Item Name : Supply and Erection garden-light fitting with porcelain holder 125
W mercury vapour lamp & choke : 19" dia
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,285
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Supply and Erection garden-light fitting with porcelain holder 125
W mercury vapour lamp & choke : 22" dia
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,286
DESCRIPTION OF ITEM :
Item Code : 15-65-d
Item Name :
Detail Qty Unit
MATERIAL
Garden light fixture with 1 No
LED 25-30 watts.
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,287
Item Name : Supply and Erection flood-light fitting with holder, complete 14"
dia with 500-W lamp
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,288
Item Name : Supply and Erection flood-light fitting with holder, complete 19«"
dia with 1000-W lamp
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,289
Item Name : Making hole in wall with necessary masonry work for exhaust fan any
size complete
2,290
Item Name : Supply and Erection best quality AC ceiling fan complete with GI
rod, canopy, blades & regulator : 36" sweep
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,291
Item Name : Supply and Erection best quality AC ceiling fan complete with GI
rod, canopy, blades & regulator : 48" sweep
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,292
Item Name : Supply and Erection best quality AC ceiling fan complete with GI
rod, canopy, blades & regulator : 56" sweep
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,293
DESCRIPTION OF ITEM :
Item Code : 15-68-d
Item Name :
Detail Qty Unit
MATERIAL
Pedestal fan 24" of appd 1 Each
quality
2,294
Item Name : Supply, installation, testing & commissioning of Direct axial Wall
Bracket fan
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
2,295
Item Name : Supply, installation, testing & commissioning of Direct axial Wall
Bracket fan
2,296
Item Name : Supply and Erection best quality exhaust fan complete with shutter
& regulator : 12"sweep
LABOUR
Electrician 0.1 Day
Sundries (Labour Only):
2,297
LABOUR
Electrician 0.1 Day
Sundries (Labour Only):
2,298
Item Name : Supply and Erection best quality exhaust fan complete with shutter
& regulator : 18"sweep
LABOUR
Electrician 0.1 Day
Sundries (Labour Only):
2,299
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 15-69-d
Item Name :
Detail Qty Unit
MATERIAL
Exhaust fan(round) upto 1 Each
6" dia (imported)
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
2,300
Item Name : Supply and Erection transpower auto circuit breaker 3-phase, 400V
fungus moisture proofing : 30 Amp.
LABOUR
Electrician 0.4 Day
Sundries (Labour Only):
2,301
Item Name : Supply and Erection transpower auto circuit breaker 3-phase, 400V
fungus moisture proofing : 60 Amp.
LABOUR
Electrician 0.4 Day
Sundries (Labour Only):
2,302
Item Name : Supply and Erection transpower auto circuit breaker 3-phase, 400V
fungus moisture proofing : 100 Amp.
LABOUR
Electrician 0.475 Day
Sundries (Labour Only):
2,303
Item Name : Supply and Erection single phase imported auto circuit breaker 6
Amp.
LABOUR
Electrician 0.075 Day
Sundries (Labour Only):
2,304
Item Name : Supply and Erection single phase imported auto circuit breaker 15
Amp.
Detail Qty Unit
MATERIAL
Auto C.Breaker 1P 15Amp 1 No
LABOUR
Electrician 0.075 Day
Sundries (Labour Only):
2,305
Item Name : Supply and Erection single phase imported auto circuit breaker 20
Amp.
LABOUR
Electrician 0.075 Day
Sundries (Labour Only):
2,306
Item Name : Supply and Erection single phase imported auto circuit breaker 30
Amp.
Detail Qty
MATERIAL
Auto C.Breaker 1P 30Amp 1
LABOUR
Electrician 0.075
Sundries (Labour Only):
2,307
Item Name : Supply and Erection of bus bars for 500 volts 3 phase AC S/W 4
copper bars 40 Amp with bar size 1 1/2" X 1/8"
LABOUR
Labourer 0.5 Day
Electrician 0.75 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,308
Item Name : Supply and Erection of bus bars 500 volts 3 phase AC supply with 4
copper bars - 100 Amp with bar size1 1 1/2" X 1/8"
LABOUR
Labourer 0.5 Day
Electrician 0.75 Day
Sundries (Labour Only):
2,309
LABOUR
Labourer 1 Day
Electrician 1.25 Day
Sundries (Labour Only):
2,310
Item Name : Supply and Erection of bus bars 500 volts 3 phase AC supply with 4
copper bars - 300 Amp with bar size 2" X 3/16"
Detail Qty
MATERIAL
Porcelain Bridge 8
Copper strip 350x50x4mm 4
Box 450x300x40 mm 1
Rag bolt 225x16mm 4
Miscellaneous II 2.5
L-iron II 1
LABOUR
Labourer 1.25
Electrician 1.5
Sundries (Labour Only):
2,311
Item Name : Supply and Erection of bus bars 500 volts 3 phase AC supply with 4
copper bars - 500 Amp with size 2" X 1/4"
Detail Qty
MATERIAL
Porcelain Bridge 8
Copper strip 350x50x6mm 4
Box 450x300x40 mm 1
Rag bolt 225x16mm 4
Miscellaneous II 3
L-iron II 1
LABOUR
Labourer 1
Electrician 2
Sundries (Labour Only):
2,312
LABOUR
Skilled Labour 0.0208 Day
Sundries (Labour Only):
2,313
DESCRIPTION OF ITEM :
Item Code : 15-72-g
Item Name : Supply & erection of Nut & Bolt 8'' or 9''x5/8''
Detail Qty Unit
MATERIAL
Nut & bolt 8'' or 1 No
9''x5/8''
LABOUR
Skilled Labour 0.0208 Day
Sundries (Labour Only):
2,314
DESCRIPTION OF ITEM :
Item Code : 15-72-h
Item Name : Supply & erection of Nut & Bolt 10''x5/8''
Detail Qty Unit
MATERIAL
Nut & bolt 10''x5/8''. 1 No
LABOUR
Skilled Labour 0.0208 Day
Sundries (Labour Only):
2,315
DESCRIPTION OF ITEM :
Item Code : 15-72-i
Item Name : Supply & erection of galvanized J-bolts
Detail Qty Unit
MATERIAL
25mm dia 1000 mm long 1 No
glavanized J-bolts with
8'' threads, 2 nuts and 2
washers.
LABOUR
Electrician 0.04 Day
Sundries (Labour Only):
2,316
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Supply and Erection of bracket of channel 3" X 1 1/2" X 1/4"
section 2' long for 2 lines
Detail Qty
MATERIAL
Nut & bolt 5/8" 2
Steel Plate 2 x 3/4 x 0.9
1/4
MS Channel 3 x 1.5 x 1/4 3.5
LABOUR
Electrician 0.04 Day
Sundries (Labour Only):
2,317
Item Name : Supply and Erection of bracket of MS channel 3" X 1 1/2" X 1/4"
Section:- 4' long for 4 lines
Detail Qty
MATERIAL
Nut & bolt 5/8" 4
Steel Plate 2 x 3/4 x 0.9
1/4
MS Channel 3 x 1.5 x 1/4 7
LABOUR
Electrician 0.04 Day
Sundries (Labour Only):
2,318
Item Name : Supply and Erection of anchor rod honley type for poles i/e clamps
& 7/13 SWG stay wire straining screws PCC 1:3:6
LABOUR
Labourer 0.009 Day
Electrician 0.003 Day
Sundries (Labour Only):
2,319
Item Name : Supply and Erection cubical type factory fabricated floor/wall
mounting steel main board comp. : On surface
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,320
Item Name : Supply and Erection cubical type factory fabricated floor/wall
mounting steel main board comp. : Recessed
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,321
Item Name : Fluorescent tube lights fitting 2.5x2.5 feet square type suitable
for fixing in recess or direct on complete with 4 Nos 2 ft 20 watts
tubes, chokes, starters, holders complete in all respects in steel
body.
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,322
Item Name : Supply and Fixing of fluorescent tube fitting rectangular box types
housing made of 22 SWG stave enameled steel sheet having spring
load inner frame attachment with acrylic or polythene complete
with 2 No 4 ft 40 watts
Detail Qty Unit
MATERIAL
Fluoresent tube fitting 1 No
rectan
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,323
LABOUR
Carpenter 0.25 Day
Electrician 0.1 Day
Sundries (Labour Only):
2,324
LABOUR
Carpenter 0.25 Day
Electrician 0.1 Day
Sundries (Labour Only):
2,325
2,326
Item Name : Supply, installation, testing & commissioning of Exhaust Fan 10'' dia
with plastic body, fan blades and louvers, complete in all respects
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,327
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
2,328
Item Name : Supply and Fixing of 18" dia Direct axial Wall Bracket fan,1450Rpm, Max
50db sound level Fan shall be made with 99% purity Copper windings
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
2,329
Item Name : Supply and Fixing PVC conduit for surface wiring (dura duct) 1/2"
including all charges for nail screws etc
LABOUR
Electrician 0.009 Day
Sundries (Labour Only):
2,330
Item Name : Supply and Fixing PVC conduit for surface wiring (dura duct) 1"
including all charges for nail screws etc
2,331
Item Name : PVC conduit for surface wiring (dura duct) 1.5" including all
charges for nail screws etc complete
LABOUR
Electrician 0.009 Day
Sundries (Labour Only):
2,332
LABOUR
Electrician 0.009 Day
Sundries (Labour Only):
2,333
Item Name : Supply and Erection PVC duct for wiring purpose complete Recessed
in walls including chase etc. : 3"x3" I/d
LABOUR
Electrician 0.018 Day
Sundries (Labour Only):
Item Name : Supply and Erection PVC duct for wiring purpose complete Recessed
in walls including chase etc. : 4"x4" I/d
LABOUR
Electrician 0.018 Day
Sundries (Labour Only):
2,335
DESCRIPTION OF ITEM :
Item Code : 15-80
Item Name : Supply and Fixing dimmer switch complete
Detail Qty
MATERIAL
Dimmer Switch 1
LABOUR
Electrician 0.04
Sundries (Labour Only):
2,336
DESCRIPTION OF ITEM :
Item Code : 15-81
Item Name : Supply and Fixing 20 Amp power plug
Detail Qty Unit
MATERIAL
Power plug 20 Amp 1 No.
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,337
DESCRIPTION OF ITEM :
Item Code : 15-82
Item Name : Supply and Fixing porcelain power plug 30 Amp
Detail Qty Unit
MATERIAL
Power plug 30 Amp 1 No.
LABOUR
Electrician 0.1 Day
Sundries (Labour Only):
2,338
DESCRIPTION OF ITEM :
Item Code : 15-83
Item Name : Supply and fixing light plug 10 Amp
Detail Qty Unit
MATERIAL
light plug 10 Amp 1 No.
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,339
DESCRIPTION OF ITEM :
Item Code : 15-84
Item Name : Supply and fitting of capacitor 2.2 uf for ceiling fans
Detail Qty Unit
MATERIAL
Capacitor 2.2 uf 1 No.
LABOUR
Electrician 0.05 Day
Sundries (Labour Only):
2,340
Item Name : Supply and fitting of ball bearing of size 6201, 6202 or 6203 for
ceiling fans
LABOUR
Electrician 0.063 Day
Sundries (Labour Only):
2,341
DESCRIPTION OF ITEM :
Item Code : 15-86
Item Name : Supply and erection of cut out, bakelite open type
Detail Qty Unit
MATERIAL
Screw 1" 0.1667 Dose
Cut out bakelite open 1 Day
type
LABOUR
Electrician 0.011 Day
Sundries (Labour Only):
2,342
DESCRIPTION OF ITEM :
Item Code : 15-87
Item Name :
Detail Qty Unit
MATERIAL
Screw 1" 2 Dose
Cut out bakelite recessed 1 Day
type
LABOUR
Electrician 0.011 Day
Sundries (Labour Only):
2,343
DESCRIPTION OF ITEM :
Item Code : 15-88
Item Name : Supply and erection of kit kat 500 volts 15/20 Amp
Detail Qty Unit
MATERIAL
Screw 1" 0.1667 Dose
Kit Kat 500 volts 15/20 1 No
Amp
LABOUR
Labourer 0.004 Day
Electrician 0.016 Day
Sundries (Labour Only):
2,344
DESCRIPTION OF ITEM :
Item Code : 15-89
Item Name : Supply and erection of kit kat 500 volts 30/35 Amp
Detail Qty Unit
MATERIAL
Screw 1" 0.1667 Dose
30/35Amp KIT KAT 1 No
LABOUR
Labourer 0.004 Day
Electrician 0.018 Day
Sundries (Labour Only):
2,345
DESCRIPTION OF ITEM :
Item Code : 15-90
Item Name : Supply and erection of kit kat 500 volts 60/65 Amp
Detail Qty Unit
MATERIAL
Screw 1" 0.1667 Dose
60/65Amp KIT KAT 1 No
LABOUR
Labourer 0.004 Day
Electrician 0.027 Day
Sundries (Labour Only):
2,346
DESCRIPTION OF ITEM :
Item Code : 15-91
Item Name : Supply and erection of kit kat 500 volts 100 Amp
Detail Qty Unit
MATERIAL
Screw 1" 0.1667 Dose
100Amp KIT KAT 1 No
LABOUR
Labourer 0.007 Day
Electrician 0.031 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 15-92
Item Name : Supply and erection of kit kat 500 volts 200 Amp
Detail Qty Unit
MATERIAL
Screw 1" 0.1667 Dose
200Amp KIT KAT 1 No
LABOUR
Labourer 0.009 Day
Electrician 0.036 Day
Sundries (Labour Only):
2,348
DESCRIPTION OF ITEM :
Item Code : 15-93
Item Name : Supply and erection of kit kat 500 volts 300 Amp
Detail Qty Unit
MATERIAL
Screw 1" 0.1667 Dose
300Amp KIT KAT 1 No
LABOUR
Labourer 0.009 Day
Electrician 0.036 Day
Sundries (Labour Only):
2,349
DESCRIPTION OF ITEM :
Item Code : 15-94
Item Name : Supply and erection of kit kat 500 volts 400 Amp
Detail Qty Unit
MATERIAL
Screw 1" 0.1667 Dose
400Amp KIT KAT 1 No
LABOUR
Labourer 0.02 Day
Electrician 0.04 Day
Sundries (Labour Only):
2,350
DESCRIPTION OF ITEM :
Item Code : 15-95-a
Item Name :
Detail Qty Unit
MATERIAL
2.2 KVA Gernerator 1 No
Extension lead 10 Yard
Change over switch three 1 No
pole
Board, Power Plug & Power 1 Set
Cost of Oil (initial 10 Ltr
start)
LABOUR
Skilled Labour 0.5 Day
Electrician 0.5 Day
Sundries (Labour Only):
2,351
DESCRIPTION OF ITEM :
Item Code : 15-95-b
Item Name :
Detail Qty
MATERIAL
2.2 KVA Gernerator 1
Extension lead 10
Change over switch three 1
pole
Board, Power Plug & Power 1
Cost of Oil (initial 10
start)
Gas conversion kit 1
LABOUR
Skilled Labour 0.5 Day
Electrician 0.5 Day
Sundries (Labour Only):
2,352
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 15-95-c
Item Name :
Detail Qty
MATERIAL
3.1 KVA Gernerator 1
Extension lead 10
Change over switch three 1
pole
Board, Power Plug & Power 1
Cost of Oil (initial 10
start)
Gas conversion kit 1
LABOUR
Skilled Labour 0.5 Day
Electrician 0.5 Day
Sundries (Labour Only):
2,353
DESCRIPTION OF ITEM :
Item Code : 15-95-d
Item Name :
Detail Qty
MATERIAL
3.1 KVA Gernerator 1
Extension lead 10
Change over switch three 1
pole
Board, Power Plug & Power 1
Cost of Oil (initial 10
start)
LABOUR
Skilled Labour 0.5
Electrician 0.5
Sundries (Labour Only):
2,354
DESCRIPTION OF ITEM :
Item Code : 15-96-a
Item Name : Supply & erection of HT pole 36' High (Spun Type)
Detail Qty Unit
MATERIAL
HT pole (Spun Type 36 ft 1 No
High)
LABOUR
Skilled Labour 0.33 Day
Electrician 0.33 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 1 Hour
2,355
DESCRIPTION OF ITEM :
Item Code : 15-96-b
Item Name : Supply & erection of LT pole 31' High (Spun Type)
Detail Qty Unit
MATERIAL
Lt pole (Spun Type 31 ft 1 No
high)
LABOUR
Skilled Labour 0.33 Day
Electrician 0.33 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 1 Hour
2,356
DESCRIPTION OF ITEM :
Item Code : 15-97-a
Item Name : Supply & erection of HT pole 36' High(H-Type)
Detail Qty Unit
MATERIAL
HT PC pole (H-Type 36 ft 1 No
high)
LABOUR
Skilled Labour 0.33 Day
Electrician 0.33 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 1 Hour
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.
2,357
DESCRIPTION OF ITEM :
Item Code : 15-97-b
Item Name : Supply & erection LT Pole 31' High (H-Type)
Detail Qty Unit
MATERIAL
LT PC pole (H-Type 31 ft 1 No
High)
LABOUR
Skilled Labour 0.33 Day
Electrician 0.33 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 1 Hour
2,358
DESCRIPTION OF ITEM :
Item Code : 15-98-a
Item Name : Supply & stringing of ACSR Osprey Conductor
Detail Qty Unit
MATERIAL
ACSR Osprey Conductor. 1 Rft
LABOUR
Skilled Labour 0.01 Day
Electrician 0.01 Day
Sundries (Labour Only):
2,359
DESCRIPTION OF ITEM :
Item Code : 15-98-b
Item Name : Supply & stringing of ACSR Dog Conductor
Detail Qty Unit
MATERIAL
ACSR Dog Conductor 1 Rft
(7/0.186)
LABOUR
Skilled Labour 0.01 Day
Electrician 0.01 Day
Sundries (Labour Only):
2,360
DESCRIPTION OF ITEM :
Item Code : 15-98-c
Item Name : Supply & stringing of ACSR Rabbit Conductor
Detail Qty Unit
MATERIAL
ACSR Rabbit Conductor 1 Rft
(7/0.132)
LABOUR
Skilled Labour 0.01 Day
Electrician 0.01 Day
Sundries (Labour Only):
2,361
DESCRIPTION OF ITEM :
Item Code : 15-98-d
Item Name : Supply & stringing of AAC Wasp Conductor ( 7/0.173")
Detail Qty Unit
MATERIAL
AAC Wasp 1 Rft
Conductor.(7/0.173)
LABOUR
Skilled Labour 0.01 Day
Electrician 0.01 Day
Sundries (Labour Only):
2,362
LABOUR
Skilled Labour 0.01 Day
Electrician 0.01 Day
Sundries (Labour Only):
2,363
DESCRIPTION OF ITEM :
Item Code : 15-99-a
Item Name : Supply & erection of 11 KV Disc Insulator
Detail Qty Unit
MATERIAL
11 KV Disc Insulator. 1 No
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
2,364
DESCRIPTION OF ITEM :
Item Code : 15-99-b
Item Name : Supply & erection of 11 KV Pin Insulator
Detail Qty Unit
MATERIAL
11 KV Pin Insulator. 1 No
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
2,365
DESCRIPTION OF ITEM :
Item Code : 15-99-c
Item Name : Supply & erection of 11 KV pin for Steel-x-arm
Detail Qty Unit
MATERIAL
11 KV pin for 1 No
Steel-x-arm.
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
2,366
DESCRIPTION OF ITEM :
Item Code : 15-99-d
Item Name : Supply & erection of Spool Insulator
Detail Qty Unit
MATERIAL
Spool Insulator. 1 No
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,367
DESCRIPTION OF ITEM :
Item Code : 15-100-a
Item Name : Supply & erection of
Detail Qty Unit
MATERIAL
25 KVA, 11/0.4 KV 1 No
Transformer.
LABOUR
Skilled Labour 1 Day
Electrician 1 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 1 Hour
DESCRIPTION OF ITEM :
Item Code : 15-100-b
Item Name : Supply & erection of 50 KVA, 11/0.4 KV Transformer
Detail Qty Unit
MATERIAL
50 KVA, 11/0.4 KV 1 No
Transformer.
LABOUR
Skilled Labour 1 Day
Electrician 1 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 1 Hour
2,369
DESCRIPTION OF ITEM :
Item Code : 15-100-c
Item Name : Supply & erection of 100 KVA, 11/0.4 KV Transformer
Detail Qty Unit
MATERIAL
100 KVA, 11/0.4 KV 1 No
Transformer.
LABOUR
Skilled Labour 1 Day
Electrician 1 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 1 Hour
2,370
DESCRIPTION OF ITEM :
Item Code : 15-100-d
Item Name : Supply & erection of 200 KVA, 11/0.4 KV Transformer
Detail Qty Unit
MATERIAL
200 KVA, 11/0.4 KV 1 No
Transformer.
LABOUR
Skilled Labour 1 Day
Electrician 1 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 1 Hour
2,371
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,372
DESCRIPTION OF ITEM :
Item Code : 15-101-b
Item Name : Supply & erection of Steel-x-Arm / D-Fitting
Detail Qty Unit
MATERIAL
Steel-x-Arm / D-Fitting. 1 No
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,373
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,374
DESCRIPTION OF ITEM :
Item Code : 15-103
Item Name : Supply & erection of Stay Wire
Detail Qty Unit
MATERIAL
Stay Wire GSL 10 mm. 1 Kg
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,375
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,376
DESCRIPTION OF ITEM :
Item Code : 15-105-a
Item Name : Supply & erection of Earth Rod
Detail Qty Unit
MATERIAL
Earth Rod 10' long. 1 No
LABOUR
Skilled Labour 0.25 Day
Electrician 0.125 Day
Sundries (Labour Only):
2,377
DESCRIPTION OF ITEM :
Item Code : 15-105-b
Item Name : Supply & erection of Earthing wire GSL 6 mm
Detail Qty
MATERIAL
Earthing wire GSL 6 mm. 1
LABOUR
Skilled Labour 0.0625
Sundries (Labour Only):
2,378
Item Name : Drilling of earth bore 3" dia 70 to 80 ft. deep or up to permanent
water table, back filling, ramming, complete in all respect. grounding
bores shall be made at 6 to 8 feet away from foundation and distance
between earth bore shall not be less than 10 feet
LABOUR
Skilled Labour 1 Day
Sundries (Labour Only):
2,379
DESCRIPTION OF ITEM :
Item Code : 15-105-d
Item Name :
Detail Qty
MATERIAL
Single Arm Pole. Having 1
step section 152.4mm :
127mm : 76.2 mm dia.
steel tubular pole
consisting of M.S. black
pipe 8 meter high
including 300mm high
service door with a 215
key lock , duly
degreased, derusted with
hot dipped galvanized,
having 2 coats of
aluminium paint, bottom
end welded to 20mm M.S.
plate 470mm x 470mm with
4 holes 28mm dia. and 4
nos. stiffener plates
20mm thick as shown on
drawing, including cost
of all necessary
materials, .
LABOUR
Skilled Labour 0.5 Day
Electrician 0.5 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 1 Hour
2,380
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
2,381
Item Name : Supply, Installation & Connecting up of earth electrodes with 600mm x
600mm x 3.2mm conductors to main earth bar including all accessories,
in 50mm dia G.I. pipe / PVC pipe class D/E up inspection chamber, heavy
duty C.I. Cover etc.
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,382
DESCRIPTION OF ITEM :
Item Code : 15-105-f
Item Name :
Detail Qty
MATERIAL
Supply of Grounding 1
connecting points
consisting of copper
plate 300mm long x50mm
wide x 6mm thick to be
installed, complete with
fixing arrangement, brass
nuts bolts, washers,
lugs, 12.5mm dia. holes
to facilitate connections
of Incoming copper
strips / copper
conductors.
LABOUR
Skilled Labour 0.5 Day
Electrician 0.5 Day
Sundries (Labour Only):
2,383
Item Name : Providing & fixing of main earth bar, with 80mm x50mm x.20mm copper bar
with terminals, insulator supports, lugs, bolts, etc. including bonding
to rebars of structure.
MATERIAL
earth bar, with 80mm x 1 Job
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,384
Item Name : Providing & fixing of Plate type Earthing commpressed with execveted
hole 6"up 63 feet,GI pipe 2"(50mm)with Tees , Sockets , Endcap of 60
(RFT) Copper Plate of 1/2"x 2"x 48", 2x 70mmsq S/Core copper bare
conductor 125 (Rft) Earth Connection Point of 1200 x 50 x 50mm (L x W x
T)
all respect
Detail Qty
MATERIAL
EARTHING SYSTEM: 1
Plate type Earthing
commpressed with
execveted hole 6"up 63
feet,GI pipe 2"(50mm)with
Tees , Sockets , Endcap
of 60 (RFT) Copper Plate
of 1/2"x 2"x 48", 2x
70mmsq S/Core copper bare
conductor 125 (Rft) Earth
Connection Point of 1200
x 50 x 50mm (L x W x T)
Inspection Pit of 300 x
300 x 450 mm (L x W x D)
complated with all
respect.
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,385
DESCRIPTION OF ITEM :
Item Code : 15-105-i
Item Name :
Detail Qty
MATERIAL
Construction of water 1
tight brick type
Grounding inspection pit
with 9” thick walls 300mm
x 300mm x 300mm internal
size with cement mortar,
internal plaster 1:4, RCC
100 mm thick inspection
pit water tight removable
cover with lifting hooks,
copper test link, with
all necessary materials.
LABOUR
Skilled Labour 0.25 Day
Electrician 0.25 Day
Sundries (Labour Only):
2,386
Detail Qty
MATERIAL
LIGHTNING PROTECTION 1
SYSTEM:
Earth electrode for
lightning protection
system comprise 17.4mm
dia, 3000mm long Copper
deposited steel rod,
including appropriate
clamp for clamping of
the (25x3)mm tape. The
copper deposited steel
rod shall be hammered
into the ground to the
depth of twelve inches
below the ground surface.
The earth electrode
includes CC inspection
chamber with cover of
size 2'x2', excavation
backfilling, etc.making
the job
LABOUR
Skilled Labour 1 Day
Electrician 1 Day
Sundries (Labour Only):
2,387
2,388
DESCRIPTION OF ITEM :
Item Code : 15-108
Item Name : Supply & erection of double Arming Bolt
Detail Qty Unit
MATERIAL
double Arming Bolt. 1 No
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,389
DESCRIPTION OF ITEM :
Item Code : 15-109
Item Name : Supply & erection of D-Bracket along with cotter pin
Detail Qty Unit
MATERIAL
D-Bracket along with 1 No
cotter pin.
LABOUR
Electrician 0.0417 Day
Sundries (Labour Only):
2,390
DESCRIPTION OF ITEM :
Item Code : 15-110-a
Item Name :
Detail Qty Unit
MATERIAL
double pole platform for 1 No
transformers.
LABOUR
Skilled Labour 0.5 Day
Electrician 0.5 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 1 Hour
2,391
DESCRIPTION OF ITEM :
Item Code : 15-110-b
Item Name :
Detail Qty Unit
MATERIAL
single pole platform for 1 No
transformers.
LABOUR
Skilled Labour 0.5 Day
Electrician 0.5 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 0.5 Hour
2,392
DESCRIPTION OF ITEM :
Item Code : 15-111
Item Name : Supply & erection of drop out cutouts
Detail Qty Unit
MATERIAL
drop out cutouts (11 KV 1 No
SY-II unit).
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 15-112-a
Item Name : Supply & erection of dead end clamp
Detail Qty Unit
MATERIAL
11 KV dead end clamp for 1 No
Osprey Conductor.
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,394
DESCRIPTION OF ITEM :
Item Code : 15-112-b
Item Name : Supply & erection of dead end clamp
Detail Qty Unit
MATERIAL
11 KV dead end clamp for 1 No
Dog Conductor.
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,395
DESCRIPTION OF ITEM :
Item Code : 15-112-c
Item Name : Supply & erection of dead end clamp
Detail Qty Unit
MATERIAL
11 KV dead end clamp for 1 No
Rabbit Conductor.
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,396
DESCRIPTION OF ITEM :
Item Code : 15-113-a
Item Name : Supply & erection of PG Connector
Detail Qty Unit
MATERIAL
PG Connector for Osprey 1 No
Conductor T-220.
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
2,397
DESCRIPTION OF ITEM :
Item Code : 15-113-b
Item Name : Supply & erection of PG Connector
Detail Qty Unit
MATERIAL
PG Connector for Dog 1 No
Conductor T-150.
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
2,398
DESCRIPTION OF ITEM :
Item Code : 15-113-c
Item Name : Supply & erection of PG Connector
Detail Qty Unit
MATERIAL
PG Connector for Rabbit 1 No
Conductor T-110.
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,399
DESCRIPTION OF ITEM :
Item Code : 15-114-a
Item Name : Supply & erection of Loop dead end clamp
Detail Qty Unit
MATERIAL
Loop dead end clamp 1 No
LC-16.
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,400
DESCRIPTION OF ITEM :
Item Code : 15-114-b
Item Name : Supply & erection of Loop dead end clamp
Detail Qty Unit
MATERIAL
Loop dead end Clamp 1 No
LC-10.
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,401
Item Name : Supply & erection of double arm GI round conical pole, hot dipped
galvanized (80 microns) 12 meters long overall thickness 4 mm, base dia
180 mm and top dia 62 with plate arrangement 450mm x 450mm x 25mm,
complete in all respects.
LABOUR
Skilled Labour 1.5 Day
Electrician 1.5 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 1
Item Name : Supply & erection of Single arm GI round conical pole, hot dipped
galvanized (80 microns) 12 meters long overall thickness 4 mm, base dia
180 mm and top dia 62 with plate arrangement 450mm x 450mm x 25mm,
complete in all respects.
LABOUR
Skilled Labour 1.5 Day
Electrician 1.5 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 1
2,403
Item Name : Supply & erection of Double arm GI round conical pole, hot dipped
galvanized (80 microns) 10 meters long overall thickness 4 mm, base dia
180 mm and top dia 62 with plate arrangement 450mm x 450mm x 25mm,
complete in all respects.
LABOUR
Skilled Labour 1.5 Day
Electrician 1.5 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 1
2,404
Item Name : Supply & erection of Double arm GI round conical pole, hot dipped
galvanized (80 microns) 12 meters long overall thickness 5 mm, base dia
200 mm and top dia 100 with plate arrangement 450mm x 450mm x 25mm,
complete in all respects.
LABOUR
Skilled Labour 1.5 Day
Electrician 1.5 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 1
2,405
Item Name : Supply & erection of Single arm GI round conical pole, hot dipped
galvanized (microns) 10 meters long overall thickness 5 mm, base dia
200 mm and top dia 100 with plate arrangement 450mm x 450mm x 25mm,
complete in all respects.
LABOUR
Skilled Labour 1.5 Day
Electrician 1.5 Day
Sundries (Labour Only):
EQUIPMENT
Mobile Crane 10 Ton 1
2,406
DESCRIPTION OF ITEM :
Item Code : 15-116
Item Name : Supply & erection of Timer TB 438
Detail Qty Unit
MATERIAL
Timer TB 438 or 1 No
equivalent (imported).
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,407
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 15-117
Item Name : Supply & erection of Magnetic contactor
Detail Qty Unit
MATERIAL
Magnetic contactor 30 1 No
amps 240V/440V (imported)
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,408
DESCRIPTION OF ITEM :
Item Code : 15-118
Item Name :
Detail Qty
MATERIAL
Providing and laying 1
pipe at a depth of 2-1/2'
including excavation and
back filling in
soft,graveling & hard
soil & at road crossing
and poles etc. including
reconditioning of road
for Road Lights Street
Lights & boundary Wall
Lights & as per
instruction of engineer
incharge & as specified
by the consultants of
following size:
a) 4"dia RCC Pipe
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,409
DESCRIPTION OF ITEM :
Item Code : 15-119
Item Name : Supply & erection of 2" PVC pipe flexible (weather proof)
Detail Qty Unit
MATERIAL
2" PVC pipe flexible 1m
(weather proof)
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,410
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,411
DESCRIPTION OF ITEM :
Item Code : 15-121
Item Name : Supply & erection of DIN rail
Detail Qty Unit
MATERIAL
DIN rail (zinc elated) 1 No
LABOUR
Electrician 0.01 Day
Sundries (Labour Only):
2,412
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,413
LABOUR
Electrician 0.06 Day
Sundries (Labour Only):
2,414
LABOUR
Electrician 0.08 Day
Sundries (Labour Only):
2,415
LABOUR
Electrician 0.09 Day
Sundries (Labour Only):
2,416
LABOUR
Electrician 0.12 Day
Sundries (Labour Only):
2,417
LABOUR
Electrician 0.13 Day
Sundries (Labour Only):
2,418
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
2,419
LABOUR
Electrician 0.75 Day
Sundries (Labour Only):
2,420
LABOUR
Electrician 1
Sundries (Labour Only):
2,421
LABOUR
Electrician 1
Sundries (Labour Only):
2,422
LABOUR
Electrician 1.25
Sundries (Labour Only):
2,423
DESCRIPTION OF ITEM :
Item Code : 15-123-a
Item Name : Supply & erection of
Detail Qty Unit
MATERIAL
3 Core Cable PVC/PVC '3 1 No
core 2.5 sqmm Cu/PVC/PVC
LABOUR
Electrician 0.007 Day
Sundries (Labour Only):
2,424
DESCRIPTION OF ITEM :
Item Code : 15-123-b
Item Name : Supply & erection of 3 CORE FLXIBLE POWER CABLE 1
Detail Qty Unit
MATERIAL
POWER CABLE 1.5 mm2 ; 3 1 No
CORE FLXIBLE
LABOUR
Electrician 0.007 Day
Sundries (Labour Only):
2,425
DESCRIPTION OF ITEM :
Item Code : 15-124-a
Item Name : Supply & erection of 2x10 mm2 Copper Cable
Detail Qty Unit
MATERIAL
2x10 mm2 copper cable. 1m
LABOUR
Electrician 0.008 Day
Sundries (Labour Only):
2,426
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 15-124-b
Item Name : Supply & erection of 2 core 1.5mmsq Fire Resistant cable
Detail Qty Unit
MATERIAL
2 core 1.5mmsq Fire 1m
Resistant cable
LABOUR
Electrician 0.007 Day
Sundries (Labour Only):
2,427
DESCRIPTION OF ITEM :
Item Code : 15-125
Item Name : Supply & erection of Flexible Copper Cable 1x4 mm2
Detail Qty Unit
MATERIAL
1x4 mm2 flexible copper 1 No
cable.
LABOUR
Electrician 0.007 Day
Sundries (Labour Only):
LABOUR
Electrician 0.03
Sundries (Labour Only):
2,429
LABOUR
Electrician 0.06
Sundries (Labour Only):
2,430
LABOUR
Electrician 0.09
Sundries (Labour Only):
2,431
LABOUR
Electrician 0.25
Sundries (Labour Only):
2,432
MATERIAL
Single Core PVC Insulated 1 Meter
400mm2
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,433
Item Name : Supply at site, installation, testing and commissioning of the One gang
light control switches 10 Amps, 250Volts one way, including appropriate
size concealed MS, powder coated back box, complete in all respects.
MATERIAL
10 Amps, 250Volts one 1 No
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,434
Item Name : Supply at site, installation, testing and commissioning of Two gang
light control switches 10 Amps, 250Volts one way, including appropriate
size concealed MS, powder coated back box, complete in all respects.
MATERIAL
10 Amps, 250Volts one 1 No
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,435
Item Name : Supply at site, installation, testing and commissioning of Three gang
light control switches 10 Amps, 250Volts one way, including appropriate
size concealed MS, powder coated back box, complete in all respects.
MATERIAL
10 Amps, 250Volts one 1 No
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,436
Item Name : Supply at site, installation, testing and commissioning of Four gang
light control switches 10 Amps, 250Volts one way, including appropriate
size concealed MS, powder coated back box, complete in all respects.
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,437
Item Name : Supply at site, installation, testing and commissioning of Five gang
light control switches 10 Amps, 250Volts one way, including appropriate
size concealed MS, powder coated back box, complete in all respects.
MATERIAL
10 Amps, 250Volts one 1 No
LABOUR
Electrician 0.04 Day
Sundries (Labour Only):
2,438
Item Name : Supply at site, installation, testing and commissioning ofSix gang
light control switches 10 Amps, 250Volts one way, including appropriate
size concealed MS, powder coated back box, complete in all respects.
MATERIAL
10 Amps, 250Volts one 1 No
LABOUR
Electrician 0.04 Day
Sundries (Labour Only):
2,439
Item Name : Supply at site, installation, testing and commissioning of the Eight
gang light control switches 10 Amps, 250Volts one way, including
appropriate size concealed MS, powder coated back box, complete in all
respects.
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
2,440
Item Name : Supply at site, installation, testing and commissioning of One gang
light control switches 10 Amps, 250Volts two way, including appropriate
size concealed MS, powder coated back box, complete in all respects.
MATERIAL
10 Amps, 250Volts two 1 No
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,441
Item Name : Supply at site, installation, testing and commissioning of 2 & 3 pin
switched socket unit 5/10 Amps, 250Volts, round pin including
appropriate size MS, powder coated back box, complete in all respects.
MATERIAL
5 /10 Amps, 250Volts, 2 & 1 No
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,442
MATERIAL
13 /15 Amps, 250Volts, 3 1 No
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,443
MATERIAL
20 Amps, 250Volts, 3 pin 1 No
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,444
Item Name : Supply at site, installation, testing and commissioning of Push Button
10 Amps, 250Volts, including appropriate size MS, powder coated back
box, complete in all respects.
MATERIAL
10 Amps, 250Volts, push 1 No
button including
appropriate size MS,
powder coated back box.
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,445
Item Name : Supply at site, installation, testing and commissioning of Fan Dimmer
with switch/ MS, powder coated back box with all associated
accessories, complete in all respects.
MATERIAL
Fan Dimmer with switch/ 1 No
MS, powder coated back
box with all associated
accessories.
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,446
MATERIAL
20 Amps DP switch with 1 No
neon indication lamp
complete with MS, powder
coated back box.
LABOUR
Electrician 0.04 Day
Sundries (Labour Only):
2,447
Item Name : Supply at site, installation, testing and commissioning of Three Pin
220 V 05/10 Amp Switch socket, complete in all respects.
2,448
Item Name : Supply at site, installation, testing and commissioning of Three Pin
220 V 20 Amps Switch socket, complete in all respects.
LABOUR
Electrician 0.04 Day
Sundries (Labour Only):
2,449
LABOUR
Electrician 0.04 Day
Sundries (Labour Only):
2,450
Item Name : Supply and installation of Flush Face Plate One Way Switch 220V 10 Amps
Switch, complete in all respects
LABOUR
Electrician 0.01 Day
Sundries (Labour Only):
2,451
Item Name : Supply and installation of Flush Face Plate Two Way Switch 220V 10 Amps
switch, complete in all respects
LABOUR
Electrician 0.01 Day
Sundries (Labour Only):
2,452
Item Name : Supply &. Installation of flush type switch (Single pole 220V 5 amps
switch 1 way) manufactured by fixed over sheet including appropriate
size outlet box of 16SWG black enameled MS sheet recessed in wall,
column etc. complete in all respects
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,453
Item Name : Supply &. Installation of flush type switch (Single pole 220V 10 amps
switch 2 way) manufactured by fixed over sheet including appropriate
size outlet box of 16SWG black enameled MS sheet recessed in wall,
column etc. complete in all respects
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,454
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,455
Item Name : Supply, installation, testing and commissioning of 2 core 1.5 Sqmm
stranded copper conductor tin coated with drain PVC insulated wires
600/1000 V. grade, fire resistant, low smoke, zero halogen Cu conductor
to be pulled in already installed 20mm dia. heavy duty PVC conduit
recessed in wall, columns, slab, floor or above false ceiling with all
necessary fixing accessories
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,456
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,457
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 15-130-c
Item Name :
Detail Qty Unit
MATERIAL
POWER AMPLIFIER, . 1 No
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,458
DESCRIPTION OF ITEM :
Item Code : 15-130-d
Item Name :
Detail Qty Unit
MATERIAL
120 watts Mixing 1 Each
Amplifier
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
Item Name : Supply, installation, testing & commissioning of Back Ground Music
Player
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
2,460
DESCRIPTION OF ITEM :
Item Code : 15-130-f
Item Name :
Detail Qty
MATERIAL
Goose neck Microphone 1
with local floor stand
and Boom BOSCH Model
LBC-2900-15 .
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,461
DESCRIPTION OF ITEM :
Item Code : 15-130-g
Item Name :
Detail Qty Unit
MATERIAL
Table Stand Microphone 1 No
BOSCH Model LBB-1950. .
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,462
Item Name : Supply, installation, testing & commissioning of Cordless MIC with
Receivers
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,463
DESCRIPTION OF ITEM :
Item Code : 15-130-i
Item Name :
Detail Qty Unit
MATERIAL
CEILING MOUNT SPEAKERS 1 No
6W, .
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,464
DESCRIPTION OF ITEM :
Item Code : 15-130-j
Item Name :
Detail Qty Unit
MATERIAL
WALL MOUNT SPEAKERS 60W, 1 No
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,465
DESCRIPTION OF ITEM :
Item Code : 15-130-k
Item Name :
Detail Qty Unit
MATERIAL
WALL MOUNT SPEAKERS 12W, 1 No
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,466
DESCRIPTION OF ITEM :
Item Code : 15-130-l
Item Name :
Detail Qty Unit
MATERIAL
BOSH 36Watts Column Loud 1 No
Speaker LAI-UW36-X
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,467
LABOUR
Electrician 0.003 Day
Sundries (Labour Only):
2,468
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Supply, connecting, testing & commissioning of recessed mounting 8" dia
Speaker having cylinderical shape 5W operating voltage 12V suitable for
PA system, complete in all respects.
MATERIAL
recessed mounting 8" dia 1 No
Speaker having
cylinderical shape 5W
operating voltage 12V
suitable for PA system, .
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
2,469
Item Name : Supply, testing and commissioning of 2 core 1.5mm. Sqmm stranded copper
conductor tin coated with drain PVC insulated wires 600/1000 V. grade,
fire resistant, LSZH Cu Conductor to be pulled in already installed
20mm dia. heavy duty PVC conduit recessed in wall, columns, slab, floor
or above false ceiling with all necessary fixing accessories as per
site conditions.
LABOUR
Skilled Labour 0.25 Day
Electrician 0.25 Day
Sundries (Labour Only):
2,470
MATERIAL
ANALOGE ADDRESSABLE 1 No
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,471
MATERIAL
ANALOGE ADDRESSABLE 1 No
SOUNDER WITH FLASHER; 24
VDC; MOUNTING BASE AND
BACK BOX; UL LISTED, .
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,472
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,473
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,474
Item Name : Supply, installation, testing & commissioning of Wall mounted Sounder
complete in all respect .
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,475
Item Name : Supply, installation, testing & commissioning of Micro processor based
Fire Alarm Control Panel, suppression consisting of loops and can
address around 125points, indicating circuits, including 2x12V VDC
Batteries, suppression zone built in power supply, including stand by
battery, alarm and trouble indication, silence alarm and reset system,
general alarm and reset system, general alarm facility, complete in all
respects.
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,476
MATERIAL
conventional type Fire 1 No
Alarm Control Panel
(FACP) having 2 zone
conventional type
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,477
Item Name : Supply, installation, testing & commissioning of Beam Detector, TX-RX,
50 meter Range, complete in all respects.
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,478
DESCRIPTION OF ITEM :
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,479
Item Name : Supply, installation, testing & commissioning of Manual call Point
completed in all respect.
2,480
LABOUR
Skilled Labour 0.125 Day
Electrician 0.125 Day
Sundries (Labour Only):
2,481
LABOUR
Skilled Labour 0.125 Day
Electrician 0.125 Day
Sundries (Labour Only):
2,482
LABOUR
Skilled Labour 0.125 Day
Electrician 0.125 Day
Sundries (Labour Only):
2,483
LABOUR
Skilled Labour 0.125 Day
Electrician 0.125 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.
2,484
LABOUR
Skilled Labour 0.125 Day
Electrician 0.125 Day
Sundries (Labour Only):
2,485
Detail Qty
MATERIAL
Layer 3 (Core) Level 1
Network Switch, Managable
for Data Rack, 24 Port
Giga Ethernet
(10/100/1000) with Copper
& Fiber Uplink Ports
Including Cost of 02 Nos
10 Giga SFP
Modules(Support 02 Nos
1.0 Giga SFP Modules) min
4 combo Rj45/SFP ports
supporting SX/LX/LH etc
min 4 SFP+ ports support
SX/LX/LH etc expansion
slots for future growth
Support stacking of up to
4 members using 1G/10G
ports Min throughput
should be 88 mpps. Min
switching capacity should
be 120 Gbps, Support
static routing, Sflow,
DLDP Support jumbo frames
9k & Mac address table
size should be 16k, Max
active vlans should be 4k
and Support port security
LABOUR
Electrician 3 Day
Sundries (Labour Only):
2,486
2,487
LABOUR
Skilled Labour 3 Day
Electrician 3 Day
Sundries (Labour Only):
2,488
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,489
Item Name : Supply and erection of Cable for Voice Communication System from
communication rack to each work station / outlet in 25mm PVC conduit /
channel as per drawing including termination, tagging at both ends,
complete in all respects
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
2,490
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,491
Item Name : Supply at site, installation, testing and commissioning of data cabinet
of approximate size as mentioned below, powder coated, having lockable
glass door at front, 4 exhaust fans on top, suitable for under
mentioned patch panels, consisting of the following voice and data
points to be terminated on modular patch panel, including cost of power
bus bar, input / output RJ-45 connectors suitable for Cat. 6a cables
patch guides, patch cords, both for Voice and Data, all necessary
accessories / materials for active and passive equipment, 24 ports
switch. The data cabinet shall be complete in all respects including
cost of all necessary materials / accessories required for proper
functioning for the data cabinet. Data cabinet shall be installed after
obtaining necessary permission from the computer specialist of the
Client.
Detail Qty Unit
MATERIAL
DATA RACK 08U 600x 600; 1 No
PREFORATED; 02x FANS; 1x
4 WAY ALL PDU;, .
LABOUR
Skilled Labour 1 Day
Electrician 1 Day
Sundries (Labour Only):
2,492
Item Name : Supply at site, installation, testing and commissioning of data cabinet
of approximate size as mentioned below, powder coated, having lockable
glass door at front, 4 exhaust fans on top, suitable for under
mentioned patch panels, consisting of the following voice and data
points to be terminated on modular patch panel, including cost of power
bus bar, input / output RJ-45 connectors suitable for Cat. 6a cables
patch guides, patch cords, both for Voice and Data, all necessary
accessories / materials for active and passive equipment, 24 ports
switch. The data cabinet shall be complete in all respects including
cost of all necessary materials / accessories required for proper
functioning for the data cabinet. Data cabinet shall be installed after
obtaining necessary permission from the computer specialist of the
Client.
LABOUR
Skilled Labour 1 Day
Electrician 1 Day
Sundries (Labour Only):
2,493
Item Name : Supply, Installation, testing and commissioning of 42 port DATA cabinet
with 3 no’s cabinet tray, 4 no’s power socket and with flexi glass door
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,494
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Supply at site, installation, testing and commissioning of data cabinet
of approximate size as mentioned below, powder coated, having lockable
glass door at front, 4 exhaust fans on top, suitable for under
mentioned patch panels, consisting of the following voice and data
points to be terminated on modular patch panel, including cost of power
bus bar, input / output RJ-45 connectors suitable for Cat. 6a cables
patch guides, patch cords, both for Voice and Data, all necessary
accessories / materials for active and passive equipment, 24 ports
switch. The data cabinet shall be complete in all respects including
cost of all necessary materials / accessories required for proper
functioning for the data cabinet. Data cabinet shall be installed after
obtaining necessary permission from the computer specialist of the
Client.
LABOUR
Skilled Labour 2 Day
Electrician 2 Day
Sundries (Labour Only):
2,495
Item Name : Supply and installation from computer outlet to 30 port patch panel
with CAT-6 DATA cable run in PVC conduit and complete in all respects
in walls including chase etc : 1.25" i/d
MATERIAL
From computer outlet to 1 Mtr
30 port patch panel with
CAT-6 DATA cable run in
PVC conduit and
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
2,496
Item Name : Supply and installation, testing and commissioning of 30 port data
patch panel surfaces mounted and complete in all respects
Detail Qty
MATERIAL
30 port data patch panel 1
surfaces mounted and
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,497
Item Name : Supply and installation of 30 ports 10/100-2 gaga uplink ports data
switch(CISCQ2960-24 TTL)
Detail Qty
MATERIAL
30 ports 10/100-2 gaga 1
uplink ports data
switch(CISCQ2960-24 TTL)
LABOUR
Electrician 3
Sundries (Labour Only):
2,498
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
2,499
Item Name : Supply and Installation of 25-Pair Telephone Junction Box with back
mounting frame and connection strip Recessed in wall Type where shown
on drawings, made of 16 SWG M.S. Sheet with hinged door. Completed in
all respects
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
Item Name : Supply and Installation of 50-Pair Telephone Junction Box with back
mounting frame and connection strip Recessed in wall Type where shown
on drawings, made of 16 SWG M.S. Sheet with hinged door. Completed in
all respects
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,501
Item Name : Supply and Installation of 100-Pair Telephone Junction Box with back
mounting frame and connection strip Recessed in wall Type where shown
on drawings, made of 16 SWG M.S. Sheet with hinged door. Completed in
all respects
2,502
Item Name : Supply and Installation of 500-Pair Telephone Junction Box with back
mounting frame and connection strip Recessed in wall Type where shown
on drawings, made of 16 SWG M.S. Sheet with hinged door. Completed in
all respects
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,503
Item Name : Supply and Installation, testing and commissioning of 24-ports 10/100-2
giga uplink ports DATA switch completed in all respects
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,504
Item Name : Supply and Installation, testing and commissioning of 48-ports 10/100-2
giga uplink ports DATA switch, complete in all respects
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,505
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
2,506
Item Name : Supply, Installation, testing and commissioning of Single Port Data
outlet of 1 x RJ-45 I/Os for Cat-6 cable and with 16 SWG back box,
complete in all respects
MATERIAL
Single port Data outlet 1 No
of 1 x RJ-45 I/Os for
Cat-6 cable and with 16
SWG back box
LABOUR
Electrician 0.01 Day
Sundries (Labour Only):
2,507
Item Name : Supply, Installation, testing and commissioning of Dual Port Data
outlet of 1 x RJ-45 I/Os for Cat-6 cable and with 16 SWG back box
completed in all respects
MATERIAL
Dual port Data outlet of 1 No
1 x RJ-45 I/Os for Cat-6
cable and with 16 SWG
back box
LABOUR
Electrician 0.01 Day
Sundries (Labour Only):
Item Name : Supply, Installation, testing and commissioning of Patch Cord CAT-6, 1m
for computer complete in all respects
LABOUR
Electrician 0.0313 Day
Sundries (Labour Only):
2,509
Item Name : Supply and Erection of 3M Cat-6 Cable in 3/4",1"pvc conduit, complete
in all respect
2,510
Item Name : Supply at site, testing, installation & commissioning of 12 Port Cat-3
Telephone Patch Panel installed in Data Cabinet
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,511
Item Name : Supply and Installation of Single Port Telephone outlet of CAT-5,1 x
RJ-45 I/Os and back box of 16 SWG, complete in all respects
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,512
Item Name : Supply and Installation of Double Port Telephone outlet of CAT-5,1 x
RJ-45 I/Os and back box of 16 SWG, complete in all respects
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,513
LABOUR
Electrician 7 Day
Sundries (Labour Only):
2,514
Item Name : Supply and Installation of Telephone Exchange with 16 Trunk and 300
Extensions with UPS Built-in 16+304 KX-TDA 600, Consol Set, CLI Card,
UPS Cable with Batteries, complete in all respects
MATERIAL
Telephone Exchange with 1 No
LABOUR
Skilled Labour 10
Electrician 10
Sundries (Labour Only):
2,515
Item Name : Supply and Installation of DT 364 Consol Set complaeted with all
respect
2,516
Item Name : Supply and Installation of KX-TDA 0193CLI Card for 16 Trunk complated
with all respect
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,517
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,518
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
2,519
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
2,520
LABOUR
Electrician 2 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.
2,521
Item Name : Providing & fixing 3 pair telephone cable (Pony make) in already
installed conduit
LABOUR
Electrician 0.002 Day
Sundries (Labour Only):
2,522
DESCRIPTION OF ITEM :
Item Code : 15-138-s-01
Item Name : Supply & Erection of Telephone vrire 1 Pair
Detail Qty
MATERIAL
Telephone vrire 1 Pair 1
LABOUR
Electrician 0.025
Sundries (Labour Only):
2,523
DESCRIPTION OF ITEM :
Item Code : 15-138-s-02
Item Name : Supply & Erection of Telephone vrire 2 Pair
Detail Qty
MATERIAL
Telephone wire 2 Pair 1
LABOUR
Electrician 0.025
Sundries (Labour Only):
2,524
Item Name : Providing fixing of telephone termination box including sheet steel
back box, complete in all respects
Detail Qty Unit
MATERIAL
telephone termination box 1 Each
including sheet steel
back box, .
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
2,525
Item Name : Providing & fixing polycarbonate flame retardant digital telephone
socket with lancy " lovory" gang plate fixed on die fabricate powder
coated metal board recessed in wall or column including connecting
MATERIAL
polycarbonate flame 1 Each
retardant digital
telephone socket with
lancy " lovory" gang
plate fixed on die
fabricate powder coated
metal board recessed in
wall or column including
connecting
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
2,526
DESCRIPTION OF ITEM :
Item Code : 15-138-v
Item Name : Supply & Erection of telephone point with socket complete
Detail Qty Unit
MATERIAL
telephone point with 1 Each
socket complete.
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,527
Item Name : Supply and Installation of Outdoor True Day & Night Color Camera 1/3"
CCD, 530TVL, 0 Lux, 49 IR LEDs, 2.8 to 10mm Auto Iris Varifocal Lens,
IP66 Rating Outdoor Weatherproof Housing, DC12V/ AC24V, PAL,
HCD-92534X-Honyewell completed in all respect
Detail Qty Unit
MATERIAL
Outdoor True Day & Night 1 No
Color Camera 1/3" CCD,
530TVL, 0 Lux, 49 IR
LEDs, 2.8 to 10mm Auto
Iris Varifocal Lens, IP66
Rating Outdoor
Weatherproof Housing,
DC12V/ AC24V, PAL,
HCD-92534X-Honyewell
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,528
DESCRIPTION OF ITEM :
Item Code : 15-139-b
Item Name : Supply and Installation of
CCD, 550TVL, Color 0.3Lux &
PAL, HCC-690P completed in all respect
Detail Qty Unit
MATERIAL
True Day & Night Color 1 No
LABOUR
Skilled Labour 1 Day
Electrician 1 Day
Sundries (Labour Only):
2,529
Item Name : Supply, Installation, Testing and Commissioning of Wall bracket box
Camera, type PoE I.P camera with day and night feature having 1.3MP
Resolution with live/recording quality of min 15 fps, Varifocal Lens
2.8-12mm, along with all mounting accessories complete in all respect
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,530
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Supply and Installation of Indoor Dome Camera,1/3" CCD, 550TV lines,
0.1lx (F2.0),Internal Sync., AWB / BLC / AGC Mirror On-Off Control,
varifocal lens 3.6mm, Gray color case, DC12V, PAL, HDC-890P-36
completed in all respect
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,531
LABOUR
Electrician 0.3 Day
Sundries (Labour Only):
2,532
Item Name : Supply Installation of 32-Channel Digital Video Recorder, real time
display 400ips andwith Built-in DVD writer,XtraStor/MPEG4
compression,1TB,HDD,SATA port with remoteviewing and management
software HNDR-E1648L-N-D-E,Honyewell.complated with all respect
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,533
Item Name : Supply, installation, Testing and commissioning of INDOOR DOME CAMERA;
2.0 MP FULL HD 1080P; 1/2.7" CMOS PROGRESSIVE SCAN; 3-10 mm VARIFOCAL
DC IRIS LENS; WDR > 100 dB; PoE; 12 VDC complete in all respects.
MATERIAL
INDOOR DOME CAMERA; 2.0 1 No
LABOUR
Electrician 0.3 Day
Sundries (Labour Only):
2,534
Item Name : Supply, installation, Testing and commissioning of CAMERA DOME; 1/2.7"
PS CMOS; 1.3 Mp HD-720P; 3-10 mm DC I V/F LENS; 76 DB WDR; PoE; 12 VDC.
complete in all respects.
MATERIAL
CAMERA DOME; 1/2.7" PS 1 No
CMOS; 1.3 Mp HD-720P;
3-10 mm DC I V/F LENS; 76
DB WDR; PoE; 12 VDC. .
LABOUR
Electrician 0.3 Day
Sundries (Labour Only):
2,535
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,536
Detail Qty
MATERIAL
16 input to 01 output 1
digital multiplexer for
CCTV system
LABOUR
Electrician 1
Sundries (Labour Only):
2,537
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Installation and Cabling (RG-11 Coaxial Cable through approved 3A" PVC
conduit)
LABOUR
Electrician 0.001 Day
Sundries (Labour Only):
2,538
DESCRIPTION OF ITEM :
Item Code : 15-139-l
Item Name : Supply and installation of 32" LCD monitor of best quality
Detail Qty Unit
MATERIAL
32" LCD monitor of best 1 Each
quality
LABOUR
Electrician 0.3 Day
Sundries (Labour Only):
2,539
Item Name : Supply & fixing of 1/3M Color Dome Cameras equipped with following
charactaristics. Built in Varifocal Lens (4.0mm - 9.0mm) Back Light
Compensation Built-in Flickerless Hiqh Resolution more than 470TV line
0.4 Lux at F1" 2 Compact Design Approval: FCC, CE
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,540
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,541
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,542
LABOUR
Electrician 1 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.
2,543
Item Name : Supply, installation, testing and commissioning of Patch Panel 12 Port
Loaded with RJ-45 I/Os Suitable for CAT-VI FTP CABLE; Rack Mount ,
complete in all respects.
MATERIAL
PATCH PANEL 12 PORT 1 No
LOADED WITH RJ-45 I/Os
SUITABLE FOR CAT-VI FTP
CABLE; RACK MOUNT , .
LABOUR
Electrician 0.06 Day
Sundries (Labour Only):
2,544
MATERIAL
PATCH PANEL 24 PORT 1 No
LOADED WITH RJ-45 I/Os
SUITABLE FOR CAT-VI FTP
CABLE; RACK MOUNT , .
