Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

Volume-I

Supplying and Fixing MS cap of 3/8" thick


15 24-39-d sheet : No 4.00 2100.39
8,401.56
10" i/d

Supplying and Fixing MS Suspension


16 24-36-a No 8.00 3,079.92
Clamp 3/8" thick for housing pipe : 10" i/d 24,639.36

Logging of bore hole with electrical


17 24-42 Job 4.00 23084
equipment and furnishing reports 92,336.00

AMOUNT (Rs.) A
8,668,242.08

LOCATION FACTOR 8% (Rs.)


693,459

TOTAL AMOUNT (Rs.)


9,361,701.44

Pumping Chamber 04-Numbers (Malook Abad No.3,Kana Bab-No8,Malakanan-No2,Tahir abad No-02)

S.N MRS # Quan


Description Unit Unit Rate Amount Rs.
o 19 tity

Excavation in shingle or gravel formation &


1 03-11-a rock not requiring blast, undressed, 50m lead m3 26.60 220.50
5,865.30
: Dry

PCC 1:3:6 in mass concrete less formwork


2 06-44-a m3 54.36 4738.98
using 50% boulders 257,610.95

Erecting & removing formwork to concrete in 104.8


3 06-46-b m2 432.74
any shape / position(Vertical) 4 45,368.46

07-05-a- Pacca brick work in ground floor Cement,


4 m3 35.12 10236.54
03 sand mortar 1:4 359,507.28

RCC in roof slab, beam, column & other


06-07-a-
5 structural members, insitu or precast. Type C m3 14.08 9813.67
03 138,176.47
(1:2:4)

Supply & fabricate M.S. reinforcement for


Tonn
6 06-08-c cement concrete (Hot rolled deformed bars 1.52 159981.50
e 243,171.88
Grade 40) ) (As per Actual)

Forms & Appendices to Bid 33


Volume-I

07-05-a- Pacca brick work in ground floor Cement,


7 m3 4.08 10236.54
03 sand mortar 1:4 41,765.08

Cement plaster 3/8" thick under soffit of RCC


8 11-10-b m2 43.48 291.20
roof slabs only upto 20' height : (1:4) 12,661.38

189.3
9 11-09-b Cement plaster 1:4 upto 20' height 1/2" thick m2 297.37
6 56,309.98

11-21-a- 359.7
10 Distempering new surface : Three coats m2 295.78
03 6 106,409.81

Cement pointing struck joints, on walls, upto 170.4


11 11-18-b m2 314.33
20' height : Ratio 1:3 0 53,561.83

Plain Cement Concrete including placing,


12 06-05-i m3 6.84 6359.02
compacting, finishing & curing (Ratio 1:4:8) 43,495.70

Provide & lay topping of concrete 1:2:4,


13 10-15-b including surface finishing & dividing in m2 45.00 676.33
30,434.85
panels: 1.5" thick

Plain Cement Concrete including placing,


14 06-05-h m3 6.24 7058.77
compacting, finishing & curing (Ratio 1:3:6) 44,046.72

Supplying and Fixing 18 SWG MS Sheet


Door/Window with angle iron frame
15 25-45-a m2 15.48 7099.62
(1.5"x1.5"x1/8"), bolt, hinges, paint etc 109,902.12
complete
Fabrication of heavy steel work with angle,
Tonn
17 25-10 tees, sheet iron etc for making trusses, girders 0.24 213889.00
e 51,333.36
etc

Electrical Work
-
Wiring of lights fan paints in 3/029 PVC
18 15-50 Job 20.00 1098.65
cable. 21,973.00
Wiring of 2 pin plug paints in 3 coat PVC
19 15-51 Job 8.00 533.64
cable. 4,269.12

20 15-61-a S/pin of tube light 4 rod complete. Job 12.00 1766.70


21,200.40

21 15-25 S/Fixing of celling fan hooks. Job 4.00 322.24


1,288.96

Forms & Appendices to Bid 34


Volume-I

22 15-69-b S/Fixing of exhaust fan 16" sweep. Job 4.00 3256.30


13,025.20

23 15-68-c S/Fixing of celling fan 56" sweep. Job 4.00 4428.69


17,714.76
15-02-a- 400.0
24 PVC conduit 20 mm (3/4") dia M 98.54
02 0 39,416.00

Supply and Erection single core PVC


280.0
25 15-05-c insulated copper conductor 250/440 V grade M 76.07
0 21,299.60
cable : 7/0.029"

Earthing of iron clad/aluminium switches etc


26 15-41 job 4.00 6466.55
with GI wire#8 SWG in GI pipe 0.5" dia 25,866.20

AMOUNT (Rs.) B
1,765,674.43

LOCATION FACTOR 8% (Rs.)


