Inspection No. Issue: Inspection Report: I D F-S P 03-0
Inspection No. Issue: Inspection Report: I D F-S P 03-0
Inspection No. Issue: Inspection Report: I D F-S P 03-0
Anderson Liu
- Reviewed by
Instrument checklist
During the inspection, the following instrument calibration status has been checked for inspection:
Inspection Finding:
1. quantity Check:
Reference documents:
→ PACKING LIST: 2013CL/142&143 DATE: 28-FEB-14
Note:
→ The actual quantity of pipes was conformed at PACKING LIST: 2013CL/142&143 DATE: 28-FEB-14
-
Packing check
Outer package:
During the inspection, packing check had been performed and found that, the pipes were bundle packing
and covered by weave cloth and then fastened by metal strip. The result was subject to buyer's
evaluation
During the inspection, packing check had been performed and found that for others size pipes, the pipes
were bundle packing and fastened by metal strip. The result was subject to buyer's evaluation.
Result: Due to the required packing was not provided by client, so actual packing was subjected by client.
Marking check
During the inspection, the following marking was painted on the external surface of pipes, the detail was
below:
BUCHANNON CORPORATION ERW BLACK CARBON STEEL PIPE ASTM A795 ****(OD)**** SCHEDULE
10 FIRE PROTECTION SERVICES
And BUCHANNON CORPORATION ERW BLACK CARBON STEEL PIPE ASTM A53 Gr. A****(OD) ***
SCHEDULE 40
Result: Due to the required marking was not provided by client, so actual marking was subjected by
client.
During the inspection, the visual quality check was performed by SGS inspector, the detail was below:
the pipes were present metal color and painted oil on the surface of pipes
Result: Due to the required visual quality check was not provided by client, so actual visual quality
check was subjected by client.
4. Dimension Check:
Sample size: (according to the client's requirement, 1% per size, 182pcs totally was selected for
visual quality check]
Reference document: [product standard at ASTM A795 and ASTM A53 and PACKING
LIST2013CL/142&143 DATE: 28-FEB-14]
UNIT· MM
Time sheet·
THIS REPORT ONLY REFLECTED OUR ACTUAL FINDINGS. THE INSPECTION WAS DONE
TO THE BEST OF OUR KNOWLEDGE AND ABILITY AND WITH DUE CARE. THE FINDINGS
ARE VALID AS FOR TIME AND PLACE OF INSPECTION.
End of report