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,545
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,546
Item Name : Supply, installation, Testing and commissioning of UTP Cat-6a Patch
Cords 1m (Supports 10 Giga Network) to be Installed in Data Cabinets
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,547
Item Name : Supply, installation, Testing and commissioning of UTP Cat-6a Patch
Cords 3m (Supports 10 Giga Network) to be Installed in Data Cabinets
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,548
LABOUR
Electrician 0.06 Day
Sundries (Labour Only):
2,549
LABOUR
Electrician 0.06 Day
Sundries (Labour Only):
2,550
Item Name : Supply and installion of Computer single port face plate CAT-6 RJ-JACK
with appropriate MS 16SWG enameled back box recessed in wall, column
etc… complete in all respects
in walls including chase etc : 1.5" i/d
LABOUR
Electrician 0.024 Day
Sundries (Labour Only):
2,551
Item Name : Supply and installion of Computer double port face plate CAT-6 RJ-JACK
with appropriate MS 16SWG Orange enameled back box recessed in wall,
column etc.complete in all respects
MATERIAL
Computer double port face 1 Each
LABOUR
Electrician 0.03 Day
Sundries (Labour Only):
2,552
Item Name : Supply and Installation, testing and commissioning of 42 port DATA
cabinet with 3 no's cabinet tray, 4 No's power socket and with flexi
glass door l
MATERIAL
42 port DATA cabinet with 1 Each
LABOUR
Electrician 3 Day
Sundries (Labour Only):
2,553
Item Name : Supply, installation, testing and commissioning of the following Fiber
Optic Cables to be installed in conduits, cable trays and dura duct
including cost of all necessary accessories/ materials complete in all
respects.
LABOUR
Electrician 0.007 Day
Sundries (Labour Only):
2,554
Item Name : Supply, installation, testing and commissioning of the following Fiber
Optic Cables to be installed in conduits, cable trays and dura duct
including cost of all necessary accessories/ materials complete in all
respects.
LABOUR
Electrician 0.01 Day
Sundries (Labour Only):
2,555
Item Name : Supply, installation, testing and commissioning of the following Fiber
Optic Cables to be installed in conduits, cable trays and dura duct
including cost of all necessary accessories/ materials complete in all
respects.
LABOUR
Electrician 0.01 Day
Sundries (Labour Only):
2,556
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Supply, installation, testing and commissioning of the following Fiber
Optic Patch cord to be installed in conduits, cable trays and dura duct
including cost of all necessary accessories/ materials complete in all
respects.
LABOUR
Electrician 0.01 Day
Sundries (Labour Only):
2,557
Item Name : Supply, installation, testing and commissioning of the following Fiber
Optic Patch cord to be installed in conduits, cable trays and dura duct
including cost of all necessary accessories/ materials complete in all
respects.
LABOUR
Electrician 0.01 Day
Sundries (Labour Only):
2,558
Item Name : Supply, installation, testing and commissioning of the following Fiber
Optic Patch cord to be installed in conduits, cable trays and dura duct
including cost of all necessary accessories/ materials complete in all
respects.
LABOUR
Electrician 0.007 Day
Sundries (Labour Only):
2,559
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Supply and Installation of 0.5 to 1mm2 Cat-5 cable laid in 1", 1-1/2"
or 2" pvc conduit or Cable Tray, complete in all respects including
clamps etc: 1.25" i/d
MATERIAL
10 Pair Cable 1 Mtr
LABOUR
Electrician 0.009 Day
Sundries (Labour Only):
2,560
Item Name : Supply and Installation of 0.5 to 1mm2 Cat-5 cable laid in 1", 1-1/2"
or 2" pvc conduit or Cable Tray, complete in all respects including
clamps etc: 1.25" i/d
MATERIAL
30 Pair Cable 1 Mtr
LABOUR
Electrician 0.009 Day
Sundries (Labour Only):
2,561
Item Name : Supply and Installation of 0.5 to 1mm2 Cat-5 cable laid in 1", 1-1/2"
or 2" pvc conduit or Cable Tray, complete in all respects
including clamps etc: 1.25" i/d
MATERIAL
50 Pair Cable 1 Mtr
LABOUR
Electrician 0.009 Day
Sundries (Labour Only):
2,562
MATERIAL
120 Pair Cable 1 Mtr
LABOUR
Electrician 0.009 Day
Sundries (Labour Only):
2,563
Item Name : Supply and Installation of 0.5 to 1mm2 Cat-5 cable laid in 1", 1-1/2"
or 2" pvc conduit or Cable Tray, complete in all respects
including clamps etc: 1.25" i/d
MATERIAL
2 Pair cable 1 No
LABOUR
Electrician 0.007 Day
Sundries (Labour Only):
2,564
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
6x PIGTAILS MULTIMODE,
TRAY & OTHER ACCESSORIES;
RACK MOUNT 1U FORM FACTOR
,.
LABOUR
Skilled Labour 1 Day
Electrician 1 Day
Sundries (Labour Only):
2,565
Item Name : Supply, installation, testing and commissioning of OFC Patch Cord; 3m;
Multi Mode; Duplex Type, complete in all respects.
LABOUR
Electrician 0.01 Day
Sundries (Labour Only):
2,566
Item Name : Supply, Installation, Testing and Commissioning of Colour 59" HD Colour
LED Monitor with wall Hanging, complete in all respects
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,567
MATERIAL
Core-i7; 8 GB RAM; 1 TB 1 No
HDD; KB Mouse DVD R/W;
Windows Graphic Card 4G
Internal Tower Type, .
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,568
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
2,569
Item Name : Supply, installation of Rubber mat 3 feet wide x 1/4" thick to be
placed all long the length of Main Panel Board in L.T. Panel Room
LABOUR
Skilled Labour 0.0625 Day
Sundries (Labour Only):
Item Name : Supply, installation of Buckets made of M.S. sheet to be hung on hooks
and filled with sand as per Electric Inspectors requirements.
LABOUR
Skilled Labour 0.02 Day
Sundries (Labour Only):
2,571
Item Name : Supply of electric shock chart fixed on wooden board and hang on wall
as per the requirement of Electrical Inspector.
LABOUR
Skilled Labour 0.02 Day
Sundries (Labour Only):
2,572
Item Name : supply,Insatallation, testing & commisioning of Single Phase KWH Energy
Meters from Main Service of LT Line to each building Complete in all
respect
MATERIAL
Single Phase KWH Energy 1 No
Meters from Main Service
of LT Line to each
building
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
Item Name : Providing and fixing of point wiring (including circuit wiring with 2.5
mmsq conductors and 2.5 mmsq green / yellow CPC) with 1.5 mmsq single
core PVC insulated 450/750 volt grade copper conductors in PVC conduit
rigid / flexible (clipped to surface or concealed in structure or under
floor), complete in all respects.
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,574
Item Name : Providing and fixing of Light point controlled by two way switch wiring
(including circuit wiring with 2.5 mmsq conductors and 2.5 mmsq green /
yellow CPC) with 1.5 mmsq single core PVC insulated 450/750 volt grade
copper conductors in PVC conduit rigid / flexible (clipped to surface
or concealed in structure or under floor), complete in all respects.
Detail Qty Unit
MATERIAL
b) Light point controlled 1 No
by two way switch
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,575
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
Item Name : Supply, installation, connecting, testing & commissioning of flush type
5Amp 3-pin switch & socket outlet with 3 pin switch and socket combine
unit with neon bulb fixed on plastic or fiber top covered, including 14
SWG metal board with earth
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,577
Item Name : Supply, installation, connecting, testing & commissioning of flush type
13 Amps 3-pin (Duplex) outlet with 3 pin switch and socket combine unit
with neon bulb fixed on plastic or fiber top covered, including 14 SWG
metal board with earth
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,578
Item Name : Supply, installation, connecting, testing & commissioning of flush type
13 Amps 3-pin simplex outlet with 3 pin switch and socket combine unit
with neon bulb fixed on plastic or fiber top covered, including 14 SWG
metal board with earth
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,579
Item Name : Supply, installation, connecting, testing & commissioning of flush type
following 16 Amps Soko type switch & socket with 3 pin switch and
socket combine unit with neon bulb fixed on plastic or fiber top
covered, including 14 SWG metal board with earth
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,580
Item Name : Supply, installation, connecting, testing & commissioning of flush type
20 Amps Soko type switch & socket with 3 pin switch and socket combine
unit with neon bulb fixed on plastic or fiber top covered, including 14
SWG metal board with earth
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.
2,581
Item Name : Supply, Installation, Connecting, testing and commissioning of 400 watt
Fan dimmer, polycarbonate flame retardant with fancy gang plate fixed
on die fabricated poweder coated metal board recessed in wall or column
, complete in all respects.
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,582
Item Name : Providing and fixing of 3/4" dia PVC conduit as raceway, clipped to the
surface or concealed in structure, or under floor including all
accessories bends, boxes, etc as required for street light + telephone
+ power cable.
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,583
Item Name : Providing and fixing of 1" dia PVC conduit as raceway, clipped to the
surface or concealed in structure, or under floor including all
accessories bends, boxes, etc.as required for street light + telephone
+ power cable.
Detail Qty Unit
MATERIAL
b) 1"dia PVC conduit as 1M
raceway, clipped to the
surface or concealed in
structure, or under floor
including all accessories
bends, boxes, etc. in the
following sizes as
required for street light
+ telephone
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,584
Item Name : Providing and fixing of 1-1/4" dia PVC conduit as raceway, clipped to
the surface or concealed in structure, or under floor including all
accessories bends, boxes, as required for street light + telephone +
power cable.
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,585
Item Name : Providing and fixing of 1-1/2" dia PVC conduit as raceway, clipped to
the surface or concealed in structure, or under floor including all
accessories bends, boxes, etc sizes as required for street light +
telephone + power cable.
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,586
Item Name : Providing and fixing of 150 mm dia RCC pipe for power cable, including
excavation, sand bedding, back-filling, accessories, manholes, etc
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,587
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,588
2,589
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,590
MATERIAL
LPDB-B7-B1, LPDB-B7-B1/1 1 No
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,591
MATERIAL
LPDB-B7-G1, LPDB-B7-F1, 1 No
LPDB-B"-31
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,592
MATERIAL
ACDB-B7-G1, ACDB-B7-F1 1 No
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,593
MATERIAL
LPDB-B8-B1 1 No
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,594
MATERIAL
LPDB-B8-G1, LPDB-B8-F1, 1 No
LPDB-3:-31
LABOUR
Electrician 1 Day
Sundries (Labour Only):
MATERIAL
LPDB-B8-S1/1, 1 No
LPDB-B8-S1/2
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,596
MATERIAL
ACDB-B8-G1, ACDB-B8-F1. 1 No
ACDB-5--51 •
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,597
MATERIAL
LPDB-B9-G1, LPDB-B9-F1, 1 No
LPDB-E^S1
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,598
MATERIAL
ACDB-B9-F1, ACDB-B9-S1 1 No
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,599
LABOUR
Electrician 1 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.
2,600
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,601
MATERIAL
LPDB-B11-G1, LPDB-B11-F1 1 No
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,602
MATERIAL
ACDB-B11-G1, ACDB-B11-F1 1 No
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,603
Item Name : Supply, Installation & Connecting up of floor or wall mounted Sub-main
Distribution Board equipment SMDB comprising of Ammeter, Volt meter
equiped with Ct's Pt's and selector switches.
MATERIAL
Floor or wall mounted 1 No
Sub-main Distribution
Board equipment SMDB
comprising of Ammeter,
Volt meter equiped with
Ct's Pt's and selector
switches.
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,604
DESCRIPTION OF ITEM :
Item Code : 15-164
Item Name :
Detail Qty
MATERIAL
Supply, installation, & 1
connecting of insect
killer
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,605
Item Name : Supply, installation, of 3/4" dia PVC Conduit for NURSE CALL SYSTEM 1
CALL BELLS
LABOUR
Electrician 0.0025 Day
Sundries (Labour Only):
2,606
Item Name : Supply, installation, & connecting of 1.5 sq.m 4 core PVC Cable for
NURSE CALL SYSTEM 1 CALL BELLS
LABOUR
Electrician 0.005 Day
Sundries (Labour Only):
2,607
DESCRIPTION OF ITEM :
Item Code : 15-166-a
Item Name : Providing and fixing of 10 zone panel for nurse call system
Detail Qty Unit
MATERIAL
10-zone panel 1 No
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,608
DESCRIPTION OF ITEM :
Item Code : 15-166-b
Item Name : Providing and fixing of 20 zone panel nurse call system
Detail Qty Unit
MATERIAL
20-zone panel 1 No
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,609
DESCRIPTION OF ITEM :
Item Code : 15-166-c
Item Name : Providing and fixing Door light indicator unit
Detail Qty Unit
MATERIAL
Door light indicator unit 1 No
LABOUR
Electrician 0.063 Day
Sundries (Labour Only):
2,610
DESCRIPTION OF ITEM :
Item Code : 15-166-d
Item Name : Providing and fixing of S0X1.5mm sq. twisted Telephone Ca
Detail Qty Unit
MATERIAL
S0X1.5mm sq. twisted 1 No
Telephone Cable
LABOUR
Electrician 0.01 Day
Sundries (Labour Only):
2,611
Item Name : Providing and fixing of call bells with push buttons including wiring
and all accessories
LABOUR
Electrician 1 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.
2,612
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
2,613
Item Name : Supply and fixing of Ready Made Fancy Sheet light plug (5-10 Amp) with
PVC box complete in all aspects
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,614
DESCRIPTION OF ITEM :
Item Code : 15-170-a
Item Name : Precurement and Fixing of 10 Pin Kit with sheet
Detail Qty Unit
MATERIAL
10 Pin Kit switch /Plug 1 Each
kit
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,615
DESCRIPTION OF ITEM :
Item Code : 15-170-b
Item Name : Precurement and Fixing of 08 Pin Kit with sheet
Detail Qty Unit
MATERIAL
8 Pin Kit switch /Plug 1 Each
kit
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,616
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,617
DESCRIPTION OF ITEM :
Item Code : 15-170-d
Item Name : Precurement and Fixing of 04 Pin Kit with sheet
Detail Qty Unit
MATERIAL
4 Pin Kit switch /Plug 1 Each
kit
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,618
DESCRIPTION OF ITEM :
Item Code : 15-170-e
Item Name : Precurement and Fixing of03 Pin Kit with sheet
Detail Qty Unit
MATERIAL
3 Pin Kit switch /Plug 1 Each
kit
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,619
DESCRIPTION OF ITEM :
Item Code : 15-170-f
Item Name : Precurement and Fixing of 02 Pin Kit with sheet
Detail Qty Unit
MATERIAL
2 Pin Kit switch /Plug 1 Each
kit
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,620
DESCRIPTION OF ITEM :
Item Code : 15-170-g
Item Name : Precurement and Fixing of 01 Pin Kit with sheet
Detail Qty Unit
MATERIAL
1 Pin Kit switch /Plug 1 Each
kit
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,621
DESCRIPTION OF ITEM :
Item Code : 15-171
Item Name : Supply & fixinng of China Kit for TV
Detail Qty Unit
MATERIAL
China Kit for TV best 1 Each
quality
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,622
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 15-172
Item Name : Supply and installation of Fan dimmer switch Clipcal made
Detail Qty Unit
MATERIAL
fan dimmer switch 1 Each
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,623
DESCRIPTION OF ITEM :
Item Code : 15-173
Item Name : Supply and installation of Bell Press
Detail Qty Unit
MATERIAL
Bell Press 1 Each
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,624
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 15-174
Item Name : Supply & Erection of 12 volt bulb with transformer
Detail Qty Unit
MATERIAL
12 volt bulb wilh 1 Each
transformer (imported)
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,625
DESCRIPTION OF ITEM :
Item Code : 15-175
Item Name : Supply & Erection of TV/satellite cable complete
Detail Qty Unit
MATERIAL
TV/satellite cable 1 Each
complete
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 15-176
Item Name : Supply & Erection of Telephone point with socket complete
Detail Qty Unit
MATERIAL
Telephone point with 1 Each
socket complete
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,627
DESCRIPTION OF ITEM :
Item Code : 15-177
Item Name : Supply & Erection of Telephone socket
Detail Qty Unit
MATERIAL
Telephone socket of 1 Each
approved quality
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,628
DESCRIPTION OF ITEM :
Item Code : 15-178
Item Name : Supply & Erection of TV socket
Detail Qty Unit
MATERIAL
TV Single Switch best 1 Each
quality
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,629
DESCRIPTION OF ITEM :
Item Code : 15-179
Item Name :
Detail Qty Unit
MATERIAL
Power Plug 15 Amp 1 Each
complete
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,630
Item Name : Supply & Erection of Swimming Pool Cascado lights direct 120/150 watt
complete
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,631
Item Name : Supply and installation of structure cable as required for CAT-6 PVC
shielded cable in already installed Trunking/ conduit/ Channel ,
inducing Balun for vedio and power facility at both ends of cable to be
provided.
The CAT- 6 cable should be 3M complete in all respects
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,632
Item Name : Provide & connect 14" color TV Monitor equiped with
following charactaristics
Microphone & Speaker built in for one way audio
VCR Connect for VCR record & play
Horizontal resolution 420V linees
NTSL/PAL
Free voltage (90-260VAC, 50/60Hz)
Approved UL,CE,CSA,DHHA
Computer Networks
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,633
LABOUR
Electrician 0.125 Day
Sundries (Labour Only):
2,634
DESCRIPTION OF ITEM :
Item Code : 15-184
Item Name :
Detail Qty Unit
MATERIAL
Acrylic boxes for switch 1 Each
4'x4'
LABOUR
Electrician 0.05 Day
Sundries (Labour Only):
2,635
DESCRIPTION OF ITEM :
Item Code : 15-185
Item Name :
Detail Qty Unit
MATERIAL
Erection of Aciylic boxes 1 Each
for switch 7'x4'
LABOUR
Electrician 0.05 Day
Sundries (Labour Only):
2,636
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 15-186
Item Name :
Detail Qty Unit
MATERIAL
Acrylic boxos for switch 1 Each
8"'x 10"
LABOUR
Electrician 0.05 Day
Sundries (Labour Only):
2,637
DESCRIPTION OF ITEM :
Item Code : 15-187
Item Name : Supply & Erection of Acrylic or bakolite sheet 7 40 , 4x4
Detail Qty Unit
MATERIAL
Acrylic or bakelite sheet 1 Each
7 40 , 4x4
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 15-188
Item Name : Supply & Erection of bakolite sheet 4 x 2
Detail Qty Unit
MATERIAL
bakelite sheet 4 x 2 1 Each
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,639
DESCRIPTION OF ITEM :
Item Code : 15-189
Item Name : Supply & Erection of PVC board 7" x 4" with all aspects
Detail Qty Unit
MATERIAL
PVC board 7" x 4" 1 Each
LABOUR
Electrician 0.04 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 15-190
Item Name :
Detail Qty Unit
MATERIAL
Extention Board 1 Each
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,641
DESCRIPTION OF ITEM :
Item Code : 15-191
Item Name : Supply & Erection of glow starter
Detail Qty Unit
MATERIAL
glow starter 1 Each
LABOUR
Electrician 0.01 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 15-192
Item Name : Supply & Erection of Brass bulb holder
Detail Qty Unit
MATERIAL
Brass holder 1 Each
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,643
DESCRIPTION OF ITEM :
Item Code : 15-193
Item Name : Supply & Erection of Insulation tape
Detail Qty Unit
MATERIAL
insulation tape 1 Each
2,644
DESCRIPTION OF ITEM :
Item Code : 15-194
Item Name : Supply & Erection of Volt meter (heavy duty)
Detail Qty Unit
MATERIAL
Volt meter (heavy duty) 1 Each
best quality
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,645
DESCRIPTION OF ITEM :
Item Code : 15-195
Item Name : Supply & Erection of Capacitor 3.5 for ceiling fan
Detail Qty Unit
MATERIAL
P.VC capacitor 3.5 1 Each
(Japan) for ceiling fan
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,646
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 15-196
Item Name : Supply & Erection of TV Cable
Detail Qty Unit
MATERIAL
TV cable 1 Each
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,647
DESCRIPTION OF ITEM :
Item Code : 15-197
Item Name : Supply & Erection of Remote Cell
Detail Qty Unit
MATERIAL
Remote cell 1 Each
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,648
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 15-198
Item Name : Supply & Erection of Ding Dong call bell best quality
Detail Qty Unit
MATERIAL
Ding Dong call bell best 1 Each
quality
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,649
DESCRIPTION OF ITEM :
Item Code : 15-199
Item Name : Supply & Erection of Starter for Motor pump
Detail Qty Unit
MATERIAL
Starter for Motor pump 1 Each
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,650
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 15-200-a
Item Name : Supply & Installation of ASD strater for 10-20 HP
Detail Qty Unit
MATERIAL
10-20 HP ASD 1 No
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,651
DESCRIPTION OF ITEM :
Item Code : 15-200-b
Item Name : Supply & Installation of ASD strater for 21-30 HP
Detail Qty Unit
MATERIAL
21-30 HP ASD 1 No
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,652
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 15-200-c
Item Name : Supply & Installation of ASD strater for 31-40 HP
Detail Qty Unit
MATERIAL
31-40 HP ASD 1 No
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,653
DESCRIPTION OF ITEM :
Item Code : 15-201-a
Item Name : Supply & Installation of DOL strater for 10-20 HP
Detail Qty Unit
MATERIAL
10-20 HP DOL strater 1 No
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,654
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 15-201-b
Item Name : Supply & Installation of DOL strater for 21-30 HP
Detail Qty Unit
MATERIAL
21-30 HP DOL strater 1 No
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,655
DESCRIPTION OF ITEM :
Item Code : 15-201-c
Item Name : Supply & Installation of DOL strater for 31-40 HP
Detail Qty Unit
MATERIAL
31-40 HP DOL strater 1 No
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,656
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : S/Fixing 3-core flexible Copper cable for submersible electric motor
10mm.
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,657
Item Name : S/Fixing 3-core flexible Copper cable for submersible electric motor
16mm.
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,658
Item Name : S/Fixing 4-core flexible Aluminium cable for service of transformer to
main board (19/64)
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,659
Item Name : S/Fixing 4-core flexible Aluminium cable for service of transformer to
main board (19/83)
LABOUR
Electrician 0.025 Day
Sundries (Labour Only):
2,660
DESCRIPTION OF ITEM :
Item Code : 15-203
Item Name : S/Fixing protector magnet coil in strater
Detail Qty Unit
MATERIAL
protector magnet coil in 1 No
strater.
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,661
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 15-204-a
Item Name : S/Fixing strater overload relay 10-30 Amp
Detail Qty Unit
MATERIAL
10-30 AMP strater 1 No
overload relay
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,662
DESCRIPTION OF ITEM :
Item Code : 15-204-b
Item Name : S/Fixing strater overload relay 31-60 Amp
Detail Qty Unit
MATERIAL
31-60 AMP strater 1 No
overload relay
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 15-204-c
Item Name : S/Fixing strater overload relay 61-100 Amp
Detail Qty Unit
MATERIAL
61-100 AMP strater 1 No
overload relay
LABOUR
Electrician 0.02 Day
Sundries (Labour Only):
2,664
Item Name : Repair of Transformer' HT leg (two -step) i/c of carriage from site to
workshop & back i/c onstalltion and Testing complete. 100-KVA
Trasformer
MATERIAL
HT leg two -step 100-KVA 1 No
Trasformer
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,665
Item Name : Repair of Transformer' LT coil i/c of carriage from site to workshop &
back i/c onstalltion and Testing complete. 100-KVA Trasformer
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,666
Item Name : Repair of Transformer' HT bush i/c of carriage from site to workshop &
back i/c onstalltion and Testing complete. 100-KVA Trasformer
Detail Qty Unit
MATERIAL
Ht bush 100-KVA 1 No
Trasformer
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,667
Item Name : Repair of Transformer' LT bush i/c of carriage from site to workshop &
back i/c onstalltion and Testing complete. 100-KVA Trasformer
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,668
Item Name : Repair of Transformer' HT leg (two -step) i/c of carriage from site to
workshop & back i/c onstalltion and Testing complete. 50-KVA Trasformer
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,669
Item Name : Repair of Transformer' LT Coil i/c of carriage from site to workshop &
back i/c onstalltion and Testing complete. 50-KVA Trasformer
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,670
Item Name : Repair of Transformer' HT bush i/c of carriage from site to workshop &
back i/c onstalltion and Testing complete. 50-KVA Trasformer
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,671
Item Name : Repair of Transformer' LT Bush i/c of carriage from site to workshop &
back i/c onstalltion and Testing complete. 50-KVA Trasformer
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,672
Item Name : Repair of Transformer body i/c of carriage from site to workshop & back
i/c onstalltion and Testing complete. 50-KVA Trasformer
Detail Qty
MATERIAL
Transformer body 50-KVA 1
TRANSFORMER
LABOUR
Electrician 1
Sundries (Labour Only):
2,673
Item Name : Repair of Transformer' HT leg (two -step) i/c of carriage from site to
workshop & back i/c onstalltion and Testing complete. 25-KVA Trasformer
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,674
Item Name : Repair of Transformer' LT Coil i/c of carriage from site to workshop &
back i/c onstalltion and Testing complete. 25-KVA Trasformer
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,675
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Repair of Transformer' HT bush i/c of carriage from site to workshop &
back i/c onstalltion and Testing complete. 25-KVA Trasformer
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,676
Item Name : Repair of Transformer' LT bush i/c of carriage from site to workshop &
back i/c onstalltion and Testing complete. 25-KVA Trasformer
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,677
Item Name : Repair of Transformer body i/c of carriage from site to workshop & back
i/c onstalltion and Testing complete. 25-KVA Trasformer
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,678
DESCRIPTION OF ITEM :
Item Code : 15-208
Item Name :
Detail Qty Unit
MATERIAL
voltage Regulator plate 1 No
(Selector)
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
2,679
DESCRIPTION OF ITEM :
Item Code : 15-209
Item Name :
Detail Qty
MATERIAL
Rweinding of Voltage 1
Regulator Coil stablizer
coil
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
2,680
DESCRIPTION OF ITEM :
Item Code : 15-210
Item Name : Furnish & Install of Volt: meter upt to 500 volt.
Detail Qty Unit
MATERIAL
Volt: meter upt to 500 1 No
volt.
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
2,681
DESCRIPTION OF ITEM :
Item Code : 15-211
Item Name : Furnish & Install of AMP meter up to 100 Amps
Detail Qty Unit
MATERIAL
AMP meter up to 100 Volt 1 No
LABOUR
Electrician 0.0625 Day
Sundries (Labour Only):
2,682
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,683
DESCRIPTION OF ITEM :
Item Code : 15-213-a
Item Name :
Detail Qty Unit
MATERIAL
10-25 Hp 1 No
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,684
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
2,685
DESCRIPTION OF ITEM :
Item Code : 15-214-a
Item Name :
Detail Qty Unit
MATERIAL
10 to 25 HP tapper 1 No
bearing for motor (V.H.S)
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,686
DESCRIPTION OF ITEM :
Item Code : 15-214-b
Item Name :
Detail Qty Unit
MATERIAL
30 to 50 HP tapper 1 No
bearing for motor (V.H.S)
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
2,687
DESCRIPTION OF ITEM :
Item Code : 15-215-a
Item Name :
Detail Qty Unit
MATERIAL
10 to 25 HP ball bearing 1 No
for motor (V.H.S)
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,688
DESCRIPTION OF ITEM :
Item Code : 15-215-b
Item Name :
Detail Qty Unit
MATERIAL
30 to 50 HP ball bearing 1 No
for motor (V.H.S)
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
2,689
DESCRIPTION OF ITEM :
Item Code : 15-216
Item Name : Supply and Filling of Transformer Oil.
Detail Qty Unit
MATERIAL
Transformer Oil. 1 Per Ltr
LABOUR
Skilled Labour 0.0104 Day
Sundries (Labour Only):
2,690
DESCRIPTION OF ITEM :
Item Code : 15-217
Item Name : Supply and Fixing of Voltage Regulator 30 KVA
Detail Qty Unit
MATERIAL
Voltage Regulator 30 KVA. 1 No
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,691
DESCRIPTION OF ITEM :
Item Code : 15-218
Item Name : Supply and Fixing of Voltage Regulator 50 KVA
Detail Qty Unit
MATERIAL
Voltage Regulator 50 KVA. 1 No
LABOUR
Electrician 1 Day
Sundries (Labour Only):
2,692
DESCRIPTION OF ITEM :
Item Code : 15-219-a
Item Name : Pump with motor for pressure pump (0.5 HP)
Detail Qty Unit
MATERIAL
0.5 HP Pump with motor 1 No
for pressure pump
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
2,693
DESCRIPTION OF ITEM :
Item Code : 15-219-b
Item Name : Pump with motor for pressure pump (1 HP)
Detail Qty Unit
MATERIAL
1.00 HP Pump with motor 1 No
for pressure pump
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
2,694
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 15-219-c
Item Name : Pump with motor for pressure pump (1.5 HP)
Detail Qty Unit
MATERIAL
1.50 HP Pump with motor 1 No
for pressure pump
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
2,695
DESCRIPTION OF ITEM :
Item Code : 15-219-d
Item Name : Pump with motor for pressure pump (2 HP)
Detail Qty Unit
MATERIAL
2.00 HP Pump with motor 1 No
for pressure pump
LABOUR
Electrician 0.5 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 15-220
Item Name : Supply and fixxing of 50 Litres Electric Geyser
Detail Qty Unit
MATERIAL
Electric Geyser 40-50 1 No
Litres
LABOUR
Electrician 0.25 Day
Sundries (Labour Only):
2,697
Item Name : Supply and fixxing of 40-50 Litres Electric Geyser including all
accessories and fittings
LABOUR
Electrician I 0.25 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per No Rs.
Labour Rates Per No Rs.
2,698
Item Name : Supply and fixxing of 15-25 Litres Electric Geyser including all
accessories and fittings
LABOUR
Electrician I 0.25 Day
Sundries (Labour Only):
2,699
Item Name : Supply and fixxing of 8-14 Litres Electric Geyser including all
accessories and fittings
Detail Qty Unit
MATERIAL
Electric Geyser 8-14 1 No
Litres
LABOUR
Electrician I 0.25 Day
Sundries (Labour Only):
2,700
DESCRIPTION OF ITEM :
Item Code : 15-221
Item Name : Supply & Erection of element for electric water heater
Detail Qty Unit
MATERIAL
element for electric 1 Each
water heater
LABOUR
Electrician 0.06 Day
Sundries (Labour Only):
2,701
DESCRIPTION OF ITEM :
Item Code : 16-01
Item Name :
Detail Qty Unit
MATERIAL
Coarse Sand 22 Cft
Burnt Brick 1350 No
LABOUR
Mason 0.5 Day
Labourer 1 Day
Water Man 1 Day
Sundries (Labour Only):
2,702
Item Name : Providing and Laying sub-base course of brick aggregate, including
compaction to required camber, grade & density
LABOUR
Labourer 1 Day
Sundries (Labour Only):
EQUIPMENT
Tractor with blade / 0.1133 Hour
Plough
Water tank 1000g 0.02 Hour
Vibrator Roller 12 T 0.05 Hour
2,703
DESCRIPTION OF ITEM :
Item Code : 16-03
Item Name : Graded Crushed Aggregate Crack-Relief Layer
Detail Qty Unit
MATERIAL
Aggregate 3/4" - 3/8" 12.5 Cft
Aggregate 3/8" - No. 4 118.0556 Cft
LABOUR
Labourer 1.0226 Day
Sundries (Labour Only):
EQUIPMENT
Static Tandom Roller ( 8 0.1573 Hour
T)
Water Tank Tow Type ( 0.236 Hour
4000 l )
Tractor 50 HP 0.236 Hour
Pump 4" delivery (Diesel) 0.0787 Hour
2,704
DESCRIPTION OF ITEM :
Item Code : 16-04-a
Item Name : Granular Sub Base Course using Pit Run Gravel
Detail Qty Unit
MATERIAL
Pitrun Gravel 125 Cft
LABOUR
Labourer 1 Day
Dresser 0.5 Day
Sundries (Labour Only):
EQUIPMENT
Motor Grader 165 HP 0.07 Hour
Lab test 0.08 Job
Water tank 1000g 0.02 Hour
Vibrator Roller 12 T 0.05 Hour
2,705
DESCRIPTION OF ITEM :
Item Code : 16-04-b
Item Name : Granular Sub Base Using Crushed Stone Aggregate
Detail Qty Unit
MATERIAL
Crushed Aggregate GB 125 Cft
LABOUR
Labourer 0.6 Day
Dresser 0.3 Day
Sundries (Labour Only):
EQUIPMENT
Motor Grader 165 HP 0.013 Hour
Lab test 0.08 Job
Water tank 1000g 0.056 Hour
Vibrator Roller 12 T 0.056 Hour
2,706
DESCRIPTION OF ITEM :
Item Code : 16-05-a
Item Name : Aggregate Base Course
Detail Qty Unit
MATERIAL
Crushed Aggregate BC 125 1 Cft
LABOUR
Labourer 1.5 Day
Dresser 0.75 Day
Sundries (Labour Only):
EQUIPMENT
Motor Grader 165 HP 0.013 Hour
Static Tandom Roller ( 8 0.156 Hour
T)
Lab test 0.08 each
Water tank 1000g 0.04 Hour
Vibrator Roller 12 T 0.08 Hour
2,707
DESCRIPTION OF ITEM :
Item Code : 16-05-b
Item Name : Water Bound Macadam Base Course
Detail Qty Unit
MATERIAL
Stone Dust 22 Cft
Crushed Aggregate Base A 125 Cft
LABOUR
Labourer 0.6 Day
Dresser 0.3 Day
Sundries (Labour Only):
EQUIPMENT
Static Tandom Roller ( 8 0.156 Hour
T)
Lab test 0.08 Each
Tractor with blade / 0.113 Hour
Plough
Water tank 1000g 0.1415 Hour
2,708
Item Name : Providing and Laying road edging of 3" wide & 9" deep brick on end,
complete
LABOUR
Mason 0.5 Day
Labourer 1 Day
Sundries (Labour Only):
2,709
Item Name : Reflective Mirrors at Sharp Curves (900 mm dia) with post Complete in
all respects
LABOUR
Mason 0.067 Day
Labourer 0.201 Day
Sundries (Labour Only):
EQUIPMENT
Concrete Static Mixer 0.133 Hour
0.19 m³ (1/4 Y³)
Water Tank Tow Type ( 0.133 Hour
4000 l )
Pump 4" delivery (Diesel) 0.0533 Hour
2,710
Item Name : Providing and Fixing Reflective Sheet Hi-intensity Grade Including
Foundation and steel Post complete in all respect
LABOUR
Reflective Sheet Fixer 1 Day
Sundries (Labour Only):
2,711
DESCRIPTION OF ITEM :
Item Code : 16-09-a
Item Name : Bitumenous Prime Coat
Detail Qty Unit
MATERIAL
Fuel Wood 1.36 Kg
Asphalt 5.576 Kg
Kerosene Oil 5.576 Ltr
LABOUR
Labourer 0.2 Day
Sundries (Labour Only):
EQUIPMENT
Tar Boiler 0.0372 Hour
Tractor with trolly 0.0185 Hour
2,712
DESCRIPTION OF ITEM :
Item Code : 16-09-b
Item Name : Bitumenous Tack Coat
Detail Qty Unit
MATERIAL
Fuel Wood 1.2689 Kg
Asphalt 2.787 Kg
LABOUR
Labourer 0.2 Day
Sundries (Labour Only):
EQUIPMENT
Tar Boiler 0.0186 Hour
Tractor with trolly 0.0372 Hour
2,713
LABOUR
Labourer 0.0236 Day
Sundries (Labour Only):
EQUIPMENT
Static Tandom Roller ( 8 0.075 Hour
T)
Compressor 300 CFM 0.0114 Hour
Bitumen Dist. Tow Type 0.0114 Hour
(2000 Ltr.)
2,714
DESCRIPTION OF ITEM :
Item Code : 16-10-b
Item Name : Double bitumenous Surface Treatment
Detail Qty Unit
MATERIAL
Asphalt 28.71 Kg
Crushed aggregate D 7.4 Cft
LABOUR
Labourer 0.0236 Day
Sundries (Labour Only):
EQUIPMENT
Static Tandom Roller ( 8 0.149 Hour
T)
Compressor 300 CFM 0.0176 Hour
Bitumen Dist. Tow Type 0.0176 Hour
(2000 Ltr.)
2,715
DESCRIPTION OF ITEM :
Item Code : 16-10-c
Item Name : Triple bitumenous Surface Treatment
Detail Qty Unit
MATERIAL
Asphalt 38.26 Kg
Crushed Aggregate T 8.8 Cft
LABOUR
Labourer 0.0236 Day
Sundries (Labour Only):
EQUIPMENT
Static Tandom Roller ( 8 0.198 Hour
T)
Compressor 300 CFM 0.0217 Hour
Bitumen Dist. Tow Type 0.0217 Hour
(2000 Ltr.)
2,716
Item Name : Resurfacing of road complete with per 100sft : 22 Ibs. bitumen, 2.5"cft
bajri/crush aggregate
LABOUR
Labourer 0.08 Day
Skilled Labour 0.005 Day
Sundries (Labour Only):
EQUIPMENT
Static Tandom Roller ( 8 0.046 Hour
T)
Compressor 300 CFM 0.0114 Hour
Bitumen Dist. Tow Type 0.0114 Hour
(2000 Ltr.)
2,717
Item Name : Resurfacing of road complete with per 100sft : 20 Ibs. bitumen, 2 cft
bajri/crush aggregate
EQUIPMENT
Static Tandom Roller ( 8 0.046 Hour
T)
Compressor 300 CFM 0.0114 Hour
Bitumen Dist. Tow Type 0.0114 Hour
(2000 Ltr.)
2,718
DESCRIPTION OF ITEM :
Item Code : 16-12
Item Name : Scarification Of Existing Road Pavement Structure
Detail Qty Unit
LABOUR
Labourer 0.0755 Day
Sundries (Labour Only):
EQUIPMENT
Bull Dozer 90 HP 0.6041 Hour
Front End Loader 2.5 m³ 0.6041 Hour
Dumper ( 10 T ) 1.2082 Hour
2,719
DESCRIPTION OF ITEM :
Item Code : 16-13-a
Item Name :
Detail Qty
MATERIAL
Coarse Sand 5.46
Crushed Aggregate 10.92
Fuel Wood 4.4784
Asphalt 23.79
Kerosene Oil 0.115
LABOUR
Labourer 0.3
Skilled Labour 0.15
Rake Man 0.07
Sundries (Labour Only):
EQUIPMENT
Static Tandom Roller ( 8 0.11
T)
Mini Asphalt Mixer 0.11
2,720
DESCRIPTION OF ITEM :
Item Code : 16-13-b
Item Name :
Detail Qty
MATERIAL
Coarse Sand 8.216
Crushed Aggregate 16.432
Fuel Wood 0.7091
Asphalt 35.68
Kerosene Oil 0.172
LABOUR
Labourer 0.425
Skilled Labour 0.215
Rake Man 0.105
Sundries (Labour Only):
EQUIPMENT
Static Tandom Roller ( 8 0.155
T)
Mini Asphalt Mixer 0.155
2,721
DESCRIPTION OF ITEM :
Item Code : 16-13-c
Item Name :
Detail Qty
MATERIAL
Coarse Sand 10.92
Crushed Aggregate 21.84
Fuel Wood 0.933
Asphalt 47.58
Kerosene Oil 0.13
LABOUR
Labourer 0.55
Skilled Labour 0.28
Rake Man 0.14
Sundries (Labour Only):
EQUIPMENT
Static Tandom Roller ( 8 0.2
T)
Mini Asphalt Mixer 0.2
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.
2,722
Item Name : Asphaltic Base Course (Asphalt Batch Plant Hot Mixed) i/c
Transportation and Finishing complete
2,723
Item Name : Asphaltic Wearing Course (Asphalt Batch Plant Hot Mixed) i/c
Transportation and Finishing complete
2,724
Item Name : Providing 3 feet high RCC railing (as per the drawing in
specifications) on bridges
Detail Qty
MATERIAL
RCC Railing 100
LABOUR
Mason 3.3527
Labourer 20
Water Man 4.8767
Sundries (Labour Only):
2,725
DESCRIPTION OF ITEM :
Item Code : 16-16
Item Name :
Detail Qty
MATERIAL
Steel (bars/rods/section) 66.77
Paint : Enamel 4
G.I pipe (light) 2" 330
Welding Rod 1
LABOUR
Mason 0.915
Labourer 6.45
Painter / Polisher 2
Welder 3
Sundries (Labour Only):
EQUIPMENT
Welding Plant Unit 6
2,726
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 16-17-a
Item Name : P&E at site : RCC km stone
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.5 Bag
Coarse Sand 6.7089 Cft
Crushed Aggregate 2 Cft
Rfcnt Steel : Plain/Local 0.008 Tonne
Wood - Partal 0.0035 Cft
Paint : Enamel 0.01 Ltr
LABOUR
Mason 0.355 Day
Labourer 1.782 Day
Carpenter 0.172 Day
Painter / Polisher 0.005 Day
Steel Binder / Cutter / 0.068 Day
Fixer
Pipe Layer 0.074 Day
Sundries (Labour Only):
2,727
DESCRIPTION OF ITEM :
Item Code : 16-17-b
Item Name : P&E at site : RCC 1/10th km stone.
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.248 Bag
Coarse Sand 1.2 Cft
Crushed Aggregate 3.1 Cft
Rfcnt Steel : Plain/Local 0.00045 Tonne
Wood - Partal 0.0106 Cft
Paint : Enamel 0.01 Ltr
LABOUR
Mason 0.139 Day
Labourer 0.341 Day
Carpenter 0.052 Day
Painter / Polisher 0.003 Day
Steel Binder / Cutter / 0.04 Day
Fixer
Pipe Layer 0.009 Day
Sundries (Labour Only):
2,728
DESCRIPTION OF ITEM :
Item Code : 16-17-c
Item Name : P&E at site : RCC boundry pillar.
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.329 Bag
Coarse Sand 0.56 Cft
Crushed Aggregate 1.5 Cft
Rfcnt Steel : Plain/Local 0.0053 Tonne
Paint : Enamel 0.01 Ltr
LABOUR
Mason 0.102 Day
Labourer 0.343 Day
Painter / Polisher 0.02 Day
Steel Binder / Cutter / 0.05 Day
Fixer
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,729
Item Name : Road signs (not exceeding 1 m2) without reflection sheet & lettering :
Supply and Fixing at site with PCC 1:3:6 upto max 3' depth
Detail Qty
MATERIAL
Ordinary Portland Cement 7.9896
Coarse Sand 29.5429
Crushed Aggregate 59.086
Steel Structual Section 306.57999
Steel Sheet 125.4189
Brush II 0.25
Paint : Enamel 0.79
LABOUR
Labourer 9.29
Painter / Polisher 1.557
Welder 6.967
Sundries (Labour Only):
2,730
Item Name : Road signs (not exceeding 1 m2) without reflection sheet & lettering :
Supply to the C&W store/site of work
Detail Qty
MATERIAL
Steel Structual Section 306.57999
Steel Sheet 125.4189
LABOUR
Labourer 2.6451
Welder 6.9677
Sundries (Labour Only):
2,731
Item Name : Road sign (any size) double pedestal 4"x2"x0.25" 11' long without
reflection sheet & lettering: Supply and Fixing at site with PCC 1:3:6
max 3' depth
MATERIAL
Ordinary Portland Cement 16.0722
Coarse Sand 59.0862
Crushed Aggregate 118.172
Steel Structual Section 401.98999
Steel Sheet 231.328
Welding Rod 0.33
LABOUR
Labourer 13.933
Painter / Polisher 2.787
Welder 9.2903
Sundries (Labour Only):
2,732
Item Name : Road sign (any size) double pedestal 4"x2"x0.25" 11' long without
reflection sheet & lettering: Supply to the C&W store/site of work
Detail Qty
MATERIAL
Steel Structual Section 401.98999
Steel Sheet 231.328
LABOUR
Labourer 2.9677
Painter / Polisher 5.574
Welder 9.2903
Sundries (Labour Only):
2,733
DESCRIPTION OF ITEM :
Item Code : 16-20-a
Item Name : Traffic Road Sign Cat 1
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 1.0667 Bag
G.I pipe (light) 2" 0.2 Rft
Traffic Road Signs 1 No
Category 1, Size 900 mm
Aggregate 3/4" - 3/8" 0.0567 Cft
Aggregate 3/8" - No. 4 0.0667 Cft
LABOUR
Mason 0.0667 Day
Labourer 0.5667 Day
Carpenter 0.0667 Day
Sundries (Labour Only):
EQUIPMENT
Concrete Static Mixer 0.1333 Hour
0.19 m³ (1/4 Y³)
Water Tank Tow Type ( 0.1333 Hour
4000 l )
Pump 4" delivery (Diesel) 0.0667 Hour
Tractor with trolly 0.2667 Hour
2,734
2,735
DESCRIPTION OF ITEM :
Item Code : 16-20-b
Item Name : Traffic Road Signs Category 2, Size 900 mm
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 1.6 Bag
G.I pipe (light) 2" 0.9843 ft
Traffic Road Signs 1 No
Category 2, Size 900 mm
Aggregate 3/4" - 3/8" 3.0017 Cft
Aggregate 3/8" - No. 4 3.5315 Cft
LABOUR
Mason 0.005 Day
Labourer 0.0085 Day
Carpenter 0.005 Day
Sundries (Labour Only):
EQUIPMENT
Concrete Static Mixer 0.02 Hour
0.19 m³ (1/4 Y³)
Water Tank Tow Type ( 0.02 Hour
4000 l )
Pump 4" delivery (Diesel) 0.01 Hour
Tractor with trolly 0.04 Hour
2,736
2,737
DESCRIPTION OF ITEM :
Item Code : 16-20-c
Item Name : Traffic Road Signs Category 3a
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.3 Bag
Coarse Sand 5.2972 Cft
G.I pipe (light) 2" 17.5 ft
Traffic Road Signs 1 No
Category 3a
Aggregate 3/4" - 3/8" 4.3543 Cft
Aggregate 3/8" - No. 4 6.3566 Cft
LABOUR
Mason 0.067 Day
Labourer 2 Day
Carpenter 0.067 Day
Sundries (Labour Only):
EQUIPMENT
Concrete Static Mixer 0.133 Hour
0.19 m³ (1/4 Y³)
Water Tank Tow Type ( 0.133 Hour
4000 l )
Pump 4" delivery (Diesel) 0.533 Hour
Tractor with trolly 0.533 Hour
2,738
2,739
LABOUR
Mason 0.067 Day
Labourer 2 Day
Carpenter 0.067 Day
Sundries (Labour Only):
EQUIPMENT
Concrete Static Mixer 0.133 Hour
0.19 m³ (1/4 Y³)
Water Tank Tow Type ( 0.133 Hour
4000 l )
Pump 4" delivery (Diesel) 0.533 Hour
Tractor with trolly 0.533 Hour
2,740
2,741
LABOUR
Skilled Labour 2
Painter / Polisher 1.75
Welder 1.5
Sundries (Labour Only):
2,742
DESCRIPTION OF ITEM :
Item Code : 16-21-b
Item Name :
Detail Qty
MATERIAL
Steel (bars/rods/section) 2079
Steel Sheet 355.6059
Brush II 1
Paint : Enamel 7.6
PCC (1:2:4) 12.5
LABOUR
Labourer 2.65
Painter / Polisher 2
Welder 2
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Each Rs.
Labour Rates Per Each Rs.
2,743
DESCRIPTION OF ITEM :
Item Code : 16-21-c
Item Name :
Detail Qty Unit
MATERIAL
Steel (bars/rods/section) 2987.61011 Kg
Steel Sheet 533.40881 Kg
Brush II 1 No
Paint : Enamel 11.4 Ltr
PCC (1:2:4) 18 Cft
LABOUR
Labourer 2.75 Day
Painter / Polisher 2.25 Day
Welder 2.25 Day
Sundries (Labour Only):
2,744
Item Name : Providing and Fixing gantry of structural steel sections as per design
/ drawings including foundation complete
Detail Qty
MATERIAL
Steel (bars/rods/section) 547.23218
Steel Sheet 155.57761
Brush II 1
Paint : Enamel 3.8
PCC (1:2:4) 8
LABOUR
Skilled Labour 1.75
Painter / Polisher 1.5
Welder 1.5
Sundries (Labour Only):
2,745
Item Name : Supply and Fixing reflective sheet on MS/aluminium road signs etc
including lettering : Diamond grade
Detail Qty
MATERIAL
Ref Sheet Diamond Grade 100 Sft
LABOUR
Reflective Sheet Fixer 1.8581 Day
Sundries (Labour Only):
2,746
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Supply and Fixing reflective sheet on MS/aluminium road signs etc
including lettering : High intensity grade
Detail Qty
MATERIAL
Ref Sheet Hi-intensity 100 Sft
Grade
LABOUR
Reflective Sheet Fixer 1.8581 Day
Sundries (Labour Only):
2,747
Item Name : Supply and Fixing reflective sheet on MS/aluminium road signs etc
including lettering : Engineering grade
Detail Qty
MATERIAL
Ref Sheet Engineering 100 Sft
Grade
LABOUR
Reflective Sheet Fixer 1.8581 Day
Sundries (Labour Only):
2,748
DESCRIPTION OF ITEM :
Item Code : 16-23
Item Name : Delineator Bi-directional (Diamond sheet)
Detail Qty Unit
MATERIAL
Delineator Bi-direction 1 Each
(Diamond sheet)
LABOUR
Labourer 0.35 Day
Sundries (Labour Only):
2,749
DESCRIPTION OF ITEM :
Item Code : 16-24
Item Name : Plastic 3M Bi Direction
Detail Qty Unit
MATERIAL
Plastic 3M Bi Direction 1 No
LABOUR
Labourer 0.35 Day
Sundries (Labour Only):
2,750
Item Name : Supply and Fixing aluminium alloy road studs as per specs Large, strip
146x30mm, 171 beads: Uni-direction
LABOUR
Labourer 0.09 Day
Sundries (Labour Only):
2,751
Item Name : Supply and Fixing aluminium alloy road studs as per specs Large, strip
146x30mm, 171 beads: Bi-direction
LABOUR
Labourer 0.09 Day
Sundries (Labour Only):
2,752
Item Name : Supply and Fixing aluminium alloy road studs as per specs Medium, strip
114x18mm, 74 beads: Uni-direction
LABOUR
Labourer 0.09 Day
Sundries (Labour Only):
2,753
Item Name : Supply and Fixing aluminium alloy road studs as per specs Medium, strip
114x18mm, 74 beads: Bi-direction
LABOUR
Labourer 0.09 Day
Sundries (Labour Only):
2,754
Item Name : Supply and Fixing aluminium alloy road studs as per specs Small, strip
75x14mm, 43 beads: Uni-directional
LABOUR
Labourer 0.09 Day
Sundries (Labour Only):
2,755
Item Name : Supply and Fixing aluminium alloy road studs as per specs Small, strip
75x14mm, 43 beads: Bi-directional
LABOUR
Labourer 0.09 Day
Sundries (Labour Only):
2,756
Item Name : Supply & Fixing of high Quality) 360 d Glass Road studs ( 4" Dia )
Including fixing at site in all respect
LABOUR
Labourer 0.09 Day
Sundries (Labour Only):
2,757
DESCRIPTION OF ITEM :
Item Code : 16-25-c-04
Item Name :
Detail Qty Unit
MATERIAL
Cats-eye Single (Raised 1 No
surface) Aluminium
LABOUR
Skilled Labour 0.0313 Day
Sundries (Labour Only):
2,758
DESCRIPTION OF ITEM :
Item Code : 16-25-c-05
Item Name :
Detail Qty Unit
MATERIAL
Cats-eye Double (Raised 1 No
surface) Aluminium
LABOUR
Skilled Labour 0.0313 Day
Sundries (Labour Only):
2,759
DESCRIPTION OF ITEM :
Item Code : 16-25-c-06
Item Name :
Detail Qty Unit
MATERIAL
Cats-eye Single (Flush 1 No
surface) Aluminium
LABOUR
Skilled Labour 0.0313 Day
Sundries (Labour Only):
2,760
DESCRIPTION OF ITEM :
Item Code : 16-25-c-07
Item Name :
Detail Qty Unit
MATERIAL
Cats-eye Double (Flush 1 No
surface) Aluminium
LABOUR
Skilled Labour 0.0313 Day
Sundries (Labour Only):
2,761
DESCRIPTION OF ITEM :
Item Code : 16-25-c-08
Item Name :
Detail Qty Unit
MATERIAL
Cats-eye Single (Raised 1 No
surface) Plastic
LABOUR
Skilled Labour 0.0313 Day
Sundries (Labour Only):
2,762
LABOUR
Skilled Labour 0.0313 Day
Sundries (Labour Only):
2,763
DESCRIPTION OF ITEM :
Item Code : 16-25-c-10
Item Name :
Detail Qty Unit
MATERIAL
Cats-eye Single (Flush 1 No
surface) Plastic
LABOUR
Skilled Labour 0.0313 Day
Sundries (Labour Only):
2,764
DESCRIPTION OF ITEM :
Item Code : 16-25-c-11
Item Name :
Detail Qty Unit
MATERIAL
Cats-eye Double (Flush 1 No
surface) Plastic
LABOUR
Skilled Labour 0.0313 Day
Sundries (Labour Only):
2,765
Item Name : Providing and Laying dry brick pavement/soling in streets etc including
prep, water, compaction & sand cushion
Detail Qty
MATERIAL
Coarse Sand 22
Burnt Brick 1400
LABOUR
Mason 1
Labourer 2.65
Sundries (Labour Only):
EQUIPMENT
Water tank 1000g 0.125
Road Roller (Static) 12 T 0.25
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.
2,766
DESCRIPTION OF ITEM :
Item Code : 16-27
Item Name :
Detail Qty
MATERIAL
Polythene Sheet 500 Gauge 110
LABOUR
Skilled Labour 0.0625
Sundries (Labour Only):
2,767
Item Name : Supply & spreading 1"-1.5" guage shingle on road surface including
compaction
LABOUR
Labourer 2 Day
Sundries (Labour Only):
EQUIPMENT
Tractor with blade / 0.0283 Hour
Plough
Water tank 1000g 0.0283 Hour
Road Roller (Static) 12 T 0.0566 Hour
2,768
DESCRIPTION OF ITEM :
Item Code : 16-29-a-i
Item Name : R.C.C. Pipe Culvert AASHTO M 170 Dia 310 mm
Detail Qty
MATERIAL
Ordinary Portland Cement 4.75
Coarse Sand 24.61
RCC Pipe Class II 310 mm 100
(AASHTO M-170)
LABOUR
Mason 1.524
Labourer 2.3622
Sundries (Labour Only):
EQUIPMENT
Water Tank Tow Type ( 4.572
4000 l )
Pump 4" delivery (Diesel) 1.524
Plate Compactor 12.326
Excavator 1.524
DESCRIPTION OF ITEM :
Item Code : 16-29-a-ii
Item Name : R.C.C. Pipe Culvert Aashto M 170 Dia 380 Mm
Detail Qty
MATERIAL
Ordinary Portland Cement 6.79
Coarse Sand 32.45
RCC Pipe Class II 380 mm 100
(AASHTO M-170)
LABOUR
Mason 1.55
Labourer 2.65
Sundries (Labour Only):
EQUIPMENT
Water Tank Tow Type ( 4.572
4000 l )
Pump 4" delivery (Diesel) 1.524
Plate Compactor 12.581
Excavator 1.524
2,770
DESCRIPTION OF ITEM :
Item Code : 16-29-a-iii
Item Name :
Detail Qty
MATERIAL
Ordinary Portland Cement 9.14
Coarse Sand 53.65
Pipe RCC 18" Class-II "B" 99.9994
LABOUR
Mason 6.09
Labourer 18.29
Sundries (Labour Only):
2,771
DESCRIPTION OF ITEM :
Item Code : 16-29-b-i
Item Name :
Detail Qty
MATERIAL
Ordinary Portland Cement 15.24
Coarse Sand 80.48
Pipe RCC 24" Class-II "B" 100
LABOUR
Mason 7.6199
Labourer 22.859
Sundries (Labour Only):
2,772
DESCRIPTION OF ITEM :
Item Code : 16-29-b-ii
Item Name : R.C.C. Pipe Culvert Aashto M 170 Dia 610 mm.