141,254

TOTAL AMOUNT (Rs.)


1,906,928.38

Surface Water Tank 100,000 Gallons 01-Number (Malook Abad)

S.N MRS # Quan


Description Unit Unit Rate Amount Rs.
o 19 tity

Exacavation in Shingle or Gravel rock not 168.2


1 03-09-a m3
requiring blasting lead upto 50 m 2 298.89 50,279.28

PCC (1:4:8) as in foundation i/c placing


2 06-05-i compacting, finishing, curing, complete i/c m3 31.68
6,359.02 201,453.75
screening and washing of stone aggregate

06-07-a- RCC(1:2:4) work i/c all material and labor 106.1


3 m3
03 except the cost of steel reinforcement 6 9,813.67 1,041,819.21

07-05-a-
4 1st Class B.B Work in (1:3) CSM m3 49.25
02 10,535.57 518,876.82

Supply & fabricate M.S. reinforcement for


5 06-08-c cement concrete (Hot rolled deformed bars Ton 11.47
159,981.50 1,834,987.81
Grade 40)

Forms & Appendices to Bid 35


Volume-I

Cement pointing struck joints, on walls, upto 212.2


6 11-18-b m2
20' height : Ratio 1:3 6 314.33 66,719.69

Plain Cement Concrete including


7 06-05-f placing,compacting, finishing & curing (Ratio m3 60.21
8,358.28 503,252.04
1:2:4)

S/F of angle iron ladder. (1.5''x1.5''x0.25'')


8 24-34 thick and M.S bars steps (0.75'') dia M.S rod m 5.48
3,148.57 17,254.16
complete.

Supplying and Fixing PVC Water Stopper 8"


wide 3/8" thick. Providing and fixing PVC
water stopper 8" wide 3/8" thick in 158.4
9 24-40 m
verticle(Wall/Column) or horizontal 8 559.14 88,612.51
(Floor/Slab)expansion joint inclusing cutting
and jointingcomplete in all respects.

S/F of M.S Main Hole Cover 2'x2' made of


angle iron frame (2''x3''x3/16'') thick covered
10 24-33 Job 1.00
with 18 gauge M.S sheet locking arrangement 975.13 975.13
and painting complete.
Supplying and Fixing C.I. vent pipe for
11 24-35 m 2.00
storage tanks including jally etc 1,697.93 3,395.86

12 11-08-b Cement plaster 1:3 upto 20' height 1/2" thick m2 2.97
308.30 915.65

Providing, laying, cutting, jointing, testing


anddisinfecting GI pipeline in trenches, with
24-16- socketjoint, using GI pipes of EN 10255 -
13 m 12.00
b11 2004(Medium Approved Quality ) including 4,412.57 52,950.84
specialsetc.Complete as per specifications6"
Nominal Pipe Size (NPS)

Providing and fixing cast iron special of BSS


class" 'B', 'C', 'D' " (such as bend, tee, cross
collar,reducer, tail piece, flanged spigot, cap,
(24-19-b- 200.0
14 flanged socket, taper, angle branch, plug, Kg
01) 0 359.33 71,866.00
etc.) for cast iron
pipe line, complete.(b) C.I. Flanged special
with flanged joints. 3" to 6" i/d

Providing & fixing of sluice valve of BSS


15 quality weight (class "B") working pressure
-
i/c cost of jointing & disinfecting

(24-22-c) BSS 6'' i/d No,s 4.00


14,092.97 56,371.88
(24-22-b) BSS 4'' i/d No,s 2.00
9,823.71 19,647.42
Forms & Appendices to Bid 36
Volume-I
03-25-
b,06-05-
I,06-07-
a-03,06- Construction of sluice valve chamber
16 No,s 4.00
08-c,07- (2'.5x2'.5) as per site condition complete. 18,980.51 75,922.04
04-a-
03,11-09-
b
(11-21-a-
Distempering New surface : Two coats tank 212.2
17 01)+(11- m2
Two Coats CSR 6 201.36 42,740.67
21-a-02)

Testing of soil for bearing capacity &


18 24-46 Meter 10.00
chemical contents upto any depth. 17,873.10 178,731.00

Total C
4,826,771.75

LOCATION FACTOR 8% (Rs.)


386,142

TOTAL AMOUNT (Rs.)


