Professional Documents
Culture Documents
Ex 5
Ex 5
Ex 5
Experiment No. 5
APPARATUS REQUIRED:
1. Cabinet
2. Millimeter
3. Voltmeter
4. Wire
THEORY:
17
7. Connect voltmeter (0 to 10 volt) in shunt of load.
8. Keep wire length for connecting meters, fuse & indicators, long enough so that
during any disassembling wires do not break from solder point.
9. If the cabinet is metallic, the ground on PCB connected to the metal chassis &
Tx metallic body.
PRECAUTIONS:
1) Test device carefully.
2) Do not touch any line wire.
18