Detail Qty
MATERIAL
Ordinary Portland Cement 15.24
Coarse Sand 80.48
Pipe RCC 24" Class-II "B" 100
LABOUR
Mason 1.3855
Labourer 2.127
Sundries (Labour Only):
EQUIPMENT
Water Tank Tow Type ( 5.5418
4000 l )
Pump 4" delivery (Diesel) 2.7709
Plate Compactor 13.29
Excavator 4.1564
Light Crane 10 T 0.5
2,773
DESCRIPTION OF ITEM :
Item Code : 16-29-c-i
Item Name :
Detail Qty
MATERIAL
Ordinary Portland Cement 18.37
Coarse Sand 107.62
Pipe RCC 30" Class-II "B" 100
LABOUR
Mason 9.1439
Labourer 27.432
Sundries (Labour Only):
2,774
DESCRIPTION OF ITEM :
Item Code : 16-29-c-ii
Item Name : R.C.C. Pipe Culvert Aashto M 170 Dia 760 mm
Detail Qty
MATERIAL
Ordinary Portland Cement 18.37
Coarse Sand 107.62
Pipe RCC 30" Class-II "B" 100
LABOUR
Mason 1.3855
Labourer 2.216
Sundries (Labour Only):
EQUIPMENT
Water Tank Tow Type ( 5.5418
4000 l )
Pump 4" delivery (Diesel) 2.7709
Plate Compactor 22.659
Excavator 4.1564
Light Crane 10 T 0.5
2,775
DESCRIPTION OF ITEM :
Item Code : 16-29-d-i
Item Name :
Detail Qty
MATERIAL
Ordinary Portland Cement 21.34
Coarse Sand 128.96001
Pipe RCC 36" Class-II "B" 100
LABOUR
Mason 10.667
Labourer 32
Sundries (Labour Only):
2,776
DESCRIPTION OF ITEM :
Item Code : 16-29-d-ii
Item Name : R.C.C. Pipe Culvert Aashto M 170 Dia 910 mm
Detail Qty
MATERIAL
Ordinary Portland Cement 21.34
Coarse Sand 128.96001
Pipe RCC 36" Class-II "B" 100
LABOUR
Mason 1.3855
Labourer 2.32
Sundries (Labour Only):
EQUIPMENT
Water Tank Tow Type ( 6.2
4000 l )
Pump 4" delivery (Diesel) 3.265
Plate Compactor 24.875
Excavator 4.95
Light Crane 10 T 0.5
2,777
2,778
DESCRIPTION OF ITEM :
Item Code : 16-29-e-ii
Item Name : R.C.C. Pipe Culvert Aashto M 170 Dia 1070 mm
Detail Qty
MATERIAL
Ordinary Portland Cement 24.39
Coarse Sand 161.28
Pipe RCC 42" Class-II "B" 100
LABOUR
Mason 2.6894
Labourer 2.57
Sundries (Labour Only):
EQUIPMENT
Water Tank Tow Type ( 6.32
4000 l )
Pump 4" delivery (Diesel) 3.659
Plate Compactor 29.875
Excavator 5.26
Crane 20 T 0.5
2,779
2,780
DESCRIPTION OF ITEM :
Item Code : 16-29-f-ii
Item Name : R.C.C. Pipe Culvert AASHTO M 170 Dia 1220 mm
Detail Qty
MATERIAL
Ordinary Portland Cement 27.43
Coarse Sand 193.59
Pipe RCC 48" Class-II "B" 100
LABOUR
Mason 2.1771
Labourer 2.86
Sundries (Labour Only):
EQUIPMENT
Water Tank Tow Type ( 6.75
4000 l )
Pump 4" delivery (Diesel) 3.895
Plate Compactor 37.85
Excavator 5.487
Crane 20 T 0.5
2,781
2,782
DESCRIPTION OF ITEM :
Item Code : 16-29-g-ii
Item Name : R.C.C. Pipe Culvert Aashto M 170 Dia 1520 mm
Detail Qty
MATERIAL
Ordinary Portland Cement 30.48
Coarse Sand 215.32001
Pipe RCC 60" Class-II "B" 100
LABOUR
Mason 2.23
Labourer 2.98
Sundries (Labour Only):
EQUIPMENT
Water Tank Tow Type ( 6.895
4000 l )
Pump 4" delivery (Diesel) 4.33
Plate Compactor 44.256
Excavator 6.25
Crane 20 T 0.5
2,783
DESCRIPTION OF ITEM :
Item Code : 16-30
Item Name : Granular Material in Bed to RCC Pipe Culvert
Detail Qty Unit
MATERIAL
Coarse Sand 110.01 Cft
LABOUR
Labourer 0.9344 Day
Sundries (Labour Only):
EQUIPMENT
Water tank 1000g 0.1 Hour
Plate Compactor 0.9344 Hour
2,784
DESCRIPTION OF ITEM :
Item Code : 16-31
Item Name :
Detail Qty
MATERIAL
Ordinary Portland Cement 17.6194
Coarse Sand 44.2222
Aggregate 2"-1.5" 35.5522
Aggregate 3/4" - 3/8" 40.6633
Aggregate 3/8" - No. 4 12.2222
Curing Compound 3.1463
LABOUR
Mason 0.3146
Labourer 3.9329
Carpenter 1.2585
Sundries (Labour Only):
EQUIPMENT
Concrete Static Mixer 0.9439
0.19 m³ (1/4 Y³)
Concrete Vibrator (Pocker 0.9439
1.5")
Water Tank Tow Type ( 0.9439
4000 l )
Pump 4" delivery (Diesel) 0.3146
Tractor with trolly 0.9439
2,785
2,786
Item Name : Confirmatory Boring including SPT's, samples, lab test bore-hole logs &
Report : Alluvial Soils
Detail Qty
LABOUR
Laboratory Staff Complete 100
Sundries (Labour Only):
EQUIPMENT
Boring Rig : Rotary #1 100
2,787
Item Name : Confirmatory Boring including SPT's, samples, lab test, bore-hole logs,
report : in Gravelly Soil
EQUIPMENT
Boring Rig: Percussion # 100 Ft
1
2,788
LABOUR
Labourer 4.25 Day
Sundries (Labour Only):
EQUIPMENT
Crane 20 T 2
Traile Loe bed 20 T 2
2,789
DESCRIPTION OF ITEM :
Item Code : 16-34-a
Item Name : Pile Load Testing : Max Load up to 121-240 tonne
Detail Qty Unit
MATERIAL
Steel G-60 Deformed 0.613
Vertical B
Steel G-40 Deformed Helix 0.17
Boring for Cast-in-place 20 M
RCC Piles in Alluvial
Soils : Dia up to 760mm
(16-35-a)
RCC 1:1.5:3 Concrete of 9.7199 M3
Anchorage (06-07-a-02)
EQUIPMENT
Kentlage Load Test 1 Job
Charges upto 240 tonne
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Job Rs.
Labour Rates Per Job Rs.
2,790
DESCRIPTION OF ITEM :
Item Code : 16-34-b
Item Name : Pile Load Testing : Max Load 241 - 300 tonne
Detail Qty Unit
MATERIAL
Steel G-60 Deformed 0.613
Vertical B
Steel G-40 Deformed Helix 0.17
Boring for Cast-in-place 20 M
RCC Piles in Alluvial
Soils : Dia up to 760mm
(16-35-a)
RCC 1:1.5:3 Concrete of 9.7199 M3
Anchorage (06-07-a-02)
EQUIPMENT
Kentlage Load Test 1 Job
Charges for 240-300 tonne
2,791
DESCRIPTION OF ITEM :
Item Code : 16-34-c
Item Name : Pile Load Testing : Max Load 301 - 360 tonne
Detail Qty Unit
MATERIAL
Steel G-60 Deformed 0.613
Vertical B
Steel G-40 Deformed Helix 0.17
Boring for Cast-in-place 20 M
RCC Piles in Alluvial
Soils : Dia up to 760mm
(16-35-a)
RCC 1:1.5:3 Concrete of 9.7199 M3
Anchorage (06-07-a-02)
EQUIPMENT
Kentlage Load Test 1 Job
Charges for 300-360 tonne
2,792
DESCRIPTION OF ITEM :
Item Code : 16-34-d
Item Name : Pile Load Testing : Max Load 361 - 600 tonne
Detail Qty Unit
MATERIAL
Steel G-60 Deformed 0.613
Vertical B
Steel G-40 Deformed Helix 0.17
Boring for Cast-in-place 20 M
RCC Piles in Alluvial
Soils : Dia up to 760mm
(16-35-a)
RCC 1:1.5:3 Concrete of 9.7199 M3
Anchorage (06-07-a-02)
EQUIPMENT
Kentlage Load Test 1 Job
Charges for 300-600 tonne
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Job Rs.
Labour Rates Per Job Rs.
2,793
DESCRIPTION OF ITEM :
Item Code : 16-34-e
Item Name : Pile Load Test Upto 601-900 Ton
Detail Qty Unit
MATERIAL
Steel G-60 Deformed 0.613
Vertical B
Steel G-40 Deformed Helix 0.17
Boring for Cast-in-place 20 M
RCC Piles in Alluvial
Soils : Dia up to 760mm
(16-35-a)
RCC 1:1.5:3 Concrete of 9.7199 M3
Anchorage (06-07-a-02)
EQUIPMENT
Kentlage Load Test 1 Job
Charges for 600-900 tonne
2,794
2,795
Item Name : Pile load test: (Pre high Strain Dynamic load test as per ASTM D
4945-08 including field data analysis results with report etc complete
Max Load 1100 tons
MATERIAL
Steel G-60 Deformed 0.613 Tonne
Vertical B
Steel G-40 Deformed Helix 0.17 Tonne
Boring for Cast-in-place 20 M
RCC Piles in Alluvial
Soils : Dia up to 760mm
(16-35-a)
RCC 1:1.5:3 Concrete of 9.7199 M3
Anchorage (06-07-a-02)
TOTAL
EQUIPMENT
Kentlage Load Test 1 Job
Charges for 900-1200
tonne
2,796
DESCRIPTION OF ITEM :
Item Code : 16-35-a
Item Name :
Detail Qty Unit
EQUIPMENT
Boring Rig : Rotary #1 100 Ft
2,797
Item Name : Boring for Cast-in-place RCC Piles in Alluvial Soils : Dia 761 - 1220
mm
2,798
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Boring for Cast-in-place RCC Piles in Alluvial Soils : Dia 1221 - 2000
mm
2,799
DESCRIPTION OF ITEM :
Item Code : 16-36-a
Item Name :
Detail Qty
EQUIPMENT
Boring Rig: Percussion # 100
1
2,800
Item Name : Boring with temporary casing in gravely subsoil for 760-1220 mm
diameter pile.
Detail Qty
LABOUR
Laboratory Staff Complete 100
Sundries (Labour Only):
EQUIPMENT
Boring Rig : Percussion 100
#2
2,801
Item Name : Boring with temporary casing in any type of Rock (till appropriate
degree of socket & RQD value not less than 90%) for 720-1220 mm
diameter pile.
LABOUR
Laboratory Staff Complete 100
Sundries (Labour Only):
EQUIPMENT
Boring Rig : Rotary #1 100
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per 100 Rft Rs.
Labour Rates Per 100 Rft Rs.
2,802
Item Name : Supply fabricate & install welded MS lining in piles of thickness as
per specs/drwg
Detail Qty
MATERIAL
M.S Sheet 100
LABOUR
Labourer 1.5945
Skilled Labour 0.7874
Sundries (Labour Only):
2,803
DESCRIPTION OF ITEM :
Item Code : 16-38-a
Item Name :
Detail Qty Unit
MATERIAL
Bearing Pad (Elastomeric) 1
LABOUR
Labourer 0.0015 Day
Sundries (Labour Only):
2,804
DESCRIPTION OF ITEM :
Item Code : 16-38-b
Item Name :
Detail Qty
MATERIAL
Bearing Pad (Steel) 100 Kg
LABOUR
Labourer 1.4764 Day
Black Smith 0.6102 Day
Welder 0.6102 Day
Sundries (Labour Only):
2,805
Item Name : Supply and Fixing spirally wound sheath of 50mm dia. For pre-stressing
of cables in precast conc. Girders
LABOUR
Steel Binder / Cutter / 0.9144 Day
Fixer
Sundries (Labour Only):
2,806
Item Name : Supply and Fixing stressing anchorages for high tensile steel wire
cables in precast girders
LABOUR
Steel Binder / Cutter / 0.15 Day
Fixer
Sundries (Labour Only):
2,807
DESCRIPTION OF ITEM :
Item Code : 16-41
Item Name :
Detail Qty Unit
LABOUR
Labourer 0.4878 Day
Skilled Labour 0.2439 Day
Mate 0.0305 Day
Sundries (Labour Only):
EQUIPMENT
PSC Girder Launching Test 0.0122 Job
2,808
DESCRIPTION OF ITEM :
Item Code : 16-42
Item Name : Stressing Cable of High Tensile Steel Wire Strands
Detail Qty Unit
LABOUR
Helper 0.9 Day
Stressing Jack Operator 0.3 Day
for Ca
Sundries (Labour Only):
EQUIPMENT
Stressing Jack for Cable 0.333 1 Hour
DESCRIPTION OF ITEM :
Item Code : 16-43-a
Item Name :
Detail Qty Unit
MATERIAL
GI Steel Ropes 1/2" Dia 105 Rft
LABOUR
Labourer 1.8288 Day
Sundries (Labour Only):
EQUIPMENT
Pickup 800 CC. 4 x 2 1.524 Hour
Cable Winch (100 T 2.4384 Hour
Capacity)
2,810
DESCRIPTION OF ITEM :
Item Code : 16-43-b
Item Name :
Detail Qty Unit
MATERIAL
GI Steel Ropes 3/4" Dia 105 Rft
LABOUR
Labourer 1.8288 Day
Sundries (Labour Only):
EQUIPMENT
Pickup 800 CC. 4 x 2 1.524 Hour
Cable Winch (100 T 2.4384 Hour
Capacity)
2,811
DESCRIPTION OF ITEM :
Item Code : 16-43-c
Item Name : Providing and fixing GI Steel (Hamp core) Ropes 1" dia
Detail Qty
MATERIAL
GI Steel Ropes 1" Dia 105 Rft
LABOUR
Labourer 1.8288 Day
Sundries (Labour Only):
EQUIPMENT
Pickup 800 CC. 4 x 2 1.524
Cable Winch (100 T 2.4384
Capacity)
2,812
DESCRIPTION OF ITEM :
Item Code : 16-43-d
Item Name : Providing and fixing GI Steel U Grips 1.5" dia
Detail Qty Unit
MATERIAL
GI Steel U Grips 1.5" Dia 1 No
LABOUR
Labourer 0.25 Day
Sundries (Labour Only):
EQUIPMENT
Pickup 800 CC. 4 x 2 0.5 Hour
2,813
DESCRIPTION OF ITEM :
Item Code : 16-43-e
Item Name : Providing and fixing GI Steel U Grips 1" dia
Detail Qty Unit
MATERIAL
GI Steel U Grips 1" Dia 1 No
LABOUR
Labourer 0.25 Day
Sundries (Labour Only):
EQUIPMENT
Pickup 800 CC. 4 x 2 0.5 Hour
2,814
DESCRIPTION OF ITEM :
Item Code : 16-43-f
Item Name : Providing and fixing GI Steel U Grips 3/4" dia
Detail Qty Unit
MATERIAL
GI Steel U Grips 3/4" Dia 1 No
LABOUR
Labourer 0.25 Day
Sundries (Labour Only):
EQUIPMENT
Pickup 800 CC. 4 x 2 0.5 Hour
2,815
DESCRIPTION OF ITEM :
Item Code : 16-43-g
Item Name : Providing and fixing GI Steel Thimble plate 1.5" dia
Detail Qty Unit
MATERIAL
GI Steel Thimble Plate 1 No
1.5" Dia
LABOUR
Labourer 0.25 Day
Sundries (Labour Only):
EQUIPMENT
Pickup 800 CC. 4 x 2 0.5 Hour
2,816
DESCRIPTION OF ITEM :
Item Code : 16-43-h
Item Name : Providing and fixing GI Steel Thimble plate 1" dia
Detail Qty Unit
MATERIAL
GI Steel Thimble Plate 1" 1 No
Dia
LABOUR
Labourer 0.25 Day
Sundries (Labour Only):
EQUIPMENT
Pickup 800 CC. 4 x 2 0.5 Hour
2,817
DESCRIPTION OF ITEM :
Item Code : 16-43-i
Item Name : Providing and fixing GI Steel Thimble plate 3/4" dia
Detail Qty Unit
MATERIAL
GI Steel Thimble Plate 1 No
3/4" Dia
LABOUR
Labourer 0.25 Day
Sundries (Labour Only):
EQUIPMENT
Pickup 800 CC. 4 x 2 0.5 Hour
2,818
DESCRIPTION OF ITEM :
Item Code : 16-43-j
Item Name : Providing and fixing GI Steel Thimble plate 1/2" dia
Detail Qty Unit
MATERIAL
GI Steel Thimble Plate 1 No
1/2" Dia
LABOUR
Labourer 0.25 Day
Sundries (Labour Only):
EQUIPMENT
Pickup 800 CC. 4 x 2 0.5 Hour
2,819
EQUIPMENT
Coupling Machine for 0.5 Hour
Ropes
2,820
DESCRIPTION OF ITEM :
Item Code : 16-45
Item Name : Saddle plate for ropes
Detail Qty Unit
LABOUR
Labourer 1 Day
Sundries (Labour Only):
EQUIPMENT
Saddle Plate for Ropes 1 Hour
2,821
LABOUR
Labourer 1 Day
Stressing Jack Operator 0.3048 Day
for Ca
Sundries (Labour Only):
EQUIPMENT
Grouting Pump Set 0.3048 Hour
2,822
DESCRIPTION OF ITEM :
Item Code : 16-47
Item Name : Cement Stabilized Sub base
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 8.75 Bag
Aggregate 2"-1.5" 50.9231 Cft
Aggregate 3/4" - 3/8" 178.2308 Cft
Aggregate 3/8" - No. 4 152.7692 Cft
Aggregate No. 4 - No. 200 483.7692 Cft
Crushed aggregate 0.75" 127.3077 Cft
to 1.5
LABOUR
Labourer 0.1307 Day
Sundries (Labour Only):
EQUIPMENT
Static Tandom Roller ( 12 0.1743 Hour
T)
Dumper ( 10 T ) 0.3485 Hour
Batching plant 0.1743 Hour
Aggregate Spreader 4m 0.1743 Hour
wide
2,823
2,824
DESCRIPTION OF ITEM :
Item Code : 16-48
Item Name : Liquid Asphalt For Curing Seal, Type Mc-250
Detail Qty Unit
MATERIAL
Asphalt MC 250 1 ton
LABOUR
Labourer 0.3333 Day
Sundries (Labour Only):
EQUIPMENT
Tractor 50 HP 1.3333 Hour
Power Broomer 0.3333 Hour
Bitumen Dist. Tow Type 1 Hour
(2000 Ltr.)
2,825
DESCRIPTION OF ITEM :
Item Code : 16-49
Item Name : Emulsified Asphalt For Curing Seal, Type SS-1
Detail Qty
MATERIAL
Asphalt SS 1 1
LABOUR
Labourer 0.3333
Sundries (Labour Only):
EQUIPMENT
Tractor 50 HP 1.3333
Power Broomer 0.3333
Bitumen Dist. Tow Type 1
(2000 Ltr.)
2,826
DESCRIPTION OF ITEM :
Item Code : 16-50
Item Name : Cement Stabilized Base
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 1.6 Bag
Furnace Oil 82.9117 Ltr
Aggregate 2"-1.5" 14 Cft
Aggregate 3/4" - 3/8" 68 Cft
Aggregate No. 4 - No. 200 16 Cft
Asphalt Grade 60/70 0.1937 Cft
LABOUR
Labourer 1.0194 Day
Sundries (Labour Only):
EQUIPMENT
Front End Loader 1.5 m³ 0.4531 Hour
Static Tandom Roller ( 8 0.9061 Hour
T)
Water Tank Tow Type ( 2.0388 Hour
4000 l )
Tractor 50 HP 0.1133 Hour
Compressor 300 CFM 0.1133 Hour
Asphalt Plant 20T 0.4531 Hour
Paver 2.5M wide 0.4531 Hour
2,827
2,828
MATERIAL
Ordinary Portland Cement 1.05 Bag
Coarse Sand 2 Cft
LABOUR
Mason 1 Day
Labourer 1 Day
Water Man 0.25 Day
Chiseler 1 Day
Sundries (Labour Only):
EQUIPMENT
Hire Charges of cement 0.5 Hour
gun
2,829
Item Name : Rock SN-Bolts (Grouted Bolts) 25mm dia - 2 m in length including fixing
and stregthening etc.
LABOUR
Skilled Labour 0.0625 Day
Driller 0.0625 Day
Sundries (Labour Only):
EQUIPMENT
Grouting Pump Set 0.2 Hour
Drill Machine 0.5 Hour
2,830
Item Name : Rock SN-Bolts (Grouted Bolts) 25mm dia - 3 m in length including fixing
and stregthening etc.
LABOUR
Skilled Labour 0.0625 Day
Driller 0.0625 Day
Sundries (Labour Only):
EQUIPMENT
Grouting Pump Set 0.2 Hour
Drill Machine 0.5 Hour
2,831
Item Name : Rock SN-Bolts (Grouted Bolts) 25mm dia - 4 m in length including fixing
and stregthening etc.
LABOUR
Skilled Labour 0.0625 Day
Driller 0.0625 Day
Sundries (Labour Only):
EQUIPMENT
Grouting Pump Set 0.2 Hour
Drill Machine 0.5 Hour
2,832
Item Name : Rock SN-Bolts (Grouted Bolts) 25mm dia - 5 m in length including fixing
and stregthening etc.
LABOUR
Skilled Labour 0.0625 Day
Driller 0.0625 Day
Sundries (Labour Only):
EQUIPMENT
Grouting Pump Set 0.2 Hour
Drill Machine 0.5 Hour
2,833
Item Name : Cut off projecting wire ends of cables & make good anchorage recess
with 1:2:4 cem. conc.
LABOUR
Mason 0.042 Day
Labourer 0.5 Day
Water Man 0.042 Day
Steel Binder / Cutter / 0.042 Day
Fixer
Sundries (Labour Only):
EQUIPMENT
Steel Cutter 0.0333 Hour
Item Name : Supply and place in position MS expansion joint assemblies as specified
& as per drawing
Detail Qty
MATERIAL
Steel (bars/rods/section) 104.9958
LABOUR
Mason 1
Labourer 2
Black Smith 1
Sundries (Labour Only):
2,835
Item Name : Supply and place in position galvanised steel 3" dia drain scuppers in
deck slab as per specs/drwg
LABOUR
Mason 0.05 Day
Labourer 0.1 Day
Steel Binder / Cutter / 0.05 Day
Fixer
Sundries (Labour Only):
2,836
DESCRIPTION OF ITEM :
Item Code : 16-56
Item Name : Providing and Fixing rain water outlet of AC pipe
Detail Qty Unit
MATERIAL
A.C.pipe (b) 3" 1.5 Ft
LABOUR
Mason 0.05 Day
Labourer 0.05 Day
Sundries (Labour Only):
2,837
Item Name : Supply and Fixing polystrene fill in expansion joints & under
diaphragms at transoms.
LABOUR
Labourer 3.766 Day
Carpenter 1.9 Day
Sundries (Labour Only):
2,838
Item Name : Providing and Laying expansion joint of neoprene strip 4"x1/4" and
plastic bitumen
LABOUR
Skilled Labour 0.1 Day
Sundries (Labour Only):
2,839
DESCRIPTION OF ITEM :
Item Code : 16-59-a
Item Name : Deep Patching (0-15 Cm)
Detail Qty Unit
MATERIAL
Coarse Sand 500 Cft
LABOUR
Labourer 0.2477 Day
Sundries (Labour Only):
EQUIPMENT
Bull Dozer 90 HP 0.3097 Hour
Motor Grader 140 HP 0.3716 Hour
Water Tank Tow Type ( 1.4864 Hour
4000 l )
Pump 4" delivery (Diesel) 0.2477 Hour
Combination Roller 18T 0.991 Hour
2,840
DESCRIPTION OF ITEM :
Item Code : 16-59-b
Item Name : Deep Patching (15-30 Cm)
Detail Qty Unit
MATERIAL
Coarse Sand 418 Cft
LABOUR
Labourer 0.2477 Day
Sundries (Labour Only):
EQUIPMENT
Bull Dozer 90 HP 0.3097 Hour
Motor Grader 140 HP 0.3716 Hour
Water Tank Tow Type ( 1.4864 Hour
4000 l )
Pump 4" delivery (Diesel) 0.2477 Hour
Combination Roller 18T 0.991 Hour
2,841
DESCRIPTION OF ITEM :
Item Code : 16-60
Item Name : Providing and Laying
LABOUR
Labourer 1.4 Day
Sundries (Labour Only):
EQUIPMENT
Static Tandom Roller ( 8 0.167 Hour
T)
Tar Boiler 0.167 Hour
Concrete Mixer 1 bag 0.167 Hour
2,842
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 16-61-a
Item Name : CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT
Detail Qty
MATERIAL
Asphalt MC 70 0.0948
LABOUR
Labourer 0.0387
Sundries (Labour Only):
EQUIPMENT
Water Tank Tow Type ( 0.0155
4000 l )
Tractor 50 HP 0.0619
Pump 4" delivery (Diesel) 0.0155
Power Broomer 0.0619
Bitumen Dist. Tow Type 0.1239
(2000 Ltr.)
2,843
DESCRIPTION OF ITEM :
Item Code : 16-61-b
Item Name : CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT.
Detail Qty Unit
MATERIAL
Asphalt MC 70 0.0379 ton
LABOUR
Labourer 0.0155 Day
Sundries (Labour Only):
EQUIPMENT
Tractor 50 HP 0.0248 Hour
Power Broomer 0.0248 Hour
Bitumen Dist. Tow Type 0.0495 Hour
(2000 Ltr.)
2,844
DESCRIPTION OF ITEM :
Item Code : 16-62
Item Name : Providing and Laying
coat as specified.
Detail Qty Unit
MATERIAL
Crushed Aggregate 26 Cft
1/2" size screened bajri 10 Cft
Liquid Asphalt 51 Kg
Wire Brush and Broom 1 No
LABOUR
Labourer 1.6 Day
Sundries (Labour Only):
EQUIPMENT
Static Tandom Roller ( 8 0.227 Hour
T)
Tar Boiler 0.227 Hour
Concrete Mixer 1 bag 0.227 Hour
DESCRIPTION OF ITEM :
Item Code : 16-63
Item Name : Providing and Laying
coat as specified.
Detail Qty Unit
MATERIAL
Crushed Aggregate 39 Cft
Liquid Asphalt 76 Kg
Wire Brush and Broom 1 No
LABOUR
Labourer 2.2 Day
Sundries (Labour Only):
EQUIPMENT
Static Tandom Roller ( 8 0.394 Hour
T)
Tar Boiler 0.394 Hour
Concrete Mixer 1 bag 0.3939 Hour
2,846
Item Name : Surface dressing with bitumen 80/100 or any other approved grade on a
primary coat of liquid asphalt (cut backs) of any approved grade primer
at 22lbs&bituman at 35lbs with 5cft of 1/2 standard size bajri per %sft
of road surface complete with rolling.
LABOUR
Labourer 0.015 Day
Water Man 0.0379 Day
Sundries (Labour Only):
EQUIPMENT
Static Tandom Roller ( 8 0.12 Hour
T)
Tar Boiler 0.12 Hour
2,847
Item Name : Providing and Laying PVC pipe (b) 8" dia in foot path of bridge for
utilities.
LABOUR
Pipe Layer 0.1 Day
Sundries (Labour Only):
2,848
DESCRIPTION OF ITEM :
Item Code : 16-66
Item Name :
Detail Qty Unit
MATERIAL
Coarse Sand 100 Cft
LABOUR
Labourer 2 Day
Dresser 0.2 Day
Water Sprinkler 0.12 Day
Sundries (Labour Only):
EQUIPMENT
Plate Compactor 0.5 Hour
2,849
Item Name : Formation of shoulder with permeable material Passing less than 7 %
from 200 seive and P.I less than 4 as specified.
LABOUR
Labourer 3 Day
Dresser 0.2 Day
Water Sprinkler 0.12 Day
Sundries (Labour Only):
EQUIPMENT
Static Tandom Roller ( 8 0.5 Hour
T)
Tractor with blade / 0.5 Hour
Plough
2,850
DESCRIPTION OF ITEM :
Item Code : 16-68-a
Item Name : Cold Milling of asphalt concrete 0-30 mm
Detail Qty Unit
LABOUR
Labourer 0.06 Day
Sundries (Labour Only):
EQUIPMENT
Tractor with blade / 0.05 Hour
Plough
Milling Machine / Milling 0.09 1 Hour
Drum
2,851
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 16-68-b
Item Name : Cold Milling of asphalt concrete 31-50 mm
Detail Qty Unit
LABOUR
Labourer 0.04 Day
Sundries (Labour Only):
EQUIPMENT
Tractor with blade / 0.04 Hour
Plough
Milling Machine / Milling 0.07 1 Hour
Drum
2,852
DESCRIPTION OF ITEM :
Item Code : 16-68-c
Item Name : Cold Milling of asphalt concrete 51-70 mm
Detail Qty Unit
LABOUR
Labourer 0.05 Day
Sundries (Labour Only):
EQUIPMENT
Tractor with blade / 0.04 Hour
Plough
Milling Machine / Milling 0.07 1 Hour
Drum
2,853
DESCRIPTION OF ITEM :
Item Code : 16-69
Item Name : Seal Coat / Pad Coat
Detail Qty Unit
MATERIAL
Crushed Aggregate 0.75 Cft
Fuel Wood 18.66 Kg
Bitumen (in drums) 6.3 Kg
LABOUR
Labourer 0.36 Day
Skilled Labour 0.03 Day
Sundries (Labour Only):
EQUIPMENT
Static Tandom Roller ( 8 0.08 Hour
T)
Tar Boiler 0.03 Hour
Tractor with trolly 0.03 Hour
2,854
Detail Qty
MATERIAL
Crushed Aggregate 143.58
Fuel Wood 37.32
Bitumen (in drums) 285
LABOUR
Labourer 5
Skilled Labour 1
Sundries (Labour Only):
EQUIPMENT
Plate Compactor 2
Mini Asphalt Mixer 0.5
2,855
DESCRIPTION OF ITEM :
Item Code : 16-71
Item Name : Grooving in existing BT road of size 4x4 cm @ 2 meter c/c.
Detail Qty Unit
LABOUR
Labourer 0.5 Day
Skilled Labour 0.1 Day
Sundries (Labour Only):
2,856
Item Name : Leveling dressing and compaction with power roller of existing base
coarse layer after asphalt scarification.
EQUIPMENT
Static Tandom Roller ( 8 0.25 Hour
T)
Tractor with blade / 0.25 Hour
Plough
2,857
Item Name : Providing and fixing kerb stone (12"x18"x6") in cement sand mortar 1:3
in center media or round about as specified.
Detail Qty
MATERIAL
Ordinary Portland Cement 0.89
Coarse Sand 3.4
CC Kerb Block Factory 100
made 12"x 18'' x 6''
LABOUR
Mason 1
Labourer 1.5
Water Man 0.5
Sundries (Labour Only):
2,858
Item Name : Providing and fixing kerb stone (12"x14"x6") in cement sand mortar 1:3
in center media or round about as specified.
Detail Qty
MATERIAL
Ordinary Portland Cement 0.89
Coarse Sand 3.4
CC Kerb Block Factory 100
made 12"x 14'' x 6''
LABOUR
Mason 1
Labourer 1.5
Water Man 0.5
Sundries (Labour Only):
2,859
Item Name : Providing and fixing kerb stone (12"x12"x6") in cement sand mortar 1:3
in center media or round about as specified.
Detail Qty
MATERIAL
Ordinary Portland Cement 0.89
Coarse Sand 3.4
CC Kerb Block Factory 100
made 12"x 12'' x 6''
LABOUR
Mason 1
Labourer 1.5
Water Man 0.5
Sundries (Labour Only):
2,860
DESCRIPTION OF ITEM :
Item Code : 16-74-a
Item Name : Bailing out standing water by Mechanical mean.
Detail Qty Unit
LABOUR
Labourer 0.015 Day
Skilled Labour 0.005 Day
Sundries (Labour Only):
EQUIPMENT
Diesel Dewatering Pump 0.05 Hour
1/2 Cs
2,861
DESCRIPTION OF ITEM :
Item Code : 16-74-b
Item Name : Bailing out running water by Mechanical mean.
Detail Qty Unit
LABOUR
Labourer 0.015 Day
Skilled Labour 0.005 Day
Sundries (Labour Only):
EQUIPMENT
Diesel Dewatering Pump 0.1 Hour
1/2 Cs
2,862
Item Name : Pavement marking in reflective thermoplast paint with glass beads for
line 15 cm width.
LABOUR
Labourer 0.55 Day
Sundries (Labour Only):
2,863
Item Name : Pavement marking in reflective thermoplast paint with glass beads for
line 20 cm width.
LABOUR
Labourer 0.733 Day
Sundries (Labour Only):
2,864
LABOUR
Labourer 0.55 Day
Sundries (Labour Only):
2,865
LABOUR
Labourer 0.7333 Day
Sundries (Labour Only):
Item Name : Pavement marking in reflective chlorinated rubber paint with glass
beads for line 15 cm width.
LABOUR
Labourer 0.55 Day
Sundries (Labour Only):
2,867
Item Name : Pavement marking in reflective chlorinated rubber paint with glass
beads for line 20 cm width.
2,868
Item Name : Pavement marking in reflective chlorinated rubber paint for line 15 cm
width.
LABOUR
Labourer 0.55 Day
Sundries (Labour Only):
2,869
LABOUR
Labourer 0.733 Day
Sundries (Labour Only):
2,870
DESCRIPTION OF ITEM :
Item Code : 16-78
Item Name : Right of Way Marker
Detail Qty Unit
MATERIAL
Rfcnt Steel: Grd-40 KSM 116.6667 Kg
Lean Concrete (06-49-f) 2.1 Cft
Concrete Class A1 39.275 Cft
(06-49-a)
LABOUR
Labourer 5 Day
Sundries (Labour Only):
EQUIPMENT
Tractor with trolly 8 Hour
2,871
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
Item Name : Providing & laying stone soling in water logged area including granular
filling & compaction complete.
Detail Qty
MATERIAL
Coarse Sand 15
Quarried Stone 100
LABOUR
Mason 0.25
Labourer 1.5
Sundries (Labour Only):
EQUIPMENT
Static Tandom Roller ( 8 1
T)
2,872
Item Name : P/L 1" thick Gravel flat stone slabs in pavement with earth filling in
voids
Detail Qty
MATERIAL
Loose Earth 10
Gravel flate stone slab 100
(1" thick)
LABOUR
Mason 3
Labourer 2
Sundries (Labour Only):
EQUIPMENT
Water tank 1000g 0.125
Road Roller (Static) 12 T 0.25
2,873
DESCRIPTION OF ITEM :
Item Code : 16-81
Item Name : Saw Cutting of Asphaltic Layers
Detail Qty
LABOUR
Plumber 0.08
Sundries (Labour Only):
EQUIPMENT
Saw / Wood Cutter Machine 0.25
(Petrol) 45 cc
2,874
DESCRIPTION OF ITEM :
LABOUR
Labourer 0.506
Skilled Labour 0.253
Rake Man 0.23
Sundries (Labour Only):
EQUIPMENT
Procuring/Transport/Layin 5.93
g/Com including
developing of JMF
2,875
Item Name : Jack Anchorage For 20 to 24 Wires 0.5" Strand (Comprising Trumpet,
Stressing Block & Wedges Complete)
LABOUR
Steel Binder / Cutter / 0.15 Day
Fixer
Sundries (Labour Only):
2,876
Item Name : Jack Anchorage For 16 to 19 Wires 0.5" Strand (Comprising Trumpet,
Stressing Block & Wedges Complete)
LABOUR
Steel Binder / Cutter / 0.119 Day
Fixer
Sundries (Labour Only):
2,877
LABOUR
Steel Binder / Cutter / 0.075 Day
Fixer
Sundries (Labour Only):
2,878
Item Name : Jack Anchorage For 13 to 15 Wires 0.5" Strand (Comprising Trumpet,
Stressing Block & Wedges Complete)
LABOUR
Steel Binder / Cutter / 0.0938 Day
Fixer
Sundries (Labour Only):
Item Name : Jack Anchorage For 8 to 9 Wires 0.5" Strand (Comprising Trumpet,
Stressing Block & Wedges Complete)
LABOUR
Steel Binder / Cutter / 0.0563 Day
Fixer
Sundries (Labour Only):
2,880
Item Name : Jack Anchorage For 5 to 7 Wires 0.5" Strand (Comprising Trumpet,
Stressing Block & Wedges Complete)
2,881
Item Name : Jack Anchorage For upto 4 Wires 0.5" Strand (Comprising Trumpet,
Stressing Block & Wedges Complete)
LABOUR
Steel Binder / Cutter / 0.025 Day
Fixer
Sundries (Labour Only):
2,882
DESCRIPTION OF ITEM :
Item Code : 16-84-a
Item Name :
Detail Qty
MATERIAL
Un-galvanized Sheath for 1
20 to 24 Wires 0.5"
Strand Cable
LABOUR
Steel Binder / Cutter / 0.0091 Day
Fixer
Sundries (Labour Only):
2,883
DESCRIPTION OF ITEM :
Item Code : 16-84-b
Item Name :
Detail Qty
MATERIAL
Un-galvanized Sheath for 1
16 to 19 Wires 0.5"
Strand Cable
LABOUR
Steel Binder / Cutter / 0.0071 Day
Fixer
Sundries (Labour Only):
2,884
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 16-84-c
Item Name :
Detail Qty
MATERIAL
Un-galvanized Sheath for 1
13 to 15 Wires 0.5"
Strand Cable
LABOUR
Steel Binder / Cutter / 0.0056 Day
Fixer
Sundries (Labour Only):
2,885
DESCRIPTION OF ITEM :
Item Code : 16-84-d
Item Name :
Detail Qty
MATERIAL
Un-galvanized sheath for 1
10 to 12 wires 0.5"
Strand cable
LABOUR
Steel Binder / Cutter / 0.0045 Day
Fixer
Sundries (Labour Only):
2,886
DESCRIPTION OF ITEM :
Item Code : 16-84-e
Item Name :
Detail Qty
MATERIAL
Un-galvanized Sheath for 1
8 to 9 Wires 0.5" Strand
Cable
LABOUR
Steel Binder / Cutter / 0.0038 Day
Fixer
Sundries (Labour Only):
2,887
DESCRIPTION OF ITEM :
Item Code : 16-84-f
Item Name :
Detail Qty
MATERIAL
Un-galvanized Sheath for 1
5 to 7 Wires 0.5" Strand
Cable
LABOUR
Steel Binder / Cutter / 0.0026 Day
Fixer
Sundries (Labour Only):
2,888
DESCRIPTION OF ITEM :
Item Code : 16-84-g
Item Name :
Detail Qty
MATERIAL
Un-galvanized Sheath for 1
upto 4 Wires 0.5" Strand
Cable
LABOUR
Steel Binder / Cutter / 0.0015 Day
Fixer
Sundries (Labour Only):
2,889
DESCRIPTION OF ITEM :
Item Code : 16-84-h
Item Name :
Detail Qty Unit
LABOUR
Helper 0.9 Day
Stressing Jack Operator 0.25 Day
for St
Sundries (Labour Only):
EQUIPMENT
Stressing Jack for Strand 2 Hour
2,890
Item Name : Stressing and Grouting for Cables ranging from 13/0.5" to 24/.05"
(Single End Stressing).
EQUIPMENT
Stressing Jack for Strand 1.4 Hour
2,891
DESCRIPTION OF ITEM :
Item Code : 16-84-j
Item Name :
Detail Qty Unit
LABOUR
Helper 0.4 Day
Stressing Jack Operator 0.15 Day
for St
Sundries (Labour Only):
EQUIPMENT
Stressing Jack for Strand 1.05 Hour
2,892
Item Name : Supply of High Tensile Pre-stressed concrete steel wire strand Grade
270K 0.5" dia. Packed in standard reeless/weldless coils of two 2000
kgs approximately binded and wraped in Hessian Cloth.
MATERIAL
Supply of High Tensile 1 Tonne
Pre-stressed concrete
steel wire strand
2,893
Item Name : Supply of P.C Steel wire Dia 4 mm and 5 mm. Packed in reeless coils of
600 kgs to 800kgs properly binded.
2,894
Item Name : Supply of P.C Steel wire Dia 4 mm and 5 mm. Packed in reeless coils of
600 kgs to 800kgs properly binded.
2,895
DESCRIPTION OF ITEM :
Item Code : 16-86-a
Item Name :
Detail Qty
MATERIAL
Galvanized Sheath for 20 1
to 24 Wires 0.5" Strand
Cable
LABOUR
Steel Binder / Cutter / 0.0091 Day
Fixer
Sundries (Labour Only):
2,896
DESCRIPTION OF ITEM :
Item Code : 16-86-b
Item Name :
Detail Qty
MATERIAL
Galvanized Sheath for 16 1
to 19 Wires 0.5" Strand
Cable
LABOUR
Steel Binder / Cutter / 0.0071 Day
Fixer
Sundries (Labour Only):
2,897
DESCRIPTION OF ITEM :
Item Code : 16-86-c
Item Name :
Detail Qty
MATERIAL
Galvanized Sheath for 13 1
to 15 Wires 0.5" Strand
Cable
LABOUR
Steel Binder / Cutter / 0.0056 Day
Fixer
Sundries (Labour Only):
2,898
DESCRIPTION OF ITEM :
Item Code : 16-86-d
Item Name :
Detail Qty
MATERIAL
Galvanized Sheath for 10 1
to 12 Wires 0.5" Strand
Cable
LABOUR
Steel Binder / Cutter / 0.0045 Day
Fixer
Sundries (Labour Only):
2,899
DESCRIPTION OF ITEM :
Item Code : 16-86-e
Item Name :
Detail Qty
MATERIAL
Galvanized Sheath for 8 1
to 9 Wires 0.5" Strand
Cable
LABOUR
Steel Binder / Cutter / 0.0038 Day
Fixer
Sundries (Labour Only):
2,900
DESCRIPTION OF ITEM :
Item Code : 16-86-f
Item Name :
Detail Qty
MATERIAL
Galvanized Sheath for 5 1
to 7 Wires 0.5" Strand
Cable
LABOUR
Steel Binder / Cutter / 0.0026 Day
Fixer
Sundries (Labour Only):
2,901
DESCRIPTION OF ITEM :
Item Code : 16-86-g
Item Name :
Detail Qty
MATERIAL
Galvanized Sheath for 1
upto 4 Wires 0.5" Strand
Cable
LABOUR
Steel Binder / Cutter / 0.0015 Day
Fixer
Sundries (Labour Only):
2,902
Item Name : Precast Reinfored Concrete Kerb New Jersy Barrier for Median (Double
Face)
Detail Qty
MATERIAL
Form Work with M.S. Pipe 51.04 Sft
scaffolding & M.S Plates
(Material) on Rental
Basis - Horizontal
Steel G-60 Deformed Bars 69.088 Kg
PCC (1:4:8) 7.77 Cft
PCC (1:2:4) 24.036 Cft
LABOUR
Mason 1.5 Day
Labourer 1.25 Day
Sundries (Labour Only):
2,903
Item Name : Precast Reinforced Concrete Kerb New Jersy Barrier for Bridge (Single
Face)
Detail Qty
MATERIAL
Form Work With M.S. Pipe 51.04
scaffolding & M.S Plates
(Material) on Rental
Basis - Vertical
Steel G-60 Deformed Bars 52.324
PCC (1:4:8) 5.83
PCC (1:2:4) 15.71
LABOUR
Mason 1.5
Labourer 1.25
Sundries (Labour Only):
2,904
DESCRIPTION OF ITEM :
Item Code : 16-88-a
Item Name : Metal Guard Rail
Detail Qty Unit
MATERIAL
Metal Guard Rail 1 1 Rft
LABOUR
Helper 0.023 Day
Welder 0.024 Day
Sundries (Labour Only):
2,905
DESCRIPTION OF ITEM :
Item Code : 16-88-b
Item Name : Metal Guard Rail End Pieces
Detail Qty Unit
MATERIAL
Metal Guard Rail End 1 1 Rft
Pieces
LABOUR
Helper 0.03 Day
Welder 0.03 Day
Sundries (Labour Only):
2,906
DESCRIPTION OF ITEM :
Item Code : 16-88-c
Item Name : Steel Post of Metal Guard Rail
Detail Qty Unit
MATERIAL
Steel Post C 150 x 100 x 27.1 Kg
5
LABOUR
Labourer 0.2 Day
Sundries (Labour Only):
EQUIPMENT
Tractor with trolly 0.1 Hour
Tractor with blade / 0.4 Hour
Plough
2,907
DESCRIPTION OF ITEM :
Item Code : 16-89-a
Item Name :
Detail Qty
MATERIAL
Ordinary Portland Cement 0.2166
Coarse Sand 0.41
Rfcnt Steel: Grd-40 KSM 3.3085
Aggregate 3/8" - No. 4 0.4
Aggregate No. 4 - No. 200 0.485
Curing Compound 0.0637
LABOUR
Mason 0.0142
Labourer 0.1557
Carpenter 0.0142
Black Smith 0.0035
Sundries (Labour Only):
EQUIPMENT
Concrete Static Mixer 0.0283
0.19 m³ (1/4 Y³)
Water Tank Tow Type ( 0.0142
4000 l )
Tractor 50 HP 0.0142
Pump 4" delivery (Diesel) 0.0071
2,908
2,909
DESCRIPTION OF ITEM :
Item Code : 16-89-b
Item Name : Concrete Post For Guardrail
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.2166 Bag
Coarse Sand 0.41 Cft
Rfcnt Steel: Grd-40 KSM 3.3085 Kg
Aggregate 3/8" - No. 4 0.4 Cft
Aggregate No. 4 - No. 200 0.485 Cft
Curing Compound 0.0637 Ltr
LABOUR
Mason 0.0142 Day
Labourer 0.1557 Day
Carpenter 0.0142 Day
Black Smith 0.0035 Day
Sundries (Labour Only):
EQUIPMENT
Concrete Static Mixer 0.0283 Hour
0.19 m³ (1/4 Y³)
Water Tank Tow Type ( 0.0142 Hour
4000 l )
Pump 4" delivery (Diesel) 0.0071 Hour
2,910
2,911
Item Name : Sand Asphalt (Plant Mixed) layer for sealing cracked road surface
(Asphalt content 6.3%) having average thickness 1.25 cm
2,912
Item Name : Sand Asphalt (Plant Mixed) layer for sealing cracked road surface
(Asphalt content 6.3%) having average thickness 1.25 cm
2,913
DESCRIPTION OF ITEM :
Item Code : 17-01-a
Item Name : Formation, dressing and preparing sub-grade in bed
Detail Qty Unit
LABOUR
Labourer 0.616 Day
Dresser 0.264 Day
Sundries (Labour Only):
2,914
DESCRIPTION OF ITEM :
Item Code : 17-01-b
Item Name : Formation, dressing and preparing sub-grade on slope
Detail Qty Unit
LABOUR
Labourer 0.8 Day
Dresser 0.4 Day
Sundries (Labour Only):
2,915
LABOUR
Mason 0.4 Day
Labourer 1.2 Day
Water Man 0.4 Day
Sundries (Labour Only):
2,916
DESCRIPTION OF ITEM :
Item Code : 17-03-a
Item Name : 1/2" thick plaster of cement, sand motar 1:10 in bed
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.34 Bag
Fine Sand 4.2 Cft
LABOUR
Mason 0.264 Day
Labourer 0.8 Day
Water Man 0.4 Day
Sundries (Labour Only):
2,917
GOVERNMENT OF KHYBER PAKHTUNKHWA
MRS CELL COMMUNICATION & WORKS DEPARTMENT
MARKET RATE SYSTEM 2020 - KPK
DESCRIPTION OF ITEM :
Item Code : 17-03-b
Item Name : 1/2" thick plaster of cement, sand motar 1:10 On slope
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.34 Bag
Fine Sand 4.2 Cft
LABOUR
Mason 0.4 Day
Labourer 1 Day
Water Man 0.4 Day
Sundries (Labour Only):
2,918
DESCRIPTION OF ITEM :
Item Code : 17-04-a
Item Name : 1«" thick plaster of cement, sand mortar 1:6 in bed
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 1.65 Bag
Fine Sand 11.7 Cft
LABOUR
Mason 0.4 Day
Labourer 1 Day
Water Man 0.4 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.
2,919
DESCRIPTION OF ITEM :
Item Code : 17-04-b
Item Name : 1" thick plaster of cement, sand mortar 1:6 On slope
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 1.65 Bag
Fine Sand 11.7 Cft
LABOUR
Mason 0.6 Day
Labourer 1.2 Day
Water Man 0.4 Day
Sundries (Labour Only):
2,920
DESCRIPTION OF ITEM :
Item Code : 17-05-a
Item Name : 3/8" thick plaster of cement, sand mortar 1:3 in bed
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.71 Bag
Fine Sand 2.5 Cft
LABOUR
Labourer 0.8 Day
Water Man 0.4 Day
Sundries (Labour Only):
2,921
DESCRIPTION OF ITEM :
Item Code : 17-05-b
Item Name : 3/8" thick plaster of cement, sand mortar 1:3 On slope
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.71 Bag
Fine Sand 2.5 Cft
LABOUR
Mason 0.5 Day
Labourer 1.25 Day
Water Man 0.5 Day
Sundries (Labour Only):
2,922
Detail Qty
MATERIAL
Ordinary Portland Cement 3.44
Fine Sand 25.7
Brick Tile (12"x6"x2") 1200
LABOUR
Mason 2.5
Labourer 5
Water Man 0.75
Sundries (Labour Only):
2,923
Item Name : Lining with Brick tiles 12"x6"x2", in c/s mortar 1:6 over a layer of
1/8" thick c/s mortar 1:6 (On slope)
Detail Qty
MATERIAL
Ordinary Portland Cement 3.44
Fine Sand 25.7
Brick Tile (12"x6"x2") 1200
LABOUR
Mason 2.75
Labourer 6
Water Man 0.75
Sundries (Labour Only):
2,924
Item Name : Lining with Brick tiles 12"x6"x2", in c/s mortar 1:3 over a layer of
1/8" thick c/s mortar 1:3 (in bed)
Detail Qty
MATERIAL
Ordinary Portland Cement 6
Fine Sand 22.5
Brick Tile (12"x6"x2") 1200
LABOUR
Mason 2.5
Labourer 5
Water Man 0.75
Sundries (Labour Only):
2,925
Item Name : Lining with Brick tiles 12"x6"x2", in c/s mortar 1:3 over a layer of
1/8" thick c/s mortar 1:3 (On slope)
Detail Qty
MATERIAL
Ordinary Portland Cement 6
Fine Sand 22.5
Brick Tile (12"x6"x2") 1200
LABOUR
Mason 2.75
Labourer 6
Water Man 0.75
Sundries (Labour Only):
2,926
Item Name : Lining with bricks 9"x4.5"x3" (First Class) in c/s mort. 1:6 ove a
layer of 1/8" thick c/s mortar 1:6 (in bed)
Detail Qty
MATERIAL
Ordinary Portland Cement 3.44
Fine Sand 25.7
Burnt Brick 1350
LABOUR
Mason 2.5
Labourer 5
Water Man 0.75
Sundries (Labour Only):
Item Name : Lining with bricks 9"x4.5"x3" (First Class), in c/s mort. 1:6 over a
layer of 1/8" thick c/s mortar 1:6 (On slope)
Detail Qty
MATERIAL
Ordinary Portland Cement 3.44
Fine Sand 25.7
Burnt Brick 1350
LABOUR
Mason 2.75
Labourer 6
Water Man 0.75
Sundries (Labour Only):
2,928
Item Name : Lining with bricks 9"x4.5"x3" (First Class), in c/s mort. 1:3 over a
layer of 1/8" thick c/s mortar 1:3 (in bed)
Detail Qty
MATERIAL
Ordinary Portland Cement 6
Fine Sand 22.5
Burnt Brick 1350
LABOUR
Mason 2.5
Labourer 5
Water Man 0.75
Sundries (Labour Only):
2,929
Item Name : Lining with bricks 9"x4.5"x3" (First Class), in c/s mort. 1:3 over a
layer of 1/8" thick c/s mortar 1:3 (On slope)
Detail Qty
MATERIAL
Ordinary Portland Cement 6
Fine Sand 22.5
Burnt Brick 1350
LABOUR
Mason 2.75
Labourer 6
Water Man 0.75
Sundries (Labour Only):
2,930
Item Name : 4" thick PCC lining, using washed screened & graded/curshed stone
aggregate : in bed : Ratio 1:2:4
Detail Qty
MATERIAL
Ordinary Portland Cement 17.62
Fine Sand 44
1/2" size screened bajri 88
LABOUR
Mason 1
Labourer 6
Water Man 0.5
Sundries (Labour Only):
2,931
Item Name : 4" thick PCC lining, using washed screened & graded/curshed stone
aggregate : in bed : Ratio 1:3:6
Detail Qty
MATERIAL
Ordinary Portland Cement 13
Fine Sand 46
1/2" size screened bajri 92
LABOUR
Mason 1
Labourer 6
Water Man 0.5
Sundries (Labour Only):
2,932
Item Name : 4" thick PCC lining, using washed screened & graded/curshed stone
aggregate : in bed : Ratio 1:4:8
Detail Qty
MATERIAL
Ordinary Portland Cement 9
Fine Sand 48
1/2" size screened bajri 96
LABOUR
Mason 1
Labourer 6
Water Man 0.5
Sundries (Labour Only):
2,933
Item Name : 4" thick PCC lining, using washed screened & graded/curshed stone
aggregate : On slope : Ratio 1:2:4
Detail Qty
MATERIAL
Ordinary Portland Cement 17.62
Fine Sand 44
1/2" size screened bajri 88
LABOUR
Mason 1.25
Labourer 7
Water Man 0.5
Sundries (Labour Only):
2,934
Item Name : 4" thick PCC lining, using washed screened & graded/curshed stone
aggregate : On slope : Ratio 1:3:6
Detail Qty
MATERIAL
Ordinary Portland Cement 13
Fine Sand 46
1/2" size screened bajri 92
LABOUR
Mason 1.25
Labourer 7
Water Man 0.5
Sundries (Labour Only):
2,935
Item Name : 4" thick PCC lining, using washed screened & graded/curshed stone
aggregate : On slope : Ratio 1:4:8
Detail Qty
MATERIAL
Ordinary Portland Cement 9
Fine Sand 48
1/2" size screened bajri 96
LABOUR
Labourer 0.5
Carpenter 1.25
Hammer Man 7
Sundries (Labour Only):
2,936
Item Name : Providing and laying Pre-cast parabolic segments, moulded with cement
concrete 1:1-1/2:3, including lowering in water channels to correct
alignment and grade, jointing, finishing where necessary, complete in
all respects:- Top width- 14" (360mm) & Total Depth- 9"(225mm)
Detail Qty
MATERIAL
Ordinary Portland Cement 0.0083
Fine Sand 0.0833
Pre-Cast Parabolic 1
Segments(3' Length)
360mm x 225mm (14"x9")
LABOUR
Mason 0.03 Day
Labourer 0.04 Day
Sundries (Labour Only):
2,937
Item Name : Providing and laying Pre-cast parabolic segments, moulded with cement
concrete 1:1-1/2:3, including lowering in water channels to correct
alignment and grade, jointing, finishing where necessary,excluding
carriage, complete in all respects:- Top width- 18" (457mm) & Total
Depth- 12"(305mm)
Detail Qty Unit
MATERIAL
Ordinary Portland Cement 0.013 Bag
Fine Sand 0.125 Cft
Pre-Cast Parabolic 1 RFT
Segments(3' Length)
457mm x 305mm (18"x12")
LABOUR
Mason 0.035 Day
Labourer 0.045 Day
Sundries (Labour Only):
2,938
Item Name : Providing and laying Pre-cast parabolic segments, moulded with cement
concrete 1:1-1/2:3, including lowering in water channels to correct
alignment and grade, jointing, finishing where necessary, etc. complete
in all respects:- Top width- 24" (600mm) & Total Depth- 14"(360mm)
LABOUR
Mason 0.04 Day
Labourer 0.05 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.
2,939
Item Name : Providing and laying Pre-cast parabolic segments, moulded with cement
concrete 1:1-1/2:3,including lowering in water channels to correct
alignment and grade, jointing, finishing where necessary, etc. complete
in all respects:- Top width- 25.5" (640mm) & Total Depth- 18"(460mm)
LABOUR
Mason 0.05 Day
Labourer 0.06 Day
Sundries (Labour Only):
2,940
Item Name : Providing and laying Pre-cast parabolic segments, moulded with cement
concrete 1:1-1/2:3, excluding carriage, lowering in water channels to
correct alignment and grade, jointing, finishing where necessary, etc.
complete in all respects:- Top width- 27" (675mm) & Total Depth-
19"(480mm)
LABOUR
Mason 0.06 Day
Labourer 0.07 Day
Sundries (Labour Only):
2,941
Item Name : Providing and laying Pre-cast parabolic segments, moulded with cement
concrete 1:1-1/2:3, excluding carriage, lowering in water channels to
correct alignment and grade, jointing, finishing where necessary, etc.
complete in all respects:- Top width- 30" (760mm) & Total Depth-
21"(525mm)
LABOUR
Mason 0.075 Day
Labourer 0.09 Day
Sundries (Labour Only):
2,942
DESCRIPTION OF ITEM :
Item Code : 18-01
Item Name : Cutting Ransome & Larson piles.
Detail Qty Unit
LABOUR
Black Smith 0.25 Day
Sundries (Labour Only):
2,943
DESCRIPTION OF ITEM :
Item Code : 18-02
Item Name : Cutting universal piles
Detail Qty Unit
LABOUR
Black Smith 0.375 Day
Sundries (Labour Only):
2,944
DESCRIPTION OF ITEM :
Item Code : 18-03-a
Item Name : Driving steel piles to depth of: Upto 15'
Detail Qty Unit
LABOUR
Labourer 0.016 Day
Skilled Labour 0.02 Day
Sundries (Labour Only):
2,945
DESCRIPTION OF ITEM :
Item Code : 18-03-b
Item Name : Driving steel piles to depth of: More than 15' to 25'
Detail Qty Unit
LABOUR
Labourer 0.016 Day
Skilled Labour 0.032 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per Rft Rs.
Labour Rates Per Rft Rs.
2,946
DESCRIPTION OF ITEM :
Item Code : 18-03-c
Item Name : Driving steel piles to depth of: More than 25' to 30'
Detail Qty Unit
LABOUR
Labourer 0.016 Day
Skilled Labour 0.034 Day
Sundries (Labour Only):
2,947
DESCRIPTION OF ITEM :
Item Code : 18-04
Item Name : Dolleying piles upto 5'
Detail Qty Unit
LABOUR
Labourer 0.22 Day
Dolleyman 0.27 Day
Sundries (Labour Only):
DESCRIPTION OF ITEM :
Item Code : 18-05
Item Name : Drilling holes in piles by hand
Detail Qty Unit
LABOUR
Black Smith 0.033 Day
Sundries (Labour Only):
2,949
DESCRIPTION OF ITEM :
Item Code : 18-06
Item Name : Raising and lowering machine
Detail Qty Unit
LABOUR
Labourer 4.38 Day
Skilled Labour 8.75 Day
Fitter 2.19 Day
Sundries (Labour Only):
2,950
DESCRIPTION OF ITEM :
Item Code : 18-07-a
Item Name : Turning Machine : 90
Detail Qty Unit
LABOUR
Labourer 4 Day
Skilled Labour 2.4 Day
Fitter 0.8 Day
Sundries (Labour Only):
2,951
DESCRIPTION OF ITEM :
Item Code : 18-07-b
Item Name : Turning Machine : 135
Detail Qty Unit
LABOUR
Labourer 4 Day
Skilled Labour 4 Day
Fitter 0.8 Day
Sundries (Labour Only):
2,952
DESCRIPTION OF ITEM :
Item Code : 18-07-c
Item Name : Turning Machine : 180
Detail Qty Unit
LABOUR
Labourer 5.6 Day
Skilled Labour 5.6 Day
Fitter 0.8 Day
Sundries (Labour Only):
2,953
DESCRIPTION OF ITEM :
Item Code : 18-08
Item Name : Travelling machine (light)
Detail Qty Unit
LABOUR
Labourer 5.7912 Day
Skilled Labour 9.6317 Day
Fitter 1.9202 Day
Sundries (Labour Only):
2,954
2,955
DESCRIPTION OF ITEM :
Item Code : 18-10
Item Name : Carriage of piling machine under different conditions
Detail Qty Unit
LABOUR
Labourer 2.4079 Day
Skilled Labour 3.9929 Day
Fitter 0.7925 Day
Sundries (Labour Only):
2,956
DESCRIPTION OF ITEM :
Item Code : 18-11
Item Name : Erecting piling machines
Detail Qty Unit
LABOUR
Labourer 15.613 Day
Skilled Labour 26.105 Day
Fitter 5.203 Day
Sundries (Labour Only):
2,957
DESCRIPTION OF ITEM :
Item Code : 18-12
Item Name : Dismantling piling machine
Detail Qty Unit
LABOUR
Labourer 14.87 Day
Skilled Labour 24.862 Day
Fitter 4.956 Day
Sundries (Labour Only):
2,958
Item Name : Hire charges of piling plant with accessories including fuel, pay of
operator and other mechanical staff, mobilization, demobilization and
idle time
EQUIPMENT
Piling plant including 1 Day
2,959
Item Name : Cutting pilchi, frash or sarkanda including carriage within one mile.
(1.6 km.)