5,212,913.49

Rising Main 01-Number (Malook Abad)

S.N MRS # Quan


Description Unit Unit Rate Amount Rs.
o 19 tity

Providing, laying, cutting, jointing, testing


and disinfecting GI pipeline in trenches, with
24-16-b- socket joint, using GI pipes of EN 10255 - 1798.
1 Meter 4412.57
11 2004 (Medium Approved Quality ) including 23 7,934,825.66
specials etc.Complete as per specifications 6"
Nominal Pipe Size (NPS).
P&L Reflux valves (C.I) of BSS
2 24-44 quality/weight including jointing material 3" No. 6.00 4398.1
26,388.60
i/d-6" i/d
Excavation of trench in all kinds of soils
449.5
3 03-51. except cutting in rock for pilelines upto 1.5m m3 188.8
6 84,876.56
depth

4 04-19-c Dismantling : Plain Cement Concrete 1:2:4 m3 53.09 2925.12


155,283.84

Plain Cement Concrete including placing,


5 06-05-f m3 53.09 8358.281
compacting, finishing & curing (Ratio 1:2:4) 443,710.34

Providing and fixing G.I Flanges 6" dia


6 24-72-c Pair 9.00 1559.3
(5/8"Thick) 14,033.70

Forms & Appendices to Bid 37


Volume-I

Total D
8,659,118.71

LOCATION FACTOR 8% (Rs.)


692,729

TOTAL AMOUNT (Rs.)


9,351,848.20

Distribution System/Supply Main 06-Numbers (Malook Abad No.3,Kana Bab- No3,Kana Bab-No2,Kana
Bab-No8,Malakanan-No2,Tahir abad No-02)

S.N MRS # Quan


Description Unit Unit Rate Amount Rs.
o 19 tity

Excavation of trench in all kinds of soils


6277.
1 03-51 except cutting in rock for pilelines upto 1.5m M³ 188.8
01 1,185,098.78
depth

1123.
2 04-19-c Dismantling : Plain Cement Concrete 1:2:4 M³ 2925.12
89 3,287,504.50

Plain Cement Concrete including placing, 1235.


3 06-05-f M³ 8358.281
compacting, finishing & curing (Ratio 1:2:4) 28 10,324,792.28

Carriage Carriage of 100 cft / 5 tonne of all


01-01-a 1120.
4 materials by truck or other means 2nd and KM 1157.91
to h 00 1,296,859.20
subsequent 1/4 mile upto 4th mile

Providing, laying, cutting, jointing, testing


and disinfecting GI pipeline in trenches, with
socket joint, using GI pipes of EN 10255 -
5
2004 (Approved Quality ) including specials
etc.Complete as per specifications of the
following Nominal Pipe Size (NPS).

24-16-c- 405.3
a) 6" light quality meter 3708.53
11 6 1,503,305.36
24-16-c- 9611.
a) 4'' Light quality meter 2289.96
09 40 22,009,719.17
24-16-c- 3308.
b) 3'' Light quality meter 1584.48
08 44 5,242,161.05
24-16-c- 7263.
c) 2-1/2" Light quality meter 1351.12
07 94 9,814,459.91
24-16-c- 10408
d) 2" Light quality meter 958.35
06 .41 9,974,901.71

Forms & Appendices to Bid 38


Volume-I

Providing & fixing of sluice valve of BSS


6 quality weight (class "B") working pressure
i/c cost of jointing & disinfecting

24-22-c a) 6" dia P.No 2.00 14092.97


28,185.94

24-22-b a) 4" dia P.No 37.00 9823.71


363,477.27

24-22-a b) 3" dia P.No 34.00 8583.27


291,831.18

24-53-e c) 2-1/2" dia P.No 68.00 7277.95


494,900.60
104.0
24-53-d d) 2" dia P.No 4782.13
0 497,341.52

Total
66,314,538.47

LOCATION FACTOR 8% (Rs.)


5,305,163

TOTAL AMOUNT (Rs.)


71,619,701.55

Non Schdule Items (Distribution System)

Providing and fixing Pressure reduce valve


dia,specificaion Including fixing at site

a) 6" dia P.No 1.00 186320.00


1 186,320.00

a) 4" dia P.No 10.00 82100.00


821,000.00

b) 3" dia P.No 5.00 57580.00


287,900.00

d) 2" dia P.No 8.00 36760.00


294,080.00

Total
1,589,300.00

Total Cost (Schdule+ Non Schdule)


73,209,001.55

Forms & Appendices to Bid 39


Volume-I

Boundry Wall 02- Numbers(Kana Baba no.2,Kana Baba no.3)

S.N MRS # Quan


Description Unit Unit Rate Amount Rs.
o 19 tity

Earth excavation in open cut upto 1.5m depth


1 03-09-a m3 13.97 298.89
for drains etc & disposal : in Ordinary Soil 4,176.30

Erecting & removing formwork to concrete in


2 06-46-b m2 81.37 432.7
any shape / position(Vertical) 35,209.33

PCC 1:3:6 in mass concrete less formwork


3 06-44-a m3 34.93 4738.98
using 50% boulders 165,517.29
07-05-a-
4 1st Class B.B Work in (1:3) CSM m3 30.15 10535.571
02 317,644.75