2,960
DESCRIPTION OF ITEM :
Item Code : 19-02
Item Name : Weaving matresses
Detail Qty Unit
LABOUR
Labourer 3.6 Day
Sundries (Labour Only):
2,961
Item Name : Supply & filling used synthetic fibre/plastic bags 1.25cft capacity
with sand or earth, sewing & stacking : in dry
LABOUR
Labourer 0.081 Day
Sundries (Labour Only):
2,962
Item Name : Supply & filling used synthetic fibre/plastic bags 1.25cft capacity
with sand or earth, sewing & stacking : Under water
LABOUR
Labourer 0.101 Day
Sundries (Labour Only):
2,963
Item Name : Supplying and filling used jute bags, 1.25 cft capacity with sand or
earth, sewing and stacking: in dry.
LABOUR
Labourer 0.081 Day
Sundries (Labour Only):
2,964
Item Name : Supplying and filling used jute bags 1.25 cft capacity with sand or
earth, sewing & stacking : Under Water
LABOUR
Labourer 0.101 Day
Sundries (Labour Only):
2,965
Item Name : Supply & filling new synthetic fibre/plastic bags 4-5cft capacity with
sand or earth,sewing, stacking : in dry
LABOUR
Labourer 0.324 Day
Sundries (Labour Only):
2,966
Item Name : Supply & filling new synthetic fibre/plastic bags 4-5cft capacity with
sand or earth,sewing, stacking : Under water
LABOUR
Labourer 0.404 Day
Sundries (Labour Only):
2,967
Item Name : Supply & filling used jute bags 4-5 cft capacity with sand or earth,
sewing & stacking : in dry
LABOUR
Labourer 0.324 Day
Sundries (Labour Only):
2,968
Item Name : Supply & filling used jute bags 4-5 capacity with sand or earth, sewing
& stacking : Under Water
LABOUR
Labourer 0.404 Day
Sundries (Labour Only):
Item Name : Carriage of synthetic fibre/plastic bags 1.25 cft capacity filled with
sand / earth : 1st 50 m
2,970
Item Name : Carriage of synthetic fibre/plastic bags 1.25 cft capacity filled with
sand / earth : 2nd & 3rd 50 m
Item Name : Carriage of synthetic fibre/plastic bags 1.25 cft capacity filled with
sand / earth : 4th and subsequent 50 m
2,972
Item Name : Carriage of new synthetic fibre/plastic bags 4-5 cft capacity filled
with sand/earth : 1st 50 m
Item Name : Carriage of new synthetic fibre/plastic bags 4-5 cft capacity filled
with sand/earth : 2nd & 3rd 50 m
2,974
Item Name : Carriage of new synthetic fibre/plastic bags 4-5 cft capacity filled
with sand/earth : 4th & subsequent 50 m
Item Name : Rolling matresses to river edge & floating, after unrolling with area :
Upto 200 m2
2,976
Item Name : Rolling matresses to river edge & floating, after unrolling with area :
Over 200 to 250 m2
Item Name : Rolling matresses to river edge & floating, after unrolling with area :
Over 250 m2
2,978
DESCRIPTION OF ITEM :
Item Code : 19-08
Item Name : Sewing empty cement bags in sheets
Detail Qty Unit
MATERIAL
Jute String 0.91 Kg
LABOUR
Labourer 1.45 Day
Sundries (Labour Only):
Item Name : Making compact round pilchi, frash or sarkanda round bundles of
specified size for the work
2,980
Item Name : Launching the bundles mentioned in Item 19-09 above & placing in
position
Item Name : Supply and staking within 150m (500 feet) : Boulders 9" (225 m) and
above
2,982
DESCRIPTION OF ITEM :
Item Code : 19-11-b
Item Name : Supply within 150m (500 feet) : Over size shingle 3" to 9"
Detail Qty Unit
LABOUR
Labourer 1.936 Day
Sundries (Labour Only):
2,983
DESCRIPTION OF ITEM :
Item Code : 19-11-c
Item Name : Supply within 150m (500 feet): Mixed graded shingle
Detail Qty Unit
LABOUR
Labourer 2.288 Day
Sundries (Labour Only):
2,984
Item Name : Supplying and stacking munj or patha trungers (6" mesh to hold 3 cft)
stones/boulders
LABOUR
Labourer 0.25 Day
Sundries (Labour Only):
2,985
Item Name : Provide & weave GI wire netting for wire crates 6"x9" mesh : 15 SWG
wire
LABOUR
Labourer 0.75 Day
Black Smith 0.75 Day
Sundries (Labour Only):
2,986
Item Name : Provide & weave GI wire netting for wire crates 6"x9" mesh : 10 SWG
wire
LABOUR
Labourer 0.75 Day
Black Smith 0.75 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per 100 Sft Rs.
Labour Rates Per 100 Sft Rs.
2,987
DESCRIPTION OF ITEM :
Item Code : 19-13-a-03
Item Name :
Detail Qty Unit
MATERIAL
G.I wire 8 SWG 15.65 Kg
LABOUR
Labourer 0.75 Day
Black Smith 0.75 Day
Sundries (Labour Only):
2,988
Item Name : Provide & weave GI wire netting for wire crates 6"x6" mesh : 15 SWG
wire
2,989
Item Name : Provide & weave GI wire netting for wire crates 6"x6" mesh : 10 SWG
wire
LABOUR
Labourer 0.9 Day
Black Smith 0.9 Day
Sundries (Labour Only):
2,990
DESCRIPTION OF ITEM :
Item Code : 19-13-b-03
Item Name :
Detail Qty Unit
MATERIAL
G.I wire 8 SWG 20.42 Kg
LABOUR
Labourer 0.9 Day
Black Smith 0.9 Day
Sundries (Labour Only):
2,991
Item Name : Provide & weave GI wire netting for wire crates 4"x4" mesh : 15 SWG
wire
LABOUR
Labourer 1 Day
Black Smith 1 Day
Sundries (Labour Only):
2,992
Item Name : Provide & weave GI wire netting for wire crates 4"x4" mesh : 10 SWG
wire
LABOUR
Labourer 1 Day
Black Smith 1 Day
Sundries (Labour Only):
2,993
DESCRIPTION OF ITEM :
Item Code : 19-13-c-03
Item Name :
Detail Qty Unit
MATERIAL
G.I wire 8 SWG 23.47 Kg
LABOUR
Labourer 1 Day
Black Smith 1 Day
Sundries (Labour Only):
Item Name : Providing and Laying shingle on top of bund, including handling of
materials within 100 m.
LABOUR
Labourer 1 Day
Sundries (Labour Only):
2,995
Item Name : Supply & dump at site, without boat, including handling within 100m :
Stone
LABOUR
Labourer 2 Day
Sundries (Labour Only):
Contractor Profit 10% + Over Heads on(M+L+E) 2% +
Income Tax 7.5%
Composite Rates Per 100 Cft Rs.
Labour Rates Per 100 Cft Rs.
2,996
Item Name : Supply & dump at site, without boat, including handling within 100m:
boulders
LABOUR
Labourer 2 Day
Sundries (Labour Only):
2,997
Item Name : Supply & dump at site, without boat, including handling within 100m :
Shingle or spawls
LABOUR
Labourer 2 Day
Sundries (Labour Only):
2,998
Item Name : Supply & dump at site, without boat, including handling within 100m :
Brick bats
LABOUR
Labourer 1.5 Day
Sundries (Labour Only):
2,999
Item Name : Supplying and dumping by boat, including loading within 100m lead :
Stone or boulder
LABOUR
Labourer 1 Day
Boat man 2 Day
Sundries (Labour Only):
3,000
14.6.2, 14.8.3
, 14.8.4
(British) : Rft
Rate (Rs)
62.00 1 No.
164.40 1 Rft
13.00 1 Sft
1,200.00 1
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 37.82
19.50
Rate (Rs)
69.50 1 RFT
500.00 1 Litre
600.00 1
1,200.00 1
1,200.00 1
3.00
TOTAL LABOUR 15.71
19.50
14.6.2, 14.8.3
, 14.8.4
(British) : Rft
Rate (Rs)
98.70 1 RFT
500.00 1 Litre
600.00 1
1,200.00 1
1,200.00 1
3.00
TOTAL LABOUR 12.49
19.50
14.6.2, 14.8.3
, 14.8.4
(British) : Rft
Rate (Rs)
128.90 1 RFT
500.00 1 Litre
600.00 1
1,200.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.26
19.50
14.6.2, 14.8.3
, 14.8.4
(British) : Rft
Rate (Rs)
164.40 1 RFT
500.00 1 Litre
600.00 1
1,200.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.91
19.50
14.6.3 , 14.8.3
(British) : Each
1,240.00 1
1,200.00 1
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 18.10
19.50
Rate (Rs)
140.00 1
576.00 1
1,200.00 1
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 23.11
19.50
14.6.3 , 14.8.3
(British) : Each
Rate (Rs)
140.00 1
1,231.00 1
1,200.00 1
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 15.84
19.50
14.6.1
(British) : Rft
Rate (Rs)
419.00 1 RFT
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 18.63
19.50
643.02 Per Meter : Rs 2,109.10
132.30 Per Meter : Rs 433.94
14.4 , 14.6,
14.7.21 , 14.8
(British) : Each
Rate (Rs)
1,250.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.72
19.50
14.4 , 14.6,
14.7.21 , 14.8
(British) : Each
Rate (Rs)
1,930.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.47
19.50
14.4 , 14.6,
14.7.21 , 14.8
(British) : Each
Rate (Rs)
3,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.26
19.50
4,280.85 Cost Per Each: 4,280.85
14.70 Cost Per Each: 14.70
14.7.21
(British) : Each
1,350.00 1
TOTAL MATERIAL 76.17
1,200.00 1
3.00
TOTAL LABOUR 4.33
19.50
14.4 , 14.6,
14.7.21 , 14.8
(British) : Each
Rate (Rs)
575.00 1
TOTAL MATERIAL 75.92
1,200.00 1
3.00
TOTAL LABOUR 4.58
19.50
14.4 , 14.6,
14.7.21 , 14.8
(British) : No
Rate (Rs)
2,370.00 1
600.00 1
750.00 1
3.00
TOTAL LABOUR 7.18
19.50
Rate (Rs)
2,890.00 1
600.00 1
750.00 1
3.00
TOTAL LABOUR 6.46
19.50
14.4, 14.5
(British) : Each
Rate (Rs)
6,500.00 1
600.00 1
3.00
TOTAL LABOUR 3.44
19.50
14.4, 14.5
(British) : Each
Each 9,500.00
TOTAL MATERIAL
Day 600.00
TOTAL LABOUR
Rs. 11,398.44
Rs. 45.94
14.4, 14.5
(British) : Kg
Rate (Rs)
250.00 1
600.00 1
3.00
TOTAL LABOUR 26.38
19.50
Spec. No :
Rft 1,200.00 1
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 19.72
19.50
Rate (Rs)
21,500.00 1
600.00 1
3.00
TOTAL LABOUR 3.43
19.50
24.3.5.6.2 ,
24.3.6.18
(British) : Each
Rate (Rs)
10,400.00 1
120.00 1
30.00 1
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 5.35
19.50
Spec. No :
19,650.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.47
19.50
Spec. No :
Unit (British) : Each
all Shower Set 4021/4023 C.P
Rate (Rs)
13,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.68
19.50
Spec. No :
28,103.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.33
19.50
29,657.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.31
19.50
15.2.3
(British) : Rft
Rft 20.00
No 30.00
No 7.00
No 10.00
No 1.00
No 1.00
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Rs. 48.13
Rs. 17.64
15.2.3
(British) : Rft
No 7.00 1
No 1.00 1
No 1.00 1
Rft 25.00 1
No 18.00 1
No 60.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 27.16
19.50
No 7.00 1
No 1.00 1
No 1.00 1
No 60.00 1
Rft 35.00 1
No 24.00 1
TOTAL MATERIAL 57.74
Day 1,200.00 1
3.00
TOTAL LABOUR 22.76
19.50
15.2.3
(British) : Rft
No 7.00 1
No 1.00 1
No 1.00 1
No 60.00 1
Rft 40.00 1
No 26.00 1
TOTAL MATERIAL 59.38
Day 1,200.00 1
3.00
TOTAL LABOUR 21.12
19.50
15.2.3
(British) : Rft
No 7.00 1
No 1.00 1
No 1.00 1
No 60.00 1
Rft 45.00 1
No 45.00 1
TOTAL MATERIAL 60.96
Day 1,200.00 1
3.00
TOTAL LABOUR 19.54
19.50
No 1.00 1
No 1.00 1
Rft 60.00 1
No 54.00 1
No 75.00 1
No 10.00 1
1,200.00 1
3.00
TOTAL LABOUR 16.24
19.50
15.2.3
(British) : Rft
Unit Rate (Rs)
Bag 550.00
Cft. 2,000.00
Rft 20.00
No 30.00
No 7.00
No 10.00
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Rs. 103.04
Rs. 44.10
15.2.3
(British) : Rft
Rate (Rs)
550.00 1
2,000.00 1
7.00 1
25.00 1
18.00 1
60.00 1
1,200.00 1
3.00
TOTAL LABOUR 33.26
19.50
111.27 Per Meter : Rs 364.96
44.10 Per Meter : Rs 144.65
15.2.3
(British) : Rft
Rate (Rs)
550.00 1
2,000.00 1
7.00 1
60.00 1
35.00 1
24.00 1
TOTAL MATERIAL 50.52
1,200.00 1
3.00
TOTAL LABOUR 29.98
19.50
15.2.3
(British) : Rft
Rate (Rs)
550.00 1
2,000.00 1
7.00 1
60.00 1
40.00 1
26.00 1
TOTAL MATERIAL 52.01
1,200.00 1
3.00
TOTAL LABOUR 28.49
19.50
15.2.3
(British) : Rft
Rate (Rs)
550.00 1
2,000.00 1
7.00 1
60.00 1
45.00 1
45.00 1
TOTAL MATERIAL 54.42
1,200.00 1
3.00
TOTAL LABOUR 26.08
19.50
15.2.3
(British) : Rft
Bag 550.00 1
Cft. 2,000.00 1
Rft 60.00 1
No 54.00 1
No 75.00 1
No 10.00 1
1,200.00 1
3.00
TOTAL LABOUR 22.75
19.50
No 7.00
No 1.00
No 1.00
Rft 10.00
No 4.00
No 12.00
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Rs. 26.46
Rs. 8.82
15.2.4
(British) : Rft
No 7.00
No 1.00
No 1.00
Rft 14.00
No 6.00
No 15.00
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Rs. 31.51
Rs. 8.82
15.2.4
(British) : Rft
No 7.00
No 1.00
No 1.00
Rft 18.00
No 8.00
No 20.00
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Rs. 36.63
Rs. 8.82
15.2.4
(British) : Rft
No 7.00
No 1.00
No 1.00
Rft 22.67
No 12.00
No 30.00
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Rs. 47.29
Rs. 13.23
15.2.4
(British) : Rft
Rft 25.67
No 15.00
No 32.00
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Rs. 55.60
Rs. 17.64
15.2.4
(British) : Rft
No 1.00
No 1.00
No 10.00
Rft 30.00
No 30.00
No 45.00
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Rs. 57.65
Rs. 11.76
15.2.4
(British) : Rft
Rate (Rs)
1.00 1 No
1.00 1 No
35.00 1 Rft
45.00 1 No
60.00 1 No
11.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 17.96
19.50
Rate (Rs)
1.00 1 No
1.00 1 No
50.33 1 Rft
60.00 1 No
100.00 1 No
11.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 17.21
19.50
15.2.4
(British) : Rft
Bag 550.00
Cft 2,000.00
Rft 10.00
No 4.00
No 10.00
No 12.00
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Rs. 53.62
Rs. 26.46
15.2.4
(British) : Rft
Bag 550.00
Cft. 2,000.00
Rft 14.00
No 6.00
No 10.00
No 15.00
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Rs. 68.84
Rs. 26.46
15.2.4
(British) : Rft
Bag 550.00
Cft. 2,000.00
Rft 18.00
No 8.00
No 10.00
No 20.00
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Rs. 69.03
Rs. 26.46
15.2.4
(British) : Rft
Qty Unit
0.0022 Bag
0.0123 Cft.
1 Rft
0.0667 No
0.3333 No
0.03 No
TOTAL
0.018 Day
TOTAL
Over Heads on(M+L+E) 2% +
15.2.4
(British) : Rft
Bag 550.00
Cft 2,000.00
Rft 25.67
No 15.00
No 10.00
No 32.00
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Rs. 105.58
Rs. 35.28
15.2.4
(British) : Rft
Qty Unit
0.0028 Bag
0.008 Cft
1 Rft
0.0667 No
0.3333 No
0.03 No
TOTAL
0.03 Day
TOTAL
Over Heads on(M+L+E) 2% +
Rate (Rs)
550.00 1 Bag
2,000.00 1 Cft
35.00 1 Rft
45.00 1 No
60.00 1 No
11.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 34.46
19.50
15.2.4
(British) : Rft
Rate (Rs)
550.00 1 Bag
2,000.00 1 Cft
50.33 1 Rft
60.00 1 No
100.00 1 No
11.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 32.19
19.50
15.2.5
(British) : Rft
Rate (Rs)
40.00 1
10.00 1
10.00 1
8.00 1
TOTAL MATERIAL 64.74
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 15.76
19.50
Rate (Rs)
35.00 1
12.00 1
12.00 1
10.00 1
TOTAL MATERIAL 63.46
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 17.04
19.50
Spec. No :
Unit (British) : Rft
Supply and Erection GI flexible pipe for wiring purpose complete 1" i/d
Rate (Rs)
40.00 1
20.00 1
18.00 1
15.00 1
TOTAL MATERIAL 58.55
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 21.95
19.50
15.2.5
(British) : Rft
Rate (Rs)
48.00 1
25.00 1
22.00 1
20.00 1
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 20.49
19.50
Rate (Rs)
55.00 1
35.00 1
38.00 1
25.00 1
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 18.43
19.50
15.2.5
(British) : Rft
Rate (Rs)
70.00 1
50.00 1
50.00 1
30.00 1
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 21.45
19.50
15.2.5
(British) : Rft
Rate (Rs)
100.00 1
100.00 1
160.00 1
35.00 1
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 16.74
19.50
Spec. No :
Unit (British) :
Supply and Erection Sahl wood strip batten for wiring complete 1/2"
Unit Rate (Rs)
Rft 5.00
Pkt 7.00
Kg 150.00
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Over Heads on(M+L+E) 2% +
Rs. 10.88
Rs. 4.41
Spec. No :
Unit (British) :
Supply and Erection Sahl wood strip batten for wiring complete 3/4"
Unit Rate (Rs)
Rft 6.00
Pkt 7.00
Kg 150.00
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Over Heads on(M+L+E) 2% +
Rs. 12.07
Rs. 4.41
Spec. No :
Unit (British) : Rft
Supply and Erection Sahl wood strip batten for wiring complete 1"
Rate (Rs)
7.00 1
150.00 1
14.00 1
TOTAL MATERIAL 62.01
1,200.00 1
3.00
TOTAL LABOUR 18.49
19.50
15.3.1
(British) : Rft
Rate (Rs)
7.01 1
TOTAL MATERIAL 46.00
1,200.00 1
3.00
TOTAL LABOUR 34.50
19.50
15.3.1
(British) : Rft
Rate (Rs)
13.58 1
TOTAL MATERIAL 57.26
1,200.00 1
3.00
TOTAL LABOUR 23.24
19.50
Rate (Rs)
15.24 1
TOTAL MATERIAL 58.94
1,200.00 1
3.00
TOTAL LABOUR 21.56
19.50
15.3.1
(British) : Rft
Rate (Rs)
19.51 1
TOTAL MATERIAL 62.20
1,200.00 1
3.00
TOTAL LABOUR 18.30
19.50
15.3.1
(British) : Rft
Rate (Rs)
28.66 1
TOTAL MATERIAL 54.63
1,200.00 1
3.00
TOTAL LABOUR 25.87
19.50
15.3.1
(British) : Rft
Rate (Rs)
73.77 1
TOTAL MATERIAL 62.30
1,200.00 1
3.00
TOTAL LABOUR 18.20
19.50
15.3.1
(British) : Rft
Rate (Rs)
182.90 1
1,200.00 1
3.00
TOTAL LABOUR 13.92
19.50
15.3.1
(British) : Rft
Rate (Rs)
6.71 1
1,200.00 1
3.00
TOTAL LABOUR 46.08
19.50
15.3.1
(British) : Rft
Rate (Rs)
8.84 1
1,200.00 1
3.00
TOTAL LABOUR 40.76
19.50
Rate (Rs)
14.94 1
1,200.00 1
3.00
TOTAL LABOUR 33.32
19.50
15.3.1
(British) : Rft
Rate (Rs)
19.20 1
1,200.00 1
3.00
TOTAL LABOUR 28.83
19.50
34.70 Per Meter : Rs 113.83
11.76 Per Meter : Rs 38.57
15.3.1
(British) : Rft
Rate (Rs)
28.66 1
1,200.00 1
3.00
TOTAL LABOUR 30.32
19.50
15.3.1
(British) : Rft
Rate (Rs)
74.38 1
1,200.00 1
3.00
TOTAL LABOUR 21.91
19.50
15.3.1
(British) : Rft
Rate (Rs)
60.97 1
TOTAL MATERIAL 55.61
1,200.00 1
3.00
TOTAL LABOUR 24.89
19.50
15.3.1
(British) : Rft
Rate (Rs)
132.61 1
1,200.00 1
3.00
TOTAL LABOUR 21.23
19.50
15.3.1
(British) : Rft
Rate (Rs)
182.90 1
1,200.00 1
3.00
TOTAL LABOUR 17.14
19.50
Rate (Rs)
289.60 1
1,200.00 1
3.00
TOTAL LABOUR 16.30
19.50
15.3.1
(British) : Rft
Rate (Rs)
378.00 1
1,200.00 1
3.00
TOTAL LABOUR 25.02
19.50
15.3.1
(British) : Rft
Rate (Rs)
487.75 1
1,200.00 1
3.00
TOTAL LABOUR 21.23
19.50
15.3.1
(British) : Rft
Rate (Rs)
713.33 1
1,200.00 1
3.00
TOTAL LABOUR 16.47
19.50
15.3.1
(British) : Rft
Rate (Rs)
25.91 1
TOTAL MATERIAL 62.93
1,200.00 1
3.00
TOTAL LABOUR 17.57
19.50
Rate (Rs)
37.20 1
TOTAL MATERIAL 66.74
1,200.00 1
3.00
TOTAL LABOUR 13.76
19.50
15.3.1
(British) : Rft
Rate (Rs)
37.20 1
TOTAL MATERIAL 63.22
1,200.00 1
3.00
TOTAL LABOUR 17.28
19.50
Rate (Rs)
48.17 1
TOTAL MATERIAL 65.99
1,200.00 1
3.00
TOTAL LABOUR 14.51
19.50
15.3.1
(British) : Rft
Rate (Rs)
68.29 1
TOTAL MATERIAL 69.01
1,200.00 1
3.00
TOTAL LABOUR 11.49
19.50
15.3.1
(British) : Rft
Rate (Rs)
165.24 1
TOTAL MATERIAL 73.75
1,200.00 1
3.00
TOTAL LABOUR 6.75
19.50
15.3.1, 15.3.2
(British) : Each
Rate (Rs)
550.00 1
2,000.00 1
47.50 1
TOTAL MATERIAL 31.20
1,200.00 1
3.00
TOTAL LABOUR 49.30
19.50
15.3.1, 15.3.2
(British) : Each
550.00 1
2,000.00 1
65.00 1
TOTAL MATERIAL 31.25
1,200.00 1
3.00
TOTAL LABOUR 49.25
19.50
550.00 1
2,000.00 1
75.00 1
TOTAL MATERIAL 29.90
1,200.00 1
3.00
TOTAL LABOUR 50.60
19.50
15.3.1, 15.3.2
(British) : Each
550.00 1
2,000.00 1
130.00 1
TOTAL MATERIAL 35.58
1,200.00 1
3.00
TOTAL LABOUR 44.92
19.50
15.3.1, 15.3.2
(British) : Each
Rate (Rs)
550.00 1
2,000.00 1
150.00 1
TOTAL MATERIAL 35.13
1,200.00 1
3.00
TOTAL LABOUR 45.37
19.50
15.3.1, 15.3.2
(British) : Each
Rate (Rs)
550.00 1
2,000.00 1
150.00 1
TOTAL MATERIAL 32.52
1,200.00 1
3.00
TOTAL LABOUR 47.98
19.50
Spec. No :
Unit (British) : Rft
wood board, 1.75" deep : 3"x3" dia
Rate (Rs)
1.00 1
30.00 1
1.00 1
TOTAL MATERIAL 49.60
1,200.00 1
3.00
TOTAL LABOUR 30.90
19.50
1.00 1
1.00 1
40.00 1
TOTAL MATERIAL 33.91
1,200.00 1
3.00
TOTAL LABOUR 46.59
19.50
Spec. No :
Unit (British) : Each
wood board, 1.75" deep : 7"x4"
Rate (Rs)
1.00 1
1.00 1
50.00 1
TOTAL MATERIAL 38.02
1,200.00 1
3.00
TOTAL LABOUR 42.48
19.50
1.00 1
1.00 1
60.00 1
TOTAL MATERIAL 41.42
1,200.00 1
3.00
TOTAL LABOUR 39.08
19.50
Spec. No :
Unit (British) : Each
wood board, 1.75" deep : 10"x12"
Rate (Rs)
1.00 1
1.00 1
80.00 1
TOTAL MATERIAL 44.75
1,200.00 1
3.00
TOTAL LABOUR 35.75
19.50
1.00 1
1.00 1
120.00 1
TOTAL MATERIAL 51.95
1,200.00 1
3.00
TOTAL LABOUR 28.55
19.50
15.4.1, 15.4.5
(British) : Each
Rate (Rs)
436.67 1
TOTAL MATERIAL 60.79
1,200.00 1
3.00
TOTAL LABOUR 19.71
19.50
15.4.1, 15.4.5
(British) : Each
Rate (Rs)
666.67 1
TOTAL MATERIAL 65.68
1,200.00 1
3.00
TOTAL LABOUR 14.82
19.50
15.4.1, 15.4.5
(British) : Each
Rate (Rs)
1,066.67 1
TOTAL MATERIAL 66.31
1,200.00 1
3.00
TOTAL LABOUR 14.19
19.50
15.4.1, 15.4.5
(British) : Each
Rate (Rs)
3,133.33 1
TOTAL MATERIAL 73.29
1,200.00 1
3.00
TOTAL LABOUR 7.21
19.50
15.4.1, 15.4.5
(British) : Each
Rate (Rs)
666.67 1
TOTAL MATERIAL 56.99
1,200.00 1
3.00
TOTAL LABOUR 23.51
19.50
15.4.1, 15.4.5
(British) : Each
Rate (Rs)
766.67 1
TOTAL MATERIAL 59.02
1,200.00 1
3.00
TOTAL LABOUR 21.48
19.50
Rate (Rs)
1,933.33 1
TOTAL MATERIAL 67.09
1,200.00 1
3.00
TOTAL LABOUR 13.41
19.50
15.4.1, 15.4.5
(British) : Each
Rate (Rs)
3,800.00 1
TOTAL MATERIAL 71.83
1,200.00 1
3.00
TOTAL LABOUR 8.67
19.50
4,908.50 Cost Per Each: 4,908.50
367.50 Cost Per Each: 367.50
Spec. No :
Unit (British) : Each
0 Amp Main switch
Rate (Rs)
8,000.00 1
TOTAL MATERIAL 74.70
1,200.00 1
3.00
TOTAL LABOUR 5.80
19.50
Spec. No :
Unit (British) : Each
ange over switch 100 Amp
Rate (Rs)
10,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.82
19.50
12,244.00 Cost Per Each: 12,244.00
294.00 Cost Per Each: 294.00
Spec. No :
Unit (British) : Each
ange over switch 200 Amp
Rate (Rs)
20,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.92
19.50
Spec. No :
Unit (British) : Each
ange over switch 600 Amp
Rate (Rs)
30,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.62
19.50
Spec. No :
Unit (British) : Each
ange over switch 500 Amp
Rate (Rs)
28,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.66
19.50
Spec. No :
Unit (British) : Each
0 Amp main switch
Rate (Rs)
25,000.00 1
TOTAL MATERIAL 76.76
1,200.00 1
3.00
TOTAL LABOUR 3.74
19.50
Spec. No :
Unit (British) : Each
0 Amp main switch
Rate (Rs)
20,000.00 1
TOTAL MATERIAL 76.58
1,200.00 1
3.00
TOTAL LABOUR 3.92
19.50
Spec. No :
Unit (British) : Each
0 Amp main switch
Rate (Rs)
15,000.00 1
TOTAL MATERIAL 76.28
1,200.00 1
3.00
TOTAL LABOUR 4.22
19.50
15.4.1, 15.4.5
(British) : Each
Rate (Rs)
2,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.30
19.50
15.4.1, 15.4.5
(British) : Each
Rate (Rs)
2,750.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.62
19.50
15.4.1, 15.4.5
(British) : Each
Rate (Rs)
4,500.00 1
TOTAL MATERIAL 73.58
1,200.00 1
3.00
TOTAL LABOUR 6.92
19.50
Rate (Rs)
5,850.00 1
TOTAL MATERIAL 74.45
1,200.00 1
3.00
TOTAL LABOUR 6.05
19.50
15.4.1, 15.4.5
(British) : Each
Rate (Rs)
10,000.00 1
TOTAL MATERIAL 75.68
1,200.00 1
3.00
TOTAL LABOUR 4.82
19.50
Rate (Rs)
10,000.00 1
TOTAL MATERIAL 77.27
1,200.00 1
3.00
TOTAL LABOUR 3.23
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
8,000.00 1
TOTAL MATERIAL 77.21
1,200.00 1
3.00
TOTAL LABOUR 3.29
19.50
Rate (Rs)
486.00 1 Mtr
42.78 1 No
1,200.00 1
3.00
TOTAL LABOUR 4.72
19.50
15.4.15
(British) : Each
Rate (Rs)
40.00 1
TOTAL MATERIAL 49.36
1,200.00 1
3.00
TOTAL LABOUR 31.14
19.50
15.4.15
(British) : Each
Rate (Rs)
180.00 1
TOTAL MATERIAL 61.18
1,200.00 1
3.00
TOTAL LABOUR 19.32
19.50
15.4.1
(British) : Each
Rate (Rs)
50.00 1
40.56 1
TOTAL MATERIAL 58.21
1,200.00 1
3.00
TOTAL LABOUR 22.29
19.50
15.4.1
(British) : Each
Rate (Rs)
10.00 1
40.56 1
TOTAL MATERIAL 74.44
1,200.00 1
3.00
TOTAL LABOUR 6.06
19.50
1.00 1
30.00 1
TOTAL MATERIAL 49.60
1,200.00 1
3.00
TOTAL LABOUR 30.90
19.50
Spec. No :
Unit (British) :
Supply and Erection switches 10/15 Amp : Recessed type
Unit Rate (Rs)
No 1.00
No 80.00
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Rs. 120.04
Rs. 22.05
Spec. No :
Unit (British) : Each
Supply and Erection 3 pin 10/15 Amp. wall socket : Open type
Rate (Rs)
1.00 1
35.00 1
TOTAL MATERIAL 42.80
1,200.00 1
3.00
TOTAL LABOUR 37.70
19.50
Spec. No :
Unit (British) : Each
Supply and Erection 3 pin 10/15 Amp. wall socket : Recessed
Rate (Rs)
1.00 1
90.00 1
TOTAL MATERIAL 58.44
1,200.00 1
3.00
TOTAL LABOUR 22.06
19.50
Rate (Rs)
1.00 1
450.00 1
TOTAL MATERIAL 72.68
1,200.00 1
3.00
TOTAL LABOUR 7.82
19.50
15.4.1, 15.4.5
(British) : Each
Rate (Rs)
1.00 1
500.00 1
Spec. No :
Unit (British) : Each
Supply and Erection 3 pin 10/15 Amp. wall socket with shoe open type
Rate (Rs)
1.00 1
500.00 1
1,200.00 1
3.00
TOTAL LABOUR 7.37
19.50
Spec. No :
Unit (British) : Each
Supply and Erection button holder/angle holder Bakelite large size
Rate (Rs)
1.00 1
40.00 1
TOTAL MATERIAL 56.51
1,200.00 1
3.00
TOTAL LABOUR 23.99
19.50
Spec. No :
Unit (British) : Each
on holder/angle holder Brass
Rate (Rs)
1.00 1
120.00 1
TOTAL MATERIAL 68.71
1,200.00 1
3.00
TOTAL LABOUR 11.79
19.50
15.4.2
(British) : Each
Rate (Rs)
100.00 1
TOTAL MATERIAL 59.62
1,200.00 1
3.00
TOTAL LABOUR 20.88
19.50
15.4.2
(British) : Each
Rate (Rs)
150.00 1
TOTAL MATERIAL 64.58
1,200.00 1
3.00
TOTAL LABOUR 15.92
19.50
Rate (Rs)
430.00 1
TOTAL MATERIAL 72.45
1,200.00 1
3.00
TOTAL LABOUR 8.05
19.50
15.4.2
(British) : Each
Rate (Rs)
920.00 1
TOTAL MATERIAL 75.05
1,200.00 1
3.00
TOTAL LABOUR 5.45
19.50
Rate (Rs)
1,020.00 1
TOTAL MATERIAL 75.29
1,200.00 1
3.00
TOTAL LABOUR 5.21
19.50
15.6.4
(British) : Set
Rate (Rs)
110.00 1
350.00 1
30.00 1
400.00 1
50.00 1
TOTAL MATERIAL 72.33
1,200.00 1
3.00
TOTAL LABOUR 8.17
19.50
15.6.4
(British) : Set
Rate (Rs)
110.00 1
350.00 1
30.00 1
50.00 1
350.00 1
TOTAL MATERIAL 71.83
1,200.00 1
3.00
TOTAL LABOUR 8.67
19.50
Rate (Rs)
350.00 1
30.00 1
120.00 1
80.00 1
95.00 1
50.00 1
20.00 1
TOTAL MATERIAL 72.68
1,200.00 1
3.00
TOTAL LABOUR 7.82
19.50
15.5.1
(British) : Each
Rate (Rs)
240.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.61
19.50
(British) : Each
Rate (Rs)
60.00 1
450.00 1
1,200.00 1
3.00
TOTAL LABOUR 12.47
19.50
(British) : Each
Rate (Rs)
450.00 1 No
40.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 15.03
19.50
15.2.10
(British) : Rft
Rate (Rs)
250.00 1
70.00 1
TOTAL MATERIAL 74.41
1,200.00 1
3.00
TOTAL LABOUR 6.09
19.50
Rate (Rs)
187.25 1
91.67 1
1,000.00 1
TOTAL MATERIAL 72.27
1,200.00 1
3.00
TOTAL LABOUR 8.23
19.50
Spec. No :
Unit (British) : Each
Supply and Erection shackle/pin insulator, medium size
Unit Rate (Rs)
Kg 150.00 1
No 120.00 1
1,200.00 1
3.00
TOTAL LABOUR 15.40
19.50
15.4.25
(British) : kg
Rate (Rs)
112.33 1
750.00 1
TOTAL MATERIAL 75.99
1,200.00 1
3.00
TOTAL LABOUR 4.51
19.50
15.2.10
(British) : kg
Rate (Rs)
150.00 1
TOTAL MATERIAL 70.20
1,200.00 1
3.00
TOTAL LABOUR 10.30
19.50
15.2.10, 15.3.1
(British) : Rft
Rate (Rs)
7.01 1
120.00 1
TOTAL MATERIAL 66.47
1,200.00 1
3.00
TOTAL LABOUR 14.03
19.50
Rate (Rs)
15.24 1
120.00 1
TOTAL MATERIAL 68.88
1,200.00 1
3.00
TOTAL LABOUR 11.62
19.50
15.2.10, 15.3.1
(British) : Rft
Rate (Rs)
19.51 1
120.00 1
TOTAL MATERIAL 69.75
1,200.00 1
3.00
TOTAL LABOUR 10.75
19.50
Rate (Rs)
28.66 1
120.00 1
TOTAL MATERIAL 71.14
1,200.00 1
3.00
TOTAL LABOUR 9.36
19.50
15.5.6
(British) : Each
Rate (Rs)
328.75 1
55.00 1
TOTAL MATERIAL 47.98
1,200.00 1
3.00
TOTAL LABOUR 32.52
19.50
15.6.1
(British) : Each
Rate (Rs)
1,600.00 1
TOTAL MATERIAL 59.62
1,200.00 1
3.00
TOTAL LABOUR 20.88
19.50
15.6.1
(British) : Each
Rate (Rs)
1,426.00 1
1,200.00 1
3.00
TOTAL LABOUR 22.52
19.50
15.6.1
(British) : Each
Rate (Rs)
3,200.00 1
1,200.00 1
3.00
TOTAL LABOUR 13.11
19.50
Rate (Rs)
22,050.00 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.83
1,756.18 1
TOTAL EQUIPMENT 5.66
19.50
15.3.1.5
(British) : Each
700.00 1 No
TOTAL MATERIAL 54.25
1,200.00 1
3.00
TOTAL LABOUR 26.25
19.50
Spec. No :
Unit (British) : Each
W mercury vapour lamp with choke
Rate (Rs)
350.00 1
1,500.00 1
TOTAL MATERIAL 72.78
1,200.00 1
3.00
TOTAL LABOUR 7.72
19.50
800.00 1
2,000.00 1
TOTAL MATERIAL 74.32
1,200.00 1
3.00
TOTAL LABOUR 6.18
19.50
Spec. No :
Unit (British) : Each
W mercury vapour lamp with choke
Rate (Rs)
1,250.00 1
3,000.00 1
TOTAL MATERIAL 75.37
1,200.00 1
3.00
TOTAL LABOUR 5.13
19.50
Rate (Rs)
14,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.18
19.50
Spec. No :
Unit (British) : Each
Supply and Fixing SMD Type LED Road light Fixture (120-130 watts)
Rate (Rs)
24,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.89
19.50
20,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.26
19.50
Spec. No :
Unit (British) : Each
Supply and Fixing SMD Type LED Road light Fixture (60-70 watts)
Rate (Rs)
11,800.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.75
19.50
14,836.00 Cost Per Each: 14,836.00
735.00 Cost Per Each: 735.00
(British) : No
55,000.00 1 No
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.35
1,756.18 1
TOTAL EQUIPMENT 2.39
19.50
Rate (Rs)
1,900.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 4.44
19.50
(British) : Each
Rate (Rs)
1,700.00 1 No
(British) : Each
Rate (Rs)
5,000.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 3.55
19.50
Rate (Rs)
2,100.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.31
19.50
Spec. No :
Unit (British) : Each
Supply, installation, testing and commissioning of following light
1x18 Watt Impact Resistant Lamp fixture with Compact
ete in all respects.
Rate (Rs)
2,300.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.19
19.50
2,792.60 Cost Per Each: 2,792.60
44.10 Cost Per Each: 44.10
(British) : Each
Rate (Rs)
12,600.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.22
19.50
(British) : Each
Rate (Rs)
3,700.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.75
19.50
(British) : Each
Rate (Rs)
8,400.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 3.33
19.50
Rate (Rs)
27,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.10
19.50
(British) : Each
Rate (Rs)
5,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.55
19.50
6,019.10 Cost Per Each: 6,019.10
44.10 Cost Per Each: 44.10
(British) : Each
Rate (Rs)
50,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.06
19.50
(British) : No
1,200.00 1
3.00
TOTAL LABOUR 3.55
19.50
(British) : Each
650.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 7.07
19.50
820.85 Cost Per Each: 820.85
44.10 Cost Per Each: 44.10
(British) : Each
850.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 6.15
19.50
1,450.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 4.88
19.50
(British) : Each
Rate (Rs)
750.00 1 No
TOTAL MATERIAL 73.95
1,200.00 1
3.00
TOTAL LABOUR 6.55
19.50
(British) : Each
840.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 6.18
19.50
4,400.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 3.63
19.50
(British) : No
Rate (Rs) Amount
1,200.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 11.61
19.50
(British) : No
1,800.00 1 No
(British) : No
1,400.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 10.50
19.50
Rate (Rs)
1,500.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 10.05
19.50
(British) : No
Rate (Rs)
2,100.00 1 No
TOTAL MATERIAL 72.33
1,200.00 1
3.00
TOTAL LABOUR 8.17
19.50
(British) : No
No 2,800.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.94
19.50
No 3,200.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.47
19.50
(British) : No
1,200.00 1 No
TOTAL MATERIAL 68.89
1,200.00 1
3.00
TOTAL LABOUR 11.61
19.50
(British) : No
1,600.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 9.64
19.50
Rate (Rs)
3,400.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.27
19.50
(British) : No
Rate (Rs)
3,400.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.27
19.50
(British) : No
2,650.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 7.15
19.50
Rate (Rs)
5,800.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.95
19.50
(British) : No
3,200.00 1 No
(British) : No
3,456.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 6.22
19.50
Rate (Rs)
2,400.00 1 Each
1,200.00 1
3.00
TOTAL LABOUR 7.56
19.50
(British) : Each
Rate (Rs)
4,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.51
19.50
Spec. No :
Unit (British) : Each
ndle bulb 60 watt(Pin/Scrcw typo)
Rate (Rs)
1,200.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.89
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
250.00 1
TOTAL MATERIAL 69.20
1,200.00 1
3.00
TOTAL LABOUR 11.30
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
250.00 1
TOTAL MATERIAL 69.20
1,200.00 1
3.00
TOTAL LABOUR 11.30
19.50
Spec. No :
Unit (British) : Each
logen rod 500 watt
Rate (Rs)
60.00 1
TOTAL MATERIAL 51.67
1,200.00 1
3.00
TOTAL LABOUR 28.83
19.50
Spec. No :
Unit (British) : Each
e rod 4' long 40 watt
Rate (Rs)
110.00 1
TOTAL MATERIAL 60.89
1,200.00 1
3.00
TOTAL LABOUR 19.61
19.50
Spec. No :
Unit (British) : Each
be rod 2' long 20 watt
Rate (Rs)
80.00 1
TOTAL MATERIAL 56.36
1,200.00 1
3.00
TOTAL LABOUR 24.14
19.50
Spec. No :
Unit (British) : Each
Watt Incandesent bulb
Rate (Rs)
20.00 1
1,200.00 1
3.00
TOTAL LABOUR 18.00
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
800.00 1
TOTAL MATERIAL 75.24
1,200.00 1
3.00
TOTAL LABOUR 5.26
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
800.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.80
19.50
Spec. No :
Unit (British) : Each
Supply & Erection of Spot light 120 /150 watt complete in all aspects
Rate (Rs)
1,400.00 1
Spec. No :
Unit (British) : Each
Rate (Rs)
150.00 1
TOTAL MATERIAL 64.58
1,200.00 1
3.00
TOTAL LABOUR 15.92
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
240.00 1
TOTAL MATERIAL 68.89
1,200.00 1
3.00
TOTAL LABOUR 11.61
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
280.00 1
TOTAL MATERIAL 70.00
1,200.00 1
3.00
TOTAL LABOUR 10.50
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
450.00 1
TOTAL MATERIAL 72.66
1,200.00 1
3.00
TOTAL LABOUR 7.84
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
1,400.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.31
19.50
Spec. No :
Unit (British) : Each
ht Head cover for street light
Rate (Rs)
350.00 1
TOTAL MATERIAL 54.25
1,200.00 1
3.00
TOTAL LABOUR 26.25
19.50
15.6.1
(British) : Each
Rate (Rs)
3,400.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.64
19.50
15.6.1
(British) : Each
Rate (Rs)
350.00 1 No.
1,200.00 1
3.00
TOTAL LABOUR 22.79
19.50
15.6.7
(British) : Each
Rate (Rs)
13,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 30.62
19.50
Rate (Rs)
14,000.00 1 No.
300.00 1 LS
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 12.92
19.50
15.6.6
(British) : Each
Rate (Rs)
22,000.00 1 No.
300.00 1 LS
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.67
19.50
15.6.6
(British) : Each
Rate (Rs)
12,000.00 1 No.
300.00 1 LS
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 12.89
19.50
16,903.50 Cost Per Each: 16,903.50
2,205.00 Cost Per Each: 2,205.00
15.6.6
(British) : Each
Rate (Rs)
20,000.00 1 No.
300.00 1 LS
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.31
19.50
15.6.6, 15.7.4
(British) : Each
Rate (Rs)
28,800.00 1
15,000.00 1
90.00 1
2,500.00 1
1,200.00 1
850.00 1
3.00
TOTAL LABOUR 3.55
1,500.00 1
4,377.87 1
15.6.6
(British) : Job
Rate (Rs)
187.25 1
48.40 1
120.00 1
TOTAL MATERIAL 45.62
1,200.00 1
3.00
TOTAL LABOUR 34.88
19.50
15.13.2
(British) : Each
Rate (Rs)
7,000.00 1
200.00 1
120.00 1
TOTAL MATERIAL 71.77
1,200.00 1
3.00
TOTAL LABOUR 8.73
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
1,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 20.88
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
650.00 1
TOTAL MATERIAL 74.74
1,200.00 1
3.00
TOTAL LABOUR 5.76
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
460.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.84
19.50
15.14.4
(British) : Each
Rate (Rs)
10,200.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 5.21
19.50
No 280.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.12
19.50
15.13.2
(British) : Rft
Rate (Rs)
20.00 1
200.00 1
TOTAL MATERIAL 75.39
1,200.00 1
3.00
TOTAL LABOUR 5.11
19.50
15.13.2
(British) : Rft
Rate (Rs)
20.00 1
150.00 1
TOTAL MATERIAL 75.24
1,200.00 1
3.00
TOTAL LABOUR 5.26
19.50
(British) : Rft
Rate (Rs)
2,500.00 1
TOTAL MATERIAL 48.44
1,200.00 1
3.00
TOTAL LABOUR 32.06
19.50
15.3.1
(British) : Each
Rft 5.00
Rft 7.01
No. 28.67
Pkt 25.00
No. 20.00
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Over Heads on(M+L+E) 2% +
Rs. 843.67
Rs. 44.10
15.3.1
(British) : Each
Rft 5.00
Rft 6.71
No. 50.00
No. 75.00
No. 28.67
Pkt 25.00
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Rs. 640.08
Rs. 44.10
15.3.1
(British) : Rft
Day 1,200.00
TOTAL LABOUR
Over Heads on(M+L+E) 2% +
Rs. 76.85
Rs. 8.82
15.3.1
(British) : Rft
Rft 5.00
Pkt 7.00
Rft 37.20
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Over Heads on(M+L+E) 2% +
Rs. 103.83
Rs. 8.82
15.3.1
(British) : Rft
Rft 6.00
Pkt 7.00
Rft 68.29
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Over Heads on(M+L+E) 2% +
Rs. 185.21
Rs. 14.70
15.3.1
(British) : Rft
Rft 6.00
Pkt 7.00
Rft 165.24
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Over Heads on(M+L+E) 2% +
Rs. 428.80
Rs. 26.46
15.3.1
(British) : Rft
Rft 5.00
Pkt 7.00
Rft 7.01
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Over Heads on(M+L+E) 2% +
Rs. 20.48
Rs. 5.88
15.3.1
(British) : Rft
Unit Rate (Rs)
Rft 5.00
Pkt 7.00
Rft 15.24
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Over Heads on(M+L+E) 2% +
Rs. 30.32
Rs. 5.88
15.3.1
(British) : Rft
Rft 6.00
Pkt 7.00
Rft 28.66
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Over Heads on(M+L+E) 2% +
Rs. 47.55
Rs. 5.88
15.3.1
(British) : Rft
Rft 6.00
Pkt 7.00
Rft 73.77
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Over Heads on(M+L+E) 2% +
Rs. 105.87
Rs. 10.29
15.3.1
(British) : Each
Rft 5.00
Pkt 7.00
Rft 7.01
No. 120.00
No. 20.00
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Over Heads on(M+L+E) 2% +
Rs. 1,821.23
Rs. 70.56
15.3.1
(British) : Each
Rft 10.00
Rft 7.01
No. 40.00
No. 30.00
No. 21.67
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Over Heads on(M+L+E) 2% +
Rs. 1,088.31
Rs. 66.15
15.3.1
(British) : Each
Rft 10.00
Rft 7.01
No. 40.00
No. 30.00
No. 30.00
No. 21.67
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Over Heads on(M+L+E) 2% +
Rs. 528.67
Rs. 32.34
15.3.1
(British) : Each
Rft 10.00
Rft 7.01
No. 40.00
No. 40.00
No. 21.67
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Over Heads on(M+L+E) 2% +
Rs. 2,036.96
Rs. 99.96
15.3.2
(British) : Each
48.40 1
900.00 1
7,000.00 1
Each 60.00 1
TOTAL MATERIAL 71.93
1,200.00 1
3.00
TOTAL LABOUR 8.57
19.50
15.4.5
(British) : Each
Rate (Rs)
50.00 1
50.00 1
83.33 1
TOTAL MATERIAL 55.96
1,200.00 1
3.00
TOTAL LABOUR 24.54
19.50
Spec. No :
Unit (British) : Each
Amp Piano type switch (PPI)
Rate (Rs)
35.00 1
1,200.00 1
3.00
TOTAL LABOUR 34.53
19.50
Rate (Rs)
70.00 1
TOTAL MATERIAL 66.16
1,200.00 1
3.00
TOTAL LABOUR 14.34
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
30.00 1
TOTAL MATERIAL 55.36
1,200.00 1
3.00
TOTAL LABOUR 25.14
19.50
Rate (Rs)
30.00 1
TOTAL MATERIAL 55.36
1,200.00 1
3.00
TOTAL LABOUR 25.14
19.50
Spec. No :
Unit (British) : Each
Amp Power Plug 3-Pin
Rate (Rs)
200.00 1
TOTAL MATERIAL 73.11
1,200.00 1
3.00
TOTAL LABOUR 7.39
19.50
Rate (Rs)
1,000.00 1
TOTAL MATERIAL 73.95
1,200.00 1
3.00
TOTAL LABOUR 6.55
19.50
15.6.3
(British) : Each
Rate (Rs)
3,000.00 1
TOTAL MATERIAL 76.28
1,200.00 1
3.00
TOTAL LABOUR 4.22
19.50
Rate (Rs)
150.00 1 No
30.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 22.38
19.50
15.6.3
(British) : Each
Rate (Rs)
200.00 1 No
30.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 19.03
19.50
15.6.3
(British) : Each
Rate (Rs)
250.00 1 No
30.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 16.68
19.50
Rate (Rs)
500.00 1
30.00 1
TOTAL MATERIAL 69.62
1,200.00 1
3.00
TOTAL LABOUR 10.88
19.50
15.6.3
(British) : Each
Rate (Rs)
250.00 1 No
30.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 16.68
19.50
408.10 Cost Per Each: 408.10
73.50 Cost Per Each: 73.50
15.6.3
(British) : Each
Rate (Rs)
850.00 1 No
30.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 7.95
19.50
15.6.3
(British) : Each
Rate (Rs)
150.00 1 No
25.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 22.79
19.50
15.6.1
(British) : Each
Rate (Rs)
250.00 1
TOTAL MATERIAL 62.50
1,200.00 1
3.00
TOTAL LABOUR 18.00
19.50
Rate (Rs)
1,900.00 1 Set
1,200.00 1
3.00
TOTAL LABOUR 8.67
19.50
15.6.1
(British) : Each
Rate (Rs)
1,350.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.33
19.50
15.6.1
(British) : Each
Rate (Rs)
1,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.30
19.50
15.6.1
(British) : Each
Rate (Rs)
550.00 1
TOTAL MATERIAL 66.60
1,200.00 1
3.00
TOTAL LABOUR 13.90
19.50
15.6.1
(British) : Each
Rate (Rs)
60.00 1
550.00 1
TOTAL MATERIAL 64.76
1,200.00 1
3.00
TOTAL LABOUR 15.74
19.50
No 60.00
No 550.00
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Rs. 875.95
Rs. 147.00
15.6.1
(British) : Each
Rate (Rs)
60.00 1
550.00 1
TOTAL MATERIAL 64.76
1,200.00 1
3.00
TOTAL LABOUR 15.74
19.50
Rate (Rs)
60.00 1
250.00 1
TOTAL MATERIAL 39.39
1,200.00 1
3.00
TOTAL LABOUR 41.11
19.50
15.6.1
(British) : Each
Rate (Rs)
60.00 1
300.00 1
TOTAL MATERIAL 42.27
1,200.00 1
3.00
TOTAL LABOUR 38.23
19.50
15.6.1
(British) : Each
Rate (Rs)
60.00 1
350.00 1
TOTAL MATERIAL 44.75
1,200.00 1
3.00
TOTAL LABOUR 35.75
19.50
15.6.1
(British) : Each
Rate (Rs)
1,850.00 1
40.00 1
950.00 1
TOTAL MATERIAL 70.10
1,200.00 1
3.00
TOTAL LABOUR 10.40
19.50
15.6.1
(British) : Each
Rate (Rs)
1,850.00 1
40.00 1
340.00 1
TOTAL MATERIAL 68.31
1,200.00 1
3.00
TOTAL LABOUR 12.19
19.50
Rate (Rs)
1,850.00 1
40.00 1
2,800.00 1
TOTAL MATERIAL 72.84
1,200.00 1
3.00
TOTAL LABOUR 7.66
19.50
Spec. No :
Unit (British) : Each
Supply & erection of Garden light fixture with LED 25-30 watts
Rate (Rs)
14,823.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.19
19.50
15.6.1
(British) : Each
Rate (Rs)
920.00 1
TOTAL MATERIAL 58.44
1,200.00 1
3.00
TOTAL LABOUR 22.06
19.50
15.6.1
(British) : Each
Rate (Rs)
200.00 1
1,520.00 1
TOTAL MATERIAL 65.99
1,200.00 1
3.00
TOTAL LABOUR 14.51
19.50
15.13.1
(British) : Each
Rate (Rs)
1,200.00 1
3.00
TOTAL LABOUR 80.50
19.50
15.5.1
(British) : Each
Rate (Rs)
2,740.00 1
TOTAL MATERIAL 73.48
1,200.00 1
3.00
TOTAL LABOUR 7.02
19.50
15.5.1
(British) : Each
Rate (Rs)
3,400.00 1
TOTAL MATERIAL 74.23
1,200.00 1
3.00
TOTAL LABOUR 6.27
19.50
Rate (Rs)
3,500.00 1
TOTAL MATERIAL 74.32
1,200.00 1
3.00
TOTAL LABOUR 6.18
19.50
Spec. No :
Unit (British) : Each
Supply & Erection of 24" Pedestal fan complete in all aspects
Rate (Rs)
3,500.00 1
Rate (Rs)
4,400.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 4.30
19.50
15.5.2
(British) : Each
Rate (Rs)
7,000.00 1 No
TOTAL MATERIAL 76.68
1,200.00 1
3.00
TOTAL LABOUR 3.82
19.50
15.5.3
(British) : Each
Rate (Rs)
1,900.00 1
1,200.00 1
3.00
TOTAL LABOUR 7.60
19.50
15.5.3
(British) : Each
Rate (Rs)
2,566.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.46
19.50
15.5.3
(British) : Each
Rate (Rs)
3,909.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.31
19.50
1,400.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.94
19.50
15.7.12
(British) : Each
Rate (Rs)
2,400.00 1
TOTAL MATERIAL 64.58
1,200.00 1
3.00
TOTAL LABOUR 15.92
19.50
15.7.12
(British) : Each
Rate (Rs)
2,900.00 1
TOTAL MATERIAL 66.49
1,200.00 1
3.00
TOTAL LABOUR 14.01
19.50
15.7.12
(British) : Each
Rate (Rs)
6,200.00 1
TOTAL MATERIAL 70.97
1,200.00 1
3.00
TOTAL LABOUR 9.53
19.50
15.7.12
(British) : Each
Rate (Rs)
450.00 1
TOTAL MATERIAL 64.58
1,200.00 1
3.00
TOTAL LABOUR 15.92
19.50
15.7.12
(British) : Each
Rate (Rs)
450.00 1
TOTAL MATERIAL 64.58
1,200.00 1
3.00
TOTAL LABOUR 15.92
19.50
15.7.12
(British) : Each
Rate (Rs)
690.00 1
TOTAL MATERIAL 68.56
1,200.00 1
3.00
TOTAL LABOUR 11.94
19.50
No 690.00
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Rs. 934.80
Rs. 110.25
15.14.5
(British) : Each
Rate (Rs)
75.00 1
850.00 1
1,450.00 1
50.00 1
50.00 1
400.00 1
TOTAL MATERIAL 64.76
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 15.74
19.50
15.14.5
(British) : Each
Rate (Rs)
75.00 1
850.00 1
1,450.00 1
50.00 1
50.00 1
400.00 1
TOTAL MATERIAL 64.80
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 15.70
19.50
15.14.5
(British) : Each
Rate (Rs)
75.00 1
850.00 1
1,450.00 1
50.00 1
50.00 1
400.00 1
TOTAL MATERIAL 57.71
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 22.79
19.50
15.14.5
(British) : Each
No 75.00 1
No 850.00 1
No 1,450.00 1
No 50.00 1
LS 50.00 1
No 400.00 1
TOTAL MATERIAL 54.85
Day 600.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 25.65
19.50
15.4.5
(British) : Each
No 75.00 1
No 1,000.00 1
No 1,450.00 1
No 50.00 1
LS 50.00 1
No 400.00 1
TOTAL MATERIAL 53.78
Day 600.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 26.72
19.50
160.00 1
TOTAL MATERIAL 69.79
850.00 1
3.00
TOTAL LABOUR 10.71
19.50
Spec. No :
Unit (British) : Each
& Bolt 8'' or 9''x5/8''
Rate (Rs)
161.00 1
850.00 1
3.00
TOTAL LABOUR 10.67
19.50
179.00 1
TOTAL MATERIAL 70.53
850.00 1
3.00
TOTAL LABOUR 9.97
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
1,164.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.07
19.50
No 15.00 1
kg 55.00 1
kg 50.00 1
1,200.00 1
3.00
TOTAL LABOUR 15.30
19.50
15.8.11
(British) : Each
No. 15.00 1
kg 55.00 1
kg 50.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.33
19.50
15.2.10
(British) : Each
Rate (Rs)
75.00 1
50.00 1
250.00 1
110.00 1
50.00 1
TOTAL MATERIAL 70.43
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.07
19.50
Rate (Rs)
2,033.00 1
TOTAL MATERIAL 67.53
1,200.00 1
3.00
TOTAL LABOUR 12.97
19.50
(British) : Each
Rate (Rs)
2,033.00 1
TOTAL MATERIAL 67.53
1,200.00 1
3.00
TOTAL LABOUR 12.97
19.50
(British) : Each
Rate (Rs)
1,900.00 1
1,200.00 1
3.00
TOTAL LABOUR 13.57
19.50
(British) : Each
Rate (Rs)
500.00 1
1,200.00 1
3.00
TOTAL LABOUR 32.06
19.50
15.5.3
(British) : Each
Rate (Rs)
1,650.00 1
50.00 1
120.00 1
TOTAL MATERIAL 65.12
1,200.00 1
1,200.00 1
3.00
TOTAL LABOUR 15.38
19.50
Rate (Rs)
1,800.00 1
50.00 1
120.00 1
TOTAL MATERIAL 66.14
1,200.00 1
1,200.00 1
3.00
TOTAL LABOUR 14.36
19.50
15.5.3
(British) : Each
Rate (Rs)
1,900.00 1
50.00 1
120.00 1
TOTAL MATERIAL 73.20
1,200.00 1
1,200.00 1
3.00
TOTAL LABOUR 7.30
19.50
15.5.3
(British) : Each
Rate (Rs)
2,559.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.08
19.50
15.5.3
(British) : Each
Rate (Rs)
3,909.12 1
1,200.00 1
3.00
TOTAL LABOUR 4.46
19.50
15.5.2
(British) : Each
Rate (Rs)
4,400.00 1 No.
1,200.00 1
3.00
TOTAL LABOUR 4.30
19.50
(British) : Rft
Rate (Rs)
8.00 1
1,200.00 1
3.00
TOTAL LABOUR 47.52
19.50
(British) : Rft
Rate (Rs)
15.00 1
TOTAL MATERIAL 45.06
1,200.00 1
3.00
TOTAL LABOUR 35.44
19.50
(British) : Rft
Rate (Rs)
25.00 1
1,200.00 1
3.00
TOTAL LABOUR 26.38
19.50
(British) : Rft
Rate (Rs)
50.00 1
1,200.00 1
3.00
TOTAL LABOUR 16.77
19.50
15.2.4
(British) : RMtr
Rate (Rs)
60.00 1
850.00 1
11.00 1
10.00 1
TOTAL MATERIAL 75.60
1,200.00 1
3.00
TOTAL LABOUR 4.90
19.50
Rate (Rs)
60.00 1
1,100.00 1
11.00 1
10.00 1
TOTAL MATERIAL 76.02
1,200.00 1
3.00
TOTAL LABOUR 4.48
19.50
Spec. No :
Unit (British) : Each
er switch complete
Unit Rate (Rs)
No. 150.00 1
TOTAL MATERIAL 58.71
Day 1,200.00 1
3.00
TOTAL LABOUR 21.79
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
200.00 1
TOTAL MATERIAL 69.20
1,200.00 1
3.00
TOTAL LABOUR 11.30
19.50
Spec. No :
Unit (British) : Each
lain power plug 30 Amp
Rate (Rs)
450.00 1
TOTAL MATERIAL 61.18
1,200.00 1
3.00
TOTAL LABOUR 19.32
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
150.00 1
TOTAL MATERIAL 66.81
1,200.00 1
3.00
TOTAL LABOUR 13.69
19.50
Spec. No :
Unit (British) : Each
acitor 2.2 uf for ceiling fans
Rate (Rs)
56.00 1
TOTAL MATERIAL 37.41
1,200.00 1
3.00
TOTAL LABOUR 43.09
19.50
(British) : Each
Rate (Rs)
220.00 1
TOTAL MATERIAL 57.68
1,200.00 1
3.00
TOTAL LABOUR 22.82
19.50
Spec. No :
Unit (British) : Each
ut out, bakelite open type
Rate (Rs)
50.00 1
23.50 1
1,200.00 1
3.00
TOTAL LABOUR 25.72
19.50
Spec. No :
Unit (British) : Each
Supply and erection of cut out bakelite Recessed type cut out
Rate (Rs)
50.00 1
24.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.46
19.50
Spec. No :
Unit (British) : Each
t kat 500 volts 15/20 Amp
Rate (Rs)
50.00 1
51.00 1
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 23.68
19.50
Spec. No :
Unit (British) : Each
t kat 500 volts 30/35 Amp
Rate (Rs)
50.00 1
97.00 1
TOTAL MATERIAL 63.12
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 17.38
19.50
50.00 1
210.00 1
TOTAL MATERIAL 66.85
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 13.65
19.50
Spec. No :
Unit (British) : Each
t kat 500 volts 100 Amp
Rate (Rs)
50.00 1
420.00 1
TOTAL MATERIAL 70.67
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.83
19.50
50.00 1
655.00 1
TOTAL MATERIAL 72.21
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.29
19.50
Spec. No :
Unit (British) : Each
t kat 500 volts 300 Amp
Rate (Rs)
50.00 1
460.00 1
TOTAL MATERIAL 70.21
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.29
19.50
619.20 Cost Per Each: 619.20
59.53 Cost Per Each: 59.53
Spec. No :
Unit (British) : Each
t kat 500 volts 400 Amp
Rate (Rs)
50.00 1
475.00 1
TOTAL MATERIAL 68.94
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.56
19.50
Spec. No :
Unit (British) : Each
Providing & Fixing Generator 2.2 KVA Petrol driven of best quaity
Rate (Rs)
77,500.00 1
300.00 1
2,500.00 1
250.00 1
220.00 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.92
19.50
Spec. No :
Unit (British) : Each
Providing & Fixing Generator , 2.2 KVA Petrol-cum-Gas driven
Unit Rate (Rs)
No 77,500.00
Yard 300.00
No 2,500.00
Set 250.00
Ltr 220.00
No 650.00
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.91
19.50
No 91,500.00
Yard 300.00
No 2,500.00
Set 250.00
Ltr 220.00
No 650.00
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.79
19.50
Spec. No :
Unit (British) : Each
Providing & Fixing Generator , 3.1 KVA Petrol driven.
Unit Rate (Rs)
No 91,500.00 1
Yard 300.00 1
No 2,500.00 1
Set 250.00 1
Ltr 220.00 1
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 3.79
19.50
Spec. No :
Unit (British) : No
pole 36' High (Spun Type)
Rate (Rs)
26,730.00 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.80
1,756.18 1
TOTAL EQUIPMENT 4.67
19.50
20,124.00 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.32
1,756.18 1
TOTAL EQUIPMENT 6.03
19.50
Spec. No :
Unit (British) : No
Rate (Rs)
23,070.00 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.06
1,756.18 1
TOTAL EQUIPMENT 5.34
19.50
Spec. No :
Unit (British) : No
Rate (Rs)
16,663.00 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.75
1,756.18 1
TOTAL EQUIPMENT 7.13
19.50
Spec. No :
Unit (British) : Rft
CSR Osprey Conductor
Rate (Rs)
440.00 1
TOTAL MATERIAL 74.05
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.45
19.50
Spec. No :
Unit (British) : Rft
Rate (Rs)
183.00 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.81
19.50
Spec. No :
Unit (British) : Rft
CSR Rabbit Conductor (7/0.132")
Rate (Rs)
93.00 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 17.00
19.50
Spec. No :
Unit (British) : Rft
AC Wasp Conductor ( 7/0.173")
Rate (Rs)
152.00 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 12.21
19.50
76.00 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 19.46
19.50
Spec. No :
Unit (British) : Each
KV Disc Insulator
Rate (Rs)
2,495.00 1
TOTAL MATERIAL 75.24
1,200.00 1
3.00
TOTAL LABOUR 5.26
19.50
1,047.00 1
TOTAL MATERIAL 72.32
1,200.00 1
3.00
TOTAL LABOUR 8.18
19.50
Spec. No :
Unit (British) : Each
KV pin for Steel-x-arm
Rate (Rs)
540.00 1
1,200.00 1
3.00
TOTAL LABOUR 12.45
19.50
Rate (Rs)
135.00 1
TOTAL MATERIAL 61.18
1,200.00 1
3.00
TOTAL LABOUR 19.32
19.50
Spec. No :
Unit (British) : No
25 KVA, 11/0.4 KV Transformer
Rate (Rs)
170,000.00 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.91
1,756.18 1
TOTAL EQUIPMENT 0.78
19.50
280,000.00 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.56
1,756.18 1
TOTAL EQUIPMENT 0.48
19.50
Spec. No :
Unit (British) : No
KVA, 11/0.4 KV Transformer
Rate (Rs)
380,000.00 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.41
1,756.18 1
TOTAL EQUIPMENT 0.35
19.50
Spec. No :
Unit (British) : No
KVA, 11/0.4 KV Transformer
Rate (Rs)
860,412.00 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.18
1,756.18 1
TOTAL EQUIPMENT 0.16
19.50
7,916.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.35
19.50
Spec. No :
Unit (British) : Each
el-x-Arm / D-Fitting
Rate (Rs)
6,993.00 1
TOTAL MATERIAL 77.10
1,200.00 1
3.00
TOTAL LABOUR 3.40
19.50
Rate (Rs)
1,472.00 1
TOTAL MATERIAL 75.65
1,200.00 1
3.00
TOTAL LABOUR 4.85
19.50
Spec. No :
Unit (British) : Kg
Rate (Rs)
150.00 1
TOTAL MATERIAL 62.50
1,200.00 1
3.00
TOTAL LABOUR 18.00
19.50
Rate (Rs)
164.00 1
TOTAL MATERIAL 63.55
1,200.00 1
3.00
TOTAL LABOUR 16.95
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
1,011.00 1
TOTAL MATERIAL 57.05
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 23.45
19.50
Kg 105.00
TOTAL MATERIAL
Day 850.00
TOTAL LABOUR
Rs. 190.55
Rs. 65.08
15.12.1
(British) : Each
Rate (Rs)
8,000.00 1 Kg
850.00 1
3.00
TOTAL LABOUR 10.44
19.50
Spec. No : 15.6.6
Unit (British) : Each
Supply at site, hoisting and installation of Single Arm Pole
Unit Rate (Rs)
No 45,000.00 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.66
1,756.18 1
TOTAL EQUIPMENT 2.85
19.50 %
(British) : Job
Rate (Rs)
35,000.00 1 Job
1,200.00 1
3.00
TOTAL LABOUR 3.05
19.50
Spec. No :
Unit (British) : Each
Supply and errection of Grounding connecting points
Unit Rate (Rs)
No 6,100.00
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 14.15
19.50
25,000.00 1 Job
1,200.00 1
3.00
TOTAL LABOUR 3.07
19.50
(British) : Job
Job 102,500.00 1
TOTAL MATERIAL 77.48
1,200.00 1
3.00
TOTAL LABOUR 3.02
19.50
Spec. No :
Unit (British) : Each
Construction of water tight brick type Grounding inspection pit.
Unit Rate (Rs)
No 4,000.00 1
TOTAL MATERIAL 68.70
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.80
19.50
15.18.8
(British) : Each
No 26,000.00 1
TOTAL MATERIAL 71.84
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.66
19.50
15.18.8
(British) : Each
Rate (Rs)
90,000.00 1 No
TOTAL MATERIAL 74.12
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.38
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
600.00 1
TOTAL MATERIAL 62.00
1,200.00 1
3.00
TOTAL LABOUR 18.50
19.50
Spec. No :
Unit (British) : Each
Bracket along with cotter pin
Rate (Rs)
450.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.76
19.50
Spec. No :
Unit (British) : Each
Supply & erection of double pole platform for transformers
Rate (Rs)
11,000.00 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.76
1,756.18 1
TOTAL EQUIPMENT 9.88
19.50
10,000.00 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.67
1,756.18 1
TOTAL EQUIPMENT 5.72
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
8,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.64
19.50
Rate (Rs)
650.00 1
1,200.00 1
3.00
TOTAL LABOUR 17.53
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
300.00 1
1,200.00 1
3.00
TOTAL LABOUR 28.83
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
300.00 1
1,200.00 1
3.00
TOTAL LABOUR 28.83
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
350.00 1
1,200.00 1
3.00
TOTAL LABOUR 16.68
19.50
510.13 Cost Per Each: 510.13
91.88 Cost Per Each: 91.88
Spec. No :
Unit (British) : Each
Rate (Rs)
160.00 1
1,200.00 1
3.00
TOTAL LABOUR 27.73
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
145.00 1
1,200.00 1
3.00
TOTAL LABOUR 29.42
19.50
Spec. No :
Unit (British) : Each
op dead end clamp
Rate (Rs)
135.00 1
1,200.00 1
3.00
TOTAL LABOUR 19.32
19.50
Spec. No :
Unit (British) : Each
op dead end clamp
Rate (Rs)
125.00 1
(British) : Each
Rate (Rs)
52,000.00 1 No
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 7.19
Hour 1,756.18 1
TOTAL EQUIPMENT 2.39
19.50
Rate (Rs)
51,000.00 1 No
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 7.27
Hour 1,756.18 1
TOTAL EQUIPMENT 2.44
19.50
Rate (Rs)
50,000.00 1 No
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 7.35
Hour 1,756.18 1
TOTAL EQUIPMENT 2.48
19.50
(British) : Each
Rate (Rs)
62,000.00 1 No
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.57
Hour 1,756.18 1
TOTAL EQUIPMENT 2.04
19.50
(British) : Each
Rate (Rs)
48,000.00 1 No
TOTAL MATERIAL 70.41
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 7.51
Hour 1,756.18 1
TOTAL EQUIPMENT 2.58
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
11,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.04
19.50
Rate (Rs)
4,288.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.62
19.50
Spec. No :
Unit (British) : Rft
Providing and laying pipe at a depth of 2-1/2'
Unit Rate (Rs)
Rft 601.00 1
TOTAL MATERIAL 51.70
1,200.00 1
3.00
TOTAL LABOUR 28.80
19.50
Spec. No :
Unit (British) : m
PVC pipe flexible (weather proof)
Rate (Rs)
376.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.77
19.50
220.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.62
19.50
Spec. No :
Unit (British) : Rft
Rate (Rs)
207.00 1
TOTAL MATERIAL 73.25
1,200.00 1
3.00
TOTAL LABOUR 7.25
19.50
Rate (Rs)
455.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.68
19.50
15.18.8
(British) : RMtr
Rate (Rs)
736.00 1
TOTAL MATERIAL 70.59
1,200.00 1
3.00
TOTAL LABOUR 9.91
19.50
15.18.8
(British) : RMtr
Rate (Rs)
976.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.94
19.50
Rate (Rs)
1,501.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.20
19.50
15.18.1
(British) : RMtr
Rate (Rs)
1,950.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.33
19.50
15.18.1
(British) : RMtr
Rate (Rs)
2,700.00 1
1,200.00 1
3.00
TOTAL LABOUR 7.23
19.50
Rate (Rs)
3,983.00 1
1,200.00 1
3.00
TOTAL LABOUR 13.15
19.50
15.18.1
(British) : RMtr
both ends for the following sizes complete
Rate (Rs)
6,967.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.87
19.50
15.18.1
(British) : RMtr
No 8,200.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 12.89
19.50
15.18.1
(British) : RMtr
No 9,800.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 11.45
19.50
15.18.1
(British) : RMtr
both ends for the following sizes complete
No 17,000.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 9.28
19.50
Spec. No :
Unit (British) : Rft
3 Core Cable PVC/PVC '3 core 2.5 sqmm Cu/PVC/PVC
Rate (Rs)
65.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.87
19.50
60.00 1
1,200.00 1
3.00
TOTAL LABOUR 12.52
19.50
Spec. No :
Unit (British) : m
Rate (Rs)
387.00 1
TOTAL MATERIAL 75.62
1,200.00 1
3.00
TOTAL LABOUR 4.88
19.50
185.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.37
19.50
Spec. No :
Unit (British) : RMtr
xible Copper Cable 1x4 mm2
Rate (Rs)
99.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.06
19.50
No 432.56
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Rs. 561.01
Rs. 44.10
15.18.1
(British) : m
both ends for the following sizes complete
No 691.44
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Rs. 914.47
Rs. 88.20
15.18.1
(British) : m
No 1,372.11
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Over Heads on(M+L+E) 2% +
Rs. 1,771.97
Rs. 132.30
15.18.1
(British) : m
No 2,521.49
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Rs. 3,380.68
Rs. 367.50
15.4.5, 15.2.4
, 15.3.2.1
(British) : Meter
Rate (Rs) Amount
4,880.00 1
1,200.00 1
3.00
TOTAL LABOUR 7.49
19.50
15.4.5
(British) : Each
590.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 6.03
19.50
15.4.5
(British) : Each
670.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 5.68
19.50
500.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 8.21
19.50
15.4.5
(British) : Each
1,200.00 1
3.00
TOTAL LABOUR 6.74
19.50
15.4.5
(British) : Each
767.25 1 No
1,200.00 1
3.00
TOTAL LABOUR 7.56
19.50
15.4.5
(British) : Each
958.25 1 No
1,200.00 1
3.00
TOTAL LABOUR 6.70
19.50
Rate (Rs)
1,183.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 7.62
19.50
15.4.5
(British) : Each
1,200.00 1
3.00
TOTAL LABOUR 5.50
19.50
15.4.5
(British) : Each
650.06 1 No
1,200.00 1
3.00
TOTAL LABOUR 5.76
19.50
15.4.5
(British) : Each
970.10 1 No
1,200.00 1
3.00
TOTAL LABOUR 5.77
19.50
575.05 1 No
1,200.00 1
3.00
TOTAL LABOUR 7.57
19.50
15.4.7
(British) : Each
1,482.45 1 No
TOTAL MATERIAL 75.66
1,200.00 1
3.00
TOTAL LABOUR 4.84
19.50
15.4.12
(British) : Each
750.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 6.55
19.50
1,040.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 6.42
19.50
15.4.12
(British) : Each
Rate (Rs)
450.00 1
TOTAL MATERIAL 70.03
1,200.00 1
3.00
TOTAL LABOUR 10.47
19.50
(British) : Each
Rate (Rs)
510.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.67
19.50
15.4.6
(British) : Each
Rate (Rs)
135.00 1
TOTAL MATERIAL 57.17
1,200.00 1
3.00
TOTAL LABOUR 23.33
19.50
15.4.5
(British) : Each
Rate (Rs)
68.00 1
1,200.00 1
3.00
TOTAL LABOUR 14.63
19.50
Rate (Rs)
87.00 1
1,200.00 1
3.00
TOTAL LABOUR 12.39
19.50
15.4.5
(British) : Each
Rate (Rs)
190.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.69
19.50
15.4.5
(British) : Each
Rate (Rs)
170.00 1
1,200.00 1
3.00
TOTAL LABOUR 12.59
19.50
15.4.5
(British) : Each
Rate (Rs)
225.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.47
19.50
15.18.8
(British) : Point
Rate (Rs)
3,547.76 1 No
TOTAL MATERIAL 74.36
1,200.00 1
3.00
TOTAL LABOUR 6.14
19.50
15.16.3
(British) : Each
Rate (Rs)
68,451.76 1
1,200.00 1
3.00
TOTAL LABOUR 3.34
19.50
136,903.52 1
TOTAL MATERIAL 77.33
1,200.00 1
3.00
TOTAL LABOUR 3.17
19.50
Spec. No :
Unit (British) : Each
Supply and installation of plena easy line 120 Watt mixer amplifier
Rate (Rs)
45,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.02
19.50
Rate (Rs)
63,703.52 1
TOTAL MATERIAL 76.78
1,200.00 1
3.00
TOTAL LABOUR 3.72
19.50
Spec. No :
Unit (British) : Each
Supply, installation, testing & commissioning of Goose Neck Microphone
Unit Rate (Rs)
No 15,850.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.44
19.50
Spec. No :
Unit (British) : Each
Supply, installation, testing & commissioning of Table Stand Microphone
Rate (Rs)
15,850.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.44
19.50
15.16.4
(British) : Each
Rate (Rs)
63,665.09 1
1,200.00 1
3.00
TOTAL LABOUR 3.36
19.50
Spec. No :
Unit (British) : Each
Supply, installation, testing & commissioning of Ceiling Mount Speakers
Rate (Rs)
1,916.01 1
1,200.00 1
3.00
TOTAL LABOUR 8.63
19.50
Spec. No :
Unit (British) : Each
Supply, installation, testing & commissioning of Wall Mount Speakers
Rate (Rs)
41,702.65 1
TOTAL MATERIAL 77.22
1,200.00 1
3.00
TOTAL LABOUR 3.28
19.50
Spec. No :
Unit (British) : Each
Supply, installation, testing & commissioning of Wall Mount Speakers
Rate (Rs)
4,910.38 1
TOTAL MATERIAL 75.20
1,200.00 1
3.00
TOTAL LABOUR 5.30
19.50
Spec. No :
Unit (British) : Each
Supply, installation, testing & commissioning of Column Loud Speakers
Rate (Rs)
18,720.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.62
19.50
(British) : m
Rate (Rs)
70.00 1 Mtr
1,200.00 1
3.00
TOTAL LABOUR 6.79
19.50
3,000.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 4.89
19.50
15.18.8
(British) : Point
Rate (Rs)
4,472.98 1 No
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.97
19.50
(British) : Each
Rate (Rs) Amount
7,235.06 1 No
1,200.00 1
3.00
TOTAL LABOUR 4.57
19.50
(British) : Each
14,371.14 1 No
15.17.4
(British) : Each
Rate (Rs)
10,727.05 1 No
1,200.00 1
3.00
TOTAL LABOUR 4.07
19.50
Rate (Rs)
6,400.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.77
19.50
15.16.7
(British) : Each
Rate (Rs)
10,850.00 1
TOTAL MATERIAL 76.44
1,200.00 1
3.00
TOTAL LABOUR 4.06
19.50
15.17.8
(British) : Each
Rate (Rs)
263,030.78 1 No
1,200.00 1
3.00
TOTAL LABOUR 3.04
19.50
75,000.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 3.15
19.50
(British) : Each
Rate (Rs)
57,193.14 1
1,200.00 1
3.00
TOTAL LABOUR 3.20
19.50
Spec. No :
10,414.22 1
TOTAL MATERIAL 76.40
1,200.00 1
3.00
TOTAL LABOUR 4.10
19.50
(British) : Each
Rate (Rs)
6,750.00 1
TOTAL MATERIAL 75.82
1,200.00 1
3.00
TOTAL LABOUR 4.68
19.50
(British) : Rft
Rate (Rs)
2,521.13 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.15
19.50
Rate (Rs)
3,000.00 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.10
19.50
(British) : Rft
Rate (Rs)
1,890.39 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 12.25
19.50
(British) : Rft
Rate (Rs)
2,000.00 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.80
19.50
(British) : Rft
Rate (Rs)
1,290.15 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 15.84
19.50
No 285,794.16 1
1,200.00 1
3.00
TOTAL LABOUR 3.96
19.50 %
(British) : Each
Rate (Rs)
64,290.95 1 No
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.77
19.50
(British) : Each
n, testing and commissioning of U/UTP, 4
(500 MHz) Network Cable supports (10 Giga) laid in PVC
Rate (Rs)
4,384.07 1 No
1,200.00 1
3.00
TOTAL LABOUR 12.33
19.50
(British) : Each
Rate (Rs)
4,384.07 1 No
1,200.00 1
3.00
TOTAL LABOUR 12.33
19.50
Rate (Rs)
57,153.95 1
1,200.00 1
3.00
TOTAL LABOUR 3.05
19.50
(British) : Each
Rate (Rs)
17,189.19 1 No
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.26
19.50
(British) : Each
Rate (Rs)
92,930.45 1 No
TOTAL MATERIAL 75.83
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.67
19.50
(British) : Each
Rate (Rs)
50,000.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 4.82
19.50
Rate (Rs)
142,797.95 1 No
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.16
19.50
72.00 1 Mtr
1,200.00 1
3.00
TOTAL LABOUR 42.54
19.50
(British) : Each
Each 18,000.00 1
(British) : Each
Each 65,000.00
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Rs. 82,085.00
Rs. 4,410.00
15.2.3
(British) : Each
Rate (Rs)
6,000.00 1
TOTAL MATERIAL 70.45
1,200.00 1
3.00
TOTAL LABOUR 10.05
19.50
15.2.3
(British) : Each
Rate (Rs)
15,000.00 1
TOTAL MATERIAL 74.52
1,200.00 1
3.00
TOTAL LABOUR 5.98
19.50
Rate (Rs)
22,000.00 1
TOTAL MATERIAL 73.49
1,200.00 1
3.00
TOTAL LABOUR 7.01
19.50
15.2.3
(British) : Each
Rate (Rs)
70,000.00 1
TOTAL MATERIAL 76.19
1,200.00 1
3.00
TOTAL LABOUR 4.31
19.50
15.2.3
(British) : Each
Rate (Rs)
125,000.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 3.74
19.50
Rate (Rs)
19,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 7.49
19.50
(British) : Each
Rate (Rs)
19,500.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 7.49
19.50
24,772.50 Cost Per Each: 24,772.50
1,470.00 Cost Per Each: 1,470.00
(British) : Rft
Rate (Rs)
70.00 1
TOTAL MATERIAL 37.41
1,200.00 1
3.00
TOTAL LABOUR 43.09
19.50
15.4.19
(British) : Each
1,200.00 1
3.00
TOTAL LABOUR 4.82
19.50
15.4.19
(British) : Each
550.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 4.65
19.50
Rate (Rs)
530.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.13
19.50
(British) : Rft
Rate (Rs)
155.00 1 No
TOTAL MATERIAL 71.93
1,200.00 1
3.00
TOTAL LABOUR 8.57
19.50
(British) : Each
Rate (Rs)
9,400.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 4.22
19.50
Rate (Rs)
500.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 8.21
19.50
(British) : Each
Rate (Rs)
550.00 1
1,200.00 1
3.00
TOTAL LABOUR 7.76
19.50
(British) : Each
Rate (Rs)
400,000.00 1 Each
1,200.00 1
3.00
TOTAL LABOUR 4.59
19.50
1,275,000.00 1 No
Day 850.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 4.23
19.50
15.7.4
(British) : Each
Rate (Rs)
21,500.00 1
TOTAL MATERIAL 73.40
1,200.00 1
3.00
TOTAL LABOUR 7.10
19.50
(British) : Each
Rate (Rs)
42,300.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.14
19.50
(British) : Each
Rate (Rs)
17,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.66
19.50
(British) : No
Rate (Rs)
650.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.02
19.50
Rate (Rs)
4,200.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.36
19.50
(British) : No
Rate (Rs)
95,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.91
19.50
(British) : Rft
Rate (Rs)
35.00 1
1,200.00 1
3.00
TOTAL LABOUR 7.97
19.50
Spec. No :
Unit (British) : Yard
ephone vrire 1 Pair
Unit Rate (Rs)
Yard 50.00 1
TOTAL MATERIAL 48.44
Day 1,200.00 1
3.00
TOTAL LABOUR 32.06
19.50
Spec. No :
Unit (British) : Yard
ephone vrire 2 Pair
Unit Rate (Rs)
Yard 100.00 1
TOTAL MATERIAL 59.62
Day 1,200.00 1
3.00
TOTAL LABOUR 20.88
19.50
(British) : Each
Rate (Rs)
2,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.26
19.50
(British) : Each
650.00 1 Each
1,200.00 1
3.00
TOTAL LABOUR 11.02
19.50
Spec. No :
Unit (British) : Each
ephone point with socket complete
Rate (Rs)
370.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.81
19.50
15.20.2
(British) : Each
Rate (Rs)
42,500.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 5.13
19.50
Spec. No : 15.2.3
Unit (British) : Each
True Day & Night Color Indoor Camera 1/3"
B/W 0.002Lux, Day/Night, DC12V/ AC24V,
Rate (Rs)
21,800.00 1
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.66
19.50
15.20.2
(British) : Each
Rate (Rs)
21,800.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 7.04
19.50
Rate (Rs)
16,750.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 3.17
19.50
(British) : Each
Rate (Rs)
18,800.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 4.46
19.50
(British) : Each
Rate (Rs)
350,000.00 1 No
TOTAL MATERIAL 77.24
1,200.00 1
3.00
TOTAL LABOUR 3.26
19.50
(British) : Each
70,000.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 3.40
19.50
84,091.00 Cost Per Each: 84,091.00
441.00 Cost Per Each: 441.00
(British) : Each
65,000.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 3.43
19.50
(British) : Each
Rate (Rs)
350,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.26
19.50
15.7.4
(British) : Each
No 18,800.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 7.65
19.50
Rate (Rs)
95.00 1 Mtr
1,200.00 1
3.00
TOTAL LABOUR 3.97
19.50
Spec. No :
Unit (British) : Each
f 32" LCD monitor of best quality
Rate (Rs)
45,000.00 1
(British) : No
Rate (Rs)
20,500.00 1
TOTAL MATERIAL 73.21
1,200.00 1
3.00
TOTAL LABOUR 7.29
19.50
15.20.2
(British) : No
Rate (Rs)
35,000.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 5.57
19.50
15.20.2
(British) : No
Rate (Rs)
32,000.00 1 No
TOTAL MATERIAL 74.70
1,200.00 1
3.00
TOTAL LABOUR 5.80
19.50
15.20.4
(British) : No
Rate (Rs)
300,000.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 3.31
19.50
(British) : Each
3,627.67 1 No
1,200.00 1
3.00
TOTAL LABOUR 4.51
19.50
(British) : Each
Rate (Rs) Amount
7,482.87 1 No
1,200.00 1
3.00
TOTAL LABOUR 4.52
19.50
(British) : Each
Rate (Rs)
4,055.89 1
1,200.00 1
3.00
TOTAL LABOUR 8.34
19.50
5,214.29 Cost Per Each: 5,214.29
367.50 Cost Per Each: 367.50
15.18.6
(British) : Each
Rate (Rs)
531.16 1
1,200.00 1
3.00
TOTAL LABOUR 6.35
19.50
15.18.6
(British) : Each
Rate (Rs)
1,500.00 1
TOTAL MATERIAL 76.28
1,200.00 1
3.00
TOTAL LABOUR 4.22
19.50
(British) : Each
Rate (Rs)
1,273.07 1
1,200.00 1
3.00
TOTAL LABOUR 7.15
19.50
Rate (Rs)
2,101.30 1
1,200.00 1
3.00
TOTAL LABOUR 5.57
19.50
(British) : Each
Rate (Rs)
480.00 1 Each
(British) : Each
530.00 1 Each
1,200.00 1
3.00
TOTAL LABOUR 7.93
19.50
50,000.00 1 Each
1,200.00 1
3.00
TOTAL LABOUR 8.21
19.50
(British) : Rft
Rate (Rs)
20.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 25.92
19.50
(British) : Rft
Rate (Rs)
40.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 20.88
19.50
(British) : Rft
Rate (Rs)
60.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 15.92
19.50
Rate (Rs)
80.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 13.11
19.50
15.18.6
(British) : Rft
Rate (Rs)
100.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 11.30
19.50
15.18.6
(British) : Rft
Rate (Rs)
300.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 5.11
19.50
90.00 1
TOTAL MATERIAL 69.20
1,200.00 1
3.00
TOTAL LABOUR 11.30
19.50
(British) : m
120.00 1
TOTAL MATERIAL 71.10
1,200.00 1
3.00
TOTAL LABOUR 9.40
19.50
(British) : m
180.00 1
TOTAL MATERIAL 73.11
1,200.00 1
3.00
TOTAL LABOUR 7.39
19.50
(British) : m
Rate (Rs) Amount
250.00 1
TOTAL MATERIAL 74.29
1,200.00 1
3.00
TOTAL LABOUR 6.21
19.50
15.7.4
(British) : Each
40.00 1
TOTAL MATERIAL 64.05
1,200.00 1
3.00
TOTAL LABOUR 16.45
19.50
Rate (Rs)
100,102.22 1 No
850.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.56
19.50
15.18.6
(British) : Each
Rate (Rs)
1,743.84 1
1,200.00 1
3.00
TOTAL LABOUR 3.53
19.50
(British) : Each
Rate (Rs)
75,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.31
19.50
150,000.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 3.15
19.50
(British) : Each
Rate (Rs)
4,682.97 1 No
TOTAL MATERIAL 68.70
1,200.00 1
3.00
TOTAL LABOUR 11.80
19.50
(British) : Rft
Rate (Rs)
321.47 1 Rft
850.00 1
3.00
TOTAL LABOUR 13.99
19.50
Rate (Rs)
2,012.39 1 No
850.00 1
3.00
TOTAL LABOUR 3.65
19.50
(British) : Each
Rate (Rs)
1,725.69 1 No
850.00 1
3.00
TOTAL LABOUR 3.76
19.50
(British) : Each
16,000.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 4.43
19.50
Rate (Rs)
876.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.07
19.50
(British) : No
Rate (Rs)
1,593.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.15
19.50
(British) : No
ight point controlled by two way switch wiring
with 2.5 mmsq conductors and 2.5 mmsq green
Rate (Rs)
1,433.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 4.28
19.50
Rate (Rs)
650.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.76
19.50
15.18.8
(British) : No
Rate (Rs)
550.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.24
19.50
15.18.8
(British) : No
Rate (Rs)
750.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.40
19.50
Rate (Rs)
790.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.29
19.50
15.4.5
(British) : No
Rate (Rs)
750.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.40
19.50
15.4.7
(British) : No
Rate (Rs)
900.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 5.01
19.50
Rate (Rs)
116.00 1M
1,200.00 1
3.00
TOTAL LABOUR 16.29
19.50
15.2.4
(British) : m
Rate (Rs)
131.00 1M
1,200.00 1
3.00
TOTAL LABOUR 15.00
19.50
15.2.4
(British) : m
Rate (Rs)
176.00 1M
TOTAL MATERIAL 68.20
1,200.00 1
3.00
TOTAL LABOUR 12.30
19.50
15.2.4
(British) : m
Rate (Rs)
170.00 1M
1,200.00 1
3.00
TOTAL LABOUR 12.59
19.50
(British) : m
Rate (Rs)
500.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.55
19.50
15.7.4
(British) : No
Rate (Rs)
30,000.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 5.98
19.50
15.7.4
(British) : No
Rate (Rs)
220,000.00 1 No
15.7.4
(British) : No
Rate (Rs)
575,000.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 3.16
19.50
75,000.00 1
TOTAL MATERIAL 76.28
1,200.00 1
3.00
TOTAL LABOUR 4.22
19.50
15.7.4
(British) : No
85,000.00 1
15.7.4
(British) : No
85,000.00 1
TOTAL MATERIAL 76.42
1,200.00 1
3.00
TOTAL LABOUR 4.08
19.50
15.7.4
(British) : No
Rate (Rs) Amount
75,000.00 1
TOTAL MATERIAL 76.28
1,200.00 1
3.00
TOTAL LABOUR 4.22
19.50
15.7.4
(British) : No
85,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.08
19.50
75,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.22
19.50
15.7.4
(British) : No
1,200.00 1
3.00
TOTAL LABOUR 3.11
19.50
15.7.4
(British) : No
75,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.22
19.50
85,000.00 1
TOTAL MATERIAL 76.42
1,200.00 1
3.00
TOTAL LABOUR 4.08
19.50
15.7.4
(British) : No
Rate (Rs)
75,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.22
19.50
15.7.4
(British) : No
Rate (Rs)
85,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.08
19.50
15.7.4
(British) : No
Rate (Rs) Amount
75,000.00 1
TOTAL MATERIAL 76.28
1,200.00 1
3.00
TOTAL LABOUR 4.22
19.50
15.7.4
(British) : No
85,000.00 1
TOTAL MATERIAL 76.42
1,200.00 1
3.00
TOTAL LABOUR 4.08
19.50
300,000.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 3.31
19.50
Spec. No :
Unit (British) : No
Supply, installation, & connecting of Insect killer
Unit Rate (Rs)
No 6,500.00
TOTAL MATERIAL 75.75
1,200.00 1
3.00
TOTAL LABOUR 4.75
19.50
15.2.4
(British) : Rft
Rate (Rs)
36.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.96
19.50
Rate (Rs)
65.00 1
1,200.00 1
3.00
TOTAL LABOUR 9.55
19.50
Spec. No :
Unit (British) : No
0 zone panel for nurse call system
Rate (Rs)
2,400.00 1
TOTAL MATERIAL 72.94
1,200.00 1
3.00
TOTAL LABOUR 7.56
19.50
65,000.00 1
TOTAL MATERIAL 77.32
1,200.00 1
3.00
TOTAL LABOUR 3.18
19.50
Spec. No :
Unit (British) : No
or light indicator unit
Rate (Rs)
800.00 1
TOTAL MATERIAL 70.81
1,200.00 1
3.00
TOTAL LABOUR 9.69
19.50
15.00 1
1,200.00 1
3.00
TOTAL LABOUR 37.44
19.50
(British) : No
Rate (Rs)
2,676.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 26.99
19.50
15.7.4
(British) : Set
Rate (Rs)
35,000.00 1 Set
(British) : Each
Rate (Rs)
250.00 1 Each
1,200.00 1
3.00
TOTAL LABOUR 11.30
19.50
Spec. No :
Unit (British) : Each
of 10 Pin Kit with sheet
Rate (Rs)
1,400.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.63
19.50
Spec. No :
Unit (British) : Each
of 08 Pin Kit with sheet
Rate (Rs)
1,200.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.89
19.50
1,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.26
19.50
Spec. No :
Unit (British) : Each
of 04 Pin Kit with sheet
Rate (Rs)
800.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.80
19.50
750.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.98
19.50
Spec. No :
Unit (British) : Each
of 02 Pin Kit with sheet
Rate (Rs)
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.69
19.50
500.00 1
1,200.00 1
3.00
TOTAL LABOUR 7.39
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
1,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.05
19.50
60.00 1
TOTAL MATERIAL 51.67
1,200.00 1
3.00
TOTAL LABOUR 28.83
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
750.00 1
TOTAL MATERIAL 74.52
1,200.00 1
3.00
TOTAL LABOUR 5.98
19.50
300.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.05
19.50
Spec. No :
Unit (British) : Each
/satellite cable complete
Rate (Rs)
100.00 1
1,200.00 1
3.00
TOTAL LABOUR 20.88
19.50
370.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.81
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
370.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.81
19.50
478.90 Cost Per Each: 478.90
36.75 Cost Per Each: 36.75
Spec. No :
Unit (British) : Each
Rate (Rs)
400.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.41
19.50
Spec. No :
Unit (British) : Each
Supply & Erection of Power Plug 15 Amp complete in all aspects
Rate (Rs)
200.00 1
1,200.00 1
3.00
TOTAL LABOUR 13.11
19.50
(British) : Each
Rate (Rs)
5,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.26
19.50
(British) : m
Rate (Rs)
95.00 1M
1,200.00 1
3.00
TOTAL LABOUR 50.45
19.50
15.20.6
(British) : No
Rate (Rs)
35,000.00 1 No
1,200.00 1
3.00
TOTAL LABOUR 3.33
19.50
(British) : No
Rate (Rs)
650.00 1
1,200.00 1
3.00
TOTAL LABOUR 17.53
19.50
35.00 1
1,200.00 1
3.00
TOTAL LABOUR 51.95
19.50
Spec. No :
Unit (British) : Each
Acrylic boxes for 7"x4" Switchboard Complete with all aspects
Rate (Rs)
45.00 1
1,200.00 1
3.00
TOTAL LABOUR 47.29
19.50
50.00 1
1,200.00 1
3.00
TOTAL LABOUR 45.27
19.50
Spec. No :
Unit (British) : Each
rylic or bakolite sheet 7 40 , 4x4
Rate (Rs)
65.00 1
1,200.00 1
3.00
TOTAL LABOUR 23.90
19.50
45.00 1
TOTAL MATERIAL 50.54
1,200.00 1
3.00
TOTAL LABOUR 29.96
19.50
Spec. No :
Unit (British) : Each
C board 7" x 4" with all aspects
Rate (Rs)
40.00 1
TOTAL MATERIAL 35.23
1,200.00 1
3.00
TOTAL LABOUR 45.27
19.50
180.00 1
TOTAL MATERIAL 66.43
1,200.00 1
3.00
TOTAL LABOUR 14.07
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
20.00 1
TOTAL MATERIAL 48.44
1,200.00 1
3.00
TOTAL LABOUR 32.06
19.50
Rate (Rs)
80.00 1
TOTAL MATERIAL 56.36
1,200.00 1
3.00
TOTAL LABOUR 24.14
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
30.00 1
TOTAL MATERIAL 77.50
19.50
420.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.17
19.50
Spec. No :
Unit (British) : Each
pacitor 3.5 for ceiling fan
Rate (Rs)
50.00 1
1,200.00 1
3.00
TOTAL LABOUR 28.14
19.50
Rate (Rs)
35.00 1
TOTAL MATERIAL 45.97
1,200.00 1
3.00
TOTAL LABOUR 34.53
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
180.00 1
TOTAL MATERIAL 68.38
1,200.00 1
3.00
TOTAL LABOUR 12.12
19.50
700.00 1
1,200.00 1
3.00
TOTAL LABOUR 5.57
19.50
Spec. No :
Unit (British) : Each
rter for Motor pump
Rate (Rs)
6,000.00 1
TOTAL MATERIAL 77.19
1,200.00 1
3.00
TOTAL LABOUR 3.31
19.50
2,500.00 1
TOTAL MATERIAL 76.58
1,200.00 1
3.00
TOTAL LABOUR 3.92
19.50
Spec. No :
Unit (British) : No
ASD strater for 21-30 HP
Rate (Rs)
4,000.00 1
TOTAL MATERIAL 76.92
1,200.00 1
3.00
TOTAL LABOUR 3.58
19.50
5,000.00 1
TOTAL MATERIAL 77.04
1,200.00 1
3.00
TOTAL LABOUR 3.46
19.50
Spec. No :
Unit (British) : No
DOL strater for 10-20 HP
Rate (Rs)
2,500.00 1
TOTAL MATERIAL 76.58
1,200.00 1
3.00
TOTAL LABOUR 3.92
19.50
4,000.00 1
TOTAL MATERIAL 76.92
1,200.00 1
3.00
TOTAL LABOUR 3.58
19.50
Spec. No :
Unit (British) : No
DOL strater for 31-40 HP
Rate (Rs)
5,000.00 1
TOTAL MATERIAL 77.04
1,200.00 1
3.00
TOTAL LABOUR 3.46
19.50
Rate (Rs)
140.00 1 Each
1,200.00 1
3.00
TOTAL LABOUR 16.68
19.50
15.3.1
(British) : Each
Rate (Rs)
200.00 1 Each
TOTAL MATERIAL 67.39
1,200.00 1
3.00
TOTAL LABOUR 13.11
19.50
15.3.1
(British) : m
Rate (Rs)
2,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 4.15
19.50
Rate (Rs)
3,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.66
19.50
Spec. No :
Unit (British) : No
Rate (Rs)
2,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.92
19.50
Rate (Rs)
3,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.62
19.50
Spec. No :
Unit (British) : No
Rate (Rs)
6,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.31
19.50
Rate (Rs)
9,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.21
19.50
(British) : No
10,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.30
19.50
(British) : No
Rate (Rs)
8,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 13.11
19.50
(British) : No
Rate (Rs)
7,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 13.69
19.50
(British) : No
Rate (Rs)
5,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 18.00
19.50
Rate (Rs)
8,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 13.11
19.50
(British) : No
Rate (Rs)
7,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 13.69
19.50
10,432.50 Cost Per No: 10,432.50
1,470.00 Cost Per No: 1,470.00
(British) : No
Rate (Rs)
6,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 15.08
19.50
(British) : No
Rate (Rs)
6,000.00 1
TOTAL MATERIAL 64.58
1,200.00 1
3.00
TOTAL LABOUR 15.92
19.50
(British) : No
No 5,000.00
TOTAL MATERIAL
Day 1,200.00
TOTAL LABOUR
Rs. 7,445.00
Rs. 1,470.00
(British) : No
Rate (Rs)
7,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 14.34
19.50
(British) : No
Rate (Rs)
6,800.00 1
1,200.00 1
3.00
TOTAL LABOUR 14.63
19.50
Rate (Rs)
6,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 15.08
19.50
(British) : No
Rate (Rs)
6,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 15.92
19.50
(British) : No
Rate (Rs)
5,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 18.00
19.50
Spec. No :
Unit (British) : No
S/Fixing voltage Regulator plate (Selector) complete in all respect
Rate (Rs)
3,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 15.92
19.50
Spec. No :
Unit (British) : No
Rweinding of Voltage Regulator Coil stablizer coil
Unit Rate (Rs)
No 1,500.00
1,200.00 1
3.00
TOTAL LABOUR 25.14
19.50
Spec. No :
Unit (British) : No
meter upt to 500 volt.
Rate (Rs)
750.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.05
19.50
Spec. No :
Unit (British) : No
P meter up to 100 Amps
Rate (Rs)
750.00 1
TOTAL MATERIAL 70.45
1,200.00 1
3.00
TOTAL LABOUR 10.05
19.50
3,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.05
19.50
Spec. No :
Unit (British) : No
S/Fixing trust bearing for i/c disk of 10-25 Hp Submersible moter
Rate (Rs)
1,000.00 1
TOTAL MATERIAL 59.62
1,200.00 1
3.00
TOTAL LABOUR 20.88
19.50
1,500.00 1
TOTAL MATERIAL 55.36
1,200.00 1
3.00
TOTAL LABOUR 25.14
19.50
Spec. No :
Unit (British) : No
Furnish & Install of tapper bearing for motor (V.H.S) of 10-25 HP
Rate (Rs)
1,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 20.88
19.50
1,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 25.14
19.50
Spec. No :
Unit (British) : No
Furnish & Install of Ball bearing for 10-25 HP motor (V.H.S)
Rate (Rs)
1,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 20.88
19.50
1,500.00 1
1,200.00 1
3.00
TOTAL LABOUR 25.14
19.50
Spec. No :
Unit (British) : Per Ltr
Rate (Rs)
300.00 1
TOTAL MATERIAL 75.28
850.00 1
3.00
TOTAL LABOUR 5.22
19.50
150,000.00 1
TOTAL MATERIAL 76.88
1,200.00 1
3.00
TOTAL LABOUR 3.62
19.50
Spec. No :
Unit (British) : No
tage Regulator 50 KVA
Rate (Rs)
285,000.00 1
TOTAL MATERIAL 77.18
1,200.00 1
3.00
TOTAL LABOUR 3.32
19.50
Rate (Rs)
5,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 11.30
19.50
Spec. No :
Unit (British) : No
Rate (Rs)
6,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 10.05
19.50
Rate (Rs)
8,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 8.41
19.50
Spec. No :
Unit (British) : No
Rate (Rs)
10,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 7.39
19.50
25,000.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.92
19.50
(British) : No
Rate (Rs)
25,000.00 1
1,000.00 1
3.00
TOTAL LABOUR 3.77
19.50
(British) : Each
Rate (Rs)
20,000.00 1
1,000.00 1
3.00
TOTAL LABOUR 3.96
19.50
(British) : Each
Rate (Rs)
15,000.00 1
1,000.00 1
3.00
TOTAL LABOUR 4.27
19.50
Spec. No :
Unit (British) : Each
ment for electric water heater
Rate (Rs)
150.00 1
1,200.00 1
3.00
TOTAL LABOUR 28.14
19.50
Spec. No :
Unit (British) : 100 Cft
Providing and Laying sub-base course of brick on edge 4.5" thick
Rate (Rs)
1,200.00 1
600.00 1
600.00 1
3.00
TOTAL LABOUR 11.86
19.50
16.3.1
(British) : 100 Cft
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 18.64
769.00 1
420.00 1
2,156.00 1
TOTAL EQUIPMENT 5.30
19.50
3,571.13 Per CUM : Rs 1,261.13
735.00 Per CUM : Rs 259.56
Spec. No :
Unit (British) : 100 Cft
ate Crack-Relief Layer
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 13.59
1,210.00 1
591.77 1
481.01 1
625.00 1
TOTAL EQUIPMENT 8.51
19.50
Spec. No :
Unit (British) : 100 Cft
e using Pit Run Gravel
Rate (Rs)
1,575.00 100 Cft
TOTAL MATERIAL 45.27
600.00 1
600.00 1
3.00
TOTAL LABOUR 23.69
4,830.00 1
595.00 1
420.00 1
2,156.00 1
TOTAL EQUIPMENT 11.54
19.50
Spec. No :
Unit (British) : 100 Cft
Crushed Stone Aggregate
Rate (Rs)
600.00 1
600.00 1
3.00
TOTAL LABOUR 11.30
4,830.00 1
595.00 1
420.00 1
2,156.00 1
TOTAL EQUIPMENT 3.91
19.50
Spec. No :
Unit (British) : 100 Cft
Rate (Rs)
600.00 1
600.00 1
3.00
TOTAL LABOUR 19.19
4,830.00 1
1,210.00 1
595.00 1
420.00 1
2,156.00 1
TOTAL EQUIPMENT 5.86
19.50
Spec. No :
Unit (British) : 100 Cft
Rate (Rs)
2,330.00 100 Cft
3,590.00 100 Cft
TOTAL MATERIAL 65.43
600.00 1
600.00 1
3.00
TOTAL LABOUR 10.07
1,210.00 1
595.00 1
769.00 1
420.00 1
16.3.7
(British) : 100 Rft
Rate (Rs)
2,600.00
9,900.00 1,000 No
TOTAL MATERIAL 59.71
1,200.00 1
600.00 1
3.00
TOTAL LABOUR 20.79
19.50
6,284.22 Per Meter : Rs 206.12
1,470.00 Per Meter : Rs 48.22
16.8.12
(British) : Each
Rate (Rs)
550.00 1
2,600.00 100 Cft
187.25 1
3,260.00 100 Cft
2,520.00 100 Cft
738.00 1
1,200.00 1
600.00 1
3.00
TOTAL LABOUR 6.05
1,282.27 1
591.77 1
625.00 1
Rate (Rs)
550.00 1 Bag
2,600.00 100 Cft
3,438.00 100 Cft
326.00 1 Sft
60.00 1 ft
850.00 1
3.00
TOTAL LABOUR 4.90
19.50
Spec. No :
Unit (British) : 100 Sft
Rate (Rs)
18.38 1
85.50 1
146.60 1
TOTAL MATERIAL 69.65
600.00 1
3.00
TOTAL LABOUR 9.34
400.00 1
742.02 1
TOTAL EQUIPMENT 1.51
19.50
Spec. No :
Unit (British) : 100 Sft
Rate (Rs)
18.38 1
85.50 1
TOTAL MATERIAL 48.66
600.00 1
3.00
TOTAL LABOUR 25.32
400.00 1
742.02 1
TOTAL EQUIPMENT 6.52
19.50
Rate (Rs)
85.50 1
3,750.00 100 1 Cft
TOTAL MATERIAL 72.33
600.00 1
3.00
TOTAL LABOUR 3.52
1,210.00 1
1,650.00 1
1,404.00 1
Spec. No :
Unit (British) : 100 Sft
Rate (Rs)
85.50 1
3,900.00 100 Cft
TOTAL MATERIAL 71.07
600.00 1
3.00
TOTAL LABOUR 3.37
1,210.00 1
1,650.00 1
1,404.00 1
Spec. No :
Unit (British) : 100 Sft
Rate (Rs)
85.50 1
3,730.00 100 Cft
TOTAL MATERIAL 71.17
600.00 1
3.00
TOTAL LABOUR 3.28
1,210.00 1
1,650.00 1
1,404.00 1
Rate (Rs)
85.50 1
3,750.00 100 Cft
TOTAL MATERIAL 67.37
600.00 1
850.00 1
3.00
TOTAL LABOUR 6.71
1,210.00 1
1,650.00 1
1,404.00 1
16.9
(British) : 100 Sft
Rate (Rs)
85.50 1
3,750.00 100 Cft
TOTAL MATERIAL 63.90
600.00 1
850.00 1
3.00
TOTAL LABOUR 9.81
1,210.00 1
1,650.00 1
1,404.00 1
Spec. No :
Unit (British) : 1000 Cft
Road Pavement Structure
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 3.71
1,245.26 1
3,828.00 1
1,500.00 1
TOTAL EQUIPMENT 76.79
19.50
Day 600.00 1
Day 850.00 1
Day 600.00 1
3.00
TOTAL LABOUR 11.28
Hour 1,210.00 1
Hour 1,250.00 1
Spec. No :
Unit (British) : 100 Sft
Dense Graded Hot Bitmac (Mobile Asphalt Mixer) 1.5" Thick
Unit Rate (Rs)
Day 600.00 1
Day 850.00 1
Day 600.00 1
3.00
TOTAL LABOUR 11.17
Hour 1,210.00 1
Hour 1,250.00 1
Spec. No :
Unit (British) : 100 Sft
Dense Graded Hot Bitmac (Mobile Asphalt Mixer) 2" Thick
Unit Rate (Rs)
Day 600.00 1
Day 850.00 1
Day 600.00 1
3.00
TOTAL LABOUR 11.04
Hour 1,210.00 1
Hour 1,250.00 1
TOTAL EQUIPMENT 6.07
19.50
16.4.8
(British) : 100 Cft
Rate (Rs)
600.00 1 Day
850.00 1 Day
600.00 1 Day
3.00 %
LABOUR 4.49 %
595.00 1 Job
1,827.00 1 Tonne
Rate (Rs)
600.00 1 Day
850.00 1 Day
600.00 1 Day
3.00 %
LABOUR 4.31 %
595.00 1 1 No
1,827.00 1 Tonne
16.8.6
(British) : 100 Rft
Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 23.53
19.50
Spec. No :
Unit (British) : 100 Rft/3row
Providing and fixing GI pipe railing (3 feet high)
Unit Rate (Rs)
Kg 120.00 1
Ltr 401.22 1
Ft 187.25 1
Pkt 464.10 1
TOTAL MATERIAL 66.53
Day 1,200.00 1
Day 600.00 1
Day 1,200.00 1
Day 1,050.00 1
3.00
TOTAL LABOUR 12.74
Hour 221.90 1
TOTAL EQUIPMENT 1.23
19.50
Rate (Rs)
550.00 1
2,600.00 100 Cft
3,438.00 100 Cft
122,000.00 1
1,600.00 1
401.22 1
TOTAL MATERIAL 34.87
1,200.00 1
600.00 1
1,200.00 1
1,200.00 1
950.00 1
900.00 1
3.00
TOTAL LABOUR 45.63
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
550.00 1
2,600.00 100 Cft
3,438.00 100 Cft
122,000.00 1
1,600.00 1
401.22 1
TOTAL MATERIAL 32.55
1,200.00 1
600.00 1
1,200.00 1
1,200.00 1
950.00 1
900.00 1
3.00
TOTAL LABOUR 47.95
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
550.00 1
2,600.00 100 Cft
3,438.00 100 Cft
122,000.00 1
401.22 1
TOTAL MATERIAL 53.62
1,200.00 1
600.00 1
1,200.00 1
950.00 1
3.00
TOTAL LABOUR 26.88
19.50
16.8.7
(British) : 100 Sft
Bag 550.00 1
Cft 2,600.00
Cft 3,438.00
Kg 137.00 1
Kg 128.00 1
No 130.00 1
Ltr 401.22 1
TOTAL MATERIAL 63.27
Day 600.00 1
Day 1,200.00 1
Day 1,050.00 1
3.00
TOTAL LABOUR 17.23
19.50
Kg 137.00 1
Kg 128.00 1
TOTAL MATERIAL 67.20
Day 600.00 1
Day 1,050.00 1
3.00
TOTAL LABOUR 13.30
19.50
16.8.7
(British) : 100 Sft
Bag 550.00 1
Cft 2,600.00
Cft 3,438.00
Kg 137.00 1
Kg 128.00 1
Pkt 464.10 1
TOTAL MATERIAL 63.73
Day 600.00 1
Day 1,200.00 1
Day 1,050.00 1
3.00
TOTAL LABOUR 16.77
19.50
16.8.7
(British) : 100 Sft
Kg 137.00 1
Kg 128.00 1
TOTAL MATERIAL 63.78
Day 600.00 1
Day 1,200.00 1
Day 1,050.00 1
3.00
TOTAL LABOUR 16.72
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
550.00 1
187.25 1
8,220.00 1
1,200.00 1
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 6.94
1,282.27 1
591.77 1
625.00 1
742.02 1
TOTAL EQUIPMENT 3.86
19.50 %
Spec. No :
Unit (British) : Each
Rate (Rs)
550.00 1
187.25 1
8,540.00 1
1,200.00 1
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 3.13
1,282.27 1
591.77 1
625.00 1
742.02 1
TOTAL EQUIPMENT 0.58
19.50 %
Spec. No :
Unit (British) : Each
Rate (Rs)
550.00 1
2,600.00 100 Cft
187.25 1
16,600.00 1
1,200.00 1
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 7.62
1,282.27 1
591.77 1
625.00 1
742.02 1
TOTAL EQUIPMENT 3.32
19.50 %
Rate (Rs)
550.00 1
2,600.00 100 Cft
187.25 1
34,600.00 1
1,200.00 2
600.00 5
1,200.00 4
3.00
TOTAL LABOUR 3.59
1,282.27 1
591.77 1
625.00 1
742.02 1
TOTAL EQUIPMENT 1.91
19.50 %
Kg 120.00 1
Kg 128.00 1
No 130.00 1
Ltr 401.22 1
Cft 23,667.98
TOTAL MATERIAL 74.54
Day 850.00 1
Day 1,200.00 1
Day 1,050.00 1
3.00
TOTAL LABOUR 5.96
19.50
Spec. No :
Unit (British) : Each
Overhead Gantry Beam/ Information Sign for Dual Carriageway
Unit Rate (Rs)
Kg 120.00 1
Kg 128.00 1
No 130.00 1
Ltr 401.22 1
Cft 23,667.98
TOTAL MATERIAL 75.96
Day 600.00 1
Day 1,200.00 1
Day 1,050.00 1
3.00
TOTAL LABOUR 4.54
19.50
Spec. No :
Unit (British) : Each
Overhead Gantry Beam/ Information Sign for Six Lane Carriageway
Rate (Rs)
120.00 1
128.00 1
130.00 1
401.22 1
23,667.98 100 Cft
TOTAL MATERIAL 76.32
600.00 1
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 4.18
19.50
16.8.7
(British) : Each
Unit Rate (Rs)
Kg 120.00 1
Kg 128.00 1
No 130.00 1
Ltr 401.22 1
Cft 23,667.98
TOTAL MATERIAL 73.49
Day 850.00 1
Day 1,200.00 1
Day 1,050.00 1
3.00
TOTAL LABOUR 7.01
19.50
16.8.7.2.2
(British) : 100 Sft
522.00 1
TOTAL MATERIAL 75.22
850.00 1
3.00
TOTAL LABOUR 5.28
19.50
326.00 1
850.00 1
3.00
TOTAL LABOUR 6.58
19.50
16.8.7.2.2
(British) : 100 Sft
198.00 1
850.00 1
3.00
TOTAL LABOUR 8.73
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
250.00 1
600.00 1
3.00
TOTAL LABOUR 38.38
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
336.00 1
TOTAL MATERIAL 47.69
600.00 1
3.00
TOTAL LABOUR 32.81
19.50
16.8.10
(British) : Each
Rate (Rs)
444.00 1
600.00 1
3.00
TOTAL LABOUR 11.40
19.50
16.8.10
(British) : Each
Rate (Rs)
458.00 1
600.00 1
3.00
TOTAL LABOUR 11.17
19.50
16.8.10
(British) : Each
Rate (Rs)
361.00 1
600.00 1
3.00
TOTAL LABOUR 13.08
19.50
Rate (Rs)
370.00 1
600.00 1
3.00
TOTAL LABOUR 12.87
19.50
16.8.10
(British) : Each
Rate (Rs)
234.00 1
600.00 1
3.00
TOTAL LABOUR 17.53
19.50
345.78 Cost Per Each: 345.78
66.15 Cost Per Each: 66.15
16.8.10
(British) : Each
Rate (Rs)
240.00 1
600.00 1
3.00
TOTAL LABOUR 17.23
19.50
16.8.10
(British) : Each
Rate (Rs)
458.00 1
600.00 1
3.00
TOTAL LABOUR 11.17
19.50
Spec. No :
Unit (British) : Each
Reflectorized Aluminium Pavement Stud (Raised Profile Type - Single)
Rate (Rs)
400.00 1
850.00 1
3.00
TOTAL LABOUR 7.83
19.50
Spec. No :
Unit (British) : Each
Reflectorized Aluminium Pavement Stud (Raised Profile Type - Double)
Rate (Rs)
425.00 1
850.00 1
3.00
TOTAL LABOUR 7.57
19.50
Spec. No :
Unit (British) : Each
Reflectorized Aluminium Pavement Stud (Flushed Profile Type - Single)
Rate (Rs)
375.00 1
850.00 1
3.00
TOTAL LABOUR 8.13
19.50
Spec. No :
Unit (British) : Each
Reflectorized Aluminium Pavement Stud (Flushed Profile Type - Double)
Rate (Rs)
400.00 1
850.00 1
3.00
TOTAL LABOUR 7.83
19.50
Spec. No :
Unit (British) : Each
Reflectorized Plastic Pavement Stud (Raised Profile Type - Single)
Rate (Rs)
300.00 1
850.00 1
3.00
TOTAL LABOUR 9.31
19.50
325.00 1
850.00 1
3.00
TOTAL LABOUR 8.86
19.50
Spec. No :
Unit (British) : Each
Reflectorized Plastic Pavement Stud (Flushed Profile Type - Single)
Rate (Rs)
275.00 1
850.00 1
3.00
TOTAL LABOUR 9.84
19.50
325.00 1
850.00 1
3.00
TOTAL LABOUR 8.86
19.50
16.3.15
(British) : 100 Cft
Cft 2,600.00
No 9,900.00 1,000 No
TOTAL MATERIAL 63.37
Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 15.25
Hour 420.00 1
Hour 1,500.00 1
TOTAL EQUIPMENT 1.88
19.50
Spec. No :
Unit (British) :
Provide and Lay Polythene Sheet under Rigid Pavement
Unit Rate (Rs)
Sft 24.38
TOTAL MATERIAL
Day 850.00
TOTAL LABOUR
Rs. 3,269.83
Rs. 65.08
Rate (Rs)
769.00 1
420.00 1
1,500.00 1
TOTAL EQUIPMENT 2.95
19.50
Spec. No :
Unit (British) : 100 Rft
SHTO M 170 Dia 310 mm
Unit Rate (Rs)
Bag 550.00 1
Cft 2,600.00 100 Cft
Rft 316.00 1
Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 8.01
Hour 591.77 1
Hour 625.00 1
Hour 302.99 1
Hour 3,100.00 1
TOTAL EQUIPMENT 18.70
19.50
Bag 550.00 1
Cft 2,600.00 100 Cft
Rft 368.00 1
Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 7.69
Hour 591.77 1
Hour 625.00 1
Hour 302.99 1
Hour 3,100.00 1
TOTAL EQUIPMENT 16.57
19.50
Spec. No :
Unit (British) : 100 Rft
Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 460mm
Unit Rate (Rs)
Bag 550.00 1
Cft 2,600.00
Rft 480.83 1
TOTAL MATERIAL 58.03
Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 22.47
19.50
Spec. No :
Unit (British) : 100 Rft
Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 610mm
Unit Rate (Rs)
Bag 550.00 1
Cft 2,600.00
Rft 654.17 1
TOTAL MATERIAL 59.56
Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 20.94
19.50
Bag 550.00 1
Cft 2,600.00 100 Cft
Rft 654.17 1
TOTAL MATERIAL 58.02
Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 5.25
Hour 591.77 1
Hour 625.00 1
Hour 302.99 1
Hour 3,100.00 1
Hour 1,250.00 1
TOTAL EQUIPMENT 17.24
19.50
Spec. No :
Unit (British) : 100 Rft
Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 760mm
Unit Rate (Rs)
Bag 550.00 1
Cft 2,600.00
Rft 1,067.75 1
TOTAL MATERIAL 63.05
Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 17.45
19.50
Spec. No :
Unit (British) : 100 Rft
hto M 170 Dia 760 mm
Unit Rate (Rs)
Bag 550.00 1
Cft 2,600.00 100 Cft
Rft 1,067.75 1
TOTAL MATERIAL 62.65
Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 4.57
Hour 591.77 1
Hour 625.00 1
Hour 302.99 1
Hour 3,100.00 1
Hour 1,250.00 1
TOTAL EQUIPMENT 13.29
19.50
Bag 550.00 1
Cft 2,600.00
Rft 2,075.00 1
TOTAL MATERIAL 67.76
Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 12.74
19.50
Spec. No :
Unit (British) : 100 Rft
hto M 170 Dia 910 mm
Unit Rate (Rs)
Bag 550.00 1
Cft 2,600.00 100 Cft
Rft 2,075.00 1
TOTAL MATERIAL 67.69
Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 3.93
Hour 591.77 1
Hour 625.00 1
Hour 302.99 1
Hour 3,100.00 1
Hour 1,250.00 1
TOTAL EQUIPMENT 8.88
19.50
16.7.2
(British) : 100 Rft
e Culvert (AASHTO M-170) Dia: 1070mm
Rate (Rs)
550.00 1 Bag
2,600.00 100 Cft
2,047.50 1 Rft
MATERIAL 66.55 %
1,200.00 1 Day
600.00 1 Day
3.00 %
LABOUR 13.95 %
19.50 %
Spec. No :
Unit (British) : 100 Rft
hto M 170 Dia 1070 mm
Unit Rate (Rs)
Bag 550.00 1
Cft 2,600.00 100 Cft
Rft 2,047.50 1
TOTAL MATERIAL 66.02
Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 4.42
Hour 591.77 1
Hour 625.00 1
Hour 302.99 1
Hour 3,100.00 1
Hour 5,000.00 1
TOTAL EQUIPMENT 10.06
19.50
16.7.2
(British) : 100 Rft
e Culvert (AASHTO M-170) Dia: 1220mm
Rate (Rs)
550.00 1 Bag
2,600.00 100 Cft
2,365.00 1 Rft
MATERIAL 66.79 %
1,200.00 1 Day
600.00 1 Day
3.00 %
LABOUR 13.71 %
19.50 %
Spec. No :
Unit (British) : 100 Rft
SHTO M 170 Dia 1220 mm
Unit Rate (Rs)
Bag 550.00 1
Cft 2,600.00 100 Cft
Rft 2,365.00 1
TOTAL MATERIAL 66.66
Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 4.12
Hour 591.77 1
Hour 625.00 1
Hour 302.99 1
Hour 3,100.00 1
Hour 5,000.00 1
TOTAL EQUIPMENT 9.72
19.50
16.7.2
(British) : 100 Rft
e Culvert (AASHTO M-170) Dia: 1520mm
Rate (Rs)
550.00 1 Bag
2,600.00 100 Cft
6,500.00 1 Rft
MATERIAL 72.57 %
1,200.00 1 Day
600.00 1 Day
3.00 %
LABOUR 7.93 %
19.50 %
Spec. No :
Unit (British) : 100 Rft
hto M 170 Dia 1520 mm
Unit Rate (Rs)
Bag 550.00 1
Cft 2,600.00 100 Cft
Rft 6,500.00 1
TOTAL MATERIAL 72.48
Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 3.48
Hour 591.77 1
Hour 625.00 1
Hour 302.99 1
Hour 3,100.00 1
Hour 5,000.00 1
TOTAL EQUIPMENT 4.54
19.50
859,215.77 Per Meter : Rs 28,182.28
5,468.40 Per Meter : Rs 179.36
Spec. No :
Unit (British) : 100 Cft
to RCC Pipe Culvert
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 14.60
420.00 1
302.99 1
TOTAL EQUIPMENT 6.73
19.50
Spec. No :
Unit (British) : 100 Cft
Concrete Class B in Bedding and Encasement of Concrete Pipe Culvert
Unit Rate (Rs)
Bag 550.00 1
Cft 2,600.00 100 Cft
Cft 3,820.00 100 Cft
Cft 3,260.00 100 Cft
Cft 2,520.00 100 Cft
Ltr 640.00 1
TOTAL MATERIAL 53.57
Day 1,200.00 1
Day 600.00 1
Day 1,200.00 1
3.00
TOTAL LABOUR 17.36
Hour 1,282.27 1
Hour 175.00 1
Hour 591.77 1
Hour 625.00 1
Hour 742.02 1
TOTAL EQUIPMENT 9.57
19.50 %
18.1.4.9
(British) : 100 Rft
Ft 1,710.00 1
TOTAL EQUIPMENT 52.59
19.50
18.1.4.9
(British) : 100 Rft
Rate (Rs)
810.00 1
3.00
TOTAL LABOUR 30.18
1,500.00 1
2,600.00
TOTAL MATERIAL 59.16
600.00 1
3.00
TOTAL LABOUR 4.87
Hour 5,000.00 1
Hour 6,250.00 1
TOTAL EQUIPMENT 16.47
19.50
Spec. No :
Unit (British) : Job
Load up to 121-240 tonne
Rate (Rs)
Tonne 125,000.00 1
Tonne 122,000.00 1
6,872.54 1
10,995.05 1
102,000.00 1
Spec. No :
Unit (British) : Job
Load 241 - 300 tonne
Rate (Rs)
Tonne 125,000.00 1
Tonne 122,000.00 1
6,872.54 1
10,995.05 1
127,500.00 1
Spec. No :
Unit (British) : Job
Load 301 - 360 tonne
Rate (Rs)
Tonne 125,000.00 1
Tonne 122,000.00 1
6,872.54 1
10,995.05 1
153,000.00 1
Spec. No :
Unit (British) : Job
Load 361 - 600 tonne
Rate (Rs)
Tonne 125,000.00 1
Tonne 122,000.00 1
6,872.54 1
10,995.05 1
170,000.00 1
Spec. No :
Unit (British) : Each
Rate (Rs)
Tonne 125,000.00 1
Tonne 122,000.00 1
6,872.54 1
10,995.05 1
185,000.00 1
18.1.4.7
(British) : Job.