5 11-08-c Cement plaster 1:3 upto 20' height 3/4" thick m2 69.65 412.04
28,696.93
Plain Cement Concrete including placing,
6 06-05-f compacting, finishing & curing (Ratio 1:2:4) m3 60.17 8358.28
502,956.73
Flooring
RCC in roof slab, beam, column & other
06-07-a-
7 structural members, insitu or precast. Type C m3 0.51 9813.67
03 5,001.33
(1:2:4)

Supply & fabricate M.S. reinforcement for


Tonn
8 06-08-c cement concrete (Hot rolled deformed bars 0.06 159981.5
e 8,816.91
Grade 40) (As per Actual)

Supplying and Fixing 18 SWG MS Sheet


9 25-45-b Gate with angle iron frame (2"x2"x3/16") m2 8.92 10336.78
92,181.56
with side window, lock, painting etc

07-05-a- 1st Class B.B Work in (1:3) CSM (3 ft over


10 m3 8.73 10535.571
02 existing walls) 91,948.04

Cement plaster 1:3 upto 20' height 3/4" thick


11 11-08-c m2 43.75 412.04
(3 ft over existing walls) 18,028.01

Forms & Appendices to Bid 40


Volume-I

Providing and fixing barbed wire (12 Guage)


fencing consisting of 1.5"x1.5"x3/16" angle
iron post 3.25 ft long, 5 to 6 ft centre to
12 25-42 centre embedded in cement concrete 1:2:4 m 97.99 685.95
67,215.08
base of size 9"x9"x12", and 3 rows of barbed
wire, painting posts, etc. complete in all
respects.

Total
1,337,392.26

LOCATION FACTOR 8% (Rs.)


106,991.38

TOTAL AMOUNT (Rs.)


1,444,383.64

Schdule Items

Pumping Machine 05-Numbers (Malook Abad No.3,Kana Bab-No.2,Kana Bab-No.8,Malakanan-


No.2,Tahir abad No-2)

S.N MRS # Quan


Description Unit Unit Rate Amount Rs.
o 19 tity

Supply & Installation, testing and


commissioning of Submersible Pump (ISO –
9906 Certified) Coupled with Submersible
rewind-able Electric Motor with AC winding
and all accessories like Motor Control Unit
24-50-a- Per
1 (equipped with UV/OV, dry run protection 5.00
07 job 936,674.38 4,683,371.90
device, surge protection, phase reverse
indicator) Complete in all accessories
including NRV, Pressure Gauge, Sluice valve
except column pipe and power cable with
appropriate Head and Discharge : 80 HP

525.0
2 24-32-f S/H/J MS Flanged Pipe 6" i/d 5mm thick Meter 6359.32
0 3,338,643.00
S/H/J MS Flanged Pipe 4" i/d 5mm thick
3 24-32-g Meter 25.00 4326.2
(part Rate) 108,155.00

Supply and installation of Submersible Flat


24-50-c- 550.0
4 Cable made of 99.9% copper, coated with Meter 1216.85
03 0 669,267.50
double PVC asper BSS Standards, 3x25 mm2

Forms & Appendices to Bid 41


Volume-I
Drilling of earth bore 3" dia 70 to 80 ft. deep
or up
to permanent water table, back filling,
ramming,
complete in all respect. grounding bores shall
5 15-105-c Each 5.00
be 10,816.6 54,082.75
made at 6 to 8 feet away from foundation and
distance between earth bore shall not be less
than
10 feet
AMOUNT (Rs.) F
8,853,520.15
LOCATION FACTOR 8% (Rs.)
708,281.61

TOTAL AMOUNT (Rs.)


9,561,801.76

Non Schdule Items

S.N MRS # Quan


Description Unit Unit Rate Amount Rs.
o 19 tity

Assessment of Strainer and blind pipe of the


existing tube well by video logging and
1 NSI Each 1.00
providing hard and soft copies of the report as 50,000 50,000.00
directed and approved by the Engineer.

Earthing System - Bore Type 05-Numbers

G.I Pipe
Supply and installation of perforated G.I pipe
50mm (2") dia. 14 SWG and tinned spike to
be installed in premade bore, all G.I pipe
accessories like tees, bends, sockets etc.: G.I
pipe shall have 1/2" predrilled hole at every 100.0
2 NSI LM
6" distance. G.I pipe shall be connected to 0 4,000.00 400,000.00
tinned copper spike as per detail shown on
drawing, complete in all respects. Length of
pipe shall depend upon the depth of the
bore. Payment shall be made as per actual
length installed.

Forms & Appendices to Bid 42