Rate (Rs)
185,000.00 1
18.1.4.7
(British) : Job.
125,000.00 1 Tonne
122,000.00 1 Tonne
6,872.54 1M
10,995.05 1 M3
MATERIAL 49.34 %
195,000.00 1 Job
Spec. No :
Unit (British) : 100 Rft
Boring for Cast-in-place RCC Piles in Alluvial Soils : Dia up to 760mm
Rate (Rs)
1,710.00 1
TOTAL EQUIPMENT 77.50
19.50
18.1.4.9
(British) : 100 Rft
Rate (Rs)
1,530.00 1
TOTAL EQUIPMENT 77.50
19.50
Rate (Rs)
1,700.00 1
TOTAL EQUIPMENT 77.50
19.50
Spec. No :
Unit (British) : 100 Rft
Boring for Cast-in-place RCC Piles in Gravelly Soils : Dia up to 660mm
Unit Rate (Rs)
Ft 1,500.00 1
Ft 810.00 1
3.00
TOTAL LABOUR 29.83
Ft 1,530.00 1
18.1.4.2.3
(British) : 100 Rft
Ft 810.00 1
3.00
TOTAL LABOUR 27.91
Ft 1,710.00 1
TOTAL EQUIPMENT 52.59
19.50
18.1.4.2.2 ,
18.3.3.2
(British) : 100 Kg
Kg 150.00 1
TOTAL MATERIAL 69.92
Day 600.00 1
Day 850.00 1
3.00
TOTAL LABOUR 10.58
19.50
Spec. No :
Unit (British) : Cubic Inch
Supply and Fixing Neoprene Bearing Pad as per specs & design
Rate (Rs)
Cubic I 54.00 1
TOTAL MATERIAL 76.23
600.00 1
3.00
TOTAL LABOUR 4.27
19.50
Spec. No :
Unit (British) : 100 Kg
Supply and Fixing Steel Bearing Pads as per specs & design
Unit Rate (Rs)
161.00 1
TOTAL MATERIAL 68.31
600.00 1
1,050.00 1
1,050.00 1
3.00
TOTAL LABOUR 12.19
19.50
16.6.7
(British) : 100 Rft
Rate (Rs)
60.00 1
TOTAL MATERIAL 68.49
950.00 1
3.00
TOTAL LABOUR 12.01
19.50
16.6.7
(British) : Set
Rate (Rs)
650.00 1
TOTAL MATERIAL 63.56
950.00 1
3.00
TOTAL LABOUR 16.94
19.50
600.00 1
850.00 1
600.00 1
3.00
TOTAL LABOUR 67.58
8,500.00 1
TOTAL EQUIPMENT 12.92
19.50
Spec. No : 16.6.7
Unit (British) : Each
Tensile Steel Wire Strands
Rate (Rs)
600.00 1
900.00 1
3.00
TOTAL LABOUR 57.92
1,000.00 1
TOTAL EQUIPMENT 22.58
19.50
207.00 1
TOTAL MATERIAL 64.27
600.00 1
3.00
TOTAL LABOUR 6.24
216.35 1
1,250.00 1
Spec. No :
Unit (British) : 100Rft
Providing and fixing GI Steel (Hamp core) Ropes 3/4" dia
Rate (Rs)
269.00 1
TOTAL MATERIAL 66.90
600.00 1
3.00
TOTAL LABOUR 5.60
216.35 1
1,250.00 1
Spec. No :
Unit (British) : 100Rft
Steel (Hamp core) Ropes 1" dia
Unit Rate (Rs)
314.00 1
TOTAL MATERIAL 68.24
600.00 1
3.00
TOTAL LABOUR 5.27
Hour 216.35 1
Hour 1,250.00 1
Spec. No : 16.12
Unit (British) : Each
Steel U Grips 1.5" dia
Rate (Rs)
131.00 1
TOTAL MATERIAL 26.09
600.00 1
3.00
TOTAL LABOUR 32.87
216.35 1
TOTAL EQUIPMENT 21.54
19.50
Spec. No : 16.12
Unit (British) : Each
Steel U Grips 1" dia
Rate (Rs)
113.60 1
TOTAL MATERIAL 23.68
600.00 1
3.00
TOTAL LABOUR 34.27
216.35 1
TOTAL EQUIPMENT 22.55
19.50
131.00 1
TOTAL MATERIAL 26.09
600.00 1
3.00
TOTAL LABOUR 32.87
216.35 1
TOTAL EQUIPMENT 21.54
19.50
Spec. No : 16.11
Unit (British) : Each
Steel Thimble plate 1.5" dia
Rate (Rs)
1,146.00 1
600.00 1
3.00
TOTAL LABOUR 11.28
216.35 1
TOTAL EQUIPMENT 5.97
19.50
1,682.49 Cost Per Each: 1,682.49
183.75 Cost Per Each: 183.75
Spec. No :
Unit (British) : Each
Steel Thimble plate 1" dia
Rate (Rs)
1,146.00 1
600.00 1
3.00
TOTAL LABOUR 11.28
216.35 1
TOTAL EQUIPMENT 5.97
19.50
Spec. No : 16.11
Unit (British) : Each
Steel Thimble plate 3/4" dia
Rate (Rs)
1,146.00 1
216.35 1
TOTAL EQUIPMENT 5.97
19.50
Spec. No : 16.11
Unit (British) : Each
Steel Thimble plate 1/2" dia
Rate (Rs)
1,146.00 1
600.00 1
3.00
TOTAL LABOUR 11.28
216.35 1
TOTAL EQUIPMENT 5.97
19.50
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 33.24
1,875.00 1
Spec. No : 16.12
Unit (British) : Each
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 40.96
625.00 1
TOTAL EQUIPMENT 39.54
19.50
550.00 1
2,600.00 100 Cft
TOTAL MATERIAL 20.02
600.00 1
900.00 1
3.00
TOTAL LABOUR 56.52
212.50 1
TOTAL EQUIPMENT 3.96
19.50
Spec. No :
Unit (British) : 1000 Cft
Rate (Rs)
550.00 1
3,820.00 100 Cft
3,260.00 100 Cft
2,520.00 100 Cft
1,210.00 100 Cft
3,100.00 100 Cft
600.00 1
3.00
TOTAL LABOUR 3.21
1,935.71 1
1,500.00 1
4,776.03 1
5,159.11 1
19.50 %
Spec. No :
Unit (British) : Ton
g Seal, Type Mc-250
Rate (Rs)
89,000.00 1
TOTAL MATERIAL 75.54
600.00 1
3.00
TOTAL LABOUR 3.17
481.01 1
192.31 1
1,404.00 1
Spec. No :
Unit (British) : Ton
Curing Seal, Type SS-1
Unit Rate (Rs)
ton 70,200.00 1
TOTAL MATERIAL 75.03
Day 600.00 1
3.00
TOTAL LABOUR 3.21
Hour 481.01 1
Hour 192.31 1
Hour 1,404.00 1
Spec. No :
Unit (British) : 100 Cft
Rate (Rs)
550.00 1
93.48 1
3,820.00 100 Cft
3,260.00 100 Cft
1,210.00 100 Cft
85,200.00 100 Cft
TOTAL MATERIAL 39.36
600.00 1
3.00
TOTAL LABOUR 5.05
1,258.21 1
1,210.00 1
591.77 1
481.01 1
1,650.00 1
14,000.00 1
2,884.62 1
TOTAL EQUIPMENT 36.09
19.50 %
16.6.7.3.9
(British) : 100 Rft
Rate (Rs) Amount
550.00 1
2,600.00 100 Cft
TOTAL MATERIAL 13.82
1,200.00 1
600.00 1
600.00 1
600.00 1
3.00
TOTAL LABOUR 58.99
700.00 1
16.6.9
(British) : Each
Rate (Rs)
120.00 1
46.60 1
TOTAL MATERIAL 66.13
850.00 1
800.00 1
3.00
TOTAL LABOUR 9.67
212.50 1
60.00 1
TOTAL EQUIPMENT 4.69
19.50
16.6.9
(British) : Each
Rate (Rs)
120.00 1
46.60 1
TOTAL MATERIAL 69.45
850.00 1
800.00 1
3.00
TOTAL LABOUR 7.73
212.50 1
60.00 1
TOTAL EQUIPMENT 3.33
19.50
Rate (Rs)
120.00 1
46.60 1
TOTAL MATERIAL 71.32
850.00 1
800.00 1
3.00
TOTAL LABOUR 6.63
212.50 1
60.00 1
TOTAL EQUIPMENT 2.55
19.50
16.6.9
(British) : Each
Rate (Rs)
120.00 1
46.60 1
TOTAL MATERIAL 72.48
850.00 1
800.00 1
3.00
TOTAL LABOUR 5.95
212.50 1
60.00 1
TOTAL EQUIPMENT 2.07
19.50
16.6.7
(British) : Each
Rate (Rs)
550.00 1
2,600.00 100 Cft
3,438.00 100 Cft
TOTAL MATERIAL 18.49
1,200.00 1
600.00 1
600.00 1
950.00 1
3.00
TOTAL LABOUR 61.72
60.00 1
TOTAL EQUIPMENT 0.28
19.50
Kg 120.00 1
TOTAL MATERIAL 60.84
Day 1,200.00 1
Day 600.00 1
Day 1,050.00 1
3.00
TOTAL LABOUR 19.66
19.50
16.7.12
(British) : Each
Rate (Rs)
254.00 1
TOTAL MATERIAL 46.70
1,200.00 1
600.00 1
950.00 1
3.00
TOTAL LABOUR 33.80
19.50
Spec. No :
Unit (British) : Each
n water outlet of AC pipe
Rate (Rs)
39.40 1
TOTAL MATERIAL 30.72
1,200.00 1
600.00 1
3.00
TOTAL LABOUR 49.78
19.50
6.9
(British) : 100 Cft
Rate (Rs)
32.00 1
TOTAL MATERIAL 32.04
600.00 1
1,200.00 1
3.00
TOTAL LABOUR 48.46
19.50
16.6.8
(British) : 100 Rft
Rate (Rs)
145.00 1
TOTAL MATERIAL 77.05
850.00 1
3.00
TOTAL LABOUR 3.45
19.50
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 3.63
1,245.26 1
1,758.00 1
591.77 1
625.00 1
3,200.00 1
TOTAL EQUIPMENT 22.10
19.50
Spec. No :
Unit (British) : 1000 Sft
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 3.71
1,245.26 1
1,758.00 1
591.77 1
625.00 1
3,200.00 1
TOTAL EQUIPMENT 25.00
19.50
Spec. No :
Unit (British) : 100 Sft
1" thick(consolidated) asphalt macadam with
liquid asphalt (cut backs) of any approved grade with premixed sand
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 17.01
1,210.00 1
400.00 1
471.80 1
TOTAL EQUIPMENT 5.80
19.50
ton 85.00 1
TOTAL MATERIAL 2.35
Day 600.00 1
3.00
TOTAL LABOUR 9.77
Hour 591.77 1
Hour 481.01 1
Hour 625.00 1
Hour 192.31 1
Hour 1,404.00 1
Spec. No :
Unit (British) : 1000 Sft
Rate (Rs)
85.00 1
TOTAL MATERIAL 2.53
600.00 1
3.00
TOTAL LABOUR 10.30
481.01 1
192.31 1
1,404.00 1
Spec. No :
Unit (British) : 100 Sft
2" thick (consolidated) asphalt macadam with
liquid asphalt(cut backs) of approved grade with precoated bajri seal
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 13.44
1,210.00 1
400.00 1
471.80 1
TOTAL EQUIPMENT 5.14
19.50
Rate (Rs)
3,438.00
85.50 1
112.00 1
TOTAL MATERIAL 61.06
600.00 1
3.00
TOTAL LABOUR 13.14
1,210.00 1
400.00 1
471.80 1
TOTAL EQUIPMENT 6.30
19.50
16.4.3
(British) : 100 Sft
Rate (Rs)
600.00 1
600.00 1
3.00
TOTAL LABOUR 3.90
1,210.00 1
400.00 1
16.7.12
(British) : 10 Rft
Rate (Rs)
230.60 1
TOTAL MATERIAL 74.59
900.00 1
3.00
TOTAL LABOUR 5.91
19.50
2,865.92 Per Meter : Rs 940.02
110.25 Per Meter : Rs 36.16
Spec. No :
Unit (British) : 100 Cft
Providing and filling sand behind abutment of bridges, culverts.
Rate (Rs)
600.00 1
600.00 1
740.00 1
3.00
TOTAL LABOUR 29.24
302.99 1
TOTAL EQUIPMENT 2.82
19.50
16.2.7
(British) : 1000 Cft
Rate (Rs)
1,575.00
TOTAL MATERIAL 67.26
600.00 1
600.00 1
740.00 1
3.00
TOTAL LABOUR 9.86
1,210.00 1
769.00 1
Spec. No :
Unit (British) : 100 Sft
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 8.13
769.00 1
5,212.00 1
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 7.43
769.00 1
5,212.00 1
Spec. No :
Unit (British) : 100 Sft
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 8.46
769.00 1
5,212.00 1
Spec. No :
Unit (British) : 100 Sft
Rate (Rs)
600.00 1
850.00 1
3.00
TOTAL LABOUR 17.62
1,210.00 1
400.00 1
742.02 1
TOTAL EQUIPMENT 7.94
19.50
16.4.10
(British) : 100 Cft
Unit Rate (Rs)
Cft 3,438.00
Kg 18.38 1
Kg 85.50 1
TOTAL MATERIAL 66.27
Day 600.00 1
Day 850.00 1
3.00
TOTAL LABOUR 11.51
Hour 302.99 1
Hour 1,250.00 1
TOTAL EQUIPMENT 2.72
19.50
Spec. No : 3.9.3
Unit (British) : 100 Sft
road of size 4x4 cm @ 2 meter c/c.
Rate (Rs)
600.00 1
850.00 1
3.00
TOTAL LABOUR 80.50
19.50
Rate (Rs)
600.00 1
850.00 1
740.00 1
3.00
TOTAL LABOUR 57.06
1,210.00 1
769.00 1
16.8.2
(British) : 100 Rft
Bag 550.00 1
Cft 2,600.00
No 145.00 1
TOTAL MATERIAL 66.86
Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 13.64
19.50
16.8.2
(British) : 100 Rft
Bag 550.00 1
Cft 2,600.00
No 114.00 1
Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 15.94
19.50
Bag 550.00 1
Cft 2,600.00
No 108.00 1
Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 16.50
19.50
Spec. No :
Unit (British) : 100 Cft
r by Mechanical mean.
Rate (Rs)
600.00 1
850.00 1
3.00
TOTAL LABOUR 14.64
1,500.00 1
TOTAL EQUIPMENT 65.86
19.50
Spec. No :
Unit (British) : Cusec
r by Mechanical mean.
Rate (Rs)
600.00 1
850.00 1
3.00
TOTAL LABOUR 9.29
1,500.00 1
16.8.10
(British) : 100 Rft
Rate (Rs)
45.50 1
600.00 1
3.00
TOTAL LABOUR 12.82
19.50
16.8.10
(British) : 100 Rft
Rate (Rs)
45.50 1
600.00 1
3.00
TOTAL LABOUR 12.77
19.50
Rate (Rs)
43.00 1
600.00 1
3.00
TOTAL LABOUR 13.31
19.50
16.8.10
(British) : 100 Rft
Rate (Rs)
43.00 1
600.00 1
3.00
TOTAL LABOUR 13.27
19.50
Rate (Rs)
15.50 1
600.00 1
3.00
TOTAL LABOUR 26.14
19.50
16.8.10
(British) : 100 Rft
Rate (Rs)
15.50 1
16.8.10
(British) : 100 Rft
Rate (Rs)
13.50 1
600.00 1
3.00
TOTAL LABOUR 28.45
19.50
16.8.10
(British) : 100 Rft
Rate (Rs)
13.50 1
600.00 1
3.00
TOTAL LABOUR 28.35
19.50
Spec. No :
Unit (British) : 100 Each
Rate (Rs)
110.00 1
22,179.23
32,174.11
600.00 1
3.00
TOTAL LABOUR 9.67
742.02 1
TOTAL EQUIPMENT 13.19
19.50
Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 19.03
Hour 1,210.00 1
(British) : 100Cft
Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 40.43
Hour 420.00 1
Hour 1,500.00 1
TOTAL EQUIPMENT 3.33
19.50
Spec. No :
Unit (British) :
Days 1,200.00
TOTAL LABOUR
Hour 686.15
TOTAL EQUIPMENT
Rs. 322.59
Rs. 117.60
Spec. No :
Unit (British) :
Leveling wearing course on existing surface of road.
Unit Rate (Rs)
Cft 3,438.00
Kg 85.50
TOTAL MATERIAL
Day 600.00
Day 850.00
Day 600.00
TOTAL LABOUR
Tonne 1,827.00
TOTAL EQUIPMENT
Rs. 48,769.17
Rs. 804.40
16.6.7
(British) : Each
Rate (Rs)
11,400.00 1
3.00
TOTAL LABOUR 3.96
19.50
16.6.7
(British) : Each
Rate (Rs)
9,120.00 1
950.00 1
3.00
TOTAL LABOUR 3.95
19.50
16.6.7
(British) : Each
Rate (Rs)
7,000.00 1
950.00 1
3.00
TOTAL LABOUR 3.78
19.50
16.6.7
(British) : Each
Rate (Rs)
7,800.00 1
950.00 1
3.00
TOTAL LABOUR 3.88
19.50
Rate (Rs)
5,000.00 1
950.00 1
3.00
TOTAL LABOUR 3.82
19.50
16.6.7
(British) : Each
Rate (Rs)
4,500.00 1
3.00
TOTAL LABOUR 3.71
19.50
16.6.7
(British) : Each
Rate (Rs)
3,200.00 1
950.00 1
3.00
TOTAL LABOUR 3.57
19.50
Spec. No :
Unit (British) : Rft
Un-galvanized Sheath for 20 to 24 Wires 0.5" Strand Cable
Unit Rate (Rs)
Rft 75.00 1
950.00 1
3.00
TOTAL LABOUR 11.01
19.50
Spec. No :
Unit (British) : Rft
Un-galvanized Sheath for 16 to 19 Wires 0.5" Strand Cable
Unit Rate (Rs)
Rft 65.00 1
950.00 1
3.00
TOTAL LABOUR 10.29
19.50
Rft 35.00 1
950.00 1
3.00
TOTAL LABOUR 13.23
19.50
Spec. No :
Unit (British) : Rft
Un-galvanized Sheath for 10 to 12 Wires 0.5" Strand Cable
Unit Rate (Rs)
Rft 32.00 1
950.00 1
3.00
TOTAL LABOUR 12.13
19.50
Spec. No :
Unit (British) : Rft
Un-galvanized Sheath for 8 to 9 Wires 0.5" Strand Cable
Unit Rate (Rs)
Rft 30.00 1
950.00 1
3.00
TOTAL LABOUR 11.32
19.50
Spec. No :
Unit (British) : Rft
Un-galvanized Sheath for 5 to 7 Wires 0.5" Strand Cable
Unit Rate (Rs)
Rft 29.00 1
950.00 1
3.00
TOTAL LABOUR 9.08
19.50
Spec. No :
Unit (British) : Rft
Un-galvanized Sheath for upto 4 Wires 0.5" Strand Cable
Unit Rate (Rs)
Rft 26.00 1
950.00 1
3.00
TOTAL LABOUR 7.03
19.50
600.00 1
720.00 1
3.00
TOTAL LABOUR 16.54
1,700.00 1
TOTAL EQUIPMENT 63.96
19.50
16.6.7.3.9
(British) : Each
Rate (Rs)
600.00 1
720.00 1
3.00
TOTAL LABOUR 16.54
1,700.00 1
TOTAL EQUIPMENT 63.96
19.50
Spec. No :
Unit (British) : Each
Stressing and Grouting for Cable below 13/0.5" (Single End Stressing).
Rate (Rs)
600.00 1
720.00 1
3.00
TOTAL LABOUR 15.64
1,700.00 1
TOTAL EQUIPMENT 64.86
19.50
16.6.7
(British) : Tonne
159,000.00 1 Tonne
TOTAL MATERIAL 77.50
19.50
16.6.7
(British) : tonne
Rate (Rs)
118.00 1
TOTAL MATERIAL 77.50
19.50
16.6.7
(British) : Tonne
Rate (Rs)
91,000.00 1
TOTAL MATERIAL 77.50
19.50
Spec. No :
Unit (British) : Rft
Galvanized Sheath for 20 to 24 Wires 0.5" Strand Cable
Unit Rate (Rs)
Rft 218.00 1
950.00 1
3.00
TOTAL LABOUR 5.96
19.50
Spec. No :
Unit (British) : Rft
Galvanized Sheath for 16 to 19 Wires 0.5" Strand Cable
Unit Rate (Rs)
Rft 210.00 1
950.00 1
3.00
TOTAL LABOUR 5.41
19.50
Spec. No :
Unit (British) : Rft
Galvanized Sheath for 13 to 15 Wires 0.5" Strand Cable
Unit Rate (Rs)
Rft 187.00 1
950.00 1
3.00
TOTAL LABOUR 5.14
19.50
Rft 148.00 1
950.00 1
3.00
TOTAL LABOUR 5.18
19.50
Spec. No :
Unit (British) : Rft
Galvanized Sheath for 8 to 9 Wires 0.5" Strand Cable
Unit Rate (Rs)
Rft 134.00 1
950.00 1
3.00
TOTAL LABOUR 5.03
19.50
164.55 Per Meter : Rs 539.73
4.42 Per Meter : Rs 14.50
Spec. No :
Unit (British) : Rft
Galvanized Sheath for 5 to 7 Wires 0.5" Strand Cable
Unit Rate (Rs)
Rft 127.00 1
950.00 1
3.00
TOTAL LABOUR 4.48
19.50
Spec. No :
Unit (British) : Rft
Galvanized Sheath for upto 4 Wires 0.5" Strand Cable
Unit Rate (Rs)
Rft 112.20 1
TOTAL MATERIAL 76.53
950.00 1
3.00
TOTAL LABOUR 3.97
19.50
16.8.2
(British) : 8 Rft
30.00 1
125.00 1
18,006.74
23,667.98
TOTAL MATERIAL 67.52
1,200.00 1
600.00 1
3.00
TOTAL LABOUR 12.98
19.50
Sft 33.00
Kg 125.00
Cft 18,006.74
Cft 23,667.98
TOTAL MATERIAL
Day 1,200.00
Day 600.00
TOTAL LABOUR
Over Heads on(M+L+E) 2% +
Rs. 18,650.21
Rs. 3,123.75
Spec. No :
Unit (British) : Rft
Rate (Rs)
742.40 1
TOTAL MATERIAL 73.63
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 6.87
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
2,690.00 1
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 4.40
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
135.00 1
TOTAL MATERIAL 68.15
600.00 1
3.00
TOTAL LABOUR 5.24
742.02 1
769.00 1
Spec. No :
Unit (British) : Cft
Concrete Beam Guardrail (including reinforcement)
Unit Rate (Rs)
Bag 550.00 1
Cft 2,600.00 100 Cft
Kg 110.00 1
Cft 2,520.00 100 Cft
Cft 1,210.00 100 Cft
Ltr 640.00 1
TOTAL MATERIAL 57.84
Day 1,200.00 1
Day 600.00 1
Day 1,200.00 1
Day 1,050.00 1
3.00
TOTAL LABOUR 16.78
Hour 1,282.27 1
Hour 591.77 1
Hour 481.01 1
Hour 625.00 1
TOTAL EQUIPMENT 5.88
19.50 %
Spec. No :
Unit (British) : Cft
(Incl. Reinforcement)
Rate (Rs)
550.00 1
2,600.00 100 Cft
110.00 1
2,520.00 100 Cft
1,210.00 100 Cft
640.00 1
TOTAL MATERIAL 58.38
1,200.00 1
600.00 1
1,200.00 1
1,050.00 1
3.00
TOTAL LABOUR 16.91
1,282.27 1
591.77 1
625.00 1
% 49.13
19.50 %
Rate (Rs)
85.50 1 kg
2,600.00 100 Cft
MATERIAL 58.76 %
600.00 1 Day
850.00 1 Day
600.00 1 Day
3.00 %
LABOUR 4.13 %
1,827.00 1 Tonne
TOTAL EQUIPMENT 17.60
19.50
Rate (Rs)
85.50 1 kg
2,600.00 100 Cft
MATERIAL 58.76 %
600.00 1 Day
850.00 1 Day
600.00 1 Day
3.00 %
LABOUR 4.13 %
1,827.00 1 Tonne
600.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : 100 Sft
preparing sub-grade on slope
Rate (Rs)
600.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
550.00 1
2,000.00 100 Cft
TOTAL MATERIAL 23.72
1,200.00 1
600.00 1
600.00 1
3.00
TOTAL LABOUR 56.78
19.50
Spec. No :
Unit (British) : 100 Sft
ent, sand motar 1:10 in bed
Rate (Rs)
550.00 1
2,000.00 100 Cft
TOTAL MATERIAL 16.06
1,200.00 1
600.00 1
600.00 1
3.00
TOTAL LABOUR 64.44
19.50
550.00 1
2,000.00 100 Cft
TOTAL MATERIAL 13.20
1,200.00 1
600.00 1
600.00 1
3.00
TOTAL LABOUR 67.30
19.50
Spec. No :
Unit (British) : 100 Sft
nt, sand mortar 1:6 in bed
Rate (Rs)
550.00 1
2,000.00 100 Cft
TOTAL MATERIAL 35.94
1,200.00 1
600.00 1
600.00 1
3.00
TOTAL LABOUR 44.56
19.50
Spec. No :
Unit (British) : 100 Sft
t, sand mortar 1:6 On slope
Rate (Rs)
550.00 1
2,000.00 100 Cft
TOTAL MATERIAL 31.35
1,200.00 1
600.00 1
600.00 1
3.00
TOTAL LABOUR 49.15
19.50
Spec. No :
Unit (British) : 100 Sft
ent, sand mortar 1:3 in bed
Rate (Rs)
550.00 1
2,000.00 100 Cft
TOTAL MATERIAL 29.42
600.00 1
600.00 1
3.00
TOTAL LABOUR 51.08
19.50
Spec. No :
Unit (British) : 100 Sft
ent, sand mortar 1:3 On slope
Rate (Rs)
550.00 1
2,000.00 100 Cft
TOTAL MATERIAL 16.33
1,200.00 1
600.00 1
600.00 1
3.00
TOTAL LABOUR 64.17
19.50
17.3.7
(British) : 100 Sft
Unit Rate (Rs)
Bag 550.00 1
Cft 2,000.00
No 14,000.00 1,000 No
TOTAL MATERIAL 58.02
Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 22.48
19.50
17.3.7
(British) : 100 Sft
Bag 550.00 1
Cft 2,000.00
No 14,000.00 1,000 No
TOTAL MATERIAL 56.05
Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 24.45
19.50
31,954.92 Per SQM : Rs 3,438.35
9,003.75 Per SQM : Rs 968.80
17.3.7
(British) : 100 Sft
Bag 550.00 1
Cft 2,000.00
No 14,000.00 1,000 No
TOTAL MATERIAL 58.99
Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 21.51
19.50
17.3.7
(British) : 100 Sft
Unit Rate (Rs)
Bag 550.00 1
Cft 2,000.00
No 14,000.00 1,000 No
TOTAL MATERIAL 57.08
Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 23.42
19.50
17.3.7
(British) : 100 Sft
Bag 550.00 1
Cft 2,000.00
No 9,900.00 1,000 No
TOTAL MATERIAL 55.00
Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 25.50
19.50
Bag 550.00 1
Cft 2,000.00
No 9,900.00 1,000 No
TOTAL MATERIAL 52.86
Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 27.64
19.50
17.3.7
(British) : 100 Sft
Bag 550.00 1
Cft 2,000.00
No 9,900.00 1,000 No
TOTAL MATERIAL 56.29
Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 24.21
19.50
17.3.7
(British) : 100 Sft
Bag 550.00 1
Cft 2,000.00
No 9,900.00 1,000 No
TOTAL MATERIAL 54.22
Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 26.28
19.50
Bag 550.00 1
Cft 2,000.00
Cft 3,290.00
TOTAL MATERIAL 56.21
Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 24.29
19.50
17.2.7,
17.3.8.2
(British) : 100 Cft
Bag 550.00 1
Cft 2,000.00
Cft 3,290.00
TOTAL MATERIAL 53.10
Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 27.40
19.50
17.2.7,
17.3.8.2
(British) : 100 Cft
Bag 550.00 1
Cft 2,000.00
Cft 3,290.00
TOTAL MATERIAL 49.60
Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 30.90
19.50
Bag 550.00 1
Cft 2,000.00
Cft 3,290.00
TOTAL MATERIAL 53.61
Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 26.89
19.50
17.2.7,
17.3.8.2
(British) : 100 Cft
Bag 550.00 1
Cft 2,000.00
Cft 3,290.00
TOTAL MATERIAL 50.30
Day 1,200.00 1
Day 600.00 1
Day 600.00 1
3.00
TOTAL LABOUR 30.20
19.50
17.2.7,
17.3.8.2
(British) : 100 Cft
Bag 550.00 1
Cft 2,000.00
Cft 3,290.00
TOTAL MATERIAL 46.64
Day 600.00 1
Day 1,200.00 1
Day 600.00 1
3.00
TOTAL LABOUR 33.86
19.50
Bag 550.00 1
Cft 2,000.00 100 Cft
RFT 168.30 1
1,200.00 1
600.00 1
3.00
TOTAL LABOUR 22.83
19.50
17.3.5
(British) : Rft
Rate (Rs)
550.00 1
2,000.00 100 Cft
191.10 1
1,200.00 1
600.00 1
3.00
TOTAL LABOUR 22.82
19.50
17.3.5
(British) : Rft
Rate (Rs)
550.00 1 Bag
2,000.00 100 Cft
226.50 1 RFT
1,200.00 1
600.00 1
3.00
TOTAL LABOUR 21.96
19.50
17.3.5
(British) : Rft
Rate (Rs)
550.00 1 Bag
2,000.00 100 Cft
288.30 1 RFT
1,200.00 1
600.00 1
3.00
TOTAL LABOUR 21.33
19.50
Rate (Rs)
550.00 1
2,000.00 100 Cft
298.20 1
1,200.00 1
600.00 1
3.00
TOTAL LABOUR 23.02
19.50
17.3.5
(British) : Rft
Rate (Rs)
550.00 1
2,000.00 100 Cft
383.40 1
1,200.00 1
600.00 1
3.00
TOTAL LABOUR 22.66
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
1,050.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
1,050.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : Rft
Rate (Rs)
600.00 1
850.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : Rft
th of: More than 15' to 25'
Rate (Rs)
600.00 1
850.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : Rft
th of: More than 25' to 30'
Rate (Rs)
600.00 1
850.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
600.00 1
540.00 1
3.00
TOTAL LABOUR 80.50
19.50
Rate (Rs)
1,050.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
600.00 1
850.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Rate (Rs)
600.00 1
850.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : Job
Rate (Rs)
600.00 1
850.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Rate (Rs)
600.00 1
850.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : 100 Rft
Rate (Rs)
600.00 1
850.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : 100 Rft
ne under different conditions
Rate (Rs)
600.00 1
850.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
600.00 1
850.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : Each
Rate (Rs)
600.00 1
850.00 1
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
18.1.4.2
(British) : per day
Rate (Rs) Amount
5,000.00 1 Day
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
19.3.4
(British) : Each
Rate (Rs)
30.00 1
600.00 1
3.00
TOTAL LABOUR 50.92
19.50
Rate (Rs)
30.00 1
600.00 1
3.00
TOTAL LABOUR 54.84
19.50
19.3.4
(British) : Each
Rate (Rs)
90.00 1
TOTAL MATERIAL 50.32
600.00 1
3.00
TOTAL LABOUR 30.18
19.50
167.08 Cost Per Each: 167.08
59.53 Cost Per Each: 59.53
19.3.4
(British) : Each
Rate (Rs)
90.00 1
TOTAL MATERIAL 46.31
600.00 1
3.00
TOTAL LABOUR 34.19
19.50
19.3.4
(British) : Each
Rate (Rs)
49.00 1
TOTAL MATERIAL 15.60
600.00 1
3.00
TOTAL LABOUR 64.90
19.50
19.3.4
(British) : Each
Rate (Rs)
49.00 1
600.00 1
3.00
TOTAL LABOUR 67.47
19.50
Rate (Rs)
150.00 1
600.00 1
3.00
TOTAL LABOUR 46.75
19.50
19.3.4
(British) : Each
Rate (Rs)
150.00 1
600.00 1
3.00
TOTAL LABOUR 50.87
19.50
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
19.3.4
(British) : 100No/50m
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
19.3.4
(British) : 100No/50m
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
19.3.4
(British) : 100No/50m
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
19.3.4
(British) : 100 Sft
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : 100 No.
Rate (Rs)
47.00 1
TOTAL MATERIAL 3.63
600.00 1
3.00
TOTAL LABOUR 76.87
19.50
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
19.2.1 , 19.3.1
(British) : 100 Cft
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
Spec. No :
Unit (British) : 100 Cft
feet) : Over size shingle 3" to 9"
Rate (Rs)
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
600.00 1
3.00
TOTAL LABOUR 80.50
19.50
19.2.1
(British) : Each
Rate (Rs)
57.00 1
TOTAL MATERIAL 19.83
600.00 1
3.00
TOTAL LABOUR 60.67
19.50
Rate (Rs)
168.00 1
TOTAL MATERIAL 27.27
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 53.23
19.50
19.3.4.9
(British) : 100 Sft
Rate (Rs)
161.00 1
TOTAL MATERIAL 48.66
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 31.84
19.50
Spec. No :
Unit (British) : 100 Sft
Provide & weave GI wire netting for wire crates 6"x9" mesh : 8 SWG wire
Rate (Rs)
152.00 1
TOTAL MATERIAL 50.98
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 29.52
19.50
19.3.4.9
(British) : 100 Sft
Rate (Rs)
168.00 1
TOTAL MATERIAL 20.03
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 60.47
19.50
19.3.4.9
(British) : 100 Sft
Rate (Rs)
161.00 1
TOTAL MATERIAL 40.28
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 40.22
19.50
Spec. No :
Unit (British) : 100 Sft
Provide & weave GI wire netting for wire crates 6"x6" mesh : 8 SWG wire
Rate (Rs)
152.00 1
TOTAL MATERIAL 52.42
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 28.08
19.50
19.3.4.9
(British) : 100 Sft
Rate (Rs)
168.00 1
TOTAL MATERIAL 24.83
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 55.67
19.50
Rate (Rs)
161.00 1
TOTAL MATERIAL 46.01
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 34.49
19.50
Spec. No :
Unit (British) : 100 Sft
Provide & weave GI wire netting for wire crates 4"x4" mesh : 8 SWG wire
Rate (Rs)
152.00 1
TOTAL MATERIAL 52.99
600.00 1
1,050.00 1
3.00
TOTAL LABOUR 27.51
19.50
Rate (Rs)
3,438.00
TOTAL MATERIAL 65.98
600.00 1
3.00
TOTAL LABOUR 14.52
19.50
19.3.5.3
(British) : 100 Cft
Rate (Rs)
3,800.00
TOTAL MATERIAL 58.90
600.00 1
3.00
TOTAL LABOUR 21.60
19.50
19.3.5.3
(British) : 100 Cft
Rate (Rs)
1,520.00
TOTAL MATERIAL 43.31
600.00 1
3.00
TOTAL LABOUR 37.19
19.50
19.3.5.3
(British) : 100 Cft
Rate (Rs)
3,438.00
TOTAL MATERIAL 57.45
600.00 1
3.00
TOTAL LABOUR 23.05
19.50
19.3.5.3
(British) : 100 Cft
Rate (Rs)
4,000.00
TOTAL MATERIAL 63.27
600.00 1
3.00
TOTAL LABOUR 17.23
19.50
19.3.5.3
(British) : 100 Cft
Rate (Rs)
600.00 1
850.00 1
3.00
TOTAL LABOUR 49.66
19.50
6.20
172.62
5.07
% 183.89
Day 60.00
Day 30.00
Day 60.00
% 4.50
% 154.50
% 65.11
Amount
72.97
5.00
% 77.97
Day 3.42
Day 7.20
Day 4.68
% 0.46
% 15.76
% 18.19
Amount
103.63
6.00
% 109.63
Day 3.42
Day 7.20
Day 4.68
% 0.46
% 15.76
% 24.36
Amount
135.34
7.00
% 142.34
Day 4.02
Day 7.80
Day 5.16
% 0.51
% 17.49
% 31.07
Amount
172.62
7.00
% 179.62
Day 4.02
Day 8.40
Day 5.16
% 0.53
% 18.11
% 38.45
Each 1,240.00
% 1,240.00
Day 120.00
Day 60.00
Day 120.00
% 9.00
% 309.00
% 300.30
Amount
Each 280.00
Each 576.00
% 856.00
Day 120.00
Day 60.00
Day 120.00
% 9.00
% 309.00
% 225.42
Amount
Each 280.00
Each 1,231.00
% 1,511.00
Day 120.00
Day 60.00
Day 120.00
% 9.00
% 309.00
% 353.15
Amount
427.38
% 427.38
Day 36.00
Day 72.00
% 3.24
% 111.24
% 104.40
Amount
No 1,275.00
% 1,275.00
Day 12.00
% 0.36
% 12.36
% 250.97
Amount
No 1,968.60
% 1,968.60
Day 12.00
% 0.36
% 12.36
% 386.22
Amount
No 3,570.00
% 3,570.00
Day 12.00
% 0.36
% 12.36
% 698.49
No 1,377.00
% 1,377.00
Day 24.00
% 0.72
% 24.72
% 273.20
Amount
No 575.00
% 575.00
Day 12.00
% 0.36
% 12.36
% 114.47
Amount
No 2,370.00
% 2,370.00
Day 60.00
Day 75.00
% 4.05
% 139.05
% 488.48
Amount
No 2,890.00
% 2,890.00
Day 60.00
Day 75.00
% 4.05
% 139.05
% 589.88
Amount
Each 6,500.00
% 6,500.00
Day 37.50
% 1.13
% 38.63
% 1,274.81
Amount
1 Each 9,500.00
77.20 % 9,500.00
1 Day 37.50
3.00 % 1.13
3.30 % 38.63
19.50 % 1,859.81
Kg 250.00
% 250.00
Day 108.00
% 3.24
% 111.24
% 69.81
14.4 , 14.6,
14.7.21 , 14.8
Amount
Rft 1,200.00
% 1,200.00
Day 120.00
Day 210.00
% 9.90
% 339.90
% 298.35
Amount
No. 21,500.00
% 21,500.00
Day 120.00
% 3.60
% 123.60
% 4,215.90
Amount
No 10,400.00
Kg 55.20
No 120.00
% 10,575.20
Day 120.00
Day 210.00
% 9.90
% 339.90
% 2,126.51
14.4 , 14.6,
14.7.21 , 14.8
Amount
No 19,650.00
% 19,650.00
Day 120.00
% 3.60
% 123.60
% 3,855.15
14.4 , 14.6,
14.7.21 , 14.8
Amount
No 13,500.00
% 13,500.00
Day 120.00
% 3.60
% 123.60
% 2,655.90
14.4 , 14.6,
14.7.21 , 14.8
Amount
No 28,103.00
% 28,103.00
Day 120.00
% 3.60
% 123.60
% 5,503.49
14.4 , 14.6,
14.7.21 , 14.8
Amount
No 29,657.00
% 29,657.00
Day 120.00
% 3.60
% 123.60
% 5,806.52
Amount
1 Rft 20.00
1 No 0.90
1 No 2.13
1 No 0.48
1 No 1.00
1 No 1.00
49.54 % 25.51
1 Day 14.40
3.00 % 0.43
30.96 % 14.83
19.50 % 7.78
Amount
No 2.13
No 1.00
No 1.00
Rft 25.00
No 0.86
No 1.80
% 31.79
Day 14.40
% 0.43
% 14.83
% 9.01
Amount
No 2.13
No 1.00
No 1.00
No 1.80
Rft 35.00
No 1.14
% 42.08
Day 14.40
% 0.43
% 14.83
% 11.01
Amount
No 2.13
No 1.00
No 1.00
No 1.80
Rft 40.00
No 1.24
% 47.17
Day 14.40
% 0.43
% 14.83
% 12.01
Amount
No 2.13
No 1.00
No 1.00
No 1.80
Rft 45.00
No 2.14
% 53.08
Day 14.40
% 0.43
% 14.83
% 13.16
Amount
No 1.00
No 1.00
Rft 60.00
No 2.57
No 2.25
No 3.05
% 69.87
Day 14.40
% 0.43
% 14.83
% 16.43
Amount
1 Bag 1.21
1 Cft. 24.60
1 Rft 20.00
1 No 0.90
1 No 2.13
1 No 0.48
44.80 % 49.32
1 Day 36.00
3.00 % 1.08
35.70 % 37.08
19.50 % 16.64
Amount
Bag 1.81
Cft. 24.60
No 2.13
Rft 25.00
No 0.86
No 1.80
% 56.21
Day 36.00
% 1.08
% 37.08
% 17.98
Amount
Bag 2.75
Cft. 24.60
No 2.13
No 1.80
Rft 35.00
No 1.14
% 67.43
Day 36.00
% 1.08
% 37.08
% 20.17
Amount
Bag 3.68
Cft. 24.60
No 2.13
No 1.80
Rft 40.00
No 1.24
% 73.46
Day 36.00
% 1.08
% 37.08
% 21.34
Amount
Bag 9.18
Cft. 24.60
No 2.13
No 1.80
Rft 45.00
No 2.14
% 84.86
Day 36.00
% 1.08
% 37.08
% 23.57
Amount
Bag 12.81
Cft. 24.60
Rft 60.00
No 2.57
No 2.25
No 3.05
% 105.29
Day 36.00
% 1.08
% 37.08
% 27.55
Amount
1 No 2.13
1 No 1.00
1 No 1.00
1 Rft 10.00
1 No 0.27
1 No 0.36
52.09 % 14.76
1 Day 7.20
3.00 % 0.22
28.41 % 7.42
19.50 % 4.28
Amount
1 No 2.13
1 No 1.00
1 No 1.00
1 Rft 14.00
1 No 0.40
1 No 0.45
56.19 % 18.99
1 Day 7.20
3.00 % 0.22
24.31 % 7.42
19.50 % 5.11
Amount
1 No 2.13
1 No 1.00
1 No 1.00
1 Rft 18.00
1 No 0.53
1 No 0.60
59.19 % 23.27
1 Day 7.20
3.00 % 0.22
21.31 % 7.42
19.50 % 5.94
1 No 2.13
1 No 1.00
1 No 1.00
1 Rft 22.67
1 No 0.80
1 No 0.90
56.21 % 28.51
1 Day 10.80
3.00 % 0.32
24.29 % 11.12
19.50 % 7.66
Amount
1 No 2.13
1 No 1.00
1 No 1.00
1 Rft 25.67
1 No 1.00
1 No 0.96
53.33 % 31.77
1 Day 14.40
3.00 % 0.43
27.17 % 14.83
19.50 % 9.00
Amount
1 No 1.00
1 No 1.00
1 No 3.05
1 Rft 30.00
1 No 2.00
1 No 1.35
62.00 % 38.40
1 Day 9.60
3.00 % 0.29
18.50 % 9.89
19.50 % 9.36
Amount
1.00
1.00
35.00
3.00
1.80
3.36
% 45.16
Day 10.80
% 0.32
% 11.12
% 10.91
Amount
1.00
1.00
50.33
1.80
6.67
3.36
% 64.16
Day 14.40
% 0.43
% 14.83
% 15.32
Amount
1 Bag 0.77
1 Cft 8.00
1 Rft 10.00
1 No 0.27
1 No 3.33
1 No 0.36
39.74 % 22.73
1 Day 21.60
3.00 % 0.65
40.76 % 22.25
19.50 % 8.64
Amount
1 Bag 1.15
1 Cft. 12.00
1 Rft 14.00
1 No 0.40
1 No 3.33
1 No 4.58
48.16 % 35.46
1 Day 21.60
3.00 % 0.65
32.34 % 22.25
19.50 % 11.13
1 Bag 1.15
1 Cft. 12.00
1 Rft 18.00
1 No 0.53
1 No 3.33
1 No 0.60
48.25 % 35.62
1 Day 21.60
3.00 % 0.65
32.25 % 22.25
19.50 % 11.16
10.00 1 No 3.33
30.00 1 No 0.90
Amount
1 Bag 1.26
1 Cft 26.60
1 Rft 25.67
1 No 1.00
1 No 3.33
1 No 0.96
52.03 % 58.83
1 Day 28.80
3.00 % 0.86
28.47 % 29.66
19.50 % 17.09
10.00 1 No 3.33
45.00 1 No 1.35
1.81
20.00
35.00
3.00
1.80
3.36
% 64.97
Day 44.40
% 1.33
% 45.73
% 21.33
Amount
2.59
26.60
50.33
1.80
6.67
3.36
% 91.34
Day 55.20
% 1.66
% 56.86
% 28.58
Amount
Rft 40.00
No 0.67
No 0.67
No 0.54
% 41.88
Day 7.20
Day 1.05
% 0.25
% 8.50
% 9.77
Amount
Rft 35.00
No 0.80
No 0.80
No 0.67
% 37.28
Day 7.20
Day 1.05
% 0.25
% 8.50
% 8.88
15.2.5
Amount
Rft 40.00
No 1.34
No 1.21
No 1.00
% 43.55
Day 12.00
Day 2.10
% 0.42
% 14.52
% 11.24
Amount
Rft 48.00
No 1.68
No 1.47
No 1.34
% 52.49
Day 13.20
Day 2.10
% 0.46
% 15.76
% 13.22
Amount
Rft 55.00
No 2.35
No 2.55
No 1.68
% 61.57
Day 13.20
Day 2.10
% 0.46
% 15.76
% 14.99
Amount
Rft 70.00
No 3.35
No 3.35
No 2.01
% 78.71
Day 20.40
Day 4.20
% 0.74
% 25.34
% 20.15
Amount
Rft 100.00
No 6.70
No 10.72
No 2.35
% 119.77
Day 21.60
Day 4.20
% 0.77
% 26.57
% 28.39
15.2.6
Rft
Amount
1 Rft 5.00
1 Pkt 0.11
1 Kg 0.30
46.54 % 5.41
1 Day 3.60
3.00 % 0.11
33.96 % 3.71
19.50 % 1.76
15.2.6
Rft
Amount
1 Rft 6.00
1 Pkt 0.11
1 Kg 0.30
49.63 % 6.41
1 Day 3.60
3.00 % 0.11
30.87 % 3.71
19.50 % 1.95
15.2.6
Amount
Pkt 0.11
Kg 0.30
Rft 14.00
% 14.41
Day 3.60
% 0.11
% 3.71
% 3.51
Amount
Rft 7.01
% 7.01
Day 4.80
% 0.14
% 4.94
% 2.30
Amount
Rft 13.58
% 13.58
Day 4.80
% 0.14
% 4.94
% 3.58
Amount
Rft 15.24
% 15.24
Day 4.80
% 0.14
% 4.94
% 3.91
Amount
Rft 19.51
% 19.51
Day 4.80
% 0.14
% 4.94
% 4.74
Amount
Rft 28.66
% 28.66
Day 12.00
% 0.36
% 12.36
% 7.93
Amount
Rft 73.77
% 73.77
Day 18.00
% 0.54
% 18.54
% 17.90
Amount
Rft 182.90
% 182.90
Day 30.00
% 0.90
% 30.90
% 41.52
Amount
Rft 6.71
% 6.71
Day 8.40
% 0.25
% 8.65
% 2.95
Amount
Rft 8.84
% 8.84
Day 8.40
% 0.25
% 8.65
% 3.36
Amount
Rft 14.94
% 14.94
Day 9.60
% 0.29
% 9.89
% 4.79
Amount
Rft 19.20
% 19.20
Day 9.60
% 0.29
% 9.89
% 5.62
Amount
Rft 28.66
% 28.66
Day 15.60
% 0.47
% 16.07
% 8.63
Amount
Rft 74.38
% 74.38
Day 24.00
% 0.72
% 24.72
% 19.18
Amount
Rft 60.97
% 60.97
Day 24.00
% 0.72
% 24.72
% 16.57
Amount
Rft 132.61
% 132.61
Day 40.80
% 1.22
% 42.02
% 33.81
Amount
Rft 182.90
% 182.90
Day 40.80
% 1.22
% 42.02
% 43.62
Amount
Rft 289.60
% 289.60
Day 60.00
% 1.80
% 61.80
% 68.17
Amount
Rft 378.00
% 378.00
Day 150.00
% 4.50
% 154.50
% 102.96
Amount
Rft 487.75
% 487.75
Day 150.00
% 4.50
% 154.50
% 124.36
Amount
Rft 713.33
% 713.33
Day 150.00
% 4.50
% 154.50
% 168.35
Amount
Rft 25.91
% 25.91
Day 6.00
% 0.18
% 6.18
% 6.22
Amount
Rft 37.20
% 37.20
Day 6.00
% 0.18
% 6.18
% 8.42
Amount
Rft 37.20
% 37.20
Day 8.40
% 0.25
% 8.65
% 8.89
Amount
Rft 48.17
% 48.17
Day 8.40
% 0.25
% 8.65
% 11.03
Amount
Rft 68.29
% 68.29
Day 8.40
% 0.25
% 8.65
% 14.95
Amount
Rft 165.24
% 165.24
Day 8.40
% 0.25
% 8.65
% 33.86
Amount
Cft 11.55
Cft 1.60
No 47.50
% 60.65
Day 90.00
% 2.70
% 92.70
% 29.38
Amount
Cft 14.30
Cft 1.80
No 65.00
% 81.10
Day 120.00
% 3.60
% 123.60
% 39.21
Amount
Cft 17.60
Cft 1.60
No 75.00
% 94.20
Day 150.00
% 4.50
% 154.50
% 47.62
Amount
Cft 19.80
Cft 3.00
No 130.00
% 152.80
Day 180.00
% 5.40
% 185.40
% 64.90
Amount
Cft 25.85
Cft 3.20
No 150.00
% 179.05
Day 216.00
% 6.48
% 222.48
% 77.03
Amount
Cft 28.60
Cft 3.60
No 150.00
% 182.20
Day 252.00
% 7.56
% 259.56
% 84.67
15.3.1, 15.3.2
Amount
No 1.00
Rft 30.00
No 1.00
% 32.00
Day 18.00
% 0.54
% 18.54
% 9.75
15.3.1, 15.3.2
Amount
No 1.00
No 1.00
Rft 40.00
% 42.00
Day 54.00
% 1.62
% 55.62
% 18.72
15.3.1, 15.3.2
Amount
No 1.00
No 1.00
Rft 50.00
% 52.00
Day 54.00
% 1.62
% 55.62
% 20.67
15.3.1, 15.3.2
Amount
No 1.00
No 1.00
Rft 60.00
% 62.00
Day 54.00
% 1.62
% 55.62
% 22.62
15.3.1, 15.3.2
Amount
No 1.00
No 1.00
Rft 80.00
% 82.00
Day 60.00
% 1.80
% 61.80
% 27.69
15.3.1, 15.3.2
Amount
No 1.00
No 1.00
Rft 120.00
% 122.00
Day 60.00
% 1.80
% 61.80
% 35.49
Amount
No 436.67
% 436.67
Day 120.00
% 3.60
% 123.60
% 108.55
Amount
Rft 666.67
% 666.67
Day 120.00
% 3.60
% 123.60
% 153.40
Amount
Rft 1,066.67
% 1,066.67
Day 180.00
% 5.40
% 185.40
% 243.10
Amount
Rft 3,133.33
% 3,133.33
Day 180.00
% 5.40
% 185.40
% 646.10
Amount
No 666.67
% 666.67
Day 240.00
% 7.20
% 247.20
% 176.80
Amount
No 766.67
% 766.67
Day 240.00
% 7.20
% 247.20
% 196.30
Amount
No 1,933.33
% 1,933.33
Day 300.00
% 9.00
% 309.00
% 435.50
Amount
No 3,800.00
% 3,800.00
Day 300.00
% 9.00
% 309.00
% 799.50
15.4.5
Amount
Each 8,000.00
% 8,000.00
Day 300.00
% 9.00
% 309.00
% 1,618.50
15.4.5
Amount
Each 10,000.00
% 10,000.00
Day 240.00
% 7.20
% 247.20
% 1,996.80
15.4.5
Amount
Each 20,000.00
% 20,000.00
Day 240.00
% 7.20
% 247.20
% 3,946.80
15.4.5
Amount
Each 30,000.00
% 30,000.00
Day 240.00
% 7.20
% 247.20
% 5,896.80
15.4.5
Amount
Each 28,000.00
% 28,000.00
Day 240.00
% 7.20
% 247.20
% 5,506.80
15.4.5
Amount
Each 25,000.00
% 25,000.00
Day 240.00
% 7.20
% 247.20
% 4,921.80
15.4.5
Amount
Each 20,000.00
% 20,000.00
Day 240.00
% 7.20
% 247.20
% 3,946.80
15.4.5
Amount
Each 15,000.00
% 15,000.00
Day 240.00
% 7.20
% 247.20
% 2,971.80
Amount
No 2,500.00
% 2,500.00
Day 300.00
% 9.00
% 309.00
% 546.00
Amount
No 2,750.00
% 2,750.00
Day 300.00
% 9.00
% 309.00
% 594.75
Amount
No 4,500.00
% 4,500.00
Day 240.00
% 7.20
% 247.20
% 924.30
Amount
No 5,850.00
% 5,850.00
Day 240.00
% 7.20
% 247.20
% 1,187.55
Amount
No 10,000.00
% 10,000.00
Day 240.00
% 7.20
% 247.20
% 1,996.80
15.4.25
Amount
Each 10,000.00
% 10,000.00
Day 30.00
% 0.90
% 30.90
% 1,955.85
15.4.25
Amount
Each 8,000.00
% 8,000.00
Day 30.00
% 0.90
% 30.90
% 1,565.85
Amount
486.00
42.78
% 528.78
Day 12.00
% 0.36
% 12.36
% 105.45
Amount
No 40.00
% 40.00
Day 22.80
% 0.68
% 23.48
% 12.25
Amount
No 180.00
% 180.00
Day 48.00
% 1.44
% 49.44
% 44.46
Amount
No 50.00
No 40.56
% 90.56
Day 30.00
% 0.90
% 30.90
% 23.51
Amount
RFT 164.00
No 40.56
% 204.56
Day 8.40
% 0.25
% 8.65
% 41.53
15.4.1, 15.4.5
Amount
No 2.00
No 30.00
% 32.00
Day 18.00
% 0.54
% 18.54
% 9.75
15.4.1, 15.4.5
Each
Amount
1 No 2.00
1 No 80.00
63.55 % 82.00
1 Day 18.00
3.00 % 0.54
16.95 % 18.54
19.50 % 19.50
Amount
No 2.00
No 35.00
% 37.00
Day 30.00
% 0.90
% 30.90
% 13.07
15.4.1
Amount
No 2.00
No 90.00
% 92.00
Day 30.00
% 0.90
% 30.90
% 23.79
Amount
No 2.00
No 450.00
% 452.00
Day 30.00
% 0.90
% 30.90
% 93.99
Amount
No 2.00
No 500.00
% 502.00
Day 30.00
% 0.90
% 30.90
% 103.74
15.4.1, 15.4.5
Amount
No 2.00
No 500.00
% 502.00
Day 30.00
% 0.90
% 30.90
% 103.74
15.4.1, 15.4.5
Amount
No 2.00
No 40.00
% 42.00
Day 15.60
% 0.47
% 16.07
% 11.23
15.4.1
Amount
No 2.00
No 120.00
% 122.00
Day 15.60
% 0.47
% 16.07
% 26.83
Amount
No 100.00
% 100.00
Day 30.00
% 0.90
% 30.90
% 25.35
Amount
No 150.00
% 150.00
Day 30.00
% 0.90
% 30.90
% 35.10
Amount
No 430.00
% 430.00
Day 30.00
% 0.90
% 30.90
% 89.70
Amount
No 920.00
% 920.00
Day 30.00
% 0.90
% 30.90
% 185.25
Amount
No 1,020.00
% 1,020.00
Day 30.00
% 0.90
% 30.90
% 204.75
Amount
No 220.00
No 700.00
No 60.00
No 400.00
Rft 300.00
% 1,680.00
Day 120.00
% 3.60
% 123.60
% 351.00
Amount
No 110.00
No 350.00
No 30.00
Rft 300.00
No 350.00
% 1,140.00
Day 90.00
% 2.70
% 92.70
% 239.85
Amount
No 350.00
No 30.00
No 120.00
No 80.00
No 95.00
Rft 300.00
No 20.00
% 995.00
Day 66.00
% 1.98
% 67.98
% 206.90
Amount
No 240.00
% 240.00
Day 30.00
% 0.90
% 30.90
% 52.65
Amount
RFT 196.80
No 450.00
% 646.80
Day 90.00
% 2.70
% 92.70
% 143.68
Amount
450.00
40.00
% 490.00
Day 90.00
% 2.70
% 92.70
% 113.10
Amount
RFT 250.00
Pkt 10.50
% 260.50
Day 10.80
% 0.32
% 11.12
% 52.90
Amount
RFT 187.25
No 5.78
No 6.00
% 199.03
Day 14.40
% 0.43
% 14.83
% 41.62
15.9.1
Amount
Kg 37.50
No 120.00
% 157.50
Day 30.00
% 0.90
% 30.90
% 36.56
Amount
Kg 37.41
Kg 750.00
% 787.41
Day 15.60
% 0.47
% 16.07
% 156.59
Amount
Kg 150.00
% 150.00
Day 15.60
% 0.47
% 16.07
% 32.29
Amount
Rft 14.02
kg 36.60
% 50.62
Day 8.40
% 0.25
% 8.65
% 11.51
Amount
Rft 30.48
kg 36.60
% 67.08
Day 8.40
% 0.25
% 8.65
% 14.72
Amount
Rft 39.02
kg 36.60
% 75.62
Day 8.40
% 0.25
% 8.65
% 16.38
Amount
Rft 57.32
kg 36.60
% 93.92
Day 8.40
% 0.25
% 8.65
% 19.95
Amount
No. 328.75
No 110.00
% 438.75
Day 270.00
% 8.10
% 278.10
% 138.21
Amount
No. 1,600.00
% 1,600.00
Day 480.00
% 14.40
% 494.40
% 405.60
Amount
No. 1,426.00
% 1,426.00
Day 480.00
% 14.40
% 494.40
% 371.67
Amount
No. 3,200.00
% 3,200.00
Day 480.00
% 14.40
% 494.40
% 717.60
Amount
No 22,050.00
% 22,050.00
Day 106.25
Day 150.00
% 7.69
% 263.94
hr 1,756.18
% 1,756.18
% 4,692.17
700.00
% 700.00
Day 300.00
% 9.00
% 309.00
% 195.00
15.6.1
Amount
No. 350.00
No. 1,500.00
% 1,850.00
Day 120.00
% 3.60
% 123.60
% 384.15
15.6.1
Amount
No. 800.00
No. 2,000.00
% 2,800.00
Day 120.00
% 3.60
% 123.60
% 569.40
15.6.1
Amount
No. 1,250.00
No. 3,000.00
% 4,250.00
Day 120.00
% 3.60
% 123.60
% 852.15
Amount
No. 14,000.00
% 14,000.00
Day 600.00
% 18.00
% 618.00
% 2,847.00
15.6.1
Amount
No. 24,000.00
% 24,000.00
Day 600.00
% 18.00
% 618.00
% 4,797.00
15.6.1
Amount
No. 20,000.00
% 20,000.00
Day 600.00
% 18.00
% 618.00
% 4,017.00
15.6.1
Amount
No. 11,800.00
% 11,800.00
Day 600.00
% 18.00
% 618.00
% 2,418.00
55,000.00
% 55,000.00
Day 106.25
Day 150.00
% 7.69
% 263.94
hr 1,756.18
% 1,756.18
% 11,117.42
Amount
1,900.00
% 1,900.00
Day 36.00
% 1.08
% 37.08
% 377.52
Amount
1,700.00
% 1,700.00
Day 36.00
% 1.08
% 37.08
% 338.52
Amount
5,000.00
% 5,000.00
Day 36.00
% 1.08
% 37.08
% 982.02
Amount
No 2,100.00
% 2,100.00
Day 36.00
% 1.08
% 37.08
% 416.52
Amount
No 2,300.00
% 2,300.00
Day 36.00
% 1.08
% 37.08
% 455.52
Amount
No 12,600.00
% 12,600.00
Day 36.00
% 1.08
% 37.08
% 2,464.02
Amount
No 3,700.00
% 3,700.00
Day 36.00
% 1.08
% 37.08
% 728.52
Amount
8,400.00
% 8,400.00
Day 36.00
% 1.08
% 37.08
% 1,645.02
Amount
No 27,000.00
% 27,000.00
Day 36.00
% 1.08
% 37.08
% 5,272.02
Amount
No 5,000.00
% 5,000.00
Day 36.00
% 1.08
% 37.08
% 982.02
Amount
No 50,000.00
% 50,000.00
Day 36.00
% 1.08
% 37.08
% 9,757.02
5,000.00
% 5,000.00
Day 36.00
% 1.08
% 37.08
% 982.02
650.00
% 650.00
Day 36.00
% 1.08
% 37.08
% 133.77
850.00
% 850.00
Day 36.00
% 1.08
% 37.08
% 172.77
1,450.00
% 1,450.00
Day 36.00
% 1.08
% 37.08
% 289.77
Amount
750.00
% 750.00
Day 36.00
% 1.08
% 37.08
% 153.27
840.00
% 840.00
Day 36.00
% 1.08
% 37.08
% 170.82
4,400.00
% 4,400.00
Day 36.00
% 1.08
% 37.08
% 865.02
1,200.00
% 1,200.00
Day 150.00
% 4.50
% 154.50
% 263.25
1,800.00
% 1,800.00
Day 150.00
% 4.50
% 154.50
% 380.25
1,400.00
% 1,400.00
Day 150.00
% 4.50
% 154.50
% 302.25
Amount
1,500.00
% 1,500.00
Day 150.00
% 4.50
% 154.50
% 321.75
Amount
2,100.00
% 2,100.00
Day 150.00
% 4.50
% 154.50
% 438.75
Amount
No 2,800.00
% 2,800.00
Day 150.00
% 4.50
% 154.50
% 575.25
Amount
No 3,200.00
% 3,200.00
Day 150.00
% 4.50
% 154.50
% 653.25
1,200.00
% 1,200.00
Day 150.00
% 4.50
% 154.50
% 263.25
1,600.00
% 1,600.00
Day 150.00
% 4.50
% 154.50
% 341.25
Amount
No 3,400.00
% 3,400.00
Day 150.00
% 4.50
% 154.50
% 692.25
Amount
No 3,400.00
% 3,400.00
Day 150.00
% 4.50
% 154.50
% 692.25
2,650.00
% 2,650.00
Day 150.00
% 4.50
% 154.50
% 546.00
Amount
No 5,800.00
% 5,800.00
Day 150.00
% 4.50
% 154.50
% 1,160.25
3,200.00
% 3,200.00
Day 150.00
% 4.50
% 154.50
% 653.25
3,456.00
% 3,456.00
Day 150.00
% 4.50
% 154.50
% 703.17
Amount
2,400.00
% 2,400.00
Day 150.00
% 4.50
% 154.50
% 497.25
Amount
Each 4,500.00
% 4,500.00
Day 30.00
% 0.90
% 30.90
% 883.35
Amount
Each 1,200.00
% 1,200.00
Day 30.00
% 0.90
% 30.90
% 239.85
Amount
Each 250.00
% 250.00
Day 30.00
% 0.90
% 30.90
% 54.60
Amount
Each 250.00
% 250.00
Day 30.00
% 0.90
% 30.90
% 54.60
Amount
Each 60.00
% 60.00
Day 30.00
% 0.90
% 30.90
% 17.55
Amount
Each 110.00
% 110.00
Day 30.00
% 0.90
% 30.90
% 27.30
Amount
Each 80.00
% 80.00
Day 30.00
% 0.90
% 30.90
% 21.45
Amount
Each 20.00
% 20.00
Day 4.80
% 0.14
% 4.94
% 4.84
Amount
Each 800.00
% 800.00
Day 24.00
% 0.72
% 24.72
% 160.68
Amount
Each 800.00
% 800.00
Day 30.00
% 0.90
% 30.90
% 161.85
Amount
Each 1,400.00
% 1,400.00
Day 30.00
% 0.90
% 30.90
% 278.85
Amount
Each 150.00
% 150.00
Day 30.00
% 0.90
% 30.90
% 35.10
Amount
Each 240.00
% 240.00
Day 30.00
% 0.90
% 30.90
% 52.65
Amount
Each 280.00
% 280.00
Day 30.00
% 0.90
% 30.90
% 60.45
Amount
Each 450.00
% 450.00
Day 30.00
% 0.90
% 30.90
% 93.60
Amount
Each 1,400.00
% 1,400.00
Day 24.00
% 0.72
% 24.72
% 277.68
Amount
Each 350.00
% 350.00
Day 150.00
% 4.50
% 154.50
% 97.50
Amount
No. 3,400.00
% 3,400.00
Day 120.00
% 3.60
% 123.60
% 686.40
Amount
350.00
% 350.00
Day 120.00
% 3.60
% 123.60
% 91.65
Amount
No. 13,000.00
% 13,000.00
Day 7,200.00
% 216.00
% 7,416.00
% 3,939.00
Amount
14,000.00
300.00
% 14,300.00
Day 1,800.00
Day 300.00
% 63.00
% 2,163.00
% 3,198.00
Amount
22,000.00
300.00
% 22,300.00
Day 1,800.00
Day 300.00
% 63.00
% 2,163.00
% 4,758.00
Amount
12,000.00
300.00
% 12,300.00
Day 1,500.00
Day 300.00
% 54.00
% 1,854.00
% 2,749.50
Amount
20,000.00
300.00
% 20,300.00
Day 1,500.00
Day 300.00
% 54.00
% 1,854.00
% 4,309.50
Amount
No. 28,800.00
No. 15,000.00
No. 180.00
No. 2,500.00
% 46,480.00
Day 120.00
Day 212.50
% 9.98
% 342.48
Day 15.00
Day 437.79
% 452.79
% 9,216.73
Amount
Rft 982.69
Rft 1,354.76
kg 1,097.28
% 3,434.73
Day 2,400.00
% 72.00
% 2,472.00
% 1,137.77
Amount
No 7,000.00
Each 400.00
Each 120.00
% 7,520.00
Day 600.00
% 18.00
% 618.00
% 1,583.40
Amount
No 1,000.00
% 1,000.00
Day 300.00
% 9.00
% 309.00
% 253.50
Amount
No 650.00
% 650.00
Day 24.00
% 0.72
% 24.72
% 131.43
Amount
No 460.00
% 460.00
Day 24.00
% 0.72
% 24.72
% 94.38
Amount
10,200.00
% 10,200.00
Day 300.00
% 9.00
% 309.00
% 2,047.50
Amount
No 280.00
% 280.00
Day 24.00
% 0.72
% 24.72
% 59.28
Amount
No 100.04
Rft 200.00
% 300.04
Day 8.40
% 0.25
% 8.65
% 60.15
Amount
No 130.06
Rft 150.00
% 280.06
Day 8.40
% 0.25
% 8.65
% 56.25
Amount
No 2,500.00
% 2,500.00
Day 1,500.00
% 45.00
% 1,545.00
% 780.00
Amount
1 Rft 149.96
1 Rft 420.47
1 No. 28.67
1 Pkt 50.00
1 No. 20.00
73.54 % 669.10
1 Day 36.00
3.00 % 1.08
6.96 % 37.08
19.50 % 137.49
1 Rft 99.97
1 Rft 220.09
1 No. 50.00
1 No. 75.00
1 No. 28.67
1 Pkt 25.00
72.28 % 498.73
1 Day 36.00
3.00 % 1.08
8.22 % 37.08
19.50 % 104.27
Amount
1 Rft 5.00
1 Pkt 0.10
1 Rft 51.82
68.80 % 56.92
1 Day 7.20
3.00 % 0.22
11.70 % 7.42
19.50 % 12.50
Amount
1 Rft 5.00
1 Pkt 0.10
1 Rft 74.40
71.06 % 79.51
1 Day 7.20
3.00 % 0.22
9.44 % 7.42
19.50 % 16.91
1 Rft 6.00
1 Pkt 0.10
1 Rft 136.58
71.49 % 142.69
1 Day 12.00
3.00 % 0.36
9.01 % 12.36
19.50 % 30.16
Amount
1 Rft 6.00
1 Pkt 0.21
1 Rft 330.48
72.83 % 336.69
1 Day 21.60
3.00 % 0.65
7.67 % 22.25
19.50 % 69.87
Amount
1 Rft 5.00
1 Pkt 0.21
1 Rft 7.01
55.64 % 12.22
1 Day 4.80
3.00 % 0.14
24.86 % 4.94
19.50 % 3.32
1 Rft 5.00
1 Pkt 0.21
1 Rft 15.24
62.77 % 20.45
1 Day 4.80
3.00 % 0.14
17.73 % 4.94
19.50 % 4.92
Amount
1 Rft 6.00
1 Pkt 0.21
1 Rft 28.66
68.12 % 34.87
1 Day 4.80
3.00 % 0.14
12.38 % 4.94
19.50 % 7.74
1 Rft 6.00
1 Pkt 0.21
1 Rft 73.77
70.13 % 79.98
1 Day 8.40
3.00 % 0.25
10.37 % 8.65
19.50 % 17.23
Amount
1 Rft 224.93
1 Pkt 14.00
1 Rft 946.06
1 No. 240.00
1 No. 40.00
74.57 % 1,464.99
1 Day 57.60
3.00 % 1.73
5.93 % 59.33
19.50 % 296.91
Amount
1 Rft 299.89
1 Rft 420.47
1 No. 40.00
1 No. 30.00
1 No. 65.01
72.90 % 855.37
1 Day 54.00
3.00 % 1.62
7.60 % 55.62
19.50 % 177.33
1 Rft 199.94
1 Rft 50.39
1 No. 40.00
1 No. 30.00
1 No. 30.00
1 No. 65.01
72.87 % 415.34
1 Day 26.40
3.00 % 0.79
7.63 % 27.19
19.50 % 86.14
Amount
1 Rft 449.85
1 Rft 946.06
1 No. 80.00
1 No. 80.00
1 No. 65.01
73.79 % 1,620.92
1 Day 81.60
3.00 % 2.45
6.71 % 84.05
19.50 % 331.99
Amount
Rft 1,548.32
Kg 3,825.00
No 7,000.00
Each 30.00
% 12,403.32
Day 960.00
% 28.80
% 988.80
% 2,605.85
Amount
No 50.00
No 50.00
Kg 55.83
% 155.83
Day 60.00
% 1.80
% 61.80
% 42.09
15.5.4
Amount
Each 35.00
% 35.00
Day 24.00
% 0.72
% 24.72
% 11.51
15.4.5
Amount
Each 70.00
% 70.00
Day 12.00
% 0.36
% 12.36
% 15.99
15.4.4
Amount
Each 30.00
% 30.00
Day 12.00
% 0.36
% 12.36
% 8.19
15.4.5
Amount
Each 30.00
% 30.00
Day 12.00
% 0.36
% 12.36
% 8.19
15.4.5
Amount
Each 200.00
% 200.00
Day 12.00
% 0.36
% 12.36
% 41.34
Amount
No 1,000.00
% 1,000.00
Day 48.00
% 1.44
% 49.44
% 204.36
Amount
No 3,000.00
% 3,000.00
Day 48.00
% 1.44
% 49.44
% 594.36
Amount
150.00
30.00
% 180.00
Day 60.00
% 1.80
% 61.80
% 46.80
Amount
200.00
30.00
% 230.00
Day 60.00
% 1.80
% 61.80
% 56.55
Amount
250.00
30.00
% 280.00
Day 60.00
% 1.80
% 61.80
% 66.30
Amount
No 500.00
No 30.00
% 530.00
Day 60.00
% 1.80
% 61.80
% 115.05
Amount
250.00
30.00
% 280.00
Day 60.00
% 1.80
% 61.80
% 66.30
Amount
850.00
30.00
% 880.00
Day 60.00
% 1.80
% 61.80
% 183.30
Amount
150.00
25.00
% 175.00
Day 60.00
% 1.80
% 61.80
% 45.83
Amount
No 250.00
% 250.00
Day 60.00
% 1.80
% 61.80
% 60.45
Amount
1,900.00
% 1,900.00
Day 150.00
% 4.50
% 154.50
% 399.75
Amount
Set 1,350.00
% 1,350.00
Day 120.00
% 3.60
% 123.60
% 286.65
Amount
Set 1,000.00
% 1,000.00
Day 120.00
% 3.60
% 123.60
% 218.40
Amount
Set 550.00
% 550.00
Day 90.00
% 2.70
% 92.70
% 124.80
Amount
No 60.00
No 550.00
% 610.00
Day 120.00
% 3.60
% 123.60
% 142.35
Amount
1 No 60.00
1 No 550.00
64.76 % 610.00
1 Day 120.00
3.00 % 3.60
15.74 % 123.60
19.50 % 142.35
Amount
No 60.00
No 550.00
% 610.00
Day 120.00
% 3.60
% 123.60
% 142.35
Amount
No 60.00
No 250.00
% 310.00
Day 300.00
% 9.00
% 309.00
% 118.95
Amount
No 60.00
No 300.00
% 360.00
Day 300.00
% 9.00
% 309.00
% 128.70
Amount
No 60.00
No 350.00
% 410.00
Day 300.00
% 9.00
% 309.00
% 138.45
Amount
No 1,850.00
No 40.00
No 950.00
% 2,840.00
Day 300.00
% 9.00
% 309.00
% 612.30
Amount
No 1,850.00
No 40.00
No 340.00
% 2,230.00
Day 300.00
% 9.00
% 309.00
% 493.35
Amount
No 1,850.00
No 40.00
No 2,800.00
% 4,690.00
Day 300.00
% 9.00
% 309.00
% 973.05
15.6.3 , 15.6.4
Amount
No 14,823.00
% 14,823.00
Day 36.00
% 1.08
% 37.08
% 2,897.51
Amount
No 920.00
% 920.00
Day 300.00
% 9.00
% 309.00
% 237.90
Amount
No 200.00
No 1,520.00
% 1,720.00
Day 300.00
% 9.00
% 309.00
% 393.90
Amount
Day 180.00
% 5.40
% 185.40
% 35.10
Amount
No 2,740.00
% 2,740.00
Day 150.00
% 4.50
% 154.50
% 563.55
Amount
No 3,400.00
% 3,400.00
Day 150.00
% 4.50
% 154.50
% 692.25
Amount
No 3,500.00
% 3,500.00
Day 150.00
% 4.50
% 154.50
% 711.75
Amount
Each 3,500.00
% 3,500.00
% 682.50
Amount
4,400.00
% 4,400.00
Day 75.00
% 2.25
% 77.25
% 872.63
Amount
7,000.00
% 7,000.00
Day 75.00
% 2.25
% 77.25
% 1,379.63
Amount
No 1,900.00
% 1,900.00
Day 120.00
% 3.60
% 123.60
% 393.90
Amount
No 2,566.00
% 2,566.00
Day 120.00
% 3.60
% 123.60
% 523.77
Amount
No 3,909.00
% 3,909.00
Day 120.00
% 3.60
% 123.60
% 785.66
Amount
Each 1,400.00
% 1,400.00
Day 75.00
% 2.25
% 77.25
% 287.63
Amount
No 2,400.00
% 2,400.00
Day 480.00
% 14.40
% 494.40
% 561.60
Amount
No 2,900.00
% 2,900.00
Day 480.00
% 14.40
% 494.40
% 659.10
Amount
No 6,200.00
% 6,200.00
Day 570.00
% 17.10
% 587.10
% 1,320.15
Amount
No 450.00
% 450.00
Day 90.00
% 2.70
% 92.70
% 105.30
Amount
No 450.00
% 450.00
Day 90.00
% 2.70
% 92.70
% 105.30
Amount
No 690.00
% 690.00
Day 90.00
% 2.70
% 92.70
% 152.10
Amount
1 No 690.00
68.56 % 690.00
1 Day 90.00
3.00 % 2.70
11.94 % 92.70
19.50 % 152.10
Amount
No 600.00
No 3,400.00
No 1,450.00
No 200.00
LS 50.00
No 400.00
% 6,100.00
Day 300.00
Day 900.00
% 36.00
% 1,236.00
% 1,423.50
Amount
No 600.00
No 3,400.00
No 1,450.00
No 200.00
LS 75.00
No 400.00
% 6,125.00
Day 300.00
Day 900.00
% 36.00
% 1,236.00
% 1,428.38
Amount
No 600.00
No 3,400.00
No 1,450.00
No 200.00
LS 75.00
No 400.00
% 6,125.00
Day 600.00
Day 1,500.00
% 63.00
% 2,163.00
% 1,603.88
Amount
No 600.00
No 3,400.00
No 1,450.00
No 200.00
LS 125.00
No 400.00
% 6,175.00
Day 750.00
Day 1,800.00
% 76.50
% 2,626.50
% 1,701.38
Amount
No 600.00
No 4,000.00
No 1,450.00
No 200.00
LS 150.00
No 400.00
% 6,800.00
Day 600.00
Day 2,400.00
% 90.00
% 3,090.00
% 1,911.00
Amount
No 160.00
% 160.00
Day 17.68
% 0.53
% 18.21
% 34.65
Amount
No 161.00
% 161.00
Day 17.68
% 0.53
% 18.21
% 34.84
Amount
No 179.00
% 179.00
Day 17.68
% 0.53
% 18.21
% 38.35
Amount
No 1,164.00
% 1,164.00
Day 48.00
% 1.44
% 49.44
% 236.34
Amount
No 30.00
kg 49.50
kg 175.00
% 254.50
Day 48.00
% 1.44
% 49.44
% 58.99
Amount
No. 60.00
kg 49.50
kg 350.00
% 459.50
Day 48.00
% 1.44
% 49.44
% 98.96
Amount
Rft 75.00
LS 2.30
No. 7.50
No. 3.30
No. 1.50
% 89.60
Day 5.40
Day 3.60
% 0.27
% 9.27
% 19.23
Amount
Each 2,033.00
% 2,033.00
Day 300.00
% 9.00
% 309.00
% 454.94
Amount
Each 2,033.00
% 2,033.00
Day 300.00
% 9.00
% 309.00
% 454.94
Amount
No 1,900.00
% 1,900.00
Day 300.00
% 9.00
% 309.00
% 429.00
Amount
No 500.00
% 500.00
Day 300.00
% 9.00
% 309.00
% 156.00
Amount
No 1,650.00
Sft 138.50
Rft 420.00
% 2,208.50
Day 300.00
Day 120.00
% 12.60
% 432.60
% 512.56
Amount
No 1,800.00
Sft 166.50
Rft 480.00
% 2,446.50
Day 300.00
Day 120.00
% 12.60
% 432.60
% 558.97
Amount
No 1,900.00
Sft 194.50
Rft 560.40
% 2,654.90
Day 120.00
Day 36.00
% 4.68
% 160.68
% 548.13
Amount
No 2,559.00
% 2,559.00
Day 36.00
% 1.08
% 37.08
% 506.03
Amount
No 3,909.12
% 3,909.12
Day 75.00
% 2.25
% 77.25
% 776.90
Amount
4,400.00
% 4,400.00
Day 75.00
% 2.25
% 77.25
% 872.63
Amount
Rft 8.00
% 8.00
Day 10.80
% 0.32
% 11.12
% 3.67
Amount
Rft 15.00
% 15.00
Day 10.80
% 0.32
% 11.12
% 5.03
Amount
Rft 25.00
% 25.00
Day 10.80
% 0.32
% 11.12
% 6.98
Amount
Rft 50.00
% 50.00
Day 10.80
% 0.32
% 11.12
% 11.86
Amount
No 1.80
RMtr 850.00
No 3.36
LS 3.05
% 858.21
Day 21.60
% 0.65
% 22.25
% 171.56
Amount
No 1.80
RMtr 1,100.00
No 3.36
LS 3.05
% 1,108.21
Day 21.60
% 0.65
% 22.25
% 220.31
15.4.7
Amount
No. 150.00
% 150.00
Day 48.00
% 1.44
% 49.44
% 38.61
15.4.6
Amount
No. 200.00
% 200.00
Day 24.00
% 0.72
% 24.72
% 43.68
15.4.6
Amount
No. 450.00
% 450.00
Day 120.00
% 3.60
% 123.60
% 111.15
15.4.6
Amount
No. 150.00
% 150.00
Day 24.00
% 0.72
% 24.72
% 33.93
15.6.4
Amount
No. 56.00
% 56.00
Day 60.00
% 1.80
% 61.80
% 22.62
Amount
No. 220.00
% 220.00
Day 75.60
% 2.27
% 77.87
% 57.64
Amount
Dose 8.34
Day 23.50
% 31.84
Day 13.20
% 0.40
% 13.60
% 8.78
Amount
Dose 100.00
Day 24.00
% 124.00
Day 13.20
% 0.40
% 13.60
% 26.75
Amount
Dose 8.34
No 51.00
% 59.34
Day 2.40
Day 19.20
% 0.65
% 22.25
% 15.78
Amount
Dose 8.34
No 97.00
% 105.34
Day 2.40
Day 21.60
% 0.72
% 24.72
% 25.22
Amount
Dose 8.34
No 210.00
% 218.34
Day 2.40
Day 32.40
% 1.04
% 35.84
% 49.36
Amount
Dose 8.34
No 420.00
% 428.34
Day 4.20
Day 37.20
% 1.24
% 42.64
% 91.60
Amount
Dose 8.34
No 655.00
% 663.34
Day 5.40
Day 43.20
% 1.46
% 50.06
% 138.83
Amount
Dose 8.34
No 460.00
% 468.34
Day 5.40
Day 43.20
% 1.46
% 50.06
% 100.80
Amount
Dose 8.34
No 475.00
% 483.34
Day 12.00
Day 48.00
% 1.80
% 61.80
% 105.95
Amount
No 77,500.00
Yard 3,000.00
No 2,500.00
Set 250.00
Ltr 2,200.00
% 85,450.00
Day 425.00
Day 600.00
% 30.75
% 1,055.75
% 16,862.63
Amount
1 No 77,500.00
1 Yard 3,000.00
1 No 2,500.00
1 Set 250.00
1 Ltr 2,200.00
1 No 650.00
% 86,100.00
Day 425.00
Day 600.00
% 30.75
% 1,055.75
% 16,989.38
Amount
1 No 91,500.00
1 Yard 3,000.00
1 No 2,500.00
1 Set 250.00
1 Ltr 2,200.00
1 No 650.00
% 100,100.00
Day 425.00
Day 600.00
% 30.75
% 1,055.75
% 19,719.38
Amount
No 91,500.00
Yard 3,000.00
No 2,500.00
Set 250.00
Ltr 2,200.00
% 99,450.00
Day 425.00
Day 600.00
% 30.75
% 1,055.75
% 19,592.63
15.6.6
Amount
No 26,730.00
% 26,730.00
Day 280.50
Day 396.00
% 20.30
% 696.80
Hour 1,756.18
% 1,756.18
% 5,686.72
15.6.6
Amount
No 20,124.00
% 20,124.00
Day 280.50
Day 396.00
% 20.30
% 696.80
Hour 1,756.18
% 1,756.18
% 4,398.55
15.6.6
Amount
No 23,070.00
% 23,070.00
Day 280.50
Day 396.00
% 20.30
% 696.80
Hour 1,756.18
% 1,756.18
% 4,973.02
15.6.6
Amount
No 16,663.00
% 16,663.00
Day 280.50
Day 396.00
% 20.30
% 696.80
Hour 1,756.18
% 1,756.18
% 3,723.66
Amount
Rft 440.00
% 440.00
Day 8.50
Day 12.00
% 0.62
% 21.12
% 89.80
Amount
Rft 183.00
% 183.00
Day 8.50
Day 12.00
% 0.62
% 21.12
% 39.68
Amount
Rft 93.00
% 93.00
Day 8.50
Day 12.00
% 0.62
% 21.12
% 22.13
Amount
Rft 152.00
% 152.00
Day 8.50
Day 12.00
% 0.62
% 21.12
% 33.64
Amount
Rft 76.00
% 76.00
Day 8.50
Day 12.00
% 0.62
% 21.12
% 18.82
Amount
No 2,495.00
% 2,495.00
Day 75.00
% 2.25
% 77.25
% 501.15
Amount
No 1,047.00
% 1,047.00
Day 75.00
% 2.25
% 77.25
% 218.79
Amount
No 540.00
% 540.00
Day 75.00
% 2.25
% 77.25
% 119.93
Amount
No 135.00
% 135.00
Day 36.00
% 1.08
% 37.08
% 33.35
Amount
No 170,000.00
% 170,000.00
Day 850.00
Day 1,200.00
% 61.50
% 2,111.50
Hour 1,756.18
% 1,756.18
% 33,892.21
Amount
No 280,000.00
% 280,000.00
Day 850.00
Day 1,200.00
% 61.50
% 2,111.50
Hour 1,756.18
% 1,756.18
% 55,342.21
Amount
No 380,000.00
% 380,000.00
Day 850.00
Day 1,200.00
% 61.50
% 2,111.50
Hour 1,756.18
% 1,756.18
% 74,842.21
Amount
No 860,412.00
% 860,412.00
Day 850.00
Day 1,200.00
% 61.50
% 2,111.50
Hour 1,756.18
% 1,756.18
% 168,522.55
Amount
No 7,916.00
% 7,916.00
Day 36.00
% 1.08
% 37.08
% 1,550.64
Amount
No 6,993.00
% 6,993.00
Day 36.00
% 1.08
% 37.08
% 1,370.66
15.2.10
Amount
No 1,472.00
% 1,472.00
Day 36.00
% 1.08
% 37.08
% 294.06
15.2.10
Amount
Kg 150.00
% 150.00
Day 36.00
% 1.08
% 37.08
% 36.27
Amount
No 164.00
% 164.00
Day 36.00
% 1.08
% 37.08
% 39.00
15.11.6
Amount
No 1,011.00
% 1,011.00
Day 212.50
Day 150.00
% 10.88
% 373.38
% 267.83
15.12.1
Kg
Amount
1 Kg 105.00
51.46 % 105.00
1 Day 53.13
3.00 % 1.59
29.04 % 54.72
19.50 % 30.83
Amount
8,000.00
% 8,000.00
Day 850.00
% 25.50
% 875.50
% 1,725.75
Amount
No 45,000.00
% 45,000.00
Day 425.00
Day 600.00
% 30.75
% 1,055.75
Hour 1,756.18
% 1,756.18
9,317.33
Amount
35,000.00
% 35,000.00
Day 24.00
% 0.72
% 24.72
% 6,829.68
15.18.8
Amount
1 No 6,100.00
% 6,100.00
Day 425.00
Day 600.00
% 30.75
% 1,055.75
% 1,389.38
25,000.00
% 25,000.00
Day 24.00
% 0.72
% 24.72
% 4,879.68
Amount
Job 102,500.00
% 102,500.00
Day 24.00
% 0.72
% 24.72
% 19,992.18
Amount
No 4,000.00
% 4,000.00
Day 212.50
Day 300.00
% 15.38
% 527.88
% 879.94
Amount
No 26,000.00
% 26,000.00
Day 850.00
Day 1,200.00
% 61.50
% 2,111.50
% 5,469.75
Amount
90,000.00
% 90,000.00
Day 1,700.00
Day 2,400.00
% 123.00
% 4,223.00
% 18,349.50
Amount
No 600.00
% 600.00
Day 150.00
% 4.50
% 154.50
% 146.25
Amount
No 450.00
% 450.00
Day 50.04
% 1.50
% 51.54
% 97.51
Amount
No 11,000.00
% 11,000.00
Day 425.00
Day 600.00
% 30.75
% 1,055.75
Hour 1,756.18
% 1,756.18
% 2,687.33
Amount
No 10,000.00
% 10,000.00
Day 425.00
Day 600.00
% 30.75
% 1,055.75
Hour 878.09
% 878.09
% 2,321.10
Amount
No 8,500.00
% 8,500.00
Day 300.00
% 9.00
% 309.00
% 1,716.00
Amount
No 650.00
% 650.00
Day 150.00
% 4.50
% 154.50
% 156.00
Amount
No 300.00
% 300.00
Day 150.00
% 4.50
% 154.50
% 87.75
Amount
No 300.00
% 300.00
Day 150.00
% 4.50
% 154.50
% 87.75
Amount
No 350.00
% 350.00
Day 75.00
% 2.25
% 77.25
% 82.88
Amount
No 160.00
% 160.00
Day 75.00
% 2.25
% 77.25
% 45.83
Amount
No 145.00
% 145.00
Day 75.00
% 2.25
% 77.25
% 42.90
Amount
No 135.00
% 135.00
Day 36.00
% 1.08
% 37.08
% 33.35
Amount
No 125.00
% 125.00
Day 36.00
% 1.08
% 37.08
% 31.40
Amount
52,000.00
% 52,000.00
Day 1,275.00
Day 1,800.00
% 92.25
% 3,167.25
Hour 1,756.18
% 1,756.18
% 11,082.08
Amount
51,000.00
% 51,000.00
Day 1,275.00
Day 1,800.00
% 92.25
% 3,167.25
Hour 1,756.18
% 1,756.18
% 10,887.08
Amount
50,000.00
% 50,000.00
Day 1,275.00
Day 1,800.00
% 92.25
% 3,167.25
Hour 1,756.18
% 1,756.18
% 10,692.08
Amount
62,000.00
% 62,000.00
Day 1,275.00
Day 1,800.00
% 92.25
% 3,167.25
Hour 1,756.18
% 1,756.18
% 13,032.08
Amount
48,000.00
% 48,000.00
Day 1,275.00
Day 1,800.00
% 92.25
% 3,167.25
Hour 1,756.18
% 1,756.18
% 10,302.08
Amount
No 11,000.00
% 11,000.00
Day 150.00
% 4.50
% 154.50
% 2,174.25
Amount
No 4,288.00
% 4,288.00
Day 150.00
% 4.50
% 154.50
% 865.41
Amount
Rft 601.00
% 601.00
Day 300.00
% 9.00
% 309.00
% 175.70
Amount
m 376.00
% 376.00
Day 36.00
% 1.08
% 37.08
% 80.34
Amount
No 220.00
% 220.00
Day 24.00
% 0.72
% 24.72
% 47.58
Amount
No 207.00
% 207.00
Day 12.00
% 0.36
% 12.36
% 42.71
Amount
RMtr 455.00
% 455.00
Day 36.00
% 1.08
% 37.08
% 95.75
Amount
No 736.00
% 736.00
Day 72.00
% 2.16
% 74.16
% 157.56
Amount
No 976.00
% 976.00
Day 96.00
% 2.88
% 98.88
% 209.04
Amount
No 1,501.00
% 1,501.00
Day 108.00
% 3.24
% 111.24
% 313.76
Amount
No 1,950.00
% 1,950.00
Day 144.00
% 4.32
% 148.32
% 408.33
Amount
No 2,700.00
% 2,700.00
Day 156.00
% 4.68
% 160.68
% 556.92
Amount
No 3,983.00
% 3,983.00
Day 600.00
% 18.00
% 618.00
% 893.69
Amount
No 6,967.00
% 6,967.00
Day 900.00
% 27.00
% 927.00
% 1,534.07
Amount
No 8,200.00
% 8,200.00
Day 1,200.00
% 36.00
% 1,236.00
% 1,833.00
Amount
No 9,800.00
% 9,800.00
Day 1,200.00
% 36.00
% 1,236.00
% 2,145.00
Amount
No 17,000.00
% 17,000.00
Day 1,500.00
% 45.00
% 1,545.00
% 3,607.50
15.18.8
Amount
No 65.00
% 65.00
Day 8.40
% 0.25
% 8.65
% 14.31
15.18.8
Amount
No 60.00
% 60.00
Day 8.40
% 0.25
% 8.65
% 13.34
15.18.8
Amount
m 387.00
% 387.00
Day 9.60
% 0.29
% 9.89
% 77.34
15.18.8
Amount
m 185.00
% 185.00
Day 8.40
% 0.25
% 8.65
% 37.71
15.18.8
Amount
No 99.00
% 99.00
Day 8.40
% 0.25
% 8.65
% 20.94
Amount
1 No 432.56
71.55 % 432.56
1 Day 36.00
3.00 % 1.08
8.95 % 37.08
19.50 % 91.37
1 No 691.44
70.19 % 691.44
1 Day 72.00
3.00 % 2.16
10.31 % 74.16
19.50 % 148.87
Amount
1 No 1,372.11
71.85 % 1,372.11
1 Day 108.00
3.00 % 3.24
8.65 % 111.24
19.50 % 288.62
Cost Per Meter: 1,771.97
Cost Per Meter: 132.30
Amount
1 No 2,521.49
69.26 % 2,521.49
1 Day 300.00
3.00 % 9.00
11.24 % 309.00
19.50 % 550.19
% 4,880.00
Day 300.00
% 9.00
% 309.00
% 1,010.10
590.00
% 590.00
Day 24.00
% 0.72
% 24.72
% 119.73
670.00
% 670.00
Day 24.00
% 0.72
% 24.72
% 135.33
500.00
% 500.00
Day 36.00
% 1.08
% 37.08
% 104.52
710.00
% 710.00
Day 36.00
% 1.08
% 37.08
% 145.47
767.25
% 767.25
Day 48.00
% 1.44
% 49.44
% 158.97
958.25
% 958.25
Day 48.00
% 1.44
% 49.44
% 196.22
Amount
1,183.00
% 1,183.00
Day 75.00
% 2.25
% 77.25
% 245.31
720.00
% 720.00
Day 24.00
% 0.72
% 24.72
% 145.08
650.06
% 650.06
Day 24.00
% 0.72
% 24.72
% 131.44
970.10
% 970.10
Day 36.00
% 1.08
% 37.08
% 196.19
575.05
% 575.05
Day 36.00
% 1.08
% 37.08
% 119.15
1,482.45
% 1,482.45
Day 36.00
% 1.08
% 37.08
% 296.10
750.00
% 750.00
Day 36.00
% 1.08
% 37.08
% 153.27
1,040.00
% 1,040.00
Day 48.00
% 1.44
% 49.44
% 212.16
Amount
No 450.00
% 450.00
Day 48.00
% 1.44
% 49.44
% 97.11
Amount
No 510.00
% 510.00
Day 48.00
% 1.44
% 49.44
% 108.81
Amount
No 135.00
% 135.00
Day 48.00
% 1.44
% 49.44
% 35.69
Amount
Each 68.00
% 68.00
Day 12.00
% 0.36
% 12.36
% 15.60
Amount
Each 87.00
% 87.00
Day 12.00
% 0.36
% 12.36
% 19.31
Amount
Each 190.00
% 190.00
Day 24.00
% 0.72
% 24.72
% 41.73
Amount
Each 170.00
% 170.00
Day 24.00
% 0.72
% 24.72
% 37.83
Amount
Each 225.00
% 225.00
Day 24.00
% 0.72
% 24.72
% 48.56
Amount
3,547.76
% 3,547.76
Day 150.00
% 4.50
% 154.50
% 721.06
Amount
No 68,451.76
% 68,451.76
Day 300.00
% 9.00
% 309.00
% 13,406.59
15.16.3
Amount
No 136,903.52
% 136,903.52
Day 300.00
% 9.00
% 309.00
% 26,754.69
Amount
Each 45,000.00
% 45,000.00
Day 600.00
% 18.00
% 618.00
% 8,892.00
Amount
No 63,703.52
% 63,703.52
Day 600.00
% 18.00
% 618.00
% 12,539.19
15.16.4
Amount
No 15,850.00
% 15,850.00
Day 300.00
% 9.00
% 309.00
% 3,149.25
15.16.4
Amount
No 15,850.00
% 15,850.00
Day 300.00
% 9.00
% 309.00
% 3,149.25
Amount
No 63,665.09
% 63,665.09
Day 300.00
% 9.00
% 309.00
% 12,473.19
15.16.7
Amount
No 1,916.01
% 1,916.01
Day 150.00
% 4.50
% 154.50
% 402.87
15.16.7
Amount
No 41,702.65
% 41,702.65
Day 150.00
% 4.50
% 154.50
% 8,161.27
15.16.7
Amount
No 4,910.38
% 4,910.38
Day 150.00
% 4.50
% 154.50
% 986.77
15.16.7
Amount
No 18,720.00
% 18,720.00
Day 150.00
% 4.50
% 154.50
% 3,679.65
Amount
70.00
% 70.00
Day 3.60
% 0.11
% 3.71
% 14.35
3,000.00
% 3,000.00
Day 75.00
% 2.25
% 77.25
% 599.63
Amount
4,472.98
% 4,472.98
Day 212.50
Day 300.00
% 15.38
% 527.88
% 972.17
7,235.06
% 7,235.06
Day 150.00
% 4.50
% 154.50
% 1,440.09
14,371.14
% 14,371.14
Day 150.00
% 4.50
% 154.50
% 2,831.62
Amount
10,727.05
% 10,727.05
Day 150.00
% 4.50
% 154.50
% 2,121.02
Amount
No 6,400.00
% 6,400.00
Day 150.00
% 4.50
% 154.50
% 1,277.25
Amount
No 10,850.00
% 10,850.00
Day 150.00
% 4.50
% 154.50
% 2,145.00
Amount
263,030.78
% 263,030.78
Day 150.00
% 4.50
% 154.50
% 51,320.25
75,000.00
% 75,000.00
Day 150.00
% 4.50
% 154.50
% 14,654.25
Amount
No 57,193.14
% 57,193.14
Day 150.00
% 4.50
% 154.50
% 11,181.91
15.16.4 ,
15.16.5
Amount
No 10,414.22
% 10,414.22
Day 150.00
% 4.50
% 154.50
% 2,060.02
Amount
No 6,750.00
% 6,750.00
Day 150.00
% 4.50
% 154.50
% 1,345.50
Amount
No 2,521.13
% 2,521.13
Day 106.25
Day 150.00
% 7.69
% 263.94
% 541.59
Amount
No 3,000.00
% 3,000.00
Day 106.25
Day 150.00
% 7.69
% 263.94
% 634.97
Amount
No 1,890.39
% 1,890.39
Day 106.25
Day 150.00
% 7.69
% 263.94
% 418.59
Amount
No 2,000.00
% 2,000.00
Day 106.25
Day 150.00
% 7.69
% 263.94
% 439.97
Amount
No 1,290.15
% 1,290.15
Day 106.25
Day 150.00
% 7.69
% 263.94
% 301.55
Amount
No 285,794.16
% 285,794.16
Day 3,600.00
% 108.00
% 3,708.00
56,431.86
Amount
64,290.95
% 64,290.95
Day 2,550.00
Day 3,600.00
% 184.50
% 6,334.50
% 13,735.99
Amount
4,384.07
% 4,384.07
Day 600.00
% 18.00
% 618.00
% 971.89
Amount
4,384.07
% 4,384.07
Day 600.00
% 18.00
% 618.00
% 971.89
Amount
No 57,153.95
% 57,153.95
Day 36.00
% 1.08
% 37.08
% 11,152.04
Amount
17,189.19
% 17,189.19
Day 850.00
Day 1,200.00
% 61.50
% 2,111.50
% 3,751.64
Amount
92,930.45
% 92,930.45
Day 850.00
Day 1,200.00
% 61.50
% 2,111.50
% 18,521.19
Amount
50,000.00
% 50,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 9,984.00
Amount
142,797.95
% 142,797.95
Day 1,700.00
Day 2,400.00
% 123.00
% 4,223.00
% 28,645.10
72.00
% 72.00
Day 75.00
% 2.25
% 77.25
% 28.67
Amount
Each 18,000.00
% 18,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 3,744.00
Amount
1 Each 65,000.00
73.43 % 65,000.00
1 Day 3,600.00
3.00 % 108.00
7.07 % 3,708.00
19.50 % 13,377.00
No 6,000.00
% 6,000.00
Day 600.00
% 18.00
% 618.00
% 1,287.00
Amount
No 15,000.00
% 15,000.00
Day 600.00
% 18.00
% 618.00
% 3,042.00
Amount
No 22,000.00
% 22,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 4,524.00
Amount
No 70,000.00
% 70,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 13,884.00
Amount
125,000.00
% 125,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 24,609.00
Amount
No 19,500.00
% 19,500.00
Day 1,200.00
% 36.00
% 1,236.00
% 4,036.50
Amount
19,500.00
% 19,500.00
Day 1,200.00
% 36.00
% 1,236.00
% 4,036.50
Amount
Rft 70.00
% 70.00
Day 75.00
% 2.25
% 77.25
% 28.28
500.00
% 500.00
Day 12.00
% 0.36
% 12.36
% 99.84
550.00
% 550.00
Day 12.00
% 0.36
% 12.36
% 109.59
Amount
No 530.00
% 530.00
Day 37.56
% 1.13
% 38.69
% 110.67
Amount
155.00
% 155.00
Day 12.00
% 0.36
% 12.36
% 32.57
Amount
9,400.00
% 9,400.00
Day 150.00
% 4.50
% 154.50
% 1,862.25
Amount
500.00
% 500.00
Day 36.00
% 1.08
% 37.08
% 104.52
Amount
No 550.00
% 550.00
Day 36.00
% 1.08
% 37.08
% 114.27
Amount
400,000.00
% 400,000.00
Day 8,400.00
% 252.00
% 8,652.00
% 79,638.00
1,275,000.00
% 1,275,000.00
Day 8,500.00
Day 12,000.00
% 615.00
% 21,115.00
% 252,622.50
Amount
No 21,500.00
% 21,500.00
Day 1,200.00
% 36.00
% 1,236.00
% 4,426.50
Amount
No 42,300.00
% 42,300.00
Day 1,200.00
% 36.00
% 1,236.00
% 8,482.50
Amount
No 17,500.00
% 17,500.00
Day 150.00
% 4.50
% 154.50
% 3,441.75
Amount
No 650.00
% 650.00
Day 75.00
% 2.25
% 77.25
% 141.38
Amount
No 4,200.00
% 4,200.00
Day 75.00
% 2.25
% 77.25
% 833.63
Amount
No 95,000.00
% 95,000.00
Day 2,400.00
% 72.00
% 2,472.00
% 18,993.00
Amount
Rft 35.00
% 35.00
Day 2.40
% 0.07
% 2.47
% 7.29
Amount
Yard 50.00
% 50.00
Day 30.00
% 0.90
% 30.90
% 15.60
Amount
Yard 100.00
% 100.00
Day 30.00
% 0.90
% 30.90
% 25.35
Amount
Each 2,500.00
% 2,500.00
Day 75.00
% 2.25
% 77.25
% 502.13
650.00
% 650.00
Day 75.00
% 2.25
% 77.25
% 141.38
Amount
Each 370.00
% 370.00
Day 30.00
% 0.90
% 30.90
% 78.00
Amount
42,500.00
% 42,500.00
Day 1,200.00
% 36.00
% 1,236.00
% 8,521.50
Amount
No 21,800.00
% 21,800.00
Day 850.00
Day 1,200.00
% 61.50
% 2,111.50
% 4,650.75
Amount
21,800.00
% 21,800.00
Day 1,200.00
% 36.00
% 1,236.00
% 4,485.00
Amount
16,750.00
% 16,750.00
Day 36.00
% 1.08
% 37.08
% 3,273.27
Amount
18,800.00
% 18,800.00
Day 360.00
% 10.80
% 370.80
% 3,736.20
Amount
350,000.00
% 350,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 68,484.00
70,000.00
% 70,000.00
Day 360.00
% 10.80
% 370.80
% 13,720.20
65,000.00
% 65,000.00
Day 360.00
% 10.80
% 370.80
% 12,745.20
Amount
No 350,000.00
% 350,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 68,484.00
Amount
No 18,800.00
% 18,800.00
Day 1,200.00
% 36.00
% 1,236.00
% 3,900.00
Amount
95.00
% 95.00
Day 1.20
% 0.04
% 1.24
% 18.76
15.20.6
Amount
Each 45,000.00
% 45,000.00
Day 360.00
% 10.80
% 370.80
% 8,845.20
Amount
No 20,500.00
% 20,500.00
Day 1,200.00
% 36.00
% 1,236.00
% 4,231.50
Amount
35,000.00
% 35,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 7,059.00
Amount
32,000.00
% 32,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 6,474.00
Amount
300,000.00
% 300,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 58,734.00
3,627.67
% 3,627.67
Day 72.00
% 2.16
% 74.16
% 721.44
7,482.87
% 7,482.87
Day 150.00
% 4.50
% 154.50
% 1,488.41
Amount
No 4,055.89
% 4,055.89
Day 300.00
% 9.00
% 309.00
% 849.40
Amount
No 531.16
% 531.16
Day 24.00
% 0.72
% 24.72
% 108.26
Amount
No 1,500.00
% 1,500.00
Day 24.00
% 0.72
% 24.72
% 297.18
Amount
No 1,273.07
% 1,273.07
Day 72.00
% 2.16
% 74.16
% 262.29
Amount
No 2,101.30
% 2,101.30
Day 72.00
% 2.16
% 74.16
% 423.79
Amount
480.00
% 480.00
Day 28.80
% 0.86
% 29.66
% 99.22
530.00
% 530.00
Day 36.00
% 1.08
% 37.08
% 110.37
50,000.00
% 50,000.00
Day 3,600.00
% 108.00
% 3,708.00
% 10,452.00
Amount
20.00
% 20.00
Day 8.40
% 0.25
% 8.65
% 5.54
Amount
40.00
% 40.00
Day 12.00
% 0.36
% 12.36
% 10.14
Amount
60.00
% 60.00
Day 12.00
% 0.36
% 12.36
% 14.04
Amount
80.00
% 80.00
Day 12.00
% 0.36
% 12.36
% 17.94
Amount
100.00
% 100.00
Day 12.00
% 0.36
% 12.36
% 21.84
Amount
300.00
% 300.00
Day 8.40
% 0.25
% 8.65
% 60.14
Mtr 90.00
% 90.00
Day 10.80
% 0.32
% 11.12
% 19.66
Mtr 120.00
% 120.00
Day 10.80
% 0.32
% 11.12
% 25.51
Mtr 180.00
% 180.00
Day 10.80
% 0.32
% 11.12
% 37.21
Mtr 250.00
% 250.00
Day 10.80
% 0.32
% 11.12
% 50.86
No 40.00
% 40.00
Day 8.40
% 0.25
% 8.65
% 9.44
Amount
100,102.22
% 100,102.22
Day 850.00
Day 1,200.00
% 61.50
% 2,111.50
% 19,919.68
Amount
No 1,743.84
% 1,743.84
Day 12.00
% 0.36
% 12.36
% 342.39
Amount
No 75,000.00
% 75,000.00
Day 300.00
% 9.00
% 309.00
% 14,683.50
150,000.00
% 150,000.00
Day 300.00
% 9.00
% 309.00
% 29,308.50
Amount
4,682.97
% 4,682.97
Day 600.00
% 18.00
% 618.00
% 1,030.18
Amount
321.47
% 321.47
Day 53.13
% 1.59
% 54.72
% 73.05
Amount
2,012.39
% 2,012.39
Day 17.00
% 0.51
% 17.51
% 395.73
Amount
1,725.69
% 1,725.69
Day 17.00
% 0.51
% 17.51
% 339.82
16,000.00
% 16,000.00
Day 300.00
% 9.00
% 309.00
% 3,178.50
Amount
No 876.00
% 876.00
Day 24.00
% 0.72
% 24.72
% 175.50
Amount
No 1,593.00
% 1,593.00
Day 24.00
% 0.72
% 24.72
% 315.32
Amount
1,433.00
% 1,433.00
Day 24.00
% 0.72
% 24.72
% 284.12
Amount
No 650.00
% 650.00
Day 24.00
% 0.72
% 24.72
% 131.43
Amount
No 550.00
% 550.00
Day 24.00
% 0.72
% 24.72
% 111.93
Amount
No 750.00
% 750.00
Day 24.00
% 0.72
% 24.72
% 150.93
Amount
No 790.00
% 790.00
Day 24.00
% 0.72
% 24.72
% 158.73
Amount
No 750.00
% 750.00
Day 24.00
% 0.72
% 24.72
% 150.93
Amount
900.00
% 900.00
Day 24.00
% 0.72
% 24.72
% 180.18
Amount
116.00
% 116.00
Day 24.00
% 0.72
% 24.72
% 27.30
Amount
131.00
% 131.00
Day 24.00
% 0.72
% 24.72
% 30.23
Amount
176.00
% 176.00
Day 24.00
% 0.72
% 24.72
% 39.00
Amount
170.00
% 170.00
Day 24.00
% 0.72
% 24.72
% 37.83
Amount
M 500.00
% 500.00
Day 24.00
% 0.72
% 24.72
% 102.18
Amount
30,000.00
% 30,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 6,084.00
Amount
220,000.00
% 220,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 43,134.00
Amount
575,000.00
% 575,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 112,359.00
No 75,000.00
% 75,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 14,859.00
No 85,000.00
% 85,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 16,809.00
No 85,000.00
% 85,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 16,809.00
No 75,000.00
% 75,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 14,859.00
No 85,000.00
% 85,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 16,809.00
No 75,000.00
% 75,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 14,859.00
No 850,000.00
% 850,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 165,984.00
No 75,000.00
% 75,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 14,859.00
No 85,000.00
% 85,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 16,809.00
Amount
No 75,000.00
% 75,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 14,859.00
Amount
No 85,000.00
% 85,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 16,809.00
No 75,000.00
% 75,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 14,859.00
No 85,000.00
% 85,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 16,809.00
300,000.00
% 300,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 58,734.00
Amount
1 No 6,500.00
% 6,500.00
Day 150.00
% 4.50
% 154.50
% 1,296.75
Amount
Rft 36.00
% 36.00
Day 3.00
% 0.09
% 3.09
% 7.61
Amount
Rft 65.00
% 65.00
Day 6.00
% 0.18
% 6.18
% 13.85
Amount
No 2,400.00
% 2,400.00
Day 150.00
% 4.50
% 154.50
% 497.25
Amount
No 65,000.00
% 65,000.00
Day 150.00
% 4.50
% 154.50
% 12,704.25
Amount
No 800.00
% 800.00
Day 75.60
% 2.27
% 77.87
% 170.74
Amount
No 15.00
% 15.00
Day 12.00
% 0.36
% 12.36
% 5.27
Amount
2,676.00
% 2,676.00
Day 1,200.00
% 36.00
% 1,236.00
% 755.82
Amount
35,000.00
% 35,000.00
Day 75.00
% 2.25
% 77.25
% 6,839.63
Amount
250.00
% 250.00
Day 30.00
% 0.90
% 30.90
% 54.60
Amount
Each 1,400.00
% 1,400.00
Day 30.00
% 0.90
% 30.90
% 278.85
Amount
Each 1,200.00
% 1,200.00
Day 30.00
% 0.90
% 30.90
% 239.85
Amount
Each 1,000.00
% 1,000.00
Day 30.00
% 0.90
% 30.90
% 200.85
Amount
Each 800.00
% 800.00
Day 30.00
% 0.90
% 30.90
% 161.85
Amount
Each 750.00
% 750.00
Day 30.00
% 0.90
% 30.90
% 152.10
Amount
Each 600.00
% 600.00
Day 30.00
% 0.90
% 30.90
% 122.85
Amount
Each 500.00
% 500.00
Day 30.00
% 0.90
% 30.90
% 103.35
Amount
Each 1,500.00
% 1,500.00
Day 150.00
% 4.50
% 154.50
% 321.75
15.5.1
Amount
Each 60.00
% 60.00
Day 30.00
% 0.90
% 30.90
% 17.55
Amount
Each 750.00
% 750.00
Day 30.00
% 0.90
% 30.90
% 152.10
Amount
Each 300.00
% 300.00
Day 30.00
% 0.90
% 30.90
% 64.35
Amount
Each 100.00
% 100.00
Day 30.00
% 0.90
% 30.90
% 25.35
Amount
Each 370.00
% 370.00
Day 30.00
% 0.90
% 30.90
% 78.00
Amount
Each 370.00
% 370.00
Day 30.00
% 0.90
% 30.90
% 78.00
Amount
Each 400.00
% 400.00
Day 30.00
% 0.90
% 30.90
% 83.85
Amount
Each 200.00
% 200.00
Day 30.00
% 0.90
% 30.90
% 44.85
Amount
Each 5,000.00
% 5,000.00
Day 150.00
% 4.50
% 154.50
% 1,004.25
Amount
95.00
% 95.00
Day 150.00
% 4.50
% 154.50
% 47.78
Amount
35,000.00
% 35,000.00
Day 150.00
% 4.50
% 154.50
% 6,854.25
Amount
No 650.00
% 650.00
Day 150.00
% 4.50
% 154.50
% 156.00
Amount
Each 35.00
% 35.00
Day 60.00
% 1.80
% 61.80
% 18.53
Amount
Each 45.00
% 45.00
Day 60.00
% 1.80
% 61.80
% 20.48
Amount
Each 50.00
% 50.00
Day 60.00
% 1.80
% 61.80
% 21.45
Amount
Each 65.00
% 65.00
Day 24.00
% 0.72
% 24.72
% 17.36
Amount
Each 45.00
% 45.00
Day 24.00
% 0.72
% 24.72
% 13.46
15.2.4
Amount
Each 40.00
% 40.00
Day 48.00
% 1.44
% 49.44
% 17.16
Amount
Each 180.00
% 180.00
Day 30.00
% 0.90
% 30.90
% 40.95
Amount
Each 20.00
% 20.00
Day 12.00
% 0.36
% 12.36
% 6.24
Amount
Each 80.00
% 80.00
Day 30.00
% 0.90
% 30.90
% 21.45
Amount
Each 30.00
% 30.00
% 5.85
Amount
Each 420.00
% 420.00
Day 30.00
% 0.90
% 30.90
% 87.75
Amount
Each 50.00
% 50.00
Day 24.00
% 0.72
% 24.72
% 14.43
Amount
Each 35.00
% 35.00
Day 24.00
% 0.72
% 24.72
% 11.51
Amount
Each 180.00
% 180.00
Day 24.00
% 0.72
% 24.72
% 39.78
Amount
Each 700.00
% 700.00
Day 24.00
% 0.72
% 24.72
% 141.18
Amount
Each 6,000.00
% 6,000.00
Day 24.00
% 0.72
% 24.72
% 1,174.68
Amount
No 2,500.00
% 2,500.00
Day 30.00
% 0.90
% 30.90
% 493.35
Amount
No 4,000.00
% 4,000.00
Day 30.00
% 0.90
% 30.90
% 785.85
Amount
No 5,000.00
% 5,000.00
Day 30.00
% 0.90
% 30.90
% 980.85
Amount
No 2,500.00
% 2,500.00
Day 30.00
% 0.90
% 30.90
% 493.35
Amount
No 4,000.00
% 4,000.00
Day 30.00
% 0.90
% 30.90
% 785.85
Amount
No 5,000.00
% 5,000.00
Day 30.00
% 0.90
% 30.90
% 980.85
Amount
140.00
% 140.00
Day 30.00
% 0.90
% 30.90
% 33.15
Amount
200.00
% 200.00
Day 30.00
% 0.90
% 30.90
% 44.85
Amount
M 2,000.00
% 2,000.00
Day 30.00
% 0.90
% 30.90
% 395.85
Amount
M 3,500.00
% 3,500.00
Day 30.00
% 0.90
% 30.90
% 688.35
Amount
No 2,000.00
% 2,000.00
Day 24.00
% 0.72
% 24.72
% 394.68
Amount
No 3,000.00
% 3,000.00
Day 24.00
% 0.72
% 24.72
% 589.68
Amount
No 6,000.00
% 6,000.00
Day 24.00
% 0.72
% 24.72
% 1,174.68
Amount
No 9,000.00
% 9,000.00
Day 24.00
% 0.72
% 24.72
% 1,759.68
No 10,000.00
% 10,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 2,184.00
Amount
No 8,000.00
% 8,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 1,794.00
Amount
No 7,500.00
% 7,500.00
Day 1,200.00
% 36.00
% 1,236.00
% 1,696.50
Amount
No 5,000.00
% 5,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 1,209.00
Amount
No 8,000.00
% 8,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 1,794.00
Amount
No 7,500.00
% 7,500.00
Day 1,200.00
% 36.00
% 1,236.00
% 1,696.50
Amount
No 6,500.00
% 6,500.00
Day 1,200.00
% 36.00
% 1,236.00
% 1,501.50
Amount
No 6,000.00
% 6,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 1,404.00
Amount
1 No 5,000.00
62.50 % 5,000.00
1 Day 1,200.00
3.00 % 36.00
18.00 % 1,236.00
19.50 % 1,209.00
No 7,000.00
% 7,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 1,599.00
Amount
No 6,800.00
% 6,800.00
Day 1,200.00
% 36.00
% 1,236.00
% 1,560.00
Amount
No 6,500.00
% 6,500.00
Day 1,200.00
% 36.00
% 1,236.00
% 1,501.50
Amount
No 6,000.00
% 6,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 1,404.00
Amount
No 5,000.00
% 5,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 1,209.00
Amount
No 3,000.00
% 3,000.00
Day 600.00
% 18.00
% 618.00
% 702.00
Amount
1 No 1,500.00
% 1,500.00
Day 600.00
% 18.00
% 618.00
% 409.50
Amount
No 750.00
% 750.00
Day 75.00
% 2.25
% 77.25
% 160.88
Amount
No 750.00
% 750.00
Day 75.00
% 2.25
% 77.25
% 160.88
Amount
No 3,000.00
% 3,000.00
Day 300.00
% 9.00
% 309.00
% 643.50
Amount
No 1,000.00
% 1,000.00
Day 300.00
% 9.00
% 309.00
% 253.50
Amount
No 1,500.00
% 1,500.00
Day 600.00
% 18.00
% 618.00
% 409.50
Amount
No 1,000.00
% 1,000.00
Day 300.00
% 9.00
% 309.00
% 253.50
Amount
No 1,500.00
% 1,500.00
Day 600.00
% 18.00
% 618.00
% 409.50
Amount
No 1,000.00
% 1,000.00
Day 300.00
% 9.00
% 309.00
% 253.50
Amount
No 1,500.00
% 1,500.00
Day 600.00
% 18.00
% 618.00
% 409.50
Amount
Day 8.84
% 0.27
% 9.11
% 60.22
Amount
No 150,000.00
% 150,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 29,484.00
Amount
No 285,000.00
% 285,000.00
Day 1,200.00
% 36.00
% 1,236.00
% 55,809.00
Amount
No 5,000.00
% 5,000.00
Day 600.00
% 18.00
% 618.00
% 1,092.00
Amount
No 6,000.00
% 6,000.00
Day 600.00
% 18.00
% 618.00
% 1,287.00
Amount
No 8,000.00
% 8,000.00
Day 600.00
% 18.00
% 618.00
% 1,677.00
Amount
No 10,000.00
% 10,000.00
Day 600.00
% 18.00
% 618.00
% 2,067.00
Amount
No 25,000.00
% 25,000.00
Day 300.00
% 9.00
% 309.00
% 4,933.50
Amount
No 25,000.00
% 25,000.00
Day 250.00
% 7.50
% 257.50
% 4,923.75
Amount
No 20,000.00
% 20,000.00
Day 250.00
% 7.50
% 257.50
% 3,948.75
Amount
No 15,000.00
% 15,000.00
Day 250.00
% 7.50
% 257.50
% 2,973.75
Amount
Each 150.00
% 150.00
Day 72.00
% 2.16
% 74.16
% 43.29
16.3.1
Amount
572.00
13,365.00
% 13,937.00
Day 600.00
Day 600.00
Day 600.00
% 54.00
% 1,854.00
% 3,068.72
Amount
2,170.00
% 2,170.00
Day 600.00
% 18.00
% 618.00
Hour 87.13
Hour 8.40
Hour 107.80
% 203.33
% 579.80
16.3.5
Amount
407.50
2,975.00
% 3,382.50
Day 613.56
% 18.41
% 631.97
Hour 190.33
Hour 139.66
Hour 113.52
Hour 49.19
% 492.70
% 875.31
16.3.1
Amount
1,968.75
% 1,968.75
Day 600.00
Day 300.00
% 27.00
% 927.00
Hour 338.10
Job 47.60
Hour 8.40
Hour 107.80
% 501.90
% 657.28
16.3.1
Amount
4,250.00
% 4,250.00
Day 360.00
Day 180.00
% 16.20
% 556.20
Hour 62.79
Job 47.60
Hour 23.52
Hour 120.74
% 254.65
% 983.71
16.3.2
Amount
4,625.00
% 4,625.00
Day 900.00
Day 450.00
% 40.50
% 1,390.50
Hour 62.79
Hour 188.76
each 47.60
Hour 16.80
Hour 172.48
% 488.43
% 1,260.37
16.3.6
Amount
512.60
4,487.50
% 5,000.10
Day 360.00
Day 180.00
% 16.20
% 556.20
Hour 188.76
Each 47.60
Hour 86.90
Hour 59.43
% 382.69
% 1,154.94
Amount
Day 600.00
Day 600.00
% 36.00
% 1,236.00
% 1,019.58
Amount
Bag 165.00
137.73
ft 3,276.88
141.95
160.19
No 738.00
% 4,619.74
Day 80.40
Day 120.60
% 6.03
% 207.03
Hour 170.54
Hour 78.71
Hour 33.31
% 282.56
% 995.14
Amount
96.80
11.44
30.25
32,600.00
1,050.00
% 33,788.49
Day 850.00
% 25.50
% 875.50
% 6,754.51
16.4.3
Amount
Kg 25.00
Kg 476.75
Ltr 817.44
% 1,319.19
Day 120.00
% 3.60
% 123.60
Hour 14.88
Hour 13.73
% 28.61
% 286.22
16.4.4
Amount
Kg 23.32
Kg 238.29
% 261.61
Day 120.00
% 3.60
% 123.60
Hour 7.44
Hour 27.60
% 35.04
% 81.25
16.4.5
Amount
Kg 1,745.91
209.25
% 1,955.16
Day 14.16
% 0.42
% 14.58
Hour 90.75
Hour 18.81
Hour 16.01
% 125.57
% 408.50
16.4.5
Amount
Kg 2,454.70
288.60
% 2,743.30
Day 14.16
% 0.42
% 14.58
Hour 180.29
Hour 29.04
Hour 24.71
% 234.04
% 583.34
16.4.5
Amount
Kg 3,271.23
328.24
% 3,599.47
Day 14.16
% 0.42
% 14.58
Hour 239.58
Hour 35.81
Hour 30.47
% 305.85
% 764.30
Amount
Kg 855.00
93.75
% 948.75
Day 48.00
Day 4.25
% 1.57
% 53.82
Hour 55.66
Hour 18.81
Hour 16.01
% 90.48
% 212.84
Amount
Kg 775.74
75.00
% 850.74
Day 48.00
Day 42.67
% 2.72
% 93.39
Hour 55.66
Hour 18.81
Hour 16.01
% 90.48
% 201.22
3.9.3
Amount
Day 45.30
% 1.36
% 46.66
Hour 752.26
Hour 2,312.49
Hour 1,812.30
% 4,877.06
% 959.86
16.4.13
Amount
141.96
375.43
Kg 82.31
Kg 2,034.05
Ltr 16.86
% 2,650.61
Day 180.00
Day 127.50
Day 42.00
% 10.49
% 359.99
Hour 133.10
Hour 137.50
% 270.60
% 637.79
16.4.13
Amount
213.62
564.93
Kg 13.03
Kg 3,050.64
Ltr 25.22
% 3,867.44
Day 255.00
Day 182.75
Day 63.00
% 15.02
% 515.77
Hour 187.55
Hour 193.75
% 381.30
% 926.15
16.4.13
Amount
283.92
750.86
Kg 17.15
Kg 4,068.09
Ltr 19.06
% 5,139.08
Day 330.00
Day 238.00
Day 84.00
% 19.56
% 671.56
Hour 242.00
Hour 250.00
% 492.00
% 1,225.20
Amount
4,916.34
20,915.01
25,831.35
339.78
240.72
169.92
22.51
772.93
47.60
12,414.46
% 12,462.06
% 7,613.55
Amount
4,916.34
26,143.76
31,060.10
339.78
240.72
169.92
22.51
772.93
47.60
12,414.46
% 12,462.06
% 8,633.15
Amount
Rft 52,600.00
% 52,600.00
Day 4,023.24
Day 12,000.00
Day 2,926.02
% 568.48
% 19,517.74
% 13,952.11
16.8.6 , 25.7.4
Amount
Kg 8,012.40
Ltr 1,604.88
Ft 61,792.50
Pkt 464.10
% 71,873.88
Day 1,098.00
Day 3,870.00
Day 2,400.00
Day 3,150.00
% 315.54
% 10,833.54
Hour 1,331.40
% 1,331.40
% 16,326.04
16.8.15
Amount
Bag 275.00
174.43
68.76
Tonne 976.00
Cft 5.60
Ltr 4.01
% 1,503.80
Day 426.00
Day 1,069.20
Day 206.40
Day 6.00
Day 64.60
Day 66.60
% 55.16
% 1,893.96
% 651.81
16.8.15
Amount
Bag 136.40
31.20
106.58
Tonne 54.90
Cft 16.96
Ltr 4.01
% 350.05
Day 166.80
Day 204.60
Day 62.40
Day 3.60
Day 38.00
Day 8.10
% 14.51
% 498.00
% 162.54
16.8.14
Amount
Bag 180.95
14.56
51.57
Tonne 646.60
Ltr 4.01
% 897.69
Day 122.40
Day 205.80
Day 24.00
Day 47.50
% 11.99
% 411.69
% 252.99
Amount
Bag 4,394.28
100 Cft 768.12
100 Cft 2,031.38
Kg 42,001.46
Kg 16,053.62
No 32.50
Ltr 316.96
% 65,598.31
Day 5,574.00
Day 1,868.40
Day 7,315.35
% 442.73
% 15,200.48
% 15,669.43
Amount
Kg 42,001.46
Kg 16,053.62
% 58,055.08
Day 1,587.06
Day 7,316.08
% 267.09
% 9,170.24
% 13,056.85
Bag 8,839.71
100 Cft 1,536.24
100 Cft 4,062.75
Kg 55,072.63
Kg 29,609.98
Pkt 153.15
% 99,274.47
Day 8,359.80
Day 3,344.40
Day 9,754.82
% 643.77
% 22,102.79
% 23,543.03
Amount
Kg 55,072.63
Kg 29,609.98
% 84,682.61
Day 1,780.62
Day 6,688.80
Day 9,754.82
% 546.73
% 18,770.96
% 20,066.84
16.8.7
Amount
Bag 586.68
Rft 37.45
No 8,220.00
1.85
1.68
% 8,847.66
Day 80.04
Day 340.02
Day 80.04
% 15.00
% 515.10
Hour 170.93
Hour 78.88
Hour 41.69
Hour 197.90
% 489.39
1,918.25
16.8.7
Amount
Bag 880.00
ft 184.31
No 8,540.00
97.86
88.99
% 9,791.16
Day 6.00
Day 5.10
Day 6.00
% 0.51
% 17.61
Hour 25.65
Hour 11.84
Hour 6.25
Hour 29.68
% 73.41
1,926.93
16.8.7
Amount
Bag 165.00
137.73
ft 3,276.88
No 16,600.00
141.95
160.19
% 20,481.74
Day 80.40
Day 1,200.00
Day 80.40
% 40.82
% 1,401.62
Hour 170.54
Hour 78.71
Hour 333.13
Hour 395.50
% 977.87
4,449.98
16.8.7
Amount
Bag 165.00
137.73
ft 3,276.88
No 34,600.00
141.95
160.19
% 38,481.74
Day 40.20
Day 240.00
Day 20.10
% 9.01
% 309.31
Hour 170.54
Hour 78.71
Hour 333.13
Hour 395.50
% 977.87
7,753.18
16.8.7
Amount
Kg 109,033.59
Kg 22,758.77
No 130.00
Ltr 1,524.64
100 Cft 1,893.44
% 135,340.44
Day 1,700.00
Day 2,100.00
Day 1,575.00
% 161.25
% 5,536.25
% 27,439.51
16.8.7
Amount
Kg 249,480.00
Kg 45,517.55
No 130.00
Ltr 3,049.27
100 Cft 2,958.50
% 301,135.32
Day 1,590.00
Day 2,400.00
Day 2,100.00
% 182.70
% 6,272.70
% 59,908.94
16.8.7
Amount
Kg 358,513.22
Kg 68,276.33
No 130.00
Ltr 4,573.91
4,260.24
% 435,753.69
Day 1,650.00
Day 2,700.00
Day 2,362.50
% 201.38
% 6,913.88
% 86,280.91
Amount
Kg 65,667.86
Kg 19,913.93
No 130.00
Ltr 1,524.64
100 Cft 1,893.44
% 89,129.87
Day 1,487.50
Day 1,800.00
Day 1,575.00
% 145.88
% 5,008.38
% 18,328.51
Amount
Sft 52,200.00
% 52,200.00
Day 1,579.39
% 47.38
% 1,626.77
% 10,486.98
Amount
Sft 32,600.00
% 32,600.00
Day 1,579.39
% 47.38
% 1,626.77
% 6,664.98
Amount
Sft 19,800.00
% 19,800.00
Day 1,579.39
% 47.38
% 1,626.77
% 4,168.98
16.8.12
Amount
Each 250.00
% 250.00
Day 210.00
% 6.30
% 216.30
% 89.70
16.8.12
Amount
No 336.00
% 336.00
Day 210.00
% 6.30
% 216.30
% 106.47
Amount
No 444.00
% 444.00
Day 54.00
% 1.62
% 55.62
% 97.11
Amount
No 458.00
% 458.00
Day 54.00
% 1.62
% 55.62
% 99.84
Amount
No 361.00
% 361.00
Day 54.00
% 1.62
% 55.62
% 80.93
Amount
No 370.00
% 370.00
Day 54.00
% 1.62
% 55.62
% 82.68
Amount
No 234.00
% 234.00
Day 54.00
% 1.62
% 55.62
% 56.16
Amount
No 240.00
% 240.00
Day 54.00
% 1.62
% 55.62
% 57.33
Amount
No 458.00
% 458.00
Day 54.00
% 1.62
% 55.62
% 99.84
16.8.12
Amount
No 400.00
% 400.00
Day 26.61
% 0.80
% 27.40
% 83.19
16.8.12
Amount
No 425.00
% 425.00
Day 26.61
% 0.80
% 27.40
% 88.06
16.8.12
Amount
No 375.00
% 375.00
Day 26.61
% 0.80
% 27.40
% 78.31
16.8.12
Amount
No 400.00
% 400.00
Day 26.61
% 0.80
% 27.40
% 83.19
16.8.10
Amount
No 300.00
% 300.00
Day 26.61
% 0.80
% 27.40
% 63.69
16.8.10
Amount
No 325.00
% 325.00
Day 26.61
% 0.80
% 27.40
% 68.56
16.8.10
Amount
No 275.00
% 275.00
Day 26.61
% 0.80
% 27.40
% 58.81
16.8.10
Amount
No 325.00
% 325.00
Day 26.61
% 0.80
% 27.40
% 68.56
Amount
Day 1,200.00
Day 1,590.00
% 83.70
% 2,873.70
Hour 52.50
Hour 375.00
% 427.50
% 3,441.65
16.5.2.2.3
100 Sft
Amount
1 Sft 2,681.80
75.99 % 2,681.80
1 Day 53.13
3.00 % 1.59
4.51 % 54.72
19.50 % 533.31
Amount
1,793.40
% 1,793.40
Day 1,200.00
% 36.00
% 1,236.00
Hour 21.76
Hour 11.89
Hour 84.90
% 118.55
% 606.83
16.7.2
Amount
Bag 2,612.50
639.86
Rft 31,600.00
% 34,852.36
Day 1,828.80
Day 1,417.32
% 97.38
% 3,343.50
Hour 2,705.57
Hour 952.50
Hour 3,734.65
Hour 4,724.40
% 12,117.13
% 9,792.04
16.7.2
Amount
Bag 3,734.50
843.70
Rft 36,800.00
% 41,378.20
Day 1,860.00
Day 1,590.00
% 103.50
% 3,553.50
Hour 2,705.57
Hour 952.50
Hour 3,811.92
Hour 4,724.40
% 12,194.39
% 11,119.41
16.7.2
Amount
Bag 5,027.00
100 Cft 1,394.90
Rft 48,082.71
% 54,504.61
Day 7,308.00
Day 10,974.00
% 548.46
% 18,830.46
% 14,193.39
16.7.2
Amount
Bag 8,382.00
100 Cft 2,092.48
Rft 65,417.00
% 75,891.48
Day 9,143.88
Day 13,715.40
% 685.78
% 23,545.06
% 19,256.40
16.7.2
Amount
Bag 8,382.00
2,092.48
Rft 65,417.00
% 75,891.48
Day 1,662.60
Day 1,276.20
% 88.16
% 3,026.96
Hour 3,279.47
Hour 1,731.81
Hour 4,026.74
Hour 12,884.84
Hour 625.00
% 22,547.86
% 19,768.74
16.7.2
Amount
Bag 10,103.50
100 Cft 2,798.12
Rft 106,775.00
% 119,676.62
Day 10,972.68
Day 16,459.20
% 822.96
% 28,254.84
% 28,686.16
16.7.2
Amount
Bag 10,103.50
2,798.12
Rft 106,775.00
% 119,676.62
Day 1,662.60
Day 1,329.60
% 89.77
% 3,081.97
Hour 3,279.47
Hour 1,731.81
Hour 6,865.45
Hour 12,884.84
Hour 625.00
% 25,386.57
% 28,870.80
16.7.2
Amount
Bag 11,737.00
100 Cft 3,352.96
Rft 207,500.00
% 222,589.96
Day 12,800.40
Day 19,200.00
% 960.01
% 32,960.41
% 49,645.12
16.7.2
Amount
Bag 11,737.00
3,352.96
Rft 207,500.00
% 222,589.96
Day 1,662.60
Day 1,392.00
% 91.64
% 3,146.24
Hour 3,668.97
Hour 2,040.63
Hour 7,536.88
Hour 15,345.00
Hour 625.00
% 29,216.47
% 49,697.90
Amount
13,414.50
4,193.28
204,750.00
222,357.78
14,628.00
21,945.54
1,097.21
37,670.75
50,491.61
16.7.2
Amount
Bag 13,414.50
4,193.28
Rft 204,750.00
% 222,357.78
Day 3,227.28
Day 1,542.00
% 143.08
% 4,912.36
Hour 3,739.99
Hour 2,286.88
Hour 9,051.83
Hour 16,306.00
Hour 2,500.00
% 33,884.69
% 50,897.29
Amount
15,086.50
5,033.34
236,500.00
256,619.84
16,464.00
24,688.80
1,234.58
42,387.38
58,065.66
16.7.2
Amount
Bag 15,086.50
5,033.34
Rft 236,500.00
% 256,619.84
Day 2,612.52
Day 1,716.00
% 129.86
% 4,458.38
Hour 3,994.45
Hour 2,434.38
Hour 11,468.17
Hour 17,009.70
Hour 2,500.00
% 37,406.69
% 58,179.24
Amount
16,764.00
5,598.32
650,000.00
672,362.32
18,287.88
27,431.40
1,371.58
47,090.86
140,025.91
16.7.2
Amount
Bag 16,764.00
5,598.32
Rft 650,000.00
% 672,362.32
Day 2,676.00
Day 1,788.00
% 133.92
% 4,597.92
Hour 4,080.25
Hour 2,706.25
Hour 13,409.13
Hour 19,375.00
Hour 2,500.00
% 42,070.63
% 140,184.91
16.7.2
Amount
2,860.26
% 2,860.26
Day 560.64
% 16.82
% 577.46
Hour 42.00
Hour 283.11
% 325.11
% 730.47
16.7.3.2.2
Amount
Bag 9,690.67
1,149.78
1,358.09
1,325.62
308.00
Ltr 2,013.63
% 15,845.80
Day 377.52
Day 2,359.74
Day 1,510.20
% 127.42
% 4,374.88
Hour 1,210.33
Hour 165.18
Hour 558.57
Hour 196.63
Hour 700.39
% 2,831.11
4,470.25
Amount
Ft 81,000.00
% 2,430.00
% 83,430.00
Ft 171,000.00
% 171,000.00
% 49,140.00
Amount
Ft 81,000.00
% 2,430.00
% 83,430.00
Ft 150,000.00
% 150,000.00
% 45,045.00
18.1.4.7
Amount
Day 2,550.00
% 76.50
% 2,626.50
Hour 10,000.00
Hour 12,500.00
% 22,500.00
% 20,640.74
18.1.4.7
Amount
Tonne 76,625.00
Tonne 20,740.00
M 137,450.80
M3 106,870.79
% 341,686.59
Job 102,000.00
% 102,000.00
% 86,518.88
18.1.4.7
Amount
Tonne 76,625.00
Tonne 20,740.00
M 137,450.80
M3 106,870.79
% 341,686.59
Job 127,500.00
% 127,500.00
% 91,491.38
18.1.4.7
Amount
Tonne 76,625.00
Tonne 20,740.00
M 137,450.80
M3 106,870.79
% 341,686.59
Job 153,000.00
% 153,000.00
% 96,463.88
18.1.4.7
Amount
Tonne 76,625.00
Tonne 20,740.00
M 137,450.80
M3 106,870.79
% 341,686.59
Job 170,000.00
% 170,000.00
% 99,778.88
18.1.4.7
Amount
Tonne 76,625.00
Tonne 20,740.00
M 137,450.80
M3 106,870.79
% 341,686.59
Job 185,000.00
% 185,000.00
% 102,703.88
Amount
Job 185,000.00
% 185,000.00
% 36,075.00
76,625.00
20,740.00
137,450.80
106,870.79
341,686.59
195,000.00
% 195,000.00
% 104,653.88
18.1.4.9
Amount
Ft 171,000.00
% 171,000.00
% 33,345.00
Amount
Ft 153,000.00
% 153,000.00
% 29,835.00
Amount
Ft 170,000.00
% 170,000.00
% 33,150.00
18.1.4.2.3
Amount
Ft 150,000.00
% 150,000.00
% 29,250.00
Amount
Ft 81,000.00
% 2,430.00
% 83,430.00
Ft 153,000.00
% 153,000.00
% 45,630.00
Ft 81,000.00
% 2,430.00
% 83,430.00
Ft 171,000.00
% 171,000.00
% 49,140.00
Amount
Kg 15,000.00
% 15,000.00
Day 956.70
Day 669.29
% 48.78
% 1,674.77
% 3,242.07
16.6.8
Amount
Cubic I 54.00
% 54.00
Day 0.90
% 0.03
% 0.93
% 10.71
16.6.8
Amount
Kg 16,100.00
% 16,100.00
Day 885.84
Day 640.71
Day 640.71
% 65.02
% 2,232.28
% 3,562.12
Amount
Ft 6,600.00
% 6,600.00
Day 868.68
% 26.06
% 894.74
% 1,456.39
Amount
No 650.00
% 650.00
Day 142.50
% 4.28
% 146.78
% 154.54
Amount
Day 292.68
Day 207.32
Day 18.30
% 15.55
% 533.84
Job 103.70
% 103.70
% 121.29
Amount
Day 540.00
Day 270.00
% 24.30
% 834.30
1 Hour 333.00
% 333.00
% 222.89
16.10
Amount
Rft 21,735.00
% 21,735.00
Day 1,097.28
% 32.92
% 1,130.20
Hour 329.72
Hour 3,048.00
% 3,377.72
% 5,110.95
16.10
Amount
Rft 28,245.00
% 28,245.00
Day 1,097.28
% 32.92
% 1,130.20
Hour 329.72
Hour 3,048.00
% 3,377.72
% 6,380.40
16.10
Amount
Rft 32,970.00
% 32,970.00
Day 1,097.28
% 32.92
% 1,130.20
Hour 329.72
Hour 3,048.00
% 3,377.72
% 7,301.77
Amount
No 131.00
% 131.00
Day 150.00
% 4.50
% 154.50
Hour 108.18
% 108.18
% 75.89
Amount
No 113.60
% 113.60
Day 150.00
% 4.50
% 154.50
Hour 108.18
% 108.18
% 72.50
Amount
No 131.00
% 131.00
Day 150.00
% 4.50
% 154.50
Hour 108.18
% 108.18
% 75.89
Amount
No 1,146.00
% 1,146.00
Day 150.00
% 4.50
% 154.50
Hour 108.18
% 108.18
% 273.81
16.11
Amount
No 1,146.00
% 1,146.00
Day 150.00
% 4.50
% 154.50
Hour 108.18
% 108.18
% 273.81
Amount
No 1,146.00
% 1,146.00
Day 150.00
% 4.50
% 154.50
Hour 108.18
% 108.18
% 273.81
Amount
No 1,146.00
% 1,146.00
Day 150.00
% 4.50
% 154.50
Hour 108.18
% 108.18
% 273.81
Amount
Day 600.00
% 18.00
% 618.00
Hour 937.50
% 937.50
% 299.81
Amount
Day 600.00
% 18.00
% 618.00
Hour 625.00
% 625.00
% 238.88
16.5.2.3.10.3
Amount
Bag 275.00
52.00
% 327.00
Day 600.00
Day 274.32
% 26.23
% 900.55
Hour 64.77
% 64.77
% 246.89
16.3.4
Amount
Bag 4,812.50
1,945.26
5,810.32
3,849.78
5,853.61
3,946.54
% 26,218.02
Day 78.42
% 2.35
% 80.77
Hour 337.39
Hour 522.75
Hour 832.46
Hour 899.23
% 2,591.84
5,633.21
16.4.12
Amount
ton 89,000.00
% 89,000.00
Day 199.98
% 6.00
% 205.98
Hour 641.33
Hour 64.10
Hour 1,404.00
% 2,109.43
% 17,805.33
16.4.12
Amount
ton 70,200.00
% 70,200.00
Day 199.98
% 6.00
% 205.98
Hour 641.33
Hour 64.10
Hour 1,404.00
% 2,109.43
% 14,139.33
16.3.4
Amount
Bag 880.00
Ltr 7,750.59
534.80
2,216.80
193.60
165.03
% 11,740.82
Day 611.64
% 18.35
% 629.99
Hour 570.09
Hour 1,096.38
Hour 1,206.50
Hour 54.50
Hour 186.95
Hour 6,343.40
Hour 1,307.02
% 10,764.84
4,507.87
Bag 577.50
52.00
% 629.50
Day 1,200.00
Day 600.00
Day 150.00
Day 600.00
% 76.50
% 2,626.50
Hour 350.00
% 350.00
% 688.25
Amount
kg 947.34
kg 74.56
% 1,021.90
Day 53.13
Day 50.00
% 3.09
% 106.22
Hour 42.50
Hour 30.00
% 72.50
% 233.52
Amount
kg 1,421.00
kg 93.20
% 1,514.20
Day 53.13
Day 50.00
% 3.09
% 106.22
Hour 42.50
Hour 30.00
% 72.50
% 329.52
Amount
kg 1,894.67
kg 130.48
% 2,025.15
Day 53.13
Day 50.00
% 3.09
% 106.22
Hour 42.50
Hour 30.00
% 72.50
% 429.15
Amount
kg 2,368.34
kg 167.76
% 2,536.10
Day 53.13
Day 50.00
% 3.09
% 106.22
Hour 42.50
Hour 30.00
% 72.50
% 528.79
Amount
Bag 81.40
13.52
35.93
% 130.85
Day 50.40
Day 300.00
Day 25.20
Day 39.90
% 12.47
% 427.96
Hour 2.00
% 2.00
% 106.93
Amount
Kg 12,599.50
% 12,599.50
Day 1,200.00
Day 1,200.00
Day 1,050.00
% 103.50
% 3,553.50
% 3,129.65
Amount
Ft 254.00
% 254.00
Day 60.00
Day 60.00
Day 47.50
% 5.03
% 172.53
% 82.19
16.7.4
Amount
Ft 59.10
% 59.10
Day 60.00
Day 30.00
% 2.70
% 92.70
% 29.07
Amount
Cft 3,200.00
% 3,200.00
Day 2,259.60
Day 2,280.00
% 136.19
% 4,675.79
% 1,509.22
Amount
Ft 14,500.00
% 14,500.00
Day 85.00
% 2.55
% 87.55
% 2,844.08
16.3.7
Amount
13,000.00
% 13,000.00
Day 148.62
% 4.46
% 153.08
Hour 385.66
Hour 653.27
Hour 879.61
Hour 154.81
Hour 3,171.20
% 5,244.55
% 3,586.67
16.3.7
Amount
10,868.00
% 10,868.00
Day 148.62
% 4.46
% 153.08
Hour 385.66
Hour 653.27
Hour 879.61
Hour 154.81
Hour 3,171.20
% 5,244.55
% 3,170.93
16.4.7
Amount
65.00
376.38
Kg 2,907.00
No 112.00
% 3,460.38
Day 840.00
% 25.20
% 865.20
Hour 202.07
Hour 66.80
Hour 78.79
% 347.66
% 906.37
16.4.3
Amount
ton 8.06
% 8.06
Day 23.22
% 0.70
% 23.92
Hour 9.17
Hour 29.77
Hour 9.69
Hour 11.90
Hour 173.96
% 234.49
% 51.83
16.4.4
Amount
ton 3.22
% 3.22
Day 9.30
% 0.28
% 9.58
Hour 11.93
Hour 4.77
Hour 69.50
% 86.20
% 19.25
16.4.7
Amount
893.88
329.00
Kg 4,360.50
No 112.00
% 5,695.38
Day 960.00
% 28.80
% 988.80
Hour 274.67
Hour 90.80
Hour 107.10
% 472.57
% 1,389.95
16.4.7
Amount
Day 1,320.00
% 39.60
% 1,359.60
Hour 476.74
Hour 157.60
Hour 185.84
% 820.18
% 1,967.75
Amount
172.59
Kg 2,223.00
No 112.00
% 2,507.59
Day 9.00
Day 22.74
% 0.95
% 32.69
Hour 145.20
Hour 48.00
% 193.20
% 532.84
Amount
Rft 2,306.00
% 2,306.00
Day 90.00
% 2.70
% 92.70
% 467.22
3.9.6.2
Amount
2,600.00
% 2,600.00
Day 1,200.00
Day 120.00
Day 88.80
% 42.26
% 1,451.06
Hour 151.49
% 151.49
% 811.26
Amount
100 Cft 19,687.50
% 19,687.50
Day 1,800.00
Day 120.00
Day 88.80
% 60.26
% 2,069.06
Hour 605.00
Hour 384.50
% 989.50
% 4,423.73
16.4.15
Amount
Day 36.00
% 1.08
% 37.08
Hour 38.45
1 Hour 469.08
% 507.53
% 105.99
16.4.15
Amount
Day 24.00
% 0.72
% 24.72
Hour 30.76
1 Hour 364.84
% 395.60
% 81.82
16.4.15
Amount
Day 30.00
% 0.90
% 30.90
Hour 30.76
1 Hour 364.84
% 395.60
% 82.99
16.4.5.3.9
Amount
25.78
Kg 342.97
Kg 538.65
% 907.41
Day 216.00
Day 25.50
% 7.25
% 248.75
Hour 96.80
Hour 12.00
Hour 22.26
% 131.06
% 249.59
Amount
Day 3,000.00
Day 850.00
% 115.50
% 3,965.50
Hour 605.98
Hour 625.00
% 1,230.98
% 6,838.79
Amount
Day 300.00
Day 85.00
% 11.55
% 396.55
% 75.08
Amount
Day 750.00
Day 21.25
Day 370.00
% 34.24
% 1,175.49
Hour 302.50
Hour 192.25
% 494.75
% 319.02
Amount
Bag 489.50
100 Cft 88.40
No 14,500.00
% 15,077.90
Day 1,200.00
Day 900.00
Day 300.00
% 72.00
% 2,472.00
% 3,408.19
Amount
Bag 489.50
100 Cft 88.40
No 11,400.00
% 11,977.90
Day 1,200.00
Day 900.00
Day 300.00
% 72.00
% 2,472.00
% 2,803.69
Amount
Bag 489.50
100 Cft 88.40
No 10,800.00
% 11,377.90
Day 1,200.00
Day 900.00
Day 300.00
% 72.00
% 2,472.00
% 2,686.69
24.2.2
Amount
Day 9.00
Day 4.25
% 0.40
% 13.65
Hour 75.00
% 75.00
% 17.21
24.2.2
Amount
Day 9.00
Day 4.25
% 0.40
% 13.65
Hour 150.00
% 150.00
% 31.83
Amount
Sft 2,275.00
% 2,275.00
Day 330.00
% 9.90
% 339.90
% 507.98
Amount
Sft 3,048.50
% 3,048.50
Day 439.80
% 13.19
% 452.99
% 680.22
Amount
Sft 2,150.00
% 2,150.00
Day 330.00
% 9.90
% 339.90
% 483.60
Amount
Sft 2,881.00
% 2,881.00
Day 439.98
% 13.20
% 453.18
% 647.59
Amount
Sft 775.00
% 775.00
Day 330.00
% 9.90
% 339.90
% 215.48
Amount
Sft 1,038.50
% 1,038.50
Day 439.80
% 13.19
% 452.99
% 288.27
Amount
Sft 675.00
% 675.00
Day 330.00
% 9.90
% 339.90
% 195.98
Amount
Sft 904.50
% 904.50
Day 439.80
% 13.19
% 452.99
% 262.14
16.8.9
Amount
Kg 12,833.34
100 Cft 465.76
100 Cft 12,636.38
% 25,935.48
Day 3,000.00
% 90.00
% 3,090.00
Hour 5,936.16
% 5,936.16
% 6,799.97
Amount
390.00
3,000.00
% 3,390.00
Day 300.00
Day 900.00
% 36.00
% 1,236.00
Hour 1,210.00
% 1,210.00
% 1,131.00
Amount
100 Cft 130.00
Cft 4,580.00
% 4,710.00
Day 3,600.00
Day 1,200.00
% 144.00
% 4,944.00
Hour 52.50
Hour 375.00
% 427.50
% 1,937.81
16.9.4
Per Cut
Amount
1 Days 96.00
3.00 % 2.88
30.81 % 98.88
1 Hour 171.54
49.69 % 171.54
19.50 % 52.17
Amount
1 Day 303.60
1 Day 215.05
1 Day 138.00
3.00 % 19.70
4.25 % 676.35
1 Tonne 10,834.11
20.58 % 10,834.11
19.50 % 7,954.94
Amount
Set 11,400.00
% 11,400.00
Day 142.50
% 4.28
% 146.78
% 2,250.79
Amount
Set 9,120.00
% 9,120.00
Day 113.05
% 3.39
% 116.44
% 1,800.44
Amount
Set 7,000.00
% 7,000.00
Day 71.25
% 2.14
% 73.39
% 1,378.89
Amount
Set 7,800.00
% 7,800.00
Day 89.11
% 2.67
% 91.78
% 1,538.38
Amount
Set 5,000.00
% 5,000.00
Day 53.49
% 1.60
% 55.09
% 985.43
Amount
Set 4,500.00
% 4,500.00
Day 41.61
% 1.25
% 42.86
% 885.61
Amount
Set 3,200.00
% 3,200.00
Day 23.75
% 0.71
% 24.46
% 628.63
16.6.7
Amount
Rft 75.00
% 75.00
Day 8.65
% 0.26
% 8.90
% 16.31
16.6.7
Amount
Rft 65.00
% 65.00
Day 6.74
% 0.20
% 6.95
% 13.99
16.6.7
Amount
Rft 35.00
% 35.00
Day 5.32
% 0.16
% 5.48
% 7.86
16.6.7
Amount
Rft 32.00
% 32.00
Day 4.27
% 0.13
% 4.40
% 7.07
16.6.7
Amount
Rft 30.00
% 30.00
Day 3.61
% 0.11
% 3.72
% 6.55
16.6.7
Amount
Rft 29.00
% 29.00
Day 2.47
% 0.07
% 2.54
% 6.14
16.6.7
Amount
Rft 26.00
% 26.00
Day 1.43
% 0.04
% 1.47
% 5.35
16.6.7.3.9
Amount
Day 540.00
Day 180.00
% 21.60
% 741.60
Hour 3,400.00
% 3,400.00
% 803.40
Amount
Day 360.00
Day 144.00
% 15.12
% 519.12
Hour 2,380.00
% 2,380.00
% 562.38
16.6.7.3.9
Amount
Day 240.00
Day 108.00
% 10.44
% 358.44
Hour 1,785.00
% 1,785.00
% 415.93
159,000.00
% 159,000.00
% 31,005.00
Amount
Kg 118,000.00
% 118,000.00
% 23,010.00
Amount
Tonne 91,000.00
% 91,000.00
% 17,745.00
16.6.7
Amount
Rft 218.00
% 218.00
Day 8.65
% 0.26
% 8.90
% 44.20
16.6.7
Amount
Rft 210.00
% 210.00
Day 6.74
% 0.20
% 6.95
% 42.27
16.6.7
Amount
Rft 187.00
% 187.00
Day 5.32
% 0.16
% 5.48
% 37.50
16.6.7
Amount
Rft 148.00
% 148.00
Day 4.27
% 0.13
% 4.40
% 29.69
16.6.7
Amount
Rft 134.00
% 134.00
Day 3.61
% 0.11
% 3.72
% 26.83
16.6.7
Amount
Rft 127.00
% 127.00
Day 2.47
% 0.07
% 2.54
% 25.25
16.6.7
Amount
Rft 112.20
% 112.20
Day 1.43
% 0.04
% 1.47
% 22.16
Amount
Sft 1,531.20
Kg 8,636.00
100 Cft 1,399.12
100 Cft 5,688.84
% 17,255.16
Day 1,800.00
Day 750.00
% 76.50
% 2,626.50
% 3,862.01
Amount
1 Sft 1,684.32
1 Kg 6,540.50
100 Cft 1,049.79
100 Cft 3,718.24
64.79 % 12,992.85
1 Day 1,800.00
1 Day 750.00
3.00 % 76.50
15.71 % 2,626.50
19.50 % 3,030.86
16.8.4
Amount
1 Rft 742.40
% 742.40
Day 13.80
Day 25.20
% 1.17
% 40.17
% 152.37
16.8.4
Amount
1 Rft 2,690.00
% 2,690.00
Day 18.00
Day 31.50
% 1.49
% 50.99
% 534.20
16.8.4
Amount
Kg 3,658.50
% 3,658.50
Day 120.00
% 3.60
% 123.60
Hour 74.20
Hour 307.60
% 381.80
% 811.26
16.8.5
Amount
Bag 119.13
10.66
Kg 363.93
10.08
5.87
Ltr 40.77
% 550.44
Day 17.04
Day 93.42
Day 17.04
Day 3.68
% 3.94
% 135.11
Hour 36.29
Hour 8.40
Hour 6.83
Hour 4.44
% 55.96
143.83
16.8.5.2.2
Amount
Bag 119.13
10.66
Kg 363.93
10.08
5.87
Ltr 40.77
% 550.44
Day 17.04
Day 93.42
Day 17.04
Day 3.68
% 3.94
% 135.11
Hour 36.29
Hour 8.40
Hour 4.44
142.50
Amount
34,288.07
4,563.26
38,851.33
339.60
240.55
169.80
22.50
772.45
11,637.99
% 11,637.99
% 9,991.66
Amount
1,406.39
187.17
1,593.56
13.92
9.86
6.96
0.92
31.66
477.40
% 477.40
% 409.83
17.3.1, 17.3.3
Amount
Day 369.60
Day 158.40
% 15.84
% 543.84
% 102.96
17.3.1, 17.3.3
Amount
Day 480.00
Day 240.00
% 21.60
% 741.60
% 140.40
17.2.5
Amount
Bag 275.00
360.00
% 635.00
Day 480.00
Day 720.00
Day 240.00
% 43.20
% 1,483.20
% 404.63
17.2.5
Amount
Bag 187.00
84.00
% 271.00
Day 316.80
Day 480.00
Day 240.00
% 31.10
% 1,067.90
% 255.02
17.2.5
Amount
Bag 187.00
84.00
% 271.00
Day 480.00
Day 600.00
Day 240.00
% 39.60
% 1,359.60
% 310.25
17.2.5
Amount
Bag 907.50
234.00
% 1,141.50
Day 480.00
Day 600.00
Day 240.00
% 39.60
% 1,359.60
% 479.99
17.2.5
Amount
Bag 907.50
234.00
% 1,141.50
Day 720.00
Day 720.00
Day 240.00
% 50.40
% 1,730.40
% 550.19
17.2.5
Amount
Bag 390.50
50.00
% 440.50
Day 480.00
Day 240.00
% 21.60
% 741.60
% 226.30
17.2.5
Amount
Bag 390.50
50.00
% 440.50
Day 600.00
Day 750.00
Day 300.00
% 49.50
% 1,699.50
% 407.65
Amount
Bag 1,892.00
100 Cft 514.00
16,800.00
% 19,206.00
Day 3,000.00
Day 3,000.00
Day 450.00
% 193.50
% 6,643.50
% 5,002.92
Amount
Bag 1,892.00
100 Cft 514.00
16,800.00
% 19,206.00
Day 3,300.00
Day 3,600.00
Day 450.00
% 220.50
% 7,570.50
% 5,178.42
Amount
Bag 3,300.00
100 Cft 450.00
16,800.00
% 20,550.00
Day 3,000.00
Day 3,000.00
Day 450.00
% 193.50
% 6,643.50
% 5,265.00
Amount
Bag 3,300.00
100 Cft 450.00
16,800.00
% 20,550.00
Day 3,300.00
Day 3,600.00
Day 450.00
% 220.50
% 7,570.50
% 5,440.50
Amount
Bag 1,892.00
100 Cft 514.00
13,365.00
% 15,771.00
Day 3,000.00
Day 3,000.00
Day 450.00
% 193.50
% 6,643.50
% 4,333.10
Amount
Bag 1,892.00
100 Cft 514.00
13,365.00
% 15,771.00
Day 3,300.00
Day 3,600.00
Day 450.00
% 220.50
% 7,570.50
% 4,508.60
Amount
Bag 3,300.00
100 Cft 450.00
13,365.00
% 17,115.00
Day 3,000.00
Day 3,000.00
Day 450.00
% 193.50
% 6,643.50
% 4,595.18
Amount
Bag 3,300.00
100 Cft 450.00
13,365.00
% 17,115.00
Day 3,300.00
Day 3,600.00
Day 450.00
% 220.50
% 7,570.50
% 4,770.68
Amount
Bag 9,691.00
100 Cft 880.00
100 Cft 2,895.20
% 13,466.20
Day 1,200.00
Day 3,600.00
Day 300.00
% 153.00
% 5,253.00
% 3,620.41
Amount
Bag 7,150.00
100 Cft 920.00
100 Cft 3,026.80
% 11,096.80
Day 1,200.00
Day 3,600.00
Day 300.00
% 153.00
% 5,253.00
% 3,158.38
Amount
Bag 4,950.00
100 Cft 960.00
100 Cft 3,158.40
% 9,068.40
Day 1,200.00
Day 3,600.00
Day 300.00
% 153.00
% 5,253.00
% 2,762.84
Amount
Bag 9,691.00
100 Cft 880.00
100 Cft 2,895.20
% 13,466.20
Day 1,500.00
Day 4,200.00
Day 300.00
% 180.00
% 6,180.00
% 3,795.91
Amount
Bag 7,150.00
100 Cft 920.00
100 Cft 3,026.80
% 11,096.80
Day 1,500.00
Day 4,200.00
Day 300.00
% 180.00
% 6,180.00
% 3,333.88
Amount
Bag 4,950.00
100 Cft 960.00
100 Cft 3,158.40
% 9,068.40
Day 300.00
Day 1,500.00
Day 4,200.00
% 180.00
% 6,180.00
% 2,938.34
Amount
Bag 4.57
1.67
RFT 168.30
% 174.53
Day 36.00
Day 24.00
% 1.80
% 61.80
% 45.73
Amount
Bag 7.15
2.50
RFT 191.10
% 200.75
Day 42.00
Day 27.00
% 2.07
% 71.07
% 52.60
Amount
11.00
3.40
226.50
% 240.90
Day 48.00
Day 30.00
% 2.34
% 80.34
% 62.19
Amount
16.50
5.00
288.30
% 309.80
Day 60.00
Day 36.00
% 2.88
% 98.88
% 79.13
Amount
Bag 22.00
7.00
RFT 298.20
% 327.20
Day 72.00
Day 42.00
% 3.42
% 117.42
% 86.03
Amount
Bag 30.25
10.00
RFT 383.40
% 423.65
Day 90.00
Day 54.00
% 4.32
% 148.32
% 110.69
18.1.4.1.3
Amount
Day 262.50
% 7.88
% 270.38
% 51.19
18.1.4.1.3
Amount
Day 393.75
% 11.81
% 405.56
% 76.78
18.1.4.1
Amount
Day 9.60
Day 17.00
% 0.80
% 27.40
% 5.19
18.1.4.1
Amount
Day 9.60
Day 27.20
% 1.10
% 37.90
% 7.18
18.1.4.1
Amount
Day 9.60
Day 28.90
% 1.16
% 39.66
% 7.51
18.1.4.1.3
Amount
Day 132.00
Day 145.80
% 8.33
% 286.13
% 54.17
18.1.4.1.3
Amount
Day 34.65
% 1.04
% 35.69
% 6.76
18.1.4.1.3
Amount
Day 2,628.00
Day 7,437.50
Day 1,314.00
% 341.39
% 11,720.89
% 2,219.00
18.1.4.1.3
Amount
Day 2,400.00
Day 2,040.00
Day 480.00
% 147.60
% 5,067.60
% 959.40
18.1.4.1.3
Amount
Day 2,400.00
Day 3,400.00
Day 480.00
% 188.40
% 6,468.40
% 1,224.60
18.1.4.1.3
Amount
Day 3,360.00
Day 4,760.00
Day 480.00
% 258.00
% 8,858.00
% 1,677.00
18.1.4.1
Amount
Day 3,474.72
Day 8,186.94
Day 1,152.12
% 384.41
% 13,198.20
% 2,498.69
18.3.3
Amount
Day 259.80
% 7.79
% 267.59
% 50.66
18.1.4.1.3
Amount
Day 1,444.74
Day 3,393.96
Day 475.50
% 159.43
% 5,473.63
% 1,036.27
18.1.4.1.3
Amount
Day 9,367.80
Day 22,189.25
Day 3,121.80
% 1,040.37
% 35,719.22
% 6,762.38
18.1.4.1.3
Amount
Day 8,922.00
Day 21,132.70
Day 2,973.60
% 990.85
% 34,019.15
% 6,440.52
5,000.00
% 5,000.00
% 975.00
Amount
Day 912.00
% 27.36
% 939.36
% 177.84
Amount
Day 2,160.00
% 64.80
% 2,224.80
% 421.20
Amount
No 30.00
% 30.00
Day 48.60
% 1.46
% 50.06
% 15.33
Amount
No 30.00
% 30.00
Day 60.60
% 1.82
% 62.42
% 17.67
Amount
No 90.00
% 90.00
Day 48.60
% 1.46
% 50.06
% 27.03
Amount
No 90.00
% 90.00
Day 60.60
% 1.82
% 62.42
% 29.37
Amount
No 49.00
% 49.00
Day 194.40
% 5.83
% 200.23
% 47.46
Amount
No 49.00
% 49.00
Day 242.40
% 7.27
% 249.67
% 56.82
Amount
No 150.00
% 150.00
Day 194.40
% 5.83
% 200.23
% 67.16
Amount
No 150.00
% 150.00
Day 242.40
% 7.27
% 249.67
% 76.52
Amount
Day 246.00
% 7.38
% 253.38
% 47.97
Amount
Day 186.00
% 5.58
% 191.58
% 36.27
Amount
Day 20.40
% 0.61
% 21.01
% 3.98
Amount
Day 984.00
% 29.52
% 1,013.52
% 191.88
Amount
Day 744.00
% 22.32
% 766.32
% 145.08
Amount
Day 81.60
% 2.45
% 84.05
% 15.91
Amount
Day 660.00
% 19.80
% 679.80
% 128.70
Amount
Day 1,050.00
% 31.50
% 1,081.50
% 204.75
Amount
Day 1,254.00
% 37.62
% 1,291.62
% 244.53
Amount
Kg 42.77
% 42.77
Day 870.00
% 26.10
% 896.10
% 177.99
Amount
Day 1,170.00
% 35.10
% 1,205.10
% 228.15
Amount
Day 720.00
% 21.60
% 741.60
% 140.40
Amount
Day 1,737.60
% 52.13
% 1,789.73
% 338.83
19.2.2 , 19.3.2
Amount
Day 1,161.60
% 34.85
% 1,196.45
% 226.51
19.2.2 , 19.3.3
Amount
Day 1,372.80
% 41.18
% 1,413.98
% 267.70
Amount
Kg 51.58
% 51.58
Day 150.00
% 4.50
% 154.50
% 39.31
Amount
Kg 672.00
% 672.00
Day 450.00
Day 787.50
% 37.13
% 1,274.63
% 372.35
Amount
Kg 2,088.17
% 2,088.17
Day 450.00
Day 787.50
% 37.13
% 1,274.63
% 648.51
19.3.4.9
Amount
Kg 2,378.80
% 2,378.80
Day 450.00
Day 787.50
% 37.13
% 1,274.63
% 705.18
Amount
Kg 517.44
% 517.44
Day 540.00
Day 945.00
% 44.55
% 1,529.55
% 390.48
Amount
Kg 1,606.78
% 1,606.78
Day 540.00
Day 945.00
% 44.55
% 1,529.55
% 602.90
19.3.4.9
Amount
Kg 3,103.84
% 3,103.84
Day 540.00
Day 945.00
% 44.55
% 1,529.55
% 894.82
Amount
Kg 777.84
% 777.84
Day 600.00
Day 1,050.00
% 49.50
% 1,699.50
% 473.43
Amount
Kg 2,410.17
% 2,410.17
Day 600.00
Day 1,050.00
% 49.50
% 1,699.50
% 791.73
19.3.4.9
Amount
Kg 3,567.44
% 3,567.44
Day 600.00
Day 1,050.00
% 49.50
% 1,699.50
% 1,017.40
Amount
Day 600.00
% 18.00
% 618.00
% 787.41
Amount
Day 1,200.00
% 36.00
% 1,236.00
% 975.00
Amount
Day 1,200.00
% 36.00
% 1,236.00
% 530.40
Amount
100 Cft 3,438.00
% 3,438.00
Day 1,200.00
% 36.00
% 1,236.00
% 904.41
Amount
Day 900.00
% 27.00
% 927.00
% 955.50
Amount
1,520.00
% 1,520.00
Day 600.00
Day 1,700.00
% 69.00
% 2,369.00
% 744.90